HomeMy WebLinkAboutRES 2307 •, J
CITY OF RENTON, WASHINGTON
RESOLUTION NO. 2307
WHEREAS the City of Renton has heretofore adopted a "Six-Year
Transportation Improvement Program" ,pursuant to Chapter 7 , Extraordinary
Session Laws of the State of Washington, and Chapter 195 of the 1961
Session Laws of the State of Washington, and as same has heretofore
been amended from time to time, and such plan and program having
heretofore been duly amended and modified from time to time as authorized
by law, and
WHEREAS the City Council, after recommendation of its Public
Works Department, caused to be held a public hearing thereon on November
26, 1979 , after notice to the public as provided by law, for the
purpose of considering adoption, modification and amendments of said
plan and program, and
WHEREAS at such public hearing held on November 26 , 1979 , due
consideration was given to the proposed changes and amendments for
the purpose of updating such plan and program, NOW THEREFORE
THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO RESOLVE
AS FOLLOWS :
SECTION I : The City' s "Six-Year Transportation Improvement
Program" and the City' s "Arterial Street Plan" are hereby further
amended and modified, all as more particularly shown on the attached
Exhibit "A" , same being incorporated herein as if fully set forth.
SECTION II : The aforestated plan and program, as evidenced
by said Exhibit shall be and constitute the City' s "Six-Year Trans-
portation Improvement Program" and the City' s "Arterial Street Plan"
and same to remain in full force and effect until further revised,
amended and modified as provided by law.
-1=_
SECTION III: The Director of Public Works and the City Clerk
are hereby authorized and directed to file this Resolution together
with the Exhibit with the Director of Highways for the State of
Washington, and as otherwise provided by law.
PASSED BY THE CITY 00UNCIL this 3rd day of December, 1979 .
.tea(
Delores A. Meat, City Clerk
APPROVED BY THE MAYOR this 3rd day of December, 1979 .
r /Dr/
Charles/,d. Delaurenti , Mayor
Approved as to form:
Lawrence J. Warren.; City--.Attorney
PAGE 2 RESOLUTION N02307
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1980 to 1985 Page 1 of 9
•
City/County RENTON — OBLIGATION PROGRAM - "EXH 1 B I T A" Hearing Date June 18, 1979
-City No. 1070 Adoption Date June 25, 1979
County No. 17 MAJOR (PRINCIPAL) ARTERIALS Resolution Number 2280
PROJECT COSTS IN THOUSANDS OF DOLLARS
PROJECT IDENTIFICATION o Total o I v OBLIGATION SCHEDULE 'FUNDING SOURCE
z Title,. Route, Road Log No., Section No., ` ; Work Length 2; m I YEAR TOTAL
E Location/Termini, Description. of Work, 1..� Codeco :4 . FEDERAL FUNDS .
Beginning Milepost .a Bridge No. c (Miles) sr �a- 1st 2nd 3rd 4,.5 a 6th UAB LOCAL
(PLEASE DOUBLE SPACE BETWEEN PROJECTS) (ELME"`) AMOUNT' PROGRAM
ELEMENT
. 1 2 3 , 4 5 . 6 7 8 9 10 II 12 i3 i4 i5 16 17 1
1 SW 43rd Street - E Valley Rd. to W Valley Rd. (joint 2 A,C,D, 1 .25 M U 3,000 2,500 900 FAS 2,964 1 ,636 5,500
project with City of Kent) . Grading, drainage, 5 E,F,G,
paving, curbs, sidewalk, illumination, signalization, 7 H, I ,N ,
bike route, landscaping, bridge, widen to 56' (with
L. 1 .D. and P-1 drainage) .
2 NE 4th Street - Monroe Ave. NE to Union Ave. NE. 3 B,C,D, 0.45 M U 200 200 200
Widen roadway to 52' (two-way left turn lane) (with 6 F,G,H
100% L. I .D.)
