HomeMy WebLinkAbout03809 - Technical Information Report TECHNICAL INFORMATION REPORT - FINAL
(FULL DRAINAGE REVIEW)
O Shuttle Express Parking Lot
Parcel#: 3340406430
Address: 800 SW 16`h Street, Renton, WA
February 10, 2015
Owner:
Peer Frank, LLC
Attn: Devin Sherrell
800 SW 16th Street
Renton, WA 98057
Phone: (425) 981-7069
D C1G
IN C O R P O R A T E D
For Submittal to DAVIDO CONSULTING GROUP, INC .
City of Renton CIVIL • STRUCTURAL • LAND USE
15029 Bothell Way NE, Ste 600 PO Box 1 132
Lake Forest Park, WA 98155 Freeland, WA 98249
Phone: 206.523.0024 Phone: 360.331.4131
Fax: 206.523.1012 Fax: 360.331.7394
380
Technical Information Report—Final
Shuttle Express Parking Lot-800 SW 16th Street February 10, 2015
CERTIFICATE OF ENGINEER
a
The technical material and data contained within this report has been prepared by or under the
direction of the following registered professional engineer(s), licensed in accordance with the rr '
laws of the State of Washington to practice in the State of Washington.
f( o. d
ri ►avi
e:
Jam . .02 it
/0NAL E
Davido Consulting Group,Inc. Page i
TIR_Shuttle Express_Final.doc ,,
Technical Information Report—Final
Shuttle Express Parking Lot-800 SW 16th Street February 10, 2015
QUICK REFERENCE PROJECT INFORMATION
General Project Information
Project Description Construction of multiple porous asphalt parking areas totaling
approximately 8,650 SF for Shuttle Express in Renton, WA.
Parcel# 3340406430
Site Address 800 SW 16th St, Renton, WA
Parcel Size 141,425 SF (3.25 Acres)
_ Project Size 43,782 SF (1.01 Acres)
Owner/Developer Peer Frank, LLC
Attn: Devin Sherrell
800 SW 16th Street
Renton, WA 98057
Phone: (425)981-7069
Consulting Engineer Erik Davido, P.E.—Davido Consulting Group, Inc.
15029 Bothell Way NE, Suite 600
Lake Forest Park, WA 98155
Phone: (206) 523-0024
Drainage
fi I Study Area j The study area is the site itself as no surface flow is leaving the
site or entering the site from adjacent properties.
Drainage Full Drainage Review Requirements per the 2009 King County
Requirements Surface Water Design Manual(KCSWDM) and City of Renton
Amendments to the KCSWDM (combination of which is
hereafter referred to as The Manual).
Tributary Drainage Predeveloped Conditions: Redeveloped Conditions:
Area & Land Cover Impervious= 8,880 SF Impervious=20,180 SF
Summary PGIS =6,585 SF PGIS= 14,696 SF
Pervious Surface=34,902 SF Pervious Surface=23,602 SF
Total=43,782 SF Total=43,782 SF
Soils Geotechnical analysis and report completed by Nelson
Geotechnical Associates, Inc.
Drainage Flow Control Best Management Practices(FCBMPs) are
Improvements proposed including permeable pavement.
ESC Measures ESC measures per Full Drainage Requirements
ti
Davido Consulting Group,Inc. Page ii
T TIR_Shuttle Express_Final doc
Technical Information Report- Final A
Shuttle Express Parking Lot- 800 SW 16th Street February 10,2015
TABLE OF CONTENTS
1. Project Overview 5
1.1 General Description of Proposal 5
1.2 Existing Site Conditions 6
1.3 Developed Site Conditions 6
1.4 Site Area and Size of Improvements 6
1.5 Disposition of Stormwater before Project 7
1.6 Disposition of Stormwater after Project 7
1.7 Soils 7
2. Conditions and Requirements Summary 9
2.1 Core Requirement #1: Discharge at Natural Location 9
2.2 Core Requirement #2: Offsite Analysis 9
2.3 Core Requirement #3: Flow Control 9
2.4 Core Requirement #4: Conveyance System 10
2.5 Core Requirement #5: Erosion and Sediment Control 10
2.6 Core Requirement #6: Maintenance and Operations 10
2.7 Core Requirement #7: Financial Guarantees and Liability 10
2.8 Core Requirement #8: Water Quality 10
2.9 Special Requirement #1: Other Adopted Area-Specific Requirements 10
2.10 Special Requirement #2: Flood Hazard Area Delineation 10 a
2.11 Special Requirement #3: Flood Protection Facilities 10
2.12 Special Requirement #4: Source Control 11 r
2.13 Special Requirement #5: Oil Control 11
2.14 Special Requirement #6: Aquifer Protection Area 11
3. Offsite Analysis 11
4. Flow Control and Water Quality Facility Analysis and Design 11
4.1 Existing Site Hydrology 11
4.2 Developed Site Hydrology 11
4.3 Performance Standards 12
4.4 Flow Control 12
4.4.1 Permeable Pavement Design 12
4.5 Water Quality 13
5. Conveyance System Analysis and Design 13
5.1 Existing Conveyance 13
5.2 Proposed Conveyance 13
6. Special Reports and Studies 14
7. Other Permits 14
8. CSWPPP Analysis and Design 14
8.1 ESC Plan Analysis and Design 14
8.2 Stormwater Pollution Prevention and Spill Plan Design 15
9. Bond Quantities, Facility Summaries, and Declaration of Covenants 16
10. Operations and Maintenance Manual 16
Davido Consulting Group,Inc. Page ill
TIR_Shuttle Express_Final.doc ,,
Technical Information Report—Final
Shuttle Express Parking Lot-800 SW 16th Street February 10,2015
APPENDICES
APPENDIX A Figure 1 -Technical Information Report(TIR) Worksheet
APPENDIX B Geotechnical Report
APPENDIX C Site Improvement Plans
APPENDIX D Temporary Erosion and Sediment Control Plan
APPENDIX E Operation and Maintenance
APPENDIX F Bond Quantity Worksheet
APPENDIX G Stormwater Facility Summary Sheet
APPENDIX H KCRTS Modeling Results
APPENDIX I Emails Between DCG and City of Renton
LIST OF TABLES
TABLE 1 Site Area and Size of Improvements 6
TABLE 2 Proposed ESC Measures and Construction Sequencing 15
LIST OF FIGURES
•
FIGURE 1 TIR Worksheet APPENDIX A
FIGURE 2 Site Location 5
FIGURE 3 Drainage Basins, Subbasins, and Site Characteristics 8
Davido Consulting Group,Inc. Page iv
TIR_Shuttle Express_Final.doc
Technical Information Report—Final s
Shuttle Express Parking Lot-800 SW 16th Street February 10,2015
1. PROJECT OVERVIEW
The project involves the construction of multiple porous asphalt parking areas totaling
approximately 8,650 SF to the south of the existing Shuttle Express building at 800 SW 16th
Street in Renton, Washington(see FIGURE 2). The new parking areas will connect to the
existing parking areas that currently serve the site. The project site is slightly over an acre in area
and is a small portion of a larger parcel. The project will adhere to the 2009 King County Surface
Water Design Manual(KCSWDM)as well as the 2010 City of Renton Amendments to the
KCSWDM,the combination of which is hereafter known as"The Manual". Given The Manual,
the project is subject to Full Drainage Review, as specified in Section 1.1 of The Manual.
This report follows the Technical Information Report(TIR)requirements for Full Drainage
Review per The Manual. The TIR worksheet is attached as FIGURE 1 in APPENDIX A.
1 qh l
` � ` — iLi
-
t. .i�� 0L
, .` C � _� NF aril Sr Nt 4
�
,,,----,AlC s* i- 1
.I'1r 3
' ' , i112r Site
gE
" 1 �— Location ~ *< r
t,\,)
4 • 0r
d'•tc !/;. - f • +, } Cedar Riv
g 219T ST
ri
• (2 ~�\
jsv. O i
4
' ' '' 1 ' '4 ti--- -----------i
0! - `y
y
-i 1i.) i
FIGURE 2 Site Location
1.1 General Description of Proposal
The project involves the construction of multiple porous asphalt parking areas totaling
approximately 8,650 SF with ingress from an existing driveway off of SW 16th Street.A new
egress for a portion of the new parking areas will connect directly to SW 16th Street. The project
will also include site drainage, grading, and landscaping. Frontage improvements to SW 16th
Street, which includes an 8-foot landscape strip and 6-foot wide sidewalk, are included in this
project as well.
Davido Consulting Group,Inc. Page 5
TIR_Shuttle Express_Final.doc -
Technical Information Report—Final
Shuttle Express Parking Lot-800 SW 16th Street February 10,2015
• 1.2 Existing Site Conditions
The existing site is accessed via an asphalt driveway from SW 16th Street. The existing site
conditions include a driveway and parking area to the east of the Shuttle Express building, lawn,
and trees. The majority of the area that will be disturbed will be the lawn area to the south of the
Shuttle Express building. However, a small portion of the existing asphalt parking area will be
replaced with porous asphalt. TABLE 1 summarizes the existing site land cover. The drainage
basin is the project limits itself as no offsite flow enters the site's drainage system.
13 Developed Site Conditions
The developed site conditions, shown in the project plans submitted under separate cover, will
include approximately 8,650 SF of porous asphalt parking lot to the south of the existing Shuttle
Express building. All new parking areas will be used for employee parking only. Stormwater
runoff from the proposed parking areas will infiltrate through the porous asphalt, which will
include a 6 or 12 inch thick storage layer of rock for stormwater storage(depth dependent on
traffic loading). TABLE 1 summarizes the developed site conditions and land cover and the
developed site drainage basin is shown in FIGURE 3.
1.4 Site Area and Size of Improvements
The pre-developed and developed site area and size of improvements are shown in FIGURE 3
and summarized in TABLE 1.
TABLE 1 Site Area and Size of Improvements
Project Site Areas
Existing Developed
SF Acres SF Acres
Impervious Areas:
Concrete Walkway 1,900 0.04 1,900 0.04
Asphalt 6,585 0.15 6,054 0.14
Gravel 395 0.01 346 0.01
Porous Asphalt 8,642 0.20
Concrete Sidewalk 3,238 0.07
Total Impervious Surface 8,880 0.20 20,180 0.46
Total New/Replaced
Impervious Surface: 11,880 0.27
Total Pollution Generating
Impervious Surface: 6,585 0.15 14,696 0.34
Total New/Replaced Pollution
Generating Impervious
Surface: 8,642 0.20
Pervious Areas:
Landscaping/Grass 34,902 0.80 23,602 0.54
Total Pervious Surface 34,902 0.80 23,602 0.54
Total Project Site Area 43,782 1.01 43,782 1.01
The land cover areas in TABLE 1 were determined by area measurements in AutoCAD from a
topographic survey performed on May 15, 2013. As shown by TABLE 1, the developed site is
adding 11,880 SF of new impervious surface. The porous asphalt parking areas will make up the
Davido Consulting Group,Inc. Page 6
TIR_Shuttle Express_Final.doc
Technical Information Report—Final _3
Shuttle Express Parking Lot-800 SW 16th Street February 10,2015
entirety of the new pollution generating impervious surface (8,642 SF)and represents the area
that will infiltrate through the permeable pavement. The new concrete sidewalk will be located in
the City right-of-way(3,114 SF of the subject property will be dedicated to the right-of-way as a
part of this project) and will sheet flow through an 8-foot landscape strip towards SW 16th Street.
1.5 Disposition of Stormwater before Project
As shown by TABLE 1,the majority of the existing site coverage is grass.Any stormwater
runoff that does not infiltrate sheet flows southerly across the site into a catch basin near the
south property line. The catch basin connects to the city's storm system on the north side of SW
16`h Street.
1.6 Disposition of Stormwater after Project
The developed site stormwater will infiltrate through the porous asphalt where there will be a 6
or 12-inch rock pocket underneath for storage.The permeable pavement facility is sized to
handle all the stormwater from a 100-year storm. Only during extreme events (greater than any
event in the available data in KCRTS), a rain on snow event for example, or if the permeable
pavement gets clogged and is unable to allow stormwater to infiltrate, will stormwater overflow
through the permeable pavement facility and sheet flow away from the existing building and into
natural vegetation. Runoff from the new sidewalk will sheet flow through an eight-foot
landscape strip prior to entering the city's storm system in SW 16th Street(see APPENDIX C for
the site improvement plans).
1.7 Soils
A geotechnical investigation was completed by Nelson Geotechnical Associates, Inc. (NGA).
The results of this investigation are summarized in a report dated June 21, 2013;a copy of the
report is attached in APPENDIX B. The NGA report includes investigation findings and
recommendations for the stormwater infiltration system.NGA dug four test pits on June 3, 2013
to depths between 8.5-feet and 12.0-feet. In all four test pits topsoil and grass was underlain by
approximately 3.8-feet to 4.8-feet of medium dense to dense, brown gray fine sand with silt,
trace gravel and varying amounts of organics which is thought to be undocumented fill. Below
the fill layer is a loose/soft, iron-oxide stained, native alluvium soils layer. All four test pits were
terminated within the alluvium soils layer. NGA also conducted two on-site infiltration tests in
the parking lot area. The measured infiltration rates from the two tests were 6.92 and 13.84
inches per hour. However, based on their observations and the varying nature of the underlying
soils throughout the site,NGA recommended using a 0.5 inch per hour infiltration rate for
stormwater modeling, thus applying a factor of safety greater than 13.
The Manual requires a minimum of three feet of permeable soil below the bottom of an
infiltration facility, and at least three feet of separation from the bottom of the infiltration facility
to the maximum wet-season water table. The NGA geotechnical report states that because the
subsurface soils have a high silt content and indications of shallow groundwater, the site
subsurface soils are poorly suited for traditional stormwater infiltration trenches. However, NGA
does recommend the use of pervious pavement surfacing to allow runoff from the parking lot to
infiltrate into the granular fill layer found within the site. The full NGA report is attached in
APPENDIX B.
Davido Consulting Group,Inc. Page 7
TIR_Shuttle Express_Final.doe
N 1p * L. A,
.� LEGEND : AREAS CALLS :
ch
Hatch denotes impervious Proposed Impervious Areas:
CL SCALE INFEET surface draining to permeable Porous Asphalt 8,642 SF (0.20 AC)
pavement Concrete Sidewalk 3,238 SF (0.07 AC)
Hatch denotes new/replaced
o pervious surface Total New/Replaced Imp. Area
z 11,880 SF (0.27 AC)
Q Hatch denotes impervious
0_ surface draining to City Total New/Replaced Pervious Area
o of Renton's storm system 12,159 SF (0.28 AC)
W
rt
w ° Existing Parking p Existing Parking I
Lii
cc Lot to Remain Lot to Remain —\
W
Existing Pervious
K Surface to Remain ....__________0___________
N e
h. N Existing Pervious 1
"o
( p.2 :T e O ; e Surface to Remain -
' ar m
flit
~ sn
m t
m u,
wlW
m Ir. /r �" / ®� Jam.
a ^ A �� ♦ .
„ ny j..- N .a/C 6 m „A,
� °
.
..
t \/ NNT ` pF 2
O ©
PO O
oQ
r .,L.
a” xm �Eot
Io b 0
N=�
„� p
RIF.50 —
6 441.111411.1) /
,. O
— tJ - 9
g _T.—� � e
a .s ' ., e
Q
Y »
1 ..... . SW 16TH STREET w
w
'I INCOMPLIANCEST/MARCO Of IENTON
ST/MARCO
CALL 2 DAYSBEFORE ` ,.,.,«.. V U a _sP
BY °Y
c?
I1-800-424-5555
-800— YOU DIG %
1-800—AREA PRO%I ":,
IUNDERGNOJND UTILITY er BY Etwo
°.M
�OCAlION6 ARE APPNO%.I O..
/ BASE PROADEDLef
*` `FOR KiC1JRACY Dnhno C(XiSN.TN(.'GAOEm.lnc. f .uo '/N i° As Niro .. r,*. CITY OF
SHUTTLE EXPRESS-NENTON PARKING LOT �n/2+/sD++
ILL OTHER EY,I571140.4=4442 cM•svMM�..PLy u. ' '� R �..,......",....N.... . .....,� , e ... RENTON BaESNWrON WAT °"1
40AB SPONNANDOR RAM Pbnn:p/Nulltl'mg/Pu01.W.r.D.P:. a CO3
om PNTEOOR A$IO wnw*�iON i.r.P 502, .&wn a..euo 01
'" ,2 11.st1F1111.'.1 FssON No REVISION BY EWE MON ^EON w.vo «�•n. SITE PLAN T
m. Al--INININ N AIA
FIGURE 3 — DRAINAGE BASINS , SUBBBASINS , AND SITE CHARACTERISTICS
Technical Information Report—Final .,
Shuttle Express Parking Lot-800 SW 16th Street February 10,2015
•
2. CONDITIONS AND REQUIREMENTS SUMMARY
The project conditions and requirements were stipulated in the KCSWDM and by the City of
Renton Amendments to the KCSWDM. The project conditions and requirements are summarized
as follows:
> The project is subject to Full Drainage Review requirements specified in Section 1.1.2 of
the Manual (>2,000 SF impervious surfaces).
> The project is subject to Level 1 flow control (or Peak Rate Flow Control Standard).
> The project is subject to enhanced water quality requirements (>5,000 SF new or replaced
PGIS will be created at a site classified as industrial).
The following sections address The Manual's core and special requirements.
2.1 Core Requirement#1: Discharge at Natural Location
The proposed drainage system has been sized to infiltrate the 100-year storm onsite. Therefore,
the proposed drainage system will emulate the natural pre-developed conditions of the site as
much as possible and any overflow will enter the downstream drainage system and maintain the
natural drainage course from the site,thus satisfying Core Requirement#1 of The Manual(see
Sections 1.5 and 1.6).
2.2 Core Requirement#2: Offsite Analysis
Stormwater will be infiltrated onsite through a permeable pavement facility and the project will
not change the rate, volume, duration, or location of discharges to and from the site. Therefore,
the project is not required to submit an offsite analysis report based on exemption#3 on Page 1-
21 of the Renton Amendments to the KCSWDM.
2.3 Core Requirement#3: Flow Control
Since the project lies within the Peak Rate Flow Control Standard Area and the target surfaces
will not generate more than a 0.1-cfs increase in the existing site conditions 100-year peak flow,
flow control is exempt according to Exception 1 on Page 1-34 of the City of Renton amendments
to the KCSWDM (See Section 4).
Since the project is on a site that is greater than 22,000 square feet and will result in an
impervious surface coverage of less than 45%of the lot the project is subject to Large Lot Low
Impervious BMP Requirements specified in Section 5.2.1.2 of the KCSWDM. Since the required
native vegetative flowpath needed for full dispersion is not present onsite and the project is not
adding any roof areas, full dispersion and full infiltration of roof runoff are not feasible.
Therefore, a BMP listed in Section 5.2.1.2.3 of the KCSWDM must be implemented to the target
impervious surfaces.The project is proposing to use permeable pavement to mitigate runoff from
all target impervious surfaces onsite,therefore satisfying the Large Lot Low Impervious BMP
Requirement. See Section 4 for a detailed description and sizing of the proposed FCBMP.
Davido Consulting Group,Inc. Page 9
TIR_Shuttle Express_Final.doc
,- Technical Information Report—Final
Shuttle Express Parking Lot-800 SW 16th Street February 10,2015
2.4 Core Requirement#4: Conveyance System
N/A. There is no new conveyance system proposed since all stormwater will be infiltrated onsite.
2.5 Core Requirement#5: Erosion and Sediment Control
Erosion and sediment control(ESC) measures have been designed for the project in accordance
with Section 1.2.5 of The Manual to prevent the transport of sediment from the site to adjacent
properties and downstream drainage facilities during construction. Temporary measures include
a stabilized construction entrance, silt fencing, tree protection fencing, and inlet protection at
impacted catch basins. Permanent measures to reduce the potential for erosion includes the
proposed permeable pavement facility and the reseeding of disturbed areas (see ESC plan in
APPENDIX D and Section 8.1).
2.6 Core Requirement#6: Maintenance and Operations
The proposed drainage facilities will follow the operation and maintenance guidelines as
stipulated in Appendix A of The Manual. An operation and maintenance manual consistent with
Appendix A of The Manual has been provided in APPENDIX E of this report.
2.7 Core Requirement#7: Financial Guarantees and Liability
A bond quantities worksheet has been completed and attached as APPENDIX F (see Section 9).
The owner may be required by the city to submit a construction bond for required improvements
and/or a maintenance bond for a portion or the entire amount calculated in the bond quantities
worksheet.
2.8 Core Requirement#8: Water Quality
Since the project site is classified as an industrial site and will add more than 5,000 square feet of
pollution generating impervious surface,enhanced basic water quality is required. However, the
native soils beneath the permeable pavement meet the groundwater protection criteria listed in
Exemption 4 Soil Treatment Exemption listed on Page 1-61 and 1-62 of The Manual. Therefore,
the project is exempt from Core Requirement#8(see Section 4.5).
2.9 Special Requirement#1: Other Adopted Area-Specific Requirements
The project is exempt from Special Requirement#1 because there are no area specific
requirements applicable to the project site.
2.10 Special Requirement#2: Flood Hazard Area Delineation
The parcel in which the project site is located contains a Special Flood Zone which is classified
as a 100-year flood plain. However, no development will occur within the flood plain for this
project. Therefore,the project is exempt from Special Requirement#2.
2.11 Special Requirement#3: Flood Protection Facilities
The project is exempt from Special Requirement#3 because it will not rely on an existing flood
protection facility(such as a levee or revetment) for protection against hazards posed by erosion
or inundation and will not modify or construct a new flood protection facility.
Davido Consulting Group,Inc. Page 10
TIR_Shuttle Express_Final.doc
Technical Information Report—Final
Shuttle Express Parking Lot-800 SW 16th Street February 10,2015
2.12 Special Requirement#4: Source Control
The project is exempt from Special Requirement#4 because the project does not require a
commercial building or commercial site development.
2.13 Special Requirement#5: Oil Control
The project is exempt from Special Requirement#5 because it does not trigger oil control
requirements since the project site is under the high-use site thresholds.
2.14 Special Requirement#6: Aquifer Protection Area
The project is exempt from Special Requirement#6 because it is not located in Zone 1 or Zone 2
of the Aquifer Protection Areas identified in Reference 11-B of The Manual.
3. OFFSITE ANALYSIS
Stormwater from the proposed development will be infiltrated onsite through permeable
pavement(porous asphalt) and the project will not change the rate, volume, duration, or location
of discharges to and from the site. Therefore,the project is not required to submit an offsite
analysis report based on exemption#3 on Page 1-21 of the Renton Amendments to the
KCS WDM.
4. FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND DESIGN
The following sections summarize the stormwater flow control and water quality facility analysis
and design.
4.1 Existing Site Hydrology
The existing site is mostly grass with some landscaping and generally slopes southerly away
from the existing building. The underlying soils are undocumented fill and alluvium with an
estimated infiltration rate of 0.5 inches per hour(see section 1.7 and APPENDIX B for more
information on the site soils). Any surface water that does not infiltrate sheet flows towards SW
16th Street and enters the city's storm system. See Section 1.2 and TABLE 1 for more
information on the existing site.
4.2 Developed Site Hydrology
The onsite development will consist of approximately 11,900 square feet (0.27 acres)of new
plus replaced impervious surface. The new and replaced impervious surface will be permeable
pavement, with the majority of the permeable pavement replacing existing grass, and new
concrete sidewalk fronting the site. Runoff from the sidewalk will sheet flow through an 8-foot
landscape strip prior to entering the City's storm system in SW 16th Street.The permeable
pavement will have an underlying rock pocket large enough to detain and infiltrate the 100-year
storm. See FIGURE 3 for the developed drainage basin map and APPENDIX B for onsite soils
information. See Sections 4.4 for more information on the permeable pavement facility design.
Davao Consulting Group,Inc. Page 1 1
TIR_Shuttle Express_Final.doc
,_ Technical Information Report—Final
Shuttle Express Parking Lot-800 SW 16th Street February 10,2015
4.3 Performance Standards
• The project site lies within the Peak Rate Flow Control Standard area determined from
the City of Renton Flow Control Applications Map and must comply with the
requirements stipulated in Section 1.2.3.1 of The Manual. However, the project is exempt
from all flow control requirements because it will not generate more than a 0.1-cfs
increase in the existing site conditions 100-year peak flow(Exception 1 on Page 1-34 of
The Manual).
• The project is subject to Large Lot Low Impervious BMP Requirements. Permeable
Pavement will be used to satisfy this requirement.
• The project site is an industrial site and is subject to the Enhanced Basic Water Quality
Menu as stipulated by The Manual. However, the project will comply with the criteria of
Exemption#4 Soil Treatment Exemption on Page 1-61 and 1-62 of The Manual and is
therefore exempt from water quality requirements.
4.4 Flow Control
As discussed in Section 2.3 and 4.3,the project is exempt from flow control requirements
according to Exception 1 on Page 1-34 of the City of Renton's Amendments to the KCSWDM
since the project lies within the Peak Rate Flow Control Standard and will not generate more
than a 0.1-cfs increase in the existing site conditions 100-year peak flow. The 100-year peak
flows from the existing conditions on the project site and the developed conditions were
determined in KCRTS using hourly time-steps as required on Page 3-10 of the KCSWDM. As
specified in Table 1.2.3.0 from the City of Renton Amendments to the KCSWDM, the
y permeable pavement was modeled as 50% impervious surface and 50%grass. The 100-year peak
flow is 0.264-cfs from the existing conditions on the project site and 0.297-cfs from the
developed conditions. See APPENDIX H for the modeling results from KCRTS. The permeable
pavement includes a 6-inch rock pocket for stormwater storage.The rock storage layer has been
sized in KCRTS and in accordance with The Manual. The tributary area to the infiltration facility
is the permeable pavement parking lot itself. The developed areas used in the modeling for sizing
of the storage layer are seen in APPENDIX H and the design approach is explained in Section
4.4.1.
The Large Lot Low Impervious BMP Requirement will be satisfied with the use of permeable
pavement. The project is proposing to use permeable pavement to mitigate runoff from all target
impervious surfaces onsite.
4.4.1 Permeable Pavement Design
The permeable pavement parking lot was designed in accordance with Section C.2.6 of the
KCSWDM which requires a minimum of 6-inches of free-draining sand or gravel base below the
permeable pavement. To ensure that a 6-inch rock layer is thick enough to handle runoff from a
100-year storm, the permeable pavement facility was sized in the KCRTS continuous event
modeling program. The infiltration rate used, 0.5 inches per hour, was stipulated by the
geotechnical engineer, Khaled Shawish, in his memo dated June 21, 2013 and provides a factor
of safety greater than 13 to the measured infiltration rates shown on Table 1, Page 4,of the
geotechnical memorandum(see APPENDIX B for the full geotechnical memorandum). The
facility was sized by iteratively increasing the depth of rock pocket until the area required for
David()Consulting Group,Inc. Page 12
TIR_Shuttle Express_Final.doc
Technical Information Report—Final
Shuttle Express Parking Lot-800 SW 16th Street February 10,2015
storage was less than the area of the rock pocket. Since the rock pocket cannot be less than 6-
inches thick,this was the beginning rock pocket depth used in the modeling. Modeling results
show that a 6-inch rock pocket is sufficient to fully detain and infiltrate all stormwater and adds a
factor of safety greater than 2 to the required depth. For a portion of the parking lot that will be
exposed to heavy loading a 12-inch base course is required for structural stability,thus providing
more stormwater storage than required. See APPENDIX H for detailed KCRTS modeling
results. The Drainage Plan submitted under separate cover shows the layout of the permeable
pavement areas.
4.5 Water Quality
The entire new and replaced pollution generating impervious surface for the project consists of
the permeable pavement parking areas. Although the project will be adding in excess of 5,000 SF
of PGIS,the project is exempt from water quality requirements since the native soils beneath the
parking areas meet the groundwater protection criteria listed in Exemption 4: Soil Treatment
Exemption on Page 1-61 and 1-62 of The Manual.
