Storm Drainage Analysis
Prepared By:
�
October 24, 2002
Revised: April 18, 2003
� � � ,
� � �
1144 EASTLAKE AVENUE E r 206.522.9510
suire 601 F 206.522.8344
� SEATTLE, WA 981OI WWW,PACLAND.CDM
Contact: joe Geiveft, Pf
� (mg3-stm.doc)
�s3o2O
Sam's Club #4835-00 Storm Drainage Analysis Renton, WA
, i ' � �
Section Page
ExecutiveSummary................................................................................•...............................2
Stormwater Drainage Report .................................................................................................2
1. Project Location ..........................................................................................................3
2. Project Overview ........................................................................................................4
a. Existing Condition
b. Discharge at Natural (Existing) Location
c. Soils Conditions
d. Wells, Septic Tanks and Fuel Tanks
e. Proposed Development
3. Conditions and Requirements Summary.......................................................................6
4. Off-Site Analysis..........................................................................................................7
a. Downstream Analysis
b. Upstream Analysis
5. Drainage Analysis .......................................................................................................9
a. Hydrologic Modeling Method
b. Sub-Basin Description
- c. Peak Runoff Control
d. Water Quality
e. Conveyance
f. 100-Year Flood/Overflow Condition
g. Existing Concrete Paved Ditch (Aqueduct) Replacement
6. Erosion Control .........................................................................................................13
7. Maintenance .............................................................................................................15
8. Covenants, Dedications, and Easements ....................................................................19
Technical Information Report (TIR) Worksheet....................................................................21
� Appendix A Figures................................................................................................24 •
�i1 Figure A1 — ALTA/ACSM Land Title Survey of the Property
Figure A2 — Site Plan
Figure A3 — Grading and Drainage Plan
Figure A4 — King County GIS Map
_ _ Figure A5 — SCS/USDA Soils Map
Figure A6 — Basin Map
Figure A7 — Offsite Basin Map
Appendix B Existing Site Hydrology Output DatalCalculations..............................30
Appendix C Developed Site Hydrology Output Data\Calculations.........................31
Developed Basin "A" — Biofiltration swale Design
Developed Basin "B" — Biofiltration swale Design
Developed Basin "C" — Biofiltration swale Design
Developed Basin "D" — Biofiltration swale Design
- Developed Basin "Roof" — Detention Pipe
Existing Concrete Paved Ditch (Aqueduct) Replacement Calculations
', Appendix D Erosion Control Calculations ..............................................................44
Appendix E Developed Conveyance (Backwater) Calculations...............................48
APPendix F Geotechnical Report.........................................................................110
, PACLAND Project� 1999010.008 Page 1
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
' I • I I
.s- � i ,� ; I
�t- '�y m.'? N �/7i ���__Qty�1'. i� , ; e�—�� ,i
��Vr�� �
i �-� � i
�"�`'�—_-- -mi �" � �1 , a G �
�'"• ay' �--...` 7, � �t ''
� + �cc �� '; I � :
i;�k1 �r�, � ��`i ; C!J � ! ����� —�; f i
��- � �`�- � ; , � , ; , ' ---�, ; :�
�'4",:-�a�� �i9�`,yx��`i ,��.,� i � � � i � � � i ��� �' ` �'
���'� i!�4 �`��'—'� �t�� � � ✓. �a�l� ; � ' (
-�� f LfJ�� '�� ; r � - �a �� � I �
� � � � � ' �� � f
� ,;t r , ' j i � � `�-��.��
- �'—=�_ �, -�2��uf- � Gx i�
r,� YQ � i �
_ � �r i, ;' �
�� , �
� � '�.` � iCeR
! ,���fJJ .. � � 1 .. I . '�T
� ' �ti
�. �;��.�r-- - r`, �' i
� � _ '�_-=` L—i
r �__ � !
� =_�--' �i�, Proposed Retail Site � �
� ,� �'
i �_�r Y � � ;;r �
- `-{����,� s� �` � f° �
_`1 � ' r
� � `��.�=��-" '� �_-'� _ .
� !, Rerrton
��� �� ---,_ -
� ; �13; 5'�, - -
. �
� �. ,
{��{ ���jr{ •� �.'�'� - -- - � ' -
�'�v-� -- �; t'�'__s�� - - " - y,�`4 � �
- _-- _
_— -- n� _ ._ , ---- - ��
_ _ _ -=-�- ,�� �att� �� ` � � � � � j 'y4 - �
.��� j�` i � � � 1 . � � . � �
;` ;��- �?�:� � 3 � � ! :� : ; � �� �t' ,
�
1i,.�-��� ��— �� �..�� t--,� -� � �� ;
��.1L--�F'3`.{�—.7�--.- W '� i y � � f,U�� t� ,f f '.
i �' �
SS i f_ 't� S4 . �Fti
� s _ � �Stik 5 t rfr`���, �,1
( �'i 3 ' �` ' R s .
II� � pl� S � � � �� `�� � ��ti tt`'
� '�F i C9�t ��� '� �1 S ' ��1 .� . '�``. �1
� ,'3 <� 1 t 5 1 t' .\
-�Xi: i i i�:��
i
i � i ' y,� i
� Ci1�� , ��. � ` � i� '��F' , ���� � �ti�`,t',
'�,'�� I ��+ ' ,��-� I 5t
j � , � ,y , 5�31 �S � i
� � � ' �( ; � ;� `� ��� ��� `� i
�� 3�� ! ��I ` � � � �� 1,,�; � 4
O 2000 Pofcrosoft Co .andior.its su liers.WI n hts.reserued'
Location: 901 South Grady Way (Southeast corner of South Grady Way and Talbot Road
South), Renton, WA 98055
Section/Township/Range: NW '/a Sec. 19, T.23N, R.5E of W.M.
Parcel/Tax Lot: 172305-9183, 202305-9007, 915460-0010, 202305-9008
Size: 16.0 acres
City, Counfy, State: City of Renton, King County, Washington
�
�
Governing Agency: City of Renton
Design Criferia: Modified 1990 King County Surface Water Design Manual (KC-SWDM)
' � PACLAND Project# 1999010.008 Page 3
Sam's Ciub#4835-00 Storm Drainage Analysis Renton, WA
' � •
Existing Conditions
The topographic survey indicates that the existing site presently has the demolished
foundation remains of two former PSE buildings, while the rest of the site is paved with
asphalt, gravel and concrete pavement with limited vegetative areas of grass/weeds. The
existing site has a slight 0.7 to 1.2% grade falling to the north and to the south of the site.
Storm runoff sheets across the property into scattered onsite catch basins where it is then
conveyed offsite into either the Grady Way or SR-515 (Talbot Road) public storm systems.
A small 1 acre patch of vegetated slope located on the east side of the site drains into a
concrete ditch that bypasses the site with off-site runoff from Renton Hill. In accordance
with the 1990 KC-SWDM, the condition of the site as it is will be used to calculate the
existing runoff condition. As listed in the attached geotechnical report and on the
SCS/USDA Soils Map, the soils on this site have been classified as SCS "D", this results in a
hydrologic curve number of 92 for the grass/weed areas as; these areas are represented in
the table below.
Table 2
Existing Conditions
Area Condition CN
9.83 AC Paved 98
2.42 AC Gravel 91
3 J4 AC G rass/Weeds 92
Discharge at Natural(Existin� Location
Stormwater presently leaves the site through a storm drains located on the northwest side
of the site into the Grady Way South public storm system and though a storm drain at the '
south corner of the site that outfalls into a 48" culvert under SR-515 (Talbot road). These
same two discharge points will be used in the site redevelopment to conveyance storm
runoff from the site. Please see the downstream analysis for more information.
� Soi/s Conditions
Zipper Zeman Associates, Inc. performed a detailed geotechnical study of the site to
determine the properties of the on-site surface and subsurface soils. This geotechnical
report titled "Subsurface Exploration and geotechnical Services Engineering Evaluation,
Proposed Retail development", dated December 6, 2002, project number J-1470 indicates
that surficial soils consist of topsoil of an average depth of varying depths present over
limited portions of the entire site, with the rest of the site being paved. These surface soils
are underlain by coal tailings fill with depths ranging of 4.5 to 12.5 feet situated on a soft
organic alluvium. The site surface soils are classified by The United States Departments of
Agriculture Soil Survey for King County, Washington, to be to be the urban complex (Ur)
(See attached Figures A5). In regards to hydrology, this soil complex is described by the
Natural Resources Conservation Service (NRCS) to be relatively impervious and hence has
a SCS Soil Hydrologic Group class of "D".
PACLAN D Project# 1999010.008 Page 4
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Wells, Septic Tanks and fuel Tanks
Based upon field reconnaissance and the environmental review, it appears that no fuel
tanks, wells or septic tanks are presently located on the property. Though it has been noted
in environmental reviews that a number of underground tanks did exist on the site, but
were removed during site remedial activities that occurred between 1987 and 1990, and
as a part of those actions, a number of monitoring wells presently exist on the site but will
be decommissioned in the near future. If at a later date any more tanks are discovered on
_ the property, they will be removed in accordance with all regulatory requirements, local,
state and federal.
Proposed Development
Project proposes to redevelop this site with a ± 135,000 square foot Sam's Club retail store
and a gas station with its associated paving, utilities, storm drainage and landscaping
improvements. This development will result in a decrease in impervious surfaces on the
site and will provide limited stormwater detention and additional stormwater treatment for
the runoff. The table below shows the break down of the proposed surface areas.
Table 3
Proposed Conditions
Area Condition CN
8.83 Paved 98
4.07 Irrigated Landscaping 92
� �� � 3.10 Rooftop 98
In the developed condition, storm runoff will sheet over the proposed asphalt paving to
strategically placed catch basins. The runoff from asphalt paving will then be conveyed
though storm drains to a oil/water separator and/or biofiltration swales for treatment before '
disposal of site. The site is further divided into five basins:
� Basin "Roof" is the roof area of the proposed retail building. Runoff from here will
receive detention in a 48" pipe before being separately conveyed, without
� treatment, to a discharge point on the west side of the site.
• Basin "A" is the area on the south side of the site, except for the gas station. This
area will be conveyed though biofiltration swale "A" to the discharge point at the
southern corner of the site.
• Basin "B" occupies areas to the front (west side) of the building. This basin area will
be conveyed though biofiltration swale "B" to discharge into the Grady Way South
public storm sewer.
• Basin "C" is the part of the site that occupies areas to the north and east of the
building. This basin area will be conveyed though biofiltration swale "C" to
discharge into the Grady Way South public storm sewer.
� Basin "D" is the rest of the site that occupies the area of the gas station. This basin
area will be conveyed though a coalescing plate oil/water separator to remove any
oils before out falling into biofiltration swale "D" for additional treatment. Final
disposal will be to the discharge point at the southern corner of the site.
PACLAND Project# 1999010.008 Page 5
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
These basins are highlighted in figure A6 and the runoff calculations are also found in the
drainage analysis section in the appendix.
� � � � ' ' �
As required by the City of Renton, storm drainage design for this project complies with the
King County Surface Water Design Manual (KC-SWDM). For this proposed retail project, a
full drainage review is required as the project is expected to cost more than $500,000 and
to replace more than 5,000 SF of on-site impervious area. Hence all five core requirements
and all five special requirements listed in KC-SWDM will be met. These requirements are
addressed below.
Core Requirement No.l: Discharge of the Natural Location: The drainage produced from
the proposed project site must occur at the natura! /ocation.
Response: The property drains to the public drainage system located in Talbot Road and
South Grady Way. The South Grady Way system connects to the Talbot Road South
system and then drains to the south west to converge with the runoff from the south of the
site. In essence, the site's natural point of discharge is the culvert crossing beneath Talbot
Road South at the southwest properry corner, which will be maintained during this project.
Core Requirement No.2: Off-site Analysis: All proposed projects must identify the
upstream tributary drainage area and perform a downstream analysis, the level of analysis
required depending on the problem identified or predicted.
Response: As stated in the off-site analysis, there is no significant off-site source of tributary
runoff from the adjoining properties. Runoff from Renton Hill will continue to bypass the
site in a storm drain/paved concrete ditch system along the south east side of the site.
Based on our site and upstream/downstream analysis, no evidence of runoff problems .
{flooding, erosion, conveyance) was encountered. There have been reported occurrences
of downstream flooding. However, as the site occupies a very small percentage of the
tributary drainage basin the runoff impact from the site is insignificant. This project will
maintain the site's current runoff characteristics hence; a more involved analysis of the
downstream is not necessary.
Core Requirement No.3: Proposed project must provide runoff control to limit the
developed condition peak rate of runoff to the existing peak rate for a specific design
storm event based on the proposed project site's existing runoff condition, and install
biofiltration measure.
Response: The King County Surface Water Design Manual allows an increase of 0.40 cfs
beyond current conditions before requiring a controlled release (retention/detention). The
proposed peak runoff is less than the existing peak runoff when detention is incorporated
into the Basin "Roof" runoff. The project does propose to provide stormwater treatment of
runoff from paved surfaces.
Core Requirement No.4: Conveyance System: All new conveyance systems for a proposed
project must be analyzed, designed, and constructed for existing tributary off-site runoff
and developed on- site runoff from the proposed project.
PACLAND Project# 1999010.008 Page 6
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Response: All new pipe systems will be designed to convey the 25-year storm peak flow.
, An analysis will be performed to provide for an overflow route of the 100-year runoff event
to prevent on-site flooding or erosion, please see the Drainage Analysis — Conveyance
' calculations for further information.
Core Requiremenf No.S: Erosion / Sedimentation Control Plan: AI! engineerrng plans for
the proposed project that propose to construct new, or modify exisring drainage facilities,
must include a plan to provide alI measures for the control of erosion and sedimentation
during construction and to permanentJy stabilize soils exposed during construction.
Response: Erosion and sediment control requirements as out lined in the KC-SWDM will
be an integral part of the project documents. These measures will include methods to
reduce erosion of onsite site soils and to prevent sediments from inadvertently leaving the
project site.
Special requirement#1: Other Adopted Area-Specific Requirement
Response: At this time, this site does not fall under any other known Adopted Area-Specific
Requirements.
Special requirement#2: Floodplain/Floodway Delineation .
Response: This project does not contain nor is it adjacent to any stream, lakes or closed
depressions; and is not situated within the 100-year floodplain, hence a floodplain /
floodway delineation is not required.
Special requirement#3: Flood Protection Facilities
Response: This project is not located near a Class 1 or 2 stream and does not propose to
modify or construct a flood protection facility.
Special requirement#4: Source Controls .
Response: Water quality source control will be utilized during the operation of the
completed project in accordance with the King County Stormwater Pollution Control
Manual.
Special requirement#5: Oil Control
Response: This site does not fall under the requirements for oil control as the number
vehicles/day are expected is below the limit of 13,500 vehicles/day for this site, and the
site will not involve the maintenance storage and use of the site by a fleet of 25 or more
diesel vehicles, heavy trucks, buses, etc. Therefore, special treatment of stormwater runoff
will not be necessary or required for the retail store. However, as a gas station will be part
of the development, a coalescing plate oil/water separator will be incorporated into the
stormwater system servicing the gas station to prevent accidentally spilt oil from leaving
the site.
• -
In accordance with the KC-SWDM and to verify the suitability of the onsite site
improvements, a levet one analysis was performed. This involves studying the watershed
PACLAND Project# 1999010.008 Page 7
�
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
conveyance path about %a mile along the upstream and downstream of the site to check for
_ conditions, such as flooding or excessive erosion, that might indicate that additional
drainage requirements standards are required.
Downstream Analysis
USGS Maps and the King County GIS System shows that runoff from the project site
eventually outfalls into the Black River, approximately 2.75 miles downstream, which
occupies a small part of the Duwamish - Green River watershed.
i
� ' Under existing and proposed conditions, a large portion of the site drains to a five-foot
- diameter culvert that crosses beneath SR-515 (Talbot Road) adjacent to the south property
� corner. The remainder of the site drains to the storm drain in Grady Way which converges
with the outlet end of the afore mentioned five-foot culvert on the west side of Talbot
Road.
From this point the total flow then continues south underneath Talbot Road for about 470
� feet before it turns west next to One Renton Place and flows under South Renton Village
Place between the Thriftway and Two Renton Place for about 1,000 feet. The storm system
then turns south at the east corner of Two Renton Place and daylights in a ditch after
� another 300 feet.
This 9 feet wide by 4 feet deep rectangular earth/rip rap ditch is part of the Rolling Hills
Creek drainage course. It flows west for about 700 feet along the north embankment of I-
405 and is sheltered by a dense covering of tree, shrubs and blackberries. This down
stream study found that it has a clean cross section with no signs of blockages or erosion.
At the I-405 /SR-167 interchange the ditch disappears underground into a �42" concrete
culvert. To the left of the 42" culvert there is a much larger 8-foot corrugated plate arch
culvert, which is situated to take extreme rainfall events that exceed the 42" culvert. �
According to the City of Renton Storm Drainage Maps, both of these culverts eventually
daylight in the southeast corner of the I-405 /SR-167 interchange where a system of open
ditches and closed pipes convey the stormwater runoff to the Springbrook Creek/Black
River/Duwamish River.
There are reported occurrences of downstream flooding problems in the South Renton
Village Place during extreme runoff conditions. This is believed to be due to the smaller
42" pipe at the end of the downstream study, but it is expected that the 8-foot diameter
corrugated plated culvert will be able to handle the future extreme events and reduce
flooding. In regards to the overall drainage basin tributary to the problem area, the site
occupies only about �1.8% of the heavily developed tributary basin. Therefore, the site is
a very small contributor of runoff to the downstream, and therefore has a nominal
influence on the downstream conditions. Further impact analysis of the downstream
system is not necessary.
Upstream Analysis
The project site is essentially isolated from off-site runoff. Runoff from the north is
intercepted with the South Grady Way drainage facilities, while drainage from the west is
P,ACLAND Project# 1999010.008 Page 8
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
intercepted by the Talbot Road South drainage facilities. The site does receive some runoff
from Benson Road South and the vegetated slope to the east, though most of this is picked
up by the existing concrete paved ditch along the east side of the site. The topography on-
site drain from the north to the south, therefore, there is no drainage contributing from the
south of the property.
As shown on the attached site plans there is a large existing paved concrete ditch that runs
down the southeast property line of the site. This channel picks up the flow from two
concrete pipes that flow from Renton Hill. The first is an 18-inch concrete pipe, which is
believed to carry ground water due to the strong sulfur smell. The second pipe is a 48-inch
concrete pipe, which carries runoff under I-405 and Benson Road South from
approximately 406 acres of residential developments on Renton Hill to the southeast side
of I-405.
The flows from both of these pipes converge at the entrance to the concrete ditch and
travels southwest along the property (ine bypassing the site. The exsiting 4-foot wide, 3-
foot deep rectangular concrete paved ditch has a clean cross section with only the
occasion small deposits of pebbles along the bottom. The channel ends at the south corner
of the site where it empties into a 5- foot diameter culvert that passes under Talbot Road
South and continues to flow to the west.
� , . . �
Hydrologic Modeling Mefhod
Hydrologic analysis of the project area was performed using the computer-modeling
program "StormSHED release 6.1.6.4", which uses the Santa Barbara Urban Hydrograph �
(SBUH} methodology. The program effectively models pre-developed and developed
runoff conditions using hydrographs for each basin. Given a specified design storm
{precipitation value) and its associated distribution, the computer model calculates runoff
hydrographs in terms of peak rates and total volume based on the approximated
� characteristics of the basin (i.e. area, curve number (CN), time of concentration (Tc), etc.).
The StormSHED software program has been designed to enable the user to apply the Level
Pool Routing Method to route the hydrographs generated from the basin analysis through a
proposed conveyance system andlor detention facility. The modeled peak flows and
volumes were used in the analysis of the proposed drainage system.
For this project the following model parameters were inputted into the StormSHED
program to size the proposed stormwater facilities:
Rain Fall Distribution: 24-hour, Type 1A distribution
Hydrograph Interval: 10 minutes
Peak Factor: 484
Tp Factor: 4
PACLAND Project# 1999010.008 Page 9
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Table 4
Precipitation Values
Storm Event Rainfall Amount (inches) '
2-yr, 24hr 2.0 ,
10-yr, 24-hr 2.9
25-yr, 24-hr 3.4
100-yr, 24-hr 3.9
Sub-Basin Description
For purposes of analysis, the existing property has been divided into four drainage basins:
• Basin "Roof" is the roof area of the building (approximately 3.1 acres), runoff from
here will be separately conveyed without treatment to a discharge point on the west
side of the site into the Grady Way South public storm sewer.
' • Basin "A" is 3.33 acres of paving and landscaping on the south side of the site that
will be conveyed though biofiltration swale "A" to the discharge point at the
southern corner of the site into the SR-51 S (Talbot Way South) public storm sewer. ,
• Basin "B" is about 3.92 acres of paving and landscaping that occupies areas to the �
front (west side) of the building. This basin area will be conveyed though
biofiltration swale "B" along the west property line to discharge into the Grady Way
South public storm sewer.
• Basin "C" is about 3.51 acres of paving and landscaping that occupies areas to the
north and east of the building. This basin area will be conveyed though biofiltration
swale "C" in the north corner to discharge into the Grady Way South public storm
sewer.
• Basin "D" is the area that occupies the proposed Gas station, about is 1.14 acres of
paving and landscaping. This basin area will be conveyed though a oil/water ,
separator and a biofiltration swale "D" to the discharge point at the southern corner
of the site into the SR-515 (Talbot Way South) public storm sewer.
Refer to figure # A6 in the appendix for an illustration of the site.
Peak Runoff Control
As the proposed site will have a peak runoff rate that is less then the 0.40 cfs increase
allowed in the 1990 KC-SWDM, storm water detention would not be required. However,
at the request of the hearing examiner, runoff from the roof will be detained in a 48"
storage pipe to reduce its peak flow. Complete analysis is included in the Appendix. A
basic summary of inputs/outputs is as follows:
Table 5
Existing Conditions
Paving Gravel Landscaping 2-year 24- 10-year 24- 100-year
Basin (acres)- (acres)- (acres)- Composite Total Area TC (min) hour Event hour Event 24-hour
CN=98 CN=91 CN=92 CN (acres) (CFS) (CFS) Event(CFS)
1 4.05 2.42 0.07 95.3 6.54 6.47 2.46 3.84 5.46
2 5.78 0.0 2.68 96.1 8.46 4.77 3.24 5.01 6.97
- _ , � �: ..
�€rt��;� "_ �_•-,.;�� : �� ��a -
- � � - - -� .�w _�_._ _ _ -� �� _ J � _
_ �.-= -.__ _. ... _� . . ._ . _.�
*Soils Type D per soils
PACLAND Project# 1999010.008 Page 10
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Table 6
Proposed Conditions
Paving Landscaping Roof Total 2-Year 10-year 100-year
Basin (acres) - (acres)- (acres)- Composite Area TC 24-hour 24-hour 24-hour
CN=98 CN=92 CN=98 CN (acres) �min) Event Event Event
(CFS) (CFS) (CFS)
A 2.50 0.84 0.00 96.5 4.47 9.71 1.29 1.97 2.73
B 3.50 0.42 0.00 97.4 3.92 8.59 1.61 2.42 3.32
C 2.01 1.50 0.00 95.4 3.51 11.16 1.19 1.87 2.62
D 0.82 0.31 0.00 96.5 1.13 6.08 0.45 0.69 0.95
Roof 0.00 0.00 3.10 98.0 3.10 5.78 1.37' 2.03' 2.76'
- - - - - - - 0.55� 1.242 1.45Z
,_ _ _.. _ _:: ._ ._a w _ - _ _ __, .._.
_
*Soils Type D per soils
' - Pre-detained Roof Peak (not included in runoff total)
' - Post-detained Roof Peak (included in runoff total)
Water Qualify
The 2-year 24-hour event runoff from paved surfaced will be treated in a biofiltration swale
utilizing 1990 KC-SWDM design criteria. Calculations for sizing the biofiltration swale are
included in the Appendix. Both biofiltration swales will be seeded with a wetland seed
mix, as the actual swale will have 0.5% slope. After treatment, the runoff will leave the site
by out-falling into the public storm sewer system along either Grady Way or Talbot Road.
Summaries of the biofiltration facilities are included in the table below.
Table 7
Summary of Biofiltration Swale Components
Basin 2"yr, 24hr Bottom Swale Length Swale Length Surface Detention •
event (cfs) Width (ft) Required (ft) Provided (ft) Area (s� Time(min)
"A" 1.29 5 155 190 1,710 10.2
"B" 1.61 4 210 220 880 11.5
"C" 1.19 6 130 145 1,450 7.8
"D" 0.45 4 100 110 880 7.6
Due a gas station being part of the project, a coalescing plate oil/water separator (CPS) will
be incorporated into the Basin "D" stormwater system to capture accidental spills outside
the canopy. This BMP will be sized to handle the 2-year flow with the following
properties.
• Treatment flow rate = 0.45 cfs = 202 gpm
• Effluent quality = 10 ppm = 10 mg/I
• 100% collected size = 60 microns
A coalescing plate oil/water separator, equivalent to the 612-1-CPS designed by the Utility
Vault Company (Oldcastle Precast Inc.), Auburn WA, will be used. This design meets the
requirements of the DOE and has the capacity to treat 219 gpm. A bypass will be
incorporated in the CPS to divert runoff from storms greater than the 2-year event to
prevent flushing of captured oils.
PACLAND Project# 1999010.008 Page 1 1
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Conveyance
For conveyance design, a backwater analysis utilizing Manning's equation was employed
with a Manning's "n" value of 0.012.
Manning's equation - Q= 1.49n xAxRv3xS'�2
With: Q = Flow (CFS)
n = Manning's Roughness Coefficient (0.012)
A = Flow Area (SF)
R = Hydraulic Radius = Area/Wetted Perimeter (LF)
S = Slope of the pipe (ft/ft)
All storm pipes were designed and checked for capacity during the 100-year event. The
storm water quantities used were calculated from StormShed software using the SBUH
� ' methodology. A summary of the calculations are presented in the appendix
100-Year Flood/Overflow Condition
The stormwater system for this project has been designed to address all storm events in
accordance with design criteria described previously. In the event of a storm larger than
the 100-yr 24-hr the system may overflow into the public right-of-way. Based on our
review, we anticipate the overflow of the stormwater drainage system would allow surface
water to discharge directly to the public storm system along Grady Way South and SR-515
(Talbot Road). Please see the attached exhibit A6 to illustrate.
Existing Concrete Paved Ditch (Aqueduct) Rep/acement '
As part of this project, it has been proposed that the existing concrete aqueduct that flows
along the southeast side of the site be relocated/replaced due to portion of the existing
system that overflow at low intensity storms. In our conservations with the City of Renton,
- it has been requested that this new conveyance system be based upon the upstream
conditions instead of matching the existing conveyance capacity of the concrete aqueduct
immediately downstream. Therefore, the offsite basin that drains into this aqueduct was
analyzed to determine the peak events flows in order to adequately size the new
conveyance system. The new system has been design to handle both the 25-year event
with a 0.5 foot freeboard and safely convey the full 100-year event. Further details of these
calcutations have been provided in the appendix.
During a unlikely high intensity rainfall event that exceed the provided 0.5 foot freeboard,
the Aqueduct replacement will overflow into to the proposed parking lot and will drain via
a combination of surface route/storm drains/swales to the discharge points of the site as
shown on exhibit A6.
PACLAND Project� 1999010.008 Page 12
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
� � � �
All erosion and sediment control measures shall be governed by the requirements of King
County and the City of Renton. A temporary erosion and sedimentation control plan has
been prepared to assist the contractor in complying with these requirements. See the
attached TESC plan.
1. Construction Sequence And Procedure
, The proposed development includes an erosion/sedimentation control plan designed to
prevent sediment-laden run-off from leaving the site during construction. The erosion
, potential of the site is influenced by four major factors: soil characteristics, vegetative
cover, topography, and climate. Erosion/sedimentation control is achieved by a
combination of structural measures, cover measures, and construction practices that are
tailored to fit the specific site.
Prior to the start of any grading activity upon the site, all erosion control measures,
including installation of a stabilized constriction entrance, shall be installed in accordance
with the construction documents.
The best construction practice will be employed to properly clear and grade the site and to
schedule construction activities. The planned construction sequence for the construction
of the site is as follows:
1. Flag and stake clearing limits.
2. Arrange and attend a preconstruction meeting with the City of Renton.
3. Install perimeter erosion control features (silt fence, construction entrance etc.)
4. Field locate all utilities.
5. Clear/demo and grub site. �
6. Grade the site in accordance with the approved grading plan.
7. Install sanitary sewers, storm, water, and other site utilities in accordance with the
approved drainage/utilities plans; provide CB inlet protection at the new inlet
locations.
� 8. Stabilize the site in accordance with the approved paving and landscaping plans.
9. Install wetland seed mix sod on bottom of biofiltration swales or seed with a
wetland seed mix to a healthy stand of grass prior to bringing the storm drain
system "on-line".
10.Thoroughly clean new storm system upon completion of paving to prevent
sediment from leaving the site.
11. Remove temporary erosion control facility upon final stabilization of entire project
site, as approved by governing jurisdiction and project engineer.
PACLAND Project# 1999010.008 Page 13
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
2. Trapping Sediment
Structural control measures will be used to reduce erosion and retain sediment on the
construction site. The control measures will be seleded to fit specific site and seasonal
conditions.
The following structural items will be used to control erosion and sedimentation processes:
• Stabilized construction entrance
• Temporary gravel construction entrance
• Filter fabric fences
• Cover measures
• Temporary swale and sediment ponds (see calculations on the appendix)
Weekly inspection of the erosion control measures will be required during construction.
Any sediment buildup shall be removed and disposed off site.
Vehicle tracking of mud off-site shall be avoided. Installation of a gravel construction
entrance will be installed at a location to enter the site. The entrances are a minimum
requirement and may be supplemented if tracking of mud onto public streets becomes �
excessive. In the event that mud is tracked off site, it shall be swept up and disposed off
site on a daily basis. Depending on the amount of tracked mud, a vehicle road sweeper
may be required.
Because vegetative cover is the most important form of erosion control, construction
practices must adhere to stringent cover requirements. More specifically, the contractor will
not be allowed to leave soils open for more than 7 days and, in some cases, immediate
seeding will be required. During the period of November lst through April 30�', all
disturbed soil areas will be stabilized within seven days. Areas next to paved areas may be .
armored with crushed rock subbase in place of other stabilizing measures.
PACLAND Project# 1999010.008 Page 14
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Maintain Stormwater Facilities I�
The owner or operator of the project shall be responsible for maintaining the stormwater ',
facilities in accordance with local requirements. Proper maintenance is important for ''
adequate fundioning of the stormwater facilities. The following maintenance program is
recommended for this project:
NO. 5 - CATCH BASINS
Maintenance Defect Conditions When Maintenance is Needed Results Expected When
Component Maintenance is performed
General Trash 8� Debris Trash or debris of more than 1/2 cubic foot which is No Trash or debris located
(Includes Sediment) located immediately in front of the catch basin immediately in front of catch
opening or is blodcing capaaty of the basin by basin opening.
more than 10%
Trash or debris (in the basin)that exceeds 1/3 the No trash or debris in the catch
depth from the bottom of basin to invert the lowest basin.
pipe into or out of the basin.
Trash or debris in any inlet or ouUet pipe blodcing Inlet and ouUet pipes free of
more than 1/3 of its height. trash or debris.
Dead animals or vegetation that could generate No dead animals or vegetation
odors that could cause complaints or dangerous present within the catch basin.
gases(e.g.,methane).
DeposiLs of garbage exceeding 1 cubic foot in No condition present which
volume would attract or support the
breeding of insects or rodenfs.
SVucture Damage to Comer of frame extends more than 3/4 inch past Frame is even with curb.
Frame and/or Top Slab curb face into the street(If applicable).
Top slab has holes larger than 2 square inches or Top slab is free of holes and �
cradcs wider than 1/4 inch (intent is to make sure cradcs.
all material is running into basin}.
Frame not sitting flush on top slab, i.e., separation Frame is sitting flush on top
of more than 3/4 inch of the frame from the top slab.
slab.
Cracks in Basin Wallsl Cracks wider than 1/2 inch and longer than 3 feet, Basin replaced or repaired to
Bottom any evidence of soil particles entering qtch basin design standards.
through cracks,or maintenance person judges that
structure is unsound.
Cracks wider than 1/2 inch and longer than 1 foot No cracks more than 1/4 inch
at the joint of any inleU outlet pipe or any evidence wide at the joint of inlet/outlet
of soil partides entering catch basin through pipe.
cradcs.
SedimenU Basin has settled more than 1 inch or has rotated Basin replaced or repaired to
Misalignment more than 2 inches out of alignment. design standards.
PACLAND Project# 1999010.008 Page 15
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
NO. 5 - CATCH BASINS (Continuec�
Maintenance Defect Conditions When Maintenance is Needed Results Expected When
Component Maintenance is perfortned
Fire Hazard Presence of chemicals such as natural gas, oil and No flammable chemicals
gasoline. present.
Vegetation Vegetation growing across and blocking more than No vegetation blocking opening
10°�of the basin opening. to basin.
Vegehation growing in inlet/outlet pipe joints that is No vegetation or root growth
more than six inches tall and less than six inches present
apart.
Pollution Nonflammable chemicals of more than 112 cubic foot No pollution present other than
per three feet of basin length. surface film.
Catch Basin Cover Cover Not in Place Cover is missing or only partially in place. Any open Catch basin cover is dosed
catch basin requires maintenance.
Locking Mechanism Mechanism qnnot be opened by on maintenance Mechanism opens with proper
Not Working person with proper tools. Bolts into frame have less tools.
than 1/2 inch of thread.
Cover Difficult to One maintenance person cannot remove lid after Cover qn be removed by one
Remove applying 80 Ibs. of lift; intent is keep cover from maintenance person.
sealing off access to maintenance.
Ladder Ladder Rungs Ladder is unsafe due to missing rungs,misalignment, Ladder meets design standards
Unsafe rust,cracks,or sharp edges. and allows maintenance person
safe access.
Metal Grates Grate with opening wider than 7/8 inch. Grate opening meets design
(If Applicable) standards.
Trash and Debris Trash and debris that is blodcing more than 20% of Grate free of Vash and debris.
grate surface.
Damaged or Grate missing or broken member(s)of the grate. Grate is in place and meets
Missing. design standards.
NO. 6 DEBRIS BARRIERS (e.g., Trash Racks)
Maintenance Defect Condition When Maintenance is Needed Results Expected When
Components Maintenance is Performed.
General Trash and Debris Trash or debris that is plugging more than 20% of Barrier dear to receive capacity
the openings in the barrier. flow.
Metal Damaged/ Missing Bars are bent out of shape more than 3 inches. Bars in place with no bends more
Bars. than 3/4 inch.
Bars are missing or entire barrier missing. Bars in place according to
design. �
Bars are loose and rust is causing 50%deterioration Repair or replace barrier to
to any part of bamer. design standards.
PACLAND Project# 1999010.008 Page 16
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
NO. 7 - ENERGY DISSIPATERS
Maintenance Defect Conditions When Maintenance is Needed Results Expected When
Components Maintenance is Performed.
Extemal:
Rock Pad Missing or Moved Only one layer of rock exists above native soil in Replace rocks to design
Rock area five square feet or larger, or any exposure of standards.
native soil.
Dispersion Trench Pipe Plugged with Accumulated sediment that exceeds 20% of tfie Pipe Geaned/ flushed so that it
Sediment design depth. matches design.
Not Discharging Visual evidence of water discharging at Trench must be redesigned or
Water Property concentrated points along trench (normal condition rebuilt to standards.
is a"sheet flovJ'of water along Vench). Intent is to
prevent erosion damage.
Perforations Over 1/2 of perforations in pipe are plugged with Clean or replace perforated pipe.
Plugged. debris and sediment.
Water Flows Out Maintenance person observes water flowing out Facility must be rebuilt or
Top of "Distributo�° during any storm less than the design storm or its redesigned to standards.
Catch Basin. causing or appears likely to puse damage.
Receiving Area Water in receiving area is causing or has potential No danger of landslides.
Over-Saturated of causing landslide problems.
Intemal:
Manhole/Chamber Wom or Damaged Structure dissipating flow deteriorates to 1/2 or Replace structure to design
Post.8affles,Side of original size or any concentrated wom spot standards.
Chamber exceeding one square foot which would make
structure unsound.
Other DefecLs See"Catch Basins"Standard No.5 See "Catch Basins" Standard No.
5
NO. 10 - CONVEYANCE SYSTEMS (Pipes & Ditches)
Maintenance Defect Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Pipes Sediment&Debris Accumulated sediment that exceeds 20% of the Pipe cleaned of all sediment and
diameter of the pipe. debris.
Vegetation Vegetation that reduces free movement of water All vegetation removed so water ,
through pipes. flows freely through pipes.
� Damaged Protective coadng is damaged; rust is causing Pipe repaired or replaced.
I more than 50%deterioration to any part of pipe.
Any dent that decreases the cross section area of Pipe repaired or replaced.
pipe by more than 20%.
Open Ditches Trash&Debris Trash and debris exceeds 1 cubic foot per 1,000 Trash and debris Geared from
square feet of ditch and slopes. ditches.
Sediment Accumulated sediment that exceeds 20 % of the Ditch Geaned/ flushed of all
design depth. sediment and debris so that it
matches design.
Vegetation Vegetation that reduces free movement of water Water flows freely through
through ditches. ditches.
Erosion Damage to See"Ponds"Standard No. 1 See"Ponds"Standard No. 1
Slopes
Rock Lining Out of Place Maintenance person can see native soil beneath Replace rodcs to design
or Missing (If the rock lining. standards.
Applicable).
Catch Basins See"Catch Basins:Standard No.5 See "Catch Basins" Standard
No.5
Debris Barriers See"Debris Barriers"Standard No.6 See "Debris Barriers" Standard
(e.g.,Trash Rack) No.6
PACLAND Project# 1999010.008 Page 1 7
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
NO. 11 - GROUNDS (Landscaping)
Maintenance Defect Conditions When Maintenance is Needed Results Expected When �
Component Maintenance is Performed
General Weeds Weeds growing in more than 20%of the landscaped Weeds present in less than 5%
(Nonpoisonous) area(trees and shrubs only). of the landscaped area.
Safety Hazard Any presence of poison ivy or other pasonous No poisonous vegetation
vegetation. present in landscaped area.
Trash or litter Paper, cans, bottles, totaling more than 1 cubic foot Area dear of litter.
within a landscaped area (trees and shrubs only)of
1,000 square feet.
Trees and Shrubs Damaged Limbs or parts of trees or shrubs that are split or Trees and shrubs with less than
broken which affect more than 25% of the total 5% of total foliage with split or
foliage of the Vee or shrub. broken limbs.
Trees or shrubs that have been blown down or Tree or shrub in place free of
knodced over. injury.
Trees or shrubs which are not adequately supported Tree or shrub in place and
or are leaning over,causing exposure of the roots. adequately supported; remove
any dead or diseased trees.
NO. 13- WATER QUALITY FACILITIES
A.) Biofiltration Swale
Maintenance Defect Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Biofiltration swale Sediment Accumulation Sediment depth exceeds 2-inches No sediment deposits on grass
on Grass Layer layer of the bio-swale,which would
impede filtration of runoff.
Vegetation When the grass becomes excessively tall Vegetation is mowed or nuisance
{greater than 10-inches);when nuisance weeds vegetation is eradicated, such that
and other vegetation starts to take over. flow not impeded. Grass should be
mowed to a height beriveen 4
inches and 9 inches.
Inlet Outlet Pipe InIeU outlet pipe clogged with sediment and/or No Gogging or blockage in the inlet .
debris. and outlet piping.
Trash and Debris Trash and debris accumulated in the biaswale. Trash and debris removed from
Accumulation bioswale.
ErosioN Scouring Where the bio-swale has eroded or scoured the Bioswale should be re-graded and
bottom due to flow channelization, or higher re-seeded to specification, to
. flows. eliminated channeled flow.
Overseeded when bare spots are
evident.
PACLAND Project# 1999010.008 Page 18
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
NO. 14 - OIL CONTROL FACILITIES
A.) Oil!Water Separators
Maintenance Defect Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed.
API Type OWS Monitoring Inspection of discharge water for obvious signs Effluent discharge from vault
of poor water quality. should be Gear with out thick
visible sheen.
Sediment Accumulation Sediment depth in bottom of vault exceeds 6- No sediment deposits on vault
inches in depth. bottom which would impede flow
through the vault and separation
efficiency.
Trash and Debris Trash and debris accumulation in vault, or pipe Trash and debris removed from
Accumulation inleU outlet,floatables and non-floatables. vault,and inleU outlet piping.
Oil Accumula6on Oil accumulations that exceed 1-inch, at the Extract oil from vault by
surface of the water vactoring. Disposal in
accordance with state and local
rules and regulations.
Damaged Pipes Inlet or outlet piping damaged or broken and in Pipe repaired or replaced.
need of repair.
Access Cover Damaged/ Cover pnnot be opened, one person cannot Cover repaired to proper
Not Working open the cover,corrosion/deformation of cover. woricing specifications or
replaced.
Vault Structure Damage- Cracks wider than 1/2-inch and any evidence of Vault replaced or repaired to
Includes Cradcs in Walls soil particles entering the structure through the design speaficaGons.
Bottom, Damage to c.�adcs, or maintenance/ inspection personnel
_ Frame and/or Top Slab determines that the vault is not structurally
sound.
� Baffles Baffles corroding, cracking, warping and/ or Repair or replace baffles to
showing signs of failure as determined by specifiptions.
maintenance/inspection person.
Access Ladder Damaged Ladder is corroded or deteriorated, not Ladder replaced or repaired and
functioning properly, missing rungs, cracks, and meets specifications,and is safe
misaligned. to use as determined by .
inspection personnel.
Cracks wider than 1/2-inch at the joint of any No cracks more than 1/4-inch
inleU outlet pipe or any evidence of soil particles wide at the joint of the inleU
entering the vault through the walls. outlet pipe.
I � � . I �
This information shall be provided at the next submittal as coordinated with the City of
Renton.
PACLAND Project# 1999010.008 Page 19
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA ,
Appendix
Technical Information Report (TIR) Worksheet....................................................................21
AppendixA Figures................................................................................................24
Figure A1 —ALTA/ACSM Land Title Survey of the Property
Figure A2 — Site Plan
Figure A3 —Grading and Drainage Plan
Figure A4 — King County GIS Map
Figure A5 —SCS/USDA Soils Map
Figure A6 — Basin Map
Appendix B Existing Site Hydrology Output DatalCalculations..............................30
Appendix C Developed Site Hydrology Output DatalCalculations.........................31
Developed Basin "A" — Biofiltration swale Design
Developed Basin "B" — Biofiltration swale Design
Developed Basin "C" — Biofiltration swale Design
Developed Basin "D" — Biofiltration swale Design
Developed Basin °Roof" — Detention Pipe
Existing Concrete Paved Ditch (Aqueduct) Replacement Calculations
Appendix D Erosion Control Calculations ..............................................................44
Temporary Sediment Pond "A" '
Temporary Sediment Pond "B"
Temporary Sediment Pond "C"
Appendix E Developed Conveyance (Backwater) Calculations...............................48
South Basin
North Basin
Appendix F Geotechnical Report.........................................................................110
PACL,AND Project� 1999010.008 Page 20
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
King County Department of Development and Environmental Services
TECHNICAL INFORMATION REPORT TIR WORKSHEET
Part 1 PROJECT OWNER AND Part 2 PROJECT LOCATION AND
PROJECT ENGINEER DESCRIPTION
Project Owner Project Name
Sam's Real Estate Investment Trust Sam's Club #4835-00, Renton, WA
Address Location
c/o PACLAND, 1144 Eastlake Blvd E, Township 23N
Suite 601, Seattle, WA 98109 Range 5E
Phone (425) 487-6550 Section SW'/-17, NE'/4-19, NW'/4-20
Project Engineer Joe Geivett
Company PACLAND
AddresslPhone 206 522-9510
Part 3 TYPE OF PERMIT Ii Part 4 OTHER REVIEWS AND PERMITS
APPLICATION
❑ Subdivison `: DFW HPA J Shoreline Management
❑ Short Subdivision ❑ COE 404 ❑ Rockery
❑ Grading ❑ DOE Dam Safety ❑ Structural Vaults
� Commercial ❑ FEMA Floodplain � Other Retaining Wall
Other ❑ COE Wetlands
Part 5 SITE COMMUNITY AND DRAINAGE BASIN
, �. ; �. _ :, -�=
Community City of Renton
- Drainage Basin Black River Basin
, Part 6 SITE CHARACTERISTICS . .
, ,:
_ River ❑ Floodplain
❑ Stream ❑ Wetlands
❑ Critical Stream Reach ❑ Seeps/Springs
C Depressions/Swales � High Groundwater Table
C Lake ❑ Groundwater Recharge
L� Steep Slopes Up to 40% (limited area) � Other Poor qualitv soils.
PACLAND Project# 1999010.008 Page 21
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Part 7 SOILS =
Soil Type Slopes Erosion Potential Erosive Velocities
Urban 0.8 to 40% Hiqh Unknown
� Additional Sheets Attached
' Part 8 DEVELOPMENT LIMITATIONS - � -
' REFERENCE LIMITATION/SITE CONSTRAINT
L� Ch. 4 — Downstream Analysis None due to not exceeding existinq peak
� Detention of roof runoff will be provided
�,
at the request of the hearing examiner.
_J
� Additional Sheets Attached
Part 9 ESC REQUIREMENTS =
, ,1�IINIMUM ESC REQUIREMENTS MINIMUM ESC REQUIREMENTS
DURING CONSTRUCTION AFTER CONSTRUCTION
� Sedimentation Facilities � Stabilize Exposed Surface
�l Stabilized Construction Entrance � Remove and Restore Temporary ESC
C� Perimeter Runoff Control Facilities
[� Clearing and Grading � Clean and Remove All Silt and Debris
Restrictions � Ensure Operation of Permanent Facilities
L� Cover Practices [� Flag Limits of SAO and open space
L] Construction Sequence preservation areas
❑ Other ❑ Other
PACLAND Project# 1999010.008 Page 22
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Part 10 SURFACE WATER SYSTEM
�
f� Grass Lined � Tank C Infiltration Method of Analysis
Channel ❑ Vault ❑ Depression Santa Barbara
L� Pipe System � Energy � Flow Dispersal Compensation/Mitigati
❑ Open Channel Dissipater ❑ �/aiver on of Eliminated Site
❑ Dry Pond ❑ Wetland Storage
❑ Regional Pipe detention
� Wet Pond ❑ Stream Detention
,� ,
- Brief Description of System Operation Piqe convevance to bioswale for treatment
before disposal to public storm sewer. Roof runoff to be detained in 48" storaqe pipes.
Facility Related Site Limitations
Reference Facility Limitation
Part 11 STRUCTURAL ANALYSIS Part 12 EASEMENTS/TRACTS
C Cast in Place Vault ❑ Drainage Easement
� Retaining Wall ❑ Access Easement �
❑ Rockery > 4' High ❑ Native Growth Protection Easement
� ❑ Structural on Steep Slope ❑ Tract
❑ Other � Other Utilitv Easements
Part 13 SIGNATURE OF PROFESSIONAL ENGINEER
I or a civil engineer under my supervision have visited the site. Actual site conditions
as observed were incorporated into this worksheet and the attachments. To the best
of my knowledge the information provided here is accurate.
Si ned/Date
PACLAND Project# 1999010.008 Page 23
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
� � • � �
Figure A1 - ALTA/ACSM Land Title Survey of the Property
PACLAND Project� 1999010.008 Page 24
LEGAL DESCRIPTION LEGEND
SEE SIEEf 3 OF 4. �— m�fic 5�ro� �, �vx�u
FASEAIENTS AND RES�RICTIONS � ��
FlDELJ7Y NATIONAL N0. 0170991 FASEAIENTS /WD RESTRICTIONS (CONTJ p- y��� �.....•,.����.',�.'. �h
u rown icrtn
1-S. NOT MPLICABLE TO BE SHOWN ON ALTA SURVEY. 1B. THIS PROPERTY IS SUBIECT TO THE 7ERA15 AND COND(TIONS OF A RESfRICTNE o pp�FR pl[ �G�
COVENANf ilS RECOROED UNOER RECORDING N0. Y00001Y300148J, RECORDS OF LW�NE
6. DELEfED. NING COUNTY, W�ISHINCTON. (NOTED HERE) � ���NS�) I�
@� IEIDIIOIE 1fW4i ��EIINID
1B. THIS PROPERTY IS SUBJECT TO RESTRICTIONS, CONDITIONS, DEDICATIONS, � GVoI wN �
7. iH15 PROPERTY IS SU&IECT TO RESERVATIONS AND/OR EXCEPTIONS CONTAINED NOTES, EASEMENTS AND PRONSIONS CONTNNED IN CITY OF RENTON LOT L1NE O SNNY YVIIIOIF "r_----�W_-- ��
IN INSTRUMENT AS RECORDED UNOER flE)CORDING N0. 539503, RECORDS OF ADJUSTMENT N0. LUA-OG-153-LU AS RECOROEU UNDER RECORDINC NO. p S,y�Gp/5pp�yy�tl1F _—_— �����
THIS EXC PTON ISHNOT�SUBJECTETOHBEEPLOTTE� ON ALTA SURVEY. THE Z0010213900004, RECOROS OF KING COUNT',WASHINCTON. (NOTED HERE) � �ypyq pyy�p�rt - �—�-'(�'.=_ ���� �� ���
CONCREfE AQUEDUCT PRESUMABt.Y FULFlLLS THIS FUNCTION, 20. TMIS PROPERTY IS SU&IECT TO THE TERMS AN�CONDITIONS OF AN INCRESS, —MwI— ppiq��p
EGRESS, PARNING AND UTIUTIES E/SENEN7 AS RECORDE� UNDER RECORDING � �� r(a�)- pp�p�p�p�p W L f E
tl-10. DELEfED. N0. 2001021J001I15, RECOROS OF KING COUN7Y,WASHINGiON. (NOTED MERE) � � x—.—x p��{p� ,, �'
� �11G ww�ni G !oR xOIE �
Q1 THIS PROPERTY IS SU&IECT TO THE TERNS AN�CONDffIONS OF A SANITARY � THIS PROPERfY IS SUBJECT TO CONDEAINATION OF ACLE55 ANO RICHT TO � �q�q '" � �
SEWER FASEMENT tiS RECORDED 11NDER RECORDINC N0. SY37431,RECOROS WKE NECESSARY SLOPES fOR CUTS OR FlLLS UPON SU&IECT PROPERTY ti5 a yp�
OF KING COUNtt, WASHINGTON. (SHOWN) CONDEMNED IN KING CWNN SUPERIOR GWRT CAUSE N0. 701083. (SHOWN � yq��q�
ANO NOIED NERE)
� iHIS PROPERTY IS SU&IECT TO THE TERIAS ANO CONDITIONS OF A PACIFIC S
NORTHWEST BELL TELEPHONE FASEMENT AS RECORDED UNOER RECORDING THE GUSE WAS BROUGHi 6Y THE ST�TE OF WASHINGION fOP ACW�SITION
N0. 7203170487, RECORDS OF KING COUNTY, WASHINGTON. (SHOWN) Of PROPERTY RIGNTS IN CONJUNCTION WIfH iHE OEVEIOPMENT OF SR-515 a n
AS IT NOW ExISTS. AMONG OTIIER TNINGS,IT NENTIONED:
� EASEMENTPAS RECORD DEUNDER RECORDNG N0. 7 052 0181�R COROSROFE A THE ACOUISITION OF PROPERTY RIGH15 FOR THE HIOHWAY SHALL NOT SCALE 1�� = 4O�
NING CAUNN,WASHINCTON. (SHOWN) AFFECT iHE OWNERSHIP RICH75 TO ELECTRICAL FACILITIES W17HIN THE
SR-513 RIGM-OF-WAV.
14. TMIS PROPERN IS SUBJECT TO COVENANTS,CONDITIONS AND HESTRICT10N5 Uf1LIlY PURVEYORS
CONTAINED IN LOT L1NE MdUSTMENT AS RECORDED UNDER RECORDING NO. B. PUCEf SHALL HAVE ALL RFASONABLE RICHTS OF ACCE55 TO AND FROM
9812109011, RECOHDS OF KING COUNiI',WASHINGTON. (NOTED HERE) SR-515 AND TliAT THE STATE WOULD PROVIDE CURB CUTS AT STA710N5 ��pM�T�I���a AENTON
12Bi90 AND 430+20. �X�5��
1065 SOI7M GR/�Q/WAY
THIS PROPERTY IS SU&IECT TO THE TEfWS AND CONDRIONS OF AN EASEHEM pENfpN,wA YlWS
TO PUGEf SOUND ENERGY,INC.AS RECAHDED UNDER RECORDINC N0. C.THE SLOPE FASEMENT ARFA(WHICH WAS NOT INCLUDED IN THE RECORDED (�7y)�w-7a6i
8812171851, RECOROS OF KING COUN7Y, WASHINGTON. (SHOWN) INSTRUMENT PROVIDED TO BARGHAUSEN CONSULTING ENCINtERS, INC.) WAS
FOR SLOPE PURPOSES ONLY AND WOULll RtVERf BACN TO PUCET WMEN TME PO'�'FN: PUCFf SOUND ENERGY
A. TRANSMISSIUN L1NE EASEMENT AKEA(SiEEL TOWER L1NE): AN FASEMlNI NECESSITV FOR SLOPES CEASES TO E7(IST. (THE LOCATION OF A 10-F00T Im 1561N AK.NE
SLOPE FJSEMENi ALONG SR-515 GRAPHIGI_LY DEPICTEO UPON TME SURVEY �F11LN1L'MA 9l005
ARU ONE HUNDRED (100) FEET IN WIDTH HAVING FIFfY(SO) FEET OF SUCH �,y�p yy�FOUNO ON TME SR-313 RIGHT-OF-WAY PLAN AND IS PRESUNABLV ���)32�-��T�
WIOTH ON EACH SIDE OF A CENlERLINE DESCRIBEA AS FOLLOWS:
THE SLOPE EASEMENT MENTIONED IN THE CAUSE.) GIS; PUGET SOUND ENER4l �
THE CENTERUNE IS AN E%ISTINC ELECTRIC TRANSMI$$ION LINE AS PRESENTLY 105 156IH AVENE
CONS7RUCTED WITHIN THE ABOVE DESCRIBEO PROPERtt. D.A SEfTLEMENT AGREEMENT RECARDINC TAJf UENS. ecLLFn1E,r�9eoos
I(!W)1z1-1J21 �
B. TRANSMISSION L1NE EASEAIEN7 N2EA(TMREE(7) SEPARATE SINCIE WOOD 22. THIS PROPER7Y IS SUBJECT TO 7HE RIGHT TO MAKE NECESSARY SLOPES FOR
POLE UNES). EACH SUCH EASEMENT MEA FIFIY(50) FEET IN WIOTH HAVINC CUTS AND FILLS UPON SU&IECT VROPER7Y tiS CRANTED IN DEED AS RECORDED �E�FP�O�E' `���Nu7a�5 �
TWENTY-FIVE (25) FEET OF SUCH WIDTN ON EACM SIDE OF THREE SEPARATE UNDER RECORDINC N0. 4827715, RECORDS OF KINC COUNf1'. WASHINGTON. (NOTED HERE) �7H 2ppq ��
CENiERL1NE5 DESCRIBED AS FOLLOWS: 2}. 7MIS PROPERfY IS SU&IECT TO ENCROACHAIENTS AS SHOWN. � �E��A�� ��
TME CENTERLINES ME THE EXISTING SINCLE WOOD POLE ELECTRIC TIUNSMISSION fiffiL ia aiBlE�nsaM
LINES ti5 PRESEN7LV CONSTRUCTED WITHIN THE�BWE OESCRIBED PROPERtt. 1�• NOT APPLICABLE TO BE SHOWN ON ALTA SURVEI'. �ozo�ueuqN w�r qomn I�
va eox iwe
C. A TRANSMISSION FASEMENT AREA FOR EACN OF 7HftEE(3) SEPARA7E �H-FRAAIE� 'w�.�l•wA BEW2 �
WOOD POLE LINES SOUTH OF FENCED AREA ANO CROSSING WERAND, EACH SUCH (�25)8/3-51W � R7
EASEMENT MEA BFJNC 50(lY(80) FEEi IN N'IU7H HAVING THIRTY(30) FEET HIGMMAY: WsooT � �
OF SUCH WIDTN ON EACH SIDE Of iHREE SEPARATE CEHTERLINES DESCRIBED D6TRICT 1
AS FOLLOWS: 15700 MnON AVE NORTH ��
SUTRl�WA 901]]
TME CENTERlINES ARE THE E%ISTING 'H-FRAAIE'WOOD POLE ELECTRONIC ����-��� � �=Y'� i y1
TRANSMISSION LINES AS PRESENTLY CONSTRUCTED WITHIN THE ABOVE pOMI Of CON furni j��' � ��
DESCRIBED PROPERTY. /; �'�
D. A DISTRIBUTION UNE EASEMENT AREA FOR FOl1R (4)SEPARATE SINCLE WOOD �8 N�Y47 I6'W � ��� ��
POLE LINES, TWO (2)ALONG TALBOT ROAD,7W0 (4) RUNNINC EAST AND WEST, ��—p68LB1' � 8/ T���F�
EACH Sl1CH EASE4ENT MFA BEINC 7EN (10) FEET IN WIDTH HAVING FIVE(5)
FEEf OF SUCH WID7H ON EACH SIDE OF FOUR(4) SEPARITE CENTERLINES f.� . ��� �� aa
DESCRIBED AS FOLLOWS: � �_� � �y �
IHE CENTERLINES ME THE EXISi1NG SINGLE WOOD PO�E ELECTRIC DISTMBUTION POwEp ��� C9.HN ���• y/
LINES AS PRESENTLY CONSTRUCTEO WITHIN THE ABOVE DESCRIBED PROPERiY. PULE '� Goi OF.� / /��
�4 � e NN� " ' 4
E. FIBER OPTIC L1NE EASEAIEM MEA: AN FASEMENT AREA TEN (10)FEET IN .! bEGDi � � /
WIDTH HAVING FIVE (S) FEET OF SUCH WI07H ON EACH SIDE OF A CENTERLINE /� � ,h ..� �� x � ` EC�
DESCRIBED AS FOlLOWS: ,�' � �
THE CEMERLINE IS iHE E%ISTING OVERMFID FIBER OFTrIC L1NE AS PRESENTLY � ��� _
LONSTRUCTED WITHIN hIE ABOVE DESCfiIBED PROPERTY. � � /�' ` f
�!,SOY M
P. ROAD FRONUGE EASE4ENT: A STRIP OP IAND FIFTEEN (15)FEEi IN WIDTH, A,/ — ,,�� � � T
THE NOHTHERLY BOUNWRY OF WNICH ADJOINS THE SOUTHERLY AIMGIN OF SOUTH / � / // '�����
GRADY WAY,A STRIP OF lANO fIREEN (15) FEET IN WI�7M, THE WESiERLY P'� ;��'� ��, -- � I ��
BOUNLURY Of WHICM ADJOINS TRE GSTERLY MMGIN OF TALBOT ROAD,A STRIP
OF UND FIFlEF11 (IS) FEET IN N70IH, IME WESTERLY BOUNOAR!OF WMIC11 I y�/ ' , ��• 15 �-y— R.-
AQ10M5 TME EASTERLY MARGIN OF BENSON ROAO;MID A$TRIP OF UNU FIFfEEN " p,O .'.. � i. �, � �♦ ��
(15) FEET IN WIDTH,TME EASTERLY BOUNDARY OF WHICN ADJOINS THE WESTERLY URi ,.- ' �� E45ENE I 'F� —_
IAARGIN OF BENSON ROAD,THE E7(TERIOR BOUNDMIES OF SAID STRIPS BEINC I \ y� .j �/, � /� y"A REC. N
EI�HER�ENGTHENED OR SHORTENED ACCORDINCLY TO INTERSECT WfTH THE -�� .� Y•�, � I�� A �3� -�
UOUNDMIES OF THE GHANTOfl'S PROPERTV. ; ji,4 // �� �p� �y�N���,I
�(// �. i . � T
16. THIS PROPERTV IS SUBJECT TO THE iERMS AND CONOITIONS OF A RESTRICTIVE � � ��� T ' ���� ' fW�10 ? '
COVENANT AS RECORDED UN�ER RECOROING N0. 20000125001281, RECORDS OF � � � �� �� ��''. . � uo�rto�c .
NINC CWNTY, WASHINCTON.(NOTED HERE) ^^/, � / yd�' /, �� -�� ,••. �wcu(ynu)��
F
17. THIS PROPERIY IS SU&IEC7 TO iHE TERA15 AND CONDfT10N5 OF A RES�RICTNE ��• / t % �_ 2 r �_ �=.r�.:!'•tdl, ,'
COVENANi AS RECORDED UNDER RECORDING NO. Y0000125001Y82,RECORDS Of � � � ����•
_'.. �� �� � i o �. ..�e,.
KING COUNTY, WASXINCTON. (NOIED HERE) i . / ? '
• ,
i � . ,� 3 �_fi�. :IIIONffO(Po
. / :� .��;'���
�,- i
i '
,4, j � \
' �� � �0� � ! r �. �
, o�, �'
,�g � j� �.: � � i nNRs.
_f���� r��� �-CB-W // � / '�.� /� ,. O� �;� �' '�y::' • ����IZIIiT��_1��'� IJ
• ,y�::� \ ... � � ,- ,�s��/
�tl'�� � i '.�./ /ICX r r/%7 •"� ;MfL1��107)I^� �y
�,�::• � I / /fl�y' •(S�t . :� FWIO—\i��V c"
�� I ww._Y� t / (� . Y � _ I
� d,.� � �� ,� ��� ,��� �`� PARCEI,-� � _—_�
�BU l0T y
sia+?�. // wi <, / (((f"�'} n • `� � uoHs ,` �r� �' � g�. Ho�c � _
J-BO%-- / .- � ' y�i '�WU(q115� �, s\ � �`RECEIINONf EQ ✓ �f+�' , I ?�7;bY -..
� \ �,�'"� �C/0�d9�.4QY � ,� l VnRE" \��.��� '/.:� 9812171951 �,5� r7� • tiy-- -" .... ,J
�W� � .ER 'R 16 00' .�Y 'r �/ . .. � ., �u"� :�f.v" `�� 9 , i o � r�w/
u,v�ai L� Qi¢P'"��. .� V r«,No •�ic s / ""� �
uodrrarnNc (
i' v �ti� al+•eA iqrirt �u(euwia) a Z��� �r'� �,y� r lt j�> I
•'6•
��"� ,� sa" ��� e��< ' Y " �l \�`( '°� � �'� �/+'�:� �, �,I
x D 1 a�� �� . s�"�'� N,� E��,
��. '��� . J��b�� .� � Sl � .�.�, Fq'�`M K��:,i± �� ' ��� ,� �
., N ' Q .,�.. . c N a � � P: � - i'OUND �s� «r t`�`, , I �
!y „ � ��IUiTiC �` ... � �� �.. .: , �
t � �' o "a4...._
�i�� � N , � MONI70RING � ' �' � ��
F �„�/.� Y Y -X � � ��R�' \ �;. ` . WELI�W.IW14)� " � 'a:. �
� ...� J§� .�
�^ „�e�"nR t� FISEMENT'D2Q �r � �a�'' I"
J
� ' u -` �T ��� \�`��9eiztN7�ivsi . F x � �;, c`- : f
/� 'Y� / . J166 � h �, •
GTCH =i' f 922 � ..:�'d ���'} I . + E%IS7MIC I • �
� � � - �z• � u1�MN� 5' WATERIiNE EASFMEM� ��°' ���'� ., .:po�r � �
� 'ti4 �0' . � n . TO CITY OF RENTON Y
i >
�� �' � B :' ER RfC NO �40529Q4d4� ° g� '� �
rnurwrr :,i l.� .,pu+e X �w��� � �+ � � � 1,�a� �#"�� ( �fRf
w�i[n V � 1 i ' .,�,
Fn I
vK�c '� � vw �`��,,,� f � �� � ;1 +
� �I _' ` �r� � ..,�� �;�� ,k �f ��`,
.%' ���- �' � �p`� �ry.. '�. �,x'��'� �°��,�r�
i p�NG�
'\\+ 9 6-` ��• _���'+'*�"" 4 I .��12 I� '
�\ - i._' �-.u,TM�T� CUY / M I.a"� .�iS.,�
\\ \ o � ,M � -� �,i .ucur ' --r"�
�`.L.
� � ,1,. ` �e ^+—=L.� _��'$. �oi �r.
� � � � � � �� L �'. ��� ` �/ � �i���� n\\.�suu+n vDSrs*�`�� !
i�w �.. ,w � : : \�' �...`-. —..�__ ��
� � `� ���_,�r- i5510N
wy ; . 2)5 : .. �:�1 ✓ LE '_
�M ,w iw iI " +, \ . . .. � -
:i
, \\ ,., -� °.' : ,�_ RC�-2..._�-� �.:
�.� .. ' � ..., �, .;; �..... �
:��� '� � ' 1 �PME // � �.
� U-�' EET 7• N4r '�� '
\ � \ .: , , W1C 311E .'�
\ �., � C `� �'`�`�fWNO ' -0¢ �� .�� fi I .�..
iW 1` n �Ni0RIN0�' � � �
r. �y�� k tl ���t� � !�
• � \ � /Z•�E / .,� . ' �" � :��
�P X ,,�.� .. I �»
' 1��-..`
����c� _ P�___ ' 1`�p, -< �MATCHLINE
�\�o` ASN/`S� �'_'—'_'_'_'___'_"_'_'—__'—'___'_'_'_'_'_'_'—'—'_'_' _ _ �..lt O�I0EE • \�\ REC. N0. /� �^�r---
L�W , ."�As�ar oT'--=- --�- .... y
�,< -�� \�• � ., wwN 7 .�a.�.98121 71 95 7/151�� ..��� � �� � �/1
� q�82 8`a �;y
sipNA�/S1CF 5Q 6 OJ/Y7/03 SRF NWC RWC ADDED BUS STOP!TEl WWL7S
LAMO 5 0.7/It/03 9F ISC RMC fJMNGED�MQt t11E.
/ Ol/09/01 A6 IdC I�C OMNGm 9EFT 5�.
[wnrs 05 1H 03 J 17/07/02 96 IEIG I�IC UIORMEY COIYENIS.
: ii/u/o2 ss � awc �nawcr caw�s t uvahn imc a[�aar.
i ii is : ea m�c aw aroacr�ns.
Mo. Dob B� Cka. ppr. WNWn
Job NumWr x�. �/�!
��'H q�S 18215 72ND AVENUE SOUTH DNIOMA� •�" PACLAND T�
�BSZ P � KENT WA 96032 o�o.n � Ma4o�,�
� Z �azsj zs�-szzz 9709 3RD AVENUE NE, SUfTE 203 ALTA / ACSM LAND TRLE SURVEY
sn..i n � (425) 251-8782 FAX �""�"d� '��
Z � „�,a.,� „�,�,, SEATTLE, WA 98115 RENTON, WA3HINGTON
sL Q.5' CML ENCINEERING, IAND PIANNING,
1 0� 4 (r�NC ENGWE� SURVEYINC, FlMRONMEMAL SffMCE$ pa�10/Y9/02 � (206) 522-9510
I f —_ _—_ _— -_—_ —__
POWER POLE-��� ��P� TCH
W/LUMMI4RE .�WNc OHOP �
W/iRANSFOHYEfl •••
W/UG OkOP
� -� LEGEND
° �- �� ���
� ��-�� �
n .O/UI V111LT
���V � �/./"' d--�.� SIIEET/l0i llCll ��'!' C�.., IVNpKi[
WAIER VILYE$ �N_\ 4 Op[��ppE �
1 G/f►71L �
• " ' � � ,��w�, � N
r , , �
FlRE HYDMNi ' „ � - � 9� 1E181b1E�MMIOII . K�,yp
. E tP
r H si{�EET� ❑ GA�I M9x .'�," W '_ IN1ER Ill�
sioH� �;� � � "�'� uart : o w�inm a�im W»�ac _— �u�rcc u�c
I�.�. N� --WA1CR SWfN(I StYFR 17FNIOUI G T W-_.•. �� �A�
gy �� - � , ,�� w t'*'F��E
ftOCNERf I Sy.� '� 1` � VALVES � Gt5 WI.YC —��— N1R UMOFJ�UD
j '(a')- PO'�'F]I WWGD
� g .„: c n --- ) A '�� —•—• ww uu Fna 1
��.�. y� �" i m IWFA YwuE o eaE xni T
+ � � wtn�nu rpoa A
� n soi
kocK� � •,• � � �unce Mni lCI
POWEN� I .'�1'��� � �( � � J
VAIIIT �
� 3i � 1
�" i
POWER POIE � ' •���`� I/ 1 L1MI15 Oi WL7ILEVEL
W/LUMnWNE ��-..�. g j� / -i'' /J) ; ���r,vtKuro I o SCALE 1�� = 40�n
W/IIG OROP ^ � I KR
VI ���.. / ;'I I� I
WATER MEfEF .Q . + /4 ./'� • �/ - I I
� 1 ' .-� / ' � !
g �` I I j" %� i ; �
W +
, I ,� i � � =
9CN ..:� �.. -1 / �� � � � //4�� I I ' I y
� f I/ Y/ /� / � J � � I
� � Ctl}AN\ . / / � J Z
� � � ,�%e- ���� �� ,r- � : �
_l4� �'.�% �:�� / /, � � i a
` p., � � / �1� I � 1 a
/ � I I
/ siRCEr �
n�,:6�51 � .S�•' . IIGM� ..�� w� I � ��
�a � � " � j
� .�� ; ��, � ;
, T�,� �N ��a� „ �.��y,Tl�` F RENTON i� �----� '�
I � � I �--' j �
. > i
�i PoWEA / � • ��N '�. ���R\P A R T) � `\ � I�
-i I Po� � �itll � •$�` . '.•.� .'•K \\���`_ � J-\�--J � �
_ � ''. � �:�..: r- �
� " � �,�6 qb�' /� � r'';�j I � uwrs or wxn�
Z I �, l � �(6 �'��.• � +� •.��. {� I� CONCAEIE PARKING
m /r �`"' � \� .s r��: �' ` c�wH i rcN �
` ��� r.. -�" � .� uHK I\ fl�v" i
�%�� „{� ,,' r�� �• a,./ � l IWTf 7� • .. � FENCE � TCM OX4 URNN GTCH
1 � "y'. ' P�I�� � � � 4�N� � I P H�ISIH ILWHOIE �SIN
�I ���� �P Ww 9.P / � • ,.�'9J90. I •r}-, - - - - --
��.� 2��� -eo �.. 4 % 4� �bp'9�1.� = g�i �-� . �}o,
;�G v '� /ti6 ��. � �
� , � .y� � \ /
� ' � y ". �' �/` ���I
� , ,�
�S UG�rt� �� %b /� a,0.t �/ ��1 u � `R� •,� n xocK kv
.� K PO N � .�. �IJB� �+w �i 6TwY ' 0 r� ' ••�•� �J
w ��� w
� ' e-etoo ,� = � ' -�
s�cr�urc � -- � �
,�J`�Q ;� - - - - -� __ + -- _ �,E-- --
�' ' '��� c-es�o•
j( �4� �" P A R C E L 3 ��- .��`- �- ' REfI1NM0 WALL
� ` �� : �-
• • —
_---
�,, �9. •�W `��',� .�... —�„�W � ._. ''rr��� Gr�_ -- = PORTION
:�
�
JE I
'�A ke _- ._—�� ' 9�.o€aoueid""" °tisw � B076'
j ,y 1F�10NE _ . \
�� '34VAULT L � _ � � " ' PARCEL 4
-, � = ,: • �.. . , � �, ��� . A
� � � ./ _ � 1� � II � (INCLUDED)
�EG W/.iER 1 x� "' • ., � .V T8 t 0�OECIDU0U9� . .ypH p
7'i 1.E�R , $ " ��' � "��$. iv auu�o �� t i, i_ ^�" -xaE-"{o�iw`,e):. � euNNN pppNr'�'
�"
i �<-' , rt•-.-,-� ��.\ .."�:'�6. . " i r .. `�S . �� tN� il - 9B 417�951 I I I \ �
- ORN�c r r.�
�Sf} VALVE �„ �"����\ '�� _� --� �or r'� ,: ' T � Mau�ir�oRiNt � � concr�cre
_ ..
,--�eoX � a;%'` ce . uart y ��' ucNr weu(o�wn)� �,i`� to / } �II � u r+�nwaee w�
�
I �ssNM c{„"' r-� i �� �.; [� �t�;:. �, ' / / I� I � q
HAIN Lk{Ic�----^ I
a. _ „
� w.
�'f+'`' NCE aR � '�C� j� / � /' I II �// II
^ __ 2 - cuAR `�� {, x`� � 1� �'�' /Q` / / II I I I ' y:
/n��. � ,� r.
f�.0 sr �'C. �}sun i � �,,,, .i $i� �� � �r e�oy�'''�(+.� � i ;Y'� ce-w
ti
.t�E�' �.'� �`�� � - �„', a ._� _ _ �+�� � ,70• � Su *� �u% � II�N cu�wu � ��� u
a$ �' �E �PFO 'M � h N0T I�WNO /I
� .?. R 'i! �t �.. �;n. ,� �r\� . � _ PS t2 O, .� ,1� q'�` I / '/� 1
�� �> - .� �,,� � l_ � � �� I �°
lU�,i�,... .� ��� 7l1� ,�, .•___ G1E. . .�yY+ � +1M �/ - �- //� I I I II�� uWIfER
.
�(IM20) •��� �S I-+ � k'�BE tN � ��I ���� •//// �� /�I I I h':
:.
. ,
�
�':•�; � �. �� r • sa, 4�'� �.��: �_ . HOIE / I
�r. 4., . Y .r. \ �� 'ido C8^NN •-� • w, � ��r. LNCE f. N� aJ';R r� � � R � �I
�`�PoUNO YT. �.`'V,�. •f �� .l�SfORM �� 'r,Q-A� /..�i �a' � ' �p'L P .i.k�"r� «, �II /��� II III .III
'YOWTONINC , . d NS ;���'' ., � �':' '�� � ,///�� / :11�I
�w[II (uwe) �,.�f�. �'r; �^-`PU'NGR r c \6 ' .� ..t� �� �p+H .,ti" y.4n / __ � �N
� ��� ��voxin �"1/ �� �t�� CB-� �,� �.�� .'� � ,a� "`�u . �' ' �'", .f � �'r� ..�3� ����
-�,• SS� �, ,�. ��;,w�i• i� ,�s_ � - •1 1 `�r PAfIV�I-/I �/ �,� / � fl P I'� �ppwEN
e5 �. ��- .. �/ �:n'` ,r'.'- ., �/ : 8 � / / / �/ / ��li �
iSfNRs �, !.�"• // +} I G�5 q � � 'TA4l aLE � OT 6: �J// // i --:ll /
•�y�� • �B POWER.� f� < w� //i-� / ucr�'� � �. 7 ly �'
'Y � M V T t� � _.' � C9-n
It.: ����,:�.,�,:e.' k� 'i � r � �r oo�•w� � —.� w�r�E
��.::.' - �.rl`s r -i�v.y /� ���� . � � �;�'. / {.-, / �[�5� / �� /�r�
r . �,•'
r -,� .�� ���' �e �' �„-� -'+
"4 ���� ''�. '' -� &�� qF t �• � �� � ' �
� � � �Y[jEx4• � �" �'� � ..�� �� � �'. pM�,�UI �� ����� ,���, ' �.� ' ����
. �. � " .. � :. e:� I
r ! � �''� }' �' r� ��NQ •. 'i� � - �/ ,� p•�• , �/ 'I�
� �.i i � `� �5',. �� C 6ff .��� / _ ,�'/� / -�F��
�.ii• • I � y / J I .,'II
�� �"' ,���\,�`_/ �
-j . °,., I i` 1" a ! :,-�T ''�"°��- ,- n � �
� ����o�� �� ���� �`�� � " 1�l
�'pl w�� ',- •.'Y ..A�1�, � PoWEfl . ^,orn�JY� � , I �-/5'17 \ � i��C �� � .��,, / �I�� I
� T� WLi �w� k�. Y � �
� o �t� I �
� ���. .� ��� A � � ` ����,��� � '����_ u"° s � ��� "„�;4'" �����
� ' , �� , � s, � .�� a �� �' � ��i � � �, ������
�"��' J :'r 'I�'tEz�R' :t.. �,� �1ET� �,"` , S o � �,\�a 1i^wu' agwppP�Y � !/ f II'��
s �F I /yAIN. �, �.. ��.• „� 3) ([(�dk �y{�
1 IQ •1 , �� /� \ \, PUCE /
�.:,
� .. 1 . , � . ��.��,•.,'.... �� / B. . / / ERl1NE OF
,.
� � � �� �'� � �� � �' Hc,�srwur �
, . -� ��
� .:,�:;� �.;.�'�::�.. �•� ��.�� . s`°'` �.�le.,�,(�����:,^ .tr' crw .uqK � �� _ �/ ��;� �noreHurxr
I '''r .,�f '•f,. ,��° :,� .}N.e o il �c. � :� \I��'\�\� \�:T�:. ���0 � /�. //�� ��� i�/�, c x oF�
I .+�. .�� '''4 �N:I�I ,�*�0,� � � �4R.`�wEl�u 1) �'n� �� I I\\�\��� � � ��� A ///�� �/��/
.,.
,� ' - I f +���� ��� � � �' � � � -.i � / /� �j /
�� •.��+ ,,���:.� � �� r'� a.y����.. t ,' r�' \`��r'�'t �`ID\ ,•"'i .'� �� / ����/ �
� �'7ti� y� . �" r � ��Y' �� �� � �E ,� r ��� �
.. .
���� t�'� �,. � ,t;m'�. ifi; �d��"':� � ��� ��„ �r� f' �,'p'� �r�� rr
� ,;, �� �' NN�� � � '��`t 4�Un� � � ) ���� �
:!� ,� � ,��� r'�l'.i. 1� e�„ ,'u� �� ,;.�' ::� � F� ��. ��9 0��' �jN ¢- �""�a �/� ''���� ��ICIO'00'
�i ;ti r . �; •"" ,z'� '''$ '' �//� "'k-toa.�a'
� , ,. -ip; �p, �..ia -+' �:' �sru�s
��. •gf x .� � "� � > 'j%^ _ _:- i � /i�� � L�Ml.6J'
��. ��F �,�5ea * �cOUM� � ��' N� �� ��' " +r� ��{ 4 �Ir �����G� ������ l
I ��f'• •�,� .`�. .••'hl �Ok '� � 'IA��n i� ut'�!.t � �/ .���_f �� � J �J I r� � l l�l
� .,�, a.�P' e„�y �R�'6 � a,� �' -' �t � �3 A PP �JOJ .�r ;;l
� �yf' � � �4 .�• a � WAR� � �`n�I��Uj,e. x � � i/� i
' �� ,. I aa � d�,�"`�� i �'� �'v'�e r / 'Y°u"� ,�'� 9���.<j '✓
I a�� S ; J� `�� � e� , in� T�cI,,� f _ -°"� � /////
.�. •�.s, • :;` I cwp � �i '�_'i�;. �-r t� �%i row /
� . '�.��•` i"�` `:�� ��3'3�.�,*�'� T� -� j ,� �, ✓�� i�'°-xo ' �` i+ lw`' �o / "�` �������������� �ie'se�,i°"c i
a�, y �� N/,/�� �
X �x�r, � �, �I: ' i )1.EOY Bi' ie�iu ' �ie i
�""o- ,� � // /
i� �. . •. .a��• z- . � � .� '� �� �G kSB,67 .,y j ,.,,� �s. ��eorj �� �� �
,..
/`�� � r��1��" ..1� � �rv,' ,.✓ ���.��I�� � // /�.�5�� y� / %/ ,,�� SSWI lllllllll�llll�/llI
• - �I:._...> •.
. ,y
" ,�.�i�- �� u:. I � � � i ;�y., � �, i ��� ��� � ��„4a"� ������������������ /
- � �, � � .,� � /////�
,,� , ,- - .
���,,, _�� �-�, ,�, �' •�� � �3 .,�/r izsYa"" �- `�� .��,cn `����d��''�' ,
. .
s �� ��� �:'` � �� �,�, ,-�o.�, � �� �,�,�� %� r , , � ����iiairirir
� _��_ a,. �, ; , , ,�K� �-,
� �: - ��r �
-��— �� � ,'� : ,aa�'3iss, ",,, �r %� ��j ;, ,� " �, ,� - - �
». " �/- ' � �° ! �w ' � /''' /Av� n o c i// ,� ';" � i" // crwN urac
� ` \� <�
/ 'h__ � _J�_ �S � --•�B35 J... !�/ /� //i�/'ry � .f P(W/ER� ��� /�� ` �\; �� ����� �E / �,�� C
n � r—_�Y ��. ' ';__ �_. � ..,._. � '.---/�/i�/ � ' �M :.� � �� �. �� .: -,�/ �/� � ,�, o� ASy�yJ`S
�--.,,_ _. ��--� ���
+ o�R�E�� �. . "'+"� � .,�/ � -/., � �� ���j -i - t�'`�,� _ �°���''1 �///������ �� r`�<
� a8 2.t77a � 3aa• ""_ L��� � /�' - ' . u�� � � -<-� • /% ; '�/� 0-a�ls•�s,.
�
� 'iw 5f � • �;... _ -„�,y . � 'i i � N ,<; � ���" �. � � ' � //��� '�"' �
.. �lo.., , � a- ,x %' � R- i7ss.es'
� ` � �-� e �`. '. ,i � ���� �� l���',, , � . �� � � � � L-l3090' y �,
I ., � n' Nr a t t Viwo � � ; 1 � x i ` '^ 8238
� 1` f a+k�� �� � , Dp,yN � /� � . ,r-/1"' / ������ I �'rip���/SiCP�`�5���
�..i-.� ��'�� A
-_. i:,.-�-� " --+'.��..i d �N�' '. �� � � �� , ��/ �` ��i �� �'�� LAND
-�»iwr- jj/-
.�.�".' x - _ � __?���YBURIm /� / ///�• i �� /t'N -�� nwars OS 18/03
/ w 8 03/11/01 S16 pMC RNG BUS SfOP!IEL WN175.
_±,--- - -`�-�� swnurr Il/��� -- �j � ��/�=__i � o�/0�/03 sa� arc nwo �ATCHLINE
.- _------ ------- ��------o�o o.��. . , i _ �,i�, , � s-e�t/�-s�--wws-�w--
J ti/02/02 96 ArC RWC ATfONW.Y COYYDIIS.
7 11/25/UI 96 IAG RNC ATiIXKY COYYFl1IS k IAM7FD TIIIF qEpppf.
1 I I 15 02 Bpl RWC qNC QR)RNEY COINp715.
No. Ool� By Ckd. I�ypr. p��q�
JoE NumD�r G_
��'H q�S 18215 72ND AVENUE SOUTH D�i9Md� �»� M PACLAND r�
10682 P � KENT WA 98032 0,�.��+F �,,,�,i
� Z (a2sj z5,-szzz ,,,,,Q 9709 3RD AVENUE NE, SUITE 203 ALTA / AC3M LAND TITLE SURVEY
sn«� � � (425) 251-8782 FAX G"`1i°� �•��0�
z ,,,,,�,.,_ �.,,,�, SEATTLE, WA 98f15 RENTON, WASHINGTON
sG �y' CML ENCINEERING, IAND PUNNING,
2 4 `r�N�ENG\NE�` SURVEYINC, EtMRONAIENTAL SEFMCES oab����o�� � (206) 522-9510
—or—
N
�J' `1
LECEND �.��� � � f=_
MATCHLINE � ` 1° "n,�`_--
� kr ---- -----�---- - - - ! i �---
��E�SEUENT Oi
C.2--s txarc apw va[ ;`e e'��" ,�w7 �T r. 7EtLP�wNE REC. NO � '�`"-�"-"-� � � '
�/.�1�}"
� vOAEMxvxf ���,� W��-�' \, ` uu1M01.E j�' 1 ` ��98 2171951��If �" . WTEa �
a\
4 s�/�� r '� rancR ♦ PACIFIC NW BELL ', � �� z),� ' e.. �- +r� � �'F v vE -'�
U �� Q TELEPHONE �\ �° �� Pi '�"��t5�%� � � ��..
�- nORA rolE �G�Qi FASEMENT REC. \� � _ 4 �oi ��-- �- ...r''
a/f OQ \ o� , :. IKNf � `__"'
iD ifltnprc rw�ai � . . N0. 7205170197 ��,' '��� �Q0% Y � - - _,��� '�� ��E��
u Wtll BVN �'�"""�,_- M7m uE e'P R 9r' �YI7�
o smNu wwqlc � wttwn mi[x Il1E � `T �.., ��- �,.� vo�� .::..�FoIE, y, -� �,,,� �8
- SdFN 951IH H �• i..•�`�:
� surtNn sm�Wwne --- _ smw oxwiurc uc �� � (z)i r+e +` t"_�
O SW WIY$F191 OFAIrM1I G � c GS IlC 0 M �0 li .� G4R :,
FA M
RA GS IE1G . .'(uc) R1FPIp1E UOFAGOIID \ �' 1\ - ���^-�- � ,;ri��
o�a w�im wx -•np� K-�- rai u aw�r �O SCALE 1'� = 40' ��1',� '�,ze, i __.._------ ---T-- �,�,,._�-��-
• aw uR rurf /' _
�m w�im w�wiat o ea�xo� rn ) -,N� I :i � � ---rua�nok--- iNc'\.
- mp�[ vK ce- wni (nuw����8�
m rmi�ct[R �n�ow�r� � - � H-� � SECf10�1 LINE
,l gni .�
0 inrmx rtu ..,� I
- - -- i,ti« i �' � I
lE
..:.II " i SIG E . , .. I �829� �,w
� u i .
SURVEYOR'S NOTES LEGAL OESCRIPTION
(METES AND BOUNOS LEGAL OESCRIP710N OF PROPOSEO SAAI'S CLUB PURCMASE) I s ��• � � � I
1.THE flA515 OF BEARWGS ANO COORDINATE POSITION FOR TNIS SURVEY IS �H`;, ' ! ���) � �
7HE WASHINGTON SGiE PLANE COORDINA7E SYS7EM (NAD1983/1991) REVISED PARCEL 1, REVISED PARCEL 2, REVISED PARCEL 3,ANO A PORTION OF I � \,(60.00' �4 � I I
NORTH ZONE. UMBERT CON�ORAIM.CONIC PROJECTION,AS PUBLISHEO REVISCO PMCEL 4 OF CIIY OF REMON LOT LINE ADJUS7MEM N0. LW-BB-ISS-LU� � �
BY THE Cltt OF RENTON. /S RECORDED UNDER NECOROING NO. 20010213800004, RECORDS OF KING CWMY, �p. I \ ��0e.p�e�q.. • � �I .I
WASHINGTON, MORE PARTICULARLV DESCRIBED AS FOLLOWS: ' iobND . � � �
2. THE BASIS OF VERTIGL DATUAI hON 1/115 SUHVtY IS NAVD 1BBB,AS � .. p. � x YOHtjONING \��. � �--�-�
PUBLISHE� BY THE CITY OF RENTON. THE BENCHIMRK USEO IS CIiY OF COMAIENCINC AT THE NORTHEAST CORNER OF SECIION 19, TOWNSHIP 2J NORTH, �«`(e�'�o) �� ,�- �
RENTON BENCHMARK NO. 2123,A STANDMD NATIONAL GEODETIC RANCE 5 FAST, WILWAERE MERIDIAN. FROM WHICH POINT THE NORTH OUARTER I I � EMENf�F�^\ -I�
SURVEY (NGS) BHASS DISC, STAMPED '0�62 1973,'SET VERTICALLY IN THE CORNER OF SAID SECTION 19 BEARS NORTH B9' 42' 18'WEST, 2861.01 fEET � r 1 EC. N0. A�1.,� �.
SOUiHERLY FACE OF THE BWCK WALL OF THE U.S. POST OFFICE 1WL D�STANT; ✓ :� I 98121719515� �
HPNDLINC BUIIDINC,MPRO%IAIATELY 1.5 FEET EAS�ERLY OF TRE THENCE SOUTH 00' 44'IB'WEST, �2.13 iEET TO THE SWTHERLY MNiCIN OF S.W. , vaY[R% � . �j j
SOUTHWEST CORNER OF THE BUILDING, IOCATED A7 7HE GRA�Y WAV,7NE POINT OF BECINNINC,AND 7HE BEGINNINC OF A NON-TANGENT 4 � y��� EASEMENT�D3� � . � .�
NORTHFASTERLY CORNER OF HOUSER WAY ANO WILLWAS AVENUE CUR'JE TO TNE LEFf, FROA1 WHICH VOINT THE RADIUS POINT OF SAIO LURVE BFMS � � \�� F REC. N0. GT[M
NORTH 40' 22'48�WEST, 3857.93 FEET DISTANT; � � \ y ATEF 9812171951 B/SIN
SOUTM,APPRO%IIMTEIY 1A FEET ABOVE 1HE GROUND. 7HE ELEVATION ��� wl� N
THENCE NORTHFASfERLY ALONG THE MC OF SiUD CURvE M10 SOUTMERLY MARCIN w_
IS 1J.750 AIETERS (�5.11 FEEf). OF S.W. GRA�Y WAY, PASSINC THROUGH A CENTRAL ANCLE OF OT 14'OS',AN -�- "' - � � _�� - -
MC DISTANCE OF 217.8] FEET; SCN � "
S. TMIS 'ALTA/ACSM UND 71TLE SURVEY'IS IN ACCOROANCE WrtH THENCE NORTM 46 23' OB� EAST.ALONG SNO SOUTHERLY MMGIN 79.E9 FEET; - - '�+��
'A1INIMUM S7ANUARD DEfAIL REOUIREMEMS FOR ALTA/ACSM IAND THENCE SOUTH 4]' 38' S2"EAST, 100.35 FEEf; / N --��-�� � SaEpMA7�OP
➢T1E SUItVEYS"JOINTIY ESTABLISHED AND ADOPTED BY THE AMERICAN THENCE SOUTH B9' 59' 3�'EAST, 9SJ0 fEEf TO 7HE BEGINNING OF A NON- � �p� � �
UNO TITIE ASSOCIATION AND AMERICAN CONGRE55 ON SUHVEYING TANGENT CURVE TO THE LEFf, FROA1 WHICH POINT THE RADIUS POINT OF SAI� Nn ���E � � � �� �� .,
AND MAVPING IN 18BB. GURVE BEARS NORiH BB' 23' IJ'EAST, 62.00 FEEf DISTANT: � CIWN uNK�WCE '
iNENCE SOUTHEAS7ERLY ALONG THE MC OF SVD CURVE, P/SSINC THROUGH A � GVf � �T . . �ILONC 7oP o�w ����}-` +
�. THIS DRAWING AIEETS THE NATIONAL AWP STANDARDS FOR A TWO-FOOT CENTRAL ANGLE OF�3' 12� 13�,AN MC DIST�lICE OF 90.04 FEET; �� �� �'� i� "�
1NENGE 5011TH EJ' 16' Jt'EAST, 1M.2d FEET, ! !1�' � ������
CONTOUR INTERVAL AND DMWWG SCALE OF 1'� 40'. UNAUiHORIZEO I � �,7 (Iq7�WNU�, � + 1 d�
EN/ARGEAIENTS AUY E%CEED THESE STAHDMDS. TMENCE SOIf�N 69' SB' 31'EAST,87.75 FEEf TO THE WESTERLY WRCIN OF AWN iWND tl ��'>>1�� � `•` 1 �`�
AVENUE SOUTH (BENSON ROAD SOUTH); � ,� �. ,.
S. ALL TIiLE MFORMATION SHOWN ON THIS AUP HAS BEEN EXTRACTED FROM TMENCE ALONG SAID WESTERLY WIRGIN THE FOLLAWINC FNE COURSES: �?����� � �-N '�� � �, I �
FlDELItt NATIONAL TITLE INSURANCE COAIPANY OF WASHINGTON 1�IENCE SOUTH 01' 29'24�WEST,298.82 FEEf TO 1HE BEGINNING OF A 199.18- I - I � q��yy,TFp� +,�,},J-
FOOi-RADIUS CURVE TO THE RIGHT; j� -BO - c SEpuV,TOR � "�'��, ��'���
COMMRAIENT N0. 0170991, DATEO OCTOBER 25, 7002. IN PREPMING THIS ���
MAP, BARGMAUSEN CONSULTING ENGINEERS, INC. HAS CONDUCTED NO �HENCE QONG�HE ARC OF SAID CURVE,PASSINC THROUGH A CENTRAL MIGLE OF � cn-sv�-'�e.'�'"�� r_�•
4 B' 4 8' 0 0',A N A R C O I n A N C E O F 1 6 9.5 3 F E E T; � _�,:�� / .r� � \
INOEPENDENT TITLE SEARCH NOR IS BARG/iAUSEN CONSULTING ��.. ✓ •
THENCE SOUTH 50' U�24�WEST,81.80 FEET TO THE BECINNING OF 507.46-F00T-
ENGINEERS, INC. AWME OF ANY TITLE ISSUES AFFECTINC THE Sl1RVEVED 1 yyy���
RADIUS CURVE TO THE LEFT; �.�����+ + ///': 1_'
PROPERIY OTHER THAN THOSE SHOWN ON THE AUP AND DISCIOSED BV THENCE ALONG THE MC OF SAID GURVE, PASSING THROUGH A CENTRAL ANGLE O� � I�( "
THE REFERENCED FIDELITY NATIONAL COAIAIRMENT. BARGHAUSEN y5' 2B'00',AN MC DISUNCE OF 225.36(EET; /� �
CONSULTINC ENGWEERS, INQ HAS RELIED WHOLLY ON FIDELI7V THENCE SOUTH 24' 48' 24'WEST, 126J0 FEEf; U���� .z + � (�
NAiIONAL'S REPRESENTATIONS OF THE TITLE'S WNUIiION TO PREPARE THENCE NORTH 7T 30� 12'WEST, 91J2 FEET; g.�SiH \ - � ry �. � ,� „ I�
THI S Sl1RV E Y AN D T H ER EF O R E B A R�H A U S t N C O N S U L T I N G E N G I N E E R S, I N C. THENCE SOUTH 11' 25' 33�WESi, 9.83 FEET; I „� � � I I1
OUQIFIES THE AUP'S ACCUftACY M10 COMPLE7ENE55 TO 7HAT EXTENT. THENCE SOUTH J1' 28' 1�'WEST, 27.44 PEET; I ' " � � I'1 �
TMENCE SOUTH St' J7'03'W6T, 412.}2 FEET; -H- ��. "'�� /
8. PROVENIY AREAS: PARCEL 1 = 359,280 t SOUARE FEEf(8.2�8 t ACRES). THENCE NORiH ET 20' 45'WEST, 59.19 PEET TO iHE FASTERLY YARCIN Of SR- __-- --- /// � ������ +
PARCEL 2 : p31,805 t SOUARE FEEf(5.324 t ACRES). 515 (TQBOT RQAD SOU7H); _ � -- - U7� - ^ 1 . v +��.��C�� �.��
PARCEL 3- 38,510 t SOUARE FEET(O.B84 3 ACRES). THENCE ALONG SAIO FASTERLY IAMGIN THE FOLLOWING FOUR COURSES: ����N �7 / y�.. ��, .
PARCEL 4 = 1BB,3B0 t SOUARE FEET (l.577 t ACRES). THENCE NORTH 07 JY' 13'EASf, 1S0.7S�EEf TO THE BECINNING O�A 750.00- p 1 II, �, ,�
(POKTION WAL-1IART PURCw�SING � 63,077 3 SpUARE FEET F00T-RAOIUS CURVE TO THE LEFf; r �� �� U y��� �� r / /
PORTION SELLER REfA1NING - 1]7,J0] f SQUARE FEET ) THENCE kONG THE MC OF SAI�CURVE,P�lS51NC THROUCH A CENTRN.µCLE OF q w I� Y / A�'A�
35' JI' 26',AN ARC OISfANCE OF{65.01 FEET; tl j'� �`��'C�,I�+��-�.�� /
h1ENCE NORTH 37 52' 11'WEST, 1�7.91 FEEf TO THE BEGNNING OF A�5.00- y . ��A ��� I
7. THIS PROVtRIY W15 LECAL ACCESS i0 SOUTH CRADY WAY AND FOOT-RADIUS CURVE 70 THE RIGHT; U _ � �.
TALk10T ROAD, SHOWN HEREON AS PUBl1C RIGHTS-OF-WAY. PMYSICAL THENCE ALONG THE MC OF SAID CURVE,PASSINC THROUGH A CENTRAL MIGLE OF 9
ACCESS MAY BE LIMRED BY INPROVEAIENTS, OR IACK THEREOF,A$ BU 36' 19',AN MC DISTANCE OF 6B.39 FEET TO THE SOUTHERLY AIARGIN OF S.W. p `� �-�� / / / 'I i
SHOWN ON THE SURVEY. GRADY WAY AND A POINT OF REVERSE CURVATURE WITH A 3837.93-F00T-RADIUS 0 ' '~ "`, j�� �
CURVE TO THE IEFF, M � I � I 0�$LOPE� M T PQR
B. TAX PMCEL NUNBERS ON THE SUBJECT PROPERTY ARE: THENCE ALONG THE ARC OF SAI�CURVE AND SOU7HERLY AURGIN, PASSING r $HPERWR CAIKE �
202305-9007-OB (PMCEL 1) TMRWGH A CEN�FAL ANCLE OF 06'06'5��,AN MC DISTANCE OF 411J4 FEET TO N � I„Np,.J610i����' /
915480-0010-00 (PARCEL 2) THE POINT OF BEGINNING. 1
172305-B1BJ-09 (PARCEL}) ► � � r . 1 " " / � � II � ' �
Y023b5-9008-07 (PARCEL 4) q ��I I .�:�� f I + �, � //// /
AREA OF ABOVE DESCRIPTION eo• x
9. ZONING: G(COMMEHCIAL ARTERIAI), RENiON,WA N I I,�, � / /
691.670 f SOUARE FEEf(15.B7B t ACRES) N I . �.I ' � R � � } / �
10, CURRENT MINIMUM BUILDING SETBACKS: 10� FRONT; 0� REAR; 10' SIDES MINIAIUM Y �/ � /��� I I /
PER THE Cltt OF RENTON 20NINC AIMIUAL. PLFASE CONSULT 20NINC MANUAL a I v IIII
FOR NLL PARTICULARS. '� q • - � � `,� // � .
11. FLDOD ZONE DESIGNATION - X,AREA DEfERqINED TO BE OUTSIDE OF p� p��� �' �� � /
500-YEAR FLOOD PWN, ACCORDING TO FLOO� INSURANCE RATE A4W, �� I � �
("FIRA17 N0. 53033C0977 F, COAIMUNITY N0. 530088, (CIiY OF REN70N), � �
PANEL N0. 0977, SUFfl% F, EFFECTNE MAY 18, 1995, KINC CAUN7Y,WISHINCTON, � � I �c t / / / / '/ �
AS PREPARED BY THE FEDERAL ENERCENCY MANAGEMENT ACENCY(�FEIAA'. F%� /// �
1 2. U T I L I T I E S O 7 H E R T t 1 A N T M O S E S H O W N A I A Y E X I S T O N T H I S S I T E. O N L Y
J-B01( N / i
THOSE UTILITIES WITH EVIDENCE OF TMEIR INSTNIATION VISIBLE AT �,� T` f. �
CRCIIN� ^U:iACC ME ^uiIOWN F;EnEJN. UNvERGFOUND Uf1Lf1Y CB-zX� �• �, - � ' ��/j�/
LOCATIONS Sf10WN ME AVPROXIMATE ONLY. UNDERGROUND
CONNECTIONS AfiE SHOWN AS 4RAICHT LWES BEIWEEN SURFACE �g_yy ` \�� ^'�� �
UTIUIY LOCATIONS BUT MAY CONTNN BENDS OR CURVES NOT SHUWN. � �
SOMt UNDERGROUND LOCATIONS SHOWN HEREON 1UY H�VE BFEN �' E ��y�
TN(EN FROM PUBLlC RECORDS. BARGHAUSEN CONSULTINC ENCINEERS, i� � ; �g+ _ // //// �
INC. ASSUMES NO UABIIIN FOR THE ACCURACY OF PUBLIC RECOFDS. J � ////
7J. ALL DISTANCES ARE IN FEET (U.S. SURVEY FEtT). � ��/ � MREI '`�� // /////////�//��
� � ���/� � ��� �,
la. TWS IS A HtLD TRAVERSE SURJEY. A SOKKIA FIVE-SECONO � ////////����//����
ELECTRONIC TOTQ STATION WAS USED TO AIEASURE THE ANGWAa IIIIIII� ��
AND DISTANCE REU710NSHIPS BE'fWEEN THE COMROLLING � ^ � � /��f �IIIIIIIIIIIIII IJ;�jllll
MONl1A1ENfAT10N AS SHOWN. CLOSURE RATIOS OF THE TRAVERSE AIET u RE __I I
OR EXCEEDED THOSE SPECIfIEO IN WAC 732-130-OBO. ALL INSIHUMtN15 I I ,/ l//�/�� �I�I�IIIIIIIII��i I
AND EOUIPMENT HAVE BEEN 1LUNTAINED IN ADJUSTAIENT ACCORDING I
TO MANUFACTURFAS SPECIFICATIONS. � �
� �� / � /
15.THIS SURVEY WA$ PREPAREO FOR TME E%CLUSIVE USE OF PACIAND j .:'I . �� ,�/j- . / � �// ///// //� _�ro6.�i
ENTERPRISES, INC., PUGET WESTERN, INC., AND FlDELRY NATIONAI.TITLE ,�
INSUfLWCE C011PANY OF WASHINGTON. RIGHTS 70 RELY ON OR USE THIS
SURVEY DO NOT IXTEND TO ANY UNNAMED PARN WITNOUT IXPRE55 .' j I�// // 1// / �IIII.W�
RECEHfIFlCATION BY BARCHAUSEN CONSULTINC ENGINEERS, ING. I fl .� I r �///� �1ll•7I� I
AND/OA THE PROFESSIONAL LAND SURVEYOR WFIOSE SEAL MPEARS HEREON. � ///�/
lti.TNE PROPEFIY HEREIN SURVEYE�ABUTTING J. F. BENSON ROAD IS SU&IECT � : !o, I � /� � I
TO 7HE RIGHT TO AIAICE NECESSARY SLOPES FOR CUTS AND FILLS AS CRW7ED �`, ���`� I // / //�/ i � I
TO KING COUNTY 8Y DEED RECORDED UNDtR RECOftDINC NO. 2827775. THENE �
WAS NO SPECIFIC ROUTE OR LOCATION WHERE TNESE SIOPE RIGHTS WERE TO � \ J 6 // �/ J` I
AFFECT THE PROPERtt WITHIN THE RECORDE� INSTRUMENT ANO THEREFORE j� � /I / �" �s!�
CONS�ITUTES AN UNPLOTfABLE BLANKEf EASEAIENT. THE ONLY EVIDENCE FOUND / // / I� I I
FOR THE LOCATION OF J. F. BENSON ROAO WAS THE KING COUN7Y SURVEYOR'S ;�
FlELO NOTES �ROA1 19Y4 WHEN THE RW�W�15 WD OUT FOR SURVEY N0. 1009-D. cpo�i[� _ _ � //�// � /��� I I�
7HOSE NOTES STATED IHAT BRA55 PLUGS WERE SET IN TME CONCRETE ROAD • � 5�� ` � // , I I
SURFACE (PRESUMABLY AFTER hIE ROAD CONSTRUCTION). 7W0 OF 7HtSE PLUG$ � � y
WERE FOUND DURINC OUR FlELD SURVEY, ONE AT STATION 20+42.12 AND ONE AT �c � I //� i�
STA710N 35+90.00. THE FIELD POSITIONS WERE WI7HIN 0.3 FEET OF THEIR � 2 ��H�F "� /�
THEORETICAL COMPUiED POSRIONS FROA/ THE 1924 FIELD NOTES. TNESE �. � � ,�••,� I / � If-
MONUMENTS WERE USEO TO ESTABLISH THE ROAD RIGHT-OF-WAY OF 30 FEET . ��� ; / ��Op'�,Je.