3 Sunset Blvd. North - Bronson Way North to F.A. I . 405. 2 C,D,E, 0.50 M U 648 430 FAUS 218 648.
Drainage, paving, curbs, sidewalk, signal , illumin- 5 F,G
ation, channelization, widen to 68' (with 20% L. I .D.) . 6
4 Valley'' Parkway SW - SW 43rd St. to SW 16th St. 1 A,C,D, 1 .7 M U 2,500 2,500 830 REGIONAL 4, 170 5,000
(Phase I) . Grading, drainage, paving, curbs, side- 6 E,F,G, FAUS
walk, illumination, signal , bike route, channel- 7 H, I ,N
ization, landscaping, bridge, 56' roadway (with 80% 8
L. 1 .D.) . P.S.C.O.G. No. 287902
5 Valley's Parkway SW - SW 16th St. to SW Grady Way 1 A,C,D, 0. 1 M U 4,500 2,987 REGIONAL 1 ,513 4,500
(Phase II) . Grading, drainage, paving, curbs, side- 6 E,F,G, FAUS
walks, illumination, signal , bike route, channel- 7 H, I ,N
ization, landscaping, bridge, 66' roadway (with 20% 8
L. I .D.) .
'Formerly "Longacres Parkway"
DISTRIBUTION
I COPY DISTRICT STATE AID ENGINEER
T 14Q-049 I COPY CHAIRMAN, URBAN ARTERIAL BOARD, OLYMPIA
__.. ., w 4 rnriv r a A a (rnii►1Tire nkii v%
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 19$Q to 1985 Page 2 of 9•
City/County . RENTON — OBLIGATION PROGRAM — "EXHIBITHearing Date June 18, 1979
City No. 1070 A"
Adoption Date June 25, 1979
. 'County No. 17 MAJOR (PRINCIPAL) ARTERIALS Resolution Number 2280
PROJECT COSTS IN THOUSANDS OF DOLLARS
PROJECT IDENTIFICATION is Wyk Total n j =% OBLIGATION SCHEDULE FUNDING- . SOURCE. TOTAL
Title, Route, Road Log No., Section Na, ; 4- i YEAR
Location/Termini, Description of Work, .. Code Length o FEDERAL FUNDS
Beginning Milepost 8 Bridge No. a a (Miles) u P cg" 1st 2nd 3rd 4,5136th UAB LOCAL
(PLEASE DOUBLE SPACE BETWEEN PROJECTS) E
( ) AMOUNT PROGRAM
I 2 3 4 5 6 7 8 9 , 10 11 . 12 13 14 15 16 17
6 Valley' Parkway SW - SW Grady Way to S 140th St. 1 A,C,D, 1 ,0 M U 4,000 2,074 REGIONAL 2,926 5,000
(Phase III) (North city limit) . Grading, drainage, 6 E,F,G, FAUS
paving, curbs, sidewalk, illumination, signal , bike 77 H, I ,N
route, channelization, landscaping, bridge, 56'
roadway (RR undercrossing) (with 50% L. I .D.)
7 Valley Parkway SW - S 140th St. to SW Sunset Blvd. 1 A,C,D, 0.6 M U
(Phase IV) (King County project) . Grading, drainage, 6 E,F, I
paving, curbs, sidewalk, illumination, channelization
landscaping, 56' roadway.
8 SR 515 Phase II (Benson Dr. S) - S Puget Dr. to S 1 D,E,F, 1 .06 M U 250 250 250
31st St. (South city limit) . State D.O.T. Project - 6 G
construct new roadway. City participation: sidewalk,
curbs, signalization, illumination, channelization.
".Formerly "Longacres Parkway"
DISTRIBUTION .
