HomeMy WebLinkAboutR-3858051. EXISTING CONDITIONS:
A. CONTACT ALL NECESSARY UTILITY PURVEYORS TO COORDINATE UTILITY CUTOFFS AND
REMOVALS. VERIFY THAT ALL APPROPRIATE SERVICES HAVE BEEN DISCONNECTED.
B. CONFORM TO LOCAL GOVERNING REQUIREMENTS REGARDING NOISE CONTROL.
C. MAINTAIN SAFE VEHICULAR AND PEDESTRIAN TRAFFIC ROUTES:
2. ENSURE MINIMUM INTERFERENCE WITH ROADS, STREETS, ALLEYS, SIDEWALKS, AND ADJACENT
FACILITIES.
3. DO NOT CLOSE OR OBSTRUCT STREETS, FIRE LANES, SIDEWALKS, ALLEYS OR PASSAGEWAYS
WITHOUT PERMISSION FROM AUTHORITIES HAVING JURISDICTION.
4. IF REQUIRED BY GOVERNING AUTHORITIES, PROVIDE ALTERNATE ROUTES AROUND CLOSED OR
OBSTRUCTED TRAFFIC WAYS.
A. VERIFY LOCATION AND ELEVATION OF EXISTING UTILITIES AT POINTS OF CONNECTION PRIOR
TO COMMENCING WORK ON NEW UTILITY THAT IS TO BE CONNECTED TO THE EXISTING
UTILITY. COORDINATE WITH OWNER'S REPRESENTATIVE IF ACTUAL CONDITIONS ARE AT
VARIANCE WITH PLANS.
B. VERIFY LOCATION AND ELEVATION OF EXISTING UTILITIES SUFFICIENTLY IN ADVANCE OF
CONSTRUCTION TO ALLOW FOR COORDINATION AND MITIGATION OF CONFLICTS WITHOUT
DOWN TIME.
5. DIMENSIONS AND LAYOUTS:
A. THE CONTRACTOR IS RESPONSIBLE FOR PRESERVING ALL BENCHMARKS AND STAKES AND IS
REQUIRED TO REPLACE ANY STAKES OR BENCHMARKS THAT ARE DISPLACED OR MISSING.
B. THE CONTRACTOR IS RESPONSIBLE FOR REVIEW OF ALL UTILITY PURVEYOR AND CITY
RECORDS RELATIVE TO THE EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS
RESPONSIBLE FOR AVOIDING DAMAGE TO THESE FACILITIES AND SHALL RESTORE ALL
UTILITIES AT CONTRACTOR'S OWN EXPENSE. THE CONTRACTOR IS TO NOTIFY THE OWNER'S
REPRESENTATIVE IMMEDIATELY IF UNDERGROUND UTILITIES NOT SHOWN ON RECORD
DOCUMENTS ARE ENCOUNTERED.
C. THE CONTRACTOR WILL BE RESPONSIBLE FOR FURNISHING, SETTING AND MARKING ALL LINE
LOCATION STAKES. A QUALIFIED LAYOUT ENGINEER, SURVEYOR, OR TECHNICAL SPECIALIST
MUST BE ASSIGNED TO THE CONTRACTOR'S CREW FOR THIS WORK AND SHALL BE ON SITE
AT ALL TIMES WHEN WORK REQUIRING CONTROL IS BEING PERFORMED, TOGETHER WITH
ALL NECESSARY EQUIPMENT, SUPPLIES AND INSTRUMENTS RELATED THERETO. THIS
EQUIPMENT AND PERSONNEL MUST BE AVAILABLE, AT NO ADDITIONAL COST TO THE OWNER
OR OWNER'S REPRESENTATIVE, FOR THE PURPOSE OF VERIFYING LAYOUT AND CERTIFYING
THE ACCURACY OF WORK ON THE SITE.
6. REGULATORY REQUIREMENTS:
A. COMPLY WITH ALL APPLICABLE FEDERAL, STATE AND LOCAL CODES AND SAFETY
REGULATIONS. IF THERE ARE ANY CONFLICTS AMONG REFERENCED STANDARDS, THE MORE
STRINGENT REQUIREMENTS SHALL GOVERN.
B. OBTAIN ALL NECESSARY PERMITS.
V,07*r 1611
1. ALL WORK SHALL BE IN CONFORMANCE WITH THE "GEOTECHNICAL ENGINEERING REPORT,
ATS WAREHOUSE, PAN GEO, INC. DEC 23, 2014.