Four soil samples from the project site, provided by Nelson Geotechnical, Inc.,were analyzed for
CEC and organic content by Analytical Resources, Inc. The two soil samples analyzed for
organic content consisted of 1.47%and 0.94%organic content, which are both above the
required 0.5%or greater organic content requirement stipulated in the Soil Treatment Exemption
section of The Manual. The results of the two soil samples analyzed for CEC were 4.30 and 4.69 •
meq/100g CEC, which are both slightly below the required 5 meq/100g CEC stipulated in the
Soil Treatment Exemption section of The Manual. However, Kamran Yazdidoost,the plan
reviewer at the City of Renton, confirmed via email that the native soils may be used to satisfy
the water quality treatment requirement despite the tested soil samples having slightly below the
required level of CEC. See APPENDIX I for the email thread between DCG and Kamran
Yazdidoost.
5. CONVEYANCE SYSTEM ANALYSIS AND DESIGN
The existing and proposed conveyance systems are discussed in the following sections.
5.1 Existing Conveyance
There is an existing Type 1 catch basin located in a grass area near the south property line. The
catch basin captures sheet flow from the grass area in which it is located and conveys it southerly
to a Type 2 catch basin in the north side of SW 16th Street via an 8-inch PVC pipe. The Type 1
catch basin and 8-inch PVC pipe will be removed as a part of this project.
An existing Type 1 catch basin is also located in the parking area east of the Shuttle Express
building. In addition,a trench drain is located near the entrance of the driveway along the east
side of the site. Both drainage structures receive runoff from the existing driveway and parking
lot and will remain and are to be cleaned if necessary.
5.2 Proposed Conveyance
N/A. There is no proposed conveyance system since runoff from all proposed impervious surface
onsite will be infiltrated through the permeable pavement.
Davido Consulting Group,Inc. Page 13
TIR_Shuttle Express_Final.doc
Technical Information Report—Final
Shuttle Express Parking Lot-800 SW 16th Street February 10,2015
• 6. SPECIAL REPORTS AND STUDIES
A geotechnical report was completed by Nelson Geotechnical Associates, Inc. (NGA)on June
21, 2013.NGA dug four test pits on June 3, 2013 to depths between 8.5-feet and 12.0-feet. All
four test pits encountered undocumented fill to depths of 3.8-feet to 4.8-feet. Test Pit locations
are shown on the Schematic Site Plan in APPENDIX B. See TABLE 1 for existing ground
cover. See the Geotechnical memorandum in APPENDIX B for the full geotechnical report.
7. OTHER PERMITS
Other permits required for this project include:
• Administrative Site Plan Review
• Washington State Environmental Policy Act (SEPA) Review
8. CSWPPP ANALYSIS AND DESIGN
This section summarizes the construction stormwater pollution prevention plan (CSWPPP)
analysis and design. The two components of the CSWPPP are the erosion and sediment control
(ESC)and the stormwater pollution prevention and spill(SWPPS) plans. Both the ESC Plan and
SWPPS serve as guides as the contractor is required to design a working CSWPPP for the site.
The analysis and design of these plans are discussed in the following sections.
•
8.1 ESC Plan Analysis and Design
' The ESC design follows the guidelines provided in Appendix D of The Manual and is intended
to satisfy Core Requirement#5 Erosion and Sediment Control.
A stabilized entrance will be maintained throughout construction of the site improvements. Silt
fencing will be installed downslope of the improvements. Chain link fencing will be used to
protect all trees that are to be preserved onsite. Street cleaning on SW 16th Street will occur daily
or as needed to remove any sediment tracked from the site. Site surface drainage will be
maintained to prevent any ponding and inlet protection will be provided at all existing catch
basins that may receive runoff during construction. All disturbed areas that will not be paved will
be stabilized by planting and mulching immediately after construction. The proposed ESC
measures are shown on the Temporary Erosion and Sediment Control Plan in APPENDIX D.
An ESC supervisor will be designated for the project and must be a Certified Professional in
Erosion and Sediment Control or a Certified Erosion and Sediment Control Lead, as recognized
by King County. The ESC supervisor will be responsible for the performance, maintenance, and
review of all ESC measures, as well as the compliance with all permit conditions relating to ESC
as described in The Manual.
Davido Consulting Group,Inc. Page 14
TIR Shuttle Express_Final.doc
Technical Information Report—Final
Shuttle Express Parking Lot-800 SW 16th Street February 10,2015
TABLE 2 Proposed ESC Measures and Construction Sequencing
(all ESC Measures Shall Comply with the KCSWDM Appendix D)
ESC Measure Comment
1 Identify Project Limits Mark by fencing or other means to contain the
grubbing and grading activities. This includes
installing temporary chain link fencing around
trees that are to remain.
2 Install temporary silt fence Install fence down-slope of the improvements.
3 Construct stabilized Use existing gravel driveway for construction
construction entrance entrance or construct new temporary entrance if
necessary(i.e., sediment tracked onto road).
4 Install inlet protection as Ensure that sediment cannot enter the existing
required, based on drainage system.
construction sequencing
5 Maintain ESC measures Relocate or install new measures if necessary to
meet King County ESC standards(KCSWDM
Appendix D).
6 Street Cleaning Provide for periodic street cleaning to remove
and sediment that may have been tracked out.
Sediment should be removed by shoveling or
sweeping and carefully removed to a suitable
disposal area where it will not be re-eroded.
7 Inspect downstream Verify that all drainage system components free
drainage system, clean if of sediment. If sediment present then repair or
necessary during implement additional ESC measures.
construction.
8 Surfacing and Sod/Seed Construct pavement, sidewalks, etc. as soon as
Exposed Areas possible. Cleared areas will be sod/seeded as
soon as possible after grading completed.
9 Remove ESC measures After hard surfaces are constructed and cleared
after site stabilized and areas are stabilized, remove ESC measures and
clean system. clean any sediment/debris in drainage system.
8.2 Stormwater Pollution Prevention and Spill Plan Design
The SWPPS plan is intended to prevent pollutants from coming into contact with stormwater
runoff, surface waters, or groundwater, during construction. Vehicles, construction equipment,
materials, chemical storage,and sediment from clearing and grading all have the potential to
pollute stormwater during construction. The following BMPs are required during the
construction of this project:
• Maintain good housekeeping.
• Designate vehicle, equipment, and chemical storage areas.
Davulo Consulting Group,Inc. Page 15
TIR_Shuttle Express_Final.doc
Technical Information Report—Final
Shuttle Express Parking Lot-800 SW 16th Street February 10,2015
• Inspect vehicle, equipment, and petroleum product storage and dispensing areas regularly
to detect any leaks or spills.
• Store and contain liquid materials in such a manner that if the tank leaks, the contents
will not discharge into the storm drainage system, surface waters, or groundwater.
• Provide maintenance and cleaning of the storm drainage system regularly by removing
sediment and debris.
• All spills will be cleaned up immediately and disposed correctly. Do not hose down spill
areas to a storm drainage system.
• All toxic materials will be stored under cover when not in use or during a rain event.
• Use storm drain covers or other similarly effective runoff control measures to prevent
sediment and other pollutants from entering catch basins.
All ESC and SWPPS BMPs will be inspected routinely by the ESC supervisor. All ESC
measures will be removed, the site stabilized, and the drainage system cleaned once construction
is completed.
9. BOND QUANTITIES,FACILITY SUMMARIES,AND DECLARATION OF
COVENANTS
The bond quantities, facility summaries, and declaration of covenants/agreements are addressed
in the following sections.
• Bond Quantities—The bond quantities for the project are calculated in King County's
Bond Quantity Worksheet attached in APPENDIX F.
• Facility Summaries—The stormwater facilities are summarized in the Stormwater
Facility Summary Sheet attached in APPENDIX G.
• Declaration of Covenants/Agreements—A declaration of covenant for privately
maintained flow control and WQ facilities will be provided under separate cover at a later
date.
10. OPERATIONS AND MAINTENANCE MANUAL
All stormwater facilities should be maintained in accordance with Appendix A of the
KCSWDM, which is attached in APPENDIX E. Maintenance of the porous asphalt is crucial in
maintaining an infiltrating surface course.
Davulo Consulting Group,Inc. Page 16
TIR_Shuttle Express_Final.doc
Technical Information Report—Final
Shuttle Express Parking Lot- 800 SW 16th Street February 10, 2015
APPENDIX A Figure 1 - Technical Information Report (TIR)
Worksheet
TIR_Shuttle Express_Final.doc
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 1 PROJECT OWNER AND Part 2 PROJECT LOCATION AND
PROJECT ENGINEER DESCRIPTION
Project Owner Devin Sherrell Project Name Shuttle Express Parking
425-981-7069 T'"r
Phone DDES Permit#
Address 800 SW 16th Street Location Township 23N
Renton, WA 98057 Range 4E
Project Engineer Erik Davido, P.E. Section 24
Company Davido Consulting Group, Inc. Site Address 800 SW 16th Street
Phone 206-523-0024 Renton, WA 98057
Part 3 TYPE OF PERMIT APPLICATION Part 4 OTHER REVIEWS AND PERMITS
❑ Landuse Services ❑ DFW HPA U Shoreline
Subdivison / Short Subd. / UPDManagement
U COE 404
❑ Building Services ❑ DOE Dam Safety 1:1 Structural
M/F/Commerical / SFR Rockery/Vault/
Clearing and Grading
❑ FEMA Floodplain ❑ ESA Section 7
LI COE Wetlands
alRight-of-WayUse
CI Other ❑ Other
Part 5 PLAN AND REPORT INFORMATION
Technical Information Report Site Improvement Plan (Engr. Plans)
Type of Drainage Review ® Targeted / Type (circle one): ® Modified /
(circle): Large Site Small Site
Date (include revision 1/16/2014; 9/05/2014 Date (include revision 1/16/2014; 9/05/2314
dates): 11121/2014 dates): 11/21/2014
Date of Final: 2/10/2015 Date of Final: 2/10/2015
Part 6 ADJUSTMENT APPROVALS
Type(circle one): Standard / Complex / Preapplication / Experimental/ Blanket
Description: (include conditions in TIR Section 2)
N/A
Date of Approval:
2009 Surface Water Design Manual 1/92009
1
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 7 MONITORING REQUIREMENTS
Monitoring Required: Yes No Describe:
Start Date:
Completion Date:
Part 8 SITE COMMUNITY AND DRAINAGE BASIN
Community Plan :
Special District Overlays:
Drainage Basin: Lower Green River Subwatershed
Stormwater Requirements: Level 1 Flow Control and Basic Water Quality
Part 9 ONSITE AND ADJACENT SENSITIVE AREAS
❑ River/Stream ❑ Steep Slope
❑ Lake ❑ Erosion Hazard
❑ Wetlands ❑ Landslide Hazard
❑ Closed Depression ❑ Coal Mine Hazard
❑ Floodplain U Seismic Hazard
❑ Other ❑ Habitat Protection
Part 10 SOILS
Soil Type Slopes Erosion Potential
Undocumented Fill 0-10% Low
U High Groundwater Table (within 5 feet) U Sole Source Aquifer
❑ Other ❑ Seeps/Springs
U Additional Sheets Attached
2009 Surface Water Design Manual 1/92009
2 ,
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 11 DRAINAGE DESIGN LIMITATIONS
REFERENCE LIMITATION/SITE CONSTRAINT
❑ Core 2-Offsite Analysis
❑ Sensitive/Critical Areas
❑ SEPA
U Other
❑ Additional Sheets Attached
_ Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet per Threshold Discharge Area)
Threshold Discharge Area:
(name or description) Project Site
Core Requirements (all 8 apply)
Discharge at Natural Location Number of Natural Discharge Locations: 1
Offsite Analysis Level: 1 / 2 / 3 dated:
Exempt by full-infiltration
Flow Control Level: 1 2 / 3 or Exemption Number Exception 1
(incl. facility summary sheet) Small Site MPs (Page 1-34 of Manual)
Conveyance System Spill containment located at: NA
Erosion and Sediment Control ESC Site Supervisor: TBD
Contact Phone:
After Hours Phone:
Maintenance and Operation Responsibility: ..rivate�/ Public
If Private, Maintenance Log Required: es /No
Financial Guarantees and Provided: (Yes-' No
Liability
Water Quality Type: Basic / Sens. Lake / Enhanced Basicm / Bog
(include facility summary sheet) or Exemption No. 4 . Soil Treatment Exemption
Landscape Management Plan: es / No
Special Requirements (as applicable)
Area Specific Drainage Type: CDA/SDO/MDP/BP/LMP/Shared Fac. None
Requirements Name:
Floodplain/Floodway Delineation
Type: Major / Minor / Exemption / None
100-year Base Flood Elevation (or range):
Datum:
Flood Protection Facilities Describe: NA
Source Control Describe landuse:
(comm./industrial landuse) Describe any structural controls:
2009 Surface Water Design Manual 1/9 2009
3
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Oil Control High-use Site: Yes /0
Treatment BMP:
Maintenance Agreement: Yes / No
with whom?
Other Drainage Structures
Describe:
Part 13 EROSION AND SEDIMENT CONTROL REQUIREMENTS
MINIMUM ESC REQUIREMENTS MINIMUM ESC REQUIREMENTS
DURING CONSTRUCTION AFTER CONSTRUCTION
❑ Clearing Limits © Stabilize Exposed Surfaces
0 Cover Measures 0 Remove and Restore Temporary ESC Facilities
0 Perimeter Protection X❑ Clean and Remove All Silt and Debris, Ensure
El Traffic Area Stabilization Operation of Permanent Facilities
® Sediment Retention © Flag Limits of SAO and open space
preservation areas
® Surface Water Collection ❑ Other
0 Dewatering Control
0 Dust Control
❑ Flow Control
Part 14 STORMWATER FACILITY DESCRIPTIONS (Note: Include Facility Summary and Sketch)
Flow Control Type/Description Water Quality Type/Description
❑ Detention ❑ Biofiltration
® Infiltration Permeable ❑ Wetpool
Pavement
❑ Regional Facility ❑ Media Filtration
❑ Shared Facility ❑ Oil Control
❑ Flow Control ❑ Spill Control
BMPs
© Flow Control BMPs
❑ Other
❑ Other
2009 Surface Water Design Manual 1/9,2009
4
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 15 EASEMENTS/TRACTS Part 16 STRUCTURAL ANALYSIS
❑ Drainage Easement ❑ Cast in Place Vault
❑ Covenant ❑ Retaining Wall
❑ Native Growth Protection Covenant ❑ Rockery>4' High
❑ Tract U Structural on Steep Slope
❑ Other ❑ Other
Part 17 SIGNATURE OF PROFESSIONAL ENGINEER
I, or a civil engineer under my supervision, have visited the site. Actual site conditions as observed were
incorporated into this worksheet and the attached Technical Information Report. To the best of my
knowledge the information provided here is accurate.
Digitally signed by Erik Davido
Date:2015.02.11 09:00:32-0600'
Signed/Date
2009 Surface Water Design Manual 1/9,2009
5
Technical Information Report—Final _-
Shuttle Express Parking Lot-800 SW 16th Street February 10,2015
APPENDIX B Geotechnical Report
Davido Consulting Group,Inc.
TIR_Shuttle Express_Final.doc
NELSON GEOTECHNICAL
►• A ASSOCIATES, INC.
GEOTECHNICAL ENGINEERS & GEOLOGISTS
Main Office Engineering-Geology Branch
17311—135'"Ave NE,A-500 5526 Industry Lane,#2
Woodinville,WA 98072 East Wenatchee,WA 98802
(425)486-1669•FAX(425)481-2510 (509)665-7696 FAX(509)665-7692
June 21,2013
Peer Frank, LLC
c/o Devin Sherrell
800 SW 16th Street
Renton,Washington 98057
Geotechnical Engineering Evaluation
Shuttle Express Parking Lot and Infiltration
800 SW 16'h Street
Renton,Washington
NGA File No. 875613
Dear Mr. Sherrell:
This letter documents our explorations and provides our opinions and recommendations for the proposed
parking lot construction and stormwater infiltration at the existing Shuttle Express office building located
at 800 SW 16th Street in Renton,Washington,as shown on the vicinity map in Figure 1.
INTRODUCTION
The planned improvements will consist of constructing an approximately 16,000 square foot parking lot
within the southern portion of the property along SW 16th Street, along with associated underground
utilities, and a stormwater management system on the property. The site is currently occupied by a multi-
level office building within the central portion of the property with associated parking areas on the north,
east and west sides of the building. The existing and proposed site layouts are shown on the Schematic
Site Plan in Figure 2. For our use in preparing this letter, you have provided us with an aerial image of
the property showing the proposed location of the parking lot area.
Stormwater Infiltration Letter June 21,2013
Shuttle Express Parking Lot and Infiltration NGA File No. 875613
Renton,Washington Page 2
SCOPE
The purpose of this study is to explore and characterize the subsurface conditions in specific areas of the
site and to provide opinions and recommendations for the proposed parking lot and the potential for
stormwater infiltration. Specifically, our scope of services includes the following:
1. Review existing soils and geologic maps of the area.
2. Explore the site subsurface soil and groundwater conditions with backhoe-excavated test
pits. Backhoe to be subcontracted by NGA.
3. Perform on-site infiltration testing.
4. Perform laboratory analysis on representative soil samples,as needed.
5. Provide recommendations for stormwater infiltration per 2009 King County Surface
Water Design Manual and City of Renton Ammendments.
6. Provide recommendations for pavement subgrade preparation and pavement sections.
7. Provide recommendations for site drainage and erosion control.
8. Provide recommendations for infiltration system installation.
9. Document the results of our explorations, findings, conclusions, and recommendations in
a written geotechnical engineering report.
SITE CONDITIONS
Surface Conditions
The site is a relatively level, rectangular shaped lot covering approximately 3.25 acres. The site is
bounded to the north by Interstate 405, to the east and west by commercial properties and to the south by
SW 16th Street. An existing multi-level office building is located within the central portion of the site
with asphalt parking and driveway areas along the north, east and west sides of the building. The
proposed parking lot expansion is to be located within a grass lawn area to the south of the office building
along SW 16th Street. We did not observe surface water on the site during our visit on June 3,2013.
Subsurface Conditions
Geology: The site is mapped on the Geologic Map of the Renton Quadrangle,King County, Washington,
by D.R. Mullineaux (1965). The site is mapped as Alluvium(Qaw). The alluvium deposits are described
as sand silt and clay deposits. Our explorations generally encountered undocumented fill soils underlain
by silty sand to silt deposits generally consistent with the description of alluvium at depth.
NELSON GEOTECHNICAL ASSOCIATES, INC.
Stormwater Infiltration Letter June 21,2013
Shuttle Express Parking Lot and Infiltration NGA File No. 875613
Renton,Washington Page 3
•
Explorations: The subsurface conditions within the site were explored on June 3, 2013 by excavating
four test pits with a backhoe. The approximate locations of our explorations are shown on the Schematic
Site Plan in Figure 2. A geologist from Nelson Geotechnical Associates, Inc. (NGA)was present during
the explorations;collected samples of the soils encountered,and maintained logs of the explorations. The
soils were visually classified in general accordance with the Unified Soil Classification System,presented
as Figure 3. The logs of the explorations are presented as Figure 4.
Each of the test pits exposed a surficial layer of topsoil and grass to a depth of 0.2 feet below the existing
ground surface. Underlying the topsoil and grass in all of our test pits we encountered approximately 3.8
to 4.8 feet of medium dense to dense,brown gray fine sand with silt,trace gravel and varying amounts of
organics which we interpreted as undocumented fill. Below the fill in all of our test pits,we encountered
loose/soft,iron-oxide stained,brown gray to gray silty sand and sandy silt with varying amounts of gravel
and organics underlain by soft to very soft, blue gray to gray sand, silt with abundant orgaincs that we
interpreted as native alluvium soils mapped for the area. All of our test pits were terminated within the
native alluvium soils at depths in the range of 8.5 to 12.0 feet below the existing ground surface.
Hydrologic Conditions
Groundwater seepage was observed at approximately 11.0 and 7.5 feet below the ground surface in Test
Pit 1 and 3, respectively. hi addition, zones of iron oxide staining and saturated soil conditions were
encountered within all of the test pits between approximately 4.0 to 12.0 feet. In our opinion, the
groundwater seepage, iron oxide staining and saturated soil conditions are indicative of the high
groundwater table associated with the nearby river.
SEISMIC HAZARD
The site is shown on the Liquefaction Susceptibility of the Renton Ouadrangle,Washington by Stephen P.
Palmer, Henry W. Schasse, Dave K. Norman, et. al. (WSDNR, 1994) to have a high liquefaction
potential. Liquefaction is the temporary loss of the shear strength of a loose soil deposit (usually
submerged clean fine to medium sand)due to a rise in pore water pressures during a seismic event. When
subjected to prolonged cyclic dynamic loads,the pore pressures within a saturated sand deposit increase,
approaching the total overburden pressure. At that time, a"quick"condition develops causing the soil to
temporarily lose its load carrying ability. Depending on the depth to the liquefiable soils and actual loads,
surface settlements can result from liquefaction.
NELSON GEOTECHNICAL ASSOCIATES, INC.
Stormwater Infiltration Letter June 21,2013
Shuttle Express Parking Lot and Infiltration NGA File No. 875613
Renton,Washington Page 4
The majority of the site soils at depth within our explorations consisted of low permeability silts and silty
sand. We did not encounter saturated clean sand layers within our explorations. However, clean sand
layers under groundwater table may exist at depth underlying the site. Based on the soils encountered
within our explorations, we expect the liquefaction potential for the upper site soils to be low. However,
there may be some potential of liquefaction of soil layers at depth below the site, but in our opinion we
would anticipate the impact to the site would be minimal.
ON-SITE INFILTRATION TESTING
We conducted two on-site infiltration tests in the proposed parking lot area. The infiltration tests were
performed within the upper granular fill and underlying native silty sand soils within the parking lot area.
For the infiltration tests, we installed a six-inch diameter vertical tube into the native silty sand soils in
Test Pit 2 at a depth of 5.0 feet below the adjacent ground surface and in the upper granular fill soils in
Test Pit 4 at a depth of approximately 4.0 feet below the adjacent ground surface. Approximately two
inches of pea gravel was placed over the soil in the bottom of the tube to limit disturbance of the soil
when water was added to the apparatus. We filled the tube with water and allowed the water to pre-soak
the underlying soils before the actual infiltration testing. After the presoak, we conducted timed
infiltration tests. The infiltration test results are shown below in Table 1. We have not applied a factor of
safety to the in-place infiltration test results shown in the table.
Table 1.Field Results-In-Place Infiltration Test Results
Location Approximate depth Duration of Test Head Loss Measured Infiltration
[ft.] [min.] [in.] Rate [in/hr]
TP-2 5.0 52 6.0 6.92
TP-4 4.0 26 6.0 13.84
CONCLUSIONS AND RECOMMENDATIONS
As stated in the 2009 King County Surface Water Design Manual, a minimum requirement of three feet
of permeable soil below the bottom of the infiltration facility, and at least three feet of separation from the
bottom of the infiltration facility and the maximum wet-season water table needs to exist. In our opinion,
based on the soil and groundwater conditions encountered in our test pits, the site conditions do not meet
these minimum requirements for infiltration.
NELSON GEOTECHNICAL ASSOCIATES, INC.
Stormwater Infiltration Letter June 21,2013
Shuttle Express Parking Lot and Infiltration NGA File No. 875613
Renton,Washington Page 5
It is our opinion that the site subsurface soils are poorly suited for traditional stormwater infiltration
trenches. The subsurface soils generally have a high silt content and indications of shallow groundwater
within these soils were observed in all of our explorations.
It is also our opinion that the use of pervious pavement surfacing to allow runoff from the parking lot to
infiltrate into the granular fill layer found within the site is feasible. Specific recommendations for
pervious pavement design have been provided in the Pervious Pavement Design subsection of this letter.
Pervious pavement requires on-going maintenance in order to prolong the life span of the pavement.
Specific recommendations for maximizing the life span of the proposed pervious pavement are included
in the Pavement Maintenance subsection of this letter. We should emphasize that on-going maintenance
of the pavement is essential for the long-term success of this approach. All recommendations for
pavement subgrade preparation and maintenance as presented in this letter should be followed for the
parking lot. We are providing a preliminary pavement design; however, this design should be verified by
the civil engineer, based on actual anticipated loads and expected performance and life span of the
pavement, and should also be checked against the recommendations of the pavement supplier.
Pervious Pavement Design
We recommend that the pervious pavement section for the parking lot be a minimum of 6 inches thick
and underlain by a minimum of 12 inches of clean crushed rock. This pavement section is preliminary
and assumes only light traffic would be imposed on the pavement. Permanent design should be the
subject to specific analysis prepared by the civil or traffic engineer and approval by the supplier.
Based on the low permeability soils encountered throughout the site at depth, we recommend that the
pervious pavement section be underlain by a minimum of 12 inches of 3/4-inch clean crushed gravel with
a minimum void ratio of 15 to 20 percent. The gravel should contain no more than 3 percent fines by
weight in order to readily infiltrate into the underlying soils. The gravel layer should help facilitate
infiltration, but will also aid in providing storage for infiltrating water. This layer should only be lightly
compacted. The subgrade below the crushed rock should be stripped of grass and topsoil material to
expose the granular fill soils prior to placing the crushed rock. These soils should generally be
encountered approximately one foot below the existing ground surface. The subgrade below the gravel
layer should be scarified to a depth of six inches and graded level. The exposed subgrade should not be
heavily compacted or contaminated with silt, as these conditions may reduce the infiltration capability of
NELSON GEOTECHNICAL ASSOCIATES, INC.
Stormwater Infiltration Letter June 21,2013
Shuttle Express Parking Lot and Infiltration NGA File No. 875613
Renton,Washington Page 6
this material. Also, construction traffic on the exposed subgrade should be avoided. We should be .
retained to observe subgrade preparation prior to placing the crushed rock layer.
Based on our observations and on-site infiltration testing along with the varying nature of the underlying
soils throughout the site, we recommend that a design infiltration rate of 0.5 inches per hour be used for
the granular fill material encountered near the ground surface. Additional recommendations and
information regarding pervious pavements are discussed on Pages 97 through 111 in the Low Impact
Design Technical Guidance Manual for Puget Sound, (Puget Sound Action Team & Washington State
University, May 2005).
The existing underlying fill and crushed rock surface should be proof-rolled with a heavy, rubber-tired
piece of equipment, to identify soft or yielding areas that require repair, however, the clean gravel layer
should only be lightly compacted. We should be retained to observe the proof-rolling, as well as the
placement of the gravel layer, prior to placement of pervious pavement. After installation, pervious
pavements should be thoroughly swept and pressure-washed periodically to minimize siltation potential
as discussed in the following section.
Pavement Maintenance
Typical methods for maintaining paved parking areas should be applied to pervious pavement. These
methods include power sweeping, blowing, vacuuming, and high-pressure washing. Keeping debris from
accumulating on top of and within the pervious pavement is important to maintaining the design
infiltration capacity of the system. Should the pavement become partially clogged with debris,
permeability could possibly be re-established with the use of vacuuming or pressure washing.
Stormwater from sources outside the pavement should never be directed onto the pervious pavement or
subgrade. Fines and organic material from off-site sources could potentially promote clogging of the
pavement section. Following the recommendations provided in this letter should help reduce the
migration of silt and debris into the pavement section.
USE OF THIS LETTER
This letter was prepared for Peer Frank, LLC and their agents, for their use in planning and budgeting the
above-referenced project only. Our services included an evaluation of the infiltration capability of the site
soils at specific locations, and should not be considered as an in-depth geotechnical study. This letter
may be used for bidding and estimating purposes, but our letter, conclusions, and interpretations should
NELSON GEOTECHNICAL ASSOCIATES, INC.
Stormwater Infiltration Letter June 21,2013
Shuttle Express Parking Lot and Infiltration NGA File No. 875613
Renton,Washington Page 7
not be construed as a warranty of the subsurface conditions. The subsurface conditions between
explorations may vary. A contingency for changed conditions should be incorporated into the project
plans.
