Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutRES 2054 ) •
•
CITY OF RENTON
RESOLUTION NO. 2054
WHEREAS the City of Renton has heretofore adopted an "Arterial
Six-Year Street Construction Program" , pursuant to Chapter 7 ,
Extraordinary Session Laws of 1961 of the State of Washington,
and Chapter 195 of the 1961 Session Laws of the State of
Washington, and as same has heretofore been amended from time
to time, and such plan and program having heretofore been duly
amended and modified from time to time as authorized by law, and
WHEREAS the City Council , after recommendation of its Public
Works Department, caused to be held a public hearing thereon on
June 28, 1976 , after notice to the public as provided by law, for
the purpose of considering the adoption, modification and amend-
ments of said plan and program, and
WHEREAS at such public hearing held on June 28 , 1976 , due
consideration was given to the proposed changes and amendments
for the purpose of updating such plan and program, NOW THEREFORE
THE CITY COUNCIL OF THE CITY OF RENTON DO RESOLVE AS FOLLOWS :
SECTION I : The City' s Six-Year Arterial Construction
Program" and the City' s "Arterial Street Plan" are hereby further
amended and modified, all as more particularly shown on the
attached Exhibits , entitled "Exhibit A", "Exhibit B" , and "Exhibit
C" , and same being incorporated herein as if fully set forth.
SECTION II : The aforestated plan and program, as evidenced
by said Exhibits shall be and constitute the City' s "Six-Year
Construction Program" and the City' s "Arterial Street Plan" and
same to remain in full force and effect until further revised.,
amended and modified as provided by law.
•
• +
SECTION III : The Director of Public Works and the City
Clerk are hereby authorized and directed to file this Resolution,
together with Exhibits , with the Director of Highways for the
State of Washington, and as otherwise provided by law.
PASSED BY THE CITY COUNCIL this 12th day of July , 1976 .
xed„,„,i) a .
Delores A. Mead, Cit ,Clerk
APPROVED BY THE MAYOR this 12th day of July , 1976 .
Charles . Delaurenti , Mayor
Approved as to legal form:
'91 A /al
Gerard M. Shellan, City Attorney
- 2-
DISTRIBUTION: SIX YEAR CONSTRUCTION PROGRAM
(1) copy: District Engineer. Dept- of Highways
• (I) copy: UABUAB-1 "EXHIBIT A"with Original Form Pag e 1 of 10
1977 - 1 9 82
6-28-76'
HEARING DATE 7-12-76 ADOPTION DATE 7-12-76 RESOLUTION NO. 2054 (COUNTY) King County,
(CITY) Renton
ROAD FCUR ESTIMATE OF COST
LOCAL NAME
ITEM LENGTH
NO. OF STREET N AB R TYPE OF WORK IN
ROAD OR STREET NO. C S A A MILES 1 9 7 7 1 9 7 8 1 9 7 9 1 9 8 p— 8 2 TOTAL
TSNL
MAJOR (PRINCIPAL)
ARTERIALS
1. SW 43rd St. , E Valley Rd. 4102 M U Reconstruct 2-lane roadway and 1.2 500,000 713,000 2,889,000 4,102,000
to W Valley Rd. (Joint widen to 3 lanes (first phase) (3-lane)
Project w/City of Kent and to 5 lanes with new railroad
undercrossing structure (second
phase) . Curbs, sidewalks,
bicycle paths, drainage system,
illumination, & signalization
also included in 2nd phase.
Note: The 4th E 5th lanes could
be constructed with the 1st phase
(3 lanes) if LID participation is
available at the east end of •
project.
2. NE 3rd Street (Sunset 3103 M U Restoration of street shoulders * 3,140 3,140
Blvd. N to Monroe Ave. placing crushed rock $ oil
NE) application.
3. Talbot Rd. S (Extension) 5351 M U Construct new 4-lane (44') 0.06 122,000 122,000
(S Grady Way to S 7th roadway section with full
St.) improvements.