2. THE PROJECT GEOTECHNICAL ENGINEER OF RECORD OR HIS REPRESENTATIVE MUST BE
ONSITE DURING CRITICAL EARTHWORK OPERATIONS. THE GEOTECHNICAL ENGINEER SHALL
OBSERVE ALL EXCAVATIONS AND FILL AREAS. IN ADDITION, THE ENGINEER SHALL INSPECT
THE SOIL CUTS PRIOR TO CONSTRUCTION OF WALLS AND INSPECT THE COMPACTION IN
FILL AREAS. THE ENGINEER MUST SUBMIT FIELD REPORTS IN WRITING TO THE PCD
INSPECTOR FOR SOILS VERIFICATION AND FOUNDATION CONSTRUCTION. ALL EARTHWORK
SHOULD BE IN CONFORMANCE WITH THE RECOMMENDATIONS IN THE GEOTECHNICAL
REPORT.
3. THE GEOTECHNICAL ENGINEER MUST BE PRESENT AT THE PRE -CONSTRUCTION MEETING(S).
IN ADDITION, THE FOLLOWING CONSTRUCTION STAGES MUST BE INSPECTED, MONITORED,
AND TESTED AS NECESSARY BY THE GEOTECHNICAL ENGINEER OF RECORD:
A. SITE CLEARING AND STRIPPING OF ORGANIC TOPSOIL FOR ALL AREAS TO RECEIVE
STRUCTURAL FILL, PAVEMENTS, OR FOUNDATIONS.
B. CUT SLOPES OVER FOUR FEET HIGH.
C. BENCHING FOR FILL TO BE PLACED ON SLOPES.
D. INSPECTION OF PROPOSED IMPORT FILL MATERIAL, PRIOR TO PLACEMENT.
E. PLACEMENT OF STRUCTURAL FILL, INCLUDING OBSERVATION OF PROPER MOISTURE
CONTENT, LIFT THICKNESS, AND MINIMUM COMPACTION.
F. SUBGRADES FOR RETAINING WALLS, FOUNDATIONS, AND FOR THE BASE OF
ROCKERIES.
G. INSTALLATION OF SUBSURFACE DRAINAGE FACILITIES.
H. UTILITY TRENCH BEDDING AND BACKFILL, INCLUDING OBSERVATION OF PROPER
MOISTURE CONTENT, LIFT THICKNESS, AND MINIMUM COMPACTION.
I. UTILITIES ON STEEP SLOPES; SLOPE ANCHORS AND/OR BACKFILL SLOPE
STABILIZATION.
J. ANY UNUSUAL SEEPAGE, SLOPE, OR SUBGRADE CONDITION AS DELINEATED IN THE
GEOTECHNICAL REPORT OR DISCOVERED IN THE FIELD.
4. AT THE END OF CONSTRUCTION, THE GEOTECHNICAL ENGINEER SHALL SUBMIT A FINAL
SUMMARY LETTER VERIFYING THAT CRITICAL STAGES OF CONSTRUCTION HAVE BEEN
INSPECTED AND ARE IN CONFORMANCE WITH GEOTECHNICAL REPORT.
7. SAFETY SYSTEMS:
A. PROTECT ALL EXCAVATION IN EXCESS OF FOUR -FEET IN DEPTH WITH A SAFETY SYSTEM
CONFORMING TO THE REFERENCED REQUIREMENTS.
B. THE CONTRACTOR'S EXCAVATION SAFETY SYSTEM SHALL BE DESIGNED BY A QUALIFIED
PERSON AND MEET THE REFERENCED REQUIREMENTS.
C. ALL EXCAVATION NOT REQUIRING TRENCH SAFETY SYSTEMS SHALL ALSO MEET THE WISHA
SAFETY STANDARDS AND CITY OF BELLEVUE REQUIREMENTS.
8. EXCAVATION:
A. MATERIALS NOT DESIGNATED FOR SALVAGE SHALL BE BROKEN UP, LOADED, AND LEGALLY
DISPOSED OF BY THE CONTRACTOR. CARE SHALL BE TAKEN REMOVING ITEMS TO ENSURE
THAT DAMAGE DOES NOT OCCUR TO THE EXISTING TREES AND IMPROVEMENTS WHICH ARE
TO REMAIN IN PLACE. ALL REMOVALS SHALL BE ACCOMPLISHED BY MAKING A NEAT
VERTICAL SAWCUT AT THE LIMITS OF REMOVAL. ALL CONCRETE WALK REMOVALS SHALL BE
SAWCUT AT THE NEXT ADJACENT JOINT. ADJACENT MATERIALS DESIGNATED TO REMAIN
THAT ARE DAMAGED BY THE CONTRACTOR DURING THE WORK SHALL BE REPLACED AT NO
ADDITIONAL COST TO THE OWNER.