Within the limitations of scope, schedule, and budget, our services have been performed in accordance
with generally accepted geotechnical engineering practices in effect in this area at the time this letter was
prepared. No other warranty, expressed or implied,is made. Our observations, findings,and opinions are
a means to identify and reduce the inherent risks to the owner.
o-O-o
NELSON GEOTECHNICAL ASSOCIATES, INC.
Stormwater Infiltration Letter June 21,2013
Shuttle Express Parking Lot and Infiltration NGA File No. 875613
Renton,Washington Page 8
We appreciate the opportunity to provide service to you on this project. If you have any questions or
require further information,please call.
Sincerely,
NELSON GEOTECHNICAL ASSOCIATES, INC.
of 1Nash/
a�g ~�:. 9�0
i,
L ' rt P� r
f'be 883 'N0
.,o`
ns ed Geo
LEE S. BELLAH
Lee S. Bellah, LG -
Project Geologist
--4444\
i,�*4., -PC4'(''�w°r ,� x ib, 2+
-4. r, 3
40
Fri-,v. a L
.z .
Khaled M. Shawish,PE
Principal
LSB:KMS:kmn
Four Figures Attached
Three Copies Submitted
NELSON GEOTECHNICAL ASSOCIATES, INC.
VICINITY MAP N
Not to Scale
Ripanan Forest
LI
'l,
F re ce
197
.tri
tt n>
e
SW lth St SW 71h SI SW 7th St - �4" 5
Oakesda/e
Aye Sh ,,,,S:"1/4Popeye, fl
P
4' T.
t
ry
✓• flay
Kodiak,_ SGtady it
Lodge applPbv
WaY
NPR'
,nth St Project ly L
Extended Stay '� >W l'21h st
America Seattle w" Gt adl*aY Site 167)
Sli
gW 130SI , z
4 St
•
rorutile Exprc-
.^:mess Offices ce 3 pr
S 151h sl
sw1611:st I swtGthst Ey+;6.
tip ,•:. a
e Larkspur v
n landnlg Renton cI, s
o .c c k9a to
tf� k� (ter
N) rt TOWnpPlaCp
tile Suites Seattle
'11eto
SouthlRenlon S 19th
iti 0
Story
Tukwila
Amtrak" SW 21st St
la Station O
ithbound)
CD
O Irnve'tsre5 a
n:
n SW 23rd St SW 23rd St
co
G
0:
FID— r.: H
O
rJ D N
(! 15 d
U
id'ctr.( ntiox * m
1 kwlla,WA , s�
m a
Renton, WA
6,
a
E
m
c
x
w
m
S
r
on
rn
m
• Project NumberNELSON GEOTECHNICAL No. Date Revision By CK cii
875613 Shuttle Express Parking Lot �N G A 'L ASSOCIATES, INC. s
1 6/20/13 Original LSB KMS o,
Vicinity Map GEOTECHNICAL ENGINEERS & GEOLOGISTS
2
• Figure 1 93,1135111Aw NE A-500 9m1w+aNCo,n (425)137.1689 O
Woad 48.WA 98072 Wena�wldWn 1309)6657608
1426).86-,564,It.48,-2510 www nyt0w9O M cern
7
73
,_, Schematic Site Plan
(t� v n Ln Approximate Scale:1 inch=100 Feet
m rn
iv Co-) 3
0-
(D
� N
0
D-
c
Zal
CD m
x , i
( •
/ <n • �� ,
N
iff it? r
1
3
Ecn I Existing
r— Parking Area
0
3 Ai
i
El Z
IP ifill 0 I
x= I > I
ass-
iZ Existing Office Existing •
m m I Building Parking I
r
z w m Area
o _
•
Az
n I TP-4 ,, TP-2
In > m TP•-1
�f G a m � 1TP-3�
glx a n Z
y > SW 16th Street Approximate location
r of proposed new
z
parking lot
O
W67
LEGEND
< •••••••••'''• Property line
w
m TP-1
j Number and approximate
E
y T
co
location of test pit
('
Reference: Site plan based on aerial photo interpretation and site observations.
NGA Drafting 2013\875-613 Shuttle Express Parking Lot'Schematic SP.dwg
4 ,
UNIFIED SOIL CLASSIFICATION SYSTEM
MAJOR DIVISIONS GROUP GROUP NAME
SYMBOL
CLEAN GW WELL-GRADED,FINE TO COARSE GRAVEL
COARSE - GRAVEL
GRAVEL GP POORLY-GRADED GRAVEL
GRAINED MORE THAN 50% GRAVEL
OF COARSE FRACTION GM SILTY GRAVEL
RETAINED ON
SOILS NO.4 SIEVE WITH FINES GC CLAYEY GRAVEL
SAND CLEAN SW WELL-GRADED SAND,FINE TO COARSE SAND
SAND
SP POORLY GRADED SAND
MORE THAN 50%
RETAINED ON MORE THAN 50%
NO.200 SIEVE OF COARSE FRACTION SAND SM SILTY SAND
PASSES NO.4 SIEVE
•
WITH FINES SC CLAYEY SAND
FINE - SILT AND CLAY ML SILT
- INORGANIC
GRAINED LIQUID LIMIT CL CLAY
LESS THAN 50%
SOILS ORGANIC OL ORGANIC SILT,ORGANIC CLAY
SILT AND CLAY MH SILT OF HIGH PLASTICITY,ELASTIC SILT
INORGANIC
MORE THAN 50%
PASSES LIQUID LIMIT CH CLAY OF HIGH PLASTICITY,FLAT CLAY
NO.200 SIEVE 50%OR MORE
ORGANIC OH ORGANIC CLAY,ORGANIC SILT
HIGHLY ORGANIC SOILS PT PEAT
NOTES:
1) Field classification is based on visual SOIL MOISTURE MODIFIERS:
examination of soil in general
accordance with ASTM D 2488-93. Dry-Absence of moisture,dusty,dry to I
the touch 6
2) Soil classification using laboratory tests
is based on ASTM D 2488-93. Moist-Damp,but no visible water. k.
3) Descriptions of soil density or Wet-Visible free water or saturated,
consistency are based on usually soil is obtained from ,,
interpretation of blowcount data, below water table s
visual appearance of soils,and/or t
test data. m
TL
. Project Number NELSON GEOTECHNICAL No. Date Revision By CK
875613 Shuttle Express Parking Lot N G A ASSOCIATES, INC. s
1 6/20/13 Original LSB KMS o,
Soil Classification Chart GEOTECHNICAL ENGINEERS &GEOLOGISTS S.
• Figure 3 l7311.7351h Aw NE.0.500 Snohoma0 CwMy(425)337-1000 0
Woodn•N.WA 00077 WAnakh.wCh.IAn)50A)5062750 Q
(425)4561009!FAA 481.7070 0
2
LOG OF EXPLORATION
DEPTH(FEET) USC SOIL DESCRIPTION
•
TEST PIT ONE
0.0-0.2 TOPSOIL/GRASS
0.2-4.0 BROWN-GRAY,FINE TO SAND WITH SILT AND TRACE GRAVEL
(MEDIUM DENSE TO DENSE,MOIST)(FILL)
4.0-7.0 SM GRAY IRON-OXIDE STAINED, SILTY FINE TO MEDIUM SAND WITH TRACE GRAVEL AND
ORGANICS(LOOSE,MOIST TO WET)
7.0-12.0 ML GRAY SANDY SILT WITH ABUNDANT ORGANICS(LOGS)(SOFT TO STIFF,WET TO SATURATED)
SAMPLES WERE COLLECTED AT 3.0,4.5,7.0,AND 11.0 FEET
LIGHT GROUNDWATER SEEPAGE WAS ENCOUNTERED AT 11.0 FEET
SLIGHT TEST PIT CAVING WAS ENCOUNTERED BETWEEN 8.0 AND 11.0 FEET
TEST PIT WAS COMPLETED AT 12.0 FEET ON 6/3/13
TEST PIT TWO
0.0-0.2 TOPSOIL/GRASS
0.2-5.0 BROWN-GRAY,FINE TO SAND WITH SILT AND TRACE GRAVEL
(MEDIUM DENSE TO DENSE,MOIST)(FILL)
5.0-7.0 SM BROWN-GRAY IRON-OXIDE STAINED, SILTY FINE TO MEDIUM SAND WITH TRACE GRAVEL AND
ORGANICS(LOOSE,WET TO SATURATED)
7.0-8.5 ML BROWN GRAY SANDY SILT WITH ORGANICS(SOFT,WET TO SATURATED)
SAMPLES WERE COLLECTED AT 3.0,6.5,AND 7.0 FEET
GROUNDWATER SEEPAGE WAS NOT ENCOUNTERED
TEST PIT CAVING WAS NOT ENCOUNTERED
. TEST PIT WAS COMPLETED AT 8.5 FEET ON 6/3/13
TEST PIT THREE
0.0-0.2 TOPSOIL/GRASS
0.2-5.0 BROWN-GRAY,FINE TO SAND WITH SILT AND TRACE GRAVEL
(MEDIUM DENSE TO DENSE,MOIST)(FILL)
5.0-7.5 SM/ML BLUE GRAY IRON-OXIDE STAINED, INTERBEDDED SILTY FINE TO MEDIUM SAND AND SANDY
SILT WITH TRACE ORGANICS(LOOSE/SOFT,WET TO SATURATED)
7.5-11.5 ML BLUE GRAY SANDY SILT WITH ORGANICS (SOFT TO STIFF,SATURATED)
SAMPLE WAS COLLECTED AT 3.0 FEET
LIGHT GROUNDWATER SEEPAGE WAS ENCOUNTERED AT 7.5 FEET
SLIGHT TEST PIT CAVING WAS ENCOUNTERED BETWEEN 7.5 AND 11.0 FEET
TEST PIT WAS COMPLETED AT 11.5 FEET ON 6/3/13
TEST PIT FOUR
0.0-0.2 TOPSOIUGRASS
0.2-5.0 BROWN-GRAY,FINE TO SAND WITH SILT AND TRACE GRAVEL
(MEDIUM DENSE TO DENSE,MOIST)(FILL)
5.0-11.5 ML BLUE GRAY SILT WITH FINE SAND AND ORGANICS(SOFT TO STIFF,WET TO SATURATED)
SAMPLES WERE COLLECTED AT 2.5,5.5,7.5,10.0 AND 11.5 FEET
GROUNDWATER SEEPAGE WAS NOT ENCOUNTERED
TEST PIT CAVING WAS NOT ENCOUNTERED
TEST PIT WAS COMPLETED AT 11.5 FEET ON 6/3/13
LSB:KMS NELSON GEOTECHNICAL ASSOCIA TES, INC.
FILE NO 875613
FIGURE 4
NELSON GEOTECHNICAL
►. A ASSOCIATES, INC.
GEOTECHNICAL ENGINEERS & GEOLOGISTS
Main Office Engineering-Geology Branch
17311—135'Ave NE,A-500 5526 Industry Lane,#2
Woodinville,WA 98072 East Wenatchee,WA 98802
(425)486-1669-FAX(425)481-2510 (509)665-7696•FAX(509)665-7692
MEMORANDUM
,o,
4,0_4?
DATE: October 28,2013 �;� 1 N� j
TO: Peer Frank, LLC c/o Devin Sherrell -' , x
FROM: Khaled M. Shawish,PE
Lee S. Bellah, LG ' '"""
•
CC: Tim@dcgengr.com p s xQla�s 9
Ben(a degengr.com
RE: Shuttle Express Parking Lot
Updated Pervious Pavement Sections
•
800 SW 16`h Street
Renton,Washington
NGA File No. 875613
This memo presents the our updated pervious pavement section recommendations and geotechnical
engineering review of the plans for the Shuttle Express Parking Lot project located at 800 SW 16th Street
in Renton,Washington.
We have previously prepared a geotechnical engineering letter for the project site titled "Geotechnical
Engineering Evaluation— Shuttle Express Parking Lot and Infiltration—Renton, Washington," dated June
21, 2013. In this letter, we provided recommendations for the pervious pavement sections. Specifically,
we recommended that the pervious pavement section for light traffic areas consist of a minimum of 6-
inches of pervious pavement surfacing underlain by at least 12-inches of clean crushed rock. Since our
letter was submitted, we have had conversations with the civil and structural engineers regarding the
proposed pervious pavement sections for both light and heavy traffic areas of the proposed parking lot.
These conversations resulted in updated pervious pavement sections of 4-inches of pervious pavement
underlain by a minimum of 6-inches of clean crushed rock for the light traffic areas and 6-inches of
Shuttle Express Parking Lot NGA File No. 875613
Updated Pervious Pavement Sections October 28,2013
Renton,Washington Page 2
pervious pavement underlain by a minimum of 12-inches of clean crushed rock for the heavy traffic areas.
We understand that the gravel layer was sized based on the anticipated runoff generated from the parking
lot area and the infiltration rate provided in our previous letter. We have been provided with Plan Sheets
COI through C05 titled "Shuttle Express— Renton Parking Lot,"dated August 2, 2013. We have reviewed
geotechnical aspects of the provided plans and found the plans to be in general accordance with our recent
conversations and our previous geotechnical letter. In our opinion the updated pervious pavement sections
for the light and heavy traffic areas should be feasible provided our recommendations in our previous letter
and in this memo are followed during construction.
We recommend that NGA be retained to provide monitoring and consultation services during construction
to confirm that the conditions encountered are consistent with those indicated by the explorations, to
provide recommendations for design changes should the conditions revealed during the work differ from
those anticipated, and to evaluate whether earthwork activities comply with contract plans and
specifications.
We trust this memorandum should satisfy your needs at this time. Please contact us if you have any
questions or require additional services.
NELSON GEOTECHNICAL ASSOCIATES, INC.
Analytical Resources, Incorporated
Analytical Chemists and Consultants
19 June 2014
Lee Bellah
Nelson Geotechnical, Inc.
17311 135th Ave NE
Suite A-500
Woodinville, WA 98072
Project: Shuttle Express Parking Lot
ARI Job No: YM63
Dear Lee:
Please find enclosed the original Chain of Custody record and the final data for the
samples from the project referenced above. Analytical Resources, Inc. received four soil
samples on June 5, 2014. The samples were analyzed for CEC and organic matter as
requested.
These analyses proceeded without incident of note.
An electronic copy of these reports will be kept on file at ARI. Should you have any further
questions, please feel free to call me at your convenience.
Respectfully,
ANALYTICAL RESOUR^ES, it•!C.
Mark D. Harris
Project Manager
206/695-6210
markh@ariiabs.corn
www.arilabs.com
enclosures
cc: file YM63
MDH/mdh
Page 1 of f y�
4611 South 134th Place, Suite 100 • Tukwila WA 98168 • 206-695-6200 • 206-695-6201 fax
Chain of Custody Record & Laboratory Analysis Request
ARI Assigned Num* c, Turn-around Requested: Page: of Analytical Resources,Incorporated
1 Analytical Chemists and Consultants
� �� 4611 South 134th Place, Suite 100
ARI Client Company: Phoned Date: ,/ Present? Tukwila,WA 98168
�i1�C4 CpN �'� C?7 G l�fCf}L- 42 43 (c/ /��� _ 206-695-6200 206-695-6201 (fax)
Client Contact: No of Cooler
www.arilabs.com
Li-t 'H?C_- '/-04# Coolers. Temps.
Client Project Name: Analysis Requested Notes/Comments
Client Project#: Samplers:
Sample ID Date Time Matrix No.Containers 0
1 I 1
144- 1 "3.c-3.5 - k<4',4 2?,e \ _ K .
kVA-1 5-4o -- .'-a/5 /4 2p, i S , I _ XC. _
ofi-2._ 2 S-- 3.E4,--r 5l14 2 7 5 I )- , _ _ .
411-?-- 3.0— 3 5cr C/5/4_ 2 r Al ___-' I -)(--.
Comments/Special Instructions Relinquished by: ////..." Received by: ^ Relinquished by Received by:
(Signature) Neff `%���.� (signature)np,.,e2r i (Signature) (Signature)
Printed Na Printed Name: Printed Name: 'Printed Name:
Company: (/ a- r Company- 1 A Company: Company:
Date&Time: Date&Time: Date&Time: Date&Time:
67/ //4-- 2 s,• S i'M LAY/9 /,110---
.Limits of Liability: AR!will perform all requested services in accordance with appropriate methodology following ARI Standard Operating Procedures and the ARI Quality Assurance Program. This program
meets standards for the industry. The total liability of ARi,its officers,agents,employees,or successors,arising out of or in connection with the requested services,shall not exceed the Invoiced amount for
said services. The acceptance by the client of a proposal for services by ARI release ARf from any liability in excess thereof,not withstanding any provision to the contrary in any contract,purchase order or co-
signed agreement between ARI and the Client.
Sample Retention Policy: All samples submitted to ARI will be appropriately discarded no sooner than 90 days after receipt or 60 days after submission of hardcopy data,whichever is longer,unless alternate
retention schedules have been established by work-order or contract.
. . . .
41911k
Analytical Resources, Incor�ora8e¢U
vioAnalytical Chemists and Consultants Cooler Receipt Form
ARI Client:i.
, r c6 ( vq lA C-I�C C�Xp`-�SS �1 LW-
('`) Project Name:
COC No(s): \/ f i Delivered by:Fed-Ex UPS Courier
Mand Dei- red Other:
Assigned ARI Job No: I ('C\ r Tracking No: A
Preliminary Examination Phase:
Were intact,properly signed and dated custody seals attached to the outside of to cooler? YES NOS
Were custody papers included with the cooler? NO
Were custody papers properly filled out(ink,signed,etc.)
S NO
Temperature of Co$!er(s)(°C)(recommended 2.0-6.0°C for chemistry)
Time: I1-(C J—) , .
If cooler temperature is out of compliance fill
out form 00070F Temp Gun lID/t. C('-�?�'7-'2
n
Cooler Accepted by: t 11 l A l tT V> Date: (4 /1 (4 Time: j1Z5
Complete custody forms and attach all shipping documents
Log-In Phase:
Was a temperature blank included in the cooler? YES NO
What kind of packing material was used?._- Bubble Wrap Wet Ice Gel Packs Baggies Foam Block Paper Other:
Was sufficient ice used(if appropriate)? (A YES NO
Were all bottles sealed in individual plastic bags? YES NCy
Did all bottles arrive in good condition(unbroken)? NO
Were all bottle labels complete and legible? NO
Did the number of containers listed on COC match with the number of containers received? .--" NO
Did all bottle labels and tags agree with custody papers? NO
Were all bottles used correct for the requested analyses? E' NO
Do any of the analyses(bottles)require preservation?(attach preservation sheet,excluding VOCs)... YES NO
Were all VOC vials free of air bubbles? YES NO
Was sufficient amount of sample sent in each bottle? NO
Date VOC Trip Blank was made at ARI
V iiQai
Was Sample Split by ARI: IA YES Date/Time: Equipment Split by:
Samples Logged by: T ) Y Date: �H 14 Time: / l/} _7
""Notify Project Manager of discrepancies or concerns""
1_ Sample ID on Bottle Sample ID on COC Sample ID on Bottle Sample ID on COC
i
I
Additional Notes,Discrepancies,&Resolutions:
SC tr1PLCS SPLIT- 1,1 L•Dcifri 61 FZ.0 t.- 2 E J4ts _ (%-9eLs At fL(C) 131
Ct..{.Cr'.-ice'- 0►L t C (N44. (... LPL3 c s) S A t—v ELf_7- >A.,-)C4 `7c,) Ctrl _
By: /-191-t.-- Date: V/Ef
9meitAir ge421,1es Pitabubhles' 'Mc Bubbles Small-"sm" (<2 mm)
2-4 mm ''s mm Peabubbles-* "pb"(2 to<4 mm)
e
o + ' F if�t •l • • •
Large `9g"(4 to<6 mm)
Headapace+"ha" (>6 mm)
0016F Cooler Receipt Form Revision 014
3/2/10
ANALYTICAL
(40
Sample ID Cross Reference Report RESOURCES
INCORPORATED
ARI Job No: YM63
Client: Nelson Geotechnical, Inc.
Project Event : N/A
Project Name: Shuttle Express Parking Lot
ARI ARI
Sample ID Lab ID LIMS ID Matrix Sample Date/Time VTSR
1. HA-1 3.0-3.5FT YM63A 14-10808 Soil 06/05/14 14:00 06/05/14 14:05
2. HA-2 2.5-3.0FT YM63B 14-10809 Soil 06/05/14 14:00 06/05/14 14:05
3. HA-1 3.5-4.0FT YM63C 14-10810 Soil 06/05/14 14:00 06/05/14 14:05
4. HA-2 3.0-3.5FT YM63D 14-10811 Soil 06/05/14 14:00 06/05/14 14:05
Printed 06/05/14 Page 1 of 1
Analytical Resources, Incorporated
Analytical Chemists and Consultants
Client: Nelson Geotechnical, Inc. ARI Job No.: YM63
Client Project No.: Shuttle Express Parking Lot
Case Narrative
1. Two samples were submitted for analysis on June 5, 2014, and were in good
condition.
2. The samples were submitted for loss on ignition determination according to ASTM
D2974, Method A and C.
3. The samples were submitted for moisture content determination according to ASTM
D2216.
4. The data is reported in percent, and is provided in summary tables.
5. There were no noted anomalies in the samples or methods on this project.
Released by: • �L Date: \-1 2 N
Le&i Technician
//
Reviewed by: C(((c:y•G CL I f G Date: 61/11H
Geo e hnicat LaboratoryManager
•
4611 South 134th Place, Suite 100 • Tukwila WA 98168 • 206-695-6200'•' d67kcn,',� e
Analytical Resources,
1011,0 Incorporated
Analytical Chemists and
Consultants
Data Reporting Qualifiers
Effective 12/31/13
Inorganic Data
U Indicates that the target analyte was not detected at the reported
concentration
Duplicate RPD is not within established control limits
B Reported value is less than the CRDL but a the Reporting Limit
N Matrix Spike recovery not within established control limits
NA Not Applicable, analyte not spiked
H The natural concentration of the spiked element is so much greater
than the concentration spiked that an accurate determination of
spike recovery is not possible
L Analyte concentration is 5.5 times the Reporting Limit and the
replicate control limit defaults to ±1 RL instead of the normal 20%
RPD •
Organic Data
U Indicates that the target analyte was not detected at the reported
concentration
Flagged value is not within established control limits
B Analyte detected in an associated Method Blank at a concentration
greater than one-half of ARI's Reporting Limit or 5% of the
regulatory limit or 5% of the analyte concentration in the sample.
J Estimated concentration when the value is less than ARI's
established reporting limits
D The spiked compound was not detected due to sample extract
dilution
E Estimated concentration calculated for an analyte response above
the valid instrument calibration range. A dilution is required to
obtain an accurate quantification of the analyte.
Laboratory Quality Assurance Plan Page 1 of 3 Version 14-003
12/31/13 •
Analytical Resources,
4016 40 Incorporated
Analytical Chemists and
Consultants
Q Indicates a detected analyte with an initial or continuing calibration
that does not meet established acceptance criteria (<20%RSD,
<20%Drift or minimum RRF).
S Indicates an analyte response that has saturated the detector. The
calculated concentration is not valid; a dilution is required to obtain
valid quantification of the analyte
NA The flagged analyte was not analyzed for
NR Spiked compound recovery is not reported due to chromatographic
interference
NS The flagged analyte was not spiked into the sample
M Estimated value for an analyte detected and confirmed by an
analyst but with low spectral match parameters. This flag is used
only for GC-MS analyses
N The analysis indicates the presence of an analyte for which there is
presumptive evidence to make a "tentative identification"
Y The analyte is not detected at or above the reported concentration.
The reporting limit is raised due to chromatographic interference.
The Y flag is equivalent to the U flag with a raised reporting limit.
EMPC Estimated Maximum Possible Concentration (EMPC) defined in
EPA Statement of Work DLM02.2 as a value "calculated for
2,3,7,8-substituted isomers for which the quantitation and /or
confirmation ion(s) has signal to noise in excess of 2.5, but does
not meet identification criteria" (Dioxin/Furan analysis only)
C The analyte was positively identified on only one of two
chromatographic columns. Chromatographic interference
prevented a positive identification on the second column
P The analyte was detected on both chromatographic columns but
the quantified values differ by ?40% RPD with no obvious
chromatographic interference
X Analyte signal includes interference from polychlorinated diphenyl
ethers. (Dioxin/Furan analysis only)
Z Analyte signal includes interference from the sample matrix or
perfluorokerosene ions. (Dioxin/Furan analysis only)
Laboratory Quality Assurance Plan Page 2 of 3 Version 14-003
12/31/13
0 Analytical Resources,
Incorporated
lay
Analytical Chemists and
Consultants
Geotechnical Data
A The total of all fines fractions. This flag is used to report total fines
when only sieve analysis is requested and balances total grain size
with sample weight.
F Samples were frozen prior to particle size determination
SM Sample matrix was not appropriate for the requested analysis. This
normally refers to samples contaminated with an organic product
that interferes with the sieving process and/or moisture content,
porosity and saturation calculations
SS Sample did not contain the proportion of"fines" required to perform
the pipette portion of the grain size analysis
W Weight of sample in some pipette aliquots was below the level
required for accurate weighting
•
Laboratory Quality Assurance Plan Page 3 of 3 Version 14-003
12/31/13 .
SAMPLE RESULTS-CONVENTIONALS ANALYTICALi
YM63-Nelson Geotechnical, Inc. RESOURCES v
INCORPORATED
Matrix: Soil Project: Shuttle Express Parking Lot
Data Release Authorized Event: NA
Reported: 06/19/14 Date Sampled: 06/05/14
Date Received: 06/05/14
Client ID: HA-1 3.5-4.0FT
ARI ID: 14-10810 YM63C
Analyte Date Method Units RL Sample
Total Solids 06/09/14 SM2540G Percent 0.01 92.67
060914#1
Cation Exchange Capacity 06/09/14 9080 meq/100 g 0.05 4.69
060914#1
RL Analytical reporting limit
U Undetected at reported detection limit
Soil Sample Report-YM63
YMG3 : 00009
SAMPLE RESULTS-CONVENTIONALS ANALYTICAL C •
YM63-Nelson Geotechnical, Inc. RESOURCES
INCORPORATED
Matrix: Soil Project: Shuttle Express Parking Lot
Data Release Authorized Event: NA
Reported: 06/19/14 Date Sampled: 06/05/14
` Date Received: 06/05/14
Client ID: HA-2 3.0-3.5FT
ARI ID: 14-10811 YM63D
Analyte Date Method Units RL Sample
Total Solids 06/09/14 SM2540G Percent 0.01 91.37
060914#1
Cation Exchange Capacity 06/09/14 9080 meq/100 g 0.05 4.30
060914#1
RL Analytical reporting limit
U Undetected at reported detection limit
Soil Sample Report-YM63
I 5 .Vi
METHOD BLANK RESULTS-CONVENTIONALS ANALYTICAL
(110
YM63-Nelson Geotechnical, Inc. RESOURCES
INCORPORATED
Matrix: Soil Project: Shuttle Express Parking Lot
Data Release Authorized ; Event: NA
Reported: 06/19/14
/ Date Sampled: NA
Date Received: NA
Analyte Date Units Blank QC ID
Total Solids 06/09/14 Percent < 0.01 U ICB
Cation Exchange Capacity 06/09/14 meq/100 g < 0.05 U PREP
Soil Method Blank Report-YM63
REPLICATE RESULTS-CONVENTIONALS ANALYTICAL. .
YM63-Nelson Geotechnical, Inc. RESOURCES
INCORPORATED
Matrix: Soil 4 Project: Shuttle Express Parking Lot
Data Release Authorized: I Event: NA
Reported: 06/19/14 / Date Sampled: 06/05/14
Date Received: 06/05/14
Analyte Date Units Sample Replicate(s) RPD/RSD
ARI ID: YM63C Client ID: HA-1 3.5-4.0FT
Total Solids 06/09/14 Percent 92.67 92.88 0.2%
Soil Replicate Report-YM63 '
ANALYTICAL -
GEOTECHNICAL ANALYSIS DATA SHEET RESOURCES "---
Organic Matter by Method ASTM D2974 INCORPORATED
Data Release Authorized: QC Report No: YM63-Nelson Geotechnical, Inc.
