HomeMy WebLinkAbout03259 - Technical Information Report - Drainage��,__�:: _
�
5�� -- 2� - 3z�G1
� L�V�.i., '? ANAC.,Y'�TS
� '�'OR,
m �A�;':��1�iAH .�T THE F�RK
� ' 9�9 UN1C)1v A���NUE;2�IE '
' REN`TC)N, �r�SH'II�iCrTQN
;.�j '
��'�t��
�
FILE NO. 825-008-041
�
PREPARED BY
TOUMA ENGINEERS
6632 SOUTH 191 ST PLACE, SUITE E-102
KENT, WA. 98032
(425) 251-0665 ��.�� �'`� � ��,
�
July 7, 2005 � ���� � ���
Revised August 23, 2005 �`� �.��L � �
L
������ r�� ���
{y� � � y
���L
,�.' �y-
Z -+�, D,'
� f�.,i � �:��.
$si?( $'�'�,.
��C'1$-(i:.E�"'��.�p�
� k�,�1 �:✓M
.\ �F1 f i�i��i.J'�',�....._.._....._
--_ �_'_�.,��.� .-..�.as_.,. . . ...i
�:..--'"�`�`fa71:�i�q�.,.i''r'.%:IT17-'
P,.,..-. .__.,.:_..,��.. 7- _...___�
�
�3259
TABLE OF CONTENTS
TABLE OF CONTENTS
� Pages
1. PROJECT OVERVIEW 1-3
� IL CONDITIONS & REQUIREMENTS SUMMARY 4-5
III. OFF-SITE ANALYSIS 6-7
IV. FLOW CONTROL & WATER QUALITY 8-17
V. CONVEYANCE SYSTEM ANALYSIS AND DESIGN 18-19
VI. SPECIAL REPORTS AND STUDIES 20
VII. BAS1N AND OTHER COMMUNITY AREAS N/A 20
VIII OTHER PERMITS 20
IX. EROSION/SEDIMENTATION CONTROL DESIGN 21
X. BOND QUANTITIES WORKSHEET N/A
STREET LIGHTING 22
�
�
I. PROJECT OVERVIEW
The subject property involved in this plat covers an area of approximately 1.73 acres. %hei•e
exis•!.�•.smul!uff=.��ite cu•ea co►rh�ihi�ti�ig ta the s•ite, crpproximately 0.2-1 acres, .sitt�atecl sur�[h►vc.�.��! �
of�the .s�te. 7his rep��rt ►��ill acldress lhe basin area c f/.97 acres The property is situated in the
north end of the City. It is bounded on the east by Union Avenue NE. lt is bounded to the south
by Kiwanis Park, and to the north by Gustafson subdivision. It is bounded on the west by fairl_y
large lot and the Seattle Transmission Line right of way. Access to the proposed subdivision
will be from Union Avenue NE via a cul-de-sac that will serve the proposed 10 lots fi-om a
single new intersection. Union Ave NE is developed at this time.
The project area is fairly flat with average slope of 5-6. The development falls within one small
basiil. Ttie surface water is directed to the east toward Union Avenue NE. "The storm will be
directed to an existing underground storm system in Union. The surface water runoff from the
site will be detained in retention facility and the outflow will be controlled and released tc�
follow natural flow to the south.
The ground cover consists of grass and several evergreen trees scattered over the entire
property. 7he C'ity stcrff c�»tsideis�ortion of the westerly area to be a hnlf fores7 a�rd a hu1�
gras.��. %he estimate cn��cr.falls within this coverage is calctrlatec�at 0./2 acre.r. 7he peak.�•.fluw.��
areu calctilcrted ijic/tating the fores[ed a�•eas. Several deciduous trees planted around the
existing house. There exists a house, detach garage and associated landscaping. The house will
� not remain and will be removed. The soil type of the site is Alderwood AmC, Arent, Alderwood
glacial till in accordance with Soil Conservation Survey.
The proposed plat will have 10 lots with lot sizes ranging from 4566 sf. to 1 1,585sf. "fhe ��lat
improvements will be designed to City of Renton Standards and requirements for streets, storm,
sewer, water and streetlights.
See the figures on following pa�es:
Vicinity map
Soils 1��1ap
Pg. - 1
�
� � •• ��...-' � _ � M [
� �1 --�" 9I M � ~ �; �K fAQf 1 I t���� (� �` �� � 1 L--}I[1 ���� � �h
„s—� 6) �t°° � I 5 sa _ 58 4 _ s�+X �0 1�_ •!, � 4i ` � -P �� . r i1
J_ m�;��I �•; " 4�E� 5�'o � _ '��e�` '� '� , � 13 ° a�. � .
, 1► �, __ _ „on . �T_ � on � ..' � � , .,. • � -
, -�-' t Ja W �� ' ' J*'� � x � � ''s �3 -D '� 'A �e�'a
�" '�� 9�^ F- n� - OS Z� s�S 4�� M '°�• c�
z � 1_ N�. i s � � ?�
�D ( S sp��Z_ _iOL37 3 � � M 14 � " , I
v+ '� � � . 1 � ���. � � � L1J ,��+ �' R1 17 16 IS o 33 32�
� r 1�Y1 33J `''� _B � � _-�_—� l-�IO� �-� � �r � �^� g � �' N =� N .., �rI�..,
6� � _ `�� 0�6� �p Sl � 01`--`i �42G� � �'�~ � }�L1A� �' �ol ib � � �c �s � lx
—�—� Z � 6 '�;J� � _ '�-�io I � ��' $ N.E. IOTH. PL
�]i� .•�Q 9I.99 !o !p �'
7t'1 � � U � N �l• /SsIJ y �� 2f t r7�'Z'Y1 4S )O • ' -
�_�. ' � .,� , Q ti3� � �= �' a• • N ,�; _
��� t9 ¢�.,'� �r� w '4 w� ` L � I'- _� y I 2� N N �r, (�
g z ��� ��5� �',6 OJ� K� s,.0 � I� �;, � - ,: 5 ' 6 Q ' S e fY. �"
, � ` r«-� .. S z
...-i3�.s�i l (j tSal sj h r r � .:t ..�»�� . � O
9 0 0^ '�s' H j.� �r II l0 9 8 , 7 � q I J 18 17 1S i!
:�S ,� t4. �• p�. � I � .., ('�R' g('���o,"�� � n, �
o ' `�' p� � /,,(� � �` z� �s � ,,, O � � ' �' � > _�3' Y� �P'� �Y`" 'd�' �
!' w�� 2 �p �1 N A6��N f I* 4 � � � ^ �U2 70 :0 �S +� •S 70 ,
1lL. -/ZSfI---� s3 !v �»
,;TY 2 76, . !� � ` . , rv.E. �o-
►� REN10M o �� s n ai o �� wo et. .s
1� too � Ct93Ac, CHURGH 97 • � � ry �� � -
11 G. DOl M A N 7 t./63 `.I, � N y� ' �' '^-- _�2 _
O J /s �
(� � .�5� � 1� � �� .; ..
r R. A � 0.25 2 Acs Ac 0.41�k. � � � H O E Y�
�� , r�.�� D.S. LITTLE I "� Ac. _ � � �7 �
~ �) ' I.o3Ac �•93Ac. 1c.toB � ' i0�' 8 U x .a f�
- '� ""�� 6 5 i _ 4 _ 3 R L 1� A E�' A�� �, Y ANA
� .. � 3 2 � � � � ��;• 6 ;
1 !D�,
� ..K ��,... ES7 ES�
U T . F S N ` _, '
1� �-- �t - - -- --f'- -•-- - c9 s- c° � � Ac.' 71 5 : 6 � :
�1 � ��7 r�.cr -r 8 IOo � bll�.
� , �� � $ Il . 321 �r so �! �u._ _L�_ �O�
� �1 '- —'2I.t�- ��20- ' �- �d�' zS.Xr � � q I� � Ia 19
�' y ►1 � � -cs--l _ � � _ e
` ^ ' �- 0.99Ac� �i �rb � � M - �
�� °' 6 5 4 3 2 1 � 0.10Ac. � � �r, ay Rtr
�2 uHR �N r� � � �� ':e iss.la - - -� � .�,,� ti� Q �
TR. ` �Toa.-ss-_-faa=` -- „��a.-,� ' - :�s s N.E..
� M �A� ���D�� / �I � „ �B � 0.42 Ac. x
� � J' ' � �] �t
iz�a �� ✓soes »t .�� �a_!S �"� � .� '�a �sd�
�*
� � -=---- � �__= o.46Ac. '-' . H �
�1; y: � , 1 !; � „ 3, � o ox � N- u �
,� � I . � )16.38 ioo x�+ ro es �c
�`' � � T— 121�.�L
� I'.
