HomeMy WebLinkAbout03076 - Technical Information Report - Geotechnical Zipper Zeman Associates, Inc.
Geotechnical and Environmental Consulting
J-1177
November 1, 2041
City of Renton
Renton City Hall— 5`h Floor
Renton, Washington 98055
Attention: iVls. Tracy Coleman
Capital Project Coordinator
Subject: Report of Geotechnical Services
Proposed Fire Station
1209 Kirkland Avenue NE
Renton, Washington
Dear Ms. Coleman,
Zipper Zeman Associates, Inc. (ZZA) has completed a geotechnical evaluation for the
proposed Fire Station at 1209 Kirkland Avenue iVE in Renton, Washington. This report presents
the results of our geotechnical evaluation relative to design and general construction
considerations. Authorization to proceed with this evaluation was provided through the contract
agreement between the City of Renton and Zipper Zeman Associates, Inc. dated September 21,
2001. The field evaluation was completed on October 1, 2001.
We understand that the project is in the early planning stages, with the fire station
building currently planned to be located in the central or southern portion of the property. The
fire station will consist of a one to ttvo story structure, with a possible basement. Portland
concrete and asphalt concrete pavements are anticipated around the station for fire truck and
emergency vehicle access, and for general parking areas.
The purpose of our geotechnical evaluation is to assess subsurFace conditions relative to
the design and construction of the fire station. The scope of our services included an exploration
program consisting of excavating seven test pit explorations at the site. Based on the subsurface
conditions observed in the test pits, we performed geotechnical analyses and formulated
recommendations that are presented in this report. Specific items addressed in this report
include:
1. Description of the project site with exploratory locations shown on a site plan;
Gi7r pF RE`.TJ�,
2. General subsurface conditions; R E C E I V E D I
3. Earthwork and site preparation recommendations; ��P � � 20�2 �
�U'L�'NG D�VISION
' 18905—33rd Avenue W.,Suite 117 Lynnwood,Washington 98036 (425)77l-3304 i
Proposed Fire Station J-1177
Renton, Washington November 1,2001
Page 2
4. Structural fill and the suitability of on-site soils for use as structural fill;
5. Recommendations relative to the construction of shallow spread footing
foundations and slab-on-grade floors;
6. Recommended lateral earth pressures for subgrade (basement) walls and retainin�
walls;
7. Preparation of pavement subgrades;
8. Wet weather construction considerations;
9. Erosion control and site drainage considerations;
10. General seismicity and liquefaction potential;
1 l. Implications of elevator shaft installation;
12. Recommendations for further study, if appropriate.
SITE DESCRIPTION
The proposed fire station site is located on the north side of NE 12`h Street, between
Jefferson Avenue and Kirkland Avenue NE. The site consists of 6 lots encompassing
approximately 1.22 acres. The site slopes down to the south with an estimated relief on the order
of 10 feet. Most of the property is covered with asphalt. A portion of the ground surface in the
south-central area is dirt covered where a previous structure has been removed from the property.
FIELD EXPLORATION
The subsurface exploration program conducted for this study consisted of completing
seven test pit explorations at the site on October 1, 2001. The approximate locations of the test
pits are presented in Figure l, Site and Exploration Plan. The test pit explorations were
completed to depths ranging from 12 to 15 feet below the existing ground surface. Logs of the
test pits are enclosed with this report.
Subsurface Conditions
In general, subsurface conditions in the test pits were fairly consistent. Test pits TP-1
through TP-6 were located in areas covered with asphalt. Test pit TP-7 was located in the
western portion of the removed structure. The asphalt and underlying base course (fill), where
present, extended to depths ranging from approximately 0.2 to 0.5 feet. Other fill consisting of
loose to dense sand with variable silt and gravel was observed in test pits TP-1, TP-5, TP-6, and
' Zi�per Zeman Associates,Inc.
