HomeMy WebLinkAbout03736 - Technical Information Report � �
��l�ll QJ��J�1'l� ('`�Q;�i -� ����� _ � 0
� � �D �C. ,c,n ��,c.�� -�'' �/�
� �
� c��-����� � � w������� � �A�►�A �
�
�
� � I n r �1 - R n n ' �1
f��� �ue �e te #� e to Highlan�_
� 4615 N.E. 4th Street
Renton, Washington
Prepared for:
��N E• Hq,�, The Kroger Co.
�-P�.°���''�s''�►��'s � 3800 S.E. 22nd Avenue
f� ' S Portland, OR 97202
� �� 9�������3
�,
G'�it�s,k'`�,r.ti i t.�i'`v��
� 'S�fl.\':�l.��
, Revised September 20, 2013
Revised June 25, 2013
� September 19, 2012
Our Job No. 15432
'
�
'
�
�
��H��
� � �f iI' s�
� \ ,x CNIL ENGINEERING, LAND PLANNING, SURVEYING
1_ __ 18215 72ND AVENUE SOUTH KENT,WA 98032 (425)251-6222 (425)251-8782 FAx
' � ,/� u BRANCH OFFICES ♦ OLYMPIA,WA ♦ TACOMA,WA ♦ CONCORD,CA ♦ TEMECULA,CA
sG ,I���'�� ? www.barghausen.com
e'
<r/ ' ��� 3 ���O
N�'' ENG{N
1.0 PROJECT OVERVIEW '
The proposed QFC Fueling Facility project is a 0.56 acre site located within a portion of the
Northwest quarter of Section 15, Township 23 North, Range 5 East, Willamette Meridian, Kinq� �
County, Washington. More specifically, the site is located at the southwest corner of NE 4� i,
Street and Duvall Avenue NE in Renton, Washington. The enclosed Figure 2 — Vicinity Map, �,
depicts the approximate location of the proposed site. I
The site was previously a gas station but the site has since been demolished. The existing
topography tends to slope to the southeast corner. There are no existing buildings on the site.
The storm drainage facility is proposed to be located in the southeast corner of the project site
. such that the site will discharge in the same location it does under existing conditions. There are
no wetlands located on this project site and road improvements are proposed for street widening
of NE 4th Street and Duvall Avenue NE. The flow control calculations utilized disturbed area
instead of jusf the development parcel, since there are road improvements along the northern and
eastern property lines of the site.
The northern boundary of the project site is formed by NE 4`h Street. Existing commercial
developments are to the south and west and Duvall Avenue NE forms the eastern property
boundary.
The proposal for this development is to construct a new fueling facility on the site with 5 fuel
dispensing islands, a canopy and a kiosk with a restroom. The site will also include a pedestrian
plaza at the street intersection. In addition, public road improvements will be constructed along
the perimeter. Elevations on the site range from 405.5 at the northwest corner down to 397.5 at
the southeast corner of the project site.
There is an approximate 0.06-acre upstream basin contributing runoff to the western and ,
southern property line of the project site. This runoff sheet flows onto the site and flows
southeast to Duvall. This upstream basin will be routed through the onsite detention and water
quality system and will discharge, much as it does under existing conditions, at the southeast
corner of the property site.
Infiltration is not feasible for this site as the on-site soils do not percolate well enough.
' A Flow Control BMP is required for this site. This project is a non-subdivision project on an
individual lot that meets the requirements for a large lot, high impervious BMP. An area of the ,
canopy roof equal to 10 percent of the site area will be direcfed to an on-site rain garden before '
being sent to the water quality and detention vault.
15432.001.doc
KiNG COU�(TY, WASHII`'GTOI�, SURFr10E WATER DES[GV MANUAL
TECHNICAL INFORMATION REPORT {TIR) �N�RKSHEET
Part 1 PROJECT OWNER AND Part 2 PROJECT LOCATION AND
PROJECT ENGINEER DESCRIPTION
Praject Owner �C K r oq t� Ca r►-��o�.�c� Project Name QFC FvrL`n a �G��fLf �7�
Phone �3-�q7 - 30 26 DDES Permit#
i
Address 39oD SE ZZnd Avc. � Location Township
Por-F I ait d. O� `17 202 Range
Project Engineer a5on ,f{J�6�• Section
Company 1?jQ.Iq�16WSG/J CO/!Sul� ��ne S Site Address `�6/s l�� yfti.�
Phone �{25 -251 - (,222 aP,�1-�n i LJA I
Pa�3 TYPE OF PERM)T APPLICATION Part 4 OTHER REVIEWS AiVD PERMtTS
❑ Landuse Services ❑ DFW HPA ❑ Shoreline
Subdivison / Short Subd. / UPD Management
❑ COE 404
� Buil ' ices ❑ DOE Dam Safety "� Struc f
M/F Commerical SFR Rocke aul
� Clearing and Grading Q FEMA Floodplain
❑ ESA Section 7
� Right-of-Way Use � COE Wetlands
❑ Other ❑ Other
Part 5 PLAN AND REPORT INFORMATION
Technical Information Repor� Site Improvement Ptan (Engr. Plans)
Type of Drainage Review Full Targeted / Type (circle one): �u11 Modified /
(circle): arge Site mali Site
Date (include revision `�� �r2 Date (include revision 9/ �/Z '
dates): � dates}:
Date of Final: Date of Final:
Part 6 ADJUSTMENT APPROVALS
, Type (circle one): Standard / Complex / Preapplication / Experimental/ Blanket
Description: (include conditions in TIR Section 2)
Date of A roval:
2009 Surface Water Design Manual U9/2009
1
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 7 MONITORING REQUIREMENTS
Monitoring Required: Yes No
Describe:
Sta�t Date:
Completion Date:
Part 8 SITE COMMUNlTY AND DRAINAGE BASIN
Community Plan : �(•W C0.5�Q,
Special District Overfays:
Drainage Basin: C Q d A�t' I�I�G� _ _
Stormwater Requirements:
Part 9 ONSITE APVD ADJACENT SENSITIVE AREAS
❑ River/Stream ❑ Steep Slope
❑ Lake ❑ Erosion Nazard
❑ Wetlands ❑ Landslide Hazard
❑ Closed Depression ❑ Coal Mine Hazard
❑ Floodplain ❑ Seismic Hazard
i ❑ Other ❑ Habitat Protection
� A9vifU' �rafcc�i� zonc 2
�
Part 10 SOILS
Soil 7ype Slopes Erosion Potential
Atder w oad Gravc�t� (� - l S �,
—�{or�
❑ High Groundwater Table(within 5 feet) ❑ Sole Source Aquifer
❑ Other ❑ Seeps/Springs
❑ Additional Sheets Attached
2009 Suiface Water Design Manual 1/9/2009
2
K.tNG COUNTY, WASHiNGTON, SGRFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
1, Part 11 DRAINAGE DESIGN LIMITATIONS
REFERENCE LIMI7ATION /SITE COiVSTRAiNT
❑ Core 2—Offsite Analvsis
❑ Sensitive/Critical Areas
❑ SEPA '
❑ Other
❑
❑ Additional Sheets Attached
Part 12 TIR SUMMARY SFiEET provide one TIR Summa Sheet er Threshold Dischar e Area
Threshold Discharge Area:
name or descri tion
Core Requirements (all 8 apply)
Dischar e at iVatural Location IJumber of Natural Dischar e Locations: 1
�ffsite Analysis Levef: 1 I 2 / 3 dated:
Flow Control Level: 1 2 / 3 or Exemption Number
incl. facilit summa sheet Small Site BMPs
Conveyance System Spiil containment facated at: aw a S rG
' Erosion and Sediment Control ESC Site Supervisor:
Contact Phone:
After Hours Phon �
Maintenance and Operation Responsibilify: Private ! Public
lf Private, Maintenance Lo Re uired: Yes 1 No
. Financial Guarantees and Provided: Yes / No
Liabili#
Water Quality Type: Basic / Sens. Lake Enhanced Basicm Bog
(include facility surr�mary sheet) or Exemption No.
Landsca e Mana ement Plan: Yes ! No
S ecial Re uirements as a licable
A�ea Specific Drainage Type: CDA/SDO I MDP/ BP J LMP/Shared Fac. None
Re uirements Name:
Floodplain/FEaodway Delineation Type: Major / i1/linor I Exemption None
100-year Base Flood Elevation (or range�:
Datum:
Flaod Protection Facilities Describe: hJIA
Source Control Describe lantluse: Fucl S+�.fi'c,-►
(comm./industrial landuse) Describe any struc#ural controls: Qi��w�t,#�C,r SP,�)��r
r un P.+� cc.,,o�I y a,r itcc�e
2009 Surface WaEer Design Manual 1/9/2009
3
' KING COU'.�1TY, WASE-IINGTO�1, SURFACE WATER DESIGN �IANUAL
� TECHIVICAL iNFORMAT�ON REPORT (TlR) WORKSHEET
� Oil Control High-use Site: Yes ! No
Treatment BMP:
� Maintenance Agreement: Yes / No
with whom?