�2 II $
` �'� � � II- izia.»
� �y►
�l ty O
�c.x^ TR'. , . °----- ---
B~ K � w a n i s . I I� ---------
�� , �
�
� ^ 1 '� I. tz�e.as
� _ ��� � 1 �
� ( �- ,
,6 : ►; � P a r k=` _ � � a S�hoo� o,st�,�� .
�-y � --- 1272j2
� 'I f�: �� --�-
r� I � � '�1
�I I�I � � � � NONE O w
Ij I �
5 ` I I � '� � � � SC
� I11
1 I
� _ �� � � School Disirict
� u i .:� u. � � _ ,a, • ,
� (� � 2 � I 'I i�� �
� �I� 'lt '� .�s �` �` �l (A) Q j , 1 I � 1
.. h (BI +��-- � 1
�� v� �f- Q = �' � --------- �: � i � I
. �/
�,�;; = ��, a r�3: seo�-77 � a �1� �_ ' ' � _ V��� ��1 .L�I��'— _ — _ .
� �
.,tio � —r-�-� �2,5.,�
h i 1 � co 6� ' � %r area ad�s csb wa 9��0 87
�p -_ n � � „ � � 3 2 1 O I � �� (NE. �
�� i U� � � ?s � _ ��'_ j i��i7--- �So—�- i .,\ a
t � i � � 2 _ � ,�s� - l � � � p 32 dc �, 9 �I
� �= �5 .� -69 Mt U31 }� �� � °�' � e :'•
� –l� __� � a �
- " ST. � "_'°„�3 : °°°° � N.E. 7TH CT.�� I,� o.t5 - - -- - �;� o -- -- �,x
' � r - . u 6 � s�n �sn �• � � � _ � ��-- - ^� 016Ac - _ � �
! 1 T_' —_ '' �.7 ��A ^ -- I�I � � }I4 0 1
� ! �j ' 4 - - I ?SA� � I� �' � -
� , —�---_ . • . In . � [� . A= n - � .�1 � I L,n��S �� -�- � i' .
�
l�ll�t, 1 i�t�l � � . �., ,
�ltl�N'1'uN lt11;�I,1�:�iv�,1 i.1
l.,r� 122°07'30"
768000� FEET 47�3�,
m ISSAOUAH I'1 Ml. lo, . _, . - �� � � �� . . -
. �� 1 � + `t. •
����:y���7��� . i •
�, � �r �+'�6� �' u !R!y f� .�
�p �' , . . .
.1 . . 'J , '. i� , a ' ' � r �e p J� .., . � '� ii _ ' �4-K �.
� ' ' — ►* I � � �'e+. a f. ;`r,a.�!4 +n � �•s�.',
�! � ' �.�`I :�.'Qrj � '� :i � �� ��`� •�� �� 1�F.�,4 . �.
I 1 .� ° �A,�'��_ � . t• '�� •��'` P� ..t
�j nmC i '.tJr.a. �� t : �r'��` �� '4 �'r .Q..i.. �t'.,��� � i �
� �.� �� 1 t' � �1 N ' Y'`' � � �. AY, � � •• t ABC 1 ��•.
,�-vt 1 � 2 y � � •.i• .7 �..
�j�,� ' ��t�� i ,,�� .p'. '�; {� 1 ¢ .. ,� �� ' • �f M� '�' • f �i i�+.w� � �..�� �
�r � �a1��6, �:� �� , , ' • � I
� ��_�ti'�� J�. � "�� '% x �' �' x 'a � �! :c'` � rj •9�5 N,%�t� t�L Jy. �y.�
` �.� .:I 11"7 •• �' 3 il. � " �� '�S� �. ��1�'�'.. Y*y:
,i.
I, �,!� 1 � 'z' � Dti{ . .:r Q i��; .��. a..�}.l�+;'• t+f L�: ! 'f, �S' =� � �i. t �'4� i��.*i''`4i
+• 4 i J �,' , _—� �I" ' �,�+,. ��. ��.��'� � �' �`` ✓ _ �'�� a�ti}�; �� ,,��r
r� �� t` �y �,�t,i�• i ;T __ •7 Jwr��F.'� �, � K�
ti. S��� . , 7�t ��,� � .'t.. !l� �j�. , 1 1 �i� i �v' ��1.
s.� y' � �_ r__ j• •���.;* �. .,c,iy`a�
_ 1'' ii .� {�.i `�f `f 'ry{�' ! �i �� � r d �� u ♦i '�� �1
\� �� An e� ' .r�� ui } t �`� �•Ils- 4_ :. �' c � '�J• �. ; • �� , r�
�,�� ' j '7� I uf, i� , p: , II ' � L� �,�' ��..ic B• • 1
� ��ig� �"� �, � �, t' ,s4.
� , � ; ii j u Q 'ugM f f�.... . ti �' .
� :��,j �. ♦�� r� � ark� '2' • . ' , . ,. •. . � SA�i ' �
Ae' `:�� ~•--- •� • �•4•� �� .�. 111 �� _ 424 �� �,� r` •s, �ttii . �r� � �''
; � . ( �� � i . � c. � . • • -`r 1.
� � t�{�_ ' ` f� 1 �.. ^ ��i. � 180 000
) � � �T :�' C�' .. �.;" �'
� ti q¢reenwoodCe� � 's�, • :.. � � •� . ,, , � � . EET
� � l- '�v•N ,sw �'y �� •I.•.�.' F
' ��} i�� ` �`' ..���i•i°� .✓L�� ��` � L�lµ'- - (, * � ; M~ � ��
�!Y ' ��� -- F �R�� .�C �i,�.' ^f. � S.� ri'
� � : �w : P 1'q. •ll• i � � .«..�.. � , I���.� . t� ..�.
� r t�a:. s`,?� tyM e� �2� i'k. f� �, .•� � �. fk;, � ���• ' 4•:
�rv� n a': ��';�� �p��, a,. �, t �� ;+ Fkr �}�ti^y � �, ,� I
, I „ i �� • ,�: �„ r �� ;• ' y• �•�ry� < •
(� / : a��+ � A� � �t •:� t �.1 ' w • . �"'X���1 1 .T � .
19f
+ 4 �i ��� P l• ;�'�` . � ��`'! � ,•1 y('Q'.:o-r-�.BC'F r�!; '�, �.
E� !P�T �V.p� �;� p c.i.. a.: � : il`� � �� `T�s ii���,1 �a:.l:.�,, 14 i��; t r�
`, . . �� `+a�i� ► �^. ��}� �` ''• �•• '�4������; ;Y� ..���� .. ') �•� ;���
,� � ��� .I ,L�f �= •;�� �r ar. t�
� � � t?k a1`�� ",��I���►� . • ', ,. v S�� 2'�7 .r�.. �u . �I. i (
� ' .. r� �U� .y�� .M �!'. ' ,y� �•y .�� . •ti .
C ;��r�ye�'e� � C�� ' ��, ` g '� ", 'j. "r`, 'j � �t�'R' `��I}�4 ��3 �' 'i "��,� ��:
R �. ,� r �`�F oG I ..� � , . •' i i ��{,� k� �-� � e�1�a •i- • �
4 t -i`�; � i 7r r � s',�i y �
`A �,,M:: G`. iy . I� �1� . ��� ��' ' •1 J �'�
� f,~• f�yy �.r �� rwr: � ;�j� ¢i ;� v�s�f�'7 - il +`• - ,�. y�� a
/ J � �- �; �.: .•� � "t1 :i. 1� . w�1 .,.P" �.;t
�' , , �f:��. , -::�'��y � ��'"'.�i • ;, t `:�, i '?F 2l�j�.-° ��Y:ti A�
� �• \h S�r ����{j� \�( I,I T • �M1 7 �y�tgfb V �� � '�'
' ' . •• ` - .i• � � ... �����f�� 1
I,�.G� �� , ..�`y� N M� ��T� ... � .��T ,�+����'�1� � y1� ',� �
' -il�p/'-'� !�:, � • � �� � �.t � .
�. f,��-prr`}� , P e�O -�� �M.��r + J� ,�. �j ? r�iliJ ?,�'*f��1,�� ��Z�����'�`� t
-P' •y� . ,(�
, ,• �� y�i���.�! Y 0,�,�Au�,#`�,tz. � .1, ,�`�` ' � ''`°�, t�it) j '4 � -4••T,.l�
r �i �r , '"� 1�ad
;E:.\ A6C '�`�.'4 ��,1�,4 f .�.�r }i- � y...' � :� xF� � � '� �:
- ---,.r . • - _. .ds� ��{a� �' ,y � Zc°. . � � f3l�k�,� � ,r n
g , i, ,1 �„�1,, .