Reported: 06/17/14 Project: Shuttle Express Parking Lot
Date Received: 06/05/14
Page 1 of 1
Client/ Date Analysis
ARI ID Sampled Matrix Date Result
HA-1 3.0-3.5FT 06/05/14 Soil 06/12/14 09:52 0.94
YM63A 14-10808
HA-2 2.5-3.0FT 06/05/14 Soil 06/12/14 09:52 1.47
YM63B 14-10809
Reported in %
Organic/Ash Content Burn Temperature 440 C Per ASTM D2974
• Report for YM63
QUI 1 r
ANALYTICAL •
®
GEOTECHNICAL ANALYSIS DATA SHEET RESOURCES
Ash Content by Method ASTM D2974 INCORPORATED
Data Release Authorized: QC Report No: YM63-Nelson Geotechnical, Inc.
Reported: 06/17/14 Project: Shuttle Express Parking Lot
Date Received: 06/05/14
Page 1 of 1
Client/ Date Analysis
ARI ID Sampled Matrix Date Result
HA-1 3.0-3.5FT 06/05/14 Soil 06/12/14 09:52 99.06
YM63A 14-10808
HA-2 2.5-3.0FT 06/05/14 Soil 06/12/14 09:52 96.53
YM63B 14-10809
Reported in %
Organic/Ash Content Burn Temperature 440 C Per ASTM D2974
Report for YM63
ANALYTICAL e,
GEOTECHNICAL ANALYSIS DATA SHEET RESOURCES
Total Solids by Method ASTM D2974 INCORPORATED
Data Release Authorized:t. QC Report No: YM63-Nelson Geotechnical, Inc.
Reported: 06/17/14 Project: Shuttle Express Parking Lot
Date Received: 06/05/14
Page 1 of 1
Client/ Date Analysis
ARI ID Sampled Matrix Date Result
HA-1 3.0-3.5FT 06/05/14 Soil 06/12/14 09:52 93.19
YM63A 14-10808
HA-2 2.5-3.0FT 06/05/14 Soil 06/12/14 09:52 92.74
YM63B 14-10809
Reported in %
i
•
• Report for YM63
0
T) 0 U.S. STANDARD SIEVE SIZE
(D rn co C �� � A ,.O 10 po �o QP oz' LOQ
A B 41'" 4bro. ,ao. \-\o. moo. N-%.o. \go. •
moo.
@ 100 11 -1- _ r .
90 . I I - 1 it I _ ,
D>< — 1-- - ti- - r' . '
Mgw 70 -.. I I 1 t _ II - I' ' _ _ _
.
-I -, . 1 . - - -.I--- - - H ---�
01 o
'6' N X60 —_ .. _ _
m _ _
z50
z 40 - __ - I I' I - 1 '-1 II 4 ' __ _. _
is i0 W30 _ - II T II _ _
ill m m 20 .... -
z yr
° in u)o _ I I , t. . t • t -
O
m Oz 10 - - _ .
:ti o .. 1000 100 10 1.0 0.1 0.01 0.001
lb 8 z AA ° ez GRAIN SIZE IN MILLIMETERS
$m n
s: m r GRAVEL SAND
COBBLES SILT OR CLAY
Z COARSE FINE COARSE MEDIUM FINE
o - -
N0
O co
U.S.C. EXPLORATION SAMPLE SOIL
SOIL DESCRIPTION
o z, SYMBOL NUMBER DEPTH DISTRIBUTION
w 0
o Gray,fine to medium sand Gravel =0%
o •SP TP-1 12.0 feet Sand =98%
• m
Silt/Clay=2%
Z
r" 0
Co
2014 NGA Project Felders18756B14 Updated Shuttle Express harking Lot Rea slDraftIng\Sieve.dwg
0
co (D.
"T? vii 0 U.S. STANDARD SIEVE SIZE
c rn co Z *• -` a ^o yo ao 00 RP OV) I,4:5
C
@ 3 4" 4b moo. 43 N\o. ‘49' 4p. .).\-O' \o.
m 100 - f l l
1 1 Hi 1
90 I I I li
80
m c —
(DD = F 7 .
CD I Nit
n k C� 7O 1 r I 7 ) 7 r r 7 •�I 4 • _ 7j r r r Ti
7 I T 1 r 1 r 7
Q} -0 w
lA N m 60 I I I I I II I.
aI I I I i 1 11 - I
11.1 50
LL T --
I—
c W 40 t -I I - . I - I, . 11 ,.,I. . - Ir-„
oZ U
a n 0 cc
w30 I �- I h — it . 1
eoz z > d
rg P1 m 20 rI _
r I I _ I I t I II 4 ,
0
I o Z 10 r _ }
it t--1-..—.L-t--i—t
i vi0P m o 0 . lilt
jI
i s m �n m 1000 100 10 1.0 0.1 0.01 0.001
s 3 p ix t§N 2, 0 Z GRAIN SIZE IN MILLIMETERS
ii il ' n
if a r GRAVEL SAND
COBBLES SILT OR CLAY
z COARSE FINE COARSE MEDIUM FINE
0
°'• v
d
r. m U.S.C. EXPLORATION SAMPLE SOIL
o SYMBOL NUMBER DEPTH SOIL DESCRIPTION DISTRIBUTION
ID
o Gray, fine to medium sand Gravel =0%
*SP TP-1 12.0 feet Sand =98%
Silt/Clay=2%
2
- C)
0
2014 NGA Project Polders18756B14 Updated Shutte Express Parking Lol Rec'slbrafsng'Sieve.dwg
Technical Information Report—Final
Shuttle Express Parking Lot- 800 SW le Street February 10,2015
APPENDIX C Site Improvement Plans
Davido Consulting Group,Inc.
TIR_Shuttle Express_Final.doc
A • 1•
; BA
F
th
al a
SHUTTLE EXPRESS
a
.. RENTON PARKING LOT
L, ° FEBRUARY 2015
, Z
a Y
CC
Q
a
z
W PROJECT INFO. -- - /- BASIS OF BEARINGS. LEGAL DESCRIPTION
SHEET INDEX wA
CO APPI1rw3 tWMCRa mTF AFraay qµ SHEET TITLE Q , SW+OSnsi SVI ONAOTHE SASS Of BEARING is CAP.OF RENT ON PER PER STATUTORY NNRRANTY DEED FILED UNDER
CA DEVN 9HERRELL CO1 COVER SHEET' TA F //' REGORGING NUMBER 201=11 1601 131.RECORDS OF DWG
PEER FRAME LLC
Q BOO.161M ST CO2 EMSTNG CO. P0/4 Q '�'N ST SSOWoRECOROti oF�nIrvG WLHrY COUNTY.NwSwN;toN
d RFNiON.3w 66, COIL 932E PUN 5. < SW I2''''' WASIRGTALL OF BLOUt 37 OF C D HILL MANS EARLINGTGN GARDENS
LiW GM FNOIRFF, CW TESL PUN N ' N53.8RENTON MONUMENT n333 1; 7 CITY OF .1101T1.TO THE CITY OFA ..TO THE PLAT MEREOF RECORDED NTTLE MASON NO I VOLUME
Ca GRADING DRAINAGE I.UTILITY MN - 3623323 OF MTS,PAGE LAIN MNG CCUNTY.NN.NGTON,
OE
W MVI00 CONSLLTI.G GROUP.INC COB CUT •a FlLL CELIEATM PIAN Sw ' RCE EPN TIgJCIXNE.11WAHE STATE DE
Fr 9023 BOTHELL WAY N.SUITE BW CITY O PENTON MONUMENT DWI WASHINGTON OR STATE H OHWgv A i BY DEED
LAKE FOREST PMR.WA 6155 Ca DETAILS • NNa3a D UNDER RECO...NURSER 5550613:
PH 3082530024 COB CETNLB woe,. E �Lt TOGETfR WITH THE EAST 4O FEET CF THAT PORPCN OF
I sueL>B ca �rAILe — — t- VFRTICAI DATUM; OFRENTON
ETHOMAS WORDVENUE ORDNANCE 3195 3RECORCEo UNDER
.M URE eURYEYIN3 Na)MAPPING.RLC IAOe -- N� H 80222036.VMC.ATTACHED SY
CENSE 4GLCOMB.P L 3 SHUTTLE YI WWI.DATUM WOMB OPER...LAV 3
PO 0.55.,
SHORELINE.WA 91155
Ba SW 18TH 9i RENT,.EIEV=35 est
Ra)N,AM ENTON,WA i BRASS COSSET IN CONCRETE MONUMENT.IN SE.
AT THE INTERSECT.OF SW 1SIH STREET*.LI.
T 1NFn --8W MOST _- -SW PITHS .. '- AVENE SW
EXISII
USED AS A BASE OF •
OPERPTHE SPONB roR9IS CURRExHUnLF E%PREes :• 2 01302 EIEV=3151
< SET NOL N SEAMAT TOP SACK OF CLAS,SW
PROPOSED aVROYEMENTe Q OtMpiN1T OF IMERSECTICN OF SW IBMRE
STET
THE NEW IMPROVEMEMSIIGL110E • £ EASTERLY OFAND F 2 WATER VALVES,3 FEET
FEET SE CF
ALOTIONAL EMPLOYEES/GUESTS IN ONLY LY WESTERLY OF 3 WATER VALVES
B UTILITY PROVIDERS.
TOTAL STLASANCE TARGET AREA 340.SF
AQ
- SENFA-OW CF RENT.9125)3307332
PATER•ON OFTOTAL DUSTING IMPERWOLS S...MO.(020.) POWER PLG NDNERGY(.)452.1.
.4
TOTAL NEWBEPUGED IMPERVIOUS SLA546 11,ee0 SF(G n Act VICINITY MAP Par(46146
NOT TO SCALE ET SOIIIU ENERGY(425)452-1211
TOTAL IMPERVIOUS SURFACE 30183.0143 AC) GAS PUG
ET
231
TOTAL NEWBEPUCED POS 0842 SF(0.20 AC) CABLE-COMCAST MD C1-
5332
{A
a UTNTY PERM.14600.2
S
k
2
r
3
a
e
IN OOAWLMNGE IMH STANDARDS CRT OF RENTON
I CALL 2 DAYS
BEFORE YOU DIG BY
F 1-800-424-5555 BY
1 LnDN
ERGROD UTILITY By D...
9 LOCATIONS ARE APPROX.)
1 WOE MAIROPOOMPR MIMIC.BY
OTROS CCG CANNOT OF.LD LURE '
DAVIpD CONS1 Nf13NO GROUP.INC. "'m" '3'" SHUTTLE EXPRESS-RENTON PARKING LOT 3/10/32516
c' • As xmm CITY OF f
_ °°" s1 REN ION BOO SWIBTHST
A.A.ORES EMOTING FDTVES AND <•)w•SIPNAR.I•lane 3M RENTON,WA
wew.MOON PONS C.OTEM 15023 B.m3 Rey NB.SwF w Po Ow 1132 4p. OW60 I --{ Illit PmP^^3/BwN��/Pw�<Fp...DAPI. CO1
i oCGPRIDBrowNETR1cTKw arert wA6lss F....a WA wl.s CONC.°.if CONCMONS ME NOT
'�""'B���wwM�iL Na. RFHSKN eY DArz ,wR -�,w m �`��"' COVER SHEEP
Fro,as,IYn. 4Fn 411411
A NININNIAA
U)
N 20 10 0 20 20
da SCALE N FEET
I
I—
:::
5 O
2
2 1
Y
Q
a
z
O
w
cc
L I
rn
LLIa
x I
w
w -
H
H
M r'
cn 4
I
U]
W
2 •
W
I>
Q
0
, . , 2
f ,.. 0
0
I
E LL
R I
e
I
E R
F .. SW 16TH STREET
7 .
I
—
R - -- cP
6
I
IN OJYPLNNCE NADI CRY OF RENTON
STA1bRM
I CALL 2 DAYS o
BEFORE YOU DIGom
E 1 800-424-5555 00
IA PRORCAN0 Wein•
°"
LOCATIONS ARE APPROX., eY. M.
1.-t DAVIDO CONSUMING GROUP.INC. rlil = �T "s so'L° ' "dip" CI-1 Y ON SHUTTLE EXPRESS-RENTON PARKING LOT
�/10/sops
OWS.BY
OSIERS OCO,CANNOT
ALL OWEN EMT.E;'/ BASE NAP/TOPOGRAPHY', cia•srR.w•I.na lAe _ Rf N ION BOO SW 18TH 5T {
t L"a°sRNRENTON,WA J
PLANS FEATURES MINI,Way NE S�..ea Po.m 11# NC.
°"'°° F"" � riun.Ina/awai„y/P"erc AWNS Door. p CO2
ARNA MOWN COPRA. Lalst .Ph WA 9111W vn.W Nw01ALEN GONOTIONS IF COW:MONS IRE NY __"wwuu
OcoPRw0roa0rierAOno.� ,".L"� ASSON BY DATE MPR uwm _ EXISTING COPDRDNS w" a^y
Al—INININ NIAIA
S. A
KEY NOTES
k O KEY DESCRIPTION DETAIL/SHEET
L VIII LEGEND. .4BBRF1]IATIf1NR: REuwE IX ca SEE SLEET Cm
(1% 20 10 0 20 MI 70.88. I ` I PAVEMENT DESIGNED FOR UO<rt LOAM ; 100100 TCONCEXTRIDEDCURB LCOS_-_
=C r'''''" IT >OEWLU[ LAOS
I
ODICJETE OEVMLK TO EXMT•xs MNYM0 OR
d SCALE IN FEET I © DEMD=DEMOLITION 2 GRACE AT 112 WA SLOPE
PAVEMENT FOR LOADS IX=EXImIND 10 NICE P.2 TN1 LANDSCAPE BERM(SEE
0_ 21.1T 0.20' O— 1 FF=FlHIRT FLOOR 3 SAW LANDSCAPE PLANS FOP DETNLST
FG=FlMR FiRADE
0. EXISTING CONTOUR GYP) IE=ANTE FEET
• EDGE AND SURFACE SEALANT AT AINT ACK COAT AT
O=LITE.ITORM ORT
PROPOSED DTA SO_=STORMi'YI SAWCUT IXASRWT EDGE AND S RFACEEX ILO
�12� SOCA-STOFM ORIINCLENgUT ] APPLY TIO[LOAi AT EDGE AND SURFACE
----_. LL BQN NEW LANDSCAPE E%MLANO STOFM DRAPL PIPE SBBCO=SNMTARY SIDE SEWER CLF T SFAUNT AT POINT
EX ROAD SURFACE `\ SES=SWANK SIDE SENER • NEW LONG ORNEWAY APRON EXIT ONLY NC.
O NEW LANDSCAPEEEx6nla s<MTARr SEWER PSE [x,TCP Or CURB aCm
]ESC=TEMPORARY EROSIONS EEDMENTATION CONTROL
J 5 RERACEIXCONC CURBSGUnER .1C0•
TSB TOP OFTOE BERM
,0 SEE LN IDD APE PLANS FOR TREE BERM.AND
U EX CONC GO TaPw�m2 ' PAVEMENT OTHER WaD9r EOETAAS
Z __- BOTTOMOF BERM T_TYF•WPC.BERM
_ 11 EX ASMWT CRAVENNI 6 PARKING TO REIMS
Q 1" .<•:• EM.•,L• • 1.SLI . >t� 12 NEWADAANL STRIPING R<IX PAVEMENT .
d Nis �7 PARKING STALL COUNT '0 50 020; 1 L OF 4 PERPENOCULAR CURB R 0000 W•
.
TOTAL NEW NEW COMPACT %COMPACT STALLS TO REMARI01
OPARKING STALLS STALLS STALLS 13 AS COMPACTwsTAL.
I- 25 7 28% T LANDSCAPING PERU0P
N00E ARCHITECTS
Z ° PUTL5
W ,] REMOYE Ex LIGHT POLE
CC 1 �:e':,,w,._ ,• PEE LING ICYCIE PARING TO BE PRANCED IN
En , ^ AAAA ,,_ EusnNC SHOP
Li, r
W • '.
2
O.
D
AAAA AAAA
I
].p Q alp Q' AAAA L
ca
555• t 500 --.. I
� 4, A>oBB . 0��c�i, R,a,.B�-,a
I z
1000 RA 23 -_ -_ T
R]� vby 1
/ �.. \ L I 1000 • - i ISb'. + 1S'' i
I. •
•' spy `/,--MASE—I� © 0 51 �.p. r— X00 I`
AMLE 2000 p)<NE N. �_
Y IC.
1' • © 4 Dp7 t Art. 82.00 A]0W Q 5p NNE 53p45 Z
.. S N 00 RI W)iirILB / 'jit Sa� 8230' L
2N
Ep 0 V b I . P�
NMF
p ,. t• •� 0,. 1]07 83.00' ]p 'i;I V 11 iF-,_ iFi P.. ,l
•� :►moi
2 En 0\_0 /�lio
'o '
'_ 0 .. � A - _ ,-.i. I '...
8
< \,..,.
-__ ..-_. AAAA...
I _:- AAAA•..-..-- .. ,.,.....r.. ----,t.- ....�.---�..-...�.�... _�79.EB. ...--�"-. AAAA.' -��_
m —_—_-- --- --- --- -'---- SW 16TH STREET
- __ —__ N ODMPwfcE VAIN OTT OF RENT.
--- --- \i mwaRDa
I CALL 2 DAYS • . "r` NM
BEFORE YOU DIG ..
F 1-800-424-5555 n
1 !UNDERGROUND LTA,00001 A •r
O.
LOCATIONS ARE APPRO., 0.
C42ANTE VANTIVOGAPPW PROVIDED SY
01PERS 13.CAW.'SE FELD GABLE DA VIM)CONSULTING GROUP.INC RNEUN .dOE.X'.'A• SHUTTLE EXPRESS-RENTON PARKING LOT 1/ID/ms
�S RN. AS N.M. • VitCITY Of BOO SW 16TH ST
o fIELOVERIFY GRACES Until'.ANS
OZWISTIONS IF COM:MONS ARE 101 rlNl•SLNFv.I-I.Ia TW _ REIN iON RENTON,WA
i :PWAVE 304. PLI m.A3: - - '^"tRw wnm F• - � Pm<.I^R/9uiMI��R/P„erK SAW Dept. CO3
.xwA.133 MwwA L0« ed. 7L
acP•xn IOCO61FaCluL .A y<Iwi N0 flfNSKK< BY IX3R APPfl [A.Gum
SITE PLAN
IA-1NININ NIAIA
10 ANY ATEA NEEDING ESC MEASURES,NOT KEYNOTES 'INSTALL PERIMETER PROTECTION SJCH AS SILT FENCNG.COMPCSTSOOLS OR
O 00101 NCMIMMEDIATE ON INACTIVE
sHe LG E CONSTRUCTION ACTIVITY SCHEDULE. WWArTIES IN Kc0Ro.NCE WITH APPENDXDOF THE VCR a NG cowry
THE E.norn INSPECTED
NIISNTAJEVEN NEDA 4 KEY DESCRIPTION OETNIBHEET FACE WATEROESKiNMviuAL
' BE NSPE<iEOAMMMNTMNEOA4xMUM L WMSTPUCiION MEETING INSTALL APPROY.NODULE PERIMETER PROTECTION
OF ONCE A MONTH.W MNZ4 HORS POST SON WT...ANO PHONE NUMBER OF ESC SUPERVISOR(MAY BE CONeIX.TED WIT H THE ECM NAIL TARTS'S PROTF PEKIN AREA(WISP RAL MOTSA Frig
ch REOURED NOTICE OF CONSTRUCTION ROM t NDUF j ONTRACTOR
0 40IZ TO Mf SHALL MORE NiHAN CNE(II FOOT FIIOOPR FENCE CLEARNG0 Z INSTALL PAPHOS ZOL LF PERIMBITP4 PROTECTION
a SCALE IN
-- OF SEDIMENT BE ALLOWED TO ACCUMULATE INSTALL CATCH BASIN PROTECTION If REWIRED NBTALL TEMPORARY STORM ORAN INET SCOT I SIN.OFF AND MARK EQUIPMENT AND TRAFFIC RAIION AREAS TO PREVENT ONMKTION BY
CI- SCALEN FEET PATHS A CATCH BASS ALL CATCH ENS GRADE ANDIM3TAU COMSTRLCTON ENTRANCE.) PGTECrION vaT
a ANC/CONVEYANCE
R CONVEYANCE LINES SHALL BE GLENN. SiL PERIMETER PROTECTION(SL r F ENCS.BRUSH BARRIER ETC) NaTKLTEMPORARV STORMS NNINE 3 9Ep4ENL KO RUAFF MUST BE REPT AWAY FROMI it PA ONMFAB
TEMPORARVEROSIONAND PAM.THE CLEWING OPERAT.N CONSTRUCT SEDIMENT wNGSMDlMPs . PROTECroNwAu cATQH RABINBaINETeN Ex DTS>
SHALL TNOTFLUSHSEDMEYSTEMENYATER MLQE WATERUCTIONLS ROADS PARKING AREA 5 ONLY LOW PRESSURE T RE OR TACK VEHCLES SHALL BE OPERATED OVER
SEDIMENTATION CONTROL: NTol THE TIME PERIOD OF
OC ca CONSTRUCT sLRF.¢wATERcwTRaseNleRCEProP D.S.RPE DOPE DRAINS.ETc)BIMulAREWeir
3 TROGTHETIC 33TH WL PROJECT WITH INBTNL APPROX.1071LF OF TEAHPORARVTREE MEPMENT SHALL
BELIMISD TOGCOSTPU.SS VEHICLE
EI
ON
I
COMA CONSTRUCTION OR I i THQEARINOMDGNTRL ENSURES IN DEVELOPMENT RANCEW 5 DCO) EQUIPMENT SwIO TA LIMITED iOAMAMMUM GIO&S VEHICLE WEIOHTOF
DEVELOPMENT ACTMTY OCCURS.A DBTRIBUIEEO SOL MEAS GREATER THAT 0 ACCORDANCE WITH MPENaXDOF THE SURFACE WATER DESIGN PRDrECrDN fENCNG(CHNNUNNI SIX SI TONS TRIM!.DUMP TRUCKS ANO DIRT PONS SHALL NOT SE
PRE.CCNSTRUCTON MEETING MUST BE HELD LSE E%CON DRIVEWAY AS CONSTRUCTION OPERATED IN LIE INFILTRATION SYSTEM FOOTPRNT AT ANN nmE
H THE CITY OF PENTON.PUBLIC WORKS THAN)HOURS SHA 01€AFED BY I EVSIEW SO THAT AS BIT EWNXTIOS CHANE ENTRANCE NECESSARYOTA HEAVY EQUIPMENT SIOUX UNLOAD IRAN AREA RA
H OFR.ENGINEER MIA..SODONG OR MASTIC COVERING THE EROSION AND SEDIMENT CONTRCX 9 ALWAYS N ACCORDANCE WITH THE On.EROSION AND SEDIMENT T INSTALL APRROS NM LF OF TEMPORARY TREE �T ADYICENT TO THE INFILTRATION SYSTEM ANG THE MTERIK SHOWS BE
O THE SEARING LIMITS I MY PERMANENT RE TENTIONOETENTION CONTROL STANONAS PROTECTION FERC sr: LINKI
O T AND AREAS OF VEGETATION RESEWAT IW FACE ITY USEDAS A TEMPORARY SETING IZ CURER AL L AREAS I HAI MALL BE LAANORKED FOR MORE THAN SEVEN DAYS I%.140 THE DRY SEASON.TWO MTNL TEWORWY9TNlQFD CONBrRIJCION •
MOVEDOhRTIE SYSTEMWM TPKKEOEOLMMENi
AS PRESCRIBED ON THE PLAN9ISWL BE , BASIN SHALL BE MO.WO WITH THE ° ENTRA 4 °'COT WINTER
(7 uEARYFIAGGEoer sXNEr TAPE CR NECESSARY ErrosaNcwrRO4FAMREs DArs DLxnc THE WET SEASON Wood FBERMuw.cowGel.RARTIOSEETNn OR GRADS NOTE'
EOUNALENT
Z FENCING IN THE FIELD PRIOR TO AND SHALL PROVIDE ADEQUATE STORAGE P _REMOVE EXISTING TIFF -
LONSTR,CTIONNMKOOMLEWTH CAPACITY IF THE PFRMANENTFKIUTTIS TO 13 ATASLQEKL AREAS THAT REACH FINAL GRADE WI MIN SEVENOAYS I ROMOSTOBER1 THROUGHAPRL000 NO SOLS SHALL REIMS EXPOSED
Y• APPENW OOF THE SURFACE WATER OESION FUroiKXTUI TIMATELY AS AN INFILTRATION 14 SEED OR SOD ANY AREAS TO ROANS ALL 0RKE0 FOR MORE THANAT * IO IWITML,wROX.IE1FlFPEmr,EIER PROTECTION MCST 1ROUGH BEAYS 500EEMEBER SNT O NG SOILS
C MANUAL CT.SERVED DURING SYSTEM THE TEMPORARY FACILITY MUST BE 15 UPON COMPLETION OF THE PRDECT.ALL OSTUFMED AREAS MUST BE STABILIZED ANG BAPS IEMOVEDIF Z SEDIMENT ORT SHALL REMAN EXPOS.FOR MORE THAN BS OSSLNSTEP RUNOFF By a
Q CONSTRUCTION DUPING THE CONSTRLCTON EC THAT THE BOTTOM Aro APPROPRIATE tt INSTALL APPROX.BM LI PERIMETER PROTECTION ECW ENieAMRIERSFILTERRUNOFFS. B.OR
0_ PERI.NO DISTURBANCE BEYOND T. EAST THREE FEET ABOVE THE
CLEMNGLIMITS SHALLINTIMATE lHE FINAL GARDE OF THE PERMANENT FACILITY OTNER SUITABLE METHOD TO INSURE THEIR PROPERTY IS NOT DAMAC£D
Z CLEMOGUMITS SHALL ENALMwNEO BY
15 PSOR TO THE BEGINNING OF THE WET tZ IPROTEC DN FENCNG�1WNlINN1 VRv1PFF OST
O THE APPLICANT/ESC SUPERVISOR FOPTYE SEASON(OCT IA ALL DISTURBED AREAS 1
rZ •
DURATION OF CONSTRUCTOR SNCL BE RENEWED TO IDENTIFY WICH HCLEARING UMTS •
l STABILIZED CONSTRUCTION ENTRANCES ONES CAN E SEEDED IN PREPS...FOR CONTRACTOR TO SWEEP STREET DMLr OR MORE
W SHALL BE NSTALLECAT THE BEGINNINGS THE WINTER.INS DISTURBED AREAS SMALL 14 OFTEN IF NECESSARY TO REMOVE TRACKED
Ce CONSTRICTION AND MALNTNNEO FOR TIE BF SEEPED WITHIN ONE WEEK OF TESEDIMENT FROM THE SITE
DILATOR OF THE PROJECT ADDITIONAL NIG CF TIE WET SEASON A SKETCH
MEASURES.SUCH VESWrvSTRNCIE°WEEN MS OF
THOSE AREAS TO BE SEEDEDAM ! INS*ALL APPROXIFMlELV 154LFBTRAW PATTIES SCOT •
WASH SYSTEMS OR WASH P.3 MAYS AREAS TO REMAIN UNCOVERED SMALL tB INSTALL APPROMMATELY TB LF STRAW WATTLES ECW
REWIRED TO ENSURE THAT ALL PAVE° SE 0W I!TED TO THE CI TY OF RENTON FOR
2 q 1 ARE
EK KEPT
POF TvDEMAND
E M N NOR O OJS TO
T INSTALL APPROXIMATELY OIF arNNW WATTLES SCOT
Q. THE DLRATI0O TIE PROJECT
X 4 ALL REOARED.DIMENTATIONEROSION
IL CNTROL...RIIES MUS!EE COMSrRUCIED • I
.413 CLEMNG
LLI ANDOP CONSTRUCT.CONSTRUCT.TO PFEOBRT a1. .. A:"
TRANSPORTATION OF SEDIMENT r0 SURFACE
TER.DRAINAGE SYSTEMS,.ADACENT
PROPERTIES ALL FACILITIES NCL E NNNTNNFD NEN.
