Loading...
HomeMy WebLinkAboutR-377605• 1 Keow ~: bNow. Call bdoi�e you dg. UTILITY CONFLICT NOTE. 1VU1 LS'.• 1. FOOTING DRAIN OF LOT 11 & 12 SHALL BE UAYLIGHTED TO THE WETLAND BUFFER. 2. FENCES, VEGETATION, AND/OR FIXED OBJECTS MUST NOT CREATE A SIGHT DISTANCE CONCERN. 3. A MINIMUM SEPARATION OF 5 FT BETWEEN DRIVEM6AY AND THE PROPERTY UNE SKILL BE PROMED. 4. ALL UTILITIES SERVING THE SITE ARE TO BE UNDERGROUND. 5. CCN NOTE: A- THE PROJECT DEVELOPER SHALL SUBAMT TO THE CITY THE CCTV INSPECTION VIDEOS AND WRITTEN REPORTS. THE CCTV INSPECTION SHALL INCLUDE ALL PROJECT STORM DRAIN LIDS AND CONNECTING CATCH BASIN AND MiV#00LE STRUCTURES THAT _ WILL BECOME CITY OWNED/AMIMNTAN4ED AND ALL PRIVATE 8 INCH 0114AVER OR LARGER DRAW LINES AND CONNECTING CATCH CA ffION.' BASIN ANDARD VIDEOOLE PLAYER (IAPG VIDEO FILUCTURES SAID M FORU4T) AND IS COMPATIBLE WITH ARE TO BE IN COLOR AND TIBLE ON CD OR DVD (�Y?AIWTE XP. THE MEO�SHALL RET IS Q 8Y THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, EACH PROJECT DRAIN PIPE SEGAAENT TO THE UPSTREAM AND DOWNSTREAM CONNECTING STRUCTURES AS SHOWN (AND IDENTIFIED) DMWNSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE ON THE APPROVED PROJECT CONSTRUCTION PLANS. PLANS OR NOT, BY POTHOLING THE UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE B- THE COSTS INCURRED IN MAKING THE INITIAL CCTV INSPECTION SHALL BE BORNE BY THE PROJECT DEVELOPER. THE CALLING UTIL17Y LOCATE a 1-800-424-5555 POTHOLING ALL OF THE EXISTING DEVELOPER SHALL BEAR ALL COSTS INCURRED IN CORRECTING ANY DEFICIENCIES FOUND DURING CCTV INSPECTION, INCLUDING THE UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY COST OF ANY ADDITIONAL CCTV INSPECTION, EXFXTRATION TESTING OR AIR TESTING THAT MAY BE REQUIRED BY THE CITY OR WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS SHOWN VERIFY THE CORRECTION OF SMD DEFICIENCY. ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR C- THE DEVELOPER SHALL BE RESPONSIBLE FOR ALL COSTS INCURRED IN THE CCN INSPECTION PERFORMED SOLELY FOR THE SHALL CONSULT WITH INSIGHT ENGINEERING COMPANY TO RESOLVE ALL BENEFIT OF THE DEVELOPER. PROBLEMS PRIOR CONSULT TO PROCEEDING WITH CONSTRUCTION. 15' ACCESS ROAD 2' CLASS B ASPHALT CONCRETE -' AF CRUSHED SURFACING TOP COURSE - 5' CRUSHED SURFACING BASE COURSE r_3_"1S"ACCESS ROAD DETAIL S NOT TO SCALE 6 URAVEL UUNVA .ICU I r l CRUSHED SURFACING TOP COURSE 19' GRAVFI ACCFSS RnAn r�4 12'GRA VEL ACCESS ROAD DETAIL 5 NOT TO SCALE LOT DRfVEWY pTH DRNEMNY CENTERLINE STATION 1 20' STA: 0+78.90 2 20' STA: 1+06.90 3 20' STA: 1+70.45 4 LO #17 lI STA: 2+00.45 5 20' STA: 2+51.35 T nT#1 20 STA: 2+74.56 7 20' STA: 2+95.82 8 20' STA: 2+95.82 9 20' STA: 3+24.31 10 20' STA: 3+41.22 I 20' STA: 3+42.75 12 20' STA: 3+34.90 13 20' STA: 3+09.66 1 20' STA: 2+69.95 15 20' STA: 2+69.95 16 20' STA: 1+15.20 17 L STA: 0+58.21 TRACT 998 147.0 144.5 s: .4 5. 