Loading...
HomeMy WebLinkAbout02972 - Technical Information Report * it. � - ,� DCI � � �� � � �'�T � � �Z � �� D ' AMATO COtiVERSANO INC. ��_ r � f��s , z� �'�:.`- � � '�I I I�� � ,��,�` �li �t`t'� RENTON PARKING I � , ; � . I � ,����� �� . �ARAGE ���� � , � � ������, . ; �s��������'� �� �-:` � RF!��I'O^T, �VASHI!��T(�N � � � E ��� ���� �w'� �,� ��� c►r;., �'. _,*� :,a ����� �� ��b ��'�,� ,_ �{` x.'� � •- �,,�,� �`¢t, � �}�.�'�,.� � � TECHNICAL INFOiZ'vir�.T10I� RE1?ORT � f �� �� � .y '�*��{ '��;�P� n r�.s�,<}x��F r #�,., x���� �' �fi���.t���, +�'-''4 �w T,:�yq. '•s,e L �,�,�'... � a� :� Y "`1 -'. �.`a�"'-�. � � � '4' �� ��, .�,.` ' ���, `r,�' prepared for ex„�,�i... �^t,fa � ��i,., � ' }���� `�'�" �-�_ '' LMN Architects � �z.'�k�`� , ' ' 4 � � �� - 801 Second Avenue �- ,���- 3� " ; ? �' Suite 501 �<����.$ . , '�` �.� '� �=� Seattle WA 98104 yy�� ;� , s A���°i`F� f � �`.k'! - E .�.a't%� ,"I' 1 ��� a :.�� �,J` t�CfV�;.;i� �ECE��fF!7 � Gi:��i( � 7 �('('`. ��. � . .. �i,� ��.�:. . ,� 9�z RENTON PARKING �ARA�E RENTON, WASHINGTON TECHNICAL INFORMATION REPORT prepared for LMN Architects 801 Second Ave. Suite 501 Seattle, WA 98014 prepared by D'Amato Conversano Incorporated 2815 Colby AvenueSuite 303 Everett, Washington 98201 � ��I� R• �, � �F WASy � � �fv ;�\ �� +� �'M z i _ C' +• � A ` '-- � "� Q�'� FC`� J j�R�'�SV�� �' ��SSIpN�G� "" � �� 1� � = _- - _ � -� DCI Job No. 00-12-002 November 16, 2001 TABLE OF CONTENTS SEGTION TITLE I. Project Overview II. Preliminary Conditions Summary III. Offsite Analysis IV. Retention/Detention Analysis and Design V. Conveyance Systems Analysis and Design VI. Special Reports and Studies VII. Basin and Community Planning Areas VIII. Other Permits IX. Erosion/Sedimentation Control Design X. Retention/Detention Facility Summary Sheet XI. Maintenance and Operations Manual I. Project Overview The site is located of f of S. 2°d Street between Logan Avenue and Bumett Avenue in the City of Renton. It is approximately 3/a of an aae in size and was previously developed with a single structure and associated parking. The site was virtually all impervious and sloped predominately to the west. There is an existing storm system in each of the sunounding sueets. The on-site storm runoff is conuibutory to the Cedar River. A seven story parking garage is proposed to be developed by the City of Renton. � �,l�C��lM �� � , � � ti � � �-,�..�. ..�.�..�..M . � -� �. ��-� � �� �.� w�► , ,�,���'��, �' { .�� � � ,P..��f^ ��s. � � �C * ,c�: �..�.;,iti,l.i� <�,..�,�j� �'°.�, �" ' ,"�, ...a.,..� � S� `� r�� � �T� ,__,M..._. ti ,ti �"�;, ,�'�,� r^^�'�� r � -�,a.�...,..,.._ , „,.,..�.,w,.;_.,,, . _� _ ,�"� '�1i�'`•�'�' '',,'t�` �` � v �� � ;�r: : ,�' ' ��'�� ( ''��� �... ,�n � �,� . � '� � ���.� .� � �1f 1 �-��R��d'l �� �.1�;j.i�� . � F'I^ i^���1�'�� rx,.:,� ,�i��-^l � � �'* r�'. . i °�.�✓tF�d'., , � � : ��� ��� � � .W ti� � � """'"""'""'" +�'' �,,„r� �' '��y�. �,; a � `� -.,,.,., � a"� J�,�'++ .�i�;'4; +�,,� �.�r� " '�'�`"`�'� ` i � � ' ''�`/ � � �� � R�`Jtl�(I1� �,,�, �,�,�,�; ��i,� � : `�'�' �, A .,�.y �, 1�.��1�1� i r � � ��` Y, '!�� � ' . � ��i . �I' T�- 1 �.� "'� � �4f�.1 � � � � � (�'� �'�"�" 4 r � ��.� 1+�'"� �.�µ� �w,� .►w,u �ar wi;, ,Y ,. �,;;��t,�,�r'i � � � �,. � �,�.,.......�� �� �u� � �� �'rs� o.." �," �JS�`� �'h .�� � ' .....,..,.-..�, ,u �` .V��. ��� 1? � � ! �� t:.;14� 'O"'"' r�'" " M.V:.�"` ���L����.d''� S.: '.•`'�,. �y, c, , c/'� wa � �� .. ,c� S j �`^�' �r, "� �,,.�" "���"' � . r ,: ;�:� . . � . �M . . ����t[ . � � .J�' rV'x� ..,.,,.�"''. . �. " , . , M� �+�+�+�..��.w.n � �� . �� ,r m�� .d� »� t. ,� �I :� ���:o- .F'�y��.J��;� t I�� *^ �„� n � _•_„�"�,�.�....._ ��.��..�.p�� � p� f� . I �� .. �'� ��.d .�� �}� ���� '��� � �w � , , .� . . �� . . . , '+.. �� .�,�+"" �^a�«,....:�,��,•�-... ,�•^ �ir i �I �i } . � � w� .�w�.� �, .. . M�� ���� � . M r � �� � �� «� f�� .J�f ' � �.���' �y d . � .,��,�+ �/� �' //y t �„�l � : . �� � � ��� r� � ,,.+.« � .M � �E �.t, J � i ' � � . . �` � . . �..r„� � _� �;�.,s M � ,`�� ',�"•� ,�' «�'" � , , < , �l ''�`„ M � %t - . `� .- - .. ."..+..�.r�-^..,.�• � �' �.'�'� ��� . _ . .�' � ,. . . ` r J .. �� . � , _� . �`�'y^."";, -^...._. J� ��� � . �� w"� ��M, � ��,'''�''�,+'` �� I(,�'��.t �?� � � . '�'�,�. � . � i ,�-' _ . .� '��`1.� . � ����� �.. �� � ���, a•� �-'-I 1� ���� 6 � � �� .�,�-.i���~1 . ( � � ( . � '�11�� � .�.,I f � � � 1 : 1 , �� :" „�w 1 � . �MPiM11 ' . d J f��y!' ' .+�M'� ... ,r' �M' �1 . �' y �� f � � y .+rv��� "r. w�"'� � ' � � . �' .� � �� V�1� � � � .���,w.�,�y'1!i��� �� �I ti./a�I .� . � .� �� ,1�.. �.�.�»..,� � ..�..�,�� T��!+:. �.�,�,,, . � �,1� �N� ��""/ J ��''� '�i��: �'T�"� , � ►� �i 4.. cn ��.�� r a ,� ,,,� �,�1� ,`� �� :i � �"^..r '�, �, ,yr��,,, � '��'a� �; �."'� V'3 —��., f"� - ,.,� � •� � � �JRU�"'� y .,.,� r��` �.:.f ' . , . , . �„ .. . .�M�MI�ww � �'� � �`1 VI C I N I 1��lAP NOT TO SCALE -� � � ✓/•'r..;' �� ... ei - -��%,` � I ` �, � �t '�- ,� ;��� �T :. B Ma`� '` � '} ��;� i� ' , ��: � � ;�� �\ �; ; ��:�{ � , - II �+F• � ��""�`' - -C' _. .��� l� ' _ °�x���""�� � �� ��,1. '1 C�O:• i � •T"' 4�-_ '��.•, • L� 3 : �� � t. �:},1� • '_ . �� . � —1 . I . . •.t'�:�5• SUOStd' R. ' I �]� �.' . y I . €` ��. .-•� � � - � �I Uf � ���11� ' .t � �.J � 1 T 1 I t.. ; ' � � ■ , 1 � 7. '''i.~ • •1� . �VOi. 2 I" UC 3 ��1 �'� � I�" p .s� � , � � i� � :• o �4 ��; : i �1�;�• I 1. y.�� ,', II � �I � _ ,...; �I'I '� I• � � ■ � ` `. ��� �� P.g� � i �- �'• u 1 i avE �. . ••�� •I;.i�i: � �� '� � EN(T _ _ .I� ;: .`t ',,,�' '�I: �; = - ���� ;� i��R o �tN,'1' ' � '�'�� ' .� • l� •.� '' �II�. _ 1 _ I'. '�-1 '11 �� 'I''�� . ` .•,. L� � � J � ,� _ Lk ' ';�,�. ' � � _ ••''� �, y� qgC � • i T -F 8t. i�f:.::: � .B�'� f�. ^ .. ' � � '� �'i �� � Atnieti - �at, /�� - ---� • ��• �- I -. � � � � �� ' h / � n' A ubsta'�� BN' Q � � �feld i -i � t- � y�'t J 111i. _•i 3 �1 � i.- � '1 O � \-� Ev�: J � - ���• � .��� .. (v� . t�.` '� - T -i�"�. — _ � kiF � •�'4 'AkF � ' 7! �. .� • +' •�i• r--/1' - , �i . , . „ _ . ■� /'1 � �` \. TI�',�lr: Be�" �G� � ; .. � . • �_- � ��iIN• 7 I � ' - s� ��/ ��- � � � �,BeLF' � �` -{s"'= ��-s ��� � .� � . � � �s f7�_� � • �' 1 ��+ ` 7ir •D� .- • . , ••.i .y�`'I ,`� �aseb�l��/ ���I I_ � • . �. i : � � 'ark � p�' � ��,; �• f . - �� - F . _ � _ � ;'�' � � -� -• �'ie �,.-=-z-= i l� �- @. +�i ■ ./' .:�an q - BeD - _ .�,_ I! � , � v'f� � t� .I , • • � �i P y rl BeGr/, f � � N�"!�" � �Rr• �r t-. �� _ � q' �� � � % �� _ i�� ��> �C'- -.k� ¢ / / . r-. ' _, � 3 �, ` O/'i RA nOAO£,t = L .... •w�•� �,,, _ � � \")I ` '•. �.q_ � . �R � F. a � � �a+' D� �N�t/ 0'¢QE `_` � ..,. � \,C �f'J '� {� .h �, � �� ��� VJo g = � � �I � � ,.:1 ,- ;I Ur , \ � -_� _ C � � _ i V:' I � r� _RkF - � � `1�Vo - �`s'� '�� Ur -�' � �i I .i c � . • , •; B {' �-: � . i �I- .'r,� _ . ; _ � 'InC i , ---- -- � _d- _ '- J r � 13 ��, � � � �I� �; � - � ' � �� � � ,_- ,= ,: �- � � -►'`� �i a , , - � � V � ' � - � \I -�' ;���' ': '� _agc >C' �oir�oLrse I j i SEa, _ — /• x � ■ __�__,`�. _ AmC �� �r I �'h AG�Fri �, � I i � � ca. �o _ ! p �.: � i�,; ii - i' - - !nC' - _ �'� - � � i._ . - M1 - - " . � _ , � — _ • i . 1° � � ' -/ r <' ,\�� $ew ge �1 pRTHE �� � ,�u =i' ; � � ��' GOS;�a \� ,,.