SN
I SATISFACTORY CONGDON.,S.TIME •.,I I
(n 1HACLEAR....CONSTRICTIONLS •..
COMPETE AND POTENTIAL Tai ONdTE
EROSION..PASSED T.MNNIENN E.REPLACEMENTL IMPLEMENTATION.
CONTROL.SYSTEMS SHALL BE RYEATXN ...... i ��
CONTR SY
RIN SC IttOf THE PERIN.. I I I
ry 1
5 DE EROSION Aro SEDIMENTATION CONTR.. Y /' Y-
SYSTEMSDEPICTEDONTHSDRAWNOME ( _ __ _ R
NTENCED TO BE MINIMUM REOU RESENTS TO •
�' \ WITa� _-�^-^
1I
UNEXPECTED
ON PROGRESSEMEET ANTICIPATED SITE D osAS ': L
UNEUCPEClED OR SEASONAL CORD ROSS �'Y �Y IPITS—LMrNa1 UNaTT—LSaTS, W
DICTATE.THE PERM T TEE SHALL ANTICIPATE F 1 Oxi-�linll
CONTROL FACILITIES THAT MORE rvWLLL BE...SSA.i0 ATION r `I —SLIM,
ENSURE COMPETE SLTATIONCONRa ON r a I•Y, O T• W
THE PROPOSED SITE DUSNG THECWRSE t ' 11
M.N.AND RE SPONSBIOF CONST.0 TON li SHALL YiYY O THE I, r .A i / Q
P IE TO MAY BE CREATE
CON01
ACTIVITIES..TO PROPERTIES DIE ODOITONAI (\ r e _ _ � , _ e CI
FACE E E A.ABOVE NOTION -
REQUIREMENTS. BE NEEDED TO '-
PROTECT ADJACENT AND -- ,
WATER QUALITY OF THE RECEIVING { CC •
a B • o Kof THS RAN IS FOR +r' N m, A 1��' )'.
X EROSONSESMENTATION CONTROL ONLY i .<4 AIL.' 1 Hsi
VMI ,I
DOES NOT CONSTITUTE AN APPROVAL OF .�_-'__------ ;s °`�UNITY—_!r- _.. n��rl«__ W__ _ _ `.i:� 'e,.
A Q
5. STORM ORNNAGE MSGR..SIZE Ndi - _ a 'l j W4
E LCUTIONO RPETEST.CiORTIES, -- .r A: _ —__ I�� e
�1
E ANY CHANNELS,OR.POSEDNR.S.RUe n .-- C_--.' '.yyaEa����Et wj�i �_ A$.�r.- • _._
R ARYMFASOFEXPIA.TS THAT
V.S.NOT - E� y1� P I'm:vim""'—' I EN • ' • ssm• ���
ROADWAYEAORIWOOAT LMTYAL EWE .Errr�d���• "
sumw
as S.SO«REOFGR Two OATS ax+Nc THE WET • �n•�'�.— -5111114! I..A��•
/p
SOMIOH SEVEN DAYS WING RHE ARC NaLR .. _ ,.. _ e T
aEAWNyARRL,aT rHPDUp13EPTEMER - e.
SOTHI SHALL BE EMENATELY STABILZEO - •'--• R e ".
P OATH THE APPROVED ESC COVER METHODS '
. (E.EDIN MULCHING.RUSTIC —_. _.-_�..--,.=..4._ .--—
CVERING
_ _
SEDIMENT CONTROL REQUIREMENTS APPLII
i U TO ACONSTRUCTION SITES CLEARING SW 16TH STREET
ETceENonoERIAND MAR.BB ,Q
i B LJSVE..LESS OIHEPWSE APPROVE° /,(J /
HE Ott TIQSV MAAPPUED IN - _—. ' Nmwl
9 CPROCESSASUREB WU BE MFaNEDIN
CONFOLMANE OATH APPENDIX DOi TINE // -� SL VAMC ORETITdI
SURFACE YAYER DESIGN MANUAL
CALL 2 DAYS BY
I1-800-424-5555
YOU DIG A,,,, Cv • Clalsomm
I1-800-424-5555 31
1 "UNDERGROUND RRaxD orlon0...BY Q
LOCATIONS
E APPROXI F
THEIRS COS.11NOT BE LATE GR
OUP,
....m ... R M PCI
+��� 'TPC,11•iF. SHUTTLE EXPRESS-flENTON PARKING LOT +/III/YD15
DAVIDO CONSULTING VNuuP,INc. GLBD Ass NOTED vitCITY Or 800 SW 18TH 5T ,1
OSP a.TNv.T•vLIP Rf_N TON RENTON,WA J
AY ROAN AMICR PLUS CMNGI E 1505BI.01 Way NESVME0 PO SDIICI^ OWW I- z. P0109/BPI I,w/V c SM DEI. ' C04
1 u.Fam PRE WARM" Fam1 WA M. NG. YW5o. By DATE APER �ARo.RO �Ni' TESC PLAN
OCGARgR10G STRUCTION rwa amN „P»I),L 9
AI—IN\\NI*
•
°, 8. P °.
4114
•
e • 1• a• a ne
1
t © LEGEND. P IX STORM DATA; -- E � /E KEY NOTES GNU
FC- I I PAVEMENT CESENEO FOR LIGHTLMD3 alMnSs RIM 21 nSCAN� SO.te�}D L� / KEY OESCAIPfKM! SHEET
N n 10 D n AO I I �� EtAi5W2A'CPP IE 15Il is CPPI,V IE IS �`` d d �►�� / I WIARACTOn 10 POTHOLE WATER
PAVEMENT IESKLNED FOR HEAVY LQAO9 E 1 TIE 24'CPP II./.17 28IY CPP SW IT CPP
O. SCALE IN FEET EIT3 SIT CPP LINABLE TOME IT --
d SOMH:sn IE IS SINE
CPR CPP RSiY fly I / SERME£PCTMET ..SE VICE •
0. ENBTIIO EY}NTQ/a HMSO. 1E 17S IT CPP I d / } } 0.1INCE DE MDPROTECTIGETEOR OSFASRQ
POROUS PAVEMENT NoTFS; Ms/ E 15 1 o i cOrasTRL iqr T �
]N;P SON IB® IE t2 A.1YHOIE
TO PPFVEHT COMPACTION WHEN IHSTAIUNG THE �`�— PROP SED...OLE(TN) E 153E 2105 / V 3 REMOVE EK LS
AGGREGATE BASE i,F FOLLOWING 5£1:5(BACK DUMPING' EtTA53tYCPP IE I2GNE IYCPP
1 ENSTRE STORM DRAM RPE •
E15.3 W2f CPP IE 183S1T CPP �V .d ,�VV CAP EDB'RPE
E I8 NNW IYCPP -- d s Cp2TWCFOR bHAL1 CIF OM Ex CB SHOULDER
THE AGGREGATE 815E 60UMPED ONTO THE S.GIUDE ESOSTIW NETER SEWER PIPE • d INSTALL OEOMES8..4IfR BETWEEN
_ 0 NOM.EDGE Cf THE�NSTAWTOxwOAGGRFGATFR _ - Y. 6 SECTION AND..0IXgeEPORT:.ASPHALT ANO lING ASPNWT
NEN PUMEO OJT aro THE SLED. , Q f3 \' Oi
J •TRU...COIN SURSEOUENT LOADS MGM ON TOP AUJ Q /VV 1 AES,RMP5 ]On
OF TE.AGGREGATE BASE N.INSTALLATION GRADING QUANTITIES: SANITARY SEWER DATA ABBREVIATIONS; c Ili
C7 PROGRESSES.MMOSUSGRADF PREPARATION WRING d $ Q �'
Z WET PERIODS(SOIL COMPACTION INCREASES TOTAL all CUT 528 CN SSW 1603 d
LB•GTp BRUIN FL•ftOMI1E
° Y O}eFllwnrN•[xIHWFrR TOTAL817RII V1fY RM.,D CIV,Cd102ETEWALK IE•IIWERT¢EVAnON
CC •IF MACHINERY MUST ACCESS THE FANG..UMII M[
TOTAL NET CET SOC 1E68 PI CONC•CCNCAETE LF.MEAL FEET
Q A...TONEEONC TRAVEL WAY WV CANN TILLED IE 235 C.O.C.OLITION SO.STORM 0.N ii‘ •('-
•.. -
d BEFORE APPUCATKIN OF THE BASE AGGREGATE ON PLACE 'MEASGALCUATFD L09lIBORADE 2f CONC El IV EG• NG ORA£ SCW•STORM DRAIN CLEM.. -
•HEAVY MU.PLATES 011 SUSGRADE AND LIMIT TRAFFIC TO INQUlE3tY0.?DEPTHINlGHT 119E' GOC¢e6 MSC.TEMPORARY EROMON 6 335CO•SEMOU'S10E SEVER �'. �
Z 1 HE OIEnIVE MA MD2D CUT DEPTH IN HEAVY USE' SEDIMENTATION CANTR(Y CLEANOUT
Q MEAS PER PAVING CRQUS SECTION SEMI ISS] EX.NESTING SW.BMITAf0 MTE SEWER
NAYBIl1pIT OF WATE IN BORAOEIEVEL MALLOW MN
ATER TIINGIILKAGGRFGATE BASF CETMLS EI 6...EV CO21 21 tt FF u TOC•TOP OF C.8
OISOM.RwAR[NfILTMTGN KAMSTHfwTEE PARING
COC¢86 FO.FIMSH ORAE TOP.TOP OF PAVEMENT
La •MEA 1611276 TVP•7 WPM
. - '''
T IMMPMATNY 62 %A.M.AGGREGATE AND 2.1.mlC E6 w - - _ - ADA RAMPS BGRADINGQ
PAYMENT,REMOVE MALCUMIIUTION OF FINE
WITH 5
CO MATERIAL EE PRESENTI ITHLIGHT EQUIPMENT ANO 9CKE I'
W RIEr SOIL TO A MN MUM DEPTH 0E SINCHEST0
ISL PREAVENT MAU.OF THE WIMP.5URPALk
a WHITE
SSU66 QUID MWNTNN AMNNAL SLOPE
a. OF 1T02 PFFCFNA06Rf3GVMEU LEnL.H ::• I
W PAVEMENTOR 144111146 COURSE INSTALLATION „
.INE POROUS ASPHALT PAVEMENT INSTAILATIONS USE ME
SAME EQUIPMFM MD 5 M IRR PROCEDURES AS
CONVENTIONAL ERNST WIN THREE NOM" •
MEM NES ,
•
EM PA•NU S.,OUAND BF ISDN. D 260-160 �� 1
(A TAXI.OR RAY DOWN..TENiERATURf SNOuTON NO •
LOWER ASN AND RANG.
•
OORA/FRY'TEII. FG+IB]
ASPMLi CFNEM ADHERES MORE T I 7J/
AND WSTAuwr Ox NAc,PEW-,C[ORONGLV, r TOP 18.W • , FIN EG 21.IR •• (L/ e
AW,.IXIAITMt>xKGNRY'U CLEAN EQUIPMENT I TOC,R« P{� •
rOC 213] _ /�
.POROUS ASPMLr AG...ME AND C.KER COWES V 1Ym EG..1( . .., EW N .
ssEE�4 k[, T.,n OP2 eoi;rs
ARE REUTER,/UNFORM GMONIONSAx0 IOW P4 ME M1 TOP lee] TL" a - TOL NIS
MATERIAL G A Mull,EQUIPMENT OPERATING ON THE TQUa. 02 26
AGGREGATE RASE SWI CAME MORE RUTTING TPM ON 1 • TOP�tP� / I 1.2� - .- .,,... - ` TOL UW -' N.1 EA
MORE DE.,GRACED BM MATERIN FOR TOC 19.56 I 666 -- i(Ya11 SON W
CONVENTIONAL PAVEMENT REQUIRE MWF
SYHHEHMV LABOR
IAVEMCNI IS EHN[R100MxM OL TIIICR TO SMOOTH RUTS ANCIPREVENT MIMS T ITOO ep /‹.........
4/ • /TpC21W J TOO TOP n.iI. �i M
ASPHALT
RA I E 1.1.P...£HDI MIK TOP
+iBE / i� 1 TOO}}10 __-.- 4 ♦ a 1a,
INFILTRATION MTF FOR NEWLY PLA([O TOC12Y I • TOP ,e Ea 21.1 T DnB, 1 .'F
KRONE ASPLIH.0 SHOULD&1m NCE.RR HOUR LIN / TLS MN TOC x2a. __- _ a a mlPa Q
'MC120UCa01M03 TO TEST RwxTRATION RATES AT I' IAD
e, . TOC -00 SO S. R R - z
PRDOUCT ATOP EN
LOCATIONSIR.L Mi[IMMRMTE OI som SQUARE FEE na TOP 0 /^/ ,, p TOG.. _.. I[ uCi MPn P, 2
TEST «ARRA ^ -`2222 TOC BTI Race. Ra "z^^^J IR G 2.273 7;7'1 19"1 ry g I „,,:,,,,,L.,,,,,..„."-..,.,..,2,,,,..„
Oc m�E� 21, 1>-
EaTEmE AND GEOGR. - ARG ” 'A"" GAA- CR H " AG AG G R R - T Q
a GEDTE„ILEREFDMMENDED.Y THE 5 8 669 99 F$9 9 ��$ � �� 9669 X869 _ i l6l! o !F tY 6 6 ga 6 6 6 i i dleL 20 62 2
NANU,ACILINI S5P1oH 110115 AND "
a RfcONMENDATCNS OF THE GEOTEaNICALENGBEER O e �IIr':NJ 2118
Ocm.e
FOR.GMT BUBGRADE SOL TYPE AND BM EST.. 0� - ` _ __ - _- , TCIP1eR.s _ - _ <�.._ F-j°�� ��'Ta raenn I
•
AG:NEurE c.•/� �.; + --- ` - - �vl�' �' 1 la i' s •-*i►��M w � �_' / Tociim
a —lur •
F. i�9L\e19�gL�\H:�q ��■r7Q�►J!'! \■�q�7■\■\■L\A'■1\■\■\■ :�1g1g101■�\■dEi■\■�\■L\■�tI � li�oT> 7; I
g \n 111 y »!!k1►�� :y \ !1\ Lr �� .a��Ir\�Lk\�\�► R �lz'�� IOC ,
i 5'as & R aa— ..«""" R SRR�R8RRa R.ER2RR„FFF 1
FG• 2105 AAA
_1 .. Rx A -3RR.acs3- @e 2 a,a a a a & a - -a
..2R-RR" F G F F G 222 22Fn--- 7222 F- FaVaNF RN"R-"G "N R"„RG fc 05 -'RR.6 C RR
-—- -—-— sms
2 2-- a.t�xtt ora oto 06t 8t6 OR 06t86S86A t8tx.e_=�a tte_—ota o.ta. aa.xta:o&k,oa ota a8-xtt osa-xa•xat-xta 8a-0ta-�tt-#tt Iaa 05t-xat- $—-$$0 LL�a.0t pe,g.--- ' • - -
sw BTH STREET ,
•
IN
\ MPLMNCE WITH CITY OF RENTON
_ _ _� eiANWR®
( CALL 2 DAYS er
BEFORE YOU DIG GRADING PLAN IIT oms0.
f 1-800-424-5555E,.•m AY Dr.
S :Ln ERLao.NEO IrrNm er D.
¢l LOCATIONS RE APPROX.) 14 wu lfi.
2OTHERS COS CANNOT OE '® DAVIf10 CONSULTING GNE%Ie.INC.
G'• �O - - - Wank NT
w"DIeD 'a°"�'• Ht CITY OF SHUTTLE EXPRESS-RENTON PARKING LOT /ID/20u
i�� msnmFE^� o csw•sIIlxlmrl.rELI.P IOW
REN TON 800 SW 16TH ST .�.
911.1 1
wv R44 w.Y NE DINAFYI Po Dm IIS DAVID .1—'.--:'''''":"..
D.R1uM Piu°°SND/UHINI RENTON,WA 1
4 .51.0001 " ...P.M CNINOT BE LAP Fu.I P. WA WISS ..°n WA Wc« F ..i v/PVDYL MD.u.m. -C05
DcoPRIOR TO NW.s+100.1 WI 111.T IT
No REVS. In DATE PIPS LR,R GRADING,DRAFJAGEAUTILRY PLAN
9
A4--ININ N NIAIA
® LEGEND
Ch LA r./:./. A 9TE cur
(A 20 100 m 10 /17' SITE FILL
1 SCALE N FEET
CL
GRADING QUANTITIES
TOTAL SITE CUT 5311CV•
TOTAL SOF RI i.VI 00,
TOTAL NET CUT 1W CT
I- 'AREAeCALCULAlFO i0 eu9oRAGE
J 8".2UOE81l OUT OEPM LN-.GNT USE-ANDS
IN VY LOP PA
L7 CROSS SECTION CET/41.8E1l i A ES E]00 ON SHEET CWI
Z
cC
Ct0-
Z z
0
I—
Z
CC
CC
CR
N
W
0
a
x
Lai
W ,/ n.... uh 1
J
- € t Id
iel, 4 t/re
t, _ ,E
R w, , 4i- - li
�i 11
�aP �s!!!!!�+ r rrrf CC
/ ii
x.
0 wolf TI*d1 . A AA! .////�!O%%%/.;%Jlii!.02% .!/ ir,Ae / 1"17 #A' /! '/!!!!J Yee);45$' ,'
N '!tom
1
SW 16TH STREET
IN COMB OF RENTON
A E WITH
CALL 2 DAYS .. - — _ — -- — T STANnwM ..
6 BEFORE YOU DIG 1 T
F 1-800-424-5555 Sr
OVCDERGROUNO UTILITY
i C ONSA APPROIO W yO ST w+.
IS0 d N"AybO a �.
DAVIW CONSULTING GROUP.INC. e't4 ...,v W As N011 Air 2.`4‘.' CITY OF SHUTTLE EXPRESS-RENTON PARKING LOT /IG/zaL0.1,OTHER E1051.0.0 FEATURE8 s
ciw•9nNArw•1mA Um �.Ay GAa gt REN TON 900 SW 16TH ST
CONGOICNS 4F 001.1104.5 An MR ,— ALTA.0.0IkeR v.av wWwwNE Su•N. woo .C..":=. PIaP,L�5/ wl,q/P„0 n.w 005 RENTON.WA
n ~ C06
MG Pg..lO mNc*quo04 FmWLL WASWAPSW1Al N0. REVISION Cv DAIL /PPR
.,.\,N,1 ..,1,T� uM ov.m CUT 6fILL DELINEATION PLAN
►--INININ N AIA
Ei• �,. • •
••
Ch NEPAL CC NOM
N DOER PAM.MATERIAL OW NCE
BOLL.UTE Rrl18 0 WRE MMFI R TO0. ATYADM FABRICcTO NEE X OR
0- yv I I PRE-APPR01£D EOM
pT,, i Y E 2.X l 1pa AIRE FMK OR ERIN
II'
I_^. ^.l IOPDONAL-PER SIR CONCOS* TENS MP MUL F1Pn
In BURY BORW a FILTER HAMA IN B' II SMWE TENSION SMAX 1
CNAiIFABRR
0 fi'YCLY . i ' \\ . \ 12' BETWEENJOINIS Ryp)
(, AM b SECURE PENCE \� ", /� 12' 12
Pm Z FILM FLING wA1aN 6 rosBrsRw x ��
a Q IaIE ANGLE STET 102 BAD(UP ME T 31nro ALUAwuM �� ,
SIPE AT THE E.OF RUN. ES PER ro3T
1 § ltt 1 \ / I Nin.(1w_1 �I
Z RADON NM MAW SOL MAIM. Loi oi (/\`' CEMENT CONCRETE EXTRUDED Cu.
O a CHAPEL NAb631 IN TRENCH AND •
ON B0111 SOB CF FENCE R 1 D'
411A Cgs
LL FABRIC CII BE AMAQ N. I 3 BARS(IVP.)
LU I a 1/2' 5 21/2•
?0LX 2-3/rX I SPACING OF ANCHOR BARS
SILT FENCE ® OFT 13 GAUGE METAL 2BURY MIN
1n PER RING GRIMLY FIGURE 0.E ULNA PPOST FENCE
EA NTSINRIGHT CFWAV, A Rl
W USE CONCRETE
cc BypFlEaRacX v NOTE
X //// CONOSR[NT 11.10
aPECIN NTE OTE ,. JOINTS NAY BE iORAEOWR INSTALLATION USING
W rp/N WHERE 5N LINA FENCE TER CONCRETE CURES
M.BE INSTALLED NEAR 1REES. TO M rvN1uM sTRENGiN.
LU •'.'` FENCE SHALL BE AT 0RPF LINE CR
R•N INK `� R4A9 GRECTEO BY ENGINEER 2 R I , R
///////Ni14 -Nt.y ���t:^. TEMPOFENCING(CHAIN UNK)RARY TREE TION® B 3 BAR
,\ SIR• ) -1 CEMENT CONCRETE EXTRUDED CURB TYPE 6 p
PER WBOOT BTDPUNF.M42OO CDi`6JON
1'-0'WARLY SPALLS '•-„.,,
N.
5
DEO-TEEAE FABRIC �INgWE FAL MOM �`' CTR. , / Ens1NC ASPHnL•_.yam z.d MN. REC IyTiE11BF
INGRSSREDIESS AREA W nvE TT
�� �V (SEE NOR 2)
it MN MCMIE56 Y yr
51ABEMFD ACCESS 91ALL BE USED IN ALL AREAS Cf TK SR WIN.000E 1RIARG AIM PANNING. MIY.IAIN• i
WIORG PUNTING S1050 0110 YEARS OF PROMONG 510.040 ACCESS RILL BE COMSCID.. ��• m.mm MW
STABILIZED CONSTRUCTION ENTRANCE E ' ,u, - —(50 NOR zT�
PER IOW COUNTY FIGURE DAG I ,Oi MM �. 1J ` - _s i ---—__—
�l
NTS
rt� wir
'`„y 14„Ilk.$p �
r HMA(or ACP CAHN ED
Ij
,1 ' R CNUUEE NOTT.NOTES: *It
/-' , Wnmonml /
1 AT DE ENO❑1K iB, OERIDN m BWASS \`---�/'
9 2 STONY DRAM NETS ARE OH,m RE PEAR SIOIM'NWYES)
1 AGE EWES PER a LINM able E`y 'P<, NOEL
P
NAMMACIIMERM
Y 0 11*2(0 00 STRUT k...1.,1
110!5 TCN 1 HIAA{P-ACP.m tl' l 1 MUST MATCH DOSING TH.Ess IF.EATER.
BASIN INSERTS ARE 110T m BE INSTALLED T D� '
e CURB NITS �` 1•X 1•Stab (SCF 0511 11,OVER 1 2. SAWCa3 SNA:L BE PO„..1-0 SETO.EOLL 0
JI• I.INSERTS SMALL BE INPECIEO ANO YAMTABED �7, ::Mmm OA.PbroP 6'CRUSHED ROCK DANAC[0 PAVEMENT.
} THEN A 1/2 INCH RAIN ACOAIOUIFS WMW A FOR 6 2,HOU0.PERIW.Q£NI/a10NR IEPIAD:W9AT S PLACEMMEENT OF
ME 01 1110 FMC SEE STANDARD PLM'
sits HAIf OF 1HE MAP IS FILLED WM 4OMFM5. mom I.r..NiamW NNONYAY�s.ewm.•.W 5114.a4•.we42,OS123* FNl CWCREm CURBS.
AT 1Ew�•m•.mlF.t..WY.NwAw,r uw4wwm3n11.
CB INLET PROTECTION ®c STRAW WATTLE CURB B GUTTER REPLACEMENT IN G)ASLw1LE WITH crtra000100
PER MING CO.,Fl01AE8 DI L.a p AM NTS PERGtt OF RENTOR 9m PLAN 103 STANDARDS
ICALL 2 DAYS NTS NTS BYOM
0 BEFORE YOU DIG BY C.M.
F 1-800-424-5555 m. a.
;UNOERGROWO UTRM .T. MN
al LOCATIONS ARE APPROXI y.L,b
6 W -p� w.v. f+01tOx ....r.
n d AS NOTED •° .. CITY OF SHUTTLE E%PRESS-RENTOR PARKING LOT +�/1D/ems
DAVIOO CONSULTING GROUP.INC. f 5_ oN.. Nit l
REN TCN 800 SW 16TH ST
ALL 01.1ENST.FEATUFES NM cla•s1NFm.r I�dLLc RENTON,WA �1
AS WO.MOOR PLANS cANNOT BE 15029.B&N.II Way NE Su APC Hm54P6 w.M1_0 $AVA.L," n mow. ow CO Fe. mr,{ :� PIanninp/BIIIAIIO/Puolk 0ar5.O.PI. CU/
AN11t NG. REVIsio0 ar Dore PPH E•,RRAW DETAILS 2
OCOMOON To mrcTRucTION B
H,,,1X:, W,,1.I„ AI—NININ NIA A
r
U1
U)
0.
a
a.
3 o
J
Z .u'n-r.w • w .
Y h
a '- t—t ��...�. Y�.:
a_ a,.P... ;„;w,ID I a a9..,� ��' * �A � ,6 u..
O CEMENT
MPEMEST CONCRETE
< J sv.vm
CC CEMENT CONCRETE ..,--Or .ar<w Pcw �ryl S .I :. I ,asaunuu.
TRAFFIC CURB AND GUTTER
Cr _ __ .....e...uwrs Ne ys.'..mu��M^.•u,•IMan, .........,?4,. ..'24#1 -
„NIN."....._ lywuacu w.xwrvN
•
WTM `1. ' _1 ..C.."7::.`I IT .:,�. . ` ww rgngT —....,,.... .._rte`” ,..1 �:$Y°m:..
r DBPRESSW CUM BEOTIDN .n. 'N � T" ,s amts :P.4.1..
-
1fn OEPREeTYEU CURB!AGOUTI •a,a.n.,a..o..NN..ewP..A.�rM.rRRr .,NI".e.., ....,",.«u.A. I IrCy;.MM r%A*
n r. w.,'....,. r
,,.ue,«..O.uva , - .f. a w.,I Ouurin
SM..,1-iSWD� .o.ow bM -.vH ..,,e.mr ovwsm.oui°ry0i¢••�iw~now
ru .r.TPU+ AT...
N,
aaurc• • i/ uw-mm NCPS.Nwv.. ., o-
.
II '•�"n' ',•"• 5,.5,:5.5... a Ds.ma v_,q _
r 1 r .".� Fr Ti
aa,c.amwu.a Waw:-w b urwa.,n.v, ammd- 'sn.wmr �
CEMENT CONCRETE
TRAFCIG CURB ¢ As u,w, so lTYEBTRAMYMA .a-.w0
DEPRESSED CURB DETAIL . U
o .5 unvu,v. 5Y - Lun,.apan FRE99EL CURD OETAF.
•
NN
e...nw .,..r=.,...e.,.. . >•F r Igme asA +IEanY,l.TYPE C13
eRu ,�...,,F., , .,...,, .w.A�R o.oA ,MOMADRAS .......,Sta...
PSTD PIAN-LSl RDRAI-Sa �.. RD 14,111 10411 P ST CEMENT COMMITS cos � 8PUeuIG•eyK en rar rr OBna r 11rnWAILII „yLPFt "ie -.u�' ewrwcurnmwwrwwwr -�4� „A
idin 9.I _
•
.u..u.,r.....
CEMFNT CONCRETE CURBS CONCRETESIDFWFUK DETAIL�iCFMF4 r,YRFTEDRIVEWAY�
°F PERCIn OF RENTON STI PLANAR PER On OF RENTON STD PLAN 102 PER an OF RENTON STO PUN 1042
j NTS NTS NTS
9
i
I
m
I
IN OIMPLNNCE WITH CRY OF RENTON
F
STANDARDS
F CALL 2 DAYS SY. rr
BEFORE YOU DIG 0.
F 1-800-424-5555 BY OM
1 NNDERGROWO UTILITY
k LOCATIONS ARE APPROXI - A4,, SY. wN.