I COPY DISTRICT STATE AID ENGINEER
aT Ko-o.,s I COPY CHAIRMAN, URBAN ARTERIAL BOARD, OLYMPIA
<�
1 nr! 'r» I COPY C.R.A.B. (COUNTIES ONLY)
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1980 to 1985 Page 3 of 9
* REVISED; ORIGINAL:
City/County RENTON - OBLIGATION PROGRAM — Hearing Date November 26, 1979 Hearing Date June 18, 1979
City No. 1070 „ Adoption Date December 3, 1979 Adoption Dote June 25, 1979
17 SECONDARY (MINOR) ARTERIALS EXHIBIT A„
• County No. Resolution Number 2307 Resolution Number 2280
PROJECT COSTS IN THOUSANDS OF DOLLARS
a . PROJECT IDENTIFICATION '� -1' Total n I OBLIGATION. - SCHEDULE . FUNDING SOURCE TOTAL
_= Title Route, Road .Loc No.; Section No. 3 ' i 3
g Location/Terini, Description of Work, g... Cods Lsefth cv ^e, `o YEAR FEDERAL FUNDS
Beginning Milepost a Bridge No. c (Miss) �& Ist 2nd 3rd 4,5 B 6th UAB LOCAL
(PLEASE DOUBLE SPACE BETWEEN . PROJECTS) (ANNUAL ELEMENT/ AMOUNT PROGRAM
I 2 3 4 5 6 _7 8 9 10 II 12 13 14 15 16 17
1 Misc.. street repairs and improvements - to be identi- S U 10 10 10
fied on prospectus and in Street Division 5-Year Plan.
2 North 30th Street - Burnett Ave. N to F.A. I . 405. 2 A,C,D, 0.4 S U 500 207 FAUS 293 500
Drainage, paving, curbs, sidewalk, channelization, 5 E,F
44' roadway (with 500 L. I .D.) . 6
3 Union Ave. NE - NE Sunset Blvd. to NE 24th St. (North 2 A,C,D, 0.7 S U 400 166 FAUS 234 400
city limit) . Drainage, paving, curbs, sidewalk, 5 E,F
channelization, 44' roadway (with 50% L. I .D.) . 6
4 Shattuck Ave. South - S 4th P1 . to S 7th St. Grading, 2 A,C,D, 0.23 S U *1 ,600 1 ,328 FAUS 272 1 ,600
drainage, paving, curbs, sidewalk, illuminaition, 5 E,F,H .
channelization, bridge, 44' roadway. 7
5 Shattuck Ave. South - S 7th St. to S Grady Way. 1 A,C,D, 0.06 S U 25 25 25
State D.O.T. project - Park & Ride Lot - construct 6 E,F,G
new roadway. City participation: Grading, drainage,
paving, curbs, sidewalk, illumination, signalization,
channelization, 44' roadway.
6 South Puget Drive & Benson Road South - intersection 2 B,D,F, S U 50 41 FAUS 9 50
improvements. Drainage, paving, curbs, sidewalk, 6 G,H, I
signalization, channelization (carry over project) .
- 7 SW 27th Street - E Valley Rd. to Valley Parkway SW. 1 A,C,D, 0.68 S U *2,000 332 REGIONAL 1 ,668 2,000
Grading, drainage, paving, curbs, sidewalk, illumin- 6 E,F,G, FAUS
. ation, signal , bike route, channelization, land- 7 H, I ,N
scaping, bridge, 44' roadway (Phase I with 80% L. I .D.) 8
P.S.C.O.G. No. 287903
- - --
DISTRIBUTION
I COPY DISTRICT STATE AID ENGINEER
l40-049 I COPY CHAIRMAN, URBAN ARTERIAL BOARD, OLYMPIA
V "IL 1571 I COPY C.R.A.B. (COUNTIES ONLY)
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 19$Q to 1985 - Page 4 of 9'
•
City/County RENTON - OBLIGATION PROGRAM - "EXHIBIT A" Hearing Date June 18, 1979
City No. 1070 Adoption Date June 25, 1979
County No. 17 SECONDARY (MINOR) ARTERIALS Resolution Number 2280
PROJECT: :COSTS IN THOUSANDS OF DOLLARS
c PROJECT IDENTIFICATIONa o Total Y OBLIGATION SCHEDULE FUNDING SOURCE
Title, Route, Road .Log No., Section No., • 03 Work ." !...