B. SPRINKLE EXCAVATED MATERIAL AND ACCESS ROADS AS NECESSARY TO LIMIT DUST TO THE
LOWEST PRACTICABLE LEVEL. DO NOT USE WATER TO SUCH AN EXTENT AS TO CAUSE
FLOODING, CONTAMINATED RUNOFF, OR ICING.
C. IN THE EVENT THE CONTRACTOR ENCOUNTERS UTILITY LINES NOT SHOWN ON THE SITE
PLAN OR OTHERWISE INDICATED TO BE SAVED, REMOVED, OR ABANDONED, THE LOCATION
OF SUCH LINES SHALL BE MARKED IN THE FIELD AND THE OWNER'S REPRESENTATIVE
NOTIFIED.
9. FILL MATERIALS:
A. ALL MATERIAL WHICH IS PROPOSED TO BE USED AS FILL, BEDDING OR BACKFILL SHALL BE
GRADED AND TESTED FOR MOISTURE CONTENT AND COMPACTABILITY. GRADATION AND TEST
RESULTS SHALL BE SUBMITTED FOR REVIEW AND ACCEPTANCE BY THE OWNER'S
REPRESENTATIVE PRIOR TO PLACEMENT OF FILL. SEE SPECIFICATIONS FOR INFORMATION
AND RESTRICTIONS ON THE USE OF RECYCLED MATERIAL AS FILL.
B. MATERIAL USED IN FILLING SHALL BE APPROPRIATE TO THE SITE AND THE INTENDED USE
OF THAT PORTION OF THE SITE.
C. TOPSOIL SHALL NOT BE USED AS A FILL MATERIAL.
D. NO FROZEN OR THAWING MATERIAL SHALL BE USED IN A FILL.
E. COMMON FILL MATERIAL SHALL CONSIST OF ON-SITE EXCAVATED SOILS FREE OF ORGANIC
AND DELETERIOUS MATERIAL AND OF SUCH SIZE AND GRADATION THAT THE SPECIFIED
COMPACTION CAN BE READILY ATTAINED. THE MOISTURE OF COMMON FILL MATERIAL AT
THE TIME OF PLACEMENT SHALL BE WITHIN A RANGE OF ONE PERCENT ABOVE TO TWO
PERCENT BELOW THE OPTIMUM MOISTURE CONTENT FOR COMPACTION.
F. GRAVEL BORROW: PER SECTION 9-03.14(1) OF WSDOT.
L4LO 'IT,
1. FOR ALL COMMERCIAL, MULTI -FAMILY, AND NEW SINGLE-FAMILY HOMES,
CONSTRUCTION -RELATED NOISE IS ALLOWED 7 AM TO 6 PM ON WEEKDAYS AND 9 AM TO
6 PM ON SATURDAYS . NO DELIVERIES SHALL BE SCHEDULED PRIOR TO 7:00 AM OR
AFTER 6:00 PM.
2. CONSTRUCTION -RELATED NOISE IS NOT ALLOWED OUTSIDE OF ALLOWABLE HOURS, LEGAL
HOLIDAYS, OR SUNDAYS.
t 110-isi 4
1. ANY EXCAVATED MATERIAL REMOVED FROM THE CONSTRUCTION SITE AND DEPOSITED ON
PROPERTY WITHIN THE CIN LIMITS MUST BE DONE IN COMPLIANCE WITH A VALID
CLEARING &GRADING PERMIT. LOCATIONS FOR THE MOBILIZATION AREA AND STOCKPILED
MATERIAL MUST BE APPROVED BY THE CIN INSPECTOR AT LEAST 24 HOURS IN ADVANCE
OF ANY DUMPING.
RIM71, ijm-.v.;PM NOTES
1. CONTRACTOR SHALL IMMEDIATELY SWEEP THE PAVED CITY RIGHT-OF-WAY WHEN DIRT
OR OTHER CONSTRUCTION RELATED DEBRIS IS DEPOSITED.
1. DUST FROM CLEARING, GRADING, AND OTHER CONSTRUCTION ACTIVITIES SHALL BE
MINIMIZED AT ALL TIMES.