ON EACH SIDE OF 7HE CENTERLWE. IN SEPTEMBER 1857,THE RIGHT-OF-WAY CB-N
PIANS FOR SR-405 WtH[APPROVEO. IN THE VICINITY OF WHERE TNE EXISTING ;��� � �`i J� / R���a•� �f*1
PAVING FOR BENSON ROAD ENCROACHES THE A/OST ONTO TME PROPERTY HEHFJN ,.` � L�AS.96��
SURVLYED, THE RIGHT-0E-WAY POR THE NEW INTERSiAfE WAS TO MATCH THE � �;� �� , ��/•' j�� I
EASTERLY RIGHT-OF-WAY OF ThE BENSON ROAD. �IELD INSPECTION SHOWS TFiAT " �
THE 70E OF 7ME SLOPE FOR iME FlLL FOR SR-103 IS WITHIN Y FEEf OF TME �w��: +^� � °' - i'/ � / �'�r�'�" �
WESTERLY EDGE OF THE OLD GONCRETE SURFACE OF THE BENSON ROAD. IT AIAY �� r &��•��
BE THAT DURING THE CONSTRUCiION OF SR-405, If WAS�EfERNINED 7HAT hIE � r `'�///�jjj �� � L�IY.4Y� I
TOE OF THE FlLL WAS T00 CLOSE TD THE TRAVELE�WAY OF BENSON ROAD AND �' � ��� '"� I/�//��//+ ���g
TMAT THE ROAD WA$ REALIGNEO TO RS PRESENT POSITION FOR THAT SAFEfI' I
CONCERN. APPMENTLY, NO ADDITIONAL RIGHTS WERE ACOUIRED FROM PUCEf w � i I�/��//����//. . �E I �
SOUNO POWER h LIGHT COMPANY FOR THE CONSTRUC�ED RO�D REALICNMENT. C�-K /
�
.,y I ��� ����` ///// // I �
SURVEYOR'S CERTIFICATE � f � � - / i I
TO SAM'S Ilk.Al ESIA1t BUSINE55 TRU57,A DEUWAFiE BUSINESS TRU57; fI
FIDELIT(NATIONAL TfTI.E INSURANCE COMPANY;FlDELITY NATIONAL 7RLE i I I
INSURANCE COAIPMII'OF WASHINGTON; WGET WESfERN, INC.,A WASHINGTON �-:7 1
CORPORAIION;AND PACUND: L I /' I
I ;' � I �
TMIS IS 10 CERTIFY TFNT THIS AAAP Oq PUT AND iHE SURVEY ON WHICM ;i: �
IT IS BtiSEO WERE IN ACCORUANCE WITH 'YINIMUM STANDARO DEfAIL � '� I �
REOUIREMENIS FOR ALTp/ACSA1 UND TRLE SURVEYS,'JOINTLY i
ESTABLISHED AND ADOPT�D BY ALTA,ACSM AND NSPS IN 19Y9,AND i
INClUDES ITEMS 2, 3, 4, 5, 7(A),8, 10 AND 11 OF TABLE A THEREOf. /, I
PURSUANI TO THE ACCURACY 5TAN�ARDS A$ADOP7E0 BY ALTA, NSPS,
AND ACSM M!D IN EFFECT ON TNE DATE OF hi15 CERTIFlCATION, I I
UNDERSIGNED NRTHER CEN71HE5 TIN7 PROPER FIELD PROCEDURES, =�
�NS7RUYEMATION,AND ADEWAIE SURVEY PERSONNEL WERE '
OUTUN DDIN THEDEAIINIYUAIHANCLEREDISTANCEOAND B SURETMOSE �\�oFMIS��'S
REOUIREMENTS fOR SURVEY AIEASUREAIENTS WHICH CONTROL IAND �, d �`
BOUNDARIES FOR ALTA/ACSM UND TRLE SURVEVS.' �� a�yc
.^N q�8 8 p iaW
�`ri� �/51 L`�'S�l�
��� LANO 1 0.7/i7/OJ 96 RrG R'Ic IODED BUS AOP t 7E1 NYRIi
R�W�0�4-FC. cawrs OS 1 B OJ S 0.S/12/03 96 RWC RMG pNNCCD SCY101 UIE
rt�asrt�o wm sux�var No.zasx � oi/oo/w s�r mc tn� aw+r,tn sn¢r s¢F.
SfRE Of WASIIINGT011
J 12/02/02 9F M1C RWC ATiOANEY COYIpIR.
2 Il/25/02 96 IdC idC ATi0Al1EY COIYIENIS t WN1ED 11RF AfPOpf.
1 11 15 2 BOI RrG RMG QIORIEY WM[NIS
No. Doh 9j C1M. I�ypr. Ii.rMon
JOD NumMr
�-�'H A�S 18215 72ND AVENUE SOUTH °ub�d- ���� �' PACLAND �
�682 F � KENT WA 98032 orw�� sRF
m- (a2sj zs�-szzz
��_ �`�� 9709 3RD AVENUE NE, 3URE 203 ALTA / ACSM LAND TT1LE 3URVEY
sn..i o � (425) 251-8782 FAX �
y � ,,,,,,,„,� ��,,,,,, SEAlTLE, WA 98115 RENTON, WA3HINGTON
sG `+' CML ENCINEERINC, tAND PUNNING,
3 0, 4
`r�N�ENG�N��P SURVEYINC, QMRONMEMAL SEfMCES Dot.������Z � (206) 522-9510
-
�---__ _-- -_ -___- -- ---___ 1
' I '�� _ __ �� �euaco �c �`' �'/�j���� >�,%%"e%�/i� _j ,;�, ��„::�/ �irv�r'�/l�f - MATCHLINE
+ :��` -�e�� -�-' I � _1 /' " ----------------
�:- j , -�------
�,�"� _ �:;` �:�� c � ,. - - --. .a � �� �� ��ii i �i �
_��,�: �, - -:��_ .����� _���;�; ��- � � �i�%ll� ; �i � -� ���i�//� %//�i% I ��
� ,a � � �
- .�4 �� � - � ��� --_`---�---�'� "�� ���) I l� � '� ��� i ,��-�i � � �nw,su�sswn '"
_-'�y -
�
��ii»teste2" - ---� � _ � ( � � � � �� ��% ;� �� � � rowm�s
--i�.�"-----[ -- -"- ..»r ..,--.__.�!,.�- , )�/ � �4 . � �
-�1��" �C'� ,+.� �...: --',-�� - .:. / /� - ..� � ���+�
, „ N
- __ � ;, � � ��� -� ' ��
��=-,-=:r� �-� ==--�-���'=�--�-��e ili���r � �ii��;;! � ,- � � �
�_os�,9�,0..
"'`�"'�-"�""_° ��--��=�- � i l�i � �� i i . ... / J ��� �' � �� a=ieo�.es' w'�'E
.�,� � +� � �- �� � ' � � c_izo.si' ��
--Tw�a�rF ��-'���" '10' SAHRAAfiY 5�61�=^ _-_ _ _ ��.����,�`�' � ���^.;l � � �' / ,� • i
� BSEMENT PER RE ��� - -�_ ��� / , � j� (
SECi10�1 L1NE � N0. 5937�34 CB- .. J3.72 , 'J8'I :. � I
�s.00� rouHo J YLII� i ��/�������� ����� � �. 1S�''ryG�� �
� 1 YONRORING / --_ - ► (�
� ' 1 � W¢L_(eVMI]A) � �������� 4;�/ n� ' ' �✓ • '- J
�... I � :ti�'.:�.7 OF Wu1 � �//�/� ////���/� �.� ��.//�� / r /
•a�s' i f - ,',�%�'���� �///��///� 75 ����" �� o SCALE 1" = ao,o
� � �� ��i���%i � // -•��//%� / !� -
� � ,, i. / � / //_ i /
� � ��rs .i. ,%iii-,��j � � � � �� ��
�. 1 /+��� �/�%� ���%����%%// /�j /9f" ,j�'"\ �� w/nn mx¢
� I �V�Ml �\ B-flft �,..� � /
_ � � �ImL_,. _„ �� j��,�//j/�//��� � /�� r ,� /���
' -' �a�- -'� `� / � � � % n _ " �j�i /
i�', sz z �� � ,//�/l[�j/l�/l,������ //i �' -���� ^/
i en� ���YSi' •l 7�l�l'i/ !�� ���� � ---�y� o'i
1 � �� , � • / � // � � / r ___J/�/•' = LEGEND
i p� ,�► � �/�1//// � e�-, ��J� .,-- �?� a-� ,���
� , W 1�/ ,� � Q. ,�
� � e - ���, ���, ., `/ n �.�.,
�_ f t� ir m , 6 h, �--�r �,�� o�
��-�� =--�� , 11/ / /i( .-- � r �,� o�
�
q AIER 6
s uuraa �� .--�- � �
��- . ..�{, � // �f' ------ ' y � ��� o,�
�+7 a qiw�
-'}.� / / / � O s�ox�rwqE -'-_ swuer mu u[
. y/ '! - � ' � ���� _-___ ���
�, �---M„ o _-�
�}�� � � ��� � - ��
� ��,E. -��w�- ��
-K�- ��
I I / / 0_�5•92�,8'� �1 f�s,�uE r�w�- roRN O�EAW
/�M�{S / � R�1809.88' W WG MUS . p���
�+��• . � .+ �. I�.+�+ ` / ! l/7"/ g:. ...�� _ -_-'- y L=IB0.89' � m W�MNOIL ' v _.. lOPE NpL
-�'-�,� � / � IN1G IflEA P�
^ �. b ml
�= ��r�-� � ��, - � , �,�. ;�t� _ �
1OMIa11 pl
�j ,
� " �� � /// �,,; �r � �� �x„ - - --
--,., �K ,
- /1!p/ fl�// "
� ,����� � Y / i/ l ,'� pa.
��/ /.: � �� �� � � -
� i��� � i � � / �� � � � '��.�
������ " � � � INVERT TABLES
/� Y ,//ij/.%� ��:�� /, ;;�/� ���j,', . _ / GTCH BASINS (CONT.)
� • ///;:,,, ,,/,�ji �/ �/, � .
�,�'�' // -- f^' .or�orr c�-n wu-�x.os iY aw s-xees isui
,.�;,�/ �� %'��/ i . � i//�� K� !�QIP E�7600
l /�� �e�j� /������j�/����'�� ~�� ���/'/ �� t7'OIP SW.1165
///%%// � .�
r ;� \ � C9-JJ NY-3�7.IJ e'GOFc r-.]LL.Y 15H1
/ ///�j// / � E'AOS E-70.W
� / � 6'MS E-]a G]
/ I I I �/// /////////////// /////� %� ��� 4O� �!.���� CB-NK RW.72.70 1Y OIP NE.79.19 15J25
� I �II(��///////�i%///; ,'' . o=os•se•so•• / �_LL wi_�,.x ,:•aw ._sza� ,s�,c
r/ III ���� ////////j � // d•55�o0- w�
I ///�.,, 2 R�1759.86'
L-19090' cB-w� Rlu-7t.�x e'cWt w-2E.tt lar]
II I �� CE-NN RIY.JSOS 12'CONC E�J1.45 ISOYO
� � /
59.37'
� ' ���� ����llJ��f f ��i � ,
// //��//// /I((/��� � 13'PYC N�]1.15
1 / %/ � �i�/ � GB-00 PoY�J{.Yt IY PYC NW�31.YB 160BY
I �(�(/ /i, l.�// /� / � / lY PK 5�]1.Y!
IIII I �/////////,/��//// �� i f9-PP R1Y.J{.00 1Y LOHC NW.]I.lO I5110
IIIII'r�� ' !
IIIIII � �/i ce-oo xiu.�.ie �x'carc�-sa�e iss�a
�;;'���� � " i/ � ce-nrt au.6x.�♦ iY m+c r�-ea2� �aa�a
J� ��/ °+ A /
���.������� �'�� ,��i �"" E�� � awH uH� � ce-ss wM-�o.w �r ca�ic sw-eiii �axn
�" ��� �;� /����� �� � �rcrcc xo•cau xw.ee.N
���� ����� � � ,� ce-n wu-n.oi �s•caHc�-e�.ee �e2�e
� �� � � ;� CATCH BASINS ie•cac Hr.a:.�e
������������ � ��� , � . ce-w wu-es.rcf iY or sw-uw �anv
� ������ �������� s � a-� �-ue� e•rw w-m.w uxeo is•ow �-x.w
� /// ////�// / 1:..� / CB-B RIY�54.09 fi'PVC E�31.N 117lY �-N:Y �JY.]7.G7 !'L�Y:L N�lI107 Il160
���������� i/��/��� ������ ;0„o u � 8'PVC N-31.11
�;;,� �� �� ��� ,•, CB-%X IIW.N.OB 12'qIP E-2&IB IIBW
r / / /���//���/ / , � CB-C NM�N.10 !'CANC NW�tY.lS 1/IVO
//��//�,//�// //// �/// .:8 , !'P�C 5.7Q07 f9-YY PoY�]1.26 12'tlIP E�N.81 1/B/B
� ////// �� ' !'CONC E.]0.W 17'Oli N.M.l1
��IIIIII IIII��SJ� �� ��� ' ' 12�QIP W�Y676
�(�l//����I���I I��������� � CB-D RMI-Jt.!! /'COIIC NW.JI.Ot 111JY
( / ���� CB-II RIY-33.63 B�D.1. 5-4B.7B 17486
ym i,i � CB-E RIY-J2J{ 1!'pIP 5-7Y.YY 16048
IIIIie•a�r e-n.c9
I'lll�I III���II�IIIIIII'IIII'll / ce-r RIY.31.6] ie•weic s.z9m i5w9 STORW DRAIN AIANHOLES
!'CONC NE.7Y.S7 SpYH-� qW-JJ.63 N'GYP N-JQIO 1331!
e•cac w-w.m
,� I ca-c RIY�JI.SI i�Y o v s-ie b ���� muH-e �nu.�.e� �e'nr N-�o.00 �50�0
� �
�,�.�i CB-N PoY.]1.15 I7'CAMC NW�7Y.70 1{1J0 SpyH-C RIY�J7.IB I!�CONC N�2!.!J 15016
1!'LpIC W�TS!]
�/j��.�� CB-1 PoII�}1.81 fUll Of YlD ISOt! s•coNc s�-xau
�Id1.71� � � CB-J RIM�]317 B'P4C 9�J1.57 11258 SpNH-D IUM�]I.l6 M' NC�31.7! N10Y
� 24' N.2E.3!
� � I �9-K RNI.71.61 !'CONC SW�7Y.31 11110 11' S�J0.]!
iE'CONL NE�76l6
2 LB-1 RW�]S00 6'LONC N�J�.]S 14JI6
r 1'MS 5-]S.]S $�YH-E RW�]I.eS 21'CONC Y.I7.1] 1110!
I Z / CB-Y RIY�3].Ll 1'CONC 4.3234 11117 Y{�COIIC M.47.IJ
m / 12'GpIC N�J0.1J
ICB-N RIM�71.01 0'U.1. 5�d1.7Y 11410 $DMH-F RIM�]I./] tY CONC W�Y6.J7 1�780
I 1'CONC N�31.7Y IB'COHC E�YSJ]
/ CB-0 RIY.31.Y2 !'PNC E�19.i2 tIS7i IE'CONC 5�25.7]
� / 0'PM� W�p.o7 SD11N-0 RIY-J2i! IS'D.I. 5-I4.5! 1KW
� 15'OJ. N�2�.78
I CB-P PoY�J1.97 B'PVC S�79.67 tI5B0
� E'VOC E-10.57 SDNH-N RW-]I.17 80'PIPE E�21.55 15110
e. I C9-0 RIY�]1.tE 10'PYC 4.7D.01 1l5B5 VAULT iLOpl�71.77
i /l !'PVC E�2Y.01 SDYN-I PoY�3262 1!'GOIIL F�7E.77 ISOE]
IB'CONC W-1fJ4
CB-R PoM�J0.03 10'FVC E�7l.�0 I�S67
� 10'PVC N�7D.10 SDMN-J RW.17.77 IE'CONL W�7E.77 1110]
! ' 1!�CONC E�YB.77
CB-4 NI4�J201 10'PVC S.Tl.OB 1l55! !'CANC N-7fl]7
�f/ i �w vvc r-m.ie ix•caic s-sza
/ I 10�PVC N�7D.06
SDYM-K Po11�N.SI 71'CONC E�2Y.l1 130l�
f9-T RIII.]1.65 10'ivC N�Yi.03 1�375 7{'COHC M�2Y.71
� 10'iNC SY/.IY.05 13'fANC SE�J0.71
� G9-U RIN-J2.E0 12'CONC N-td00 11]00 SOMN-1 WM-J2.Y5 tY CONC NW-37J0 1H77
IY CONC SW-28,00
� SDNN-N RMI�J5.93 4�'CONC 4��0.0.1 tI2BB
. I CB-V Po4�3100 !'PVC W.]Y./0 11{E1 Ia'CONC W�]47]
!'PYC S.32q
SOYN-N NW�JI.OB 3!'UIP NE�J0.11 1715�
ca-w nww-�c.e� e'cac s-�ae� ���s�
f9-% RIY.]1.67 17'CONC MW�27.73 117Y{
40 17'CONC g�27.7J
� ca-v wu.�i.N ix•conc He-se.e� i4�e� S/WRARY SEWER MANHOLES
e•cac w-xo.ro SSMH-A aw-�o.�s i2'cac sc-ss.�s ius�
� e•cac e-2�.se is•cac sw-N.�s
re-z Pou�ai.o� e•ca�c e-xu.m iuet SS1N-B aw-a�.oi i:•cac rx-:e.ei ��ai
CB-M PoY-3].J7 12'COHC E-2Y.t7 11lY� 12'CONC SW-ffiJ1
17'CONL 5.7Y.57 $y�H-C RY.3�.J! 0�fANC NW.26.1! 11400
f9-BB PoII�]1.79 17'qIP N�7fll1 I{YSI e'��-�e.xe
S9IH-D RY-32J3 1Y'CONC N-25.IB 119JJ
P:� 0� age�vlclnity.gif �-� Riu-a�.ee e�caCONic c:�oae 14°�° �s•canc s-ssoe
¢C CB-00 RW�]1.7] 12'CONC W.26lE 1�801 SSYH-E RY�31.SY 12'CONC N�25.{Y 1493t
12'CONC 5�2}7i
� E'Oi E.7A61
s� 591H-i PoY�.U.10 12'COMC N�72B9 15377
CB-EE PoY�J7.5! !'OIP N.ri.51 1{7YB 13'CONC W.7]71
�- CB-Fi RW.]2Y! E'CONC N.]651 14101 $y,�N-G RNI�37.{0 1D' SW. 1�IY7
� !'CONC 5�7651 E'COHC E-2a.]0
��,1 A�1 (�.� W � CB-W RNI.70.75 !'COIIC S-IniS t�07S !'CONc S-tS30
s•cac w-xe.io
3\ 0� SN 9f r CB-NN PoM�11.0.7 B'CONC N-TB.QS 1M76 591M-M RY.].1.lY 6'LOIIL E�
�` �y N !�CONC S.79.Q] 6'CONC W.77.�p 11921
°�"< e•ca+c s.n.00
�'" ` sswt�-i row-as.so E'COHC NW�27.OS 1419i
� e•coru e�xzu
����Op�82 Ea��S�� 5 03/�7� 96 RMC RMIC pNNCED SEMER lNE VN.US.
VICINITY MAP
� LANO � o,i�ro3 � r� � ���r.
ciwM[z OS 18 03 NTd 3 1P/02/02 9F R'/G N'YG ATTORNEY WYUFNfS.
2 11/25/02 $RF RNG NWG ATiORNEY[OYYCNIS t WMIED 71RF AF,PONf.
1 11 1S 1 BOI IfIC RWG ATIORIEY CpWEHfS.
No. Dob Br pd. Appr. R�Nsion
JoE NumMr u^ .. _..__.
��'jr,,,�� DwlqnE= 600N: �� ��
18215 72ND AVENUE SOUTH PACLAND
�682 Q' � KENT WA 98032 uo.� s"F H„y�,,,�,i
m Z �azsj zs�-szzz 9709 3RD AVENUE NE 3URE 203 ALTA / AC3AA LAND TRLE 3URVEY
sn..i o � (425) 251-B782 FAX °'�"'°� '•�' �
s � „�,,,,.,� �.„,�, 3EATTLE, WA 98115 RENTON, WASHINGTON
sG y' CML ENCINEERING, IAND PUNNING, �ZO6� SZZ��
4 ,, 4
`r�N�ENG�NF'�P SUKVEI1NC, DMRONMENTAL SERVICES oat.��/�/� �
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
� ��
I
Figure A2 — Site Plan
PACLAND Project� 1999010.008 Page 25
_ _ _
_ _ _ _ _
o _ ,. _, 9GNAL „ ,_ .. _
p EXI511NG'RAFFIC
� SEE SHEET C-1.1 FOR SITE � °f,�R�;TFlR� � � �x�snN�a�s sTo�. LEGEND
L-69 59' ' OORDINAlE WITH K�JG CWNTY AIE7R0.
DATA AND PLAN NOTES ��R=45:°°• -
�" SiD. �UTY PAVENENT '
` BENC ES/-SEATING AREA � � C-B.o
_ I__ 2 EA. 'IIABERFORII W1LLOW,MDDEL,�2783-6 ' � HEAVY DUTY PAVEIIENT Z •
J REGAL BLUE POwDER COATED, EIABmD@ IN c-ao
/ - `� �
� , CONCRETE AS PER A�ANUFACTURER'S RECOIAENDAlION C�NCRETE PAVEIIENT e
I `����\\\�`. ' O PAVEMENT SiDEWAIX C_&� 5
� ' U `1AK-'c SEE ROAD PLANS
�, �.� `'�,�` �c;� ��� � " AJ S �1D'AIIN. LANDSCAPE BUffER_ PAVENENT PER C-flo
�1 _.� . � °�c . '� + /1 1 (CR- SHEETS) � ARCH. PLANS
%'�-�>`� '�� � �� ��/9�t I , FOR EN7RANCE e
GRAPHIC SCALE Q ^" ,�� 's; �"A'� c � "'�0�.II/ DETAILS AND CONCRETE CURB k CUTiER c-e.o
o O� .��i� �1 ; ��AC °c ;:, i P A� '�lw DE9GN IN R.O.W.
� �
� �� /1���` ��`(6�r,a,� � L"P9 nS� 8 1�y� - BENCHES/SEA7ING AREA
� m rtxr� TRANSMISSION PDY�R � � / '. �C -�c/ , Qlr.S>� I ' 3 EA.nMBERFORN N1LL�W,AIODEL�2783-6 ,i•
� mon a so n ' -� � �� � � ,ti `� ��y' -_ -
:EG�;PRIAIARY POWER �yO, i , �,f u�— �` �c,^� Rl<` \I REGAL BLUE POWOER C�ATED, EAIBEDDED IN i
LINE) v � i �� � `��� �` ` •�� CONCREiE AS PER MANUFACTURER'S RECOMENDATION �
��/ �i ' I ' u� ;�__._��n�; - / � � .
`P +� ; � F �����` c / �•�\ " a\� s. PROPOS�D TRAFFIC SIGNAL � l
p l / � �! ` '��. ��c � L; ,��/ � rth (SEE OFf91E ROAD
EXIS➢NG FlRE / �✓ � i � ��._�o� ,:� kD ` r '`= IAIPROVEYENT PLANS, SHEE�S �j � _.
HYDRANT � �7� i ie Z- LKr' \ ., n►. ' cR-)
SEE RCAD PLANS ;CR- �/ '� ' � _�_ �— �.`/ ` I
SITE CCNiRACTOR TO BUI�D CURB � SHEETS)FQR Q �. I T+}� 1
AND GUTIER,STORM DRNNACE, ENTRANCE DFTAILS � � � •
D(ISLNG ti. � 1 1� 55tON �— �. �; //� -
UTILITIES AND RWGH GRADE GAS AND DESIGN IV R.O.W. 9'� AN�. �— �SYSL'4� '�� � R,, �
—t— S ,' 8t o ,1 / SEE ROAD PLANS
SIDEWALK a EN� � �— ! �� / �f�� , ' � (CR- SHEETS)fOR
STAiION AREA �? �p r R��� � ' �•- o V,\�.
iHIS AREA(GAS STATION) EJOSTING FIBER � L� � J � ���`' ;FG�' % � V .,3 ` -. \ �(/�\
i � ', ^ I �- ` r�� � EN'FtANCE�ETAILS
� TD BE KEPT FREE OF JOB ;- �P�C hLEPHONE . �, , � ��,� � •� � �
TRAILERS OR STORAGE BY = VAULT —�I�<.' � ' �' w ; iy.,Tl�—�^a; zs� U;u � (' 15 �,�;i�' 1�� � \ C�� � � g[1D DESIGN IN R.O.W.
CONiRACTOR - _� �� a �, � i ^y �� � �:2 ;tt)� � 1 � 3F � � - � \
GAS CONTRACTOR i0 BE ON 9TE ����\ . �. I /� P. � � � `
\ V P ' � -r� T f 6�' \ �\� �C`
SIMI/LTANE0U5LY. CONTRACTOR TO_-- � i � �' �- J -
I �� . ,; �J� /f
/, f
COOR�INAlE WORK AS NEE�FD.' . �/ i ��._',� �� C � ". .�. . c 4 R�`� � at ` r �f N � y, �� - 4bZ�J[' �.
/
-.._� ,�. .�� . .. � �-�. � �.". � � : � � d5 �� .
i�
. , �
��� _.,_.. ,. . . \ �. . p- ..
`
. I � �� � ''�� l. ` �c \�i C�.-� �Y' ` �W � i1
�� ��i � ' • �
�
_- -i -
�� ��
� . _^ � . ; I,li � I i ill � � v_ �; ��� �% �
6l '
, � , io
, ,
,.,
�� -
, ..
_ _
� � -, ,� .'..'. . , �I,��.. ___ ..... \ � �. .�', V z �
• � . �
�`.
SE_ROAD PLANS FOR ' , � � ��e�� � rl� '. (��.� ,�£pa �,� err- ��� _ _� � b .- _
ENTRANCE DETAll.S 0.ND �,��cl ;9� ��' �� �` � �� ' •S " w �'`�� -�-- A:• � �� �� �� � AD `.,�/w S ��
. ,, �.
DESIGN JN R.O.W. ,�� �/` R�Sp.� �i � � �' /, { f te i !���6vr�� i w � � `�� w�
�
- ' ,:�,�� . � .' ' i �. ,-. ' ; I I f ��� ^� ! � ---A�;��-LAND�CAPE--- ------ - ---._� AE � �' �)
i I J, W � a i',
i - i �A�l � �� ,_. � ISLaND�f'rP. � - � , �...,`.
' :'����d�' �` � � �� �� ,- —,, '" p "``-'� ' � �� i t����:. o �� :.NOT A �
�^�V�� � �'Y ��� `� � `\ �AS y'�MN ION �/ '/�'��l�`� I �' I I R L��,'� n a� AH AH �A N fAli � D � 92�0: PART
m �,.
e, �-�: l� �� i � �� RAT�CON�tACi) !i.- 2 � T u �,A EN1RY �. �" ' ti n'-`;�o
I��, '� "A�Q�, � i[n�� ��� \� l � / � � ' 19 f 1 1 ' ; ( � ::� VA �B'� ;� PROPOSED
��o� .�.�. `,!` �� � \�/ � .. v ! . ,��� � �, / v i I - ! � ; �-' . . 6 .-: v5 i z.FC�ESS ID .. '
. 'n',`r,. �.�. .. -�9� \ i �� � � . .��. �1������`:�� � i , � i � ; a �J' " '�� :° . CITY OF .. .
f" S \ i �� �� '� � f / � � i I ' � � ' ✓ AJ RENTON
'. . .. � � �
r�. Z
����y,�� 7 47
�. � v '� �.. /;Si5�1 , ��. P��r :`1 - � � PRCPER7'f e
�(7Rqn � . .�e i:i� �^ �RC/� � i � 9,i , �� vG o �" � G 'i+�+� ' ��\ .a��, j� OO PIPE BOI.LARO C-9A '
(�.� � } '`� i
� K.� . .� l`�` �� � ► J �1 � 1 . ,�` o oti_� dQ NUNBER OF PARKING STALLS PER ROW
� � � � � s ���� � � � '� �
• ' �F .'.�/ - � � � � GREASE AND OIL/WATER G: � , ` \ ;' -.
' ` � ' � SEE SHEET C 11 FOR
I � / L V /v �$4" ' � -� r SEPARATOR, SEE ARCH. i , i- �� �� � LEGEND/DESCRIP110NS, TYP.
��/ T / � � / 'N� �� '� t� r u r PLANS �i ��
C1�IS I ING �� � � / / � � � TIRE RL-'35R-� � . ��•:, 1%�� C DENOiES COAIPACT STALL(9.5'X 16�
^S .� ��8� � ' � � I �i " NWNiING GROSS S.F. W OCK SHOHN: 135,373 S.F. G i 1
W�ANDS i�>^' � \� a � � I � � AREA USE: RETAIL � _I �`; NOT A —• CHAIN LINK FENCE c 9.0
�� �K; ; i' ^I 1 1�' g CONSiRUCiION iYPE: V-N - i K�. . � � '
' � ' ' :
i i
� �, � �2:
' ''� � CART CORR I
i Fi � � . - SCREEN -
� ��� �
,
�
_�� �;u , x PA ,� �9.0
__ . �------ --� . �
_. .. _ , ;�
5 A' �,, RT
...: ... :� . , . . . . . .,g .
(R \ { �, : {' �AK �. . .I . �6� . . .. ---------- H I T f ���_ T. - � AISIE IAARKER 9GN �_Q3
' f ; [ , `'` ,1 '
NOT A PART � . . ..... . . .. .. ` ' i r' �f '; - - - -ASSOCIATE PARKING BOUNDARY
v�kr�+--- �------------- / i � _ � :. ..... . . .
� � � � �; � � � � (ASSOCIATE PARKINC STALLS TO BE
_--� ,� v_� � ` .� G �; i � � ?AINTED WFIIIE. SNSL/4�� �
a-. ( G Qj COIAPACTOR I I � NUNBER OF ASSOqATE PARKING STALLS
N31�9�'.. Z . � WITH SCREEN W � I. . I '�
PER ROW, 140 STALLS TOTAL
\� c7 N11'25'3��� '^ � �'1, H ��i, .��rl � u r:J `/ ` I '� P� ; I � SNSL/4' SINGLf WHI7E SOUO L1NE/4''MDE II
� -�. ;� �+ . . i ! ! COMPRESSOR 521'36'23'W � -- s.
9.83' u�1' � '' ' -'- T �r ->SYSL�.4., SINGLE YELLOW SOLID UNE/4''MDE EACH
', � ` _ •. � � w BLE YELLOW SOUD LINF /4'1MDE EACH '
^ � _ _. . __ �'" r; STORIA WATER AOUADUC +\ ' . ` ' � . ..�� s�, .�.�... . `.... . � �,. � _
c� OOU
� _ _ 35�. �t i H . .'... .'.'........ y 4. UGFiT POLE AND Fl%TURE(iYPE BV)
J .. . � j
1 .
- —— —— _ � __ _ N24 6'2d• � T JIB CRAN N ., ,{r �r ���r
" - E 0 `€_SiRIPING �, � � S�:SHEET C 31
� .._.. . .. __ � ... ._... ... NZa�45'<4'E . . ._ �. � . ^ J^ _�.. � .. o ; _ � .. - . .
_ � ?• - 9 5' ^ _ _ 50-' ��--�� ��/ S 2 GREASE{NTERCEPTOR '2824 0. >, �
� gi �¢f n _ '�AT�H t1NE i26.'0' _"`�� v ` H Np\ � <� LIGHT PIXE AND FlXIURE(TYPE KV) II
—5ag �. - - - - - -� � �_<< 6; BETAINING NAL_ � SEE ARqi. PLANS q54� SEE SHEET C-3.1
% _ � BENSON ROAD SOUTI—► I �, ,3 MAx. ���f,7 ;
� AR �5
�: � �_ 6� ;3, �c-R.�.W. �LENGJ�,�9 � PYtON 5GN B 4` c�-- UGHT POLE AND'FlXTURE(TYPE GV) �i
o , � R-gu i - � GEG.GATION _ -- 201'� / o __ _ �r62 ��v� SEE SrIEET C 3. I
%
� �; �g���' 1` � u RE(TYPE JVAIW)
_ _. : ;
� R. ..� D.E.p _ _._ _. . . �'4zq., ` =3?g `AP.�N ECE SHEET CND'FlX1U
N . �; 2Q�ot r�:���4 ,�o��+'vii�i� � -... _ y`E� �:�."3.r-. MATCH LiNE — — — — — — � ��' �
� �� H
� ,� . ��',~ cJ�`c er'6 J . ��t ��!/ _ � .� ..,....
Y � � � ' 03-t4-03
� - ����� ' , 'I s�� �y~ ') ,CNECKE� FOR COMPLIANCE RECOMAIENDED �G����E� 1'=50� ,6„ �,"I � ..} .,� �' Y OF SAM'S CIUB#4835-00 Ilp�
�s I:� �r� - � , P� ` �� , ro cn s-an�onRos Fc� naPRovn� �"� � � K E N TC N 901 SOUTH GRADY WAY � 'm� �
z �b h,,s•eac �� �0 4'isicc6° t� JaTE 3Y 2 PERWT C01WEN1S RESUBYITfA1 '�PACIAND/18 3 iuD �� t1 .e. � I
� � 1144 Eastlake Ave.E T(206)522-9510 �'�0�,�4�n�� �'J�o■n^"'�� �ntE Er ' B!D ADDENDUM 1 '.PACUND 4 7 03 j� �� ��� o� RENTON,WA 98055 V '""� 1.O I
� �-,�ir.�jB�ildiny/Public Wo�ks D±pL i I
3 I Suite601 F (206)522-d344 � �nTE Bv '�. z,..�a
Seatie,'NA 98109 .,.�N.axt;�.n.�on ', �se'nn.r i mm na�+oc'�a"-,mm �qT' BY ��� REV�SION � 3" C�7E � �+FPR ���� SfTE PLAN °`�
� � , � II
i
�
NOTES SITE LEGEND
1. ALL WOftN AND YAiERIALS SHALL COMPLY WITH ALL GTY/COUNTY 4. REFER"0 BOUNDARY SURVEY FOR LEGAL DESCRIPTION, DIIAENSIONS OF � FIRE LnNE SHALL BE IDENTIFlED BY A FOUR INCH WIDE JNE AND CURB O 18' WIDE CONCRETE CURB ANO GUTTER TYPiCAL 5
PNNTED BPoCHT RED. THE BLOCK LETTERS SHALL STAiE'FlRE LANE- NO C-ao
REGJLA710N5 AND CODES AND O.S.H.A. STANDARDS. PROPERTY IJNES, BA9S OF BEARINGS 8 9ENCHMARK INFOR►IAiION. (SEE pp{tKING,' BE EIGHTEEN INCHES HIGH,PAWED NHITE,LOCATED NOT LESS 2
2• 1HE DESIGN SHOWN IS BASED UPON THE ENqNEER'S lJNDERSTANDING OF SHEET[S-1) THpN GydE FOOT FROA1 iHE CURB fACE, AT FlFfY FOOT INiERVALS.(PER TO PAINiED DIREC110NAL ARROW TYpICAL. �_�
iHE EJOSiINC CONDI710N5. 7HIS PLAN DOES NOT R�PRESENT A DETAILED 1p. SEE SHEET C-1.2 FpR SIlE DIAIENSIONS. RENTON CODE pi 4-4.F.c.i) e
FlEL�SURVEY. THE E%ISTING CONDI11qJS SHONN ON TFIIS PLAN SMEET ARE OD UGHT POLE BASE(TYP) C-9.t
BASED UPON SUR4EY PREPARED BY BARGHAUSEN CONSULTING ENGINEEERS, ��' ��-��P�N1ED S7RIPING SHALL BE DOUBLE COAIED.SEPARATE e
NC., OATED 10-29-02,AND REVISED 03-27-03. THE CONTRACTOR IS COATS SHALL BE APPLIEO NO SOONER 7HAN 4 HWRS APART. Q 4'BLACK NNYI CHNN LINK FENCE �_yp
CONTRACTOR TD REFER TO PROJECT SPECIFlCATIONS fOR A�DI110NAL W NSLE INDICATOR SIGNS iYPICAL �
4ESPONSIBIE FOR VIItIF11NG FlELD CONDlTIONS PRiOR TO BIDDING THE � O c-a3
PROPOSED SITEWORK IIAPROVEIIENiS. IF CONFUCTS ARE DISCOVERED, 7HE PAVING MARKING REWIR4IENTS.) QC PEDESTRIAN CROSSWALK WITN 4'1YIDE PAINIED H4iITE STRIPING PARALIEL
TO DIRECTION OF TRAFFlC AT 2'-0'O.C.UNLESS NOiED OTHERWISE. SEE 3 �
CONTRACTOR SHALL�OTIFY 1HE OWNER PRIDR TO INSULLA710N OF ANY �Z pqRKING L0T S7RIPING SHALL BE YELLOW, 4'WIDTH, k DOUBLE COATED, g�p�pN FOR WIDTH. � �NO iRUCKS'SIGN. C-e.3 c-a4
PORTION OF 1HE SITEWORK WHICH WOULp BE AfFECTED. IF CONTRACTOR UNLESS OIHERYMSE NOlED. IJGHT POLE BASES TO BE PAtNiED TRAFFIC
�OES NQT ACCEPT ElOSTING SURVEY, INCLUDWG"OPOGRAPHY AS SHOWN yE�LOW DWBLE COAT � � C �e
ON THE PLANS, 1M7HWT DCCEPiIJ�l,HE SHALL HAVE�tADE,AT HIS OWN � � � PEDESTRIAN CROSSING SICN W11A-2 AND W11A-2P TYPICAL AT P_JESiRiAN 2 'iRUCK ROU1E' SIGN. C-fl3 c-a.�
EXPENSE, A ?OPOGRAPHIC SURVEY BY A REGISTERED IAND SURVEYOR AND 13. ALL DISNRBED AREAS ARE i0 RECEIVE FWR IN�^l,iES OF TOPS(NL,SEED, CROSSWALKS AS NOiED ON PLANS.
SUBNIT IT TO hIE OWNER FOR RENEW. MUICH ANO WAiER UNiIL A HEALTHY STAND OF GRASS IS ESTABLISHED. E •��-pp�NTE'J WFiIiE ON PAVEMENT TYPICAL �_dZ `:J ��Uq(Epr 9GN. C-a� C-a�
3. CAU710N - NDnCE TO CON1{2ACTOR 14. ALL SLANDS MA7H CURB AND GUTTER SHALL BE LANDSCAPED. THOSE O
THE CONTRACTOR IS SPECIFlCALLY CAU110NED THAT THE LOCAiION AND/OR ISLANDS ARE TD HAVE IB'CURB ANO qJTiER. ALL REAIAINING ISIANDS O RAMPED PAVEIAENT AT VESiIBULE TO BE FLUSH WITH TOP OF SIDEWALK AT p8 'TRUCN ENTRANCE�SIGN. e�
ELEVAlION OF EXISi1NG UTil1T1ES AS SHOWN QN 1HESE PLANS IS BASED ON ARE TO BE SIRIPED AS SHOWN. S.OR NAx111UN. REFER TO ARCHITECNRAL PLANS. c-a} o-a4
RECORDS OF THE VARIIXIS Ui1LIT1ES,AND NHERE PCSSIBLE,AIEASlJRE11ENTS �5. EbSiING STRUCIURES'MTHIN CONSTRUC710N LIAIITS ARE TO BE
TAKEN IN iHE FIELD.THE INFOR�IAl10N IS NOT TO BE RELIED ON AS BONC OG DOT PORCH.SEE ARCHITEC7URAL PLANS FOR EXACT 9ZE, LOCATION FOR AC STOP'SiF21PING, 18'STCP BAR, AND 'STOP'SIGN. 5 �
ABANDONm,REMOVED OR RELOCATE� AS NECESSARY.ALL COST SHALL B: TIPICAL AT ALL ON 9TE'SiOP' LOCATIONS. c-a2 C-a+
EXAC'OR CONPLETE iHE CCNTRACTOR MUST CALL'HE APPROPRIATE INCLUDED IN BASE BID. STOOPS, STAIRS AND/OR RAAIPS 1FiAT 4AY BE REOUIRm.RAIIP PAVEAIENT
U71L17Y COIIPANY AT LElST 48 4WRS BEFORE ANY EXCAVAlION TO FLUSH WITH 1HE TOP OF STOOP. O CONCRElE SDEWALK 4 e
REOUEST EXACT FlELD LOCATON OF UPL1ilE5. �T SFINLL BE THE 16. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL RQOCATIONS, INCLUDING C-e.o C-ai
RESPONSIBILITY OF THE CONIRAC'OR TO RELOCATE ALL El(ISiING UTIUTIES BUT NOT LIN17E0 T0, ALL UilU71ES, STORAI DRAINAGE, 9GNS, 7RAFFlC O 6��PL°E BOILARD TYP. UNLESS NOiE�OTHERYASE. �
- AND EXISTING I�IPROVENENTS WHICH CONFlJCT WIiH iHE PROPOSED SIGNA�S k POLES, ETC.AS REWBED. ALL WORK SHALL BE IN �'9�� AE CURB RAMP DETAIL �_gp
IMPROVEAIENTS ON PiE PLANS. ACCORDANCE WITH GOVERNING AUTHORITIES SPECIFICATIONS AND SHALL BE Oj AT GRADE OVERHEAD DOOR LOCATION. SEE ARCHITECNRAI PLANS FOR
__ 4. CON7RACTOR SHALL REFER TO ARCHITECiURAL PLANS FOR EXACT APPROVED BY SUCH. ALL COST SHALL BE INCLU�ED IN BASE BID. D(ACT SIZE AND LOCATION FOR COORDINATION WITH CML PUWS. AG REFER TO SITE LIGHIING PLAN SHEET C-3.4 FOR LIGHT POLE LOCAiION
LOCATION AND DIYEN90NS OF VESTIBULE, SLOPm PANNG, EXIT PORCHES, AND INFORMA710N.REFER TO MEP PLANS FOR SITE UGHIING ELECTRICAL
SIDEWALKS, RAYPS k TRUCK �OCKS, PRECISE BUIL�WG DIMENSIONS AND t7. PriON SIGNS SHALL BE CONSTRUC7ED BY OiHERS. THE CONTRACTOR OJ 4' WIDE x 130'LONC YELLOW PAINiED TRUq( ALIGN4ENT STRIPES SPACED qRCUliF2Y.
IXACT BUIIDING UiIt1TY.NIRANCE LOCATIONS SHALL MSTALL CONDUIT AND ELECiRICAL qRCUIT BETWEEN iFff PYLON 10'-0'O.C.CENIERED ON DODR
5. DIMEN50NS SH01Ml RffER TD FAC�OF CURB, FACE OF BUILDING OR TO ���5)AND THE UCHTING PANEL O �CRE1E COAIPACTOR PAD AND SCREEN WALL. REFER TO ARCHIiECTURAI OO 4� WIDE PUN7ER AT BUILDING,SEE ARCH. PLANS
?HE CENiERUNE OF PAVEAIENT S7RIPMG,UNLESS 6Tr1ERYMSE NDiED. 18. THE 51E'hORK CONIRACTOR SHALL CONNECT ALL t1GHTS M1THW THE PLAN fOR EXACT LOCAiICN AND $LDPE �
RETAIL STORE'S DEMISED AREA TO TNE SECURIlY GRCUIT AS SHOYM ON AI CURB SCUPPER C-ao
5. ALL PA4ED PARKING LDT AREAS WITFiIN 7HE L111175 OF INPROVEAIENTS OL CONCRETE iRANSFORLIER PAD, WITH 4 PROIECiIVE BOLLARDS. CONTRACTOR
SHALL BE STANDARD D111Y PAVE�IIENT UNLESS OIHERWISE NOTED. TME ELECTRICAL PLAN. TO COORDINAiE YATH LOCAL POWER COMPANY FOR DETNLS.
7. CONTRACTOR SNALL PROVIOE A 10/PORARY?RAFFlC CONiROL PLAN FOR 19• CURB RADII A�JACENT TO PARKING STALLS SHALL 6E 2'. AlL OTHER CURB AJ SEGNENTAL BLOCK WALL SEE RETAINING WALL PUNS
THE pTY ENqNEER'S APPROVAL PRIOR TO ANY WORK INiHIN iHE qTY RADII SHALL BE 10', UNLESS OiFIERWISE NDTED. O ACCESSIBLE PARKING SPACE TYPICAL SEE DETAIL SHEET FOR ACCESSIBLf
RIGHT-OF-WAY. 20. REFER TD ARCHIlEC'URAL PLANS FOR 97E LIGHi1NG ELECiRICAI PLAN. PARKING SPACE SIZE. 9CN AND SYYBOL('VAN'-INDICAiES VAN O ASSOCIATE PARKING
ACCESSIBLE SPACE) ASSOCIAiE PARKING STALLS TO BE PAINTED WHIIE
8 FIRE LANE S1PoP�IG ARWND BUILDING PEPoYEiER APD ALONG FlRE 1f2UCK (SWSL/4')
ACCESS WAYS SHALL BE INSTALLED AS PART OF TINS CONTRACT,IN O ?qIN1ED ISIAND 1YPICAL UNLE55 NOlED OTNERWISE. SiRIPES SHALL BE ��`"""""-^--� -,i-�+'�.r4"''{""ti
ACCORDANCE'MTH iHE LOCAL CODE AND FlRE MARSHALL REOUIREIIENTS. ?AMTED SYSL/4'AT 2'-0'O.C. SEE DETAII SHEET. (IF YAiHIN � O ��ENTAL BLOCK WALL/ROCKERY-HEIGFiT<4' � �
ASSOCIATE?ARKINC BWNDARY, THEN SiRIPES SHAIL BE PAINTED �^.,,,,,,,,.,_.,.�..+�w�. .
SNSL/4'AT 2'-0' O.C.)
SITE DATA BUILDING DATA O 8' WIDE PEDESTRIAN CROSSWALK. EDGE UNES PAINTE�SWSL/B�N7iH 6 i
INSIDE STRIPING PAINIE�SWSL/4'AT 2'-0� o.c. C-a2
APPROXIMAlE BUILDING AFEA = 135,373 SF P��JDICULAR TO EDGE L1NES I
ACWISIiION OP CART CORRAL c-so
PARCEL A = 2.9 AC PARKING DATA
PARCEL B = '3�AC O JB CRANE SiRIPING, 1�'x 15'. SYSL AT 2'O.C.
TOTAL ACOUISI110N = 15.9 AC PARKING PROVIDED O Z'-0'LOA6ING ZONE AT ALL S2ACES ADJACENT TO CURB AND GUTfER -
STANDARD STALLS = 572 STALLS
USE GAS STATION STALLS = 10 STALLS 1YPICAL. 4'PAIN?ED YELLOW STRIP�NG�2'-0'O.C. PERPENDICULAR TQ
PROPOSED RETAIL = 15.9 AC COMPACT STALLS(i6'X 9.5')= 35 STALLS PARKING SPACE.
INCLUaNG GAS LOT ACCESSIBL" STALLS = 15 STALLS
TOTAL = 15.9 AC TOTAL STALLS = 642 STALLS
PARKING RAT10= 4.7 /1000 SF
BUILDING SEBACKS
FRONT = 10'
SiDE = 0'
� REAR = 0' �
�
�
�
i
�
�
� R. � 7.E.p .
`�i' r� �� .q-Q�o�reaq�/� �,�ot��xi,�j�
� I ; v 1 -� �/��� z
, � �
� �- ��. % �CHEC(J FCR CCMPLL4NCE RECOMMENOED � ��a�'E' - r D3-14-03'�
� "; �'•,y��: _ , I I�9 � � �� Tn CI"� 5'ANDARDS FOR APPROVAL , � NONE ,o„ ,�,,,. A ,.} `,I TY ��� SAM'S CLUB#4835-00 - �
� �519` e o "'�� � '' RENTON 901 SOUTHGRADYWAY � J
, �
i � '�i�st.°+c� �rs�tv� I DATE 8Y cuo
� 1144 Eastlake Ave.E. ' 20fi)522-9510 �ss�on..s+`'� �SS�UNAL�` DATE aY 2 �� PERNiT C,Ou4FNT5 RESUBUITTAL �PACLAND�18 O3 ��, ..F1J�.i i � RENT�N,WA 98055 i V '�"� I
� Suite601 P 20fi)522-8344 � DPTE BY � �F-55 ���* -a�nirgj��llcir�q/puClic Wor.s Dept. � ��-'�.1
Seattle,WA 98109 �nwN?xL:no.mr � r.at�s r�tT�.ma :�u�eu%osr s.zx� N0. I R1�1510�' . BY �ATE APPR � �� . v:
_ onr_ er ess I SITE PLAN NOTES
i
Sam's Club #4835-00 Storm Drainage Analysis Renton, WA
Figure A3 - Grading and Drainage Plan
PACLAND Project� 1999010.008 Page 26
---- ---------- _ __ _ - -------- ___ ..
_--- - __ _ ---_ ---- ---.. .__ -- -----.__.----- _____ __ __ ----- ------- ---------_ _ _--- - -_ _ __ -__ __ _. ...---------_ _ __ ___ _ _ _ --__ _. ._ _ ____ __ _
� , ,. ..�
'"�" � �� LEGEND
SEE SHEET C-2J FOR GRADING �% � ' ``- ��� -'�
%� h , - � �� ".�,4,1 ,�t :� � EX CONiWR STORII ORNN PIPE 5g
�AND DRAINAGE NOTES. SEE ,, � ' � ,' �'�!'��� �' RETAI�NNG WAIi �' , PROPOSED CONTCUR �34-
SHEETS C-2.2 — C-2.4 FOR _ ,i� :�� . �* �_ `� � '"� _ .� s, FlNISHED FLOOR ELEVATION �
, a, .u�a' � +'w�oE z a�o' , s�ot aFVAnau �
r `�.�,� � BIOFlLTRAiION �-22 . 2 TOP Of WALL:LEVATION iW
�, , � d `�� , ,�S � ' ' 0 0.5 TYPE I CATCH BASIN c-s.o BOTTOAI OF WALL-EL AT GRADE BW
STRUCTURE AND PIPE SCHEDULES ` ` 1- -'. ;;- �' n
G, ' V , . � �,_a3 _� �`�j9 � "�"- TYPE II CATCH BASIN � t
AND DRAINAGE PROFILES. sEE ROAo PUNs FoR<F � � � � ,r� � - � � m3 �Q/y ' "- ` C-6.1 PAVEAIENT FLUSH IM1H 9DEWALK �-;
�/: � 49 y f_. � y�� 3!3�J�-"-SEGAIENT;� OCK.WAIL/RDqCERY CLfANWT TO GRADE 3
EN7RANCE DETAILS�tiJD �'� '�,' ,, ,' ; - _- '�}o��03 �y,q y _ ��.o.T.�. • C-5o PoP-RAP �
CALL 48 HOURS a.o.w. � O _.. � ) �
BEFORE YOU DIG _ � ��' q " �y���j�tia3 0 3, OAD PLANS STORAI DRAIN END PIPE —� � 3 ' r .,. �I
� � �. � '�,' � ,� `S '� ra 3 �(SHEE -)FOR c-e.o c-s.t =4 # ��5+-�..
—800-424-5555 � r'' � , �y,�' /<-�_ _-� � � `��,\ -��ti s6 � EN�nNc� . s iwo ��, ' ,�. -�'^"`p-
� ��Y ,ai . .8 � ,,�6 � DESIGN IN`it.0. . �, a � `��`,,,�` � I
� +' � y�, �� _ s y'� 3j,o . �`,�,�w�'�� _ � _ - .'
�-> ��l �!J-3' $ b� '✓ ..�: '1 .\, c ��.�^' n�' -�i..�
�-G•( . �� � � ° -. '�' � __ 6qj�4 ... 35.' -ti..� IE =�268� y'`-` `^ �'� ��r""� !-^� "�.y",ysy^"'.''.i .
r��
,
. ,
„
,: .
�'' •�� < �I::��, , , �S5�i �_' 4 ~� � �` � � ��
,
_ � , •
: . , , � _` �
`35.5 -, �".
ff' �Q` ,, . �`.. ,� - - � �� 4 `� � -=� �^ P`���` y'�,.��''� �
4 �
GRAPHIC SCALE - ' ,t �' c � 53 � ` :",p�<P� �r�
_ � . _. 'iy:` 'Q . �„�, ' � �' Z�; j�� ��� � . ..
, � • '�:
�,�,.' � p ':1 , �t�1y-- ��` ' �` .`_ ,�EE�ROAD PLANS FOR
a o a b -
( n+rzer) � " :�, �G . � � ,, EATRdJJCE AETAIIS AND
i�n. w,n ,. > �• �'_' �` "`, R.OW
s � _
..�� .;.' '�, r� I .' ' . ' SY1 t �/ .
4 ^
:
:
: , . ,
� . :. � �` j
- -' ,' i .
., -�
� ' ys.o ' .�,0, � 6 ` � I
_ �
, � ; �� . '
, .
.::.`s^
.
_ r
�.
� .._ . , � ,
- .� ,r,� ,. .; , . .�. �r
. ., ,
"•37. Jis .: .;, _ =�. ..,, .JP' '-.. � .;:� �" ����i 1�,; .
��6 � t
SEE ROAD PLANS(SHEETS ' ', �-�'' ^ ,, , • , `i , . �- � � �
, y1 l3,S
CR-)FOR ENiftANCE 'L1 "..- "i y�.. . - � .�' S , sP� - �.----�o ,.31 Y`"�� ...
.
DETNLS AND DE9GN ,,, `�.� !-�� v ''�" . �" __. �, �. '�. \: 'y � 6 ����`'
J
R.D.W. 3' 4'WIDE x 140'-,'�_•--:.� _,-: .�, �a> ., �''• � -- -- ��n 'tt� `f� '(� '� 'b' f 'b 611E '- � / ` �
, � .
. 16� . .:. �s . ..,- •. � �' 31 fr WID�7(.L45'
c-21 BIOFIL3RA�Olh"' I /=.... / ,..`. ` J� ,` ' .` v v �r- ------ ----��,--- R--- ------ --- -— —3}''� � :: B�OFltTRATION' C-t2
,,,:�-"�` � ,.. . s.. __, .,. . �o . . Rc �?B `$ "� ' 'S �'° `b � : '� �'
SWAtf'�D'0 0.57 " i� SI7E•C TRACTOR 70`CLEAR..I � ,! �.-•� .ti/ a �c,� � 'b , 5 g`� 5 _ -' . f
; t�' -> :.. � �' � m •�--- ----- -- -- -- - _ �� SWALE'C'�O.Sz
' TYEE.6 C ✓ �� . .�S`!, ds`� " ROUGH E AND7NSTALL':STORAI . ' �" . , `,..�j� $� � ' ��
, '" J�
� �o � - � - DRAINS.tlil S,.CL'R$ANO ' , 1 , � ,� _� ,�r: 19�ppW 38.80 _ � _ �j
� °t/ �
EXIS3#NG�50 �y _ GI1TiQt IN GAS '. - , \\J ,9 �b �,..� �� ,�r� J - ;i Sl" ' . ._ �
1: = 28.2� � TE CONTRACTOR T0 CCa7DINATE i � e � \ '�<M .tq�J �s y, Y �lp �? � �
EXIS�G.SD 4� � � �� 1 ���TH GAS 57AT10N CONiRAC OR.-_, F� � Jc,� '�es � �`b � ` FLU fX1RB � (b � � >
� af *t Yn
5}k tY
.t� '� 6 FOOTING DRNN - � o -
� _� ' v4
��0-REMAIN:�� ' _ ��36:2 . " .- j ,7B.6 4y � ;A �11 . .
� � 'E . ^ < � 'd� �frf� SEE FWNDATION PLAN fi� � v °
' \ � 1,_� , 75 z ;.'-°}�/y„'.��.� y�' 36� �� '�?� S `�, IE = 36A �,,ti i3 , '„'dC aS2a.. N�1Tpi EXISTING " . . -
� IE = 28.5 4 , 1� �y7 �r� 36.� - tv'__f 755 ��1 ��*��= FLUSH CURB �o » DRIYEWAY .
3 RIP-RA� J . � ,:�. �� 15? `,s :, - `�x' , �o '�1, pA x.'�..
. '. t
o=1a � i� `'� � - � =r
134'SY ..� 17 i: ❑ � -' ,� �e � � � ; I
e, - - ��� ,' �•� � -- , >.,`� °'ti
. �? i141 1 ,{y. '�`Ei '. ,\ *8 J r'i$� 7,� l- I• �►' q' . , •J � RE�iAININ�NGLL �1.0
. _
a' �
. a : . _ -
, ..
.
, � _
.
. . •3 ,� . �-
. . �' /
� � �b t _-�� i Q I �� ' $�� ' J -� , •�
. .. � ` ` `
_ � � B 1
, , : . ._ � s 6 �0 y `� _
612�7-CP5 ql WATER 1 •. � ,. _-"___ �3 . ys: s ,k�O , ,+ � � ; ~ � �\ ` - _- .
`tt �
ti � �
SEPARATOR•BYllilEtll'' . ,• `3 . rE 29. � '�s 'i i . /� x;, - , •y .. �i'� �,7g - " �
5_1MDE.x 200"` / •
VAUET COM�PANY Of2 ' C-z2 ^q r ��. ' 2 = c ` J �` ��,�` ,7fl� - R-TR , '�s � ,y,
BIOEILiRATION ef � �:� , et •,,,' ` � 9Z _' _.��_ _ -� �y f'"
APRRO�IF�EDUAL SWAE€ A �-0:5$: - , :,., . , ` ,,', ;�91 . -ti• 1 , 3 S.F. � �`� �;_z
� ,`•. a ` ' 9 GROSS'5.F W/DOCK SHOWN: 35 37
\ . � �1 ' USE: RETAIL �4
. ' ,. . i% �\ � �,�; �9� ,�� q+� CONSTRUCTION iYPE: Y-N � ------ �
r�EPLACE�XISPNG ROUADU�T - `�e :k + ' � 1 - t, 3x,�, � � l j
+N�4 11ANNER T0 Ni�HA�IZE _.` �� � /` �\ � S5rt''� � ,. s„� �i FFE= 39.0 I ..t-'` , � \� ' '- �
. IMPACF ON AOJAC�iT WEl[JiND._ - _T YMDE z 1I4'--.-=1 �\� �- , �F' o �� � �� �, '
= CONTRACTOR'Q REPAIR ANY DRAINAGE$WAtf Q?�3&.. ' � � �c� 7� �tJ'?i \� �
��
,;
OMARGE CRU�Q'Q Wf7iAND °. - _. ' � i._ i. _ _ .�a -- --w�,, q� .... � 4p
_
. , �
: _ - , .
.;, ; _ �" y •
DURING CCIVS1R11CiIDN.. _ � , _ r �.: ' ' �f
.�
UR�„�SEk1P-PER9`(3 �' cp
-''�-_ _ . ; � � R. �z ' � 61 `y -
' .._ -- -_.- � � 44'q -"-' � 64$ �. ,. $� ._.. .. � ..�� :: .. � �� . ��T�C7.. � ��
� . ._ _ . - r - - — -_
�,,
' �� 1fiANFORIIER �6' FOOTNG GRAlN 6'FOOTINC D AIN y&� 6110 , s
_ � ` - _ .0 FOUY SEE'FOUN 71 J -
-, � },"' -: - ; 9 � :E_ 37.5 A IE= 37.5 A �� �
Sp'R � A� � 9� g
_
' \ . ;:: ;. r-- i; . � 9�{r ,pcP . $,�� P�o �g� � p AN � �� ���ON PUW �9 S�¢
.,_ . :- ._��::� -�._._.. ,_ . . - , - /:l�`��\ �q. . 7 �97 . . }9. ��
� ::.
;.:.: �.,.. _ ' .--_
. _
.. . . . ���..;
..�. ._.. . . . . _ ..-.•...' . :. -. ,.',':'. . . . �,�w^
.
.....�.- .. ._.... - � .
`
... . ... .�.- ._ - - "_� .._. :.
. _.. ...-... .; . .., .._.: .. .__ -- ..
.. . . , _.. ... -- .
..- _ ' '_ __ ... _
.
�:;.:. ._� . . .. . :.:.... .
: _ _ . . C-0.4 3$YI flQl1A�UGt.. �-I� _ �� f �, �_L; 2� ��j ��
: -_ , , . _ _.. __ . /�
, _ - ''' :
_ _- . - _ n _ _
- �-_- - - - -
�. , '�L�
,.. ,�__ _ _ < L� _ _
_. :. __ - aa
, ,,: -�____ ' _ �
�..._ _� -- . _: _
__� � I '
_...__ _ r. -
' A I �� � L" CQN7BACTOR TbyINSTALL A 6'
&
,,:: - - s"� 5 � '�� + ' .�s � PERFORATED-IN�RCE TOR DRAIN.
_ _ __
_`"""�•-`-^-�---•-.� _- .
��
_ , . - N
_ _ � _ -
� lg/
___- � . ..-._.�._,�`, . _ , .�,� .:-_. � _ ._ . .. _.. _ ,_L _
`�
. ' jy :
�
- ____ '—..-___ -. . .�_:._ � . �- —— ..._ A `.:o>.
, �
^ _.
.__._' _... .,_.,_.,,._-:� ... . , . ;
` ' R�TAIN� G ur � '
o ' --____.�..�. : \��x i
..� < - �_�_..__ } ,
--- - - • __
:: - -,_., _. . ���
,_
�� ��� �. � �s
;, .: : __ �_-___ __ , x
_ �__�,. . _ _ .. .. 4
�\
� . .,. - - --- _�..._:_ -_. �..
;._>"
_.- '_ ... � _.. .._ ,..
o _ ., _ - � _ - . � - �
i r: , � ;�',� _ _ _ - - ' ` �ELEAN Ut1T, '
_
_ _
_ `
� =_ ' °-a ='�",�r,.�?"-,�`��� .--r.sp"" �",�`� _ - _ ...
BENSON_RQAD_ SOUTH -`,�,.
.___ -_� __ -• --
� _ _ - -- -- _--�--- _ -. .. _. _
rt �
, -: �� ,�'
. _ _
-��ca� �
� —- -_ _ - w� _
- __ _ .
,� _. --- . ,
� � w CO4N� TQ u\ \
�
� ._ ,
,
�
_
_ _ a
� --. �.. . �.. `. ..-. .. , C.:
f
r
Pv�Nv
i . .:: . �". .• - -" S-2�.EX.48"SD"�� � .CONNECT 0 � _- �P�`-�� .�- - .
i ,:
� ' '� � - : tE 3943 � EX'14 SG '`CflNTRACTOR TO PLACE 10 AIIN.OF QUARRY SPALLS
S —_ :_ . _ � J'_ � '.. -
_ � '�;�, �
�E 39 PER SECPON 9 13.6 OF 2002 WSDOT STANDARD
� �. QN � L� D.E.p r r -- - _ -- : � c.i _ E
rn .h F�al�45B�,�ID `u1 r�dp� � . -: � `� �; ` �, . . .
.
\.
� � -- � � - - - ��� _ - " }'- p GHTS OUTAOF THEEEPR OSED 3�RSlOFEAG
I,, J ,, : °��� , �� �� ��»
. . _ , ►.
_ _
_ _.... -
� ��
� _�_� % � . � � ' � I �� CHEC<ED FOR COMPLUWCE� RECOMMENCED � 1"=50' ��z,,,e. � �f Y SAM'S CLUB#4835-00 �px
� r-- . _ , , ,� ...,,�», CI T. OF � 3-ih03
i=:�il�'u.,�'� _ , / J TO CI'Y STANDM2D5 FOR APPROVAL E� � ' i��.�:
� � RENTON 901 SOUTH GRADY WAY
� ' '�, A��y.:�9 tie' '90 *et�eo e° �. pATE BY 2 PER41T CpAYENTS t7E5U8WTTAl PACUN�1 7B W �KH � �� v
W '�'� � � �aTura �' RENTON,WA 98055 v
; 1144E25UakeAve E. T f206)522-9510 3.cv��'�'� ��1GPLLE'� �qTE BY 1 91D ADDENDU4 1 PACU!b 4 4 � �� „���„�� ?onnirqjB�-��a:ngjPublic Works ,^xpt i. (���2.�
'} i Sui[e 601 F (206)522-B344 � , ��a. �:;.._ �'� i Y v
- seatue,WA 98_09 h�,.a;�wo.«� �.'��,�:o� i ��e.^ ����� ��� eY NO. �EV SION er DATE oP=R GRAOING AND DRAINAGE PLAN
I"`.
_
i � �
CfTY OF RENTON iHE PROPOSED SIIE DURING iHE COURSE OF CONSiRUCTION, IT SHALL BE 1HE OBLIGAIIDN AND RESPONSIBILITY
GRADWG NOTES OF TnE PERMIIEE TO AD6RESS ANY NE�,�1 CONDITIONS iHAT MAY BE CREAiED BY THE ACTIVIIIES ANO TO PROWDE
SURFACE WATER DRAINAGE NOTES ADDITIONAL FACILITIES, OVER AND ABDVE MINIlAU4 REWIREAIENTS,AS IdAY BE NEmED, TO PRQiECT ADJACENT
PROPERiIES AND WATFR QUALIiY OF iHE RECEIVING DRAINAGE SYSTEM.
�• PiE 6E5GN SHDWN IS BASm UPON THE ENGINEER'S UNDERSTANDING OF iHE E%ISnNG CONDIilONS. hiE?LAN SURFACE WATER DRAINAGE NOTES AND SPEGFlCAPCNS
ODES NDT REPRESENT A DETAIIED FlELD SURVEY. THE EXISiING CONDIilONS SHOWN ON THIS PLAN SHEET ARE 23. APPROVAL DF iH15 PLAN IS FOR EFOSION/SEDIMFNTATION CONTROL ONLY. IT�OES NOT CONSTIiUTE AN APPROVAL
BAS"tD UPON THE SURVEY PREPARED BY BARGHAUSEN CONSULTNG ENqNEERS, INC., DAiED t�-29-02, REVISED 1.BEfORE ANY CONSiRUC710N OR DEVELOPLIENT ACi1VITY OCCURS, A PRE-CONSiRUCTION AIEEIING MUST BE HELD WI1H THE CITf OF RENTON OF SiOR�I DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES,RESlF21CTDRS, CHANNELS, OR REiENiION FACWiIES.
03-72-03. iHE CONiRACTOR IS RESPDNSIBLE FOR VERIFYING=1ELD CONDIilONS PRIOR TO BIDDING THE PROPOSED PL1N RE4IEWER.
517EWORK IMPROVEMEN75. IF CONFllCTS ARE DISC04ERED,7HE CANTRACTOR SHALL NOTIFY THE OWNER PRIOR TO 24.�URING THE 11ME PERIOD OF OCTOBER 1ST THROUGH APRIL 30h1,ALL PROJECT DISiRIBUTED SOIL AREAS GREATER
INSTAL�ATION Of ANY PORTION DF THE SIiEWORK NFIICH WOULD BE AFFECTED. IF CONTRACTOR DOES NOT ACCEPT Z.ALL CCNSiRUCT10N SHALL BE IN ACCORDANCE W1iH THE 1996 STAN�ARu SPECIFICAiIONS FOR ROAD, BRIOGE AND Ml1NICIPAL 1HAN 5,000 SQUARE FEET, iHAT ARE T�BE LEFT UN-WORKED FOR MORE THAN 12 HOURS,SHALL BE COVERED BY
IXISIING SUR4EY, INCLUDING TOPOGRAPHY AS SH�WN ON THE PLANS, HITHWT EXCEPTION,HE SHALL HA4E MAQE, CONSTRUCTIDN PREPARED BY WSDOT AND THE AUERICAN PUBLIC VNRKS ASSOCIATION (APWA), AS AIAENDED BY THE CIiY OF RENTON PUBLIC MULCH, SQDOING OR PLASTC COVERING.
AT NIS OHN EXPENSE, A TOPOGRAPHIC SURVEY BY A REGIS1ERm LAND SURVEYOR AND SUBIAIT IT TO h1E OWNER �KS DEPARiMENT.
FOR REVIEW.
25. IN ANY AREA WFiICH HAS BEEN STRIPPED OF VEGETATION AND WHERE NO FURTHER WORK IS AN71qPATED rOR A
2. iHE SPOT ELEVATIDNS INDlCATED ON iHIS PLAN REPRESENT THE DESIG� TOP OF PAVENENT, UNLESS QTHER4NSE 3.hiE SURFACE WATER DRAINAGE SYSTEM SHALL BE CONSIRUCTED ACCORDING TO ?NE APPROVED PLANS, WHICH ARE ON FlLE IN THE PUBLIC PERIOD 30 DAYS OR MORE, ALL DISNRBED AREAS MUST BE IMMEDIAiELY STABIIJZE�W1TH MULCHING, GRASS PLANIING
NOiED. WORKS DEPARIMENT. ANY DEVIAiICN =ROM iHE APPROVEQ PLANS WILL RE.UIRE WRITTEN APPROVAL FR�M iHE CITY OF RENTON PUBIIC OR 01HER APPROVED EROSIDN CINJTROL TREATMENT APPLICABLE TO 1HE T1ME OF IEAR. GRA55 SEECING ALONE 1MLL BE
WORKS DEPARIAIENT, SURFACE WATER UTILITY SECTION. ACCEPTABLE ONIY DURING hfE IAONIHS OF APRIL THROUGH SEPTEMBER, INCLUSI�E. SEEDING MAY PROC�, HONEVER,
3, CAUTION- NOTICE TO CDNiRACTOR WFiENcVER IT IS IN hIE IN7ERE5T OF�HE PERMITEE, BUT MUST BE AUGA1ENiED WITH MIJLCHING, NETTING OR OTHER
� i}iE CONTRAC�OR IS SPECIFlCALLY CAUiIONED AT THE LOCATION AND/OR ELEVAiION OF IXISTING UTI:�TIES AS 4. A COPY OF THESE APPROVED?LANS IAUST BE ON iHE JOB SITE WFiENE1�E�CONSiRUCTION IS IN PROGRESS 1REAlAENT APPROVED BY TF!E CI1Y OF RENTON, OUiSIDE THE SPEqFIED TIME PERIOD.
I SHOWN ON THESE°LANS 15 9ASE�ON RECORDS OF'HE VARIWS UTILITY COAIPANIES AND, WHERE POSSIBLE,
I �1EASURE1pENTS TAKEN IN 1HE RELD.hiE!NFORMAiION IS VOT B�RELIE➢ ON AS 90NG EXACT OR COMPLEiE. hIE 5.DA1UM SHALL BE NAVO 88 UNLESS OiHERWISE APPROVED BY THE GTY OF RENTON PUBLIC WORKS 6EPARTAIENT. REFERENCE BENCHIAARK 26.FOR ALL EROSION/SEDIAIENTAiION CONTROL PONDS WHERE THE DEAD STORAGE DEPTFI EXCEEDS 6 INCHES,A FENCE
CONTRACTOR MUST CALL TrE APPROPRIATE UTILITY�0lA?ANY AT LEAST 48 HOURS BEFORE ANY=%CAVA110N TO AND ELEVAiIONS ARE NOIED ON 7HE PLANS. IS RE�UIRED WITH A NIhIUUM HEIGFIT OF THREE (3)FEET, 3:1 SIDE SLOPES
I REOUEST EXACT FIE11 LOCAlIOY OF UTILITIES. !T SHALL B�THE RESPONS181UTY OF THE CONTRACTGR TO . ,..,,: - ..,.- - <,.., , _ ..- -,.
_..
I ,.-. �
RELOCA'E ALL EXISPNG UT1Li11E5 W}fICH CONFLICT W1TFi THE PROPOSED INPROVEIAENTS SNOWN ON THESE PLANS. fi.ALL SEDIMENTATION/ERDSION FACILI11E5 AIUST BE IN OPERATION PRIOR TO CLEARING AND 9UILDING CONSTRUCiION, AND 'FIEY MUST BE �Y7. A iEMPCRARY GRAVEL CONSiI211CTIGN ENIF2ANCE, 'S FEET H7DE X 100 FEET LONG X 12 INC4ES iHICK (MIN.) OF 4 TO-
d. CONTRACTOR IS RESFONSIBLE FOR JEMOIJTION OF EXISTNG STBUCTURES INCLUOING RE110VAL OF ANY E%ISTING SATSFACTORILY MAINTAINED UNiIL CONSiRUCTION IS COMPLEiED AND THE POTENTIAL FOR ON-SIlE EROSION HAS PASSED. 8 INCH QJARRY SPALLS SHALL BE LOCAlED AT ALL PCINTS OF VEHICULAR INGRESS AND EGRESS TO THE �ONSTRUCTION
UTILI11E5 SERNNG 'HE STRUCTURE. UTILITIES ARE TO 3E REIAOVED TO THE RIGHT-OF-WAY. 7, qu RETENTION/DETENTION FACILITIES IAUST BE INSTALLED AND IN OPERAiION PRIOR TO OR W CONJUNC�IDN 1NTN AL!CONSTRl1CTI0N SITE FER CDNSTRUC110N ENTRANC"c DE7�11L.
� 5. ALL UNSURFACED AREAS DISTliRBE�BY GRADING OPERA�ON SFiALL RECEIVE 4 INCHES OF TOPSOIL CONTRAC70R ACi1V�1Y UNLESS OTHERWISE APPROYED BY 1HE PUBUC WORKS�EPARTMENT,suRFncE wa�R unurr sEcnoN. BUILDING PAD PREPARATION NOTE
SHALL APPLY STABIL:ZAiION FABRIC TO ALL SLOPES 3H:'.V OR STEEPER. C6NiF2AC70R SHALL STABILIZE UNPAVED
DISIURBED AREAS AS SHOHN ON THE LANDSCAPE PLANS IN ACCORDANCE VII1H IOCAL SPEGFlCAiIONS. 8. GRASS SEED MAY BE APPLIED BY HYDROSEE�ING. iHE GRASS SEED MIXNRE, OTHER hIAN C�TY OF RENTON APPROV�C STAN�ARD MIXES, FOliNDATION SUBSURFACE PREPNtATION (04/04/03)
6. ALL CUT AND FILL SLOFES SHALL BE CONS7RUCiED PER 1HE UBC CDDE AND APPLICABLE LOCAL REGULAiION. pu SHALL BE SUEMITiED BY A LAN^uSCAPE ARCHIlECT AND APPROVED BY THE PUBLIC WORKS DEPARiA1ENT, SURFACE WATER UTILIiY SECTION. $py'S CLUB �4835
CUT AND FlLL SLOPES SHALL BE 3:1 �t FLATTER UNLESS OiHER'MSE NOiED. RENT04,WA
9. ALL PIPE AND APPIJRTENANCES SHALL BE LAID ON A PROPERLY PREPAR�D FOl1NDA710N IN ACCORDANCE WIiH SECP.ON 7-02.3(1) OF THE
7. CONTRACTOR SHALL ASSURE POSIIIVE DRAINAGE AWAY FROM BUILDINGS FOR ALL NATURAL AND PAVED AREAS AND CURRENT STAiE OF WASHINGTDN STANDARO SPECIFlCA�ON FOR ROAD AND 9RIDGE CONSTRUCTION. iH1S SHALL�NCLU6E NECESSARY LE4flJNG UNLESS SPECIFlCALLY IYDICAlED 01HERWISE IN THE)RA'MNGS AND/OR SPECIFlCAilONS, iHE LIMITS OF THIS SUBSURFACE
SHALL GRADE ALL AREAS TO PRECLUDE PONMNG Of WATER. QF 1HE iRENCH BOTTOM OR hIE TOP OF'HE`OUNDATION MATERIAL, AS Wc1L AS PLACEA�E�T AND COUPACiION OF REQUiRm BEDDING PREPARATION ARE CONSIDERED TO BE 'HAT PORTION OF THE SITE�IREC7LY BENEATH AND 10 FEET BEYOND iHE
MAIERIAL,TO UNIFORIA 6RADE SO':HAT iHE ENTIRE LENGTH OF 7HE PIPE MSLL BE SUPPORTED ON A UNIFOR�ILY DENSE, L'N11ELDING BASE.
� B. ALL POLLUTANTS OhIER THAN SE�INENT ON-SITE DURING CONSiFiUC�ION SHALL BE HANDLED AND 91SPOSE�OF IN pLL PIPE BEDDING SHALL BE APWA CLASS'C",YATH THE EXCEPTION Of PVC rIPE. ALL iRENCH BACKFlII SHALL BE C�MPACIED TO MINIMUN �ILDING AND APPURiENANCES. APPURTENANCES ARE THOSE IlElAS ATTACHED TO THE B111L01NG PROPER (REFER TO
A IAANNER 1HAT DOES NOT CAUSE CONIANINATIQN OF STORMWATER. THE CONTRACTOR SHAIL ADHERE TO ALL DRAW`NG SHEET SPl), TYPICALLY INCLUDING, BUT NOT LIUIiE�T0,iHE BUILDING SIDEWALK$ GARDEN CENIER, PORCHES,
TERMS AND CONDITIONS AS OUTllNm IN iHE�ENERAI N.P.D.E.S PERAIIT fOR STORAIWATER QISCHARGE ASSOCIAIED 95x FOR PAVEUENT AND STRUC1URAl FlLL AND 90%OTHERVASE PER ASTM D-1557-70. PEA GRAVEL BE�DING SHALL BE 6 INCHES OVER Rq�1P5, STOOPS,iRUCK WELLS/DOCI(S, CONCRETE APRONS, COMPACTOR PAD, ETC. THE SUBBASE AND VAPOR
WITH CONSTRUCiION ACiIVI11E5. AND UNDQt PVC PIPE. BARRIER, WHERE REQUIRED,DOES NOT_XTEND BE�ON�iHE UAlliS OF?HE AC7UAL BUItDING AND THE APPURiENANCES.
�
' �• PROPERDES AND WATERWAYS DOWNSTREA�1 OF THE SITE SHALL BE PROTEC?ED fRQU EROSION DUE TO INCREASES 10. GAIVANIZE�STEEL PIPE AND ALUMINIZED STEEL PIPE FOR ALL DRAINAGE FACIIJTIES SHALL HAVE ASPHALT iREATMENT�1 OR BETTER ?}{E SURFlCIAI COAL TAILINGS ANO EXISiING FlLL SQILS SHALL 6E COVERED WITH GRANUL4R S1F2UCiURAL FILL TO
IN iHE VQLUME, Vf10CITY AN�PEAK FLOW RATE OF STORMWAiER RUNOFF FR0�1 PRDJECT SITE. INSIDE AND OUTSI�E. ACHIEVE SUBGRADE ELEVATION BENEAiFi 1HE FLOOR SLAB AND PROVIDE ADEQUATE SUPPORT FOR ALL FWNDATION
' 10. CONSTRUCiION SHAti CONPLY W1iH ALL APPIJCABLE GOVERNING CODES AND BE CONSiitUCTED TO SAAIE. 11. STRUCIURES SHALL NOT BE PERMITTED'MTHIN 10 FEET OF iHE SPRfNG LINE OF ANY STORM�RAINAGE PIPE, OR 15 FEET FROM hiE TOP CONSTRUCiICN EOUIPMENT. 7HE U?PER ONE F00T OF EXPOSED FlLL SOILS SHALL BE PROOF ROLLED AND COMPACiED
OF ANY qiANNEL BANK. TD A FIRIA AND UNYIELDING CONDITION?RIOR;T�RLACWG THE GRANULAR SiRUCTURAL FlLL. A PASSIVE IAEiHa'r'E GAS
>>• CONiRACTOR TO REMOVE UNSUITABLE SOILS LOCATED WITHIN THE BIIILDINGS SPLAY LJNE OF THE FOOTINGS AS 10 �ENTiNG SYSTEIA SHALL BE INSTALLED i4 12 INCHES:DF WASFIED ROCK FlLL PRIOR TO INSTALLAiION OF 1HE METHANE
' LISTED IN THE B1111.DING PA6 PREPARADON NOTE BELOW. 12. ALL CATCH BASIN GRAiES SHALL 8E DEP4ESSED Q.10 FEET BELDW?AVEUENT LEVEL GAS VAPOR BARRIER. A 2-INCH THICK�AYE3 OF.,FROTECTIVE MATERIAL SHALL BE INSTALLED OVER THE AIEiHANE GAS
12. FOR BOUN�ARY AND TOPOGRAPHIC INFORMATION RffER TO PROJECT SURVEY. 73.OPEN CUT ROAO CROSSINGS PiROUGH EXISTiNG PUBLIC RIGHT OF WAY 1NlL NOT 3E ALLOWED UNLE55 SPEqFICALLY APPROVED BY qT( BARRIER iHAT�S CAPABLE OF SUPPORIING REINfORGNG SiEEL SUPPORTS.
13. FOR LAYIXIT INFORNAiION REFER TO THE SITE PLAN AND HORIZONTAL CONTROL PLAN. OF RENTON?IANNING/BUILDING/PUBLIC WORKS ADMINISTRATOR.
ESiABLISH iHE FlNAL SIIBGRADE ELEVATION AT 22 INCHES BELOW iHE=1NISHED CONCRETE ELEVATION WHEN USING AN
' STORM DRAINAGE NOTES 14. ROCK FOR EROSION PROiECT'ON OF ROADSIDE DITqiES, WHERE REQUIRED, SHALL BE OF SOUN�OUARRY ROqC PLACED TO A DEPhi OF B-�Nqi SLAB TO ALLOW FOR THE SLAB 1HICKNESS, A 2-INCH UEiHANE BARRIER?ROTECTIVE LAYER, A1INIMUM 10-MIL
ONE 1 FOOT AND IAUST AIEET'HE FOLLOWING SPECIFlCA7lONS: METHANE GAS VAPOR BARRIER,AND 12 INCHES OF 7/8-INCH MINUS WASNED ROqC. SIX-INCH DIAMETER PERFORAIED
1. IXISiING DRAINAGE STRt1CiURES TO 9E INSPECiED AN�REP.4IRE� AS NEEDEO, AN�EXISTING PIPES TO BE CLEANED O AIETHANE 4ENTING PIPES SHALL BE=]AEEDDED IN THE WASHE� ROCK PJ2 TF!E PROJ�CT PLANS. 1HE 2-INCH IAEIHANE
4- B INCH ROCK /40- 70X PASSiNG; BARRIER PROlECiIVE LAYER SHALL BE CCNiROLLED DENSITY FlLL`JR A?PROVED IAIPORTED GRANULAR AIAlE�IALS. THE
OUT TO RElAOVE ALL SILT AND QEBRIS. 2- 4 INCH ROCK /30- 40X PASSING; AND CON7RACTOR IS RESPONSIBLE FOR C8T.41NING AC�URATE IAEASUREMENTS=0R ALL q1T AND FILL DEP7HS REQUIRED.
2 IF ANY�RISDNG STRUCTURES TO RE�IAIN ARE DAAIAGED DURING CONSTRUCTION IT SHALL BE THE CONIRACTDRS LE55 THAN 2 INCH ROCK/10- 20X PASSING.
RESPONSIBWTY TO 3EPAIR AND/OR REPLACE THE EXIS7ING S1RUCiURE AS NECESSARY TO RETURN IT TO EXISTING EXISTING FOUNDAT10N5,SLABS,PAVEMENTS, UTILITIES,AND BELOW-GRADE STRUCTURES SHALL BE REMO�ID FRCI� OR •
CONDI110NS OR BETTER. 15. ALL BUILDING OCWN SPOUTS AND FOOTING DRAINS SHAt1 BE CONNECTED TO 1HE STORIA DRAINAGE SYSiEM, UNLESS APPROVED BY THE PROPERLY ABANqONEQ,JII-BLACE WiT1iIN;iHE,BUlWlN6 AREA. EXISTING PILING SHALL BE CUT OFF 3 FEET BELOW THE
' 3. STORM DRNNAGE PIPE�ITH LESS THAN 2'-0'COVER SHALL BE CLA55 IV REINFORCED CQNCREiE PIPE, DR CITY PLAN REVIEHER OR Sl1RFACE WATER UTILIIY SECTION. AN ACCURAiE1�DIIIENSIONm,CERiIFlED AS-BUILT DRAWING OF THIS DRAINAGE BOTTOIA OF TF�PRDPOSED GRAD�EEANS%SUBGRADE AND TH�R LOCAiIONS SURVEYED FOR FUiURE-REfERENEE D4IRING
APPROYfD EQUAL i0 SUSTAIN H-20 LOADING. SYSTEM W1LL 3E SUBAIITTE�TO THE qT'!UPON COAIPLE110N. � WS7ALLAiION,OF.THE'NENI-PILE FO YJC'RiICNS. =XISTING UNDERGROUND UTWIIES LOCAlED NIIHIN iHE BUIIDING AREA'Ql '
SHALL BE GROUTED IN PLACE. WFIERE?'LE INSTALLATIQN CONFLICTS W1i!i ABANDCNED UTILITIES, LfAiI�ED$EC'IfNS'Of
4• ALL ONSIiE STORN DRAINAGE PIPE SHALL BE SMOOiH WALLED INiERIOR,MANUfACTURER'S VERIFICATION OF 16. ISSUANCE OF�IiE Bl11LDING OR CQNSTRUCTION PERMITS 8Y THE CITY OF RE!JTON DOES NOT RELIEVE THE OWNER Of iFiE CONiINUING T-IE'UilUilES_SHAtL BE REIAOVED OR 1HE PILE MAY BE RELOCATED UPON JIRECTIQN OF THE STRUCTURAL ENqNEER.
AIANNINGS ROUGHNESS COEFFICIENT N=0.012 OR_ESS.AS APPROVE� BY 1HE CITY OF RENTON AND PRG�CT LEGAL OBLIGATION AND/OR UABILITY CONNECiED'MTH ST6RM SURFACE WATER DISPOSITION. FURTHER, THE CITY OF RENTON DOES N07 REAIOUE SURFACE VEGETAiION, TOPSOIL ROOT SYSTEAIS, ANO UNSUITABLE ORGANIC NATERIpL FROY 1HE BUILDING AREA. '
SPEqFlCAlI0N5. ACCEPT ANY OBLIGATION FOR hlE PROPER FUNCTONING AND IAAiNTENANCE OF TNE SYSTEAI PR0I�DED DURING CONSIRUC7ICN. STRIPPED SOILS SHOULD NOT BE REUSE�AS STRUCNRAL FlLL UNLESS APPROVE�BY THE OWNER'S GE�TECHNICAL
5. PRECAST STRUCNRES MAY BE USE�AT CONTRACTOR'S OPTION. =NGINEER. PROOF ROLL E%POSEC SUBCRADE REMOVE AND REPLACE UNSUITABLE AREAS'MTH SUITABLE NATERIAL
6. ALL CATCH 3ASINS AND AREA DRAINS ARE?0 EE SITUATED SUCH hIAT THE OUTSICE mGE OF�A1E�RAME IS »• TME CONTRACTOR SHALL BE RESPONSIBLE FCR PROVIDING ADEQUATE SAFEGUARD, SAFETY DEVICES, PROlECiiVE EQUI?MENT,FLAGCERS, FILL SFIALL BE FREE OF ORGANIC AND OTHER OEtETERI0U5 AIATERIALS AND SHALL IIE_T iHE FOLLONANG REOUIREIAENTS: .
AND ANY 01HER NEEDE6 ACTIONS?0 FR0IECT THE UFE, HEALTH,AND SAF�iY OF THE PL'6LIC, AND.TO PROTECT PROPERiY IN CONNECTION
AT TOE OF CURB OR FLDYNNE OF IX1T1ER (VMERE APPlICABLE). WI1H ;HE PERFORAIANCE OF W'ORK COVERED BY 1HE CONTRACT. ANY WCRK WIiHIN THE TRAVELED RIGHT OF WAY iHAT A1AY INiERRUPT LOCATION WITH RESPECT TO FlNAL GRADE P.I. LL
�• CATCH BASIN INLET PROiECTION /EROSiON CONTROL TO 9E USED FOR ALL NEW INLETS. !lORMAL TRAFFlC FLOW SHALL RE�UIRE A iRAFFlC�ONTROL PLAN APPR04E BY hIE PU8L1C WORKS DEPARTMENT, iRANSPORTAl10N SYSTEMS BU:L�ING AREA, BELOW UPPER 4 FEET 20 AIAX. SO lAAX.
g, ALL STORM?IPE ENTE.RING STRUCNRES SHALL BE GRWiED TO ASSIJRE C�INECTION AT SiRUC1URE IS D�NSION. ALL SECTIONS OF iHE 4lSDOT STANDARD SPECIFlCAiIONS 1-07-23 TRAFFlC CONTROL SHALL APPLY. BUIL�ING AREA, UPPER 4 FEEf 12 11A%. 40 MAX
WATERIIGHT. 18. SPECIAL DRNNAGE MEASURES N1LL BE REOUIRED IF THE PRO,FCT LaCA�N .S WIT-IIN THE AQUIFER PROTECiION AREA(APA). STRUCTURAL FlLL SHALL BE PLACED IN LOOSE LIFTS NOT EXCEE�ING 8 INCHES IN THICKNESS AND COMPACTED TO AT
g. ALL STORM SEWER AIANHOLES IN PAVED AREAS SHALL 3E%LUSN YATH �AVEMENT, AND SHALL HAVE TRAFFlC LEAST 95 PERCENT OF'HE!AODIFIED P�OCTOR MAXIA1U11 DRY DENSITY(AS�tI D-1557)AT A �IOISNRE CONiENT WITHIN
BEARING RING AND �VERS. MANHOLES'N lJNPAVED AREAS SHALL BE 6' ABOVE FlNISH GRADE. LIDS SHALL BE 19• BEFORE ANY CQNS7RUCTION OR DEVELOPMENT ACi1VIiY OCWRS, A PRE-CONSiRUCTION MEEiING k1UST BE HELD'MTH iHE CITY OF 2 PERCENT BQOW TO 2 PERCENT ABOVE iHE OPTIMUTA.
LABELED'STORAI SEWER". RENTON,PUBLIC WORKS DESIGN ENGiNEER.
10. ALL STORU STRUCTURES SHALL HAVE A SMOOTH UNIFORM POURED NORTAR INVERT FROM INVERT M -0 INVERT 1HE FWNDATION SYSTEAI SHALL BE�IL�S BELO'�1 COLUAINS, WALLS, AND FLOORS AS DESCR18ED IN iHE SOILS REPORT
OUT, tINLE55 CTHERWISE�IOWN IN THE CATCH BASIN DETAIL 20. ALl L'MITS OF CLEARING AND AREAS OF UEGETATION PRESERYATION AS?RESCRIBED ON 1HE PLAN(S}SHALL BE CLEARLY FLAGCED IN THE BY ZIPPER ZENAN ASSOCIATES, INC. DATED DECEkIBER 6, 2002, OR SUITABLE ALTERNATI4E5 APPROVED 8Y THE ORNER.
FlEL�AND OBSERVE� DURING CONSIF2UCTION.
11. CONTRACTOR SHALL CONNECT ROOf DRAIN LEADERS TO FROPCSED STDRI� DRAINS AS SHOWN. THIS FCUNQATION SUBSURFACE P4EPARATION DOES NOT CONSTINTE A COMPLETE SIiE WORK SPECIFlCATION. IN �ASE OF
21. ALL REQUIRm SE�IIJENTATION/EROSION �ON1i20L FACILITIES MUST BE CQNSTRUCTED AND IN OPERA110N PRIOR TO LAND CLEARING AND/OR CONFLICT, INFORMATION CCVERED;N THIS PREPARATION N01E SHALL TAKE?RECED�NCE OVER THE PRO�ECT
CONS1ItUCT10N TO=NSURE iFIAT SEDIMENT LADEN WATER �OES NOT?JTER THE NATURAL DRAINAGE SYSTEM. ALL EROSION AND SEDIMENT 5?ECIf'CATIONS. REFEB -0 THE SPECI,9CAilONS FOR SPECIFlC INFORAIAiION NOT COVERE�IN THIS PREPARAiION.
� , CALL 48 HOURS rACIU71E5 SHALL BE MAINTAINED IN A SATiSFACTORY CON�ITION CNi1L SUCH T1ME THAT CLEARING AND/OR CONSif2UCTI0N IS COIAPLEiE AND ADDITIONAL RECOMIAENOATIONS�fAY ALSO BE=OUND IN THE GEOTECNNICAL REPORT PREPARED BY ZIPPER ZEMAN
� I BE�ORE �OU DIG ?OTENTIAL FOR ON-SITE EROSION HAS PASSED. 'HE INPLElAENTAiION,AIAINTENANCE,REPIACEMENT AND A�DI110NS TO ASSOCIATES, INC.,DATED DECEMBER 6, 2002. THE GEOTECHNICAL REPORT',S FOR INFORMAiION ONLY AND IS NOT A
� � 1�-�00-424-5S�JrJ �ROSION/SEDIIAENTAiION C6NiR0!SYSTEAIS SHALL BE iHE RESPONSIBILIiY 0�THE PERL11iEE. CONSTRUCTION SPEqFICA710N.
„�% Z2. hIE EROSION AND SEDIAIENTATION CaN7ROL SYSTEMS�EPICTED ON h115 JRAWING.ARE WiENDED TO BE MINIAIUM REOUIREMENTS TO MEET
� ANTICIPAiED SITE CONDIiIONS. AS CONSTRUCTION PROGRESSES ANO UNEXPECTED OR SEASDNAL CON�ITIONS DICTATE, THE PERMITEE 9iALL
� ANTICIPAiE 7HAT 410RE EROSlQN AND SEDIAIENTAiION CDN7ROL FACILITIES WIC�B� 'JECESSARY TO ENSURE COYPLETE SILTATION CDNTROL ON f
� srs�g����� N ft. � D.Ep I
� � ���,� �: '�,Qt�i�a.ttp,��G�� M14 a���M1y,��j� �
� �y� � �- s I� �I CaECKED FOR COMPLIANCE R=COMMENOED ���a ���„v � u � � ��3-14-�73 I
� ="-� �.,.. , ro cirr sTnNOA��s Fca naa�ovn� vTs ,� �asp �T QF SAM'S CLUB#4835-00 r � �
� ���� � � � ,� � � a�soc� � < < �"� .a � � T 901 SOUTH GRADY WAY �f�
� F =1� REN �GN I
?��isTSR°�+� opeB��IS".ER��y DATE BY 2 P,RMT COUMENT$RESU94MTTAL PACLFNO a 1B J ��,;NH/DMD J
( � onrE er � aio a�eEN�u�a � � � RENTON,WA 98055 � j
3 1144 EdStleke AVe.E. T 206`�22 9510 �S(ONAL� '�'+ep���`'� .PAC:..UJO 4 4 �3 �� � � T��A ;=lcnring/Bui'd��:�g/Pubiic Works Cspt � 1 :1 ��rro 2.1
� Suite 601 F (206)522-8344 Da7E BY '� � -
� SeaMe,wa 5e�os wV,w.Prcu'n.mn �n�r t m� rxrc�u�cusr a mo3 DA'E ev uo. j rzEvisioN =Y �are APPR �� '�`��' I � GRADING AND DflAINAGE N�TES `''
II �
.
i4u�NY+ f u � �•.i ';!.>'M i""": . .R
1 � �.... �, 7/ * ? 1� E I�h��,.!
,�.9��L . "M � ��7. 3��.��� A� i,�n :
�
.A��{� �"r,�� �r. ,�tlk.' �
, �„ �. � '� �_�':lr� '�,�'�!���
'�i+��^�I; �^���� ���'!� " c,� �.I�r�l�llF� ��i��wj/,
�ta���, " �,�. ' �'�� �k�-:�
� � � ��,,,,,,. ,-�`��� x�a�+l���$t��!# �dl��!�i���
. , �
� Ep� � ���, , , �;�.��',i� ;���#M��'� H �t.l���
-
��''�'� • �.,.. �,� I� ,
� , � ���;. � �i��36. ��E�it�iit � �_ :-�_ ..
� ;�b,�.
'M��!��� �Ai��':�' 'i���€� �P �:. "
y �.� ,�' ,� '������� �Sf�C�'.t�}� � s��.
�m� « E
� «' � , a .. . ." ���I..�s�n,1,N ; � r��4� �� ���� P��`.},�.,��
. " - .:' �� ., ' , *
• �L: a �,AqSM�,� �M�Wi ��i M�,
� °
r, I
� ,�: .. ' ��� �"�'r�P'""� � '����i�f..
�;�� k �"+�""�,� �'i����,� '� � Y":a��:
�..�,� ���t€1�.�'� � . �� �,���rl�!���rt�rr� �6f#`i��?' "
� � � �� � -0 '4 rry�� �1���'. v a,� ,•
� �t �
• �� �� �T-d �
— � 'i YM .4h. �������I� � �
'�,I�,' v,., `4� � � � w�. j
= � .:h � �`.� �+(.:'.T.i.��P,e . ,„r �s°
� a:.�
RAY /��' ��•�t�-0�- '
���g`�� ,��/" ,{ � ���` � -
L "��
�P + Y,
�"� : %� � ������r��.:� u�F �.,
.�'�`' - ���`���� �'�� ,; `.-..e..,;,.,,��" ���• ' €.� iMJ�i�11'
�..� ,��"',�����.��� ,;' ��'�l��'�4����� �� ,,,,��_;€�:��l��f��M� ��C�'�
n, �.awlr r
�
o���. ,A, ,�;��,�G"� ,r�� � � X3�i "; � ����►!� ��f'.
�� ��.����IIIM�Y���„�'.�" ��� ����� �i"'3§e� �#��p�w";���lq���" � �'�
�y,���►��.'4la��.�.r'rM�11.k;. � K •� t � .w�ii:QiM���� ������
�.:�y�s"w^�F`.;1�1'ww�'lf.'..x�KW��,/ lAiw� '/lY������/�� !1.`�..x��rl. �'�'�. T .v�Y��-
� � ` y• �¢ '�� � �+�{��Y;.('��� �}'� .•
����'y �, f s'�'"�' s'�r Ma .�`�YP.�Fi �,".tr �f1 'r�E�i'�y •• ,�,.
�R ,pm.._ �.,� ,t �`'� �V,"y'���
•
.-
• ' : 11 • � •
' � 1 1
F- . . � .�� ' , ' Y .
4 ' / � ' �
�� ����#: � }�.'.���'�� 5� !�� '�
� ;� i �� �'
� �t��� ` - � � �������' � `��'� ��--
�l, �---=�
�'" ���_��.���� ��'��'�� ���/��� ��.r ��� '��
�~�""`<�`�•�t' !''�K��_� �_ �� i ,j�'�{�,_i�� :��
���� _ .� i �'� �� f �� � '�_ ��
� X� 1
.� � � �f :�ti �
:�. y _ f� �t�',i%' .-.��� \i.'!.� �
{�: � �� ,.�.��� ,`:
` v�����n.3����.c� -��� � 1
, _ -_, �::�`: �� '
� .'� �� � � � � �T # -
/ �/�' ������'s1"�,lrt '��.�� �' rt �. r c
_ � � �� �,
fc� � ti
t��� � ��� ������' ��YTs'.iT�� t �;�� s�. �.� - t�d� ....