18905—33rd Avenue W.,Suite ]l7 Lynnwood,Washington 98036 (425)7?1-3304
Proposed Fire Station J-1177
Renton,Washington November 1. �'001
Page 3
TP-7. Some concrete debris and boulders were observed in the fill in test pit TP-6. The fill
extended to depths ranging between 1 foot and 2 feet in these test pits. Native glacial till
consisting of dense to very dense silty sand with gravel was observed below the asphalt in test pit
TP-4, located in the northwest portion of the site, which is higher in elevation than the rest of the
site. The glacial till extended to a depth of approximately 5 feet.
Below the asphalt, fill, and native glacial till was native sand with minor to some silt and
variable gravel. The gravel content generally increased with depth where observed. These sands
typically were in a medium dense to dense condition and extended to the bottom of the test pits.
Soil descriptions presented in this report are based on the subsurface conditions observed
at the specific test pit locations. Variations in subsurface conditions may exist between the
exploration locations, and the nature and extent of variations between the explorations may not
become evident until construction. If variations then appear, it may be necessary to reevaluate
the recommendations presented in this report.
Groundwater
No groundwater or seepage zones were observed in the test pits at the time of excavation.
It should be noted that groundwater conditions and soil moisture contents are expected to vary '
with changes in season,precipitation, site utilization, and other on- and off-site factors. Zones of
perched water may tend to develop above the relatively impermeable glacial till and silty zones
within the native sand during periods of wet weather.
CONCLUSIONS AND RECOMMENDATIONS
� Based on the subsurface exploration program, the project appears feasible utilizing
conventional shallow foundation support. The following recommendations have been prepared
for the design and construction of conventional spread footing foundations and concrete slab-on-
grade floors.
Site Preparation
We anticipate that cuts on the order of 10 feet will be required to establish the finish floor
elevation for the planned basement. Site preparation should include the removal of asphalt,
existing fill, and organic soils, if encountered, and any other deleterious debris from building and
paving areas, or those locations where "structural fill" is to be placed. Exposed soils following
site preparation should consist of the native medium dense to dense sand or the dense to very
� dense glacial till. Any excavations that extend below finish grades should be backfilled with
structural fill as outlined subsequently in this report.
Preparation for site grading and construction should include procedures intended to drain
ponded water and control surface water runoff. It may not be possible to successfully utilize on-
' Zi�per Zeman Associates, Inc.
18905—33`°Avenue W.,Suite 117 Lynnwood,Washington 98036 (425)77]-3304
Proposed Fire Station J-1177
Renton, Washington November 1, 2001
Page 4
site soils as "structural fill" if accumulated water is not drained prior to grading, or if drainage is
not controlled during construction. Attempting to grade the site without adequate drainage
control measures will reduce the amount of on-site soil effectively available for use, increase the
amount of select import fill materials required, and ultimately increase the cost of the earthwork
and foundation construction phases of the project.
After removal of pavement, existing fill and other deleterious material, and prior to
placement of structural fill, we recommend that foundation and floor subgrade areas, pavement
areas, and areas to receive structural fill be proofrolled and compacted to a firm and unyielding
condition in order to achieve a minimum compaction level of 92 percent of the modified Proctor
m�imum dry density as determined by the ASTM:D-1557 test procedure. Proofrolling should
be accomplished with a heavy compactor, loaded double-axle dump truck, or other heavy
equipment under the observation of a representative from our firm. The need for or advisabiliry
of proofrolling due to soil moisture conditions should be determined at the time of construction.
We recommend that a representative from our firm observe the soil conditions prior to and
during proofrolling to evaluate the suitability of stripped subgrades.
Excavated site soils may not be suitable for use as structural fill depending on the
moisture content and weather conditions at the time of construction. If soils are stockpiled for
future reuse and wet weather is anticipated, the stockpile should be protected with plastic
sheeting that is securely anchored. If on-site soils become unusable, it may become necessary to
import clean, granular soils to complete wet weather site work.