2. IMPERVIOUS SURFACES ON OR NEAR THE CONSTRUCTION AREA SHALL BE SWEPT,
VACUUMED, OR OTHERWISE MAINTAINED TO SUPPRESS DUST ENTRAINMENT.
3. ANY DUST SUPPRESSANTS USED SHALL BE APPROVED BY THE DIRECTOR.
PETROCHEMICAL DUST SUPPRESSANTS ARE PROHIBITED. WATERING THE SITE TO
SUPPRESS DUST IS ALSO PROHIBITED UNLESS IT CAN BE DONE IN A WAY THAT
KEEPS SEDIMENT OUT OF THE PUBLIC DRAINAGE SYSTEM.
NTS N
GRADING NOTES 5 CONSTRUCTION NOTES 6
G. STRUCTURAL FILL SHALL BE NON-ORGANIC SOIL, ACCEPTABLE TO THE OWNER'S
REPRESENTATIVE, PLACED IN MAXIMUM 8 -INCH LOOSE LIFTS, WITH EACH LIFT BEING
C" QC REWON TESCo NOTES
1.
BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRECONSTRUCTION
COMPACTED TO AT LEAST 95% OF THE MODIFIED PROCTOR MAXIMUM DENSITY USING
1
MEETING MUST BE HELD WITH THE CITY OF RENTON, PUBLIC WORKS DESIGN ENGINEER.
ASTM:D 1557. STRUCTURAL FILL SHALL BE PLACED AND COMPACTED WITHIN 2% OF THE
2
i
FIRE ACCESS DRIVEWAY
OPTIMUM MOISTURE CONTENT.
2.
ALL LIMITS OF CLEARING AND AREAS OF VEGETATION PRESERVATION AS PRESCRIBED ON
8.31.15
4
THE PLAN(S) SHALL BE CLEARLY FLAGGED IN THE FIELD AND OBSERVED DURING
10.COMPACTION:
5
CONSTRUCTION.
REQUIRED COMPACTION: COMPACT FILLS AND BACKFILLS TO THE FOLLOWING MINIMUM RELATIVE
3.
ALL REQUIRED SEDIMENTATION/EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND IN
COMPACTION (PERCENTAGE OF MAXIMUM DRY DENSITY DETERMINED IN ACCORDANCE WITH
OPERATION PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TO ENSURE THAT SEDIMENT
ASTM D1557).
I
LADEN WATER DOES NOT ENTER THE NATURAL DRAINAGE SYSTEM. ALL EROSION AND
I
SEDIMENT FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME
LOCATIONS REQUIRED MINIMUM I
THAT CLEARING AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON-SITE EROSION
ION
COMPACTION
UTILITY TRENCHES: 95
HAS PASSED. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND ADDITIONS TO
UNDER WALKS AND PAVING: 95r%
Drawn
Project
EROSION SEDIMENTATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE
/
AGAINST WALLS: 90%
PERMITEE.
PLANTING AND LANDSCAPE AREAS: 85%
4.
THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE
OTHER:
INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS
95%
CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE
11.FIELD QUALITY CONTROL:
PERMITEE SHALL ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES
WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE.
A. THE OWNER'S TESTING AGENCY SHALL PERFORM TESTING. THE OWNER'S TESTING IS ONLY
DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY
TO VERIFY CONFORMANCE WITH THE PROJECT PLANS. THE CONTRACTOR IS RESPONSIBLE
OF THE PERMITEE TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE
FOR CONFIRMING THAT THE WORK MEETS THE REQUIREMENTS OF THE SPECIFICATIONS
ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM
AND THE CITY OF RENTON.
REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER
QUALITY OF THE RECEIVING DRAINAGE SYSTEM.
5.
APPROVAL OF THIS PLAN IS FOR EROSION/SEDIMENTATION CONTROL ONLY. IT DOES NOT
CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES,
RESTRICTORS, CHANNELS, OR RETENTION FACILITIES.
6.
DURING THE TIME PERIOD OF OCTOBER 1ST THROUGH APRIL 30TH, ALL PROJECT
DISTRIBUTED SOIL AREAS GREATER THAN 5,000 SQUARE FEET, THAT ARE TO BE LEFT
UN -WORKED FOR MORE THAN 12 HOURS, SHALL BE COVERED BY MULCH, SODDING OR
PLASTIC COVERING.
7.