4. Bronson Way N , S (Main) 2253 M U Improve existing 4-lane roadway 0.2 80,000 80,000
Ave. S to Houser Way N) (no widening) . Replace curbs,
gutters, F, sidewalks on north
• - side. Place asphalt overlay &
upgrade drainage system,
• signalization, $ channelization-
• • *Started
in 1976.
SA-1 REV. 4'74
t.+STR,BUToON: SIX YEAR CONSTRUCTION PROGRAM
(i) copy: District Engineer, Dept. of Highways
(I) copy: UAB with Original UAB-I Form Page 2 of 10
"EXHIBIT A"
1977 - 1 9 82
6-28-76 •
(COUNTY)
HEARING .DATE 7-12-76 ADOPTION DATE 7-12-76 RESOLUTION NO. 2054 (CITY) l<ing County, Renton
ITEM LOCAL NAME ROAD F CUR LENGTH ESTIMATE OF COST
OR ULRU TYPE OF WORK
N0. OF STREET N
ROAD OR STREET NO. C S A A MILES 1 9 7 7 1 .9 78 19 79 19 80— 82 TOTAL
TSNL
• 5. Sunset Blvd. N (Bronson 2104 M U Improve existing 4-lane roadway 0.5 588,600 588,600
Way N to FAI 405) (No widening) . Replace deter-
iorated curbs, gutters, E
upgrade channelization, signal-
ization & illumination.
6. Longacres Pkwy. SW (SW 4201 M U Construct new 4-lane (56') road- 1 .7
43rd St. to SW 16th St. way with full improvements.
(Phase I)
7. Longacres Pkwy. SW (SW 4201 M U Construct new 4-lane (56') road- 1.0
Grady Way to S 140th St.) way with full improvements.
(Phase II)
8. Longacres Pkwy. SW (SW 4201 M U Construct new 4-lane (56') road- 0.1
16th St. to SW Grady Way way with full improvements.
(Phase III)
9. Longacres Pkwy. SW (S 4201 M U Construct new 4-lane (56') road- 0.6
140th St. to SW Sunset way with full improvements.
Blvd.) (Phase IV)
SECONDARY (MINOR)
ARTERIALS
1. Misc. street repairs & S U Pavement overlay; shoulder * 49,000 6,000 55,000
improvements (to be improvement; storm sewer upgrade.
• identified on prospectus
& in Street Dept. 5-Year
Plan) .
*Started
in 1976.
SA-I REV. 4'74
()isT..TION: .SIX YEAR CONSTRUCTION PROGRAM
t1) copy: District Engineer, Dept. of Highways
(I) copy: UAB "EXHIBIT A"
• with Original UAB-I Form Page 3 of 10
1977 — 19 82
•
6-28-76
HEARING DATE 7-12-76 ADOPTION DATE 7-12-76 RESOLUTION NO. 2054 (COUNTY)(CITY) King County,Count , Renton
ROAD FCUR ESTIMATE OF .COST
LOCAL NAME OR ULRU
ITEMNOOF STREET N A B R TYPE OF WORK LENGTH
ROAD OR STREET NO. CSAA MILES 1 9 7 7 19 78 19 79 19 80- 82 TOTAL
T $ N L
2. S 7th St. (Rainier Ave. 4802 S U Widen existing 2-lane roadway to 0.5 72,000 72,000
S to Smithers Ave. S) 44' . Construct new curbs,
gutters, sidewalks, $ .asphalt
pavement. Upgrade drainage
system, illumination, 4
channelization.
3. Garden Ave. N (N 4th St. 2551 S . U Widen existing 2-lane roadway to 0.5 133,000 133,000
to N 8th St.) 44' . Construct new curbs,
gutters, sidewalks, F, asphalt
pavement. Upgrade drainage •
system F channelization. .