O
s, �, a.LAN SLAB NOTED ....la'F'4'.. SHUTTLE EXPRESS-RENTON PARKING LOT 2/ID/2°S
DADI00 CONSULTING GROUP,INC. CITY OF 800 SW 16TH ST
CANALL OTHER ESISTI.PEATURES ONO $�9�PEI.OVERIP/GRADES UTILITIES A. RENTON RENTON,WA
vAS S..As..PLANS CANNOT BE IS.BONE Wry NR SUM Nu Pu.BmlI S2 `3 `" v k.,uwm I-• iiill Ylonninp/Bulltlinp/Pu01'IO Np.Aa UPI. DETAILS C08
DCOLCTE0A PRIOR TO SNONN.
CONTACT
TICN LAO Far,Pak WA 9.155 PmNIN WA se?.. RIO. N0 REVISION BY DATE APPR ""��"" " B O.S
B,,I,,4 w,,,1 vR AI—IN N N N AIA
r•
•. II.
•
O PAM
MEENOTE5•40/1D 1:� IU NOTE ENSONI
a PER sT
0- AEE NOTE 10.10.4 ISEE NOTE 1°ELDER
SEE NOTE,IELOM
f,eT - ABMEA.N,.S ErA I OwPFYMFB
l -
J
Z FR. FON SEPARATION 1..V.OvEN
F
Y a��wE OCON6O &.lENEM)
QwSBNEIMF NO TE3 BFLOAR SEE NOTE.EEL.,..................°C. E F oTWIEEN. CUFM CFF FCLOOELDN ED ORM IIs.
Cl- IOSN.1 ISE•N L
Z PERMEABLE PAVEMENT PERMEABLE PAVEMENT
O CUM MAP NOT MTCOIIRCTC S A _ I,E.M wP.I.ONT. a.
�G `•
//CUM QRUT.O,r..N. Noart Nar•m o�H at M CROSS-SECTION FOR CROSS-SECTIONLOFOR
•w"' LIGHT LOADS ® HEAVY LOADS
Ul
a 1 `�F ..I., .MM RRE. }ARO:...`` .N"I ,a:�:-"ww"`wirrrr�°:'�•s Nrs cm NTS
cD a cm
2 DOWNER•_tua maw., ,, E ..NI PI 0R' �Ell� •••••
,W•
I Ne.ywr.. AaCo. m..•w PERMEABLE PAVEMENT NOTES.
_ CAO en.n.ort PPR Cut NAGE.,
UJ CHOKER GOGR6E FOR R RhOD MIEBLB ,m*+R%n1 FFOR REPARATION.MGR STABS OATuy
.P•no Cam M Brno DA MOH was NAM* tOKERCOuRSEF RPERvin SWI.BE SB-TO MTN.
PeY+..R O,N� V �/� www PN.IS BrDA.CV..MON 0••••••••1 CM ml P.s.M DRABLY GRADED STONE WITH GEOTE%TILE PROPERTY REOLXREMEMS
a..
Ir cum.
A WASH E MORE FOLLOWING
vwM(rirj• hwwMC' E 9EPAMTON SOIL STABILIZATION
a HAtmale H iw �NYArwPUAlti. ill + me•m • C.r.4CaurebYcera REO FENT 1092E NUMBER S)1 9MNTM:ETTHEFOLLOMNG OEOTE%TILEPROPFRTY METHOD WOVEN INDrmDYEN WOVEN INDNWGYEN
W .aM\ Y �" _ _ RTI. C. of sl./mw.a xweE ENMEL.Bm Oil O.)51 N030 MAX NO EO YRx.
w'•Br'M IwR.NMIroPD PMFwfR.P Eno
RAMS
IOS
romca nu�rri.�. .� T
W a_l. J•__�-. '.� - _-1.. �`a= �•�mV�� �'� Pe.ea,. BMO.no ' (""cue wa D'sr' I� WATER PERMITTIVITY DUW 0038EC-t MN D OBEGIMN.
- ��. - e°1"o6F:�4���I►1 - wro Nord 0 BO la arm<Mop no M. Bu � Y HGRAB rf�ANDILEx.., QRECTgN 13 4•12 3n LB MN 7E0.MN 5tl LB YIN SO LBMN
NF.Ew. to rtes.slLAaeaR 0 �eS11ecv�a[[ )M+.FP».vA.4.=`y`�ml.yn.e.N.rery GRABFNLLJoe STRAIN. YACIENE
C MO
•t .wl... ...... r-+ WwAI...1:21r"PI s''' •'n^V., a GRABF LuRESTCNINE RECTINM DES,, .Swi xmYr .Mx is(a
N ON
rNFw II..I cDNA, -rlw1.. N.e r.nrr- `vwso wNwTurttw B Yee nlMwwYP�N00 aw..s,•bmnM BAR E DOSENA AND DOM220111
AGGREGATE STORAGE LAYER-6'BEM MN IGRAOATWN FROM NO9IRFNGLH 406<31.11 NO LB MN }A LEI MIN bOIB MN
L ` , WBOOT SPECS) RINCTLNE REMSTAME 0WO .M LB MN 310 LBMN SA IB YIN E315 LB IAN
xAP.OIIe•NWT. TFAR03RENGTH INYAOfl3O DASD PO LB MN 50 LB MN 114 LB MN NLB MN
XAMCMNE DIRECTION
NA.La1 PLAN VOW 2.PERNIFESa F RAIIARJ ULTRAVIOLET SIV)RADMTION DA3M 50R STRENGTH RETAINED MN.AFTER 503 HOURS Ft
TYPE PIBnoppSNLA PERMEABLE BNLAST SHALL MEET THE REQUIREMENTS OF SEC TON STABILITY XENON ARC TEWEE
I.Nw...4 _ BOSOM FOR BALLAST EXCEPT FOR THE FOLLOWING SPEOAL
` .Bw REPOREMENTS TIE GRADING NSI QUALITY REQUIREMENTS ARE
......Ss .
rLxAla x.APwPf
HAM.w.e..FM
—1.2-a.:1411.,-.'""rind NF.TAM.le IN� '-----
^ %r m.M MAX 'y"rn to ErYrn.wEs.'.r K MIXDE55
Mw r 05-100
"",Br`s�"m..•o�. • • AIM."... Ti. . •GENERAL PRIOR 70 THE PRODUCT.OF PIIMA 1NE CONTRACFOR SHALL DETERMINE A DEO.
40.10 AGGREGATE STRUCNNE AND ASPHALT BINDER CONTENT IN ACCORDANCE WITH ANDO,STANDARD
_ NMw. f/� -�
,s.gl ." OPERA MEG PECCODURE 732 ONCE THE DES.AG.E.TE STRUCTURE AND•SPHAPI TENDER CONTENT
....._-= NO A ,.. HAVE BEEN DETERMINED THE 0.TRACTOR SIMLL AMR,THE P.AA MX DE RCN ON.1
O 'aoRramo ware.NA.•.. a...P..=rm.OO NO IDD - Da .MOSTANDARD SPEC.CATIONS VERIFICATION Or THE MOL DESIGN BY TG THE CESI.MEETS THE NEOUIR DAVITS OF SECTIONS FHE C.T;t"Ir°A0.3 GENCY ES
VSGTIEMI No FRAcrLXE )s MN MBOOT NQT NEEDED
,TA rMPdq. smmm S. ALL PERCENTAGES ARE BY WEIGHT WH[BE
THE
REQOI JOB TARE FORMULA IAA,
OFTHETHECA 1..C4.OF MA ANY POOTIONAL
PROJECT ENGNEER MO MAY BE WOE
IONS
. .PA.Ie.T �\,r!!_' T .PER BECTON COM)ROAL•O ROM
RAR DOCUMENTS I..ar.STATISTICAL PIOTlk,,
BgMAOFFOR PAVEF( 8 XeIACP EwSDO 3MDARDSNDFCAna STANCE
�� ED��CDR9L�T9TDQPEMATERAL9WIHINTE
CPERVIOUS HOOSES CONTRACT OCSH4 MATERIALS STOCIWITHWTH THE WITHIN TIE
IOUS
TESTING Wu BE CONDUCTED AS OUTUNED IN
,I ODIAMIEFCIAL EVALUATION WHERE COMMENDAL ENNA IS ALLOYED IT CAN BE occETED 81)A
0 AREA TIE AREA SHALL NOT BE GRACED BELOW THE FINISH GRADE AND OL CONTENT IS REDUIREO
LEAMNGAMINIMIO OF C.STRST OF CTI MATNOF IALTHE INNIOUS PAVEMENT r['uANERITHE COMA. ATERE n QAwnw
SYSTEIMMEDM
TEMPORARY
CONSTRUCTION
ENT ANCEM AERIALS.IF H.RTIHYAI PAVREG Cuss'..CERTIFICATE
9Y6lEM 1EMPwMY ar.SiRlCign EMRAti=E MATERIALS.IFTON OF ASPHALT MIX.THICKNESS AS IFFSCAT ED ON PLANS CONFORMING TO AAMITO SP.1 PRIOR TO THE
G 22.POLYMER MCOIFIED.WITH 5 POUNDS OF PIER PER
F. LOCATED IN THE RUINOUS PAVEMENT AREA SFMLL BE FULLY PROP/cll..OF MINA THE CONTRACTOR SHALL DETERMINE A DESIGN AGGREGATE STRUCTURE AND
B PERM WNW MIMS,VW PAVEMENT AREAS TRUCT. ARR.)7 smo.CONTENT IN ACCOR.NCE PATH NAPA INFORMATION.RES GI u A THE
1M•PRRPIRO MM ANY MT TNBIMSINgBM•POMMT EO FROM
PERVOHEO FOR PERCEPT ASPHALT BINDER IN T.FNMA SHALL IE 6O TO 65 PERCENT WEIGHT OF Mu
g IN uNLESS THE THEAPERVODE IS UIS AREA Qi THE GEOTEXTI.AND FOAL ACC:THAN...NG ANO MASH PHMR MOS,.
% DEPTH OF BASE ROC%ME IN RADE PER THE PIANS P TIE ENGINEER
PERPENDICULAR CURB RAMP N DETERMINES THAT THE PER..PAVEMENT OUPMENT T. •GENERAL•.CERTANCE CF P141.SHALL BE AS BEEN
ALUATI.PALL BE AS DiCUSSIED IN THE
F PER WROOT STD PLM Ftltld} O CORS MERE[SWAGED
BPO REPLACE A DEPTH OF BASE ROCK SEvALLATICN STAPLING OF PHIAA F. M TSA,
NTS NO ADDITIONAL PAYMENT WILL BEEvALUATICNWALBE USED FOR COMTE..Him AND
I INTOE FOR THE REMOVEDAND REPLACED BASE ROCK T SPECIREO IN eH.377)A.'EN.S FQI cOMMERCAL
HMA HAL IN AT THE DISCRETION OF THE E.INEER
'1 THE ENQNEER WILL INSPECT THE 911BORADE AND UNLESS ACCEPT..1 OTHERWISE DIRECTED BY TIE ROWER THE CONTRACTOR WALL TE IVMAL TRA CONFORMANCE TO THE
g REMOVE ANY ACCUMULATION OF FINE MATERIAL.SCARIFY THE TIE REQUIREMENTS CF MCTIQ.BOSM31 ME RUC,.
STANDARD SPECIFIGTION EM
1 509 TO A...DE TOITHE UM APPTH CF 5 INCHES MO APTRRPRIATE COMMPAC BON MPACT THE PHLM DEVIATION
N0 ASIEVE MOW.. PERCENT PASSNG.0
NO(NEVE TONG BSC. PERCENT PASSING ISA IN DOLRIN.CE WITH CITY CF RENTOR
STAEpARDe
NO OD NEVE TO NO 3m SIEVE PF
I CALL 2 DAYS ASPHALT 100ERN PERCENT B.OERCONTENT42
SY Dm
BEFORE YOU DIG BY OMR
F 1-S00-424-5555 BY IDM.
10001(DN APDERPROUND D�ROx BY DILITY
M1- I AHS
o .z/ID/zms
I
BASE MAPTOPCGRAGSPRENOED BY
dA WAD �. ...
AS NOILD ""38'470"' CITY OT SHUTTLE EXPRESS•RENTON PARKING LOT
G DAVI00 C.%O*4.i1N0 GROUP.INC �e °� nMLI1I•CONDITIONS IF CONEIG.S ARE POTs 800 SW 16TH ST
FIR DVERIFY GRADES UTILITIES AND
CGS•slSw..al•Lmul U. — R E_N TON RENTON.WA
Ixcro eoNM Wm NIS - Oe"�MX wm F.v • PIOrIrrPB/BAYNIB/P<IX 0000 0.PL. T�oi�
1 CZNSTRLCTEDATO 5.0.4.CGOTACT
Ib 1..P.L.W.V. 4mWLL W�NON AONy N0. RLWSIOTN OY DATE MPR1"..12„,,t orm DETAILS 9 9
5,rxN »I.I,IAl-INININ NIA A
Technical Information Report—Final
Shuttle Express Parking Lot- 800 SW 16th Street February 10,2015
APPENDIX D Temporary Erosion and Sediment Control Plan
Davido Consulting Group,Inc.
TIR_Shuttle Express_Final.doc
10 AM AREA NEEDING ESC MEASURES.NOT
REQUIRING MMEDwTE ATTENnaN,SHALL BE CONSTRUCTION ACTIVITY SOHFOI II F.
KEY NOTES INSTALL PERIMETER PROTECTION SUCH AS SILT FENONG,mMPOST wD(SOR
N SEVEN(7)DAYS 1 STRAW WATTLES IN ACCORDANCE WITH APPENDIX THE 2WB W NG COUNTY
I THE ESC
ADDRESSED
Es orvlNAcnvESITES swL KEY DESCRIPTION OETAILJS HEFT SURFACE WATER DESIGN MANUAL
BE INSPECTED AND I.WNTAINED A MINIMUM PRELONSTRUCTION MEETNC. N18i,M1.'PRO%.tSMU ERIM[iRPROTEOTON ]
OF ONCE A LOWING A STORM VEST N01R5 POST MON MATHNAME ANC PHONE CUMBER OF ESC SUPERVISOR(MAY BE CONSOLIDATED KITH THE - 6CN
N 1 REQUIRED NOTICE OF CONSTRUCTION MON) Z DX TTN PFRIMFr. Ncx] CONTRACTO • •,-. .. .. ,•N ...
20 IA 0 2°.iiiii MAH DE II)FooT FUG OR FENCE CLEARING LIMITS NBTAII Aron RPROIPCTON ECM
R
ON Z OF SEDIMENT BE ALLOWED TO ACCUHUTATE INSTALL CATO/BASIN PROTECTION IF REWIREDINSTALL EQUIP TEMPORARY STORM DRAW IN µ
ET 1 OFF AND MKINFlL� AREAS EA9 i0 PREVENT COMPACTION BY
IL SCALE IN FEET WTHIN A CATCH BASIN ALL CATCH BASINS GRADE AFC INSTALL CONSTRUCTION ENTRANCERI 3 OW] EQUIPMENTµD TRAFFIC
EL AND CONVEYANCE LINES SHALL BE CLEANED INSTALL PERIMETER PROTECTION(SILT FENCE,BRUSH BARRIER,ETC). PROTECTION Z 9EDMENi PRC RUNOFF MUST BE REPT AWAY FROM INI"XTRATONAREAB.
TEMPORARY EROSION AND THE CLEANING OPERATION caNsrRWT SEDIMENT PONDS AND TRAPS INSTALL.TEMPORARY STORM DRAIN INET
PRIOR TO PAVING T LADEN WATERA. PROTECTOR O ALL CATCH BASINS IN.LETS N EX DCO]
SEDIMENTATION CONTROL INTO n.DT FLuSH OWNSTREAM SYSTEM CONSTR.T
STABILIZE
WATER CO2TSALLS ANSI PARMTG AREA 3 CR,LOW TIRE OR
'INTERCEPTOR OKES,PPE SLOPE DNNNS.ETC)9MULTµEWSY PRi�LSY SYSTEMS
WRING
VEHICLES ION BERACTIO OPERATED OVER
13 THROUGH
PERIOD L OCTOBER IST WITH _ PROJECT DEQ PSCTH APP..t T OF TEMPORARY TREE THE I<FIRTRq NGUREAU CONSTRUCTION CCNPACTION
1 BEFORE ANY CON9TRLCTIONON OIJGH MACH 30TH.ALL PROJECT 0 EMI RDEVELOPMENT PROTECTOR FENCING(CHAIN UMAI 2 EQUIPMENT SHALL BE LIMITED TO A MARA.CROSS VEHICLE WEIGHT OF
DEVELOPMENT ACTIVITY OCCURS A T DISTRIBUTED SOL AREAS GREATER TINT OSON CONTROL MEASURES IN ACCORDANCE WITHAPPEN.%00f THE SURFACE WATER DF-SIGN MXM)TONS TRHXDL COMP TRUCKS AND DIRT PANS SHALL NOT BE
PRECONSTRUCTON MEET.°MUST BE HEIR µE TO.LEFT UN"WORKED FOR MORE mANGol.ANO MANUFACTURERS RECOMMENDATIONS. S USE
ENTEX crE DRNEWAY AS CONSTRUCTION OPERATED IN THE INFILTRATOR SYSTEM FOOTPRINT AT MH TIME MHERE
WITH THE CITY 6 RENTON PUPUBLICST
MORALS STAN 12 HOURS. ALL BE COVERED BY 1 RELOCATE EROSION CONTR0.MEASURES OR INSTALL NEW MEASURES SO THAT AS SITE CONDITIONS CHANGE RANCE NECESSARY THE HEAVY EQUIPMENT SHOULD UNWDINAN AREA
H DEMON ENGINEER COVERING THE EROSION AND SEDIMENT CONTROL IS ALWAYS N ACCORDANCE WITH THE CITrs EROSION AND SEDIMENT ] IF OF TEMPURA THEE ADJACENT TO THE NELTRNTON SYSTEM AND THE MATERIAL SNOOD BE
0 Z DORIES CF THE CLEAR.°UNITS t urvOPE ENT RETENTION.OETENTI. STANDARDS FENCING(CHAIN ANA) rtv DC0T MOVED OVER THE SYSTEM PATH TRACKED EQUIPMENT
J AND AREAS OF VEGETATION PRESERVATION FACILI TY USED AS A TEMPORARY SETTLING 12 COVER ALL AREAS TINT NU U UNWORKED FOR MORE THAN SEVENOAYS WRING THE DRY SEASON OR ttC INSTALL TIE ORARY STABILIZED CONSTRUCTION
AB MESCRIBED OAT','""IN SHALLBE BASIN SHALL BE MOD RED WITH THE CLAYS DURING THE WET SEASON OATH STRAW,WOOD FIBER MULCH.COMPOST.PLASTIC SHEETING OR x B'CSI
C7 0.EARr FLAWED er GI,RVEr TAPE aR NECESSARY EROSON CCNTROL MEASURES ENTRANCE WINTER GRAOINO NOTE'
n 7 ENCIIL IN THE FIELDPROR TO AND SHALL PROVOS.EQUATE STORAGE IS STABILIZEALLAREAS THAT REACH FINAL GRADE WITHIN SEVEN DAYS S. REMOVE EOSIN°TREE • FROM OCTOBER tTHROUGH APRIL 30,NO SOILS SHALL REMAIN EXPOSED
' Y CONSTRUCTION IN ACCORDANCE NUN CAPACITY IF THE PERMANENT EA.,IS TO OR 9OD ANY TO REMAIN UROWS RDFORBORE THAN 30DAYS 10 INSTALL NWT 1
ENDS 0 CF THE SURFACE WATER DEMON FUNCTION UL TIBATELY AS AN INFILTRATOR 14 ED ALL A•PROX.INCL Lf PERIMETER PROTECTOR FDR MORE THAN 2 DAYS FROM MAY I THROUGH SEPTEMBER 30.NO SOILS
MANUAL MO OBSERVED DURING SYSTEM.THE TEMPORARY FACILITY MUST BE 15 UPON COMPLE DISTURBED THE PROJECT,ALL DISTED AREAS MUST BE STABILIZED AND BAPS REMOVED IF ECO] SHALL REMAIN EXPOSED FOR MORE THANE DAYS ADJACENT PROPERTIES
Q CONSTRUCTOR DURING THE CONSTRUCTION ROUGH GRADED SO THAT THE BOTTOM ANO APPROTRATE. I I INSTALL ARMOR.IMJ lF PERIMETER PROTECTION PCO] SHALL BE PROTECTED
STRIPS,FRONTORMENT ON SRORMMNTER RUNOFF BY
D. PERIOD,NO DISTURBANCE BEYOND THE EON VEGETATIVE BUFFERNT BARRIERS,FILTERS,BERMS.OR
CLEARING LIMITS SHALL BE PERMITTED.1HE FINAL GRADE OF THE PERMANENT ABOVE
INSTALL APPROX.CN IF OF TEMPORARY TREE O R SUITABLE METHOD TO INSURE THEN PROPERTY IS NOT DAMAGED.
O ORTIS 15 PRIOR TO THE BEGINNING OF THE NET ILT 2 PROTECTION FENCING ICH..UNC) ]
ep ORATOR OF CONSTRUCTOR SEASON(OCT I I.ALL OSHURBEO AREAS 13 CLEARING LIMITS -
Z 3 STAMLRED CONSTRUCTION ENTRANCES HENCSHALL E REVIEWED.EDEA IN IDENTIFYWHICHF. SWEEPCONTRACTOR TO
W SHALL BE INSTALLED AT THE BEGINNING OF NESCANREOSS OSTURBED
HALL I. OFTEN IF NECESSARY TO REMOVE TRACKED •
Z CONSTRUCTION AND MAINTAINED FOR NATHIN ONE WEEK OF T.
SEDIMENT FROM THE SITE
DURATION OF TIE PROJECT ADDITW.
•
OL BEGINNING OF THE WET SEASON.A SKETCH 15 INSTALL APPROXIMATELY ISA LF STRAW COAT TILES ECO]
MAP OF TSE AREAS TO BE SEEDED ANO
HASH SYSTEMS HO
EMS CR WASH PADS MAY BE SLCH AS CONSTRUCTED
THOSE AREAS TO REMAIN UNCOVERED SHALL 15 INSTALL APPROXIMATELY 213 LF STRAWWATTLES EGO)
41.1
W REQUIRED
TO EAS KEPT ENQUIRE THAT
LEAN ATOLLND PKOUTTO BE SISMITTED TO TIE CI TY OF RENTON FOR 17
REVIEW INSTALL APPROMMATEL v NO V STRAW WATTLES ECO]
E[ ROAO RIGHT OF wAY DOESRF
_ E DURATION OF THE PROJECTLEIT DR
OH
A ALL REQUIRED
W
A HPCCTRILT
I
I
UJ µ OCe
TRANSPORTATION OF SED MUST EE T FACE
WATER,DRAINAGE SYSTEMS AND ADJACENT
IES
LL
FACOIE TI SI ALL EEM NTAMBDINgMAND ENT
'j SATISFACTORY CONDITION WTL SWI TIME I
(n THAT CLEARING ARDOR CONSTRUCTION IS
COMPLETE AND POTENTIAL FCR CNSITE
EROSION HAS PASSED THE IMPLEMENTATION,
MAINTENANCE.REPLACEMENT AND -6 -
ADDTIONS TO EROSONSEDMENTATION •
CONTROL SYSTEMS SHALL BE ME n ' 1 t •//�
REBPONSIBUTY OF THE ERMTTEE ', - �' \ J _
5 THE EROSICR AAO SEDIMENTATION CONTROL -/ •
SYSTEMS DERCTEOON THIS CRANING ARE .t �` � } FA�T•f--�
.TENDED TO eE M.MUM RECUREMENtS TO ^ -
MEETANTOPATEDSITECCNDtONS.AS /!. • :� _ I- 11A1e _ I
CONSTRUCTION PROGRESSES AND
DICTUNEATE,TIE PERED OR MITAL TEE
ANTICIPATE
€ 'r. LRa LIMRFRZ DrTS--Ltf1S- �S rr !/S,f //SE e t / Fl ---
ACTIVITIES AND TO PROVIDE ORAL '
S.
BOVE
REQUIREMENTS.
EQLTEMENTS.Aro Y.NE N DINT _ ,.� l --_.
W REMENis.ABMAr eE NEEDED.TO r �� ,�
PROTECT ADJACENT PROPERTIES AND ; f - �js •4
qui
WATER QUALM OF THE RECE VIN° --DRAINAGE SYSTEM - -
a 6 APPROVAL OF HS FUN IS FOR RNx- 1 C- 0 •
R ERCSONSEDIMENTATON CONTROL ONLY T �" ' J MIIM� •
N,T-
A COES HANNEL DOR RETENTION
APPROVAL OF • a -�� k -_----
_ _ ��.�.r�•- ������ .
o a� UMI M1TS- MITA 1T TT3=yyITS- ,.90'
5 STORM DRAINAGE DESIGN,SEE NOR • • - , -• O /`\Y�. E�
a LOCATION DF PIPES.RESTRCTORS, - _ .JO , ®
S CHANNELS.ON RETENTON ILS.TES ,., �� 4.
] ANY AREAS OFEXPOS OW HA.ACLUNOT - -_• _- yi 0% __.ROADWAY EMBANKMENiS,THAT CULL NOT BE . • rIF /q
DISTURBED FOR TWO DAYS DURING THE WET . Ir ✓
SEAeON OCTOBERSEVEDAYS DURNO THE
DRY "
�' 30THH10R SEVEN DAYS WRING THE DRY '�31YHt •
�^SJxB7•'�-'>t[MI'1ix11, -. ' - •O./
SEASON(APRIL,SIT THROUGH SEPTEMBER KA
SEASON(ASHUN IL IMMEDIATELY STABILIZED YTY"!"IWt-�BfNI StlYHlT--Tnrvrt
i ROTHTHE APPROVED IMC COINER METHODS 3 \v^ O
E EG SEEDING MULCHING.PLASTIC ©,
I COVERING.ETCI .... -'-
9 8 NET 9...WNS-ASO.,EROSONFNO . .. • -- - ----- -..�---� - - --- �--� • ---
SEDIMENT CONTROL REQUIREMENTS APPLY
II TO ALL CONSTRUCTOR SITES C LEAPING SW 16TH STREET �^/
BETWEEN ODOBERtARC MARM.H130 /� /
INCLUSIVE,UNLESS OTHERPASE APPROVED ,L"
BY THEC ttiINOWHµADIISTMENi `-
PROCESS _
9 COVER MEASURES WILL BE APPIEON
CONFORMANCE WTHAPPENDXDOF THE \ Y IN COMPLIANCE WITH CRY OF RENTON
SURFACE WATER DESIGN MVWINL. �- --- _ STANCARCS
�{ CALL 2 DAYS \. -`.j• BY. .
BEFORE YOU DIG Y. D..
F 1-800-424-5555 " BY w.
:UNDERTX3T
GROUND UY
3.
1 OCATKINS kr.APP110X.1 ", -• Br. Dela
OTHERS DOG CANNOT BE HELO LAME
CURACY CONTRACTORS.. DAVIW CONSULTING GROUP,INC ° Fs1�' "s NOTED a•' CITY OF SHUTTLE EXPRESS-RENTON PARKING LOT 2/1OPOIs
E W,•BN4A,•L•BR REN TON BooswlerrlsT ��
ALL OT,ER EXISTING FEATURES ARO -onwu PENTON,WA .s.,.1
a Bd.B w.rNB,SSSMI9 DB•,Naz $� ° oMWooM F -{ P. .9/e.,Mm9/PUCIs MA.w D•M. C04
.IMA Eu.LPAB.WA WI55 FN..wA 992. -PONA._E NO. li PARC. BY DATE APPA �M�'
DCOPRON To CONSTRLCTw ,A,itnA RNI1,IAIIL EBK xMAw TESC PLAN
Al-'N NIN NIAIA
G
K
(I) (101 WE POSTS 110106 FMpC WTEWL Kr A[f
NOS.USE STAPLES 0R VIRE INN TO
0. p MAN ENBBC 10 ME WAR TWA CR
0. M_ PRE-APPROVED NUE
—
b i �-�T R 2'%MAgo MBF GAWK 0R EQAU.