�r �11" " -cra'_'''�- �r' •�• i � �-' 3r' ,i, i�r•;}
1- u� G
II J `�. .�f, K ��. �o
�.� �T� - ' - _ - Y �:-s��"- •� 1 :�^r^�,P y," ��[ �� �'w� -
� <`. ��\ Agp '.�. �`1/`, ' �r� :. � ' id- u ` C�.�'� �. .� -� P+ �s.' � vMa. W
R £�� __ a �' \ i I .' � j �• �• . .ai/ 4 .A.•� pNg't i .�f,Rt I. . � I � �; '?y `
� •�'���,IV/��� �Cf\` ap • / '�f � �� ;,�3n �� Aa�e�' ••�.'i h�. G � � �
t�ls l�. 'A ��•. ' �j� . . •
♦ 6' ��1 � �¢ � �}r �{ � • ��• y�`F6�''�� �� �a ��j�lT' . s . II •°� o�� ���" PY Rh -Wi
.�� �+'�!r q �'`�h , ��'j ., _ � , � '`�al i- �J�' ' Ur �""''��+'i: r d
'� �''l .p. If � IV� "�`y���'� �,�d. _ � ���� ��� \ _.!' + ` �a: + • � E
. ,y f��b.,� . � ��� `�t nd 1��:��t � . I . ..., Q
\ S'�i o�` � ` AkF r f'. � � � t '� � �': Ng �
� Cik � A6C \.�•`�a s ti ��;� �y..ti 1�,; 'A� �; l � PY 169 '
♦ ti � u � t� AH�' �1aG��t �fd ��r ��� a h�
� ;+� • \�o� �,¢:` .��'z , '�;No �-� ' � � �
� �Apa`�� �' ' �c��. ,: : � �'��+ �,' g � � ,. ., •. -
u �� �,ii'. `C ,� , . -,�• 9r _i � `AQt�J.f � � "`'�,�.' � . ! t ' � .e
. `y�� ' .., . � �.r�.. � H � � + 4�,;� ,r ��:x i -� �,p4�,...�
�p.��� 1, `t. Ev .�� r�u�%�y �<' �� `��AkF�� �1,��� ",��'�i
` �i^ .�-�_ ° �� ��. > ..,, o q '� ` AQp.' t� �'" `' 1 �`' , � �� 4 =','�
rtt �r Y.`� e *� • •����� ''' S �:,�' �Yr'� �4 -rT �
M .r� �'G+ '�{ �1 ad ._ __a t ""' , ��C 7 1.
-- �— � 2, '-,. AY'e �,----- - :- - `°�t- ----- w a ��BM e,.'.i 27'30„
'� � 0. ,�- -- - -°=----•-- ,- :2 � -- -_ , BM�B2-- �49G-a.--
� � +. �ia �A B f �' ' :
i '+ — �j�r k`�� 1 K'"`�. 3 a�+3�°jsGt4 -���� _:
�' VI .� # .�' 1�' '` ;���, :� ,,;,, ' :'� �o
: � �� - - � :t : r•
�w��+xb,� �'s , y ', :�;,� AkFwi ��p�,
e �jsw� e.i *�`����y,�R}�� "� � '�. 1 � �A �r...
� �'t fs'IR �`"�'' l' .1 ".. {� .�', ,
nmc � 3jt���a� I� f � �' a •: , � P 68 1�'t�.�.>� �pfPELINE` A�C�
�`.�t��#`�� { � s�•; �" Nme+ � 'P. ��t' 2'-- -'`
� � <[ ,i' � � tii � 492 '� "u� �
Urt � � ��- ` � ��. '� `d� r �1-. ��.. �`..}
' ,� '� � y�, � �,
� � ti � `� � ���'�'^;� �'��`"'� �'F,�Ro `� '�. -- �.
, ' ' i � f�, �p. '1'' '�, � '�$k•� "�tl �ui` '�'p Agf? a;.:.i.+ ,r.?i
, •�\`�`�i�s�'.� ,yh, `N �_ �-, Y � w ��i4 '��^'�♦ .� � y�''��� s� �� ��� �F
'�� ���, ��,'; ;: .' , � _ '� O�����. �x Q ��AgB�+�
V�'� Y�` `�• 1� .r C� �i �, �' � • 1� � ��� 1w � 4� r ,,s�( •i
,`�, Tt K , e�A µ , ��� ` �.� eG1. �t ����;��1��. 1��7�� � �� -�
'� _� ` 93' �m .i;. -- - � 4� ;,- ��'�irr{• Tk�,,. �,� 443
- • - ---- --- f-'`s ----�j� �''- �, v!, ` t � .' '
- . • , .. � , . . �ArH - � � v . .
11. PRELIMINARY CONDITIONS SUMMARY
CORE REQUIREMENT #l: DISCHARGE AT NATURAL LOCATION
The allowable outflow from the site will be discharged to its natural location. The Leve) 2 flow
control is calculated to match the developed peak discharge rates to the existing site coiidition
peak discharge rates for tl�e 2-year and 10-year return periods.
CORE REQUIREMENTS #2: OFF-SITE ANALYSIS
Refer to off-site analysis on subsequent pages.
CORE REQUIREMENTS #3: FLOW CONTROL
Preliminary calculations are provided on subsequent pages addressing runoff rate. The sizing
for detention and runoffcontrol facility and its routing calculations are included in this report.
CORE REQUIREMENTS #4: CONVEYANCE SY5TEM
The conveyance system will be designed using the rational method as presented in the King
County 1998 SWM Manual.
CORE REQUIREMENTS #5: EROSION/SEDIMEN�'ATION CONTROL PLAN
The Erosion/Sedimentation control facilities will consist of filter fabric fences to be placed
along the northeast and northwest boundary of the site. Temporary Erosion and Sedimentatioi�
traps will be considered during construction of plat improvements.
- CORE REQUIREMENTS #6: MAINTENANCE AND OPERATION N/A
CORE REQUIREMENTS #7: FINANCIAL GUARANTEES AND LIABILITY' N/A
CORE REQUIREMENTS #8 WATER QUALITY
The water quality facility proposed for this project consists of a wet-vault.
Pg. - 4
1
SWM SPECIAL REQUIREMENTS
Special Requirements #1: Adopted Area Specific Requirements.
The site drains to the Cedar River via the Maplewood Creek Sub-basin.
Special Requirements #2: Delineation of the 100-yr Flood Plain. NA
Special Requirements #3: Flood Protection Facilities. NA
Special Requirements #4: Source Gontrol. NA
� Special Requirements #5: Oil Control NA
h---
�
Pg. - 5
III OFF-SITE ANALYSIS
UPSTREAM
The site is the situated west of Union Avenue NE, north of the Kiswanis Park. 1 here exi.s�t.��a
snurll ntf-site arec� coiltribrrt�ng t�the site, apprnxinzately 0.2�f�rcres, sitlrated southwest of the
s•ite. 7itis re�ort tivill uc�c�i•es.�• the bastft area of 1.97 acres. The sheet flows drains easterly
toward existing storm system in Union Avenue NE. .
DOWNSTREAM
Surface runoff from the proposed plat sheet flows east to Union Avenue NE. The runoff then
travels south via existing under ground storm system in Union, and directs the flow to NE 4`�'
Street, approximately quarter of mile from the site. The flow crosses NE 4`�' in the southeasterly
direction into,a more defined swale. The flow continues in southerly and southeasterly direction
, over steep area until it reach the Cedar River, approximately 1.5 miles south fi-om the site.
Pg. - 6
'
I , l� ' -`� , ' . � � • � .
i
.,,- 11�} Si � .� ! �: � N�. llth_St �,3.�-, ' '��
►, . , i ,
�. �.. � � .__ __._.! , ...._ _ .._.�-! � `r�` u.w-e �, . . �_ �� j � 1fi�1�'.1,
1 I� 1 , �� � �r.'
� . . . _ �.__.._ .--- . _._... � St �
f ' � ; { �as'o d���;� � , � � � 11 ,^it-�..��_� i5:ci i ,�- - ,,�,��y f• -
, ,
� � _ . � NE 4
, , ! . ,
1 � ; �..� y �.._
►�r i0t �j � '. -I . .' �� E :' 1 n 1lr11�L'II ` ..1+� � ...! 'J // r�.,�7�( i��I �3'd7
19 9.G7-{ � , .
- --..... J.. ..�..� 4__ �� � �Ut'i�1��, � �. � +�)^^. _ t7 l'`a --1 '' � ''.�•' ' �.. ,e.' .
. i •..I ... . . __.__,. . . .. B�- - . ..r �. P . t i
- i __ �s,n-e I� C� i '� d f n ' r '� ��
r�- i j f` ,,'. .;t—_ I, _ M�.a-� -.�.,,) , '. -- 'l`�`1��� _ , � .,J� ; � Ir. , .
i � �- � ,
� � � ,I � �,. ,� I ,,�,: �. � . � ;11, �`' i , .r� •,;t ( i . .