�,Cisp szi + i � _ i ■. �� ��� -_ � . -. '� �� � � 'u �AtnC� o ,�� � 1 Substai �gC i Ur�� ` �� • �` 't , ' ` ��' � - ` 1 - - � � �" �' / '12� a�l 9r' d ZQ ' �RgD � ,.1 \j4 : M 16 �� y s � i,� � [� i- i� 1�' �� '�I���w 2� ��: �.i,- P'.i�`-- '7 �` �-� � ` �C- _ -U � = �C ���i� _ i � SI.. -•. � I�` �II' � ar ; �. � 1-�� i - �� � ,. i � �• �, n �= � '� � ii �� Ur �' � � � I J� � � ��' � � � . � L�ngacre$ ' �� �� P;. � _ � , :i a rr�� F �'i.� �' �' -+ r� ��I 11� .I. Ij- ��, ��(''.. / �. v��� � ��i. '��� - (-.� - I Pki - ,7-.tr7_O 1�� ;�� �j' �-' �S .�� /��/� 7 �i � l i� �_ � _��l �• �I� � �� �` �' ��'r %/ !/% c �i�. �i R�--;,���� ' Py = • i I'� _•n TBeCPI _��t- -.,. ' � � I f I�;I�� Ur;i�_I �WO - __ I �-BeD --_�ii n,- � . - :� `�i,, - (J � - ✓�- i % ���i f �` Ur �' u:f( r11�� '�y 'r v� - �.i f� �i Track: „�I 1l 'J . � l� �D ,�� / , i�� �F L I J ^ � - :� _.� _-,--. SOILS MAP ur � ��-b�,n II. Project Summary There are no preliminary conditions for this project. II' � _ I III. Offsite Analysis The site discharges to the storm system in Logan. Runoff flows east in Logan in the City of Renton storm system to an eventual outlet to the Cedar River. No storm problems were noted by the City in the downstream system. N. Flow Control and V1�'ater Quality Facility Analysis and Design Water QualitX A seven story parking garage is proposed to be developed by the City of Renton. The top floor of the garage will not be covered and therefore a water quality vault is proposed to provide settlement and oil/water separation prior to release into the downstream system. The vault has been sized using the 1998 King County Surface Water Design Manual using the Basic Water Quality Menu. The mean annual storm is 0.47". The volume factor is 3. The area draining to the water quality vault is 23,774 square feet (7`� floor). The required volume of storage per the King County Manual is: V� = 0.9A�p x R/12 = .9 x 23774 x 0.47/12 = 838 cf. Vf= 3x838 = 2514cf Volume provided = 12 x 40 x 6 = 2580 cf Therefore water qualit�T system is adequate. Detention The site is exempt from detention per Core Requirement#3 which states: "A proposed project or any threshold discharge area within a project is exempt if less than 5,000 square feet of new imperious surface will be added and the project or threshold discharge area is not within a Landslide Hazard Drainage Area." The developed site will contain small areas of planters, driveways, sidewalks and the remainder will be covered by the garage. The development will not increase the site impervious surface. 6.4.1 WETPONDS—BASIC AND LARGE—METHODS OF ANALYSIS FIGURE 6.4.1.A PRECIPITATION FOR MEAN A.NNUAL STORM IN INCHES (FEET� � s'^ 1.0/ LA 1.2 - ST 1.0 I,A 0.8 LA. G.9 I''A 1'� I ST 1 1 = .•rf � s�l �., -- � i ..+T��� ra.. r ti � � ..uc ...o. e - .•-�� '�',. ,. �,�r �� , T . �^ :� �� � .,. � -� �. ,� � ,�e �' s r€/r'�'�+ � __ f fi� t � S�� �- ' 1. �. - ��_ -;� �-� 'k:i.�� �� _. : � �v . 1 / � �: �„_ �'r �� � i _ � 1 � �.-� '�F:. t�I,�� \, :_�'t�� ', � � ; ,Y �... - r : �/� _ � ' ���lVU�j.� _I .♦ r�� ,J'��=.. e . _ '�=..ij� ,i � 'i k,. • i�r.;� :..': i ��. I � O .-� . � �. �/(� . �I ^i ' 3 r.!'" l �f. � � �� � � t'"=•� �� , a .�,i--n_ t `� * .Z:ll<ct ^ «� ` y� .rr�.- r�q°e�� — �� � t" �� �� � � �";�"_ s,Tl. ' � !��.' 'k `. �� ^ 1 .�, —��.,�� �+-' `�� '\f� � �f�+���r � '^� '_� ' ....� -. ' �� � �� •t J � �� '� " �.`��J��^.� � � %,' �ti� . �., �� � l� � 1 / "Y � � ��� �.�5 A �. �i �• -�~G__ � ! - L?L�4 ,.r{ � / ' _ ' 1 . -~P / �^ �-�1 3' ..i { ..¢Q� \� ..r �_ "�' � - .:� , �' � \ �`rl ...��,J� 1 �X' � _ '�T�T. � �/ ..-.r (`/ �\ � 1 / � ' \\ �� ��J�.�l .�'�! p `"i.�� �r�: � l �i 7 '. � 4=o � • 1 �,,!`.r �f� , -- - �`. " � . � _ � i �, � �i -i! /• , j -� -- - \ � _ �`! — ...0 ` = :� � �`� ��I, ,1� C \ � � -- - _:`t' � �__J . � � 4 4 � '�` - = t - �' /�`—=%d r��'' •� } '°°" `1 -'q � ``�— / — ".E �3ead - � Q � _- , � ��hj�l , �'-- ri�__'/�/ - - i,� P '�--.=.� - ��;�'�'�! 1,��`, .� \ �`� --, �.i �,F V,�_� p �� �__ -- '� ,` �' :�� ��, / -�. ' e 0.54" '� .�s! ` � - - (Q. 0 4 5' ) ��,�i� e � -c �j, ,4 p � - �.,,a.�ar�; � 0.47' Q`., (0.039' ) � � ` . • _ +, . �.�_ _ Incorporated Area r �o �c� River/Lake �.47_ � ��, ^ �— — Major Road (0.03 9' ) 0.52' � � �^� {0.043' � �~ 0.65' � NOTE:Areas east of the eastemmost isoplwial should use 0.65 b.56' (0. 054' ) inches unless rainfali data is avaiiable for the location of interest (0.047' ) �The meen annual stortn is a eonceptual stortn fand by dividmg the anrwal preapitalion bY the total rwmber d stortn events per ysar result,generates large amounu of runoff. For this application,till soil types include Buckley and bedrock soils,and alluvial and outwash soils that have a seasonally high water table or are underlain at , a shallow depth(less than 5 feet)by glacial till. U.S. Soil Conservation Service(SCS) hydrologic soil .;' groups that are classified as till soils include a few B,most C,and all D soils. See Chapter 3 for '� classification of specific SCS soil types. 1998 Surface Water Dcsign Manual 9/1/98 6-69 �'. Conveyance Calculations The conveyance system is within the building and has been sized by the mechanical engineer in accordance with LTBC requirements. VI. Special Reports I A copy of the soils report is induded. ��` �(�� Golder Associates tnc. .� 18300 NE Union Hili Road,Suite 200 �' V v���r � Redmond,WA 98062-3333 �s��tes Telephone{425)883-0777 ` Fax(�25)882-5498 � GEOTECHNICAL INVEST'IGATION � PROPOSED MUNICIPAL PAItKING STTZUCTURE RENTON,WASHINGTON � Prepazed for: � City of Renton � � Prepared by: � Golder Associates Inc. Redmond,Washinb on � ' / � t � � �% ,! ��.. � �`Robe .Plum,Principal � O�rG;ZT PL�2 � ���ar wtis�r�tic 1 September 26,2001 y� -+= 0 013-1579.000 092brlpl.doc � ��: � � O,�,� ��.-cF0 �� ,� G�' ��1���, ( EXPIRES � OFFICES ACROSS ASIA,AUSTRA:ASIA,EUROPE,NOR"H,4MER1:.A,SOUTH AMERICA � � � �: September 26,2001 i Our ref. 013-1�79.000 TABLE OF CO:NTE:NTS Page No. �x 1. INTRODUCTION 1 2. FIELD EXPLORATION 2 ' 3. SUBSURFACE CONDITIONS 3 4. SEISMIC CONSIDERATIONS 4 4.1 Liquefaction Evaluation 4 - 4.2 UBC Site Class Designation 4 R 5. GEOTECHi�'ICAL DESIGN RECOMtiIENDATIONS � 5.1 General �' '. 5.2 Auger Cast Pile Axial Load Criteria � 5.3 Lateral Load Resistance 6 5.4 Slab Criteria 6 � 5.5 Permanent Wall Design Criteria i 5.6 Drainage Provisions 7 :�- 6. CONSTRUCTION CONSIDERATIONS 8 � 6.1 Subgrade Preparation 8 6.2 Utility Trench Construction 8 �;: 6.3 Earthworks 9 6.4 Auger Cast Piles 9 � 6.5 Construction Monitoring 9 �- 7. USE OF REPORT 10 � LIST OF FIGURES �_ t� Figure 1 Site Exploration Plan � Figure 2 Liqueiaction Assessment t� LIST OF APPENDICES < ;. Appendix A Borehole Logs � ' �r� �„ � � � � t� �, Golder Associates � � � September 26,2A01 -1- Our ref.013-15i9.000 1. INTRODUCTION This report presents the results of a geotechnical engineering study for the proposed parking garage at 2id Avenue and Logan Street in Rentan Washington,as shown on .' Figure 1. We proceeded with our investigation based on your August 10�2001 approval of our July 2,2001 proposal letter. We understand that the structure will consist of a 7- level above parlcing garage with no below grade levels. Maximum column loads are , anticipated to be in the range of 750 to 1,000 kips. The proposed garage will be located adjacent to the new transi#center currently under construction as shown on Figure 1. � The site is essentially level and is currently partially paved. The purpose of this study was to explore the soil