Subgrade soils that become disturbed due to elevated moisture conditions should be
overexcavate d to expose firm, non-yielding, non-organic soils and backfilled with compacted
structural fill. We recommend that the earthwork portion of this project be completed during
extended periods of dry weather, if possible. If earthwork is completed during the wet season, it I
may be necessary to take extra precautionary measures to protect subgrade soils. Wet season �I
earthwork may require additional mitigative measures beyond that which would be expected
during the drier summer and fall months. This could include diversion of surface runoff around
exposed soils, draining of ponded water on the site, and collection and rerouting of groundwater
seepage from upgradient on- and off-site sources. Once subgrades are established, it may be
necessary to protect the exposed subgrade soils from construcrion traffic. Placing quarry spalls,
crushed recycled concrete, or clean pit-run sand and gravel over these areas would help protect
the soils from construction traffic.
Structural Fill
All fill material placed in building, pavement, and non-landscaped areas should be placed
as structural fill. Prior to placement, the exposed subgrade surfaces to receive structural fill
should be prepared as previously described. All structural fill should be free of organic material,
debris, or other deleterious material. Individual particle size should be less than 3 inches in
maximum dimension.
' Zipper Zeman Associates, Inc.
I8905—33rd Avenue V4'.,Suite I I7 Lynnwood,Washington 98036 (425)771-3304
Proposed Fire Station J-11i7
Renton,Washington November 1,2001
Page�
, Structural fill should be placed in lifts no greater than 8 inches in loose thickness. The
structural fill should be compacted to at least 95 percent of the modified Proctor maximum dry
density as determined by the ASTM:D-1557 test procedure in building areas and to a depth of 2
feet below the subgrade surface in pavement areas. Below a depth of 2 feet in pavement areas,
the structural fill should be compacted to at least 90 percent of ASTM:D-1557. In the case of
roadway and utility trench filling, the backfill should be placed and compacted in accordance
with current local codes and standards.
The suitability of soils for use as structural fill use depends primarily on the gradation �
and moisture content of the soil when it is placed. As the amount of fines (that soil fraction
passing the U.S. No. 200 sieve) increases, soil becomes increasingly sensitive to small changes
in moisture content and adequate compaction becomes more difficult, or impossible, to achieve.
Generally, soils containing more than about 10 percent fines by weight (based on that soil
fraction passing the U.S. No. 4 sieve) cannot be compacted to a firm, non-yielding condition
when the moisture content is rnore than a few percent from optimum. The optimum moisture
content is that which yields the greatest soil density under a given compactive effort.
The native sand observed in the test pits generally appears suitable for use as structural
fill. However, the glacial till observed in test pit TP-4 (to a depth of approximately 5 feet), and '
the native silty sands (in the upper 1 to 2.5 feet in test pits TP-1, TP-2, and TP-6) contain a
significant fine-grained fraction. Consequently, use of these soils as structural fill will require
that strict control of moisture content be maintained during the grading process. Soil moisture
conditions should be expected to change throughout the year. Drying of over-optimum moisture
soils may be achieved by scarifying or windrowing su�cial materials during extended periods of
dry weather. Soils which are dry of optimum may be moistened through the application of water
and thorough blending to facilitate a uniform moisture distribution in the soil prior to
compaction.
In the event that inclement weather or wet site conditions prevent the use of on-site soil
or non-select material as structural fill, we recommend that a "clean", free-draining pit-run sand
and gravel be used. Such materials should generally contain less than 5 percent fines, based on
that soil fraction passing the U.S. No. 4 sieve, and not contain discrete particles greater than 3
inches in maximum dimension. It should be noted that the placement of structural fill is, in
many cases, weather-dependent. Delays due to inclement weather are common, even when using
select granular fill. We recommend that site grading and earthwork be scheduled for the drier
months, if at all possible.
Permanent Fill Slopes �
Permanent fill slopes should be constructed no steeper than 2H:1 V. If the slopes are
exposed to prolonged rainfall before vegetation becomes established, the surficial soils will be
prone to erosion and possible shallow sloughing. Surficial repairs, such as protecting affected
' Zipper Zeman Associates, Inc.