>m YEAR TOTAL
Length i c ?....,_0'1
E Location/Termini, Description of Work, t .,- c, o Code = - FEDERAL FUNDS
Beginning Milepost a Bridge No. - (Mika) oa 1st 2nd 3rd` 4,5&6th UAB LOCAL
(PLEASE DOUBLE SPACE BETWEEN PROJECTS) " ANNUAL) AMOUNT PROGRAM '
ELEMENT
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
8 SW 27th Street - Valley Parkway SW to W Valley Rd. 1 A,C,D, 0.53 S U 2,000 1 ,328 REGIONAL .672 . . . 2,000
Grading, drainage, paving, curbs, sidewalk, illumin- 6 E,F,G, FAUS
ation, signal , bike route, channelization, landscaping 8 I ,N
44' roadway (Phase II with 20% L. I .D.) RR undercrossing
9 Wells Ave. Bridge - and approaches 7 A,B,J, 0.04 S U 1 ,400 1 , 120 BRIDGE 280 1 ,400
Bridge replacement. L REPLACE.
10 SW Grady Way Bridge - Longacres Dr. SW to W Valley Rd. 7 A,B,J, 0.5 S U 2,500 2,500 4,000 BRIDGE 1 ,000 5,000
" (joint project with Tukwila) . Bridge replacement. L REPLACE.
f
11 SW Grady Way - Lind Ave. SW to Longacres Dr. SW. 2 A,C,D, 0.7 S U 1 ,050 456 FAUS 594 1 ,050
Drainage, paving, curbs, sidewalk, illumination, 5 E,F,H
channelization, P-1 bridge, 44' roadway (with 50% 6
L. I .0.) . 7
12 S Puget Dr. & SE Puget Dr. - Benson Rd. S to SE Jones 2 A,C,D, 0.34 S U 500 42 FAUS 458 500
Pl . Drainage, paving, curbs, sidewalk, illumination, 5 F,G,H,
channelization, 56' roadway (with 90% L. I .D.) . 6 J •
13 .SE Puget Dr. - SE Jones Pl . to Edmonds Ave. SE. 2 A,C,D, 0.78 S , U 800 664 FAUS 136 800
Drainage, paving, curbs, sidewalk, illumination, 5 F,G,H,
channelization, 44' roadway 6 J
- 14 Lake Washington Blvd. North - N Park Dr. to NE 51st 2 A,C,D, 3.03 S U 3,500 2,178 FAUS 1 ,322 3,500
St. (North city limit) . Drainage, paving, curbs, 5 E,F,H
sidewalk, illumination, channelization (with 25% 6
• L. 1 .D.) .