Othe� Draina e Structures
� Describe:
� Part 13 EROSION AND SEDIMENT CONTROL REQUIREMENTS
' MlNIMUM ESC REQUIREMENl"S MINIMUM ESC REQUIREMENTS
DURING CONSTRUCTION AFTER C�NSTRUCTION
� Clearing Limifs � Sfabilize Exposed Surfaces
� Cover Measures �Remove and Restore Temporary ESC Facilities
' � Perimeter Protectfon � CEean and Remove All Silt and Debris, Ensure
� Traffic Area Stabilization Operation of Permanent Faci(ities
' � Sediment Retention ❑ Flag Limits af SAO and open space
preservation areas
' ❑ Surface Water Coflecfion [] Other
� Dewatering Control
� � Dust Control
❑ Flaw Control
' Part 't4 ST�RMWA7ER FACILITY DESCRIPT(ONS Nofe: Include Facilit� Summa and Sketch
Flow Controf T e/Descri tion Water Quafi T e/Descri tion
' � Detention -�� U V �f ❑ Biofilfratlon
❑ Infiltration � Wetpool V���
� ❑ Regiona! Facility �l Media Filtrafion �'Dt'ri1�i��2f W�
�5�' ,�,cd.�0..
� ❑ Shared Facility � Qil Control v u ��r`ra.+�.T
� �Io�v Control 'n d u�d t,v� Spill Cantrol dr���G
BMPs , Q� � T2-e. C� ���—
� ❑ Flow Confrol 6MPs
❑ Other
❑ Oftter
i
I
I
� 2009 Surface Water Design Manual E/9/2009
4
�
�
N �
� �
� .�
� U
L.L �
i
�
�� o� + VICINITY MAP r ��
.� G� i �
��PS`���� � o�° / ��.,
`�.
- � �0�` �i�� z Z �,,
��'eP� a` � � w
Q
a
� ¢ ¢
� f �Z � J
� � � Z
1
�
; ; P1E �TH S-REEi
O 5� --
�900 '���R I , A i
.�
�� SfTE
/ 169
�-��,
R��T���
��F�9�
Ro.{�
�'�
�\
�
� �
N.T.S.
�\
.`�_
Figure 3
Drainage Basins, Subbasins,
and Site Characteristics
snrtn wvaai.e(x'cW
�-�w.a
2{'COMc E��8Z58
s[r�cR ww+o�e(s4•oN) scwen uuua�(sr'ou) :s'oonc sy-xza
rw-�oe.�s
24'7 E�15+DEFP IW��OJb6 I �� (iLOWS i0 MESTJ
24}W-25'+DE� 41'C�1C hE-�E719 �
(FLOWS i0 OES') _. � , te'PYC N�J6216 � ��
t'RC 600P SSE�]0127 . I' "� . .. ..14 COMC W.�]6270 �
C'RC GROP Mr-IO1M .. : !•� . � . . .. � . o GTCX Bl�
9 10 . � ••�'• . . •• , . ': . �" ��.B••Dl��_IDJY�7�8.' 1; � �^ '� wPoY� 102.77 i1Q 3'Oa�ED 51116N'F a014Y
16 � •��.• � ��� . �.�\ 16'E 2�3.77.SIg(�SE�, . '-. • ' � \ �' � a{ �12�CONC E-]lL42 _ � M/PINfJI N CFIAERUIE Oi M.E
F'12-Gp N.r'�� �.. {H Sf.(f106�MESf OF fE1D K.
� se�oz'�a't na.�a' "coa Z°���°°R') , ies coNc w.���r�, . �J m�o oN n-�-zou
�.'cak.��1v i�s� . , �� . . {arc ov ionoi camAa��esi)
. , J Y :see�aYte .ia�u.�i y : _ r . r.'• ..
a.w.cai gc i� ��� �! • . i , •� - . • rnxM u�ran s
no.ta�aac uonwort w/ �-�m.ss .. :.t s.s• , , . , . ,• . o
9M45 PN N Glg A lY qP E�1U129 '! .� .G.,- � �l .. ' J . i.' � ' �•- � � .�y . . �.�:.I ... ..�.� �..�,,.
ura ro�c.Kc a n�am sr. �Y at s-�ae.4s s..",-� .. - �; j � '. o .=-:-�:�;'� �. � i �� . t5 THE
vm�o a�e--e-2oiz u'cw w-�m.� + e!a�r�ih+Te s�wrF -i- _ - ; ,,. � '' 1 �'i oac�s�
(arc o�Aarta mnna l+sw) ��:_a� .,. � . t NE.47H-ST1�C�'f r . ;` "4 -� e•ecai n f � �: :,"� m[�� na r oo�n���eium�v rwai � �0
A =y ��- � � . �T� � . :�' � .� �7bD0' R14�101.T1
� - -M sr :��_: ..w ' S�.Laq,�n � . i r c a�c e_�o�x a a�a nc ax n. �
_ .f1. N. d.': "' �W:'�. 1Y WK.A-��s �:i�s��sr a ac�n a.Kc.�
__'___
�. ,. . ---• ------ ------ P`----- Hsrt�o cn ea-nou
. . _ , . �
. ... � ��. n. �-�.:c---- -..t -
- - - °"' uariaam .iemc secw'iet tae.m----- _ > T ss�-g<"�'- _ �.r.
- - ' , • �
o to 4o I um�xsN �u1f �,' , scr rtEe�.e/uw s�t� l gr�r+/cw �'�� % " �- �=-----
m � r:
� rta�-�o�.zs y� ws¢o�s�oois � ., , I
I � 1T'Dl N�IOSEO �� � fNO 1i�PE9�R/GP GTCH 6�SN Y/fU(ED l5 10016 ,, ��
PE9
SCALE 1' a�29"�Q � - _ _ . � -���Y �-',�s.�r •-� i �„^ � �", � ��
� -�- /- � mr 1� ,r av e-+oo.�o I �� 1M��_. aeox ��DGv�`O PV�
I �1�I. u ew w-�mae I ruu�i.aa stiov�rac sevx�1. -c
� 1'P011lW �y tY O�E�]9iB0 � ,: p' "' w � -
� HDG.CQLW � ' • / .� I 12�C11P M-7B0.W ' �__
:j__ f ` _
' (rrr"") � , �"��ooie �.
RESERVA710NS AND IXCEPT10NS(aen iwsr�eoc�v m�r�� i �! / � � � � � I e �I� ���
COAIPANYS FlLE N0.NCS-520794-OR1.Mlm JULY 20,2U12) � �� ��P � � �
1.LffN OF THE REAL ESiATE EXC6E S41E5 TA7(NO SIAidMACE UPON Mff SACE OF I I• .... � I SIXD lA I � W �I
APN 157�9121 � lY 0.L�I-]97ffi � fPN 157J0'r9057
� �,,:+ao.n Z I
SND PRD15E5, IF INIPMD. AS OF THE QAiE FEA�N,iHE IXC�TN(RAiE FOR 7FIE � ��' �
GIY OF RENfON IS AT 1.78x. � �' .± . � � �� � � ��
�vr/u�coOE:210o I I'
FOR ALL TW1SrCf10NS RECOROED ON OR AF7ER dUIY 1.2W5: ' '�caK 5�J97d2 i, �
•A fEE Of=10.00 WXl BE CHMGED ON ALL EXEIFT TRW5ICTIONS: I •��, O��r�� t � \�.--� . Q I
•A FEE OF�5.00 H1LL 8E CFW2CED ON ALL TAXABLE TRAN54CfI0N5 N�DORqN TO hE I EX61�IC RETNL BtIONG �!� s r .� t • � � PROCEDURE / NARRATNE
ocns�r�uc a,c i �t: , = � t pp��• i ti a �•� A 11�6LE 5800 GPS RECEVER ilallBLE 5600 RQBOTC TOTIL SfA7�ON.M1D lU5
41!(rIRE RANGER Q4TA OOLLECfOR SUPFtEMFNTEU WRH FEID NOlES WERE USED 70 MFitSURE
2 OELNOUIXf GENENAI TA7�5 NR TI£YEAR 2012�PWS MERESf ANU PDNL7E5. 1 j-�' � I Fws[l�Etrt�ta���Be FOrt 1 I NO 6TABlJSH 7!f!qR¢ONfAI AND VER11C1i1 CONfROI PONIS FfLD FOR 7H5 SUfNEY.
� Q /��1, XFi1T PUW 1�6 FASEUEM TE7a�vW6 MHEX UX L05 tOVEN 4EfER ��, � TFE REAILTING OWU MEf15 OR DICEIDS TME STANDAI�S F'O(i LANO BOUNDARY �
�(0� TEL WLLIIT SUfNEYS/5 SET FORRI N VAC 3]2-130-090.