4. Shattuck Ave. S Railroad 5501 • S U Construct a new railroad underpass 0.23 110,000 290,000 400,000
Underpass $ Road Improve- structure to replace the present
ment (S 4th Place to S substandard wooden underpass
7th St.) bridge, in conjunction with
widening existing 2-lane roadway
to 44' . Install new curbs, •
gutters, sidewalks, asphalt _ -
pavement, illumination,
channelization, & upgrade drainage
system.
- 5. Shattuck Ave. S Access 5501 S U Construct new 4-lane (44') road- 0.06 94,268 94,268
Road (S 7th to S Grady way with full improvements
Way)
. 6. S Puget Dr. $ Benson Rd. 6203 S U Phase I : Signal controller 160,000 160,000
• S Intersection (Phase I) replacement; improved channeliza-
tion.
See page 4, Item 8 for Phase II.
r •
SA.1 REV. 4,74
(•I TRIBUTION: ,SIX YEAR CONSTRUCTION PROGRAM
(I) copy: District Engineer. Dept. of Highways Page 4 of 10
• (I) copy- UAB with Original UAB-1 Form "EXHIBIT A"
1977 1 9 82
6-28-76 (COUNTY)
HEARING DATE 7-12-76 ADOPTION DATE 7-12-76 RESOLUTION NO. 2054 (CITY) King County, Renton
--
ROAD ' F CU R ESTIMATE OF COST
ITEM LOCAL NAME OR ULRU LENGTH
NO, OF STREET N A B R TYPE OF WORK IN
ROAD OR STREET NO. , C S A A MILES 1 9 7 7 1 9 7 8 1 9 7 9 1 9.8 0-8 2 TOTAL
TSNL
7. Lind Ave. SW (Phase I) 4401 S U Construct new 4-lane (44') road- 1.7 1,195,000 1,195,000
(SW 16th St. to SW 43rd .. way with full improvements and
St.) construct the required structure
over the P-9 drainage channel .
8. S Puget Drive and Puget 6203 S U Widen existing 2-lane roadway to 1 .0 325,000 325,000
Drive SE (Benson Road S 4 lanes (44') . Construct curbs,
to Edmonds Ave. SE) gutters, sidewalks. Upgrade
(Phase II) drainage system, illumination, &
channelization.
9. Lake Wash. Blvd. North 2501 S U Improve existing 2-lane roadway. 2 .5 263,500 891,000 971,500 2,126,000
(North Park Drive to Construct curbs, gutters,
North 44th Street) sidewalks . Upgrade drainage
(Parkway Section) system, illumination, $
channelization.
10. SW Grady Way (Lind Ave. 4202 S U Widen existing 2-lane roadway to 1.2 3,603,000 3,603,000
SW to West City Limits) 4 lanes (44') . Construct curbs,
gutters, sidewalks. Upgrade
drainage system, illumination,
?, channelization. Replace
existing steel bridge structure
with a new 4-lane overpass with -
sidewalks, illumination, & -
. channelization.
11. Union Ave. NE (NE Sunset 3801 S U Widen existing 2-lane roadway to 0.7 355,000 355,000
• • Blvd. to NE 24th St.) 44' . Construct curbs, gutters,
E sidewalks. Upgrade drainage
system & channelization.
SA.1 REv. 4 "4
CAST RIBUTION: SIX YEAR CONSTRUCTION PROGRAM
(1) copy: District Engineer. Dept. of Highways
(1) copy: UAB with Original UAB-i Form Page 5 of 10
9 7 7 — 1 9 8 Z "EXHIBIT A"
. 6-28-76 (COUNTY)
HEARING DATE 7-12-76 ADOPTION DATE 7-12-76 RESOLUTION NO. 2054 (CITY) King County, Renton
ROAD FCUR ESTIMATE OF COST
ITEM LOCAL NAME OR U L R U - LENGTH
OF STREET N. A B R TYPE OF WORK IN
NO. ROAD OR STREET NO. C S A A MILES 1 9 7 7 1 9 7 8 1 9 7 9 1 9 8 ©—82 TOTAL
TSNL
12. SW 27th St. (W Valley 4222 S U Construct new 4-lane (44')
Road to E Valley Road) roadway with full improvements.