DISTRIBUTION
COPY DISTRICT STATE AID ENGINEER
DOT 140-04e I COPY CHAIRMAN, URBAN ARTERIAL BOARD, OLYMPIA
P: 9 I COPY C:R.A.B. (COUNTIES ONLY)
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 19$Q to 1985 Page 5 of 9
City/County RFNTON - OBLIGATION PROGRAM - Hearing Date June 18, 1979
City No. 1070 "EXHIBIT A" Adoption Date June 25, 1979
County No. 17 SECONDARY (MINOR) ARTERIALS Resolution Number 2280
PROJECT -COSTS -IN THOUSANDS OF DOLLARS
PROJECT IDENTIFICATION a — I E OBLIGATION. SCHEDULE FUNDING '...:SOURCE
Z Title, Route, Road Log No., Section No. 3 Work Tottl1 c0 j >� TOTAL
Length �_ ♦ c m YEAR
E Location/Termini, Description of Work, w Code co c FEDERAL FUNDS
= Beginning Milepost a Bridge No. x (Miles) I-6 0f N. oo. 1st 2nd _ 3rd 4,5&.6th UAB LOCAL
(PLEASE DOUBLE SPACE BETWEEN PROJECTS) ir U ( EMENT) AMOUNT PROGRAM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
115 Garden Ave. North - N 4th St. to N 8th St. Drainage, 2 A,C,D, 0.5 S U 250 250 .250
paving, curbs, sidewalk, channelization, 44' roadway 5 E,F
(with 75% L. I .D.) . 6
116 Lind .Ave. SW - SW 16th St. to SW Grady Way. Drainage, 2 A,C,D, 0.2 S U 1 ,000 900 FAI 100 1 ,000
i paving, curbs, sidewalk, illumination, signal , 5 E,F,G,
channelization, bike route, landscaping, FAI 405 6 H, I ,N
bridge, 44' roadway (with 10% L. I .D.) . 7
8
17 Sunset Blvd. NE - F.A. I . 405 to NE Park Dr. Drainage, 2 A,C,D, 0.9 S U 1 ,250 519 FAUS 731 1 ,250
paving, curbs, sidewalk, channelization (with 50% 5 E,F
L. I .D.) . 6
18 Benson Road South - S Grady Way to SE 31st St. 2 A,C,D, 1 .8 S U 2,000 830 FAUS 1 ,170 2,000
(South city limit) . Drainage, paving, curbs, side- 5 E,F,H
walk, channelization, bridge (with 50% L. I .D.) . 6
7
19 South 7th Street - Rainier Ave. S to Smithers Ave. S. 2 A,C,D, 0.5 S U 200 149 FAUS 51 200
Drainage, paving, curbs, sidewalk, illumination, 5 E,F
channelization, 44' roadway (with 10% L. I .D.) . 6
,
DISTRIBUTION
I COPY DISTRICT STATE AID ENGINEER
DOT 140-049 I COPY CHAIRMAN, URBAN ARTERIAL BOARD, OLYMPIA
APRIL 1979 I COPY C:R.A.B. (COUNTIES ONLY) •
Page 6 of 9
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1980 to 1985
City/County RENTON — OBLIGATION PROGRAM — "EXHIBIT A" Hearing Date June 18, 1979
City No. 1070 Adoption Date June 25, 1979
• County No. 17 COLLECTOR ARTERIALS Resolution Number 2280
PROJECT COSTS IN THOUSANDS OF DOLLARS
X •-_OBLIGATION SCHEDULE. FUNDING SOURCE •
PROJECT IDENTIFICATION o : Totol w TOTAL
z° Title, Route, Road Log No., Section No., 3 Work o m c o YEAR
Length
Location/Termini, Description of Work, ,o w Code mac, o :� •FEDERAL: `FUNDS
UAB LOCAL
z Beginning Milepost Bridge No. X (Mile") 3a 1st 2nd 3rd 4,5 E?<.6th AMOUNT PROGRAM
(PLEASE DOUBLE SPACE BETWEEN. PROJECTS) %ELEMENT)
1 2 3 " 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1 Misc. street repairs and improvements - to be identi- C U 10 10 10
fied on prospectus and in Street Division 5-Year Plan.
2 Talbot Road South - S 16th St. to S 43rd St. (South 2 A,C,D, 1 .8 C U 500 207 FAUS 293 500
City Limits) . Drainage, paving, curbs, sidewalk, 5 E,F
illumination, channelization (joint project with King 6
County) (with 50% L. I .D.) . .