TAX ACCOUMf NO.: 152J0�912I-07 � OF^"�1�1` /'I � NE�PFONED(Wn�i ssR6UC�5F�t�1 �7b .
wowar eium: f s,ese.n I �p5_�� I. -� { �, �mca�s��a�w.s N.�vam. -� '� ' � ,�% HORIZONTAI. DATUM - BA51S OF BEARINGS
NIOUPIf PM: =0.00 I U1p' 1 I � � \ �� `-p' � POIIER FttE WN 83(1991)(PQi UIY OF RIXIOtQ
/JIDUNf DUE: f 6.2(17.55 � �� � � N/PR SPoCE
�ss�sm wm YKue f 4�1,BOn.00 I l � . , � "I (5rtE m�c�auxK
�s�sm u��a�+�r wv-u� :ooa ��ar�orr� � �� 5� { � \ � � •� � � VERTiCAL DATUM - BASIS OF ELEVATIONS (NAVD 88)
� ELEV-400A0) NAVD 7988(PER Cf1Y OF NENTON)
3-DEL�IOUENf CENERAI TA%ES FOR TFff YEAR 2011.PU15 RfIERESf MID PENLL116. � ��Y P/m�[14 LLc /',�- �� � \ \ G�u0 uD � ' � � �:
IEAT PU�P `_ 191�J9791 � �� GTCH B�SW CIIY OF REMON VERTK'i1L CONiROL PONT�tE51�,BEING
VJ(ACCOUNT HO.: 152106-9124-0J � �: I Ir oA N-�ssa� ;r" wu-�a�s
� �� I �, 1F DJ.Y�]85�7/ � � �� '�� E'CIP S�39i70 F1EV�J98.SS Ff.(INVD a6)
AYOUHf 80.1m: =5.�08.24 � ��� \ "'�- 1� 12�Dl E-J95.�' � � r r--------
/� �-�--___� Ka�sw.- CALCULATED LAND AREA�
ANOUMf OUE. f 8.8/.79 � " 1 I,. � - � _ r� - ��) ..�� e . -� N �'e'
f-1 RN._7ii:78 n Y1,09it S.f. (O.Si4 ACkES)
�ssessm v�o v�u.ue i 4►i.eoo.aa � �� /�� , . ._. ""i�. -�z'oT s-�,� �� u '�,N I I
ASSESSED NPROVEYENT YILUE: =0.00 (NOf PLOTTABL� I 1'�w0 IEms I. '. . �^- �`�`-- 1z'o.�E�m.�1 pp �.'�� (9TE DOES N0T CONfNN ANY�EC�STWPFD PMIwG 1d�A5 OR�0..�NGT)
� anc.cauwn � �.� � a+o 1y'nEa�+/ua �z•ins�-�s.a '
a.oaxrarort eo�wu ruc�s r-oR TMe r�za�o.ruis enE�sr�rn r��s. � f�U , .} _ ta+E�s Jr.as• __t�--' ( l�- SffE ADDRESSES�
mo 1�'n�r+/c�
1 �'fl i r.ms�s�s5s' �emc u <I ��szxis-aoei �sis rE m+srr�r.�ru
TA7(ACCOIMf NO.: 157�05-912h01 i ,�:. . r ..` : �� �: �NfbG.10�LVE "�____-- �- � .
� --- --- - �,,:_----�.�___ _ -- ;--rtox'amw/u� � ' • �•�� : I � Gra e+sM FLOOD INFORMATION
AMOLLMf Bl1�D: =4�925.34 .!ti5�9i'vE`��:� � r .m - ._.__ �,..•�;7y55�--
AMOUNf PAD: :0.00 � ; - _ i" 20A1� � �'` I RW 0.1 M7.17J95�E fEDEAAL E►IERGENCY YANAGEIQI!AGENLY(FDM)�/FOR1N7101t FRY(FL000
AMWM DIE: s 6.798.97 I - -. - � � J7
n i� � NSUkNCE RATE 1NP)YAP No.SJOJlC0982 F,PAdEL 982 OF tYLS d�lID MAY 76.
����IAND VALUE: =M1,B00.00 I � ' 8 WN ` I �I a-�P N�y� 1995.Tff SIaIECT PROPERtt i5 N ZONE X(UNSHADED),MFAS DEfER1NED 70�
ASSESSED IMPRfNE1ENT VALI�: s 0.00 (NOf PLOfpBLE) � ,� 4 11 I �483n .Y.'^ � � 1 ` I aurs�oE soo-rFue Rnooawa.
5.Q^/L1EN5 If ANY OF iFE CIIY OF RENTON I �^ -- � � *� , �"5 -���� : ; �, ;'X1M0°D ZaNING INFORMATION - CA - COMMERCIAL ARTERIAL �
(NOT PLORABLE) �" I a 3.17 F� GENERAL CFWiAC7ER6TIC5 OF TFf COMAIEACYIL PRTERWL ZONE ME
. � a�• �LT �. � ,`,� wu •r •GA VFLYE E d 5.56 �u' •�� �r� YIAflAI LDT SIZE s000 scuu�r�
6. kESER/ATONS AND IXCEPi10NS,NClU7�:NG THE iEflMS IND CONDf1qN5 1Fifl�OF: I �� � � Y Gti5 .= o. tY FDS 5-'JYS52 � ,�
- �p y�7 . (F O R L O 7 C R F A'E D P F T F R N W F N B E R 2 0 0 4}
FESERviNG: M►ERhL I �'•` � � � .' �� 12'IDS W�`7iS.52 � � � n WU_T � SOE 5'-fH�CK 10 fEET•
FESER4ED BY: NORfFERN PACFIC RLLR41D COIPMff L----- 'M .�. .�. � : y
FECOFOED UN7,SCL0.5E0 ------------t, "� .�� ' �� . �\I c
�-------------- -----�-----=--- '� '-'s''-- U�ONCASIREEf}:
fiE�GYiCING NFOPANTpN: 192�.70 (N O f PLOTT A B.E) S�UM I11E lDT B � �- � • �" S�E SETBI�CK NOIE••
/� ti�^ I�M S E l&1 C K: N O f E'••
FOtE'NO IXNIIN�TpN ILlS BEOI MADE TO RlEfB�lE 7NE PRESENT RECORD OWNQt OF 4,� /Y ��6� ^, � VACCE55� � 1NIMU61 BULDB�If:IflGM: SO FEE'f
7HE ABOVE Ii�ERALS.OR MINERAL UNOS AND APPIIRfFNAM PoGHfS 7HEREfO.OR TO � /����� ��/,� IN%MUA1 BULDING CdJERIGE: 65S(755 F PARNPlG N BUILDNC OR ON-SRE
CETERIAINE WT1ER5 WWRi WY AFFECT 7HE UNDS OR RIGH15 50 RESEfTiED V r� • ,. � �'�" �
/� ,�I��x •SUBJEW TD REDUCTION MtOIIGH S1TE Pl/N DEVELOP1FNf FEVEW PROCESS
7.EASEMEM.INCLVONG TEitl6 AND PROWSIONS CONUrFD iiffJiEllt //� la.�-------_ �15 fEEf REOUitED F SITE ABUfS A NESUOi11PL 20tE
FOft ONNKELD / 1 � ZONNG NFORW710N WAS NOT PROADEO BY lbURER. PIFi�CONSULT 7HE REMON ,�y
RECORDIMG kK'OIalA7qN: .R1NE�. 1982 U10Qi�alC Ip.820G0.10168 V �� �� �� ly� "' I •rs
AFFECTS: IS D6CRi�TFEREEI ���� C 1_ ��S T�� � � YUlBUPAL CODE(RYC 71RE 4)FOR/�DDffIONAL OETNLS IND POSS�E 51fE SPECFIC �
(s1orH Bur PER 1�5 ws i�w�urm) � �� � ��� � u:cn aatN I �q�mmns.
8.faGM TO\iN�NECESSIRY SLOP6 FOR WIS OR FlLLS UPON SND PPEL6E5 FOFt �• ` � � ��V' ' ,_•��"��� � I REFERENCE SURVEYS: � oe
KNC COUNI'!AS CRAMm BY DEED RECOROED JUIIE 24�/987 UOER RECOR�ING ND. w�� �I • � � � � 12'0.L 5-SG43Y � 1.CffY OF RFMON 11A ND.LIYr05-0.71-UA RECORDNG N0.2005071990000D.
87�6241�88.(llOT PLOfTABIE� / `�� , � '
9.IFIE lER►6 AND PR0�751ONS CONTNED N T!E OOCUMENi ENRREO'ORDBNNCE ND.
� NOTES: -
4612'�.IUNE 21.1996 AS PECORONC N0.%06210966 OF OFFICNL I�COt�S. LE G E N D �, V I C I N I T Y M AP ,.�„���,,,��,,,,�s�,�,��„,�E��„�
�o.oEm ov musrµo n£�n.ks iwo co►iorraNs n+eREw. � A �QNATqN.MA UIIUtt NMKINGS 0lLY.7HE TIiUE LOG710N,NATURE MA/OR
(YtANfOR/IRUSTOR: SMUNY�LLC t S'NNIX.LLC QP rawrcu e a�tr�p�eapa WJ � DASfENCE OF BELOM CFiCNO FFATURES.�EIECfEO pi tNOEfECfED.SHOUID BE
CRANIEEIBENEF1CWtY: F/57510E NHDING.LLC.A YYl4flNGfON LIIfIED YOtlFFD.