IN ANY AREA WHICH HAS BEEN STRIPPED OF VEGETATION AND WHERE NO FURTHER WORK
IS ANTICIPATED FOR A PERIOD 30 DAYS OR MORE, ALL DISTURBED AREAS MUST BE
IMMEDIATELY STABILIZED WITH MULCHING, GRASS PLANTING OR OTHER APPROVED EROSION
CONTROL TREATMENT APPLICABLE TO THE TIME OF YEAR. GRASS SEEDING ALONE WILL BE
ACCEPTABLE ONLY DURING THE MONTHS OF APRIL THROUGH SEPTEMBER, INCLUSIVE.
SEEDING MAY PROCEED, HOWEVER, WHENEVER IT IS IN THE INTEREST OF THE PERMITEE,
BUT MUST BE AUGMENTED WITH MULCHING, NETTING OR OTHER TREATMENT APPROVED BY
THE CITY OF RENTON, OUTSIDE THE SPECIFIED TIME PERIOD.
8.
FOR ALL EROSION/SEDIMENTATION CONTROL PONDS WHERE THE DEAD STORAGE DEPTH
EXCEEDS 6 INCHES, A FENCE IS REQUIRED WITH A MINIMUM HEIGHT OF THREE (3) FEET,
3:1 SIDE SLOPES.
MS
GENERAL NOTES 1
1. NO HAZARDOUS LIQUID PRODUCTS, INCLUDING BUT NOT LIMITED TO PETROLEUM PRODUCTS,
FUEL, SOLVENTS, DETERGENTS, PAINT, PESTICIDES, CONCRETE ADMIXTURES AND FORM OILS
SHALL BE STORED ON-SITE WITHOUT PRIOR APPROVAL. IF REQUESTED, THE CONTRACTOR
SHALL PROVIDE FOR SPILL CONTAINMENT IN ACCORDANCE WITH KING COUNTY AND CITY OF
RENTON REQUIREMENTS. CONTRACTOR SHALL PROVIDE A LIST OF THE TYPES AND SIZES OF
LIQUIDS THAT WILL BE STORED/HANDLED ON SITE. CONTRACTOR WILL ALSO SHOW THE
PROPOSED LOCATION FOR STORAGE ON A PROJECT SITE PLAN AND WILL PROVIDE A
PROPOSED METHOD OF SECONDARY CONTAINMENT. THE OWNER'S REPRESENTATIVE AND KING
COUNTY SHALL REVIEW AND APPROVE THE PLAN PRIOR TO STORAGE.
2. CONSTRUCTION WASTE SHALL BE PROMPTLY REMOVED FROM THE SITE AND SHALL NOT BE
STOCKPILED.
3. NO STATIONARY FUEL TANKS SHALL BE ALLOWED.
4. FUELING OF CONSTRUCTION EQUIPMENT SHALL BE B A MOBILE FUEL TRUCK AND SHALL BE
ALLOWED ONLY IN PAVED AREAS. CONTRACTOR SHALL PROVIDE A PLAN FOR FUELING AREA
SPILL CONTAINMENT TO THE OWNER'S REPRESENTATIVE AND CITY OF RENTON WITH A
PROPOSED METHOD OF SECONDARY CONTAINMENT. THE OWNER'S REPRESENTATIVE AND CITY
OF RENTON, SHALL REVIEW AND APPROVE THE PLAN PRIOR TO FUELING. ALL SPILLS,
CONTAINMENT, AND CLEAN UP SHALL BE THE CONTRACTOR'S RESPONSIBILITY AND AT THEIR
OWN EXPENSE.
5. FUELING OF CONSTRUCTION EQUIPMENT SHALL ONLY BE ALLOWED DURING DAYLIGHT HOURS.
6. THE CONTRACTOR SHALL REMOVE FROM THE SITE ALL EQUIPMENT THAT REQUIRES
SIGNIFICANT REPAIR. MINOR REPAIRS OR MAINTENANCE MAY BE ALLOWED ON SITE IN AN
APPROVED AREA. THE CONTRACTOR SHALL SUBMIT A PLAN FOR THE PROPOSED LOCATION
OF VEHICLE MAINTENANCE AND REPAIR AND SHALL INDICATE THE PROPOSED METHOD OF
CONTAINMENT FOR POSSIBLE LEAKING VEHICLE FLUIDS. THE CONTRACTOR SHALL ALSO
PROVIDE A PLAN TO THE OWNER'S REPRESENTATIVE AND CITY OF RENTON FOR THE
COLLECTION, STORAGE, AND DISPOSAL OF VEHICLE FLUIDS. THE OWNER'S REPRESENTATIVE
AND CITY OF RENTON SHALL REVIEW AND APPROVE PLAN PRIOR TO ANY ON-SITE
MAINTENANCE.