3 SW 16th Street - East Valley Road to Monster Road SW. 5 A,C,D, 0.9 C U 800 800 800
Drainage, paving, curbs, sidewalk, illumination, 6 E,F,H
channelization, bridge, 44' roadway (100% L. I .D.) . 7
4 East Valley Road - SW 16th St. to SR-167 Ramps. 2 A,C,D, 1 .6 C U 2,000 2,000 2,000
Drainage, paving, curbs, sidewalk, illumination, 5 E,F
channelization, 44' roadway (100% L. 1 .D.) . 6
5 NE 12th Street - Edmonds Ave. NE to Union Ave. NE. 2 A,C,D, 1 .0 C U 1 ,320 548 FAUS 772 1 ,320
Drainage, paving, curbs, sidewalk, illumination, 5 E,F
channelization, 44' roadway (with 50% L. I .D.) . 6
6 Taylor Ave. NW & Taylor Place NW - Renton Ave. Ext. 2 A,C,D, 0.6 C U 600 373 FAUS 227 600
to Stevens Ave. NW. Drainage, paving, curbs, side- 5 E,F
walk, illumination, channelization, 44' roadway (with 6
25% L. I .D.) .
- 7 Monroe Ave. NE - NE 4th St. to NE 12th St. Drainage, 2 A,C,D, 1 .0 C U 1,320 548 FAUS 772 1 ,320
paving, curbs, sidewalk, illumination, channelization, 5 E,F
44' roadway (with 50% L. I .D.) . 6
•
DISTRIBUTION -
• I COPY DISTRICT STATE AID ENGINEER
DOT 140-049 I COPY CHAIRMAN, URBAN ARTERIAL BOARD, OLYMPIA
APRIL 1979 I COPY C.R.A.B. (COUNTIES ONLY)
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM !SU to 1.985
Page 7 of 9
RENTON — OBLIGATION PROGRAM — " Hearing Date June 18, 1979
City/County "EXHIBIT A
City No. 1070 Adoption Date June 2.5, 1979
'County No. 17 COLLECTOR ARTERIALS Resolution Number 2280
PROJECT COSTS IN THOUSANDS OF DOLLARS
PROJECT IDENTIFICATION S Y Totot o :: OBLIGATION SCHEDULE FUNDING SOURCE
Title,. Route, Road .L No., Section No., 4.1 3 *' . o YEAR - TOTAL
Log
Locotion/Termini, Description of Work, 1,� ,,cod. Lertgtl� 20 -. `o _ FEDERAL FUNDS
Beginning iMilepost a>� .Bridge No. (MII.$) let 2nd 3rd 4,.5 6th, VAB _ LOCAL
(PLEASE DOUBLE SPACE BETWEEN PROJECTS) (A"N"AL.) AMOUNT PROGRAM
ELEMENT
I 2 3 _ 4 . 5 6 7 8 9 10 11 12 , 13 14 15 16 17
8 Burnett Ave. N - Lk. Wash. Blvd. (S Term.) to Lk. 2 A,C,D, 0.6 C U 792 329 FAUS 463 792
Wash. Blvd. (N Term) . Drainage, paving, curbs, side- 5 E,F
walk, illumination, channelization, 44' roadway (with 6
50% L. I .D.) .