LYIBIL7fY CqIPANY QT BtAOIE wLLT � ¢ $�«NS��7 �' �
rnusree ��rnus�saMces,t+c. LEGAL DESCRIPTION Qw +�ru o m wnar w�aw t�o�ol �v�' Sv � � � z.�asr�wccs�in�r(us svmfr r�rj
MqUHr: S564A�0.02 (PER iRST AYFRIGW T(RE IHA1RNiCE CONPoWY'S FlLE N0.Nf„5-520794-ORI.MTED �� 5�7 ucW • SEt�/P�w�s�atP � � 3.NO EVICENCE OF SOIL BOPoNGS WEHE OBSERVED AT 111E TB�E OF 7HE FlELD SUNVEY.
PECOft�Fh JANUARY 22,2007
MY 2C,2012) �O lm Im �,�7
RECOfl�INC NfY1AWT%1l1: 20070122001941 (NOT PlOITIHF) tt qpn�
i i.u+v rarair,�rm raarr.aR cwu�Nc�.uwe sr un�mr,u:c�uox�c, eur n+¢� �eo r�(as�su�o ua�c n��sr ur�ov�noatNrwsr awvtr� � �aa ��
oF n�noRnn�owRrm or nf rwRnf,�sr au�mot ov n+e ramm�sT ou�t¢a �c�v+m�r
NOT IAIRED TO,A CRE➢ffCR,7RUSIEE Oq OE6TOR IN POSSESSION P!BM1Q2U�TCY TO OF SEC110N 15,TOYR19f 23 NOIiIH,RM16E 5 FASf,WJI.,N 10J6 CO11N11', � a'�
AVOD OR IN✓AL1p4TE TFi4T CERfAN CONVEYAHCINC DOCUt�1EM WFiICH REWRDEO DECEtlBER ���. wRK90al ;�,;,���„ �q� �yp'`�
J1.2009 AS RECOR�EAS N0.20091231000.104 OF OFFlCUL RECORCS.(NQf PLOTTA�E) a rm�r rw�uia SUI7VEYOR'S CERTIFlCATION:
12 EVOF?ICE Of 7HE N11FpMY OF THE NDMD EKCEPI hIE NE5f 150 FEEf 7lEAEOF, B ax.�x a W _a fwler am u[ BG
EV F?C Ue1(S)TO IXECUIE 1}f FORIfK%7MING 0 IIB7l1C uisIXE Sf�l pAMILE UE �1('�� T0:FlIFD Yfrtx 57d1F5,NG.Ma F�7 IYFlafwx 1�rtE raJRwICE COl�u/r: � ptd�.
OOClA1ENT FOR FASTSUE FUNDINC�LLC.COPIES OF TFE qlRRfNT OPEFNTPIG M,IimEM AND IXCEPf 7HE FASf 20 FEEf i1�OF CONJEYED TO 10aG COUNIY FOR pOW 0 WW b�9f(� ��-- OW IMI IEKL � �711 G nas a m eemn nMt n�s wr ae rur�r.o n�E sur�.r ai rxai rr s e�n�c wmc N � Ag y/ DAl
SHWID BE SUBMITTED PRIOR TO CL09JG.(NOT PLDTTABLE) RlRPOSES BY D�RECOROED UIDER RECOROINC N0. 1804907� O SW��cWitlf(SOrO -//-- �f�R ICCOmWCE FrtH 11E 20i1 Iat+MUY S7xril��ETii F�uEN15 FOR Ali�//�C54 tANO 71RE 3�`,�� y�y=(
11.EVDENCE OF 7HE AUTHDRIIY Of 7FE OiFlCERS OF OUALITY F000 CEMEAS.A DIYgON NID DfCEPf 7HE NOflfH]5 FEEf TFEREOF CONV�YED TO IQNG COUNTY FON R61D O srom su w�4[(�0 "-•'- aI rtg g.� SumE�'s.A�mr 6t�8lraTm Rro�mvrm Br,�i�Nm nsPs uD urai�o�s�5 1��,S,4.a. �` � �'o sn
OF FREO 1EYER STORES,NC,70 IXECUIE TNE FORf}iCOM'�NG MSfRIIAEM.COPIES OF PUpPO5E5 6Y D�RECOR�ED U11DER FFCORDINC N0.5849734; � o SMwe'v7Ut�iFAart� ' ' '•�� �.�W(�).0.0.Itpxe�t;t7,it u+o 7z Or TMiF�n[p[oi.nE FE1D wORic ve�5
7HE tt1RREM MIICLES OF INCORPoRATION.BYUWS MID CERIIFlED COP6 Of � CK IflQ(CIQ -���1 M/1NNM6 RE7m IN M1QbT�012 5 m
MPROPfiUTE RESOLUiqNS SNOUD�SUBAH�IED M210R TO CIOSING.(NOT PlD'IiABL� NW IXCEPT TH0.T POHf10N IYWG NORTHFASTERLY OF THE MC OF A qRCIE WYANG A aG G5 MnE -t- Gs w�nw!Ww6 �, W.IE OF MT OR uW: NlW57 74 30t2 a 9 40016 p �'� �
R�DIUS OF 25 t"EEl.S�D CIRCLE BEING 1ANGEM TO A LNE JS FEEf SOUIH OF AIA 'r,P FC 0.E pQ'
14.UlRECOItOf�1�iawv rx IF ANY� RIGHiS OF VENOORS AND SECURIIY AGP�If ON YARAL.LEL TO TME NORIH LRIE OF SND SUBOMSION AND TAtICf7ff TO A WE 20 fFEf # nE O�e.'n pr� i-- 19H+OF x�rWIW16 �ID �O,�.AC I Si� •�
PERSUNAL Pfl�PERiY AlD PoGHTS OF TEN�NfS.AND SECUREU PARTIES i0 R�7AME YESf OF�ANU P/dNLLfl TO iHE FAST LW°OF 540 AIB�INSION/S CONVEYED 70 ImIC A ra umwr�q -�1- raa w rwowa wi[
FlXTIAffS AT iHE EXPRATION OF TF£TERM.(NOf PLORA� COUI�ltt FOR S.E. 128TH STREET BY DEEO RECOROEO JUtf 24. 1987 INOER RECORDNC � M1FA WrqF -rls9- awee/apt ufs sam
N0.670624118& � ��� ��
D wie171 w�[ 'O �6 7� 011EN B.MLLE PLS. �ATE
�/ IVA$HINCTON RECISf7A'bN N0.�0018
a. Sf . J�" C7fF�01161lF �a
I�
-
DEVELOPED BASIN MAP ���P�� � P�GHq��t�
�� �vosm�P�vom+r � m �Z
� ,JJ � v ii ; t
��---, « .-_ � ' ; ounwc cancr�re au+e ......................... o ?
�f p,,L�, � � l s
0 f0�s 00' �0 "`��\ �+ - ,�'ti'_"-. NEM CONCAEIE CZfB �G`T�hO EN'�p�'
: : r' :
. '
: : �� C � « _:� � � NEM CONC.S1NE — ^
��' , � � , '�-"
...
f � - 1ffi15 7Yi41 AVEl111E SOUIH
J� � \� � � �/� L_-"� EX U/G POWER —f(fFQ NING 1W1 98012
; � �: / t• �
^•\ \ •�'=-'�: �j, �""_' EX.7F1EPFpNE —i (42S)T31-6224
! ' �� �� � `_' —..
� � /C.,\:� `�•�� � C`• \�O�/ \`,`�•�„ EXStING S701W flPE � A�11tn�D.�K S�FA��7 �.
----___-_�='--------------�r------------------------------------="F`.• j yD�DO ,r. �l;`"`" _:�I�vll;i,,0��..n.:_ ?s>�O-_'_:�--`�=__'=��_i- ocnlr�c swru�r s�x� ss '
. � . � � ��'-- : U� ,1�� .- � r':
� � � :- - ... .�` E7m7NC YD17FR lNE --------1'!(Fil}- .