and groundwater conditions at the site and prepare preliminary o otechnical engineering recommendations for the proposed , development. Environmental sampling and testing of the soil or groundwater were not cvithin the scope of this study. � � � � a � � - � Golder Associates September 26,2001 -� Our ref.013-1579.000 2. FIELD EXPLORATION The exploration work consisted of drilling five borings in the summer of 2001 to maximum depths of about 50 feet. A standpipe piezometer was installed in boring BH-1 with the screened section sealed at a depth from about 25 to 53 feet. The approximate locations of the borings are shown on Figure 2 and summary_ logs are presented in Appendix A. The borings were located in the field by pacing from existing landmarks such as the property corners,roadways,existing structures,and topographic/geomorphic features and should be considered approximate. The borings were drilled,using a Foremost B-59 hollow stem auger rig from Holt Drilling. Disturbed representative Standard Penetration samples were obtained at about 5 foot intervals. All samples were sealed in plastic jars to prevent moisture loss and returned to our laboratory for further examination. The soil samples were classified in accordance with the Unified Soil Classification System,which is presented in the Soil Description Index in Appendix A. The number of blows to drive the sampler at 6-icn intervals were recorded with the number of blows to drive the sampler between 6 inches and 18 inches penetration recorded as the SPT value. A geologist from our firm examined and logged the soil conditions observed in each of the explorations. Pertinent information including depths,strati�aphy,soil engineering characteristics,and b oundwater occurrence were recorded. The stratification depths indicated on the s1�mmarv lob represent the approximate boundaries bet�veen soil types. The soil and b oundwater conditions were those recorded for the location and dates indicated and may not necessarily represent those of other times or locations. The borings were backfilled with bentonite chips in accordance with�NDOE criteria. � [ ` i� � � � � Golder Associates , i � � I Se tember 26 2001 -3- Our ref.013-1579.000 IP � I 3. SUBSURFACE CONDITIONS � � The site is underlain by fill and alluvium from the Cedar River consisting primarily of i interbeded gravelly sands,sandy gravels,and sands. Specifically,the soil units encountered in our borings consisted: i � • FILL: The thiclmess of the fill ranb d from about 4 feet in boring BH-1 to about I 12.5 feet in BH-13. There did not appear to be any trend in these depths with location on the site. The unit generally consisted of sand with various I percentages of silt and gravel. Based on the drilling action and SPT values I ranging from about 2 to 10 b/foot,the fitll is very loose to compact. Although not encountered in the boring samples,the fill could contain orb nics and building I debris. I • Fluvial Alluvium This deposit consisted mainly ot a compact to dense interbeded I sandy gravel,gravely fine to coarse sands and sand with occasional siltier zones. � Boring BH-5 encountered a thin layer of very loose sandy silt at a depth of about 23 feet. Although there was considerable variation in the SPT values,the blow counts trended to increase with depth. The SPT values generally ranged from about 10 to 30 b/ft at depths less than about 25 feet and increased to about 20 to Iover 40 b/ft below about 25 feet. We have discounted some of the very high � values,which likely reflect a high gravel content. All of the borings terminate c in th.is urut at depths of about 50 feet. Groundwater was observed in all of the borings at a depth of about 17.0 ft bgs at the time of our field investiga�on and in the piezometer installed in BH-1 in the summer ot 2001. These levels are likely affected by the water level of Lake Washington. The piezometer should be read periodically over the winter and summer of 2001. Normallv the groundwater levels rise slightly during the winter%spring months but due to the lowering of the Lake in the winter, the b oundwater level may not e�chibit much change. � � �� � � � � � Golder Associates September 26,2001 -4- Our ref.013-1579.000 4. SEISMIC CONSIDERATIONS 4.1 Liquefaction Evaluation The site is located in an area considered to have a moderate to high liquefaction potential due to the occurrence of thick fills and loose sands/silts of the Cedar River valley. To assess these risks,a liquefaction analyses was performed using standard methods developed by Seed and others. These methods use the results of the SPT,soil type,and sample depth to assess the liquefaction risk for saturated soils below the water table. In general,the method involves calculating a corrected SPT values considering the overburden stress and silt content. Siltier soils are gi�en an increased value due to the lower liquefaction potential. These corrected values are then compared with the values required to resist liquetaction that depends on the design earthquake assumed. We considered three events ranging from a Magnitude 6.5 to 7 with peak b ound accelerations ranging from 0.15g to 0.25g. The results are shown on Figure 2 as a plot of N1 versus depth. The lines represent the required values to resist liquefaction at several earthquake levels while the points represent the corrected sample SPT values. As shown on the plot,virtually all ot the points lie well above the required values for the seismic events considered. Therefore, we conclude that the site has a low potential for liquetaction. 4.2 UBC Site Class Designation Based on the UBC method of estimating the Site Class using the sou conditions, a Site Class Designation D is reconunended. � � Golder Associates September 26,2001 -5- Our ref. 013-1579.000 5. GEOTECHNICAL DESIGN RECOMMENDATIONS 5.1 General The site is underlain by about 4 to 10 feet of fill overlying compact to dense granular soils. These conditions are considered more favorable than many areas in downtown Renton which tend to be underlain by an upper 10 to 20 feet of loose/soit sands,silts, and organic zones. The soils underlying the fills are suitable for supporting the desib foundation loads on spread footings. Alternatively the structure could be supported on driven or drilled piles. Due to the soils being only rnmpact at shallower depths,the allowable bearing pressure would be moderate at about 5 ksf. This would result in relatively large footings. In addition,the fills are unsuitable for bearing requiring that the footinb are either placed at depth of 4 to possible over 10 feet or the fill is over-excavated and replaced with structural fill. Based on discussions with the design team,the decision was made to support the building on 18-inch diameter 100-ton capacity auger casts piles. Driven piles were considered to be unacceptable due to the noise and vibration unpacts. The first level slab need not be pile supported and can be placed as a slab-on-b ade by proof-rolling and compacting the existing subgrade. 