13. N 30th St. (Burnett Ave. 2352 S U Widen existing 2-lane roadway to 0.4 ' 150,000 150,000
N to FAI 405) 44' . Construct curbs, gutters,
$ sidewalks. Upgrade drainage
- system & channelization.
14. Lind Ave. SW (Phase II) 4401 S U Widen existing 2-lane roadway $ 0.2 1,400,000 1,400,000
(SW 16th St. to SW structure over I-405 to provide
Grady Way) 4-lane (44') capacity. Construct
new curbs, gutters, sidewalks,
extra 2 lanes of roadway $ •
structure, drainage system,
landscaping, illumination,
signalization, & channelization.
15. Sunset Blvd. NE (FAI 405 3203 S U Improve existing 2-lane roadway. 0.9 1,046,400 1,046,400 .
to NE Park Drive) Construct curbs, gutters, $
sidewalks. Upgrade drainage
system & channelization.
16. Benson Rd. S (S Grady 5303 S U Widen existing 2-lane roadway to 1.8 733,000 733,000
Way to SE 31st St.) 4 lanes (44') . Construct curbs,
gutters, F sidewalks. Upgrade .
• . drainage system F, channelization.
_
SA-I REV. 4'-74
,,,s-r,. UTioN: SIX. YEAR` . CONSTRUCTION PROGRAM
(1) copy: District Engineer, Dept. of Highways
g
• O) copy: UAB with Original UAB-1 "EXHIBIT A"
Form Page 6 of 10
1977 — 1982
6-28-76 (COUNTY)
HEARING DATE 7-12-76 ADOPTION DATE 7-12-76 RESOLUTION NO. 2054 (CITY) King County, Renton
ROAD F C U R ESTIMATE OF COST
ITEM LOCAL NAME OR U L R -U LENGTH
NO. OF STREET N A B R TYPE OF WORK IN --
ROAD OR STREET NO. C 5 A A MILES 1 9 7 7 1 9 7 8 1 9 7 9 1 9 8 0- 8 2 TOTAL
TSNL
g bridge1,420,000
17. Wells Ave. Bridge & Wells 5101 S U Construct new across Cedar1,420,000
Ave. N (Cedar River River in conjunction with widen-
south bank to North 6th ing of 2-lane roadway to 44' . .
St.) Includes curbs, gutters, side-
walks, paving, drainage system,
landscaping, illumination,
channelization.
COLLECTOR ARTERIALS
1. Misc. Street Improvements C U Pavement overlay, shoulder * 27,000 23,000 50,000
(To be identified on improvement, storm sewer upgrade.
Prospectus F, in Street
Dept. 5-Year Plan.)
2. SW 16th St. (E Valley 4902 C U Phase I: Widen existing 2-lane 0.9 245,000 485,000 730,000
Road to Monster Road SW) roadway to 44' . Construct curbs,
gutters, & sidewalks. Upgrade .
drainage system, illumination, &
channelization. Phase II:
Construct new bridge structure
over P-1 drainage channel.
3. E Valley Road (SW 16th 4501 C U Widen existing 2-lane roadway to 1.6 900,000 900,000
. St. to SR 167 Ramps) 4 lanes (44') . Construct curbs,
gutters, & sidewalks. Upgrade
drainage system, illumination, &
channelization.
*Started
- . in 1976.