:
_ �a i.+::.,,�!,"�,,� ...............n�! ::T,:uss3i.:z_.�m..=.�,..---r,,. ,. " '�f-:� � ii'�rtic�s��j��v� �. �-------- --- '
. .�r.r �
-----
F•��,,�,.,5 T,��� =���-r.�-U.� _E�':t }(
2;7 E�[�f[i�"' f..�l=/0520 F�1�-�QI65 � (FL6i5 W F�) �'_ '�'. p�p05m��� � .3� �
2i i W-2'+-Gai� _ _ _ _ ' ' _ ' _ 12'Ct?E�SL030 24'CON:!T=39249 Lt_ �—� tl� ��
(FLG.iS T011ES() ' ' ' _ _ _ ' _ ' ' ' �ir'a��ri-tea�3- - - - ie-vF H=59?iff _ ' - �-► PROPOSm SE�'fR NWHOLE • �� �
6'F1C[ROP SSE=391.87 'i CQ� 7d270 _ _ _ G.7 G=�1 � 8
6'h'.0 U10i -�Ol.i] � G u..e� - - o PROPOSm SfOWI DRAPU�GE � g�m3S�
�-" --__- '. ci,' DI \'7iT���a x)i'E� - R_l� m77 �
� �-_--'____ GC4'�c:E lII1C•r. . , _ r^ '�
. _ -__ . —..--J-
12'W X'E d79.Z1 0 '}'_
---- -�----- iz•u�- w-. � PRDPOSfD 7tPE fL GTGH BA9N � y
zws a 1B �sas�s "rFws.ua io i�- �� -- \ � ��i 16�C9,:,17.,Sn� � �� �<O���
zw ar�ot sea.+a• ucis. Pwvosfn lrae z-4e•�cx a�u�
16'E tY39.7t - i
WCH 6iS�Y - o
�--f41 `�.il/4 �
(�1 40'� _ ' ' ' _ ' ' _ _ '..� ' ' .� �..I_ _ -� -__ ��.,.-IL'�.�` ! ��!!1�-_G_.��/G 1 '7�� � ( E7057Q16 fR01Rq CQIIOUIt u� 2LV 0 2
4U0 LFJ � � . _ ' ` `� _ I
1'CI�Ea4N'�_ � ' �I � - U� � �
i!OL 5 c 4U".S{ �— , G � � I � I �
Y c��,�u..�at.•. N ,\ �7� r`. + s��;-• l` - - - - - - - { - - - �1 e-eslt9r I �c� �rr���i i _� PIdOPOSEO RA91E0 6AAOE�Of Elkl6lnar t9ss ' ��y '�.
'. .�
m iD ---'�-�+_'r—l.�,=y�I'� ^ � — — —^— ��� u�P t5.00' - n � U a ,"J� '�.
i� ' _
. '� ' ��;' 1�7d70' 12'CC2iC E-J7738 o r��"
"' --tKJ-'' 1 .� 1� 7,.6 �
' T ";�• _ "' ' _ _' 2 Cf C 3) I�.Ff dc Ui4CH OOSINC � Y V .'.
-- 1_. ,y . P1�0'F1ffM SIYILE -�
_ , R -
�W, —� MIT � ��
—. — _- P� � �-r-. . •- • _ -r�� � T� � q"'� \ �s
�Gi_kl L'�..7 liL I 1 y/ •i . • .:: - �.-:• _- �_ :.�_� � f 1 � � � �-zrrr_______ �
' ��
� r_ie�a��, � /� -� _ i� � �. F +f(+�I(��� � i%��
i i� n.i.n.. . ���, _ � � �-5, , -' �-- - --�`✓ __ �. ` -1` :y�'�Ij'��IL��,����I� / � �.:<.,L Fo[�
� ' � -"�" , :l , ' , � � ---- � • , .n � � hth' �_ / s.c,4
� ) � 1 � � Il�` _ �� � G�
i fji i-�L �. - k , ='�-- 1�,;� -- ,�;, , '� - -� i -_---- RAi� 6G.rd Cr� 't��'"s��.�
r r.;�,, � � � � y < � :
�.�U.m,i��:� JI ,+w " \- � ,�`—��.\ 1;������ +, � 'I
� (o�a��� " � i �� '`� �i � �1�:*n ::� � ��._i � ChTCH EL':1
, J i , � ,--��. .1., t,. �—. �,- ��.���
�, � ��� ' ,'jti �� ' I ����.� i � �. � �� I iz oy.�n.is�.�r., o�,rF�BS&Eoa�,`�x
j �I _ i •. / �' � � � � �i� � I i ��:frh) ,rs�o ���
I JI �� �i i j� �': ia � _ ,� �,_ ��iz=ca:cs �n N�i f
i /'I �i �� , / ,// ���.ry/�/ ..\� �t( �i � � I f., I� mn isvx�=:ca
� �� � „��' < /i�� � i'Y �� � j� � !�I ,� � n n
I II � '.Q �� �h � �� � � . � I
� �- F-r� ��,,.,, /1 I ' H ' � : • � f��i`� �. �� J v. � � % , i � �� �' �_L- /--- �--� On5/� si`^'S/� � � � � �
I f I I �b I b • � 1/ �1 �: fi f�# 1 i:' i i \�� i I / / L'�t � n�" u� m
� � /�I � �i� ���/ 1 ��{,i��� \ - -J�I I(' _ _ J � ��YFr,: D.�V �"{C•
i� `�����., � ii � �' t3 �
� 1.Ot R Ro;i �I r�1 �� O. ��� ,• �i�'3� �� j' ��( yir 1.{- �-} �-i[t��wu (� /� ' VI�V S
' I U��o.OSt-��.A �I � � �• ' '� i� ���- �. -,/ V _ / � - - #-- -�� � os `� M� ►npu
� 4ot � �
i `���� � �i. I � i , : i - �'.�/, � •�..l` � � _� ,� - - =---, - I�j a�,a s�.r� /� c GrVi Da5 �
� �� � � ,� �: � /�i . •,y. \ '. ;� � s �rt, r 1% I�(`-rtc Eo�wctc< V'�� � �
� � ; � i g' ^`�/ , �q� '� j �- . .. � � � �r euv_soo.Eo, en
� ti=�i>z ti e-.i � i
I�. . � � / � C �}
' I:C.f F. _Y P.Ri+.lu.0.0 �I i�.. i�'-�-� • /> r � / �. t -� Z �.
/ cvcx a�s:+ p
� �I I I i � �j' \ ,.% \ � � � r•v_sv.0 I
I I i ' ;. ; !�.� � � � "� /.j , o•uro s_��.s.�o (/) I
i �' -
I � I I �( : �. ' �" � � �: � ' '� � e � ��-------
� �I / i i : • � __ �_ • _� �� 1.. �� .' I � I � '
� Se},�S /�� j i . _ ��7''-,. --. _.- 'i` �`y ), �� � � '�.
I ff o I1 :,� I �1., i� �' _ �_ .-JL 1 '- ,' �, Jm ' 'u ' � i
� cu,;.cc ` ,,� �, �"ZJ f' I
i (rr ,�j�� /'J �' �_- - -- � 1 .�� �— ��_..
1 � �i� i ` _ r:,,_ � ,.;�,�. - - �
_ , _
, -
i �� ` � -- _ — _ '
, -- —
�a i , _ -- �-_ ._ i
__-__-___� ,� _'_—'�— "-.-�_�_-_,____-----� _...-r� �,� 0.1'1' i I �GiCNElS") fn
� C�5 Y/LYE �..� v — — -_ -- _ __ — I � �
� � — ` -- � ,1.�� .oi 1 � �•i�397.43 �
�i'D.IN-395.3:7 � m
� __ � ���� � � I/ � � �-��� '� --- � 11"D.L 5�SBS.JJ x
,. I � / � �9I6'�'I V�ti,flE_ ` ' � I ` / B�R�P N-S?S.t3 � � �
I ' I �� ;L 11�`J115 � / ^
�F � I / e�,a i�s.iz � " � � I��cucN ei�+ � � � � i
� �I I I I 1k�P c��'V(.S}i t,7 137 F ) �� SQ!!D LA o rc �
r I I t1lYiY ��iI(����] � �, � ♦ \ �/� lEI:CE �,4 c Yl791 � � GW. o
I `���` I yAIRT L � � F'f�l_tJ1VE�E c J7s.54 J � � f2'�r.N-3'.:,.31 fX
� `�;X I'� (.S K' " t1'!LG S >.g2 � r � fY RI.4 a .i31 d
_ :�'.
� •�.�-� �� �;;ti1 % �T /x'�--r��assz /sr:.�Ty _ ,7� 1 __ � .V ro � ,�
� `• / � � / -1 V�If I �='��`J- � � G\li.�l G�S'.I 12 {.E ��
� �i. Y
J .
L_____ _____-_ _�L______________ '_--�-____`___ _- _-__ � ,�.
i:!`' �4�.m1 I��_Lr�T 8 ��^� i- 1 �rr ', k:lf=J77.19 Pro' ISIJY Rv�
� ' --� �' , � 1P'Dl S=3)i�S� 1M I� /��
� 1P'O.tE=3^i.1
�:" �J° GICO Cl.cl \ \ `!1 � 1 �Bl• � o
�� f!J�lO7.G)J _\'Jll(�ul Hh M�795.I OIo�v1 IIDC
�z'u5 w-,;��:t � \ _ �cc.. 5 � I � o
l /� � \ N � 3 � tl- ,.,.... °»�+`«e„ '" �
D•�+S 1 I'C �5�/1 / \_ \ �—. _.,. oa� zoe.0 ..
