Loading...
HomeMy WebLinkAboutS-3625030, 0 U Li I- cn z 0 Q cn w I N I z 0 z w Iz 0 U 0 U U Q / 0 Q U Q c 0 U L 0 U a Q 0, aD 0 0 Q- < Q 0 O N 0 0 0 Ln 0 O > U U 0 0 N i Q z w N O N z 0 Iz w > 6" SAWCUT FINAL JOINT 6" DEEP BREAK REMAINING DEPTH OF CONCRETE (TYP. EACH SIDE) da a 8 1/2" Dia. X 12" LONG 12" EPDXY COATED DOWEL BAR @ 18" TYP ON CENTER ALL FOUR SIDES BACKFILL -� (SEE BEDDING/BACKFILL DETAIL) a _ n d a. e d Q d Q d' TRENCH LIMIT 4.5' MAX PAYMENT LIMIT OF PATCH EXCEPT AS DESCRIBED IN NOTE 1 EX. 1-1/2" ASPH. CONC. PAVEMENT, TYP. EX. 8" CONC. PAVEMENT, TYP. 6" CSTC ASPHALT PAVEMENT RESTORATION DETAIL RAINIER AVE N CB RIM=58.15 SSMH 5307 008 IE 12"CONC. N=33.95 F - RIM=57.78 IE 8"CONC. S=55.65 IE 6'N=54.38 IE 12" CONC. W=54.05 IE CHANNEL S=53.48 IE 8 NE=53.60 ROUTE TRACER WIRE IN TO I MANHOLE AND ATTACH/SECURE TO TOP RUNG OF LADDER WM ADR SG NO VISILE INVERT b " ---- i 2x5 CV I - PO - - ___-------- - ----- i -�- PO W 2W"Mp- -CLW----W----W- S--W- i 18' MP CO -----COM _� - P--- - C - _ COM----- -P - APPROXIMATE PAVEMENT RESTORATION LIMITS. (SEE DETAIL ABOVE) 66LF-6"PVC C900 FORCE 2-6" 2-6" 45' BEND, MJxMJ - W/ CONCRETE BLOCKING 2LF-6"PVC C900 SPOOL � ■ 1 -----�-i i ' ■ i ' ■ 1 ' ■ 1 ' ■ 1 kIN---'0` ----- i 1 ■ 01-10 XI ■ ■ W/ ONCRETE BLOCKING _----------------------------------------------------------------------------- ------- -AS SHOWN (MAX 1/2 CB II _� _ _______------------------------------ cB MAINTAIN 3' CLEARANCE BETWEEN MANUFACTURER'S RIM=51.71 II 41LF-6"PVC C900 �I ■ APPROXIMATE CONCRETE PANEL VR55.31 °� - DOUBLE ■ TI (BENEATHASPHALT)N-54.51 398LF-6"PVC C900 FORCE MAIN UNDERGROUND POWER AND FORCE MAIN RECOMMENDATION IE 8 N-50.91 II FORCE MAIN LOCATIONS (BENEA II _------------------------ ______________________________________ EX. CONC. SIDEWALK U------------UBP LS- REMOVE EX,� SSMH ------- -------- - ---....................�...�.................................�.................. .......0000.. RIMCHAN - ............................�........�......... 7 • „TREE LS V U� 0 0 0 0 �' 0 0♦ � CTR CHANNEL E-39.05 UBP �"� PRUTILITY AT C10 CLEANOUT 16"MP A�/�NDONED ' PROVIDE LOCATE 16 MP ,� I SSFM MINIMIZE DISTURBANCE TO STEEP SLOPE DURING APPROXIMATE � TRACER WIRE AND 3" WIDE PER DETAIL ■ 0 MP 14It�IP SIDEWALK/CURB/GUTTER PAY TAPE ALONG ENTIRE FORCE ■ II FORCE MAIN INSTALLATION. INSTALL JUTE MATTING LIMITS 10' MAX. REPLACE TO A T 7 _ _ MAIN LENGTH PER DETAIL C 1 O8IT PIP H 8 MP MP AND