� � � • s+�� �... .f�_. 3.� . ._ �_� _..
�x�7R� _ �' ����l.", w " +� R� ,�M�� • . �_ '�r' -
��' _ �' ������
__'� �'+�����_ �����. � �. d-' -=,_,��`�; '` �.
�, �/ � � i ' ��s_� ,� 1y :
•.. � � � ' �.. ; �rr.:_:
_x=,h .�"' ., i t �� �. "�a. r �-:> ,��'
�'�,�,+,',. H_ �t h - � — .ti' ..�A"�,�"
.� � i ��e ,�'.
� ��" ' J f �� �,�( �'a:�)
��� y + ..` � ��� +C . �.. -�`�
���*��` '� 1��' �}� �'4� _�� '�,�'•
:�_- -_ �,��- _� � �� � . �r � \ -
� �� � ` : ; ��' �����
�.�.......�}� .��``�� � "�.:..�. - _ *�c..
, _
s ~ +a.; ,'�� ,i`���',, � e
� 1 , � � t
.s;_ •�� ,+ � . �
��t. ,i t<�''`���.; � 3� f��" �� f.
� ��� t� ; .�-
� ..,. ~'� � ,� _�
1 � ~ f
�': r`''� ti ��: ,
+�� � - •'f�=� i�; � �:�,.. -' � ��-
.v �� t �ty_ ���``�;i���•`o� je+�.:'!��/�E f +' � -
_ �� - - , ' � - ��1 � M:
«F:- }. ,�.:�. �.
• �_ �� ���. .-.-. s .: � � � y�i�,�>�i
�v�; �' t} s iA. �i.r���
r i„ -..si7ii�►�'�., _ ..
•. . •
' � • •'•1 1 11: :
--
r II�
Sam s Club#4835-00 Storm Drainage Analysis Renton, WA ;
Figure A6 - Basin Map
PACLAND Project# 1999010.008 Page 29
_ _ __ _ _
_ __ _
_ _ _ _ _ _ _
___ __. _ _ _ _ _ _ _ __ _ _ __ _ _ _ _ _ _ __ __ _ _ _ _ _ _
I , 46 � �',�,e;0 �
i
i � � i
' , q 4� �.._ �- 1
d9,, 4M ���
1
�
�
•��
3
O. � � .�..�/m� L .
h� 49 � -';�}��a�/ I.�j
1
� � '��V ;°���3���Q_y
� �� � � � � ���. ' �� �� ����� �
v�� s, , � �'�_ ��' _-
�Q' � '�
� :
��� � l.� �7I n n (, c t. IE 26.B ��'- ,
� 53
� 4 M P`��S
5 �� 5
,s J vy��-�'�P
_ o
o �
.-�. , . o
2L
�
�
2 , .
_ — � � ��- � � .
� � '��--! •iE _ ,� ..
16 \� / 1 4^ 22'
- TYPE tl CB OVER' _ r � \
ElOSi1NG SD g
�;
IE._= 28.2� . i
ERIS'IMG SD � 12 3 15 �� � I
TO REUAIN , � �� ,� � �t �o ew
� / \ � �} ' 7 B
-- s E= 29� 4 . � '� e J BASIN �ROOFn �°o
. , „ _
� • �� _ � ,� ❑� �;»��'
' " 9 � II ' JD s �
_ .4 j � � .
_ .. .. 5 � O n A II (i � v ;';� �,�«.,..:...�� .
-� � . � -� . 5 0 �ASI A �� ��- � z 1 �
. ' . - -IE� 29.
, . �;, :. ,� � _
• -- a �� _ ��a-T� ---Fp� '�
._. �-- - `� GRGSS S.F. �V/D�,K SHOYM: 135,373 S.F. - Y I
i In� USE: �ETAIL BX,y ,�
� . �I JI CONSTRUCTIDN TYPE: V-N 1
U I
�-- �\ lJ 39.y
- — :\ � '�
� , ;
{. � o �
—`�_ ,� ,
� L
- - _ fit 61
� 10 �`
� 1 4 10 ,�
♦ � \ 9
.�
. 1 \ / x � �0 n � � -�++R
- ... � ' � �i �.La
.. ... . �-��- \ � �I
\
.._ ._ � � � � " �
..... ... .._. - . �� � I
-. .._..._. _. -. . _ _ \ , Shc ., '
-- _ ..._.. ..�_.__. . _ -...._ . _ .. . .. . �_. ._ _ .<._. ... .. .. _ — 1 i��� � Cl .-..
� ;�5 ,' Y' ,,»
_ -- - - _ �_ I
&
_ __ . _ ._ �� ��
_ _.
_
_ _ - ._. _
- - _ _ - -- -- ' __
_ _ _ _ BENSON_ROAD SOUTH _ •\_�- .I\ _
_ _ _ P`�ENv��.
_ — - - -- -
_ -:. _ - -
� R. �e �.�p - _ MP�N I
� . � y Q�o���i,p,G �oT v�yyi�I . � .. �-
'� �--�; � o�.` yc�� a,�� - .
� � � . ' � �- e�ac+w.s�c.� - , r.� �� : -1�-03
� ' 1 -. � ' ��� � ly' � rHEC�=D =0R COMFU�NCE :ECOMMeNDEO �� ,�@ "� Y �„�F � SAM�S CLUB4F4H3�J-OO
J ,;`;,,�_,;;., _ , ,� � -o cin STANDARDS =0R APPRCVAL :RG/RP !� r, � 901 SOUTH GRADY WAY
.e. �,o ��, � _ R_ �T�r: ,�'°`.
��i 'b Ph'15T60.�,T,br o �CIST4a�.�6 �AT_ �� ��.:KH '
-a=astiaKe=v=.E. T r2ee1 522-5510 ��ox.�s+�'` �''sro.��s� onr� c� o.�r�u =����rq; g/ RENTON,WA 98055 1' VJ
- �R� e�,ie�� P��i� wo�.5 o�p�. F�G.—A6
� �cice GC: F i 2Cfi1 52�B3V4 � -DATE � • ���+« �� � a
SeatTe,'NA 981C9 ..vn+P,:dwrc.mn ��N-T'���� i ��A�`��'=.� r�oT_ � _ VD. � RE'J�.SIOv `._BY .,ATE AFPR I�^�!^p� BASIN MAP � �
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Figure A7 — Offsite Basin Map
PACL,�ND Project# 1999010.008 Page 30
T - ��rt�t�/Il" .tG� \�i %//.G• i ♦ �
= I, `+�.`� �-�1����=�y�� ����`�'.--+r`� �'���.�'..Z+�i�����1��,��iEt��'�E��lia������ ! ��/,• ������iL1�F �,�
� ', �'�'� '`°�i�i�%�i���K� .�� r`��-r�'T LV�/r' ��:�jlj' 'i: �t�� � ---iii`n' ---� --- �- �f__ �,� _/ �.-/..,,F�'F��,,, �
. _ _
�+f�: a�'�'b�s�'�'.� �`h�'��'�il�� �,: �� ./� \���'�s� r'��i:�,�i#'�j��l�'�,'��f�l{'�"-1��_i YI'T�i�la�p,�,-�i��' � _ 1'1� �r rn,::ti 'V���i� --- •�
�r ., �.r
� ,,,q ;s;.=:��aa .�-�a�jl / ( �� ,� �-� we �ii ��-�� � I��.��-=R;lr1, �������_.�'4�f�/�,��_�`���� ��~ ��,�� h'�
'� �" � � � ��� � `� . r ���..{� ,:��
� Q�"1��� ���tjf� f i ' �, 'y ` �.�dti -�iii�l�ti• Afi •�. 'i� I If�%>:^.N�s;� ; a ���� .� .� irl���� ' ,�
aa� � / �' �.j ��y �inlr-iteas-r. J I'� �� lri����, �' ,_��I�.`�{�.�� ���.:�'
.. ��, ..r: I`_'�� I.� �.� �, MQ:< .�. .s - �.� �, ,ILi'�.�.�� �� S• 1,��•_J��'J. ...1t%� .Gv!y
. �� � � ��/� I { � '�1 p � � h����i_:�f�^�Y a __ �j��'�!3 .,,� .,_�� �-•' :� q r
��, r^� ,� �,� r � % ������y� '� � �.lF�`'�r�L+�.�%i""' �p/�1��,`�'�►1\'��f����i� - L 1�1 `� '.h�..�-_"'_��s;�.-��.=� �� :�`�%�
i��•ti�'.�� �� j �� � �:.. �"'�r. J�� \ 47�, �•��.��._. • jl : ����,�� n �a� :��i�.'._'���f1+�r A��,��. ��� i� �
/�w�','�,s�a:'�, I�Q1 ` � ��, � �-\\ ��' � �Sy - •I��i �' a����:.��� �I�- ��i��l� '��i1l�� �iil�1 �� 1��� ���� ���o.�
� �'�► ,,•�:.�:rM� ry (, �. � ,� y ,�. �E1i� ,� . ri?�.R;:.���- �I s.a U��.- �d-'ti�. ,cti�.���l�r'9�i� J�".� �
-'«`� •"'�.`�e,�.::�� - / � �� � ,.,.;�'�„ .3,.� -���r!A` �,l��iT ��J►�� .�� ,�;�=�� l- r� �1'i�.�'.IIi � n - d!�w�_j ��. ___ � - �1`7L!
� �I��J '\�f ;:�" �ri� � ��� V� � .����r �:� �'�� ��I�iV� _�` tl ���i- � �v� � ��IF�--" '�;�- � � �� .�.
�.%,'-- / �.1=. �.,. I'�: � ■ r" . � �II` � � � a � � 1
���, � ► .'a � "� � �,, ,�/'�. �j,, �i\.�l�l•-ai`� ,a�,..���r'Li���� .ti� �. �a � j - ' ��
��,» 1�• � /� , `�. ''� r �: �l�l. �� �A Mr, - SS „�� �.. �I�n��fi�r���k..�J S� � � � I 7 Iy�'
�M=������,� �_ �n4 � /� �,�- Ii i�\ � ��• vW��`1J��� � , ° !:i��� .i �i►v.--�_�°'��!�'-�= �'� �1 'f p�I
\ � �� ,.,.� '� I� . ���+r �� � � �1 --��-, z
:..� �: �`�� ��1 / / '' �; •;�I�;-`,� �,�:,h'1,'��C4"-�..�' �� y�j,�il��., A .�,�„l�.�-i; �i �,.: ., �g::j.---' � ��G
c5�r a,�� $'' ;�i � � r�'� � � �:�..`��F� �''+'=�t�K ��.�A7 �. �i��3r���-.��������_ �1�fL�� a }� � „M �'�h'�1~'�
_.�: '1 � �a�..�5s �� ♦ rZ•..I► -"7P'� - %'�l �t . �
,. •������. ��._ :aail �' N'� � .i a. �f �iil �1►���.,�••���_ IL/. ` �t � ���-�� � ��.� -- -' � A�1 N I� 4 �N
" � �!�A�/��a_ :+!'. ``:/ - - � �� �`��o. ��i t�w,�s ,���; r� �'-an --� (.O_�,.'-''�•��p � �e���i.- �j(,H-��"` ��! _ _—'-=�==-Y�:-=� - -}�= -
� ��I'�w.� �� ���.O�Y� �� 1� � '.�a;! . '\�`l������ �s�°�`'"/�,�1.A '�� rif►;��_ • 1 E�__,.�✓I�ill � r.f�7jA� �i�•=-i - _.
� ����i.. �i �N' �,�� �� .� ��. .J .ff i��` 1�'J��� '+_� !-�•.�•�1; �"r'�li� t7 �� ~ �'�p�a,����*'��;�
! �-`� �C / • � � \ � �l v f.� 6 r
�aa�.�r -`.�'♦.�"� � ,�` �� - '���� ���� :- s~�i» � y,�;������ �j�I�1��i'1I,,��•1�A;:; � I � �� i : � ���I�.."�,��% L�„r i��.:�
yw_�._r/S; :I� i` J�/� �.':� 1N�1} jy� i� i���\I;;'�5��.;r�.i?i.%4�i?�� ����r`'=� r�H �,7�4�;��aAG. ����� � �' - _���rg��/ �
�w 1�„y, a i�,:.s_s � / � � �!awas �� ������:,� c+��\v!�.,wl. .��.�d� -�b ���� � �� %� r �;� � � .�i
t �+J`C`� 7 'h �Y�` l � l:�. �- � ��' 11�=� d' R �,_f�
�t���'sy ��, '�a �� „� -�'�'� '''�' `1� �!, •�►�' ��� � �ir�'-=� �j�( ���3 ����._�l�C/�.C� ,o�w���� .� �_y A n��
:�.-�ar- �iii.- � .�. �, \.M♦ �I H �.-_ � r � c
����i����dS�y iC� /� � +�r�t���..�C'���M�'♦ `��//i� �i�C�, .������r�+���►� il,-�L���I�'��i7�1�►`�.t�, �� � °�� _ - _ �"av���,1�i�'��%:�;•
��9/. -:=-ea: '�? �� �"e� 1 ► �a'�i'e•'•��`'v►� '� � ��� '� fi��, � "1����� —--�i{.�yyh �� LY -y ���'- = n►r,._�/�
.V4/..�- ..,sy. e� t ,��� �l I IIJt�i���: _!1i►? t�i:s''• ��r ��"� ��` �7C i.`�" ���� u � — ,.� i s^'�~ � ••',�,�-���
� � �y �•' ��� � ia � ��- � p s` � ✓� � �► ` �r_�t � �i� �,7�r�r . N�• +- � /�i���� �� ��;� e"?�6�
', s � � �I�� t�ji ♦�. '�' fl�� r �
�'.v..i�r�� �� a i �t�, 1� �`��b., �'�"►.�'v�'�', a�w,�� �_.LL.11 �-� l• t + fuli��:... � •s� ,..'r��
�i�► � �a` . �cr 7 .• � � ar � ?► � �i1 �- 1 � •;��.,. rn. �s ';.�e, /
I= r��1 � ��� �-i■ � � � , ''�� '��`r ,� .
� - !�� ��_• .,/� '� 'r. N �����- �i3 �„ I��f� i-� "� � 3 �
��� '� - ![ �i!� ���S�If���la7 �.� '�_'�oy'� ,ti a�br� ���� 1!. p � � 1��''�.'� r- • � .�1 ��
/��'�',: ul � � 9 !,_ II ��• �
�' '��•/; .. �' ` �� I1 rc�..`��v:�;���j ��:`n-�7.� ��.'';'�~vh.:y�d�R7,��';��lii�� �La��i'�1����=� ��-��������"..�� ������ il�u.��,.,,-�
�, �r� .�_ ►��'��� ,�1ft�_���?�.,.:l��,� �sN���j��,�l+��j �'�.�`'+���j �r y`� =_�,��..� _= �Ir��� �����v�7 ,�'i�L
- �:_ o,� ��� � .��r�V7•l�j������' �7'?;"� _"�w'' �AA �1�i �7�r 1��+��� .�����- i�� �"��/- N::'t ��r �� �. �'�� :- -�L�7
�� n� 4�L� � ((/j ,�r�=._ /• a� 'L �1
��_� � ,1 � ^Qi:�''�F��r�ai`:1� �wJ� � �'� d��� ���( ii'T��'- � <iirl:iC��I+II���/Li� ��_ �. �� _ .'If` .�'�, '�'►-
. i%'" �" �V�1 �� ���L.�'.���`:���'���7.+,!���,r'c������,�-`'�"�\\/�������..`j/.'��y T ���-=1�1/n��i�IIO�.*"'...�l��'-i�' " r ? .,! � � `ii��%;
, r "--►�� ��=� r � �r t1i. - -�! \ rD �'F,� 1 7 �1�:;�• -I IT�i- - -__ � � � �� ■ r
�: _� -`�-` _ �� .�.����`fQ�',� J � � ���� �'`.. �i. � �%�i � � e: �� .-.�--� ��- �� %n�.:��
' �,' � � � �' ` .. � � :_ � �--► e_�� � �,_ ��((���_r� � t r�j�y ��, a
�� - ��-r�, ti : � -� �/ S�°�w��n� �r.�. ��� �� ��' .. � /S � �' �qj � r �� � � �
� i� �-'�I r� ' � � ��yYL�=�'�'�ir �n� w� p�;µ�\ �;�a�i�■ Y '✓: ��i� �i ���t �^RRe:=.�� ��, i!���� 7� ��i'�l�'-����
� �� /�' �� ���`� �� .� - �� � .1.. �'�" `� ,. L�A ►�\�`. �' � � Ja`�..���� \ �! `" �I �, � a
i� i �' �� ,�.�� � �� � - �1/��i�7+gir�-.�-0 �� ��� � r"��,����z���, � ��L�It.'�-`.✓"/�i � �`_��. �ti��-� ��/f�e�t� - A
� •���. %�J� •r ► � �a°� � N:, Lh��'--''�•=-y�,��..1� ��zr,,• 'f�i7 �.-• .y�1�";:- •..►•.�e7:.:w.r ,����a����� _ I�;::�I�I � '�i�%��-_ �P'�k:S _�-�
� � ilij� /�� ���� �Rr��.� ,r����I��� �st"�y�4�X���g�i`'e��i�����`i%� �� �_ �,.�,�i-� �.�� �J���� r[���� ��
�: � ���'I `� , � �(/� :i �.w %5���=���i�-��%>��•k�y� '�rRy�'Iq� �'4A�f.�S�11�=:'Li��l.�7"��C �f ��"/�' _. ���I`l�{-9 ,riLeb.:�����►1�'.`/A���a�i`�����h��
�' Oi` � � ;� _ � . :.� L� �..7�y �, �`+3���,�``• �% i y
� �1'� : 1ti � ~,_�/ ���'��:��ii•C:�n1A'`��'�t�E�j,r•��"l�;�r �'� 1�=���, ��s�"�:��.,r��s'�i-��i�-�b� _�!i"i'�y31.:fi.���'��'�_ _ ;� .\
��•�..::.�..�'` � ' �� +ti I!� � !�; . �=��.i"/' � 7 V I
' � 1►��
� ' �/ \ < �- !s �.a� �� �-�!c IJ y. �/ �� �1�, i �
� � �+- ���.�� f� ..� . — t �— ..;� _ / _,;�c�-�+��,�,I��•��s�11� ��,�� �.
�.�—�.f-1 i�i� •�u�.=l��-� ����' � �•� 3 /.�.°��'q 'i1 .•� a =i,� A''�''�.�F].�� ' �Ii� D�O_ .� -� ss =z���si�i��,�0 � �r - 1NiI
`� i.� ����� � �� �����L1�+'..�!"�: �1l�, �'�`�;� ors�qt , $�.� ,ri+� ��- _ ;i��:•11. •.sa�-. �G� �_ � ���_JR,�1
■ _ _ � � �.:�..i:��_�i� ^�, b �8 �s'�,Cs:�_�-��'�/� � �// _ �.. r• � Iil `1
' .�V��•�'�LL;s�L�y��L.�.=;,i. -�u�Z-' �_►�- � �-�` - a -�.:�a�sr1���'����-�:ej-��"i" �/'+;���~�,7L/� _ �,.-�. ~'r ;� i7�7up�.�.�7,li7�,,'-Li'rf���-� ��:1 !i
■', ��f�����i�'��:n�s�'. � �`,.—V�� i� •`. „��7+C� .'�.�,J ��`s�'i.���L� a�� .� -��i i��L��r ����� .v�.`����:���� ��.�:±���� � n4n���� �til�+�s�...��GJfI �f�t,��5�
' = �- �:� =��;�: '�P�/ � 111 � j� ► � '"�' ► �"r�,i Y - -- .: �.-_��.1D:'it��- �
� -���f���w��.9-ii"�re��'��.�����e� �e ��1- ;a„�c. I�'�.�'�';r-_"�.__� 1 S��,�. �i��•�f I � 'i �s�- t :� _ �u... '
� I �I• =�Gy� .�Ti� •��i:��.,�NIR.'E:�!�`�'�. i� -�z,F���.� ��� � -+ra.�� 'i�Lr �������w.�l� ��� 't�� ii������1"l�`'.1'I��Y ��1���f�. ����i �l��7
�.��_ � _.�l- ,.r�id..�.�,..;�'g a �'' ---^.�e � � r �_, �;i•; �'�� /�/ ' � • � ,.,,���., �.•.,-, r�e i -� _1�� .�s-..w,
_ .�.. � � ��.l�Cla�'.� � � �► � .� ��.� � �� . � r:'� � /\- r (] ��?5'
�� ■ �---_ � ^ �h` � - � _ l��� �� u•����� �S�i7� I���i?����s����\ja���� .� i: �� ` �, �! ylI '°��c I�l�"���(�' i
�_!�~' �J 1 J � - �� _ _' ��i ! �`_ ..� .R�, � ,� 1 ."`. �T���. -��,���.._ .�� s'�� ��I �' `�,�(���1����i� u :i��A° ��� .� Ij� II� j
��r�^r��7 � -.1� 'ti,, `€!ii•',tr�+;s: ��-�.►__�=�4 =_a ►"� p'��li' ��r. u: �����;� ,��`:,T` 1 µ� � ■��i� oj I��F�a'� s!�':?;���/'t i� - 1�1���
�_----�a.�a��.��� .� � , - :t= -��-� � � � ��v'�; ��� : i -- _� � ��1 .�:.,.��N _/ �� � �� � �f
3, �,�,� ���_ �:- ,�� r_��,�_ ,. � �: � ���,. , :-� , ip .. - � �� .,- : � :_��_ �� r�'_�1� �
� -� �.;.i �;�f - �r . '�:�:�i i �-'�s�:- �;� '''� ru r �Z�Nr•l�-f/� ---- '+��1,�
,• _��,-��,-Y'�����y� M��'�' ��c'-�L�� �� '� - _� -� �iw,�.`i.` � ��.1.�4:,, z _ l� � � - ��
I I�-�:�f���- �C.�1 �.�� Y�p i��,'.'e��Tl����'���..LII'iE�������1.� ,a--� � � i�; �._ � � i
�- '_�s �!.��.�_� _- ��.a � � ri �i te�E �ji�� e p}■ �r�� i' ,I � �I�i��I���ryJ , . /�� ii;:�i����� l�y�
� �. � ,,, s���.. —s�.-�'` a��'..ei _-- �:�. ��� �=e _:'���.�; '��"' y —�,1� � � ,ry♦ �,/" r v ■
~���_. �.��...s = ��c'�^.�r+s;, �=; �,� `'���: �.�y�'s=�:+".s�� -••••i .M1 i:��1 u �_■�. i�i�►�I�. ��'d ����, {��� �►
� ' ---� 's �_ � '.
�..- � -.r �� �. viI
"f�,�•,"'�Y_ --:�"a,� ��q�l�� _�:��.�7_'�: �_.�' 9 �c.,,�.�1 --���,� ,{ !1��: �l�'_�� v L i'•�]���� �•����' p� 1. ,��,
, � - �-�-a�-.•��.�'i=��v�ia:is$ ��„�t�; a`�=" � �/�,�f;. •:�_ ��,��. �';'�����`� i�1t -=_=�_� ,�: � !� �'��i �_/�L�.�Ir!�ar,�k��.f� �_�
/�� _�.��.�'�� {8 3 ��a�� � �jfi`� �=-- � .`� _ +�►- . c,�i /��t;,�-.�t� P%'� ����i,l �� _ ��;�r.'�1i� �i�".-�"-,�-_- '_�- --- -
��r�i��i �a� �:�. �s � ��� � _..�.,_ � �. �. � � - --. ,; _ �-�� --
� „ �- �� �'.�� ___ ' ��� •�K a�,� ^�. :�� _""-I � `1e,'� �k, �rn� ��a ..r1
i ffi r; �� �.• ,[�� s�� Ir � i �►E� �I K-• �� .�j� -.�
�t J .�- :..�a, "!� %(•• �'��/ � ,��� ��1�{�..� '�J '�����,�,� �I- f�
f ,�:�+n:.!ea� ���-_- '���i�T!��t � [i' � a i��J ���1'R ` �� I����� .�.� . ;��.'., 1� I _���dS�!Li ��'IF`j��7��i�� i��L/
f� -'� '� L 1l "u-= /st;��z'-�±��:..� � '�'.. .J -- .i� - :`��-'�'�=i3 ��i l� � 'i�'-�i�,. �riS-s ��' i jjj���� --�� ��
��� ,�, .� .-.�. �.,_� ����
.� � ' �,w1 � \ �:�$ - _ i � L1 �:��,9"_ -F�i �.e•,�-•-;;
„' "" '1_a� .• �, .T�� � 3��� � �,'.% �'13°� ��� G -!'-4� y� _- � _ '--���i �2� ��ill.��I_ �. �_�� *.,,,,,,����-. ►�r
� _ #`'_; !7 r�- .\ —_" -- --_ `av'N��� r r�J -r• �'�r��. 1.
�� #=_ ,:s�"" .� �•l�� � ��� � � r� ����:�' e..���
� "�� I � � � � i�ka��/'r I•r1/✓ i/ � �
���III� ' - � � , � �---. �..� , �.�.:,�-'�,+ ___ �_.,.�.
■ `�' �f �•� ��=�•�r�;_ � ��� � � �'� � :: '� �-�--- __ � f �
"" ''� �.-�s��� _ .y�, ' ' �3,1►' �,� z; ���•�\`� 'y1 r_ �,J "���i�3z:��;�.�,�/������,.�:�ry ��r,� .��...:�e,
_ - .
_ _
::.
• . ..:.:.. - - r
- y�
't �' �; - _ �• "� � ��" �%'�-•. � ��.:�'�.j�� _ o-_------'�^-.__�..:.;;`.��?3:::i`�^� `��%i:.•i'7���Yd�'/-- ���"f`s
�' . �::-� �-... - �- �- � � - � --- -' � " _
' III�C�111 -- ---�-� �. _ . y , - - - � ' '° _ �:._
.:.� _
�
..,: . .. ,., .� - , �- �.
.
�_. g �,
■ ' .I� j '�' � -i .(_ � ��i�.Y�l '� "r ._ � ,.^ �i". .� E.�i � _ �"�`���t:�;' _ .`i��t• '�11I.•u-'� _ _ ,-�
. .� � :
7�'
..�C
�
1 1 • � ���y�; _ . ��4 � .�I + �— �i�/�-`{ •�' ���"�r,\ " ` � ������ `�_�I. �.i '�"'P.1����1y '
i�'` ���`�� _ ?�:! . , • � _ =�� ' _ � �� - ars - . ��� .� ii, i. I�
II ( - _ �.�� � .� ��.�.r_ '.\ • ��� ��' d � ��y��q,�� ����m=�i * $=�,` [ �` �`�C� -.9.+- �1�sawAAi�aaP.--^��
� ___ - f �r- �'�� .r �i�• '�c ������. a`T�c __ ,cs�'�.�� -�,.,_ = M�lR=•�' i� �� a ,yEli.��.:r �_`��`�-,s�.�,•_ ,rt--.s- il --:� -
= =- �.-< `��.Y - 4T''� ':;�;. i .�f•,, / 1 f�` �\r.r,'�`�_ _ - :��., _+..f� �,�.� .'�.r� ►,. .�Y}.�., q _ -__ -i�sir;;�r- � '-.,:i.Ty_,� --_
. a
�.
'd �,-- -"1 ..� �y T�R �� �r
—_ ' I __ �_ :Ir�- �'r✓ "�.�'�'..�`��.�ia���.`...,���. l- - _ ����� r� .� •�,,:s - � �'a�y.�-�"y'"��I .Y'�' `-}. !•►/�L9 .f/Se '3N.�:_ - �cy��t6rl��a :�i.
_- ..,� ���' _���:'��� '��C�R,�., �j�+�-`-- �_ .��_..�r. �7-� �. J-�,�_�r.��.. ,�_:., _z. -,f�""s`�7r.��:, _6 ir�-T. �
--- ��lYl�a��`` _ , �\'�/� . -s%�C`�•� ,7�1, '• '� ',�''l��� d�����Rr� '�.�-'zs��"`I�._,_�>'d���- - � ��?'�$``�r-.. s;T . ��, S'^".�- _�'=.� ",i'�*(6p:���
-- - _ �.!r{i'' '�i�,� ��►���-_. ,l.•..�..��`.4i���ri, .' `~ � .w -!0�'�-'+ _ - - -4�• '_��_o:: �r �� ��+�.a.:¢' dl�g�����-�` � ,;;,.��" �.�z -
_ �'�i. " ,,.,,r�'�''�.: ///�� `I,/��' -- �'- •+s�eaT�,'�� :s•A � ! �"'�'��, �' ,' � :�3��',�3�� -� __, "�,..� _"
�� � �i ,� t�, �,�, � r�a��� ). �_ ��,���� ���...;�:.04.0 -;`.'!�', : - "� �r _�(1�'�`.� � .y�
�tr— ___ �.i:-��• i. +',`��t�,',,1�'.•,i: � _ \... ' i. _��ia : p �a�� t= L=:,; - �. �►_�' �. .:a�:=- �..sES�.�x � y%
� ,
.• ., . - �
�.
, �.q,� � � �'� /�
= �. �e -_:_��-�_, =.; ����� ' , �° 1'�"��� -- � �} '�= y;��'i.r �v �y:' �� ��'°'•'�''��� '�e"'� � '" �
�
`,'�\ � � .�,5�� ' 1:�,� �J � - ��- �.� �i � �.. F°{����fw.�� - �.1�' �.s�y°.� •.f����� f,�.r�:���
� riil� ' - s ` ,?_- ° _ `�,.� • � �ar r�. - ;-_-�� , � r:.
� 1�1\ -- r � __ - �, _ ;=_ - -� - -
a � ..,_ � \..� � -_.- -- _:-- �.� � �-s� id�� � :�� � / , ��'
�_ .�- ' :. � µ� �s " ��" � � ��- �
� ��,:.��� � � - --�-'' - _ - ��.��` ��_ ' �..�' . �� �-��� .y �.�-1P6��'� °'��1�1*���.'���� f'�}'���.i� ��"�T�.�'��.�����.�� -�,iZ
. e '- � .
" �1'1„ ,� �i � � ,� - �� .- � = _ =���� - � �� �� .:a.�4 �k��� '�i` _ _ � ��� � ��s�i�1�11��.'y �t�i��tl
— '�'� , <_� .� .�.. _ � : _ _ ___-., ����''•��^ -��_�Jy���;;� ��+4�0'��/ J� A����► ✓���p, 1 —� �/ r�: � � �- �� �:�
1�q G �F!1 � � .1�� � �\� i, � " .�� _ �-- -- ��~�� �r ~ 9�.. l� ��Z�� •f';' �/ -_�� �/���/-,3����{� ����� �
�L:a ���Y���i" �. ` ' r � � --..~�__-,� x�� f�ITd�'.� -��� _ �, : r 4�l�j' � �;��!,,��M�.�" � �_Y��!1yP�y ?�������:��%9���r�,,�
.
� � � � \`\� �c, �..`.�- ,�� ��� - � � d S �S�e avr e,�r�� � �` �%� ? --. ��/►�. Tib. .rw1, � v��
. /' ,: � �+y � a: ,,Y�h� ''e p �-.3 ' pf��_`�
��� r ' � .. ,s � " _ •E ��'^�� � fi� � ..�!••���i�j L. LIr •1�"�rv.•!aY- i
� ' ` •e � _ � �` �_. ',� ,r - ��i _;� .ra '41 �:���r'��ri w � ���.;�' �r����ti,.aa7��,��L�i��4� ����� - �:?J,`�
_- ���nn��� .� \� = = A= _ - � _ ����:�� - � ��. �. _ " .�,,;�,�.�.,,,,�. ��. -.�,�,;___
,
�' - : �
' • . - a „ -�_ - _- - '� _ �= �=���- _- � -_ -- -_ =���-�.�=�'-- - - e�-�,,Y;�g •t �_..�.,. .., _.
.. • _
, , _- _� _ -- /���
�-� �"„���'?' I■�!� t� ��. ����'`-���` ��"�-- ` `� l�� l =.�-�.- .:�`���--- " "s• �]�='i� .`-�,�'�:;�!'"' �' 7 �3�+�!
�t �� � �._ i`� . -- � - -� -- --- -----
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
� i i • � � � � � � � • i 1 , �
BasinlD Peak Q Peak T Peak Vol Area Method Raintype Event
------- (cfs) (hrs) (ac-ft) ac /Loss
Exist Basin"1" 2.85 8.00 0.9638 6.54 SBUH/SCS TYPEIA 2 yr
Exist Basin"1" 4.24 8.00 1.4509 6.54 SBUH/SCS TYPEIA 10 yr
Exist Basin"1" 5.76 8.00 1.9938 6.54 SBUH/SCS TYPEIA 100 yr
Exist Basin"2" 3.24 8.00 1.1380 8.53 SBUH/SCS TYPEIA 2 yr
Exist Basin"2' S.01 8.00 1.7590 8.53 SBUH/SCS TYPEIA 10 yr
Exist Basin"2" 6.97 8.00 2.4577 8.53 SBUH/SCS TYPEIA 100 yr
Drainage Area: Exist Basin "1"
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.0700 ac 92.00 0.29 hrs
Impervious 6.4700 ac 98.00 0.11 hrs
Total 6.5400 ac
Supporting Data:
Pervious CN Data:
Vegetation 92.00 0.0700 ac
Impervious CN Data:
Impervious Paving 98.00 6.4700 ac
Pervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Shallow Flow over pavement 200.00 ft 1.10% 27.0000 1.18 min
Channel Flow through storm sewer 520.00 ft 0.40% 42.0000 3.26 min �
Sheet over landscaping 40.00 ft 2.00% 0.4000 13.05 min
Impervious TC Data: �
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Flow over paving 200.00 ft 1.10% 0.0110 3.39 min
Channel Flow through storm drain 520.00 ft 0.40% 42.0000 3.26 min
Drainage Area: Exist Basin "2"
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area C N TC .
� Pervious 2.7500 ac 92.00 0.17 hrs
Impervious 5.7800 ac 98.00 0.14 hrs
Total 8.5300 ac
Supporting Data:
Pervious CN Data:
Vegetation 92.00 2.7500 ac
Impervious CN Data:
Impervious Paving 98.00 5.7800 ac
Pervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Flow over grass 10.00 ft 3.00% 0.1300 1.49 min
Sheet Flow over pavement 387.00 ft 0.50% 0.0110 7.88 min
Channel Flow through storm sewer 120.00 ft 0.40°/a 42.0000 0.75 min
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Flow over paving 387.00 ft 0.50% 0.0110 7.88 min
Channel Flow through storm drain 115.00 ft 0.40% 42.0000 0.72 min
PACLAND Project# 1999010.008 Page 31
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
' � � • � I • � � • � � � � � • � 1 , �
BasinlD Peak Q Peak T Peak Vol Area Method Raintype Event
----- (cfs) (hrs) (ac-ft) ac /�oss
Basin"A" 1.29 8.00 0.4554 3.33 SBUH/SCS TYPEIA 2 yr
Basin'A" 1.97 8.00 0.6993 3.33 SBUH/SCS TYPEIA 10yr
Basin"A" 2.35 8.00 0.8360 3.33 SBUH/SCS TYPEIA 25 yr
Basin"A' 2.73 8.00 0.9731 3.33 SBUH/SCS TYPEIA 100 yr
Basin"B" 1.61 8.00 0.5608 3.92 SBUH/SCS TYPE1A 2 yr
Basin"B" 2.42 8.00 0.8507 3.92 SBUH/SCS TYPEIA 10 yr
Basin"B" 2.87 8.00 1.0126 3.92 SBUH/SCS TYPEIA 25 yr
Basin"B" 3.32 8.00 1.1747 3.92 SBUH/SCS TYPEIA 100 yr
Basin'C" 1.19 8.00 0.4518 3.51 SBUH/SCS TYPEIA 2 yr
Basin'C' 1.87 8.00 0.7053 3.51 SBUH/SCS TYPEIA 10 yr
Basin"C" 2.25 8.00 0.8481 3.51 SBUH/SCS TYPEIA 25 yr
Basin"C" 2.62 8.Q0 0.9915 3.51 SBUH/SCS TYPEIA 100 yr
Basin"D" 0.45 8.00 0.1543 1.14 SBUH/SCS TYPEIA 2 yr
Basin"D" 0.69 8.00 0.2375 1.14 SBUH/SCS TYPEIA 10 yr
Basin"D" 0.82 8.00 0.2842 1.14 SBUH/SCS TYPEIA 25 yr
Basin"D" 0.95 8.00 0.3311 1.14 SBUH/SCS TYPEIA 100 yr
Basin"RooP 1.37 8.00 0.4595 3.11 SBUH/SCS TYPEIA 2 yr
Basin'Root" 2.03 8.00 0.6912 3.11 SBUH/SCS TYPEIA 10yr
Basin"Roof 2.40 8.00 0.8202 3.11 SBUH/SCS TYPEIA 25 yr
Basin"Root" 2.76 8.00 0.9493 3.11 SBUH/SCS TYPEIA 100 yr
Drainage Area: Basin "A" I
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.8323 ac 92.00 0.17 hrs '
Impervious 2.5000 ac 98.00 0.16 hrs
Total 3.3323 ac
Supporting Data:
Pervious CN Data: ,
Irrigated Landscaping 92.00 0.8323 ac
Impervious CN Data:
Impervious Paving 98.00 2.5000 ac
Pervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Flow over grass 15.00 ft 3.00°/a 0.2400 3.28 min
� Shallow Flow over pavement 190.00 ft 1.00% 27.0000 1.17 min
Channel Flow through stormdrain 370.00 ft 0.50% 42.0000 2.08 min
Channel Flow through bioswale 200.00 ft 0.50% 17.0000 2.77 min
Channel Flow through stormdrain 140.00 ft 0.50% 42.0000 0.79 min
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Flow over paving 240.00 ft 1.00% 0.0110 3.98 min
Channel Flow through storm drain 370.00 ft 0.5o% 42.0000 2.08 min
Channel Flow through bioswale 200.00 ft 0.50% 17.0000 2.77 min
Channel Flow through storm drain 140.00 ft 0.50% 42.0000 0.79 min
Drainage Area: Basin "B"
Nyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
P.�CLAND Project# 1999010.008 Page 32
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Area CN TC ,
Pervious 0.4200 ac 92.00 0.21 hrs '
Impervious 3.5000 ac 98.00 0.14 hrs
Total 3.9200 ac
Supporting Data: '
Pervious CN Data:
Irrigated Landscaping 92.00 0.4200 ac
Impervious CN Data:
Impervious Paving 98.00 3.5000 ac
Pervious TC Data:
' Flow type: Description: Length: Slope: Coeff: Travel Time
� Sheet Flow over grass 14.00 ft 2.00% 0.2400 3.74 min
Sheet Flow over pavement 240.00 ft 1.60% 0.0110 3.38 min
' Channel Flow through storm sewer 321.00 ft 0.50% 42.0000 1.80 min
Channel Flow through bioswale 220.00 ft 0.50% 17.0000 3.05 min
Channel Flow through storm sewer 64.00 ft 0.50% 42.0000 0.36 min
Impervious TC Data:
' Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Flow over paving 240.00 ft 1.60% 0.0110 3.38 min
Channel Flow through storm drain 321.00 ft 0.50% 42.0000 1.80 min
Channel Flow through bioswale 220.00 ft 0.50% 17.0000 3.05 min
Channel Flow through storm drain 64.00 ft 0.50% 42.0000 0.36 min
Drainage Area: Basin "C"
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 1.5000 ac 92.00 0.29 hrs
Impervious 2.0100 ac 98.00 0.19 hrs
Total 3.5100 ac
Supporting Data:
Pervious CN Data: •
Irrigated Landscaping 92.00 1.5000 ac
Impervious CN Data:
Impervious Paving 98.00 2.0100 ac
Pervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
. Sheet Flow over grass 40.00 ft 2.00% 0.2400 8.67 min
Channel Flow through storm sewer 890.00 ft 0.50% 42.0000 4.99 min
Channel Flow through bioswale 145.00 ft 0.50% 17.0000 2.01 min
Channel Flow through storm sewer 295.00 ft 0.50% 42.0000 1.66 min
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Flow over paving 130.00 ft 1.00% 0.0110 2.49 min
Channel Flow through storm drain 890.00 ft 0.50% 42.0000 4.99 min
Channel Flow through bioswale 145.00 ft 0.50% 17.0000 2.01 min
Channel Flow through storm drain 295.00 ft 0.50°/a 42.0000 1.66 min
PACLAND Project# 1999010.008 Page 33
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Drainage Area: Basin "D"
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.3177 ac 92.00 0.18 hrs '
Impervious 0.8221 ac 98.00 0.10 hrs
Total 1.1398 ac
Supporting Data:
Pervious CN Data:
Irrigated Landscaping 92.00 0.3177 ac
Impervious CN Data:
Impervious Paving 98.00 0.8221 ac
Pervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Flow over grass 35.00 ft 3.00% 0.2400 6.63 min
Shallow Flow over pavement 90.00 ft 1.00% 27.0000 0.56 min
Channel Flow through stormdrain 210.00 ft 0.50% 42.0000 1.18 min
Channel Flow through bioswale 140.00 ft 0.50% 17.0000 1.94 min
Channel Flow through stormdrain 110.00 ft 0.50% 42.0000 0.62 min
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Flow over paving 150.00 ft 2.00% 0.0110 2.12 min
Channel Flow through storm drain 210.00 ft 0.50% 42.0000 1.18 min
Channel Flow through bioswale 140.00 ft 0.50% 17.0000 1.94 min
Channel Flow through storm drain 150.00 ft 0.50% 42.0000 0.84 min
Drainage Area: Basin "Roof'
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC �
Pervious 0.0000 ac 86.00 0.00 hrs
Impervious 3.1080 ac 98.00 0.10 hrs
Total 3.1080 ac
Supporting Data:
Impervious CN Data:
- Roof 98.00 3.1080 ac
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Flow over roof 360.00 ft 2.00% 0.0110 4.27 min
Channel Flow through storm drain 240.00 ft 0.40% 42.0000 1.51 min
PACLAND Project# 1999010.008 Page 34
Sam's Club#4835-00 Storm Drainage Analysis Renton,WA
Developed Basin �A" — Biofiltration swale Design (KC-SWDM)
Project name: Renton Proposed Sam's Club#4835-00 Date: 09/03/02
Project number: 19990I0.008 Designer: RDP
SwaleDesignation: DevelopedBasin "A"
' Q1o0-yr,24-hr: 2J3 cfs If high flows flow through
' Q25-yr,24hr: O CfS If high flows bypass
Qwq(2-yr,24-hr): 1.29 cfs Water quality design flow
Will high flow flow through?(Yes or no) enter"y"or"n"
Manning's roughness coeff(naq): 0.35 KC-SWDM
Design flow depth(y): 0.66 ft 0.66'for a wetland seed mis KC SWDM
Longitudinal slope along flow(s): 0.02 1%-6%<1.5%underdrains are req'd KC SWDM 6.3.1.2
Side slope(�: 3.0 H:1V 3H:1V max,>3:1 reinforced grass,>1:1 rockery(max 2')
Swale bottom width(b): �`d3 ft Ok
b = (Qti+�q*n„g)/(1.49*(y^1.67)*(s^O..i))
Cross sectional area(Awq): � ��� � 4�.1 sf
A wy =b*y+Zy^2
Design flow velocity(vWq): „� �Q��fps <1.Ofps maz; Ok
v,�q =Q wq/A wq
Min.Hydraulic residence time: 540 s KC SWDM 63.1.1 step 4
Min.swale length(L): ��68 ft >100';Ok
L =�40*v�
Swale layout adjustment-Calc top area and ro��ide e ui��lent area.KC SWDM 6.3.1.1 step 5
' Top width above sides(bslo�): 4A ft
b slope =2*Z*y
Top azea(Acop): �,.�_ wu,�, „sf
fl top = ro f tb slope�L i
Revised bottom width(bf): 5 ft Enter new width
Revised swale length(Lc): 155 fr >100';Ok "
New Q2-yr flow depth(y): 0.60 fr
i y=((Qwq*nwq)/1.49*(s^D.S)*b)^3/5
Cross sectional azea(Awq): . ,-�>l sf
A wq =b*y+Zy^2
Design flow velocity(vwq): � =�_�Y fps <1.Ofps maz; Ok
v,.n =Q wq/A wq
Conveyance capacity for flows>Qwq
Manning's roughness coeff(nc): 0.35 KC SWDM
Design Flow(Q25-yr or Q100-yr): 2.73 cfs Q100-yr
Depth of 25-yr or 100-yr flows(yc): 0.94 ft
yc = (Q*nc/(1.49*(s^0.5)*b))^(3/S)
Cross sectional area(Ac): 7.38 sf
A� =b*y�+Z*y�^2
Hydraulic radius(Rc): 0.67
R c =A c/(b+2'�y c*((Z^2)+1)^0.S)
Flow capacity(Qc): �,��cfs >Qdesign; Ok
Q c = (1.49/n c)*A c*(R c^0.67)*(s^0.S)
High flow velocity(VloO): :-,f:.w..:�� _. fps <5 fps; design Ok
V1oo =Qroo/A�
PACLAND Project# 1999010.008 Page 35
.� :: -_ -
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Developed Basin "B" — Biofiltration swale Design (KGSWDM)
Project name: Renton Proposed Sam's Club#d835-00 Date: 09/03/02
Project number: 1999010.008 Designer: RDP
Swale Designation: Developed Basin "B"
Qtoo-yr,z4-tv: 331 cfs If high flows flow through
Q25-yr,2a-t,r: 0 cfs If high flows bypass
Qwy(2-yr,24hr): 1.61 cfs Water quality design flow
Will high flow flow through?(Yes or no) enter"y" or"n"
Manning's roughness coeff(n�): 0.35 KGSWDM
Design flow depth(y): 0.66 ft 0.66'for a wetland seed mix KC SWDM
Longitudinal slope along flow(s): 0.02 1%-6%<1.5%underdrains are req'd KC SWDv16.3.1.2
Side slope(Z): 3.0 H:1 V 3H:1 V max,>3:1 reinforced grass,>1:1 rockery(max 2')
Swale bottom width(b): 5.4 ft Ok
b =(Q wq*n„q)/(1.49*(y^l.67)*(s^0.S))
Cross sectional area(Awq): .:=�:8 sf
A wy =b*y+Zy^2
Design flow velocity(vwq): ,,�. ;-_�___ ;fps <1.Ofps maz; Ok
v..q =Q wq/A wq
Min.Hydraulic residence time: 540 s KC SWDM 63.1.1 step 4
Min. swale length(L): �¢ _�$d ft >100;Ok
L =540'v„�
Swale layout adjustment-Calc top area and rovide e uivilent area.KC SWDM 6.3.1.1 step 5
Top width above sides(bstope): � s� 4:0 ft
b slope =2*Z*y
Top area(Acop): sf
A top =(b f+b s►ope)L r'
Revised bottom width(bf): 4 ft Enter new width ,
Revised swale length(Lf): 210 ft >100';Ok
New Q2-yr flow depth(y): 0.79 ft
y=((Qwq*nwc�/1.49*(s^0.5)'b)^3/S
Cross sectional area(Awq): 5.0 sf
A wq =b#y+Zy^2
Design flow velocity(vwq): ,,�__,:�_ fps <1.Ofps maz; Ok
v,�y =Q wq/A wq
Conveyance capacity for flows>Qwy
Manning's roughness coeff(nc): 0.35 KC SWDM 6.3.1.1 or 4.4.1.2
Design Flow(Q25-yr or Q100-yr): 3.31 cfs Q100-yr
Depth of 25-yr or 100-yr flows(yc): 1.2 T fr
yc =(Q*nc/(1.49*(s^0.5)*b))^(3/5)
Cross secrional azea(Ac): 9.24 sf
Ac =b*yc+Z*yc^2
Hydraulic radius(R�): _ :: Q_7�
R� =A�/(b+2*y�*((Z^2)+1)^0.5)
Flow capacity(Qc): .� � _���& cfs >Qdesign; Ok
Qc = (1.49/ncJ*Ac'(Rc^0.67)*(s^0.�)
High flow velocity(Vtoo): _.. ., -,;=��1�fps <5 fps; design Ok
Ytoo = Q too/A�
PACLAND Project� 1999010.008 Page 36
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Developed Basin "C" — Biofiltration swale Design (KGSWDM) I
Project name: Renton Proposed Sam's Club#4835-00 Date: 09/03/02
Project number: 1999010.008 Designer: RDP
Swale Designation: Developed Basin "C"
Qtoo-yr,24-hr: 2.62 cfs If high flows flow through
Q25-yr,24-hr. 0 cfs If high flows bypass
Qwq(2-yr,24-hr): 1.19 cfs Water quality design flow
Will high flow flow through?(Yes or no) enter"y"or"n"
Manning'sroughnesscoeff(nwq): 0.35 KGSWDM
Design flow depth(y): 0.66 ft 0.66'for a wetland seed mix KC SWDti1
Longitudinal slope along flow(s): 0.02 1%-6%<1.5%underdrains aze req'd KC SWDM 6.3.1.2
Side slope(Z): 3.0 H:1V 3H:1V max,>3:1 reinforced grass,>1:1 rockery(max 2')
Swale bottom width(b): �'�:0 ft Ok
b= (Q wq*n„g)/(1.49*(y"1.67)*(s^0.S))
Cross sectional area(Awq): 3.9 sf
A wq =b*y+Zy^2
Design flow velociry(vwq): � ,�:l1-30:fps <1.Ofps mas; Ok
v,�q =Qwq/A wq
Min.Hydraulic residence time: 540 s KC SWDM 63.1.1 step 4
Min. swale length(L): ��=I64 ft >100';Ok
L =540*v„g
Swale layout adjustment-Calc top area and ro�-ide e ui��ilent area.KC SWDM 6.3.1.1 step 5
Top width above sides(bstope): 4A ft
b s[ope =2*Z*y
Top area(Acop): � sf
A top = (b f+b slope)L;
Revised bottom width(bf): 6 ft Eoter new width '
Revised swale length(Lf): `. 13d ft >100';Ok
New Q2-yr flow depth(y): `0.51 ft
y = ((Qwq*nw�/1.49*(s^0.5)*b)^3/S
Cross sectional area(Awq): _" 3�9 sf
A wy =b*y+Zy^2
Design flow velocity(vwy): � 03I fps <1.Ofps maz; Ok
v,.y =Q wq/A wq
Conveyance capacity for flows>Qwq
Manning's roughness coeff(nc): 0.;5 KC SWDM 6.3.1.1 or 4.4.1.2
Design Flow(Q25-yr or Q 100-yr): 2.62 cfs Q 100-yr
Depth of 25-yr or 100-yr flows(yc): 0.82 ft
yc = (Q*nc/(1.49*(s^0.5)*b))^(3/5)
Cross sectional azea(Ac): -'�'Si�9 sf
A� =b*y�+z*y�^2
Hydraulic radius(Rc): 0.62
Rc =Ac/�+Z*Y�*���2)+1)^0.5)
Flow capacity(Qc): __ _s.,��4�,cfs >Qdesign; Ok
Q c = (1.49/n c)*f1 c*(R c^0.67)*(s^0.S)
High flow velocity(V1oo): �,��� _�!. �fps <5 fps; design Ok
Vloo = Q1o0/Ac
PACLAND Project# 1999010.008 Page 37
Sam's Club#4835-00 Storm Drainage Analysis Renton,WA
Developed Basin "D" — Biofiltration swale Design (KC-SWDM)
Project name: Renton Proposed Sam's Club#4835-00 Date: 09/03/02
Project number: I999010.008 Designer: RDP
Swa[e Designation: Developed Basin "D"
Q100.yr,24hr: 0.95 cfs If high flows flow through
Qz5-yr,24-hr: 0 cfs If high flows bypass
Qwq(2-yr,za-hr): 0.45 cfs Water quality design flow
Will high flow flow through?(Yes or no) enter"y"or"n"
Manning's roughness coeff(nwy): 0.35 KGSWDM
Design flow depth(y): 0.66 ft 0.66'for a wetland seed mix KC SWDM
Longitudinal slope along flow(s): 0.02 1%-6%<1.5%underdrains are req'd KC SWDM 6.3.1.2
Side slope(Z): 3.0 H:1V 3H:1V max,>3:1 reinforced grass,>1:1 rockery(max 2')
Swale bottom width(b): =��� ft <2';Swale layout adjustment req'd
b =(Q wq*n„�)/(1.49*(y"1.67)*(s^0.S))
Cross sectional area(Awq): -- ' 2.3 sf
A wy =b*y+Zy^2
Design flow velocity(vaq): ��ei1:Z0 fps <1.Ofps maz;Ok
v,�y =Qwq�l�wq
Min.Hydraulic residence time: 540 s KC SWDM 63.1.1 step 4
i�1in.swale length(L): �� '`;�,b6 ft >100';Ok
L =540*v�
Swale lavout adjustment-Calc top area and ro��de e uivilent area.KC SWDM 63.1.1 step 5
Top width above sides(bslope): : ` 4.0 ft
b slope =2*Z*y
Top azea(Acop): - sf
A top =(b f+b slape)L i
Revised bottom width(bf): 4 ft Enter new width ,
Revised swale length(Li j: :- 100 ft Calc length<100'rounded up to 100'
New Q2-yr flow depth(y): 0.37 ft
Y—((�'4*nwq)/1.49"(s^0.�1*h�^3i�
Cross sectional area(Awq): 1.9 sf
A wq =b*y+Zy^2
Design flow velocity(vwq): , �-_: _4,24 fps <1.Ofps maz; Ok
v Hq =Q wq/A wq
Conveyance capacity for flows>Qwq
Manning's roughness coeff(nc): 0.35 KC SWDM 6.3.1.1 or 4.4.1.2
Design Flow(Q25-yr or Q100-yr): Q.95 cfs Q100-yr
Depth of 25-yr or 100-yr flows(yc): 0.57 ft
yc =(Q*n c/(1.49*(s^0.5�*b))^(3i5j
Cross sectional area(Ac): -3.27 sf
Ac =b*yc+Z*yc^2
Hydraulic radius(Rc): `�0:43
R c =A c/(b+2*y c#((Z^2)+1)^0.5%
Flow capaciry(Qc): 1.12 cfs >Qdesign; Ok
Qc = (1.49/nc)*Ac*(Rc^0.67)*(s^O.�i
High flow velociry(V1oo): � w.,:�,Q fps <5 fps; design Ok
Vtoo = Q�oo/A�
PACLAND Project# 1999010.008 Page 38
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Basin "Roof" - Detention Pipe Design
Running S:1WashingtonlRenton\grimeslGRADY WY-SR 515 (RNG3)14ReportslStorm102-10-24
PermitlStormShed\Basin-roof.pgm on Tuesday, January 07, 2003
Project Precips
[2 yr] 2.00 in
[10 yr] 2.90 in
[25 yr] 3.40 in
[50 yr] 3.40 in
[100 yr] 3.90 in
Event Summary
BasinlD Peak Q Peak T Peak Vol Area Method Raintype Event
---- (cfs) (hrs) (ac-ft) ac /Loss
Basin'RooP' 1.3693 8.00 0.4595 3.11 SBUH/SCS TYPEIA 2 yr
Basin"RooP' 2.3987 8.00 0.8202 3.11 SBUH/SCS TYPEIA 25 yr
Basin"RooP' 2.7633 8.00 0.9493 3.11 SBUH/SCS TYPEIA 100 yr
Basin Definition
Drainage Area: Basin "Roof'
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 020
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.0000 ac 86.00 0.00 hrs
Impervious 3.1080 ac 98.00 0.10 hrs
Total 3.1080 ac
Supporting Data:
Impervious CN Data: '
Roof 98.00 3.1080 ac
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time .
Sheet Flow over roof 360.00 ft 2.00% 0.0110 4.27 min
Channel Flow through storm drain 240.00 ft 0.40% 42.0000 1.51 min
Sforaqe Structure Definition I
Node ID: Roof Detention -48" Pipe
� Desc: Roof Detention in 48"Pipes
Start EI: 27.8000 ft Max EI: 34.0500 ft
Contrib Basin: Contrib Hyd:
Length Diam Slope UpNode DnNode Num
450.0000 ft 4.0000 ft 0.50 % 1
Outlet Structure Definition
Control Structure ID: Roof Detention Riser - Multiple Orifice Structure
Descrip: Multiple Orifice for the roof detention pipe
Start EI Max EI Increment
27.8000 ft 37.0000 ft 0.10
Orif Coeff: 0.62 Bottom EI: 25.80 ft
Lowest Diam: 3.5000 in
out to 2nd: 2.7500 ft Diam: 4.0000 in
PACLAND Project# 1999010.008 Page 39
Sam's Club #4835-00 Storm Drainage Analysis Renton, WA
RLPooI Node De�nition
Node ID: Roof Detention -48" RLP
Desc: RLP node for Roof Detention Pipes
Start EI: 29.0000 ft Max EI: 33.5000 ft
Contrib Basin: Contrib Hyd:
Storage Id: Roof Detention -48" Pipe Discharge Id: Roof Detention Riser
Routin_q lnformation
2 yr Match Q:0.5930 cfs Peak Out Q:0.5508 cfs-Peak Stg:30.55 ft-Active Vol:2283.75 cf-Pipe length:450.00 ft
25 yr Match Q: 1.2927 cfs Peak Out Q:1.2443 cfs-Peak Stg:32.16 ft-Active Vol:0.10 acft-Pipe length:450.00 ft
100 yr Match Q: 1.5473 cfs Peak Out Q:1.4518 cfs-Peak Stg:33.07 ft-Active Vol:0.12 acft-Pipe length:450.00 k
Outflow HvdroQraph lnformation
HydID Peak Q Peak T Peak Vol Cont Area
------ (cfs) (hrs) (ac-ft) (ac)
Basin"RooP-2yr out 0.55 8.67 0.4594 3.1080
Basin"Roof-25yr out 1.24 8.33 0.8201 3.1080
Basin"Roof-100yr out 1.45 8.33 0.9496 3.1080
PACLAND Project# 1999010.008 Page 40
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Existing Concrete Paved Ditch (Aqueduct) Replacement Calculations
Runoff Peak Analysis
With the help of the City of Renton Utility Systems Division - Surface Water section, the
basin draining into the existing aqueduct from the existing 48" concrete culvert was
delineated as shown in attached Figure A7. This 406.3 acre basin covers two types of
residential zoning whose surface properties where determined as follows:
R-8 (8 dwelling units/acre):
The area was assumed to be 60°/o impervious surfaces.
(This was because large tracts of the area are still undeveloped)
RM-1 (Residentia! Family lnfi!):
The actual amount of impervious surface was measured.
(As this area is fully developed)
Using this data and the model parameters listed in the Hydrologic Modeling Method
discussed above, the 25-year and 100-year peak flow was calculated making the following
assumptions for the surface properties.
Curve Number for Impervious Surfaces: CN = 98
Curve Number for Pervious Surfaces: CN = 90 (SCS="C" type soils)
As listed in the following calculations, the 100-year, 24-hour event peak was determined
to be 163.07 CFS for the existing 48" concrete culvert.
In addition, an 18" concrete storm drain that is believed to carry groundwater also
discharges into the existing concrete aqueduct. As groundwater flows are notoriously .
difficult to estimate, a conservative approach was used adding the full flow capacity of this
18" pipe to the 100-year, 24-hour surface water flow.
Slope of 18" pipe = 16.65°/0
Capacity of 18" pipe = 46.52 CFS �
Total offsite flow (100-year event) = 163.07 CFS + 46.52 CFS = 209.59 CFS
Conveyance
As the existing aqueduct is undersized in a couple of areas, the new aqueduct has been
sized with a 4' width x 4' depth cross section at a 1.05% bottom slope. These geometric
properties give the new aqueduct the ability to convey the 209.59 CFS of the 100-year
event with --0.5 foot of freeboard, utilizing Manning's roughness coefficient of n=0.012.
PACLAND Project# 1999010.008 Page 41
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Calculation Summary
Basin Upstream Event Summary:
BasinlD Peak Q Peak T Peak Vol Area Method Raintype Event
----- (cfs} (hrs) (ac-ft) ac /�oss
Basin Upstream 138.17 8.50 93.6079 406.28 SBUH/SCS TYPEIA 25 yr
Basin Upstream 163.07 8.17 110.1683 406.28 SBUH/SCS TYPE1A 100 yr
Drainage Area: Basin Upstream
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min �
Area CN TC
Pervious 0.0000 ac 92.00 0.00 hrs
Impervious 406.2800 ac 94.26 1.28 hrs
Total 406.2800 ac
Supporting Data:
Impervious CN Data:
RM-I Zoning (impervious)SCS ="C" 98.00 31.1800 ac
RM-I Zoning (pervious)SCS ="C" 90.00 66.3300 ac
R-8 Zoning (8 units/acre)40% per 90.00 123.5100 ac
R-8 Zoning (8 units/acre)60% imper 98.00 185.2600 ac
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Flow over grass 300.00 ft 1.20% 0.1500 36.61 min
Shallow Flow over grass 257.00 ft 1.20% 11.0000 3.55 min
Shallow Flow over grass 147.00 ft 3.31% 11.0000 1.22 min
Shallow Flow over grass 328.00 ft 0.61% 11.0000 6.36 min �
Shallow Flow over grass 1115.00 ft 4.57% 11.0000 7.90 min
Shallow Flow over grass 255.00 ft 10.55°/a 11.0000 1.19 min
Channel Vegitative stream 2341.00 ft 3.93% 10.0000 19.68 min
PACLAND Project# 1999010.008 Page 42
Sam's Club#4835-00 Storm Drainage Analysis Renton,WA
Convayance Calculafion Summary
,
. _ _ _.
� ���� �
i Solve For Depth of Flow �
�� r Critical Depth Check
,- --_ _ ._ ._.-- -- -------- -----,
- F . � �- .- . . -._��.
�. ' "_t � � � . - - .�.
, � Flowrate cfs 209.5900 '� � �
i ' ' '
Slope ftlft 0.0105 Select
� � ': , ; ; :
; Manning's n 0.0120 Select �
' � ;
4_._- ,
' �' ; Flow Depth ft 3.5129 i i ------- _ ,
{ ! _��--.�.�.._�_—_ .��__�
Height ft 4.0000 ` Velocity fps �14.9157
' Area ft2 16.0000
! Bottom Width ft 4.0000
Perimeter ft 12.000�
, _ _ _
' Wet Area ft2 14.0517
: _ - ` Wet Perim ft 11.0258
( ; - � i Hyd.Fiadius ft 1.274A
- ' Top Width ft 4.0000
� �
� : " Percent Full 0 87.8228
----.._...._..............:......................_._.
:•_....:.............Crit�cal.................� Output � Plot � Rating �
�K Cancel Help
PACLAND Project# 1999010.008 Page 43
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
� � � • � I � � � i �
The Temporary Sediment Ponds "A", °B" and "C" where sized to handle a 2-yr, 24-hour
event using the KC-SWDM requirements. Each pond was located to treat runoff from the
following areas as summarized in the table below.
Temporary Sediment Pond Summary
Temporary Drainage Basins I 2-yr Combined Water Top of Bottom Orifice
Sediment Events 2-yr event Surface bank Dim. Dim. Size
Pond Dim.
"A" A-1.29 cfs, D-0.45 cfs 1.74 cfs 90' x 30' 102' x 42' 69' x 9' 1.75"
"Bn g-1.61 cfs 1.61 cfs 100' x 33' 112' x 45' 79' x 12' 2.00"
"C" C-1.19 cfs, Roof-1.37 cfs 2.56 cfs 126' x 42' 138' x 54' 105' x 21' 2.50"
The required surface area of the pond is indicated in the table above by the Water Surface
Dimensions. This area is located 3.5 feet above the bottom of the pond and is the
minimum required surface area to treat the runoff. The Top of Bank Dimension is the
required surface area at the top of the pond bank located 2 feet above the water surface
elevation with a 3:1 bank slope. Calculations for these areas are shown below.
PACLAND Project�# 1999010.008 Page 44
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Temporary Silt Pond "A" Design (KC-SWDM)
Project name: Renton Proposed Sam's Club#4835-00 Date: January 8, 2003
Project number: 1999010.008 Designer: RDP
Pond Title: Temporary Silt Pond"A"
SEDIMENTATION POND CALCULATIONS
References: -King County Washington Surface Water Design Manual, 1998, Appendix D, Sec
Pond Requirements: -Design Flow � Peak discharge from a pre-developed 2-yr, 24hr storm (p.D-28)
-Max.slope 3:1 (p.D-28)
-Length-tawidth ratio a 3:1 to 6:1 (p.D-28)
-Pond to be divided into two equal cells by a permeable divider(p.D-29)
-Min. pond depth = 3.5ft(top of riser to bottom of pond), plus 1ft freeboard
Assumptions: -Settling velocity of 0.00096 ft/s
Sediment Pond Sizing:
Qwq(2-yr, 24-hr): 1.290 cfs Pre-dev storm design flow (10-yr optional)
Pond Surface Area = �:5 sf
SA= 2 x Qwq/0.00096
Settling Depth = 2.00 ft Min.s 2ft(2-4feet range)
Sediment Storage Depth = 1.5 ft 1.5ft Recommended Depth
Length-to-width ratio = 3 :1 Between 3:1 to 6:1
Top Dimensions
Length= 90 ft
Width= 30 ft
Bottom Dimensions
Length= 6g ft Using Max. slope 3:1
Width= 9 tt Using Max.slope 3:1
Pond bottom wid[h is greater then 10 feet,proceed to Top Area •
Adjusted Top Dimensions
Length= tt
Width= - ft
Adjusted Bottom Dimensions
Length= % �l ft Using Max. slope 3:1
� Width= = A� ft Using Max.slope 3:1
Top Area = 2688 sf
Bottom Area= 300 sf
Sediment Storage Volume= 1185 cf
Total Volume= 5228 cf
Sizing of Discharge Mechanisms
Dewatering Time 24 hrs 24 Hours (typ.)
Area of dewatering office= _ _ � sf
Ao=Asx(2xh)"0.5/(0.6x3600xTx�'0.5) �
Diameter of dewatering office = 1.83 in. Round number to closest 0.25" ',
D s 24x(Ao13.14)"0.5
Diameter of the perforated tubing = ' 3.83 in. Round number up to closest 0.50"
Dp=D+2
PACLAN D Project# 1999010.008 Page 45
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Temporary Silt Pond "B" Design (KC-SWDM)
Project name: Renfon Proposed Sam's Gub#4835-00 Date: January 8, 2003
Project number: 1999010.Oa8 Designer: RDP
Pond Title: Temporary Silt Pond"B"
SEDIMENTATION POND CALCULATIONS
References: -King County Washington Surface Water Design Manual, 1998, Appendix D, Sec
Pond Requirements: -Design Flow — Peak discharge from a pre-developed 2-yr, 24hr storm (p.D-28)
-Max. slope 3:1 (p.D-28)
-Length-to-width ratio — 3:1 to 6:1 (p.D-28)
-Pond to be divided into two equal cells by a permeable divider(p.D-29)
-Min. pond depth � 3.Sft(top of riser to bottom of pond), plus 1ft freeboard
Assumptions: -Settling velocity of 0.00096 ft/s
Sediment Pond Sizing:
Qwq(2-yr, 24-hr): 1.61 cfs Pre-dev storm design flow (10-yr optional)
Pond Surface Area — sf
SA— 2 x Qwq/0.00096
Settling Depth = 2.00 ft Min.—2ft(2-4feet range)
Sediment Storage Depth = 1.5 ft 1.Sft Recommended Depth
Length-to-width ratio � 3 :1 Between 3:1 to 6:1
Top Dimensions
Length— 100 rt
Width= 33 rt
Bottom Dimensions
Length= 79 ft Using Max. slope 3:1
Width= 12 tt Using Max. slope 3:1
Pond bot[om width is grea[er then 10 fee[, proceed to Top Area
Adjusted Top Dimensions •
Length= �ft
Width= _- ft
Adjusted Bottom Dimensions
Length= rt Using Max. slope 3:1
Width= - rt Using Max. slope 3:1
Top Area = 3354 sf
Bottom Area= 986 sf
Sediment Storage Volume= 2135 cf
Total Volume= 7596 cf
Sizing of Discharge Mechanisms
Dewatering Time 24 hrs 24 Hours (typ.)
Area of dewatering office= sf
Ao�Asx(2xh)"0.5/(0.6x3600xTx�'0.5)
Diameter of dewatering office = �:__�in. Round number to closest 0.25"
D=24x(Ao/3.l 4)"0.5
Diameter of the perforated tubing = 4:i� in. Round number up to closest 0.50"
Dp=D+2
PACLAN D Project# 1999010.008 Page 46
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Temporary Silt Pond "C" Design (KC-SWDM)
Project name: Renton Proposed Sam`s Gub#4835-00 Date: january 8, 2003
Project number: 1999010.008 Designer: RDP
Pond Title: Temporary Silt Pond "C"
SEDIMENTATION POND CALCULATIONS
References: -King County Washington Surface Water Design Manual, 1998,Appendix D, Sec
Pond Requirements: -Design Flow = Peak discharge from a pre-developed 2-yr, 24hr storm (p.D-28)
-Max. slope 3:1 (p.D-28)
-Length-to-width ratio = 3:1 to 6:1 (p.D-28)
-Pond to be divided into two equal cells by a permeable divider(p.D-29)
-�'vtin. pond depth = 3.5ft(top of riser to bottom of pond), plus 1 ft freeboard
Assumptions: -Settling velocity of 0.00096 ft/s
Sediment Pond Sizing:
Qwq{2-yr, 24hr): 2.56 cfs Pre-dev storm design flow (10-yr optional)
Pond Surface Area = 'sf
SA= 2 x Qwq/0.00096
Settling Depth = 2.00 ft Min.=2ft(2-4feet range)
Sediment Storage Depth = 1.5 ft 1.5ft Recommended Depth
Length-to-width ratio = 3 :1 Between 3:1 to 6:1
Top Dimensions
Length= 126 tt
Width= 42 tt
Bottom Dimensions
Length= 105 rt Using Max. slope 3:1
Width= 21 ft Using Max. slope 3:1
Pond bottom width is greater then 10 feet, proceed to Top Area
Adjusted Top Dimensions •
Length= tt
Width a - ft
Adjusted Bottom Dimensions
Length= ft Using Max. slope 3:1
Width= _ ft Using Max. slope 3:1
Top Area = 5333 sf
Bottom Area= 2233 sf
Sediment Storage Volume= 4106 cf
Total Volume= 13240 cf
Sizing of Discharge Mechanisms
Dewatering Time _ 24 hrs 24 Hours (typ.)
Area of dewatering office= �:�� �- sf
Ao a Asx(2xh)"0.5/{0.6x3600xTx�'0.5)
Diameter of dewatering office = 2.58 in. Round number to closest 0.25"
D�24x(Ao/3.14)"0.5
Diameter of the perforated tubing = - �,;._4,5$ in. Round number up to closest 0.50"
Dp=D+2
PACLAND Project# 1999010.008 Page 47
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
� i � • � � �
i
, The "South" Basin
Layout Report: South Side
Project Precips
'� �� [2 yrj 2.00 in
[10 yr] 3.40 in
�� [25 yr] 3.40 in
[100 yr] 3.90 in
[6 mo] 1.27 in
ROUTEHYD []THRU [South Side] USING TYPE1A AND [100 yr] NOTZERO RELATIVE
, Reach Area Flow Full Q % Full nDepth Size nVel fVel CBasin/ Hyd
----- ac cfs cfs ratio ft --- ftls ftls ---_______
SD#16 0.2326 0.1884 2.7366 0.07 0.1777 12"Diam 1.9963 3.4843 CB-B#16
SD#15 0.3653 0.3099 2.7366 0.11 0.2272 12"Diam 2.3105 3.4843 CB-B#15
SD#18 0.3534 0.3264 2.7366 0.12 0.2332 12"Diam 2.3451 3.4843 CB-B#18
SD#17 0.5129 0.4786 2.7366 0.17 0.2830 12"Diam 2.6189 3.4843 CB-B#17
SD#14 0.9531 0.8598 2.7366 0.31 0.3850 12"Diam 3.0844 3.4843 CB-B#14
SD#13 1.1320 1.0279 2.7366 0.38 0.4247 12"Diam 3.2359 3.4843 CB-B#11
Bio"D" 1.1320 1.0279 - 1.00 0.2209 Ditch 0.9979 -
SD#12 1.5410 1.3664 2.7366 0.50 0.4996 12"Diam 3.4831 3.4843 CB-B#12
SD#11 1.7199 1.5346 2.7366 0.56 0.5355 12"Diam 3.5839 3.4843 CB-B#11
Curb-E Ditch 0.7700 0.6859 - 1.00 0.1105 Ditch 1.1639 - Curb Out-E
Curb-W Ditch 1.0500 0.9465 - 1.00 0.1337 Ditch 1.3105 - Curb Out-W
SD#06 0.3500 0.3327 7.0304 0.05 0.1481 12"Diam 4.5885 8.9513 CB-B#O6
SD#08 0.2970 0.2741 2.7366 0.10 0.2137 12"Diam 2.2289 3.4843 CB-B#08
SD#09 0.7210 0.6037 2.7366 0.22 0.3192 12"Diam 2.7966 3.4843 CB-B#09
SD#07 1.0880 0.9266 2.7366 0.34 0.4011 12"Diam 3.1473 3.4843 CB-B#07
SD#03 1.5804 1.3948 3.3516 0.42 0.4498 12"Diam 4.0718 4.2674 CB-B#03
Bio'A" 2.6304 2.3413 - 1.00 0.2854 Ditch 1.1967 - •
SD#58 3.1504 2.6735 2.7366 0.98 0.7996 12"Diam 3.9712 3.4843 CB-B#58
Ex.SD#A 4.8703 4.2081 1.2238 3.44 -1.0000 12"Diam 3.4385 1.5582
- - Rch App Bend Junct HW Max EU
- -- Loss Head Loss Loss Elev Rim EI
From Node To Node ft R ft ft R ft
Ex.CB-N-A 30.6000
CB-N#62 Ex.CB-N-A 31.6469 0.1799 0.1150 0.0670 31.6489 34.0000
CB-N#11 CB-N#62 31.8290 0.0470 0.0145 - 31.7965 32.7000
CB-N#12 CB-N#11 31.9331 0.0000 0.0000 - 31.9331 33.0000
CB-N#59 CB-N#12 30.0638 0.1626 0.0048 -- 29.9061 34.0000
CB-N#13 CB-N#59 30.1016 0.1477 0.0019 ---- 29.9558 36.5000
CB-N#14 CB-N#13 30.2420 0.1065 0.0434 0.0434 30.2223 36.1000
CB-N#15 CB-N#14 30.3091 0.0619 0.0179 -- 30.2651 35.5000
CB-N#16 CB-N#15 30.8706 - - - 30.8706 35.7000
CB-N#17 CB-N#14 30.3906 0.0854 0.0350 -- 30.3402 36.0000
CB-N#18 CB-N#17 30.8178 - -- -- 30.8178 36.0000 ,
CB-N#58 CB-N#62 31.9665 0.0001 0.0001 ---- 31.9664 32.0000
CB-N#02 CB-N#58 30.2350 0.2574 0.0068 0.1087 30.0931 33.0000
Curb-W CB-N#02 1.1257 0.0001 0.0001 - 1.1257 35.5000 �
Curb-E Curb-W 0.2645 - - - 0.2645 35.5000 I
CB-N#03 CB-N#02 31.5230 0.1538 0.0012 0.0393 31.4098 33.8000
CB-N#O6 CB-N#03 31.5070 -- - - 31.5070 33.8000
CB-N#07 CB-N#03 31.7660 0.1214 0.0006 0.0376 31.6827 34.4000
CB-N#08 CB-N#07 31.7990 - --- -- 31.7990 34.3000
CB-N#09 CB-N#07 32.3438 -- -- ------ 32.3438 34.4000
PACLAND Project� 1999010.008 Page 48
CB-N#15 CB-N#16
��fl Ji�� � �
r.r
1�,'- �
�,�e
�
�lJ .
C B-N#12 C B-N�ty 3 ��- � �
CB-N#59
�-- - Bin ����� - -
�[l � S �1�
CB- 1 CB-N#17 CB-N#18
�D �l 7
�ts2 Curb-1N Curh-E �
Ex. CB-N-� {r���tr�-EQi�h � _ ;
�
58 I
Curb-'r+hl Ditch
B-N#58 �B{ � a2 CB-N#03 CB-N##U7 CB-N#09 :
- — - -- .B_i o ����� �
-- - -- - _ _ � �
�
SD O6 SD 0$
C -N#06 C -M#08
3U.265 ft 30.8�1 ft
..',�'�.�].�.r��--��
�.�� , s
31 .933 ft 29.956 ft 30.2
29.906 ft
._ - 1.�.3_rfs, _ _ 1 ,��.
1 .� fs 0. cfs
30 818 ft
31.7 ft 3U.340 ft •
1 .5 cfs
49 ft 1.�126 ft U.264 ft
30.60p ft �-^ _ Il.6��f� _ .� - '
� .
. cfs �
0.95�cfs
�.966 ft � 31.4� 0 ft 31.683 ft 32.34A ft
30.0�3 ft
• - - _ 2.3Qcfs
_ � _ _ _ ,
0.3 cf� 0.2 cfs
31 507 ft 3 799 ft '
F
F
4
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Reach Records
Reach ID: Bio "A"
Section Properties:
Shape: Ditch Routing Method: Travel Time Translation
� Size Material Mannings n Hyd params By
Conc-Steel Form 0.0350 Mannings Formula
Length Slope Entrance Loss
200.0000 ft 0.50 %
Width Bank Hgt ss1 ss2
6.0000 ft 2.0000 ft 3.00h:1 v 3.00h:1 v
Up Node Dn Node Up Invert Dn Invert
CB-N#02 CB-N#58 29.3000 ft 28.3000 ft
, Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/Exfil Hold Up Hold Dn Match Inv Allow Smaller
' 0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
2.6304 ac 2.3413 cf 2.3413 cf 1.1967 ft/s 0.2854 ft
Ent Loss Exit Loss Frict Loss Start TW
_ 0.000000 ft 0.000000 ft 0.000000 ft 31.9664 ft
Reach ID: Bio "D"
Section Properties:
Shape: Ditch Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
Conc-Steel Form 0.0350 Mannings Formula
, Length Slope Entrance Loss
140.0000 ft 0.50 %
Width Bank Hgt ss1 ss2 , '
4.0000 ft 2.0000 ft 3.00h:1 v 3.00h:1 v
Up Node Dn Node Up Invert Dn Invert
CB-N#59 CB-N#12 29.4500 ft 28.7500 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
� In/E�I Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
1.1320 ac 1.0279 cf 1.0279 cf 0.9979 ft/s 0.2209 ft
Ent Loss Exit Loss Frict Loss Start TVV
0.000000 ft O.Qa0000 ft 0.000000 ft 31.9331 ft
Reach ID: Curb-E Ditch
Section Properties:
Shape: Ditch Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
Conc-Steel Form 0.0350 Mannings Formula
Length Slope Entrance Loss
22.0000 ft 1.54 %
Width Bank Hgt ss1 ss2
5.0000 ft 1.0000 ft 3.00h:1 v 3.00h:1 v
PACLAND Project ,# 1999010.008 Page 49
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Up Node Dn Node Up Invert Dn Invert
Curb-E Curb-W 0.0000 ft 0.0000 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/Exfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capaciry Velocity Normal Depth
0.7700 ac 0.6859 cf 0.6859 cf 1.1639 ft/s 0.1105 ft
Ent Loss Exit Loss Frict Loss Start TW
0.000000 ft 0.000000 ft 0.000000 ft 1.1257 ft
Reach ID: Curb-W Ditch
Section Properties:
Shape: Ditch Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
Conc-Steel Form 0.0350 Mannings Formula
Length Slope Entrance Loss
- 160.0000 ft 1.54 %
Width Bank Hgt ss1 ss2
5.0000 ft 1.0000 ft 3.00h:1 v 3.00h:1 v
Up Node Dn Node Up Invert Dn Invert
i Curb-W CB-N#02 0.0000 ft 0.0000 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/Exfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
1.0500 ac 0.9465 cf 0.9465 cf 1.3105 ft/s 0.1337 ft
Ent Loss Exit Loss Frict Loss Start TVN •
0.000000 ft 0.000000 ft 0.000000 ft 30.0931 ft
Reach ID: Ex. SD#A
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
- Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
32.0000 ft 0.10 % Square Edge w/Headwall
Diam
1.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#62 Ex. CB-N-A 28.2000 ft 28.1680 ft
Conduit Constraints: ,
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop '
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/Exfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
4.8703 ac 4.2081 cf 1.2238 cf 3.4385 ft/s -1.0000 ft '
Ent Loss Exit Loss Frict Loss Start TUV
PACLAN D Project# 1999010.008 Page 50
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
0.222881 ft 0.445762 ft 0.378233 ft 30.6000 ft
comment: Hydrograph not shifted, 5.33 min forwarded.Submerged or overtop bank condition.
Reach ID: SD#03
Section Properties:
, Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
205.0000 ft 0.75 % Square Edge w/Headwall
Diam
1.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#03 CB-N#02 30.8000 ft 29.2625 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
' In/Exfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
1.5804 ac 1.3948 cf 3.3516 cf 4.0718 ft/s 0.4498 ft
Ent Loss Exit Loss Frict Loss Start TW
0.128721 ft 0.257442 ft 0.266203 ft 30.0931 ft
Reach ID: SD#06
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
' Length Slope Entrance Loss
12.0000 ft 3.30 % Square Edge w/Headwall
Diam
, 1.0000 ft
' Up Node Dn Node Up Invert Dn Invert
CB-N#06 CB-N#03 31.2000 ft 30.8040 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
' 2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/Exfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
0.3500 ac 0.3327 cf 7.0304 cf 4.5885 ft/s 0.1481 ft
Ent Loss Exit Loss Frict Loss Start TV11
0.163468 ft 0.326937 ft 0.000886 ft 31.4098 ft
Reach ID: SD#07
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
74.0000 ft 0.50 % Square Edge w/Headwall
Diam
PACLAND Project# 1999010.008 Page 51
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
1.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#07 CB-N#03 31.2000 ft 30.8300 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
InlExfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
1.0880 ac 0.9266 cf 2.7366 cf 3.1473 ft/s 0.4011 ft
Ent Loss Exit Loss Frict Loss Start TW
0.076904 ft 0.153809 ft 0.042408 ft 31.4098 ft
Reach ID: SD#08
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
12.0000 ft 0.50 % Square Edge w/Headwall
Diam
1.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#08 CB-N#07 31.3000 ft 31.2400 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/Exfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
0.2970 ac 0.2741 cf 2.7366 cf 2.2289 ff/s 0.2137 ft •
Ent Loss Exit Loss Frict Loss Start TW
0.038573 ft 0.077146 ft 0.000602 ft 31.6827 ft
Reach ID: SD#09
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
140.0000 ft 0.50 °/a Square Edge w/Headwall
Diam
1.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#09 CB-N#07 31.9000 ft 31.2000 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/Exfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
0.7210 ac 0.6037 cf 2.7366 cf 2.7966 ft/s 0.3192 ft
P,ACLAND Project# 1999010.008 Page 52
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Ent Loss Exit Loss Frict Loss Start TVN
0.060721 ft 0.121442 ft 0.034059 ft 31.6827 ft
Reach ID: SD#11
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
58.0000 ft 0.50 % Square Edge w/Headwall
Diam
1.0000 ft
Up Node Dn Nade Up Invert Dn Invert
CB-N#11 CB-N#62 28.4000 ft 28.1100 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/Exfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
1.7199 ac 1.5346 cf 2.7366 cf 3.5839 ft/s 0.5355 ft
Ent Loss Exit Loss Frict Loss Start TW
0.029640 ft 0.059280 ft 0.091169 ft 31.6489 ft
Reach ID: SD#12
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
53.0000 ft 0.50 % Square Edge w/Headwall
Diam �
1.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#12 CB-N#11 28.8000 ft 28.5350 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
- 2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/Exfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
1.5410 ac 1.3664 cf 2.7366 cf 3.4831 ff/s 0.4996 ft
Ent Loss Exit Loss Frict Loss Start TUV
0.023501 ft 0.047002 ft 0.066054 ft 31.7965 ft
Reach ID: SD#13
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
15.0000 ft 0.50 % Square Edge w/Headwall
Diam
PACLAND Project# 1999010.008 Page 53
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
1.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#13 CB-N#59 29.5000 ft 29.4250 ft
Conduit Constraints: !,
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop ',
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft I
In/E�I Hold Up Hold Dn Match Inv Allow Smaller ',
0.0000 in/hr YES YES YES NO I
Conduit Summary: �
Trib Area Flow Capacity Velocity Normal Depth �,
1.1320 ac 1.0279 cf 2.7366 cf 3.2359 ft/s 0.4247 ft �
Ent Loss Exit Loss Frict Loss Start TW
0.081298 ft 0.162595 ft 0.010580 ft 29.9061 ft
Reach ID: SD#14
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
� Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
- Length Slope Entrance Loss
35.0000 ft 0.50 % Square Edge w/Headwall
Diam
1.0000 ft
Up Node Dn Node Up Invert Dn Invert ,
CB-N#14 CB-N#13 29.7000 ft 29.5250 ft !,
Conduit Constraints: '
- Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft '
In/Exfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary: ;
Trib Area Flow Capacity Velocity Normal Depth '
0.9531 ac 0.8598 cf 2.7366 cf 3.0844 ft/s 0.3850 ft • '
Ent Loss Exit Loss Frict Loss Start TW I,
0.073863 ft 0.147726 ft 0.017271 ft 29.9558 ft I
Reach ID: SD#15
Section Properties:
- Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
58.0000 ft 0.50 % Square Edge w/Headwall
Diam
1.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#15 CB-N#14 30.0000 ft 29.7100 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/Exfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
0.3653 ac 0.3099 cf 2.7366 cf 2.3105 ft/s 0.2272 ft
PACLAND Project� 1999010.008 Page 54
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Ent Loss Exit Loss Frict Loss Start TW
0.041446 ft 0.082893 ft 0.003719 ft 30.2223 ft
Reach ID: SD#16
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Cast-Iron, New 0.0120 Mannings Formula
Length Slope Entrance Loss
125.0000 ft 0.50 % Square Edge w/Headwall
Diam
1.00Oa ft
Up Node Dn Node Up Invert Dn Invert
CB-N#16 CB-N#15 30.6000 ft 29.9750 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/Exfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
� Trib Area Flow Capacity Velocity Normal Depth
�- 0.2326 ac 0.1884 cf 2.7366 cf 1.9963 ft/s 0.1777 ft
Ent Loss Exit Loss Frict Loss Start TVII
i 0.030940 ft 0.061881 ft 0.002963 ft 30.2651 ft
Reach ID: SD#17
I` Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
' 61.0000 ft 0.50 % Square Edge w/Headwall
Diam '
1.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#17 CB-N#14 30.0000 ft 29.6950 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
- 2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/Exfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
0.5129 ac 0.4786 cf 2.7366 cf 2.6189 ft/s 0.2830 ft
Ent Loss Exit Loss Frict Loss Start TW
0.053252 ft 0.106503 ft 0.009325 ft 30.2223 ft
Reach ID: SD#18
Section Properties:
Shape: Circular Routing Method: Travel Time Translation '
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
98.0000 ft 0.50 % Square Edge w/Headwall
Diam
PACLAND Project# 1999010.008 Page 55
r
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
1.0000 ft �
Up Node Dn Node Up Invert Dn Invert
CB-N#18 CB-N#17 30.5000 ft 30.0100 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
InlExfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
0.3534 ac 0.3264 cf 2.7366 cf 2.3451 ft/s 0.2332 ft
Ent Loss Exit Loss Frict Loss Start TVV
0.042697 ft 0.085393 ft 0.006968 ft 30.3402 ft
Reach ID: SD#58
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
10.0000 ft 0.50 % Square Edge w/Headwall
Diam
1.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#58 CB-N#62 28.3000 ft 28.2500 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/Exfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
3.1504 ac 2.6735 cf 2.7366 cf 3.9712 ft/s 0.7996 ft •
Ent Loss Exit Loss Frict Loss Start TVU
0.089964 ft 0.179927 ft 0.047709 ft 31.6489 ft
PACLAN D Project# 1999010.008 Page 56
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Node Records
Node ID: CB-N#02
Desc: Type II Catch Basin
Start EI: 29.4000 ft Max EI: 33.0000 ft
Contrib Basin: Contrib Hyd:
Hgl Elev: 30.0931 ft
Struct Type: CB-TYPE 2-48 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 2.0000 ft Bot Area: 12.5664 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.2574 ft
Bend Loss: 0.0068 ft Junction Loss: 0.1087 ft
Node ID: CB-N#03
Desc: Type II -Catch Basin
Start EI: 30.4000 ft Max EI: 33.8000 ft
Contrib Basin: CB-B#03 Contrib Hyd:
Hgl Elev: 31.4098 ft
Struct Type: CB-TYPE 2-48 Classification Catch Basin '
Ke Descrip: CONC: Headwall: square edge;.ke=0.5 '
Catch Depth: 2.0000 ft Bot Area: 12.5664 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.1538 ft
Bend Loss: 0.0012 ft Junction Loss: 0.0393 ft
Node ID: CB-N#06 '
Desc: Type I -Catch Basin '
Start EI: 30.5000 ft Max EI: 33.8000 ft
Contrib Basin: CB-B#06 Contrib Hyd:
Hgl Elev: 31.5070 ft
Struct Type: CB-TYPE 1 Classification Catch Basin •
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 1.4160 ft Bot Area: 3.9700 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.0000 ft
- Node ID: CB-N#07
Desc: Type I -Catch Basin
Start EI: 3�.8000 ft Max EI: 34.4000 ft
Contrib Basin: CB-B#O7 Contrib Hyd:
Hgl Elev: 31.6827 ft
Struct Type: CB-TYPE 1 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 1.4160 ft Bot Area: 3.9700 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.1214 ft
Bend Loss: 0.0006 ft Junction Loss: 0.0376 ft
Node ID: CB-N#08
Desc: Type I -Catch Basin
Start EI: 30.9000 ft Max EI: 34.3000 ft
Contrib Basin: CB-B#08 Contrib Hyd:
Hgl Elev: 31.7990 ft
PACLAND Project# 1999010.008 Page 57
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Struct Type: CB-TYPE 1 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 1.4160 ft Bot Area: 3.9700 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.0000 ft
Node ID: CB-N#09
Desc: Type I -Catch Basin
Start EI: 31.1000 ft Max EI: 34.4000 ft
Contrib Basin: CB-B#09 Contrib Hyd:
Hgl Elev: 32.3438 ft
Struct Type: CB-TYPE 1 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 1.4160 ft Bot Area: 3.9700 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.0000 ft
Node ID: CB-N#11
Desc: Type II -Catch Basin
Start EI: 28.5000 ft Max EI: 32.7000 ft
Contrib Basin: CB-B#11 Contrib Hyd:
Hgl Elev: 31.7965 ft
Struct Type: CB-TYPE 2-48 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 2.0000 ft Bot Area: 12.5664 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.0470 ft
Node ID: CB-N#12
Desc: Headwall/End of pipe
Start EI: 28.8000 ft Max EI: 33.00Oo ft
Contrib Basin: CB-B#12 Contrib Hyd: .
Hgl Elev: 31.9331 ft
Struct Type: CB-TYPE 1 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 1.4160 ft Bot Area: 3.9700 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.0000 ft
Node ID: CB-N#13
Desc: Type II -Catch Basin
Start EI: 29.6000 ft Max EI: 36.5000 ft
Contrib Basin: CB-B#11 Contrib Hyd:
Hgl Elev: 29.9558 ft
Struct Type: CB-TYPE 2-48 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 2.0000 ft Bot Area: 12.5664 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.1477 ft
Node ID: CB-N#14
Desc: Type II - Catch Basin
Start EI: 29.8000 ft Max EI: 36.1000 ft
Contrib Basin: CB-B#14 Contrib Hyd:
PACLAND Project# 1999010.008 Page 58
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA I
Hgl Elev: 30.2223 ft II
Struct Type: CB-TYPE 2-48 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 2.0000 ft Bot Area: 12.5664 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.1065 ft
Bend Loss: 0.0434 ft Junction Loss: 0.0434 ft
Node ID: CB-N#15
Desc: Type I -Catch Basin
Start EI: 30.1000 ft Max EI: 35.5000 ft
Contrib Basin: CB-B#15 Contrib Hyd:
Hgl Elev: 30.2651 ft
Struct Type: CB-TYPE 1 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 1.4160 ft Bot Area: 3.9700 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.0619 ft
Node ID: CB-N#16
Desc: Type I -Catch Basin
Start EI: 30.7000 ft Max EI: 35.7000 ft
Contrib Basin: CB-B#16 Contrib Hyd:
Hgl Elev: 30.8706 ft
Struct Type: CB-TYPE 1 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 1.4160 ft Bot Area: 3.9700 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.0000 ft
Node ID: CB-N#17
Desc: Type I -Catch Basin .
Start EI: 30.1000 ft Max EI: 36.0000 ft
Contrib Basin: CB-B#17 Contrib Hyd:
Hgl Elev: 30.3402 ft
Struct Type: CB-TYPE 1 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 1.4160 ft Bot Area: 3.9700 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.0854 ft
Node ID: CB-N#18
Desc: Type I -Catch Basin
Start EI: 30.6000 ft Max EI: 36.0000 ft
Contrib Basin: CB-B#18 Contrib Hyd:
Hgl Elev: 30.8178 ft
Struct Type: CB-TYPE 1 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 1.4160 ft Bot Area: 3.9700 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.0000 ft
;
Node ID: CB-N#58
Desc: Headwall/ End of Pipe
PACLAND Project# 1999010.008 Page 59
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Start EI: 28.3000 ft Max EI: 32.0000 ft I
Contrib Basin: CB-B#58 Contrib Hyd: ,
Hgl Elev: 31.9664 ft '
Struct Type: CB-TYPE 2-48 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 2.0000 ft Bot Area: 12.5664 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.0001 ft
Node ID: CB-N#59
Desc: Headwall/End of Pipe
Start EI: 29.4500 ft Max EI: 34.0000 ft
Contrib Basin: Contrib Hyd:
Hgl Elev: 29.9061 ft
Struct Type: CB-TYPE 2-48 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 2.0000 ft Bot Area: 12.5664 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.1626 ft
Node ID: CB-N#62
Desc: Type II -Catch Basin
Start EI: 28.800o ft Max EI: 34.0000 ft
Contrib Basin: Contrib Hyd:
Hgl Elev: 31.6489 ft
Struct Type: CB-TYPE 2-48 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 2.0000 ft Bot Area: 12.5664 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.1799 ft
Bend Loss: 0.1150 ft Junction Loss: 0.0670 ft
Node ID: Curb-E
Desc: Curb Scupper
Start EI: 35.0000 ft Max EI: 35.5000 ft
Contrib Basin: Curb Out-E Contrib Hyd:
Hgl Elev: 0.2645 ft
Struct Type: Dummy Classification Storm Dummy
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 0.0000 ft Bot Area: 0.0000 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.0000 ft
Node ID: Curb-W
Desc: Curb Scupper
Start EI: 35.0000 ft Max EI: 35.5000 ft
Contrib Basin: Curb Out-W Contrib Hyd:
Hgl Elev: 1.1257 ft
Struct Type: Dummy Classification Storm Dummy
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 0.0000 ft Bot Area: 0.0000 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.0001 ft
PACLAND Project# 1999010.008 Page 60
Sam's Club #4835-00 Storm Drainage Analysis Renton, WA
Node ID: Ex. CB-N-A
Desc: Existing Headwall/End of Pipe
Start EI: 28.1600 ft Max Ei: 32.1600 ft
Contrib Basin: Contrib Hyd:
Hgl Elev: 30.6000 ft
I Struct Type: CB-TYPE 1 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 1.4160 ft Bot Area: 3.9700 sf
Condition: No particular shape. Status: Existing Structure
Approach Credit: 0.0000 ft
PACLAND Project�k 1999010.008 Page 61
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Contributing Drainage Areas
Drainage Area: CB-B#03
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.0000 ac 90.00 0.00 hrs
Impervious 0.1424 ac 98.00 0.03 hrs
Total 0.1424 ac
Supporting Data:
Impervious CN Data:
Asphalt 98.00 0.1424 ac
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Asphalt 93.00 ft 1.51% 0.0110 1.62 min
Drainage Area: CB-B#06
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.0000 ac 90.00 0.00 hrs
Impervious 0.3500 ac 98.00 0.04 hrs
Total 0.3500 ac
Supporting Data:
Impervious CN Data:
Asphalt 98.00 0.3500 ac
' Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Asphalt 75.00 ft 1.30% 0.0110 1.45 min
Shallow Over Asphalt 184.00 ft 1.10% 27.0000 1.08 min
Drainage Area: CB-B#07
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.0000 ac 90.00 0.00 hrs
Impervious 0.0700 ac 98.00 0.02 hrs j
Total 0.0700 ac I
Supporting Data: II
Impervious CN Data:
Asphalt 98.00 0.0700 ac
Impervious TC Data: �!
Flow type: Description: Length: Slope: Coeff: Travel Time I
Sheet Over Asphalt 56.00 ft 1.10% 0.0110 1.22 min �
Drainage Area: CB-B#08 I!,
Hyd Method: SBUH Hyd Loss Method: SCS CN Number I
Peak Factor. 484.00 SCS Abs: 0.20 �
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC i
Pervious 0.0000 ac 90.00 0.00 hrs '
Impervious 0.2970 ac 98.00 0.06 hrs I
PACLAND Project�# 1999010.008 Page 62
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Total 0.2970 ac
Supporting Data:
Impervious CN Data:
Asphalt 98.00 0.2970 ac
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Asphalt 230.00 ft 1.13% 0.0110 3.75 min
Drainage Area: CB-B#09
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.1787 ac 90.00 0.15 hrs
Impervious 0.5423 ac 98.00 0.09 hrs
Total 0.7210 ac
Supporting Data:
Pervious CN Data:
Landscaping SCS=D 90.00 0.1787 ac
Impervious CN Data:
Asphalt 98.00 0.5423 ac
Pervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Landscaping 34.00 ft 2.00% 0.2400 7.62 min
Sheet Over Asphalt 74.00 ft 1.00% 0.0110 1.59 min
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Asphalt 321.00 ft 1.00% 0.0110 5.14 min
Shallow Over Asphalt 10.00 ft 1.00% 27.0000 0.06 min
Drainage Area: CB-B#11
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20 �
Storm Dur: 24.00 hrs Intv: 10.00 min ,
Area CN TC !i
Pervious 0.0000 ac 90.00 0.00 hrs
Impervious 0.1789 ac 98.00 0.05 hrs
Total 0.1789 ac
- Supporting Data:
Impervious CN Data:
Asphalt 98.00 0.1789 ac
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Asphalt 248.00 ft 2.18% 0.0110 3.Ofi min
Drainage Area: CB-B#12
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC !
� Pervious 0.1290 ac 90.00 0.08 hrs
Impervious 0.2800 ac 98.00 0.08 hrs
Total 0.4090 ac
Supporting Data:
Pervious CN Data:
PACLAND Project# 1999010.008 Page 63
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Landscaping SCS=D 90.00 0.1290 ac
Impervious CN Data:
Asphalt 98.00 02800 ac
Pervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Across Landscaping 42.00 ft 3.00% 0.1300 4.70 min
Impervious TC Data:
_ Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Asphalt 330.00 ft 1.20% 0.0110 4.89 min
Drainage Area: CB-B#14
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.0000 ac 90.00 0.00 hrs
Impervious 0.0749 ac 98.00 0.02 hrs
Total 0.0749 ac
Suppo�ting Data:
Impervious CN Data:
Asphalt 98.00 0.0749 ac
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Asphalt 45.00 ft 1.00% 0.0110 1.07 min
Drainage Area: CB-B#15
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.0260 ac 90.00 0.04 hrs
Impervious 0.1067 ac 98.00 0.03 hrs
Total 0.1327 ac '
� Supporting Data:
I Pervious CN Data:
Landscaping SCS=D 90.00 0.0260 ac
Impervious CN Data:
Asphalt 98.00 0.1067 ac
- Pervious TC Data:
Flow type: Description: Length: Slope: C�eff: Travel Time
Sheet Across Landscaping 10.00 ft 2.00% 0.1300 1.75 min
Shallow Gutter Flow 70.00 ft 1.00% 27.0000 0.43 min
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Asphalt 85.00 ft 1.00% 0.0110 1.78 min
Draina e Area: CB-B#16
9
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
, Pervious 0.1000 ac 90.00 0.14 hrs
�' Impervious 0.1326 ac 98.00 0.03 hrs
Total 0.2326 ac
Supporting Data:
PACLAN D Project# 1999010.008 Page 64
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Pervious CN Data:
Landscaping SCS=D 90.00 0.1000 ac
Impervious CN Data:
Asphalt 98.00 0.1326 ac
Pervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Across Landscaping 65.00 ft 2.00% 0.1300 7.83 min
Shallow Gutter Flow 50.00 ft 1.00% 27.0000 0.31 min
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Asphalt 95.00 ft 1.00°/a 0.0110 1.94 min
Drainage Area: CB-B#17
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious O.OQ00 ac 90.00 0.00 hrs
Impervious 0.1595 ac 98.00 0.02 hrs
Total 0.1595 ac
Supporting Data:
Impervious CN Data:
Asphalt 98.00 0.1595 ac
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Asphalt 80.00 ft 2.50% 0.0110 1.17 min
Drainage Area: CB-B#18
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.0400 ac 90.00 0.11 hrs '
Impervious 0.3134 ac 98.00 0.03 hrs
Total 0.3534 ac
Supporting Data:
Pervious CN Data:
Landscaping SCS=D 90.00 0.0400 ac
Impervious CN Data:
Asphalt 98.00 0.3134 ac
Pervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Across Landscaping 35.00 ft 2.00°/a 0.1300 4.77 min
Sheet Across Pavement 80.00 ft 1.00°/a 0.0110 1.69 min
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Asphalt 80.00 ft 1.00% 0.0110 1.69 min
Drainage Area: CB-B#58
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.5200 ac 90.00 0.12 hrs
Impervious 0.0000 ac 98.00 0.00 hrs
PAC LA N D Proj ect# 1999010.008 Page 65
Sam's Club#4835-00 Storm Drainage Analysis Renton,WA
Total 0.5200 ac
Supporting Data:
Pervious CN Data:
Landscaping SCS=D 90.00 0.5200 ac
Pervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Across Landscaping 56.00 ft 2.00% 0.1300 6.95 min
Drainage Area: Curb Out-E
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.0000 ac 90.00 0.00 hrs
Impervious 0.7700 ac 98.00 0.09 hrs
Total 0.7700 ac
Supporting Data:
Impervious CN Data:
Asphalt 98.00 0.7700 ac
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Asphalt 346.00 ft 1.13% 0.0110 5.20 min
Drainage Area: Curb Out-W
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.0000 ac 90.00 0.00 hrs
Impenrious 0.2800 ac 98.00 0.04 hrs
Total 0.2800 ac
Supporting Data:
I Impervious CN Data: '
Asphalt 98.00 0.2800 ac
Impervious TC Data: I
Flow type: Description: Length: Slope: Coeff: Travel Time I
Sheet Over Asphalt 150.00 ft 1.60% 0.0110 2.32 min
PACLAND Project# 1999010.008 Page 66
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Layout Hydrographs
Hydrograph ID: Ex. CB-N-A - 100 yr
Area: 4.8703 ac Hyd Int: 10.00 min Base Flow:
Pending tt translation: 5.33 min
Peak Flow: 4.2081 cfs Peak Time: 7.83 hrs Hyd Vol: 1.4181 acft
Time Flow Time Flow Time Flow
hr cfs hr cfs hr cfs
0.67 0.0125 8.83 1.4664 16.67 0.5642
0.83 0.0496 9.00 1.4814 16.83 0.5642
1.00 0.0914 9.17 1.2619 17.00 0.5643
1.17 0.1392 9.33 1.0973 17.17 0.5428
1.33 0.1834 9.50 1.1185 17.33 0.5258
1.50 0.2117 9.67 1.0433 17.50 0.5279
1.67 0.2484 9.83 0.9985 17.67 0.5267
1.83 0.2786 10.00 1.0030 17.83 0.5273
2.00 0.2972 10.17 0.9373 18.00 0.5271
2.17 0.3276 10.33 0.8879 18.17 0.5057
2.33 0.3530 10.50 0.8944 18.33 0.4885
2.50 0.3679 10.67 0.8486 18.50 0.4907
2.67 0.3843 10.83 0.8166 18.67 0.4895
2.83 0.3982 11.00 0.8204 18.83 0.4901
3.00 0.4110 11.17 0.7973 19.00 0.4899
3.17 0.4224 11.33 0.7815 19.17 0.4684
3.33 0.4327 11.50 0.7836 19.33 0.4512
3.50 0.4421 11.67 0.7614 19.50 0.4534
3.67 0.4677 11.83 0.7451 19.67 0.4522
3.83 0.4890 12.00 0.7473 19.83 0.4527
4.00 0.4949 12.17 0.7250 20.00 0.4525
4.17 0.5389 12.33 0.7087 20.17 0.4527
4.33 0.5732 12.50 0.7108 20.33 0.4527
4.50 0.5768 12.67 0.6885 20.50 0.4528
4.67 0.6228 12.83 0.6721 20.67 0.4528
4.83 0.6574 13.00 0.6742 20.83 0.4528
5.00 0.6608 13.17 0.6732 21.00 0.4529
5.17 0.7073 13.33 0.6739 21.17 0.4529
5.33 0.7425 13.50 0.6739 21.33 0.4530
5.50 0.7454 13.67 0.6527 21.50 0.4530
5.67 0.7925 13.83 0.6357 21.67 0.4531 •
5.83 0.8279 14.00 0.6380 21.83 0.4531
6.00 0.8303 14.17 0.6369 22.00 0.4532
6.17 0.9172 14.33 0.6376 22.17 0.4316
6.33 0.9839 14.50 0.6375 22.33 0.4144
6.50 0.9823 14.67 0.6162 22.50 0.4165
6.67 1.1133 14.83 0.5992 22.67 0.4152
6.83 1.2122 15.00 0.6014 22.83 0.4158
- 7.00 1.2076 15.17 0.6003 23.00 0.4155
7.17 1.3636 15.33 0.6009 23.17 0.4157
7.33 1.4801 15.50 0.6008 23.33 0.4157
7.50 1.4745 15.67 0.5795 23.50 0.4158
7.67 3.0003 15.83 0.5624 23.67 0.4158
7.83 4.2081 16.00 0.5646 23.83 0.4158
8.00 4.0898 16.17 0.5635 24.00 0.4158
8.17 2.9419 16.33 0.5641 24.17 0.1775
8.33 1.9232 16.50 0.5639 24.33 0.0094
8.50 2.0757 16.67 0.5642 24.50 0.0018
8.67 1.6788 16.83 0.5642 24.67 0.0004
PACLAND Project# 1999010.008 Page 67
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
The "North" Basin
Layout Report: North Side
Project Precips
[2 yr] 2.00 in
[5 yr] 2.90 in
[10 yr] 3.40 in
[25 yr] 3.40 in
[100 yr] 3.90 in
[6 mo] 1.27 in
ROUTEHYD []THRU [North Side] USING TYPE1A AND [100 yr] NOTZERO RELATIVE
Reach Area Flow Full Q %Full nDepth Size nVel fVel CBasin/ Hyd
----- ac cfs cfs ratio ft ---- ftls ftls ------------
SD#65 0.0983 0.0940 3.8701 0.02 0.1074 12"Diam 2.0703 4.9276 CB-B#65
SD#TW 0.1450 0.1388 1.3126 0.11 0.1464 8"Diam 2.4446 3.7604 CB-B#TW
SD#39 0.1565 0.1418 2.7366 0.05 0.1547 12'Diam 1.8354 3.4843 CB-B#39
SD#38 0.2768 0.2518 2.7366 0.09 0.2050 12"Diam 2.1747 3.4843 CB-B#38
SD#37 0.8412 0.6657 2.7366 0.24 0.3359 12"Diam 2.8742 3.4843 CB-B#37
SD#36 1.2382 0.9fi17 2.7366 0.35 0.4093 12"Diam 3.1793 3.4843 CB-B#36
SD#35 1.5602 1.2087 2.7366 0.44 0.4653 12"Diam 3.3762 3.4843 CB-B#35
SD#34 1.8894 1.4593 2.7366 0.53 0.5195 12"Diam 3.5403 3.4843 CB-B#34
SD#33 2.2298 1.7700 2.7366 0.65 0.5854 12"Diam 3.7052 3.4843 CB-B#33
SD#32 2.5304 2.0301 3.8701 0.52 0.5144 12"Diam 4.9868 4.9276 CB-B#32
SD#31 0.0481 0.0460 2.7366 O.o2 0.0902 12"Diam 1.3097 3.4843 CB-B#31
SD#30 0.0951 0.0853 2.7366 0.43 0.1211 12"Diam 1.5759 3.4843 CB-B#30
SD#29 2.6255 2.1154 3.8701 0.55 0.5273 12"Diam 5.0370 4.9276
SD#28 2.7682 2.2519 3.8701 0.58 0.5478 12"Diam 5.1132 4.9276 CB-B#28
Bio"C" 2.7682 2.2519 - 1.00 0.2790 Ditch 1.1807 -
SD#26 3.3862 2.7345 4.9617 0.55 0.6624 15'Diam 4.1414 4.0432 CB-B#26
SD#57 3.1000 2.8453 2.7366 1.04 -1.00Q0 12"Diam 1.0397 3.4843 CB-B#57
SD#25 3.1000 2.8453 3.8701 0.74 0.6373 12"Diam 5.3862 4.9276
SD#24 3.1000 2.8453 156.03 0.02 0.3751 48"Diam 4.7817 12.4167
SD#61 3.1000 2.8453 3.8701 0.74 0.6373 12"Diam 5.3862 4.9276
SD#60 3.1000 2.&453 3.8701 0.74 0.6373 12"Diam 5.3862 4.9276
SD#23 3.1000 2.8453 156.03 0.02 0.3751 48"Diam 4.7817 12.4167
SD#22 3.1000 2.8453 156.03 0.o2 0.3751 48"Diam 4.7817 12.4167 '
SD#21 3.1000 2.8453 7.0169 0.41 0.5540 15"Diam 5.4188 5.7179
SD#20 6.4862 5.5798 4.9617 1.12 -1.0000 15"Diam 1.1246 4.0432
SD#63 0.2329 0.2116 3.8701 0.05 0.1588 12"Diam 2.6368 4.9276 CB-B#63
SD#56 0.2499 0.2356 3.8701 0.06 0.1674 12'Diam 2.7220 4.9276 CB-B#56
SD#55 0.5466 0.5142 3.8701 0.13 0.2462 12"Diam 3.4220 4.9276 CB-B#55
SD#54 0.7323 0.6865 2.7366 0.25 0.3414 12"Diam 2.8991 3.4843 CB-B#54
SD#53 0.8295 0.7775 2.7366 0.28 0.3647 12"Diam 3.0007 3.4843 CB-B#53
SD#64 0.3234 0.2982 3.8701 0.08 0.1878 12"Diam 2.9183 4.9276 CB-B#&4
SD#52 1.2369 1.1554 3.8701 0.30 0.3746 12"Diam 4.3017 4.9276 C&B#52
SD#51 1.6792 1.5605 3.8701 0.40 0.4418 12"Diam 4.6628 4.9276 CB-B#51
SD#50 1.8272 1.6958 3.8701 0.44 0.4632 12"Diam 4.7650 4.9276 CB-B#50
SD#49 0.2287 0.2093 5.1923 0.04 0.1371 12"Diam 3.2295 6.6110 CB-B#43
SD#!48 0.4208 0.3545 3.8701 0.09 0.2045 12"Diam 3.0713 4.9276 CB-B#48
SD#47 0.4208 0.3545 4.0590 0.09 0.1997 12"Diam 3.1765 5.1681
SD#46 0.8113 0.7003 2.7366 0.26 0.3450 12"Diam 2.9151 3.4843 CB-B#46
SD#45 0.8806 0.7545 2.7366 0.28 0.3589 12'Diam 2.9760 3.4843 CB-B#45
SD#44 1.3127 1.1381 8.3026 0.14 0.3126 15"Diam 4.7413 6.7655 CB-B#44
SD#43 3.3686 3.0433 7.0169 0.43 0.5756 15"Diam 5.5146 5.7179 CB-B#43
SD#42 3.3686 3.0433 7.0169 0.43 0.5756 15'Diam 5.5146 5.7179
Bio"B" 3.3686 3.0433 - 1.�0 0.4093 Ditch 1.4223 --
SD#40 3.5096 3.1440 4.9617 0.63 0.7222 15"Diam 4.2796 4.0432 CB-B#40
SD#19 9.9958 8.7238 4.9617 1.76 -1.0000 15"Diam 1.7582 4.0432
PACLAND Project# 1999010.008 Page 68
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
-- - Rch App Bend Junct HW Max EI/
-- -- Loss Head Loss Loss Elev Rim EI
From Node To Node ft R ft ft R ft
Ex.CB-N-B 28.0750
CB-N#19 Ex.CB-N-B 29.4838 0.3210 0.0094 0.1178 29.2901 33.8000
CB-N#20 CB-N#19 30.8399 0.0835 0.0831 0.0449 30.8845 34.0000
CB-N#26 CB-N#20 31.1914 0.0001 0.0002 - 31.1915 33.5000
CB-N#27 CB-N#26 30.0858 0.4060 0.0015 - 29.6813 33.0000
CB-N#28 CB-N#27 30.6950 0.3940 0.0050 0.0145 30.3205 36.2000
CB-N#fi5 CB-N#28 30.4206 - - - 30.4206 35.1000
CB-N#29 CB-N#28 30.9516 0.3862 0.4357 0.0134 31.0146 37.8000
CB-N#32 CB-N#29 31.7246 0.0789 0.0969 - 31.7426 37.000�
CB-N#33 CB-N#32 32.0428 -- - - 32.0428 37.2500
CB-N#TW CB-N#33 34.4290 - - - 34.4290 36.0000
CB-N#34 CB-N#33 33.0114 0.1770 0.0037 - 32.8381 38.0000
CB-N#35 CB-N#34 33.4308 0.1570 0.0028 ----- 33.2766 38.0000
CB-N�i36 CB-N#35 33.7784 0.1283 0.0032 --- 33.6534 38.0000
CB-N#37 CB-N#36 34.1687 0.0734 0.0011 - 34.0963 38.0000
CB-N�i38 CB-N#37 34.6769 - - - 34.6769 38.0000
CB-N#39 CB-N#38 35.0332 -- --- -- 35.0332 37.8000
CB-N#30 CB-N#29 31.0727 0.0266 0.0004 -- 31.0465 37.4000
CB-N#31 CB-N#30 31.1302 -- - - 31.1302 34.0000
CB-N#21 CB-N#20 31.0475 0.3550 0.3424 - 31.0348 35.6000
CB-N#E22 CB-N#21 31.5679 0.3550 0.0018 - 31.2147 38.7000
CB-N#t23 CB-N#22 32.0327 0.4505 0.0016 - 31.5838 37.7000
CB-N#60 CB-N#23 33.1870 0.2038 0.0008 - 32.9839 37.7000
CB-N#61 CB-N#60 33.3707 0.3550 0.0016 - 33.0172 37.7000
CB-N#24 CB-N#61 33.4327 0.4505 0.0020 - 32.9842 38.5000
CB-N#25 CB-N#24 34.7870 0.2038 0.0012 - 34.5844 38.4000
CB-N#57 CB-N#25 36.1113 - - - 36.1113 38.4000
CB-N#40 CB-N#19 29.6176 0.0004 0.0000 -- 29.6172 33.0000
CB-N#41 CB-N#40 29.3766 0.4722 0.6369 ---- 29.5413 33.0000
CB-N#d2 CB-N#41 30.2778 0.0955 0.0007 - 30.1830 32.5000
CB-N#43 CB-N#42 30.3450 0.0724 0.0005 0.0303 30.3034 32.0000
CB-N#50 CB-N#d3 30.5349 0.0613 0.0007 - 30.4743 33.9000
CB-N#51 CB-N#50 30.7753 0.2873 0.0065 0.0406 30.5351 34.3000
CB-N#63 CB-N#51 30.7501 - - - 30.7501 34.0000
CB-N#52 CB-N#51 31.4426 0.1398 0.0010 0.0377 31.3415 35.3000
CB-N#53 CB-N#52 31.6116 0.1305 0.0006 -- 31.4816 36.2000
CB-N#54 CB-N#53 31.7768 0.1818 0.1820 - 31.7770 34.3000 .
CB-N#55 CB-N#54 32.2037 0.1150 0.1159 - 32.2046 36.0000
i CB-N#56 CB-N#55 32.5648 - - - 32.5648 36.5000
; CB-N#64 CB-N#52 31.6003 - - - 31.6003 34.1000
- ' CB-N#-0d CB-N#43 30.3351 0.0143 0.0095 0.0029 30.3332 31.4000
CB-N#49 CB-N#44 30.4447 - - - 30.4447 33.2000
CB-N#45 CB-N#44 30.3604 0.0123 0.0001 -- 30.3481 32.3000
CB-N#46 CB-N#45 30.3833 0.1567 0.0021 -- 30.2287 31.4000
- CB-N#47 CB-N#46 31.6291 0.1465 0.0009 - 31.4836 33.1000
CB-N#48 CB-N#47 32.2296 - -- -- 32.2296 32.8000
PACLAND Project a`- 1999010.008 Page 69
CB-N�t49 CB-N#44 CB-N#45 CB-N#46 CB-N#-07 CB-N#t48
Y.
� n �
,,, „ �. i�i.,
�Q �
CB-N#41 CB-N�t42 CB- 43 CB-N#50 CB-N#51 CB-N#52 CB-N#53 CB-N#54
�
� � 3 S 4 55
�iQl��g�� -N#63 -N#64 B-N#55 CB-N#56
C��N#40 �""�
CB-Ntt21 CB-N#22 CB-N#23 CB-N#60 CB-N#61 CB-N#24
CB-N�25 CB-N#57 '
SD 40 SD 21 �
Ex. CB-N-B #19 C #20
;,
S 6
C -N#26 CB-N#27 CB-N#28 CB-N�t29 CB-N#30 CB-N#31 '
� ����
S 5 S 2
C -N#65 C -N#t32 CB-N#t33 CB-N#34 �g-N#35 �B-�#3� CB-N#37 CB-N#38
CB-N#39 .
S
C N#TW
;
30.445 ft 30.333 ft 30.348 ft 30.229 ft 31.484 ft 32.230 ft
��,-.. -.
y.1 cfs
29.541 ft 30.y 83 ft 30. ft 30.474 ft 30.535 ft 31.341 ft 31.482 ft 31.777 ft
�
I 0. cfs 0.' s U. cfs
3.0� cfs 3 .750 ft 3 .600 ft 2.205 ft 32.565 ft
�f�..
29�.�17 ft 31.035 R � 'I
3 1.2 1 5 ft 3 1.5 8 A ft 3 2.9 8 4 ft 33.017 ft 32.984 ft '
34.58-0 ft 36.11�I ft !
r
3.1 cfs 2.8 cfs ��~
28.075ft 2 90ft 3 4ft
� �
2. cfs
31 191 ft 29.681 ft 30.321 ft 31.015 ft 31.046 ft 31.130 ft
2�.�fs ' s
0. s 2. fs
3 421 ft 31 743 h 32.043 ft 32.838 ft 33,z77 fit 33.653 ft 34.096 ft 34.677 ft
35.033 ft
0. fs
34 429 ft
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA ',
Reach Records II
Reach ID: Bio "B"
Section Properties:
Shape: Ditch Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By '
Conc-Steel Form 0.0350 Mannings Formula
Length Slope Entrance Loss
220.0000 ft 0.50 % '
Width Bank Hgt ss1 ss2 '
4.0000 ft 2.0000 ft 3.00h:1 v 3.00h:1 v �
Up Node Dn Node Up Invert Dn Invert '�
CB-N#41 CB-N#40 28.3000 ft 27.2000 ft
Conduit Constraints: '�
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/Exfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth '
3.3686 ac 3.0433 cf 3.0433 cf 1.4223 ft/s 0.4093 ft '
Ent Loss Exit Loss Frict Loss Start TVV
0.000000 ft 0.000000 ft 0.000000 ft 29.6172 ft
Reach ID: Bio "C"
Section Properties:
Shape: Ditch Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
Conc-Steel Form 0.0350 Mannings Formula
Length Slope Entrance Loss
145.0000 ft 0.50 %
Width Bank Hgt ss1 ss2 ,
6.0000 ft 2.0000 ft 3.00h:1 v 3.00h:1 v
Up Node Dn Node Up Invert Dn Invert
CB-N#27 CB-N#26 29.4000 ft 28.6750 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
� In/Exfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
2.7682 ac 2.2519 cf 2.2519 cf 1.1807 ft/s 0.2790 ft
Ent Loss Exit Loss Frict Loss Start TW
0.000000 ft 0.000000 ft 0.000000 ft 31.1915 ft
Reach ID: SD#19
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
15" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
15.0000 ft 0.50 % Square Edge w/Headwall
Diam
1.2500 ft
PACLAND Project� 1999010.008 Page 70
Sam's Club#4835-00 Storm Drainage Analysis Renton,WA
Up Node Dn Node Up Invert Dn Invert
CB-N#19 Ex. CB-N-B 26.9000 ft 26.8250 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/Exfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
9.9958 ac 8.7238 cf 4.9617 cf 1.7582 ftls -1.0000 ft
Ent Loss Exit Loss Frict Loss Start TV1/
0.392353 ft 0.784707 ft 0.231789 ft 28.0750 ft
comment: Hydrograph shifted 10.00 min,0.00 min forwarded.Submerged or overtop bank cond
Reach ID: SD#20
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
15" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
169.0000 ft 0.50 °/a Square Edge w/Headwall
Diam
1.2500 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#20 CB-N#19 27.7000 ft 26.8550 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/Exfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
6.4862 ac 5.5798 cf 4.9617 cf 1.1246 ft/s -1.0000 ft •
Ent Loss Exit Loss Frict Loss Start TW
0.160509 ft 0.321018 ft 1.068342 ft 29.2901 ft
comment: Hydrograph not shifted, 9.86 min forwarded.Submerged or overtop bank condition.
Reach ID: SD#21
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
15" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
23.0000 ft 1.00 % Square Edge w/Headwall
Diam
1.2500 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#21 CB-N#20 28.1000 ft 27.8700 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/Exfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
PACLAND Project# 1999010.008 Page 71
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
3.1000 ac 2.8453 cf 7.0169 cf 5.4188 ftls 0.5540 ft
Ent Loss Exit Loss Frict Loss Start TW
0.041736 ft 0.083471 ft 0.037806 ft 30.8845 ft
Reach ID: SD#22
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
48" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
145.0000 ft 1.00 % Square Edge w/Headwall
Diam
4.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#22 CB-N#21 29.6000 ft 28.1500 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/Exfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
3.1000 ac 2.8453 cf 156.0324 cf 4.7817 ft/s 0.3751 ft
Ent Loss Exit Loss Frict Loss Start TW
0.177522 ft 0.355044 ft 0.000482 ft 31.0348 ft
Reach ID: SD#23
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
48" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
186.0000 ft 1.00 % Square Edge w/Headwall �
Diam
4.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#23 CB-N#22 31.4000 ft 29.5400 ft
Conduit Constraints:
� Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/E�l Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
3.1000 ac 2.8453 cf 156.0324 cf 4.7817 ft/s 0.3751 ft
Ent Loss Exit Loss Frict Loss Start TW
0.177522 ft 0.355a44 ft 0.000618 ft 31.2147 ft
Reach ID: SD#24
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
48" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
72.0000 ft 1.00 °/a Square Edge w/Headwall
PACLAND Project# 1999010.008 Page 72
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Diam
4.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#24 CB-N#61 32.8000 ft 32.0800 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/Exfil Hold Up Hold Dn Match Inv Atlow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
3.1000 ac 2.8453 cf 156.0324 cf 4.7817 ft/s 0.3751 ft
Ent Loss Exit Loss Frict Loss Start TV1l
0.177522 ft 0.355044 ft 0.000239 ft 33.0172 ft
Reach ID: SD#25
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
79.0000 ft 1.00 % Square Edge w/Headwall
Diam
1.0000 ft
Up Node Dn Node Up Invert Dn Invert ,
CB-N#25 CB-N#24 33.6000 ft 32.8100 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/Exfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 inlhr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth • '
3.1000 ac 2.8453 cf 3.8701 cf 5.3862 ft/s 0.6373 ft '
Ent Loss Exit Loss Frict Loss Start TVN
0.225240 ft 0.450479 ft 0.426886 ft 33.5332 ft
Reach ID: SD#26
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
15" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
126.0000 ft 0.50 % Square Edge w/Headwall
Diam
1.2500 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#26 CB-N#20 28.5000 ft 27.8700 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/E�I Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
PACLAND Project# 1999010.008 Page 73
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
3.3862 ac 2.7345 cf 4.9617 cf 4.1414 ft/s 0.6624 ft
Ent Loss Exit Loss Frict Loss Start TV11
0.038551 ft 0.077101 ft 0.191304 ft 30.8845 ft
Reach ID: SD#28
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
43.0000 ft 1.00 % Square Edge w/Headwall
Diam
1.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#28 CB-N#27 29.7000 ft 29.2700 ft
Conduit Constraints: "
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/E�l Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
2.7682 ac 2.2519 cf 3.8701 cf 5.1132 ft/s 0.5478 ft
Ent Loss Exit Loss Frict Loss Start TW
0.202988 ft 0.405976 ft 0.145554 ft 29.9118 ft
Reach ID: SD#29
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
29.0000 ft 1.00 % Square Edge w/Headwall �
Diam
1.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#29 CB-N#28 30.0000 ft 29.7100 ft
Conduit Constraints:
- Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/Exfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
2.6255 ac 2.1154 cf 3.8701 cf 5.0370 ft/s 0.5273 ft
Ent Loss Exit Loss Frict Loss Start TW
0.196984 ft 0.393967 ft 0.086620 ft 30.3313 ft
Reach ID: SD#30
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
116.0000 ft 0.50 % Square Edge w/Headwall
PACLAND Project ,# 1999010.008 Page 74
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Diam
1.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#30 CB-N#29 30.6000 ft 30.0200 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
InlExfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
0.0951 ac 0.0853 cf 2.7366 cf 1.5759 ft/s 0.1211 ft
Ent Loss Exit Loss Frict Loss Start TW
0.019281 ft 0.038561 ft 0.000563 ft 31.0146 ft
Reach ID: SD#31
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss ,
83.0000 ft 0.50 % Square Edge w/Headwall I
Diam
1.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#31 CB-N#30 31.0000 ft 30.5850 ft
Conduit Constraints: '�
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop ��
2.0000 ft 15.0000 ft 3.0000 ft 0.5�00 ft 2.0000 ft 0.0000 ft
In/Exfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary: '
Trib Area Flow Capacity Velocity Normal Depth • '�,
0.0481 ac 0.0460 cf 2.7366 cf 1.3097 ft/s 0.0902 ft
Ent Loss Exit Loss Frict Loss Start TW
0.013318 ft 0.026636 ft 0.000117 ft 31.0465 ft
Reach ID: SD#32
- Section Properties: '
Shape: Circular Routing Method: Travel Time Translation
, Size Material Mannings n Hyd params By
12" Diam Conc-Steel F�rm 0.0120 Mannings Formula
Length Slope Entrance Loss
76.0000 ft 1.00 % Square Edge w/Headwall
Diam
1.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#32 CB-N#29 30.8000 ft 30.0400 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/Exfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
PACLAND Project# 1999010.008 Page 75
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
2.5304 ac 2.0301 cf 3.8701 cf 4.9868 ft/s 0.5144 ft
Ent Loss Exit Loss Frict Loss Start TV1l
0.193076 ft 0.386152 ft 0.209076 ft 31.0146 ft
Reach ID: SD#33
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
87.0000 ft 0.50 % Square Edge w/Headwall
Diam
1.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#33 CB-N#32 30.4000 ft 29.9650 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/E�I Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
' 2.2298 ac 1.7700 cf 2.7366 cf 3.7052 ft/s 0.5854 ft
Ent Loss Exit Loss Frict Loss Start TW
0.039431 ft 0.078861 ft 0.181924 ft 31.7426 ft
Reach ID: SD#34
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
' Length Slope Entrance Loss
109.0000 ft 0.50 % Square Edge w/Headwall '
Diam
1.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#34 CB-N#33 32.2000 ft 31.6550 ft
Conduit Constraints:
- Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
InlExfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
1.8894 ac 1.4593 cf 2.7366 cf 3.5403 ft/s 0.5195 ft
Ent Loss Exit Loss Frict Loss Start TW
0.097312 ft 0.194623 ft 0.154936 ft 32.1745 ft
Reach ID: SD#35
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
101.0000 ft 0.50 °/a Square Edge w/Headwall
P,ACLAND Project# 1999010.008 Page 76
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Diam
1.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#35 CB-N#34 32.7000 ft 32.1950 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/Exfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
1.5602 ac 1.2087 cf 2.7366 cf 3.3762 ft/s 0.4653 ft
Ent Loss Exit Loss Frict Loss Start TVII
0.088499 ft 0.176998 ft 0.098487 ft 32.8381 ft
Reach ID: SD#36
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
100.0000 ft 0.50 % Square Edge w/Headwall
Diam
1.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#36 CB-N#35 33.2000 ft 32.7000 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/Exfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth •
1.2382 ac 0.9617 cf 2.7366 cf 3.1793 ft/s 0.4093 ft
Ent Loss Exit Loss Frict Loss Start TW
0.078477 ft 0.156954 ft 0.061738 ft 33.2766 ft
Reach ID: SD#37
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
100.0000 ft 0.50 % Square Edge w/Headwall
Diam
1.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#37 CB-N#36 33.7000 ft 33.2000 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/E�l Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
PACLAND Project# 1999010.008 Page 77
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
0.8412 ac 0.6657 cf 2.7366 cf 2.8742 ft/s 0.3359 ft
Ent Loss Exit Loss Frict Loss Start TVII
0.064137 ft 0.128275 ft 0.029584 ft 33.6534 ft
Reach ID: SD#38
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
135.0000 ft 0.50 % Square Edge w/Headwall
Diam
1.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#38 CB-N#37 34.4000 ft 33.7250 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/E�I Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
0.2768 ac 0.2518 cf 2.7366 cf 2.1747 ft/s 0.2050 ft
Ent Loss Exit Loss Frict Loss Start TV11
0.036718 ft 0.073436 ft 0.005715 ft 34.0963 ft
Reach ID: SD#39
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
85.0000 ft 0.50 % Square Edge w/Headwall �
Diam
1.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#39 CB-N#38 34.8000 ft 33.1750 ft
Conduit Constraints:
- Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/Exfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
0.1565 ac 0.1418 cf 2.7366 cf 1.8354 ft/s 0.1547 ft
Ent Loss Exit Loss Frict Loss Start TVV
0.026155 ft 0.052310 ft 0.001141 ft 34.6769 ft
Reach ID: SD#40
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
15" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
87.0000 ft 0.50 % Square Edge w/Headwall
PACLAND Project# 1999010.008 Page 78
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Diam
1.2500 ft
Up Node Dn Node Up invert Dn Invert
CB-N#40 CB-N#19 27.3000 ft 26.8650 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/Exfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
3.5096 ac 3.1440 cf 4.9617 cf 4.2796 ft/s 0.7222 ft
Ent Loss Exit Loss Frict Loss Start TVV
0.050961 ft 0.101922 ft 0.174614 ft 292901 ft
Reach ID: SD#42
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
15" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
15.0000 ft 1.00 °/a Square Edge w/Headwall
Diam
1.2500 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#42 CB-N#41 28.5000 ft 28.3500 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/E�l Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth •
3.3686 ac 3.0433 cf 7.0169 cf 5.5146 ft/s 0.5756 ft
Ent Loss Exit Loss Frict Loss Start TW
0.236109 ft 0.472218 ft 0.028207 ft 29.5413 ft
Reach ID: SD#43
- Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
15" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
10.0000 ft 1.00 % Square Edge w/Headwall
Diam
1.2500 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#43 CB-N#42 28.6000 ft 28.5000 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/Exfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
PACLAND Project� 1999010.008 Page 79
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
3.3686 ac 3.0433 cf 7.0169 cf 5.5146 ft/s 0.5756 ft
Ent Loss Exit Loss Frict Loss Start TUN
0.047747 ft 0.095495 ft 0.018805 ft 30.1830 ft
Reach ID: SD#44
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
15" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
44.0000 ft 1.40 % Square Edge w/Headwall
Diam
1.2500 ft
Up Node Dn Node Up Invert Dn Invert
' CB-N#44 CB-N#43 29.2000 ft 28.5840 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop I
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/Exfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
1.3127 ac 1.1381 cf 8.3026 cf 4.7413 ft/s 0.3126 ft
Ent Loss Exit Loss Frict Loss Start TW
0.006678 ft 0.013356 ft 0.011572 ft 30.3034 ft
Reach ID: SD#45
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
15.0000 ft 0.50 % Square Edge w/Headwall '
Diam
1.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#45 CB-N#44 29.3000 ft 29.2250 ft
Conduit Constraints:
- Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/Exfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
0.8806 ac 0.7545 cf 2.7366 cf 2.9760 ft/s 0.3589 ft
Ent Loss Exit Loss Frict Loss Start TW
O.d07166 ft 0.014331 ft 0.005700 ft 30.3332 ft
Reach ID: SD#46
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
51.0000 ft 0.50 °/a Square Edge w/Headwall
PACL,AND Project# 1999010.008 Page 80
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Diam
1.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#46 CB-N#45 29.6000 ft 29.3450 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/E�I Hold Up Hold Dn Match Inv Allow Smaller
0.0000 inlhr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
0.8113 ac 0.7003 cf 2.7366 cf 2.9151 ft/s 0.3450 ft
Ent Loss Exit Loss Frict Loss Start TW
0.006174 ft 0.012347 ft 0.016697 ft 30.3481 ft
Reach ID: SD#47
Section Properties: �
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
; Length Slope Entrance Loss
157.0000 ft 1.10 % Square Edge w/Headwall
. Diam
, 1.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#47 CB-N#46 31.3000 ft 29.5730 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/E�l Hold Up Hold Dn Match Inv Allow Smaller
0.0000 inlhr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
0.4208 ac 0.3545 cf 4.0590 cf 3.1765 ft/s 0.1997 ft
Ent Loss Exit Loss Frict Loss Start TW
0.078339 ft 0.156fi78 ft 0.013167 ft 30.2287 ft
Reach ID: SD#48
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
59.0000 ft 1.00 °/a Square Edge w/Headwall
Diam
1.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#48 CB-N#47 31.9000 ft 31.3100 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/E�I Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
PACLAND Project# 1999010.008 Page 81
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
0.4208 ac 0.3545 cf 3.8701 cf 3.0713 ft/s 0.2045 ft
Ent Loss Exit Loss Frict Loss Start TVI!
0.073235 ft 0.146469 ft 0.004948 ft 31.5556 ft
Reach ID: SD#49
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance L�ss
56.0000 ft 1.80 % Square Edge w/Headwall
Diam
1.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#43 CB-N#42 30.2000 ft 29.1920 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop �
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/Exfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
I . 0.2287 ac 0.2093 cf 5.1923 cf 3.2295 ft/s 0.1371 ft
Ent Loss Exit Loss Frict Loss Start TW
0.000552 ft 0.001103 ft 0.001638 ft 30.3332 ft
Reach ID: SD#50
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
64.0000 ft 1.00 % Square Edge w/Headwall
Diam
1.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#50 CB-N#43 29.2000 ft 28.5600 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/E�l Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
1.8272 ac 1.6958 cf 3.8701 cf 4.7650 ft/s 0.4632 ft
Ent Loss Exit Loss Frict Loss Start TW
0.036197 ft 0.072394 ft 0.122854 ft 30.3034 ft
Reach ID: SD#51
Section Properties:
Shape: Circular Routing Meth�d: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
75.0000 ft 1.00 % Square Edge w/Headwall
PACLAND Project# 1999010.008 Page 82
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Diam
1.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#51 CB-N#50 30.0000 ft 29.2500 ft
Conduit Constraints:
Min Ve► Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
InlE�l Hold Up Hold Dn Match Inv Allow Smaller
0.0000 inlhr YES YES YES NO
_ Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
1.6792 ac 1.5fi05 cf 3.8701 cf 4.6628 ft/s 0.4418 ft
Ent Loss Exit Loss Frict Loss Start TVN
0.030649 ft 0.061299 ft 0.121905 ft 30.4743 ft
Reach ID: SD#52
Section Properties: �
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
72.0000 ft 1.00 % Square Edge w/Headwall
. Diam
1.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#52 CB-N#51 30.8000 ft 30.0800 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
, 2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/Exfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
12369 ac 1.1554 cf 3.8701 cf 4.3017 ft/s 0.3746 ft
Ent Loss Exit Loss Frict Loss Start TV11
0.143670 ft 0.287340 ft 0.064161 ft 30.5351 ft
Reach ID: SD#53
, Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
75.0000 ft 0.50 % Square Edge w/Headwall
Diam
1.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#53 CB-N#52 31.1000 ft 30.7250 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/E�I Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
PACLAND Project# 1999010.008 Page 83
Sam's Club#4835-00 Storm Drainage Rnalysis Renton,WA
0.8295 ac 0.7775 cf 2.7366 cf 3.0007 ft/s 0.3647 ft
Ent Loss Exit Loss Frict Loss Start TVV
0.069910 ft 0.139819 ft 0.030265 ft 31.3415 ft
Reach ID: SD#54
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
52.0000 ft 0.50 % Square Edge w/Headwall
Diam
1.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#54 CB-N#53 31.3000 ft 31.0400 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop �
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/Exfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
. 0.7323 ac 0.6865 cf 2.7366 cf 2.8991 ft/s 0.3414 ft
Ent Loss Exit Loss Frict Loss Start TW
0.065255 ft 0.130510 ft 0.016358 ft 31.4816 ft
Reach ID: SD#55
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
44.0000 ft 1.00 °/a Square Edge w/Headwall
Diam
1.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#55 CB-N#54 31.8000 ft 31.3600 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/Exfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
0.5466 ac 0.5142 cf 3.8701 cf 3.4220 ft/s 0.2462 ft
Ent Loss Exit Loss Frict Loss Start TV1/
0.090917 ft 0.181834 ft 0.007767 ft 31.7770 ft I
Reach ID: SD#56
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Cono-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
59.0000 ft 1.00 % Square Edge w/Headwall
PACLAND Project# 1999010.008 Page 84
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Diam
1.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#56 CB-N#55 32.3000 ft 31.7100 ft
Conduit Constraints:
Min Vel Max Ve� Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/E�l Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
0.2499 ac 0.2356 cf 3.8701 cf 2.7220 ft/s 0.1674 ft
Ent Loss Exit Loss Frict Loss Start TW
0.057524 ft 0.115048 ft 0.002186 ft 32.2046 ft
Reach ID: SD#57
Section Properties: � I�
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
320.0000 ft 0.50 % Square Edge w/Headwall I
. Diam
1.0000 ft '
Up Node Dn Node Up Invert Dn Invert
CB-N#57 CB-N#25 35.2000 ft 33.6000 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft I
In/E�I Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary: '
Trib Area Flow Capacity Velocity Normal Depth
3.1000 ac 2.8453 cf 2.7366 cf 1.0397 ft/s -1.0000 ft
Ent Loss Exit Loss Frict Loss Start TW ,
0.008393 ft 0.016786 ft 1.729158 ft 34.6000 ft
comment: Hydrograph not shifted, 5.13 min forwarded.Submerged or overtop bank condition.
Reach ID: SD#60
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
53.0000 ft 1.00 % Square Edge w/Headwall
Diam
1.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#60 CB-N#23 32.0000 ft 31.4700 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/Exfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
PACLAND Project# 1999010.008 Page 85
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Trib Area Flow Capacity Velocity Normal Depth
3.1000 ac 2.8453 cf 3.8701 cf 5.3862 ft/s 0.6373 ft
Ent Loss Exit Loss Frict Loss Start TW
0.225240 ft 0.450479 ft 0.286392 ft 32.1932 ft
Reach ID: SD#61
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
15.0000 ft 1.00 °/a Square Edge w/Headwalf
Diam
1.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#61 CB-N#60 32.1000 ft 31.9500 ft
Conduit Constraints: �
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/Exfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
, Trib Area Flow Capacity Velocity Normal Depth
3.1000 ac 2.8453 cf 3.8701 cf 5.3862 ft/s 0.6373 ft
Ent Loss Exit Loss Frict Loss Start TVN
0.101894 ft 0.203788 ft 0.081054 ft 32.9839 ft
Reach ID: SD#63
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
54.0000 ft 1.00 % Square Edge w/Headwall
Diam
1.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#63 CB-N#51 30.5000 ft 29.9600 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/Exfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary: I
Trib Area Flow Capacity Velocity Normal Depth
0.2329 ac 0.2116 cf 3.8701 cf 2.6368 ft/s 0.1588 ft
Ent Loss Exit Loss Frict Loss Start TV1l
0.053981 ft 0.107963 ft 0.001614 ft 30.5351 ft
Reach ID: SD#64
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula �
Length Slope Entrance Loss
PACLAND Project# 1999010.008 Page 86
Sam's Club#4835-00 Storm Drainage Analysis Renton,WA
54.0000 ft 1.00 % Square Edge w/Headwall
Diam
1.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#64 CB-N#52 31.3000 ft 30.7600 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/E�I Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
0.3234 ac 0.2982 cf 3.8701 cf 2.9183 ft/s 0.1878 ft
Ent Loss Exit Loss Frict Loss Start TVN
0.066122 ft 0.132245 ft 0.003205 ft 31.3415 ft
Reach ID: SD#65 -
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
12" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
, 34.0000 ft 1.00 °/a Square Edge w/Headwall
Diam
1.0000 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#65 CB-N#28 30.1000 ft 29.7600 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/Exfil Hold Up Hold Dn Match Inv Allow Smaller
0.0000 in/hr YES YES YES NO
Conduit Summary:
Trib Area Flow Capacity Velocity Normal Depth
0.0983 ac 0.0940 cf 3.8701 cf 2.0703 ftls 0.1074 ft
Ent Loss Exit Loss Frict Loss Start TVN
0.033279 ft 0.066558 ft 0.000201 ft 30.3205 ft
Reach ID: SD#TW
Section Properties:
Shape: Circular Routing Method: Travel Time Translation
Size Material Mannings n Hyd params By
8" Diam Conc-Steel Form 0.0120 Mannings Formula
Length Slope Entrance Loss
60.0000 ft 1.00 % Square Edge w/Headwall
Diam ��,
0.6667 ft
Up Node Dn Node Up Invert Dn Invert
CB-N#TW CB-N#33 34.2000 ft 33.6000 ft
Conduit Constraints:
Min Vel Max Vel Min Cov Min Slope Max Slope Min drop
2.0000 ft 15.0000 ft 3.0000 ft 0.5000 ft 2.0000 ft 0.0000 ft
In/E�l Hold Up Hold Dn Match Inv Allow Smaller '
0.0000 in/hr YES YES YES NO
Conduit Summary:
PACLAND Project# 1999010.008 Page 87
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Trib Area Flow Capacity Velocity Normal Depth
0.1450 ac 0.1388 cf 1.3126 cf 2.4446 ft/s 0.1464 ft
Ent Loss Exit Loss Frict Loss Start TW
0.046399 ft 0.092798 ft 0.006711 ft 33.7706 ft
Node Records
Node ID: CB-N#19
Desc: Type II -Catch Basin
Start EI: 26.9000 ft Max EI: 33.8000 ft
Contrib Basin: Contrib Hyd:
Hgl Elev: 29.2901 ft
Struct Type: CB-TYPE 2-48 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 2.0000 ft Bot Area: 12.5664 sf
Condition: No particular shape. Status: Proposed Structure '
Approach Credit: 0.3210 ft
Bend Loss: 0.0094 ft Junction Loss: 0.1178 ft
Node ID: CB-N#20
Desc: Type II - Catch Basin
Start EI: 27.9000 ft Max EI: 34.0000 ft
Contrib Basin: Contrib Hyd:
Hgl Elev: 30.8845 ft
Struct Type: CB-TYPE 2-48 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 2.0000 ft Bot Area: 12.5664 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.0835 ft
Bend Loss: 0.0831 ft Junction Loss: 0.0449 ft
Node ID: CB-N#21
Desc: Type II -96"Catch Basin w/FCS
Start EI: 28.1000 ft Max EI: 35.6000 ft
Contrib Basin: Contrib Hyd:
Hgl Elev: 31.0348 ft
Struct Type: CB-TYPE 2-96 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 2.0000 ft Bot Area: 50.2650 sf ,
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.3550 ft
Node ID: CB-N#22
Desc: Type II -96"Catch Basin
Sta�t EI: 29.6000 ft Max EI: 38.7000 ft
Contrib Basin: Contrib Hyd:
Hgl Elev: 31.2147 ft
Struct Type: CB-TYPE 2-96 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 2.0000 ft Bot Area: 50.2650 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.3550 ft
Node ID: CB-N#23
PACLAND Project#, 1999010.008 Page 88
Sam's Club#4835-00 5torm Drainage Analysis Renton, WA
Desc: Type I I -96"Catch Basin
Start EI: 31.4000 ft Max EI: 37.7000 ft
Contrib Basin: Contrib Hyd:
Hgl Elev: 31.5838 ft
Struct Type: CB-TYPE 2-96 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 2.0000 ft Bot Area: 50.2650 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.4505 ft
Node ID: CB-N#24
Desc: Type II -96"Catch Basin
Start EI: 32.8000 ft Max EI: 38.5000 ft
Contrib Basin: Contrib Hyd:
Hgl Elev: 32.9842 ft
Struct Type: CB-TYPE 2-96 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5 �
Catch Depth: 2.0000 ft Bot Area: 50.2650 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.4505 ft
Node ID: CB-N#25
• Desc: Type I -Catch Basin
Start EI: 33.6000 ft Max EI: 38.4000 ft
Contrib Basin: Contrib Hyd:
Hgl Elev: 34.5844 ft
Struct Type: CB-TYPE 1 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 1.4160 ft Bot Area: 3.9700 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.2038 ft
Node ID: CB-N#26
Desc: Headwall/ End of pipe
I Start EI: 28.5000 ft Max EI: 33.5000 ft
Contrib Basim CB-B#26 Contrib Hyd:
Hgl Elev: 31.1915 ft
Struct Type: CB-TYPE 1 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 1.4160 ft Bot Area: 3.9700 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.0001 ft
Node ID: CB-N#27
Desc: Headwall/ End of pipe
Start EI: 29.3000 ft Max EI: 33.0000 ft
Contrib Basin: Contrib Hyd:
Hgl Elev: 29.6813 ft
Struct Type: CB-TYPE 1 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 1.4160 ft Bot Area: 3.9700 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.4060 ft
PACLAND Project# 1999010.008 Page 89
(
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Node ID: CB-N#28
Desc: Type I -Catch Basin
Start EI: 29.7000 ft Max EI: 36.2000 ft
Contrib Basin: CB-B#28 Contrib Hyd:
' Hgl Elev: 30.3205 ft
Struct Type: CB-TYPE 1 Class�cation Catch Basin
Ke Descrip: CONC: Headwall:square edge;.ke=0.5
Catch Depth: 1.4160 ft Bot Area: 3.9700 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.3940 ft
Bend Loss: 0.0050 ft Junction Loss: 0.0145 ft
Node ID: CB-N#29
Desc: Type I -Catch Basin
Start EI: 30.0000 ft Max EI: 37.8000 ft
Contrib Basin: Contrib Hyd:
Hgl Elev: 31.0146 ft �
Struct Type: CB-TYPE 1 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 1.4160 ft Bot Area: 3.9700 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.3862 ft
• Bend Loss: 0.4357 ft Junction Loss: 0.0134 ft
Node ID: CB-N#30
Desc: Type II -Catch Basin
Start EI: 30.6000 ft Max EI: 37.4000 ft
Contrib Basin: CB-B#30 Contrib Hyd:
Hgl Elev: 31.0465 ft
Struct Type: CB-TYPE 2-48 Classification Catch Basin
' Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 2.0000 ft Bot Area: 12.5664 sf
Condition: No pa�ticular shape. Status: Proposed Structure
Approach Credit: 0.0266 ft
Node ID: CB-N#31
Desc: Type I -Catch Basin
Start EI: 31.0000 ft Max EI: 34.0000 ft
Contrib Basin: CB-B#31 Contrib Hyd:
Hgl Elev: 31.1302 ft
Struct Type: CB-TYPE 1 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 1.4160 ft Bot Area: 3.9700 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.0000 ft
Node ID: CB-N#32
Desc: Type I - Catch Basin
Start EI: 30.8000 ft Max EI: 37.0000 ft
Contrib Basin: CB-B#32 Contrib Hyd:
Hgl Elev: 31.7426 ft
Struct Type: CB-TYPE 1 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 1.4160 ft Bot Area: 3.9700 sf
PACLAND Project# 1999010.008 Page 90
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.0789 ft
Node ID: CB-N#33
Desc: Type II-Catch Basin '
Start EI: 31.6000 ft Max EI: 37.2500 ft
Contrib Basin: CB-B#33 Contrib Hyd:
Hgl Elev: 32.0428 ft
Struct Type: CB-TYPE 2-48 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 2.0000 ft Bot Area: 12.5664 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.0000 ft
Node ID: CB-N#34
Desc: Type II -Catch Basin
Start EI: 32.2000 ft Max EI: 38.0000 ft
Contrib Basin: CB-B#34 Contrib Hyd:
Hgl Elev: 32.8381 ft
Struct Type: CB-TYPE 2-48 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 2.0000 ft Bot Area: 12.5664 sf
' Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.1770 ft
Node ID: CB-N#35
Desc: Type II -Catch Basin
Start EI: 32.7000 ft Max EI: 38.0000 ft
Contrib Basin: CB-B#35 Contrib Hyd:
Hgl Elev: 33.2766 ft
Struct Type: CB-TYPE 2-48 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 2.0000 ft Bot Area: 12.56fi4 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.1570 ft
Node ID: CB-N#36
Desc: Type I - Catch Basin
Start EI: 33.2000 ft Max EI: 38.0000 ft
Contrib Basin: CB-B#36 Contrib Hyd:
Hgl Elev: 33.6534 ft
Struct Type: CB-TYPE 1 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
, Catch Depth: 1.4160 ft Bot Area: 3.9700 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.1283 ft
Node ID: CB-N#37
Desc: Type I -Catch Basin
Start EI: 33.7000 ft Max EI: 38.0000 ft
Contrib Basin: CB-B#37 Contrib Hyd:
Hgl Elev: 34.0963 ft
Struct Type: CB-TYPE 1 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
PACLAND Project# 1999010.008 Page 91
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Catch Depth: 1.4160 ft Bot Area: 3.9700 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.0734 ft
Node ID: CB-N#38
Desc: Type I -Catch Basin
Start EI: 34.4000 ft Max EI: 38.0000 ft
Contrib Basin: CB-B#38 Contrib Hyd:
Hgl Elev: 34.6769 ft
Struct Type: CB-TYPE 1 Classification Catch Basin
Ke Descrip: CONC: Headwall:square edge;.ke=0.5
Catch Depth: 1.4160 ft Bot Area: 3.9700 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.0000 ft
Node ID: CB-N#39
Desc: Type I -Catch Basin �
Start EI: 34.8000 ft Max EI: 37.8000 ft
Contrib Basin: CB-B#39 Contrib Hyd:
Hgl Elev: 35.0332 ft
Struct Type: CB-TYPE 1 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
• Catch Depth: 1.4160 ft Bot Area: 3.9700 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.0000 ft
Node ID: CB-N#40
Desc: Headwall/ End of pipe
Start EI: 27.2000 ft Max EI: 33.0000 ft
Contrib Basin: CB-B#40 Contrib Hyd:
Hgl Elev: 29.6172 ft
Struct Type: CB-TYPE 1 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 1.4160 ft Bot Area: 3.9700 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.0004 ft
Node ID: CB-N#41
Desc: Headwall/ End of pipe
Start EI: 28.3000 ft Max EI: 33.0000 ft
Contrib Basin: Contrib Hyd:
Hgl Elev: 29.5413 ft
Struct Type: CB-TYPE 1 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 1.4160 ft Bot Area: 3.9700 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.4722 ft
Node ID: CB-N#42
Desc: Type II -Catch Basin
Start EI: 28.4000 ft Max EI: 32.5000 ft
Contrib Basin: Contrib Hyd:
Hgl Elev: 30.1830 ft
Struct Type: CB-TYPE 2-48 Classification Catch Basin
PACLAND Project# 1999010.008 Page 92
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 2.0000 ft Bot Area: 12.5664 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.0955 ft
Node ID: CB-N#43
Desc: Type II - Catch Basin
Start EI: 28.5000 ft Max EI: 32.0000 ft
Contrib Basin: CB-B#43 Contrib Hyd:
Hgl Elev: 30.3034 ft
Struct Type: CB-TYPE 2-48 Class�cation Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 2.0000 ft Bot Area: 12.5664 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.0724 ft
Bend Loss: 0.0005 ft Junction Loss: 0.0303 ft
Node ID: CB-N#44
Desc: Type I -Catch Basin
Start EI: 28.7500 ft Max EI: 31.4000 ft
Contrib Basin: CB-B#44 Contrib Hyd:
Hgl Elev: 30.3332 ft
• Struct Type: CB-TYPE 1 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 1.4160 ft Bot Area: 3.9700 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.0143 ft
Bend Loss: 0.0095 ft Junction Loss: 0.0029 ft
Node ID: CB-N#45
Desc: Type I -Catch Basin
Start EI: 31.3000 ft Max EI: 32.3000 ft
Contrib Basin: CB-B#45 Contrib Hyd:
Hgl Elev: 30.3481 ft
Struct Type: CB-TYPE 1 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 1.4160 ft Bot Area: 3.9700 sf
Condition: No particular shape. Status: Proposed Structure
_ Approach Credit: 0.0123 ft
Node ID: CB-N#46
Desc: Type I - Catch Basin
Start EI: 29.1000 ft Max EI: 31.4000 ft
Contrib Basin: CB-B#46 Contrib Hyd:
Hgl Elev: 3�.2287 ft
Struct Type: CB-TYPE 1 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 1.4160 ft Bot Area: 3.9700 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.1567 ft
Node ID: CB-N#47
Desc: Type I -Catch Basin
Start EI: 29.7000 ft Max EI: 33.1000 ft
PACLAND Project# 1999010.008 Page 93
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Contrib Basin: Contrib Hyd:
Hgl Elev: 31.4836 ft
Struct Type: CB-TYPE 1 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 1.4160 ft Bot Area: 3.9700 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.1465 ft
Node ID: CB-N#48
Desc: Type I -Catch Basin
Start EI: 30.0000 ft Max EI: 32.8000 ft
Contrib Basin: CB-B#48 Contrib Hyd:
Hgl Elev: 32.2296 ft
Struct Type: CB-TYPE 1 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 1.41 fi0 ft Bot Area: 3.9700 sf
Condition: No particular shape. Status: Proposed Structure -
Approach Credit: 0.0000 ft
Node ID: CB-N#49
Desc: Type I -Catch Basin
Start EI: 29.5000 ft Max EI: 332000 ft
' Contrib Basin: CB-B#49 Contrib Hyd:
Hgl Elev: 30.4447 ft
Struct Type: CB-TYPE 1 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 1.4160 ft Bot Area: 3.9700 sf
Condition: No pa�ticular shape. Status: Proposed Structure
- Approach Credit: 0.0000 ft
Node ID: CB-N#50
Desc: Type II -Catch Basin
Start EI: 29.20�0 ft Max EI: 33.9000 ft
Contrib Basin: CB-B#50 Contrib Hyd:
Hgl Elev: 30.4743 ft
Struct Type: CB-TYPE 2-48 Classification Catch Basin
Ke Descrip: CONC: Headwall:square edge;.ke=0.5
Catch Depth: 2.0000 ft Bot Area: 12.5664 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.0613 ft
Node ID: CB-N#51
Desc: Type I - Catch Basin
Start EI: 30.0000 ft Max EI: 34.3000 ft
Contrib Basin: CB-B#51 Contrib Hyd:
Hgl Elev: 30.5351 ft
Struct Type: CB-TYPE 1 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 1.4160 ft Bot Area: 3.9700 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.2873 ft
Bend Loss: 0.0065 ft Junction Loss: 0.0406 ft
Node ID: CB-N#52
PACLAND Project# 1999010.008 Page 94
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Desc: Type II-Catch Basin
Start EI: 30.8000 ft Max EI: 35.3000 ft
Contrib Basin: CB-B#52 Contrib Hyd:
Hgl Elev: 31.3415 ft
Struct Type: CB-TYPE 2-48 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 2.0000 ft Bot Area: 12.5664 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.1398 ft
Bend Loss: 0.0010 ft Junction Loss: 0.0377 ft
Node ID: CB-N#53
Desc: Type II- Catch Basin
Start EI: 31.1000 ft Max EI: 36.2000 ft
Contrib Basin: CB-B#53 Contrib Hyd:
Hgl Elev: 31.481 fi ft
Struct Type: CB-TYPE 2-48 Classification Catch Basin -
Ke Descrip: CONC: Headwail: square edge;.ke=0.5
Catch Depth: 2.0000 ft Bot Area: 12.5664 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.1305 ft
• Node ID: CB-N#54
Desc: Type II - Catch Basin
Start EI: 31.3000 ft Max EI: 34.3000 ft
Contrib Basin: CB-B#54 Contrib Hyd:
Hgl Elev: 31.7770 ft
�� Struct Type: CB-TYPE 2-48 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 2.0000 ft Bot Area: 12.5664 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.1818 ft
Node ID: CB-N#55
Desc: Type II - Catch Basin
Start EI: 31.8000 ft Max EI: 36.0000 ft
Contrib Basin: CB-B#55 Contrib Hyd:
Hgl Elev: 32.2046 ft
_ Struct Type: CB-TYPE 2-48 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 2.0000 ft Bot Area: 12.5664 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.1150 ft
Node ID: CB-N#56
Desc: Type I Catch Basin
Start EI: 32.3000 ft Max EI: 36.5000 ft
Contrib Basin: CB-B#56 Contrib Hyd:
Hgl Elev: 32.5648 ft
Struct Type: CB-TYPE 1 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 1.4160 ft Bot Area: 3.9700 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.0000 ft
PACLAND Project# 1999010.008 Page 9�
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Node ID: CB-N#57
Desc: 8"Cleanout
Start EI: 35.2000 ft Max EI: 38.4000 ft
Contrib Basin: CB-B#57 Contrib Hyd:
Hgl Elev: 36.1113 ft
Struct Type: CAST METAL INLET Classification Storm Cleanout
Ke Descrip: CONC: Headwall:square edge;.ke=0.5
Catch Depth: 0.0000 ft Bot Area: 1.0000 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.0000 ft
Node ID: CB-N#60
Desc: Type II -96"Catch Basin
Start EI: 32.0000 ft Max EI: 37.7000 ft
Contrib Basin: Contrib Hyd:
Hgl Elev: 32.9839 ft
Struct Type: CB-TYPE 2-96 Ctassfication Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 2.0000 ft Bot Area: 50.2650 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.2038 ft
Node ID: CB-N#61
Desc: Type II -96"Catch Basin
Start EI: 32.1000 ft Max EI: 37.7000 ft
Contrib Basin: Contrib Hyd:
Hgl Elev: 33.0172 ft
Struct Type: CB-TYPE 2-96 Classification Catch Basin
� _ Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 2.0000 ft Bot Area: 50.2650 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.3550 ft
Node ID: CB-N#63
Desc: Type I -Catch Basin
Start EI: 30.5000 ft Max EI: 34.0000 ft
Contrib Basin: CB-B#63 Contrib Hyd:
Hgl Elev: 30.7501 ft
Struct Type: CB-TYPE 1 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 1.4160 ft Bot Area: 3.9700 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.0000 ft
Node ID: CB-N#64
Desc: Type I -Catch Basin
Start EI: 31.3000 ft Max EI: 34.1000 ft
Contrib Basin: CB-B#64 Contrib Hyd:
Hgl Elev: 31.6003 ft
Struct Type: CB-TYPE 1 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 1.4160 ft Bot Area: 3.9700 sf
, Condition: No particular shape. Status: Proposed Structure
PACLAND Project# 1999010.008 Page 96
Sam's Club#4835-00 Storm Drainage Analysis Renton,WA
Approach Credit: 0.0000 ft
Node ID: CB-N#65
Desc: Type I -Catch Basin
Start EI: 30.1000 ft Max EI: 35.1000 ft
Contrib Basin: CB-B#65 Contrib Hyd:
Hgl Elev: 30.4206 ft
Struct Type: CB-TYPE 1 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 1.4160 ft Bot Area: 3.9700 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.0000 ft
Node ID: CB-N#TW
Desc: Truck Well Drain
Start EI: 34.2100 ft Max EI: 36.0000 ft _
Contrib Basin: CB-B#TVN Contrib Hyd:
Hgl Elev: 34.4290 ft
Struct Type: CB-TYPE 1 Classification Catch Basin
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch C�epth: 1.4160 ft Bot Area: 3.9700 sf
Condition: No particular shape. Status: Proposed Structure
' Approach Credit: 0.0000 ft
Node ID: Ex. CB-N-B
Desc: Existing Type II -Catch Basin
Start EI: 26.8000 ft Max EI: 34.0000 ft
Contrib Basin: Curb Out-E Contrib Hyd:
Hgl Elev: 28.0750 ft il
Struct Type: CB-TYPE 2-48 Class�cation Manhole
Ke Descrip: CONC: Headwall: square edge;.ke=0.5
Catch Depth: 2.0000 ft Bot Area: 12.5664 sf
Condition: No particular shape. Status: Proposed Structure
Approach Credit: 0.0000 ft
PACLAND Project# 1999010.008 Page 97
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Contributing Drainage Areas
Drainage Area: CB-B#26
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.3380 ac 90.00 0.08 hrs
Impervious 0.2800 ac 98.00 0.08 hrs
Total 0.6180 ac
Supporting Data:
Pervious CN Data:
Landscaping SCS=D 90.00 0.3380 ac
Impervious CN Data:
Asphalt 98.00 0.2800 ac
Pervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Across Landscaping 42.00 ft 3.00% 0.1300 4.70 min
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Asphalt 330.00 ft 1.20% 0.0110 4.89 min
Drainage Area: CB-B#28
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.0000 ac 90.00 0.00 hrs
Impervious 0.0444 ac 98.00 0.03 hrs
Total 0.0444 ac
Supporting Data:
Impervious CN Data:
Asphalt 98.00 0.0444 ac
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Asphalt 120.00 ft 2.31°/a 0.0110 1.67 min
Drainage Area: CB-B#30
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC '
Pervious 0.0200 ac 90.00 0.08 hrs '
Impervious 0.0270 ac 98.00 0.01 hrs
Total 0.0470 ac
Supporting Data: ,
Pervious CN Data:
Landscaping SCS=D 90.00 0.0200 ac I
Impervious CN Data:
Asphalt 98.00 0.0270 ac '
Pervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Across Landscaping 35.00 ft 3.00% 0.1300 4.06 min
Sheet Across Paving 35.00 ft 1.00% 0.0110 0.87 min
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
PACLAND Project# 1999010.008 Page 98
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Sheet Over Asphalt 35.00 ft 1.00% 0.0110 0.87 min
Drainage Area: CB-B#31
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.0000 ac 90.00 0.00 hrs
Impervious 0.0481 ac 98.00 0.02 hrs
Total 0.0481 ac
Supporting Data:
Impervious CN Data:
Asphalt 98.00 0.0481 ac
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Asphalt 121.00 ft 4.13% 0.0110 1.34 min
Drainage Area: CB-B#32
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.0579 ac 90.00 0.17 hrs
Impervious 0.2427 ac 98.00 0.05 hrs
Total 0.3006 ac
Supporting Data:
Pervious CN Data:
Landscaping SCS=D 90.00 0.0579 ac
Impervious CN Data:
Asphalt 98.00 0.2427 ac
Pervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Landscaping 65.00 ft 3.85% 0.2400 9.84 min
Shallow Gutter Flow 106.00 ft 2.00% 27.0000 0.46 min
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Asphalt 160.00 ft 1.10% 0.0110 2.84 min
Shallow Gutter Flow 102.00 ft 2.00% 27.0000 0.45 min
Drainage Area: CB-B#33
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.0420 ac 90.00 0.13 hrs
Impervious 0.1534 ac 98.00 0.04 hrs
Total 0.1954 ac
Supporting Data:
Pervious CN Data:
Landscaping SCS=D 90.00 0.0420 ac
Impervious CN Data:
Asphalt 98.00 0.1534 ac
Pervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Across Landscaping 67.00 ft 2.84% 0.1300 6.97 min
PACLAND Project# 1999010.008 Page 99
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Shallow Gutter Flow 119.00 ft 1.00% 27.0000 0.73 min
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Asphalt 100.00 ft 1.25°/a 0.0110 1.85 min
Shallow Gutter Flow 119.00 ft 1.00% 27.0000 0.73 min
Drainage Area: CB-B#34
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.2702 ac 90.00 0.06 hrs
Impervious 0.0590 ac 98.00 0.02 hrs
Total 0.3292 ac
Supporting Data:
Pervious CN Data:
' Landscaping SCS=D 90.00 0.2702 ac
Impervious CN Data:
Asphalt 98.00 0.0590 ac
Pervious TC Data:
� Flow rype: Description: Length: Slope: Coeff: Travel Time
Sheet Across Landscaping 80.00 ft 33.30% 0.1300 3.00 min
Shallow Gutter Flow 51.00 ft 1.00% 27.0000 0.31 min
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Asphalt 40.00 ft 1.00% 0.0110 0.97 min
Drainage Area: CB-B#35
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.2280 ac 90.00 0.08 hrs
Impervious 0.0940 ac 98.00 0.02 hrs
Total 0.3220 ac
Supporting Data:
Pervious CN Data:
Landscaping SCS=D 90.00 0.2280 ac
- Impervious CN Data:
Asphalt 98.00 0.0940 ac
Pervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Across Landscaping 125.00 ft 33.30% 0.1300 4.29 min
Shallow Gutter Flow 51.00 ft 1.00% 27.0000 0.31 min
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Asphalt 40.00 ft 1.00% 0.0110 0.97 min
Drainage Area: CB-B#36
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.3030 ac 90.00 0.08 hrs
Impervious 0.0940 ac 98.00 0.02 hrs
PACLAND Project# 1999010.008 Page 100
Sam's Club ,#4835-00 Storm Drainage Analysis Renton, WA
Total 0.3970 ac
Supporting Data:
Pervious CN Data:
Landscaping SCS=D 90.00 0.3030 ac
Impervious CN Data:
Asphalt 98.00 0.0940 ac
Pervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Across Landscaping 140.00 ft 33.30% 0.1300 4.70 min
Shallow Gutter Flow 50.00 ft 1.00% 27.0000 0.31 min
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Asphalt 40.00 ft 1.00% 0.0110 0.97 min
Drainage Area: CB-B#37
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.4570 ac 90.00 0.08 hrs
Impervious 0.1074 ac 98.00 0.02 hrs
Total 0.5644 ac
Supporting Data:
Pervious CN Data:
Landscaping SCS=D 90.00 0.4570 ac
Impervious CN Data:
Asphalt 98.00 0.1074 ac
Pervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Across Landscaping 140.00 ft 33.30% 0.1300 4.70 min
Shallow Gutter Flow 60.00 ft 1.00% 27.0000 0.37 min
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time •
Sheet Over Asphalt 60.00 ft 1.00% 0.0110 1.34 min
Drainage Area: CB-B#38
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
- Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.0216 ac 90.00 0.06 hrs
Impervious 0.0987 ac 98.00 0.03 hrs
Total 0.1203 ac
Supporting Data:
Pervious CN Data:
Landscaping SCS=D 90.00 0.0216 ac
Impervious CN Data:
Asphalt 98.00 0.0987 ac
Pervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Across Landscaping 15.00 ft 1.00% 0.1300 3.20 min
Shallow Gutter Flow 70.00 ft 1.00°/a 27.0000 0.43 min
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Asphalt 80.00 ft 1.00% 0.0110 1.69 min
PACLAND Project# 1999010.008 Page 101
Sam's Club#4 - Storm Draina e Anal sis Renton Wq I
i35 �� g y ,
Drainage Area: CB-B#39 I�
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min ',
Area CN TC '
Pervious 0.0174 ac 90.00 0.16 hrs
Impervious 0.1391 ac 98.00 0.05 hrs
Total 0.1565 ac
Supporting Data:
Pervious CN Data:
Landscaping SCS=D 90.00 0.0174 ac
Impervious CN Data:
Asphalt 98.00 0.1391 ac
Pervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Across Landscaping 53.00 ft 1.00% 0.1300 8.78 min
Shallow Gutter Flow 90.00 ft 1.00% 27.0000 0.56 min
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Asphalt 104.00 ft 0.60% 0.0110 2.56 min
Shallow Gutter Flow 42.00 ft 1.19% 27.0000 0.24 min
Drainage Area: CB-B#40
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.1410 ac 90.00 0.06 hrs
Impervious 0.0000 ac 98.00 0.00 hrs
Total 0.1410 ac
Supporting Data: .
Pervious CN Data:
Landscaping SCS=D 90.00 0.1410 ac
Pervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Across Landscaping 30.00 ft 3.00% 0.1300 3.59 min
� Drainage Area: CB-B#43
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 020
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.0000 ac 90.00 0.00 hrs
Impervious 0.2287 ac 98.00 0.07 hrs
Total 0.2287 ac
Supporting Data:
Impervious CN Data:
Asphalt 98.00 0.2287 ac
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Asphalt 275.00 ft 1.66% 0.0110 3.71 min
Shallow Gutter 52.00 ft 1.02% 27.0000 0.32 min
PACL�,ND Project# 1999010.008 Page 102
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Drainage Area: CB-B#44
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.0206 ac 90.00 0.08 hrs
Impervious 0.1828 ac 98.00 0.08 hrs
Total 0.2034 ac
Supporting Data:
Pervious CN Data:
Landscaping SCS=D 90.00 0.0206 ac
Impervious CN Data:
Asphalt 98.00 0.1828 ac
Pervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Across Landscaping 55.00 ft 4.80% 0.1300 4.83 min
Shallow Gutter Flow 13.00 ft 1.54% 27.0000 0.06 min
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Asphalt 393.00 ft 1.54% 0.0110 5.09 min
Drainage Area: CB-B#45
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.0341 ac 90.00 0.07 hrs
Impervious 0.0352 ac 98.00 0.02 hrs
Total 0.0693 ac
Supporting Data:
Pervious CN Data:
Landscaping SCS=D 90.00 0.0341 ac
Impervious CN Data: '
Asphalt 98.00 0.0352 ac
Pervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Across Landscaping 42.00 ft 4.80% 0.130Q 3.89 min
Shallow Gutter Flow 53.00 ft 1.05% 27.0600 0.32 min
- Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Asphalt 31.00 ft 1.30% 0.0110 0.71 min
Shallow Gutter Flow 53.00 ft 1.05% 27.0000 0.32 min
Drainage Area: CB-B#46
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.0103 ac 90.00 0.05 hrs
Impervious 0.3802 ac 98.00 0.09 hrs
Total 0.3905 ac
Supporting Data:
Pervious CN Data:
Landscaping SCS=D 90.00 0.0103 ac
Impervious CN Data:
PACLAND Project# 1999010.008 Page 103
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Asphalt 98.00 0.3802 ac
Pervious TC Data:
Flow type: Description: Length: Siope: Coeff: Travei Time
Sheet Across Landscaping 15.00 ft 3.00% 0.1300 2.06 min
Shallow Gutter Flow 130.00 ft 1.00% 27.0000 0.80 min
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Asphalt 288.00 ft 1.25% 0.0110 4.31 min
Shallow Gutter Flow 158.00 ft 1.14% 27.0000 0.91 min
Drainage Area: CB-B#48
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.1040 ac 90.00 0.12 hrs
Impervious 0.3168 ac 98.00 0.07 hrs
Total 0.4208 ac
Supporting Data:
Perviaus CN Data:
Landscaping SCS=D 90.00 0.1040 ac
Impervious CN Data:
Asphalt 98.00 0.3168 ac
Pervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Landscaping 45.00 ft 2.00% 0.1500 6.54 min
Shallow Gutter Flow 86.00 ft 1.10% 27.0000 0.51 min
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Asphalt 240.00 ft 1.10% 0.0110 3.92 min
Shallow Gutter Flow 86.00 ft 1.10% 27.0000 0.51 min
Drainage Area: CB-B#49 '
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.0000 ac 90.00 0.00 hrs
� Impervious 0.1803 ac 98.00 0.05 hrs
Total 0.1803 ac
Supporting Data:
Impervious CN Data:
Asphalt 98.00 0.1803 ac
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Asphalt 216.00 ft 1.76% 0.0110 2.99 min
Drainage Area: CB-B#50
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.0000 ac 90.00 0.00 hrs
Impervious 0.1480 ac 98.00 0.07 hrs
Total 0.1480 ac
PACLAND Project# 1999010.008 Page 104
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Supporting Data:
Impervious CN Data:
Asphalt 98.00 0.1480 ac
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Asphalt 300.00 ft 1.58% 0.0110 4.06 min
Drainage Area: CB-B#51
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.0000 ac 90.00 0.00 hrs
Impervious 0.2094 ac 98.00 0.06 hrs
Total 0.2094 ac
Supporting Data:
Impervious CN Data:
Asphalt 98.00 0.2094 ac
Irnpervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Asphalt 254.00 ft 1.52% 0.0110 3.61 min
Shallow Gutter Flow 14.00 ft 0.70% 27.0000 0.10 min
Drainage Area: CB-B#52
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.0000 ac 90.00 0.00 hrs
Impervious 0.0840 ac 98.00 0.04 hrs
Total 0.0840 ac
Supporting Data:
Impervious CN Data: �
Asphalt 98.Od 0.0840 ac
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Asphalt 165.00 ft 1.52% 0.0110 2.55 min
Shallow Gutter Flow 13.00 ft 1.54% 27.0000 0.06 min
Drainage Area: CB-B#53
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.0000 ac 90.00 0.00 hrs
Impervious 0.0972 ac 98.00 0.05 hrs
Total 0.0972 ac
Supporting Data:
Impervious CN Data:
Asphalt 98.00 0.0972 ac
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Asphalt 199.00 ft 1.31% 0.0110 3.15 min
Shallow Gutter Flow 16.00 ft 2.50% 27.0000 0.06 min
P,ACLAND Project#, 1999010.008 Page 105
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Drainage Area: CB-B#54
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.0000 ac 90.00 0.00 hrs
Impervious 0.1857 ac 98.00 0.06 hrs
Total 0.1857 ac
Supporting Data:
Impervious CN Data:
Asphalt 98.00 0.1857 ac
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Asphalt 220.00 ft 1.31% 0.0110 3.41 min
Shallow Gutter Flow 35.00 ft 2.00% 27.0000 0.15 min
Drainage Area: CB-B#55
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC '
Pervious 0.0000 ac 90.00 0.00 hrs
�- Im ervious 0.2967 ac 98.00 0.05 hrs
P
Total 0.2967 ac
Supporting Data:
Impervious CN Data:
i Asphalt 98.00 0.2967 ac
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Asphalt 200.00 ft 1.60% 0.0110 2.92 min
� Shallow Gutter Flow 40.00 ft 2.00% 27.0000 0.17 min
Drainage Area: CB-B#56 �
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.0000 ac 90.00 0.00 hrs
" Impervious 0.2499 ac 98.00 0.05 hrs I
Total 0.2499 ac
Supporting Data:
Impervious CN Data: '
Asphalt 98.00 0.2499 ac
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Asphalt 144.00 ft 1.18% 0.0110 2.53 min
Shallow Gutter Flow 74.00 ft 1.35% 27.0000 0.39 min
Drainage Area: CB-B#57
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.0000 ac 90.00 0.00 hrs
Impervious 3.1000 ac 98.00 0.07 hrs
, PACLAND Project� 1999010.008 Page 106
Sam's Club#4835-00 Storm Drainage Analysis Renton,WA
Total 3.1000 ac
Supporting Data:
Impervious CN Data:
Roof 98.00 3.1000 ac
Impervious TC Data: .
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over roof 325.00 ft 2.00% 0.0110 3.93 min
Drainage Area: CB-B#63
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.0000 ac 90.00 0.00 hrs
Impervious 0.2329 ac 98.00 0.07 hrs
Total 0.2329 ac
Supporting Data:
Impervious CN Data:
Asphalt 98.00 0.2329 ac
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Asphalt 308.00 ft 1.56°/a 0.0110 4.16 min
Shallow Gutter Flow 19.00 ft 1.11% 27.0000 0.11 min
Drainage Area: CB-B#64
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.0000 ac 90.00 O.dO hrs
Impervious 0.3234 ac 98.00 0.06 hrs
Total 0.3234 ac
Supporting Data:
Impervious CN Data:
Asphalt 98.00 0.3234 ac
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Asphalt 257.00 ft 1.62% 0.0110 3.55 min
� Shallow Gutter Flow 39.00 ft 1.11% 27.0000 0.23 min
Drainage Area: CB-B#65
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.0000 ac 90.00 0.00 hrs
Impervious 0.0983 ac 98.00 0.04 hrs
Total 0.0983 ac
Supporting Data:
Impervious CN Data:
Asphalt 98.00 0.0983 ac
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Asphalt 105.00 ft 1.55% 0.0110 1.76 min
Shallow Gutter Flow 71.00 ft 1.55% 27.0000 0.35 min
PACLAND Project ,# 1999010.008 Page 107
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Drainage Area: CB-B#TW
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.0000 ac 90.00 0.00 hrs
Impervious 0.1450 ac 98.00 0.02 hrs
Total 0.1450 ac
Supporting Data:
Impervious CN Data:
Asphalt 98.00 0.1450 ac
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet Over Asphalt 112.00 ft 3.00% 0.0110 1.43 min
Drainage Area: Curb Out-E
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.0000 ac 90.00 0.00 hrs
Impervious 0.7700 ac 98.00 0.09 hrs
Total 0.7700 ac
Supporting Data:
Impervious CN Data:
Asphalt 98.00 0.7700 ac
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time '
Sheet Over Asphalt 346.00 ft 1.13% 0.0110 5.20 min
' PACLAND Project# 1999010.008 Page 108
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
Layout Hydrographs
Hydrograph ID: Ex. CB-N-B - 100 yr
Area: 9.9958 ac Hyd Int: 10.00 min Base Flow:
Pending tt translation: 10.00 min
Peak Flow: 8.7238 cfs Peak Time: 7.83 hrs Hyd Vol: 2.9088 acft
Time Flow Time Flow Time Flow
hr cfs hr cfs hr cfs
0.67 0.0246 8.83 2.9772 16.67 1.1576
0.83 0.0994 9.00 3.0322 16.83 1.1578
1.00 0.1856 9.17 2.5936 17.00 1.1580
1.17 0.2830 9.33 2.2365 17.17 1.1140
1.33 0.3738 9.50 2.2871 17.33 1.0774
1.50 0.4328 9.67 2.1441 17.50 1.0824
1.67 0.5064 9.83 2.�433 17.67 1.0812
I 1.83 0.5694 10.00 2.0561 17.83 1.0819
2.00 0.6077 10.17 1.9244 15.00 1.0818
2.17 0.6686 10.33 1.8174 18.17 1.0378
2.33 0.7222 10.50 1.8328 18.33 1.0011
2.50 0.7536 10.67 1.7423 18.50 1.0061
2.67 0.7876 10.83 1.6723 18.67 1.0048
2.83 0.8166 11.00 1.6819 18.83 1.0055
3.00 0.8428 11.17 1.6367 19.00 1.0053
3.17 0.86n1 11.33 1.6019 19.17 0.9613
3.33 0.8874 11.50 1.6071 19.33 0.9245
3.50 0.9065 11.67 1.5628 19.50 0.9295
3.67 0.9582 11.83 1.5275 19.67 0.9282
3.83 1.0031 12.00 1.5327 19.83 0.9289
4.00 1.0156 12.17 1.4881 20.00 0.9287
4.17 1.1032 12.33 1.4527 20.17 0.9289
4.33 1.1768 12.50 1.4578 20.33 0.9289
4.50 1.1845 12.67 1.4131 20.50 0.9291
4.67 1.2753 12.83 1.3775 20.67 0.9292
4.83 1.3500 13.00 1.3826 20.83 0.9293
5.00 1.3569 13.17 1.3817 21.00 0.9294
5.17 1.4492 13.33 1.3826 21.17 0.9295
5.33 1.5250 13.50 1.3828 21.33 0.9296
5.50 1.5306 13.67 1.3394 21.50 0.9297
5.67 1.6240 13.83 1.3031 21.67 0.9298 '
5.83 1.7005 14.00 1.3083 21.83 0.9299
6.00 1.7050 14.17 1.3072 22.00 0.9300
6.17 1.8790 14.33 1.3081 22.17 0.8857
6.33 2.0227 14.50 1.3082 22.33 0.8489
6.50 2.0186 14.67 1.2646 22.50 0.8538
6.67 2.2803 14.83 1.2281 22.67 0.8524
6.83 2.4939 15.00 1.2333 22.83 0.8530
" 7.00 2.4827 15.17 1.2321 23.00 0.8528
7.17 2.7937 15.33 1.2330 23.17 0.8531
7.33 3.0458 15.50 1.2329 23.33 0.8531
7.50 3.0315 15.67 1.1892 23.50 0.8532
7.67 6.1305 15.83 1.1527 23.67 0.8532
7.83 8.7238 16.00 1.1578 23.83 0.8533
8.00 8.4612 16.17 1.1566 24.00 0.8534
8.17 6.0352 16.33 1.1574 24.17 0.3649
8.33 3.8870 16.50 1.1573 24.33 0.0032
8.50 4.2028 16.67 1.1576 24.50 0.0005
8.67 3.4702 16.83 1.1578 24.67 0.0001
' PACL,AND Project# 1999010.008 Page 109
Sam's Club#4835-00 Storm Drainage Analysis Renton, WA
� � • � • � . ' • � �
Geotechnical Report
Zipper Zeman Associates
Subsurface Exploration and Geotechnical Engineering Evaluation
Proposed Retail Development
S. Grady Way and Talbot Road
Renton, Washington
Project # J-1470
December 6, 2002
PACLAND Project?k 1999010.008 Page 110
�
�
W
� W
W
Zipaer Zeman Associates, Inc.
Geotechnical and Environmental Consultants
J-1470
December 6, 2002
PacLand ���������
- 1144 Eastlake Avenue E., Suite 601 """'
Seattle, Washington 98109 ���� - ;� ;;�;,F;
--" Attention: Mr. Joe Geivett,P.E.
�����
Subject: Subsurface Exploration and Geotechnical Engineering Evaluation
Proposed Retail Development
: S. Grady Way and Talbot Road
Renton, Washington
r- •
' Dear Mr. Geivett:
��� This report presents the results of our subsurface exploration and geotechnical engineering
� � evaluation for the above-referenced project. The authorized scope of services for this project
_ ' consisted of our field exploration programs for the slope stability analysis and site evaluation,
'"`Y field and laboratory testing, geotechnical engineering analyses, and preparation of this report. Our
services were completed in accordance the scopes presented in our Proposal for Subsurface
Exploration and Geotechnical Engineering Services, Slope Stability Analysis, and Proposed
Retail Development (P-1673) dated September 3, 2002 and September 13, 2002, respectively.
Written authorization to proceed with this project was provided by PacLand on September 19,
_ 2002.
;
� The purpose of this evaluation was to establish general subsurface condirions at the site
..-� from which conclusions and recommendations for foundation design, pavement design, and
general earthwork construction for the project could be formulated. In the event that there are any
' changes in the nature, design, elevation, or location of the proposed structure, the conclusions and
recommendations contained in this report should be reviewed by Zipper Zeman Associates, Inc.
(ZZA) and modified, as necessary, to reflect those changes. This report has been prepared in
accordance with generally accepted geotechnical engineering practice for the exclusive use of
Pacific Land Design and their agents for specific application to this project.
�XECUTIVE SUMMARY
, The following is a brief summary outline of the geotechnical conclusions and
recommendations for this project. The summary should be read in complete context with the
� accompanying report for proper interpretation.
Review of Existing Literature
• We reviewed two geotechnical reports completed for the project site that were provided to us
by the property owner. In October 1999, a report was prepared by GeoEngineers titled
Geotechnical Engineering Services, Proposed Home Depot Development. Another report by
18905 33`�Avenue W.,Suite 117 Lynnwood,Washington 98036 (425) 771-3304
Proposed Retail Development J-1470
S. Grady Way and Talbot Road December 6,2002
Renton,Washington Page 2
Terra Associates, Inc. was prepared in September 2000 and was titled Geotechnical Report,
_ Southpoint Corporate Center.
' Subsurface Conditions
• The subsurface evaluation consisted of completing 43 hollow-stem auger and mud rotary
borings, and 3 electric cone probes across the project site, as shown on Figure 1, the Site and
Exploration Plan. Of the 43 borings, 6 were completed in a separate phase in order to
evaluate the stability of a.proposed alteration to protected slopes along the east side of the site.
The slopes were man-made as a result of placing coal mine tailings on the site.
� A large portion of the site is currently covered with asphalt pavement and structural concrete
floors. Elsewhere, the surface is covered with gravel. Surficial site soils typically consist of
4'/z to more than 11%Z feet of very loose to loose, moist, wet, and saturated, brown to black;
coal, cinders, sandstone, and shale fill. Limited topsoil of variable thiclaiess should be
expected in areas that are not currently developed.
• In general, the fill materials are underlain by alluvial soils consisting of very soft to soft peat,
• clay, silty clay, clayey silt and silt, as well as very loose to loose sandy silt and sand with
: varying proportions of silt and gravel. Sandstone bedrock was encountered at depths ranging
from as shallow as 19 feet to greater than 110 feet. These generalizations should be used in
conjunction with the attached exploration logs.
• Groundwater depths varied across the site from 3 to 12 feet at the time of completing the
explorations. The elevations of the groundwater levels vary between 23 and 34 feet with the
highest groundwater elevation occuning near a small pond that is between the outflow from
two discharge pipes at the base of the slope along the east side of the site and the north end of
_ _ the aqueduct. Groundwater levels,including quantity and duration of flow, should be expected
to fluctuate throughout the year due to on- and off-site factors.
Site Preparation
• Topsoil, if encountered in undeveloped azeas, should be completely stripped and removed
from the building pad and parking lot areas. Stripping should also include the removal of
existing asphalt pavement, asphalt and concrete rubble, and vegetation that consists primarily
of limited brush and trees.
• The proposed 3H:1 V permanent slope that will be created after removing the lobe of coal
mine tailings on the east side of the site appears feasible, based upon our slope stability
analyses. However, in order to maintain adequate slope stability safety factors, we
recommend that a series of groundwater collection pipes be installed above the sandstone
bedrock contact in order to limit the build-up of perched groundwater in the remaining loose
fill materials that will comprise the finished slope.
Zioner Zeman Associates.Inc.
18905 33rd Avenue W.,Suite 117 Lynnwood,Washington 98036 (425)771-3304
Proposed Retail Development J-1470 �
S.Grady Way aad Talbot Road December 6,2002
Renton,Washington Page 3 I,
• All asphalt and concrete should be removed prior to placing fill in low areas. Existing asphalt
and gravel surfacing should be left in place wherever possible to protect the site from
construction traffic and provide laydown areas.
• Pile foundations beneath the existing structural slabs on site should be cut off a minimum of 3
feet below slab and pavement subgrade elevations. Other concrete foundation elements, slabs,
and walls should be removed and disposed or crushed for reuse as structural fill.
• Exposed soils will likely consist of moist to wet coal tailings. As such they should be
considered susceptible to disturbance from construction traffic. Existing fill soils (the entire
site) should be covered with a minimum of 12 inches of pit-run sand and gravel, crushed
recycled concrete, or other approved granular material to protect the sensitive subgrade.
• Existing underground utilities should be removed or grouted in place. Excavations created in
order to remove the utilities should be backfilled with compacted structural fill. Deeper
underground structures, such as manholes, should also be backfilled with structural fill, lean-
mix concrete, or controlled density fill.
• • Depending on the groundwater levels at the time of construction, dewatering may be
necessary to lower groundwater levels if utility excavations or other underground siructures
extend below the shallow groundwater table.
• Peat should be expected in some of the deeper utility excavations and should be
overexcavated and replaced when encountered.
Structural Fill
• All fill used to raise grades should be compacted to a minimum 95 percent of the modified
Proctor maximum dry density.
• It is our opinion that all of the existing coal tailings fill on site should be considered
unsuitable for reuse as structural fill. Random areas of silty sand will likely be encountered
and would likely be suitable for reuse as structural fill, although it is not possible to quantify
the amount of this material. Granular material immediately below existing pavements and
slabs should also be considered suitable for reuse.
• The parking lots and building pad should be covered with a minimum of one foot of pit-run
snad and gravel or equivalent.
• Common fill used for general grading below the upper foot should have less than 15 percent
fines passing the U.S. No. 200 sieve. During periods when wet weather construction is
necessary, we recommend that import fill materials consist of pit-run sand and gravel or
crushed recycled concrete with less than 5 percent fines.
Zip�er Zeman Associates.Inc.
18905 33rd Avenue W.,Suite 117 Lynnwood,Washington 98036 (425)771-3304
Proposed Retail Development J-1470
S. Grady Way and Talbot Road December 6,2002
Renton,Washington Page 4
Utilities
� Existing on-site, underground utilities should be removed, relocated or properly abandoned in
place in order to prevent possible future settlement problems. All existing underground
utiliries should be decommissioned, abandoned, or backfilled in accordance with all
applicable State and local regularions.
� We anticipate that most utility subgrades will consist of very loose to loose coal tailings fill or
possibly soft silt, loose silty sand, or peaty soils. Soils deemed unsuitable for utility suppo�t
should be overexcavated a minimum of 12 inches in order to develop a firm, uniform base.
Where peat is encountered, we recommend that the entire thickness of the material be
removed and replaced.
� - • Existing on-site soils are considered unsuitable for utility trench backfiil. �
• The two existing mine runoff drain pipes that enter the east side of the site will be tightlined
` across a portion of the site. We recommend that the company or agency who owns or is
responsible for their maintenance be determined in order to coordinate a long-term
• maintenance and inspection program. We further recommend that the peak flow in the drain
pipes be determined in order to size the proposed tightline pipe. This should likely be done in
the late winter or spring when groundwater would be anticipated to be at its highest.
Building Foundations
• Based upon the soil conditions encountered, we recommend that augercast pile foundations be
used to support the proposed building. We recommend using 18-inch diameter piles with
allowable axial compressive capacities of 75 tons, provided the piles penetrate a minimum of
2 feet into the sandstone bedrock or extend to a maximum of 85 feet below the pile caps.
Building Floor Slab
• Based upon a finish floor elevation of 37 feet, grading across most of the building pad will
vary from a fill of up to about 3 feet to a cut of up to about 4 feet. However where the lobe of
coal mine tailings is present along the east side of the site, cuts of up to about 20 feet will be
necessary. Due to the presence of the very loose to loose coal fill and the potential for
liquefaction of the underlying native soils, we recommend that the floor slab be pile
supported.
• Subgrade compaction may be difficult to achieve because of the existing very loose coal fill.
Instead, it may become necessary to proofroll the subgrade with a loaded.dump truck or other
suitable heavy equipment to reveal areas of soft or pumping soils. Overexcavated materials
should be replaced with non-organic compacted structural fill. The same process should be
completed in cut areas of the building pad once the cuts have been completed.
• A woven geotextile (as necessary) and a minimum of 12 inches of pit-run sand and gravel fill
should be placed above floor subgrade soils and be compacted to a minimum of 95 percent of
Zioner Zeman Associates.Inc.
18905 33rd Avenue W., Suite 117 Lynnwood,Washington 98036 (425) 771-3304
Proposed Retail Development J-1470
S. Grady Way and Talbot Road December 6,2002
Renton,Washington Page 5
the modified Proctor maximum dry densiry. We recommend that a durable methane/water
vapor barrier be placed between the 12 inches of granular structural fill and the capillary
break. A minimum 6-inch thick capillary break layer consisting of free-draining aggregate
should be placed over the methane gas barrier.
• We recommend that the building be underlain with a passive methane gas venting system that
is installed in the 12 inches of granular soil below the methane gas barrier and be routed to the
outside of the building. Confined spaces and underground structures should also be vented.
Light Pole Foundations
• Due to the loose fill conditions on site, we recommend that the parking lot light poles and
large signs be supported on augercast piles. It may be possible to consider other pole support
options, such as overexcavating the poor soils around the pole foundation and replacing if
with compacted structural fill or placing the light pole in a larger diameter steel pipe to
effectively increase the diarneter of the foundation.
Drainage
• A perimeter footing system is recommended for the proposed structure due to the depth to
groundwater at the time of our explorations relative to the proposed finish floor elevation.
Retaining Walls
• Cast-in-place concrete walls should be supported on augercast piles.
• Backfilled subsurface walls should be designed using equivalent fluid pressures of 35 and 55
pcf for active and at-rest loading conditions, respectively. Surcharge pressures from
backslopes,traffic, and floor loads should be added to the earth pressures.
• Walls should be backfilled with a minimum of 18 inches of free-draining granular structural
fill that communicates with a footing drain or weepholes at the base of the wall.
Subsurface Walls
• Relatively shallow groundwater levels should be expected across the eastern portion of the
site. The highest groundwater elevation at the time of drilling was approximately 34 feet and
occurred along the toe of the slope along the east side of the site. Waterproofing systems
should prevent moisture migrarion through the walls, floors, and construction joints as
necessary to satisfy the owners requirements.
• Subsurface walls and floor slabs should be designed to resist hydrostatic lateral and uplift
forces, additive to the lateral earth pressure. Along the east side of the site, structures that
extend below elevation 34 feet should be designed for hydrostatic forces.
�i�er Zeman Associates.Inc.
18905 33rd Avenue W.,Suite 117 Lynnwood,Washington 98036 (425) 7'1-3304
Proposed Retail Development J-1470
S.Grady Way and Talbot Road December 6,2Q02
Renton,Washington Page 6
East Slope Retaining Wall
• A cut of approximately 18 feet will be necessary in the slope along the east side of the site in
order to provide access around the southeast comer of the proposed building. Permanent
shoring using soldier piles set in drilled holes that extend into the native sandstone and
retained by tieback anchors is recommended for the proposed wall. Soldier pile drilling
within the water-bearing sand deposits will likely require stabilizing the holes because the
saturated sands are very loose to loose. A program to maintain stabilized soldier pile holes
should be the responsibility of the contractor. The contractor should also be required to have
the capability to case holes when required.
• Historical records indicate that there were mineshaft adits in the area of the proj ect site.
Review of the historical documents leads us to suspect that one of the mine openings may be
- along the alignment of the existing 48-inch drainpipe that daylights on the project site. We
did not encounter conditions that would indicate the presence of the shafts. However, if a
zone of fill and/or a mine adit exists in the anchor zone of the proposed wall, it may not be
possible to install some of the tiebacks as recommended.
• • Permanent tiebacks will also be necessary to support the proposed cut. We anticipate that a
single row of tiebacks will be sufficient. However, we would also anticipate that the tiebacks
could extend beyond the limits of the site and into the Benson Road right-of-way. The
feasibility of constructing permanent tiebacks in the right-of-way should be determined.
• Tieback anchors should be performance and proof tested. We recommend that all of the
tiebacks be performance tested to 150 percent of the design load and that that a minimum of 2
anchors be proof tested to 300 percent of the design load.
n,^a
• Recommendations for Further Stud� We recommend that additional subsurface
explorations be completed in support of the retaining wall design. If a mineshaft is present in
the tieback zone, further definition of the conditions prior to bidding would reduce the
- . possibility of change orders and delays during construction. Evaluations could consist of
surficial geophysical evaluations using resistivity or magnetics and/or downhole geophysical
methods in predrilled holes. We also recommend that the 48-inch pipe be logged with a
camera to determine its alignment and where it ternunates.
Pavement
• Based upon compacting the exposed subgrade to a minimum of 95 percent of the modified
Proctor maximum dry density, standard pavement sections should consist of 3 inches of Class
B asphalt over 4 inches of crushed gravel base course over a minimum of 12 inches of pit-run
subbase. Heavy duty pavement sections should consist of 4 inches of Class B asphalt over 4
inches of crushed gravel base course over 12 inches of pit-run subbase. Depending on the
actual level of compaction, it may be necessary to use a geotextile fabric and additional
subbase. This would have to be determined at the time of construcrion. Asphalt-treated base
(ATB) may be substituted for crushed gravel base course (CGBC) at a ratio of
0.75"ATB:1"CGBC.
�ju�er Zeman Associates.Inc.
18905 33rd Avenue W.,Suite 117 Lynnwood,Washington 98036 (425)771-3304
Proposed Retail Development J-1470
S.Grady Way and Talbot Road December 6,2002
Renton,Washington Page 7
Infiltration
• Due to the composition of the fill materials on site and the anticipated high groundwater levels
across the site, we recommend that infiltration rates be considered negligible.
SITE AND PROJECT DESCRIPTION
The approximate 16 acre project site is located east of the intersection of South Grady
Way and Talbot Road (State Route 515), in the N.W. '/o of Section 20, Township 23 North, Range
5 East in Renton, Washington. The property is bordered to the north by the Renton City Hall
Building, to the west and south by Talbot Road, to the north and west by South Grady Way, and
to the east by Benson Road and undeveloped land. The site is currently vacant, and with the
exception of an area along Benson Road, the project site is covered with asphalt pavement, gravel-
covered areas, and the remains of two structural slabs that supported former buildings that have
been demolished. Slopes and a large lobe of coal mine waste fill on the eastern margin of the site
are prunarily covered with blackberry brush and maple trees. The slopes appear to be on the
order of 20 to 30 feet in height and vary in steepness from about 1'/zH:l V to 2H:1 V, or flatter.
. Based on topographic information provided to us, it appears that the flatter portion of the site
varies in elevation between approximately 30 and 39 feet. It appears that Benson Road is
approximately 30 feet above the project site. A concrete aqueduct is situated along the toe of the
eastern slope and conducts water that appears to originate from the former Renton Coal Mine.
There are many above- and below-ground utilities at the site, some of which are still live.
High voltage electrical transmission lines also extend across the site.
As a result of past environmental site assessments on the project site, there are numerous
resource protecrion wells across the site. We estimate that there could be between 30 and 40
wells across the site.
We understand that the proposed development will consist of an approximate 135,000
square foot building with associated parking and landscaping. At the time of preparing this
report,the finish floor elevation is anticipated to be 37.0 feet. We anticipate that the exterior walls
will be constructed of concrete masonry block or steel frame and metal stud, and that steel tube
columns will provide interior roof support. Typical bay spacing between columns and walls is
approximately 50 by 47 feet and exterior columns are typically spaced 47 feet apart. For
purposes of preparing this report, the following structural loads are anticipated:
Interior column gravity load 65 kips
Estimated maximum gravity load due to severe live loading ' 150 kips
Exterior column gravity load 50 kips
Maximum Column uplift forces from wind 30 kips
Uniform load on continuous footings 1.5-2.0 kips/lineal foot
Maximum uniform floor slab live load 250 psf
Maximum floor slab concentrated load 16.0 kips
Z�,per Zeman Associates.Inc.
18905 33rd Avenue W.,Suite 117 Lynnwood,Washington 98036 (425) '?1-3304
Proposed Retail Development J-1470
S. Grady Way and Talbot Road December 6,2002
Renton,Washington Page 8
Zipper Zeman Associates should be notified of any deviation from the project description
_. presented herein to detemune its potential effect on the conclusions and recommendations
presented herein.
� SUBSURFACE CONDTTIONS
The subsurface exploration program completed by ZZA at the project site included 43
hollow-stem auger and mud-rotary borings, the approximate locations of which are presented on
Figure 1, the Site and Exploration Plan, enclosed with this report. Of the 43 borings, 6 were
completed in a separate phase in order to evaluate the stability of a proposed alteration to a lobe
- of coal mine waste fill along the east side of the site. We also reviewed the logs of subsurface
explorations completed by GeoEngineers and Terra Associates for previous proposed projects on
the subject site. Copies of the boring logs completed for this evaluation are enclosed in Appendix
A. -
The borings electric cone probes completed in the building pad and parking areas for this
study extended to depths ranging from 11%2 to 110'/z feet below the existing ground surface.
Below the surface, soils typically consisted of 4'/z to more than 11'/z feet of very loose to loose,
. moist, wet, and saturated, brown to black, coal, cinders and shale fill. In general, the coal ranged
in size from silt to gravel sized. In many borings loose silty sand fill that appeared to originate
from the local sandstone formation was also encountered. Underlying the coal mine wastes,
interbedded alluvial soils consisting of very loose to loose silty sand and very soft to soft sandy I
silt, peat, organic silt, and clayey silt extended to depths of 15 to 49 feet below grade. The
alluvium graded to medium dense sand with varying proportions of silt and gravel and medium
stiff to stiff sandy silt, silt, organic silt, clayey silt and silty clay that extended to depths of
approximately 18%z to 107 feet below grade. Very dense, weathered sandstone bedrock was I
encountered below these materials and extended to the bottom of the borings. The sandstone is
part of the Renton Formation that is also the source of the coal fill encountered on the site. The
sandstone appears to dip relatively steeply to the west. ,
Borings B-lA through B-6A were completed on the lobe of coal mine waste fill along the II
east side of the site. Subsurface conditions consisted of 20 to 36 feet of very loose to loose, damp
to wet, brown and btack, coal and cinder fill with random layers of silty sand that originated from ,
the sandstone bedrock. Because of the steeply dipping sandstone bedrock in the area, borings B- '
lA, B-2A, and B-3A, that were completed along the western margin of the fill, encountered 7 to
19 feet of very loose to loose sandy alluvial soils beneath the fill. Sandstone bedrock was
encountered in borings B-lA and B-2A at depths of 29 and 47 feet below existing grades, ,
respectively. In borings B-4A, B-SA, and B-6A, an approximate 3-foot thick layer of very loose,
wet to saturated, silty sand was encountered between the tailings and the dense sandstone. The
very loose layer was interpreted to be residual soil derived from the weathering of the sandstone.