„W (OPTIONAL-PER SITE 030101)
lP y 6'HIGH
TENSION HARE OR TOP MIL(DIP)
In __- -._i-.. ....-.__ 1 - BURY BOl104❑RTFA WIENAL x D' GAUGE MA%
r •
%13'RFNd "ABLRNIC '011,r
3 o ;A �� SBil
\� ! SETWEENJ[FNT9 RIP)
NM
O
(:5 Y NILM - 6 SECURE �\.. //'' �. \ ,'•k\
a ? MRA FABIC YARRMI m B HATH _T \ •
Q NOR:NNOE NT E.SACH UP TIC h ; OInp ALl1MINUM --
SICK AT THE END G RUN ES PEN POS )( ���
as p P ito AIN.(lw.)
Z NOOSE WN NA.SQL uA1EAl F. 1\ \- •
' ��
O d NAVEL MCEILL IN TREE.AM \ CEMNT CONCRETE EXTRUDED CURB
ON 0081 51045 W PENCE
\ \
~z MBNC ON ME WEAN \ t0' A 2 BARS(TVP)
QTl/f XByfl( 2 I/2'I S' 2 t/I 1 SP AOA.OF ANCHOR BARS
OFT I2 NUDE METAL 1BURY MN
NE FENCE
(n W
PER WNGCNTYFlWRE DIE LL POST�.
co NTS N RENT OF WAY, E
•
la NE CONCRETE
00 gp6q Fig PIER./// IFICTM PER TE DPD SITE NOTE' ��s ��
W / ,..,4#0.....° ERIOPYpi INSPECTOR MHERE NEELIN.FENCE 'ARM pNOER TER= TCONCfETE CW�F.S
LA/ Alf' IS TO SE INSTALLED NEAR TREES
E SHALL BE AT 01.UNE CR
J ��YNI DIRECTED BY EIX3INEEN a•R i R-
4.
_ // / }'i #LINT 's�7,"�js( TEMPORARYACING(CHAINLINE K) 17 N Elm
/ // oti,. w NTS
to /// �1 ,q;?`. iPE�T.
A'.Z;.4N .0,:j'.. I1 CEMENT CONCRETE EXTRUDED CURB TYPEB P
PIT-IIT WATERY(9ALLS *4 x$ Tli
PERYvaroT 010 PLAN F-w.xm COT
NTS
Ai .1`
L£0-100(4 FAME MENDE RCL WON ' , ~..0.4—"r B.0'NN.
IMQF95/EG65 AREA �_EYIS71 ASWRY T _� NEW CURB
1•I \ -ME.1'T (SEE NOTE 2)
MTTER
IT NAL TNONES Owen.or •k *?4,47:V
�!'—..
STABREO ACCf4 9BL E USED x E.I.MCAS Of ME SIR WN LULGL TRAFFIC APO PARING. :)
NCLUMO PLANING SR.OTHER WEANS OF FROM M STAB.AERO MILL BE COWERED. YYYI.�R A*l.fIMW
LAw��rl SA
•
STABILIZED CONSTRUCTION ENTRANCE ` (SEC NOR B)�
PER ENG COUNT(FIGURE Ac ''''I'L. i�Mw -- i ..
NTS 4 1' •
�.Pswr if/� ' •
'TY.. a
5
SASTFRAL sTREE*NN�MUEE 1
�. rTs.PRIRM n) XMA(w A[P Uau B) y._.__..___.
OWN•
i NOTES' \ ` - )/ rm.Pm (seL Nor 1),C.
J "'� `: ) IS CRUSHED 1 XOL*
1.s11i MN METS NEED TOE EWL(0 oerwoow(ro owns �" a. ucuav*.n,
E AT TIE END 6 1HE SOB. PEAR STORY VOLUMES)
X. I STOMA DRAM MErs AE QEY 111E FE701' - 1MYUY
F STALED N MANAGE CEMCES PER TIE '�'� Live SHAM / l
[ u.AxuFACNKR S REDOME]IOAIIQK.G1Q) ". / 1 YusT MATCH NE.TN ONE.11 NEATER.
I BAN OPERTS ME IN CURB NEM NOT 10 E MULLET 1"X 1"Male (5 WA(n...!.....!.,71',:s.CB) J( I SAWNI Bn E PGSILIX,IU t'-o'BEYt%M 1000 0
nXNm Re.PR..,
E'CRUS I),DEP OAYAGEO P�NCYExT.
t }INSERTS SHALL E MSPECRD AND WANT.. f'CRUSE:HON NE l
[N A I/3 RICH RAN ALQIYQARS WMX A
N IBOA PEM0G CLEM AM/OL REPLACE INSERT Ixlfxl OF TM15 10 00 L5
WIN 11I11 E NC TARP F 0 WN SCANTS. V A[fYENi AT E on EAC[SfEC51ANDARO PLAN
LBrVMWwWWwNWrNssw.oin..U.AxMe AY N.vmeN.Ta-(1s1II�0 T FOR CMCNT GGNGER CURBS.
YWrMWsw�wr,rwod�.NN Mo•al n rv..Wre........
CB INLET PROTECTION QSTRAW WATTLE© CURB 8 GUTTER REPLACEMENT Q IN COMPLIANCE WITHCRY OF RENTOR
PER NNGCWITV FlOWE9DNL OOAM O N.
PER CIN OF ON STD PLNN1m STANDARDS
CALL 2 DAYS "'s "Ts BY. D.M.
( BEFORE YOU DIG BT_
F 1-800-424-5555 61 *0*
! UNDERGROUND UTILITY By 0.w
LOCATIONS ARE APPROX.! 'LbO A.A.
Ti C G DAVRX> Q N - . DSR d AS WILD CI TY OF SHUTTLE EXPRESS-RENTON PARKING LOT 0/10/2011
s CONSUMING GROUP,INC. I tpt BOO SW 18TH STPEWTER.,GRADES.PALMS.AND I °�/
C c�wsrNam.rl,Nau.P r... - RENITON RENTON,WA r..J
I WA MISS Fn.4P WA 1130 ownm ma Tam.{ Pbnni"q/B.il6ng/PuBlc Work.NW CD!
OCGPRIORTO WNOTRULTgN Y.S..Iola u1,l1 ALAI ,DNA'- N0. 010/5105 BY DALE APPfl ®Rx DRAW DETAILS7 9
IAI-INININ NIAIA
Technical Information Report—Final
Shuttle Express Parking Lot- 800 SW 16th Street February 10, 2015
APPENDIX E Operation and Maintenance
Davido Consulting Group,Inc.
TIR_Shuttle Express_Final.doc
O&M Manual February, 2015
Shuttle Express Parking Lot
Operation and Maintenance Manual
Person or Organization Responsible for Maintenance of the On-Site Storm System:
Peer Frank, LLC
Devin Sherrell
800 SW 16th Street
Renton, WA 98057
The Location Where the Operation and Maintenance Manual is to be Kept:
Shuttle Express Business Office
800 SW 16th Street
Renton, WA 98057
*Note: The manual and maintenance activity log must be made available to the City of
Renton for inspection purposes.
Description of On-Site Storm System
The on-site storm system for the Shuttle Express Parking Lot project consists entirely of a
porous asphalt parking lot(approximately 8,650 SF)with underlying rock pocket and soil •
treatment layer.
Stormwater runoff from the site will infiltrate through the porous asphalt where there will
be a 6-inch to 12-inch rock pocket underneath for storage. The permeable pavement
facility is sized to handle all the stormwater from a 100-year storm with a factor of safety
greater than 2.Only during extreme events (greater than any event in the available data in
KCRTS), a rain on snow event, or if the permeable pavement gets clogged and is unable
to allow stormwater to infiltrate, will stormwater be leaving the site through an overflow
route. The new parking areas have been designed so that if an overflow were to occur
runoff would flow away from existing buildings and towards existing vegetation.
The permeable pavement facility will serve as source control of pollution on the project
site. In order to control pollutants, proper maintenance and cleaning of debris, sediments,
and oil from stormwater collection and conveyance systems is required per the operation
and maintenance recommendations found in the 2009 King County Surface Water Design
Manual(KCSWDM) and the City of Renton Amendments to the KCSWDM. See the
attached sheets for operation and maintenance requirements pertaining to the project.
Shuttle Express Parking Lot DCG, Inc.
O&M Manual February, 2015
Contact Information for Stormwater Facility Installers:
Contractor(Installer of On-Site Stormwater Facilities)
Bruno DeSimone
Superior Asphalt Maintenance, Inc.
P.O. Box 66956
Burien, WA 98166
Phone—206.246.3237
Bruno@SuperiorAsphaltNW.com
Civil Engineer(Designer of On-Site Stormwater Facilities)
Erik Davido, P.E.
Davido Consulting Group, Inc
15029 Bothell Way NE
Lake Forest Park, WA 98155
Phone—206.523.0024
tim@dcgengr.com
Attachments
• Operation and Maintenance Recommendations for Infiltration Facilities from the
'= 2009 KCSWDM
• Operation and Maintenance Recommendations for Grounds (Landscaping) from
the 2009 KCSWDM
Shuttle Express Parking Lot DCG, Inc.
APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL,CONVEYANCE,AND WQ FACILITIES
NO. 2-INFILTRATION FACILITIES
Maintenance Defect or Problem Conditions When Maintenance Is Needed Results Expected When
Component Maintenance Is Performed
Site Trash and debris Any trash and debris which exceed 1 cubic foot Trash and debris cleared from site.
per 1,000 square feet(this is about equal to the
amount of trash it would take to fill up one
standard size office garbage can). In general,
there should be no visual evidence of dumping.
Noxious weeds Any noxious or nuisance vegetation which may Noxious and nuisance vegetation
constitute a hazard to County personnel or the removed according to applicable
public. regulations. No danger of noxious
vegetation where County personnel
or the public might normally be.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
I pollution as oil,gasoline,concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Grass/groundcover Grass or groundcover exceeds 18 inches in Grass or groundcover mowed to a
height. height no greater than 6 inches.
Infiltration Pond,Top Rodent holes Any evidence of rodent holes if facility is acting Rodents removed or destroyed and
or Side Slopes of as a dam or berm,or any evidence of water dam or berm repaired.
Dam,Berm or piping through dam or berm via rodent holes.
Embankment
Tree growth Tree growth threatens integrity of dams,berms or Trees do not hinder facility
slopes,does not allow maintenance access,or performance or maintenance
interferes with maintenance activity. If trees are activities.
not a threat to dam,berm,or embankment
integrity or not interfering with access or
maintenance,they do not need to be removed.
Erosion Eroded damage over 2 inches deep where cause Slopes stabilized using appropriate
of damage is still present or where there is erosion control measures. If erosion
potential for continued erosion. Any erosion is occurring on compacted slope,a
observed on a compacted slope. licensed civil engineer should be
consulted to resolve source of
erosion.
Settlement Any part of a dam,berm or embankment that has Top or side slope restored to design
settled 4 inches lower than the design elevation. dimensions. If settlement is
significant,a licensed civil engineer
should be consulted to determine
the cause of the settlement.
Infiltration Pond, Sediment If two inches or more sediment is present or a Facility infiltrates as designed.
Tank,Vault,Trench, accumulation percolation test indicates facility is working at or
or Small Basin less than 90%of design.
Storage Area
Infiltration Tank Plugged air vent Any blockage of the vent. Tank or vault freely vents.
Structure
Tank bent out of Any part of tank/pipe is bent out of shape more Tank repaired or replaced to design.
shape than 10%of its design shape.
Gaps between A gap wider than%z-inch at the joint of any tank No water or soil entering tank
sections,damaged sections or any evidence of soil particles entering through joints or walls.
joints or cracks or the tank at a joint or through a wall.
tears in wall
Infiltration Vault Damage to wall, Cracks wider than'A-inch,any evidence of soil Vault is sealed and structurally
Structure frame,bottom,and/or entering the structure through cracks or qualified sound.
top slab inspection personnel determines that the vault is
not structurally sound.
2009 Surface Water Design Manual—Appendix A (/92009
A-3
APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL,CONVEYANCE,AND WQ FACILITIES
NO. 2-INFILTRATION FACILITIES
Maintenance Defect or Problem Conditions When Maintenance Is Needed Results Expected When
Component Maintenance Is Performed
Inlet/Outlet Pipes Sediment Sediment filling 20%or more of the pipe. Inlet/outlet pipes clear of sediment.
accumulation
Trash and debris Trash and debris accumulated in inlet/outlet No trash or debris in pipes.
pipes(includes floatables and non-floatables).
Damaged Cracks wider than 1/4-inch at the joint of the No cracks more than/-inch wide at
inlet/outlet pipes or any evidence of soil entering the joint of the inlet/outlet pipe.
at the joints of the inlet/outlet pipes.
Access Manhole Cover/lid not in place Cover/lid is missing or only partially in place. Manhole access covered.
Any open manhole requires immediate
maintenance.
Locking mechanism Mechanism cannot be opened by one Mechanism opens with proper tools.
not working maintenance person with proper tools.Bolts
cannot be seated. Self-locking cover/lid does not
work.
Cover/lid difficult to One maintenance person cannot remove Cover/lid can be removed and
remove cover/lid after applying 80 lbs of lift. reinstalled by one maintenance
person.
Ladder rungs unsafe Missing rungs,misalignment,rust,or cracks. Ladder meets design standards.
Allows maintenance person safe
access.
Large access Damaged or difficult Large access doors or plates cannot be Replace or repair access door so it
doors/plate j to open opened/removed using normal equipment. can opened as designed.
Gaps,doesn't cover Large access doors not flat and/or access Doors close flat and covers access
completely opening not completely covered. opening completely.
Lifting Rings missing, Lifting rings not capable of lifting weight of door Lifting rings sufficient to lift or
rusted or plate. remove door or plate.
Infiltration Pond, Plugged Filter bag more than 1/2 full. Replace filter bag or redesign
Tank,Vault,Trench, system.
or Small Basin Filter
Bags
Infiltration Pond, Sediment 6"or more of sediment has accumulated. Pre-settling occurs as designed
Tank,Vault,Trench, accumulation
or Small Basin Pre-
settling Ponds and
Vaults
Infiltration Pond, Plugged High water level on upstream side of filter Rock filter replaced evaluate need
Rock Filter remains for extended period of time or little or no for filter and remove if not
water flows through filter during heavy rain necessary.
storms.
Infiltration Pond Rock missing Only one layer of rock exists above native soil in Spillway restored to design
Emergency Overflow j area five square feet or larger,or any exposure of standards.
Spillway native soil at the top of out flow path of spillway.
Rip-rap on inside slopes need not be replaced.
Tree growth Tree growth impedes flow or threatens stability of Trees removed.
spillway.
I/9/2009 2009 Surface Water Design Manual—Appendix A
A-4
APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL,CONVEYANCE,AND WQ FACILITIES
NO. 11 -GROUNDS (LANDSCAPING)
Maintenance I Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Site Trash or litter Any trash and debris which exceed 1 cubic foot Trash and debris cleared from site.
per 1,000 square feet(this is about equal to the
amount of trash it would take to fill up one
standard size office garbage can). In general,
there should be no visual evidence of dumping.
Noxious weeds Any noxious or nuisance vegetation which may Noxious and nuisance vegetation
constitute a hazard to County personnel or the removed according to applicable
public. regulations. No danger of noxious
vegetation where County personnel
or the public might normally be.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil,gasoline,concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Grass/groundcover Grass or groundcover exceeds 18 inches in Grass or groundcover mowed to a
height. height no greater than 6 inches.
Trees and Shrubs Hazard Any tree or limb of a tree identified as having a No hazard trees in facility.
potential to fall and cause property damage or
threaten human life. A hazard tree identified by
a qualified arborist must be removed as soon
as possible.
Damaged Limbs or parts of trees or shrubs that are split or Trees and shrubs with less than 5%
broken which affect more than 25%of the total of total foliage with split or broken
foliage of the tree or shrub. limbs.
Trees or shrubs that have been blown down or No blown down vegetation or
knocked over. knocked over vegetation. Trees or
shrubs free of injury.
Trees or shrubs which are not adequately Tree or shrub in place and
supported or are leaning over,causing exposure adequately supported;dead or
of the roots. diseased trees removed.
1/9/2009 2009 Surface Water Design Manual—Appendix A
A-16
Technical Information Report— Final
Shuttle Express Parking Lot- 800 SW 16th Street February 10, 2015
APPENDIX F Bond Quantity Worksheet
Davido Consulting Group,Inc.
TIR_Shuttle Express_Final.doc
Site Improvement Bond Quantity Worksheet S15 Web date: 02/22/2013
King County
Department of Permitting & Environmental Review
35030 SE Douglas Street, Suite 210
Snoqualmie, Washington 98065-9266 For alternate formats, call 206-296-6600.
206-296-6600 TTY Relay 711
Project Name: Shuttle Express Parking Lot Date: 2/10/2015
Location: 800 SW 16th Street, Renton, WA Project No.:
Activity No.:
Note: All prices include labor, equipment, materials, overhead and
Clearing greater than or equal to 5,000 board feet of timber? profit. Prices are from RS Means data adjusted for the Seattle area
or from local sources if not included in the RS Means database.
yes X no
If yes,
Forest Practice Permit Number:
(RCW 76.09)
Page 1 of 9
Unit prices updated: 02/12/02
Version: 11/26/2008
Bond Quantity Worksheet_Version 20081126.xls Report Date: 2/10/2015
.
Site Improvement Bond Quantity Worksheet S15 Web date: 02/22/2013
Unit #of
Reference# Price Unit Quantity Applications Cost
EROSION/SEDIMENT CONTROL Number
Backfill &compaction-embankment ESC-1 $ 5.62 CY
Check dams, 4"minus rock ESC-2 SWDM 5.4.6.3 $ 67.51 Each
Crushed surfacing 1 1/4"minus ESC-3 WSDOT 9-03.9(3) $ 85.45 CY
Ditching ESC-4 $ 8.08 CY
Excavation-bulk ESC-5 $ 1.50 CY
Fence, silt ESC-6 SWDM 5.4.3.1 $ 1.38 LF 601 1 829
Fence, Temporary(NGPE) ESC-7 $ 1.38 LF 248 1 342
Hydroseeding ESC-8 SWDM 5.4.2.4 $ 0.59 SY
Jute Mesh ESC-9 SWDM 5.4.2.2 $ 1.45 SY
Mulch, by hand, straw, 3"deep ESC-10 SWDM 5.4.2.1 $ 2.01 SY
Mulch, by machine, straw, 2"deep ESC-11 SWDM 5.4.2.1 $ 0.53 SY
Piping, temporary, CPP, 6" ESC-12 $ 10.70 LF
Piping, temporary, CPP, 8" ESC-13 $ 16.10 LF
Piping, temporary, CPP, 12" ESC-14 $ 20.70 LF
Plastic covering, 6mm thick, sandbagged ESC-15 SWDM 5.4.2.3 $ 2.30 SY
Rip Rap, machine placed; slopes ESC-16 WSDOT 9-13.1(2) $ 39.08 CY
Rock Construction Entrance, 50'x15'x1' ESC-17 SWDM 5.4.4.1 $ 1,464.34 Each 1 1 1464
Rock Construction Entrance, 100'x15'x1' ESC-18 SWDM 5.4.4.1 $ 2,928.68 Each
Sediment pond riser assembly ESC-19 SWDM 5.4.5.2 $ 1,949.38 Each
Sediment trap, 5' high berm ESC-20 SWDM 5.4.5.1 $ 17.91 LF
Sed.trap,5'high,riprapped spillway berm section ESC-21 SWDM 5.4.5.1 $ 68.54 LF
Seeding, by hand ESC-22 SWDM 5.4.2.4 $ 0.51 SY
Sodding, 1"deep, level ground ESC-23 SWDM 5.4.2.5 $ 6.03 SY
Sodding, 1"deep, sloped ground ESC-24 SWDM 5.4.2.5 $ 7.45 SY
TESC Supervisor ESC-25 $ 74.75 HR 8 1 598
Water truck, dust control ESC-26 SWDM 5.4.7 $ 97.75 HR 2 1 196
WRITE-IN-ITEMS****(se_page 9)
Temporary Inlet Protection $ 60.00 Each 10 1 600
ESC SUBTOTAL: $ 4,029.46
30%CONTINGENCY&MOBILIZATION: $ 1,208.84
ESC TOTAL: $ 5,238.30
COLUMN: A
Page 2 of 9
Unit prices updated: 02/12/02
Version: 11/26/2008
Bond Quantity Worksheet_Version 20081126.xls Report Date: 2/10/2015
Site Improvement Bond Quantity Worksheet Web date 12/02/2008
Existing Future Public Private Quantity Completed
Right-of-Way Right of Way Improvements (Bond Reduction)*
&Drainage Facilities Quant.
Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Complete_ Cost
GENERAL ITEMS No.
Backfill&Compaction-embankment GI-1 $ 5.62 CY 377 2,118.74
Backfill&Compaction-trench GI-2 $ 8.53 CY
Clear/Remove Brush,by hand GI-3 $ 0.36 SY _
Clearing/Grubbing/Tree Removal GI-4 $ 8,876.16 Acre 0.6 5,325.70
Excavation-bulk GI-5 $ 1.50 CY 526 789.00
Excavation-Trench GI-6 $ 4.06 CY
Fencing,cedar,6'high GI-7 $ 18.55 LF
Fencing,chain link,vinyl coated, 6'high GI-8 $ 13.44 LF
Fencing,chain link,gate,vinyl coated, 2( GI-9 $ 1,271.81 Each
Fencing,split rail,3'high GI-10 $ 12.12 LF
Fill&compact-common barrow GI-11 $ 22.57 CY
Fill&compact-gravel base GI-12 $ 25.48 CY
Fill&compact-screened topsoil GI-13 $ 37.85 CY
Gabion,12"deep,stone filled mesh GI-14 $ 54.31 SY
Gabion,18"deep,stone filled mesh GI-15 $ 74.85 SY
Gabion,36"deep,stone filled mesh GI-16 $ 132.48 SY
Grading,fine,by hand GI-17 $ 2.02 SY
Grading,fine,with grader GI-18 $ 0.95 SY 380 361.00 2291 2,176.45
Monuments,3'long GI-19 $ 135.13 Each
Sensitive Areas Sign GI-20 $ 2.88 Each
Sodding,1"deep,sloped ground GI-21 $ 7.46 SY 311 2,320.06 1040 7,758.40
Surveying,line&grade GI-22 $ 788.26 Day
Surveying,lot location/lines GI-23 $ 1,556.64 Acre
Traffic control crew(2 flaggers) GI-24 $ 85.18 HR 40 3,407.20
Trail,4"chipped wood GI-25 $ 7.59 SY
Trail,4"crushed cinder GI-26 $ 8.33 SY
Trail,4"top course GI-27 $ 8.19 SY
Wall,retaining,concrete GI-28 $ 44.16 SF
Wall,rockery GI-29 $ 9.49 SF
Page 3 of 9 SUBTOTAL 6,088.26 18,168.29
Unit prices updated: 02/12/02
*KCC 27A authorizes only one bond reduction. Version: 11/26/08
Bond Quantity Worksheet_Version 20081126.xls Report Date:2/10/2015
Site Improvement Bond Quantity Worksheet Web date 12/02/2008
Existing Future Public Private Bond Reduction*
Right-of-way Right of Way Improvements
&Drainage Facilities Quant.
Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Com.lete Cost
ROAD IMPROVEMENT No. r
AC Grinding,4'wide machine<1000sy RI-1 $ 28.00 SY
AC Grinding,4'wide machine 1000-2000 RI-2 $ 15.00 SY
AC Grinding,4'wide machine>2000sy RI-3 $ 7.00 SY
AC Removal/Disposal/Repair RI-4 $ 67.50 SY
Barricade,type I RI-5 $ 30.03 LF
Barricade,type III(Permanent) RI-6 $ 45.05 LF
Curb&Gutter,rolled RI-7 $ 17.00 LF
Curb&Gutter,vertical RI-8 $ 12.50 LF 22 275.00
Curb and Gutter,demolition and disposal RI-9 $ 18.00 LF 82 1,476.00 221 3,978.00
Curb,extruded asphalt RI-10 $ 5.50 LF
Curb,extruded concrete RI-11 $ 7.00 LF 660 4,620.00
Sawcut,asphalt,3"depth RI-12 $ 1.85 LF 311 575.35
Sawcut,concrete,per 1"depth RI-13 $ 1.69 LF
Sealant,asphalt RI-14 $ 1.25 LF
Shoulder,AC, (see AC road unit price) RI-15 $ - SY
Shoulder,gravel,4"thick RI-16 $ 15.00 SY
Sidewalk,4"thick RI-17 $ 35.00 SY 360 12,600.00
Sidewalk,4"thick,demolition and disposi RI-18 $ 29.50 SY
Sidewalk,5"thick RI-19 $ 38.50 SY
Sidewalk,5"thick,demolition and dispos RI-20 $ 37.50 SY
Sign,handicap RI-21 $ 85.28 Each 2 170.56
Striping,per stall RI-22 $ 5.82 Each 25 145.50
Striping,thermoplastic,(for crosswalk) RI-231 $ 2.38. SF I
Striping,4"reflectorized line RI-24; $ 0.25 LF ,
Page 4 of 9 SUBTOTAL 14,351.00 9,489.41
Unit prices updated: 02/12/02
*KCC 27A authorizes only one bond reduction. Version: 11/26/08
Bond Quantity Worksheet_Version 20081126.xls Report Date:2/10/2015
Site Improvement Bond Quantity Worksheet Web date 12/02/2008
Existing Future Public Private Bond Reduction*
Right-of-way Right of Way Improvements
&Drainage Facilities Quant.
Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Complete Cost
ROAD SURFACING (4"Rock=2.5 base&1.5"top course) For'93 KCRS(6.5"Rock=5"base&1.5"top course)
For KCRS'93,(additional 2.5"base)add RS-1 $ 3.60 SY
AC Overlay,1.5"AC RS-2 $ 11.25 SY
AC Overlay,2"AC RS-3 $ 15.00 SY
AC Road,2",4"rock,First 2500 SY RS-4 $ 21.00 SY
AC Road,2",4"rock,Qty.over 2500SY RS-5 $ 19.00 SY
AC Road,3",4"rock,First 2500 SY RS-6 $ 23.30 SY
AC Road,3",4"rock,Qty.over 2500 SY RS-7 $ 21.00 SY
AC Road,5",First 2500 SY RS-8 $ 27.60 SY
AC Road,5",Qty.Over 2500 SY RS-9 $ 25.00 SY
AC Road,6",First 2500 SY RS-1C $ 33.10 SY
AC Road,6",Qty.Over 2500 SY RS-1' $ 30.00 SY
Asphalt Treated Base,4"thick RS-1 $ 20.00 SY
Gravel Road,4"rock,First 2500 SY RS-12 $ 15.00 SY
Gravel Road,4"rock,Qty.over 2500 SY RS-14 $ 8.50 SY
PCC Road,5",no base,over 2500 SY RS-1 t $ 27.00 SY
PCC Road, 6",no base,over 2500 SY RS-1€ $ 25.50 SY
Thickened Edge RS-17 $ 8.60 LF
Page 5 of 9 SUBTOTAL
Unit prices updated: 02/12/02
*KCC 27A authorizes only one bond reduction. Version: 11/26/08
Bond Quantity Worksheet_Version 20081126.xls Report Date: 2/10/2015
Site Improvement Bond Quantity Worksheet Web date 12/02/2008
Existing Future Public Private Bond Reduction*
Right-of-way Right of Way Improvements
&Drainage Facilities Quant.
Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Complete Cost
DRAINAGE (CPP=Corrugated Plastic Pipe,N12 or Equivalent) For Culvert prices, Average of 4'cover was assumed.Assume perforated PVC is same price as solid pipe.