7. TRUCK WASHOUT SHALL NOT BE ALLOWED ON SITE. THE CONTRACTOR SHALL PROVIDE
TRUCK WASHOUT OFF-SITE AT AN APPROVED AND LEGAL LOCATION.
8. CONTRACTOR SHALL PROVIDE TO THE OWNER'S REPRESENTATIVE AND CITY OF RENTON THE
LOCATION OF SPILL RESPONSE MATERIALS. CONTRACTOR WILL ALSO IDENTIFY DISPOSAL
METHODS FOR CONTAMINATED WATER AND SOIL AFTER A SPILL.
9. THE CONTRACTOR SHALL PROVIDE A REPORT TO THE OWNER'S REPRESENTATIVE AND CITY
OF RENTON IDENTIFYING THE PERSONNEL RESPONSIBLE FOR POLLUTION PREVENTION,
INCLUDING CONTACT INFORMATION, AND CLEARLY LISTING THE RESPONSIBILITIES OF THESE
PERSONNEL.
10.THE CONTRACTOR SHALL PROVIDE A DESCRIPTION OF THE PROCEDURES TO BE USED IN
MONITORING THE POLLUTION PREVENTION BMPS AND RESPONDING TO A BMP THAT NEEDS
ATTENTION, INCLUDING RECORD KEEPING.
11.THE CONTRACTOR SHALL PROVIDE A REPORT TO THE OWNER'S REPRESENTATIVE AND CITY
OF RENTON IDENTIFYING THE PERSONNEL RESPONSIBLE FOR SPILL PREVENTION, INCLUDING
CONTACT INFORMATION, AND CLEARLY LISTING THE RESPONSIBILITIES OF THESE PERSONNEL.
12.THE CONTRACTOR SHALL ALSO PROVIDE A DESCRIPTION OF THE PROCEDURES TO BE
USED IN MONITORING THE SPILL PREVENTION BMPS AND RESPONDING TO A SPILL INCIDENT,
INCLUDING RECORD KEEPING.
NTS
SWPPS NOTES 7
9. A TEMPORARY GRAVEL CONSTRUCTION ENTRANCE, 24 FEET X 50 FEET X 8 INCHES OF 4
TO 6 INCH QUARRY SPALLS SHALL BE LOCATED AT ALL POINTS OF VEHICULAR INGRESS
AND EGRESS TO THE CONSTRUCTION SITE.
AA
MS
CITY OF RENTON TESC NOTES
NTS Q
NOT USED O
IN COMPLIA14CE WTH CITY OF RENTON
STANDARDS
BY:/. -aft/0 -AAA
BY: Daft:
Dab: 1,01heBY: Daft:
61. %S5
CLIENT:
ATS AUTOMATION
OLD MILWAUKEE SUBSTATION
450 SHATTUCK AVENUE S.
RENTON, WA 98055
�t -
ARC H 1 T E C T S
WEAVER ARCHITECTS, INC.
141 1 FOURTH AVENUE, SUITE 810
SEATTLE, WASHINGTON 98101
P. 206.262.9622
F. 206.262.9507
All reproduction & intellectual property rights reserved c 2014
911 Western Ave
Suite 420
Seattle, WA 98104
p. 206.725.1211
f. 206.973.5344
engineering plicwww.1piclengineering.com
W�p
r rd
A STRUCTURAL ENGINEERING CORPORATION
2124 Third Avenue - Suite 100 - Seattle, WA 98121
ph: 206.443.6212 fax: 206.443.4870
www.swensonsayfaget.com
Professional seal
J. A�
�� qF WAshj�
'moo + 30766ip
`SSIDNALrt
No.
Issue Description
Date
1
PERMIT SET
5.08.15
2
i
FIRE ACCESS DRIVEWAY
6.12.15
3 A
PERMIT REVISIONS
8.31.15
4
CONSTRUCTION DOCUMENTS
9.15.15
5
TESC
9.25.15
6 ®
PERMIT REVISIONS
10.07.15
I
I
Drawn
Project
by: JLC Reviewed by: LJP
No: 06071 -2015-01
TESC NOTES
Original drawing is 22" x 34". Scale entities accordingly if reduced
C1.3
I D
n
-n4
t
<p
Cal
I z
m
D
9
D
=;
i 7rz
C
G
C i
z
R1
m
m
Cn
I �
D
I D
n
-n4
t
<p
Cal
I z
m
D
9
D
�>
1
'D p
> >
1
>� O