�'� ,� �-� � �I - � �� l_.._�:.. "NE lOfif
, � : l N� j _,� ;;1Qf�t �3,f�� , . `,� ��� � - � -
� ' 'I ,[' • � ' 4.C7-
, ��. •. 1, � ..._.�r . �.__ �'�Ly' ' �1 �I . ' ,,`�, 1��� - _ - I --�•-- ..
.. ; , : �.,'__r"....__ '�_ 3W-f� � � . � .1�� ,. - , y ` 11: I
....i�_
� 1 7
. �
- I � �� l �-� - -� __.J � . .�/ {1�,.- � .� � `,ti �� ���� � .
� , `d �:E ; r r � �a.w-i� u,c 3-u'�,, `. � 1,..._. i 4.��a p!
� ' �� .r 1.�,�. ; . '. .r ..+-- :•� `l N��1. , � � �ti1M-7 � i , I '�UI � �I
� I i S i _�,... N
i I , � � � , � �l i� % � � --� i ��� > i I
� � , �, � .. ,i �' ,' . i:' �i ` '. � . � Q i
��_� �r , � . , ' � . '� UJ4�3 � IOth,�� -5�.�� , T � , sl,�1 u I ' �' 1{.0 S� - -e. �
,n � �3:�. .�. _ ;;.ci �
��"P�' � .+, � ` � ., � _... �_ _/ '_'s�-- yz � � � � �4---��
. i I t•-
� � .. I ��_ , u.c+-�r' ��`y � A i ' �� � � ; f I`. li � ` 1 .i. _ �.
a.cr � ...� ' � 1 � �_.`� +-,
�. .` '� , � �
�a.c�- �e i€,+t!. ` i_ �'IE ilO�h ;5�._.. :�a.ra � �..1?F.�!-4..�_._......) ��. . ...N�,lOth'.:�t.'.�uN� _.1.�.�:��+ ---- N � �i � � � ' �
.__ _._. -. . c,
� '�-��� , , � t ..7i 1, _ .._._ .._ ,.. �._-• - - ._rl?.�i: ._ _ :. :_!, _ y. S- ~4.Uc�_ �3" .
.....
i i, �J��
' � 1� t �_"_'*�''r � 4 u.i++-i1. _i__ ,, ,� _ ., -�i �I � s�ox.�, , ii
� ` i � , ! -- ' i, �- � E 9�h Pl , !'"" �
�
� .i � j l ; , ' ,
i , I ' � _ � �..
_�f .L..�_,.!�... ► �:_ �,,,�f,-� h;S � ��
, _
, . _ .. __- --._.__..__. , �� !T�
-----_
. _ ___. . ._..r.._�._.,_�._.. n,a,-� � '. � �,03.
. ... ,
/� � � ,-_.._.... � .- _ _ ��,a- � , s».
O�iO[410
11 - j . I �I�.i?4�� . O.. _ ._..i '�"` I . i�_� . , / � I��JI� i�/
� ' - _I ', i i � � �... f �♦ _ N�11��� . I . �
4 + �`� ` I - , y�aa u
, �, '�s ��'" . �
,� � ` � � �,� Ci�;�h ,� (� . _ � ' .
r �,� > '.�'. ( � , �- . �
i � . , , ti,.,�`./ �; "`� �m-�, I�
. �
MP�r , :p,� � � ���,_, �
Ct NE �, �� � ,� a� �z � ` -�( ; �
I. I �f �
, °'i , ,
�� .. 4 � PK � �; — ' `.'1`` `" .. i) ,.I . ' f ' ;Q� i};15-� � - �
r..� � ; ;� `• . N
I _� � � ��° t� S� ` _� , � �`���hy C �� ' � W
�c�-.�_. _a� 1.�__�__; . _ � � �1 , _ _.. . _ _ _ . . _� �
r ..T. ..i,__ � �. ?�: � ;. i,� Z
1I '�--t qf93 i � r�] \ I, '�[ '.1 I'\ ( l""�� --,i � � . I i�y� � .__ .}.�{i � I
� � I
� : ; � , � ��_y ; \; t , � ; � _. ._
; ,
[ �
,. , . > , ,. ; � i
1 I�
1 ,�� . . I `�� . I ' 1 ��� -��� � .'��� -� ! . . .f .� l�.�.-.l.
a i . � � _ � t �•. ! � .� . -�� � �L� i i . ' �' -i .'—__4 �
` , ' � • ` .� ' } �. E�t � - . .:�,�.� NE 11�� vt.�'!- .� , C='i
� � � ',; • N _�,_--� ; '� �� � � ��
� i ;i � �i �� . � ' 7 . I , -�-,-�--.. _ � �.„:� �
,. �1A�1(�-'II7h �c. , ; � ; �-- -�:,_ , , �. �
.._ � � �,.'_,__l. /t Jl1� ,. � 1 , i /i ."` l _ .,� i I�M{'1 �.1% 14.16-1] i
y . i+f�- _. 19ii-7 � .) ,r ,._ .`�. �. .�U.�i-7� ir .�"R. - . ` ,.. . . , I I � � � 1 • � 11 > N,C6�
�.��-�%. li _.. .....� � _� . .y,._.. . f F.. � � 7tMl �1. �� ib _ .. �/, l�.f% C
� � �� �� ��! C � ��`. . , �.�� . . .1._.�.__.....� ��:K-� � ,.
� � -� r � ' ��`, � �� � � , ' -�', t` __�_ !; �,.E�-a N
_, i; , � � ; , , —.--,--�.____,.__� E 7tlh ,.:,
, �t, ►aFa-� � ` � ; � , ( � � --
:
; � , , , i
p�t�. �a F�O i 1 ��v � ' � I � � I is,�t _. � -» s'°s-'
" t�I_ , . ,Fs a '� n . --� : - - _i ,, ': ,._..,_tr e-� ` , �
�
�. �" ��' ¢ fa -i� 3.cc y�,. , ' ���,��a .
f r �
�-- L'c�.-..�...._'�,=� n� � � - J ', �b't�i��� ,.,s u `
��11 Pl � t�e�,e. ,� , ( i�i . 1�.1 ��s=e. - , r �� -
> ►iXi-i -ei'• Y��' r � ,,� `� .�".S Y , ` u' _e:''.._� �:� _ P I.
,_ _ .. . :,' � �"', > �.,: „ � - ,� '�j � � �v '� � _..• �4 ,� �1'-
. _
. . . t '`, (
� I � ' li '� F�' ,� ��' �� { t Cu) �7�,I_ I�H9-7 � 1.�6/� r i . •` �i
A �; � -y, 13.F 9:' ��/. I . � . , �� ��... " ( �I " � �' � . .
�� ��6 'Pl�._� _ �an . th P�� �� �� °� j �i- � a�� �'_ _`"- � �'� ��� °' � .� � � i���� �
, l
�- -- (f t k.- -
_._
� - •-Y ran-`. � -�1 ; .._1 . ---r- - - ..._ I �_ � � ,
i � -r or .h� ,.
_;.r_....1.;. 1 .' .. _._ 1 � ,i� �.' r �� Q / i '
' � �. i ,y'�' ' �' ' I� i' ' ` ' r `'t-� .! *� F
�'.., � � �I ' � I 1 � ' j � �. .- .�. '
� � t :�' 1 ' . � � '�� :I � � u � f 7;{07�0
a 1 � �� 1� : �d �e»•� { � �-
- _._.. '
u � _ '
` �� ��: ur� ��� > > t _- � -�� 6th 5��,; _ r-fi �.��_��._--- (�,- , ._ Prlvote ! �'�,
_ ,y M 1 I
' - -v+ ���-111-.�.�.� !17 i , '� - i la.G�� - 4�.��#( �,C -;---- -T'` . ._ .�,' ;. i
..J ���'j` � ;i i I�F7� I ' � �� .13.G7Ni .€ �I� . •� . , - - � - -��
�> ��� I � �� �'� �
c a � � i3.w I � �'� � �
j�.. S � �1�'7 7 � l i . t�...y �. 1]~ �I . ." ,� ; � 1{J7k3 331W7t1
- 1 f�-� •'4 �ai�-�� t; �h i�7, � � PA_�a -lr1/f -I ' { ��r;� ' a��i�. \,
► u� �� , ��L_ .�. K , �, . _ ,�- - - - ,��.�-� � n, v �a�o >io ,
_ _.._ . - , . - �, . _ � ._.
y ian-ie ;;"'7"__. ,, �_' !�' 3 ii,ai�� u,w_i =i�r'-I�:�.._.__u� ' exn�w
�� ye ,r..
us'�,�s � � ti\ ��`, � i �� -7- - - �- ' _. � � �� _ , ,�
. u�-�� n-u � � � � , . i �i'� �' � , � •"�th Si►�.d�-,
s � - #,c..� �'� u, -� -�:•s � �.