5.2 Auger Cast Pile Axial Load Criteria For an 18-inch auger cast pile with an allowable static axial compression load of 100 tons (200 kips),a total penetration below the existing ground surface of�0 feet is recommended for desib purposes. To provide design flexibility and consider different design loads,the following table presents allowable loads for 16-inch and 18-inch piles with depths ranging from 40 to 60 feet. Regardless of the load,the minimum depth should be 40 feet. E (F�llowab(e Capa�i� Depth ��.; Compr._ � Upiift ' .';Gase :: ::" `. FeEt Kit�s �ns 16-inch Diameter 40 j 115 70 Y 45 145 85 50 175 105 55 200 125 60 235 150 � 18-inch Diameter 40 130 75 45 165 95 � > � �(}: ,°2(3E�"A<�' :��t� �.`' 55 235 145 60 265 170 � � Golder Associates September 26,2001 -6- Our ref.013-1579.000 The above table only considers geotechnical criteria. Structural criteria may limit the - allowable loads. Typically the maximum loads on 16-inch piles is about 100 tons (200 ldps) and for 18-inch piles about 125 tons (250 kips). For short-term transient loads,the above values can be increased by 1/3. If a load factor design is used,the ultimate axial loads can be assumed to be twice the allowable loads. Settlement is expected to be less than%z-inch. 5.3 Lateral Load Resistance Lateral load resistance will be provided through a combination of lateral resistance of vertical piles and passive pressure on the sides of the pile caps. Since the structure will be pile supported,base friction cannot be used. Assuming a nominal allowable lateral displacement of about%4-inch,the following allowable transient loads can be used for design(assuming all of the lateral loading is transient): • PASSIVE PRESSURE ON SIDES OF PILE CAPS: Based on a fluid with a pressure of 125 pcf; this low value is recommended for strain compatibility with the piles. _ If needed,this value could be increased to 200 pcf but would require a zone of s�uctural fill be placed against the pile cap. • LATERAL LOADS ON PILES: For 18-inch piles limited to about%�-inch of lateral movement,an allowable transient load of 20 kips can be assumed tor a fixed head condition and 7 kips for a free head condition. For 16-inch piles,an allowable transient load of 17 kips can be assumed for a fixed head condition and 6 kips for a free head condition. These loads can be doubled if an allowable lateral movement of%z-inch is acceptable. • PILE STRESSES: On request,we could provide shear and moment versus depth from the LPILE results. Alternatively,for simplicity,the structural engineer could assume that a"point of fixit�' of 12 feet for the free head condition and 9 feet for the fixed head condition. 5.4 Slab Criteria The first floor slab can be designed as a normal slab on grade provided the existing subgrade is prepared as discussed in Section 5.6. � All slabs should be underlain by a capillary break which consists of at least six inches of sand drainage blanket overlain by plastic sheeting. The drainage blanket should meet the requirements of section 9-03.13(1)of the 1991 Washington State Standard � Specifications for Road,Bridge and Municipal Construction. At the contractor's option, the plastic can be overlain by about two inches of drainage sand. It has been our � � Golder Associates September 26,2001 -7- Our ref.013-1579.000 � experience that some contractors feel that the upper sand layer is necessary for proper curing of the concrete. If needed,the subgrade can be assumed to have a subb ade modulus of 75 kcf. 5.5 Permanent Wall Design Criteria Although no retaining walls have been identified at this time,the following is provide for completeness: • NOI�1-YIELDIIV'G WALLS FORI�IED IN OPE?�'EXCAVATIO�S: I�on-yieldi.*�g walls formed in open excavations with backfill placed against the wall can be designed for an at-rest pressure equal to fluid with a densit,y of 50 pcf. This assumes that the walls are braced with the floors acting as struts. • YIELDING WALLS rORMED IN OPE:�1 EXCAVATIONS: Yielding walls formed in open excavations with backfill placed against the wall can be desib ed for an active pressure equal to fluid with a density of 35 pcf. This assumes that the walls have not been braced and will yield at least 0.2 percent of the wall height. This condition could occur if some or all of the wall is backfilled prior to placing the adjacent floor slabs or for any cantilever retairung walls. The above recommendations assume no build up of hydrostatic pressure behind the wall and that adequate drainab will be installed as discussed below in Section 5.6. The earth pressure values assume a level backfill slope and do not include any surcharge loads. 4Vhere traffic loads will occur adjacent to the wall,a uniform surcharge load of Z00 pst should be added. 1 5.6 Drainage Provisions � In areas where the final slab b ade i below the adjacent exterior b ades,we recommend that the walls be positively drained to mllect any perched groundwater,water that infiltrates � from adjacent ground,and/or from leaky utilities. The drainage system should cansist of drainage behind the peruneter walls and footing drains. In addition,any retaining walls should be provided with wall and footing drains. � Drainage behind walls can consist ot b ocomposite drains or a minimum tw•o toot w�de zone ot clean sand and gravel iill with less than 10 percent passing the No.200 sieve. lf required,a fnoting drain should consist of a 4-inch diameter heavy walled perforated PVC pipe or equivalent. The pipe should be surrounded by at least 6 inches of drainab material as described above. Qean-outs should be provided. � �� Golder Associates September 26,2001 -8- Our ref.013-1579.000 6. CONSTRUCTION CONSIDERATIONS - 6.1 Subgrade Preparation Since the structure will be pile supported the existing fills need not be removed. However,the subgrade needs to be stabilized in order to provide adequate support for construction equipment the slab on b ade and pavement areas. In general during dry weather,the existing fill subb ade should provide adequate support for construction equipment. The contractor should anticipate that there may be some localized loose/soft unstable areas that may require over-excavation and replacement or a stabilizing layer of fill or ballast. Although the fill is generally relatively clean,during wet weather the contractor should assume that the need for subb ade stabilization to support cons#ruction activities will increase. ' The subgrade in both the slab-on-grade and pavement areas need to be stabilized. This should consist of the tollowing procedures: • PROOF-ROLLING: Areas should be proof-rolled with a fully loaded 10-wheel � dump truck at the pavemendslab subgrade elevation. • OVER-EXCAVATION OF UNSL�ITABLE AREAS: Areas which rut,weave excessively or otherwise appear unsuitable during proof-rolling should be over- excavated and backfilled with compacted structural fill. The depth of the over- excavation depends on the nature of the unsuitable areas with the intent to � provide a subgrade that will support a fully loaded dump truck in general,the maximum depth of over-excavation will likely be on the order ot 18-inches. � • COMPACTION: After proof-rolling and stabilization of the unsuitable areas,the surface should be thoroughly compacted with a heavy vibratory roller to at least 95 percent of maximum dry density as determined by ASTM 1557,Method D. � In general,the subgrade should be compatible with minimal over-excavation required. The contract should be set up to allow payment on a cubic yardage basis for any over- excavation required. For budgeting purposes,we suggest assuming that about 20 percent of the areas may require 18-inches of over-excavation. Dr,y weather construction would minimize the need for over-excavation. 