SA-1 REV. 4174
-
( ,,,,,sUTioN: SIX YEAR CONSTRUCTION PROGRAM ,
(1) copy: Oistnct Engineer, Dept. of Highways
Page 7 of 10
(1) copy: UAB with Original UA B•1 Form
1 9 7 7 __ 1 9 8 2 "EXHIBIT A"
6-28-76 (COUNTY)
HEARING DATE 7-12-76 ADOPTION DATE 7-12-76 RESOLUTION NO.. 2054 (CITY) King County, Renton
ROAD FCUR ESTIMATE OF COST
ITEM LOCAL NAME LENGTH
N0. OF STREET . N A .8 R TYPE OF WORK IN
ROAD OR STREET NO. CSAA MILES 1 9 7 7 1 9 7 8 1 9 7 9 1 9 8 0—$2 TOTAL
T S N L ,
f
4. Talbot Rd. S (S 15th St. 5701 C U Improve existing 2-lane roadway. 1.8 495,000 495,000 1
to S 43rd St.) ((Joint Construct curbs, gutters, $
City/County Project) sidewalks. Upgrade drainage
system, illumination. Install
channelization at Victoria Park
(S 19th St. & Scotts Terrace) . t'
1
5. NE 12th St. (Edmonds Ave. 3552 C U Widen existing 2-lane roadway to 1.0 425,000 425,000 's
NE to Union Ave. NE) 44' . Construct curbs, gutters,
, sidewalks. Upgrade drainage
system, illumination, &
channelization.
6. Taylor Ave. NW $ Taylor 1003 C U Widen existing 2-lane roadway to 0.6 300,000 300,000
Place (Renton Ave. Ext. 44' . Construct curbs, gutters,
to Stevens Ave. NW) & sidewalks. Upgrade drainage .
system, illumination, & .
channelization.
7. Monroe Ave. NE (NE 4th 3401 C U Widen existing 2-lane roadway to 1.0 507,000 507,000 _#
St. to NE 12th St.) 44' . Construct curbs, gutters,
? sidewalks. Upgrade drainage
system, illumination, $
channelization.
8. Burnett Ave. North (Lake 2451 C U Widen existing 2-lane roadway to 0.6 300,000 300,000
Wash. Blvd. N (S Term) 44' . Construct curb, gutters,
to Lake Wash. Blvd. N & sidewalks. Upgrade drainage
- (N Term) system, illumination, E
•
channelization.
I,
SA-1 REV. 4 74
•
,sy.. copy SIX YEAR CONSTRUCTION PROGRAM Page 8 of 10 .
11) copy: D4stnct Engineer, Dept. of Highways
• (1) copy: UAB with Original UAB-1 Form
1 9 7 7 - 1 9 8 2 "EXHIBIT A"
• 6-28-76 . (COUNTY)
HEARING DATE 7-12-76 ADOPTION DATE 7-12-76 RESOLUTION NO. 2054 (CITY) King County, Renton .
ROAD FCUR ESTIMATE OF COST
ITEM LOCAL NAME OR U L' R U LENGTH
NO. OF STREET N A B R TYPE OF WORE IN
ROAD OR STREET NO. C S A . A MILES 1 9 7 7 1 9 7 8 1 9 7.9 1 9 8 0— 8 2 TOTAL
T S N L
• 1
9. Aberdeen Ave. NE (Sunset 3251 C U Widen existing 2-lane roadway to 1.3 1,340,000 1,340,000
Blvd. NE to NE 27th St.). 44' . Construct curb, gutters, $
sidewalks. Upgrade drainage
system, illumination, &
- channelization.
10. Park Ave. N & N 40th St. 2491 C U Widen existing 2-lane roadway to 0.4 195,000 195,000
(N 30th St. to Lake Wash. 44' . Construct curbs, gutters, F,
Blvd. N) , ' sidewalks. Upgrade drainage
system, illumination, $
channelization.
SPOT IMPROVEMENTS .