1890�-33`°Avenue�V.,Suite l U Lynnwood,Washington 98036 (425)771-3304
Proposed Fire Station J-1177
Renton,Washington November 1,2001
Page 6
areas with quarry spalls, jute matting or other system, may be necessary until vegetation is
established.
Temporary and Permanent Cut Slopes
Temporary slope stability is a function of many factors, including the following:
1. The presence and abundance of groundwater;
2. The type and density of the various soil strata;
3. The depth of cut;
4. Surcharge loadings adjacent to the excavation;
5. The length of time the excavation remains open.
It is exceedingly difficult under the variable circumstances to pre-establish a safe and
"maintenance-free" temporary cut slope angle. Therefore, it should be the responsibility of the
contractor to maintain safe slope configurations since the contractor is continuously at the job
site, able to observe the nature and condition of the cut slopes, and able to monitor the subsurface
materials and groundwater conditions encountered. It may be necessary to drape temporary cut
slopes with plastic or to otherwise protect the slopes from the elements in order to minimize
sloughing and erosion. We do not recommend unsupported vertical cuts deeper than 4 feet if
worker access is necessary. The cuts should be adequately sloped or supported to prevent injury
to personnel from local sloughing and spalling. The excavation should conform to applicable
Federal, State, and local regulations.
For preliminary planning purposes only, temporary cuts in the fill and upper 3 to 4 feet of
native sand will likely require slopes of 2H:1 V or flatter to reduce the potential for sloughing.
The medium dense to dense sand observed at depth in the test pits is anticipated to maintain cut
slopes on the order of 1 H:1 V. For all cut slopes, if seepage or surface runoff occurs and is not
controlled, flatter temporary slopes may be necessary. These guidelines assume that surface
loads, such as equipment loads and storage loads, will be kept a sufficient distance away from
the top of the cut so that the stability of the excavation is not affected.
For medium dense to very dense native soils, or compacted structural fill, we generally
recommend all permanent cut slopes be designed at a 2H:1V inclination or flatter. It has been
our experience that permanent slopes steeper than 2H:1 V will tend to ravel and slough to a flatter
inclination over time. In addition, with the steeper slopes, topsoil erodes readily and it is more
difficult and takes longer to establish vegetation for slope protection.
Foundations
All footings should be founded on the medium dense to dense native sand, glacial till, or
on compacted structural fill that extends down to these competent native soils. Footings should
not be founded on or within loose or disturbed native soil or fill unless it has been evaluated and
' Zi�per Zeman Associates, Inc.
18905—33rd Avenue W.,Suite i 17 Lynnwood,Washington 98036 (425)771-3304
Proposed Fire Station J-1177
Renton, Washington November 1,2001
Page 7
approved by the geotechnical engineer. Continuous or column footings may be designed for a
maximum allowable bearing pressure of 3,000 psf. A one-third increase in this bearing pressure
may be used for short-term wind or seismic loading. Exterior footings should extend at least 18
inches below adjacent grade for frost protection, while interior footings should extend at least 12
inches below adjacent grade. We recommend that all continuous and isolated footings be at least
18 and 24 inches in width, respectively.
We estimate that the total settlement of foundation members founded within the medium
dense to dense sand, glacial till, or structural fill prepared as described above may approach 1
inch. Differential settlement of foundations founded within the same soil type could approach %2
inch over a distance of 30 feet. Settlements would occur elastically as the loads are applied.
Foundation settlement is oftentimes a function of the condition of the footing excavation
subgrade. Under no circumstances should footings be cast atop loose or soft soil, slough, debris,
or surfaces with standing water. We recommend that a representative from our firm observe the
condition of the footing subgrades prior to pouring footing concrete in order to confirm that the
bearing soils are undisturbed and that conditions are consistent with the recommendations
contained within this report.