6.2 Utility Trench Construction Unless the utilihes are deep,the majority of the trench will be excavated in loose sand and gravel fills. Normal bedding criteria will be acceptable unless very soft, unstable soils are encountered at the pipe invert. Although unstable areas are not anticipated � based on the borinb,if encountered some over-excavation and placement of a stabilizing fill layer might locally be re9uired. The excavated soils will generallv be suitable tor backnll above the specified pipe bedding material. � Golder Associates � � September 26,2001 -9- Our ref. 013-1579.000 � Trench backfill placed in slab and pavement areas should be compacted to at least 95 percent of maximum dry density as determined by ASTM 1557,Method D. In general - landscaped areas the compaction can be reduced to 90 percent of maximum dry density. � 6.3 Earthworks � In general mass earthworks will be minimal. Fills placed in areas of pavements and inside the building footprint should be well b aded sand and b avel placed in maximum � 12-inch thick loose lifts and compacted to at least 95 percent of maximum dry density as determined by ASTM 1557,Method D. � On-site excavated soils can generally be used for structural fill provided they can be properly moisture conditioned and contain no organic debris,building debris,or other unsuitable materials. � 6.4 Auger Cast Piles Auger cast piles are particularly sensitive to the installation methods and contractor experience. Poor equipment and/or inexperienced contractors can result in piles that are improperly installed and,in the �vorst case,piles that are completely"necked" providing essentially no significant resistance. Thus,it is essential that auger cast piles be installed by qualified,experienced contractors with the full time construction monitoring of experienced geotechnical field engineers. General monitoring requirements include the auger down pressure,identification of cuttings,grout pressure,the rate of auger withdrawal,and b out take. It is also recommended that as a minimum one small rebar is placed full depth into the b out after aub r removal as a check on hole "necking". If the rebar cannot be installed full depth,the pile should be rejected. '� 6.5 Construction Monitoring Critical geotechnical aspects of construction should be monitored by a qualified geotechnical field engineer. This includes pavement and slab subb ade preparation, placement and compaction of struchual fills,construction of wall and footing drains (if required),and installation of the auger cast piles. � � Golder Associates • September 26,2001 -10- Our ref. 013-1579.000 . 7. USE OF REPORT This report has been prepared exclusively for the use of the City of Renton and their f consultants for specific application to this project. The conclusions and f recommendations presented in this report are based on the explorations accomplished for this study and conversations regarding the proposed development of the site. Once � the site project plans are finalized,we recommend that we be given the opporhuuty to review the plans and specifications to verify that they are in accordance with our recommendations. The integrity and performance of the aub r cast pile foundation � system and the development of a suitable pavement/slab subgrade depends greatly on proper construction procedures. Therefore,it is recominended that a geotechnical engineer be retained to provided geotechnical services during the critical aspects of the ` project. i The Golder field borings were performed in b neral accordance wzth locally accepted � geotechnical engineering practice to provide inforrnation for the areas explored. There are possible variations in the subsurtace conditions between the borinb and variations ��ith in the b oundwater conditions with time. �Ne recommend that a contingency for � unanticipated conditions be included in the construction schedule and budget. � � I � � � � � � Golder Associates ��-�-•-^-7 �...; � � � --_-� .r ��� ---t-�-- -��'�.�'�r_-_-r�-_-r•.�.�.`,.�. k,� .. � _ S I. �. , :� �I '� '. � ��.� L � i-'������-'�` ��i._���_���..�'=c,��-� t----j-*- �_ T` r�r_��I -� �- - ` ��� ,Y'-i I .� �—�— '�c- _ —'?_TT_"i ; � � � : � i � — _ _�+ � �� '. � � `�� ' i I - 4��!--� I ' �'I ! i LOGAN AVENUE ` _--��_ � I—� �T' . �1 . i -- --- - _----:-;'-._r i I I i I . � � � � - �`'r-I -�� -,: r r._.__,.�y i f i � L �I 1 1 I i I � � I �_�'.�._ ,�� �� t"`_..:�1�.--�- 1-----��� � � i ; . \ � _ � � - ��-�� -- - -- ;� i , '! ,, �I' �C---��` I - '"-h-^ ��-'�.�^ i ��_ -- � '�, i �.� _�_ = BH-2 ( i I ! � i �i ii - L�� 6' I i - –f – - – –la 1 –� �:I,r_ � �i �'�� .1� � I I � BN-4� � Ty � � � � �: . . , . 1 . . ` ` - �� I,r � � I � � � , �x� � ; , �{, i. � �; E: — — — — — — — � �, �� 4 -- �I I � � � � ' _ ' " � i -� L-�- � I I � � ' �; I* � � � � . i; , � : _ � � w�- � --�--"� r II �' � � ' _'_'_ _ _ Y � ' i r -'-. �--' ,.J 7 - �� � I, t �� � � I � � � � � � T i i , � - ,� � �---�`�' r� ' �BH-3 ' t i @ ! !i y I 7 � �J I 1� I I I . (1 �.{� - _ .. '.k..-_- -I / _'-' -. y _' _. _._ _ ' '�f I __ " --F;- "�'� ; PRO ,OSE GARAGE -'� ., � � � �---.-r ; _�.m� - - - -- i hi �. �3 I r � � . _.� ��.� -:_ '�f i � �� �U' ' +�'� ] l:' — - -� ������ �, I `a � _� : ��- O � :( �� . 3 •i�' r; ���� I'i � ', � - -,_j{ � ; i V Q �--� � � _ F; � � � �� : �;! ' � � `- � t�� ~ I , � t£ ,1 – – �� – �� - - –� �\ ~ t � � �� ; : � ,1� . w , �� -- ~ `- � �- j �I� I�-- _. _' � �� Z �I�� !;�� i ' �' � .� _� � i i j � o , �ry� � ' r�� ` ~ z � � '�+ �, � ' � , N i A -� ; � _ — , 'f�.L.J.� : �.—�- '�. � � � I ! � � ~ � . � t,_`«A �i �{ � �i I i j � ,I � 1 � ���I O � � '�. \I �. � �. � �� s •U. �— , `_:��� i�BH-5 I I 1 BH-1 �i �--r'i n i` . � ' � �� �' i -'�I � � — � — — � �� ����.� ` J' '.i L :�' —"� _{ —._--��—�� . �_'_.•p7.. .. .�. �•--I'�,—�_�,.:I _ I _ � I i .�� I �� �=" '. �..�.t . r r-..... � ; . ',� � ^ _ l LL+ �, ;� �� r—'=—�. . ; ; .. I . ; ' �. 1 - 1-; `�., ; 1 :�.- �.-_- � � - � ,rr_ -- �- � `--1-t-�- �`�'�'---^— .,'�r�< �--`-=1-- ?..s �-'� �. _ :.-�- r: _ � 1 '' I IY i )u-� �aw9��; � �.,� �. ,-4 5..�-t 3 ._i;.i- �..:.. r . � I t �__i.J .. --���-i+� �, - .�y_�rL�e �----'�`�'i ���-L�_� , i � i t-_ - __ ` .- _���___ � � i ' ` , 't---�----Q'. � _-+-----�----Ft� _ ' I I I L_ - -__-_ —_f—________ ._ '___ �`��� I � �T � � � � — �- — .t'' �-" - BURNEi7 AVENUE �.� ` �' ; � ! � � i �; . �;�_--`- 1� . - — --�`;�g �"' -- � � ii � �� _ : < �... I � � i , i i ,>� ,�� _ � � '_'.�—. ��. '�. . . . . . � +... .�._�� L,�.,i�� � �':^!'."� -- T � ' � � LEGEND i OBH_1 0 2o ao BORING LOCATION FEET 1 F!GURE � SITE PLAN S�URCE:HASE PROVIDED BY lMN ARCHITECTS,8/13/01. RENTON PARKING GARAGE�'WA � bc:ark�K:lPro�ects120011013,�79��0��,6�.aW9;9-z�-,�ax�_ae5ar:. Golder Associates Unified Soii Classitication System Component Definitions by Gradation soil C4oss�fication Criteria for 0.ssigning Groua Symbols ond Names Generofized Component Size Range Group Descriptions Bouieers ADo�e 72 in. OnRSE-GRNNFD SOILS GRAvE15 CLEAN GRI�VELS Gw weli-gratlea Grwelt wore than SOS MOff than SOS o( Leas then SS finaa Cocblsa 3 in. to 12 in. I reta7ned on coane trection CP Poorly-grede0 qraveia Na 200 aieve rNa�ned on Gra.