_ ; .
ia,F?-� .,�p- - _�. �, "�,� �
„"�" 11 `l 'i 191fTl-' FO' � _. _ _ •`�.~_
Wj7-s � i � f0. �Q�f� . '��
U.F7-1�. _� � �.. �_���� j�� ._} � '�,'�, . `. . ' . , . .,�� 1�.b`� � . , ..
� � � 13.F7-7 V,p. :�A�-�� �I� l7 )7! 11�`� � .19-1 � .
�
--- - s7.-s _- � `� �, ' ' ! ca' � 1�,�`I ��� .._ � �� -� ��.w-sE
'� --' y �:�r ^+�w� _ ., ; -n i �� � i� 1�-.-; i /- '
'i, / -� � ; '� ! � r.�' � �i �3. 1
� ' ,i' � r�•. i �. � � ; �ij �� 't� a u.�r-c
i i I
, f , , �,.. � ,i:., � �'��-,.,.� � '! � �,.r-� - .
, '' t�� -� � �- u �.�3C'", � i � ' �i
Soafe-� r`� _.,,..,..,. ' ' � r -_ ru,�e-e
� i3rne � 'p ..�i, � ^7 _ nr � ��l
i �
; �
FLOW CONTROL AND WATER QUALITY
The Plat subdivision Level 2 Analysis will be based on the 1998 KCSWDM using the Level 2
flow control method to match '/2 the 2 year through the 50 year developed peak flows to the
existing conditions peak flow rates.
The basin area consisting of developing 1.73 acres of plat and small off-site area of
approximately 0.24 acres contributing to the site. The development includes asphalt paving,
driveways, houses and landscaping. The flow from drainage basin is directed through a
detentior�/wet-vault for peak flow control and Water Quality measures. The roof runoff from the
new houses will be collected in catch basin pick-ups and directed to the conveyance system.
Pre-Developed Conditions ,
Forest 0.06 acres forested �I
Grass - 0.06 acres grass �, �
Grass � 1.64 acres
� Impervious 0.21 acres
"l'otal Area 1.97 Acres
Post—Developed
� 1�orest 0.06 acres
Grass/Landscaling 0.60 acres
For this Level 2 analysis of the 10 lot preliminary plat we will use 4000 SF/lot per Section
3.2.2. 1 KCSWDM), or 75°/a of the lot whichever is less.
Lot Area. Impervious
1 6226 4000 Sf
2 5579 4000 SF
3 6019 4000 SF
4 7066 4000 SF
5 5822 4000 SF
6 4573 3430 SF
7 4500 3375 SF
8 4500 3375 SF
9 4500 3375 SF
10 6527 4000 SF
Total 37555 SF = 0.86 acres
Right Of Way = 15694 sf 0.36 acres
Easement = 4000 sf 0.09 acres
Total Impervious = 1.31 acres
Pg. - 8
'
The above information will be used in the King County KCRTS computer program to establish
the existing and proposed time series for the peak flow analysis. The calculated vault will be
73'x 39' x 5.0' of live storage depth, inside measure. There will be a wetpool volume for water
quality within the same vault as calculated below.
- WATER QUAI.ITY
The wet-vault permanent pool will be sized per section 6.4.1.1, page 6-68 of the KCSWDM.
The
V� _ (0.9A; + 025A,g + O.lOAu�+O.OIA�) x (R/12)
V� = volume of runoff from mean annual storm
A; = area of impervious SF
A,�= area of till grass soil covered with grass SF
A,��= area of till forest soil covered with forest SF
A„ = area of outwash soil covered with grass or forest SF
R = rainfall from mean annual storm (figure 6.4.1.A),= 0.47"
, �
S ��c,.,�-,- -:;; -� r o ' > >"' '° �
,
V�_ (0.9(49,926) + 0.25(24,830) )x (0.47/12)
��/ . :7 � . > >�� �z��� s��
_ (44847 + 6208) 0.47/12 =(51055)(0.47/12) = 2000 CF
Vb = 3(2000) = 6000 CF
�, -- �_ � : � � , - � . � , ��
The required depth of the wetpool is 6000 CF/(73x39) = 2.11' calculated.
Per the King County SWDM the depth of the wetpool should be 3', with 1' average depth for
sediment storage.
This volume will be accommodated within the bottom of the detention/wetvault to be designed
and constructed in the southeast corner of this proposed lO lot subdivision.
The overall inside depth of the vault will have to be:
1' sediment storage
3' dead storage for the wetpool
5.0' live storage for detention
0_5' top clearance
9.5' total depth
B10-F1�.'�'$ATION
We have accommodated for the water quality within the wet-vault as designed above.
STORM WATER PEAK FLOW CONTROL:
Reter to the following pages for the wet-vault sizing calculations.
Pg. - 9
'
savannah2.txt
KCRTS Command
CREATE a new Time Series
------------------------
Production of Runoff Time series
Project Location : Sea-Tac
Computing Series : predev.tsf
Regional Scale Factor : 1.00
Data Type : Reduced
Creating Hourly Time Series File
Loading Time Series File:C:\KC_SWDM\KC_DATA\STTF60R. rnf .
Till Forest 0.06 acres
Loading Time Series File:C:\KC_SWDM\KC_DATA\STTG60R. rnf .
Till Grass 1.70 acres '�
Loading Time Series File:C:\KC_SWDM\KC_DATA\STE160R. rnf .
Impervious 0.21 acres
--------------
Total Area : 1.97 acres
Peak Discharge: 0.463 CFs at 6:00 on �an 9 in vear 8
storing Time Series File:predev.tsf .
Time series Computed
KCRTS Command
CREATE a new Time Series
------------------------
, Production of Runoff Time series
Project Location : Sea-Tac
computing series : dev.tsf
Regional Scale Factor : 1.00
Data Type : Reduced
creating Hourly Time Series File
Loading Time Series File:C:\KC_SWDM\KC_DATA\STTF60R. rnf .
Till Forest 0.06 acres
Loading Time Series File:C:\KC_SWDM\KC_DATA\STTG60R. rnf .
Till Grass 0.60 acres
Loading Time Series File:C:\KC_SWDM\KC_DATA\STE160R. rnf .
Impervious 1. 31 acres
--------------
Total Area : 1.97 acres
Peak Discharge: 0.750 CFS at 6:00 on ]an 9 in Year 8
storing Time series File:dev.tsf .
Time series Computed
KCRTS Command
Enter the Analysis TOOLS Module
-------------------------------
Analysis Tools Command
----------------------
Compute PEAKS and Flow Frequencies
----------------------------------
Loading Stage/Discharge curve:dev. tsf .
Flow Frequency Analysis
--------------------------------------------------------
Time series File:dev.tsf
Project Location:5ea-Tac
Frequencies & Peaks saved to File:dev.pks .
Analysis Tools Command
----------------------
Page 10
'
SAVANNAH AT THE PARK SUBDIVISION
Flow Frequency Analysis
Time Series File:predev.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--- ----Flow Frequency Analysis --
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) �' (CFS) Period
� G.205 4 2/09/Ol 2:00 0.463 1 1�0.00 0. 990
0. 124 6 1/OS/02 16:00 0.256 2 25. 00 0. 960
0.256 2 2/27/03 7:00 0.213 3 10. 00 0. 900
0. 084 8 8/26/04 2:00 0.205 4 5.00 0. 800
0. 118 7 1/05/05 8:00 0. 194 5 3.00 0. 667
0.213 3 1/18/06 16:00 0. 124 6 2. 00 0.500 ,
0. 194 5 11/24/06 3:00 0. 11b 7 1.30 0.231
0.463 1 1/09/08 6:00 0.084 8 1. 10 0.091 �
Computed Peaks 0. 394 50. 00 0. 980
Elow Frequency lnalysis
Time Series File:dev.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--- -----Flow Frequency Analysis
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) Period
0. 373 6 2/09/O1 2:00 0.750 1 100.00 n. 99C;
0. 308 8 1/OS/02 16:00 0.491 2 25. 00 u. 960
i 0.448 3 2/27/03 7:00 0.448 3 "10.00 0. 90U
0. 338 7 8/26/04 2:00 0.405 4 5. 00 0. 800
0. 405 4 10/28/04 16:00 0. 397 5 3.00 0. 667
0. 397 5 1/18/06 16:00 0. 373 6 2.00 0. 5U0
0.491 2 10/26/06 0:00 0. 338 7 1.30 0.231
0.750 1 1/09/08 6:00 0.308 8 1. 10 0. 091
Computed Peaks 0.664 50. 00 0. 980
DETENTION REQUIREMEPITS:
DIFFERENCE BETWEEI•d 100-YERR PEAK FLO[^7S :
0.750 - 0.463 = 0.287 CFS > 0. 1 CFS
THEREFORE DETENTION IS REQUIRED.