Dense to very dense sandstone was encountered at depths of 23 to 33 feet below existing grades. ,
Four borings (B-4, B-9, B-36, and B-37) were completed in the area of the proposed
retaining wall that is situated near the southeast corner of the proposed building. Boring B-4
encountered approximately 7 feet of loose silty sand fill over 8 feet of loose native soils I
consisting of sand with varying proportions of silt, gravel and organics. At 15 feet, a 3-foot thick
Zip�er Zeman Associates,Inc.
18905 33rd Avenue W., Suite 117 Lynnwood,Washington 98036 (425)7?1-3304
Proposed Retail Development J-1474
S.Grady Way and Talbot Road December 6,2002 ,
Renton,Washington Page 9
layer of inedium dense, silty sand with some gravel, interpreted as highly weathered sandstone
was encountered. At a depth of approximately 18%z feet, very dense sandstone was encountered.
In borings B-36 and B-37, approximately 41/z to 6% feet of very loose to loose silty sand and coal
tailings fill was encountered. In B-36, interbedded, very loose silty sand, sandy silt, and peaty
- organic layers were encountered between 6'/Z and 13 feet. Between 13 and 19 feet, medium stiff
sandy silt with interbedded silty sand and organics extended to a depth of approximately 19 feet.
At his depth, very dense sandstone was encountered. In B-37, very loose to loose alluvial sand
with varying proportions of silt gravel and peat was generally encountered. However, a 4-foot
thick peat layer was encountered between 8'/� and 28 feet below grade. Dense grading to very
dense sandstone was encountered at a depth of 28 feet and continued to the bottom of the boring.
- Boring B-9 was completed above the site along the edge of Benson Road. Approximately 10 feet
of loose to medium dense, silty sand fill was encountered below the surface. A possible relic,
� silty sand topsoil layer was encountered between 10 and 10'/2 feet. Between 10'/Z and 20 feet,
medium dense silty sand was encountered. This material graded to a dense condition and-
extended to a depth of about 25 feet. At that depth, the material graded to very dense weathered
sandstone.
The enclosed boring logs should be referred to for more specific information. Figure 1,
. the Site and Exploration plan includes information regarding the thiclrness of fill and depth to
. . bedrock at each of the boring locations.
' Groundwater Conditions
Groundwater was encountered at the time of drilling in 39 of the 43 the borings.
Excluding the topographically higher borings, groundwater levels varied in depth across the site
from 3 to 12 feet at the time of completing the explora.tions. The elevations of the groundwater
levels varied between 23 and 34 feet with the highest groundwater elevation occurring nearest a
small pond that is between the outflow from two discharge pipes at the base of the slope along the
east side of the site and the north end of the aqueduct. Based on information presented by
GeoEngineers, it appears that the observed groundwater levels at the time of drilling coincide
with their observations.
Wet soils were encountered in borings B-4A, B-SA, and B-6A above the sandstone.
Perched groundwater should be expected to develop above the sandstone in areas above the
regional groundwater table. Variations in groundwater conditions should be expected due to
seasonal variations, on and off-site land usage, irrigation, and other factors.
Seismic Criteria
According to the Seismic Zone Map of the United States contained in the 1997 Uniform
Building Code, the project site lies within Seismic Zone 3. The Seismic Zone Factor (Z) for
Seismic Zone 3 is 0.30 that corresponds Seismic Coefficients Ca and C„ of 0.36 and 0.84,
respectively. Based on soil conditions encountered at the site, the subsurface site conditions are
interpreted to correspond to a seismic soil profile type SE as defined by Table 16-J of the 1997
Uniform Building Code. Soil profile type SE applies to an average soil profile within the top 100
feet consisting predominantly of soft soil characterized by Standard Penetration Test blowcounts
Zinoer Zeman Associates.Inc.
18905 33rd Avenue VV.,Suite I 17 Lynnwood,Washington 98036 (425) 771-3304
Proposed Retail Development J-1470
S.Grady Way and Talbot Road December 6,2002
- Renton,Washington Page 10
less than 15, a shear wave velocity of less than 600 feet per second, and an undrained shear
strength less than 1,000 psf. Some of the near-surface soils are considered to be prone to
liquefaction during a design earthquake with a 10 percent probability of exceedance in 50 years.
Results of pH and Resisrivi , Testing
Results of the pH and resistivity testing are presented in the following table.
Borin and Sam le Number De th eet H Resistivitv ohm-cm
IB-2,S-1 5-6'/Z 6.9 4,600
B-5 S-2 5-6'/: 6.7 9,400
B-8, S-5b 15'/Z 5.6 3,300
B-26.S-2 5-6'h 5.6 4,500
• The electrical resistivity of each sample listed above was measured in the laboratory with
� distilled water added to create a standardized condition of saturation. Resistivities are at about
their lowest value when the soil is saturated. Electrical resistivities of soils are a measure of their
_ resistance to the flow of corrosion currents. Corrosion currents tend to be lower in high resistivity
soils. The electrical resistivity of the soil varies primarily with its chemical and moisture
contents. Typically, the lower the resistivity of native soils, the more likely that galvanic currents
��
may develop and increase the possibility of corrosion. Based on laboratory test results, resistivity
values for the near surface native soils varied between 3,300 and 9,40Q ohm-cm. Soils with
resistivity values between 2,000 and 10,000 ohm-cm are generally associated with soils classified
i„P, as "mildly to moderately corrosive". The pH of the soils is slightly acidic but is not considered
- significant in evaluating corrosivity. Therefore, it is our opinion that Type UII cement is suitable
for this project. With respect to the need for protection of buried metal utilities, we recommend
that PacLand consult with the manufacturers of specific products in order to determine the need
for protection.
Climate Data
According to the U.S. Department of Commerce, Climatic Atlas of the United States,
1993, the project site lies within the Puget Sound Lowlands Region of Washington. Mean
monthly rainfall varies from a low of 0.96 inches in July to a high of 5.56 inches in December.
Between November and March, there are about 20 days per month where 0.01 inches or more of
rainfall occurs. Normal daily minimum temperatures are above freezing throughout the year.
Mean annual total snowfall is about 12 inches.
. Weather data from the Western Region Clirnate Center (WRCC) for Kent, Washington
(the nearest weather station) varied slightly from the Climatic Atlas and likely represents a more
accurate representation of the local weather. The greatest mean monthly snowfall occurs in
�inoer Zernan Associates.Inc.
18905 33rd Avenue W.,Suite 117 Lynnwood,Washington 98036 (425)771-3304
Proposed Retail Development J-1470
S.Grady Way and Talbot Road December 6, 2002
Renton,Washington Page 11
January and averages 7.3 inches. Average monthly rainfall and snowfall amounts can be greatly
exceeded as can be seen in the enclosed weather data.
The mean total precipitation for each month at the Kent weather station is:
January: 5.73 in. July: 0.85 in.
February: 4.32 in. August: 1.15 in.
March: 3.88 in. September: 1.78 in.
April: 2.70 in. October: 3.49 in.
May 1.86 in. November: 5.88 in.
June: 1.56 in. December: 6.00 in.
The WRCC Monthly Total Snowfall, Monthly Total Precipitation, and Monthly Normals
- data are also presented in Appendix D. �
CONCLUSIONS AND RECOMMENDATIONS
The geologic conditions at the site are considered to be relatively poor from a geotechnical
. engineering standpoint. The soil conditions generally consist of very loose to loose fill soils
composed primarily of coal and cinders over very soft to soft peat, silt, clay, clayey silt, and sandy
silt, as well as very loose to loose, wet to saturated silty sand and sand. The fill soils are
considered unsuitable for shallow foundation support and the native peat, silt and clay exhibit
relatively low strength and high compressibility characteristics that makes them susceptible to
consolidation when loaded. Consolidation under normally loaded foundation elements would
produce excessive total and differential settlements of the structure. Additionally, the cleaner,
very loose to loose sands are susceptible to liquefactian during a design earthquake. Liquefaction
susceptible sands were encountered in the borings within the building pad and the resulting
settlement associated with the occurrence of liquefaction could result in relatively large
F,'--
differential settlements across the building pad. Preloading would not mitigate the liquefaction
i potenrial at the site.
Environmentally Critical Areas - Stee� Slo�e. Landslide. and Erosion Considerations
The slopes around the base of the fill lobe are relatively steep and are considered sensitive
andlor protected slopes as presented in the Municipal Code of Renton. As such, slopes
categorized as sensitive or protected are also considered to be geologic hazards by the City of
- Renton. In order to modify the ridge, it was necessary to evaluate the soils and complete a slope
stability analysis of the proposed modifications to the slope.
Steep slope areas are classified as protected or sensitive. A protected slope is defined as a
hillside, or portion thereof, with an average slope of 40 percent or greater with a minimum
vertical rise of 15 feet. A sensitive slope is a hillside, or portion thereof, of 25 percent to less than
40 percent or and average slope of 40 percent or greater with a vertical rise of less than 15 feet
abutting an average slope of 25 percent to 40 percent. It is our opinion that all of the affected area
would be classified as protected or sensitive.
, i
;�,inuer Zeman Associates.Inc.
18905 33rd Avenue W.,Suite 117 Lynnwood,Washington 98036 (425)'71-3304
Proposed Retail Development J-1470
S.Grady Way and Talbot Road December 6,2002
Renton,Washington Page 12
Moderate landslide hazard areas are defined as those areas with slopes between 15 and 40
percent where the surficial soils are underlain by permeable geologic units. High landslide hazard
areas are defined as those areas with slopes greater than 40 percent and areas with slopes between
15 and 40 percent where the surficial soils are underlain by low permeability geologic units. It
appears that slopes are greater than 15 percent and aze underlain by both permeable and
impermeable soils. Therefore, it appears that the existing slope would fall within both categories
depending on the subsurface conditions.
The lobe of fill would also be defined as a high seismic hazard area due the hillsides being
comprised of loose fill over alluvium and post-glacial silts and peats. It also meets the definition
of a high erosion hazard area because the slopes are greater than 15 percent.
Slo�e Stabilitv Analy,sis
A slope stability analysis was performed for the site using the XSTABL5.2 computer
program. The stability analysis was based on a generalized subsurface soil and groundwater
profile through the existing and was developed using the site-specific subsurface data. Two direct
shear test were completed on representative samples obtained in borings B-3A at a depth of 16 to
. 16'/z feet and B-SA at a depth of 21'/z to 22 feet. This provided us with strength parameters that
� were used in the slope stability analyses,
A topographic and subsurface profile was developed along line A-A' as shown on Figure
1, the Site and Exploration Plan. Based on the relative density, grain size distribution.
depositional history, and the site specific subsurface and laboratory data, it is our opinion that the
friction angle and cohesion values are reasonable estimates of the site soil strength parameters.
i '- SOIL PARAMETERS FOR SLOPE STABILITY ANALYSES
` Soil Layer Friction Angle (�) Cohesion (ps� Moist Unit Weight
�
;' ' c
� Coal Tailin s 37 0 70
Loose Sand Above
, Sandstone 33 0 120
Loose Alluvium 32 0 120
Sandstone 15 3,000 140
Our analysis evaluated both static and dynamic (seismic) conditions for the exisring slope
inclinations with and without an inferred perched groundwater table. The USGS Seismic Hazard
Mapping Project earthquake hazard map for the area indicated a peak horizontal bedrock
acceleration of 0.32g for an earthquake with a 10 percent exceedance in 50 years. Our analysis
used a dynamic (seismic) horizontal ground acceleration of 0.16g (1/2 the peak acceleration)
conditions for the permanent cut slope inclination of 3H:1 V, which is more indicative of the
average ground acceleration during a seismic event of design magnitude. Figure 2, Generalized
Subsurface Profile A-A', presents the subsurface soil and groundwater profile used for our
analysis.
Ziooer Zeman Associates.Inc.
18905 33rd Avenue W.,Suite 117 Lynnwood,Washington 98036 (425)77]-3304
Proposed Retail Development J-]470
S.Grady Way and Talbot Road December 6,2002
Renton,Washington Page 13
The following table presents the results of the static and dynamic stability analysis
conducted for this project.
TABLE 1
- RESULTS OF SLOPE STABILITY ANALYSIS
I Minimum Minimum
- Slo e Confi tion Static Safe Factor Seismic Safe Factor
3H:1 V Permanent Slo e 2.1* 1.3*
* Reduced factors of safety are possible if high groundwater or low shear strength materials are present in the slope.
Based on our analysis, a permanent cut slope inclination of 3H:1 V appears to be suitable
`" for static and seismic conditions. The results of the pseudostatic stability analysis (lowest safety
' factor) are presented on Figure 3.
The occurrence of perched groundwater above the sandstone and within the tailings would
reduce the factor of safety and could potentially cause failure. In order to reduce the risk of
. groundwater and surface infiltration destabilizing the slope, a subsurface drainage should be
installed to maintain groundwater levels as deep as possible. A series of perforated interceptor
drains on about a 25-foot lateral spacing in a herringbone pattem and connected to a collector
pipe will likely be necessary. The laterals would be connected to a collector pipe installed
essentially down the middle of the proposed slope. We recommend that the laterals be installed on
the sandstone and that the lowest set of interceptor pipes be installed to an invert elevation of 34
feet. We recommend that our firm review the design of the drains and that ZZA monitor their
installation. The final depths and locations will likely require field adjustments based on the
conditions encountered during construction.
Erosion Mitigation
The soils comprising the proposed cut slope are susceptible to erosion by flowing water.
We recommend the following erosion control Best Management Practices be implemented dunng
construction:
• Establish well-defined clearing limits to reduce the amount of vegetation disturbed during
construction;
• Place silt control fence downslope of disturbed areas;
• Cover excavated slopes with plastic sheeting during rainfall events;
• Cover disturbed and graded areas with straw, excelsior blankets, or other appropriate erosion
control materials, combined with seeding or other planting, to promote revegetation. Excelsior
blankets such as Curlex�, jute matting such as Geojute�, or other rolled erosion control
products, installed in accordance with the manufacturer's recommendations, are
recommended for sloping portions of the site disturbed during construction. Such areas
ZiR�er Zeman Associates.Inc.
18905 33rd Avenue W., Suite 117 Lynnwood,Washington 98036 (425)771-3304
Proposed Retail Development J-1470
S.Grady Way and Talbot Road December 6,2002
- Renton,Washington Page 14
include spots were the existing landscaping waste located at or slightly over the slope break is
removed.
• Perched groundwater could daylight on the proposed 3H:1 V slope that generally is not evident
on the existing slopes. If groundwater seepage daylights on the slope, it might cause shallow
slumping. These areas, if it occurs, should be covered with a minimum of 10 inches of riprap.
We recommend that riprap conform to the specificarions for Quarry Spalls as presented in
section 9-13.6 of the 2002 WSDOT Standard Specifications.
Foundations Settlement Discussion
There are three modes of potential settlement relative to the soil conditions encountered at
the site. The existing fill soils are comprised primarily of very loose to loose coal fragments in
the size range of silt, sand, and gravel. The composition and relative density of this material�
makes it unsuitable for support of shallow foundations. The very soft to soft peat, silt, clay, and
clayey silt are expected to consolidate under the weight of static foundation loads and fill soil
surcharges. Additional, long-term settlements are probable due to secondary compression of
these materials. Finally, seismically-induced liquefaction in the very loose to loose saturated
• sandy soils below the water table is also a significant risk. We have estimated that seismically-
- induced settlements on the order of 4 to 7 inches could occur within the zones of sand that were
encountered across the building pad.
Because of the subsurface conditions encountered, we recommend that the building be
supported on pile foundations or soils that are deeply mixed with cement. In our opinion, either
option used to support structurai loads for the new building would substantially reduce the risk of
excessive post-construction settlement and transmit foundation loads through liquefaction
' susceptible soils. We recommend that the floor also be supported on piling or columns of cernent-
� mixed soil that extends to the bedrock.
�,uefaction Anal,�is
As part of this study, we performed a site-specific liquefaction analysis using the methods
developed by Seed and Idriss for the soil condirions encountered in our boring. Liquefaction can
be described as a sudden loss of shear strength due to the sudden increase in porewater pressure
caused by shear waves associated with earthquakes. Based. on our liquefaction analysis, we
estimate that there is a risk that liquefaction would occur at various depths between approximately
10 to 40 feet below the existing ground surface during a design level earthquake event, as
discussed below. Laboratory testing was completed as a part of this liquefaction analysis, the
results of which are attached or indicated on the boring logs, as appropriate.
Based on the Uniform Building Code (UBC) guidelines, seismic analysis should be based
on an event having a 10 percent probability of exceedance in 50 years or return period of
approximately 475 years. According to available historical data, this return period within the
Seattle-Portland area would be associated with an earthquake of approximate Richter magnitude
7.5. According to the United States Geological Survey, the peak ground surface accelerati�n
��oer Zeman Associates.Inc.
18905 33rd Avenue W.,Suite 117 Lynnwood,Washington 98036 (425)771-3304
r-�, �
Proposed Retail Development 7-1470
S.Grady Way and Talbot Road December 6,2002 I
Renton,Washington Page 15 '
produced by an earthquake of this magnitude will be about 0.3g at the subject site, which
corresponds with the locally accepted acceleration values for fill or alluvial soils.
� Using these seismic parameters, we computed safety factors against liquefaction for the
- various soil layers below the water table using an analysis method developed by Seed and Idriss.
i- Our analyses revealed a high probability of liquefaction (safety factors ranging from <1 to 1.3)
� within the zones of sand that were encountered at various depths below the water table down to
r depths of 40 feet and more.
The report titled Liquefaction Susceptibility for the Des Moines and Renton 7.�-minute
� Quadrangles, Washington, (Geologic Map GM-41), prepared by the Washington State
� Department of Natural Resources, delineates the site as being underlain by Category I soil
deposits. Category I soil is defined having a high susceptibility to liquefaction. The report
- presents quotes from the Mayor and City Engineer of Renton after the 1965, Richter magnitude
� 6.5, Seattle-Tacoma earthquake. Reportedly, the entire lengths of Burnett Street and 7`� Avenue
' required filling and paving to repair settling. In some places, the settlement was reported to be as
-- much as 2 feet. Burnett Street and 7�' Avenue are located just north and west of Grady Way,
respectively, and within a few hundred feet of the project site.
Liquefaction could produce surface disturbance in the form of lateral spreading,
subsidence, fissuring, or heaving of the ground surface, which could result in cracldng, settling or
tilting of the building. Volumetric strain on the order of 1/z to 3 percent could be possible in the
liquefiable layers which conelates the potential settlements of about 4 to 7 inches of settlement,
depending on the thickness of liquefiable soils. Due to the potential for liquefaction, as well as
the relatively high settlement potential for shallow foundations, a pile foundation system that
transmits foundation loads to the competent bedrock or dense soils encountered at a depth of
� approximately 19 to approximately 85 feet is recommended.
Site Pre arp ation
Critical geotechnical considerations on the site include the moisture-sensitive soils
encountered, high groundwater conditions along the east side of the site, the poor quality coal
tailings fill across the site, and the deeper compressible and potentially liquefiable soils. The
design recommendations presented in this report are therefore based on the observed conditions
and on the assumption that earthwork for site grading, utilities, foundations, floor slabs, loading
dock walls, and pavements will be monitored by a qualified geotechnical engineer.
Any existing buried utilities, underground storage tanks or septic tanks on the site should
be removed, relocated, or abandoned, as necessary, in accordance with all local, state and federal
� regulations. Localized excavations made for removal of utilities should be backfilled with
structural fill as outlined in the following section of this report. The excavated soils should be
considered unsuitable for reuse as structural fill.
Stripping, excavation, grading, and subgrade preparation should be performed in a ma�er
and sequence that will provide positive drainage at all times and provide proper control of
erosion. Accumulated water must be removed from subgrades and work areas immediately and
Zin�er Zeman Associates.Inc.
18905 33rd Avenue W.,Suite 117 Lynnwood,Washington 98036 (42�)'71-3304
Proposed Retail Development J-1470
S. Grady Way and Talbot Road December 6,2002
--- Renton,Washington Page 16
prior to performing further work in the area. If ponded surface water collects it should be pumped
or drained to provide a suitable discharge location. The site should be graded to prevent water
from ponding in construction areas and/or flowing into excavations. Exposed grades should be
crowned, sloped, and smooth-drain rolled at the end of each day to facilitate drainage if inclement
weather is forecasted. Equipment access may be limited if drainage efforts are not accomplished
in a timely sequence. Project delays and increased costs could be incurred due to the muddy
conditions if a working drainage system is not utilized.
Site preparation will require the removal of limited surface vegetation and organic-rich
topsoil across the site. Based on the conditions encountered in the explorations, we recommend
that all organics, root mats, and topsoil be stripped to an average depth of 6 inches in those areas
where topsoil is present. Additional removal of vegetation and/or organic-rich soils, such as in
areas of heavy vegetation, should be determined by a qualified geotechnical engineer at the time
of grading based on the subgrade material's organic content and stability. �
In general, relatively wet condirions prevail in the project area between November and
May. During this period, the existing surficial fill soils could remain relatively wet and unstable.
A relatively high groundwater table along the east side of the site and the probability of cutting
. this area down to approximately elevation 35 or 36 feet will expose very loose fill soils that are
- - currently wet to saturated. The surficial soils aze sensitive because of the elevated moisture
. contents and will become unstable if they are not protected from construction traffic. In wet
conditions, additional soils will need to be removed and replaced with a coarse crushed or
naturally occurring sand and gravel or crushed recycled concrete mat. Other stabilization
methods such as lime or cement treatment are not recornmended due to the high organic content
of the coal tailings fill. Where overexcavation is necessary, it should be confirmed through
monitoring and testing by a qualified inspection firm.
We recommend that site preparation and initial construction activities should be planned
�� to reduce disturbance to the existing ground surface. The severity of construction problems will
, _:
I � be dependent, in part, on the precaurions that aze taken by the contractor to protect the moisture
and disturbance-sensitive site soils. Construction traffic should be restricted to dedicated
driveway and laydown areas to prevent excessive disturbance of the parking area and driveway
subgrades. If site stripping and grading acrivities are performed during extended dry weather
periods, a lesser degree of subgrade stabilization may be necessary. However, it should be noted
that intermittent wet weather periods during the summer months could delay earthwork if soil
; moisture conditions become elevated above the optimum moisture content. The use of a working
- surface of pit-run sand and gravel, crushed rock, or quarry spalls may be required to protect the
exisring soils particularly in areas supporting concentrated equipment traffic.
Prior to placing structural fill in the building pad, the subgrade should compacted to a firm
and unyielding condition, moisture conditions permitting. Alternatively, the building pad should
be covered with a woven geotextile equivalent to Mirafi 600X and a minimum of 12 inches of
select granular structural fill. The building pad may then be raised to the planned finished grade
with compacted structural fill. Subgrade preparation and selection, placement, and compaction of
? structural fill should be performed under engineering controlled conditions in accordance with the
� project specifications. We recommend that the building pad be surfaced with a minimum of 18
Zi�ner Zeman Associates.Inc.
18905 33rd Avenue V4'.,Suite 117 Lynnwood,Washington 98036 (425) 771-3304
Proposed Retail Development J-1470
S.Grady Way and Talbot Road December 6,2002
- Renton,Washington Page 17
inches of "select" granular fill, or free-draining crushed ballast or base course, as defined by
Sections 9-03.9(1) and 9-03.9(3), respectively, of the 2002 WSDOT Standard Specifications
Manual. Material considered to be "select" should meet the 2002 WSDOT Standard
Specifications Section, 9-03.14(1), Gravel Borrow, or be approved by the owner's geotechnical
engineer. Haul roads should be constructed by placing a woven geotextile such as Mirafi 600X or
Amoco 2006 over the existing coal tailings with a minimum of 12 inches of select granular fill
placed over the fabric. 'The fabric should only be placed in areas between the rows of augercast
piles and not where the piles will be drilled.
If earthwork takes place during freezing conditions, all exposed subgrades should be
- allowed to thaw and then be recompacted prior to placing subsequent lifts of structural fill or
foundation components. Altematively, the frozen material could be stripped from the subgrade to
reveal unfrozen soil prior to placing subsequent lifts of fill or foundation components. The frozen
' soil should not be reused as structural fill until allowed to thaw and adjusted to the proper
moisture content, which may not be possible during winter months.
Structural Fill
�-,
. All structural fill should be placed in accordance with the recommendations presented
��� herein. Prior to the placement of structural fill, all surfaces to receive fill should be prepared as
previously recommended in Site Preparation section of this report.
Structural fill includes any fill material placed under footings, pavements, or other
permanent structures or facilities. The existing surficial fill soils should be considered unsuitable
___ for reuse as structural fill. Limited zones of silty sand may be encountered in the large lobe of
coal tailings fill on the east side of the site and should be considered suitable for reuse as
structural fill. However, it appears that the majority of the lobe consists of coal.
� It appears that material used as structural fill will need to be imported. On-site soils
considered suitable for reuse appear to be limited to the base course material beneath the existin�
. . asphalt pavement and limited pockets of silty sand that is layered in the coal tailings fill.
Materials typically used for import structural fill include clean, well-graded sand and gravel ("pit
run"), clean sand, various mixtures of sand, silt and gravel, and crushed rock. Recycled concrete,
if locally available, is also useful for structural fill provided the material is thoroughly crushed to
a well-graded, 2-inch minus product. Structural fill materials should be free of deleterious,
organic, or frozen matter and should contain no chemicals that may result in the material being
classified as "contaminated".
Import structural fill for raising site grades can consist of a combination of"common" and
' "select granular" material. "Common" structural fill consists of lesser quality, more moisture-
! sensitive soil, such as the soils encountered at the project site, that is free of organics and
deleterious materials, is compactable to a firm and unyielding condition, and meets the minimum
specified compaction levels. We recommend that common structural fill meet the requirements
of the 2002 WSDOT Standard Specifications Section, 9-03.14(3), Common Borrow.
7i�er Zeman Associates.Inc.
;
18905 33rd Avenue W.,Suite 117 Lynnwood,Washington 98036 (425)771-3304
Proposed Retail Development J-1470
S. Grady Way and Talbot Road December 6,2002
�- Renton,Washington Page 18
' "SelecY' granular fill consists of free-draining naturally occumng, crushed aggregate, or
- quarry spalls. Select fill is generally used when less moisture sensitive material is needed for
structural fill applications. "Select" structural fill should meet the requirements of the 2002
WSDOT Standard Specifications Sections, 9-03.12(2), Gravel Backfill for Walls or 9-03.14(1),
- for Gravel Borrow.
Structural fill should be placed in lifts not exceeding 8 inches in loose thickness.
- Individual lifts should be compacted such that a minimum density of at least 95 percent of the
modified Proctor (ASTM:D-1557) maximum dry density is achieved. Higher compaction levels
should be achieved where called for in the project specifications of the local development
standards. Subgrade soils below pavement areas and all base course materials should also be
compacted to a minimum of 95 percent of the Modified Proctor maxirnum dry density. The top
12 inches of compacted structural fill should have a maximum 2-inch particle diameter and alI
underlying fill a maximum 6-inch diameter unless specifically recommended by the geotechnicar
engineer and approved by the own�r. We recommend that a qualified geotechnical engineer from
ZZA be present during the placement of structural fill to observe the work and perform a
representative number of in-place density tests. In this way, the adequacy of earthwork may be
evaluated as grading progresses.
The suitability of soils used for structural fill depends primarily on the gradation and
moisture content of the soil when it is placed. As the fines content (that portion passing the U.S.
No. 200 sieve) of a soil increases, it becomes increasingly sensitive to small changes in moisture
content and adequate compacrion becomes more difficult or impossible to achieve. We therefore
recommend that grading activities be scheduled for the driest time of year in consideration of the
moisture-sensitive nature of the site soils. Adjusting the moisture content of the site soils during
the wetter and colder months between November and March would be much more difficult to
accomplish. If inclement weather or soil moisture content prevent the use of imported common
_, borrow material as structural fill, we recommend that use of"select" granular fill be considered.
It should be noted that the placement of structural fill is in many cases weather-dependent and
delays due to inclement weather are common even when using "select" granular fill.
Reusing wet or excessively over-optimum on-site or import soils for structural fill would
necessitate treahnent of the soils to reduce the moisture content to a level adequate for
compaction. In the summer, air drying is commonly incorporated. When air drying is not
feasible, kiln dust admixtures are typically used to increase the workability of the wet soils to a
level where the soils can be compacted. The admixtures are extremely alkaline and can increase '
the pH of the soil mixture. Before such admixtures are considered, we recommend that their use
be submitted to the appropriate overseeing agency since some jurisdictions are putting restrictions
on their use, in particular kiln dust. If moisture conditioning of the soils is required to increase the
moisture content of dry-of-optimum soils, we recornmend that the soils be uniformly blended
with the added moisture.
Based upon the nature of the existing fill soils, it is our opinion that the subgrade soils
exhibit a low potential for swelling. However because the surficial fill soils consist primarily of
coal, we anticipate that the material left in place could generate methane over time.
Zioner Zeman Associates.Inc.
18905 33rd Avenue`'��., Suite 117 Lynnwood,Washington 98036 (42�)771-3304
Proposed Retail Development J-1470
I �_ S.Grady Way and Talbot Road December 6,2002
- Renton,Washington Page 19
Excess soils may require stockpiling for extended periods of time before they can be used.
_ . It is recommended that all stockpiled soils intended for reuse as structural fill be protected with
anchored polyethylene sheet plastic strong enough to withstand local wind conditions.
Utili Trenching and Backfilling
Exisring on-site, underground utilities should be removed, relocated or properly
abandoned in place in order to prevent possible future settlement problems. All existing
underground utilities should be decommissioned, abandoned, or backfilled in accordance with all
applicable State and local regulations. Alternatively, abandoned utilities may be grouted in place.
If the trench backfill materials above the existing utilities consist of coal tailings fill, we
recommend that it be considered unsuitable for reuse as structural fill anywhere on site. If any
exisring utilities are to be preserved, grading operations must be carefully performed so as to not i
disturb or damage the e�sting utility. -
We anticipate that most utility subgrades will consist of very loose to loose coal tailings
fill or possibly soft silt, loose silty sand, or peaty soils. Soils deemed unsuitable for utiliry support 'I
should be overexcavated a minimum of 12 inches in order to develop a firm, uniform base. Where
, peat is encountered, we recommend that the entire thiclrness of the material be removed and
replaced. The replacement fill will be difficult to compact due to groundwater seepage and/or the
underlying so$, native soils. Where possible, the structural fill used to replace overexcavated I
soils should be compacted as specified and as recommended in this report. Where water is
encountered in the excavations, it should be removed prior to fill placement. Alternatively, clean
(less than 1 percent fines) quarry spalls could be used for backfill below the water level. We
recommend that utility trenching, installation, and backfiiling conform to all applicable federal,
state, and local regulations such as OSHA for open excavations.
In boring B-37, approximately 4 feet of peat was encountered at a depth of about 8'/z feet
below eacisting grade or about elevation 33%Z feet. This is in the area of an alignment for a 4-foot
diameter pipe that will convey mine runoff along the toe of a permanent retaining wall. We
understand that the pipe may be covered with as little as one foot of soil. Given the proposed cut
of about 5 to 6 feet in the area of boring B-37, it appears that the pipe invert will be situated in the
middle of the peat. It is our opinion that the peat is not suitable for support of the pipe and should
therefore be overexcavated and replaced with compacted structural fill. It appears that dewatering
will be necessary to accomplish this since groundwater was encountered approximately 8 feet
below grade at the time of drilling. We recommend that similar measures be taken for all deep
utilities and structures, such as manholes and vaults, when peat or otherwise unsuitable materials
are encountered. We recommend that trench excavation and preparation for all utilities be
completed in general accordance with WSDOT Standard Specification 7-08.
Existing on-site soils are considered unsuitable for utility trench backfill. Instead,
imported soils that can be compacted to the minimum recommended levels should be used taking
into consideration the surrounding soil and groundwater conditions at the time of construction.
Pipe bedding and cover should be placed according to utility manufacturer's recommendations
and local ordinances. Generally, it is recommended that a minimum of 4 inches of bedding
material be placed in the trench bottom. All bedding should conform to the specifications
Ziuner Zeman Associates.Inc.
18905 33rd Avenue W.,Suite 117 Lynnwood,Washington 98036 (4?5)i71-3304
Proposed Retail Development J-1470
S. Grady Way and Talbot Road December 6,2002
Renton,Washington Page 20
gresented in Section 9-03.12(3) of the WSDOT Standard Specifications Manual or be approved
by the owners' geotechnical representative based upon specific conditions encountered at the site.
All excavations should be wide enough to allow for compaction around the haunches of pipes and
underground tanks. Otherwise, materials such as controlled density fill or pea bravel could be
used to eliminate the compactive effort required.
Backfilling for the remainder of the trenches could be completed utilizing common fill or
select granular fill, depending on soil moisture and weather conditions, as well as groundwater
levels. Compaction of backfill material should be accomplished with soils within t2 percent of
their optimum moisture content in order to achieve the minimum specified compaction levels set
forth in this report and project specifications. However, initial lift thiclaiess could be increased to
levels recommended by the manufacturer to protect utilities from damage by compacting
equipment. For planning purposes, we recommend that all native soils be considered unsuitable
� for reuse as structural fill. -
Filtered sump pumps placed in the bottoms of excavatians or other conventional
� dewatering techniques are anticipated to be suitable for dewatering excavations that terminate
above the water table, if seepage is encountered. Pumped dewatering well systems would likely
. be required to facilitate excavations below the water table.
a '
,
Pre-bid test pits could assist in evaluating the most economical means of site excavation.
Relatively flat slopes, benching, or temporary bracing may be needed. Conventional trench box
shoring is also an option for the project,
Tempo� and Permanent Slo�es
, Temporary slope stability is a function of many factors, including the following:
• The presence and abundance of groundwater;
• The type and density of the various soil strata;
� The depth of cut;
• Surcharge loadings adjacent to the excavation;
• The length of tirne the excavation remains open.
It is exceedingly difficult under the variable circumstances to pre-establish a safe and
"maintenance-free" temporary cut slope angle. Therefore, it should be the responsibility of the
contractor to maintain safe temporary slope configurations since the contractor is continuously at
the job site, able to observe the nature and condition of the cut slopes, and able to monitor the
subsurface materials and groundwater conditions encountered. It may be necessary to drape
temporary slopes throughout the site with plastic sheeting or other means to protect the slopes
from the elements and minimize sloughing and erosion. Unsupported vertical slopes or cuts
deeper than 4 feet are not recommended if worker access is necessary. The cuts should be
adequately sloped, shored, or supported to prevent injury to personnel frorn local sloughing and
spalling. The excavation should conform to applicable federal, state, and local regulations.
Zip„per Zeman Associates.Inc.
1890� 33rd Avenue W,,Suite 117 Lynnwood,l�'ashington 98036 (42�)771-3304
Proposed Retail Development J-l470
S.Grady Way and Talbot Road December 6,2002
Renton,Washington Page 21
We recommend that all permanent slopes constructed in the coal tailings be designed at a
3H:1V (Horizontal:Vertical) inclination or flatter. Temporary siopes should be excavated at an
inclination no steeper than 2H:1 V. Where wet or saturated coal tailings are exposed, temporary
and permanent slope angles flatter than those may be necessary.
Permanent structural fill placed on existing slopes steeper than SH:1 V
(Horizontal:Vertical) should be keyed and benched into natural soils of the underlying slope. We
- recommend that the base downslope key be cut into undisturbed native soil. The key slot should
be at least & feet wide and 3 feet deep. The hillside benches cut into the native soil should be at
least 4 feet in width. The face of the embankment should be compacted to the same 95 percent
_ relative compaction as the body of the fill. This may be accomplished by overbuilding the
embankment and cutting back to the compacted core. Alternatively, the surface of the slope may
be compacted as it is built, or upon completion of the embankment fill placement.
Shorin�Desigr�Criteria '
Development of the site will require the construction of a permanent retaining wall near
the southeast corner of the proposed building. The exposed maximum height of the wall will be
approximately 18 feet. However, we understand that a 4-foot diameter pipe will be installed
• along the base of the wall to convey mine runoff that currently is routed to the site and then
through an aqueduct to the south end of the site. Below the pipe, the native soils will consist of
very loose sand and silty sand, as well as soft peat, and silt. Sandstone bedrock was encountered
about 19 to 24 feet below the existing ground surface in the area of the wall. Based on the
subsurface conditions encountered at the site we recommend that the retaining wall consist of
soldier pile shoring with permanent riebacks. A permit to allow the permanent tiebacks in the
Benson Road right-of-way will likely be necessary for a tieback-supported system. If permanent
tiebacks aze not permitted, it will be necessary to consider designing a cantilevered soldier pile '
wall or a temporarily tied-back wall that is integrated with a pile-supported concrete retaining I
- wall.
The lateral movement of soil and shoring surrounding the excavation will cause varying ,
degrees of settlement of streets and sidewalks adjacent to the excavation. The settlement-
sensitivity and importance of any adjacent structures and improvements need to be considered
when selecting appropriate shoring system and design criteria. The excavation will be near
Benson Road that contains utilities that may be settlement-sensitive. ii
The shoring design criteria presented in this report should be used by the structural
engineer and contractar to design an appropriate system. The shoring system design should be
reviewed by Zipper Zeman Associates, Inc. for conformance with the design criteria presented in �,
this report. It is generally not the purpose of this report to provide specific criteria for construction
methods, materials, or procedures. It should be the responsibility of the shoring subcontractor to
verify actual soil and groundwater conditions at the site and determine the construction methods
and procedures needed for installation of an appropriate shoring system. �
ZiRper Zeman Associates.Inc.
18905 33rd Avenue W.,Suite 117 Lynnwood,Washington 98036 (425) 771-3304
Proposed Retail Development J-1470
S.Grady Way and Talbot Road December 6,2002
' - Renton,Washington Page 22
I�ateral Earth Pressures and Movement
The design of shoring is conventionally accomplished using empirical relationships and
apparent earth pressure distributions. These earth pressure distributions or envelopes do not
represent the precise distribution of earth pressures but rather constitute hypothetical pressures
from which tieback loads can be calculated which would not likely be exceeded in the excavation.
Additionally, pressures must be selected adjacent to existing settlement-sensitive utilities that will
tend to limit deflections, both vertical and horizontal.
Design of temporary shoring could be based on either "active" or "at-rest" lateral earth
pressures, depending on the degree of deformation of the shoring that can be tolerated. Shoring
which is free to deform on the order of 0.001 to 0.002 dmes the height of the shoring is
considered to be capable of mobilizing active earth pressures. This lateral deformation is likely to
be accomplished by vertical settlement of up to roughly 0.005 times the height of the shoring;
which may extend back from the side of the cut a distance equal to roughly the height of the cut.
Lesser degrees of settlement may also occur within a setback extending twice as far back. A
greater amount of lateral deformation could lead to greater vertical settlements behind the wall. If
no structural elements aze located within this zone, or if any structural elements within the zone
. are considered to be insensitive to this degree of settlement, then it would be appropriate to design
utilizing active earth pressures. An assumed "at-rest" earth pressure condition theoredcally
assumes no movement of the soil behind the shoring; however, some settlement should
realistically be anticipated due to construction practices and/or the fact that it is not possible to
construct a perfectly stiff shoring system.
All deep excavations do invite a certain amount of risk. Since the selection of shoring
techniques and criteria affect the level of risk, we recommend that the final selection of shoring
1 design criteria be made by the owner in conjunction with the structural engineer and other design
, team members. The project shoring walls could be designed using active pressures, provided
lateral movement and vertical settlement to the degree described above is considered tolerable.
The anticipated lateral and vertical movements of 1-inch or less with active earth pressures are
typically tolerable for streets and buried utilities.
For the case of a cantilevered shoring system, or shoring with only one level of internal or
external bracing, the applied lateral pressure would be represented by a triangular pressure
distribution termed an equivalent fluid density. Figure 4 of this report illustrates the
recommended pressure distribution. We recommend an active pressure equivalent fluid density
of 36 pounds per cubic foot (pc� for these conditions. Additional lateral pressure should be
added to this value to model surcharges such as street or construction loads, or existing
foundation and floor loads. For design of shoring for assumed "at-rest" earth pressure conditions,
with cantilever piles or one level of bracing, we recommend using an equivalent fluid density of
50 pcf
As noted on Figure 4, a backslope surcharge is recommended for shoring. The backslope
surcharge load is added to the height of the excavation as an equivalent soil height of H/4,where
H is the height of the wall in feet. We also recommend applying a uniform seismic pressure of
16H to the shoring wall. It appears that Benson Road is more than 25 feet away from the wall and
Zinner Zeman Associates.Inc.
18905 33rd Avenue W., Suite 117 Lynnwood,Washington 98036 (425)771-3304
Proposed Retail Development J-1470
S.Grady Way and Talbot Road December 6,2002
Renton,Washington Page 23
should not impose a traffic surcharge. Other surcharge pressures acting on the shoring can be
determined by the methods shown on Figure 5, and should be added to the lateral earth pressures
as discussed above.
Soldier Piles
Soldier piles for shoring are typically set in pre-augered holes and backfilled with lean or
structural concrete. Vertical loads on such piles could be resisted by a combination of friction and
' � end bearing below the base of the excavation. We recommend neglecting the side friction
throughout the loose and soft native soils and using a value of 2,000 psf in the sandstone. An
allowable end-bearing value of 30 ksf (kips per square foot) can be used for soldier piles
embedded at least 5 feet into the sandstone. The above values include a factor of safety of 1.5.
_ Embedment depth of soldier piles below final excavation level must be designed to
provide adequate lateral or "kick out" resistance to horizontal loads below the lowest strut or
' tieback level. For design, the lateral resistance may be computed on the basis of the passive
�-,
pressure presented on Figure 4, acting over twice the diameter of the concreted soldier pile
section or the pile spacing, whichever is less. We recommend that the passive resistance within
the upper loose and soft soils be neglected and that an allowable passive resistance of 1,200 psf be
_ • used for that portion of the pile embedded in the sandstone.
If excessive ground loss is allowed to occur during pile installarion, increased settlement
of the areas retained by the shoring would be more likely to occur. Soldier pile drilling is
anticipated to extend through water-bearing coal tailings and native sand layers. Casing is
recommended for these drilling conditions, in order to prevent caving. The contractor should be
responsible for installation of casing, or using alternate means at their discretion, to prevent
caving and loss of ground during pile drilling.
.-�� We recommend lagging, or some other form of protection, be installed in all areas. Due to
� soil arching effects, lagging may be designed for 50 percent of the lateral earth pressure used for
shoring design. Prompt and careful installation of lagging will reduce potential loss of ground.
� The requirements for lagging should be made the responsibility of the shoring subcontractor to
prevent soil failure, sloughing and loss of ground and to provide safe working conditions. We
recommend all void space between the lagging and soil be backfilled. The backfill should be
free-draining in order to prevent the build-up of hydrostatic pressure behind the wall. A
permeable sand slurry or pea gravel should be considered for lagging backfill. If the lagging is
exposed for the life of the wall, we recommend that it consist of concrete. If the wall is faced
-. with a protective layer of concrete, the lagging should be adequately treated to resist rot.
Lateral Su��ort and Tiebacks
Lateral support for the shored wall should be provided by tieback anchors. We anticipate
that the anchors will be drilled into competent sandstone bedrock. However, historical records
indicate that there were mineshaft adits in the area of the project site. Review of the historical
documents leads us to suspect that one of the mine openings may be along the alignment of the
existing 48-inch drainpipe that daylights on the project site. We did not encounter conditions that
Ziooer Zeman Associates.Inc.
18905 33rd Avenue W.,Suite 117 Lynnwood,Washington 98036 (425)771-3304
Proposed Retail Development J-1470
S.Grady Way and Talbot Road December 6,2002
.-. Renton,Washington Page 24
would indicate the presence of the shafts. However, if a zone of fill and/or a mineshaft exists in
the anchor zone of the proposed wall, it may not be possible to install some of the riebacks as
recommended. We recommend that additional subsurface explorations be completed in support of
' the retaining wall design. If a mineshaft is present in the tieback zone, further definition of the
conditions prior to bidding would reduce the possibility of change orders and delays during
construction. Evaluations could consist of surficial geophysical evaluations using resistivity or
magnetics and/or downhole geophysical methods in predrilled holes. We also recommend that
the 48-inch pipe be logged with a camera to determine its alignment and where it terminates.
The anchor portion of the tieback must be fully located a sufficient distance behind the
retained excavation face to develop resistance within the stable soil mass. We recommend the
anchorage be attained behind an assumed failure plane that is formed by a 60° angle from the base
' of the excavation and set back from the retained excavation face for a horizontal distance of one-
� - fourth the height of the soldier pile above the bottom of the excavation. The zone in front of the
above-described plane is called the "no-load zone". The unbonded portion of the tieback anchor
should extend entirely through the no-load zone, and should be a minimum of 15 feet in length.
- The anchor portion of the tieback should be a minimum length of 12 feet. All tieback holes
within the no-load zone should be immediately backfilled. The sole purpose of the backfill is to
, prevent possible collapse of the holes, loss of ground and surface subsidence. We recommend
��,::; that the backfill consist of sand or a non-cohesive mixture. Sand/cement grout could be utilized
oniy if some acceptable form of bond-breaker (such as plastic sheathing) is applied to the tie-rods
within the no-load zone.
' Anchor holes should be drilled in a manner that will minimize loss of ground and not
' disturb previously installed anchors. Caving will likely occur in the coal tailings above the
sandstone and will likely require the use of casing. Caving could also occur if wet or saturated
zones are encountered. Drilling with and grouting through a continuous-flight auger or a casing
�-
would reduce the potential for loss of ground.
Using the design values presented herein is dependent on a well-constructed anchor. We
recommend that concrete be placed in the drilled tieback anchor hole by tremie methods such as
pumping through a hose placed in the bottom of the hole or pumping through the center of a
continuous-flight auger. In this way, the grout is forced up through the anchor zone under
pressure, with the resulting anchor more likely to be continuous. The grout should not be placed
into the anchor zone by simple gravity methods such as flowing down a chute. We recommend
that Zipper Zeman Associates, Inc. monitor all tieback installation.
With a low-pressure grouted tieback shoring system, we estimate an allowable concrete-
sandstone adhesion of 3,000 pounds per square foot (ps fl is recommended. We recommend that
all anchors be located at least 10 feet below ground surface. For high-pressure grouted or
secondary grouted anchors, the adhesion is highly dependent on grouting procedures. For
planning purposes, a four-inch diameter pressure-grouted tieback can be assumed to have the
same capacity per lineal foot as a 12-inch diameter low-pressure grouted (augered) tieback, or '
roughly 9 kips per lineal foot.
Ziouer Zeman Associates.Inc. I
18905 33rd Avenue W., Suite 117 Lynnwood,Washington 98036 (425)771-3304
Proposed Retail Development J-1470
S.Grady Way and Talbot Road December 6, 2002
Renton,Washington Page 25
Tieback Testing and Lockoff
All permanent tieback anchors should be perFormance tested to at least 150 percent of
design capacity prior to lockoff. Performance testing should include increasing the load on the
- tieback to the test load in five increments. Each increment is to be held long enough to obtain a
stable measurement of rieback deflection, and the 150 percent load is to be held until five minutes
elapse with less than 0.01 inch of creep movement. The anchors should then be locked off at 80
percent of design load.
Tieback adhesion capacities presented in this report are estimates based on soil conditions
encountered in the borings. The final adhesion capacity for each anchor installation method and
soil type should be determined by field tests. We recommend that at least two, 300-percent
tieback proof tests be completed prior to instatling production tiebacks for each soil type and
installation method. Proof tests should consist of applying the load in eight increments to the test
load, with each increment held until 5 minutes elapses with less than 0.01 inch of creep. The 300-
percent load should be held unti130 minutes elapse with less than 0.01 inch of creep.
Acceptance criteria for tieback tests should include all of the following:
1. Hold maximum test load for required duration with less than 0.01-inch of creep;
2. Linear or near-linear plot of unit anchor stress and movement, with creep movement less than
0.08 inches per log cycle of time;
3. Total movement during performance test loading, from 50 to 150 percent of design load,
exceeds 80 percent of theoretical elastic elongation of unbonded tendon length;
4. Total movement during test loading, does not exceed theoretical elastic elongation of
unbonded tendon length plus 50 percent of bond length;
5. Performance of the anchor head/pile connection acceptable to the structural engineer. -
Failure of an anchor to meet the required test acceptance criteria should be brought to the
attention of the structural engineer. In most cases, where total anchor movement is within
tolerable ranges, a reduced capacity will be assigned to the subject tieback. If total anchor
movement is in excess of 6 inches, we recommend that the anchor be abandoned and replaced.
Shorin,g.�Vlonitoring
Any time an excavation is made below the level of existing buildings, utilities or other
structures, there is risk of damage even if a well-designed shoring system has been planned. We
recommend, therefore, that a systematic program of observarions be conducted on adjacent
facilities and structures. We believe that such a program is necessary for two reasons. First, if
excessive movement is detected sufficiently early, it may be possible to undertake remedial
measures that could prevent serious damage to existing facilities or structures. Second, in the
unlikely event that problems do arise, the responsibility for damage may be established more
equitably if the cause and extent of the damage are better defined. Monitoring can consist of
conventional survey monitoring of horizontal and vertical movements.
Zinoer Zeman Associates.Inc.
18905 33rd Avenue W., Suite 117 Lynnwood,Washington 98036 (425) ??1-3304
Proposed Retail Development J-1470
S.Grady Way and Talbot Road December 6,2002
Renton,Washington Page 26
The monitoring program should include measurernents of the horizontal and vertical
movements of the retained improvements and the shoring system itself. At least two reference
lines should be established adjacent to the excavation at horizontal distances back from the
excavation space of about 1/3H and H, where H is the final excavation height. Monitonng of the
shoring system should include measurements of vertical and horizontal movements at the top of
each soldier pile. If local wet areas are noted within the excavarion, additional monitoring points
should be established at the direction of the soils engineer. Reference points for horizvntal
movement should also be selectively placed at various tieback levels as the excavation progresses.
The measuring system used for shoring monitoring should have an accuracy of at least
0.01-foot. All reference points on the existing structures should be installed and readings taken
prior to commencing the excavation. All reference points should be read prior to and during
critical stages of construction. The frequency of readings will depend on the results of previous
readings and the rate of construction. As a minimum, readings should be taken about once a week
throughout construction until the excavation is completed. A registered surveyor should complete
all readings and the data should be reviewed by the geotechnical engineer.
Buildin,g Foundations
We recommend that the proposed building be supported on pile foundations due to the
risk of settlements that exceed the maximums presented in the Geotechnical Investigation and
Report Requirements. We recommend that foundation support be provided by augercast piles,
although other pile options such as timber or pipe piles could be considered. If steel piles are
considered, the effects of corrosion will need to be taken into account. We can provide
recommendations for alternarive pile options,if requested.
As noted in the Subsurface Conditions section of this report, the thickness of coal tailings
fill, compressible soils, and potentially liquefiable soils, and the depth to sandstone bedrock varies
across the site. In general, the depth to sandstone bedrock varies from about 19 to more than 110
feet below existing grades. We anticipate that the auger will be able to slightly penetrate the
bedrock as it appears to be moderately to highly weathered at the contact. It is our opinion that
piles can achieve the recommended allowable capacities with a maximum length of 85 feet.
We understand that the former buildings on site were timber pile supported. Of the two
pile supported buildings, the proposed building envelopes one entire building and a portion of
another. Therefore, we recommend that the layout of the piles take into consideration the location
of the existing piles. We also recommend that the location of the piles be surveyed in order to
modify the layout of the new piles before construction begins.
An augercast pile is formed by drilling to an appropriate pre-determined depth with a
continuous-flight, hollow-stem auger. Cement grout is then pumped down the stem of the auger
under high pressure as the auger is withdrawn. The final result is a cast-in-place pile.
Reinforcing can be lowered into the unset concrete column to provide lateral and/or tension
capabilities.
7,�' �er Zeman Associates.Inc.
18905 33rd Avenue W.,Suite 117 Lynnwood,Washington 98036 (425)771-3304
Proposed Retail Development J-14'0
S.Grady Way and Talbot Road December 6,2002
Renton,Washington Page 2;
Pressure grouting methods typically result in a grout column diameter in excess of the
nominal diameter of the drilled hole. The soft and loose soils on the site could provide difficult to
augercast pile construction due to grout loss into the loose/soft soil strata. We anticipate grout
volumes within the soil column could average about 150 to 180 percent of the theoretical volume
of drilled holes. The contractor should be required to stagger the pile grouting and drilling ,
operations, such that all completed piles within 10 feet of the pile being drilled have set for at �
ieast 24 hours. Greater spacings may become necessary due to the length of the piles and should
be determined at the time of construcrion.
Augercast piles would gain their vertical compressive capacity mainly from end-bearing
on bedrock or end-bearing and skin friction in soils below the liquefiable zone where bedrock is I
not encountered. Vertical uplift pile capacity will develop as a result of side fricrion between the
pile and the adjacent soil in addition to the weight of the pile. Due to the variable depth of the
bedrock, augercast piles will likely vary in length from about 20 to 85 feet. Recommended ,
augercast pile capacities are presented in Table 1 below. The vertical compressive pile capacities !
presented assume that adjacent piles are located at least three pile diameters apart and that the
piles supported on the sandstone bedrock are embedded a minimum of 2 feet into the rock.
Lateral pile capacities are also presented in Table 1 for 18-inch diameter piles. The allowable
. lateral capacities are based on fixed- and free-head conditions and limiting the deflection to '/2 '
inch.
Because augercast piles are drilled, obstacles such as rocks, utilities, foundations and other
man-placed debris in the subsurface can cause difficult installation conditions. It is possible that
obstacles encountered during drilling the piles would require relocation of piles at the time of
construction if impenetrable obstacles are encountered at planned pile locations. It may be
necessary to periodically remove the pile auger from the holes during drilling in order to verify
depths of the various soil types, and penetration into the bearing soil layer.
We understand that the proposed building will be designed for the typical structural loads
as presented to ZZA in the Geotechnical Investigation Specif cations and Report Reguirements.
Based upon these values, as well as the conditions that could develop during a liquefaction event,
we have developed allowable compressive and uplift capacities for 18-inch diameter augercast
piles. The recommended pile lengths and associated allowable capacities are presented in Table 1
below. The allowable capaciries may be increased by one-third to resist short-term transient
forces. If the piles are spaced closer than three pile diameters, the allowable capacities should be
reduced. The reduction factor will be based on the actual center to center pile spacing and the
configuration of the group.
Zinoer Zeman Associates.Inc.
18905 33rd Avenue W.,Suite 117 Lynnwood,Washington 98036 (425)771-3304
Proposed Retail Development J-1470
I �_ S.Grady Way and Talbot Road December 6,2002
-- Renton,Washington Page 28
r
TABLE 1
ALLOWABLE CAPACITIES OF AUGERCAST PILES � ;
Pile Diameter Estimated Pile Allowable Allowable Allowable Lateral
(Inches) Length (feet) Compressive Uplift Capacity Capacity, fixed
Capacity(tons) (tons)* head/free head ,
tons
18 in bedrock 20 - 30 75 2 6.0/3.0
18 in bedrock 30—40 75 4 6.0/3.0
18 in bedrock 44—50 75 6 6.0/3.0
18 in bedrock 50—60 75 10 6.0/3.0 '�
18 in bedrock 60- 70 75 15 6.4/3.0
18 in bedrock 70 - 80 75 22 6.0/3.0
18 in soil 85 75 36 6.0/3.0
* Does not include the weight of the pile '
Based on an assumed modulus of horizontal subgrade reaction of 3 pci in the loose and
• soft near-surface soils, the stiffness factor (T) for a fixed- and free-head, 18-inch diameter auger-
cast pile was calculated to be 88 inches (7.3 feet). The recommended allowable lateral capacities
are based on 1'uniting deflection to 0.5 inch. We recommend that the reinforcing cages extend a
minimum of 30 feet into each pile, or the full pile length if it is shorter than 30 feet. In addition to
the reinforcing cages,we recommend that a full-length center bar be installed in each pile in order
to develop the allowable uplift capacity.
Some downdrag forces on the piles should be expected to develop over time as the peat
and organic-rich soils consolidate over time. We estimate that forces of up to about � tons could
develop on longest piles that penetrate through the greatest thicknesses of compressible soils.
However, given the 2.5 safety factor applied to the ultimate pile capacities, it does not appear that
the downdrag forces will adversely affect the performance of the piles.
Provided the piles are designed in accordance with our recommendations and they are
constructed in accordance with industry standards, we estimate that total settlements will be less
than one inch. Differential settlements are estimated to be less than 1/2 inch in 40 feet.
The integrity of augercast piles is controlled in the field and can be affected by many
variables. Unlike steel or timber piles with structural characteristics that can be predetermined
during design, the construction of augercast piles must be continuously observed in order to
determine that the piles have been constructed in a manner that will achieve the required design
characteristics. Therefore, we recommend that ZZA provide construction observation services
during the installation of the augercast pile foundations. This will allow us evaluate all of the
variables that go into constructing an augercast pile and determine the adequacy of the piles as
they are constructed.
�uer Zeman Associates.Inc.
18905 33rd Avenue W.,Suite 117 Lynnwood,Washington 48036 (4Z5) 771-�304
Proposed Retail Development J-1470
S.Grady Way and Talbot Road December 6,2002
_ Renton,Washington Page 29
Methane Gas Mitigation
The presence of peat, organic-rich soils and coal tailings at the site can result in the
, generarion of inethane gas as the organics decay. Methane gas will follow the path of least
�_; resistance and has been shown to migrate laterally to find escape paths. It accumulates in pockets
both inside and outside of buildings. Methane can present an explosive hazard if it concentrates in
confined or enclosed spaces within a building, in underground vaults, conduits, and other
, _ collection points. We recommend that a methane barrier system that prevents the passage of
methane gas into the building be provided under the floor slab and that a collecrion and venting
system be installed below the gas barrier. We recommend that the vapor barrier be installed after
the pile foundations have been constructed but before the capillary break is placed. The venting
system should consist of 4-inch diameter perforated pipes fully enveloped in granular soils that is
routed to the outside of the building.
Further study of the development of inethane at the site could be completed to determine
how significant the development of inethane is at the site. We would recommend that a minimum
of four gas collection wells be installed at the site in order to collect samples of the vapor
generated. The concentrarion of inethane would then be determined in the samples and specific
recommendations could be formulated based on the test results.
�tructural Floors
We recommend that all floor slabs be supported on augercast piles due to the thickness of
very loose coal tailings and the risk of liquefaction induced settlements. We recommend that the
slab be supported on a minimum of 12 inches of nonexpansive, granular structural fill compacted
to a minimum of 95 percent of the modified Proctor maximum dry density (ASTM D-1557).
This will provide the support for the augercast pile construction equipment.
' We recommend that 6 inches of free-draining granular material be placed over the
building pad to serve as a capillary break. Aggregates similar to those specified in WSDOT 2002
Standard Specifications for Road, Bridge, and Municipal Construction, listed under specifications
9-03.12(4), 9-03.15 or 9-03.16 can be used for capillary break material provided they are
modified to meet the fines content recommendarion. Alternatively, we recommend that the
capillary break consist of free-draining aggregate that conforms with ASTM D2321, Table 1,
Classes of Embedment and Bacicfill Material, Class IA, IB, or II (GW or GP). The fines content
of the capillary break material should be limited to 3 percent or less, by weight, when measured
on that portion passing the U.S. No. 4 sieve. A water vapor barrier is not considered to be
necessary if a methane gas barrier is constructed. After the capillary break is placed, it will be
required to support the reinforcing steel for the structural floor and its supports (dobies). We
understand that it is very important to maintain the proper clearance between the structural fill
;` subgrade and the rebar. Therefore, we recommend that the contractor submit detailed information
� in a timely manner about the material they intend to use in order to determine its adequacy for the
intended use.
�,
', 7,�'�,uer Zeman Associates.Inc.
18905 33rd Avenue W.,Suite 117 Lynnwood,Washington 98036 (42�) 771-3304
Proposed Retail Development J-1470
S.Grady Way and Talbot Road December 6,2002
- Renton,Washington Page 30
We recommend that all outdoor slabs and sidewalks supported on a minimum of 12 inches
of nonexpansive, granular structural fill compacted to a mi�imum of 95 percent of the modified
Proctor maximum dry density(ASTM D-1557).
. We have estimated a vertical modulus of subgrade reaction of approximately 150 pounds
per cubic inch for a 12-inch thick layer of granular soil compacted to a minimum of 95 percent of
the modified Proctor maximum dry density.
�
Conventional Retaining Walls
The lateral soil pressure acting on backfilled walls will primarily depend on the degree of
compaction and the amount of lateral movement pernutted at the top of the wall during
backfilling operations. If the wall is free to yield at the top an amount equal to at least 0.1 percent
- of the height of the wall, the soil pressure will be less than if the wall structurally restrained from-
lateral movement at the top. We recommend that an equivalent active fluid pressure of 35 pcf be
used for yielding walls and an at-rest equivalent fluid pressure of 55 pcf be used for non-yielding
- backfilled walls. These equivalent fluid pressures assume the bacicfill is compacted to
approximately 90 percent of its modified Proctor maximum dry density. We recommend that we
, be allowed to review the design values and modify them, if necessary, if they are to be applied to
F,;,: walls greater than 12 feet in height. For those portions of foundations embedded more than 18
inches below finish surrounding grade, we recommend using an allowable passive earth pressure
' of 125 and 250 pcf in the existing loose fill and in structural fill that extends laterally beyond the
limits of the footing a distance of twice the embedment depth, respectively. We recommend
using an allowable base friction coefficient of 0.30.
�� The above equivalent fluid pressures are based on the assumption of a uniform horizontal
backfill and no buildup of hydrostatic pressure behind the wall. Surcharge pressures due to
���
sloping ground, adjacent footings, vehicles, construction equipment, etc. must be added to these
values. For loading docks, surcharge loading on the floor slab above the dock will result in a
horizontal, uniformly distributed surcharge on the wall equal to 40 percent of the distributed
vertical loading. We can provide surcharge criteria for other loading conditions behind the
loading dock wall, if requested. We recommend a minunum width of 18 inches of clean,
granular, free-draining material should extend from footing drains at the base of the wall to the
ground surface, to prevent the buildup of hydrostatic forces. Altematively, weepholes on 4-foot
centers could be constructed at the bases of the wall to provide a drainage path. It should be
realized that the primary purpose of the free draining material is reduction in hydrostatic
pressures. Some potential for moisture to contact the back face in the wall may exist even with
this treatment, which may require more extensive water proofing be specified for walls which
require interior moisture sensitive finishes.
� Care should be taken where utilities penetrate through backfilled walls. Minor settlement
of the wall backfill soils can impart significant soil loading on utilities, and some form of flexible
connection may be appropriate at bac�lled wall penetrations.
Zioner Zeman Associates.Inc.
18905 33rd Avenue W.,Suite 117 Lynnwood,Washington 98036 (42�)771-3304
Proposed Retail Development J-1470
S.Grady Way and Talbot Road December 6,2002
Renton,Washington Page 31
Drainage Considerations
A perimeter foundation drainage system is recommended for this site due to the proposed
finish floor elevation and the depth to groundwater at the time of our explorations. All retaining
walls should be designed to include drainage systems that drain by gravity to a storm sewer or
other suitable discharge location.
_ Water from downspouts and surface water should be independently collected and routed
to a suitable discharge location. Final exterior grades should promote free and positive drainage
from the building areas at all times. Water must not be allowed to pond or to collect adjacent to
foundations or within the immediate building area. We recommend that a gradient of at least two
percent for a minimum distance of 10 feet from the building perimeter be provided, except in
paved locations. In paved locations, a minimum gradient of one percent should be provided
_ unless provisions are included for collection and disposal of surface water adjacent to the.
structure.
For design purposes, we recommend using a high groundwater elevation of 34 feet along
the east side of the site. Permanent structures that extend below this elevation should be designed
to resist hydrostatic pressures and should be appropriately waterproofed.
�"'� The two existing mine runoff drainpipes that enter the east side of the site will be
tightlined across a portion of the site. We recommend that the company or agency that owns or is
responsible for their maintenance be determined in order to coordinate a long-term maintenance
and inspection program. We further recommend that the peak flow in the drainpipes be
determined in order to size the proposed tightline pipe. This should likely be done in the late
r� winter or spring when groundwater would be anticipated to be at its highest.
Pavement Design Parameters
rT
��� The subgrade soils are anticipated to generally consist of very loose to loose coal tailings.
_ As such, a CBR sample was not collected because it is our opinion that a minimum of one foot of
- structural fill will be necessary over the coal. Therefore, we have assumed that the fill will have a
minimum California Bearing Ratio (CBR) of 50 percent. This would be similar to using a pit-run
sand and gravel soil. All soil within the upper one foot of the base course must have pavement
support characteristics at least equivalent to this and must be placed under engineering controlled
conditions. A confirmatory CBR test should be completed on the proposed import road bed
material.
�snhalt Concrete Pavement
� ' It must be recognized that pavement design is a compromise between high initial cost and
little maintenance on one side and low initial cost coupled with the need for periodic repairs. As a
result, the owner will need to take part in the development of an appropriate pavement section.
Critical features which govem the durability of the surface include the level of compaction of the
subgrade, the stability of the subgrade, the presence or absence of moisture, free water and
Zi�oer Zeman Associates.Inc.
18905 33rd Avenue W., Suite 117 Lynnwood,Washington 98036 (42�) ;71-3304
Proposed Retail Development J-1470
S.Grady Way and Talbot Road December 6,2002
Renton,Washington Page 32
organics, the fines content of the subgrade soils, the traffic volume, and the frequency of use by
heavy vehicles. Our recommendations are based upon a 20-year design life.
The pavement design recommendations assume that the subgrade and any structural fill
will be prepared in accordance with the recommendations presented in this report. The top 12
inches beneath the pavement surface should be compacted to a minimum of 95 percent relative
compaction, using AASHTO T-180 (ASTM: D1557) as a standard. However, the majority of
- the surficial soils consist of coal fill that may be difficult to compact and can break down over
time.
The pavement design recommendations assume that the subgrade and any structural fill
will be prepared in accordance with the recommendations presented in this report. All fill, as
well as the upper 12 inches beneath the pavement surface should be compacted to a minimum of
95 percent relative compaction, using AASHTO T-180 (ASTM:D1557). Specifications for
manufacturing and placement of pavements and crushed top course should conform to
specifications presented in Divisions 5 and 4, respectively, of the 2002 Washington State
Department of Transportation, Standard Specifications for Roads, Bridges, and Municipal
Construction. We recommend that the subbase course material conform to Sections 9-03.9(1),
. Ballast, 9-03.10, Aggregate for Gravel Base, 9-03.14(1), Gravel Borrow, 9-01.14(2), Select
_ Bonow, or 9-03.11 Recycled Portland Cement Concrete Rubble, with the maximum aggregate
size of 3 inches. The crushed aggregate base course material conform to Section 9-03.9(3),
� Crushed Surfacing Top Course. In lieu of crushed gravel base/top course, asphalt-treated base
(ATB) can be substituted. The ATB would provide a more durable wearing surface if the
pavement subgrade areas will be exposed to construction traffic prior to final paving with Class
_ B asphalt. Production and placement of asphalt should be completed in accordance with Section
5-04 of the WSDOT Standard Specifications. We recommend using a Class B mix as described
in Section 9-03.8(6), Proportions of Materials, of the WSDOT Standard Specifications. ATB
�,., should conform to the specifications of Section 4-06, Asphalt Treated Base of the WSDOT
' Standard Specifications.
i
Recommended Pavement Sections for 20-Year Lifes an '
ATB Substitute for
Traffic Asphalt Crushed TopBase Pit-Run Subbase Crushed Aggregate
Thiclrness in. Course in. Inches Inches *
Hea 4 4 12 3
Standard 3 4 12 3 �
*ATB: Asphalt Treated Base may be substituted for crushed TopBase Course beneath Class B asphalt.
Pavement design recommendations assume that the subgrade can be compacted to a
minimum of 95 percent of the modified Proctor maximum dry density and that construcrion
monitoring will be performed. If the subgrade can only be compacted to 90 percent of the
modified Proctor or 95 percent of the standard Proctor, we recommend that an additional 5 inches
of subbase be added to the pavement section. Continual flexible pavement maintenance along
. with major rehabilitarion after about 8 to 10 years should be expected to obtain a 20-year service
life.
Zioner Zeman Associates.Inc.
18905 33rd Avenue W.,Suite 117 Lynnwood,Washington 98036 (425) 7?1-3304
Proposed Retail Development J-1470
S.Grady Way and Talbot Road December 6,2002
Renton,Washington Page 33
If possible, construction traffic should be limited to unpaved and untreated roadways, or
specially constructed haul roads. If this is not possible, the pavement design should include an
allowance for construction traffic.
Stabilizing the subgrade with a fabric such as Mirafi 600X or similar may be necessary
during wet weather construction or wet subgrade conditions. Proper geotextile fabrics will
maintain segregation of the subgrade soil and base course materials. If the subgrade soils are
allowed to migrate upwards into the base course,the result would be decreased pavement supporc.
The use of stabilizarion fabric will not reduce the necessary base rock thickness, as fabric does not
provide structural strength at such shallow depths. If the subgrade is disturbed when wet,
overexcavation may be required and backfill with import fill.
Concrete Pavement -
Concrete pavement design recornmendations are based on the soil parameters used for the
- asphalt pavement design, and an assumed modulus of rupture of S50 psi and a minimum
compressive strength of 4,000 psi for the concrete. For standard and heavy-duty concrete
. pavement sections, minimum concrete pavement sections are presented below.
Recommended Base and Subbase Thiclrness
Traffic Concrete Crushed Base Pit-Run Subbase (in)
Surfacin in Course in
Hea 6 4 12
Standard 5 4 12
The materials and construction procedures should be in accordance with WSDOT
, Standard Specifications for concrete pavement construction.
Stormwater Detention
It appears that underground stormwater detention vaults may be constructed on site. If
liquefaction related settlements can not be tolerated, we recommend that the vaults be supported
on augercast piles. Even if the vaults are supported on piles, we recommend that the grading be
completed prior to excavating for the vaults in order to preconsolidate the native soils around the
limits of the vault. We recommend that the area of the vaults be preloaded with a 3-foot
surcharge (using a soil with a unit weight of 125 pc fl to reduce the effects of differential
settlements around the perimeter of the vault that would likely be manifested in the asphalc
surfacing over time. This surcharge should extend at least 5 feet beyond the limits of the vault
and be left in place a minimum of 4 weeks. We esrimate that the resulting consolidation could be
on the order of 1 inch or more. Based on previous projects with similar conditions,we understand
that settlement of this magnitude may not be acceptable with respect to the possibility of damage
to the pipe connections at the vault.
We recommend that a minimum of two settlement plates be installed on the existing
subgrade at each vault location and that the elevations of the plates be determined prior to the
Zinner Zeman Associates.Inc.
18905 33rd Avenue W.,Suite 117 Lynnwood,Washington 98036 (425) 771-3304
Proposed Retail Development J-1470
S.Grady Way and Talbot Road December 6,2002
- Renton,Washington Page 34
placement of any structural filUsurcharge soils. Readings made by a qualified surveyor should be
completed twice a week until the finish subgrade elevation has been achieved. From then on, the
readings should be taken once a week until it is determined that the vault excavation can begin.
The survey information should be provided to ZZA in a timely manner for review.
Because of the loose/soft, wet subgrade conditi�ns below the surface, (even after
preloading) we recommend that vault subgrades be overexcavated a minimum of 18 inches in
order to replace the loose/soft soils with relatively uncompressible granular soils. These materials
would also provide a working surface. If the vaults are not pile supported and peat is encountered
in the bottom of the excavation, we recommend that all of the peat be removed and replaced with
- - compacted structural fill. Prior to placing the granular fill, we recommend that a geotextile such
as Amoco 1199, Layfield 104F, or similar(with an AOS of 70 or less) be placed over the exposed
subgrade except in those areas where the augercast piles will be installed. The fill should be
- placed in maximum 6-inch thick lifts and be statically rolled and compacted. Vibratory
compactors should be used with extreme caution as these could soften and disturb the underlying
native soils. Pumped sumps or well points may also be necessary around the perimeter of the
vaults depending on groundwater levels at the time of construction. If groundwater is present, we
recommend that the water level be maintained a minimum of 18 inches below the top of the
, gravel pad during construction. We recommend that the structural fill placed over the geotextile
consist of select aggregate as described in the Structural Fill section of this report.
At the time of drilling, the groundwater elevations varied between 23 and 34 feet. Where
applicable, we recommend designing the vault for buoyant forces for that portion that extends
below the interpreted seasonal high groundwater levels. If underground vaults are used and their
locations are determined, we recommend that ZZA be contacted in order to determine if buoyant
forces should be incorporated into their design.
CLOSURE
The conclusions and recommendations presented in this report are based, in part, on the
explorations accomplished for this study. The number, location, and depth of the explorations
were completed within the constraints of budget and site access so as to yield the information to
formulate the recommendations. Project plans were in the preliminary stage at the time of this
report preparation. We therefore recommend that ZZA be provided the opportunity to review the
project plans and specifications when they become available in order to confirm that the
recommendations and design considerations presented in this report have been properly
interpreted and implemented into the project design package.
The integrity of earthwork, structural fill, and foundation and pavement performance
depend greatly on proper site preparation and construction procedures. We recommend that a
qualified geotechnical engineering firm be retained to provide geotechnical engineering services
during the earthwork-related construction phases of the project. If variations in the subsurface
conditions are observed at that time, a qualified engineer would be able to provide additional
geotechnical engineering recommendations to the contractor and design team in a timely manner
as the project construction progresses.
��ner Zeman Associates.Inc.
1890� 33rd Avenue W., Suite 117 Lynnwood,Washington 98036 (425) 771-3304
Proposed Retail Development J-1470
S.Grady Way and Talbot Road December 6,2002
.- Renton,Washington Page 35
We appreciate the opporninity to have been of service on this project and would be
pleased to discuss the contents of this report or other aspects of this project with you at your
convenience. If you have any questions,please do not hesitate to call.
__ Respectfully submitted,
Zipper Zeman Associates, Inc.
. �o°�S s�j�1Y
�
��.
Thomas A. Jones,P.E. �' ''� z
Associate '� �' `�
� 29074 W
_ Q��S�ON�������V .
EXPIRES 4/27/ 0 3 1
Enclosures: Figure 1 —Site and Exploration Plan
Figure 2—Generalized Subsurface Profile A-A'
Figure 3 —Pseudostatic Seismic Stability Analysis
Figure 4—Recommended Design Criteria for Shoring, Cantilever or Single Row of
Tiebacks
Figure 5—Surcharge Pressure Acting on Adjacent Shoring or Subsurface Wall
r Appendix A—Field Procedures and Exploration Logs
Appendix B—Laboratory Testing and Classification
Appendix C—Geotechnical Investigation Fact Sheet, Foundation Design Criteria,
'�' Foundation Subsurface Preparation Notes and AASHTO Pavement
Design
Appendix D—Climatic Data
Distribution: PacLand—7 copies
�inoer Zeman Associates.Inc.
18905 33rd Avenue W.,Suite 117 Lynnwood,Washington 98036 (425)771-3304
.- �� .� !
' �� �
,,` .� � � • \ -
'�,� � ,. .-e�2o� � A� �
� ���
�.� , i�/ �'� ��Avy ,. �1
/ ,� � _�� `��,- � � $� �
� ��, /�y /�� 8-19'��� 18 �`_ 'bs6 ��� }�� '', J �
s�- / �B-21 �� �� � �� ` ;� ���� :�•�/ ��a
0 I
z} �
19 tA I 21 .�. '4 ��„
24� . � '� . � ` / . i J�.2 \�� ' ' IE�34/8 � ~ i ' ` �/
0 1 Zo ;,,� �/ TB-'I 02 i 23 `�, " � \ '�
•.e� � �j '�,I � �G6-17 � Z, r ,� � �'\. y� • �
APPROXIMATE SCALE IN FEET v � / � � 1e GB 1 � � �� �.� � � �
v� ,� �1\�=a'
s--� ��' ,�� � � �� '-�---- -'�1----� ��. �&17 �. .'� -15� ' � '� � � � ,
�� �. � , yo y: }1' J.l 103� . �. �' y .
�� � , 23 � �� ' -
\ /� \. zc � ��' • ���2 � �. �'0' v �
� / .� � L7 1 `'
" �� � � S7 �21�1S2�i � 37 � .
�i � , 1- y.+ � i� ,t ^ \ 37 5)
,P,, . �i � o a �� $-, S � �GB-1 ` ;
;�� `� , / � B�� � �' 's ,r B- ;�!% i, �
' ��,, j-� � -� � _ _-- � � � �B-11_ _� ,b �' -�� % �`��'
�� / �80 -° / --- --- - � � � n I � ° 6'1MDE X 1 5• ``•
�%� �`\` / „ : . � � n -�,o \��` �' ``�� � � 3 &OS�NALE 0 O.SX���.
`�� � ��.. ./ t ` \ '�o G' , � . � "--- .v 3fi \ / �� � '
2
.� , ' /� �`� /'/�� � �!.' N � � �� p J/ �f *j . �``� +�', .
,, / ` / 11 ?i` `\ 6 •,�j ' ,�,.---`\ 31t.fiQ x (T�G'� 28 � 1� �`��� '�''' ..?
�, � `� /�_� �_l\ 10 � ` 9�I.e�`, �� I E17TR7 . "�B�3 � ��/ -� � `�- ''
ti �- � �\ . i 74 �
� ��/ �y � ��y IE 28.2 \��; \`+ �,� 8 � �fi � r,��O _ . .� 'i �;„ ' ` ��9,��� � }g '/� ' /' �
� � �' �2� � � _28 " Y ' ,� � C7 �:" P-3 ;r� „ � � � Y
� ,�y'i� �' �5 ��`,. � �ir�� � B-29�S � ; 1 '� � ° ♦ ,, , ��--'' �� _
,¢t %' ,.I• ''`., `` � V< V" 1�' 6 '� , .•, �-�� ` �
"'� ''�.`�`�•� '� 1 �'•'� .� �� s zae 9¢ �- � ;\ `,GB-�O � e �: � P-2 , -��"- ;� , �/± '� � �,.
' `��'• �''\.� ' � �s I � � I � ,�, - � a VB 1 . � , .
� • . � � � � ' ,.. ',� n ,
.� ,'�• . ������1 - "'�B-31 B � � � � PRO.F��SSED `�'AiL „ z ,-� _
. - '` •�� ,• ,�. ' ����.� ��.ZCb � � �i 4 � � .:1.,__y _. - � n ' n �9 ` -
�,_ .-i n o B _ ' � -�'- .. (��„]'�oss i�. a 5+a�a+ n � � .
� \`_� ,� » '_��. ,, '', ' Q •._'_"��...__;'. (e�oanc��zzrn���3s.3n sv. ';�P-1 �c `�
� \ � �'�'���' • � `.� � �'' � 'GB=4 ' ����� ,`,'"''� '!/ \ �\ \'
�\ � �,�� �� �p � �,� coHs�cna�a �-N GB-6 � � ��.,
��� �• -
��--� � � � � ��,\� , z • Z -k #o -�"P sx -$ � � �
��� `�� , _ 8=35 i: � -�" ' �` .
•r� �� ����� . \ � � 4:. _.�- � , � G&5 \ ��n.au� ' �ao � �'. .
\ , � �.
1� __ �\ \ ' � ��----- �' r,
�� \ �\`�T�- 'c-'�—�`�r a �. �' � �_ �� , '''' � \ -'�a � � e,
.�+•�-. - \ \7 �\ ,� � �� ( ! 1�C�� �
/�� a� ^� \ \ / � \ \ � � r, /\ 70.00' 4 l ` \
�_ _���----�� } .
\� �� � ���.���/^}+.� CON� • _ '\ /// �o \ � �,
a�, �� � \�\�'�„,, �f- �\\ �-��i} � AOUE�UF� � \ � � 8. � \ C,
�,r...� ` \ '�#�- � \ V
x -^__� ` ` � `L-- � .��` � ( 8-�,� �� . �� (38-13� gti� �, � � �
_���� ���� ��\��� i— -���-�---'� ' -`'`s' ��� � �, � � �3 r �
� ` 5rp-
` ���—�1 ���`� _"'_�_� � ��� I � . . �x I 71 4� �\.��
`� .waz.�.a.w �tanrc+c -W g! �s 3
�
. . +.���� - 46 '�r.1 ;5'�. '� µ . �r � . � �
� � � i
• � 52 & � ���'�� �
' � , .
� � BENSON ROA �� 5 �
\. �_ �:" Q SOU�TH �� �� �•�y ���i� B- 2 • /"�' -�N.
_ --__. v _ _._ aw-3so &9 •\ � ''j��% S�v �
—�_ �.�\���------- -- --� ' \. .` � - - � E
y�- � ��\— 1 �__—��.. sxw�r, _��' . \ . . � w`� �\
� � \1 � �� � —� 3 � � ` p A ii /' N p���`� ��
\ \� - \ ���� �—��3�`'�� ���, _ � M P\ ' . \
// � , - - ----
.o ��.,,,` \: 1 ��1 � n�..�'� ��� p _-- y,,,.
LEGEND: - ����, � .�. � '� " �� \�
v:. �i.. . �°. #. ���� �
.,, \ �.� ' �_--�� '—�• •_— �
�B-1 APPROXIMATE BORING l �---. . � �, _— ���
� �
LOCATION AND NUMBER -}° __���—� T--'�, � •�----- �------ � '�
♦ P-1 APPROXIMATE DUTCH CONE PROBE
LOCATION AND NUMBER Zi�per Zeman Associates,Inc.
Projed No:,l-1470 Proposed Retaii Project
�GB-11TB-1 APPROXIMATE BORING LOCATION AND NUMBER OF EXPLORATION GeotE:chnical and Environmental Consufting Renton, Washincton
Drawn by: J.Duncan
COMPLETED BY GEOENGINEERS ( }AND TERRA ASSOCIATES ( ). FIGURE 1 -SITE AND EXPLORATION PLAN
A A' 1�3905 33rd Avenue West, Suite 117 Date: Oc'�. 2002
� GENERALIZED GEOLOGIC Lynnwood,Washington s8036
CROSS SECTION Tele: (425)771-3304 Fax: (4251771-3549 Scale:As Noted
Basemap DWG File Provided by PACLAND,dated 9/13/02.
r
_ A �B-�z A�
gp (OFFSET 6'NORTH) B-1A (SLOPE EVALUATION) 80
( (OFFSET 4'SOUTH)
EXISTING GROUND I
/ I SURFACE
� �
\ / � (
60 � � B-3 (SITE EVALUATION) 64
� ` . 6 $ (OFFSET 20'SOUTH)
� � ATD / 18 I
\ ' � � PR�E'QS�O / Very loose to medium dense � i
� /// FlNIS �� COALtailings.(FILL)
Very dense SANDSTONE \ p� ,�/ / HG�QE. 3 I
40 '� / 4Q
.�\ // 3 PROPOSED FINISH GRAC�E g
50/4 � / • . �
� 50/4" \ � � / ATD _ 3/ 1/�/ ATD 2/ �
� 50/1" �� � 4 �
c
< � � 5 Irrterbedded very loose to loose, 3 c
� 2� Loose,sii' SAND � � silty SAND,sandy SI!T,and SILT with �� 2� o
� ry � � 4 variable gravel,wooc,and organic �
� � � debris coMent.(ALLWIUM) 3 �
W \ 8 W
Very dense SANDSTONE �3� 5
50/1 � � 5 �
0 \ \ 22 0
\ \
� � a
\ \ »
\
��
-20 —���" -20
-40 `- -44
LEGfND: NOTES:
B-1 EXPLORATION NUMBER,APPROXIMATE LOCATION,AND THE STRATA ARE BASED UPON INTERPOLATION
OFFSET 4'SOUTH OFFSET FROM PROFiLE A-A� BETWEEN EXPLORATIONS AND MAY NOT REPRESENl'
ACTUAL SUBSURFACE CONDITIONS. SIMPLIFIED NAMES
ARE SHOWN FOR SOIL DEPOSITS,BASED ON
GENERALIZATIONS OF SOIL DESCRIPTIONS.
' SEE EXPLORATION IOGS AND REPORT TEXT FOR MORE
7 STANDARD PENETRATION RESISTANCE DETAILED SOIL AND GROUNDWATER DESCRIPTIONS.
s MEASURED GROUNDWATER LEVEL AT TIME OF DRILLING
- OR DATE NOTED Zihper Zeman Associates,Inc. Project No:J-1470 h�enton Retail Slope Stability Anaiysis
o � � Geotc�chnical and Environmental Consulting Drawn by:J. Duncan Renton, Washington
1�905 33rd Avenue West, Suite 117 FIGURE 2-GENERALIZED SUBSURFACE
Note: HORIZONTAL 1"=20' Date: Oct.2002 PROFILE A-A'
VERTICAL 1'=2D' Lynnwood, Washington 98036
See Figure 1 for location of profile. Tele: (425)771-3304 Fax: (425)771-3549 Scale:As Noted
L
. . , . . . . . ...� ..:q . i ,
� „ _ . :..J . .__::;i �r
Pseudostatic Seismic Stability Analysis
J1470A1 10-29—•+� 9:36
Renton Retail
200 1 � most critical surfaces, MINIMUM BISHOP FOS = 1 .312
SOIL STRENGTH VALUES
1 60 Soil Type 1: Loose to medium dense
coal tailings(Fill),Q�=37°,C=0 psf.
Soil Type 2: Interbedded very loose to
loose, silty sand, sandy silt, and silt
��20 widi variable gravel, wood, and
organic debris content (Alluvium),
� 0=32°,C=0.0 psf.
N Soil Type 3: Loose silty sand
X (Residual Soil),0=33°,C=0 psf.
a 80
� Critical Failure Surface Soi! Type 4: Very dense sandstone,
� FOS= 1.312 0=15°,C=3000 psf.
3
40
4
�� 1 w 1
2
0
0 40 80 120 160 200 240 280 320
X—AXIS (feet�
Z�PER ZEMAN ASSOCIATES,INC. Project No. J-1470 Renton Retail
Date: September 2002 Renton,Wasl�ington
GEOTECHNICAL AND ENVIRONMENTAL Scale: Noted
CONSULTING Pseudostatic Seismic Stability Analysis
FiQure 3
-- - -
, - , ,--� ._.., , , , >;� "� �' :�; -� ,. ; ., . , ..;� . - ' i _ . �i
; _ _ . _ . _._. _ _
� , ,
Hs=EQUIVALENT SOIL NOTES:
SURCHARGE FOR BACKSLOPE B
HS 1.SOIL SURCHARGE"Hs"APPLIES TO
2H:1V BACKSLOPE SURCHARGE. EXCAVATION BASE
�i-- ADDITIONAL SURCHARGE REQUIRED
AS NOTED ON FIGURE 4,AND/OR FOR 2' ASSUME NO RESISTANCE
GROUND SURFACE SLOPE ABOVE TOP OF PILE.
GROUND\ (APPROXIMATE 2H:1V)
SURFACE �
� 2.ACTIVE,AT-REST,AND SURCHARGE (fs�
� PRESSURE ASSUMED TO ACT OVER } } (fs) (qa)
\ PILE SPACING ABOVE EXCAVATION ALLOWABLE ALLOWABLE
BASE AND OVER PILE DIAMETER }f� FRICTION END BEARING
BELOW EXCAVATION BASE. NATIVE SOIL 0 ksf 0 ksf
NO LOAD ZONE. \ SANDSTONE 2.5ksf 30 ksf
LOCATE ALL � 3.PASSIVE PRESSURE ASSUMED TO RECOMMENDED MINIMUM EMBEDMENT
ANCHORS BEHIND � ACT OVER TWICE THE GROUTED
THIS LINE � SOLDIER PILE DIAMETER OR THE PILE DEPTH 5 FEET INTO SANDSTONE
\ SPACING,WHICHEVER IS SMALLER. B. VERTICAL CAPACITY OF
\ H PASSIVE PRESSURES INCLUDE
FACTOR OF SAFETY OF ABOUT 1.5. SOLDIER PILE
TIEBACK ANCHOR NEGLECT LOOSE/SOFT NATIVE SOILS.
(TYP.) 36(H+D) 36 Hs 16 H 4.SEISMIC PRESSURE=16 H,Hs=H/4
� 5.D=DEPTH OF EMBEDMENT INTO
��--- - SANDSTONE.
_ FRICTION
� 6.ALL DIMENSIONS IN FEET. SOIL TYPE A( DHESIONj
NATIVE SOIL 0 ksf
� SANDSTONE 3.0 ksf(augered)
60' 9.0 klf(pressure grouted)
_ _ y_ EXCAVATION BASE VERIFY WITH LOAD TEST 300%OF DESIGN STRESS �
� H/4 � LEVEL,SEE TEXT.
/ �
� �_ PROPOSED PROOF TEST TO 150°/a OF DESIGN ANCHOR LOAD,
� � 4-FT DIA.PIPE SEE TEXT.
� _ _ _ _ SANDSTONE
�p C. TENTATIVE ANCHOR PULLOUT
I I RESISTANCE
r �
PASSIVE PRESSURE
ACTIVE PRESSURE 36(H+D)+36(Hs)+16 H 100 D(psf)in loose/soft native soil
AT-REST PRESSURE 50(H+D)+50(Hs)+16 H 1200 D(psf)in sandstone
A. LATERAL EARTH PRESSURE -NO LOAD ZONE
NOTE: Ziuper Zeman Associates,Inc. Project No.J-1470 PROPOSED RETAIL DEVELOPMENT
FIELD VERIFY BACKSLOPE ANGLE Geotechnical and Environmental Consulting Renton,Washington
BETWEEN WALL AND BENSON Date:Nov.2002
ROAD BEFORE DESIGN. �8905 33rd Avenue West,Suite 117 F(gure 4: Recommended Design Criteria for
Lynnwood,Washington 98036 Drawn by:J.D. Shoring Cantilever or Single Row of Tiebacks
Tele: (425)771-3304 Fax:(425)771-3549
x=mD POINT LOAD
q
I (FOR m > 0.4)
1 � 1.77q m2 �2
� 6h - p 2 � �m2+ �2�3
,� (FOR m < 0.4)
6 0.28q � �z
6h h D2 (0.16+n2)3
BASE OF EXCAVATION q 6,h =ah cos2 (1.1$)
�,\j\/\�\/\/ � 6 h
/n/� //. \
$ 6h
PLAN VIEW OF WALL
q, Ib per ft2
STRIP LOADING PARALLEL
(3/2 � a' TO EXCAVATION
' p ah = 2�(�3-sin �3 cos 2a)
� ,,
6h
BASE OF EXCAVATION
�,\j/�//\/\//,/`
q, Ib per ft2
UNIFORM LOAD DISTRIBUTION
6h = 0.4q
q = VERTICAL PRESSURE in psf
BASE OF EXCAVATION
�i\/j�//\�\//i�.
Zipper Zeman Associates,Inc. Project No.,1-1470 PROPOSED RETAIL DEVELOPMENT
Geotechnical and Environmental Consulting Renton,Washington
Date:Nov.2002
18905 33rd Avenue West,suite i�� Figure 5: Surcharge Pressure Acting on
Lynnwood,Washington 98036 Drawn by:J.D.
Tele:(425)771-3304 Fax:(425)771-3549 Adjacent Shoring or Subsurface Wall
•_
APPENDIX A
FIELD EXPLORATION PROCEDURES AND LOGS
r-
�-z
r�
. . FIELD EXPLORATION PROCEDURES AND LOGS
J-1470
, Our field exploration program for this project included 43 borings and 3 cone
penetrometer probes advanced between September 19, 2002 and October 10, 2002. The
:--�� approximate exploration locations are shown on Figure 1, the Site and Exploration Plan.
'; Exploration locations were determined by measuring distances from existing site features with a
tape relative to an undated Draft Grading and Drainage Plan prepared by PacLand. As such, the
"� exploration locations should be considered accurate to the degree implied by the measurement
method. The following sections describe our procedures associated with the explorarion.
Descriptive logs of the explorations are enclosed in this appendix.
� Soil Boring Procedures
`� Our exploratory borings were advanced using track- and truck-mounted drill rigs
� operated by an independent drilling firm working under subcontract to our firm. The borings
were completed utilizing hollow-stem auger and mud rotary drilling methods. An experienced
�� geotechnical engineer from our firm continuously observed the borings logged the subsurface
� conditions encountered, and obtained representative soil samples. All samples were stored in
• moisture-tight containers and transported to our laboratory for further visual classification and
F,�`
���� testing. After each boring was completed, the borehole was bacicfilled with soil cuttings and
' bentonite clay.
r Throughout the drilling operation, soil samples were obtained at 2.5- to 5-foot depth
� intervals by means of the Standard Penetration Test(ASTM: D-1586). This testing and sampling
, �,.� procedure consists of driving a standard 2-inch outside diameter steel split spoon sampler 18
inches into the soil with a 140-pound hammer free falling 30 inches. The number of blows
� required to drive the sampler through each 6-inch interval is recorded, and the total number of
�.� blows struck during the final 12 inches is recorded as the Standard Penetration Resistance, or
� s "blow count" (N value). If a total of 50 blows is struck within any 6-inch interval, the driving is
� stopped and the blow count is recorded as 50 blows for the actual penetration distance. The
--� resulting Standard Penetration Resistance values indicate the relative density of granular soils
and the relative consistency of cohesive soils. ,
Undisturbed samples were obtained by pushing a 3-inch outside diameter, seamless steel 'I
, Shelby tube into the soil using the hydraulic system on the drill rig in accordance with ASTM:D-
1587. Since the thin wall tube is pushed rather than driven, the sample obtained is considered to
r � be relatively undisturbed. The samples were classified in the field by examining the ends of the
+ tube prior to sealing with plastic caps. The samples were then transported to our laboratory
where they were extruded for further classification and laboratory testing.
The enclosed boring logs describe the vertical sequence of soils and materials
encountered in each boring, based primarily upon our field classifications and supported by our
subsequent laboratory examination and testing. Where a soil conta.ct was observed to be
� gradational, our logs indicate the average contact depth. Where a soil type changed between
sample intervals, we inferred the contact depth. Our logs also graphically indicate the blow
T" count, sample type, sample number, and approximate depth of each soil sample obtained from
the boring, as well as any laboratory tests performed on these soil samples. If any groundwater
was encountered in a borehole, the approximate groundwater depth, and date of observation, is
FIELD EXPLORATION PROCEDURES AlV'D LOGS
J-1470
Our field explorarion program for this project included 43 borings advanced between
October September 19, 2002 and October 10, 2002. The approxunate exploration locations are
shown on Figure 1, the Site and Exploration Plan. Exploration locations were deternuned by
measuring distances from exisring site features with a tape relative to an undated Draft Grading
and Drainage Plan prepared by PacLand. As such, the exploration locations should be
� � considered accurate to the degree implied by the measurement method. The following sections
describe our procedures associated with the exploration. Descriptive logs of the explorations are
enclosed in this appendix.
, Soil Boring Procedures
Our exploratory borings were advanced using track- and truck-mounted drill rigs
operated by an independent drilling firm working under subcontract to our firm. The borings
were completed utilizing hollow-stem auger and mud rotary drilling methods. An experienced
geotechnical engineer from our firm continuously observed the borings logged the subsurface
conditions encountered, and obtained representative soil samples. All samples were stored in
• moisture-tight containers and transported to our laboratory for further visual classification and
testing. After each boring was completed, the borehole was backfilled with soil cuttings and
bentonite clay.
Throughout the drilling operation, soil samples were obtained at 2.5- to 5-foot depth
intervals by means of the Standard Penetration Test(ASTM: D-1586). This testing and sampling
procedure consists of driving a standard 2-inch outside diameter steel split spoon sampler 18
inches into the soil with a 140-pound hammer free falling 30 inches. The number of blows
required to drive the sampler through each 6-inch interval is recorded, and the total number of
. blows struck during the final 12 inches is recorded as the Standard Penetration Resistance, or
"blow count" (N value). If a total of 50 blows is struck within any 6-inch interval, the driving is
stopped and the blow count is recorded as 50 blows for the actual penetration distance. The
resulting Standard Penetration Resistance values indicate the relative density of granular soils
and the relative consistency of cohesive soils.
Undisturbed samples were obtained by pushing a 3-inch outside diameter, seamless steel
Shelby tube into the soil using the hydraulic system on the drill rig in accordance with ASTM:D-
1�87. Since the thin wall tube is pushed rather than driven, the sample obtained is considered to
be relatively undisturbed. The samples were classified in the field by examining the ends of the
tube prior to sealing with plastic caps. The samples were then transported to our laboratory
where they were extruded for further classification and laboratory testing.
The enclosed boring logs describe the vertical sequence of soils and materials
encountered in each boring, based primarily upon our field classifications and supported by our
subsequent laboratory examination and testing. Where a soil contact was observed to be
gradational, our logs indicate the average contact depth. Where a soil type changed between
sample intervals, we inferred the contact depth. Our logs also graphically indicate the blow
count, sample type, sample nurnber, and approximate depth of each soil sample obtained from
the boring, as well as any laboratory tests performed on these soil samples. If any groundwater
was encountered in a borehole, the appro�cimate groundwater depth, and date of observation, is
I
- depicted on the log. Groundwater depth estimates are typically based on the moisture content of
soil samples, the wetted portion of the drilling rods, the water level measured in the borehole ��
after the auger has been extracted.
The boring logs presented in this appendix are based upon the drilling action, observation
of the samples secured, laboratory test results, and field logs. The various types of soils are
indicated as well as the depth where the soils or characteristics of the soils changed. It should be
noted that these changes may have been gradual, and if the changes occurred between samples
intervals, they were inferred.
Electric Cone Penetrometer Probes
A local exploration company under subcontract to our firm performed three electric cone
penetrorneter probes for this project on Septernber 26, 2002. The descriptive soil interpretations
_ presented on the cone penetrometer probe logs have been developed by using this classification
chart as a guideline. It consists of a steel cone that is hydraulically pushed into the ground at up
to 40,000 pounds of pressure. Sensors on the tip of the cone collect data. Standard cone
penetrometers collect information to classify soil type by using sensors that measure cone-tip
pressure and friction. The detailed interpretive logs of the static cone penetrometer probes
accomplished for this study are presented subsequently.
,
r-
SLOPE STABILITY EVALUATION BORING LOGS
PROJECT:Renton Retail Siope Stability JOB NO. J-1470 A BORING B-1A PAGE 1 OF 3
Locatlon: Renton,WA Approximate Elevation: 56.5 feet
Soil Description m m � � Penetration Resistance �
r ac a� � :; � � � c
m R ~ � � � f0 Standard Blows per fooi Other j y
C v� v� Z C9 3 Z �
0 10 20 30 40
Loose,moist,brovm,silty,g2velty SAND(Fill)
��- ' ' '_�_ _ i' � ' i '_T_' �� T " �i_ � _
s, - -1- - ; - - ; - - ; -- ; -- ; -- ; - - ; -- ; -- 5
Loose to medium dense,moist,dark brown to black, � � - �-- -' - - - � � ` -- ��-�--'--� ��'--
� 5 silty SAND with some grdvel.trace organics � ; : : ; ; � � �
, interbedded with COAL fragments(Fill) �� � - ;-"` -' ` � � ' �� i�� ;' � ; ' - ; - "' 'i
S-2 �, 18
� . , , , ,
10 ; ; ; ; : ; : ; ;
Loose,moist,dark brown-black,siity SAND with trace 3_3 ;� � � � � � � � � 7
gravel and organics interbedded with COAL fragments � ___ - - - �- -- - - ; -- � -- ----- ----- -- - --.
(Fill) ' ; ; ; ; ; ; '
F� • — - - - - - - - - !' -- `--`--;- -�-- '- - ; - -
5:.:�'� . � . � � � � , .
. � � � � � � � �
' '_"__'_"'_'__'_'__'__'___"___"__'____"_'_ �_�_ ' ' 'r ' ' r' " r ' '�'"r''t ''t'
'" ' ' ' " � '"a '' ''a' 'i'" '' ''
15 . , , , , ,
Very loose,moist,dark brown-black and reddish-pink, S-4 �, . � � � , , 3 MC
-- - - - - -
silty SAND with trace gravel interbedded with COAL �__ - -� - - • - - � - - • --�- - � - -• - -•- - � --
���' and SANDSTONE fragments(Fiil) , , , , . � , . �
, +i - - -
i -- � --, - r -7-- ,-- ;- . ;-- ;-
i � , � � , . � . ,
�"•.� _ � � � � � � � � .