9 Aberdeen Ave. NE - Sunset Blvd. NE to NE 27th St. 5 A,C,D, 1 .3 C U 1 ,500 622 FAUS 878 1 ,500
Drainage, paving, curbs, sidewalk, illumination, 6 E,F,H
channelization, bridge, 44' roadway (with 50% L. I .D.) 7
10 Park Ave. North & North 40th Street - N 30th St. to 2 A,C,D, 0.4 C U 500 207 FAUS 293 500
Lk. Wash. Blvd. N. Drainage, paving, curbs, sidewalk, 5 E,F
illumination, channelization, 44' roadway (with 50% 6
L. I .D.) .
11 Monroe Ave. NE - NE 2nd St. to NE 4th St. Drainage, 1 A,B,D, 0.28 C U 370 307 FAUS 63 370
paving, curbs, sidewalks, illumination, channelization 6 F,G,H, (COUNTY) (COUNTY)
44' roadway (joint project with King County) . J
DISTRIBUTION
I COPY DISTRICT STATE AID ENGINEER
�
_oI COPY CHAIRMAN, URBAN ARTERIAL BOARD, OLYMPIA
i t�oT Drum4owrs4t I COPY C.R.A.B. (COUNTIES ONLY)
- SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1910 to 1985 Page 8 of 9
City/County RENTON — OBLIGATION PROGRAM — "EXHIBIT A" Hearing Date June 18, 1979
City No. 1070 Adoption Date June 25, 1979
County No. 17 SPOT IMPROVEMENTS Resolution Number 2280
.PROJECT COSTS IN THOUSANDS OF DOLLARS
PROJECT IDENTIFICATION io I . E OBLIGATION SCHEDULE FUNDING SOURCE
Title, Route, Road Log No., .Section No., " ; work Total a YEAR TOTAL
a Locotion/Termini, Description of Work, A.. .Coe, "rig" cv '%- FEDERAL FUNDS
Beginning Milepost 9 Bridge No. 2 o (5fei)-4 1 0� Atlast 2nd 3rd 4,5 Q.6th UAB LOCAL
(PLEASE DOUBLE SPACE BETWEEN PROJECTS) (ELEMENT) AMOUNT PROGRAM
• 1 '2 3 4 - 5 6 7 8 9 10 II - 12 13 14 15 16 17
I1 Monster Road SW alternate access road (due to 1 A,C,D, U 210 130 FASP 80 210
' closure of railroad crossing) 6 E,F
2 SW ,7th St. & Hardie Ave. SW - intersection improve- 3 B,C,D, U 90 90 90
ments. Drainage, paving, curbs, signal , street 6 F H I
lighting and channelization (with 25% L. I .D.) . J
3 Renton Area Transportation Study (joint project - 100 90 HPR r 10 100
State Department of Transportation) (STATE)
l
DISTRIBUTION
I COPY DISTRICT STATE AID ENGINEER
o_ost I COPY CHAIRMAN, URBAN ARTERIAL BOARD, OLYMPIA
1�.Nis'r: I COPY C.R.A.B. (COUNTIES ONLY) -
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM I9$Q to 1985 Page 9 of 9
e City/County RENTON — OBLIGATION PROGRAM — "EXHIBIT A" Hearing Dote June 18, 1979
City No. 1070 Adoption Dote June 25, 1979
r •County No. 17 LOCAL ACCESS STREETS Resolution Number 2280
PROJECT COSTS, IN THOUSANDS OF DOLLARS
c r
PROJECT IDENTIFICATION o al Total — I i OBLIGATION SCHEDULE . FUNDING SOURCE
•
i TOTAL
3 a Title, Route, .Rood Loogg No., Section No., u3Work Ltegthis tz-�• YEAR
I, Locotan/Terminl, Description of Work, c Code 15 E p1 FEDERAL FUNDS
l E Beginning Milepost. & Bridge No. S (Mlles) vL a 3 ANNUAL ' 2nd 3rd 4,5&.6th _ UAB LOCAL
ti (PLEASE DOUBLE SPACE BETWEEN PROJECTS) _ (ELEMENT AMOUNT PROGRAM
' I 2 3 4 . 5 6 7 8 9 10 11 12 13 14 15 16 17
I Misc. street repairs and improvements - to be identi- A U 71 71 71
' r fied on prospectus and in Street Division 5-Year Plan.
1 12 North 1st Street - Park Ave. North to Burnett Ave. 2 B,C,F, 0.2 A U 150 150 150
North. Drainage, paving, channelization. 6 H
' ' 3 Renton Ave. South - S 3rd St. to S 10th St. Drainage, 2 A,C,D, 0.5 A U 350 . 217 FAUS )'33 350
paving, curbs, sidewalk, illumination (with 25% 6 E,F
L. I .D.) .
t
i
/t
I
i
t
4
i '
I DISTRIBUTION
I COPY DISTRICT STATE AID ENGINEER
1 t�aT _�t I COPY CHAIRMAN, URBAN ARTERIAL BOARD, OLYMPIA
Argo. nit I COPY C.R.A.B. (COUNTIES ONLY)