�d 3 in. to No. a (s.76mm) No. 4 Si�v� ravel and nk GRAvEt,S wliFt FiN6 GM y��� Coene grovei 3 in. to 3/� i�. More Uon 72S finea r�� �d by Fme qreve: 3/4 in. to No. 4 {t.76mm} � MiYturn Sand No. 4 (�.76mm) to No. 200 (0.074mm) S�rtDS CIE�w SwDS Sw wen-qreded Sonaa SOx or mo�e of Wa 1l+on SS fmo Coane sand No. a (a.76mm) to !b. t0 (2.Omm) toarae froetion SP Pporiy-yroded $anEa Medium sona No. 10 (2.Omm) to No. 40 (0 aQmm} poases No. 4 Siex SnNJS 1NTH flNES 5�1 SorW ond Sut 1fi.turea Fine aanA No, s0 (0.42mm) to No. 200 (O.C7�mm) Mon thon 12i fnea 5Jt on6 Cloy SmoNer thon No. 200 (0.074mm) SC Sand ond Cby 1fi�tures flNE-GRA7NED SOILS SILTS ANO CUYS Cl Lo.-p�Osticity Cbya SOS or more yann LiCu�d limit 1NpRGANIC 7+e Ns. 2D0 s�e�e ku Vron SD Non-prostK ontl l.o.- "` P�°�°"r �"� Samples Non-poaue ona Lo.- ORGANK OL �=K'h'�anic Cwys Non-ptastic onC La.- SS SPT Sompler (2.0' OD) o�oriicity Orqorvc S�tta HD Neovy Duty SpGt Spoon SiLTS AND C.AYS ��� CM Hign-piasticily qoys Sh SneiDy TuDe L'puid fmut ? alc�v Sampkr qreater tMn SO YH itiqn-plmtitity SiH� B Bu1k liigh—plmLtRy ORCANIC OH �9on�c C.op C Corea Hign—piosticRy Oryanic Silt� Unkaa ottienise noteG, dr'rve semp�.es I HIGMLY ORGlwiC SOILS Prim¢rily orqonic mottcr, dark �, eaor, c�a otivcnceC ritn it0 Ia. nommer ritn I orqenic oEor P' Peal JO in. Orop. � � Relative Density or Consistency Laboratory Tests Utilizinp Standard Penetration Test Values Tes; Oes:gna;:on Cohesionless Soils�0� Cohesive Soils ��� No�amrc (t) Denaity 0 ��� ��� Relative (�� Undreined (d? Groin S�za G Density N, Diown/R Densdy Ccnsistency N, blors/tt. Sheer Strength rometn N ��) �PS�) � AtterDerg Lim�ta (1) ', I Very �oox 0 to ♦ 0 - 75 Very aofl 0 to 2 <250 ConsoGdetion C loox 4 W 10 1S - 35 Sott 2 W ♦ 250-500 Unconfined U Compact 10 to JD 35 - 65 �mm 4 to E 500-t000 Uu Tria. uu �, Denae 30 to 50 6S - ES StHf 8 to 15 1p00-2000 CU Triaa CU I � vary 'Jena� o.er 60 >QS Wry StiH 15 to JO 2900-4000 CD Triax CD i Mortl o�er JO >4600 Permeo0itty P (a) Saih eonsistinq of grove!. sanC. ond filt, either seporptely p in combination, possesimg ne etioracteriatin (7) uoisture and Atteroesg Limits ot plostici!y, ond eahibiting O�ained Dehovia. D�otteE on loq. � � (D} So'ib poaeaainy Me choracterirtia of plesticity. and edii0itinq untlroined pMoriw. (e) Rcier te te� of �STY 0 75D6-8� for a Asfnrtion o� N; i+ normeny co�wraaee eones�onk»swli Qalative Dmaity tertna orc boxE on N wlwa eomcteC for o•erb�rden presauru. (d) una.o��a �n�,.�m�ycn - i/2 ��o+�ra»a eomas�on svs�qtn. Silt end Ciay DeSCriptions � Tyoicol Unified i Description Designotion Dascriptive Terminolofly Denotinp Component Proporttons sn w� c�a�-v�a.�) � noy.y s�ic ct-M� (a. oa�c�c��y) Deseriptive Terms Ronge of �ropoRion �ity Cioy CL cwy cr+ TtOCf 0—SA. PlaatiC Silt 11H ' so�rne o.�aJ.e+ive�O� li-3oz orye�fe soib oL. a+. Pt MO 30—SOS (o) Us� GravNy. sonay « Sitty o: avD�ovriat� � � ' - ��° Golder Associates ; � Figure SOIL CLASSIFICATION/LEGEND ; � ' �:a-,ow�.oRM sn RECORD OF BOREHOLE B-1 sHEET,ar z PROJECT: City of Renton Garage DRILLING METHOD: 4'HSA DATUM: Local ELEVATION: 25 PROJECT NUMBER: 013-1579 DRILLING DATE: 08/16f2001 AZIMUTH: N/A INCLINATION: -90 LOCATION: Northeast comer of site DRILI RIG: 6-59 COORDINATES: not surve d � SOIL PROFI�E SAMPLES PENETRATION RESISTANCE = BI.OWSIR■ W NOTES �-, � N = ELEV. LL w BLOWS Q �o x ao ao WqTE�LEVELS � p� � DESCRIPTION � �� DePTH � r}- P�6 in N W WATER CONTEWT(PERCENT) GRAPHIC p c� fl 2 iao w namrner � �'`'. Wi m . ( � 70 inch aroD � 0.0-0.1 0.1 � � A h I Cement seal '� �_ Q S�2 5 antl Busn Ei�! i=! mount _� :6c Road base fill . .. 22.5 monument %ii; ii�: ^. :�: 2.5-40 ----- -- - — — 2a � � Compact,Pale due 58 6/2 moderate olive — t Sg �7.tg.�2 3p �=� brown SY 4/4,massive gravelly SAND with 2t� 1.5 * sift m�stLl)�SP-SML____J� 4.0 4.0-23.0 I 5 CompaG fignt dive grey interbedded �°�o grevelly SAND to SANOY grevels,moist �� p: � subrouMed to rounded(FIUVIAL .Q ALLWIUM)(SP-GP) � o ° Gravei 7one�5-6' C� � � ' 2 55 a-�0.16 26 �=4 � o�0 1.5 � o D, 1 I � �� � � � o�o I ' � O� i o ao � SP.GA p .p� 3 SS 11-72-9 21 1.5 I i � ° � I � � is °�° I I � Grave�Zone o D' ' I I o Q° � c � � � � " � o D , , ` ��' � 4 SS �� 8-8-7 )5 1.5 ' � < �a°a� � � � a i o 3� � I � 20 p Q � e �o��° � ! � � Bentontle OD. � chipsw�th 1' PVC 7ipe I � _ o a 2A �-5 Heaving Sanq lone(t�22 5' ___ _ 23.0 5 � SS 9-1&12 30 I t5 I � 23.0-31.0 °lZe� I Dense,mo0erate yelbw t0yr 5l4 tlar t � I yellow brown 10 YR 42 interbeaded fne to p Q. I i 25 medi�m SAND wiN gravelly coarse to �.Q.�� I � medium SAND mnes,wet (FWVIAL a ALLUVIUM)(SP-GP) ?��. ( Da ' � SP-GP .Q °�° �_5 6 SS 1522-22 � 44 �5 � oa I ■ ' ; I so - �------ -- --- -- —�---o�n i , D D -6A � � 31.0-34.5 p 3t.0 I I � Dense,moderate,Yeibw brown tOYR 5/4 o f\o { N SANDY GRAVEL subroundeC,wet v I � � (FLWIALALLWIUM)(GP) �p o O � � 7 SS � 17-20-25 45 �=5 �o` 1.5 ■ Q o 3 - -- - -- -- -- — -9S i x' � 34.5-42.5 34.5 � � O CompaC moderele yellow brown 10VR I i � S/4 interDedded,greve!ly coarse to fine � I � SAND, trece ta liltle sd!,wet(FLWIAL i � � ALLWIUM)(SP-SM) � SP-SM I �7 � t-F � B I SS 1579-74 � 33 �5 _ ! 0 � �}_ I � ��■ � C � ° aa i � � � L continued on neM a i i W 1 in to 5 ft LOGGED: GJK ? DRILLING CONTRACTOR: Holt CHECKED: DPF yT-Golder �, DRILLER: Ray DATE: 08/21/2001 ASSOCiTt�s mi , � ' RECORD OF BOREHOLE B-1 SHEET2ot 2 PROJECT: City of Renton Garage DRILLING METHOD: 4'HSA DATUM: Local ELEVATION: 25 � PROJECT NUMBER: 013-1579 DRILLING DATE: 08/16/2001 AZIMUTH: WA INCLINATION: -90 LOCATION: Northeast comer of site DRILL RIG: &59 COORDINATES: not surve ed ' � SOIL PROFILE SAMPLES PENETRA7ION RESIS7ANCE O � � BLOWS/fl■ NOTES �-- � y � EIEV. W W BLOWS Q �o zo 30 �o WATER LEVELS o v Z OESCRIPTION y Q p � a per 6 in N V WATER CONTENT(PERCENT) GRAPHIC �; � � � DEnTH Z � u0thnammer � W.� eW 'w: m ( � 3o rcrl�aov 40 34.5-42.5 nn Compact,moderate yeNow brovm tOYR '1 I 5/4 interbetlded.92velVycoarse W fine SP-SM �� SAND, trace to little si�,wet(FLUVIAL ALLUVIUM){SP-SM)(Continuad) .��5 42.5-43.5 ------- SP 42.5 �—p � Loose,medium gray(NS),massive,fine to _ -18.5 9 SS 9-3-4 7 i SAND we�FlUVIA1 ALLUVIU�(,�P�� - 43.5 �'$ ■ 43.5-52.5 � Very Dense,Moderate yellow 5rown ard 45 Q medium gray interbedded fine to coarse 20�24 Sil�ca y SAND trace gravel,wrth small fine sand sand filter = lenses,wet(Ouvial aAwiumj(SP) ' �S pack and � •� � sbtted PVC �{ P PCe ���{. . � ; 10 SS 19-43�6 �� 1.5 I. ' » � 1 � 50 I � .1 . I I -2'.5 --- Bonng completed at 52.5 R.--- --— 52.5 �_5 ( ' 11 SS 19-25-29 '`� t.5 I "• � 55 - I i ( I , � � I 50 I ' I � 65 � I I I i TO I � � N a o �U � 3 �� �s ! � I � a � � � � � � BO I j � I � � �' 1 in to 5 ft LOGGED: GJK - � y DRILLING CONTRACTOR: Holt � ~Golder T CHECKED: DPF � DRILL�R: Ray DATE: OSI21/2001 ASSOCic1iC'S � � RECORD OF BOREHOLE B-2 SHEET 1 oi 2 PROJECT: City of Renton Garage DRILLING METHOD: 4'HSA �ATUM: local ELEVATION: 25 PROJECT NUMBER: 013-1579 DRILLING DATE: 08I16/20�1 AZIMUTH: N/A INCLINATION: -90 LOCATION: Southwest Corner of Site DRILL RIG: &59 COORDINATES: not surve ed � SOIL PROFILE SAMPLES PENeTRATION RESiSTANCE BLOWS 1 ft! r�-. W � ELEV. � '' io m �o '0 NOTES LL� � V a� wm � BLOWS � a WATER LEVELS p Z DESCRIPTION y Q O � y per 6 in N � WATER CONTENT(PERCENT) � �� ~ V w. W' _ p c: CEft)H Z tao m namme. z w m JO nch droo � 1 0.0-0.1 0.1 '� t Psohalt ! 