20 , ; � . , . , , ,
Very loose,moist,black,COAL fragments with some S-5 �� � � � � � � � ' 3
siltySAND{Fill) --,---,- - - , -- ,- - ,- - , -- , -- , -- ; --
- -- � - - � - - ' - -- - ` - - ' -- - - -
--� --* - r- --------- --- ------
I •-- 25 YN � ' : ; : : ' : ;
Expianation a �o Zo so ao 50
I Monitoring Well Key �
2-inch O.D.split spoon sample p Clean Sand Moisture Content
� 3-inch I.D Shelby tube sample � Cuttings plastic Limit Naturel Llquid Limlt
� � No Recovery � Bentonite
� Grout
� Groundwater level at time of drilling
ATo or date of ineasurement B Screened Casing
Zipper Zeman Associates,lnc. BORING�OG Figure A-1
Geotechnical&Environmental Consultants Date Driiled:9/19/02 Logged By:CRT
PROJECT: Renton Retail Slope Stability JOB NO. J-1470 A BORING B-1A PAGE 2 OF 3
Location: Renton,WA Approximate Elevation: 56.5 feet
�
Soll Description m � � ,o Penetration Resistance w
L aa a� � � � 0 � c
m � � � � � �0 Standard Blows per foot Other � y
o cA v� 2 C9 � Z H
0 10 20 30 40
Very loose,moisl,black,COAL fragments with some , � , � ,
silty SAND and SANDSTONE fragments(Fili} S� �� � � � �, , . 3 MC
- -- - - s - -� - - -' -- ---
�i --� --� - � -- -- -r ------ -- --- - -
� -'--'-_-'-"_-'--'--�--_""__"_'__'__'_"- -"_-- • 1 , , . . . � ,
- - A� - - r- -c -- r - r - - r - -t - � - - ? - - � - -
30 , . , .
r-:
Very loose to loose,saturated,brown-gray,SAND with S-7 � , , � , , , , , 4 GSA
�. ' some silt ana gravel and trace organics and wood -- -- - - ' - - '- - = - - ' - - ; - -=- -= - - ' -- = -- _
� fragments � � � � � � � � �
�:r , , � � , , � ,
35 ; ; ; : : ; ; ;
^�_ s-a -- *- - , - : -- •- *- -:-- ' -- ;--: -- s zoa
• ��� � _ L_ _ _ L _ _ 1 _ _1_ �1_ _
������ _ _ f_ _ � �_� _ � T __ __t� T _ _ _ _ 1 __
40 , , , , , , , , �
ss --:- - ; - - 1 -- . --;--;--1-- ; •; a 200
Grades to very loose,saturated,brown-gray,silty �
SANDwithsomegravelandtraceorganics . _ _� _ _ �_ _ _ __ _ ___ _______ _ _ __ _ __ .
45 . : . : .: . : . : : : . � -----
Medium stiff to stiff,wet,brown-gray,sandy SILT with ��0 � �� � � � � � � � 8
some clay and organics interbedded with silty SAND - -- '-- '- -= -- = - -=--=--= -- = --= --
with some gravel � � � � � � � �
- --�--�- - -1- - ' --
Dense to very dense,moist,tan-brown,silty,weathered �� , , , � . , , ,
SANDSTONE . _ � _ ' ' ' ' ' ' ' '
' r " . ' ' ' r '' r ' '' r ''� '_
50 : ' ; : : :
Explanation o �o zo so ao so
Monitoring Well Key
I2-inch O.D.split spoon sample � Clean Sand Moisture Content
� 3-inch I.D Sheiby tube sample � Cuttings piastic Limft Nacurei Uquid Limit
� No Reoovery � Bentonite
� Grout
� Groundwater level at time of drilling
ATD or date of ineasurement B Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnical&Environmental Consultants Date Drilied:9l19102 Logged By:CRT
PROJECT:Renton Retail Slope Stability JOB NO. J-1470 A BORING B-1A PAGE 3 OF 3
Location: Renton,WA Approximate Elevation: 56.5 feet
Soil Description � Penetratlon Resistance y
m m �
L a a aa � g; � � 3 �
oy � N Z � � Standard Blows per foot Other Z �
0 10 20 30 40
Very dense,moist,tan-brown,siity SANDSTONE S �� ; ; ; ; ; ; ; ; ; � 50/3„
� _ __' ' ' _ __ '- 1 ''1 _
_ _r_ _ � _ _ �' � 1 ��T__ � _ __��_ ___
. � . . �
������������___-_____��_�___�__��������������� ����������� ��_
� � � � __ � � �_ �_ 1__ � _ __
55 Very dense,moist,light gray,silty SANDSTONE ; ; ; ; ; ; ; ; ;
� --�- - - - - � -- � -- , --; -- :--•-- ; -
' Boring completed at 55.5 feet on 9119l02 5-12 , , , • , , , , � 50/1'
Groundwater seepage observed at 29 feet at time of � � - � - - - � � - ' � � � � �---� -- � - � � � �
driaing . � � . , � , .
60 ; ; ; ; ; ; ; ; ;
� • - -- - - - L --L-� -1--1- -
._�'_ _ _ �_ _ f__T- _i�'i''1_ _ , __
65 , . . , , �
70 - --- � - -- � ---- • -- � --
- -- - - -1 -- i--1- -
_ ' __ _ _ __ f___ _ . __i_ .T" 1__ � '_
75 : ; , , ; : ' ;
Explanation o �0 2o aa ao so
I Monitoring Well Key
2-inch O.D.split spoon sample � Clean Sand Moisture Content
� 3-inch I.D Shelby tube sample � Cuttings Piasac um+c Nawral LiQuld Limit
� No Recovery � Bentonite
� Grout
� Groundwater level at time of drilling
a,ro or date of ineasurement B Screened Casing
Zipper 2eman Associates,Inc. BORING LOG Figure A-1
Geotechnical 8�Environmental Consultants Date Drilled: 9/19/02 Logged By: CRT
PROJECT:Renton Retail Slope Stability JOB NO. J-1470 A BORING B-2A PAGE 1 OF 2
Location: Renton,WA Approximate Elevation: 56 feet
Soil Description � m � ,a Penetration Resistance ,�
t aa a� 3 «; � 0 3 �
oN � y Z � 3 Standard Blows per foot Other Z �
0 10 20 30 40
Loose,damp,brown,silry SAND with some gravel,coal � � � �
and sandstone fragments(Fill) ___�__ � _ _ � � � '
---- - - - - ' ' - - - -. �, - - ; - - � - - � - -
------- - - � - - � - - � - - - - - - -- �-- - - --
5 ; , , � ; ; ; , ;
Loose,moist,dark brown-black,slity SAND with some �� �� _ .- � - _� _� _ ; _ : _ _ ; __ ; _ � -_ 5
. gravel with interbedded C�AL and pink-orange
SANDSTONE fragments(Fill) ; ; ; ; ; ; ; ; ;
---------------------------------------------- . , , , , . , ,
�� pink-orange SANDSTONE ftagments(Fill)
---------------------------------------------- , , � , , � , � ,
-- 10 ; ; ; ; ; ; ; ; ;
Loose,moist,dark brown-black,silty SAND with S-2 ; , ; * ; ' ' ' 9 MC
interbedded COAL and SANDSTONE fragments(Fq) _� -- - , -- ,- -- - -, --�-- --------- - --.
_ • _._ - - � -- - •--'- �- -
--- - -� - - � . -- �- -.-- , --,--1-- � --
- - - -� - - - - --'-- - -- - - --
15 , . , , , . , ,
�M S-3 - --- -• - � - - �--'-- � - -•-- �-- • -- 11
20 ; . ; ; ; ; ; , ;
Loose,moist,han-brown,silty weathered SANDSTONE �q � ' , r • � � � � 5 MC
and COAL fragments with some wood fragments(Fill) � - - '- - - = - -= -- '- - = - - =- -'- - ' - -= - -
'_"""_'_____""_"_'_"_�__'__'__'_"'_"� «����M��
- - -- -� - -i --1--'- - '--
Very loose,moist to wet,brown-gray,silry SAND with � � � � � � � � �
some gravel,interbedded with sandy SILT with some __�_____ - -� -- - - - � --�--r -- . -----,-- , --
organics ' ' ' . , ; ;
25 , . : ,
Explanation o �0 2o so ao so
I Monitoring Weil Key
2-inch O.D.spiitspoon sample 0 Clean Sand Moistu�e COntent
� 3-inch I.D Shelby tube sample � Cuttings p�u�L1mit NaWral Llquid Umit
� No Recovery � Bentonite
� Grout
� Groundwater level at time of drilling
ATD or date of ineasurement � Screened Casing
Zipper Zeman Associates, Inc. BORING LOG Figure A-1
Geotechnical&Environmental Consultants
Date Drilled:9119/02 Logged By:CRT
.--
� PROJECT: Renton Retail Slope Stability JOB NO. J-1470 A BORING B-2A PAGE 2 OF 2
Location: Renton,WA Approximate Elevation: 56 feet
r-
Soil Description _ � � ,a Penetration Resistance y
t aa a� � ,� � 0 � c
d � ~ � 3 � � Standard Blows perfoot Other j �+
O v� V� 2 C9 � Z H
0 10 20 30 40
Very loose,wet,brown-gray,silty SAND with some �5 A� . � � ; � ; ;� ' 2 MC
gravel,intebedded with sandy SILT with some organics _
--- - - - - - - - -- - - - --- � ' - -
_�_' - -� - �--. -- � -,--,--.--, - � --
30 ---------------------------------------------- : ; ; ; ; ; ; ,
Very dense,moist,tan-brown,silty weathered � S-6 _ , _ , ,� , � , ` . , _� 50/5 MC
; SANDSTONE
r-- � � � � � � � �
- 35 ; ; ; : ; ; ' ; ;
Very dense,moist to wet,light gray,silty SANDSTONE __ S_� ; ; ; ; ; ; ;
, , ;� , , , , � 50/3" MC
�� • ------ ' -- �-- � - -! - -i--i-- !--;- - - - -
u� � � i � i i � . �
• �� _ _ � �_ �__ __T_ �T�� T_ _ . �_T__ 1 _ _
_ _ ' _ _1 __ _ _ ' � � • �� �� � 1 �� 1__ , __
� � i � . � . � i � I
� S-8 - - - --; --r - ; - ; -; - '-- ; - -- --. 50l3"
Bwingcompleteda140.4feeton9/19/02 - -, - - �--• -- , -- , -- • - - •--• - - , ---
Groundwater seepage observed 25 feet at time of �~� ; ; ; ; ; ; ; ; ;
driAing _ _ _
45 - -- --� --- - -� --�-----�---- - � - -
- - -� --L-- L - -1-- 1--� - - - -
_ _ � _ _�__ __ _ _ i�' T'�1__T_' ' '
5p : : ; ' : : ' ; '
Explanation o �0 2o so ao so
Monitoring Well Key
I2-inch O.D.split spoon sample � Clean Sand Moisture Content
� 3-inch I.D Shelby tube sample � Cuttings Plastic Limit Nan,� Llquid Limit
� No Recovery � Bentonite
� Grout
� Groundwater level at time of drilling
ATD or date of ineasurement B Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnical&Environmental Consultants Date Drilled:9/19/02 Logged By:CRT
PROJECT: Renton Retail Siope Stability JOB NO. J-1470 A BORING B-3A PAGE 1 OF 2
Location: Renton,WA Approximate Elevation: 69 feet
Soil Description � Penetration Resistance y
r mm m °' � ` � � � c
r aa °.a � w —
a E a E � o � Standard Blows per foot Other j �
G N ~ v1 Z f9 3 �
0 10 20 30 40 Z ~
, , . � : ' � �I
�_ --'- - - - ' - - - - - - - - - - - -- '
��_�_ _ _�'' f ' ' �_' f..T" . __T_ '1_ _'
������� _ _ ' ' � ' L _ _ _ � ' ' �� � � '1�� '_
5 ; : ; , ; ; ; ; ;
Very loose,mast,dark brown-black,sifty SANO with g_1 . � � ' ; � ; • ; + 2
some gravel.COAL,SANDSTONE,SILTSTONE _________ _ _ �_ __ � _ _� __ : _ _ � ._�__; __ '__: __ .
fragments and trace organics{Fill) , � � � � � � �
�� , , , , � . : � .
Loose,moist,dark brown-black,COAL tailings with S-2 , ; ' ' ; ' , ; 9
some silty SAND with sandstone and sittstone - - � - . -� - - -.--.-- . -. -
. fragments(Fill) ; ; ; ; ; ; ; ; ;
--- - - -�-- � --1--'--'-- '- -
i � � � i � � � �
' '-r ' -r- - �- -r-' r '-r'-r-'i''� --'
�5 Loose,moist,black,COAL tailings(Filq S-3 � � � � � � � 6
20 --• - - � -- •-- •--•--•--•--•--• --
Very loose,moist,tan-orange-white,highly weathered, S-4 �� �� � � � � � � � 3 MC
silty SANDSTONE(Fiil) - - ' � - " � "- . ""�" ':-'�--;-' ; - - --
---------------------------------------------- , � , , , , , �
_ " L _ � _ 1 _
Very loose.moist,black,COAL taiGngs(Fill) � ^Y , � � ; � � � � ;
- �r ' - r ' ' r'' r ' -r'' t' ' r'-1 ' ' ' '
25 : : : ; : '
Explanation o �o zo so ao so
Monitoring Well Key
I2-inch O.D. split spoon sample � Clean Sand Moistu�e Content
� 2.5-inch I.D ring sample � Cuttings plasdc Limit Naturel L(quld Limit
� No Recovery � Bentonite
� Grout
� Groundwater level at time of drilling
ATD or date of ineasurement B Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnical 8 Environmental Consultants Date Drilled•9/19/02 Logged By: CRT
PROJECT:Renton Retail Slope Stability JOB NO. J-1470 A BORING B-3A PAGE 2 OF Z
Location: Renton,WA Approximate Elevation: 69 feet
Soil Description � Penetration Resistance �
L a a a� � :; � � � c
Q � � y Z � � Standard Blows perfoot Other j �
0 10 20 30 40 Z
Very loose,moist,black.COAL TAILINGS(Fill) S-5 .; ; ; ; ; ; ; 3
�`•� � ; , � , , , , ,
, ----- - - - - - � - - - . - - - - - --* - + - , -
______— - - � - - - - - - - -�-- -- -- -- � - -
R� , � : , � , , ,
30 ; , , : ; ;
-�- �6 �` - - � - ; �; - - , ; --, - ;-- ; -- s F,+c
; . , , , , , , ,
F`, �'_" ' � � � � , � � � .
35 : : � ; ; ; , ; ;
S-� ;� ; ; ' •; ; ; ; ; � Mc
---------------------------------------------- — --- - -- � - � - -. - - � - •
Loose,moist,brown-g2y,silty SAND with some gravel ; ; ; ; ' ; ; ;
' andtraceorganics ----- - - - - - � - - - - - � - - • - -' -- ' -- ' - -
{-� . � � . , , ' , � �
�.`iy � � , . , � � � �
�
. � � , � � � � �
• ����������� _ ' " � _ ' � ' _ � ' � t ' ' T'� T'_i _� T__ � __ '
� � � � � � �
�������������������������_���__�������_�_����� .�_l _ � �� �l �� L _�l__ 1��1�� l�_ 1 __ "
40 � � � ' � � -�- ; ;
Medium dense,wet,brown-gray,sitty SAND with some ; ; ' ' ; ; , ; ;
-- - - --- -- - - - - - -- ----- - ---- --
gravel to gravelly Silty SAND S_8 ATD , � � , , , , , 19 200
, , � � , : ; , , ; ;
` ' Bonngcompletedat41.5feeton9l19l02 __�___ - - = - - --- - - - =--=--=--=-- =-- = - -
, Groundwater seepage observed at 40 feet at fime of � � � � � � � �
dritling ------ - - - - -• - - � -- - -- ---•--•-- •-- ---
�,,,� , � . , � , , , ,
' 45 _ :_ : : - � -�--� -�--- -� --
- - - � - - - L - -1- - -'-- 1-- ' -- �
__ f � _ � _ _� � � T _ _ T_ _ i � � 1_� __ '
50 : : : :
Explanation o io 2o so ao so
Monitoring Well Key
I2-inch O.D.split spoon sampie � Clean Sand Moisture Content
� 3-inch I.D Shelby tube sample � Cuttings plastic Limlt Nawrai Uqufd Limit
� No Recovery � Bentonite
� Grout
� Groundwater level at time of drilling
ATD or date of ineasurement B Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnicai 8�Environmental Consultants Date Drilled:9/19102 Logged By: CRT
PROJECT: Renton Retail Slope Stability JOB NO. J-1470 A BORING B-4A PAGE 1 OF 2
Location: Renton,WA Approx(mate Elevation: 68.5 feet
Soil Description m m � ,a Penetration Resistance ,�
r a a a� � ;; � 0 � c
o y � N Z � � Standard Blows per foot Other j �
0 10 20 30 40
Coaltailings over , . , , � � , , ,
"' - - - - - --- • - i - ------ 1 - ' -
I. �� � '�� � r � �� � T __T�� T��1��1 '_ '
{� � � � . i � � �
Loose,damp,brown and black,mix of wal and cinders -- . __� _ _ � _ _ . __�_ _.__.__ . __�__. __ .
F-^ (Fill) S-1 , � , � , � . , , g
5 , , , . : : ;
Very loose,damp,brown and olack,mix of coal and S-2 � ' . • • . , ! 3
� cinders(Fill) ------------ � � . � � � - - � - ; . -
F 7 Loose,damp,brrnnm and black,miu of coal and cinders � S-3 _ � . � ' ' ' ' : : - 6
(Fiil) . : : . :--�-- � - � - � -
10 ; ; ; ; ; ; ; ; ;
. Loose,damp,brown and bladc,mix of coal and cinders ' Y_ S-4 ' * f ; ' 1 ; ; ; 10
(Fill) -- , , , � � , . � �
r-3 • ---------- - - ; - - � - , - - i - i-- i -- ' -- i- ' - �
�.;s.� � , , � . � � , �
Loose,damp,brown and bladc,mix of coai and cinders __—�_ � - - � - - - - -� -- r -- ;--;-- ; --T--, --
(Fill) S-5 � , , , , , , � 9
- - -- -- -- -- --•-- --' -- --
15 . , . , , , �
' ' _' . '' ' 'T_'� 'S '_7' '_ ''
Very loose,damp,brown and black,mix of coal and ^�� S-6 � L L � L : � , j 6 MC
. _ cinders(Fill) ; � ; ; ; � ; : ;
�; , . � , , � , � ,
� 20 - - - -- - - - --- • - - • - -• - • - • -• --
� � S-7 -•- - , --; - , - •--;-- ; -- ;--i --- 5 MC
� - --�--L--1- -1-- '- -' -- �
_ _� __�__��_ i_ � i__T__ T __T_ _l __
- - 25 ; : : : : : ; :
Explanation o �0 2o so ao so
� Monitoring Well Key
2-inch O.D. split spoon sample Molsture Content
� Clean Sand
� 3-inch I.D Shelby tube sample � Cuttings plastle Llmit Naw�ai Uquid LGnR
� No Recovery � Bentonite
� Grout
� Groundwater level at time of drilling
ATD or date of ineasurement B Screened Casing
Zipper Zeman Associates,Inc. BORlNG LOG Figure A-1
Geotechnical 8 Environmental Consuttants Date Drilled: 10/10/02 Logged By:TAJ
PROJECT:Renton Retail Siope Stability JOB NO. J-1470 A BORING B-4A PAGE 2 OF 2
Location: Renton,WA Approxlmate Elevation: 68.5 feet
Soii Description � Penetration Resistance y
� am c� � d � 0 � c
m � � � � � 3 Standard Blows per foot Other j �
p fA V1 2 C7 Z F-
0 10 20 30 40
Very loose,moist,brown and black,mix of coal and g_g � � ' ' ' ' 3 MC
cinders(Filp -_ •- -- - - - - - - - -� - - - - - -- -
,,,_ , ; ' . ' ; " , . -
_�' ' _ ' r '' r ' ' '' r ' 'r ''*' ' r'"t" ' + ''
30 ; ; ; ; ; ; ; ; ;
---------------------------------------------- s_s � : : ; ; ; ; ; �; 2 nnc
Very bose,wet,brown,sitty,fine to medium SAND __�____ � � � � � � � �
; . , . , , ,
---------------------------------------------- - - - -� - - � - - - - - � - - • --•- - • -- . _MC=55S4
Wood debris S-10 ; ; ; ; ; ; ; �� � 38 MC
r•
- -------'-------------- ---'-'_ " ' ' - ' - - - - -' -- - ' - - --' ''' ' '
Very dense,moist,orange-tan,silty SAND(Weathered � � � � � � � � �
Sandstone) -_ - • - •- ---- - --- - •--•-- • , --
,,., 35 � ; ; ; ; : ; --- � -
_�_ S-» - � - �- - � --� --�- - - _--: -. --� so13
Boring completed at 36 feet on 10110/02 ; ; : ; ; ; ' ; ;
_. No groundwater observed at time of driliing �M_� . __ : _ _ � __ �__�__.__�__� __,__� __ .
----^-- --r-- r - - � --r - -,--r --.-- -, --
40 , , , , , , , ,
45 - - - - - - �--� - -- ----� --• -- � - � --
_ _ ._ L._ L . _ l _ _1 . . 1 _ _ 1 _ '
50 : : : : : : ; :
Explanation o �o Zo so ao so
I Monitoring Well Key
2-inch O.D.split spoon sample � Clean Sand Moisture Content
� 3-inch I.D Shelby tube sample � Cuttings Plastic Limit NaWral Llquld Limit
� No Recovery � Bentonite �
� Grout
� Groundwater level at time of drilling
aro or date of ineasurement r� Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnical 8�Environmental Consultants Date Drilled: 10110102 Logged By:TAJ
PROJECT:Renton Retail Siope Stability JOB NO. J-1470 A BORING B-5A PAGE 1 OF 2
Location: Renton,WA Approximate Elevation: 61.5 feet
Soil Description � PenetraUon Resistance a
� ad c� � m` � 0 � c
m � � � � a � Standard Blows perfoot Other j m
p fA tn 2 C� Z H
0 10 20 30 40
Coal tailings $� � � , , � � � �
- - - -- ' -- �--1-----'--1- - ' --
.. . �_���������������������_���������������������� � i i � � i � i �
. ----- ' � ' ' r ' r "' r ''*''r''t•'7 ' ' � '
Loose,damp,brown,silry SANO with trace gravel(Fill) — --- - - - � - - � - - - --�- -�- _._ _ . . . , _ _
F— s-z 1 ; : ; ; ; ; ; ,o
5 : : : ; ; ' ; ;
� Very bose,damp,brown and black,COAL TAILINGS � � � � � � � � �
(Fill) S'3 �� � ; , , � � � 3
10 ; ; . ; , ; � ; ;
_ • ��« - - - - - � -- � • - 1- ! --1- -'-- � - - ' --
Loose,damp,brown and black,COAL TAILINGS(Fill) """ '"'"' - � - - ' - - ` - - ` --' --'- - '- - ' - - ' - -
5-4 � , , , , , , 10
- -� - - - - -- - - - -- -- - -' - - '--
15 , , . , � , ,
' ' ' _ '' � ''i 'i' _''T'' _'_.'' '
Loose to medium dense, moist,brown and black, � � � � � � �
COALTAILINGS(FII) "'— --- - -, - • • - - , - - . -- ,--•- - ,- - -- - - - -
' S-5 � � � � ' . � � 11
Z� thin wood in tip of sampler ; : ; ; ; ; ; ; ;
----------------------------------------------• _ _ S-6 - -� - ; -- ; - - ; -;- -�-- 1- -�- - ; -- s
Loose,wet,brown,siiry SAND � - ; - - , - ,- - ; - ;- : - ; -; - - -
__L _ _L '_ i__ L__L__1_ _2'_ 1 ._
��� ��� i i � i � i i �
---------------------------------------------- S-7 � � � , � , , ; ; 33
Very dense,wet,motUed orange-tan,silty SAND - -� -- � -- � --* - - *-- T- - *- - � -- • --
25 (Weathered Sandstone) ; ; , ;
Explanatlon o �o 2o ao ao so
I Monitoring Well Key
2-inch O.D.split spoon sample � Clean Sand Moisture Content
� 3-inch I.D Shelby tube sample � Cuttings plaatle Umit Naturel Llquid Llmit
� No Recovery � Bentonite
� Grout
� Groundwater level at time of drilling
aro or date of ineasurement � Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnical&Environmental Consultants Date Drilled: 10/10l02 Logged By: TAJ
PROJECT:Renton Retail Slope Stability JOB NO. J-1470 A BORING B-SA PAGE 2 OF Z
Location: Renton, WA Approximate Elevation: 61.5 feet
Soil Descriptlon L Penetratio�Resistance y
� � � °' � ` � � � _
L aa °.� � «' —
fl. � � � � � �° Standard Blows perfoot Other j y
p fn fn Z t7 � Z H
0 10 20 30 40
ery ense,wet,mo orange-tan,silry � � •
(Weathered Sandstone) S'8 , ; , ; ; ; , ; , �50�4�
- - - - - - ' - - -- ' -- 1- - -- ' - -
Bonng completed at 26 feet on 10110/02 ; ; ; ' ' ' ' ' '
NogroundwaterobservedattimeofdriDing � -- -� --�--�- -*--*--*--*--*--, --
---- - - - - - - - - �-- -- - - - --- - --
30 ; : : ' ; ; ; ;
35 : ; ; ; ; ; ; ; '
� -- - - - - � - -1 --i- - �- -�-- - - -
����� _ _ � _ _ � _ _ , ' _ � � _ ' T'�T_ ' T�' 1 ' '
40 , , , , , , , , ,
45 - - - - -- -- � -----_ - �- �--�- � -
- -- �- - - - - . , _ � . , . _
- - ;- - - = - - ; - - � --: : ;- - , --= - -
50 : : ; : : ' ;
Explanation o �0 2o so aa so
I Monitoring Well Key
2-inch O.D.split spoon sample � Clean Sand Molsture Content
� 3-inch I.D Shelby tube sample � Cuttings plastic Umit Natural Liquld LImR
� No Recovery � Bentonite
� Grout
� Groundwater level at time of drilling
ATD or date of ineasurement B Screened Casing
Zipper Zeman Associates,Inc. BORlNG LOG Figure A-1
Geotechnical&Environmental Consultants
Date Driiled: 10/10/02 Logged By:TAJ
PROJECT:Renton Retail Slope Stability JOB NO. J-1470 A BOR{NG B-6A PAGE 1 OF 2
Location: Renton,WA Approximate Elevation: 57 feet
Soil Description � Penetration Resistance y
r m �, m °' _ ` � 0 � �
r a a °.a � :'
m � � � 3 0 � Standard Blows per foot Other j m
G fA VJ Z U' Z i—
0 10 20 30 40
Biackberty briars over � , � � , �
-------- - - - - - - - ' - - - , , , �
'_ - - - �-- � - - r --� --: - -,- -. - , --
5 : ; ; ; ; ; ; ; ;
Medium dense,damp,dark br�wn,COAL and COAL S"� L ` ,� ` ` � + , , �7
CINDERS(Fill) —--- - - ; - ; - ; - ? - - ; - ; -- ? - - -
10 , � . ; ; ; ; ;
Medium dense,damp to moist,brown,red-brown a�d S-2 ' ; ; , ' ; ' ; ; 19
black,COAL,si1tySANDandCINDERS(Fill) -- --- � --� -- � --- - -- ------ ----- - --�
_------__ � , , - -i --1- -- -- 1--'- - ' --
_ _������ _ _ � '_ � ' _ � __ � ' 'i __T '� � __ __ � __
_ _ L __� _ � L _ _ 1 __ __ � � __1_ _ __
15 , , � , , , . , .
Loose,damp,black,COAL TAILINGS(Fitl) S-3 , � , , , , , , 10
20 - - - - - • - - � - - - - - • - -�- � --• - - • --
---------------------------------------------- -
Very loose,wet,brown,silty SAND with trace to some S-4 � � � � ' � ' ' 2 MC
gravel --�-- - i - - i - - - - - ; - - ; -- 1 - -; i - -
, , , , , . , GSA
' _ _ _ � ' _ L' ' L _ _1__ 1'_1_ '
Very dense,moist,orange-brown and gray-tan,silty ; ' ' ' ' ' ' ; ;
SAND(WeatheredSandstone) - - ' -- � --�-- r- - ;--'- - '--'-- ' --
25 : : ; : ; ; ;
Explanation o �0 2o so ao 50 ,
Monitoring Well Key
I2-inch O.D. split spoon sample � Clean Sand Moisture Content
� 3-inch I.D Shelby tube sample � Cuttings Plasdc Limit Natural �iq��a umit
� No Recovery � Bento�ite
� Grout
� Groundwater ievei at time of drilling
^T� or date of ineasurement � Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnical 8�Environmental Consultants Date Drilled: 10/10102 Logged By:TAJ
' PROJECT:Renton Retaii Slope Stabiliry JOB NO. J-1470 A BORING B-6A PAGE 2 OF 2
Location: Renton,WA Approximate Elevation: 57 feet
Soii Description � Penetration Resistance �,
� °' � g0' � ` � � � c
r Qa �-� � �
� � � � � � 10 Standard Blows per foot Other � �
C VJ fn Z (9 � Z F�—
0 10 20 30 40
Very ense,moist,orange-brown a gray-tan,
silry SAND{Weahtered Sandstone) , , � � ; ; ; � 5�'
'____ - - - - - `- - - - - - - - - - - ' -
• Boring completed at 25.5 feet on 10110102 ; ; ; : ; ; ;
No groundwater observed at time of driUing � � • � �
- - - • - -� - -, -� - - - , --*-- , - -
�r^-' � . � � . � � �
gp : ; ; : ; ; ; ; ;
�--- ��_ , , , , , , , , ,
35 ; ; ; ; ; ; ; : ;
.. - ____-- - -- � - - � - -i -- 1 - - 1 -- 1 - -
^� _ _ f_ � � ��_��_ � __ T�_ _ _ T__ __
����� �� L _ � ��L��1�� ' ��1 �� 1 __1�_ __
40 , , , , . , , ,
45 - - - - - - -- � - - --- � ---- � - -
- - 1 - -- i --- --
_ ' � '' � '' f '_ f' ' T ''T" , 'T' ' _
50 : ; : ; ' ; : :
Explanation o �o zo so ao so
Monitoring Well Key
I2-inch O.D.split spoon sample � Clean Sand Moisture Content
� 3-inch I.D Shelby tube sample � Cuttings plastic Lfmlt Nawrai Uquid Limit
� No Recovery � Bentonite
� Grout
� Groundwater level at time of driiling
ATD or date of ineasurement B Screened Casing
Zipper Zeman Associates,Inc. BORtNG LOG Figure A-1
Geotechnical 8� Environmental Consultants Date Drilled: 10/10102 Logged By:TAJ
i
SITE EVALUATION BORING LOGS
�-
'',._.$ . II
r�
I�
��� �
...5
i
�r. -
F�
�••i
PROJECT: Renton Retail JOB NO. J-1470 BORING B-1 PAGE 1 OF 2
Location: Renton, WA Approximate Elevation: 36 feet
Soil Description � m � � Penetration Resistance H
r a Q a.°'c � ;; � � � c
� N � y Z � � Standard Blows per foot Other j �
Z
0 70 20 30 40 50
Surface gress over tan-brown,silry,gravelly SAND ; . , ,
(Fill) ' , ' ' ' ' .
- - - - - -- - - - - - - - i ' - ' -- �
' __ f__ __� __ __ '._ _.T�-T��t ��
Loose to medium dense,moist,brown,silty,gravelly _ ' ' ' 1' ' , ; ; '
_ SAND with Vace organics(Fill) �_ � ; - - ; -- ; --�--1 -- ; --
S1 � - - - - � 17 MC
5 ---------------------------------------------- : ; ; ; ; ; ; ;
�.., Loose,moist,gray-black,silty SAND with some gravel —� S_2 -� - - ' - - `� ' -- ;--,--' --, - -. -- 4 MC
� and some organics(Fiil) � � � � � � � � �
r Very loose,moist,gray-black,silry,gravelly SAND to ' '
graveity,sandy SILT with some organics(Fill) S-3 �' i . � : ; : : : 3 MC
-- 10 � ; ; ; ; ; . ; ;
---------------------------------------------- S� ATD .; - ; - ; -- ;- i -1- -;-•; -- - -- 3 200
Soft,wet,gray-black,silty SAND with some organics -- �- - �- - � -- . -- �----- ------ --- - - --
------- - - - -- � � i , _ , , _ .
:a.:.i , , , , , � � � �
� . , , � � , , �
� __'_'____"____'___""_""'_'_"'._'_"""' _M'�"»" . ''r'"r" 'r '" r''t''r''r''* _'i '_ .
_ . '���' _ _ ' ' ' `' 't '' t'' '' ' '_ 1 '' '' __-
15 , , , , , , , ,
�Y -9 Y tY S-5 � , -- r - -; - - ;- -;-- ;----� --i-- 2 GSA
Ve loose,wet,brown ra -black,sil SAND with
trace gravel interbedded sandy SILT and organic SILT __ __ _ -- '- - ;- -; -- -- ' -- ;--; - - ; - - ; --
j —y— - , . : , : : . � ,
�r,"T ; , ; ; ; ; � ; ;
;.
20 --�- � -•-- � - •--•--�-- • -- --
Very dense,mois�orangish-tan-brown,weathered silty �"" , , � . , , , ,
' SANDSTONE S-6 � � � � � � � � � 5016"
- - �- - - -- -
_ _ _ _ _ f_ _! _ _ �� _ T � T�� T�� T� � __
25 ; , , . . , � . ,
Explanation o io zo so ao so
I Monitoring Well Key
2-inch O.D.split spoon sample � Clean Sand MOisture Content
� 3•inch I.D Shelby tube sample � Cuttings Plastie Limlt Nan,rai Uquid Limlt
� No Recovery � Bentonite
� Grout
� Groundwater level at time of dniling
ATD or date of ineasurement � Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnical 8�Environmental Consultants Date Drilled:9123/02 Logged By:CRT
PROJECT: Renton Retail JOB NO. J-1470 BORING B-1 PAGE 2 OF Z
Location: Renton,WA Approximate Elevation: 36 feet
Soil Description m � L � Penetration Resistance �
� d m �
a °� a� = d � � � �
� � F � � o �0 Standard Blows per foot Other � �
o N N Z (') � Z H
0 10 20 30 40 50
e dense,moist,h ht ra ,sil AND N • • •
S-T ' , , � , ; ; ; � � f�W5"
Bonng completed at 25.5 feet on 9/23l02. _ � __._ .,_ __
- - -- - - ' - -
Groundwater encountered at approximately 10 feet at ; ' ; ; ; ; ; ; ;
tlme of drillf�g. ---__-�- � � � � � � � � �
_ '_r '' "'r '" r'"r''r'_T''7''i ''
' ' ` '' '' '_ '" "'a' 'i'" '' � ''
30 : � ; ; ; ; : ; �
35 ; ; ' ; ; ; , ; ;
• -- - - - - ' - -- - � - -1- - i--� --
ht�.� . � � � � � � � .
. _"'»"» " � ' � ' ' ' r"* " , ' * "� " "
40 . , , , , , � ,
�-� � ; ; ; ; � ; � ;
45 �' ; � ; ; ; , : ; '
- - - - - �- - � - � , , , , �
__ " _ _ __t -_f_ T� '_'T' �1'_ � '_
5p ' : ; : ' : ;
Explanation o �o zo so ao so
Monitoring Weil Key
I2-inch O.D.split spoon sample � Clean Sand Moisture Content
� 3-inch I.D Shelby tube sample � Cuttings PlasUc Limit Nacurai Uquid Limit
� No Recovery � Bentonite
� Grout
� Groundwater level at time of drilling
ATD or date of ineasurement B Screened Casing
Zipper Zeman Associates,Inc. BORtNG LOG Figure A-1
Geotechnical&Environmental Consultants Date Drilled:9/23/02 Logged By: CRT
PROJECT: Renton Retail JOB NO. J-1470 BORING B-2 PAGE 1 OF 3
Location: Renton,WA Approximate Elevation: 34 feet
Soil Description m m � ,o Penetration Resistance y
L a a a� � wa�, � � � c
m � � � � � 1° Standard Blows per foot Other � �
- c cA 47 Z U' � Z ~
0 10 20 30 40 50
2 inches asphalt and 2 inches crushed rock over ,
brown,silty,gravelly SAND(Fill) �� ' ' ' ' '
---------------------------------------------- , . � , . � � � ,
' '. _ , ' " r '' '' r'_ "� '� '' '_
Loose,moist,brown-gray,silly SANO with some gravel, - -� - - - - - -- - - -- -- -- -- - -
� sandstone fragments and trace organics(Fill) _ S-1 ,� , , , , , , , � 7
5 ; ; ; ; ; ; � ; ;
--------------------------------------------- . --
Very loose.wet,gray,silty SANO with interbedded g_2 A� .`--, --' -- � -- ,-� '_� '-, -- ' 2 GSA
sandySlLT — — - - r --; --r-- ; - r--s �-- � - ; --
Loose,wet,brown-gray,silty SAND to sandy SILT with __ _ ;__ ; _ _; __; _ _; _ ;___ _ _; __
some wood S-3 � � � , , ' ' '
10 , ; . ; ; ; ; ; ;
Loose,saturated,gray,gravelly SAND with some silt, _�^ - - � -- '- � * - f -* ; - � _ ; _ _
trace wood and organics � � � , � � , 9
-----�--- - .-
- - --L- -1--1--'--1--1-- ' - -
� i i i i i i i i
_"'_____"'_'_"__"___'___'_'________'_""' ^'^'�»"" ' '_r' ' r' 'r'"r'"r"" r"'r""i ' ' � '' '
_ '�''� '' '' ''a'''"_a'' '' _'
15 , , , , . , ,
Soft,wet,brown-grey,sandy 51LT with interbedded silry S-5 �. . , � , � . ,M�% � 3 MC
SANDandorganicSlLT -- - -;- -• --�-- --- -- ; --;-- - -; --
20 ' ; ; ; ; ; ; ; '
Very soft,moist to wet,dark brown,PEAT,ORGANIC g� � ,� ' ' • , , . ,
SILT with interbedded silty SAND _ _ ; __ ; __ __;__ __ __ ' _ 2 MC
�`~ � , . , , ,
- -'- -' -- 1 - � ' -
���������������������������������___��������__ � i � � � � i � �
Soft,wet,brown-gray,silly SAND interbedded with _w------ - - ; - - t - - - -- �-- r -- - --- - - --- - - -
sandy SILT and WOOD ' ' ' '
25 : : :
Explanation o �o Zo so ao so
I Monitoring Weil Key
2-inch O.D.split spoon sample p Clean Sand Moisture Content
� 3-inch I.D Shelby tube sample � Cuttings p�asUe L.imit Naa,�ai Liquid Limit
� No Recovery � Bentonite
� Grout
� Groundwater level at time of driiting
AT° or date of ineasurement � Screened Casing
Zipper Zeman Associates,Inc. BOR{NG LOG Figure A-1
Geotechnicai&Environmental Consultants Date Drilled:9/23102 Logged By: CRT
PROJECT: Renton Retail JOB NO. J-1470 BORING B-2 PAGE 2 OF 3
Location: Renton,WA Approximate Elevation: 34 feet
Soil Description � Penetration Resistance y
� � m � °� � ` � � � c
y a a a a � ;;
� � � � � o �Q Standard Blows per foot Other j �+
G v� v� Z C7 � Z H
0 10 20 30 40 50
Soft,wet,brown-gray,silty SAND interbedded with �� . , ; , , ; , 5
sandy SILT and wood ' ' ' ' ' ' '
- - - - - - - - � -- - - -
--------- - - ;- - - , - - . - - . - -r- - . - -,- -.-- * --
3p ; ; ; ; ; ; ;
. _ Loose.wet,gray,silty SAND with some grevel S-S � ; ; � � , , ; � 4 GSA
interbedded with sandy SILT --- _ - ; __ ; _ __ __ _ _ - _ - _ - _ , _- , - _
_ _ 35 � ; � � ; ; � � �
--�-- S-9 - --�- � - -� - , - , - _--;--�-- , -- 6
-. -
- • -------- -- - - - -L --!--i--1 --i--i- -
»��r�» _ _r_ _ _ _ _f " _f � _- t ��T'-T�' 1 __ '
� � r � � � � i r
_�����������������������_��������������������� «����� � __ L l ��L t ♦ t 1 1
40 , , , , , , , ,
Loose,wet,brown�ray,silty SAND with some gravel ��0 �� , , : , , . , , 7
and Vace organics - - � - - . -
�5 � � � , � � � � �
- -� -- •- - � - - • -- �-- • --�--•-- � --
Stiff,wet,gray,sandy SILT with some gravel with ��� ; � ; ; � , , � � 10
interbedded silty SAND � ,
Medium dense,moist,tan-brown,weathered silty ' ' ' ' ! ' ' ' '
- - - -L - - 1-- i- --
SANDSTONE ------------ � - ; - ' � - = - - '-- '- -: .
_ _� _ � _ _ � _ _ _ _ T__ T _ _T__ � __ _ _
50 , ; ; ,
Exptanation o �o Zo so ao so
I Monitoring Well Key
2-inch O.D. split spoon sarnple Moisture Content
� Clean Sand
� 3-inch l.D Shelby tube sample � Cuttings Plastle Limit Naturel Liquid Limit
� No Recovery � Bentonite ,
. � Grout
Groundwater level at time of drilling
ATD or date of ineasurement B Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnical&Environmental Consultants Date Drilled:9/23102 Logged By: CRT
PROJECT: Renton Retail JOB NO. J-1470 BORING B-2 PAGE 3 OF 3
Location: Renton,WA Approximate Elevation: 34 feet
Soil Description � m L ,� Penetration Resistance y
r a a a� 3 � � 0 � �
m W � � � � 1° Standard Blows per foot Other j y
. C f� fn Z V' 3 Z H
0 10 20 30 40 50
Medium dense,moist,tan-brown,silty,highly �12 , � . � , � zs
weathered SANDSTONE ' ' ' '
55 ; ; : ; ; ; ; :
Very dense,moist.�ight gray,siliy SANDSTONE S-13 ` L L ; ; , � , � � 50/3'
Boringcompletedat56.3feeton9/23/02. _�_ _ __ _ _ _ _ __ __ __ _ __ ___ ___ _ ___ __
Groundwater encountered at approximately 5.5 feet at � � � � � � � �
r- time of drilling. _ _ � _ � � � � � � � � _
� 60 ---- - . , . - - - , : , - --
• -- - -�- -�--1 --1--' --1- -
��� ' "�'_ _'�_'t'' '_T''T"' T'_l __
_�L � _ L� �, �� ' � _ , _� __ � � ' __ __
65 , , , , , , , . ,
� ; ; ; ; ; ; ; ; ;
70 ; ; ; ; ; ; ; ; ,
- - - - - - - - �--- - - i - -1--'--
75 : : '. : : :
Explanation o �o zo so ao so
� Monitoring Well Key
2-inch O.D.split spoon sample � Clean Sand Molsture COntent
� 3-inch l.D Shelby tube sample � Cuttings PiasUe umu Naturei Liquld Limtt
� No Recovery � Bentonite
� Grout
� Groundwater level at time of drilling
ATD or date of ineasurement � Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnical&Environmental Consuttants Date Drilled: 9/23l02 Logged By: CRT
PROJECT: Renton Retail JOB NO. J-1470 BORING B-3 PAGE 1 OF 3
Location: Renton,WA Approximate Elevation: 38 feet
Soil Description � � � ,� Penetration Resistance a
L aa a� � w � 0 � c
m � � � � � t0 Standard Blows per foot Other j �
o t� N2 C� � Z ~
0 10 20 30 40 50
inches asphalt over inches oose to medium dense, � �
moist.brown.silN.aravellv SAND fFilll , , . � � , �
---------------------------------------------- ---------- � � � � L-- = - - ' -- i .
� � '! � _���T'�T __ T' ' � 1'_
Very loose,moist,biack,COAL TAILINGS(Fill) ' � � � ' ' � �
_ _ �_ S�� -.` - -i - - ` - -�- - ; -- ; - - ; -- ; -- ; -- 3
5 ; : ; ; : ; ; ' ;
. s-2 -�` - - ; --;- - '- - �--�- - 1-- ;-- ; -- 3
_ � ; � ; , � � � ; ,
---------------------------------------------- �---- S_3 ATD . ; - - ; -- ; - - ; - - ' --; - '-- i -- i -- 2
10 ; ; ; ; ; ; ; ;
Very loose,wet,9raY,silty SAND interbedded with g� '�, - �- - --�-----� -�--�'�� � 2 200
organicSllTandPEAT _ - - � - - -- � - - -,--• -* - , --
- �-
------ - - - - � - i -1- 1- ' - ' -
� � "f _ _ __ � �' T' �'_�T�� � _t__ ' _ �
���«�� _ _ ' _� ' � � �� L� �l� �L_�1�� , �_ ' __ .
15 , , , . , , ,
Very loose,wet,brown-gray,silty SAND with trace �� S-5 i � i ; ; ; ; ; i 3
gravet interbedded with ORGANIC SILT to sandy SILT � - -� - -�- - • - - ---•--�- - •--•-- • --
2� � ; , ; , , ; ;
Loose,wet,brown-gray.silty SAND with some gravel � S-6 - �� -- � 1 -- '--�--�-- 1- '-- � -- 10
interbedded with organic silt,peat,charcoal,sandy si(t � - -'- -- =-- = --=--=-- '--'-- =-- = --
and some organics
- - - - � - ' -
- - � - - �- - � --- - - - - -------- - --
25 : : ' ' : ' : ;
Explanation o �o zo ao ao so
I Monitoring Well Key
2-inch O.D.split spoon sampie 0 Clean Sand Moisture Content
� 3-inch I.D Shelby tube sample � Cuttings Plastic L(mit Naeurai Liquid Limit
� No Recovery � Bentonite
� Grout
� Groundwater level at time of drilling
ATD or date of ineasurement B Screened Casing
Zipper Zeman Associates,lnc. BORING LOG Figure A-1
Geotechnical&Environmental Consultants Date Drilied:9/23l02 Logged By:CRT
PROJECT: Renton Retail JOB NO. J-1470 BORING B-3 PAGE 2 OF 3
Location: Renton,WA Approximate Elevation: 38 feet
Soil Description m � � � Penetration Resistance H
r °aa aa � �; � ' � � c
m � � � � a 16 Standard Bbws per foot Other j .y
G N V� Z (� � Z ►�
0 10 20 30 40 50
Soft,wet,brown,sandy SILT interbedded with organic �� . � ' ' ' ' 3
silry,peat,silry sand and trace gravel __ ____ ___ _ _ _ __ _ _ __ __ � __: __ ,__ ,__: __ .
` - -� -- � --�- - � -- - -,-- -�--,--
- ---------------------------------------------- . , , , .
30 ; ; ; ; ; ; :
, Loose,wet,brown-gray,silry SAND with some gravel S-8 - -`- - ' - - : - - . - - ' - -,- -•-- , --' ' ' S
_ 35 : : ; ; ; ; ; �
Loose,wet,brown�ray,silty SAND with some gravel S-9 * ; ' ; ' ' ; ' S
interbedded with sandy SILT and trace organics — --- � - -� -- � - -�--� --� --•--•--,-- �- -
• ------ - - - - - - - - ---1- 3 1 -
� � � � � i � i
'__'_"____"_ "_� "*"r"'r "' r'_r"T"t' _� " .
-��_- "' "' ' ' �'' '' ''t'' '' � '_ ' '
40 , , , , , , , . .
Medium dense,saturated,gray,SAND with some S-10 ; ; ; ;� � , , ; ; 22
. graveiandsilt — --�--'--� -- - - - ; --`- - ,-- -- � --
..r � � , � � � � , �
45 ; ; ; ; ; ; ; ;
Loose,wet,gray,silry SAND with some gravel to 5-71 � �� � � � � � � � S
graveliy.trace organics _�_ - ; -- i - - , - - ; - -;- -1 --; - ;--;- -
_ _ � � � � -
� � � � � � , � �
'_"'_'_'_'_�'_�'�'_�'_"_'_"'__"__'_'_"'_' �_'�"'
' _ _ r '' � "' r ''r "'r ''r''�'"T'_7'' .
5p ' : ' ; ' :
Explanation o �o zo so ao so
Monitoring Well Key
I2-inch O.D.split spoon sample � Clean Sand MOisture Content
� 3-inch I.D Sheiby tube sample � Cuttings Plastie Limit Natural Liquid LimR
� � I
� No Recovery � Bentonite
� Grout
� Groundwater level at time of drilling
ATD or date of ineasurement B Screened Casing
Zipper Zeman Associates,inc. BORING LOG Figure A-1
Geotechnical&Environmental Consultants Date Drilled:9J23/02 Logged By:CRT
PROJECT: Renton Retail JOB NO. J-1470 BORING B-3 PAGE 3 OF 3
Location: Renton,WA Approximate Elevation: 38 feet
Soil Description � � � � Penetration Resistance y
� °' � � � c
d � � � � � �6 Standard Blows per foot Other � y
G tn v� Z C� 3 Z �
0 10 20 30 40 50
Medium dense,wet,gray,silty SAND with some grevel g_�Z ' . ; � ; ; ��
and trace organics _ _ '
�� _ _ � _ _ � _ _ . _ _ T_ _T _ _T__� �T''1'� '
���_-___�_���_�__�___�������_����������������� ���r���� , � � i i � � � i
5$ Very dense,moist,orango-tan,weathered silty __ __ _ _ _ _ _ _ _ _ _ _ ____ _ __ ______ _ ___ _ __
SANDSTONE S-13 , , ; � , , . ; � 50/5"
r � � � , � � � , �
_ 60 Very dense,moisk light gray,silty SANDSTONE � ' ' ' ' ' ' ' '
� S-14 - -; - ; ; -- ; -; -i-- ;- ; - ; --. 50/1'
Boringcompletedat60.5feeton9l23/02 �_�� . - -� - - � - - ;-- �----- ---- - -=--- -- .
Groundwater seepage observed at 8.5 feet at time of ; ; ; ; ; ; ; ; ;
" driliing ------- ` - - = - • ' -- ' -- �-- ' -- '-- '--1 --
��� _ _ � _ _ � � �T � � _T__ T_ � T'_l __ .
_ � _ _ ' __ ' �� �� ' �_ .� �1�� l�_ ' __
65 � � , , , , , , ,
�- ; ; ; ; ; : ; ; ;
�� ' ; ; : ; ; ; ; ;
• 7� ; � ; ; ; : : ; :
_ _ L_ _ _ __ ' 1 ' 1_ ' .
-__-_--� __ � ' _ � _ f �T __ i_ _ �T__T_ � T_ i ' _ II
75 � ; : : : ' : !
Explanation o io 2o so ao so '
Monitoring Well Key
I2-inch O.D.split spoon sample 0 Clean Sand MOtstu�e COntent
� 3-inch I.D Shelby tube sample � Cuttings plasde Limft NaWral Uquid limit
' � No Recovery � Bentonite
� Grout
� Groundwater level at time of drilling
AT° or date of ineasurement B Screened Casing
Zipper Zeman Associates, Inc. BORING LOG Figure A-9
Geotechnical 8.Environmental Consultants Date Drilled: 9/23/02 Logged By: CRT
PROJECT: Renton Retail JOB NO. J-1470 BORING B-4 PAGE 1 OF 2
Location: Renton,WA Approximate Elevation: 39.5 feet
Soil Description � Penetration Resistance y
r m �, d °' � ` � � � �
y aa c'� � � :.
Q � � � Z � 3 Standard Blows per foot Other j �
2 �
0 10 20 30 40 50
3 inches asphalt over 1.5 inches gravel over 2 inches , , ,
asphalt over loose to medium dense,damp,brown, ' , ' . '
---- - - - - - - - L - - -- - - - - -- - �
, . silty,gravelly SAND(Fill) � � � � � � �
---------------------------------------------- ---- , � � , � , � � �
''r''r " " r' "T ' ' r ''r""r''1' ''
Loose,moist,dark brown,siity SAND with some gravel ' - - - - � - - ` - - � - - , -- , -- , �- , -- , --
and organics(Fiil) S-1 � � , • , , , 4 MC
5 , : ; : ' ;
_ --�- S-2 - ,- - r •, - - � - - ` - ; , -- � -; -- 5 MC
• Loose,mast.tan-brown,silty,9revelly SAND with Vace -- =- - - - - - -'------ - - -
organics _ 5�3 _ •_ . : - - • --• -•--•-- • --• -- 5
10 � ; , ; ; ; ' ; ; ;
�- ---------------------------------------------- — � --' -- = - -= - - = - ----- - - - -- -
Loose,wet,tan-brown,SAND with some silt and gravel S-4 A� ; , � * ; : � � ; 9 GSA
« � , , i � � i � ;
���������� _�� __�� � f��T '�T__T ��T�'1��1 ''
_ _1 � _ L� _ L � � ' . � .��1�� �� l�_ __
15 , , , , , , , ,
------------- � , , , � , , - -- - -
--------------------------------- �
- --- - -- - - - -- -------
Medium dense,moist,tan-brown,silty SAND with � S-5 , , � , � � � , 19
some gravel(Hghly Weathered SANDSTONE} - - ; - - '- - ; -- ' - -=-- - -- --- --- ' --
20 ; � � - � - - � -- � -- � -- � -- ---
Very dense,moist,whitish-tan-brown,siity , , , , , , , , ,
SANOSTONE —�-- S-6 - - ' - - • -� - � � . , , � 50/6'
- -�- ----- i-- '-- '- -
Very dense,moist,light gray,silty SANDSTONE � ~ ' ' ' ; ' ; ' ' '
- - - � - - � - - - -� - .--*-- ,-- ,--,--
25 : : , , : , � ,
Explanation o �o Zo so ao eo
I Monitoring Well Key
2-inch O.D.split spoon sample 0 Clean Sand Moistu�e Content
� 3-inch I.D Shelby tube sample � Cuttings plasUc Limit Natural Liquid Limlt
� No Recovery � Bentonite
� Grout
� Groundwater level at time of drilling
ATD or date of ineasurement B Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnical&Environmental Consultants Date Drilled:9/24J02 Logged By: CRT
PROJECT: Renton Retail JOB NO. J-1470 BORING B-4 PAGE 2 OF 2
Location: Renton,WA Approximate Elevation: 39.5 feet
Soil Description � � ,, � Penetration Resistance y
y a Q aa 3 ;r � � � c
m � � R � � 10 Standard Blows per foot Other j y
o v� m Z t9 3 Z Im
0 10 20 30 40
Very dense,moisC light gray,silty SANDSTONE �7 , ; ; ; ; ; �50I2„
�,. _ '� � �'� f � � f � i'�T" 'T _' T' ' � ' ' .
[:"_, ! � . � i � � � �
3p ; : ; ; ; ; ; ; ;
-_-- -; - -- - - ; . _ . _ . . - -�- -� - - ;- - � - -
. . S-8 . , , . , .
Bonng completed at 30.2 feet on 9/24/02. . . , , , , , , ,
50/2'
_______ • - - -- ----- - --- ------------ - - --
Groundwater encountered at approximatelyl0 feet at ; ; ; ; ; ; ; ' ;
timeofdriliing. ------- - - - - --- - � - - • --•--•--• -- •--• --
35 ; ; ; ; ; ; ; ; '
- ------ - - � - -� - -L _ � � i -i--1--� --
����� ' ' � '' ' '� ' 'T''T'_T_ 'T''1''1'�
_ _L_�l ��' �� ' � �1�� ' ��1��1�_! __
40 , , . , , , , , ,
45 : ; , ; ; ; ; ; �
- - --i - -1- - 1- -
_ _ _ i _� � �_ f �__ __T��T��T__ T_ _1 __
50 ' : : ; ; : ;
Explanation o �0 2o ao no so
Monitoring Well Key
I2-inch O.D.split spoon sample p Ciean Sand Moisture Content
� 3-inch I.D Shelby tube sample � Cuttings plastic Limit riacurai Liquid Limit
� No Recovery � Bentonite
. � Grout
Groundwater level at time of driliing
ATo or date of ineasurement � Screened Casing
Zipper Zeman Associates, Inc. BORING LOG Figure A-1
Geotechnical&Environmental Consultants Date Drilled:9124/02 Logged By: CRT
PROJECT: Renton Retail JOB NO. J-1470 BORING B-5 PAGE 1 OF 3
Location: Renton,WA Approximate Elevation: 34.5 feet
r -
Soil Description m � � ,a Penetration Resistance ,�
� c, � c,� c d � � 3 c
� � � � � o t6 Standard Blows per foot Other j �
_ C fn � Z V' � Z H
0 70 20 30 40 50
5 inches asphalt over concrete ruhble over medium , � . � . , , ,
dense,moist,brown,sandy GRAVEL(Fill) ' ' ' ' ' ' ' ' '
-------- - -- - - - - - 5-- '- - 1- - � _ .
" ---------------------------------------------- � , , , , , ,
"_' --r- ; --� -- � -- -- - -,--,- - , --
Soft,moist,bladc,COAL TAILINGS with some silty ___ _ _ � __ ; _ � _ � � � � � �
SAND and sandy SILT(Filp S � � ; - ' - ; .-- - - ; - - ; -- ; - - ; _- 4
5 , ; ' ; ; ; ; ;
~-�N S-z •�- - ; --r - r- ; - - , - -� --; - ; -- 3
� � , . ; � , � � � �
--- — - -= - - --- = - - -- --- - -- - - --
---------------------------------------------- S-3 ATD .i , � , , � , , ; 3
Very loose,wet,gray,silty SAND with some wood and ' � ' ' ' '
organics - --- -�- ;-- ;- - • -�- ---- •- - - - -
10 , , , , , , � �
Loose,saturated,gray,gravelly SAND with some silt S-4 , ; � � �� � ; ; ' 4 GSA
andwooda�dpeat - -- --�- - ; - � -- - � - - •- • - - • --
• ----- --'-- -' - -1--'- -1- - ' --
��_�� __'__' _.� __i_ � _T__1__1 _ _ � _
���� __ _ _' _ _l' � L�� ' __ ' _' , __ ' _ __
15 , , , , , . , , ,
--- s-s � ' , ; ; : : ; ; s
20 Loose,saturated,gray,silty SAND with interbedded - �-�� •- -- •--• - •- --�- � • -
sandy SILT with some wood S-6 � � � � � � � � 4 200
� - -- -- � � i � � i � ,
- -.-- ' r - -- r -- r - - - - - � -- t - - - --
25 ; ; ' : ' ; : ; :
Explanation o io zo so ao so
Monitoring Well Key
I2-inch O.D.split spoon sample 0 Clean Sand Moisture Content
� 3-inch I.D Shelby tube sample � Cuttings Plastic Limlt Naturel uqutd�u�,u
� No Recovery � Bentonite
. � Grout
Groundwater level at time of drilling
AT° or date of ineasurement � Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnical&Environmental Consultants Date Drilled:9126102 Logged By: CRT
PROJECT:Renton Retail JOB NO. J-1470 BORING B-5 PAGE 2 OF 3
Location: Renton,WA Approximate Elevation: 34.5 feet
Soil Description � � � ,� Penetration Reslstance �
t aQ aa � « � � � c
m R F,�', � � 0 14 Standard Blows per foot Other j �
- C W tnZ C7 � Z F��-
0 10 20 30 40
Loose,wet,grey,silty SAND with some gravel and g_� ;. ; ; ; �; ' ' 7 MC
interbedded sandy SILT with some organics ___ ____ _ _ : _ _ , __ , _ _ , __, ._�__: _
����� _ _: _ _� _ _f _ �� _ � �_��T��T� � _
30 ; ; ; ; ; ; ; ; ;
.. Very loose to loose,wet,brown-gray,silry SAND with S-8 � � , , � � , ; , 4
interbedded sandy SILT with some organics --- --- - - = --'r - - = - - = -- =- -= --=-- =-- ' -- �
r^ � � � � � � � � ,
35 ; ; ; ; : ; ; ; '
Loose,wet,gray,silty SAND with some gravel and � S-9 � i ; ; ' ; ' ; 5
organics --�--�- � - -*--•--*--�--,- --
' ��_ _ � _ ,. _ � , � , , _ � _
���������������������������������������������� ����� _ _ �_ �f_ _ f _ _ T__ _ _ . __T � __ : _
���� __ ��' � �L� �L�� ' _� , �� 1 �� ' �� ' �
40 • . , . , , .
Loose,saturated,greenish-gray,silty SAND with some S-10 ;� ; ; ; ; : , � ; 7
gravel _ _ - - � - - � - - • - -•-- � -- ---•- -�-- • - -
45 Stifr,moist,orange-brown-gray,sandy SILT with some --'--'- -' "'- '" ''-- '-- ' - ' -
day(Highly Weathered SANDSTONE) 5-11 • � � � � � � � � 35
Very dense,moisl,light gray,silty SANDSTONE --- --�--, -- , - - , � ` � ' ; , -
- -� - - � - -- -- l- -�--'-- ,. . �_ _
' �__ � '� f ' �f__T__i_ _ i' _ ' _' 1 '_
50 : : ; ; : ' ; :
Explanation o �o zo so ao so
Monitoring Well Key
I2-inch O.D.split spoon sample 0 Clean Sand Moisture Content
� 3-inch I.D Shelby tube sample � Cuttings plasde Limk Natural Llquld Umit
� No Recovery � Bentonite
� Grout
� Groundwater level at time of drilling
ATD or date of ineasurement B Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnical&Environmental Consultants Date Drilled: 9/26102 Logged By:CRT
PROJECT: Renton Retail JOB NO. J-1470 BORING B-5 PAGE 3 OF 3
Location: Renton,WA App�oximate Elevation: 34.5 feet
Soil DescripUon � m � ,Q Penetration Resistance �,
r aa a� � :; � 0 � _
o � F y Z � � Standard Bbws per foot Other � �
Z �
0 10 20 30 40
Very dense,moist,light gray,silry SANDSTONE S_12 ' ; ; ; , ; ; . oord•
� � ' _ " L _' ' " __ __ " _! _ '
Boring completed at 50.4 feet on 9/26/02. ______ � � � � � �
i — — -- -� - �- -*- - � -- --- - ----- --
. Groundwater encountered at approximatety 8 feet at � ,' , � , , , ,
time of drilling. `_ - - -- ` - - - - -- -- -- - - -- - -
r.-.. , � , , � � � � �
55 ; ; ; : ; ; : ; ;
_ 60 � ; ; ; ; ; � ; ; ;
_ � ��w_�� __ L. . L __L_ . 1 _ .1_ ' _1__ 1_.1__
�- '-i' 'f�'f' 1 -i-'i-'T' ' 1''t ' '
'' � �l� ' ' _ ' � ' , ' '1�� �� ' ' �J �_
65 , , . , , , , , ,
70 --- - : : -- - �--•--�- - �- � - -
- - - • - - � -- i- 1 -
. _� _ _� _ _� __ �_ _ i _.T _ _ _ _ l__1 _.
75 : ; : : ' : : : '
Explanation o �o so so ao so
Monitoring Well Key
I2-inch O.D.split spoon sample � Clean Sand Mo'tsture Content
� 3-inch I.D Shelby tube sample � Cuttings piastfc Umit Natu►ai Uquld Umft
� No Recovery � Bentonite
� Grout
� Groundwater levei at time of drilling
ATD or date of ineasurement B Screened Casing
Zipper Zeman Associates,inc. BORING LOG Figure A-1
Geotechnical 8�Environmental Consuitants Date Drilled: 9l26l02 Logged By: CRT
PROJECT:Renton Retail JOB NO. J-1470 BORlNG B-6 PAGE 1 OF 3
Location: Renton, WA Approximate Elevation: 35.5 feet
Soil Description m m � � Penetration Resistance y
s a m a� � `m � 0 � c
� � � � � o �0 Standard Bbws per toot Other j y
o tn v� Z C9 � Z �
0 10 20 30 40 50
3"Asphalt over 6"base ; ; ; ; ;
- �--�- , r - � -*--, --�--,- �--
Loose,moist,orange-gray,siliy fine to medium SANO - -�- - - - - - - --- - -- - -- ---- -- - -
with some gravel and occasional cinders(Fill) S-1 ` � � � , , . . , . , 4 GSA
r� � : , ; ; . : , ,
Loose,moist,orange-gray,sitty SAND with occasional S'2 j � � � � � , • � � � 5 MC
cinders(FA) "— --,--- --, - r- -,--c--,-- , - r- , --,--
, � , , � , � , � . �
-------------------------------------------- --- . - -�-- •- -,- - • - -�--;--;--;--�- -•- -;--
' Medium dense,gray,saturated,gravelly fine to coarse ATD -- - -�-- - - ; - -,- -;--, _; -,_ ; -, -
, SAND with some silt ^ g.3 - '-- -- ',:--'-----,- • -♦- --- ; _ 17 GSA
' ---------------------------------------------- � , � , , , , , , � ,
10 , , , , , , , , , ,
Very soft,wet,dark gray-brown,SILT with some fine S-4 � ; � ; � ; ; ' : ; ; * 2 ATT
sandandfinewoodyderbis — --- - - -�- -�- -•- - �- -•--•- -�--• --�--� - -�. -
------- - - -� �- --�-- --�--*- � -� � -
- -- - --- - - �- - -�--- '-- --
15 , , , , , , , , , , ,
_ - ,--� ,--i--i- -T -�-----�- , i--
Soft,wet,dark gray-brown,SILT with some fine sand � S-5 � . ; 1 : . ; ; ; i ; � 4 MC
and fine sand interbeds and fine woody debris . _ ___ .__,__.__,__.__�_ _ . __,_ _. __�__ .
20 --�-- - - �- - •--�--• -�--•--�---- -�--
Very loose,wet,dark gray-brown,silty,fine SAND S-6 � � � � � � � � � � � � 1 200
25 ' ; ; ; ; ; ; ; ' ;
Explanation o �o zo so ao so so
Monitoring Weil Key
I2-inch O.D.split spoon sample 0 Clean Sand Moisture COntent
� 3-inch I.D Shelby tube sample � Cuttings plastic Llmit Natural Liquld Llmit
� No Recovery � Bentonite
. � Grout
Groundwater level at time of drilling
A� or date of ineasurement E� Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnical&Environmental Consultants Date Drilled:9/24/02 Logged By: EJL
PROJECT:Renton Retail JOB NO. J-1470 BORING B-6 PAGE 2 OF 3
Location: Renton,WA Approximate Elevation: 35.5 feet
Soil Description m m L ,a Penetretion Resistance y
r aQ a� 3 « � 0 3 c
� � � � � � 10 Standard Blows per foot Other j �
O fn U� Z (7 � Z H
0 10 20 30 40
Very loose,saturated,gray,silty,fine SAND with fine S_� .; ; ; � , � . � 3
woody debris and interbeded siit __ __ ' ' ' ' ' ' ' '
--� - - - � - - - - - - - ----
�,._ ' , , - ; - , -- , "�- , .
; ������� - __ � _ _ � � _ �� ; �_�T ��T�_ T__-__-
I � i � i . � i � i
���_��_������������������____ � -� � . . � i : �
T'_�' _________�_______
30 : ; ; ; ; ; : ; ;
Stiff,wet,brown-gray,SILT with fine sand interbeds ��Y S-8 L � ` ` � ' ;� ; , 9 MC
and some woody debris - - - - _ . - _ ; - ;- -; - - -- , --; -
---------------------------------------------- , , � , � , � � �
35 ; , ; ; ; ; ; ; ;
- � -- - - - - - - -- - - - -- -- - --- -- ------
Medium dense,wet,green-gray,silty fine SAND with �9 * ; , ; ;� ; ; ; ; 5 200
fine sand interbeds ' ' '
- -------- - - � � - ,. - � , -�--
� � � , , � � ,
'_"__'_______'___'____"___'_'_"__"___'___' �'_' '' ' "" r ' ' r'_ r''r__T"_7''�
_' ' r ''
40 , , , , . . , ,
Very dense,saturated,gray,gravelly SAND 5-10 ; ; ; ; ; ; ; � ' � 51
�� , � � , � , � � �
, 45 , ; ; , ; ; ; ; ;
Dense,saturated,gray,gravelly,fine to coarse SAND 5-11 � ' ' � • � � 46
- - - � - -� --- - - `--� -1- -
" ' r ' _ � ' ' '' � ' ' �''T ' '1_ ' T''1_'
50 : ; : ; :
Explanation o �o zo so ao so
I Monitoring Well Key
2-inch O.D.split spoon sample � Clean Sand Moistut'e Content
� 3-inch I.D Shelby tube sample � Cuttings plastie Limit Naturel uqu�a um�c
� No Recovery � Bentonite
� Grout
� Groundwater level at time of drilling
ATO or date of ineasurement B Screened Casing
Zipper Zeman Associates,inc. BORING LOG Figure A-1
Geotechnical&Environmental Consultants Date Drilled:9124102 Logged By: EJL
PROJECT: Renton Retail JOB NO. J-1470 BORING B-6 PAGE 3 OF 3
Location: Renton,WA Approximate Elevation: 35.5 feet
� Soil Description � Penetration Resistance �,
.. m m �, � � a� i
s ama aa 3 ;; � 0 � �
Q N � y Z � � Standard Blows per foot Other j �
d
Z
0 10 20 30 4D 50
Dense,saturated,gray,gravelly,fine to coarse SAND S_�2 ; ; ; : ;. � ; ; 32
r . _ _ _ ' ' ' ' _ ' ' _ ' ' _ ' ' i ' '' � �
. __'_�" ' r '' . _ r ' ' ' ' r ' � ' ' t ' '_'' ''
('-� , , � i i � � i i �
55 � ; ; ' ' ; � ; ;
Very stiff,moist,light green-grey,CLAY with interbeds , , , , , , , ,
of fine sand S-13 � � , , , ,� , � 32
Dense,moist,light brown grading to gray,fine to � � � • � � � �
mediumSANDwithtracetosomesilt �_ _ __ _ _ __ _ _ _ _ _ _ ________ __:__ .__
60 ; ; ; � ; ; � ; ;
-----------------------------------------------— — s�a ---; - - ;--; --- - ; -;--;-- ; -- ; --. sa
Very dense,satureted,orange,grevelly,silty SAND __ __�_- __ - i -- --,--;--; --
, � � � � � � � ,
.. _ ---------------------------------------------- � � � � i- -' -
�_����_�_ "__ _ _ ' _________ _ 1__1__! _ _ '
��� " _ � _ " � _ _ � _ _t� �__i__ T __1 _ _ __'
__ _ _ L _ _' __ , �� ' _ _1�� _ _ 1_� _�
65 , , , , , � ,
Very dense,damp,lignt gray,SANDSTONE S-15 ; , ; ; , , , ; � 50/t'
� -- � - - ; - - � - - • -- � -- ;--� -- ;--� --
------ . � � � � � , , �
�t � � ; , , , � �
70 Very dense,damp,light gray,SANDSTONE �� ; ; ; ; ; ; ; ; ;
__� -- --�--- --- --�--�-- ;- -�-- �--,
... g_�g , � , , � , , � , 50/2"
Bori�gcompletedat70.2feeton9/24102 .__ � _ _ : __:__: __� __�__: __ �__ :__.
Groundwater seepage observed at 7.5 feet at tlme of �� , , , , , , . , ,
drilling --� - - � � -- - � --*--• - •-- --
� � � � t � i , �
-'-r - - r- 'r - - 'r'- ''T' ' r'-� --
� � 75 , . . � . � . , �
Explanation o �0 20 3o ao so
Monitoring Well Key
: I 2-inch O.D.split spoon sample � Clean Sand MoiSture Content
� 3-inch I.D Shelby tube sample � Cuttings Plastic Limit Naturei Liquid Limk
� No Recovery � Bentonite
� Grout
� Groundwater level at time of drilling
ATD or date of ineasurement � Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnical&Environmental Consultants Date D�illed: 9/24/02 Logged By: EJL
PROJECT: Renton Retail JOB NO. J-1470 BORING B-7 PAGE 1 OF 4
Location: Renton, WA Approximate Elevation: 34.5 feet
Soil Description � Penetretion Resistance w
L a a a� � w � � � c
o � � y Z � � Standard Blows per foot Other j �
2 �"'
0 10 20 30 40 50
3 inches asphalt over 6 inches gravel base , . � � �
_____' - - � - -�-- � -- �-- -- � -- .--.-- , --
Very loose,moist,black,COAL TAILINGS - - - - - - - -- � -- -- ----- -- - - -
_ S-1 .. : � � � � , , , 3
5 ; ; ' : ' ; ; ;
:__ -- - S-2 .; ; - -; - - � -- �- - ; -- �� � ; 3 MC
---------------------------------------------- , -
_ Very loase,wet to saturated,grey,silty,fine SAND _— _ _ _ _ ____ ; ___ _; __ _ _ __ _ , __
. , � � , , , � � ,
_- Very loose,wet to saturated,gray,fine to medium � - ! - -� - ' � � - -�--�-- -- ---" � - -
SAND with some silt and trace gravel S-3 � ; ; ; ; ; ; � ; ; 2 GSA
`�- 10 ` ♦ - -; - -• -- ;- -:- -; -- ;- - • --- ; -
Loose,saturated,gray,fine to coarse SAND with Irace S-4 � ; ; ; � � ; � ; 6
silt - - � - - �- - �-- -� -�- * - * - --
• ------- - - -- - - - . , , _ _
------ --� -- �-- 1 -- r - - r --r-- � - -- 1 --
�_"____'_'______'��___'___'_�'�'�__�_'_"_�__ � i � � � � i � �
. . _��_ ' ' '_ ` _ ' � ' ' t '' � '' _' ' _' � '' � ''
15 , ; , , , , , , ,
--- - - � - - - - � , -- ,- ---- --- , -�ac=s3
Very loose,saiurated,gray-brown,silry Hne SAND with �___ S-5 � ; ; ; ; ; ; ; ; i � 2 200W
_ woodl/4inchesintip --� --� --- - -• -- --'--� -- -- i --
M1�.� � i � � � � � � �
' � 2� , , � i � � � � i '
Loose to medium dense,saturated,gray,gravelly S-6 � � � ' � . ' � � 11 GSA
SANDwithsomesilt --,- -- ,- - - - - ; -- -- - ; -- ; -;- -; --
- � - - - - - - - 1 - ' - -
� � i i i : �
���������������������������������������������� . _ _ '_ __ f__ i _ _ ! _ _T �_ T__T�� '__ ] _ '.
Stiff,wet,brown,organic SILT � ' ' ' ' ' ' ' '
25 ; : ; ' ' ; .
Explanation o �o 2o so ao so i
Monitoring Wel!Key
I2-inch O.D.spiit spoon sample � Clean Sand Moistu�e Content '
� 3-inch I.D Shelby tube sample � Cuttings Plastic Limit Natural Uqutd Lim(t
� No Recovery � Bentonite
� Grout
� Groundwater level at time of drilling
ATD or date of ineasurement B Screened Casing
Zipper Zeman Associates,inc. BORING LOG Figure A-1
Geotechnica(8 Environmental Consultants Date Drilled:9/24/02 Logged By:EJL
PROJECT: Renton Retail JOB NO. J-1470 BORING B-7 PAGE 2 OF q
Location: Renton,WA Approximate Elevation: 34.5 feet
� Soil DescripUon m m � ,� ` Penetration Resistance � �
am aa � m � � a c
a W � R � o �° Standard Biows per foot Other j �
o f/) fn Z C� � Z F�—
0 10 20 30 40
Medium dense,wet,gray,SAND with some silt S_� , . ; ' , , 19
' - -- - - - - � � -
�"_ --� - - � - --�- -r - *--t--r- - - ----
- ' ` ' - - " " � '- - ' '- - ' � " '-
� � � � , � � � � �
30 ; ; ; ; . ; , ; ; �
^ Medium dense,wet,brown-gray,silry SAND with silt S-8 L L �` , � � • • , �3
interbeds
35 —'---- - - ; - ' � - - ' --- - - - -� - -� - ----
Soft,wet,dark gray-brown,SILT with sand interbeds � S-9 �; � ; ; i � i ; ; 3 MC
andthinorganiclayers -- �-- . - -�-- --- ---- - ----
--- - - - -'--'--�--�- -'--
� __� __ _�T ��f� _�T�_T� � T _ . ��
i i i � � 1 � �
���_���_�����__�_������_�����������������_���� ����� - __ l _ _L �� l ��l��l . �L� � 1� �1__J �_ .
40 , , , , , , , ,
Medium dense,saturated,gray,gravetty fine to coarse S-�o ' ;� ; ; ; , ; : �7
SANDwithVacesilt --- -- -� _ . � - ` - - ` - - ` -- ;--;-- •- -�--•--
45 --- --� -�- �-------- �- - � --•--
Medium dense to dense,sawrated,9rey,greveliy,fine S-11 � � � � � � � � 34
to caarse SAND to fine to coarse sandy GRAVEL ' , ';'' , ' � -' .-- -�- -; - - ;'-;--
-- �- -L - -'--'- - '- -'- -
_ _ i _ � _ _ � '' T �_ � _ _ _T _ _ T� � __
5p : : : : : : '
Explanation o �o zo so ao 50
I Monitoring Weil Key
2-inch O.D.split spoon sample � Clean Sand MOisture COntent
� 3-inch I.D Shelby tube sample � Cuttings Pi,.uc umn Naturel Liquid Limit
� No Recovery � Bentonite
� Grout
� Groundwater level at Gme of drilling
AT� or date of ineasurement B Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnical 8�Environmental Consultants Date Drilled:9/24l02 Logged By: EJL
PROJECT: Renton Retail JOB NO. J-1470 BORING B-7 PAGE 3 OF q
Location: Renton,WA Approximate Elevation: 34.5 feet
Soil Description m � � � Penetration Resistance y
r aa a� � ;; � 0 3 �
� � � � � � � Standard Blows perfooi Other j �
o cA N 2 �7 Z F-
0 10 20 30 40
Medium dense,saturated,gray with orange and brown, 3.12 � � � � � � Z6
siltygravellySAND --- -- -- - - - - - - - - - - - - •- - - - �-- � - -
- --, --� -- -- � - - � - � -----.--,- -
55 : ; ' ' ; ; ; ; ;
Dense,saturated,gray,sandy GRAVEL S-13 ; ; , , , , , � � 39
60 ; ; ; ; ; ; ; ; ;
Stiff,we�green-gray,clayey SILT with occasional S-14 � � ; ; ; ; � ; ; 9
interbedsoffineSAND - � -- - -- - --� -- ---. --*--.-- •-----�
----- -- - - � -- - L L 1 --
i � � i � i � �
""__""__"'____'___""_"__'_'_""'_'_" �-��� ' " ' � _'r ''*
'� ' 'T ' '
65 . , . • r . , ,
Loose,saturated,gray,fine to medium SAND with , , , . , ,
trace silt and gravel M S-15 - -,� - ;- , 1 , , , , 7
- --------------------------------------------- —� - - � - - ; - - ; --;-- -- � - - -- - -� --
Medium stiff,wet,gray,fine sandy SILT and 51LT with • � � � � � �
traceGaY ------- - -r-- � -- � r--r--r--�--� - ;--
70 - -� --• - - � - • -• - •--•--� -• --
Medium dense,saturated,gray,fine SAND with Uace 5-16 � � � � � � � 16
silt _ - - ,- - - ,- - ,- - - ,- - ; --- -- , --;- - -
i � � � , -' - -'- -' . _ ' --
__ _ � .' f __ t " 'T'�T � 'T��T ___ __
75 ; : : : ; : ;
Explanation o �o zo ao ao so
Monitoring Well Key
I2-inch O.D.split spoon sample � Ciean Sand Moisture Content
� 3-inch I.D Shelby tube sample � Cuttings plastfe Umit Natural uyu�d umic
� No Recovery � Bentonite
� Grout
� Groundwater level at time of drilling
ATD or date of ineasurement � Screened Casing
Zipper Zema�Associates,Inc. BORING LOG Figure A-1
Geotechnical�Environme�tal Consultants Date Drilled: 9124l02 Logged By: EJL
PROJECT:Renton Retaii JOB NO. J-1470 BORING B-7 PAGE 4 OF 4
Location: Renton,WA Approximate Elevation: 34.5 feet
^ Soil Description L Penetration Resistance �,
t Q Q O..0 3 w; - � � C
a. � � � � � 1° Standard Blows per foot Other � y
",_ C tn v� Z C� � Z �
0 10 20 30 40
Medium dense,saWrated,gray,fi�e SAND with trace g_�� � . ; � � � zs
siit -- -- , ' ' ' ' '
---- -- - - - -�- - � - - .--;-- *-- � --_-- --
� � , � � , � �
---------------------------------------------- ----------
80 ' ; , ; , : . ;
Medium dense,wet,gray with some orange,gravelly -� - ' - - ` � " � - - ` - - ' " - ' � - ' � � � - � ' - "
� SAND with some silt S-78 . . , � � . � 26
---------------------------------------------- , , , � , � � ,
Dense to very dense,light gray,SANDSTONE in tip ___ ___ _ _ _ _ __ _ _ ________ _____ __ _ _ _
� � , , , � � � , ,
- 85 ; ; ; ; ; ; ; ; ;
Very dense.Iight gray SANDSTONE � �19 --� - -' - � - - ' , - ' -- ' - - ' -- ' - -� 50l3'
� ---- --'- -- -- -' - -1--'- - '--
- �� i i . � i r � . i
��� _ _ � _ _ f_ _ . __��_ __ __ T_ _ T__ 7 __
� _ _� L_�l �� , _� __ _ _ ' �_ ' __ __
Very dense,light gray SANDSTONE � � � • • � � �
90 -t__,__ --; - - , - , - - , - , ---- ,--;-- , --�
Boring completed at 90 feet on 9/24/02 5-20 ; ; . ; � , ; ; ; 50/2'
Groundwater seepage observed at 9.5 feet at time of ____________ - - -� - - � --• - - � --�--•- - •- - • -- � --
drilling � , � , � , � , �
�� _ - -- - -•--� - - i--•--;- -; -- 1-- - - -
�: '� - - - -
95 - -- - - � -- � - - - -- � -- �- - �-- � --,--
���-� � � � . � � i � i
' ' ' ' i'_L"'1" ' '1" '
_ _f _'('� i 'T '�i'�T _ _' t ' ' 1 '_ �.
..._ �O� . . � . . ! ' , �
Explanation o �0 2o 3o ao so
Monitoring Welf Key
I2-inch O.D.split spoon sampfe p Clean Sand Moisture Content
� 3-inch I.D Shelby tube sample � Cuttings PlasUe Llmft Nacurai Liquld Limit
� No Recovery � Bentonite
� Grout
� Groundwater level at time of drilling
ATD or date of ineasurement B Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnicai&Environmental Consultants Date Drilled: 912M02 Logged By: EJL
_.,
PROJECT: Renton Retail JOB NO. J-1470 BORING B-8 PAGE 1 OF 5
Location: Renton, WA Approximate Elevation: 36 feet
Soil Description � � � ,6 Penetration Resistance w
t a a a� 3 « � � 3 c
m � � � � � � Standard Blows per foot Other � y
C N � z (7 � Z F
0 10 2U 30 40 50
3 inches asphalt pavement over 5 inches base , , , � , , ,
---; --�--�- - ------------ --- --�
Loose,moist,black,COAL taili�gs(Fill} , , , , � , , , ,
S-1 , ; �, � � ; � 18
5 ; ; ; � ; ; ; ;
Loose,damp,orange-brown,silty fine to medium SAND g_2 � � � ; � • ; � , 4 GSA
with Vace gravel and some anders,and coal Wifings - - - - - - -- - - - - - - --- ---- - --- -- - _
(Fill) ; ' ; ; ; ; ; ; ;
� ---------------------------------------------- � - - � - � - - ' -- -- � -- , --; - -- -
_ orange-light gray,SANDSfiONE fragments(Fill) � � � � � �
S-3 � � 4 MC
Loose,wet,gray.fine to medium SAND with trace -�L . - - - • - • ; ;--•-- • -
10 9ravel _ , � , . , , , ,
r.- _ ATD - - -
Loose,saturated,gray,silty fine to coarse SAND with � f � ' � T f � T ; 9 GSA
some gravel , � � , , , , , ,
" � '��'�r� _ .L _ � � � � 1_ 1_ i � _
'" ''l_' L '' ' ' ' '' ' '' , '' '' ' __
15 Very loose,saturated,gray,fine to coarse SAND _ _ , _ , _ , _ , _ , _; _;__; __ _
---------------------------------------------- S-5 � : � , , � � � � 5
Soft to medium dense,wet,brown,sandy SILT with _ __� � - -�- -- - -� - - • -- ---�--•- - • - ---
� wood debris 1l2 inches thick ; : ; ; , ; ; ; ;
20 ---- -�--•--•--------�-- •�7o9c
Soft,wet,brown,SILT with some fine sand and �g �, � � , , � � � � � 3 MC
abundant wood derbis(PEAT) ------ --i --;-- , -- ; --i--;--; - '--i --
- - - - - - - - -- - - ' -
- , - - ; -- � -- � -- ----- ---- ------
25 : , , : ; : :
Explanation o �0 2o so ao so
I Monitoring Well Key
2-inch O.D. split spoon sample � Clean Sand Moisture Content
� 3-inch I.D Shelby tube sampie � Cuttings Plastic Limit Natural Llquid Limft
� No Recovery � Bentonite
. � Grout
Groundwater levei at time of drilling
Aro or date of ineasurement B Screened Casing
Zipper Zeman Associates, Inc. BORING LOG Figure A-1
Geotechnical& E�vironmental Consultants Date Drilled:9I24IO2 Logged By: EJL
PROJECT: Renton Retail JOB NO. J-1470 BORING B-8 PAGE 2 OF g
�ocation: Renton,WA Approximate Elevation: 36 feet
Soil Description L Penetration Resistance y
r mm m °' � ` � � � c
r aa a� 3 ::
m � F � 3 � 3 Standard Blows per foot Other j �
p v� tn Z CU Z h-
0 10 20 30 40
Medium stiff,wet,brown,PEAT S_� , ; ; ; i MC=93% . 6 MC
__ - ,-- -*-- � - - . - - .--.--*--,- - , --
�� � . , , , , ,
gp ; : ; ; ; ; ;
_ Dense,saturated,gray,fine to coarse,sandy GRAVEL �g ; �; ; ; ; y ' ; '� 47 200
r; to gravelly SAND with trace silt _ , � � , ,
�„ , , � , , , , ,
35 ; ; ' ; � ; ; ;
Dense,saturated,gray,fine to coarse sandy GRAVEL N� S-9 __ � _ _ � __ i _ _ : - ; -; __'_ I � �
. . ' � -- -- -� - -L --`--1- - 1-- -
__� __f__ __ !_ _� _'T__T_'T__ . _ , _ '
��t_'l��l � ' 1 ' ' _ _ __ _� ' __ _ _
40 , , , , , , , �
Medium dense,saturated,gray,flne to medium SAND S-10 ; , �, ; � ; , ; 18
45 --•-- ---- - - � - - �--�------ -�--
. Medium dense,saturated,grey,sitty,ftne to medium ��� , � , ,� , ; , �� Ggq
SAND with trace gravel -- -- - - ,- - ,- ,- -; -; - , -_--
-� - ; - - - - � - - - -* - - _ - - � -- . -
50 : : : : :
Explanation o �o Zo so ao so
I Monitoring Well Key
2-inch O.D. split spoon sample ...��_.� Clean Sand MotStUre COntent
� 3-inch I.D Shelby tube sample � Cuttings plastic Umit Natural Uquld Limit
� No Recovery � Bentonite
� Grout
� Groundwater level at time of drilling
ATD or date of ineasurement B Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnical&Environmental Consultants Date Driiled:9/24/02 Logged By: EJL
PROJECT: Renton Retail J08 NO. J-1470 BORING B-8 PAGE 3 OF $
Location: Renton, WA Approximate Elevation: 36 feet
_, Soil Description � Penetration Resistance y
s a Q a� _ � - Q d a�
7 C
m � � � 3 a 14 Standard Blows per foot Other � �
C m v� Z (7 � Z fd
0 10 20 30 40 50
Medium dense,saturated,grey,gravelly,fine to coarse S_�Z � , � ;. ; � � � 22
SANO � � � , �
' - -L -- -- - - - -
�������� _�r__ ' ' _ � __ ' _ _i 'T��i�_t_ ' __
�. ������� �� �� _ _ - _ ' __L�� ' � � �� � _ _ _
�__ � � � � i � � . i
55 ; ; ' ; ; ; ; ; :
Dense,saturated,gray,gravelly,fine to medium SAND N�_- S-13 _ _, _ _; - _i __ ; - _ ; - _ I �. _- ; - ' __ 33
�__ � � i � � � � � i
. . 60 � i ' i � � � � �
Medium dense,saturated,gray,gravelly SAND with M�_ S-14 ' ; i �; i ; ; ; i 78
somesilttosNrySAND --� -- - - -- - - -- --*-- -�--
------ --,-----` - L ' -- - - -
�������� _ _ � _ _ � _ __i' _ f __��_i__ i__ l _'
��� _ __ �_ _�L ��L��1�_1 �� ' ��1_ _ ' __
65 �q�ium dense,saturated,green-gray,silty,fine ta _ _ ___; _ __;__;_ ;__;__ , _ _; __
medium SAND with some gravei S-15 , , ; ; �. , , , , 33
---------------------------------------------- — --- -- -�- - • - -• --• - - ' --' -'- -' - -
Medium dense,saturated,brown,silty,fine SAND with ; ; ; ; ; , , ;
thin seams of black,anders,coal pieces at 66 feet ____�_M_ - -- - -=- -- --- -- - --- - ----'--�--.
ir's � � . � � � � , �
70 -- - - � - � -- � - � --- ----- ; �
Soft,wet,9reen-gray,sflty CLAY S-16 � ; ; ; , ; ; Mc=S�% . 4 ATT
+-__^-__ _ _� _ _ ( � �� � ___ � __ _ _T�_l _ _ � __ II
75 ; : ; ; ' ; ; I,
Explanation o �o zo so ao so '
Monitoring Well Key
I2-inch O.D.split spoon sample � Clean Sand Moisture Content
� 3-inch I.D Shelby tube sample � Cuttings Plastie Umk Natural Liquid Limit
� No Recavery � Bentoniie
� Grout
� Groundwater level at time of driiling
AT° or date of ineasurement � Screened Casing
Zipper Zema�Associates,Inc. BORING LOG Figure A-1
Geotechnical&Environmental Consultants Date Drilled: 9124/02 Logged By: EJL
PROJECT: Renton Retail JOB NQ. J-1470 BORING B-8 PAGE 4 OF 5
Location: Renton,WA Approximate Elevation: 36 feet
Soil Description � � � � Penetration Resistance �,
r a a a.c � �ar, � � � �
Oy � � Z � 3 Standard Blows per foot Other � �
0 10 20 30 40
Z �
Medium dense,wet,green-gray,clayey SILT ' '
---------------------------------------------- S-17 � . , , , , � 16
Medium dense,safurated,gray,silty,fine SAND - , -- � - - ; - - - , - -- -;- --- - , --
^-- _ _ �_ _r__! __ T__ T_____ __T__ __
���� _ _ ` _ ' __ ' ' l_ _ ''_ __ __ __ __
80 , , . , , � � ,
- Loose,saturated,gray,siity fine to medium SAND with '� 5-18 � � ; � ; ` ' , ; 9 GSA
tracegravel - - r - -r --r-- r - - - , - ;- � - � -
r_ , , , , , � � , -
,
� ---------------------------------------------- ------ - - - ---•-- �-- •-----------•--� -
� 85 Dense,saturated,brown,fine to medium SAND � -- �-���', - , -- � -�--� - � - � - �
�-- S-19 - - - - -;- -�- - , - � -*--*-- * --� - 45
" • ---- - - - - - - --- ._ � , , , - - - -
---- - - �--� --� - - - r- ---- ------ - -
- -- �- - - - -- �-- -- -- -- --' - -
90 Medium dense to dense,saturated,brown,fine to _� S-20 ; i ' ; � � � � � 30
mediumSAND - - - - � - - - - . - ; - -� - - � � - �
� , � , � , ;
,f-`z � � � � � � � � ,
' 95 — - - -� --�-- ------ -- ---�--- --
- Dense to very dense,wet,gray,fine to medium SAND g_21 , � , , , , ; , � � gg
with 4 inches yellow-brown,SANDSTONE fragments - _ ' _ _' __ '-__= __ '-__=__=__ '__= __
' _'L' 'L''L' ' '1' I '1_ '_ '_
'_ �"_ ' �'_r '' r'_1_'*'' ''T ' '
1�0 . , � . , . .
Explanation o �0 2o so ao 50
� Monitoring Well Key
2-inch O.D.split spoon sample � Clean Sand MOiStu�e Content
� 3-inch I.D Shelby tube sample � Cuttings Piascie umic Natural Liquld Limit
� No Recovery � Bentonite
- � Grout
Groundwater level at time of drilling
ATD or date of ineasurement B Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnical 8�Environmental Consultants Date Drilted: 9/24/02 Logged By: EJL
PROJECT: Renton Retail JOB NO. J-1470 BORING B-8 PAGE 5 OF g
Location: Renton,WA Approximate Elevation: 36 feet
Soil Description m � � � Penetration Resistance ,�
r a a a� 3 :; � � � c
m � F � 3 a '0 Standard Blows per foot Other j �
- O tq m Z C� � at
0 10 20 30 40 Z ~
_�� - - - - - - - - --� - - - - -- ---- - - - -- - -
105 � ' � � ; ; ' � �
Dense,moist,9ray,silty SAND _�— 5-22 - -;- -'--'--'- -'- - r- -� - -�--'�- 4T
; ,
�"; ---- - -�--'---�--� - -�- -`--, - -`--'- - -
��� Very dense,moist,gray,silty SAND _ _� __�__;. _ ;._ _� _ _�_ _�_ -�- -;-- -
, --�--- 5-23 � � � � ; � ; : � 50/5'
----------- � --'---' --'- --'-- -'- - -'---'-- -'-- -'- - -
Bonng completed at 110.5 feet on 9/24l02. � � , � � � � �
Groundwater seepage observed at 9.5 feet at time of � � � ; � � � �
_ ' driliing. ---- --;--�- -�- - - -;- -r--�--�--, - -
�..F, , , , , � � � ,
115 ' ' ' ' ' ' ' ' '
_, , , , ,
, .»...�_ "r"r" " "� '_ " ' "�"'� "
' _ ' ''� '_� ''�' ' '' ' ''' '�'" ' _ '
� ' ' '_ ' '_'"_ ''_' _' ',-'''_'_' ':_ '
� �20 ' _`_ '�_'`_'`' '.' '` ' "�' '..' '� ''
" ' _ _ 't ' '_ ' '' ' _ ' ,"' '' ' '
�2� � . . . � � � � �
Explanation o in 2o so ao so
Monitoring Weli Key
= 2-inch O.D.split spoon sample � Clean Sand Moisture Content
� 3-inch I.D Shelby tube sample � Cuttings plastic Limit Natural Liquid Limit
� No Recovery � Bentonite
� Grout
� Groundwater level at time of drilling
ATD or date of ineasurement � Screened Casing
Zipper Zeman Associates, Inc. BORING LOG Figure A-1
Geotechnical&Environmental Consultants Date Drilled: 9l24102 Logged By: EJL
PROJECT:Renton Retail JOB NO. J-1470 BORING B-9 PAGE 1 OF 2
Location: Renton,WA Approximate Elevatfon: 71 fest
Soil Description L Penetration Resistance H
� C. d G.0 C d - 0 3 C
� � � � � � 1° Standard Bbwsperfoot Other � y
o v� cA Z C7 � Z �
0 10 20 30 40
Gravelly,silty SAND shoulder ; � ; ; ; ; ;
------ - - -- , , i , , , -
' , wire wrapped wood-siave pipe -------------------- ' ; � � ; ; ; ; ;
---------------------------------------------- --------- , � �
- - � -- - - - - r - -. - - r--, - ---- - -
� � ; � ; ; , ; ; �
, _ Medium dense,moist,orange-brown,siity SAND with __� S-1 ' 1� i � ` i � , � 12
trace grevel(Fiil) -- - - ; - - ; - ; - - ; -- - - , -;--; -
{P Y� -- --, - - -- -- -- -- - - -- --
-- Loose to medium dense,orange-brown to black,silry -- � -� � - ' � � - � " - �--�--�-"��- � � - -
�� SAND with Vace gravel(Filp S'Z ' ;� ' ' : : ; ; ; ��
�� black coal from 8 1/2 to 9 feet � � � � , � � �
� - - - - -
---------------------------------------------- S-3 r � , ' ' ' ' 6 MC
loose,brown,silty SAND(TOPSOIL) � � � �
---------------------------------------------- � � . . ,
, Loose,damp,orange-brown to brown,silty SAND with ; ; ; , ; . ;
trecegravel ----- - - - --, - ;- - � - -1 -- �--; - -;-- ; -- -
Medium dense,damp,light brown,graveily SAND with ��_ g.4 � ; ; � ; J , T ; ' 16 GSA
somesiit -- -- - -- -- - - -- -- - - -- - -
15 , , , , , , , , ,
Medium dense,damp,light to buff,silty SAND with S-5 � , ,� , ; , , , 17 MC
tracegrevel -- - - -� --- - - • - - - - - , --�--;- - �-- ;- -
� � � , � � ; � ,
20 ; ; ; ; : ; ;
Dense.damp,sVongly mottled orange and tan.silty - - - ' --' -- ' --' --'-- -- -- ---- - ;--
SAND S-6 � � � � � � � � 34 MC
Dense,damp,strongiy mottled orange and tan,fine, ; ; ; � ; � � : ;
sandySlLTtosiltyfi�eSAND _w_____ • --� -- � --• --* --------- --------
, � L , _ , ,
_ _ _ __ _ � � ! �_ ! ��T __ � �T_ _ � _ _ l __
25 ; ; : ; ' : :
Explanation o +o 2o so ao so ,
Monitoring Well Key
I2-inch O.D.split spoon sample ..�.�,.., Clean Sand Moistu�e Content �
� 3-inch I.D Shelby tube sample � Cutti�gs p�ast�c�imit NaWral Liquid Limft
� No Recovery � Bentonite
� Grout
� Groundwater level at time of driiling
ATD or date of ineasurement � Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnical 8�Environmental Consultants Date Drilled: 10/10/02 Logged By:TAJ
� --
PROJECT:Renton Retail JOB NO. J-1470 BORING B-9 PAGE 2 OF y
Location: Renton,WA Approximate Elevation: 71 feet
Soil Description � m � � Penetration Resistance ,�
r aa a� � ;; � 0 � c
m R � � � o `� Standard Blows per foot Other j .m
G � (n Z C� � Z ►–
0 10 20 30 40
Very dense,moist,mottled orange and tan,silty SANO g_7 : � ; , ; ; ; ; ' � 5D13" MC
(Very Weathered Sandstone) ___ ____ ,
__ _ _ ___ L _ � ___ _ _ 1_ � __ _
�"'_. �. � � . � . , � .
� ^�� _ _ �� _�� � � � _�_ _ T_ _T__T _� � __ _ _ _
�������� _ _ _ _ _' � � � � __ � � ��1__ ' �� _ _ '
30 ; ; � ; ; ; ; ;
- - - � - - �- - - - - � - - • - -•--� --�-- � - -
Very dense,moist,orange-brown-tan,silty SAND S-8 , ,� , � � � . , �50/2' MC
(Weathered Sandstone)
rT , � � � � � � � �
Very dense,moist,mottled orange and tan,sil2y SAND � � � � � � ' � �
, _ 35 (Weathered Sandstone) �` __ �__�_ _ _ _ _ _ ___�__ __ _ _ _ .
--+—� S_9 � � , � � � � � � � 50C2'
Boringcompletedat35.5feeton10/10/02 ___�_�__ - - - � - - -- - - - - --- = - --- ------- - - -
, No groundwaterobserved at time of drilling ; ; ; ; ; ; ; ; ;
• ------- - - - - - � -1 - - -
�.,_; i � � � � � � � �
` ��M��' ' _� ''�' ' � ' 'T ' ' 'T'' T ''t''�' ''
������ �_ ; � _' �� , � �L�_ 1 _� 1 �� 1 �� '_� ' � � I
aa
� __--- - - ; - -;- - ; - -;-- ; --'- -= --;--� - -
45 - -�- � � --� � -----�------ -
_ _ r __ ' � % _ T __T__ T __ . __ 1 _ _
50 ' : , ; , ,
Explanation o �o zo so ao so
Monitoring Well Key
I2-inch O.D.split spoon sample 0 Clean Sand MOisture Content
� 3-inch I.D Shelby tube sample � CUttIf19S Plastie Ltmit Natural Uquid Limit
� No Recovery � Bentonite
� Grout
� Groundwater level at time of drilling
ATD or date of ineasurement B Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnical 8�Environmental Consultants Date Drilled: 1011U/02 Logged By TAJ
PROJECT: Renton Retail JOB NO. J-1470 BORING B-10 PAGE 1 OF q
Location: Renton, WA Approximate Elevation: 36 feet
Soil Description � m � ,a Penetration Resistance y
r aa a� � � � 0 � c
m � � � � 0 14 Standard Blows per foot Other j �
o N (/� Z U' � Z Im
0 10 20 30 40 50
3 inches asphalt over 5 inches base . � � .
_�� - - -- - - - --- '-- -- -
r—, � � , � � � � ,
_��__�_ - - - -r- . - -r - -*--;-- --t-- - -
' Very loose,damp,black,COAL TAIUNGS(Fili) ----- ----- � � � � � � � � � � _ _
- S-1 ., , , , � � , , � 3 MC
5 ; ; ; ' ; ; ; ;
Loose,damp to moist,black,COAL TAILINGS mixed 5-2 � , ` ` � , � , , 5 MC
_ withbrowncinders(FII) ----- - - - - -r - - ; ; , ; --r--: --;-- c --
" Very loose,wet,black,COAL TAILINGS mixed with _ _ �_ _ _ _ _ __ _ _ ___ ____ _ _ _ __ _ _ _
cinders(Fill) S-3 �; � ; ; ; ; ; ; ; 3 MC
io ---------------------------------------------- -- -- A� - - ; � -;- - ;- - : - -;- -; - -; -;--i - _
Soft,saturated,green-gray,clayey 51LT with interbeds � � ; ' ; ; ; ; ; ; � 4 2DOW
silty,fineSANDseams --- --- - � - - �--� - • - *- -• - - • - �--, --
-------- L � � i � i � � � .