We recommend that perimeter footing drains with cleanouts be installed around the
planned building. The drains should consist of a minimum 4-inch diameter perforated pipe I
embedded in at least a 24-inch wide envelope of clean, free-draining granular material containing I,
less than 5 percent fines (material passing the U.S. No. 200 sieve). Footing drains should be
directed toward appropriate storm water drainage facilities and not onto adjacent slopes. Roof
drains should not be connected to the footing drains. We recommend that the ground surface
adjacent to foundations be sloped to drain surface runoff away from the structure.
Slab-On-Grade Floors
Slab-on-grade floor subgrades should be prepared in accordance with the site preparation
recommendations presented above. All slab-on-grade floors should be founded on the medium
dense to dense native sand, glacial till, or on compacted structural fill extending down to these
competent native soils. Slab-on-grade floors should not be founded on or within loose or
dishubed native or fill soil unless it has been evaluated and approved by the geotechnical
engineer. We recommend that at least 4-inches of clean coarse sand and gravel (containing less
than 5 percent material passing the U.S.No. 200 sieve) be placed between the prepared subgrade
and bottom of the concrete floors. This zone will serve for support, and as a capillary break and
working surface.
In floor slab areas where moisture sensitive floor coverings are planned, an impermeable
membrane (e.g. polyethylene sheet) should be placed directly beneath the floor slab to act as a
vapor barrier. The impermeable membrane should be protected by two inches of fine, moist
sand placed both above and below the membrane. The sand cover will provide protection for the
' Zipper Zeman Associates, Inc.
18905—33nd Avenue W.,Suite 117 Lynnwood,Washington 98036 (425)771-3304
Proposed Fire Station J-1177
Renton,VVashington November 1,2001
Page 8
membrane and will promote uniform curing of the concrete slab. The sand cover should be
moistened and tamped prior to slab placement.
For basement and other below grade floors, we recommend that an underslab drainage
system be installed below the new floor slabs. The underslab drainage system should consist of
at least 12 inches of structural fill consistina of free-draining (less than 3 percent fines) coarse
sand and gravel. To discharge water which tends to collect in the zone of structural fill, we
recommend that a system of 4-inch diameter perforated drainage pipe be installed in trenches
which extend below the zone of free-draining structural fill. These trenches should be at least 12
inches deep and backfilled with the free-draining coarse sand and gravel. The perforated
drainpipe should have a maximum center-to-center spacing of 25 feet and should be sloped to
drain to a suitable discharge. Cleanouts should be provided for the perforated drainpipe.
Backfilled Walls/Lateral Earth Pressures
All backf'ill placed behind retaining or basement walls should be placed as structural fill
compacted to a minimum of 92 percent of the maximum dry density per ASTM D-15�7. The
compactive effort should be increased to 95 percent where settlement sensitive facilities are
supported on the wall backfill. To minimize lateral earth pressures and prevent the buildup of
hydrostatic pressures, the backfill within 24 inches of the wall should contain less than 5 percent
fines, based on that portion passing the U.S. No. 4 sieve, coupled with a perforated pipe drain
placed at the base of the wall backfill, similar in configuration to that described for the perimeter
footings. The upper 1-foot of the wall backfill should consist of low permeability silty soii and
the ground surface should be sloped away from the wall in order to reduce the potential for
surface water infiltration behind the wall.
The following recommended lateral earth pressures, presented as equivalent fluid
densities, are based on the assumption of a relatively level backfill (slopes of 4H:1V, or flatter)
with no buildup of hydrostatic pressure behind the wall. If the backfilled walls are structurally
restrained from lateral movement at the top, we recommend that they be designed for an"at-rest"
equivalent fluid density of 55 pounds per cubic foot (pc�. If the top of the wall is free to move
laterally in an amount equal to at least 0.1 percent of the wall height, they may be designed for
an "active" equivalent fluid density of 35 pcf. For building and retaining wall foundations, we
recommend using an allowable base friction value of 0.35. Passive resistance for foundations
embedded at least 18 inches below finish grades may be computed using an allowable equivalent
fluid density of 250 pcf.