.
� � ------- "
�_ E
•O� �C' et-vc 5cdti
O V.!1�E� � Oisk FIr: �
f.�IUf ELL�7, � ��
I /�,� � kV�39J.4J � o
�W`dS�Q, � 12'D.L N�3^A.59 I I � .
iz•ci.s-.•�i�.�
� ��� 4l15!E�1H SIREFT 8
I I a�rto�L� n
� �
a
OFC �
RIELINQ FACB.tiY
o�o.hs •• �
0
of 12 �
�
�--- - - - - - --- --- -
� DEVELOPED BASIN MAP PROPOSED ASPIaLT PAYQIFM � P�GHqV�'�
� ' pRpppSEp ppryCqE1E PAV61Q7f � m Z
1�_no� �� � '_ v �' IXISl1NC CONCNEfE CURB -'__'__-••:....,,_.:. o ` ��_
' ' i j � � y
i �
� �
� �`� : � � ; l t�Y COPN:fiEIE CURB d'p� 1� f,g•
0 10 20 40 �
Q--� ,^\\ ; R t"'-'_ ti7 OONC.SWLE - l�hQ EN6�N�t�
. ; w .
. , , .. �-
� ` �\{ p c �� .,� �`•. �"___
� . _ � 18215 77M1 A4QlUE SOUiH
� J\; 7. � '�!h '------; IX.V/C PdWOt ----i(Fl�)--- NEM�riA 980.12
� r•�;•r � � - �=-i�, h t'----' EX IELEPHONE -7 -- (12S 231-6Y22
� ; �" �� g��� `�`'�;./ '-�, ` (�)xs�-e�az v�
� . ;`D • : � -- 3, �
� t : ��� J/� �� �I l ..."""' L-. D�SINC SIORII PPE AlIMri16.�FNMqIddfK�SiR%'6
._.�._"" •,�• � _
:
. � = -
----'---•'--'"-------- -- -'-' -- -------�- - FXb7tiG S4iIGR/SEWER PoPE zs
'------- •----------
:-
t t t .-- --------------- ;�s �F�j� „ - °=__ -- o
, . ,
---
_ �
, , . :� - ;
,:�• .. �
. . �r. .,, , , , . : _ _ ------ - ----
�� � �� «������
.: �� .,; �, �
. , z� :A! :��
`: .
.?
.cl.Jt 1'.:,�FIE ,i C. ::.�.._:.......J.'_""'_ 'fATJ:k1P�S41�::.,,...:m:�_r..=:" r a:..-� ! ,., ,� ,� �•�"-"' ""' O05IWC YYA7FR IINE ( )
�fr
'\ �:
fi't�4"1.45 i1Pi 1 L �( " ,`�� ��K+ - 4'�PI I � �
_��'7i-W}:i.'t£ 54'p,�� 24' y Y � M
21h E-zs'+t�cEr �iv-�o>.sa f%���sa3.ad \ �: (w:�s io 6r317 � •t-9•r� -� PfmP0.StD SSIi1HURY SEIMER � ii�',
2f�7 K'�25'4-[? _ _ _ _ ' _ _ _ �12'[4�E�SW.30 44'ti•:}:hE_?021Q \ � - __- e � �
16'RL II-J92.IE \ _ �. • Y
(ilfi':S R11lFSfJ ' ' ' _ _ _ ' ' _ ' _ ' 12�CY?1Y.•SM.S]- _ _ _ _24'fA:�r1Y=�L10 GiCti F.L"! � PROP06fD SEMffl WNNOLE Z �� ��52�
G�F�C FCO?C_�5�1.1-i! - _ _ � v
e'F.L cx�L•'��nl!a lru�;i�..�s�� �r�uo w o PROPOSED S�aa DM�IAGE o�� O ��i �
_�_ _-_-_
1+7tC3f.1131r'i 5:.•p 4'DI.1LTi =?'�7�'. � ktJ�4Qi77 s�
.___-�'- \ I �
-. . .'___ ..
_'
��S 0` SEC d ib SStS75' IQAS.SEC. TO 1 4 ppR,___.'_ \ � � ��;U 7CHi ,d� PFtOP'OSED TYPE IL CATCH&lSP! � ¢ ��U m��
_ � Cl'10� 604.IN EAS. . 170J T 15'CQ� t IL
1
cauN su:� �-- �a��oav.�r �� � � Paorosm twE 2-�e'GrGI etis� � m , <O��
/ i:� � rai , x
�'SJD Lq I J 1.-�..: ,. - -_ -__. _`� _ _�_ . �]ai.as
�'I�4J7.73 �' � � � j �.I. -- � O7SlNC GHOIRID SPOT EIEYAION �
) GH lR
"c['_ Es Sl1TJ_ G LG I � _ ��'I1 � / - Q r
`2'DI 5 e SCd.54 ' _ ' ' _ _ ' ' _ '- � - - �� --�G �1..�.-��CG ��I �V�f S - E7aSfNG GROUO CONfOUR iC9.0 �
r .. _
c����a tn�.7� � t_ .iiE sir.c - - - - S`'� 7 S � 0 3
C V / L() r 1 L � - - _ � `UIGi E\S 1 U
Sp y� __'-.:._�y�.�-��� •D L�\ - -_ �L, . �Y � _-� / hiE 1 L_ PROP06ED FWAIm CRIOE SPOf ElE1GA710M � W � ���
� ' �
� ^ c � �_ U , n �
�
� � - ' ' ' _�1' .W367C r �-- IYCG:CE'S=7.'.5 ... � _,,�`�
"""__' S
y� , �v �-L 12'Cr.;c 1l.317.•, PAYOIQ1f SNME W p`�o^R
I '- P< - �'�'? ' " N[Er e�ura�oamnc � � Y�g"�
- r---�- - - �; a� � � . , t g$�'
r� g��,M r r
I �cvcae�r.v -i;,T+ '� � �. ' )'� �__ -�'=-r=------- � r9!$€�
� �.,�a so�as �� , ' ',. � `
� �z'a�.n.aca.co __ s, ,,, '^ --- ✓,----- � I�� � / w
' j ��' " ��''p5- i ! ' ' '� � ____ ` -�?a� � ; ����� -F"'E
,�� tl'n��.�
� � � ��.�.y� i � ''' -.` ; .' l� � S'�G
� r r ;����� I� 1 ) ! ���� '' '� '�' �---- ��� �' -- �• ' - -� ` • % �P o���Sp�me
I I � � ,��"� � �. �! '"` ' ��� ` 1 '• o.t _ � ��
�vc_ccii�� � �1� � ti
,; •�,� �
� (7iii.'1) I � ' i�� � ' z�`�. ♦ ��T• *"_ _ .4 � � CUqI 4'.c�� x
� �I c ��� � �� ''�� ���' 1,' ����:�2.� � � .��ti i�o jdiaz "$ 2ess� e
I II '� i ,.. ' Ii ''. � ` �1`i j \ .' `' i IYDCN= /:: ffqF�/SIE6t'�\,r�"`"
� / � .��� � � I � � � _ � � /�'v-f�'� s�o xb
i Ii � ii'•��''• / '�` ��, � � �, L�- i �•cc'as , _ NAl E
� i �� : ��' i i_ : �
� �� I :•�t� /�' 4 �! �•,'/��.' ' t �' + �` �', �� � � n n
� I� ' �\ ��l14 ��";� �y' t � �S '`l i � / k' �' $ R
�� \ n
� c.,sn,c r�ei[�.�o��: /11 /� 4i �3' �I' i � �- i , b I 3 �+ � q �
I /�I �, � �.`�ii,• \ ��` �tl�: � ',y% i J I � i � _l- `�•,. _ '�' � '�° �
t:,, � ::.x � �-
, �i F� �► • �`> � ' � - - �- ' � - - ? i1''
� � -� �� - �:� � � � d
; �ot u«o�i i �' 'o:' � -' L j ` 4 , \ ' {r �� ,�.,���.,
I G�(OF p3\_� �i � (� ,� � _ ,`�s'r '' ' - `�� � � 4. ' - - �� �
I �Up-�' �I J� '' i � �'� -S�' ,��� .i..`. . � � ;� � �t�So:�rm� C te� '^ � � d d
� r li I � 1 ) ' �"'� � - �� ' '�'q� , \ l. � 3 , i�, I '�r�crs nr¢ C.�V��Q./Lr�J� �rGK.S
I I I I � - " `� :cb' _c ' C ^ I�(��r�wa�vnz �-.-
� � ��� � 1 �� � \ � �.; �I� ntv �oo.co) (n
/PX 15231�-:�,I:t �I � �'- /� (
� f%`A fR'!Y Fi:tli�x:.LLf. � /`i(' 1� •��/ ��- `.. /� � Z
I �I ( I i �� `j�.` � ' y_ � � 9 /1'�-�ux�i nsvc:�� p
I I I �� . • ' ��.. .� :: � u�, B'CPP 5=39i.70 �� �
� � I ;; :. , � � . . ., , �i- �,�t� no -
� ; �
, , _ . `� ; _ ,
_ - r
{ ' ��rw.. �l ia�h
� Sz-� �' � �� -,_ �� �--�'"--,:_ : ' ''' �n s o, � ' � ` {� �0.W fG�' f1Gtl% �
� 1'Gf1J:] I�U.: � 1._. 1� / _ � ._ �JQ- ' .. ; � _'` � I_ �� -� ' '� �,�/�� ,V � �� � �
� [tDi,CLlI":1 � E�j' � �'j �
I (if.'G7�� r � _ � - � ` ' _ '�f}'I T- � �����/'` � �.