------ - -- r - - r' r 'r' ' --r- -r-' --i --
15 , , , , , , ,
Loose,saturated,gray,silty SAND in tip S-5 . , , , , , , � ,
Medium dense,wet,gray,fine to medium SAND with _ _ _ _ _ __ _ _ _ _ _ _ _ __ _ _ _ _ ____ _ _ _
some sitt and trace gravel with interbeds of brown, � � ���� � � �
` organic SILT with wood derbis(PEAT) S-6 � � � � � � � � 6 GSA
20 -- - - --�--�--• --� - -� - - � -Mc=i�ex
Medium dense,wet,brown,orga�ic SILT with abundant 5-7 � � � � � � � � � 5 MC
wooddebris(PEA� - - - ,- --,- --; - ;--;- - ; ;--; --
_ . _ _ _ _ _ _ _ _ i__ . __ T__ ___ T__ �i _
25 � . � � ,
Explanation o �o zo so ao so
Monitoring Well Key
I2-inch O.D.split spoon sample � Clean Sand Moistul'e Content
� 3-inch I.D Shelby tube sample � Cuttings Plastic Limit Naturdl u�d Lim1t
� No Recovery � Bentonite
� Grout
� Groundwater level at time of drilfing
ATD or date of ineasurement B Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnical& Environmental Consultants Date Drilled: 9126l02 Logged By: EJL
PROJECT: Renton Retaii JOB NO. J-1470 BORING B-10 PAGE 2 OF 4
Location: Renton, WA Approximate Elevation: 36 feet
Soil Description � m � � Penetration Resistance y
� ad aa � d � � 3 �
m � F,�`, � 3 Q �6 Standard Biows perfoot Other � �
o m fnZ C7 � Z H
� 0 10 20 30 40
Stif`.wet,brown,fibrous PEAT �g ; . ; ' MC=�se% � 9 MC
� � _ ' _ _ __ " ____ _1 ''1_ _' _ ' "_ 1_ _
«�� __�_ ' i � _ __ f_ _ �T_�T��T�_ i _ _
""__�"__���"_'�"_"�"_"__'__'_�"'�_'__ ���" '' 'i ' �' � i ' 'i_ 'T __T ' ' ' '
30 : ; ; ; ; ; ; ; ;
Medium dense,saturated,gray-brown,fine interbeds of S-9 � , �. , . � , � 13 200W
silty,fine SANO and fine,sandy SILT with occasional --- -- � - -'- - - ',- - - = - -=- - ' --;--=--'- '
wood debris � � � � � � , ;
s' ------- - - - -
35 ; ; ; , ; ; ; ; ;
- Stiff wet,brown fbrous PEAT -------------------- --� � , � � � � ,
fine to medium SAND with some silt------------=--- --� S-10 -- r� . - '--'- -T - . --,_ �=��% � 7 MC
------------------------------
Stiff,we,brown,fibrous PEAT � � � � � � � �
----------------------------------------- ---
Green-gray,Gayey SILT ' ' ' ' ' ' ' ' '
' ---------------------------------------------- ----------- -- - - - - - - - --;- - ,-------- --- - -
�', , , ; , , , � � ;
'✓.F � � � � � �
`��� ' _ � � �� �T_'T _ __ � '_ . __
_ _ _ _ ' _ _ ' � �L� � 1 � _ __1_ '__1_' '
40 ; , . , , , , , ,
-- - � - , - ;- �- - ;- ---� -;--; - -
Medium dense,saturaled,gray,gravelly,fine to coarse S-11 � , . , � ; , , , 24
SANDwithVacesiR --- - - � - - , - - ;- - , - - `-- , -- � -- --- --
45 - - -- �- � - -�- � ----•-- �- -- --
. Dense,saturated,grey,grevelly,fine to coarse SAND 5-12 � � � � � � � � � � 52
withtracesiit _. - - ,- - , - ,- -;- -�- -;--�- -;- ; - -
�a ; ; : ; ; ; ; :
Explanation o �o so so ao so
Monitoring Well Key
I2-inch O.D.split spoon sample 0 Clean Sand Moisture Content
� 3-inch I.D Shelby tube sample � CUttI(19S PlasUc Limit Naturol Lfquld Umit
� No Recovery � Bentonite
� Grout
� Groundwater level at time of drilling
AT� or date of ineasurement B Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnicai&Environmental Consultants Date Drilled:9/26/02 Logged By EJL
PROJECT: Renton Retail JOB NO. J-1470 BORING B-10 PAGE 3 OF 4
Location: Renton,WA Approximate Elevation: 36 feet
Soil Description L Penetration Resistance y
� � � °' � ` � � � �
Y a a a.° � ::
m � � � � 0 � Standard Bbws per foot Other j w
o V� c� Z C� 3 Z 1a►
0 10 20 30 40
' Medium dense,saturated.gray,gravelly,fi�e to coarse g_ig . ' ' ' ' 15
SAND _ _ � � ,
P._ - — - -- - - - - - , - - ,- - - - - - - - - ; - -�- � --
j -"_"--- - - -- r--r- - � - -*- ------- -- --
� , � � � i . . . � � �.
F,_ . . � � � � � �
55 Medium dense,saturated,gray,gravelly,fine to coarse __ ___ __�_ _ __ _ _ _ _ _ _ _ _ _ _ ___ _ _ _ � __; ___
SAND S-14 , , , � � � , 24
---------------------------------------------- , , , ,
�
Medium dense,saturated,green-gray,slity CL4Y with , ; , ; , � , ; �
some sand ' ' ' ' ' ' ' '
r- , � , , , � , ,
_ 60 � , . � , � � , �
Medium dense,saturated,gray,fine to medium SAND S-15 ; � �; ; � ; ; ' 13
- M�_ - - - - i--1--' - - �
, r�� _' __f�_� __ _ _: � �' ' _�l __
_ _ ' __, __ _ _ ' __ ' _ _1 � _ ' _ _ ' __ __
65 , , , , , , , , ,
Medium dense,saturated,gray,fine to medium SAND S-16 : ; , � , � , , ; 19
withsmall(1f8")clumpsofyeilowSAND ---- -- -�- -� - -� - - �- -�- - �--•--�--� --
7� : ; ; ; ; ; ; � ;
� -- �--•--• --• --�-- � --•-----, -- �
Stiff,wet,green-gray,silty CLAY with fine sandy SILT ��� ; ` ; ; , ; ; 9
interbeds 1!4 inches thick _ Y_ . _ ;__ i _ _ ; __1_ ; _ ; __ , __ , , __
' ' _L _ ' _L '_ 1_ _! _ � 1_ _
__ � __� " _ 'i_ _T__ T_.___1__ 1 __ '
75 : : : ; ' '
Explanation o �o Zo so ao so
I Monitoring Well Key
2-inch O.D.split spoon sample � Clean Sand Moisture Content
� 3-inch I.D Sheiby tube sample � Cuttings Ptastic Limit Natural Liquid Limit
� No Recovery � Bentonite
� Grout
� Groundwater level at time of drilling
ATD or date of ineasurement � Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnical&Environmental Consultants Date Drilled: 9/26IO2 Logged By: EJL
PROJECT:Renton Retail JOB NO. J-1470 BORING B-10 PAGE 4 OF 4
Location: Renton,WA Approximate Elevation: 36 feet
Soil Description m m � � Penetration Resistance y
L a a a.n � « � � 3 �
� - � � � � 0 3 Standard Blows perfoot Other � �
o N N 2 t� Z F—
0 70 20 30 40
Very dense,moist,orange-brown,silty AN with
some gravel S'18 ; � ; ; ; ; ; � 52
---------------------------------------------- - --- , , , , � - - -- - '- -'
����W» � _ _ _ . _ _ � � � �� �T� _T __ _7__ __
""'•' Very dense,damp to moist,light gray,SANDSTONE � � �
80 - - � - - � - - �- - � - -• - -• - -•-- � - - � --�
Boring completed at 80 feet on 9/30/U2 S-19 , , , , , , . , , 50/1"
Groundwater seepage observed 9.5 feer at time of __�M__ � � � � � � � � �
drilling - -; -- , - -: - - r - - ; - ; --; - ;- -i --
85 ; ; ; ; ; ; ; ; ;
���__ - -� - � -�- - � -�- - . --�- -_- - � --
' ---- - - -�--i--i- ---- 1- -
_.._.� _ '� ' r "'r' 'r' 'r''r'' r'':"'1''
9� , . , , , , , ,
95 - -_ - - - ; : • - ---� -------
--� --� --� --r - -�- -1 --
_ �� " � " _ _ _ _ _ � " _ _ _ 7" _ _ __
�OQ . . . . . . . �
Explanation o �o zo so ao so
I Monitoring Well Key
2�nch O.D.split spoon sample � Clean Sand Molsture Content
� 3-inch I.D Shelby tube sample � Cutti�gs plastk Limit Natural Liquid Limit
� No Recovery � Bentonite
. � Grout
Groundwater level at time of drilling
ATo or date of ineasurement B Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figu�e A-1
Geotechnfcal&Environmental Consultants Date Drilled: 9I26102 Logged By: EJL
PROJECT: Renton Retaii JOB NO. J-1470 BORING B-11 PAGE 1 OF 4
Location: Renton,WA Approximate Elevation: 38 feet
Soil Description � � L ,o Penetration Resistance y
t a a a.a � :; � � 3 c
o � � y Z � � Standard Blows per foot Other j �
Z
0 10 20 30 40 50
2'Asphalt,2"Base � � � , . �
.. ------- - - � - - L- - -- ' -
�,T . . i � � i � � i
�. ������ _ _ �__: _ i _�T _'T__ ' 'T__t _'t __
� Loose,moist,black Coai Tailings with orange cinders , � , , , � , ,
- - � - -- - - --
,�.. g_� � � � � , � � � , 4 MC
5 ; ; ; : ' ; : , ,
—� s-2 -�- - - - � -�-- 1--� -- ---� �, __ a n�ac
So�,moist btack(dayey texture)Coal Tailings ; ; , ; , ; ; ;
�_ Sott,wet,bfack Coal Tailings . ' ' ' ' ' 1' ' '
--_�W S�3 ATD -� - - � - - - - - 1 - -------._ 'MC=59%-� 4 MC
�� � � � � � � � �
ery soft,wet,black,fine-grain Coal Tailings S-4 � ' ' ; ; ; ; ; M���' � 2 MC
- -- ' - - ' --� --i - -1- --�--
Medium dense,saturated,gray,gravelly SAND with �5 ; ;� � � � � � � � 12 GSA
15 �acesilt - - '-- � - ' ' ' ' ' --- - --
' " � ' r '' r ' "t '"T' � ,
' ' _ ' ' ' '' ' ' ' ' i'_a"'' ' '' '_
2� ' _ ` '""' ` "' � _._""' "' � _'
Loose,satureted,gray,fine SAND with some silt ;. ; ; ; ; ; ; t�C=5�96 7 An
S-6
Medium dense,saturated,green-gray,Gayey SILT ___�_ - - � -- - -- � -- � -� -� ---- � -- --
with occasional wood debris ; ' ; ; ; ; ; ; ;
25 ; ; ; ; ; ' ' ; ;
Explanation o �o zo so ao 50
Manitoring Weli Key
I2-inch O.D. split spoon sample � Clean Sand Moisture Content
� 3-inch I.D Shelby tube sample � Cuttings Plasde Limit Na�ura�d Limk
� No Recovery � Bentonite �
� Grout
� Groundwater level at time of drilling
ATD or date of ineasurement B Screened Casing
Zipper Zeman Associates,inc. BORING LOG Figure A-1
Geotechnical&Environmental Consultants Date Drilled:9/25/02 Logged By: EJL
PROJECT:Renton Retail JOB NO. J-1470 BORING 8-11 PAGE 2 OF q
Location: Renton,WA Approximate Elevation: 38 feet
Soil Description � m � ,a Penetration Resistance ,�
� a m a� � m � � � c
m � � � � 0 � Standard Blows perfoot Other � �
G � M Z C9 Z F�
0 10 20 30 40
Medium dense,saturated,gray,silry fine SAND with g_7 ; . ; � � ; 12 200
sionaly fine wood debris ___ '
r:� � , . � � . � � �
'�-" ' - - ; - - , -- r-- r- --- -'r--1'- T --
rl --------- -- - - - - -- , -- - - -- -- , -- -- --
30 ; ' ; ; ; ; ; ; ;
Medium dense,saturated,gray,silty fine SAND with �—� � _ _, _ _�_ , - i -- ' - ; _ ' _- I - � - ��
ocqtional wood debris
r_^ � � , � � , . � �
_ 35 ; ; ; ; ; ; ' ; ;
Medium dense,saturated,gray,silty fine SAND S-9 � ; ; �; ; ; ; ; � ' 13 2DOW
-_--- - - - - �- - L - -1- -i-- '--1 -- �
. i � i � � i i � �
'_'_'______'__""_____'______'___'_____'_"__ �_r�. -' ' r ' ' r"'r"' r' r ''r_'r'_r''�
40 , , , ,
SGff,wet,brown,organic SILT(Peat)with �10 ; � . � ; ; MF��3� � 15 MC
interbedded of fine to medium Sand with silt lenses ___ -- �- - � - - � - - � - - •-----•-- � --� - - -
r.- , � , , � � � � �
45 - - - - - � - - -- --- � --� -- �-- � - -
SGff,saturated,gray,fine sandy SILT ��� ; ; ; ; ' � ; ' ; 31
Dense,saturated,gray,fine,coarse sandy GRAVEL _ _� _ _ �_ _ �_ _ , _ _ _ , __ r_ ;__; _ _
_ _� _ _ _ __ f__ � __ ♦ � T ��1�_ _ l _ _
50 : ' ; ; ; , , ,
Explanation o �o Zo so ao so
� Monitoring Well Key
. I 2-inch O.D.split spoon sample 0 Clean Sand Moisture Content
� 3-inch I.D Shelby tube sample � Cuttings Plastfe Limit Nawrel Liquid Limit
� No Recovery � Bentanite
� Grout
� Groundwater level at time of drilling
ATD or date of ineasurement B Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnical&Environmental Consultants Date Drilled:9/24/02 Logged By: EJL
PROJECT: Renton Retail JOB NO. J-�470 BORING B-11 PAGE 3 OF 4
Location: Renton,WA Approximate Elevation: 38 feet
Soil Description � � � � Penetration Resistance �,
� a °' a� � :; � � � �
� � � � � � � Standard Blows per foot Other j �
p M v� Z C9 Z H
0 10 2D 30
5-12 � � , ;. ; � , � , �
Medium dense,saturated,gray fine-coarse sandy _____ __r _ _ _ _ _ _ __L _ _ _ __ _ _____ _ _ ____ __ _
t�� GRAVEL to gravelly fine to coarse sand with trace , ; ; ; ; ; ;
-_� _ _ i _ _ _ �� f_�i�� __T__i � �i__ __
55 ; ; , ' ; ; ; ;
Medium dense,satureted,ary,fine to coarse SAND S-13 L � ` � � + � � � 25
with trace silt and some gravel - _— -- _ - - ; - ; - - , -- : - -; - - ;- -;--i- -
r-- , . , , , , ,
� , � � �
i ---------------------------------------------- , , , , � � . , �
�.. 60 ^ __- - - -- - '- - '_ - , ; ' ' - .--� --
MCt�0396
s-ia ; � ; ; ; ; ; � �o rnC
Stiff,moist,dark brown,organic SILT and PEAT and ^__� ._ _ _ , _ _ __ __r__ __r_ _,_ _ 7 __ .
1'thick fine sandy silt i�terbedded � , � � � � �
� , , � � ,
' ---------------------------------------------- --________— � -- -- -�
- - - - * -- --�-- - � -- , - -
_ _ L �_ ' _�� _ _ 1 __ 1 __ ' �_1 �_ 1__l __
Medium dense,saturated,green-grey,silty fine to �~ , ; , ; ; , : . ;
6� medium SAND with pieces of clayey silt ' ' ' ' ' ' '
----------------------------------------------- --�__ S-15 - - , -- , --� -• --` -- '-- , -- , -- __ 19
Medium dense,wet gray,fine to medium SAND with � � � � � � � �
Vacegravel ------ - - r - - c--r --r- ; - ; - ; -;--;--
70 - • - - -- - � - -• -- �- � -- • -- -- - - - -
Stiif,wet,greenyray and blue-gray,highly plastic ', , ;
CLAY with thin flne sand Interbeds
5-16 � ` 9 ATT
75 ; ; ; ; ; ; ; ; ;
Explanation o �o zo so ao
Monitoring Well Key
I2-inch O.D.split spoon sample 0 Clean Sand MoiStu�e COntent
� 3-inch I.D Shelby tube sample � Cuttings Plasde LimR Nawrai Liquid Limk
� No Recovery � Bentonite
� Grout
� Groundwater level at time of drilling
ATo or date of ineasurement 8 Screened Casing
Zipper Zeman Associates, Inc. BORING LOG Figure A-1
Geotechnical&Enviro�mental Consultants Date Drilled: 9l24/02 Logged By: EJL
PROJECT: Renton Retaii JOB NO. J-1470 BORING 8-11 PAGE 4 OF 4
Location: Renton,WA Approximate Elevation: 38 feet
Soil Description � � � � Penetretion Resistance u,
r a a aa � w? � 0 � _
m � � � � o `0 Standard Bbws perfoot Other � �
C tI� q� Z C7 � Z �
0 10 20 30
Medium dense,saturated,brown,fine SAND wilh S_�� � . , � , , , �9
trace silt ' ' '
r-.R , � , , � � � ,
$� , � , � , � , � ,
Medium dense,saturated,gray,fine SAND with trace - - -r--� - r- -r--,--r - -r- -� �
_ - ---------------------------------------------- 5-18 . , � , � � , 34
Dense,saturated,brown,fine SAND - -, --;- -�- --- -�- -;-•-- --- - -- -
85 � ' ; ' ; : ; ; ;
'� ' Brownsand '"_ -- -�--�- -�- -�--�- -� - � � ;
S_t9 � , , , , � , � � 29
----------------------------------------------
Medium dense ta dense,saturated,gray,fine SAND ____y_— ._ ____�__� _ _�___,_ _ _�__ _�___.___�_
with green-gray clayey silt interbeds ; ; ; ; ; ; ; ; ;
g.::�a � � � � � � � � �
9� � � � i � � i � �
Dense,wet,gray,with light gray and black organic - f--^- r --�- r - -�-- -'- -'- -' --
fragments,blue-gray sand seams.silty sand with _� S-20 - - ----- -, - -,--- -- -i-�-- - _- -; -- 34
some gravel � � , , � � , �
95 ; ; ; ; ; ; ; ' ;
Dense,wet,gray,silty SAND with some gravel and S_2� ' r r , ' r� r ' , 32
light gray sandstone fragments �__ --;--_- ; - -; - -: - - --- ;- - -- -
Becomes rough drilling(sandstone) � ' ' ' ' ' ' ' '
Boringcompletedat100feeton9/25/02. -�-�---�� - - - -- -- -- - - -- - -- ------ - -- -- --
100 Groundwater observed at 8 feet at time of drilling. 5"22 , � � � � . , � � � 5010
Explanation o io Zo 30
� Monitoring Well Key
2-inch O.D.split spoon sample 0 Clean Sand Moisture Content
� 3-inch I.D Shelby tube sample � Cuttings plasUc Umlt Natural Liquid Limlt
� No Recovery � Bentanite
� � Grout
� Groundwater level at time of drilling
ATD or date of ineasurement 8 Screened Casing
` Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geatechnical 8�Environmental Consuitants Date Driiled: Logged By: EJL
PROJECT: Renton Retail JOB NO. J-1470 BORING B-12 PAGE 1 OF �
Location: Renton,WA Approximate Elevation: 35.5 feet
Soil Description � Penetration Resistance H
� � � � � - � 3 C
� a a a� � a;
Q � � N Z � � Standard Blows per foot OMer ? �
0 10 20 30 40 50 Z
3"asphalt over loose,moist,brown,silty,gravelly ; : ; ; . , ;
SAND(Fill) � � � � � � �
; ---------------------------------------------- � � � � � � � � �
, �������� _ � _ _ f_ _ _ ___� _ _T__ �� 1 �� _ _
Very toose,moist,brown-black,COAL TAILINGS with - - � _ _ _ _ _ _ _ _ _ __ __ __ __ _ _
' silty SAND(Fili) _ S-' �, . , � � , . � � 3 MC
5 : ; ; ; ; : : ; ;
• loose,moist,browo-Wack,COAL TAILINGS with siity S-2 � � , , � �; , � 6 MC
SAND(Fill) - - - r - -; - -r-- , � � ----- �--- --
loose,moist,whitish-brown,silty SANO to sandy 51LT - - - - - - - -- - - - - '---- - - --- --
with some sandstone and coai (Fill) 5-3 ' � ' ' : �: : : ; 8 MC
, , , , , � , ,
---------------------------------------------- . , � � , �
10 , , ,
– -- — -- -' - -'--'--'--=-- '-- '- - = ----
Loose,wet to saturated,whitish-brown,weathered �4 ATD ' ' ; ; ; ; ; ; ,
SANDSTONE,SILTSTONE hagments(Fill) ; �� , , , , , 8
_ Boring completed at 11.5 feet on 9/26/02 ._ _ _ _ _:__ �__:__;_ __ � , �
Groundwater seepage observed at 11.5 ieet at time of � ; ; ; ; ; ; ; ; ;
drilling
. � �.���� _ _ _ _ f�_ � �T_ _T� _T�_T� _ T__i__
���� ��' �_ ' __ ' __ __L __ ' __ ' _ � 1�_ ' __ ��
15 , , , , , , , ,
20 ; ; ; ; ; ; ; � ;
------- - -r - -r_ r- - 1-- -- 1 1- - , --� -
i � � � r i
" ' _� _ ____i _ _T _ _� " _ ___ T_ _ ' '_7�_ '
25 ' : : : : :
Explanation o �0 2o so ao so
Monitoring Weil Key
I2-inch O.D.split spoon sample � Clean Sand Moistut'e Content
� 3-inch I.D Shelby tube sample � Cuttings Plastic Limit Natural Lfquid Llmit
� No Recavery � Bentonite
� Grout
� Groundwater level at time of drilling
aro or date of ineasurement 8 Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnical&Environmental Consultants Date Drilled:9126/02 Logged By:CRT
PRQJECT: Renton Retail JOB NO. J-1470 BORING B-13 PAGE 1 OF 1
Location: Renton,WA Approximate Elevation: 35 feet
_ Soil Description L Penetration Resistance ,�
.. m m � �o .. d a>
r aa a� � :; � 0 � y
m � � � � o � Standard Biows per foot Other j m
* G fn (n Z C7 Z F—
0 10 20 3D 40 50
Surface grass over loose to medium dense,damp, ; ; ; ;
- brown,silty,gravelly SANO(Fill) � � � � � � � �
. ���� __f_ '�_ _�' �i__-__ i __T__T __1 _ _
Loose,moist,dark brown-black,COAL TAILINGS with , ; ; ; , ; , ,
some silty SAND,SANDSTONE fragments(Fill) ' - - - -�--- - - --•--� __,__ ,__ � __
" S-1 , �, � � � . , , 8 MC
- - - � -
5 ; ; : ' ; ; � � ;
---------------------------------------------- -- � � _ . . - - �-
Very soft,moist,blue-gray,sandy siity CLAY with S_2 . ' � ; '��—� p q�
some organics M___ �_ � �
�� Very soft,wet,olue�ray,saRdy SILT interbedded with __ ___ • - __ _ _ __ _ _ _ � - _______ ;__ ___ � __
some silry SAND and some organics S_3 ATD . ; ; ; ; ; , , ; ; �
10 ; � ; � ; � ; ;
s-a ♦ ; ; ' ; ' ; ' ; , �
, Boring completed at 11.5 feet on 9/26/02 ___________ _ __ _ _ ___ __ _ ______ ___ ___ ___ _ _ _ .
Groundwater seepage observed at 8A feet at time of ; ; ; ; ; ; ;
drilling _ --- - � - - � � *- � - � -, --
"�' � ' r_ ' i "r' , ' 7 '
15 , , , , , , �
r,; , , , � , , � , ,
20 - - - -- -- -�- �--- - --- �-- �- - � - -
� - - - - � � , i � � � ,
- - r- - - -r - - � -r-- �-- t-- --- ' --
25 : ; : ' : : ;
Explanation o �o zo ao ao so
Monitoring Well Key
I2-inch O.D.split spoon sample � Ciean Sand Moisture Content
� 3-inch I.D Shelby tube sample � Cuttings Pfastie Limit Natural Uquid Limit
� No Recovery � Bentonite
� Grout
� Groundwater level at time of drilling
ATD or date of ineasurement B Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnical 8 Environmentai Consultants Date Drilled:9I26/02 Logged By: CRT
PROJECT: Renton Retail JOB NO. J-1470 BORING B-14 PAGE 1 OF �
Location: Renton,WA Approximate Elevation: 34 feet
Soil Description L Penetration Resistance �,
� � °' °1 °' � ` � � � c
L °. a a a 3 .°.:
� � � � � � � Standard • Blows perfoot Other j w
o v) fA Z (� � Z F
0 10 20 30 40 50
Surface grass over loose to medium dense,damp, ; , ; , ; ;
brown,silty,gravelly SAND(Fill) , , ' ' ' ' , '
- - - - - -1 -- ' - - 1- - -
F' � � � � � � � ,
� - -- -r- r-- r - -• - - -r--t-- t--' -
'_"'____'_"_'___'_""__��'��_'___�_"'__'__ � "� ` ' ' � '' ' ' ' ' ' . ' 't- , , �
,.- Loose,moist,brown,silty SAND with some organics g_� ; .; � ', . ; , , ; 8 MC
mixed with COAL TAIUNGS(FIIj ___ � � � � � �
5 ' ; ; ; , ; ,
s-z -� - - �-- , - - ; �;-- �--;-- ;-- ; -- a Mc
---------------------------------------------- ------ -----
- - - - - - - - - - - - - -- - - - - - -- - - --- --
Very loose to bose,moist to wet,blue-gray,silty SAND , ; ; ; ; ; ; ; ;
interbedded with sandy SILT with some organics _______ . __' _ _: _ _ :_ _ ; _ _ � _ _ � __;_ _; . _: __
*^ ATD , , � , � � , ,
Very soft,wet.blue-gray,sandy SILT interbedded with —�-- S-3 � -, --, --' - -' -- ; -- , -- , -- , - _.__ �
siliy SAND and some organics — � • � ; •--;-- ;- -;-
, _ 10 , , , , , , ,
� �, , � � . , , . , 3
' Boring completed at 11.5 feet on 9l26l02 . __._ _ _ : __� _ __ __1 _ __ __. � ,
Groundwater seepage observed at 7.5 teet at time of � ; ; ; ; , ; ; ;
drilling - - - - - � � , � �
� ------- - - � - � - -, --.- -, • -
- - - - -- � -- -- - - --�-- -- --
15 , , , , , , , , I
�.� ; ' ; � ; � ' ; ;
20 ; ; ; ; ; ' � ; :
. � � � i � , -1- -� --
-' � ' - r' - r ' - r - r -- . -'r ' r-- i --
_ 25 ' : : : : ; : ' :
Explanation o �0 2o so ao so
I Monitoring Weil Key
2-inch O.D.split spoon sample � Clean Sand Moisture Content
� 3-inch I.D Shelby tube sample � Cuttings plastic Limit Natural Uquid Llmit
� No Recovery � Bentonite
. � Grout
Groundwater level at time of drilling
Ar° or date of ineasurement r� Screened Casing
Zipper Zeman Associates, Inc. BORING LOG Figure A-1
Geotechnical 8�Environmental Consultants Date Drilled•9/26102 Logged By:CRT
PROJECT: Renton Retail JOB NO. J-1470 BORING B-15 PAGE 1 OF �
Location: Renton,WA Approximate Elevation: 32 feet
� Soil Description L Penetration Resistance y
w d d � �
t aa a� 3 «; � � � �
m � � � � � 10 Standard Blows per foot Other j w
o tn tA Z �7 � z F�—
0 10 20 30 40 50
Surface grass over loose to medium dense,damp, � , , , � , ;
brown,silty,gravelly SAND(Fill) ___ ' ' ' ' ' ' ' '
- - --`- -' - -' - -
^ __f__ _ _� � T _i__T���_�T �_ l __
Loose to medium dense,moist,brown,silty,gravelly � � � • � � �
SAND with some organics{Filt) __. _ _ � _ _ _ _ , _ _ � __ _ _ � _ _ � __, __
- ---------------------------------------------- g_� ; � . ; ; , , , 12 MC
Loose,moist,btack,COAL TAILINGS mixed with silty --- --; - -; - - ; - - ; -- ;- -= -- ;- - ;--- --
5 SAND,some gravel and organics(Fill) ; ; ; ; ; ; ; ;
---------------------------------------------- S_Z . ��` -- � --�- -•- - •--�-- :- �-- � - - 2 GSA
Very loose,wet,blue-gray,silty SAND with some gravel ___ �_ � � � � � �
- - -- - - - - - - - - ;- - - - - -- ---
interbedded with sandy SILT and some organics ATD ; ; ; ; ; ;
_ . ---------------------------------------------- ^� S_3 • I - I - - � - - � -- ' _-;--�-- ; -_. __ Z
�'- �� - � - - - -- 1 - , -- -- ---- - 1 ---- -
Very soft,wet,brown-gray,sandy SILT with some � � � � � � �
organics with interbedded organic SILT � � ; ; ; ; ; ; : ; ; �
_ � Boring completed at 11.5 feet on 9126/02 ____�_ - - - - - � - -� _ _-- - -� --
- Groundwater seepage observed at 6 feet at time of � � ; , , , ; ,
d�ling --------- - -; - - , - - ; - , , � _ ;- � - . --
- r --r- -r- - i -
�-r-- ' _ '' ' '� '_ _' _' '' '' '' ''
15 , , , , , , ,
20 ; ; ; ; ; ; ; ; ;
' ' ' ' i _ � i � i � ' 1''i'_ I�'
''�' ' r _' r' _ r ' ' 'r''t' ' 1'' , '
- `1.5 . � . � . � � � .
Explanation o io zo so ao 50
I Monitoring Well Key
2-inch O.D.split spoon sample 0 Clean Sand Moisture Content
� 3-inch I.D Shelby tube sample � Cuttings plastic Limit Naturel Liquid Limit
� No Recovery � Bentonite
� Grout
� Groundwater level at time of drilling
ATD or date of ineasurement � Screened Casing
Zipper Zeman Associates, Inc. BORING LOG Figure A-1
Geotechnical 8�Environmental Consultants Date Drilled:9/26J02 Logged By: CRT
PROJECT: Renton Retail JOB NO. J-1470 BORING B-16 PAGE 1 OF �
Location: Renton,WA Approximate Elevation: 36 feet
Soil Description � � � � PenetratEon Resistance ,�
� C. d G� � 01 - 0 3 C
m � � a � o � Standard Blows per foot Other j d
p m �n 2 U' Z �
0 10 20 30 40 50
3*inches of ASPHALT above 7.5±inches of ; ; ; ;
medium dense,damp,brown,sandy GRAVEL ---------- - - ' - - '- -- � - -=- - 1 - • '- - = - - '--= - -
� (Crushed Rodc Base Course) ; � , , , , , � ,
------- - - � - - - - - - - � -- --- -r - - , --- - -
Medium dense,moist,brown and gray,silty sandy ' ' ' ' '
-'-
GRAVEL(Fill) ---- 5_1 - - - -� - - ; - - �- i - - ; - - ; - ; - ; -- 21 MC
GSA
- - - - - - - - - r - r-- , -;--,-- , --;--
5 ; ; ; ; ; ; ; ;
--�__ S-2 - - - • - r - -1- - - - - -- t-- � , - � GA
- Medium dense,mast to wet(below 10 feet)brown and ; ; ' � � � �
gray,silty,gravelly SAND(Fill) ' ; ; ; ' ; ;
— - �3 - - - -• - *- • -•- - •--• - - --- •-- 15 MC
�Q � , ; ; . ; � , �
� . - - ; - - ;. ; - ; - i --i-- ; -- - , -- 12
� ATD - - • --- - �- -• - • • -�- - �-- --
Bori�g completed at 11.5 feet on 9l25/02. ________ - - ; - - : - - - - , , ; , - , - , -
' Groundwater encountered at approximately 10.5 feet at , . • , , � , ,
timeofdriiling. -------- - -� - - -- - - -� -- • - - * - - � - • -- � --
- '- - - - -- �- i- -
15 , , , , , , . , ;
���_�� '_ �' � _ "� �'T__ T_ i _T '_ T "' � '
_� l'� L '_, __ __ L__1__ _' l '_ __
�"^ �� � � � � � � , � ,
2� - " -- ' - " '- """""-"--'- -
25 ; ; ; ; ; ; ;
Explanation o lo zo so ao so
I Monitoring Well Key
2-inch O.D.spiit spoon sample p Clean Sand MOistu�e Content
� 3-inch I.D Shelby tube sample � Cuttings plastic Limit Naturel Liquid Limit
� No Recovery � Bentonite
� Grout
� Groundwater level at time of drilling
AT° or date of ineasurement B Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnical&Environmental Consultants Date Drilled:9l25/02 Logged By:DCW I�
PROJECT: Renton Retail JOB NO. J-1470 BORING B-17 PAGE 1 OF �
Location: Renton,WA Approximate Elevation: 35 feet
� Soil Description � Penetration Resistance ,�
.. m d � �
` a m a� � d � 0 � c
a � � � � 0 10 Standard Blows per foot Other j n
c V7 tA Z C9 � Z F-
0 10 20 30 40 50
3 inches pver 3 incnes asphalt,crushed rock over : ; ; ; ; ;
medium dense,moist,brown,silty,gravelly SAND(Fill} , , , , , , ,
---------------------------------------------- -------w � , , , .
__'_�_ - - - ; - � - - -- -- - - - - - - - r -- , --
Loose,moist,black,COAL TAILINGS with reddish ash - - - - � - - - - ----- -- � __ . __ � __
�' anders with some silty sand(Fili) _ S-1 , �� � � � � � � � g
5 ; ; : ; ; ; ; � ;
- j — S-2 - - ,` - -� - r --;- i -- r- -� -- � - - ±-- 1t
y
r-_ . � � � � , � ,
Loose to medium dense,black,COAL TAILINGS with ------- - - ` - - =- - � - -�-- = - -=-- �- - = -- =- -
reddish ash anders with some silty sand(Filq _ S-3 = � : : : ; ; ; 14
10 ; : ; ; ; ; ; �
. s-a �► ; ' ; : ; ' i o
r_.. • . -+--' . - . - � -L - � � - t -- a" i ' ' -'
�, ,{ Looseto medium dense,wet to saturated,whitish-browrn � ATD ; ' ; ' ; ; ; ; ;
I gray,SHALE fragments mixed with COAL TAILINGS --- ---- - - ; - -� - - �- -. - - � - --- - - - - - -- - --
- (Fill) S-5 , � , , , � , � , 10
- - - - - - - - -` - - - - -- -- ' -- --
;` , �5 Boring completed at 14 feet on 9l26/02 � � � � � ; � �
Grounwater seepage observed at 14 feet at time of ----------- �- - - � -- � -- ; - - * -- �- -- � -- � --
_ driilin9 � : , � . , � ; :
F: ----- - - - - ;- - �- - - - ; - - ;- - �-- . . . , --
� - ------ - - - - - -r- -r-- 1 - --------- ---
�� -------- � � , � � � � � ,
2� , , � � � � � �
- - - -- - ,- - ' - � - -
- - r - r- - r - - -- * -- r- - r -- t --, --
_ _ 25 : ; ; ; ; ; : ;
Expianation o io zo so ao so
Monitoring Well Key
I2-inch O.D.split spoon sample � Clean Sand Moisture Content
� 3-inch I.D Shelby tube sample � Cuttings plastic umit Natu�d Limit
� No Recovery � Bentonite ♦
- � Grout
Groundwater level at time of driliing
ATD or date of ineasurement B Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnical 8�Environmentai Consultants Date Drilled:9/26IO2 Logged By:CRT
PROJECT: Renton Retail JOB NO. J-1470 BORING B-18 PAGE 1 OF �
Location: Renton,WA Approximate Elevation: 35 feet
Soil Description m � L ,o Penetratlon Resistance y
r °' ` � � � �
a m a� = m
m � � � � a t0 Standard Blows per foot �ther � H
C (n V1 Z C7 � Z �.d.
0 10 20 30 40
4±inches ASPHALT and 2±inches medium dense, ; ; : , ; ; ;
damp,brown,sandy GRAVEL above iaose,damp, -------- � s__. __ : __�__ .
reddish-brown and black,silty SAND with some � • � � � � � �
gravel(coal and sedimentary rodc fragments,FII) --------- ---� - - ' ' ' ' - :--;- ; --;--
r-- r -- r--r- -
" ' _ ' ' ' ' "' ' ' '_a'' '' , ''i '
' S-1 � �� � ; � � � � � 8 200
5 ; ; ; ; ; ; ; ; ;
t S-2 - -� - r- -r- - r- - � -r- i - ; , _ 6 MC
y
� � � � , � . � �
---------------------------------------------- S-3 � , � � , � � � � 6 MC
10 Loose,staturated,pale gray,silty SAND with gravel- . ' ' ' ' ' ' ' ' '
' size friable sedimentary rock fragments(Fill) ATD : ; ; ; ; ; ; ; ; 5
S-4
Boringcompletedat11.5feeton9l25l02. ---' - - '- -' - - =- -=--�--=-- = -- '--�
Groundwater encountered at approximately 10 feet at � � � ; ; ; ; ;
time of driiling. ____r__ -- - - - -.-- -- * --.-- - , --
__ L' _C''i__L' 1 '1 ' ' '
15 , : , , , , , , ,
___ _ _�__ _ _�_ -i��T��T�-T�� i � ���
��` __L�� � �L '_ ' �� __1'��_' 1_'
2� __ � _ _ �__ �__ �__ _ _____ ___ _ ___ __
25 ; � ; ; , ; ' ;
Explanation o �o zo ao ao 50
Monitoring Well Key
I2-inch O.D.split spoon sample � Clean Sand �oisture Content
� 3-inch I.D Shelby tube sample � Cuttings piastie Limit Naturel Llquid Limit
� No Recovery � Bentonite
� Grout
� Groundwater tevel at time of driliing
AT° or date of ineasurement 8 Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnicai&Environmental Consultants Date Drilled:9/25/02 Logged By: DCW
PROJECT: Renton Retail JOB NO. J-1470 BORING B-19 PAGE 1 OF 1
Location: Renton,WA Approxlmate Elevation: 34.5 feet
Soil Description m � � ,� Penetration Resistance y
s a a a� � «; � � � c
m � F,�`, � � � fQ Standard Blows per foot Other j H
p U� � Z (� � Z H
0 10 20 30 40 50
1.5±inches ASPHALT above 3±inches medium , , , � , � , , .
;-- dense,damp,brown,gravellySAND """-- - - - ; - - ` --- -- ; - - ; - - ;-- ;- - ; -- ;- -
---------------------------------------------- ------- - - � - - � r - - ; - - ; . -- � -- , ; --
loose,moist.bladc.pi�k,9raY,silry SAND with trace — -- - - ' - - ' - - ' -- ' -- ' - - ' -- ' -- - - - - - -
,. . gravel(coal and shale fragments-fill) � ` ` � � 1 • 1 '
- S � - - -� �� � � � ; 7 MC
5 . . : ;
--- - � - � - - - - - - - - - . . _ _ . . . . ._ . _ _
----------------------------------------------- s-z : � : � ; ; ; ; s nnc
Stiff,moist,bladc,fine and fibrous ORGANICS ____ __ _ _ ; . _ ' . _ ' _ ; _ _ ' _ i __; 1 _i _ _
r Loose to very loose,moist to saturated(below 8.5 S-3 • , �; ' ' ' ; �! ' 8 MC
feei),black,pink and gray,silty SAND(coal and shale ATD � ' � ` �
fragments-fill) — -- - -- -- -- -•- -;-- �-- ;-- •-- ;-- ; - -
_ . 1p , , , , , , , �
s-a ♦� ; ; ' ; ' ; ; ; 3
. Bwing completed at 1�.5 feet on 9l25/02. _____� _ . _ _ _
` — - -- - ' - • --- - - - - - ----- --- -
Groundwater encountered at approwmately 8.5 feet at ; ; ; ; ; � ; ; ;
dme of drilling. --------- --� - - � - --* - - - • - *- -� --
- -� � i � t � � � �
15 ; ; ; ' ; ; ' , ,
------__ - ; -- - -- ; -- � - - - -- - r-- -- - , - -
- -� - - -� - -� - - -- -- � - - -
20 - - � --- - - �- - � -- � -- �----- �- - - - -
25 ; ; ; ; ; ;
Explanation o io Zo so ao so
Monitoring Well Key
I2-inch O.D.split spoon sample 0 Clean Sand Moisture Content
� 3-inch I.D Shelby tube sample � Cuttings Plastic Limit Natural Uquid Limit
� No Recovery � Bentonite
� Grout
� Groundwater level at time of drifling
ATO or date of ineasurement 8 Screened Casing '
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnical&Environmental Co�sultants Date Drilled:9/25102 Logged By: DCW
PROJECT: Renton Retail JOB NO. J-1470 BORING B-20 PAGE 1 OF �
Location: Renton,WA Approximate Elevation: 35 feet
_ Soil Description � Penetration Resistance y
� � � � � C � - 0 3 C
a a� d
m � � � 3 � f6 Standard Blows perfoot Other � y
. p fn V! Z C7 � Z F�m-
0 10 20 30 40 50
1.5±inches ASPHALT above 1.5 inches medium ; ; ; ; ; ; ; ;
dense,damp,brown,sandy GRAVEL above loose -----
- ,- - - - -- - - - - -- --- -- - - -- - -- - - -
grading to very loose,moist grading to saturated ; ; ; ; ; : : ;
(bebw 7 feet),black,silty SAND(coal fragments-fill) ____—__ . _ _r__�_ _�_ _ ' ' ' ' ' '
r''�'_ r''i'' r '' _'
__ _�_ S"1 -�- - '- - ! - - ' -- ,-- •1 -- � - - - -- 4 GSA
5 ; ; ; ; : : ; ;
-�_ s-z -�` _ - ; --,- ; -- ; - - ,�i -- : -- J, - _ a �sa
, � , , , , , , ,
_ ------- ATD - - ; - - �- -�- - ; • - �-- ;- - �-- ; - - � --
�, , , � � , , � ; .
--- -- g-3 � ;- -� - • - - • --�-- •--•-- MC=58%-� 2 MC
_ 10 ; � ; ; ; ; ; ; ;
s-a ♦, ; ; ; : : : ; ; 3
, . � oring completed at 11.5 feet on 9/25/02. __�_ _ _ � _ � _ � � � � _
-'- - - - - '- - '- - -=-- =--=-- ' -- =-
roundwater encountered at approximately 7 feet at ; ; ; ; ; ; ' ; ;
'meofdrilling. ------ - -�-- �-- � - - • --*-- •--*- - � --�--
- -1-- � - - - �-- , -- , - -
15 ; , , ; , , ; ,
, , , , ,
"""""""'�' ' " ; ' 'r" r" � '_r" r"r'" �" 7 _' .
20 "`_' ` " " ' . " `"'''" "' " " "
2� ; ; � ; ; , ; � ,
Explanation o �o zo so ao 50
Monitoring Welt Key
I2-inch O.D.split spoon sample p Clean Sand Moisture Content
� 3-inch I.D Sheiby tube sample � Cuttings Plastle Limit Naturel Uquid Limit
� No Recovery � Bentonite �
. � Grout
Groundwater levei at time of driUing
Aro or date of ineasurement B Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnlcal&Environmental Consultants Date Drilled:9/25/02 Logged By: DCW
PROJECT:Renton Retail JOB NO. J-1470 BORING B-21 PAGE 1 OF �
Location: Renton,WA Approximate Elevation: 34.5 feet
Soil Description � Penetration Resistance �,
� � � 0� � ` � 0 � �
r °. c n.� � :% ;-
Q y � N Z � � Standard Bbws per foot Other � �
d
Z
o �o zo sa ao
1.5±inches ASPHALT above 3.5±inches medium , � � � �
dense,damp,brown,sandy GRAVEL above medium ' ' ' ' ' ' '
dense,damp to moist,black,gray,and beige,SAND �^ � ; , ; ; ; _ " : " ; -
' (reworked coal and shale rock fragments-fill) . , , , , , , ,
�" ' ' '''r' ' r ' 'r '' ' 'r '' ' '1"_�''
—�- S ' - - ` - -�- - - -•- - 1 -- , -- ,- -' -- � - - . 11 MC
-----------------------------------------------
5 : ; ; ; , : ; ;
s2 � � - -;--; - - ; �`--; --� --; -- ; -- z nnc
Very loose,wet to saturated,black SAND with -- � - � ' �'" � ' - � --T-- �--'- - � -" � "
horizontal bedding(coal fragments-fill) ; ; ; ; ; ; ; ; ;
_ . , . , � � , � . �
��- S_3 ATD �~ - -:-- � - - � --•-- • - • • -- --• 3 MC
_ 10 ; ; ; ; ; ; , : ;
s� ♦' ; ' ; ; ; ; ; ; 3
� Boringcompletedat11.5feeton9/25/02 . _ _ _ _ _ __ __ __ _ _____ _____ __ __ _ ___
Groundwater encountered at approximately 8 feet at ; ; ; ; ; ; ; ; ;
time ot drilling ------ - - -- -• - - -- - - - -- - -
- - - - - -i --1--i- � i i
15 � , , , , , , , ;
_�_ -- --�--�-- : --r------------ --
- - -- - - - - � --�--�--•-- -- --
---_--- - - = - -i - ,-- ----i--T--_----- --
21l '_ `_'�'' . _ _ � __`'_''_�'_�__ �__
25 � ; ' � � ; �
Explanation o io zo so ao so
I Monitoring Well Key
2-inch O.D.split spoon sample � Clean Sand Moisture Content
� 3-inch I.D Shelby tube sample � Cuttings Plastic Limit Natural Liquid Limit
� No Recavery � Bentonite
� Grout
� Groundwater level at time of driliing
ATD or date of ineasurement 8 Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnical 8�Environmental Consultants Date Drilled: 9125IO2 Logged By:DCW
PROJECT: Renton Retail JOB NO. J-1470 BORING B-22 PAGE 1 OF �
Location: Renton,WA Approximate Elevation: 35.5 feet
Soil Description � � � ,a Penetration Resistance y
� am ca � d � � � �
m � � R � a �0 Standard Blows per foot Other j H
� C W f� Z C7 � Z �
0 10 20 30 40
2±inches ASPHALT above 2.5±inches medium � , , , ,
dense,damp,brown,sandy GRAVEL above loose, ' ' ' ' ' ' _
-�-����--'� _ _ . _ _ _ _ _ _ _ _ _ _ 1 _ 1_ __
t^^ damp to moist,black,siity SAND(coal fragments-fillj � � � � � � �
�� - - � --� - - � - - � - -r- - � --,-- • -- , --
- - - � - - - - -- -- --
F"" S-1 � • � � � , , � � 6 MC
5 ; ' ' , , �
. . �r— S-2 - -•--r : --; - r --!• !- - � - - ± -- 5 MC
y
. , � � � � � � � �
� Grades to wet at 8 feet M� S_3 ATD .; - - : - -' -- ; _ --- i - ; -- . -- ,� 3 MC
_ 10 ; , ; : ; , ; ; ,
S-4 �� ; ; ' ' ; ' 3
- - Boring completed at 11.5 feet on 9/25/02. _____w___ . - - �- -= - - � --� -- . --=--1-- 1-- = -
Groundwater encountered at 8 feet at time of driiling. ; ; ; ; � ; , ; ,
����� " . _ _ � f _ � _ _ T _ _ i � � T 1 � � 1 _� __
15 , . , , , , , ,
20 ; , ; ; , ; ; ; ;
- - - - � - - -- - -1--
��f_ __ _ _ � _ _ i _ _ i__T__ T ' _ l__ t __
25 : : : ' , : ; ;
Explanation o �0 2o ao ao so
I Monitoring Well Key
2-inch O.D.split spoon sample � Clean Sand Moisture COntent
� 3-inch I.D Shelby tube sample � Cuttings plastfc Limk Naturel Liquid Limit
� No Recovery � Bentonite
. � Grout
Groundwater level at time of drilling
ATD or date of ineasurement � Screened Casing
Zipper Zeman Associates, Inc. BORING LOG Figure A-1
Geotechnical 8�Environmental Consultants Date Drilled:9l25/02 Logged By:DCW
PROJECT:Renton Retail JOB NO. J-1470 BORING B-23 PAGE 1 OF �
Location: Renton,WA Approximate Elevation: 34.5 feet
Soil Description � � � � Penetration Resistance y
� am a� � m � � � _
c � � � � � �0 Standard Blows per foot Other � �
" o v� v� Z C7 � Z F��-
0 10 20 30 40
1.5±inches ASPHALT above 3 inches medium , , , , , , ;
dense,damp,brown,gravelty SAND above loose, ' ' ' ' ' ' '
--'-������ ' L _ _ _ _' _ 1 '_ _ "
-�� moist,black,pinic,and red,silty SAND with trace
GRAVEL(coal a�d shale fragments) � � ; � ' � ' � ;
' ������ _ �f� ��� � �� � ��T�� �T��T __� __
�_ � S_� - -;- -1- - ,- - - ; �;-- ; -- ; - - ; -- ; - - ,o nnc
5 ; ' ; ' ; ; ; ;
- SZ - -� -�- - ;- - ; - - �--:-�- -�--, -- s nnc
--------------------------------------------- — . - -: - -;- -; - -- - - ;--;--; - -;--- - -
� Very loose,wet,black,pink,red,silty SAND(coal and __ _ qTp _ � _ � � � � � � � � _
. shale fragments) - - -- S-3 �, -, , - , -- , -- , - , --MC�3� �
3 MC
, , . � , , � � ,
r- �Q � � � � � � � � �
�_'_"__'__'__"__����_'____'�_'_�'_'��_'�"_' �' _ _ _ ' '' ''' '' ' _" ' ' '_'' '"" " '''_''
Very soft,wet,gray,SILT and fine sandy SILT � . ,i , ; ; ; ' ; ; ; 2
- - Boringcompletedat11.5feetonS/25/02. ._ _�_ _�_ _ �_ _� __�_____ __ __ ___ _
Groundwater encountered at approximately 7.5 feet at �� ; ; ; ; ; ; ; ; ;
time of drilling. _ � � _� _ � __ __ • _ � � _ __
_ "_�"" _r ' _r" , � ' r ' _ * '
15 , , , , , ,
�,; --------- - -i- -;--� -- ; - -;--'-- �- -� --- --
� _--_.__ - r --;- -; - - ; -- r--r-- : - -,--,--
�-A. _��_ , , � , � � � �
Z� ; � ; ; : ; ; ; ;
- -, , i , , , , , ,
- -� - -� • - - - -- --- --- -- - - --- --
25 : : ' ; ; : ' ;
Explanation o �o Zo so ao so
Monitoring Well Key
�� � I 2-inch O.D.split spoon sample Moisture Content
0 Clean Sand
� 3-inch I.D Shelby.tube sample � Cuttings Plastie Limit Naturel Liquid Limit
� No Recovery � Bentonite
. � Grout
Groundwater level at time of drilling
ATD or date of ineasurement B Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnical8�Environmental Consultants Date Drilled:9125l02 Logged By:DCW
PROJECT: Renton Retail JOB NO. J-1470 BORING B-24 PAGE 1 OF �
Location: Renton,WA Approximate Elevation: 34 feet
Soii Description � � L � Penetration Resistance a
x °' ` � � � �
y Q- °'a a� � �
m � � � � � � Standard Biows per foot Other j H
o Nl v� Z C9 � Z I°i
0 70 20 30 40
4±inches ASPHALT above 4.5±inches medium � '
dense,damp,brown,graveliy SAND above very loose, --_—____ _ _ ._ _ . _ _ _ ' _ _ _ _ _ _ _ _ _ __ _ _ __ _ _ _ _ _ _
''`; moist,grading to wet,Wack and reddish orange,silty ; ; ; ; ; ; ; ; ;
SAND(coal and sedimentary rocfc fragments-fill) �____w _ _ _� _ � � • � � � � �
. ' r ' ' r ' 'r' _ ____' , ___'' 7 '_
� «� S� �,` -- : -- ' - - ; - - � --i--; - - , _ . ; __ 3 MC
5 : ; ; ; ; ; ; ;
S-2 �, , � � ; ; � � � 3 MC
_ . --; - - r - - ; -- ,- - � --�--1 --;-- --
�� aTo ---- - --- � - - •--•- • -•- -�-- �--
��, , , , , , , , � ,
---------------------------------------------- 3_3 . . , � � ; ;� � � � 2 MC
Very soft,wet,gray,SILT and sandy SILT __:__ � _ :__ � __ __: _ ; _; __
r 10 , , � , , , � � ,
S� , , . , � , � � � �
�-, Boringcompletedat11.5feeton9/25/02. . --=--�--=-- =--=--=-- =- -1- ----
`'" Groundwater encountered at approximately 6.5 feet at . ; , ; ; , , � ;
time of drilfing. -_---- --,- - --- ' ' - - ' ' ' '
' r _ 'r' ' r''T''�'_� '
�5 � i , � � � . . �
r�.-, � � , � � , � � �
Z� � , , , , , , . ,
^ _ - _ _f_� f _ _ ! __ �_ _T__T __T_ _ T_____
. - �� � � I � ' ' ' I �
Explanation o �o Zo so ao. so
I Monitoring Well Key
2-inch O.D.split spoon sample 0 Clean Sand Moisture Content
� 3-inch I.D Shetby tube sample � Cuttings Plastic Limit Natural Liquid Limk
� No Recovery � Bentonite
� Grout
� Groundwater level at time of drilling
ATD or date of ineasurement � Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnical&Environmental Consultants Date Drilled:9J25IO2 Logged By: DCW
PROJECT: Renton Retail JOB NO. J-1470 BORING 8-25 PAGE 1 OF 3
�-
Location: Renton,WA Approximate Elevation: 33 feet
Soii Description � � � � Penetration Resistance �,
t aa a� 3 �; � � � c
Q � F � z � � Standard Blows perfoot Other Z �
0 10 20 30 40
inc es asp a over in es oose,mois, ar
brown,silry,graveliy SAND(Fiq) , � , , , , ; ;
---------------------------------------------- -------- - - - - - - - - - - - - ' -- - -
r- -,- , � � . -; -- , - - ;-
�� __f _' f_ _ _ _ _ i __ i_� _ � � _ , _
Loose,mast,black,COALTAILINGS(Fill) —' '—' � -- � -- �-- � - - � --� __. __ ,_ _ �__,_ _.
� S-1 � � ; : � � � � � 6
5 ' : : ; : ; : ; ;
Very loose,moist,black,COAL TAILINGS(Fill) 5-z �` , ` . , . . � , 3
; - . --i- - � - ; - . - -;-- � --; , --� --
, _�_ ATD --�- -^-- �- - • ----- • --•-- • --� --
�� , . , , , , , � �
---------------------------------------------- g_g : � � , � � � � � 5
Soft,wet,dark brown,ORGANIC SILT with sorne sand __ _�__ _ _ _ _ __ _ ___________ ______-
1 O interbedded with gray,SAND with some s�lt and gravel ; � ; ; ; ; ' '
G��
S-4 �� ' � � ; ' ' ' 7 GSA
• Loose,saturated,gray SAND with some gravel and _ ' ' ' ' ' ' '
, Vacesilt -- - -; - - � --• - - --;--• ;- -;--- --
----- - - - - - - � . , i � .
���i � � . - � --�-' , , ' , ' , -
"'________"_ � � � � � � �
' _'__'______'_.'_"_______""'.' � '_ 'r ' ' r' 'r ' ' r''r'' r''t' 'i
15 , . , , , , �
Loose,wet,gray,silty SAND with some organics,Vace S-5 ; �� ; ; ; ; ; M�'��' � 8 2U0
- gravel interbedded with sandy SILT -- - -- -� i� - ;- - ; ' "; '" ; ''; "';' '; '-'- -
�; _'_____ , . , , ,
„ , , , , � , � . �
� 20 � ; ; : ; : . �
,- . Grades to medium dense �_ S-6 __' _ _, �' _ _ ; __ ; _� _'__ � _ ; _ 11 GSA
� , i � � � . , --' - -
- -�- - - - � - - - - -r-- , -- � - - ,--, --
r - 25 : : � : : ;
' , Explanation o �o zo so ao so
' Monitoring Well Key
f ` I 2-inch O.D.spiit spoon sample � Clean Sand Moistu�e Content
� 3-inch I.D Shelby tube sample � CUttiflg5 Plastic Limit Natural Liquid Limit
� No Recovery � Bentonite
� Grout
� Groundwater level at time of drilling
AT° or date of ineasurement 8 Screened Casing
, Zipper Zeman Associates,tnc. BORING LOG Figure A-1
Geotechnical 8�Environmental Consultants Date Drilled:9/24l02 Logged By�CRT
PROJECT: Renton Retail JOB NO. J-1470 BORING B-25 PAGE 2 OF 3
Location: Renton,WA Approximate Elevation: 33 feet
Soil Description m � � � Penetration Resistance ,�
r aa aa � :; � 0 � c
Q N � N Z � � SWndard Blows per foot Other > m
0 10 20 30 40
Z �
Medium dense to dense,wet,gray,gravelly SAND to S_� � . ; , �
sandy GRAVEL with some silt,Vace organics ___ _�_ ' ' '
- - � - - - -- - - - -
c_- -� - � � � � � , - � - � -
^�� __ � __f __�� � i� _T __T__T�_ __ __
T`� . . � � � � r � i
30 : : : : ' ; ; ;
s-s ; ; ; : ; �; ; ; : 2a
�,,,, , , , . , , , , ,
�.z 35 ; : ; ; _ , ; ; ;
� --� s-s - -�- ;--; -�- - ; �-- ; -;- ; -- 20
-- • ------- - - -1- - - L - - -1 - -i-- 1- ---
_.j i � . i � i � i .
; i i � � i � i � i
__'_"'___"'________'_'______'_'_'__'_.__"_' �.__" ' ' 'r ' ' r _' r ' ' r " _r_ ' t' 'r'' '''r
40 , , , , , , . , ,
Loose to medium dense,wet,gray,silty SAND with 5-10 , � : , . , , � 11
some gravel with interbedded PEAT(3') - - - -; - -;--` - - ;" ";"" ;"";"' , --;--
k ------ - -r - - �--r -- r --r- - � --- ----� --
6 i , i � � � � � �
�'� i � � � . i � � �
, 45 - --- � ---- -- - -- - � --� - - - � --
Medium dense to dense,wet,gray,gravelly SAND with S-11 ' ' ' ' '� ' ' 37 I
somesiltandtraceorganics . __ : __:__ � _ _ � __�_ _ �_ _ �_ _ ____ __ .
_ � - � � " 1 '' L" '1''' ''
'_'__"_�"_"_�_'__'�'____""_____"_"�__" -�����������
Medium dense,wet,gray,silty SAND with some gravel � � � � � � � � �
' and peaty organics(1^, ����� � ' i -- f '- f ' ' I- 'T'�T''T' 'T''?' '
- 50 : ; ; ' ; : , ; ;
Explanation o io zo so ao so
Monito►ing Well Key
I2-inch O.D.split spoon sample 0 Clean Sand MOiSture Content
� 3-inch I.D Shelby tube sample � Cuttings plastic Limit Natural uquw um�c
� No Recovery � Bentonite
� Grout
� Groundwater level at time of drilling
ATD or date of ineasurement B Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnical8� Environmental Consultants Date Drilled:9124/02 Logged By:CRT
PROJECT:Renton Retaii JOB NO. J-1470 BORING 8-25 PAGE 3 OF 3
Location: Renton,WA Approximate Elevation: 33 feet
Soil Description � Penetration Resistance y
� � °' � °� c ` � 0 � c
� a a a� � °:
Q � � N Z � � Standard Blaws per foot Other � � �
0 10 20 30 40 Z
Medium dense,wet,gray,silty SAND with some grevel �.,12 � � � . � � zo
and peaty organics(t") _ __ , ' ' ' ' ' ' '
t - - -- - - �- - -- -1- -1 -- �
.`^ . i � i � i i � . � I
� . _ _f �_T _ i __ 1 _ � T _ � T� T� �t ��� ��
�_______________�_�_�____________-____________ — ._ _ �_ _� __ � _ _ t__ �_ � i__a__1__ � __ . I
nmm � � i � i � i � i
55 : ; ; ' ; ; ; :
---- . . . . . . . .
• Medium dense,wet,gray,silty,fine SAND S-13 � � , � , . , 17
g;z , � � , � � � , -
� 60 � , , , � ' , _
Loose,wet,gray,silty SAND interbedded with sandy �_— S-14 ; , : ' ; ; ; ' ; 9
SILT - - • - - � - - � - -� -- --•- • � � --
+`""� -------- - - - - --- -- '- -i--1- -'--
���.� . . � � . � i i i
� � � � � i �
' ______________________________________________ �__��.___�� . . _ _ _ � _ . _ .._-_�_. T_ _ i __1__
��� _ _' _�L_' 1 _ _ __L�_l__ 1__ __ _'
65 � , � , , , , , �
Medium dense,saturated,gray,silty SAND interbedded __�^ 5-15 ; ; � � ; ; ; ; ; 20
withsandySlLT - - � - -;- - ; - - • - - • --�- -;-- ' --; --
�� , , � � , , , �
" �„ Very dense,damp,light gray,silty SANDSTONE � - -' - -'--'- - = - -' - - '--=--' --' --
70 ___� - - ; - - ; -; - ; - :-- ;- ;-- -- -; -� oar
Boring completed at 70 feet on 9l24/02 S-16 � � � � � � �
Groundwater seepage observed at 6.5 feet at time of - - -=--'- -'--�--=--=--'--=--'--
driliing � ; � ; , , , ; ; �
- - . _ 1 ' - ' t ' '- -, --
_ _�_ _ _ f_�t _ _ _ _ � __T_� T_� _ �T ' __
- 75 : : ' ; ; : ' : ;
Explanation o �0 2o ao ao so
'_ Monitoring Wetl Key
I F : I 2-inch O.D.split spoon sample Moisture Content
� � � Clean Sand
� 3-inch I.D Shelby tube sampie � Cuttings Plastie Limit Natural Uquid L(mit
� No Recovery � Bent�nite
� Grout
, � Groundwater levei at time of drilling
f....
ATD or date of ineasurement 8 Screened Casing
Zipper Zeman Associates, Inc. BOR�NG LOG Figure A-1
Geotechnical& Environmental Consultants Date Drilied: 9/2M02 Lagged By: CRT
PROJECT:Renton Retail JOB NO. J-1470 BORING B-26 PAGE 1 OF �
Location: Renton,WA Approximate Elevation: 32 feet
�,.;.
Soil Description � Penetration Resistance �,
� " °' °' °i = ` � � � _
� fl' a a-� � w
m � � � � 0 16 Standard Bbws per foot Other j y
^ G tn V� Z C7 � Z H
� 0 10 20 30 40 50
urface grave over medium dense,moist,brown,silry, ; ; ; ; ; ; ; ; ;
sandy GRAVEL(RII) � � , , , , � , ,
---------------------------------------------- --___� � � . � � � � ,
������^���� _ _ �_ _ _ � ' _ _ _ _ T _ ' ' t�_T_ _ T__ i_ '
Loose,moist,black,silty SAND,COAL TAILINGS, _ ' � ' ' ' ' '
�.� some organic wood dabris(Fill) �- S � - � �-� -- ; - - ; - - ; -- � - - ; -- ; --
� � � , 11
5 ; ; ; ; ; ; ; ; ;
,._.,
Very loose,moist,block,silty SAND with COAL '�- S-2 �` ` ; � ; , ' ; � 3
? TAILINGS wootl debris and organics(F11) � � � � � � � �
`�� Very soft,wet,black,organic SILT with some wood — - • -- - - ------ - -- - - - - � ----- � MC=1az%
iragments __� �3 ATD . - I - - --' -- ' -- ' - - , --� - � --� 1 ATT
, � , , , . ,
, � , , �
---------------------------------------------- — — --
-- -- ---- -------------- ----
Very soft,wet to saturated,greenish�ray,sandy SILT S-4 � � ; � ;� ; � � 1 MC
with some day interbedded with silty SAND ' ' ' ' ' '
-------- - - -t-- � - , -'- - '- -
���w __ �� i _- _ _ t � � T� _T�_ T_� i� � __
i � r � i � i � i
���_���_�����__�_����__�����_������������_���� ������� . � � L L 1��1 1 1 1
15 , , , , , , , , ,
— - -- : - -�--�-- ,--- : ------- - ------
Ve soft,wet,bro ra ,sil SAND interbedded with � � � , , , M�tt676
�Y �-9 Y tY S-5 � : , , , , , � 2 200W
siItySANDa�dPEAT(4") -- --- -- � - - � - - � - -` - - •--'-- -- •--• • -
20 ; � ; ; � ; ; : ;
Medium dense,wet,gray,sitry SAND with some brow� � � ' � ' � -` �� ' ' ' � ' --'���
� organics and Vace gravel S-6 � � � � � � � � � 16
Boring completed at 21.5 feet on 9/26/02 _____ - - � - -� -� -- -- �--� - -•- ;--
Groundwater seepage observed at B feet at time of , � , . , ,
driiling ------ - - ,- - -�-- ;- - -1 - -; -- --- ; - , -'--
__ _ _ _ �__�__ ! _ _T _ � __ T__7 �_� __
_ 25 ; ' ; ; ; ; ; ' ;
Explanation o �o 2o so ao so
I Monitoring Well Key
2-inch O.D.split spoon sample Moisture Content
� Clean Sand
� 3-inch!.D Shelby tube sample � Cuttings Plastic Limit Naturel Liquid Limft
� No Recovery � Bentonite
. � Grout
Groundwater level at time of drilling
ATD or date of ineasurement B Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnicai&Environmental Consultants Date Drilled: 9126102 Logged By: CRT
PROJECT:Renton Retail JOB NO. J-1470 BORING B-27 PAGE 1 OF �
Location: Renton,WA Approximate Elevation: 31 feet
� Soil Description � Penetration Resistance H
.. °' m °' m = � � � � c
t aa a� � ::
Q. � � � 3 0 1° Standard Blows per foot Other � y
' o � f� 2 C7 � Z 1�
0 10 20 30 40
Medium dense gradi�g to very loose,moist grading to ; ; ; ;
wet(below 4.5 feet),brown,gray,and black,grevelly, • ' ' ' , ,
.�----- - - - - - - - - - -- -- --'--
�"s' silty SAND(Fill) � � � � � �
k� � � � , � � � , �
� , --��'-- - - - - ' - r - - r - - r - - *- - - -' � -t--
' ' ' _ _ _ _ ' _' "" a'' ' "'a'"1''
�"'� S-1 , � � �� � � , � � 16 MC
_ ' . - r - - ; - - r - - r - -r -- i --,-- ; ,--
5 ATD - -` -- ` -- ` - - `--` - - '--'- - ' -- '--
-- ��� S-z �.' - r- - r - - r•- ; - , - � � � 3 MC
� ------------------------------------------- -
Soft to very soft,wet,gray,SILT with interbeds of ------ - -- -- -- --- - - - - ---------- -----
saturated,greenish-gray,fine to medium SAND, ; ; ; ; ; ; ; ; '
" irtegular horizons of fibrous wganics up to 0.25 inches ____ _ _ ________ ____ ___
[hick --- - S_3 •• -- � • - - •- ' -- • --�-- • - --- 3
10 ; ' ; ; ; ' ; ; ;
s-a � ; ; : ; ; ; ; ; � �
Boringcompletedat11.5feeton9/25/02. -------- . - - -= -- = -- = - -=-- =--= --1-- '- -1-- -
�i_� . , , , � , , , ,
Groundwater encountered at approximately 4.5 feet at • , � � � � � �
timeofdriilin9� - --,- --�--, - -;-------- ---------
- -- - - - - -- - -`- - -- -- -- --
15 � , , , , , ; ,
� ---- ; ; ; ; � ; ; ; ;
20 - - - �- ---�-- � -- � - �---- � -----
. . � � i � � � � ; -
" ' � ' � _ _ , _ _ _ ''T_ _ i_ _ � _ ' __l'_
. GJ � . � . � � � � �
Expianation o �0 20 3� ao so
Monitoring Well Key
I2-inch O.D.split spoon sample � Clean Sand Moisture Content
� 3-inch I.D Shelby tube sample � Cuttings plastie Umit Natural uquia um�c
� No Recovery � Bentonite
. � Grout
Groundwater level at time of driiling
ATD or date of ineasurement E Screened Casing
Zipper Zeman Associates,Inc. BORlNG LOG Figure A-1
Geotechnical& Environmental Consuftants Date Drilled:9/25l02 Logged By:DCW
PROJECT: Renton Retail JOB NO. J-1470 BORING B-28 PAGE 1 OF �
Location: Renton,WA Approximate Elevation: 32.5 feet
Soil Description m � � ,6 Penetration Resistance y
L aa a� � y � 0 3 c
a � � � � � � Standard Blows per foot Other j y
C t/� t/� Z C7 3 Z H
0 10 20 30 40
Loose to medium dense,damp,brown,gravelly SAND ; ; ; ; ;
(Fillj . � � �
�.. -------- - - - - ,- - - - - - - - - ; - - - -; - ;--- - -
---------------------------------------------- --------- , � , , , � � � ,
' ' � ' ' r'' � ' ' r'" r''T"'r'_i'_t"'
Medium stiff to soft,moist to wet,dark brown,sandy - - � -- � _ _ __ _ _ _ __ __ ___ __ _ _
SILT with some fine organics(FI1) _ S-t 1 � � � . � � . 5 MC
5 ; ; ; ; ; ; ; ; :
—��_ S'2 �1 -- ;- !- � -; -r -- 1 -- � - ' _ � 3 MC
. - - - --- - - � - - ; - - -- -�-- • -- •-- • - -
---------------------------------------------- qTp ; _ , . , , , ;
Very soft.wet.9raY.SILT with some wood fiber -- ~ g g � - - - � - - � - , -- , --�--�-�; -- � -- 1 MC
horizons - - - - --�---- - • - - •--• --�--•--- - -
- 10 ; � ; , , ; ; ; ;
� � � . , ; ' ' , ' ; 2
. Boringcompletedat11.5feeton9l25/02. -- - : - - :-- � - -_ - -:--=--i --1 - - = - -
Groundwater encountered at approximately 7.5 feet at v�� , . � , , , , ,
time of drilling. _________ _ ' ' _ ; _ ' ' ' ' ' ' _
'r '' r' ' r ' " r ''T ''T' "� � . t '
15 , . , . , , , ,
20 - � - � -- - - - -- �---- � -� -- -
- -' - � L - '- - '- i � --
_ _ __ 'i�� f ��T ' T_'T_�T_� 1 ��1 __
25 ; : : , ,
Explanation o �o Zo so ao so
Monitoring Well Key
I2-inch O.D.split spoon sample � Clean Sand MolstU�e Content
� 3-inch I.D Shelby tube sample � Cuttings Plastic Limit Natural Llqutd Llmlt
� No Recovery � Bentonite
� Grout
� Groundwater level at time of drilling
ATo or date of ineasurement B Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnical 8�Environmental Consultants Date Drilled:9/25102 Logged By: DCW
PROJECT:Renton Retail JOB NO. J-1470 BORING B-29 PAGE 1 OF �
Location: Renton,WA Approximate Elevation: 33 feet
Soil Description � Penetration Resistance y
m a► �o
r G1 �. - 0 3 =
Q m O.� = 41 �
m � � � � a i° Standard Btows per foot Other � y
o V7 fn Z (7 3 Z H
0 10 20 30 40
3.5±inches ASPHALT above 4±of inedium dense, , , , , , , , , �
damp,brown,gravelly SAND above very loose,moist, _____________ _ � _ _ i _ _ _ _ __ _: __
'-� black,silty SAND(coal fragments)with scattered ; ; ; ; � ; � ; ;
horizons of brown,gravelly SAND(FiA) ___�_ .
- - --. - � -- r -- ------- - - - -
- -- - - --'- - -- ---
s-' �` --; - - , _ � � � , � 3 MC
5 ; ; ; ; ; ' ; ; ;
-�` s-z � - ' - -L - -; - ` -. -;- -.-� _ , _ _ � Mc
� , . . , . , , , ,
--------------------------------------------- ------ A� - - � - -�- - � - - �- -�- -� • - ; - -• --� --
- Very loose,saturated,gray,fine SAND with some sitty � � � � � � � �
zones and scattered fibrous organics '"' — - - r-- �--; -'; '' , '� � � �-- - � -; -
S'3 � � ; � ; � � � � � 1 MC
- - 10 ; ; , ; . ; ; ; '
� � ; , ; ; ; ; ; ; ; �
Bonngcompletedat11.5feeton9/25/02. ____�___ . _ _� __�__: __ .__� __�__._ _,__: ._.
Groundwater e�countered at approximately 7.0 feet at ; ; ; ; ; ; ; ; ;
time of drilling. _ � � _ � � _ � _ � � � � _
"'�"_ 'r- � - r--r - -r-- r' -T-'1 '
�5 i � i � � � �
2� ' _. " " " " " �""'"• """'
� , � i , , , � -� --
- � -- � --r --*--r - -r-- r -1- -t --
25 : ; ; : ; ; : ;
Explanation o �o zo so ao 50
Monitoring Well Key
I2-inch O.D.split spoon sample � Clean Sand Moisture Content
� 3-inch t.D Shelby tube sample � Cuttings Plasdc Llmit Natural Liquid Um(t
� No Recovery � Bentonite .
- � Grout
Groundwater level at time of drilling
ATD or date of ineasurement B Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnical 8 Environmental Consultants Date Drilled:9/25102 Logged By: DCW
PROJECT: Renton Retail JOB NO. J-1470 BORING B-30 PAGE 1 OF �
Location: Renton,WA Approximate Elevation: 34 feet
Soil Description � � � ,D Penetration Resistance y
r m d � � - � m a�
r a a °'� � °�; � �
Qy � y Z � � Siandard Blows perfoot Other Z �
0 10 20 30 40
Medium dense,damp,brown,gravelly SAND(Fill) � � � � � � � �
-------- - - - ' - - - - � � i � �
- - - r-- r''r- -r- -r -- 't'-T'- -'
Very loose,mast grading to saturated,black,red,and � � � � � � � �
beige,silty SAND and sandy SILT(coal fragments-filq _ '__ _ � __; ' ' � ' '
� _�__ S-1 .. . � - - � - - � -- -- � - - M�5856 � 3 MC
5 — S-2 A. �� ; -- ;- - �- - ;- - i -- ; -- �- - ,MF-59x � 2 MC
� - - r-- ; -- � � � --r -;- ;- ;--
g'3 � � � , � � � � MC=58% � 1 MC
---------------------------------------------- , , , , � , � ,
'- �� Very stiff,wet,gray,SILT with trace fine SAND and __ -- - ;- -; -; - , -- ;-- , -- ; --;--
fibrous organics S-4 � ; ' ' ; ' ; ' ; ; 0
_ � Boringcompletedat11.5feeton9/25/02. �--«- • - -- -- - ---- -- -- --- � --,--1--, -- ,
Groundwater encountered at approximately 5.5 feet at ; ; ; ; ; ' , ; '
time of drilling. � � � , � - -- � � �
--- -r'-r--r--r"r- , -T-- r--1-
'- -' � ''1 - 1 --a '' -' '- '- --
15 , , , , , , , , ,
20 ---- •-- �--- - � ------ ----� --
- ----� -- �- -1 - -L -- i- -1- -
' _r __ f __ � � ' T _ _T__T''T'_� _ '
2g ; ' ; : ' : : : '
Explanation o �o Zo so ao so
I Monitoring Well Key
2-inch O.D.split spoon sample � Clean Sand Moisture Content
� 3-inch I.D Shelby tube sample � Cuttings Plastie Lfmft Naturel Uquld Limit
� No Recovery � Bentonite
. � Grout
Groundwater level at time of drilling
aro or date of ineasurement B Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnical 8 Environmental Consultants Date Drilled:9/25IO2 Logged By:DCW
PROJECT:Renton Retail JOB NO. J-1470 BORING B-31 PAGE 1 OF 1
Location: Renton,WA Approximate Elevation: 32 feet
Soii Description � Penetration Reslstance ,�
� � � °� � ` � � � c
y a a °.� � :'
o N � � Z � � Standard Bbws per foot Other j F
Z
0 10 20 30 40
Medium dense grading to very loose,damp to moist, ; ; ; ; ; , ; ;
brown and dark gray,silty SAND with trace gravel(Fill) —_-----_ .__ ___� _ _ � _ _ �_
' - -r - �-- � - -, -- � - -r- -,--.--, - -
r- _�� S�� ..` -- ; - - , �. - - ; - - ; --'- -'-- i -- 3 MC
5 ---------------------------------------------- , � , , , ; ; ; ;
Verysoft.wet,darkbrownandgray,SlLTwithsome -- --- - -� - -• - - � - - � - - � - - • - - �- - - - -- • - �
fine sand and organic material interbeds �-_ S-2 i ; ; ; i ; ; 1 � 0 MC
-------------------------------------------- ----- . --^ --�-- � - -• --• -- •- -�--;- -; --
r-- ATD , � � � � � � , �
Loose to very loose,saturated,grey,fine SANO with -- ' - , -- ,- - - ,- - -;----- , --;--; --
some fine and fibrous organics S-3 * ' ' ' ' : : �� � 5 MC
10 ; ; ; ; ; ; ; ; :
�.,� � : ; ; ; ; ; ; : 4
_ _ Boring completed at 11.5 feet on 8/25/02. � � � � � � � � �
�_���__ _ _ _ _ _ L _ _L__1__1. _ l __
: Groundwater encountered at approximately 7.5 feet at ; ; ; ; ; ; ; ; ;
time of drilling. � • � � � � � � �
-w�- - ' 'r ''r'' r "'r ' 'r' 'r' , _' T' '' '
15 , , , , , , , , ,
20 - -- --�- -� - -- - � -�--�-----, --
��__. , , , , � , , , ,
- - ---�-- � - -1- -1 --i- -1 - -
' _ _ ___ _ _ _ T ' 'T_ _ T _ _T_' �1 ��
25 : : ' : : : : :
Explanation o �o zo so ao so
Monitoring Well Key
I2-inch O.D.split spoon sample � Clean Sand Moisture Content
� 3-inch I.D Shelby tube sample � Cuttings plastic limit Nawr� Uquid Ltmit
� No Recovery � Bentonite
. � Grout
Groundwater level at time of drilling
ATD or date of ineasurement B Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnlcal&Environmental Consultants Date Drtlled:9/25l02 Logged By:DCW
PROJECT:Renton Retail JOB NO. J-1470 BORING B-32 PAGE 1 OF �
Location: Renton,WA Approximate Elevation: 33 feet
Soil Description � Penetration Resistance �,
x mm d °' � ` � � � _
Y °. a °.� � �
Q y � y Z � � Standard Blaws perfoot Other � F
Z
0 10 20 30 40
Medium dense,damp,brown,silty,gravelly SAND(FII) ; ; ; ; ; � ; ;
, , � , , , � ,
___� ��_�_ '' ' - � __ � _ _ T _ _'._i' _T__T. 'i'_ "
Medium stiff,moist to wet,black and brown,silty SAND _ _ ' ' ' ' ' ' ' '
,.,-. (coal fragments-fill) - • � - � - - � -- -- � --
S , -t- - - - - - - -: , � , 5 200
- - . -- ; - 1 - -; - - ; - - r- -r - - , -,--,--
5 ATD � . , � ' � � �
_ Very loose,wet,black,SAND with some fine roots and g_2 . � � . � ; ; ; MC=5i9� � Z MC
wood fibers(coal fragments-fill) - -- --r - -r--r - - r ; - ; - - ; --;- ; -
----------------------------------------------
�,.,�, , , , , , , , , ,
Very loose,saturated,gray-brown,fine SAND --- -- - - ,---,- - - ,- - -- ; - - -- ;- , --
S'3 � ; , ; , ; �� � � 4 MC
- 10 ; ; ; ; , ; � ; �
s-a ♦; ; ; ; ; ; � ; ; 3
,:-� Boring completed at 11.5 feet on 9/25l02. � � � � � � � �
����� _ ''L_' L_ '1' '1' "1 '_
f'�'' Groundwater encountered at approximately 4.5 feet at ; ; ; ; ; ; ; ; ;
Gme of drilling. _ � � � � � � � � _
-�-w�- "r"" r'" r "r "r'_r_' '1"7 '
�� � � � , � � � � �
� � '�"'�" � . � � � � � � �
2� -- , - , -,-'• --. -•"•'-*--� --
. . � L � � � � � � ,
_ _ �_ . ' ' f ' ' T ' _T�_ � _ _T'-T__l __
25 ; : ; ; : , ; ;
Explanation o io zo ao ao so
Monitoring Well Key
I2-inch O.D.split spoon sample � Clean Sand MoiStu�e Content
� 3-inch I.D Shelby tube sample � Cuttings Plastie LimR Na�uroi Liquid Limit
� No Recavery � Bentonite
� Grout
� Groundwater level at time of drilling
_ aro or date of ineasurement B Screened Casing
Zipper Zeman Associates,inc. BORING LOG Figure A-'1
Geotechnical&Environmental Consultants Date Drilled:9125/02 Logged By:CRT
PROJECT:Renton Retaii JOB NO. J-1470 BORING B-33 PAGE 1 OF �
Location: Renton,WA Approximate Elevation: 33 feet
Soil DescripUon � Penetration Resistance y
� � m � � � ` � � � c
� a a °-�O � «
a � � � � o �0 Standard Blows per foot Other � w
p fA fn Z ('1 3 Z F
' 0 10 20 30 40
Medium dense to bose,damp,brown,sandy GRAVEL ; ; ', ; ;
(Fill) ------- - -,- - - ; - - , - - ,- - - , - - ; -- ' - - ; - ; --
. _� ' �f'_ f_ _ � _ � T��T��T��T��t__�__
r i � � � � � �
���������������������������������������������� ����� l�_
_ _ _ _ _ _ _ _�1��1��1�� __ __
- Very soft,wet,dark brown,SILT with abundant fine S-1 � ; , , � . , , r,�C�i,x � 2 MC
and fibrous organics,and thin interbeds of sand size __ _ . _ __ __ _ _ _ � _ _ ; __ ; _ _ � � _ _: ___ _ _ _
5 coal fragments(FlII) ; ; ; ; : ; ; ,
- :� �� S-2 • ; - -r-- ; r-- ; -- ; -� -, - -,• 2 MC
� . , � � . , , � , ,
---------------------------------------------- ---------- A� - -� - - ;- - - - - ;- -;-- ;--•- - • --; --
loose,satureted,gray,gravelly SAND -- ;-- ; ' ; ' - ;' '; '' ; '' , ' , ' , '-
- S3 ---•-• - - • ••-----•-- •-- •--• -- 7 MC
- 10 ; ; ; ; ; , ; ; ;
s-a k ; ; ; ; ; ; : 4
----------------------------------------------- - --- � --� - - � - - � - - •- -�--�-- •--• - - • - -
Medium sUff wet.brown orqanic SILT , . , , . , , � .
Boringcompletedat11.5feeton9/25/02 "'"""'"""" � --=- - �- - � - _L__,__ :__�__,_ ., __
Groundwater encountered at approximately 7.0 feet at ! � � � � ' ' � '
timeofdrilling. ----- - -�-- �- - �-- .--.- - ; -- ,--;--, - -
-- -- -- - - �-- -- -- -- --- --
15 , , , , , , , ,
2� ; ; ; ; ; ; ' ; ;
- - - - • - -1 --1 --
' ' '' _ � ' ' _ ' _ i''T' '1''T'' i''l __
25 ' : ; : : '
Explanation o �o zo so ao so
Monitoring Well Key
I2-inch O.D.split spoon sample � Clean Sand Moisture Content
� 3-inch I.D Sheiby tube sample � Cuttings plasUe Umit Naw.ai �d Limit
� No Recovery � Bentonite
. � Grout
Groundwater level at time of driiling
AT� or date of ineasurement B Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnical&Environmental Consultants Date D�illed:9/25102 Logged By: DCW
PROJECT:Renton Retail JOB NO. J-1470 BORING B-34 PAGE 1 OF �
Location: Renton, WA Approximate Elevation: 33 feet
Soil Description m m � � Penetration Resistance a
� a d a� � m � 0 � �
a � � � � o �6 Standard Blows per foot Other j w
_ . O V1 NZ C9 � Z H
0 10 20 30 40
4±innches ASPHALT above 2±inches of inedium �
dense,damp,brown,gravelly SAND above very ___________ _ , _ � _
- loose,moist to wet,bladc and brown,silty SANO(coal � � � � � �
fraGments-flll) , , � � , � � � ,
������ _ _ _ _ _ _ _r � _ � � �� __ T_ �T__ l _�
. i ! � � � � � i �
�.d � S.� ATD �` - - ; --; - - ; -- ' - - ; -- - -;-.; 3 MC
5 --r- - i - ; -- � -r--r-- ?- -r- i --� '�
`�_' S-2 .-` � = ;--i - r--`-- r- -•- ,--;-- 2 MC
----------------------------------------------
Verysoft,wet,gray,SlLTwithsaturetedfinesand --- -- -- -; - - -- ; - ---- , -----;- - = --- --
interbeds — - S-3 � r -- r - • --'- .- --- • --�- - • - - � MC
10 ; � ; ; ; ; � '
s-a ; : ; ' ; ; ; ' ; o
- -. Boring compieted at 11.5 feet on 9/25/02. ____�_____ -_- - - : __:_ _ L _ ___ _,__�_ _, __,_ _.
Groundwater encountered at approximately 3.5 feet at ; , , , , , ; ,
timeofdriliing. ------ ---� - -� - -�- - � --r--r- - . -- .--,--
-- --�--`--' -- -- --- -- -- --
15 , . , , , , , . ,
20 ; ; : , ; , ; ; '
_ � _ � _ ,. ,. . , � � �--
___ _ _ � _ _ �__ f _ 'i' _T �' T _ _ T__ __
25 ; ' ; : ; ; ' '
Explanation o �o zo 3o ao so
I Monitoring Well Key
2-inch O.D.split spoon sample Moistu�e Content
� Clean Sand
� 3-inch f.D Shelby tube sample � Cuttings Plastic Umit Natural Liquid Llmit
� No Recovery � Bentonite
. � Grout
Groundwater level at time of drilling
AT° or date of ineasurement � Screened Casing
Zipper Zeman Associates,inc. BORING LOG Figure A-1
Geotechnical 8�Environmental Consultants Date Drilled:9/25J02 Logged By:DCW
PROJECT:Renton Retail JOB NO. J-1470 BORING B-35 PAGE 1 OF �
Location: Renton,WA Approximate Elevation: 34 feet
Soil Description � m � ,o Penetration Resistance y
r m � � � � �
cm aa � d
m � � � � 0 t° Standard Blows per foot Other j w
o tJ) tA Z U' � Z F�-�
0 70 20 30 40
3+ASPHALT above 7.5±inches medium dense, , , . � , ,
damp,brown,g2veily SAND(Fill)above very loase, ___M_ ' ' ' ' ' ' ' ' '
moist,black SAND(coal fragments-fiil) - - - - - - � � - - � -- ; -" �� -�- -� -- � - "
� ��� ' _-__�_ �� '' T'_T� T "T__T__ t_'
!� _�� S_� .,` - -; - - � - - ; -- i - --1�- - - ; -- , '- 3 MC
5 � � ; ; ' ; ; � �
� _ — . � � . -- -- -�--•--�- -�-
�. - -- -- - - - - - M
S-2 A� � , , � � � � , � � 2
, , � � �
-------- '
Very soft,wet,gray,SILT and sandy SILT with some ___________ ___ _ _ _ _ _ _ _ _ _____ ________ __ _ _ _ .
�, fine and fibrous organics ; ; ; ; ; ; ; ; ;
-�� S-3 •--� --� -- � - - � -- ; --;--;-- � -_: • 0 MC
�-c 10 ; � ; ; ; ' � ;
s-a ♦ � ; ; ; , ' ; ; ; �
. Boringcompletedat11.5feeton9/25/02. ------- -- � - ;-- �- -1__L_ _: __�__.__ __
' Groundwater encountered at approximately 5 feet at � , � � � � � � �
timeofdritlin9• ---- - - ; - -�-- � -- �--r-- -- --,--, --
15 , , � , , , , ,
�;� ~ ; � ; : ; ; ; ; ;
20 --- - �- -�-- �- -�--� ----- � -� -
_ ' ' L ___ 1_ ' _
__�__ �� _ _ �__ �__�_ _ �i _T__1__
25 : : : ; ' : ' : :
Explanation o �0 2o so ao 5o
Monitoring Well Key
I2-inch O.D.split spoon sample 0 Clean Sand MoiStu�e Content ,
� 3-inch I.D Shelby tube sample � Cuttings plastle Umit Natural LJquid Limit �
� No Recovery � Bentonite ,
. � Grout �,
Groundwater level at time of drilling
nro or date of ineasurement B Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnical&Environmental Consultants Date Drilied:9125102 Logged By: DCW
PROJECT:Renton Retail JOB NO. J-1470 BORING 8-36 PAGE 1 OF 2
Location: Renton,WA Approximate Elevation: 34 feet
Soii Description � m � ,D Penetration Resistance y
� am a� � d � � � �
a R � � � o � Standard Blows per foot Other j �
. - O t� v� Z (7 � Z �
0 10 20 30 40
3 inches asphalt over loose to medium dense,mast. ; ; . ; ;
brown,silty,gravelly SAND(Fill) � � � � � �
---------------------------------------------- --------- - - - - - - � - - - - - - - - -
--------- - - � - - -r - �--- -- - - ----- --
Very loose,moist,black,COAL TAILINGS(FII) �_ _y ' ' ' ' ' ' ' �
- - � - - --- -- - - -- -- - - -- - -
t"r S-1 �, � � , � , � � � 3
---------------------------------------------- — , � � , , � � � ,
5 : ' � ; ; ; ; ; ;
Very loose,moist,brown-gray-black,silty SAND with - -` - -; - - ; -- - --;--; --; - -• --' --
' some gravel interbedded with COAL TAILINGS(Fill) _ ___ S'2 -�_ '_ _ __ ;-- ; _'; i ; ' ; 2
---------------------------------------------- '
� Very loose,moist to wet,gray,silty SAND with some - -- -- ,-- - ; --- --;-- , --;--;- - , ; - -
' gravel interbedded with biack sandy SILT and peaty _-�_N S-3
organicsl2") . •; - - - - -• --�--� -�---- -� --; - - 3
10 A� � � � � , � ,
�y � � � � , � � � , 4
_" ������ _ _ , L � i � _ � � _ ' "
������������������_���__ � i � � � � i . 7 _
��_������������������� '�����
_ ' __ i_ _ � _ _ __ __
. ������ ��1 � �' __1 __ �_ ' '_�__ 1� _ 1 __ ' _ _
15 , , , , , , , � �
Medium stiff,moist to wet,brown-gray,sandy SILT with � g_5 ;� ; ' ; ; ; ; ; 7
some interbedded silty SAND with some organics - - � - - - - - - -- � - -• --•--•- - � --� - -
�:,, , , � , � , , ,
20 Very dense,moist,tan-brown,silty weathered - -�--�-� � -- � �•- �--�- - �--� --
SANDSTONE _' S-6 � � � � � � � � � � 50/6'
--------- - 1 - ' f - r - L --1--1- ' 1 _ ,
����_'��������_������������������������������� �������.���
Very dense,moist,light gray,silty SANDSTONE � � � � � � � � �
--� -- �--� --� --- -;-- -- , -, -
25 ; : : ; ; ; ' ;
Explanation o �o Zo ao ao so
I Monitoring Well Key
2-inch O.D.split spoon sample 0 Clean Sand MoiSture Content
� 3-inch I.D Shelby tube sample � Cuttings Plastic Umk Natunl Liquid Limit
� No Recovery � Bentonite
. � Grout
Groundwater level at time of driliing
ATD or date of ineasurement B Screened Casing
Zipper Zeman Associates, Inc. BORING LOG Figure A-1
Geotechnical&Environmental Consultants Date Drilled:9124/02 Logged By: CRT
PROJECT: Renton Retail JOB NO. J-1470 BORING B-36 PAGE 2 OF 2
Location: Renton,WA Approximate Elevation: 34 feet
Soil Description � Penetration Resistance y
� � °' °' °' � ` � � 3 c
y aa a.° � «
� � � a 3 � � Standard Blows per foot Other � a
o N NZ C9 � Z F�-
0 10 20 30 40
Very dense,rnoist,light gray,siity SANDSTONE S_� ; ; ; ; �SOl4"
______ - - - - - - - - - • - - - - - - - ' - - - -
�� __f�� � � ���_ �t _ _• �T__ 1_ _� __
30 ; ; : ; ; ; : ; ;
--�-- s-s --�-- ;-- � - - �- - ; - - �- -�- - ,-- ; - -.sora•
Boring completed at 30.4 feet on 9l24/02 _�____ _ ______ _ _ _ _ _ _ __ _ _ _________ _ _ _
Graundwater seepage observed at 9.5 feet at time of , � � ; , , , , .
drilling --- --- --• --- -- �- -•--•--•--� - - • --
r" � � � � � � � , �
_ 35 � ; ; ; _ ; : ' ; ; I
---- --�--� -- � _ , , , , _ , . -�--
� ������� �� �_f �_f ��! � � � T� � , � 1__1 ��
40 , , . , , , , .
45 � ; : ; ; ; , ; :
- -�-- t - - � - -� -- ._ � _ , ._, . -� --
- ; - - � - - ; - � -- , -- � - -:- - ; - -; --
50 ; ' : : ; ; :
Explanation o �0 2o so ao so
Monitoring Well Key
I2-inch O.D.split spoon sample 0 Clean Sand Moisture COntent
� 3-inch I.D Shelby tube sample � Cuttings plastic Llmit rwmni uqu�a umn
� No Recovery � Bentonite
. � Grout
Groundwater level at time of drilling
Aro or date of ineasurement B Screened Casing
Zipper Zeman Associates, Inc. BORING LOG Figure A-1
Geotechnical&Environmental Consuttants Date Drilled:9/24/02 Logged By: CRT
PROJECT: Renton Retail JOB NO. J-1470 BORING B-37 PAGE 1 OF Z
Locatlon: Renton, WA Approximate Elevation: 42 feet
Soii Description m � L � Penetration Resistance y
r aa a,a 3 « � � � c
a � � � � o t0 Standard Blows per foot Other j y
• o v� tn Z C9 � Z F
0 10 20 30 40 SD
Surface grass over : ; ; , ; , � ,
------ , ` , , , ----- - � -
r- , - ,- - �� � - , - , - ,
� ��� _� _ _ _ _ � _� � _ T �T__T__�__ l__
Loose to medium dense,moist,brown-black,silty ___ _� __� __ . _ _ � _ _ �__, _ _. ._. __�_ _ � _ _
P.., SAND with some gravel,coal tailings and organics(Fill) S_� ; � ; ; ; ; ; ; ; ��
; � ---------------------------------------------- ; ; : ; ; , , , ,
t Very loose,moist,brown-black,silty SAND with Vace � S-2 �` ` ` ` L ` ' ; : 3
! gravel,interbedded with sandy SILT and PEAT _ _ _ _ _ �_ _ � _ _ _ _ _ � _ _'_ _' _ ____ : . _ .
; , , , , , , , ,
r� . � � � � � , � ,
' ---- - � - -�-- - ' - -= - - = - -- - --- - --- - --
---------------------------------------------- �3 AT� .i , � � � � , : ; 3
VerysoTtwet.brown,PEAT - ----- - - -; - - • - - ; - -;--;- � --� -
�r 10 , , , � � , , , .
g� � ; ; ; ; ; ; ; �
-- - --- - � --L- -1--�--1 --� --
' �_���,������_���������������������������������� i i � � i � � r �
Very loose,wet,gray,silty SANO interbedded with ____ ---� - - � --r -- i - -r - -T--i- -; -- ; --
organic SILT and PEAT S-5 � , : , ; ; , ; � , 2
I - --, - - , - - -- - - - -�-- - - , - - - -
15 ---------------------------------------------- , , , , , ,
Loose,saturated,brown-gray,gravelly SAND with S-6 ; � ; ; ; � ; , � 10
somesilt --- -- -- -- - ; - -• � - �- -� --;--; - -�--;--
�� � ; : � � , , , ;
, 20 ; ; ; , ; ; ; ; �
� . Very loose,saturated,brown,silty SAND with some S 7 �� - � -� - � - -� -�--� -- � --, -- p
grevel and trace organics �— --,- - , - ,-- ; - - ,--- , -- -;-- - --
_-_____-- - -: - - , - - r - - � - - �, - - - � - - � -- , --
25 : : : : : ; :
Explanation o �o zo so ao 50
Monitoring Well Key
I2-inch O.D.split spoon sample � Clean Sand Moisture Content
� 3-inch I.D Shelby tube sample � Cuttings plasde Limit NaWral Llquid Limit
� No Recovery � Bentonite
� Groundwater level at time of drilling
e Grout
AT° or date of ineasurement B Screened Casing
Zipper Zeman Associates, Inc. BORING LOG Figure A-1
Geotechnical 8.Environmental Consultants Date Drilled•9l24/02 Logged By: CRT
PROJECT: Renton Retail JOB NO. J-1470 BORING &37 PAGE 2 OF 2
Location: Renton,WA Approximate Elevation: 42 feet
Soil Description � Penetration Resistance ,�
� °' °' °i °' � ` � � � �
r a a �-� � «
m � � a � � 10 Standard Blows perfoot Other j �
C �n v� Z L7 � Z H
0 10 20 30 40
Loose,wet,brown-greenish-gray,si►ty SAND with S� . ; � � , s
some gravel and Vace organics _ ' ' ' ' '
, --------- - -- ; - � - -; - -� -. - , - *--t-- - --
r - - - - - -- - � . � � " -
30 ; ; ; ; ; ; ; ; ;
Dense,moist,tan-brown,silry weathered SANDSTONE ""- ' - - ` -- `� - '- - ' - �`�- ;� � ' � - ' � - ' - -
---------------------------------------------- -- S 9 - - i --r -- r - -i -r-- , -- � t- - ;- - �
Very dense,moist,light gray,silty SANDSTONE � ' � • � � � � � �
35 , , , , , , , , ,
--_-- - - ,- - ,- - - ,- - , - - ; --;- -; - - ;- -; - -
Boring completed at 35.2 feet on 9l24l02 S"10 ; ' ; ' ; ' ' ' ; � SO/2"
Groundwater seepage observed at 8 feet at time of ��—���� - - - r -- '-- ` - -` - -T --.- - '--'- - ' --
' drilling ' � 1 � � � � � �
��� ' ' _ " ' f ���� �t�_T''f''T'�T' • _'
»�� _ _ _ _ _ _ � , �_ ' _ _ ' _� __1_ _ __ __
40 , , , . , . , � �
�::, ' : : ; ; : ; : ;
45 ; ; ; ; ; , : ' ;
� � , i � � � i �
-_-_-_--- _ _ � _ _ f__� _ _ _ _T _'T''T_ _i _ _ � __
- JO . 1 . . . I ; � �
Explanation o �o zo so ao so
Monitoring Well Key
I2-inch O.D.split spoon sample � Ciean Sand Moistu�e Content
� 3-inch I.D Shelby tube sample � Cuttings Ptasde Limit Nawrai Liquid Limlt
� No Recovery � Bentonite
. � Grout
Groundwater level at time of drilting
ATD or date of ineasurement B Screened Casing
Zipper Zeman Associates,Inc. BORING LOG Figure A-1
Geotechnical 8 Environmental Consultants Date Drilled:9124102 Logged By: CRT
APPENDIX B
LABORATORY TESTING PROCEDURES AND RESULTS
J-1470
LABORATORY TESTING PROCEDURES
All drilling samples were collected using split-spoon and Shelby tube sampling
techniques as described in ASTM D-1586 and D-1587, respectively. Samples collected from test
pit excavations were obtained from discrete soil layers in order to have a representative number
of disturbed, but representative samples. A series of laboratory tests were performed on
�-- representative samples during the course of this study to evaluate the index and geotechnical
engineering properties of the subsurface soils. Descriptions of the types of tests performed are
given below.
Visual Classification
�' Samples recovered from the exploration locations were visually classified in the field�
during the exploration program. Representative portions of the samples were carefully packaged
in moisture tight containers and transported to our laboratory where the field classifications were
� verified or modified as required. Visual classification was generally done in accordance with the
: Unified Soil Classification system. Visual soil classification includes evaluation of color,
. relative moisture content, soil type based upon grain size, and accessory soil types included in
` � the sample. Soil classifications are presented on the exploration logs in Appendix A.
h„i.
Vloisture Content Determinations
Moisture content determinations were performed on representative samples obtained
�� from the exploration in order to aid in identification and correlation of soil types. The
determinations were made in general accordance with the test procedures described in ASTM:
D-2216. The results are shown on the exploration logs in Appendix A.
��
� Grain Size Analysis
: A grain size analysis indicates the range in diameter of soil particles included in a
particular sample. Grain size analyses were performed on representative samples in general
accordance with ASTM: D-422. The results of the grain size determinations for the samples
were used in classification of the soils, and are presented in this appendix.
Atterberg Limits
The liquid limit, plastic limit, and plastic index of representative cohesive soil samples
were determined using standard Atterberg limits testing procedures in general accordance with
ASTM:D-4318-84. The Atterberg limits are presented in this appendix.