1 CB#13 N I I F- 5 ` w ew�oc, / LOT#16 a LOT#2 .0 PLANTER I • 135-23 - I ; a C •' - - � SCALE: 1" = 30' �� • • i �� � _ ~��` � I � I I � I � I I l CB# , mC 998 24.0' y O • r (TYPE -1) -1) L, LOTU 11 30 15 0 30 60 loll 5' --i LOT#1 I I LOT#1 S i OPEN SPACE ' I I FRENCH DRAIN 12. i .0 I I TO C815 It F ` VAUL o ` I I I 20' ACCESS I D/W CUT START STA: 2+58.38 a ° ` I a "' I :: • � I I ,I & UTIurY I EASEMENT CB#1 + + o(TYPE*0 e 2-48 I Its j_ d 113 0 CB#8 1 - • a ". e -' - ------ ----�'� o i (4 x9' PERK FILTER VAULT v `n • • i �' ► cn W/5-12'/18'CARTfGES)I ;6'O. CB#2 ,----------- Al L4 f LOT#1 3 2-4810) ACCESS S e I L T#S I, ,. ROADj : . I • 1 Keow ~: bNow. Call bdoi�e you dg. UTILITY CONFLICT NOTE. 1VU1 LS'.• 1. FOOTING DRAIN OF LOT 11 & 12 SHALL BE UAYLIGHTED TO THE WETLAND BUFFER. 2. FENCES, VEGETATION, AND/OR FIXED OBJECTS MUST NOT CREATE A SIGHT DISTANCE CONCERN. 3. A MINIMUM SEPARATION OF 5 FT BETWEEN DRIVEM6AY AND THE PROPERTY UNE SKILL BE PROMED. 4. ALL UTILITIES SERVING THE SITE ARE TO BE UNDERGROUND. 5. CCN NOTE: A- THE PROJECT DEVELOPER SHALL SUBAMT TO THE CITY THE CCTV INSPECTION VIDEOS AND WRITTEN REPORTS. THE CCTV INSPECTION SHALL INCLUDE ALL PROJECT STORM DRAIN LIDS AND CONNECTING CATCH BASIN AND MiV#00LE STRUCTURES THAT _ WILL BECOME CITY OWNED/AMIMNTAN4ED AND ALL PRIVATE 8 INCH 0114AVER OR LARGER DRAW LINES AND CONNECTING CATCH CA ffION.' BASIN ANDARD VIDEOOLE PLAYER (IAPG VIDEO FILUCTURES SAID M FORU4T) AND IS COMPATIBLE WITH ARE TO BE IN COLOR AND TIBLE ON CD OR DVD (�Y?AIWTE XP. THE MEO�SHALL RET IS Q 8Y THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, EACH PROJECT DRAIN PIPE SEGAAENT TO THE UPSTREAM AND DOWNSTREAM CONNECTING STRUCTURES AS SHOWN (AND IDENTIFIED) DMWNSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE ON THE APPROVED PROJECT CONSTRUCTION PLANS. PLANS OR NOT, BY POTHOLING THE UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE B- THE COSTS INCURRED IN MAKING THE INITIAL CCTV INSPECTION SHALL BE BORNE BY THE PROJECT DEVELOPER. THE CALLING UTIL17Y LOCATE a 1-800-424-5555 POTHOLING ALL OF THE EXISTING DEVELOPER SHALL BEAR ALL COSTS INCURRED IN CORRECTING ANY DEFICIENCIES FOUND DURING CCTV INSPECTION, INCLUDING THE UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY COST OF ANY ADDITIONAL CCTV INSPECTION, EXFXTRATION TESTING OR AIR TESTING THAT MAY BE REQUIRED BY THE CITY OR WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS SHOWN VERIFY THE CORRECTION OF SMD DEFICIENCY. ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR C- THE DEVELOPER SHALL BE RESPONSIBLE FOR ALL COSTS INCURRED IN THE CCN INSPECTION PERFORMED SOLELY FOR THE SHALL CONSULT WITH INSIGHT ENGINEERING COMPANY TO RESOLVE ALL BENEFIT OF THE DEVELOPER. PROBLEMS PRIOR CONSULT TO PROCEEDING WITH CONSTRUCTION. 15' ACCESS ROAD 2' CLASS B ASPHALT CONCRETE -' AF CRUSHED SURFACING TOP COURSE - 5' CRUSHED SURFACING BASE COURSE r_3_"1S"ACCESS ROAD DETAIL S NOT TO SCALE 6 URAVEL UUNVA .ICU I r l CRUSHED SURFACING TOP COURSE 19' GRAVFI ACCFSS RnAn r�4 12'GRA VEL ACCESS ROAD DETAIL 5 NOT TO SCALE LOT DRfVEWY pTH DRNEMNY CENTERLINE STATION 1 20' STA: 0+78.90 2 20' STA: 1+06.90 3 20' STA: 1+70.45 4 20' STA: 2+00.45 5 20' STA: 2+51.35 6 20 STA: 2+74.56 7 20' STA: 2+95.82 8 20' STA: 2+95.82 9 20' STA: 3+24.31 10 20' STA: 3+41.22 11 20' STA: 3+42.75 12 20' STA: 3+34.90 13 20' STA: 3+09.66 14 20' STA: 2+69.95 15 20' STA: 2+69.95 16 20' STA: 1+15.20 17 20' STA: 0+58.21 LOT YARD Dl?AIN RMI ROOF/ FOOTING IE 1 150.7 147.7 2 149.0 146.0 3 148.1 145.1 4 143.5 140.5 5 142.7 139.2 6 142.6 139.6 7 139.0 137.3 8 140.8 136.8 9 137.8 135.0 10 137.7 134.7 11 128.0 126.0 12 127.0 125.3 13 129.5 125.0 14 129.8 124.5 15 135.8 132.8 16 148.1 145.1 17 150.5 147.5 TRACT 998 147.0 144.5 FLOW LINE SEE NOTE $, AND DETAIL 1 5' 2.5' LANDSCAPE 0.o2 FT./FT. CEMENT CONCRETE VERTICAL CURB & GUTTER STANDARD 3A- FULL THICKNESS FULL DEPTH EXPANSION JOINT (TYP) ��j!.may POINT A, SEE DESIGN STANALIARD 5 CUL DL' SACPL N SCALE: 1 "-20' 40' R. 0. W. 24' PAVEMdNT WIDTH i 4' ACP 6' CSTC/CSBC LLOAD A (SECTION C- C) �'S NOT TO SCALE SUBACCESS STREET (PUBLIC) or NOTES 1. ALL JOINTS SHALL BE CLEANED AND EDGED. 2. SEE SECTION 4.01 FOR SURFACING REQUIREMENTS J. CONCRETE PAVEMENT SMALL BE BRUSHED TRANSVERSELY WITH A FIBER OR WIRE BRUSH OF A TYPE APPROVED BY THE ENGINEER. 4.3/8' THNRU EXPANSION JOINTS SHALL. CONCRETE BE PLACED AT BACK, SIDES AND SIDEWJ_K 5' FRONT. MAXIMA EXPANSION JOINT ThVCK MIN. SPACING IS 14' CENTER TO CENTER. 5. SEE SECTION 3.01 FOR ADDITIONAL rWRAAVWAY QVIV IW"VAnq ruK itmi pct FLOW LINE 4' MAMA CLASS 112 DETAILS 1 AND 2 l PG 64-22 OVER 6' 6' CEMENT CONCRETE L COAMAERCMIL HM 4 DRIVEWAY APPROACH CLASS 1'v PG 64-22 i 3/8' THIRD EXPANSION ,JOrNT COMPACTED 4' CSBC DETAIL 1(VERTICAL CURB) SUBGR40E SECTION A -A (*'2ESIDENTIAL DRIVEWAYAPPROACHMTAIL �S' NOT TO SCALE 20' ACCESS UTILITY EASEMENT SLOPE rowvms YARD DR40N 6' CONCRETE J 4' CRUSHED SURFACING BASE COURSE 20'ACCESS / UTILTIYEASEMEATDETAIL NOT TO SCALE CD: R 3176G5 5' SIDEWALK 0.02 FT� NFT. SUBG4DE SLOPE 0.02 FT /FT. 2.5' 1' S�0PF