, 1 11� � i - /.�I1_24y_=+7
� ��� � ����':[:��'"-- "__' '__� - 1
� " '_____'_____-_' __�- !
\� ___,- � r . u
J•1x u � . �.: X
, ; y�,
, --------- � -� �---_--- --_�-_____-_ �--_=. ; : ��,�. - , � � �-G,���, 2728 � � �
' 6�5 VlL�E- � P . `-_ �`.'� I ` �
, 0.01 �•l=�97A3 j
I 1 It'D.L IY�395.79 1 � �
� � �� � �� `�Tc,i i,�:Ir�c 1� �'� ,� , _ ' I �,J7�s?�H-�ns� a r � Y
4 IA115 11.�!1.�5 j / S���C�:1 I ` \ `t ` Gi � �
� I / f,�l�S�-.�7 =E � CATCfI Ht5�71 �/� �yp5 � _
I � �� � ,���.d�.,,_4� � � 1 `� c ar
� - I ElIX�./_?J�f9.17 I � \ �/'r�iE]YE �jn�St ��Sr� 4v��. ��� � � s 8 � � -
p�•^ r��y. � � 6'Gi �)L\E f�775..'.5 I .,sl \� � Il'DJ.N�355.77
-.m "
� `,�,�" J ,�T ,-5 Y;1:" l�o •/:fi 5= 7s57 � 12'OJ.V a 13i.S7 N
c �
---� �:F� �� 2'1P5Y/��Y75[1 �5�`£(f(� ( r ,1i3 � IP'DLE-33i37 ����� � �� i ^ n • `
� I '/,� � I
� I �L- 1 AOC65 r t�t.;� . �, : ,� � _
L_____________ 1___-___--_____--___ �_____j__ . _�__ �-�_ I 7.}3
�. Q115i�
:;•ni�_u�r o � - �� i,'ei�s��rs.i7.. Pio7.�t/:ts�.72� sbr.Ioae71
'1 t:�D.L E�3=5.t. �
, �:�v / fAiU1 E.lS:I� \ 1 !:, . �` ,,Ly- � � Da�qmd B�^ �
� � � =+�- .,rc,_ , �`,r��=s.3.,,� watU a,•id d c � �, ;
r.��_�nz.c� (d.l. �' ( amm xoc r
li F4:Ir�: �r.� I .,J
/� \ \ \ b i j \ �� r � Chedied B�: �RI �
/ \_p i , \ �f k�.w�x ---- Ufl��v 1� �
� Dolr. z06.t7
�J_ �
Scals
l'F.G Q�j,
�L`� I '" �V d � S� nuk Frc $
a�ol P.L'!1 I YaMt
f.'t�s^.J.47 �
Il�DI.H=371.5]I �
tt 01.5�.,1.5� 1 � 'd
I 4613 NE 47H SfHFET n
, I RkHidN.YU1 ry
� I �
OFC �
R1aNO FACLRY �
aa xa: %
of 12 �
�
'�
�
� �
� �
L �
�
� .�
� VJ
I ._ _ __, ___ _ _ - --
Soil Map—King County Area,Washington
� �
N �y
Ql �
� N
�
563493 563502 563511 563520 563529 563538 563547 563556 5635G5 563574
47'29'18" n � 47°29'18"
m �
N
N N
h N
�:4:p...y..
� � tC
� �
� tl'� ,�,.. m
N �n
N �
�
ti
�
� «�'
N �
i,
' �., ��... ,�^.�,. �
.. • �•�r. •'•� ros�
i ...,,.:... �.. �;✓, '.,'
� '�'
t0 ��� O
n �
� 'G' r'
� � �
N ;+
u�7 7% - ry l�" � � uj
' iii Y
�^ � ' . ... -.
Y
' a� x t -��}. ,�p
:Vy,� ... ' . ���� µ*�, „,,�
,N..r
�..} � `s4. �Rm�*.;�4M , ..
� �4��C
� � �
rn
� �ry� ��X. ��
� �� '��W� �fd..
� . C ��� �"� � �!�
' � � `
y y;�t
������ 4 ; F''�
.yi.,
i 'k� 9�>
�
i� �
IM 9k�� �� '� a ;� z ` - .
r . i
��� � ���� ,�� Y�9�
�i . ����m6' f � a+i�e5: .t� � � •' � ��,+ <�. �
I� e fi'" f � M1a r �q.. .�
� �ia"i � a, b' ��' �G
� � ` �, x � " ��r y a <� �' �w'. �� �"
R y�„ "`� lr�. p � "
;"'t',�,' � �•. '� O�y.'°?,�'�ez r '�:�'".' F
' -„ ��u .: ,.,,�_ .:
� �
! : f����" ��'
`d,- .,.;wYo"w. ;Pk«Uw���� -
n tL�� ..tf9 ���. . •��,��•'���IT v"s ��; v
N , •;7a y . M.
N �
� N
e r �
N
� , � ' E:
. : , ... �n.,: ' .
• 54�. ::. .� .. - ���
..,.. . , ... .
47'29'16" -
47'25 16"
563493 563502 563511 563520 583529 583538 563547 563556 563565 583574
� Map Scde:1:422 if printed on A size(8.5"x 11")sheeC �
� �
� N Meters
A 0 5 10 20 30 �
Feet
0 20 40 80 120
U_S� Natural Resources Web Soll Survey 5/29/2012
� Conservation Service National Cooperative Soil Survey Page 1 of 3
_ _ --- — -- __ --, __ ,_. __ _
--- - . _,
� , , -, � � � ; � __ � � �
Soil Ma�King County Area,Washington
MAP LEGEND MAP INFORMATION
Area of Interest(AOI) (�} Very Stony Spot Map Scale: 1:422 if printed on A size(8.5"x 11")shee�
� Area of Interest(AOI) � Wet Spot The soil surveys that comprise your AOI were mapped at 1:24,000.
Soils , Other
Soil Mep Units Waming:Soil Map may not be valid at this scale.
special une Features ENar ement of ma s be ond the scale of ma in can cause
Speclal Point Features :;, Gully 9 p y pp 9
� Blowout misunderstanding of the detail of mapping and accuracy of soil line
. . Short Steep Slope placement.The maps do not show the small areas of contrasting
� Borrow Pit soils that could have been shown at a more detailed scale.
.�. Other
}< Gay Spot Please rely on the bar scale on each ma sheet for accurate map
Political Features p
♦ Gosed Depresslon � Cities measufements.
?{ Gravel Pit Water Features Source of Map: Natural Resources Conservatlon Service
,. Gravelly Spot �� Sveams and Canals Web 5oil Survey URL: http://websoilsurvey.nres.usda.gov
Coordinate System: UTM Zone 10N NAD83
� Landfill Transportatlon
This product is generated from the USDA-NRCS certified data as of
/4, Lava Flow +++ Rails the version date(s)listed below.
ala nnarsh or swamp N Interstate Highways Soil Survey Area: King County Area,Washington
x Mine or Quarry -� us Routes Suroey Area Data: Version 6,Sep 22,2009
� Miscellaneous Water � Major Roads Date(s)aenal images were photographed: 7/24/2006
(� Perennial Water � Local Roads The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
v Rock Outcrop imagery displayed on these maps.As a result,some minor shifting
-�- Saline Spot of map unit boundaries may be evident
. . Sandy Spot
� Severely Eroded Spot
p Sinkhde
�r Slide or Slip
� Sodic Spot
w Spoil Area
� Stony Spot
�� Natural Resources Web Soil Survey 5l29/2012
Conservatton Service NaGona)Cooperative Soil Survey Page 2 of 3
Soil Map-King County Area,Washington
Map Unit Legend
King County Area,Washington(WA633)
Map Unit Symbol Map Unk Name Acres in AOI Percent of AOI
AgC Aldervvood gravelly sandy loam,6 to 15 0.6 100.0°�
percent slopes
Totals for Area of Interest 0.6 100.0%
� Naturel Resources Web Soii Su►vey 5I29/2012
_ Conservation Service Nationai Cooperative Soil Suroey Page 3 of 3
2.0 CONDITIONS AND REQUIREMENTS SUMMARY
2.1 Analysis of the Eight Core Requirements
Core Requirement No. 1: Discharge at the Nafural Location.
Response: This project site will discharge to the existing storm system in Duvall near
the southeast corner of the site, the same as current conditions.