STABILIZE DISTURBED AREA OF SLOPE PER COR ■ 1 ��"Mp 1110 STD. PLAN 213.20. ANCHOR JUTE MATTING TO SLOPE - -- - - - - - - -- ----- _ � r NEAREST SIDEWALK JOINTS - - - CA^ - _ _ C10 PER DETAIL 12 - AP I AND HYDROSEED ON TOP OF MATTING. __ - - - -� _ ■ hUP _� _ II I �� kiMIH� 79 RiM„25. Ar 2 Y PB UP rB� ■ - -- _ /_ CTR C 'ANNE[ 5=15.10 IE R \/� W=23.E�2 UNLOCATABLE UBP SET IN SET IN �' \ RIM=25.90 �� ■ IIII / - .�. IE 8" P�!C W=23.52 _ , \ IE 12" CONC W=2.x.20 \ ■F0 FU rO - F FI/0 W. OF 3.5'x3.5' CONC. UP CONC. BA�t \ F0 �-- FO I I �� FO Fn CURB GRASS SAP OHP�� I -OHN UBr I� Fn FU FO F0 FO S _ GRASS ��- I / UP PX OHP OHP - I - r 0 F ---- FO I '- Fn rr, -- FO FO --1 SCA PX CV I� SEND OF 8„WW i �` r„ �---AS ASAAINI - Fv -z I -- M ----M--- ---W - ��R' r � �:mm- INr �- o ---M-- - PP -- WH , G 16"WW c J/ i - -M- - - -M- - o P --- °- ------P -- -- �. �. l�,■�-.�+� CV _ _ P___---_- _P _ _ - - P _ --V-ERT CURB _--__= P=== 8 LT _EEE, OEM_WEEMIN VERT CURB i cf)- Fj _ ____ _ _ W- -W -W- _ _OEM I "--P� :17p -'A _ - - i `r* I I III ' I I 0 - - - -- - - - 12"AR �- __-W --p-`_ -------------- - -- - - - - - - - ---- ----- P/P+=-- _ ACCESS MH �`'------------ --- - -�- - - - - - - - - - - - - - � LS RIM=26.21 ------------ - � - ---+---- - - - T -- W-_ SSMH 5307 073 III womm NONE IME NONE EM11 SEEN INE I EM! ME IME IME MEN RIM 01010 1=10 IME IME IME IME SEEN 0=1 NEWS IME I DEPTH OF SHAFT=3.1' p -'_W P'�- - CONC. BASE RIM=26.81 VERT CURB WTR SURFACE=19.21 ® _ _ _ _ _ _ _ _ VERT CURB __-- -�= CTR CHAN.-16.59------------------------_____---------------------- - - - -- - -- -- - =P _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ x X X X X X X X X X X U X X X - �-' -`�� x - - W X WM v ue o 7' CLK FNC OM---- -PM - = -- _ ___--� -S P✓1-_-_ __ COQOM= = 1. THE FINAL SAWCUT JOINT SHALL BE A MINIMUM OF 1' BEYOND THE UNDISTURBED EDGE OF THE TRENCH. IF THE FINAL JOINT IS WITHIN 3' OF THE END OF THE PANEL, THE JOINT SHALL BE THE END OF THE PANEL. 2. PORTION OF THE ROAD WITHOUT CONCRETE BASE SHALL BE RESTORED WITH 8" OF ASPHALT OVER 6" OF CSTC. 3. ALL ASPHALT PATCH AREA OUTSIDE OF PAY LIMIT SHOWN SHALL BE CONSIDERED INCIDENTAL TO OTHER ITEMS OF WORK. 4. ALL TRENCHES IN ROADWAY AREAS SHALL BE SECURED BY BACKFILL AND PATCH OR STEEL PLATES PER SPECIAL PROVISION 5-06 AT END OF EACH WORK DAY. THIS WORK IS INCIDENTAL TO ALL TRENCH RESTORATION WORK. 5. ALL TEMPORARY PATCHES ON TRENCHES SHALL BE PERMANENTLY PATCHED WITHIN (2) WEEKS OF COMPLETION OF WORK WITHIN THE ROADWAY AREA UNLESS APPROVED BY THE ENGINEER. 