Surcharges due to sloping ground, adjacent footings, vehicles, construction equipment,
etc., must be added to these values. The above equivalent fluid pressures assume that the
backfill behind the walls is level and compacted to approximately 92 percent of the modified �'
Proctor(ASTM D-1557) maximum dry density. Additional compaction adjacent to the wall will I
increase the earth pressure, while a lesser degree of compaction could result in post construction ��
settlements.
' Zipper Zeman Associates, Inc.
18905—33`'Avenue W.,3uite 11? Lynnwood,1Vashington 98036 (425)i i 1-3304
Proposed Fire Station J-11 i7
Renton,Washington November l,2001
Page 9
Utility trenches may act as a oundwater conduits by intercepting perched groundwater
seepage. Some of these utility trenches may lead to the proposed building. Therefore, it is
highly recommended that the wall backfill consist of free-draining aggregate as recomrnended
above. Additionally, footing drains should be constructed at elevations below all wall
penetrations and preferably at footing elevations. These drains should be connected to an
approved storm water discharge receptor.
Seismic Criteria
Figure 16-J in the 1997 Uniform Building Code classifies the subject site as being within
Seismic Zone 3. Based on the subsurface conditions encountered at the site and published
geologic literature, it is our opinion that Soil Profile Type S� should be used to describe the
average soil properties within the upper 100 feet beneath the site. This designation describes
soils that are considered very dense with a shear wave velocity of 1,200 to 2,500 feet per second,
Standard Penetration Test values greater than 50, and an undrained shear strength greater than
2,000 psf.
Soil liquefaction is a condition where loose, saturated granular soils loose strength during
the ground shaking associated with an earthquake. No groundwater was encountered at the site
to the bottom of the test pit excavations. In addition, the soils encountered in our test pits
typically consisted of glacial till or medium dense to dense sand. The risk of liquefaction at the
site is considered low due to the lack of groundwater and the overall condition of the native soils.
Erosion Control
Erosion and sedimentation controls are recommended during construction to reduce the
potential impacts to adjacent areas. Erosion control measures should be designed to prevent
sediment transport. This may be accomplished by constructing water bars or utilizing other
methods to control surface water runoff, and constructing silt fences to control sedimentation. If
construction is accomplished during the winter months, we further recommend that temporary
erosion protection be provided consisting of covering exposed soil areas with plastic sheeting,
jute matting, and/or straw.
We recommend that all bare soil areas be planted or mulched as soon as possible. It may
be necessary to provide temporary erosion protection until vegetation has been reestablished.
Pavements
The native medium dense to dense sand and glacial till are considered suitable for
subgrade support of pavements. We recommend that the subgrade in pavement areas be
prepared as recommended in the Site Preparation section of this report. The upper one-foot of �
pavement subgrade soils should be compacted to at least 95 percent of the maximum dry density I
Zipner Zeman Associates, Inc.
18905—33rd Avenue�'V.,Suite 117 Lynnwood,Washington 98036 (4?5)771-330�4
Proposed Fire Station J-1177
Renton, Washington November 1, 2001
Page 10
determined in accordance with the ASTM D-1557 test method. The extent of any soil
improvement or replacement can only be determined at the time of construction. Finished
subgrade surfaces should be constructed to facilitate drainage and prevent ponding of water
below the pavement section. We recommend that a layer of crushed base course be placed
between the prepared subgrade or structural fill, and the pavement working surface material
(asphalt or concrete). Base course material under Portland concrete and asphalt pavement
should conform to Specification 9-03.9(3) of the WSDOT/APWA 2000 Standard Specifications,
or current City of Renton or King County standards. Base material should be moisture
conditioned and compacted to a minimum of 95 percent of the maximum dry density per ASTM
D-1557.
Other Considerations
We understand that an elevator for the new fire station facility may be considered. The
elevator shaft may extend below the depth explored in our test pits. It is unknown if
groundwater might be encountered within the limits of the elevator shaft. We recommend that
the installation of the elevator shaft be monitored by a representative from our firm to assess if
any special measures are necessary to deal with groundwater encountered in the drilled elevator
shaft hole.