Consolidation Test
A one-dimensional consolidation test was performed in general accordance with
_ ASTM:D-2435 on a selected sample of the site soils to provide data for developing settlement
estimates. The undisturbed soil sample was carefully trimmed and fit into a rigid ring. Porous
stones were placed on both the top and bottom of the sample to allow drainage. After seating
loads were applied, the sample was inundated and the swell was measured. Vertical loads were
�� then applied to the sample incrementally in such a way that the sample was allowed to
consolidate under each load increment over time. The rebound of the sample during unloading
was also measured.
� Direct Shear Test
',...
Two direct shear tests were completed in support of the stability analyses completed for this
project. The tests were completed in general accordance with ASTM D-3080. Samples were
subjected to four stress increments {500 to 2,000 psfl and the shear stress was determined at each
point. The apparent cohesion and friction angle of the soil for peak and/or residual conditions
• could then be inferred from a best-fit line through the four points.
.�� Organic Content Test
F� The organic content of three near-surface samples were determined by AASHTO T-267, .
Organic Content by Loss on Ignition.
.- pH and Resistivity Tests
' Soil chemical analytical tests were completed on three representative soil samples by
r-, ' AMTEST Laboratories in Redmond, Washington. The results of the pH and resistivity tests
`°"'` were used to assess the corrosion potential to concrete and unprotected steel.
��
;�
�-���
.
�
PLASTICITY CHART
ASTM D 4318
_ so
�
�
_ 50 i -
i
I
� - 40 �
�
� .
� 30 ow as c inor anic san y i soi s;e s ic si s;
<- c io ani ts Ga anc�sil cla s
�, Medium i
.. �
� i
r' � 20 � ' -
a i
cla silts !
� 10 �
7
• 4 � an s
0
0 10 20 30 40 50 60 70 80 90 100
Liquid Limit%
USCS Received Liquid Plastic Plasticity
S mbol Borin Sam le Descri tion M.C. % Limit Limit Index Comments
" � � B-8 S-16 MH 57 fi0 33 27
� B-11 S-6 MH 57 59 37 22
� B-6 S-4 MH 55 78 47 30
� B-11 S-16 CH 44 66 29 37
Remarks:
PROJECT NO: J-1470 PROJECT NAME:
7.i�ner Z.eman Associates,,jn� DATE OF TESTING: 1017/02 Rentan Retail
Geotechnical and Environmental Consulting
PLASTICITY CHART
ASTM D 4318
so
i
�
; ;
50
�
40 �
�
x � �
� ow as c morgamc san y an � soi s;e s ic si s;
L 30
o anic silt cla s an sil cla s
�, Medium �
..
u
:.
- � 20 � "
a '
�
cla si{ts
10 ;
7 i
- �
. 4 an s j
' 0 , �
0 10 20 30 40 50 60 70 80 90 100
Liquid Limit%
USCS Received Liquid Plastic Plasticity
S mbol Borin Sam le Descri tion M.C. (°/a Limit Limit Index Comments
� B-26 S-3 CL 132 42 34 8
� B-13 S-2 ML 39 46 26 20
�
�
Remarks:
PROJECT NO: J-1470 PROJECT NAME:
7j��er Zeman Associate�jn� DATE OF TESTING: 10/9/02 Renton Retail
Geotechnical and Environmental Consulting
CONSOLIDATION TEST
BASED ON ASTM D 2435 AND ASTM D 4546
Ii,
Job Name: Renton Retail Exploration No.: B-37
Job No: J-1470 Sample No.: S-4
Date: 10/1/OZ Depth (ft): 10-10.5
Tested By: EUME Description: Peat
Moisture Content (°!o): Before: 60.3 After: 107.4 Wet Unit Weight(pcfl: 73.6
Atterberg Limits: LL= PL= P1= U.S.C.
I
,
- ; Stress{tsf}
: � 0.01 0.10 1.00 10.00 100.00
i 10 20.0
--+—Settlement
_ �
' - �- Rebound �
� _ _. 18.0 ;
� �—Cv
� � - _ _ --_- !
,
' 0
i _ - -- - _ �_ --- -- 16.0
. �
�
i _ __ _
� _ - 14.0
i -10
�
- - 12.0
. ... ; ;
� _. _. . _ _ _ _.:.__ : . . :. _ ,
e
c'�
c _ _ < ;
N -20 � � 10.0 � !
� a
� ' � . - a,
Q '�. v
.
.,
` a.o
� ,. .
. ,
- ,
� -so �
; s.o I
, - I
I i
' __ , 4.Q
-40
_ _ . ._. . 2.0
-50 0.0
i
i i '
i
Zipper Zeman Associates, Inc.
Geotechnical and Environmental Consulting
GRAIN SIZE ANALYSIS Test Results Summary ASTM D1140,4z2
SIZE OF OPENING IN INCHES U.S.STANDARD SIEVE SIZE HYDROMETER
� �r e• 3 +irr �ra• a�e- a io zo ao so �oo zoo
10 , i i : , I ; I I � i � i � , � ; , � � !
, � ' j I
' � �
9 j ! � ! , ' , � I � I �
' I I �i Ii ' i � I � I � � I i � �
= 8 I � � � � r I
� � i �
w i � I I � 1 � I ' � �
� 7 i � , � �
m I ! i � I
� I � �
z 6 ii ' � i -
� l � i
� 5 ' �
Z � a � �
V � i , I i . ,
a4 I +; ilii i � I '
' I
. � I ;
3 i !i
! � � ; �
Z II ii ; �
I � I, ! ! i �
; ;
1 � ' ! I
� ��
i � �� � � i � i � i �':
1000.000 100.000 10.000 1.000 0.100 0.010 0.001
PARTICLE SIZE IN MILLIMETERS
Coarse Fine Coarse Medium Fne Silt Gay
BOULDERS COBBLES GRAVEL SAND FINE GRAINED
Comments:
Expioration Sample Depth (feet) Moisture(%) Fines(°/a) Description
B-1 S-7 30-31.5 20 7.4 gravelly SAND with
some silt
PROJECT NO: J-1470A PROJECT NAME:
7j�.per Zeman Associates,Inc.
DATE OF �oitio2 Renton Retail Siope
Geotechnical and Environmental Consulting TESTING: StBbllity
GRAIN SIZE ANALYSIS Test Results Summary ASTM D 1140,422
SIZE OF OPENING IN INCHES U.S.STANDARD SIEVE SIZE HYDROMETER
3g� 1Y g� 3' 172' 3I4• 3/8' 4 10 20 40 50 100 200
1� � �, � I � � ;� �.i � �i
I � ! ' i ! I ' I I � i
_ 9 ! � � � ', I � ''
! ' ( � i I . ;
i � , �
, �
� � � �
{� : � O I i j I I �
O �
W I � I
. . � 7 ` i I
� i � , � � � : � i
. �' I I � � � i � � � i
W 6 j �
- Z � � i � � i -
LL � �
' ' � i, , , I
W 5 � j � i ' i
_ t� I j � j I
W 4 ' � � � ' � + � '
a � ; ,
. 3o I I � � ' i � �
, �� i i � � I �
i ' �
2 � i i i
� I � �I � 1
� ' � � I I
_ ' , I I '
� ;I i � � i
1000.000 10U.000 10.000 1.000 0.1 QO 0.010 0.001
PARTICLE SiZE IN MILLIMETERS
Coarse Fne Coatse Medium Fne Silt Clay
BOULDERS COBBLES GRAVEL SAND FINE GRAINED
Comments:
Exploration Sampie Depth (feet} Moisture(°/a) Fines(%) Description
B-6 S-4 20-21.5 20 30.0 silry SAND with some
gravel
PROJECT NO: J-1470A PROJECT NAME:
�p�er Zeman Associates. IIIC. DATE OF 10l14/02 Renton Retail Slope
Geotechnicat and Environmental Consulting -�STING: StBbillty
GRAIN SIZE ANALYSIS Test Results Summary ASTM D 1140,422
SIZE OF OPENING IN INCHES U.S.STANDARD SIEVE SIZE HYDROMETER
� ir e 3• ,ur �a• 3re� a io zo ao sa �o0 200
10 ;
9
; , � !
� .
�
� I
- = 8 ' ; I fi i i
C9 �
w � ' �
3 � I I � ;
m
W 6 '
-- Z -
�
ti � ; � ,
� � � .
Z 5 � j ! �
W
. _ a' ' I i � I �
d 4 � f � �
,. 3 � �
I ' � i �
�
i ' I
� ; I �
_.. 2 ; �
, i ' ' i
1 I ' _" I 1 I
, I � I ` � i I '
1000.000 100.000 10.000 1.000 0.100' 0.010 I 0.001
PARTICLE SIZE IN MILLIMETERS
Coarse Fine Coarse Medium Fine 5itt Clay
BOULDERS COBBLES GRAVEL SAND FINE GRAINED
Comments:
Exploration Sample Depth (feet) Moisture(%) Fines(%) Description
B-1 S-5 15-16.5 39 28.9 silty SAND with trace
gravel
PROJECT NO: J-1470 PROJECT NAME:
7,iuner Zeman Associates�Inc. DATE OF �ois�o2 Renton Retail
Geotechnical and Environmentat Consulting TESTING:
GRAIN SIZE ANALYSIS Test Results Summary ASTM D 1140,422
SIZE OF OPENING IN INCHES U.S.STANDARD SIEVE SIZE HYDROMETER
- se� tr e� �- ,vr �a• �e- a �0 2o ao so �oo zoo
10 � � , � ! � i � �
I
� �
' � ' � I i � I I � ; � �
9 i i �
I ,
-- z $ j i � � ; '
� ' i' ' i
w ; ,
_ � 7 �
m J I I i ;
W 6 � � tl
LL i I ' I -
W5 I I i
� I II �
a4 � �
, I I
� �I
3 i ,i
� �
� � � ��
z � +
�
� � � I ,
i � � �
; � �
� � � : , �� �
1000.000 100.000 10.000 1.000 0.100 0.010 0.001
PARTICLE SIZE IN MILLIMETERS
Coarse Fine Coarse Medium Fine Silt Clay
BOULDERS COBBLES GRAVEL SAND FINE GRAINED
Comments:
Exploration Sample Depth (feet) Moisture (%) Fines(%) Description
B-2 S-2 5-6.5 29 32.3 silry SAND
PROJECT NO: J-1470 PROJECT NAME:
7,i�per Zeman Associates�T_nc•
DATE OF �oisro2 Renton Retail
Geotechnical and Environmental Consulting TESTING:
GRAIN SIZE ANALYSfS Test Results Summary ASTM D 1140,422
SIZE OF OPENING IN INCHES U.S.STANDARD SIEVE SIZE HYDROMETER
� - 3e• �r �- 3• �trr ya• � a to 2o aa so �o0 200
10 I , � �
� � ' i � � ' � �
.- � i �
� i ; �
-' 9 i I i
is I �
� � �
� � � � i ;
� � � i ;
-- } ,
- m ' �
' � i i' ! �
ws ; �
z , -
� 5 � ; ' ' i
Z � �
w , � ,
_ _ c.�
� 4 ' 1 I
a i
. � i � ' �
3 i
i � j �
I '
2 i I � i �
� � � � � i � �
,. _ � i i � I I � I i
II . ' i � ' I � � j
-:�
1000.000 100.000 10.000 1.000 0.100 0.010 0.�01
PARTICLE SIZE IN MILLIMETERS
Coarse Fine Coarse Medium Fine Sitt Clay
BOULDERS C086LES GRAVEL SAND FINE GRAINED
Comments:
Exploration Sample Depth (feet) Moisture(%) Fines(%) Description
B-2 S-8 30-31.5 25 25.3 silty SAND with some
gravel
PROJECT NO: J-1470 PROJECT NAME:
7.i�ner Zeman Associates, Inc.
DATEOF �o�s�o2 Renton Retail
Geotechnical and Environmental Consulting TESTING:
GRAIN SIZE ANALYSIS Test Results Summary ASTM D 1140,a�
SIZE OF OPENING IN INCHES U.S.STANDARD SIEVE SIZE HYDROMETER
sc i r s• s- �+n• �ra• � a i o zo ao so �oo zoo
10 I I I i � � i
` I ,
9 �
I ,
i � '
� � 8 � I � � �
I
W � i I
� ' ; �
m '
� � ! � ' I � ,
ws � � ; � ;
�- LL I � , t i -
Z $ � �
�
W
_ _ U
� 4 '
a � � , � , ,
I � '
; , �
. 3 � �
� I �
�
2 i I �
� ;
� � i i
I �
�
1
�:i
� � � . . , i �jl ! �
1000.000 100.000 10.000 1.000 0.100 0.010 0.001
�`
� PARTICLE SIZE IN MILLIMETERS
`" Coarse Fine Coarse Medium Rne Sitt Clay
BOULDERS COBBLES GR.4VEL SAND FINE GRAINED
Comments:
Exploration Sample Depth (feet) Moisture(%) Fines(%) Description
B-4 S-4 10-11.5 20 7.2 SAND with some silt
� and some gravel
PROJECT NO: J-1470 PROJECT NAME: '
7.l�.per Zeman Associates�i_nc.
DATE OF �oisio2 Renton Retaii
Geotechnical and Envirotunental Consulting TESTING:
GRAIN SIZE ANALYSIS Test Results Summary ASTM D 1140,a22
SIZE OF OPENING IN INCHES U.S.STANDARD SIEVE SIZE HYDROMETER
as• �r � 3- ��r2• ya• �+e- a �o zo aa so �ao soo
10 ! I ; � I I � i
9 � ; � !
� � �
= 8 I �i ' , �
� '
�
w i �
- �
�
� '
m i ;
W 6 � i
_ Z ! ; •
_ �
LL � i
Z5 � I I �
U � I � I ;
W 4 � � i �
a �
3 '
,
�
I ' � j � !
2 � i I ,
i �
�
1 , � i , �
I � � I I , �
; � � �,; � � I ; I :�
1000.000 100.000 10.000 1.000 0.100 0.010 0.001
PARTICLE SIZE IN MILLIMETERS
Coarse Flne Coarse Medium Fne Sift Clay
BOULDERS COBBLES GRAVEL SAND FINE GRAINED
Comments:
Exploration Sample Depth (feet) Moisture(%) Fines(%) Description
B-5 S-4 10-11.5 27 8.4 gravelly SAND with
some silt
PROJECT NO: J-1470 PROJECT NAME:
7ioner Zeman Associates� in� DATE OF �as/o2 Renton Retail
Geotechnical and Environmental Consulting TESTING:
�-
GRAIN SIZE ANALYSIS Test Results Summary ASTM D 1140,422
SIZE OF OPENING IN INCHES U.S.STANDARD SIEVE SIZE HYDROMETER
- 35 12' B• 3• 1 1!2' 3/q• 318' 4 10 20 40 50 100 200
_ . 10 I I I I I I ' I 1 i I I !
9 ! I � ' � I i I I 1 i
il •' I I �
i � � �
' I �
= a j i I i
W �iij , ' i I � ' ! I ', i
_ � , � �
� ; � I I �
� ' ; ' I
m
� I I � I ! I f I
Z 6 � � � i � �I -
t . j � �
, � , �
�-- � i
Z 5 i ' i
_ r-T U I I !1 I i � � �� i
� 4 i i i
, a ii � � � ji ' � ; i i � �
i 30 I i I i I I I Ii i
� � ' � I �I1 � � � , ; �
2 � � � , � � � I
� I �
I i i � ` ; i
� j; I � ; � I
1 , � � i
,� �_, � ' : I I� ! ��I i � i ` ,
1000.000 100.000 10.000 1.000 0.100 0.010 0.001
PARTICLE SIZE IN MILLIMETERS
Coarse Flne Coarse Medium Fne Silt Clay
BOULDERS COBBLES GRAVEL SAND FINE GRAINED
Comments:
Exploration Sample Depth (feet) Moisture(°/a} Fines(%) Description
B-6 S-1 2.5 16 20.8 silty SAND with some
gravel
PROJECT NO: J-1470 PROJECT NAME:
Zinner Zeman Associates,TI1C. DATE OF TESTING: 10/4l02 Renton Retail
Geotechnical and Environmental Consulting
GRAIN SIZE ANALYSIS Test Resuits Summary ASTM D 1140,422
SIZE OF OPENING IN INCHES U.S.STANDARD SIEVE SIZE HYDROMETER
� � ,r e^ a� �irr �a• �+a a io 2o ao so ioo zoo
10 , i I , I i
'� I
�
". 9 � � � I I , � � � j �
� j i ji I ; I
_ $ i I � � i , � � ! � i
� il � ! I I� Ifl ! I � �
�
w ; � t
� �
� ' ' ' � � ' I
_ m 7 ' � ' I � � � f � ( j �
� 6 � I I � � I I � � f
W
�-- Z I -
i
L,�, i � �
W 5 � I I � � I
U 4 i i I � �I '
a i � I �
. I � ;
3 ' � ' �
� � � � i I i ill � � j � i � , ' , ! � i I
2 i i � I I � ; I i
' ' � I
j � i i
I I I � '�� j �
� I II � I �
' � � � i (
� i I i 1 ; �
� i ' ! � !I �
� i . I I I i , I i � ' I i � I I , I
1000.000 100.000 10.000 1.000 0.100 0.010 0.001
PARTICLE SIZE IN MILLIMETERS
Coarse Fine Coarse Medium Fine Silt Ciay
BOULDERS COBBLES � GRAVEL SAND FINE GRAINED
Comments:
Exploration Sample Depth (feet) Moisture(%) Fines(%) Description
B-6 S-3 7.5 18 5.4 gravelly SAND with
some silt
PROJECT NO: J-1470 PROJECT NAME:
7.i�per Zeman Associatec,jll� DATE OF TESTING: 10/4/02 Renton Retail
Geotechnical and Environmental Consulting
GRAIN SlZE ANALYSIS Test Results Summary
r�
SIZE OF OPENfNG IN INCHES U.S.STANDARD SIEVE SIZE HYDROMETER
•— 3g' 1T 6- 3• 11/2' 3/4" 3J8' 4 10 20 40 50 100 200
� �� ; � i jl � � i � I i
� � � I � i
9 �
� � �
; � ; � i I � ,
H I I ,
2 8 ; l ;
C9 I
�
_.. � 7 � I �
� � � �
W6 ; � � �
- z
� 5 � � � I
z �
W ! �
W 4 I � I I
a i ;
F-, ' i i
A.;=;:� 3 i � i
i i � ; I
2 I ' i ' ;
�
i
�
1 I I � �
� � I �
1000.000 100.000 10.000 1.000 0.100 0.010 0.001
PARTICLE SIZE IN MILLIMETERS
Coarse Fi�e Coarse Medium Fne Siit Clay
BOULDERS COBBLES GRAVEL SAND FINE GRAINED
Comments:
I
Exploration Sample Depth (feet) Moisture(%) Fines(%) Description
B-7 S-3 7.5' 35 9.7 SAND wiih some siit
and Uace gravel
PROJECT NO: J-1470 PRaJECT NAME:
_7,j�per Zeman Associates,1_� DATE OF 10J6/02 Renton Retail
Geotechnical and Environmental Consulting TESTING:
GRAIN SIZE ANALYSIS Test Results Summary
SIZE OF OPENING IN INCHES U.S.STANDARD SIEVE SIZE HYDROMETER
. ae� �r e � �irr �4• 3ra• a io zo ao so �ao zoo
10 ' � ) ( i I �
9 ; � �
I
_ �— � i
= 8 � � I
� � 'i � i
� � I I � I '
7
� '
m , I �
I '
' � 6 i i i
r- Z I I -
, �
� Z 5 � �
W
- W 4 ' t i ''
a
3
i
i �
�
2 � I ' i ' I
1 � I �
� !I � ! , � I I � � I '
1000.000 100.000 10.000 1.000 ' 0.100 0.010 0.401
PARTICLE SIZE IN MILLIMETERS
Coarse Fine Coarse Medium Fne Silt Clay
BOULDERS COBBLES GRAVEL SAND FINE GRAINED
Comments:
Exploration Sample Depth (feet) Moisture (%) Fines (%) Description
B-7 S-6 20' 25 11.2 9�velly SAND with
some silt
PROJECT NO: J-1470 PROJECT NAME:
7.inner Zeman Associates,Inc•
DATE OF io�s�o2 Renton Retail
Geotechnical and Environmental Consulting TESTING:
GRAIN SIZE ANALYSIS Test Results Summary
SIZE OF OPENING IN INCHES U.S.STANDARD SIEVE SIZE HYDROMETER
3s- ir s- a �irz� �ra• �e• a io 2o ao so ioo zoo
10 i � 1 I ' i I i � � I
� ,
9 ' � I
' �
.__ F— 8
I � � I I '
2 ;
W I ' I �
i
� 7 ' , �
} i ' '�
m � � , .
� 6 � ' �
W
Z � -
ti.. ' ! i
H ' �
Z5 ' �
W I
_ W 4 ' i I ;
G. � i � i
3 �
i I � � ' �
2 I k I
I i I �
;
� � � � �
; I � j; ,
1000.000 100.000 10.000 1.000 0.100 0.010 0.001
PARTICLE SIZE IN MILLIMETERS
Coarse Fine Coarse Medium Fne Silt Clay
BOULDERS COBBLES GRAVEL SAND FINE GRAINEO
Comments:
Exploration Sample Depth (feet) Moisture(%) Fines(%) Description
B-8 S-2 5' 14 18.1 silty SAND with trace
gravel
PROJECT N0: J-1470 PROJECT NAME:
7.i�Der Zeman Associates,In� DATE OF �ois�o2 Renton Retaii
Geotechnical and Environmental Consulting TESTING:
GRAIN SIZE ANALYSIS Test Results Summary
, SIZE OF aPENING IN INCHES U.S.STANDARD SIEVE SIZE HYDROMETER
-- 3s- ir �- 3• i irr �a• sre- a �o zo ao so ioo 200
10 i i i i I + i i i ` j i `
j � i �
�
9 i I I i 1 � , ;
i i , i i f � � 1
� � ' ' I j I
= 8 ' I � ' 4 i
, � , � � ,
w I � I
� , � �
i
m � �
,� i ,
� �
�
wfi , ;
� z � � �' � -
� i ; � � � ';
F,— ' �
_ W 5 ' i � �' ! ' I '
� � � � � ' � fk ' I
W 4
a ! ' � j ' ,
. ; ;
_ _ 3 ' I ii I �
, ii ` � � , �
I � I I � '
2 � i i �
� I ; i E
, ii I � i
�
� i
' i . � � ! li I i
_ _ 1000.000 100.000 10.000 1.000 0.100 0.010 0.001
PARTICLE SIZE IN MILLIMETERS
Coarse Fine Coarse Medium Fine 5ilt Clay
BOULDERS COBBLES GRAVEL SAND FINE GRAINED
Comments:
Exploration Sample Depth (feet} Moisture(%) Fines(%) Description
B-8 S-4 10' 20 22.2 silry SAND with some
gravel
PROJECT NO: J-1470 PROJECT NAME:
7,i�per Zeman Associates, In� DATE OF �asro2 Renton Retail
Geotechnical and Env'uonmental Consulting TESTING: !
GRAIN SIZE ANALYSIS Test Results Summary
SIZE OF OPENING IN INCHES U.S.STANDARD SIEVE SIZE HYDROMETER
�• �r �- 3- �,rr ya• �re• a �o zo aa so �ao zoo
10 I ,
I
I � I
9
�
� � !
= 8 I � i I
t9 ' j ,
( �
W '
� 7
m � � I
� s I � i '
w ;
z i
LL j �
Z 5 I
W i
V ' �
W 4 i I � �
a �
i I ' �
3 i
; +
; �
�
�
2 � j �
;
� � � ' � I '
�
�
' ii � I
1000.000 100.000 10.000 1.000 0.100 0.010 0.001
PARTICLE SIZE IN MILLIMETERS
Coarse Fine Coarse Medium Fine Sitt Clay
BOULDERS COBBLES GRAVEL SAND FINE GRAINED
Comments:
Exploration Sample Depth (feet) Moisture(%) Fines(%) Description
B-8 S-11 45' 22 33.1 silry SAND with trace
gravel
PROJECT NO: J-1470 PROJECT NAME:
7.inner Zeman Associates, Tnc. DATE OF �o�s�o2 Renton Retail
Geotechnical and Environmental Consulting TESTING:
GRAIN SIZE ANALYSIS Test Results Summary
SIZE OF OPENING IN INCHES U.S.STANDARD SIEVE SIZE HYDROMETER
.- 3�- ir s• s• �ve ya• �re' a �0 2o ao so ioo zao
�o ; � �
� I I II ' ( I �
s
I �
i ;
i �
F-. _ $ ; , i �
� ;
w ! I � � � I
� 7 i �
� m ' ; 1
�
r-- z 6 � � -
� � i� ;
;
. Us � E ; I
� , �
W 4 ,
a
. s � I I � ,
�
2 '
�
; � i
1 '
� i ; +
� I � � � I
1000.000 100.000 10.000 1.000 0.1 QO 0.010 0.001
PARTICLE SIZE IN MILLIMETERS
Coarse Fine Coarse Medium Fne Sift Clay
BOULDERS COBBLES GRAVEL SAND FINE GRAINED
Comments:
Exploration Sample Depth (feet) Moisture(%) Fines(%j Description
B-8 S-18 80' 19 10.4 SAND with some silt
and trace gravel
PROJECT NO: J-1470 PROJECT NAME:
71Dne1' ZeII18ri ASSOC1SteS,TIIC. DATE OF 10l6/02 Renton Retaii
Geotechnical and Environmental Consulting TESTiNG:
GRAIN SIZE ANALYSIS Test Results Summary ASTM D 1140,422
SIZE OF OPENING IN INCHES U.S.STANDARD SIEVE SIZE HYDROMETER
-- 36' 12' 6' 3' 11/2' y4' 3!8' 4 10 20 40 50 100 200
��
� i ' � , � � I
� � � �
- i � , ' ' �j � , i
9 '
! � I � i � Ii ,
F-- = 8 I I � � � i
� ' � ; I � I � ;�
� I � i ;I i il� ' � ; ;
� , � � �
} i � . E I j '
m I I i i
, i
� �.
W 6 j , � ; i � i
. _ Z �, � ; ; � ; � � .
Z5 � i ! ' ,I
W �
`-' � { I ! I i
a 4 �� j ; ' j �� ;
� '
- ' 3 ! li ' I ;� � i i i�i � ; ' �
� , i ;
,;
� � � . I � �
2 � I
� � �
, , � I ± ! ' I � i
: � �
1 I ' i i i . . � I i I
- { � I � i '
; ; � i
I
� I , : ! � , I
iaoo.000 �oo.000 �o.000 �.000 o.�oo o.o�o o.00�
PARTICLE SIZE IN MILLIMETERS
Coarse Fine Coarse Medium Fine Silt Clay
BOULDERS COBBLES GRAVEL SAND FINE GRAINED
Comments:
Exploration Sample Depth (feet) Moisture(°/a) Fines(%) Description
B-9 S-4 12.5-14 2 5.3 gravelly SAND with
some silt
PROJECT NO: J-1470A PROJECT NAME:
Zip.per Zeman Associates,Inc. DATE OF 10/14/02 Renton Retail Slope
Geotechnical and Environmental Consulting TESTING: StBbllity
GRAIN SIZE ANALYSIS Test Results Summary
SIZE OF OPENING IN INCHES U.S.STANDARD SIEVE SIZE HYDROMETER
3c �r s- � i�n- ya• sre� a io 2o aa eo �o0 200
�
10
I � � � � �
'�� , � ; I '
9 �
;
�-- � $ � �
_ . ,
w ' � � i � �
� 7 �
i
- m � � � I
W6 ' ( " �
--- z -
�
: H 5 '
Z � ' ; ; � :
W , � I
- C� ; �
p�, 4 � i
, I � I
30 � i
� 1
, , �
2 I i i ,
I �
� � I I , i I
��_ � j ; �
� i , �
� 1000.000 100.000 10.000 1.000 0.100 0.010 ' 0.001
PARTICLE SIZE IN MILLIMETERS
Coarse Flne Coarse Medium Fne Silt C1ay
BOULDERS COBBLES GRAVEL SAND FINE GRAINED
Comments:
Exploration Sample Depth (feet) M�isture(%) Fines(%) Description
B-10 S-6 17' 31 9.1 SAND with some silt
and trace gravei
PROJECT NO: J-1470 PROJECT NAME:
7.inner Zeman Associates, nc.
DATE OF �o�sro2 Renton Retail
Geotechnical and Environmental Consulting TESTING:
GRAIN SIZE ANALYSIS Test Resutts Summary
r-
SIZE OF OPENING IN INCHES U.S.STANDARD SIEVE SIZE HYDROMETER
36' 72' � 3� 1 1f2" 3I4' 3!B' 4 10 20 40 50 100 200
10 I � � j ; � I i I � ' i i
. - � i I'
9 I 1
I i + i �
I
�_ �— j ;
2 8 � ;
C9
w
_ � � ' �
; �' �
� � � �
m I �
� � � ' � ; � � I i 1
ws � � � ;
� z ! ' -
� I � �i � I �
H
Z5 � ' ; �
- � I I
W 4 i
a
• i I
� �;t;4 g
I
_ 2 � �I I
' I i i i
� ! I i I , I !
1 i i ; , � � ;i I �
�.., ; i i � '! i
,: � � ;
3 i I i i � � ;
�
1000.000 100.000 10.000 1.000 0.100 0.010 0.001
PARTICLE SIZE IN MILLIMETERS
Coarse Fine Coarse Medium Fine Silt Clay
BOULDERS COBBLES GRAVEL SAND FINE GRAINED
Comments:
Exploration Sample Depth (feet) Moisture(%) Fines(%) Description
B-11 S-5 15' 12 4.6 gravelly SAND with
• trace silt
'�" PROJECT NO: J-1470 PROJECT NAME:
7jDD�1'Z8ri18II AcSOC18tBS� l�nc•
DATE OF 10l6/02 Renton Retail
Geotechnical and Environmental Consulting TESTING:
GRAIN SIZE ANALYSIS Test Results Summary ASTM D 1140,422
r�-
SIZE OF OPENING IN INCHES U.S.STANDARD SIEVE SIZE HYOROMETER
� �r e� r i�rr �<• srs a �0 2o ao sa �oo Zoo
10 , i �
r I I9 I
- -. 2 8 � �
� � I'
W j i �
� 7 i i
}M I i
W � I I
H. � I i i
W
Z -
. u.
Z 5 �
W
� 4 f ; I �
a � ; i .
30 i `
� �I
, I I :
�
2
�
� � �
� , , I , �
1000.000 100.000 10.000 1.000 0.100 0.010 0.001
PARTICLE SIZE IN MILLIMETERS
Coarse Fne Coarse Medium Fine Silt Clay
BOULDERS COBBLES GRAVEL SAND FINE GRAINED
Comments:
Exploration Sample Depth (feet) Moisture(°/a) Fines(%) Description
&15 S-2 5-6.5 36 20.8 siity SAND with some
gravel
7,inner Zeman Associatec_,1_nc• PROJECT NO: J-1470 PROJECT NAME:
DATE OF �o�sro2 Renton Retail
Geotechnical and Environmental Consulting TESTING:
��
GRAIN SIZE ANALYSIS Test Resufts Summary ASTM D 1140,az2
SIZE OF OPENING IN INCHES U.S.STANDARD SIEVE S1ZE HYDROMETER
' 3g• 12' S� 3" 1 12' y4' 3/8' 4 10 20 40 50 100 200
�� �
I I I
. i ; i
r-.- i I � '� i I �
i
9 � ! C , ! !
i � � �
� f i
�. H i i i i �
W 8 � ! � � � I � i
� - '
' � � ' I , � �il
� � —�--
m �! I � � ' �
� � � i � � �
� 6
W �
Z i i
� 5 � ; � ;
W ; � i �
� I i
� 4 �
d i � ' � �
�-, ' I I i;�' i , � ; � �
, s ; � ,� ; � � I
I i ' , ,
__. 2 �
i
� i � _� �
i i � � i i I I '� �
1 I
_ i + ' � I I II �
� i� ; . . � � � �
�•�
1000.000 100.000 10.000 1.000 0.100 0.010 0.001
PARTICLE SIZE IN MILLIMETERS
Coarse Fine Coarse Medium Fne Silt Clay
BOULDERS C08BLE5 GRAVEL SAND FINE GRAINED
Comments:
Exploration Sample Depth (feet) Moisture(%) Fines (%) Description
B-16 S-1,S-2 2.5-5.0 11 14.4 siiry sandy GRAVEL
composite
r-
: PROJECT N0: J-1470 PROJECT NAME:
%' 7ipper Zeman Associates, In� DATE OF �or3�o2 Renton Retail
Geotechnical and Environmental Consulting TESTING:
� GRAIN SIZE ANALYSIS Test Results Summary ASTM D 1140,a22
SIZE OF OPENlNG IN INCHES U.S.STANDARD SIEVE SIZE HYDROMETER
3e� tr e^ 3• ��rz• �a• �s a �0 2o aa so iao zoa
10
� ;�
nr- I � � i
s � I
, • h ; �
I
�
t� $ j � �
W i ; �
� � �
} 7 � ' ' �
m �
� 6 I
W I
'� Z ,
� i i
Z 5 �
� _ U ! �
� 4 I
a I ,
,
. '. 3 I
�
i
. t �
2
i
1
I i ! �ii I I � �
1000.000 100.000 10.000 1.000 0.100 0.010 0.001
�� PARTICLE SIZE IN MILLIMETERS
Coarse Fne Coarse Medium Fne Silt Clay
BOULDERS COSBLES GRAVEL SAND FINE GRAINED
Comments:
r:' ��
Exploration Sample Depth (feet) Moisture(%) Fines(%} Description
B-25 S-4 10-11.5 14 2.5 SAND with some
gravel and trace silt
PROJECT NO: J-1470 PROJECT NAME:
71nner Zeman Associates, Tn� DATE OF 10/9/02 Renton Retail
Geotechnical and Environmental Consulting TESTING:
,�,-
GRAIN SIZE ANALYSIS Test Results Summary ASTM D 1140,a22
SIZE OF OPENING IN INCHES U.S.STANDARD SIEVE SIZE HYDROMETER
- . 3G 1 Y 6' 3' 1 1 Ml' 3/4' 318" 4 t 0 20 40 50 100 200
10 � I
� � � i l , � � I
� , ; � � ' ,
I ; ; � '
9 , I � I ,
I
- 2 $
C9 �
� � � i � I
7 �
m � i I.
� 6 I
W �
- . Z � j ; � -
LL
Z �
_ W �
U ', �
� q , ,
W � 1a �
• I
. 3 ; + I
�
? j � I
2 � I
i � ' i � '
' 1 I I
t
r-{ �
� I , I
�q 1000.000 100.000 10.000 1.000 0.100 0.010 0.001
PARTICLE SIZE IN MILLIMETERS
Coarse Fne Coarse Medium Fine Sift Gay
BOULDERS COBBLES GRAVEL SAND FINE GRAINED
Comments:
Exploration Sample Depth (feet) Moisture(%) Fines (%) Description
B-25 S-6 20-21.5 29 18.4 silty SAND with trace
grevei
PROJECT NO: J-1470 PROJECT NAME:
7.iDner Zeman Associates, Inc. DATE OF �as�o2 Renton Retail
Geotechnical and Environmental Consulting TESTING:
SAMPLE � DEPTN(ft) CLASSIFICATION
J1470 63 S-3 I 16.0-16.5 � COAL TAILiNGS
TEST CONDITIONS:
r 2.00 � � i � , � I I '
1.90 � � � ! I i '
i
'- 1.80 I
� i
1.70 � ' �
; I i
`�l' 1.60 I � i J, I
I
1.50 ' i
� I I
1.� I I I �
I ' �
1.30 I � ,
I �
r Y 1.20 � �
,.., I i � I I I �
� 1.10 , ' � I � i
� - w I ,
;
� 1.00 I I � I I � i
H
� , ; ; I ;
• Q 0.90 �
_ w I
2 0.80 ,
� �
I � I '
0.70 i i , ! � ! i
0.60 � I j i i ' I
I ,
i
0.50 , �
; i �
0.40 � �
� i I �
' 0.30 � � � �
; I
0.20 '� , ,
0.10 �
I i I I
0.00 � � � I I i ' ' � I I ! I
0.00 0.25 0.50 0.75 1.00 1.25 1.5Q 1.75 2.00
NORMAL STRESS (ks�
FRICTION ANGLE(degrees) 37
APPARENT COHESION(psf} 340
AVERAGE DRY DENSITY(pc� 49.9
AVERAGE WATER CONTENT(%) 18.9
Zipper Z�man and Associates, Inc. DIRECT SHEAR
Miscellaneous Testing Services TEST RESULT
PROJECT NO.: ZOOZ-O�2 FIGURE: �
HWACIRS 200'<C92.GPJ 9I2oiC2
SAMPLE DEPTH(ft) I CLASSIFICATION
`" J1470A 85� 6 8�7 21.5-23.5 I (SM)silty SAND,occasional organic inclusion
i
TEST CONDITIONS:; RESIDUAL
2.00 � I ' ( I i ! � I �
� I , � � t ' I j '
_ 1.90 � , � i � i I
� ! � � I i � ;
._ 1.80 � � �
�
1.70 � � l
�-
�. , i I �
i.so �
� �
� �
_ 1.50 � ,
' 1.40
� � '
� i
-- 1.30 i � , , , i
�
- Y 1.20 I i � � �
� �
�
�°' � 1.10 � i � � � � I
� � ! I
� 1.00 ; � � I � �
. CA
R�; Q 0.90 � ;
w i I i I ! � � ili
� 0.80 i I I I
0.70 i i I !
I �
0.60 � � I j f
i
0.50 I ' I
� i
0.40 �
�"'
0.30 � ` I I I i
I ' I +
0.20 � �
I '
' I �
0.10 � i � I
i
0.00 � ' I � i I I � I � I
0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00
NORMAL STRESS (ksf)
' FRICTION ANGLE(degrees) 35
APPARENT COHESION(psf} 120
AVERAGE DRY DENSITY(pcfl 91.0
AVERAGE WATER CONTENT(%) I 30.4
( Zipper Zeman and Associates, Inc. DIRECT SHEAR
Miscellaneous Testing Services TEST RESULT
PROJECT NO.: ZOOZ-O92 FIGURE: 2
HWADIRS 2Q02092.GPJ 10/25/02
Organic Content Test Results
ASTM D-2974
f��
Test Location Moisture Content % Or anic Content %
I,-- B-2 20-21.5 ft. 97 12
B-26 7.5-9 ft. 57 19
�
�
SOIL CHEMICAL ANALYSIS RESULTS
. SAMPLE LOCATION DEPTH T H RESISTNITY ohm-cm
B-2, S-2 5-6'/z 6.9 4,600
� B-5, S-2 5-6'/z 6.7 9,400
;
I B-8, S-Sb 15%z 5.6 3,300
B-26, S-2 5-6%z 5.6 4,500
n
' APPENDIX C
�-; GEOTECHNICAL INVESTIGATION FACT SHEET,
FOUNDATION DESIGN CRITERIA,FOUNDATION SUBSURFACE
'� PREPARATION NOTES,AND AASHTO PAVEMENT DESIGN
T•:
i
r-.i
�I
�
�
�>;';�
i
I
T S
A
I
n',�
�_':S
C EOTECHI�ICAI,INVESTICATION FACT SHEET
�--
Include this form in the Geotechnical Report as an Appendix.
'�� PROJECT LOCATION:_S. Grady Wa�and Talbot Road. Renton. Washington
Engineer: Thomas A. Jones Phone#: 425-771-3304 E-mail: tom jones e.zi��erzeman.com
�....,
,` '. Geotechnical Engineering Co.: Zipper Zeman Associates. Inc. Report Date: December 6. 2002
�.,� Ground Water Elevarion: 23 to 34 feet Fill Soils Characterisrics:
, �
� Date Groundwater Measured: October.2002 Maximum Liquid Limit: 40 in upper 4 feet
Maxirnum Plasticity Index: 12 in u�ner 4 feet
F-' � Specified Compaction: 95%ASTM:D-1557
� Moisture Content Range:-2 to+2% nular
-1%to+3%fine-grained
� TopsoiUStripping Depth: 6 inches min..limited areas,,,�see textl .
, Undercut(If Req'd): 18 inches below structural slab
"'? Compaction: 95%ASTM:D-1557 or 98%ASTM D-698
� Modified Proctor Results: Not completed on existing coal tailings fill,see report
�-; '
•" �i Recommended Compaction Control Tests:
1 Test for Each 5.000 Sq.Ft ac Lift(bldg. area)
' ' 1 Test for Each 10.000 Sq.FL�Lift(parking area)
Structural Fill Maximum Lift Thiclmess 8 in.(Measured loose)
' Subgrade Design CBR value = N/A for coal tailings fill. assumed 50°/a at 95% relative com�acrion of ASTM D-
'
� 1557A for subbase material.see text
!`? COMPONENT ASPHALT CONCRETE
; Standard Heavy Standard Heavy
- . Stabilized Subgrade
(If Applicable)
Subbase Material �� 12 12 12
(Pit-run Sand and Gravel)
Crushed Gravel Base Course 4 4 4 4
Leveling Binder Course
Surface Course _� 4 � �_
NOTE: Asphalt and concrete sections are based on minimum subgrade compacrion levels of 95% of the modified
Proctor maximutn dry density. All compacted subbase should have a minimum CBR value of 50. This information
should not be used separately from the geotechnical report.
- �OUNDATION DESIGN CRITERI.4
Include this form in the Geotechnical Report as an Appendix.
PROJECT LOCATION: S. Gradv Wa�and Talbot Road. Renton. Washington
Engineer: Thomas A. Jones Phone#: 425-771-3304 E-mail: tom.jones�zip.perzeman.com
Geotechnical Engineering Co.:Zi�er Zeman Associates. Inc. Report Date: December 6. 2002
Foundation type: Augercast�iles u�to 85 feet long and grade beams(see report1
Allowable bearing pressure: 75-tons�er�ile. su��orted on bedrock. or dense soils
Factor of Safety: 2.5
- - Minimum footing dimensions: Individual: 24 inches Continuous: 24 inches -
Minimum footing embedment: Exterior. 24 inches Interior: 12 inches ��I
Frost depth: 1 S inches I
_ • Maximum foundation settlements: Total: <1 inc I�,
Differential: <0.5 inch in 40 ft. '
Slab: Potential vertical rise: <1/<inch below slabs �'i
Capillary break(describe): 6 inches free-draining sand and gravel. see floor slab section of report ,
Vapor barrier: Recommended for methane gas and soil moisture !
Subgrade reaction modulus: 1�O�si/in at 95%com�action ASTM D-1557
Method obtained: CBR correlation
Perimeter Drains (describe): Building: 4 inch dia.perforated PVC or corru�ated lg astic
Retaining Walls: 4 inch dia. �erforated PVC or corrugated plastic. or
wee�holes
Cement Type: I
Retaining Wall: Active: 5 c , At-rest pressure: 55�cf,Passive: variable. se report
Allowable Coefficient of Base Friction: 0.30
COMMENTS:
NOTE: This information shall not be used separately from the geotechnical report.
AASHTO 1993 METHOD FOR DESIGN OF ASPFLAI,T PAVEMENT STRUCTURES
FOR: PROPOSED RETAIL DEVELOPMENT, RENTON, WASHINGTON
DESIGN LIFE: 20 YEARS
DESIGN CALIFORNIA BEARING RATIO: 50%(imported pit-run sand and gravel)
�-� INPUT VALUES FOR STRUCTURAL NUMBER(SN) REFERENCE
��_.
' Estimated ESAL (20 yrs)=43,800(Std.), 335,800 (heavy duty) Specified
F'�
Reliability(R)= 85% Specified
�,
Standard Normal Deviation(Zr)= 1.037 I-62
f
Overall Standard Deviation(So)=0.45 Specified
Resilient Modulus (M�= 12,000 psi I-14
Effective Resilient Modulus (MR, seasonally adjusted)=4,600 psi II-15
��
Initial Serviceability(Po)=4.2 Specified
�- Terminal Serviceability(P�)=2.0 Specified
��:,+
Design Serviceability Loss (PSI)=2.2 II-10
Structural Number(SN): Hvy=3.4, Std=2.5 II-35
r
Input values for thickness calculations
;`:�
� Asphalt layer coefficient(a�)=0.37 II-18
� Base course layer coefficient(a2)=0.14 II-19
i
�
.;,:;
Base course drainage coefficient(m2)= 1.35 II-25
. -,
Subbase layer coefficient(a3)=0.13 II-21
� Subbase layer coefficient(m3) = 1.30 II-25
Recommended Pavement Section Thicknesses (inches) I
i I'�
Asphalt Concrete Crushed Base Course Pit-Run Subbase Imported Roadbed
� Standard 3 4 0 12
Heavy 4 4 0 12 �
Imported roadbed must have a minimum CBR value of 50 when compacted to a minimum of 95 of the
modified Proctor maximum dry density. Add 5 inches subbase if subgrade compaction is 90 percent of
, modified Proctor maximum dry density.Verify CBR of import sample.
"- AASHTO 1993 METHOD FOR DESIGN OF CONCRETE PAVEMENT STRUCTURES
FOR: PROPOSED RETAIL DEVELOPMENT, RENTON,WASHINGTON �
T! DESIGN LIFE: 20 YEARS
DESIGN CALIFORNIA BEARING RATIO: 50%(imported pit-run sand and gravel)
� INPUT VALUES FOR STRUCTURAL NUMBER(SN) REFERENCE
r-^.
Estimated ESAL(20 yrs)=43,800 (Std.), 335,800 (heavy duty) Specified
Reliability(R)=85% Specified
, Standazd Normal Deviation(Z�) = 1.037 I-62
�' Overall Standard Deviarion(So)=035 Specified
Resilient Modulus(MR)= 15,000 psi I-14
rT
Effective Resilient Modulus(MR,seasonally adjusted) =4,000 psi II-15
Effective Modulus of Subgrade Reaction=300 pci II-39
� ' Initial Serviceability (Po)=4.2 Specified
�n_i
Terminal Serviceability(Pt)=2.0 Specified
Design Serviceability Loss (PSI)=2.2 II-10
Input values for thickness calculations:
� � Mean Concrete Modulus of Rupture=550 psi Recommended
�
Base course layer coefficient(aZ)=0.14 II-19
Base course drainage coefficient(m2)= 135 II-25
' Base Modulus (ESB)=30,000 psi II-19
Subbase la er coefficient a =0.13 II-21
Y ( 3)
Subbase layer coefficient(m3)= 1.30 II-25
- Subbase Modulus (ESB}=20,000 psi II-21
- Recommended Concrete Pavement Section Thicknesses(inches)
Concrete Crushed Base Course Pit-Run Subbase Imported Roadbed
Standard 5 4 0 12
Heavy 6 4 0 12
Imported roadbed must have a minimum CBR value of 50 when compacted to a minimum of 95 of the
modified Proctor maximum dry density. Add 5 inches subbase if subgrade compaction is 9� percent of
the standard Proctor maximum dry density. Verify CBR of import sample.
�._ FOUNDATION SUBSURFACE PREPARATION NOTES
UNLESS SPECIFICALLY INDICATED OTF�RWISE IN THE DRAWINGS AND/OR SPECIFICATIONS, THE
LIMITS OF THIS SUBSURFACE PREPARATION ARE CONSIDERED TO BE THAT PORTION OF THE SITE
� . DIRECTLY BENEATH AND 10 FEET BEYOND TF�BUILDING AND APPURTENANCES. APPURTENANCES
ARE THOSE ITEMS ATTACHED TO THE BUILDING PROPER (REFER TO DRAWING SHEET SP]),
TYPICALLY INCLUDING, BUT NOT LIMITED TO, TI-� BUILDING SIDEWALKS, GARDEN CENTER,
--. PORCHES,RAMPS, STOOPS,TRUCK WELLS/DOCKS,CONCRETE APRONS, COMPACTOR PAD,ETC. THE
SUBBASE AND VAPOR BARR�R,WHERE REQUIRED,DOES NOT EXTEND BEYOND THE LIMITS OF THE
ACTUAL BUII.,DING AND TF�APPURTENANCES.
THE SURFICIAL COAL TAILINGS AND FII,L SOII.S SHALL BE COVERED WITH A 1��NIMUM OF 12
INCHES OF GRANULAR STRUCTURAL FILL BENEATH THE FLOOR SLAB. THE UPPER ONE FOOT OF
EXPOSED FILL SOILS SHALL BE PROOFROLLED AND COMPACTED TO A NIINIMUM OF 95 PERCENT OF
THE MODIFIED PROCTOR MA}CIlvIUM DRY DENSITY PRIOR TO PLACING GRANULAR STRUCTURAL
', FILL. A PASSIVE METHANE GAS VENTING SYSTEM SHALL BE INSTALLED IN THE GRANUALR FILL
' PRIOR TO INSTALLATION OF Tf-� METHANE GAS VAPOR BARRIER. SIX INCHES OF CAPILLARY
BREAK SHALL BE INSTALLED OVER THE METHANE GAS BARRiER.
ESTABLISH TI� FINAL SUBGRADE ELEVATION AT 22 INCHES BELOW FII�iISHED FLOOR ELEVATION
WI�N USING A 4 INCH SLAB OR AT 23.5 INCHES BELOW TI�FINISHED CONCRETE ELEVATION WHEN '
- USING A 5.5 INCH SLAB TO ALLOW FOR THE SLAB THICKNESS, A 6 INCH CAPILLARY BREAK,
METHANE GAS VAPOR BARRIER, AND 12 INCHES OF GRANULAR SUBBASE. THE CAPILLARY BREAK
SHALL BE FREE-DRAIMNG AGGREGATE THAT CONFORMS VJITH WSDOT STANDARD SPECIFICATION
• 9-03.12(4), GRAVEL BACKFILL FOR DRAINS OR ASTM D2321, TABLE 1, CLASSES OF EMBEDMENT AND
, ,; BACKFILL MATERIAL, CLASS IA, IB, OR II (GW OR GP). THE CONTRACTOR IS RESPONSIBLE FOR
� OBTAIl�TING ACCURATE MEASUREMENTS FOR ALL CUT Ai�TD FILL DEPTHS REQUIRED.
EXISTING FOUNDATIONS, SLABS, PAVEMENTS, AND BELOW-GRADE STRUCTURES SHALL BE
REMOVED FROM TI�BUII.DING AREA. REMOVE SURFACE VEGETATIONS, TOPSOIL,ROOT SYSTEMS,
ORGAI�IIC MATERIAL, EXISTTNG FILL,AND SOFT OR OTHERWISE UNSUITABLE MATERIAL FROM TI�
BUILDING AREA. STRIPPED SOILS SHOULD NOT BE REUSED AS COMPACTED STRUCTURAL FILL.
PROOFROLL EXPOSED SUBGRADE. REMOVE AND REPLACE UNSUITABLE AREAS WITH SUITABLE
MATERIAL. FILL SHALL BE FREE OF ORGANIC AND OTHER DELETERIOUS MATERIALS A?�iD SHALL
MEET THE FOLLOWING REQUIREMENTS:
LOCATION WITH RESPECT TO FINAL GRADE P.I. L.L.
BUILDTNG AREA,BELOW UPPER 4 FEET 20 MAX. 50 MAX.
BUILDING AREA,UPPER 4 FEET 12 MAX. 40 MAX.
STRUCTURAL FILL SHALL BE PLACED IN LOOSE LIFTS NOT EXCEEDING 8 INCHES IN THICKNESS AND
COMPACTED TO AT LEAST 95 PERCENT OF THE MODIFIED PROCTOR MA��IMUM DRY DENSITY
(ASTM: D-1557) AT A MOISTURE CONTENT WITHIN 2 PERCENT BELOW TO 2 PERCENT ABOVE THE
OPTIMiJM.
THE FOUNDATION SYSTEM SHALL BE AUGERCAST PILES BELOW COLUIVINS, WALLS, A��iD FLOORS
AS DESCRIBED IN THE SOILS REPORT BY ZIPPER ZEMAN ASSOCIATES, INC. DATED DECEMBER 6,
2002.
THIS FOUNDATION SUBSURFACE PREPARATION DOES NOT CONSTITUTE A COMPLETE SITE WORK
SPECIFICATION. IN CASE OF CONFLICT, INFORMATION COVERED IN THIS PREPARATION SHALL
TAKE PRECEDENCE OVER THE PROJECT SPECIFICATIONS. REFER TO THE SPECIFICATIONS FOR
SPECIFIC INFORMATION NOT COVERED IN THIS PREPARATION. ADDITIONE�L, RECOMI��NDATIONS
MAY ALSO BE FOUND IN THE GEOTEC�INICAL REPORT PREPARED BY ZIPPER ZEMAN ASSOCIATES,
INC., DATED OCTOBER 31, 2002. THE GEOTECHMCAL REPORT IS FOR INFORMATION ONLY AND IS ',
NOT A CONSTRUCTION SPECIFICATION. i
r--
" APPENDIX D
CLIMATE DATA
�-;
��
r, '
F
es•::r
�
�:,
f: :
, The following climate data was obtained from the internet web page of the Western Regional Climate Center
- ;
I _ _
_ ��v i, WAJrillV�r1VN Yenod �f Kecord Monthly Climate Summary Page 1 of 1
.�.
KENT, WASHINGTON (454169)
Period of Record Monthly Climate Summary
- Period of Record : 11/1/1948 to 12/31/2001
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Annual
��,
Average Max. 45.9 50.7 54.6 60.7 67.4 72.5 78.0 77.5 72.0 61.3 51.5 46.0 61.5
Ternperature(F)
. Average Min. 33.5 35.0 36.5 39.8 44.6 49.7 52.4 52.2 48.3 42.6 37.0 33.9 42.1
Temperature (F)
Average Total 5.73 4.32 3.88 2.70 1.86 1.56 0.85 1.15 1.78 3.49 5.88 6.00 39.20
- Precipitation(in.) -
Average Total 1.6 0.5 0.7 0.0 0.0 0.0 0.0 Q.0 0.0 0.0 03 0.9 4.0
SnowFall (in.)
Average Snow 0 0 0 0 0 0 0 0 0 0 0 0 0
Depth (in.)
, • Percent of possible observations for period of record.
' Max. Temp.: 91.5% Min. Temp.: 91.5%Precipitation: 91.9% Snowfall: 90.4% Snow Depth: 88.9%
Check Station Metadata or Metadata graphics for more detail about data completeness.
Western Regional Climate Center, tivrcc�.dri.edu
http://www.wrcc.dri.edu/cgi-bin/c1iRECtM.pl?wakent 10/29/02
.. i , �
K�N'1', WAS�IITVC;'1'UN Yenocl of 1Zecord Ueneral Climate Summary - Precipitation Page 1 of 2
KENT, WASHINGTON
Period of Record General Climate Summary - Precipitation
Station:(454169) KENT
From Year=1948 To Yeai=2000
Precipitation Total Snowfall
Mean High Year Low Year 1 Day Max. � � � � Mean High Year
0.01 in. 0.10 in. 0.50 in. 1.00 in.
dd/yyyy
in. in. - in. - in. or #Days # Days #Days # Days in. in. -
yyyymtndd
January 5.73 11.75 53 0.83 85 2.30 19/1967 20 13 �� 1.6 18.2 69
February 4.32 8.85 61 0.37 93 2.95 08/1996 16 11 ��1 0.5 6.5 49
March 3.88 7.90 97 0.44 65 2.25 OS/1972 17 11 �� 0.7 10.0 89
April 2.70 6.82 91 0.25 56 2.19 04/1991 14��� 0.0 0.0 49
May 1.86 4.39 84 0.38 67 1.79 31/1997 11 ��� 0.0 0.0 49
June 1.56 3.93 84 0.10 51 2.24 12/2000�9��l �� 0.0 0.0 49
July 0.85 3.53 83 0.00 58 1.15 Ol/1954�5 �2�0� 0.0 0.0 51
August 1.15 5.13 68 0.00 67 1.73 18/1975 �6�3 �0� 0.0 0.0 49
September 1.78 5.75 78 0.00 75 1.97 23/1978 �9�5 �1 � 0.0 0.0 51
October 3.49 821 75 0.31 87 2.16 09/1955 14 �8 �2� 0.0 0.0 51
November 5.88 10.33 99 0.88 52 2.56 20/1959 19 13 ��1 0.3 6.0 60
December 6.00 10.79 79 1.86 78 6.00 27/1949 21 13 ��l 0.9 13.2 68
Annual 39.20 54.54 96 21.69 52 6.00 19491227 161 96 23 �5 4.0 18.2 69
Winter 16.06 23.62 99 6.59 77 6.00 19491227 57 36 10� 3.0 31.4 69
http://www.wrcc.dri.edu/cgi-bin/c1iGCStP.pl?wakent 10/29/02
. , , ,
��N �, wt»ril�v�r�uN rertod ot Kecord Cieneral Llimate 5ummary - Precipitati�n � Page 2 of 2
Spring 8.44 15.87 97 4.89 92 2.25 19720305 42 24�� 0_7 10.0 89
Summer 3.56 9.28 68 I.04 87 2.24 20000612 20 10�� 0.0 0.0 51
Fall 11.15 17.31 55 2.13 52 2.56 19591120 42 26�7� 0.3 6.0 60
' Table updated on Jun 4, 2001
For monthly and annual means, thresholds, and sums:
Months with 5 or more inissing days are not considered
Years with 1 or more missing months are not considered
Seasons are climatological not calendar seasons
Winter= Dec., Jan., and Feb. Spring=Mar., Apr., and May
Summer=Jun., Jul., and Aug. rall = Sep., Oct., and Nov.
--__- -- _ __-- -- - -- - - —
---- --_. —_---- __- -- --- -
_ --
Western Regional Climate Center, w�-cc�a.,d�i.edir
i . I
http://www.wrcc.dri.edu/cgi-bin/cIiGCStP.pl'?wakent 10/29/02 �
KENT, WASHINGTON
Period of Record General Climate Summary - Temperature
Station:(454169) KENT
From Year--1948 To Year=2000
Monthly Averages Daily �xtremes Monthly Extremes Max. Temp. Min. Temp.
IIighest Lowest >_ <_ <_ <_
Max. Min. Mean High Date Low Date Mean Year Mean Year 90 F 32 F 32 F 0 F
dd/yyyy ddlyyyy
F F F F or F or F - F - # Days # Days # Days # Days
yyyymmdd yyyymmdd
January 45.9 33.5 39.8 64 20/1981 -10 18/1950 4_5.7 53 29.5 49 0.0 0.8 12.6 0.0
February 50.7 35.0 42.9 71 29/1968 a-5 O1/1950 . 47.7 91 34.7 89 0.0 0.2 9.6 0.0
March 54.6 36.5 45.6 74 29/1964 10 04/1955 49.7 92 40.4 55 0.0 0.0 7.9 0.0
April 60.7 39.8 50.3 86 30/1976 25 20/1961 54.3 92 46.3 55 0.0 0.0 3.2 0.0
May 67.4 44.6 56.1 92 20/1963 27 Ol/1954 61.3 58 51.9 62 0.1 0.0 0.5 0.0
June 72.5 49.7 61.1 100 09/1955 33 19/1956 65.6 69 57.5 71 U.6 0.0 0.0 0.0
July 78.0 52.4 65.2 99 12/1951 38 03/1962 69.7 58 62.0 86 2.0 0.0 0.0 0.0
August 77.5 52.2 64.8 99 09/1981 34 29/1980 69.5 97 60.8 73 1.3 0.0 0.0 0.0
September 72.0 48.3 60.1 96 07/19$1 28 27/1972 64.4 95 56.5 59 0.3 0.0 0.2 0.0
October 61.3 42.6 51.9 86 O1/1975 24 28/1971 55.5 93 49.1 72 0.0 0.0 2.4 0.0
November 51.5 37.0 44.2 74 02/1970� 23/1985 49.3 95 34.7 85 0.0 0.3 8.2 0.0
December 46.0 33.9 39.9 69 27/1980� 23/1983 44.4 58 34.7 85 0.0 0.8 12.8 0.0
Annual 61.5 42.1 51.8 100 19550609 -10 19500118 54.3 98 49.3 55 4.3 2.1 57.3 0.1
Winter 47.5 34.1 40.9 71 19680229 -10 19500118 44.6 92 36.4 69 0.0 1.8 35.0 0.0
http://www.wrcc.dri.edu/cgi-bin/c1iGCSt1'.pl'?wakent 10/29/02
� , , . ,
xLN t', wn�HIiv�iUN t�eriod ot �tecord t.i�eneral (:li��iale �uiilinaiy - Temperature � � Page 2 of 2
Spring 60.9 40.3 50.6 92 19630520 10 19550304 54.9 92 46.7 55 0.1 0.0 11.6 0.0
Summer 76.0 51.4 63.7 100 19550609 33 19560619 67.1 58 60.9 54 3.9 0.0 0.0 0.0
Fall 61.6 42.6 52.1 96 19810907 a-1 19851123 55.5 95 48.8 61 0.3 0.3 10.8 0.0
Table updated on Jun 4, 2001
For monthly and annual means, thresholds, and sums:
Months with 5 or more missing days are not considered
Years with 1 or more missing months are not considered
Seasons are climatological not calendar seasons
Winter= Dec., Jan., and Feb. Spring= Mar., Apr., and May
Summer=Jun., Jul., and Aug. Fa11 = Sep., Oct., and Nov.
--- -- — -------- ------- -------- -- --- ---- ---
Western Regional Climate Center, i-,�rcc ci,clri,edu
http://www.wrcc.dri.edu/cgi-bin/c1iGCStT.pl`?wakent 10/29/02
���.,�,u��y r��cra�C �cmperarure, iS�N l, WAJH1N�i'1�UN Page 1 of 2
KENT, WASHINGTOl�T
Monthly Average Temperature (Degrees Fahrenheit)
(454169)
File last updated on Oct 24, 2002
*** Note *** Provisional Data *** After Year/Month 200207
a= 1 day missing, b=2 days missing, c =3 days, ..etc..,
z= 26 or more days missing, A=Accumulations present
Long-term means based on columns; thus, the monthly row may not
sum(or average)to the long-term annual value.
MAXIMUM ALLOWABLE NUMBER OF MISSING DAYS : 5 .
Individual Months not used for annual or monthly statistics if more than 5 days are missing.
Individual Years not used for annual statistics if any month in that year has more than 5 days missing.
��`� JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANI�
1948 -----z -----z -----z -----z -----z -----z -----z -----z -----z -----z 44.28 36.35 40.32
� 1949 29.47 a 35.08 i 45.98 50.20 57.00 58.98 -----z 62.98 -----z -----z -----z 36.44 n 50.77
1950 25.73 i 39.04 -----z -----z -----z -----z -----z -----z -----z -----z -----z 47.3 8 g 39.04
1951 38.82 41.86 42.08 52.63 c 57.39 63.83 67.34 64.56 61.24 c 51.47 44.05 a 37.40 51.89
1952 36.98 41.83 44.27 51.02 56.82 59.50 66.42 66.61 60.83 a 54.38b40.10 41.13 51.66
1953 45.66 b 42.48 46.10 49.82 55.82 a 58.87 65.21 65.00 60.09 b 51.68 45.90 41.71 52.36
1954 36.45 43.75 42.98 48.65 55.95 58.65 62.23 61.79 59.62 50.69 49.08 40.81 50.89
1955 40.15 39.54 40.35 46.33 53.29 60.68 62.18 62.90 58.85 51.21 38.81 a 37.89 49.35
1956 38.82 35.72 42.02 50.87 58.70 a 58.70 66.77 64.94 59.13 50.50 41.74 a 40.58 50.71
1957 32.15 a 40.00 45.72 a 52.45 60.24 62.62 63.60 a 63.05 62.43 50.15 41.23 41.29 c 51.24 "
1958 41.63 47.14 44.85 d 50.95 61.28 a 65.37 69.66 66.15 59.28 52.77 42.95 44.35 d 53.87
1959 40.83 b41.02 a 44.81 50.45 a 53.77 61A2 b4.82 61.74 56.45 50.61 42.05 a 39.05 50.55
1960 38.06 41.00a43.88b49.70 52.92 59.38 65.52 62.68 57.24a51.95 43.10 38.00 50.29
1961 42.85 44.20 45.88 b 47.75 54.93 a 63.57 a 66.48 67.16 57.10 a 49.24 40.03 a 39.40 51.55
1962 37.42 a 42.15 a 42.�7 a 50.93 a 51.94 59.30 63.85 62.96 d 60.02 b 52.27 45.62 a 41.70 a 50.89
1963 34.17 a 46.80 43.92 a 48.62 55.38 f 59.65 62.61 62.95 a 62.75 52.78 f 44.40 41.03 50.69
1964 41.48 41.41 45.15 47.55 a 53.65 60.18 64.15 63.26 58.08 52.31 41.37 36.44 50.42
1965 40.45 42.75 44.87 51.02 53.28 b 60.97 66.68 65.85 57.42 55.19 47.90 39.16 52.13
1966 40.32 42.80 45.50 50.13 55.15 59.90 63.53 64.50 61.32 51.31 45.07 a 44.21 51.98
1967 42.34 42.93 42.48 46.53 55.89 64.38 65.61 69.15 63.52 54.02 45.73 40.35 52.74
http://www.wrcc.dri.edu/cgi-bin/c1iMONtavt.pl?wakent 10/29/02
_ Montnly Average �l�emperature, KFNT, WASHINGTON Page 2 of 2
1968 39.85 45.98 47.97 48.95 56.52 60.43 67.03 a 63.29 59.33 50.84 44.95 35.90 51.75
1969 32.40 40.89 45.79 49.53 58.23 a 65.63 64.26 61.83 a 59.78 a 50.50 44.83 42.31 51.33
1970 40.16 44.88 45.27 a 47.52 55.12 a 63.22 65.10 63.68 56.84 a 50.03 44.73 38.37 51.24
1971 39.90 41.52 42.12 a 49.18 55.88 c 57.55 65.77 67.14 c 58.03 50.87 45.25 37.71 50.91
1972 36.71 41.62 47.37 46.98 58.06 60.27 64.b3 64.26 56.48 49.08 44.83 37.47 50.65
1973 38.73 43.71 46.26 49.47 56.37 60.62 a 63.98 60.77 59.37 51.15 41.95 43.26 51.30
� 1974 38.08 43.57 45.80 a 50.10 53.50 60.80 62.81 64.98 62.17 z -----z 42.90 52.47
1975 39.95 41.88 43.84 46.48 55.43 a 59.75 65.52 d 62.34 60.38 52.08 44.75 42.48 51.24
�.�. 1976 42.55 41.53 43.12 a 49.57 56.22 b 54.94 v 63.75 a 62.63 a 61.26 a 51.62 a 45.21 b 42.24 50.88
1977 3b.63 45.61 44.18 51.80 53.45 61.27 63.13 68.34c 57.02 -----z42.82 -----z 52.42
1978 43.63 45.54 47.85 -----z 54.90 a 63.55 b 65.76 64.94 58.42 52.97 -----z 36.23 53.38
'- � 1979 3 5.36 b 41.57 -----z 50.17 c 56.15 h 60.60 66.08 65.03 a -----z -----z 43.27 44.10 50.77
1980 33.36 f 44.00 -----z 52.97 a -----z -----z 63.63 62.52 b 60.50 k -----z 45.80 43.85 52.13
1981 42.76 43.66 48.56 50.07 c 54.20 a 58.22 c 63.09 c 66.92 a 59.90 -----z 44.27 -----z 53.17
� 1982 40.02 42.38 44.77 47.93 55.35 63.63 62.32 64.45 60.98 a 52.10 41.33 39.44 51.23
1983 43.76 46.39 48.03 49.83 -----z 60.50 64.26 65.45 58.37 50.31 47.33 35.27 51.77
, - 1984 42.94 44.81 49.03 49.23 54.55 60.13 65.45 64.42 60.26 a 49.18 44.35 36.47 51.73
1985 36.39 39.00 42.95 50.20 55.68 60.97 67.34 64.13 56.82 -----z34.70 34.73 49.35
. 1986 44.18 43.29 49.60 49.07 55.69 62.80 62.05 67.21 j 58.50 53.60 44.98 40.21 51.27
1987 39.53 45.18 47.87 53.33 56.77 62.13 63.45 a 64.98 61.20 53.10 47.47 37.79 52.73
1988 39.50 43.55 45.23 50.88 -----z 59.48 65.11 64.23 60.02 -----z 45.57 40.56 51.41
1989 40.84 34.70 43.63 53.03 55.92 62.77 -----z -----z -----z 51.91 c 46.08 41.17k48.61
- 1990 42.85 -----z 47.74 -----z -----z -----z -----z -----z 64.18 51.74 -----z 34.92 48.29
1991 39.53 47.70 44.27 50.07 55.08 59.80 67.55 67.63 62.00 52.73 47.40 42.95 53.06
1992 43.92 47.02 49.71 54.30 64.61 -----z -----z 67.35 60.28 54.00 45.22 38.62a 52.10
1993 37.48 4Q.93 48.24 50.93 -----z 61.65 62.45 66.16 61.78 55.53 41.13 40.08 a 51.49
1994 44.39 40.25 48.34 53.20 59.08 60.98 68.60 67.Q8 64.38 52.26 41.83 41.05 53.45
- 1995 -----z 45.54 47.56 52.05 60.11 62.98 68.34 64.00 64.43 52.82 49.30 41.65 55.34
1996 40.74 43.78 47.97 53.38 54.66 61.31 a 68.87 67.42 58.65 52.35 43.98 39.71 52.74
1997 41.29 42.98 46.40 51.50 60.53 61.82 66.68 69.50 63.25 52.48 48.77 41.21 53.87
1998 43.21 46.46 48.00 51.65 57.13 62.65 69.39 68.03 63.45 53.26 47.02 40.87 54.26
1999 42.93 b 43.46 a 45.84 b 50.60 d 53.62 c 60.43 b 64.67 a 66.50 d 61.98 d 51.65 d 48.38 a 42.24 b 52.69
2000 40.85 a 44.33 45.87 a 52.75 56.05 62.48 65.85 64.42 a 61.32 52.89 d42.58 41.05 c 52.54
2001 42.62 a 41.02 b 46.55 a 49.26 c 57.32 59.95 64.50 66.13 e 60.50 b 51.43 c 47.14 a 41.83 a 52.35
2002 41.79 42.91 43.18 50.30 55.29 63.18 66.68 -----z -----z -----z -----z -----z51.90
Period of Record Statistics
MEAN 39.87 42.85 45.54 50.23 56.07 61.17 b5.20 64.87 60.14 51.91 44.30 39.97 51.81
S.D. 3.35 2.65 2.22 1.91 2.22 1.87 1.99 2.08 2.20 1.49 2.84 2.60 1.13
SKEW -0.92 -0.63 -0.08 -0.08 0.60 0.45 0.36 0.27 0.15 0.30 -0.72 -0.30 0.29
MAX 45.66 47.70 49.71 54.30 61.28 65.63 69.66 69.50 64.43 55.53 49.30 44.35 54.26
MIN 29.47 34.70 40.35 46.33 51.94 57.55 62.05 60.77 56.45 49.08 34.70 34.73 49.35
NO 51 52 51 51 46 49 49 49 48 43 49 49 34
YRS
http://www.wrcc.dri.edu/cgi-bin/cIiMONta��t.pl?wakent 10/29/02
l���L,�,y r�vcra�c�v�uumum i em�erature, ttr,i�i, wP.�tilNti 1 UN Page 1 of 3
KENT, WASHINGTON
Monthly Average Minimum Temperature (Degrees
z---
Fahrenheit)
(454169)
�-
File last updated on Oct 24, 2002
*** Note *** Provisional Data *** After Year/Month 200207
- a = 1 day missing, b =2 days missing, c = 3 days, ..etc..,
z= 26 or more days missing, A=Accumulations present
Long-term means based on columns; thus, the monthly row may not
� sum(or average) to the long-term annual value. -
MAXIMUM ALLOWABLE NUMBER OF MISSING DAYS : 5
Individual Months not used for annual or monthly statistics if more than 5 days are missing.
Individual Years not used for annual statistics if any month in that year has more than 5 days missing.
�5�� JAN FEB MAR APR MAY JUN NL AUG SEP OCT NOV DEC ANN
1948 -----z -----z -----z -----z -----z -----z -----z -----z -----z -----z 35.80 29.65 32.72
1949 20.5� 29.75 36.61 39.77 43.87 44.03 -----z 50.42 ----z -----z -----z 27.41 n 37.86
1950 15.77 i 31.39 -----z -----z -----z -----z -----z -----z ----z -----z -----z 42.50 g 31.39
1951 33.26 35.11 34.52 38.44 c 44.45 49.37 52.74 50.13 48.63 43.42 36.62 a32.16 41.57
1952 31.10 35.34 36.52 38.33 44.13 47.97 51.97 53.45 47.00 44.03 b 31.60 34.71 41.35
1953 40.90 a 35.89 38.32 39.97 44.27 a 49.23 51.71 51.90 47.20 41.58 37.93 35.42 42.86
1954 30.55 37.04 32.13 39.10 43.81 47.87 49.10 50.84 50.17 41.84 43.40 34.52 41.70
1955 35.52 33.32 33.10 36.9Q 43.32 49.97 52.10 50.03 48.40 44.42 32.31 a31.74 40.93
1956 31.90 29.34 33.77 38.07 45.00 a 48.43 53.19 51.81 48.07 42.77 35.55 a 35.29 41.10
1957 25.90 a 32.86 38.27 a 42.40 48.74 51.43 51.27 a 50.13 48.23 40.97 33.23 36.18 c 41.63
1958 36.61 41.36 35.11 d39.47 47.53 a 53.53 54.42 50.52 47.17 42.03 35.03 37.57 c 43.36
1959 34.35 33.96 a 36.65 40.45 a 41.90 50.17 50.26 47.97 46.40 41.10 32.55 a 32.55 40.69
1960 31.48 32.75 a 34.17 a 39.07 42.84 46.67 49.68 52.03 45.62 a 43.03 34.97 30.68 40.25
1961 34.61 37.93 37.28b38.37 43.33a50.14a52.10 51.77 44.03a39.13 30.17a33.03 40.99
1962 29.17 a 33.19 a 32.73 a 40.48 a 42.61 46.17 50.10 51.17 b 47.10 a 42.81 37.62 a 35.30 a 40.70
1963 27.33 a 37.21 34.07 a 39.10 41.92 e 49.13 51.39 50.13 a 49.93 42.00 e 36.87 35.13 41.19
1964 35.58 32.28 36.97 37.43 40.97 49.73 52.23 51.74 46.73 41.16 35.67 30.71 40.93
1965 35.19 35.89 31.61 39.73 41.28 b 47.47 52.00 53.26 44.70 44.00 40.43 32.55 41.51
1966 34.39 34.39 35.19 38.50 40.94 48.30 51.13 49.84 49.07 41.29 37.72a38.68 41.62
inc� �c �c �n �c �� �n �c cn n� cc cn o� ci �� ci on �o i� �n o� �� rn ^a� n^r ni nn
http:,'iwww.wrcc.dri.edu/cgi-binicliMONtmnt.pl?wakent 10/29/02
...v�,�..a y c�v�a ag� 1Y11111111LL111 i cilt��Gl a�u!C, 1LGlV 1, W EiJt111V lT 1 V N Yage 2 ot 3
17U/ JV.LV .J'-F.YV »..J7 JJ.UV 't.J.VJ .)V.OJ .J1..7G .71.0`F YO.1.) YY.O! J/.7/ �Y.71 'fi1.7Y
''� 1968 33.87 34.66 39.48 38.57 45.00 49.27 52.87 a 51.55 49.37 41.19 37.57 30.06 41.95
1969 27.23 32.43 34.45 39.80 44.60 a 54.07 50.10 48.67 a 48.77 39.32 37.73 35.42 41.05
1970 33.87 34.57 34.53 a 37.83 42.48 48.93 50.42 49.13 44.76 a 39.42 36.67 32.61 40.44
� 1971 34.00 34.86 34.30 a 37.60 44.11 c 47.97 52.06 53.14 c 45.70 42.00 39.03 32.52 41.44
1972 30.61 34.28 39.45 37.77 44.74 49.47 50.90 49.81 44.23 37.68 37.10 32.19 40.69
�--; 1973 31.16 34.18 38.10 37.47 43.29 49.93 a 49.77 47.65 46.13 42.26 35.37 37.97 41.11
r
` ' 1974 31.29 37.36 37.SOa41.87 44.03 47.73 50.32 50.45 45.63 z -----z36.61 42.28
1975 34.10 34.50 35.19 36.23 43.00 a 48.53 52.00 d 51.84 45.43 44.45 37.60 36.81 41.64
'� 1976 36.52 34.97 34.53 a 38.23 44.17 a 44.96 d 51.00 53.03 a 49.83 40.57 a 36.86 a34.81 41.62
1977 29.81 36.07 35.97 39.30 43.19 49.50 50.39 54.1Ob45.77 -----z35.23 -----z41.93
1978 37.87 38.54 38.03 -----z 43.57 a 50.21 b 52.84 53.55 50.03 41.39 -----z29.87 43.59
1979 28.07b 35.18 -----z 39.57b43.86 c 47.43 52.39 52.53 a -----z -----z 35.37 37.74 41.35
1980 25.68 f 36.31 -----z 41.48 a -----z -----z 50.81 49.52 b 47.17 -----z 38.07 37.55 42.99
1981 34.42 34.07 37.13 39.48 c 42.70 a 48.52 c 50.31 b 50.81 45.50 -----z 33.80 -----z 41:67
1982 34.06 35.07 34.97 35.43 42.77 49.97 49.45 50.87 48.28 a 42.03 32.20 32.16 40.61
1983 36.61 38.00 38.19 36.43 -----z 50.17 53.55 53.29 46.33 39.13 40.80 28.90 41.95
�' 1984 36.61 36.76 39.87 38.57 43.39 49.43 51.45 49.84 47.90a38.97 37.97 30.06 41.73
1985 29.32 30.39 32.39 40.00 42.42 48.43 50.26 49.45 45.13 -----z27.03 28.48 38.48
. 1986 36.65 34.79 39.84 38.90 44.13 49.80 50.81 52.48j 48.30 43.84 39.90 33.48 41.86
F-
����� 1987 32.71 36.93 39.06 41.63 45.68 48.93 5230 a 51.23 48.40 40.16 40.20 31.55 42.40
1988 32.94 35.52 35.90 41.00 -----z 48.27 51.35 51.00 47.53 -----z 40.10 34.52 41.81
1989 35.68 25.68 35.32 41.23 45.10 51.37 -----z -----z -----z43.21c39.90 34.85k39.69
1990 3 7.97 -----z 3 8.5 5 -----z ----=z -----z -----z -----z 5 3.93 43.26 -----z 29.29 40.60
1991 33.39 40.04 36.71 41.63 47.77 51.40 56.39 57.52 50.67 43.06 42.00 37.45 44.84
1992 37.55 38.76 39.45 44.73 48.55 -----z -----z 55.77 50.20 46.23 39.17 33.13 a 43.35
1993 30.84 31.04 39.48 43.67 -----z 53.33 54.52 56.10 49.57 47.26 33.03 33.87 42.97
_ _ 1994 39.26 33.93 39.29 44.87 49.39 51.03 57.00 56.39 53.83 44.13 36.17 35.06 45.03
1995 -----z 38.86 37.52 43.10 49.68 53.23 58.45 54.65 53.97 44.48 43.23 35.35 46.59
1996 35.58 35.03 39.19 44.73 46.58 51.34a57.52 56.42 50.60 45.48 3830 34.65 44.62
1997 35.65 35.64 39.61 42.73 50.87 53.80 57.06 59.00 53.43 46.29 40.37 34.00 45.71
1998 37.58 39.54 40.23 41.83 49.71 53.17 59.23 57.39 52.77 45.29 41.03 35.71 46.12
1999 37.86b37.44a37.86b38.73d44.36c52.21b54.57a57.22d49.38d42.63d42.00a37.62b44.32
2000 34.73 a 36.24 38.07 a 43.53 47.97 52.73 56.35 �4.70 a 52.23 45.48 d35.00 34.61 c 4430
2001 36.13a32.15b38.00a40.67c46.58 51.30 54.58 56.15e51.14b44.25c41.38a35.73a44.01
2002 37.26 35.29 36.29 42.07 46.32 53.13 56.55 -----z -----z -----z -----z -----z43.84
Period of Record Statistics
MEAN 33.64 34.95 36.57 39.84 44.68 49.80 52.54 52.28 48.34 42.59 37.05 33.89 42.16
S.D. 3.78 2.84 2.35 2.33 2.44 2.24 2.54 2.73 2.63 2.20 3.42 2.66 1.62
SKEW -0.97 -0.53 -0.29 0.37 0.83 -0.07 1.01 0.64 0.50 -0.09 -0.46 -0.25 1.05
MAX 40.90 41.36 40.23 44.87 50.87 54.07 59.23 59.00 53.97 47.26 43.40 38.68 46.12
MIN 20.55 25.68 31.61 35.43 40.94 44.03 49.10 47.65 44.03 37.68 27.03 28.48 40.25
NO 51 53 �1 51 48 50 49 49 49 44 49 49 36
YRS
http://www.wrcc.dri.edu/cgi-bin/cIiMONtmnt.pl?wakent 10/29/02
1v1V111L1�' 1 1G1�1�111Q11V11� 1LC,i�1, vv t�Ji711V V 1 V1V Yage 1 of 2
KENT, WASHINGTON
Monthly Total Precipitation (inches)
'�"`� (454169)
File last updated on Oct 24, 2002
'"' *** Note *** Provisional Data *** After Year/Month 200207
a= 1 day missing,b=2 days missing, c =3 days, ..etc..,
z=26 or more days missing,A = Accumulations present
r � Long-term means based on columns; thus, the monthly row may not
sum (or average) to the long-term annual value.
MAXIMUM ALLOWABLE NUMBER OF MISSING DAYS : 5
F ' Individual Months not used for annual or monthly statistics if more than 5 days are missing.
Individual Years not used for annual statistics if any month in that year has more than 5 days
�-.,
missing.
��� JAN FEB MAR APR MAY JUN JiJL AUG SEP OCT NOV DEC Ai�1N
�-� ' 1948 0.00 z 0.00 z 0.00 z 0.00 z 0.00 z 0.00 z 0.00 z 0.00 z 0.00 z 0.00 z 6.85 6.32 13.17
�:��
1949 0.91 7.51 3.51 2.25 0.49 1.23 0.00 z 0.42 0.00 z 0.00 z 0.00 z 30.70 n 16.32
1950 0.00 z 0.00 x 0.00 z 2.33 1.90 0.00 z 0.00 z a.00 z 0.00 z 0.00 z 0.00 z 6.75 f 4.23
1951 7.39 7.31 3.68 0.62 1.23 0.10 0.64 1.00 2.38 6.09 4.90 3.75 39.09
r 1952 4.08 2.66 2.86 1.95 1.03 0.75 0.54 0.56 0.17 1.08 0.88 5.13 21.69
� 1953 11.75 3.42 3.04 2.70 3.26 2.33 0.67 1.86 1.18 4.97 7.02 6.31 48.51
1954 7.93 3.98 2.45 2.81 2.04 1.97 1.92 1.29 a 1.85 1.54 7.16 5.75 40.69
1955 3.22 4.04 3.02 4.18 1.64 1.20 1.96 0.35 1.31 7.52 8.48 a 10.42 47.34
�-� 1956 8.65 1.81 5.76 0.25 0.70 1.94 0.52 0.91 2.26 6.95 2.07 5.79 37.61
I957 3.19 5.49 6.25 2.61 1.72 1.11 1.21 1.17 0.86 3.53 3.2I 6.36 36.71
1958 7.52 6.18 2.34 3.64 0.72 0.72 0.00 0.35 1.29 3.82 8.13 7.87 42.58
1959 8.25 2.95 4.06 3.47 I.50 2.13 0.66 0.42 3.57 2.69 7.03 6.59 4332
1960 5.65 4.00 3.99 3.18 3.43 0.87 0.00 1.78 1.38 4.43 8.37 2.70 39.78
1961 7.90 8.85 4.55 a 2.68 3.43 0.56 0.56 0.55 0.67 3.20 3.81 6.20 42.96
1962 2.40 2.48 3.13 2.10 2.20 0.83 0.54 1.42 2.13 3.67 8.96 5.48 35.34
1963 2.27 5.30 2.47 3.14 0.82 e 1.91 1.22 0.95 1.17 3.38 8.86 4.86 36.35
1964 9.92 1.48 3.70 1.10 0.97 3.04 1.10 1.49 2.11 1.20 8.51 6.01 40.63
1965 5.80 3.85 0.44 3.68 1.56 0.48 0.47 2.59 0.�4 2.93 4.58 6.69 33.61
1966 5.00 2.07 4.31 1.80 1.47 1.25 1.34 0.47 1.82 2.58 5.56 7.59 35.26
1967 9.48 2.93 3.90 2.34 0.38 1.83 0.05 0.00 0.99 6.91 2.62 3.98 35.41
http://www.wrcc.dri.edu/cgi-bin/c1iMONtpre.pl?wakent 10/29/02
iviviiu►iy ric�i�t�.a�iuli, nr,lv t, vvt+�r111v1r1 Vlv rage L ot l
1968 6.91 5.51 5.09 1.43 1.57 3.49 0.66 5.13 2.12 4.18 5.99 8.39 50.47
1969 6.43 3.71 2.12 4.45 3.00 1.23 0.47 0.21 5.70 1.47 2.76 6.95 38.50
1970 8.49 2.47 3.63 3.58 1.48 0.67 0.55 0.57 2.84 2.84 5.82 9.92 42.86
- 1971 5.78 4.05 7.54 2.65 1.59 3.13 0.48 0.60 4.27 3.75 5.84 6.78 46.46
1972 6.65 8.80 6.39 5.17 0.67 1.85 1.59 1.45 4.36 0.90 3.91 8.70 50.44
1973 4.59 1.81 2.38 1.35 1.69 3.30 0.08 0.18 2.12 3.33 8.33 8.71 37.87
1974 8.12 4.90 5.98 3.09 2.44 1.31 1.47 0.02 0.17 0.00 z 0.00 z 6.63 34.13
1975 6.83 5.86 3.35 2.80 1.57 1.02 0.71 4.36 0.00 8.21 5.45 7.35 47.51
,.,_ 1976 5.81 4.82 2.95 2.28 1.68 0.65 1.16 3.22 1.21 2.18 0.99 2.68 29.63
1977 2.51 1.40 4.08 0.67 3.73 OJS 0.42 3.98 2.59 0.00 z 5.69 0.00 z 25.82
� 1978 5.67 3.59 2.79 O.OQ z 1.96 1.27 1.52 1.30 5.75 0.85 0.00 z 1.86 2b.56
T� 1979 2.55 6.17 0.00 z 1.49 133 0.36 1.02 1.24 0.00 z 0.00 z 2.56 10.79 27.51
1980 4.68 5.03 0.00 z 3.64 0.00 z 0.00 z 0.69 0.88 1.77 0.00 z 9.92 7.98 34.59
1981 2.83 5.15 2.87 2.07 2.60 2.78 1.23 0.37 3.53 0.00 z 5.23 a 0.00 z 28.66
r 1982 4.98a 7.25 3.95 2.00 0.69 1.11 0.72 0.59 1.84 4.18 5.20 6.25 38.76
1983 7.07 4.76 4.40 1.51 0.00 z 2.45 3.53 2.33 2.24 1.17 8.76 a 5.56 b 43.78
�.� 1984 4.21 a 4.51 4.40 a 3.06 4.39 a 3.93 0.00 0.12 1.13 3.12 8.64 5.57 43.08
: 1985 0.83 2.66 a 3.35 a 1.32 a 1.24 2.33 0.05 0.86 2.11 0.00 z 4.60 2.34 21.69
1986 7.54b.4.34 2.69 1.79 1.97 0.69 0.87 0.05 1.80 4.01 8.19 3.33 a 37.27
Y;;; � 1987 5.42 a 3.13 5.53 a 3.10 2.68 a 0.16 0.52 a 0.36 1.27 0.31 2.76 6.96 32.20
1988 4.24 1.13 5.10 3.98 0.00 z 1.64 0.59 0.36 1.88 a 0.00 z 9.04 a 3.53 31.49
1989 3.29 3.16 5.21 b 2.79 2.63 1.40 0.00 z 0.00 z 0.00 z 3.08 c 5.51 5.04 i 27.07
1990 8.35 a 0.00 z 3.05 0.00 z 0.00 z 0.00 z 0.00 z 0.00 z 0.10 6.90 0.00 z 3.20 a 21.60
1991 4.49 533 a 5.67 6.82 1.63 1.37 0.29 1.97 0.01 1.76 5.38 3.02 c 37.74
fi,. 1992 7.04 c 2.98 b 1.09 3.40 a 0.40 0.00 z 0.00 z 1.26 1.00 2.75 5.77 b 4.07 29.76
1993 4.20 037 4.67 4.84 b 0.00 z 1.89 e 1.50 a 0.28 0.00 1.88 1.34 a 5.16 b 26.13
1994 3.07 a 636 3.71 3.30 1.29 1.39 0.32 0.32 1.28 3.59 5.35 7.71 37.69
�'' 1995 0.00 z 4.49 3.89 1.69 0.75 1.68 a 1.30 2.22 1.36 4.23 b 8.98 6.50 37.09
t :
1996 7.69 a 8.67 2.17 a 6.12 2.74 0.52 0.91 1.31 2.08 a 5.77 b 6.16 a 10.40 a 54.54
1997 6.35 a 2.12 a 7.90 4.12 a 3.85 2.32 1.57 1.09 3.05 5.56 f 3.61 a 3.12b 39.10
1998 7.57 2.76 3.56 a 0.90 2.45 c 1.34 b 0.50 0.29 O.b2 3.12 a 10.24 a 9.43 42.78
1999 7.38b 6.81a 4.64b 1.45c 2.Olb 1.78a 1.10 1.56 0.12 2.38b10.33a 4.95 44.51
2000 3.71 a 5.71 2.42 a 1.50 2.85 2.94 0.50 0.39 1.22 4.1 S 2.85 2.49 30.73
2001 2.74 1.59 3.00 a 3.72 b 1.36 3.92 1.22 1.85 0.79 3.27 b 11.23 6.39 a 41.08
2002 5.92 4.31 3.31 3.48 1,25 2.00 0.84 a 0.00 z 0.00 z 0.00 z 0.00 z 0.04 z 21.11
Period of Record Statistics
MEAN 5.68 4.27 3.85 2.74 1.84 1.62 0.85 1.17 1.76 3.49 5.99 6.Q1 40.03
S.D. 2.39 2.04 1.48 1.35 0.97 0.96 0.64 1.12 1.34 1.90 2.66 2.28 6.51
SKEW 0.04 0.41 0.55 0.68 0.67 0.68 1.59 1.72 1.18 0.67 -0.07 0.15 -0.22
MAX 11.75 8.85 7.90 6.82 4.39 3.93 3.53 5.13 5.75 8.21 11.23 10.79 54.54
MIN 0.83 037 0.44 0.25 0.38 0.10 0.00 0.00 0.00 0.31 0.88 1.86 21.69
NO 52 52 51 52 49 50 49 50 49 43 49 49 36
YRS
T -`
http://www.wrcc.dri.edulcgi-bini cIiMONtpre.pl?wakent 10/29/02
��lu���u�y 1 u�ai �nuwraii, n�i�i, W HJtillVlr 1 UN Page 1 of 4
KENT, WASHINGTON
Monthly Total Snowfall (Inches)
_ - (454169)
File last updated on Oct 24, 2002
� *** Note *** Provisional Data *** After Year/Month 200207
a= 1 day missing, b= 2 days missing, c =3 days, ..etc..,
z= 26 or more days missing,A= Accumulations present
� Long-term means based on columns; thus,the monthly row may not
sum (or average) to the long-term annual value.
MAXIMUM ALLOWABLE Iv�LJMBER OF MISSING DAYS : 5
Individual Months not used for annual or monthly statistics if more than 5 days are missing.
Individual Years not used for annual statistics if any month in that year has more than 5 days
, missing.
��� JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN ANN
� 1947- 0.00 z 0.00 z 0.00 z 0.00 z 0.00 z 0.00 z 0.00 z 0.00 z 0.00 z 0.00 z 0.00 z 0.00 z 0.00
48
1948- 0.00 z 0.00 z 0.00 z 0.00 z 0.00 0.00 2.30 6.50 0.00 0.00 0.00 0.00 8.80
49
1949- 0.00 z 0.00 0.00 z 0.00 z 0.00 z 2.00 n 22.10 i 0.00 0.00 z 0.00 0.00 0.00 z 0.00
SO
1950- 0.00 z 0.00 z 0.00 z 0.00 z 0.00 z 0.00 f 1.10 0.00 7.60 b 0.00 0.00 0.00 8.70
51
_. 1951- O.QO 0.00 0.00 0.00 0.00 1.50 5.60 0.00 0.00 0.00 0.00 0.00 7.10
52
1952- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
53
1953- 0.00 0.00 0.00 0.00 0.00 0.00 11.30 0.00 O.00b 0.00 0.00 0.00 1130
54
1954- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 0.00 0.00 0.00 5.00
5�
1955- 0.00 0.00 0.00 0.00 5.50 a 7.00 0.30 6.10 d 7.00 0.00 0.00 0.00 25.90
56
1956- 0.00 0.00 0.00 0.00 0.00 1.50 5.80 3.00 e 0.00 0.00 0.00 0.00 1030
57
1957- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
58
1958- 0.00 0.00 0.00 0.00 0.00 c 0.00 0.00 a 0.00 w 0.00 a 0.00 0.00 0.00 0.00
59
1959- 0.00 0.00 0.00 0.00 0.00 0.00 a 3.00 0.00 3.00 0.00 0.00 0.00 6.00
60
http:;'i w��w.wrcc.dri.edu/cgi-bin/cIiMONtsnf.pl?wakent 10/29/02
ZO/6Z/OT �uaxen��Id�us�I�IOY�Iii�/uiq-i��/npa•up•��.�nn•nnnnn���:d�c�
00'0 00'0 z00'0 00'0 00'0 00'0 00'0 00'0 00'0 00'0 00'0 00'0 00'0 £g
-Z86T
00'Z 00"0 OQ'0 00'0 00'0 00'0 00'Z z00'0 00'0 z00'0 00'0 00'0 00'0 Zg
-I86i
00'0 00'0 00'0 00'0 00'0 00'0 00'0 E00'0 00'0 z00'0 00'0 00'0 00'0 ig
-086 T
00'0 z 00'0 z 00'0 00'0 z 00'0 00'0 z00'0 00'0 00'0 z 00'0 z 00'0 00'0 00'0 �g
-6L6I
00'0 00'0 00'0 00'0 z00'0 00'0 00'0 00'0 z00'0 00'0 04'0 00'0 00'0 6L
-8L6I
00'£ 00'0 00'0 z00'0 00'0 00'0 00'0 z00'0 00'£ z00'0 00'0 00'0 00'0 g�
-LL6I
09'0 00'4 00'0 00'0 00'0 00'0 09'0 00'0 00'0 00'0 40'0 00'0 00'0 LL
-9L6I
OZ'0 00'0 00'0 04'0 00'0 00'0 00'0 00'0 OZ'0 00'0 00'0 00'0 00'0 9L
-SL6i
08'0 00'4 00'0 00'0 00'0 00'0 08'0 Q00'0 z00'0 z00'0 00'0 00'0 00'0 SL
-�bL6i
08'0 00'0 00'0 00'0 00'0 00'0 OS'0 00'0 00'0 00'0 00'0 00'0 04'0 ��
-�L6i
00'9 00'0 00'0 00'0 QO'0 00'0 00'Z 00't� 00'0 00'0 00'0 00'0 00'0 £L �
-ZL6I
00'Oi 00'0 00'0 00'0 00'0 00'0 00'Ot S00'b 00'0 00'0 00'0 00'0 00'0 ZL
� -iL6T
0£'�b 00'0 00'0 00'0 00'0 OI't OZ'£ 00'0 00'0 00'0 00'0 00'0 00'0 iL
-OL6I
00'0 00'0 00'0 00'0 00'0 00'0 00'0 00'0 00'0 00'0 00'0 00'0 00'0 4L
-696t
Oti'i£ 00'0 00'0 00'0 00'0 00'0 OZ'8I OZ'£t 00'0 00'0 00'0 00'0 00'0 69
-896 i
OS'I 00'0 00'0 00'0 00'0 00'0 z 00'0 OS'I 00'0 00'0 00'0 00'Q 00'0 89
- -L96T
OL'£ 00'0 00'0 00'0 00'0 00'0 00'£ OL'0 00'0 00'0 00'0 00'0 00'0 L9
-996i
00'£ 00'0 00'0 00'0 z00'0 Oa'0 z00'4 00'£ 00'0 00'0 00'0 00'0 00'0 99
-S96I
09'� 00'0 00'0 00'0 00'0 00'0 z00'0 09'£ 00'0 00'0 00'0 00'0 00'0 S9
-t�96 i
00'0 00'0 00'0 00'0 00'0 00'0 00'0 00'0 �00'0 00'0 00'0 00'0 00'0 �9
-£96I
OS'Z 00'0 a 00'0 00'0 00'0 OS'i 00'I 00'0 00'0 00'0 00'0 00'0 00'0 £9
-Z96T
Oi'8 00'0 QO'0 00'0 09'0 OS'9 00'0 00'i 00'0 00'0 00'0 00'0 00'0 Z9
-i96i
00'9 00'0 00'0 00'0 a00'0 00'0 00'0 00'0 00'9 00'0 00'0 04'0 00'0 t9
-096i
ti3� Z a�Ed I�In.L�I�TTNC�M `T t�� `rreinnouc Tr.i�T �TiT1TT(1TAT
ZO/6Z/0 i luaxEn��,jd•�us�NOY1ItI�/utq-t$��npa•up���.inn•nnn��n�;i:d�q
4£ OS 6t ZS OS OS L� 9� S� �b 6t OS 8� S��
ON
00'0 00'0 00'0 00'0 00'0 00'0 00'0 00"0 00'Q 00'0 00'0 00'0 00'0 1�IIY�i
0�'i£ 00'0 00'0 00'0 00'OI OS'9 OZ'8I OZ'£i 00'9 00'0 00'0 00'0 00'0 XdY�t
8�'Z 00'0 00'0 00'0 £Z'� ZZ'£ OZ'£ T6'£ 66'£ 00'0 00'0 00'0 00'0 �1c1�IS
Oti'L 00'0 00'0 00'0 Ii'Z 8S'I 6b'£ i�'Z £Z'T 00'0 00'0 00'0 00'0 'Q'S
8�'� 00'0 00'0 00'0 99'0 I S'0 SS'I 98'0 i�'0 00'4 00'0 00'0 00'0 1�I�'3Y�I
s�c�si�E�s pio�ag�o pouad
00'0 00'0 00'0 00'0 00'0 00'0 00"0 00'0 00'0 00'0 �00'0 00'0 00'0 ZO
-TOOZ
04'0 00'0 00'0 00'0 00'0 �00'0 00'0 00'0 0�'0 00'0 00'0 00'0 00'0 t0
-OOOZ
00'0 00'0 00'0 00'0 00'0 00'0 00'0 00'0 00'0 00'0 00'0 �00'0 pp'p 00
-666I
00'0 00'0 00'0 00'0 00'0 00'0 00'0 00'0 00'0 00'0 00'0 00'0 00'0 66
-866I
00'0 00'0 00'0 00'0 00'0 00'0 00'0 00'0 00'0 00'0 00'0 00'0 00'0 S6 -
-L66i
0£'Z 00'0 00'0 00'0 00'0 00'0 00'0 0£'Z 00'0 00'0 00'0 00'0 00'0 L6
-966T _
00'Z 00'0 00'0 00'0 00'0 00'0 �00'Z 00'0 00'0 00'0 00'0 00'0 00'0 96
-S66i
00'0 00'0 00'0 00'0 00'0 00'0 z00'0 00'0 00'0 00'0 00'0 00'0 00'0 S6
-t66i
00'T 00'0 00'0 00'0 00'0 00'I 00'0 00'0 00'0 00'0 00'0 00'0 00'0 _66I � -
00'0 00'0 z00'0 00'0 00'0 E00'0 00'0 z00'0 00'0 00'0 00'0 00'0 z00'0 £6
-Z66t
00'0 z00'0 00'0 00'0 00'0 00'0 00'0 00'0 00'0 00'0 00'0 00'0 00'0 Z6
-I66t
0£'0 00'0 00'0 00'0 00'0 00'0 00'0 QO£'0 z00'0 00'0 00'0 z00'0 z00'0 i6 _,
-066 t
00'0 z00'0 z00'0 z00'0 00'0 z00'0 00'0 00'0 00'0 04'0 z00'0 z00'0 z00'0 06
-686i .
00'Oi 00'0 00'0 00"0 00'Oi z00'0 �00'0 00'0 00'0 z00'0 00'0 00'0 00'0 68
-886t
00'0 00'0 z00'0 00'0 00'0 00'0 00'0 �00"0 00'0 00'0 00'0 00'0 00'0 gg �
-L86I
00'0 00'0 00'0 00'0 00'0 00'0 00'0 00'Q 00'0 00'0 00'0 00'0 00'0 �g
-986 t . �
00'0 00'0 00'0 00'0 00'0 00'0 00'0 z 00'0 z 00'0 z 00'0 00'0 00'0 00'0 98
-S86t
00'0 00'0 00'0 00'0 00'0 z 00'0 z 00'0 z00'0 00'0 00'0 00'0 00'0 00'0 sg
-t�86 i
oo�o oo-o oo-o oo-o ao�o oo�o oo�o oo�o oo�o oo�o oo�o oo�o oo�o �g --�
-£86t
b3� £ a��d �Tfl.TrinrTuc�ann `T I�T'�T `TTP.IMniIC' TV.1C1T iCTTflTT(1TAT