FIRST INTERVAL = 50� OF 2-YR FLW
= 0. 5 * 0. 124
= 0. 062
II�ITERVAL SIZE _ (50-YR-50'�OF 2-YR} /36-1
_ (0. 394-v. 062) /35
= 0.0092
Qmaz = 4/3 * 50'= Or ��-'iR
= 4/3 * O. u62
= 0. 0825
Pg. - 11
'
�
o i target.dur �
��
� I �!
N ; - -- - ',
O '
��
O
N_ , • - --- -_ _ _ -
O
��
� ��
�.
,i.
�
� � � �,
n ---- -- --
�- ----- ------
------
.-I.- O
U
�
� I
� �
�
c�
(/) N ------ -
,_ � � __--
� � �r
`
�
O .._ Y. --"-___.-_ _.. . . . ___ ...
O
I `, \
i
\b
� ,.
o I - _ __ _ _ .
0
o ''
0
� , i , , _ i � , i - --;- T- i- ,���--�_ _��r�rr�__�- T -i ; i 1_.1 � - ; i i i i i i
10 -5 10 -4 10 �3 10 �2 1� � ���
Pg. — 1 2
' Probability Exceedence
Rctcntion;Uetention Facility
`Pype of Facility: Detention Vault
Facility Length: 71. 00 ft
Eacility Width: 40.00 ft
Eacility Area: 2840. sq. ft
Eticctiv� Storage Depth: 5. 00 ft
stage 0 Elevation: 0.00 ft
Stor ge Volume: 14200. cu. ft
�iser Head: 5.00 ft
Riser Diameter: 12.00 inches
Idumber of orifices: 2
Full Head Pipe
C�rifice # Height Diameter Discharge Diameter
�ft) (in) (CFS) (in)
l 0. 00 1.20� � 0.087
:' 3. 00 , 1.60 � 0.098 4.0
Top Notch Weir: None
Outflow Rating Curve: None
�tage Elevation Storage Discharge Percolation
( ft) (ft) (cu. ft) (ac-ft) (cfs) (cfs)
'� . 00 0. 00 0. 0.000 0.000 0.00
�i , U1 0.01 28. 0. 001 0.004 0. 00
i . U3 0. 03 85. 0. 002 0. 006 0. 00
�i . u4 0. 04 119. 0. 003 0. 008 0.00
i�. 05 0. 05 142. 0. 003 0.009 0.00
U. 06 0. 06 170. 0.004 0.010 0.00
0. 08 0. 08 227. 0.005 0.011 0.00
C,. 05 0.09 256. 0. 006 0.012 0.00
��. 10 0. 10 284. 0. 007 0.012 0.00
�_!.20 0.20 568. 0.013 0.017 0.00
U. 30 0. 30 852. 0.020 0.021 0.00
u. 40 0.40 1136. 0.026 0. 025 0.00
[i , 50 0.50 1420. 0.033 0.028 0.00
ii . 60 0.60 1709. 0.039 0. 030 0. 00
�i .70 0.70 1988. 0.046 0. 033 0. 00
0. 80 0.80 2272. 0.052 0. 035 0.00
u. 90 0. 90 2556. 0.059 0.037 0.00
1 . 00 1. 00 2840. 0.065 0.039 0. 00
1. 1G 1. 10 3124. 0.072 0. 091 0. 00
1.20 1.20 3408. 0.078 0. 093 0.00
1 . 30 1 . 30 3692. 0.085 0.045 0.00
� 1.40 1. 40 3976. 0.091 0.046 0. 00
1. 50 1. 50 4260. 0.096 0. 048 0.00
1.60 1. 60 4544. 0. 104 0. 049 0.00
1.70 1.70 4828. 0. 111 0.051 0.00
1. 80 1. 80 5112. 0. 117 0.052 0.00
1. 90 1. 90 5396. 0. 124 0.059 0.00
2. 00 2. 00 5680. 0. 130 0.055 0. 00
2. 10 2. 10 5964. 0. 137 0. 057 0. 00
2.20 2.20 6248. 0. 143 0.058 0. 00
Pg. - 13
'
2.30 2.30 6532. 0. 150 0.059 0. 00
2.40 2.40 6816. 0. 156 0.061 0. 00
2.50 2. 50 7100. 0.163 0.062 0. 00
2. 60 2.60 7384. 0. 170 0.063 0. 00
2.70 2. 70 7b68. 0. 176 0.064 0.00
2. 80 2. 80 7952. 0. 183 0. 065 0. 00
2. 90 2. 90 8236. 0. 189 0.067 0.00
3. 00 3.00 8520. 0. 196 0. 068 0. 00
3. 02 3. 02 8577. 0. 197 0.068 0. 00
3.03 3. 03 8605. 0. 198 0. 070 0. 00
3. 05 3. 05 8662. 0. 199 0. 073 0. 00
3. 07 3. 07 8719. 0.200 0. 077 0.00
3.08 3. 08 8747. 0.201 0.082 0. 00
3. 10 3. 10 8804 . 0.202 0.088 0. 00
3. 12 3. 12 8861. 0.203 0.093 0. 00
3. 13 3. 13 8889. 0.204 0. 094 0. 00
3. 15 3. 15 8946. 0.205 0.096 0. 00
3.25 3.25 9230. 0.212 0. 105 0. 00
3. 35 3. 35 9514. 0.218 0. 113 0. 00
3. 95 3. 45 9798. 0.225 0. 119 0.00
3. 55 3. 55 10082. 0.231 0. 125 0.00
3. 65 3. 65 10366. 0.238 0. 131 0.00
3.75 3.75 10650. 0.244 0. 136 0.00
3. 65 3. 85 10939. 0.251 0. 141 0. 00
3. 95 3. 95 11218. 0.258 0. 145 0.00
4 . 05 4 . 05 11502. 0.264 0. 150 0. 00
4 . 15 4 . 15 11786. 0.271 0. 154 0.00
� 4 .25 4 .25 12070. 0.277 0. 158 0. 00
4 . 35 4 . 35 12354. 0.284 0. 162 0. 00
4 . 45 4 . 45 12638. 0.290 0. 166 0. 00
9 . 55 4.55 12922 . 0.297 0. 170 0. 00
9 . 05 4. 65 13206. 0.303 0. 173 0.00
4.75 4 .75 13490. 0. 310 0. 177 0. 00
4 . 85 4 . 85 13774. 0.316 0. 180 0.00
4 . 95 4 . 95 14058. 0. 323 0. 184 0.00
5. 00 5. 00 14200. 0.326 0. 186 0.00
5. 10 5. 10 14484 . 0. 333 0.497 0. 00
5.20 5.20 14768. 0.339 1 .060 0.00
5. 30 5.30 15052. 0.346 1. 800 0. 00
5.40 5. 40 15336. 0.352 2.590 0. 00
5. 50 5. 50 15620. 0.359 2. 880 0.00
5. 60 5. 60 15909. 0. 365 3. 130 0. 00
5. 70 5.70 16188. 0.372 3. 370 0.00
5. 80 5. 80 16472. 0.378 3. 590 0.00
5.90 5. 90 16756. 0. 385 3. 800 0.00
6. OU 6. 00 17040. 0.391 4.000 0. 00
6. 10 6. 10 17324 . 0. 398 4. 190 0.00
6.20 6.20 17608. 0.409 4.360 0. 00
6.30 6.30 17892. 0.411 4.540 0.00
6.40 6.40 18176. 0.417 4 .700 0.00
6. 50 6.50 18460. 0.424 4 . 860 0.00
6. 60 6. 6a 18744. 0.430 5. 020 0.00
6. 70 6.70 19028. 0.437 5. 170 0. 00
6. 80 6. 80 19312. 0.443 5.310 0. 00
6. 90 6. 90 19596. 0. 450 5.450 0.00
Pg. - 1 4
'
7.00 7.00 19880. 0.456 5.590 0.00
Hyd Inflow outflow Peak Storage
Target Calc Stage Elev (Cu-Ft) (Ac-Ft)
1 0.75 0. 46 0. 49 5. 10 5. 10 14480. 0.332
2 0. 37 ******* 0. 18 4.74 4.74 13470. 0.309
3 0.38 ******* 0. 17 4.49 4.49 12761. 0.293
4 0.40 ******* 0. 16 4. 19 4. 19 11913. 0.273
5 0.45 ******* 0. 19 3.85 3. 85 10932. 0.251
6 0.29 ******* 0.08 3.07 3. 07 8723. 0.200
7 0. 31 ******* 0. 06 2.01 2.01 5699. 0. 131
8 0. 34 ******* 0. 05 1.57 1.57 4955. 0. 102
�
Route Time Series through Facility