We understand that on-site stormwater disposal systems may be considered at the site. In I��!
general, the lack of a permanent shallow groundwater table, and the granular nature of the native '�
soils observed in the test pits appear to suggest that some on-site infiltration may be feasible. '
However, we recommend that required soil infiltration testing per City of Renton and/or King ,
County Stormwater standards be performed to assess appropriate infiltration rates used in the
design of on-site stormwater disposal systems. We recommend that any additional subsurface
testing be performed in the immediate area of the planned infiltration system(s).
CLOSURE
This report has been prepared in accordance with generally accepted geotechnical
engineering practices for the exclusive use of the City of Renton for specific application to the
planned fire station at 1209 Kirkland Avenue NE in Renton, Washington. The conclusions and
recommendations presented in this report are based on the explorations accomplished for this
study. The number, location, and depth of the explorations were completed within the site and
scope constraints of the project so as to yield the information necessary to formulate our
recommendations. The plans for this project were in the preliminary stage at the time this report
was written. Under the circumstances, it is recommended that we be provided the opportunity
for general review of the, project plans and specifications in order to confum that the
recommendations and design considerations presented in this report have been properly
interpreted and implemented into the project design package.
Zipper Zeman Associates, Inc.
I8905—33rd Avenue W.,Suite 1 l7 Lynnwood,�V�shington 98036 (425)771-3304
Proposed Fire Station J-1177
Renton,Washington November 1,2001
Page 11
The integrity and performance of foundation systems depend greatly on proper site
preparation and construction procedures. Field judgement by a qualified engineer will be
necessary in order to determine the adequacy of the site drainage and foundation support
systems. Therefore, because of our familiarity with the site soils, we recommend that Zipper
Zeman Associates, Inc. be retained to provide geotechnical engineering services during
earthwork and foundation construction of the fire station. If variations in the subsurface
conditions are observed at the time of construction, we would be able to provide additional
geotechnical engineering recommendations to the contractor and owner in a timely manner as the
project construction progresses.
We appreciate this opportunity to be of service to you, and would be pleased to discuss
the contents of this report or other aspects of the project with you at your convenience.
Respectfully submitted,
Zipper Zeman Associates, Inc.
w o Tx�r� � �/1�'"
��� F tVA$� cASO �s s
, e �
ti � � � °� Timothy H. Roberts, P.E., P.G.
`-�:, Project Engineer
r 19409 ,�4
�"�`�FecSTE��'����
L Sf�iV AL �� �,,.r—'� t� S
EXPIRES 4/3/2402 ; James B. Thompson, P.E.
Principal
�
i
Enclosures: Figure 1 —Site and Exploration Plan
Test Pit Logs (TP-1 through TP-7)
;-
�
�
. i �
�
, �-�,
I
I '�
Zipper Zeman Associates, Inc.
18905—33rd Avenue W.,Suite 117 Lynnwood,�Vashington 98036 (425)7'(-3304
i
N.E. 13TH STREET
i �
' TP-4 ui
Z TP- W
W ' z
Q w
I >
� TP-2 �❑
� TP-5 zQ
�
w �
W TP-7 Y
�
—� Y
� TP-1 �
TP-6 �
N.E. 12TH STREET
m '
a I
z I
EXPLANATION
�TP-6 p ?00 200
ZZA TEST PIT NUMBER AND
APPROXIMATE LOCATION
SCALE IN FEET
Zipper Zeman AssoCiates,Inc. Project No.J-1177 Renton Fire Station
Geotechnicat and Environmental Consulting Date:October 2001 City of Renton
Drawn by:SCK Washington
18905 33rd Avenue West,Suite 117 Scale:As Noted
Lynnwood,VVashington 98036 FIGL'RE 1 -SITE AND EXPLORATION PLAN
Tele:(425)771-3304 Fax:(425)771-3549
Renton Fire Station J-11i7
Renton, WA Tzst Pit Log
Pa�e 1
Test Pit TP-1
Depth (feet� Material Description
0.0-0.3 2" Asphalt over base course (Fill)
0.3-1.3 Dense, damp, dark brown, silty SAl'�1D with gravel. (Fill)
1.3-2.0 Medium dense to dense, damp, orange-brown, silty SAND with
occasional gravel.