0.1-2.0 `' Road base fill p�p �' 2.0-5.0 —— —— ———— — 2.0 I Compau,bose,moderete brown SyrS�'6 tn pale yelbw brown 10YR&+2 interbetlded t SS 0-1-1 2 �=5 `, sitty fine to medium SAND wdh sandier S� 1.5 � 1j lenses with iron staining and moMing ly (FILL)(SM1 ————— --— 20.0 U 5 - GravelZone z s.o_ss.o a'fl Compact.moderale yelfow broHm 10 YR �_. . : 514,interbeddeE gravelly fine[o coarse j � SANDS and SANDY GRAVEIS sub �. angular to sub rounded,wet(FLWIAL Q �_c , ALLW�UM)(SP/GP) 2 SS 2-fr3 9 t.5 ; ,o ° � I � I a . o ; � a � � � ` I 1-5 Q;: 3 I SS I 6•'3-12 25 1.5 � Q 1 I ■ ,s ; � � � ` j - � � � I I � -'�:0:': � . � Q i o � 4 SS 7-it-t3 � 24 ' .,.5 ' H � • S � 20 0 � , Q a �_ , � sPc Q: ' � � `Q 5 � SS 12-t2•17 23 iS � `` I ■ o:.� I 25 Gravel Zone @ 2S2T a ' � � O o:.� ' �:`. 6 SS � 7•12•t3 25 7.5 , i ■ �' i 1 30 � °: � Q a I I � Q. � °f Gravel Zone Q 3235 � I � � o. � 7 SS 14-22-50/5.5 50/5.5j�' < ! 3 I i Q.:. I � 35 � Q c: � I � I o. : I ^ � � i p; . j � � Q 8 SS 12-25-23 � 48 i� I c . '14.0 1 1.� � ■ c _ _ 39.0 I C P-GM i ° ao i o, �9 u- L cononued oa ne»Daoe ' I I � LL 1 in to 5 ft LOGGED: GJK ^ I = DRILLING CONTRACTOR: Holt CHECKED: DPF � � ''Golder � DRILLER: Ray D:,TE OB'21r2QQ' ASSOCiTi�s � RECORD OF BOREHOLE B-2 SHEET 2 of 2 PROJECT: City of Renton Garage DRILIING METHOD: 4"NSA DATUM: Locai ELEVATION: 25 PROJECT NUMBER: 013-1579 DRILLING DATE: OB/t6/2001 AZIMUTH: N/A INCLINATION: -90 LOCATION: Southwest Camer of Site DRILL RIG: 8-59 COORDINATES: not surve d �-' SOIL PROFILE SAMPLES PENETRATION RESISTANCE = BlOW51 ft■ � �— � � ELEV. ¢ � to 2o ao ao NOTES a.t y =� w W BLOWS Q WATERLEVELS o v Z DESCRIPTION y a O � a per 6 in N WATER CONTENT(PERCENT) � �� 7 � V � � DEryTH Z iaa ie�m,br ¢ W.%—��'W� m � � ao��a�oo a0 39.0-a5.o pense,moderate ye:low hrown 101R42, a I massive,SANDY GRAVEL trace to IitUe sitt(GP-GM)(Continued) o GP-GM o �_5 Q 9 SS 23-27-19 46 1.5 � O N 2 45 — —.——__— _� '20.0 � 45.0-50.0 � a5.0 `v Dense,light hrown 5YR5/6,interbe0ded �.� ``� SANDY GRAVEL with Gravely fine to �a._�.� medium SAND,suh anguWr to sub rounded,wet(FLUVIAL ALLWIUM) :'. :: (GPlSP) SPG �` •Q. 10 SS 13-8-31 39 �=5 � i 1.5 o C.J � — — —— —— -25.0 I iBoring completed at 50.0 R. SOA I '� I I _ I + � 55 I I � 60 � 1 I 1 � : 1 65 i � I . ( 1 ,o � i I � I � I � � _N I� �i 3 I � c 75 J i� ' � I I I � � o � � � � � BO � � 1 in to 5 ft LOGGED: GJK ° DRILLING CONTRACTOR: Holt CHcCKED: DPF i�' �GO1d�I i W :�SSOCic'�[C'S � � DRILLER: Ray DATE: 08121/2001 a � — — RECORD OF BOREHOLE B-3 SHEEi 1 of 2 FROJECT: City of Renton Garage DRILLING METHOD: 4'HSA DATUM: Local ELEVATION: 25 PROJECT NUMBER: 013-1579 DRILLING DATE: 08/17/2001 AZIMUTH: WA INCLINATION: -90 LOCATION� Center of Site ORI�L RIG: 8-59 COORDINATES: not surve d � SOIL PROFlLE SAMPLES PEN£TRATION RESISTANCE O F i � BLOWS/fl■ w � ELEV. � � to zo w �o NOTES o� � � ' a� wm a BLOWS Q WA'ER LEVELS � Z DESCRIPTION y Q G � � per 6 in N WATER CONTENT(PERCENT) � C.� � F- U ' m c9 �Eft�H z uo m nammar z W. W N'� JO inc�tlrop � D.0-0.1 0.1 � A5 hal 0.1-2.0 � Road base fiA 23 Q z.o-a.o---- ----- — z.o Loose,dark 9ray(N6)interbed fine SAND � with charcoal Ca3.5'becoming moderate S� 1 SS 2-2-3 , 5 0_5 brown fine sand with sil[,moest(FlLL)(SM) 21 p ].5 � a.o-iz.s-------- — a.o � 5 Very loose grey(NS}dark yelbw aarge 10YR616 moriled,interbedded fine to medium SAND wilh SAND trace to IitUe SILT iron staining and charcoal Dresenl (FII.L)(SP-SM) � � SP-SM : 2 SS 1-1-1 2 1.5 i ■ i I � ,,� 10 + I Gravel zone�t0.S1Y �: �, 12.5 � 125-14.0 — - --- - --- — -� -- 12.5 j � CompaM dark ye!low hrown 70YR 4,'2, GP o�° 3 SS f �1•13-13 yg , 0_5 � � massive,SAN�Y GRAVEL sub angular to ��p 'S � rcunded,mast(FLUVIAL ALLWIUM) -- �y Q G? p� - � t5 14.0 25.0 � � � �, Compact,Mode2te yellowish brown fine to O� � coarse SAND.trace to fitt�e su;and gravel, wet(FIUVIAL ALLUVIUM)(S?) , �o + ! � 0 � _ �Q i � O� i ! 4 SS 4-5-7 ' 12 1=9 I < � o Qa f.5 � z� � sP Op I 1 I ° � � � � ��� � o D i j Q I �a o � j o O 5 SS ' 3-9-12 21 � 7.� ! O � I 25 - —— - — — — — ° �A I � 25.0•480 � 25.0 ! Compact,daAc yetlowish brown 1CYR 5!4 0!10� � betlCed sandy GRAVEL wrth Gravelty i hL� � � �� SC'A�N,O trate siN.,wel(FLUVIAL ALLUVIUM) I rOQ O i I � 6 I �o � 6 SS t413-16 29 �; �.5 I Q I 30 0�a ; O° � � � � ' o p� � � N o> GP Po O o Q 7 SS 72-23-47 >50 �=� � F Q O^0 �... » �" � 35 Q D I ' ; � q i � o p� a o p � i � C � o 00 � O1 8 SS 5-8-12 2G � � pO� 7.5 l s i I � 0 4� i o r\° � � L con;iwed on nexl a e � 1 in to 5 ft LOGGED: GJK `� ° DRILUNG CONTRACTOR: Holc CHECKED: DPF . �Golder R o DRILLER: Ray DATE: 08/21/2001 �L��SSOC1c1tC'S i � j RECORD OF BOREHOLE B-3 sHEErzor z PROJECT: City of Renton Ga2ge ORILLING METHOD: 4"HSA DATUM: Local ELEVATION: 25 � PROJECT NUMBER: 013-1579 DRILLING DATE: OS71712001 AZIMUTH: N!A INCLINATION: -90 LOCATION: Center of Site DRILL RIG: 8-59 COORDINATES: not surve ed n SOIL PROFILE SAMPLES PENETRATION RESISTANCE = BLOWS/R■ �-, W v ELEV. � F' �� � � �� NOTES W� � U �� wm a BLOWS ¢ WATER LEVELS I o Z OESCRIPTION y Q O � per 6 in N � WATER CONTENT(PERCENT) 7 K� � � U C � DEkTH Z t�O�Ehemmer � W. w W� m � � 30 mU MOP � 25.0•48.0 � - Compact,dark yellowish Orown iCYR 574 a�� � bedded sandy GRAVEL with Gravetly SAND trace silt,wel(FLWIAL ALLUVIUM) o � (GP)(ContrnuedJ Q o Q° 1_5 Q Op 9 SS 12•14-9 23 1.5 � = GP 45 � o Q° O e oO D a Qo 1 � _ o �J -23.0 1-5 48.0-50.D - - ————— — — 48.0 10 SS 17-�320 39 1.5 Dense,motle2te yellow brown 10YR 5.�4, P�M o � massive,SANDY GRAVEL,sub rounded to sobangular hace to liti;e silt,wet o _p5.0 � 50 _(�WIAL�LWIUM)LPSzML__, — 50.0 Bormg compleled at 50.0 R. � � �; 55 I ' i 1 60 65 I 70 0 � I � O � I Q � 75 I - � 1 � a 1 ` ` 1 � ! � � � I I o I C I I � � 80 I � i � w 1 in to 5 ft LOGGED: GJK = DRILLING CONTRACTOR: Hon CHECKED: DPF �s Golder o DRILLER: Ray DATE: 08l21/20a1 ASSOCic`�t�s m RECORD OF BOREHOLE BH-4 SHEET 1 of 2 PROJECT: City of Renton Garage DRILLING METHOD: 4"HSA DATUM: Locai ELEVATION: 25 PROJECT NUMBER: 013-1579 DRILLING DATE: 09/0512001 AZIMUTH: WA INCLINATION: -9Q LOCATION: Northwest Comer of Site DRILL RIG: B-59 COORDINATES: not surve � � SOIL PROfILE SMIPLES PENETRATION RESISTANCE � BLOW51 R■ y "� � E�EV. � � �o � 30 w NOTES �� � U a� � wm a BLOWS Q WATER LEVEL5 O Z DESCRIPTION y Q p � � per 6 in N i v WATER CONTENT(PERCEN7J 7 �– �' W� W � V, DE�TH Z t40 W trmmer � W O m I ( y 30 vcn Erop 0 nl O.Q-0.1 �� 0.1 1 As^hatt 1' O.i-10.0 Very Ixse ro compacl,reddish bown (t0YR4;3) massiveSiITYSANDIrace little 6ne gravel moist(fll)(SM) S-1 SPT ;J18' 3li8' 0 3 1.5 5 I SM S-2 SPT 2/�8- 2178' �—� I LS i 5-3 SPT 3�i-6 72 �=2 � 1.5 � 10 15.0 10.0-17.0 10.0 _oose to Compact,moderate aive brown .