' Inflow Time Series File:dCv. tsf
Outflow Time Series File: r i �:r
Inflow/Outflow Analysis
Peak Inflow Discharge: U. 750 CFS at 6: u0 on Jan 5 in Year ts
' Peak Outflow Discharge: 0.493 CFS at 9:00 on Jan 9 in Year 8
Peak Reservoir Stage: 5.10 Ft
Peak Reservoir Elev: 5.10 Ft
Peak Reservoir Storage: 14980. Cu-Ft
. C;. 3j2 Ac-Ft
� Flow L�uration from Tirne Series File: rdout. tsf-
�utoff Count Frequency CDE Exceedence Probability
CFS k $
0.003 43387 70.755 70.755 29.245 0.292E+00
0.007 3596 5.864 76.619 23.381 0.234E+00
0.012 3392 5.450 82.069 17. 931 0. 179E+00
0. 017 2875 9 .689 86.758 13.292 0. 132E+00
0.022 2277 3.713 90.471 9.529 0.953E-01
0.027 1588 2.590 93.061 6. 939 0.694E-01
0.032 1292 2. 107 95."168 4.832 0. 483E-01
0.037 984 1.605 96.773 3.227 0.323E-u1
0.042 645 1. 052 97.825 2. 175 0.218E-u1
0.047 425 0. 693 98.518 1.482 0. 148E-01
0.052 340 G. 554 99.072 0. 928 0. 928E-��2
0.057 149 0.293 99.315 0.685 0. 685E-02
0.062 130 0.212 99.527 0.473 0. 473E-02
0.067 111 0.181 99.708 0.292 0.292E-02
0.072 54 0. 088 99.796 0.204 0.209E-u2
0.077 11 0.018 99.819 0. 186 0. 186E-U2
0.082 5 0.008 99.822 0. 178 0. 178E-02
0.087 2 0.003 99.826 0.174 0. 174E-u2
0.092 1 0.002 99.827 0. 173 0. 173E-u2
0. 097 8 0. 013 99. 640 0. 160 0. 160E-02
0. 101 12 0.020 99.860 0. 140 0. 140E-02
0. 106 7 0.011 99.871 0. 129 0. 129E-u2
0. 111 6 0.010 99.881 0. 119 0. 119E-02
0. 116 5 0.008 99. 889 0. 111 0. 111E-02
u. 121 3 U. G05 55. 894 0. 106 0. 106E-U2
Pg. - 15
'
�. 126 9 0. 015 99. 909 0. 091 0. 913E-03
G. 131 3 0.005 99. 914 0. 086 0. 864E-03
�. 136 9 0.015 99. 928 0.072 0.718E-03
�=!. 141 8 0.013 99. 941 0.059 0.587E-03
�:�. 196 7 0.011 99.953 0.047 0.473E-03
��. 151 5 0.008 99.961 0.039 0.391E-03
�_�. 156 8 0.013 99. 974 0.026 0.261E-03
��. 161 3 0.005 99. 979 0.021 0.212E-03
!;. 166 4 0.007 99. 985 0.015 0. 147E-03
�-. 171 4 0.007 99.992 0.008 0. 615E-04
�; . i76 3 0.005 99. 997 0.003 0.326E-04
I�ur;at ion Comparison Anaylsis
base File: predev.tsf
IJew File: rdout. tsf
�.'i,c .�t t [Ji�i t � : Discharge in CFS
-----Fraction of Time----- ---------Check of Tolerance-------
C�,t�tf Base New rChange Probability Base New '6Change
u. u63 I 0. 54E-02 0. 43E-02 -20. 1 � 0. 54E-02 0.063 0.060 -9 . 6
��� ��8 I 0. 33E-02 0. 18E-02 -94 . 0 � 0. 33E-02 0.078 0. 066 -15. 5
G. u93 � 0. 19E-02 0. 17E-02 -9.5 � 0. 19E-02 0.093 0. 075 -19. 3
�-�. 108 � 0. 13E-02 0. 13E-02 -4. 9 � 0. 13E-02 0. 108 0. 104 -3.0
i�, 123 � 0. 86E-03 O. 10E-02 18.9 � 0.86E-03 0. 123 0. 131 6.8
�. 138 � 0.60E-03 0. 67E-03 10. 8 � 0. 60E-03 0. 138 0. 141 2.4
��. 152 � 0. 36E-03 0. 38E-03 4 .5 � 0. 36E-03 0. 152 0. 153 0.4
��. 1.67 � 0.29E-03 0. 13E-03 -55. 6 � 0.29E-03 0. 167 0. 155 -7.4
:'• 182 I 0. 16E-03 O.00E+00 -100.0 � 0. 16E-03 0. 182 0. 165 -9.7
�.�. 197 � 0. 98E-04 O.00E+00 -100.0 � 0.98E-04 0. 197 0. 170 -13.9
i,.212 I 0.�9E-04 O. 00E+00 -100.0 � 0.49E-04 0.212 0. 173 -18.5
��.227 � 0. 33E-04 O. 00E+00 -100. 0 � 0. 33E-09 0.227 0. 176 -22. 4
�i.242 � 0. 16E-04 O. 00E+00 -100.0 � 0. 16E-04 0.242 0. 177 -27 . 1
t�t�;�:i�num positive excursion = 0.008 cfs ( 6. 8$)
occurring at 0. 123 cfs on the Base Data:predev.tsf
and at 0. 131 cfs on the New Data:rdout.tsf
Nlaximum negative excursion = 0.079 cfs (-30.81�)
.�ccurr:iny at 0.255 r_fs on the Base Data:predev. tsf
�ri:1 �; 0. 1 �l�r cl 5 :�n t_l�t I�]�1�� Data: rdout. t�f
Route Time Series through Facility
Inflow Time Series File:dev.tsf
Cutflow Time Series File: rdout
lnrl.ow/Outflow Analysis
Peak Inflow Discharge: 0.750 CFS at 6:00 on Jan 9 in Year 8
Peak Outflow Discharge: 0.493 CFS at 9: 00 on Jan 9 in Year 8
Peak Reservoir Stage: 5.10 Ft
Peak Reservoir Elev: 5.10 Ft
Peak Reservoir Storage: 14980. Cu-Ft
. 0.332 Ac-Ft
Flow Duration from Time Series File:rdout.tsf
Pg. - 16
'
�
N _ _ _ ___ _--- ------__ _- _
� o I rdout.dur
- target.dur �
_ ,
_ �
,-� �
, CV- ---- ,_ _ _ _ - _ ------ _ - -
O
I
' �'
' �
O ,
�� �
N '-_ ----_- — .� - ___ _- -- - - ---_ _— __
O
_ ' , �
j�� � � R ��
i -
-
�
_ —. � - ��,
i � � _ . --- -- - - ____
- --- -- _ __ .--- -- - --
, ,
�� � o �����,�
U
� �--
a� ��
rn
� � �
c�
� N ,°�`
(n _
� ,>.--- _ _ -- - _ _
,^_ _ _ _ - _ -- ---- _- --- ----
J O �i
�� ��
�_, ! '�t'
i ;�;!�'
1,`,
<^>�
� X.
00 �t;.
O- _ __ _ _ - --- - _ ____ __ - ----�';� \�--- -_ _ __ _
O �
,
Y; �,
� 00 _- -- <J,
- --- <
�
%'�
� �
O '�<--_
a
r
� II
� I
10� .4 --7- _� I 1- T 1�1 1 ��T�T�---��-��TfT�—��_�l_I_i_i.�_�T_ _ _� I I ! I I I
-5 �� -a 10 -s �� -2 �� -� ��o
Pg. - 17
' Probability Exceedence
V. CONVEYANC� S�'STEM ANALYSIS AND DESIGN
Based on the topography of the site we anticipate pipe slopes to be equal or greater than 1.0 %.
The 100-year developed peak flow for the site was calculated at 0.67cfs. The capacity of a l 2-
inch pipe with 1.0% slope is able to handle 3.71 cfs. King County Surface Water Design
Manual 1998 requires to the conveyance pipes to be designed based on 25-year storm.