2.0-5.5 Medium dense, damp, gray, fine to medium SA:�1D with minor silt.
5.5-14.0 Medium dense to dense, damp to moist, gray-brown, gravelly SAND
to sandy GRAVEL.
Test pit completed at 14.0 feet on 10/1/O1.
No groundwater seepage observed.
No caving observed.
Test Pit TP-2
Depth �feet) Material Description
0.0-0.5 2"Asphalt over base course (Fill)
0.5-1.5 Medium dense, damp, orange-brown, silty SAND with gravel.
1.5-2.75 Medium dense to dense, damp, gray, SAND.
2.75-4.5 Medium dense, damp, gray, fine to medium SAND with minor silt.
4.5-6.5 Medium dense to dense, damp, gray-brown, gravelly SAND with
occasional cobbles.
6.5-13.5 Medium dense to dense, damp to moist, fine to medium SAND with
minor silt.
Test pit completed at 13.5 feet 10/1/O1.
No groundwater seepage observed.
No caving observed.
� .
Renton Fire Station J-1177
Renton, WA Test Pit Log
Page 2
Test Pit TP-3
Depth(feet) Material Description
0.0-0.3 2 '/2"Asphalt over base course (Fill)
0.3-15.0 Medium dense, damp, gray-brown, fine to medium SAI�D with minor
silt.
Test pit completed at 1�.0 feet on 10/1/O1.
No groundwater seepage observed.
No caving observed.
Test Pit TP-4
Depth (feet) Material Description
0.0-0.2 Asphalt
0.2-0.8 Dense, damp, brown, silty SAND with gravel. (Till)
0.8-5.0 Dense to very dense, damp, gray-brown, silty SAND with gravel.
(Till)
5.0-12.0 Dense, damp, gray-brown, fine to medium SAND with minor silt.
Test pit completed at 12.0 feet on 10/1/O1.
No groundwater seepage observed.
No caving observed.
�
Renton Fire Station J-1177
Renton, WA Test Pit Log
Page 3
Test Pit TP-5
Depth (feet) Material Description
0.0-0.2 Asphalt
0.2-1.0 Medium dense, damp, brown, silty SAND with gravel. (Fill)
1.0-3.75 Medium dense to dense, damp, gravelly SAlvD with some silt.
3.75-13.0 Medium dense to dense, damp, gray-brown, fine to medium SAND
with occasional cobbles.
Test pit completed at 13 feet on 10/1/O1.
No groundwater seepage observed.
No caving observed.
� ' Test Pit TP-6
Depth(feet) Material Description
0.0-0.2 Asphalt
0.2-2.0 Medium dense; damp,brown, silty SAND with gravel, concrete
debris, boulders. (Fill)
2.0-2.5 Medium dense, damp, orange, silty SAND.
2.5-5.0 Medium dense to dense, damp, gray, gravelly SAND with minor silt.
5.0-5.5 Medium dense to dense, damp,brown, silty SAND.
5.5-14.0 Medium dense to dense, damp, gray-brown, fine to medium SAND
with minor silt.
Test pit completed at 14.0 feet on 10/1/O1
No groundwater seepage observed.
No caving observed.
Renton Fire Station J-1177
Renton, WA Test Pit Log
Page 4
Test Pit TP-7
Depth (feet� Material Description
0.0-1.� Loose, damp, brown, silty S�ND with gravel. (Fill)
1.5-15.0 l�ledium dense to dense, damp, gray-brown, fine to medium SAND
with minor silt.
Test pit completed at 15.0 feet on 10/1/O1.
No groundwater seepage observed.
No caving observed.
� I