1. Wells Ave. Bridge, Cedar U Repair structure 0.0 * 3,700 3,700
River
2. Monster Road Bridge U Repair structure 0.0 * 4,700 4,700
3. Pavement Marking Program U Install buttons $ tape (city-wide) * 60,000 60,000 -
4. Monster Rd. SW Railroad U Install automatic flashing 145,000 - 145,000
Crossing Signal Improve- signals
ment
5. NE 4th St. 4 Monroe Ave. U New signal installation 20,000 20,000
NE
*Started
in 1976.
S4.1 REV. 4 74
C-+STg(BUTioN: t - 'SIX- YEAR CONSTRUCTION PROGRAM
(1) copy: District Engineer, Dept. of Highways
Page 9 of 10
•
(I) copy: UA9 with Original UAB-1 Form'
1 9 7 7 — 1 9 8 2 - "EXHIBIT A"
6-28-76 (COUNTY)
HEARING DATE 7-12-76 ADOPTION DATE � 7-12-76 RESOLUTION NO. 2054 (CITY) King County, Renton
•
ROAD FCUR •
LOCAL NAME ESTIMATE OF COST
ITEM OF STREET N A, B R TYPE OF WORK LENGTHI _
ROAD OR STREET NO. C S A A MILES 9 7 7 7 8 9 T 9 TOTAL
T S N 1 9 842-82
L
6. Duvall Ave. NE F NE Sun- ' U New signal installation. 32,000 32,000
set Blvd.
7. Rainier Ave. S E1 S Grady U Replace signal controller and 13,500 13,500 '
Way include in computer system.
8. SW Grady Way $ Lind Ave. U Replace signal controller and 11,000 11,000
SW include in computer system.
9. S Grady Way & West Entr. U Replace signal controller and 9,200 9,200
to Shopping Center include in computer system.
10. S Grady Way $ East Entr. U Replace signal controller and 9,200 9,200
to Shopping Center include in computer system.
11. SW Sunset Blvd. , SW U Replace signal controller and !11;000 11,000
Langston Rd. , & Hardie include in computer system.
Ave. SW
12. N 3rd St. Railroad U Install automatic flashing R/R to
Crossing Signal Improve- signals , provide
ment estimate
' LOCAL ACCESS STREETS
- 1. Misc. Street Repairs and LA U Street overlay, sealing, shoulder *121,400 148,450 32,650 91,850 394,350
improvements (to be improvement, $ storm sewer
. identified on prospectus upgrade.
& in Street Dept. 5-Year
Plan)
' *Started
in 1976.
A.i REV. ♦.74 t
S
•
S.
( i,TRIBUTION: SIX YEAR CONSTRUCTION PROGRAM
(]) copy: District Engineer, Dept. of Highways Page 10 of 10
(l) copy: UAB with Original UAB-1 Form
"EXHIBIT A"
1977 - 1 9 82
6-28-76 (COUNTY)
HEARING DATE 7-12-76 ADOPTION DATE 7-12-76 RESOLUTION NO. 2054 (CITY) King County, Renton
ROAD F CUR ESTIMATE OF COST
ITEM LOCAL NAME OR ULRU LENGTH
TYPE OF WORK
NO. OF STREET NABR IN
ROAD OR STREET NO, C SA A MILES 1.9 7 7 1 9 7 8 1 9 7 9 1 9 8 0— 8.2 TOTAL
T S N L
2. Royal Hills Dr. SE Cul- 6103 LA U Construct turn-around for bus 0.1 * 4,900 4,900
de-sac and automobile traffic.
3. N 1st St. (Park Ave. N to 2223 LA U Overlay plus curb replacement. 0.2 22,000 22,000
Burnett Ave, N) and storm sewer upgrade.
4. Renton Ave. S (S 3rd St. 5521 LA U Improve existing 25' roadway (no 0.5 215,000 215,000
to S 10th St.) widening) . Replace curbs,
gutters, sidewalks; place asphalt
overlay and upgrade drainage
system & channelization.
•
•
*Started
. • in 1976.
SA.1 REV. 4 74