��.i 5-0 SPT 2-5-7 �� 15 I (SY4i41 well gradded SAND littk fine . � I gravel trace SILT moist,becomming we7� � 17' SP .. S-5 SPT 4�-3 � 1.5 I , � � ■, I _ 'S I I � � 8.0 ------ ---- — � �` 17.C-22.0 `f 17.0 I � i Comoact reddish brown f SY 4f1)sandy o Qo��, � � GRAVEL.wet(GP)(Fhrvial ALLUVIUM) S-6 SP7 �5-t0 15 i �:5 � a I GP ��� I • -1 N I � 20 °�o v I C ' OO�� � b j � 3.0 J • 22.0-27.5 — ——— --— N 22.0 I Compaa to dense,brown sitty undedy I• • GRAVEL.wet(GWj(FLWIAL ALLWIUM) � .,� S-7 SPT I 22-18-t t I 29 �5 I r ' ' � ' ~ 25 � GW ri,�J I � r� �l I �:`� I � J � 2�.0•sz.s �- '� -z.s � �� Compaci to very at depth inlerbedded o o I � . brown(10VR 3�1.Santly Garavel $-g SPT � 5-7-7 14 �5 ` � � I �,ntebeatleC wrth with dense sanay — o �i � � I __g;�el�vet�P�SA4�W111 — C i 30 °�,� I I � `o � � o O a � � � 0� � � �' o D � �P b� S-9 SPT i 17-9-11 20 j �-5 ^j a I o�o I � � c 35 � � �� � f � � o,� � , . � 0 a � o D � � � ' ^ - I � � °! ��'o $-10�SPT 11-t7-19 36 �—� � o OD �5 I ■ C � I I I C Q 40 I o n° + � � � L conlinued on ned a ' � � 1 in to 5 ft LOGGED: MDH ryl DRILLlNGCONTRACTOR: Hoit CHECKED: DPF ��. =GOld�t ' �� DRI�LER: John DATE: 09/20l2001 :�SSOCic'�t�S I � RECORD OF BOREHOLE BH-4 SHEET2of 2 PROJECT: City of Renton Garage DRILLING METHOD: 4"HSA DATUM: Locat ELEVATION: 25 PROJECT NUMBER: 013-1579 DRILLING DATE: 69/05l200� AZIMUTH: NJA INCLINATION: -90 LOCATION: Northwest Comer of Site DRILL RIG: B-59 COORDINATES: not surve ed � SOIL PROFILE SAI�IPLES PENETRATICN RESISTANCE i BLOWSfR■ � a� � V ELEV. � F �� � � w NOTcS W„ �n =� w w BLOWS ¢ WATER LEVEIS 0 Z DESCRIPTION y Q O � y per 6 in N WATcR CONTENT(PERCENT) � � �� � r- c� C V, DEP�TH z taolLhammer � '�'. w 'N� 9 ( � 30 nch O�op 40 27.0-52.5 � Compact lo very at depN inferbedded o�a brown(10YR 3J3),Sandy Garevel intebedded with vnN dense sandy O � grevel,wel,(GP)(ALLUVIUM)(CoMinued) Q ' °�� 1_Q � OD S-11 SPT 5-5-15 24 1.5 ¢ � 1 � x 45 a o Qo O Q GP oO D � 0�o o D O ,po � S12 SPT 3t-33-t9 >50 �-5 O� 1.5 » 50 �Qo * O � � __ _ — — __ __ _ _ � '27.5 � Boring completed at 52.5 R ' 52.5 � S-13 SPT 1'r22•19 1 4� 15 I 55 ' � � � i � � I ti 60 ' � � ! I I 65 I i � i 70 � � I 0 io a rn d ( � 3 o �' c� � -, a � I i � � i ' c �I 80 � 1 � i � I � � W 1 in to 5 fl LOGGED: MDH ° DRILLING CONTRACTOR: Holt CHECKED: DPF �' �Golder m� DRILLER: John DATE: 09/20/20C1 :�SSOCiTt�S � RECORD OF BOREHOLE BH-5 SHEET 1 of 2 OJECT: City of Renton Garage DRILLING METHOD: 4"HSA DATUh1: Local ELEVATION: 25 OJECT NUMBER: 013-1579 DRILLING DATE: 0910512601 AZIMUTH: N!A INCLINATION: -90 OCATION: 5otheast Cmer of Site DRILL RIG: &59 COORDINATES: not surve ed - � SOIL PROfILE SAMPLES PENETRA710N RESISTANCE � BIOWSlft■ � - � ELEV. � � io zo ao �o NOTES � m -� w W BLOWS Q WATER LEVELS Z DESCRIPTION y Q O � y per 6 in N I WATER CONTENT(PERCENT) 7 �J � ~ U W�I E/ iW, � DE TH Z ,�o�e romme. � m � �ft� 70 nr1�Orov 0.0-0.2 0.2 A h It 2' o Qo ' I ! 0.2-10.0 ' Compact.Dark brvwn Wive(tOYR 3!4), o p � _ nonstartified,gravely SAND,i�ace to I;itUe Q silt.moist(GP)(Fil) - �p si sP-r aa-a e °5 . f � 00 I o O S2 SPT 613-15 yg 0_5 O 1.5 � o Qp o � 0-5 Qo S-3 SPT 6-7013 23 1.5 ■ o � o --- - - - - -- — o D is.o - io.—o-zzs � �o.o i - Compact to dense,yelbw 6rrnm ItOYR �.. ��' S�d SPT 1�-3538 >5C � �=5 I 4/3),sandy g�avel to graveiy SAND.vace a � ��5 » � sil,moist.wetQ17'subangularto suDrcur.ded(SP!GP)(FLWIAL � � . ALLUVIUAt; �O . � i Q S-5 SP' 11-73•�6 29 �:5 I ' � I 5 - ( Q I ( �� SP/GP� ':� 1 l �` - _= I a , I ' j i �` f � � � 0:.:�� S�b �SPT 5-8-15 i 23 �:� �■ � . -�� Q _Q. � � � �, � I `r o L I � � � a ' � � � 2.5 22.5-23.0 -- - —-- -- — - MUCL 2.0 ' Verv Sett,grey(NSlinterbedded sandv � 23.D ST SPT 2118' 21+8' �—� ^ � '�� SILT,wkh s�iry day, wet(MUCL)(Fluvial 1'S � �� Alluvium;___.__ ____._ ___ _ ,��<' 23.0-32.5 I . Dense,Grey(5Y 413)inierbeCtled fine silry I -i ' fine SAND,with yellow orarge brown silty � r; Sand wilh IitUe g2vel,wet(SM)(Flwial I J _ - {° Alluvium) ! - � r: I � SM S-8 SPT I 32513 38 � i.5 i - 1� � � �-3� _ _ _ �.� � �� � --_.t` � - — - _ _ _ — '7S � ='_ 32.5-52.5 9..:-..� 32.5 j I � I ,' Dense.Brown(1CYR 32)intarbedded I,•.• S9 SPT 9-1St5 30 �5 I � `�. '� gravels wilh sanC,wet(SW-GW) ,�.�i� , _ r i �..� c1 s� � .5•:• ' ` I =� �w� �::�: �� ����� � � .', � � _ � :•11.� IS•10 SPT' 612-22 34 ( ;'.5 I ■ � a,`!• I �' .0.'� I I �-=C I L .^.onunued an nea�t ae i - t in to 5 ft LOGGED: MDH -_ _ GRILLING C�NTRACTOR: Holl CHECKED: DPF �Golder DRI�LER: John GATE: 09/29/2001 ���SSOCiTt�S RECORD OF BOREHOLE BH-5 SHEET2of 2 PROJECT: City of Renton Garage DRILLING METHOD: 4"HSA DATUM: Local ELEVATION: 25 PROJECT NUMBER: 013-1579 DRILLING DATE 09/OSl2001 AZIMUTH: N!A INCLINATION: -90 LOCATION: Sotheast Cmer of Site DRILL RIG: 8-59 COORDINATES: not surve ed � SOIL PROFILE SAMPLES PENETRATION RESISTANCE � BLOW S 1 R■ � �-� W � ELEV. � � �o io 3o ao NOTES W� � rn =� w W BLOWS Q WATER LEVELS 0 Z DESCRIPTION N Q O � T per 6 in N WATER CONTENT(PERCEM) � K'� 7 F V Wr W, � � DEPTH Z �+0��� � w m �ft) 3o incn aop 40 32.5-52.5 Dense.Brovm(tOYR 3Q1 interbedded •�•� � gravels wit�sand,wet(SW-GW} ;Q;:Q � (Continue� .tY. '�:4: S-„ 5� �-,2-z, � 1=0 . ,_5 . , N '♦• S �a�•� 45 � �'�•,' � 'O.' P W� '.�. .a..� .t�•. I ��.�. 1 5-12 SPT 78-2118 I 47 1 S . 1 � 50 •'y;� 'D.'.' � i �'�' -27.5 f I - — -Bonng comDleted al 52.5 R --—- — 52.5 , 5-13 i SPT 11-2&32 >50 �=5 i t.� » i I I 55 � � ! � -a 50 I , I � � � r` + � � ! • I 65 i ! ' � ' ( ( I I 70 I � � f � � < � , � � � '` ' ' � � � , � � , � a : , i , � � �� U 8� � w � � � 1 in to 5 k LOGGED: MDH ° DRILLING CONTRACTOR: Holt CHECKED: DPF ffy Golder � DRfI.LER: John DATE: 09120/2001 �SSOCiTt�S � x VII. Other Permits City building, utility and R/�4ti'permits are anticipated. � � ,I �i �I ��, �I � VIII. ESC Analysis and Design The site is less than one acre in size and therefore perimeter control is adequate. The site is flat and will require minor regarding to establish. Catch basin inserts, a construction entrance, and filter fabric fence are proposed. IX. Bond Quantities, Facility Summaries and Declaration of Covenant Bonds and a Dedaration of Covenant are not required for the City owned project. Detention facilities are not proposed. X. Operatians and I�laintenance Ivianual APPENDIX A 'v1AINTENANCE ST?.NDARDS FOR PRNATELY MAI?�TTr1I:�iED DRAINAGE FACILITIES NO. y3-WATER DUALITY FACILITIES (CONTINUEl7y D� Wetvaults Maintenance Defect Condition When Maintenance is Needed Results Expected When Component Maintenance is Performed Wetvautt Trash/Debris Trash and debris accumulated in vault,pipe or Trash and debris removed from Accumulation inleV outlet,(incfudes floatables and non- vault ;��atabies). Sediment Accumula0on Sediment accumulation in vault bottom that Remova!of sediment from vault. in Vault exceeds the depth of the sediment zone pius 6- inches. Damaged Pipes InieV ouUet piping damaged or broken and in Pipe repaired and,`or replaced. need of repair. Access Cover Cover cannot be opened or removed,especially Pipe repaired or repiaced to Damaged/Not Worfdng by one person. proper working specifications. Vault Structure Vautt Cracks widerthan 1/2-inch and any No cracks wider than t/4-inch at Damaged evidence of soil particles entering the structure the joint of the inleU outlei pi�e. through the cradcs,or maintenance/inspection Vault is determined to be personnef determines that the vault is not struc:urally sound. structuratly sound. Baffles Baffles corroding,cracking,warping and�or Repair or repiace baffles tc showing signs of failure 2s determined by specifica5ons. maintenance/inspection staff. Access Ladder Damage Ladder is corroded or deteriorated,not functioning l.adder replaced or repaired to properly,missing rungs,has cracks and/or specifications,and is safe to misaigned. use as determined by inspection perscnnel. 1998 Suriace Wacer Design Manual 9;ii98 A-13