HomeMy WebLinkAboutR-386515I
1 "C22# 10,1 # 10G
TOFA (U)
C-)
Ell
S 41)C,3#500KCM,1 #2G
1 1-1 /4"C, 4# 1, # 6G~'
PSB4-1/8,10,12
2
E110 E5 4
1 1/2 1) ,3#1,1 #2G---
l"C,
2#10)1#10G-
TOFA (U) ZTOFf'It, TOFA ( ) ll�I SPARE
70
um.
0
EXISTING 1-1 /4"C
3#1, #6G
i
SHELTER SERVICE
SERVICE �
5 \-4
I ,PANEL 120/208VCP
�
05-425/15 �4
3/411c; 2#122 #1 _ D J
7
0 F (u) TOFA (u
BATOOL
0 L /� s
I NA
c
•�d s
�:,->4# 1 1 #6G
PSB5-1/8,1 OP 12 -
I
V RM
EXI ING POWER ISLAND
-EXISTING PANEL PS134-1
1 'C,2#10,1#10G
C, 2#10, #10G
PS64-1/1a
TOFA c s qu) To cU 1 2#10,
�� 1#10G
c
UTURE
Xx
Sis li 1 )PC # 1 1
��NA
EXISTING 1-1/411c EXISTING 3/411c 2
'L
----
•
• 1 y
� k
ilk
TJ I'
k tW]
j
Idl
105-426 : t ■- - 1
PANEL PS135-1�
�j B5 CREW 05-426/15SHELTER SERVICE
\
SHELTER 3/41IC2 2#12, #12GND JBOX
�16, 11 1 \\
ov
3/4"C, 2#102 COG 2
" PSBS-1 1 a \\
1 C,2#10,1 1 /
1 1/2 C23# 111 #2G
C, 2#10,1# I u
A (U) TOFA (U) (U) TO U) TOFA (U) TOFA ( ) TO T) TOFA
�P
o
CD
I�
4 C,3#500KCM,1 #2G 11 0 4" C,3 500KCM 1 2G I ,�o�� "
o - -
/ C� # I # / 4 C,3#500KCM,1 #2G
c
o
LLI STS STS " IT# S �� STS STS c
1 / " ,2# 10,1 # 10G Q� ' 1 C, 2# 10,1 # 10G � 1 " C,2 10,1 10G
I / # #
1 /
Lu / Q
C,2#10,1 #10G
w / /
cn Lu I
z /I 3 C, 7#2/0 401)[1Z CABLE, 1 #2G 3 C, 7#2/0 400HZ BLE, 1 #2G
0 400 HZ ROUND 400 HZ GROUND P� /
F- 1 C, 7# 14, 5 SPARE I POWER P T 1 C, 7# 14, 5+2 SPARE
c I POWER PIT
� _
0 1' #10,1#10G
U
0
L- SVO
�
(U) ROFA (U) ROFA (U) ROFA (U) OFA (U!!)
J
MEN
Q
TOFA (E) TOFA (E) TOFA (E) TOFA (E) TOFA (E)
FA (U)
TOFA (U) TOFA (U) TOFA (U) TOFA (U) TOFA (U) TOFA (U) TOFA (U)
FUTURE
G-
C) v
L o
o° / P� SVO SVO
'4 fL1AROFA (U) ROFA (U) ROF'A ROFA (U) RKA (U ROFA (U)
/�\R EASE
LEASE EINE
31 ON1308
TOFA (E) TOFA (E) TOFA) TOFA (E) TOFA (E) TOFA (E) TOFA (E) TOFA (E) TOFA (E) TOFA (E) TQA (E) TOFA (E)
1
E111 E515
TOFA (U) TOFA (U)
to
z
0
to
� w
� z
J
V
Q
J
1
I
ROFA (U) ROF (U)
ROFA (U)
A, d
LEGEND GENERAL NOTES
NOT USED 1. PER IFC 2006, CHAPTER 11, AVIATION FACILITIES:
TOFA (E) TOFA (E) TOFA (E) TOFA (E)
FOFA (U) TOFA (U) TOFA (U) TOFA (U) TOFA (U) TOFA (U) TOFA (U) TOFA (U) TOFA (U) TOFA (U) TOFA (U) TOFA (U) TOFA (U) TOFA (U) TOFA (U) TOFA (U) TOFA (U)
TOFA (U)
AIRCRAFT BEING FUELED SHALL BE POSITIONED
SUCH THAT ANY FUEL SYSTEM VENTS AND OTHER
FUEL TANK OPENINGS ARE A MINIMUM OF
TWENTY-FIVE FEET (7620mm) FROM BUILDINGS OR
STRUCTURES OTHER THAN JET BRIDGES; AND FIFTY
FEET (15 240mm) FROM AIR INTAKE VENTS FOR
BOILER, HEATER OR INCINERATOR ROOMS.
2. ALL INTERIOR WIRE TO BE #12 THHN/THWN UNLESS
OTHERWISE NOTED. ALL OUTDOOR WIRE TO BE
XHHW.