Access Road,R/D D-1 $ 21.00 SY _
Bollards-fixed D-2 $ 240.74 Each _
Bollards-removable D-3 $ 452.34 Each
*(CBs include frame and lid)
CB Type I D-4 $ 1,257.64 Each-
CB Type IL D-5 $ 1,433.59 Each
CB Type II,48"diameter D-6 $ 2,033.57 Each .
for additional depth over 4' D-7 $ 436.52 FT
CB Type II,54"diameter D-8 $ 2,192.54 Each ,
for additional depth over 4' D-9 $ 486.53 FT ,
CB Type II,60"diameter D-10 $ 2,351.52 Each
for additional depth over 4' D-11 $ 536.54 FT ,
CB Type II,72"diameter D-12 $ 3,212.64 Each .
for additional depth over 4' D-13 $ 692.21 FT
Through-curb Inlet Framework(Add) D-14 $ 366.09 Each .
Cleanout,PVC,4" D-15 $ 130.55 Each
Cleanout,PVC,6" D-16_ $ 174.90 Each
Cleanout,PVC,8" D-17 $ 224.19 Each
Culvert,PVC,4" D-18 $ 8.64 LF
Culvert,PVC,6" D-19 $ 12.60 LF ,
Culvert,PVC, 8" D-20 $ 13.33 LF
Culvert,PVC, 12" D-21 $ 21.77 LF
Culvert,CMP,8" D-22, $ 17.25 LF .
Culvert,CMP,12" D-23 $ 26.45 LF
Culvert,CMP,15" D-24 $ 32.73 LF
Culvert,CMP,18" D-25, $ 37.74 LF ,
Culvert,CMP,24" D-26 $ 53.33 LF
Culvert,CMP,30" D-27 $ 71.45 LF .
Culvert,CMP,36" 0-28 $ 112.11 LF .
Culvert,CMP,48" D-29 $ 140.83 LF
Culvert,CMP,60" D-30 $ 235.45 LF ,
Culvert,CMP,72" D-31 $ 302.58 LF
Page 6 of 9 SUBTOTAL
Unit prices updated: 02/12/02
*KCC 27A authorizes only one bond reduction. Version: 11/26/08
Bond Quantity Worksheet_Version 20081126.xls Report Date:2/10/2015
Site Improvement Bond Quantity Worksheet Web date 12/02/2008
Existing Future Public Private Bond Reduction*
Right-of-way Right of Way Improvements
DRAINAGE CONTINUED &Drainage Facilities Quant.
No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Complete Cost
Culvert,Concrete,8" D-32 $ 21.02 LF
Culvert,Concrete,12" D-33 $ 30.05 LF
Culvert,Concrete,15" D-34 $ 37.34 LF
Culvert,Concrete,18" D-35 $ 44.51 LF
Culvert,Concrete,24" D-36 $ 61.07 LF
Culvert,Concrete,30" D-37 $ 104.18 LF
Culvert,Concrete,36" D-38 $ 137.63 LF
Culvert,Concrete,42" D-39 $ 158.42 LF
Culvert,Concrete,48" D-40 $ 175.94 LF
Culvert,CPP,6" D-41 $ 10.70 LF
Culvert,CPP,8" D-42 $ 16.10 LF
Culvert,CPP, 12" D-43 $ 20.70 LF
Culvert,CPP, 15" D-44 $ 23.00 LF
Culvert,CPP, 18" D-45 $ 27.60 LF
Culvert,CPP,24" D-46 $ 36.80 LF
Culvert,CPP,30" D-47 $ 48.30 LF
Culvert,CPP,36" D-48 $ 55.20 LF
Ditching D-49 $ 8.08 CY
Flow Dispersal Trench (1,436 base+) D-50 $ 25.99 LF
French Drain (3'depth) D-51 $ 22.60 LF
Geotextile,laid in trench,polypropylene D-52 $ 2.40 SY
Infiltration pond testing D-53 $ 74.75 HR
Mid-tank Access Riser,48"dia, 6'deep D-54 $ 1,605.40 Each
Pond Overflow Spillway D-55 $ 14.01 SY
Restrictor/Oil Separator,12" D-56 $ 1,045.19 Each
Restrictor/Oil Separator,15" D-57 $ 1,095.56 Each
Restrictor/Oil Separator,18" D-58 $ 1,146.16 Each
Riprap,placed D-59 $ 39.08 CY
Tank End Reducer(36"diameter) D-60 $ 1,000.50 Each
Trash Rack,12" D-61 $ 211.97 Each
Trash Rack,15" D-62 $ 237.27 Each
Trash Rack,18" D-63 $ 268.89 Each
Trash Rack,21" D-64 $ 306.84 Each
Page 7 of 9 SUBTOTAL
Unit prices updated: 02/12/02
*KCC 27A authorizes only one bond reduction. Version: 11/26/08
Bond Quantity Worksheet_Version 20081126.xls Report Date:2/10/2015
•
Site Improvement Bond Quantity Worksheet Web date: 12/02/2008
Existing Future Public Private Bond Reduction*
Right-of-way Right of Way Improvements
&Drainage Facilities Quant.
Unit Price Unit Quant. Price Quant. Cost Quant. Cost Complete Cost
PARKING LOT SURFACING
2"AC,2"top course rock&4"borrow _PL-1 $ 21.00 SY
2"AC, 1.5" top course&2.5"base cour PL-2 $ 28.00` SY
4"select borrow PL-3 $ 4.55 SY _
1.5"top course rock&2.5"base course PL-4 $ 11.41 SY
UTILITY POLES&STREET LIGHTING Utility pole relocation costs must be accompanied by Franchise Utility's Cost Statement
Utility Pole(s)Relocation UP-1 Lump Sum
Street Light Poles w/Luminaires UP-2 Each
WRITE-IN-ITEMS
(Such as detention/water quality vaults.) H4.
Pervious HMA WI-1 $ 117.00 TN 290 33,930.00
Washed Drain Rock WI-2 $ 19.00 TN 535 10,165.00
Choker Course for Pervious HMA,2" ,WI-3 $ 30.00 TN 105 3,150.00,
WI-4
WI-5
WI-6
WI-7
WI 8
WI-9
wi-bo
SUBTOTAL 47,245.00
SUBTOTAL(SUM ALL PAGES): 20,439.26 74,902.70
30%CONTINGENCY&MOBILIZATION: 6,131.78 22,470.81
GRANDTOTAL: 26,571.04 97,373.50
COLUMN: B C D E
Page 8 of 9
Unit prices updated: 02/12/02
*KCC 27A authorizes only one bond reduction. Version: 11/26/08
Bond Quantity Worksheet_Version 20081126.xls Report Date:2/10/2015
Site Improvement Bond Quantity Worksheet Web date: 12/02/2008
Original bond computations prepared by:
Name: Erik Davido, PE Date: 2/10/2015
PE Registration Number: 33723 Tel.#: (206) 523-0024
Firm Name: Davido Consulting Group, Inc.
Address: 15029 Bothell Way NE Suite 600, Lake Forest Park, WA 98155 Project No:
ROAD IMPROVEMENTS&DRAINAGE FACILITIES FINANCIAL GUARANTEE REQUIREMENTS
PERFORMANCE BOND* PUBLIC ROAD&DRAINAGE
AMOUNT BOND*AMOUNT MAINTENANCE/DEFECT BOND*
REQUIRED AT RECORDING OR
Stabilization/Erosion Sediment Control(ESC) (A) $ 5,238.3 TEMPORARY OCCUPANCY***
Existing Right-of-Way Improvements (B) $ 26,571.0
Future Public Right of Way&Drainage Facilities (C) $ -
Private Improvements (D) $ 97,373.5
Calculated Quantity Completed (E) $ -
Total Right-of Way and/or Site Restoration Bond*/** (A+B) $ 31,809.3
(First$7,500 of bond*shall be cash.)
Performance Bond*Amount (A+B+C+D) = TOTAL (T) $ 129,182.8 T x 0.30 $ 38,754.9 OR
Minimum bond*amount is$2000.
Reduced Performance Bond*Total*** (T-E) $ 129,182.8
Use larger of Tx30%or(T-E)
(B+C)x
Maintenance/Defect Bond*Total 0.25= $ 6,642.8
NAME OF PERSON PREPARING BOND*REDUCTION: Date:
*NOTE: The word"bond"as used in this document means a financial guarantee acceptable to King County.
**NOTE: KCC 27A authorizes right of way and site restoration bonds to be combined when both are required.
The restoration requirement shall include the total cost for all TESC as a minimum,not a maximum. In addition,corrective work,both on-and off-site needs to be included.
Quantities shall reflect worse case scenarios not just minimum requirements. For example,if a salmonid stream may be damaged,some estimated costs for restoration
needs to be reflected in this amount. The 30%contingency and mobilization costs are computed in this quantity.
***NOTE: Per KCC 27A,total bond amounts remaining after reduction shall not be less than 30%of the original amount(T)or as revised by major design changes.
REQUIRED BOND*AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY DDES
Page 9 of 9 Unit prices updated: 02/12/02
Check out the DDES Web site at www.kingcounty.aov/permits Version: 11/26/08
Bond Quantity Worksheet_Version 20081126.xls Report Date: 2/10/2015
It,
Technical Information Report— Final
Shuttle Express Parking Lot- 800 SW 16« Street February 10, 2015
APPENDIX G Stormwater Facility Summary Sheet
Davido Consulting Group,Inc.
TIR_Shuttle Express_Final.doc
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
STORMWATER FACILITY SUMMARY SHEET DDES Permit
Number
(provide one Stormwater Facility Summary Sheet per Natural Discharge Location)
Overview:
Project Name
Shuttle Express Parking Lot Date 2/10/2015
Downstream Drainage Basins
Major Basin Name Green/Duwamish River Watershed
Immediate Basin Name Lower Green River Subwatershed
Flow Control:
Flow Control Facility Name/Number N/A
Facility
Location N/A
I
If none,
Flow control provided in regional/shared facility(give _
location)
No flow control required X Exemption number
Exception 1 of Page 1-34 of the City of Renton' s
Amendments to the KCSWDM.
General Facility Information:
Type/Number of detention facilities: Type/Number of infiltration facilities:
ponds ponds
vaults tanks
tanks trenches
Control Structure Location
Type of Control Structure Number of Orifices/Restrictions
Size of Orifice/Restriction: No. 1
No. 2
No. 3
No.4
Flow Control Performance Standard
2009 Surface Water Design Manual 1/9/2009
1 •
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
Live Storage Volume Depth Volume Factor of Safety
Number of Acres Served
Number of Lots
Dam Safety Regulations(Washington State Department of Ecology)
Reservoir Volume above natural grade N/A
Depth of Reservoir above natural grade N/A
Facility Summary Sheet Sketch
All detention, infiltration and water quality facilities must include a detailed sketch.
(11"x17' reduced size plan sheets may be used) N/A
2009 Surface Water Design Manual 1/9/2009
• 2
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
Water Quality: Exempt via exemption 4 Soil Treatment Exemption on Page
1-65 of the KCSWDM.
Type/Number of water quality facilitiesBMPs:
biofiltration swale sand filter(basic or large)
(regular/wet/or continuous inflow) sand filter,linear(basic or
large)
combined detention/wetpond sand filter vault(basic or
large)
(wetpond portion basic or large) sand bed depth (inches)
combined detention/wetvault stormwater wetland
filter strip storm filter
flow dispersion wetpond(basic or large)
farm management plan wetvault
landscape management plan Is facility Lined?
oil/water separator If so, what marker is used
above
(baffle or coalescing plate)
Liner?
catch basin inserts:
Manufacturer
pre-settling pond
pre-settling structure:
Manufacturer
high flow bypass structure (e.g., flow-splitter catch basin)
source controls
Design Information
Water Quality design flow
Water Quality treated volume(sandfilter)
Water Quality storage volume(wetpool)
Facility Summary Sheet Sketch
2009 Surface Water Design Manual 1/9/2009
3
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
a
All detention, infiltration and water quality facilities must include a detailed sketch.
(11"x17"reduced size plan sheets may be used) N/A
2009 Surface Water Design Manual 1/9/2009
4
Technical Information Report— Final
Shuttle Express Parking Lot- 800 SW 16th Street February 10, 2015
APPENDIX H KCRTS Modeling Results
Davido Consulting Group,Inc.
TIR_Shuttle Express_Final.doc t
KCRTS Peak Flows—Existing Conditions
(for use of Exception 1 on Page 1-34 of the City of Renton Amendments to the KCSWDM)
imum
- ..uction o no iu -ries
Project Location : Sea-Tac
Computing Series : Predeveloped.tsf
Regional Scale Factor : 1.00
Data Type : Reduced
e KCRTS.4nalysisTools _ -.-.,
Creating Hourly Time Series File -_.-
Loading Time Series File:C:\KC_SVDM\KC_DATA\STTG60R.rnf 8 Compute PEAKS and Flow Frequencies I
Till Grass 0.80acres Scaling Yr: 8
Loading Time Series Fila:C:\KC_SVDM\KC_DATA\STEI60R.rnf 8 Plot Flow FRFQUENCIES
Impervious 0.20 acres Adding Yr: 8
Total Area 1.00 acres Compute Flow DURATION and Exceedence
Peak Discharge: 0.264 CFS at 6:00 on Jan 9 in Year 8 ]
Storing Time Series File:Predeveloped.tsf 8 Plot Probability EXCEEDENCE Curves
Time Series Computed COMPARE Flow Durations
KCRTS Command
Extract a HYDROGRAPH
Enter the Analysis TOOLS Module
Plot a HydroGRAPH
Analysis Tools Command
Compute VOl UME Discharge
Compute PEAKS and Flow Frequencies
RETURN to Previous Menu
Loading Stage/Discharge curve:predeveloped.tsf -" ---"-"-_-"- -"----
Flow Frequency Analysis Compute a Flow Frequency Curve
Time Series File:predeveloped.tsf -- -
Project Location Sea-Tac
iiikKgRTS40 o 0 iiii
--Annual Peak kIow Rates Flow Frequency Analysis------ --- ----- -
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) Period
0.120 4 2/09/01 2:00 0.264 1 100.00 0.990
0.079 7 1/05/02 16:00 0.148 2 25.00 0.960
0.148 2 2/27/03 7:00 0.125 3 10.00 0.900
0.065 8 8/26/04 2:00 0.120 4 5.00 0.800
0.083 6 10/28/04 16:00 0.116 5 3.00 0.667
0.125 3 1/18/06 16:00 0.083 6 2.00 0.500
0.116 5 11/24/06 3:00 0.079 7 1.30 0.231
0.264 1 1/09/08 6:00 0.065 8 1.10 0.091
Computed Peaks 0.225 50.00 0.980
KCRTS Peak Flows—Proposed Conditions
(for use of Exception 1 on Page 1-34 of the City of Renton Amendments to the KCSWDM)
Production of Runoff Time Series
Project Location Sea-Tac
Computing Series : Developedtsf a KCRTSAnalv;ir Toc.5
Regional Scale Factor 1.00
ReducedICompute PEAKS and FloFrequencies J?j
Data Type : w
Creating Hourly Time Series File I I
Plot Flow FRFOUFNCIF S
Loading Time Series File:C:\KC_SVDM\KC_DATA\STTG60R.rnf 8 - _.__ _...._—_I
Till Grass 0.68 acres Scaling Yr: 8
Loading Time Series File:C:\KC_SVDM\KC_DATA\STEI60R.rnf 8
Impervious 0.32 acres Adding Yr: 8 Compute Flow DURATION and Exceedence
Total Area : 1.00 acres Plot Probability EXCEEDENCE Curves
Peak Discharge: 0.297 CFS at 6:00 on Jan 9 in Year 8
Storing Time Series File Developed.tet 8 I COMPARE Flow Durations
— ------ -- KCRTS Command
Time Series Computed
Extract a HYDROGRAPH J
_____________ Plot a HydroGllAPH
Enter the Analysis TOOLS Module ' Compute VOLUME Discharge __
---- -------------------
Analysis Tools Command
RETURN to Previous Menu
Compute PEAKS and Flow Frequencies
Compute a Row Frequency Curve
Loading Stage/Discharge curve:developed.tsf --
Flow Frequency Analysis
.7ect oration: -a- ac ,
--Annual Peak Flow Rates-- ----Flow Frequency Analysis-----
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) Period
0.139 4 2/09/01 2:00 0.297 1 100.00 0.990
0.100 7 1/05/02 16:00 0.171 2 25.00 0.960
0.171 2 2/27/03 7:00 0.146 3 10.00 0.900
0.093 8 8/26/04 2:00 0.139 4 5.00 0.800
0.116 6 10/28/04 16:00 0.137 5 3.00 0.667
0.146 3 1/18/06 16:00 0.116 6 2.00 0.500
0.137 5 11/24/06 3:00 0.100 7 1.30 0.231
0.297 1 1/09/08 6:00 0.093 8 1.10 0.091
Computed Peaks 0.255 50.00 0.980
s .• .
r a ,
KCRTS Time Series and Peak Flows for Sizing Permeable Pavement Facility
(Tributary area to the permeable pavement is the permeable pavement itself. No runoff from surrounding areas is anticipated.)
..Uc ion o 'uno t ime ries - '
.1
Project Location : Sea-Tac
Computing Series : Permeable Pavement tsf
Regional Scale Factor 1.00 l A KCRTS Analysis Took t I kilalle
Data Type : Reduced
Creating Hourly Time Series File I Compute PEAKS and Flow Frequencies I?
Loading Time Series File:C:\KC_SVDM\KC_DATA\STEI6OR.rnf 8 1...j
Impervious 0.20 acres Scaling Yr: 8 Plot Flow FREQUENCIES
•
Total Area : 0.20 acres
Peak Discharge: 0.095 CFS at 6:00 on Jan 9 in Year 8 Compute Flow QURATION and Exceedence
Storing Time Series File-.Permeable Pavement.tsf 8
Plot Probability EXCEEDENCE Curves
Time Series Computed
COMPARE Flow Durations
KCRTS Command
Enter the Analysis TOOLS Module Extract a IIYDROGRAPH
11 II- ------- — ---- Plot a HydroQRAPH
Analysis Tools Command
Compute YOLUME Discharge
— --
Compute PEAKS and Flow Frequencies
Loading Stage/Discharge curve:permeable pavement.tsf RETURN to Previous Menu
Flow Frequency Analysis _..____..
Compute a Flow Frequency Curve •
Time Series File:permeable pavement.tsf , --
Project Location•Sea-Tac - •
Frequencies & Peaks saved to File:Permeable Pavement.pks
IPIIlinlgjllgillPillillIlliMMMlla
:, O-_ x
•
Jecrat ion: - ac .
---Annual Peak Flow Rates--- Flow Frequency Analysis------
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) Period
0.048 7 2/09/01 2:00 0.095 1 100.00 0.990
0.043 8 1/05/02 16:00 0.073 2 25.00 0.960
0.059 3 12/08/02 18:00 0.059 3 10.00 0.900
0.050 6 8/26/04 2:00 0.059 4 5.00 0.800
0.059 4 10/28/04 16:00 0.052 5 3.00 0.667
0.052 5 1/18/06 16:00 0.050 6 2.00 0.500
0.073 2 10/26/06 0:00 0.048 7 1.30 0.231
0.095 1 1/09/08 6:00 0.043 8 1.10 0.091 1
Computed Peaks 0.087 50.00 0.980 _
Retention/Detention Facility .
Type of Facility: Gravel Infiltration Trench
Facility Length: 2045.33 ft
Facility Width: 2.00 ft
Facility Area: 4091. sq. ft
Effective Storage Depth: 0.50 ft
Stage 0 Elevation: 100.00 ft
Storage Volume: 614 . cu. ft
Vertical Permeability: 120.00 min/in
Permeable Surfaces: Bottom
Riser Head: 0.50 ft
Riser Diameter: 18.00 inches
Top Notch Weir: None
Outflow Rating Curve: None
Stage Elevation Storage Discharge Percolation
(ft) (ft) (cu. ft) (ac-ft) (cfs) (cfs)
0.00 100.00 0. 0.000 0.000 0.00
0.03 100.03 37. 0.001 0.000 0.05
0.05 100.05 61. 0.001 0.000 0.05
0.08 100.08 98. 0.002 0.000 0.05
0.10 100.10 123. 0.003 0.000 0.05
0.13 100.13 160. 0.004 0.000 0.05
0.15 100.15 184 . 0.004 0.000 0.05
0.18 100.18 221. 0.005 0.000 0.05
0.20 100.20 245. 0.006 0.000 0.05
0.23 100.23 282. 0.006 0.000 0.05
0.25 100.25 307. 0.007 0.000 0.05
0.28 100.28 344. 0.008 0.000 0.05
0.30 100.30 368. 0.008 0.000 0.05
0.33 100.33 405. 0.009 0.000 0.05
0.35 100.35 430. 0.010 0.000 0.05
0.38 100.38 466. 0.011 0. 000 0.05
0.40 100.40 491. 0.011 0. 000 0.05
0.43 100.43 528. 0.012 0.000 0.05
0.45 100.45 552. 0.013 0. 000 0.05
0.48 100.48 589. 0.014 0. 000 0.05
0.50 100.50 614 . 0.014 0. 000 0.05
0.60 100.60 614. 0.014 0. 462 0.05
0.70 100.70 614 . 0.014 1. 310 0.05
0.80 100.80 614 . 0.014 2. 400 0.05
0.90 100.90 614 . 0.014 3.700 0.05
1.00 101.00 614 . 0.014 5. 160 0.05
1.10 101.10 614 . 0.014 6. 590 0.05
1.20 101.20 614 . 0.014 7. 120 0.05
1.30 101.30 614 . 0.014 7. 610 0.05
1.40 101.40 614 . 0.014 8. 070 0.05
1.50 101.50 614 . 0.014 8. 510 0.05
1.60 101.60 614 . 0.014 8. 920 0.05
1.70 101.70 614 . 0.014 9. 320 0.05
1.80 101.80 614 . 0.014 9. 700 0.05
s
1.90 101.90 614. 0.014 10.070 0.05
2.00 102.00 614. 0.014 10.420 0.05
2.10 102.10 614. 0.014 10.760 0.05
2.20 102.20 614. 0.014 11.100 0.05
2.30 102.30 614. 0.014 11.420 0.05
2.40 102.40 614. 0.014 11.730 0.05
2.50 102.50 614. 0.014 12.030 0.05
Hyd Inflow Outflow Peak Storage
Target Calc Stage Elev (Cu-Ft) (Ac-Ft)
1 0.09 0.00 0.00 0.50 100.50 614 . 0.014
2 0.07 ******* 0.00 0.10 100.10 124 . 0.003
3 0.06 ******* 0.00 0.08 100.08 92. 0.002
4 0.06 ******* 0.00 0.06 100.06 72. 0.002
5 0.05 ******* 0.00 0.04 100.04 45. 0.001
6 0.05 ******* 0.00 0.03 100.03 37. 0.001
7 0.05 ******* 0.00 0.03 100.03 32. 0.001
8 0.04 ******* 0.00 0.02 100.02 27. 0.001
i
Technical Information Report—Final •
Shuttle Express Parking Lot-800 SW 16th Street February 10,2015
•
•
APPENDIX I Emails Between DCG and City of Renton
Davido Consulting Group,Inc.
TIR_Shuttle Express_Final.doc
• From: Kamran Yazdidoost[mailto:KYazdidoost@Rentonwa.gov]
Sent: Monday, July 07, 2014 1:37 PM
To:Tim Gabelein
Cc: Steve Lee; Ben Iddins
Subject: RE: Review comments for Shuttle Express Renton Parking Lot
Good afternoon,
Sorry for the late response,the answer is yes. Please let me know if you have any question.
Thanks,
Kamran Yazdidoost
Plan Reviewer
City of Renton
PH (425)430-7382
kyazdidoost@rentonwa.gov
From: Tim Gabelein [mailto:Tim@dcgengr.com]
Sent: Monday, June 30, 2014 7:57 AM
To: Kamran Yazdidoost
Cc: Steve Lee; Ben Iddins
Subject: RE: Review comments for Shuttle Express Renton Parking Lot
Thanks Kamran. To clarify,we can eliminate the engineered soils layer and utilize the native soils for
water quality treatment?
Thanks,
Tim Gabelein, PE
Davido Consulting Group, Inc.
Phone: 206.523.0024 ext. 105
Cell: 360.929.4224
From: Kamran Yazdidoost[mailto:KYazdidoostt Rentonwa.gov]
Sent: Monday, June 30, 2014 7:54 AM
To: Tim Gabelein
Cc: Steve Lee; Ben Iddins
Subject: RE: Review comments for Shuttle Express Renton Parking Lot
Good morning,
Your project submittal and proposed changes would be okay. Your project permit fees can be
recalculated with new bonding calculations and project cost submittals to be provided along with the
changes.
Thanks,
Kamran Yazdidoost
Plan Reviewer
City of Renton
PH (425)430-7382
kyazdidoost@rentonwa.gov
From: Tim Gabelein [mailto:Tim@dcgengr.com]
Sent: Wednesday,June 25, 2014 10:52 AM
To: Kamran Yazdidoost
Cc: Steve Lee; Ben Iddins
Subject: RE: Review comments for Shuttle Express Renton Parking Lot
Kamran,
I wanted to update you on the Shuttle Express project and let you know the latest as the project is going
a slightly different direction now.We are still proposing a parking lot but it will be scaled back in size and
be comprised of mostly the westerly portion of the previously submitted plans.We are working with the
client on the layout of the lot based on their fleet vehicles.What will the change in Site Plan do to the
review process since we already submitted a different parking lot configuration and received the first
round of review comments?
An additional question I have is for the stormwater review engineer on the project.We had previously
submitted plans with a 24"engineered soils layer below the porous asphalt parking lot for water quality
treatment. We recently received results from a soils lab that show the native soils very closely match the
soils required to waive the water quality treatment layer requirement.This would be a significant cost
savings to the client.The results of the tests are below. Could you please forward these results to the
appropriate reviewer as we would like to be able to proceed without the addition of the 24"soils
treatment layer for this revised parking lot layout and would like their blessing to do so based on the
results below and the criteria at the end of the email from the Stormwater Design Manual. Please feel
free to have them call me to discuss.
Cation Exchange Capacity(CEC)
Test Pit#1:4.69 meq/100g
Test Pit#2:4.30 meq/100g
Requirement:5.00 meq/100g or greater
Organic Content%
Test Pit#1: 1.47%
Test Pit#2: 0.94%
Requirement:0.5%or greater
Measured Infiltration Rate
Test Pit#1: 6.92 iph
Test Pit#2: 13.84 iph
Requirement:9 iph or less(project not in ground water protection zone)
Gradation Requirement
Site soils meet gradation requirement(section b below).
Soil Treatment Exemption
A proposed project or any drainage area within a project is exempt if the runoff from pollution-
generating impervious surfaces is infiltrated in soils that meet the "groundwater protection criteria"
outlined below.
Groundwater Protection Criteria:The first 2 feet or more of the soil beneath an infiltration facility must
have a cation exchange capacity greater than 5 and an organic content greater than 0.5%,AND must
meet one of the following specifications for general protection of groundwater:
a) The soil must have a measured infiltration rate of less than or equal to 9 inches per hour, except in
groundwater protection areas where the measured rate must be less than or equal to 2.4 inches per hour
(NOTE THAT THE PROJECT IS NOT IN A GROUNDWATER PROTECTION AREA), OR
b) The soil must be composed of less than 25%gravel by weight with at least 75%of the soil passing the
#4 sieve, and the portion passing the#4 sieve must meet one of the following gradations:
• At least 50%must pass the#40 sieve and at least 2%must pass the#100 sieve, OR
• At least 25%must pass the#40 sieve and at least 5%must pass the#200 sieve.
*Cation exchange capacity shall be tested using EPA Laboratory Method 9081.
*Organic content shall be measured on a dry weight basis using ASTM D2974.
*Measured infiltration rate shall be as measured by the EPA method or the Double Ring lnfiltrometer
Method(ASTM D3385).
For some soils, an infiltration rate of less than 9 inches per hour may be assumed based on a soil texture
determination rather
than a rate measurement. For more details,see the "Groundwater Protection"requirements in Section
5.4.1.
Thanks,
Tim Gabelein, PE
Davido Consulting Group, Inc.
Phone: 206.523.0024 ext. 105
Cell: 360.929.4224
4