I
, Pg. - 1 8
'
1 '
� '
tmp#l.txt
Manning Pipe calculator
Given Input Data: �
shape . . . . . . . . . . . . . . . . . . . . . . . . . . Circular �
solving for . . . . . . . . . . . . . . . . . . . . . oepth of Flow
Diameter . . . . . . . . . . . . . . . . . . . . . . . . 12.0000 in
Flowrate . . . . . . . . . . . . . . . . . . . . . . . . 3. 7100 cfs
slope . . . . . . . . . . . . . . . . . . . . . . . . 0.0100 ft/ft
Manning's n . . . . . . . . . . . . . . . . . . . . . 0.0120
computed Results:
Depth . . . . . . . . . . . . . . . . . . . . . . . . . . . 9.4416 in
Area . . . . . . . . . . . . . . . . . . . . . . . . . . 0.7854 ft2
wetted Area . . . . . . . . . . . . . . . . . . . . . 0.6629 ft2
wetted Perimeter . . . . . . . . . . . . . . . . 26.1803 in
Perimeter . . . . . . . . . . . . . . . . . . . . . . . 37.6991 in
velocity . . . . . . . . . . . . . . . . . . . . . 5. 5967 fps ',
Hydraulic Radius . . . . . . . . . . . . . . . . 3.6461 in i
Percent Full . . . . . . . . . . . . . . . . . . . . 78.6799 %
Full flow Flowrate . . . . . . . . . . . . . . 3.8597 cfs
Full flow velocity . . . . . . . . . . . . . . 4.9143 fps
Critical Information
Critical depth . . . . . . . . . . . . . . . . . . 10.3296 in
critical slope . . . . . . . . . . . . . . . . . 0.0070 ft/ft
Critical velocity . . . . . . . . . . . . . . . 4.9237 fps
Critical area . . . . . . . . . . . . . . . . . . . 0.7535 ft2
critical Perimeter . . . . . . . . . . . . . 27.5087 in
critical hydraulic radius . . . . . . . 3.9443 in
critical top width . . . . . . . . . . . . . . 12.0000 in
Specific energy . . . . . . . . . . . . . . . . . 1.2628 ft
� Minimum energy. : : : : : : : : : : : : : : : : : : 1.2912 ft
Froude number 1.2442
Flow condition . . . . . . . . . . . . . . . . . . Supercritical
Pg . -1 `)
'
VI. SPECIAL REPORTS AND STUDIES
VII. BAS1N AND OTHBR COMMUNITY AREAS
VIII. OTHER PERMITS
Pg. -2 0
'
IX. TEMPORARY EROSION
The Temporary Erosion Plan will be designed to the 1998 King County Surface Water Design
Manual, Appendix D.
A rock construction entrance will be shown on the plans at the entrance road to the site. The
detail will be included on the plans. A silt fence is to be erected at the bottom of slopes.
TEMPORARY SEDIMENT TRAP
Traps should be constructed on the south side of the entrance road for about 1.73 acres of
development.
The surface area of the trap:
SA= 2 X (QZ/0.00096)= 2080 sf/cfs of the 2yr developed peak
The 2 year developed peak for the site is 0.33 cfs.
Sediment Pond peak flow= 0.33 cfs, SA= 0.33(2080) = 686 SF �I,
Try a pond with 3' of sediment depth that measures 19' x 40' at the top of the weir= 760 square
feet.
I' SEDIMENT TRAP #1
Depth Elev. Dimension
Top of Benn
4.00' 420.00 25'x46' Top of Berm
3.00' 419.00 19'x40' weir— 760 SF
2.00' 418.00 13'x34'
1.00' 417.00 7'x2 8'
0.00' 416.00 1'x22' Bottom of sediment storage
Pg. - 21
'
RESIDENTIAL STREETS LIGHTINGS
FOR
SAVANNAH AT THE PARK
GENERAL INFORMATION:
CONDUCTOR
STREET CIRCUIT USE-RHH(XLP)
PHOTO CELL CIRCUIT THHN
CONUCTOR INSULATION 600 VOLTS
SERVICE
CONTRACTOR CABINET 120/240 VOLTS
3-WIRE SERVICE
PHOTO CELL CONTROL 240 VOLTS
2-WIRE
POLE MOUNTING HEIGHT 25 FEET
LAMP VOLTAGE 100 WATTS
UNIFORMITY RATIO 0.2 FOOT-CANDLE '
LUMINAIRE GE MODEL N0. N-250A2
LUMINAIRE SPECIFICATIONS REFER TO ATfACHED SPECIFICATIOINS
DETERMINE LAMP AND BALLAST OPERATION CURRENT CIRCUIT NO. 1
LINE CURRENT DROP 0.76 AMPS FOR 240 VOLTS
TOTAL LINE DROP LAMP AMPS POLES AMP-TOTAL
1 0.76 2 1.52
2 0.76 1 0.76
DETERMINE VOLTAGE DROP USING AWG WIRE SIZE#8 CIRCUIT NO 1
LAMP AMPS WIRE LENGTH RES-OHM CONST. DROP WIRE #
I
� 1 1.52 2 81.5 0.66 1000 0.163522 8
2 0.76 2 197 0.66 10�0 0.19763 8
TOTAL 0.361152
PERCENTAGE OF VOLTAGE DROP 0.001505 0.15048 %
OK IT IS LESS THAN 5% DROP
Pg. - 22
'
�,,� �7i2005 08:41 FAX 4252510625 TOLTMSA E:�GI:VEERS �001
i
�
�
i
rx. r��ox.��ERoszorr
�
The Temporary Erosion Plan will be designed to the 1998 King County Surface 1?Vater Design
Manual; Appendix D.
A rock construction entrance will be showrt on the plans at the entrance road to the site. The
detail will be included on the plans. A silt fence is to be erected ax the bottom of slopes.
TEMPORARY SEDIlVIENT TRAP
Traps should be constructed on the south side of the entrance road for about 1.73 acres of
development. �
The surface area of t�e trap:
SA=2 X(Q�/0.00096)= 2080 sf/cfs of the 2yr developed peak
The 2 year developed peak for the site is 0.373 cfs. �
i
Sediment Pond peak flow=0 373 cfs, SA=0.373(2080)= 775 SF '
�
Try a pond with 3' of sediment depth that measures 20' x 40' at the top of the weir=800 square �
feet.
SEDIlvlENT TR.AP #1 �
Depfh Elev. Dimension ;
Top of Berm
4.00' 420.00 26'x46' Top ofBerm � i
3.00' 419.00 20'x40' weir—76� SF �
2.00' 418.00 14'x34' '
i.00' 4i�.00 g�s' �
0.00' 416.00 2'�2' Bottom of sediment storage �
I
�
I
. Post-it'D Fax Note 7671 �a�9 J O� pa°ges�Z i
� I
zo R�O/I QVI?i! From �0�,/ %GU/J?4 i
Ga�oePt. � �� Co. i
Phone# Phone k �zf�D�
" Fax it 5[z y�[�.313- 72 y� Fax# '�Zd�/- O 62�
' i
I
, 09,i07/2005 08:�1 FAy 4252510625 TOLTM�I ENGI�EERS (�002
�
The above information will be used in the King County KCRTS computer program to establish '
the existing and proposed time series for the peak flow analysis. The calculated vault will be
71'x 40' x 5.0' of live storage depth, inside measure. There will be a wetpool volume for water '
quality within the same vault as calculated below. �
. �
WATER QUALITY `
The wet-vault permane�nt pool will be sized per section 6.4.1.1, page 6-68 ofthe KCSWDM. �
The
V�= (0.9A; + 0.25A��+ O.l0A�+0.OlAo) x (R/12)
V�= volume of runoff from mean annual storm
A;= area of impervious SF �
A:g= azea of till grass soil covered with grass SF
Atr= area of tili forest soil covered with forest SF '
A4 = area of outwash soil covered with grass or forest S�F
R = rainfall from mean annual storm (figure 6.4.1.A)=0.47"
I
I
V�_ (0.9(52,249) �0.25(26,136)+0.10(2613)) x (0.47/12)
_ (51,524+ 6�34+261)0.47/12= (58,319)(0.47/12)=2284 CF
Vb = 3(2284) =6852 C� I
I
The required depth of the wetpool is 6852 CFI(71x40) =2.4' calculated. Available storage is � ,
OK. Per the King County SWDM the depth of the wetpooi shouid be 3', with 1' average depth �
for sediment storage. , i i
I
This volume will be accommodated within the bottom of the detention/wetvault to be designed I
and constructed in the southeast corner of this proposed lO lot subdxvision. I
�
The overall inside depth of the vault will have to be:
1' sediment storage ;
3' dead storage for the wetpool ;
5.0' live storage for detention ' ;
0_5' top clearance � ',
9.5' total depth I �
WET-VAULT �
We have accommodated for the water quality within the we�t-vault as designed above.
STORM WATBR PEAK FLOW CONTROL:
Refer to the following pages for the wet-vault sizing calculations. '
Pg. - 9 