3. COLOR CODING OF CONDUCTORS SHALL BE
OBSERVED ON ALL CIRCUITS 600 VOLTS OR LESS
AS FOLLOWS:
120 208V 277V 480V
"A" PHASE (LEFT BUS IN PANEL) BLACK BROWN
"B" PHASE (CENTER BUS IN PANEL) RED ORANGE
"C" PHASE (RIGHT BUS IN PANEL) BLUE YELLOW
NEUTRAL WHITE GRAY
EQUIPMENT GROUND GREEN GREEN
PHASE ROTATION: CLOCKWISE
4. IDENTIFY ALL RECEPTACLES, JUNCTION BOXES,
SWITCHES, ETC. WITH CIRCUIT IDENTIFICATION.
5. INSTALL REVISED PANEL SCHEDULES UPON
COMPLETION OF JOB.
OFA (U) TOF
6. NO EXPOSED GALVANIZED STEEL TO BE INSTALLED
ABOVE GRADE ON APRON. PVC COATED OR PAINTED
RIGID STEEL IS ACCEPTABLE.
REFERENCE DRAWINGS
RTN-APRON-B-EO (HAZARDOUS CLASSIFICATION)
A RTN-APRON-B-E503
RTN-APRON-B-E514
CONSTRUCTION NOTES
11 PROVIDE AND INSTALL 1-1/4))C AND #1 WIRE FROM
EXISTING JBOX TO WEST SIDE OF CREW SHELTER AND
INTO SERVICE PANEL. PROVIDE SAWCUTTING,
EXCAVATION AND SURFACE REPAIR PER THE CIVIL
ENGINEER'S REQUIREMENTS. SEAL WALL
PENETRATIONS PER ARCHITECT'S REQUIREMENTS.
P:PROVIDE AND INSTALL 3/4" CONDUIT AND #10 WIRE
FROM EXISTING JBOX TO TOOL CABANA FOR
CONVENIENCE POWER AND LIGHTING. PROVIDE
FA (U) k SAWCUTTING, EXCAVATION AND SURFACE REPAIR PER
THE CIVIL ENGINEER'S REQUIREMENTS.
3 INSPECT & RE -TORQUE WIRE TERMINATIONS AT PANEL
AND PROVIDE CONTINUITY TEST ON ALL CONDUCTORS.
[4� PROVIDE CONDUIT AND CONDUCTORS FROM CREW
TOFA (E) SHELTER PANELBOARD TO TOOL CABANA.
5 PROVIDE 4 -FLEX, GFCI PROTECTED, RECEPTACLE,
BOX, AND FITTINGS. MOUNT RECEPTACLE INSIDE TOOL
CABANA AT 18" AFF.
6 ' PROVIDE LOCAL AREA, LINE VOLTAGE, SWITCHING, BOX
AND FITTINGS.
[7 - PROVIDE SURFACE MOUNTED, 32W, T82 1X4
FLUORESCENT LIGHTING FIXTURE WITH GASKETED
POLYCARBONATE LENS COVER AND ELECTRONIC,
N STATNT START BALLAST.
8. COORDINATE ALL SHUTDOWNS WITH BOEING
FA (U) TOFA CONSTRUCTION MANAGER.
O M M I`- UD in � M " - O to w P� UD u") rt r7 N O
M N N N N . N N N N
U U U U U U U U U U U U U U U U U U U U U
"- A
o a
B
- o
D
C� a
_d
E
o p
F
0 G
H
J
n ' w Q K
I V KEY PLAN
SCALE : NONE
L
20' 1 2 ' 40'
SCALE IN FEET
rj=300:) I
1 0 U C 1 -UK V I KU V I 1 U N
NOVEMBER11 2015
CASNE ENGINEERING, INC.
ELECTRICAL AND TECHNOLOGY CONSULTANTS
10604 NE 38th PL., SUITE 205 KIRKLAND, WA 98033
(425) 522-1000 WWW. CASNE. COM JOB NO. 151-071
SYM
REVISION
BY
APPROVED
DATE
SYM
REVISION
BY
APPROVED
DATE
L
��' �� �
�'
® _ROVED
'O 25276 �y
1�s ISTEg� 1�'
SIGNAL � � � IIh
II
ACCEPTABILITY
THIS DESIGN AND/OR
SPECIFICATION IS APPROVED
W
J.BAILEY
A
07.05.12
SUBTITLE
480Y/277V PARTIAL POWER PLAN
CURRENT REVISION
W3441886
SYMBOL
A
DATE
11.11.15
-
APRON B REACTIVATION - RECORD DRAWING 1131966
HGI
ROG
12.13.13
C
�
C
L
CHECKED
P.TSCHERNEGA
08.17.12
SHEET
E 111
A
APRON B CI PROJECT W3441886
CASNE DAT
11.11.15
T.SAVINO
08.17.12
TITLE APRON B CI PROJECT
APRON B
ELECTRICAL MASTER RENTON, WA
BY
DEPT.
DATE
CHECKED
J.HOUSEL
08.14.12
A V
R.GWINN
08.17.12
JOB N0.
1131966
COMP N0.
APPROVED
DWG N0.
RTN-APRON-B-E111
13
•
4z
Viz*,c
m=
L
cn
N z
z
m
0
D
D
60
0
c
cn
13 •
D m
o
0 n
n
3z
m
O
D
0
Nz
�>
uq z
_ CD O
CD
o�
I
O
C,
rn
n
C
�
C
L