6. APPDXIMATE LOCATIONS OF EXISTING CONCRETE PANELS BENEATH ASPHALT PAVEMENT ARE SHOWN BELOW. THERE APPEAR TO BE FOUR LANES OF CONCRETE PANEL ROUGHLY CENTERED UNDER FIVE LANES OF ASPHALT. POTHOLES INDICATE ASPHALT 8.5" THICK WHERE NOT UNDERLAIN BY CONCRETE PANELS. P SE 07-23-05 CB RIM=56.51 CTR CHANNEL=55.71 CB --7------PLUG PLUG AND ABANDON EXISTING FM CONNECTION TO NORTH. CONNECT NEW FORCE MAIN TO EXISTING _ _ _ _ _ _ MANHOLE AND RECHANNEL TO ACCOMMODATE NEW - - - FLOW DIRECTION. G G G I -------------------�---RIM=48.67 SSFM I - - - _ - - - - - SSMH 53_07 011 --------------- -----------------!I----------- --------------------------------- ##----------- - - - - -- II -------------- ' SE= 40.12 II ABANDONED SSFM �W EST EDGE TURN LANE WEST EDGE TURN LANE II FM PENETRATION RAISED TO AVOID GAS LINE. 45' BEND EX. 12"SD FROM II ADDED IN MANHOLE TO DIRECT DISCHARGE TO CHANNEL UHAUL LOT �y EAST EDGE TURN LANE EAST EDGE TURN LANE II � ! 2-6" 45' BENDS, MJxMJ II 9LF-6"PVC C900 SPOOL e 1-6 45 BEND (MJxMJ) DEFLECT_ FORCE MAIN _ _ _ _ _ _ -i I- -W/ CONCRETE BLOCKING x _ I BLACK RIVER 60"0 ! o �� I W/BARBED TOP RCP CULVERT � S' SSCO(3) I ASPH ASP c CB x SEE LIFT STATION SITE REMOVED EX. T RIM=25.26 PLAN SHT. C7 FOR 4 TRA ASPH R R EX. S LIFT STATION .E 8" PVC E=26.96 x C10 BLDG PER DETAIL Ex. 21"0 CONC. DETAILED SITE PLAN STORM DRAIN AND FORCE MAIN PIPING BLDG SCALE IN FEET Stant ec 11130 NE 33rd Place, Bellevue WA 98004 phone: (425) 869-9448 www.stantec.com 5-361503 NOTES: 1Q MEGALUGS REQUIRED ON ALL MJ FITTINGS. O2 MANHOLE COATINGS SHALL BE PER SPECIFICATIONS. THESE CONSTRUCTION RECORD DOCUMENTS HAVE BEEN PREPARED BASED ON INFORMATION PROVIDED BY OTHERS. STANTEC HAS NOT VERIFIED THE ACCURACY AND/OR COMPLETENESS OF INFORMATION AND SHALL NOT BE RESPONSIBLE FOR ANY ERRORS OR OMISSIONS THAT MAY BE INCORPORATED HEREIN AS A RESULT. 0 nm -n RIM=54.64 z �0 C O -SDMH c IE 8"CONC. N=53.14 .n "z m RIM=56.63 IE 8"CONC. S=53.14 Cn SDMH CB 9 IE 12" CONC. N=51.93 IE 6"CONC. W=53.84 RIM=51.25 RIM=49.14 IE 8" CONC. E--53.33 IE 24"CONC. N=45.95 NO MEASURE DOWN IE 12" CONC. S=53.13 SSMH 5307 009 IE 8"CONC. E=47.95 IE 8" CONC. SW=53.75 RIM=54.57 CTR CHANNEL N=50.67 CB RIM=51.12 IE 12"CONC. S=46.15 IE 12" CONC. NW=53.43 --,` MONF-KC-J-2 IE CHANNEL N=50.32 SII IE 8"GONG. S-48.15 WM -�-_ -------- _- _---------_ --- �_ ---- -� ----24 MPC = I--- W H WV /// -- �W UBP 20"MP 20"MP _ P /// /// LS �► -�- - - - -W- - W- - -W- - - --w-- S I _ Ls PO V - _ 24"MP -COM--- --C AQ t P- n �--�- _, _ -- - -- - --_-- M---- c� - �- --- - �M --- --- r-nNA_ �CIIDtI-- �Giv1 P_-�. -r�npd- UBPM 1 �l P --COM----- M, V V ---- P _ �1 -- -��� ===-c''�1== -- - COM-- C-O�vI- ===ADM== _- ���M =_= __- =__�=- _- -_ =_ �M- --=-------------------- -- ----- - ---------------------------- - - --- -_ --- - -- - ----- - - _���-� = =----- -_=-------------------- ----- _------ -- ------ . -- ------------------ -- ----------p---------- ----------- __ --�-------------------- - c> UBP ---- - �EgEEEEEE UBP momm gEEE EEEE gEEE EgEE IgEEE gpEE EMA SEEN 010101 SEEN SEEN EM1 EEEE momm IME =01 RIM RIM NONE 01M ME! 0=1 1000 IMP momm owl IMP NONE momm Mai wom momm M � � � � � �.SEEN - - - - _ -G- G Gtr G G G- G --7------PLUG PLUG AND ABANDON EXISTING FM CONNECTION TO NORTH. CONNECT NEW FORCE MAIN TO EXISTING _ _ _ _ _ _ MANHOLE AND RECHANNEL TO ACCOMMODATE NEW - - - FLOW DIRECTION. G G G I -------------------�---RIM=48.67 SSFM I - - - _ - - - - - SSMH 53_07 011 --------------- -----------------!I----------- --------------------------------- ##----------- - - - - -- II -------------- ' SE= 40.12 II ABANDONED SSFM �W EST EDGE TURN LANE WEST EDGE TURN LANE II FM PENETRATION RAISED TO AVOID GAS LINE. 45' BEND EX. 12"SD FROM II ADDED IN MANHOLE TO DIRECT DISCHARGE TO CHANNEL UHAUL LOT �y EAST EDGE TURN LANE EAST EDGE TURN LANE II � ! 2-6" 45' BENDS, MJxMJ II 9LF-6"PVC C900 SPOOL e 1-6 45 BEND (MJxMJ) DEFLECT_ FORCE MAIN _ _ _ _ _ _ -i I- -W/ CONCRETE BLOCKING x _ I BLACK RIVER 60"0 ! o �� I W/BARBED TOP RCP CULVERT � S' SSCO(3) I ASPH ASP c CB x SEE LIFT STATION SITE REMOVED EX. T RIM=25.26 PLAN SHT. C7 FOR 4 TRA ASPH R R EX. S LIFT STATION .E 8" PVC E=26.96 x C10 BLDG PER DETAIL Ex. 21"0 CONC. DETAILED SITE PLAN STORM DRAIN AND FORCE MAIN PIPING BLDG SCALE IN FEET Stant ec 11130 NE 33rd Place, Bellevue WA 98004 phone: (425) 869-9448 www.stantec.com 5-361503 NOTES: 1Q MEGALUGS REQUIRED ON ALL MJ FITTINGS. O2 MANHOLE COATINGS SHALL BE PER SPECIFICATIONS. THESE CONSTRUCTION RECORD DOCUMENTS HAVE BEEN PREPARED BASED ON INFORMATION PROVIDED BY OTHERS. STANTEC HAS NOT VERIFIED THE ACCURACY AND/OR COMPLETENESS OF INFORMATION AND SHALL NOT BE RESPONSIBLE FOR ANY ERRORS OR OMISSIONS THAT MAY BE INCORPORATED HEREIN AS A RESULT. 0 nm -n z �0 C O c n .n "z m m m Cn 0 9 > -n 0 -0 c 10 DCn < Z