Core Requiremenf No. 2: Off-Site Analysis.
Response: This project has prepared an off-site analysis that is located in Section 3.0 of
this Technical Information Report. Please refer to that document for the off-site analysis.
Core Requirement No. 3: Flow Control.
Response: This project will provide flow control in the form of a weUdetention vault
located in the southeast corner of the project site discharging to the same location as it
does under existing conditions. Level 2 (Duration standard)flow control was used to size
the facility. A Flow Control BMP is also required. A rain garden is proposed in the
northeast corner of the site.
Core Requiremenf No. 4: Conveyance System.
Response: The conveyance system for this project site was sized according to the 2005
King County, Washington Surface Water Design Manual (KCSWDM}. Since the project
site is less than 10 acres in size, the pipe conveyance system was sized based on the
Rational method utilizing an initial time of concentration of 6.3 minutes and a Manning's
"n" value of 0.014. The 100-year event was analyzed. A backwater calculation is also
included to show 0.5 foot of freeboard is maintained.
Core Requiremenf No. 5: Temporary Erosion and Sediment Control.
Response: This project site will follow the erosion and sediment control measures as
delineated in City of Renton Core Requirement 5, section 8.0 of this report and the
Demolition and TESC Plan included in the construction plans. Clearing limits will be '
specified, cover measures will be instituted, perimeter protection will be installed in the
form of silt fences, a rock construction entrance will be installed, and the streets will be
swept clean of sediment after construction at the end of each day.
Core Requiremenf No. 6: Mainfenance and Operations.
Response: This project will concur with all maintenance and operations requirements as
delineated in the 2005 KCSWDM for projects of this nature.
Core Requirement No. 7: Financia!Guarantees and Liability.
Response: This project will concur with all financial guarantees and liability
requirements of the 2005 KCSWDM as delineated for projects of this nature.
15432.001.doc
Core Requirement No. 8: Water Quality.
Response: The Water Quality Menu followed for this project site requires that the
Enhanced Basic Water Quality Menu be followed for this development due to its
commercial nature. One of the options of the Enhanced Basic Water Quality Menu is to
use a two-facility treatment train. This project is proposing a combined detention and wet
vault with water quality volume located below the live storage in the vault such that three
times the mean annual storm will be provided as dead storage below the live storage in
the weUdetention vault. The second treatment will be a Stormfilter manhole with CSF
media.
2.2 Analysis of the Five Special Requirements
Specia!Requiremenf No. 1: Other Adopted Area-Specific Requirements.
Response: To the best of our knowledge, the site is not located in an Other Adopted
Area-Specific Requirement area; therefore, Special Requirement No. 1 does not apply.
Specia!Requirement No. 2: Flood Hazard Area Delineation.
Response: This project does not contain, nor is it adjacent to a flood hazard area for a I
river, stream, lake, wetland, closed depression, marine shoreline, or a King County
mapped channel migration zone. Therefore, the requirements of this Special
Requirement do not apply.
Special Requirement No. 3: Flood Protection Facilities.
Response: This proposed project will not rely on an existing flood protection facility, nor I
does it propose to modify or construct a new flood protection facility. Therefore, the
requirements of this Special Requirement do not apply.
Specia/Requirement No. 4: Source Control.
Response: This project is a commercial site development; therefore, source control is
required. Sources controls on this project include covering the fuel dispensing islands I
with an overhead canopy as well as routing the under-canopy drainage through an
oil/water separator prior to discharging to the sanitary sewer.
Special Requirement No. 5: Oil Control. '�,
Response: An oil/water separator will be installed to collect runoff from the under-
canopy area of the fuel facility. As additional protection a tee �utlet in the detention vault
is being used.
Special Requirement No. 6: Aquifer Protection Area.
Response: This site is located in Aquifer Protection Area Zone 2. The onsite soils are
not conducive to infiltration. The only runoff to the proposed rain garden is from the
canopy roof which is non-pollution generating impervious surface.
15432.001.doc
� - I
i�-�
' .i
3.0 OFF-SITE ANALYSIS
A Level 1 Off-Site Drainage Analysis has been prepared for this project site. That document is
attached herewith in its entirety. This document should meet all of the requirements of the City of
Renton for off-site analysis for this devel�pment.
� i
__a
___�
� �
.I 1'
�i' _f
__� .
�
�
�_ �
�
I j
, )
�
15432.001.doc
LEVEL 'I OFF-SITE DRAINAGE ANALYSIS
QFC Fuel Center - #871 Renton Highlands
4615 N.E. 4th Street
Renton, Washington
Prepared for:
�����E SNvR�,�� The Kroger Co.
; _ ,. 3800 S.E. 22nd Avenue
�� � �
' �,�: '� � Portland, OR 97202
�,� I,qr�,2
� a �,
�;� ���.,?�f��. �?
��s�s���.,�:,�.F��.
September 19, 2012
Our Job No. 15432
GNAL
� �, s� CIVIL ENGINEERING, LAND PLANNING,SURVEYING,ENVIRONMENTAL SERVICES
�
m � ? 18215 72N�AvENUE SOUTH KENT,WA 98032 (425)251-6222 (425)251-8782 F�vc
° ? BRANCH OFFICES ♦ OLYMPIA,WA ♦ TEMECULA,CA ♦ WALNUT CREEK,CA
I
�G�r ��V�� py' www.barghausen.com
'HC ENGIN��
TABLE OF CONTENTS
TASK 1 STUDY AREA DEFINITION AND MAPS
EXHIBIT A Vicinity Map
EXHIBIT B Downstream Drainage Map
EXHIBIT C Upstream Basin Map
TASK 2 RESOURCE REVIEW
EXHIBIT D FEMA Map
EXHIBIT E Sensitive Areas Map
EXHIBIT F SCS Soils Map
EXHIBIT G Assessor's Map
EXHIBIT H Wetland Inventory Map
EXHIBIT I Basin Reconnaissance Summary Report
TASK 3 FIELD INSPECTION
EXHIBIT J Off-Site Analysis Drainage System Table
3.1 Conveyance System Nuisance Problems (Type 1)
3.2 Severe Erosion Problems (Type 2)
3.3 Severe Flooding Problems (Type 3)
TASK 4 DRAINAGE SYSTEM DESCRIPTION AND PROBLEM DESCRIPTIONS
EXHIBIT K Drainage Complaints
15432.003.d oc
TASK 1 STUDY AREA DEFINITION AND MAPS
The proposed QFC Fuel Center project is a 0.56 acre site located within a portion of the Northwest
quarter of Section 15, Township 23 North, Range 5 East, Willamette Meridian, King County, Washington.
More specifically, the site is located at the southwest corner of NE 4th Street and Duvall Avenue NE in
Renton, Washington. The enclosed Exhibit A — Vicinity Map, depicts the approximate location of the
proposed site.
The site was previously a gas station but the site has since been demolished. The existing topography
tends to slope to the southeast corner. Elevations on the site range from 405.5 at the northwest corner
down to 397.5 at the southeast corner of the project site. There are no existing buildings on the site.
The storm drainage facility is proposed to be located in the southeast corner of the project site such that
the site will discharge in the same location it does under existing conditions. There are no wetlands
located on this project site and road improvements are proposed for street widening of NE 4th Street and
Duvall Avenue NE. The flow control calculations utilized disturbed area instead �f just the development
parcel, since there are road improvements along the northern and eastern property lines of the site.
The northern boundary of the project site is formed by NE 4`h Street. Existing commercial developments
_ are to the south and west and Duvall Avenue NE forms the eastern property boundary.
The proposal for this development is to construct a new fueling facility on the site with 5 fuel dispensing
islands, a canopy and a kiosk with a restroom. The site will also include a pedestrian plaza at the street
intersection. In addition, public road improvements will be constructed along the perimeter. The storm
drainage facility is proposed to be located in the southeast corner of the project site such that the site will
discharge in the same location it does under existing conditions.
The City of Renton GIS mapping shows a wetland on the site but there is no evidence of a wetland per
the Critical Areas Review report by Altmann Oliver Associates, LLC. (See Exhibit E)
Infiltration is not feasible for this site as the on-site soils do not percolate well enough.
UPSTREAM DRAINAGE ANALYSIS
Based on review of the project survey and our site visit, there is an approximate 0.06-acre upstream
basin contributing runoff to the western and southern property line of the project site. This runoff sheet
flows onto the site and flows southeast to Duvall. This upstream basin will be routed through the onsite
detention and water quality system and will discharge, much as it does under existing conditions, at the
southeast corner of the property site.
15432.003.doc
Q
�
� �
�--+ �
� �
� '�
x _U
W �
-- — --�
���G��� VICIN [ TY MAP , �\ �\
•�
,1��p.S�'�� 0�' / `�
�
a�' ,.�
��� Li� �-' Z i
��eP� �� � � �
a
Q
z Q Q
o > ,,,
\ z � .� �
�
� � z �
i
i
/ P•JE 47H STREET
S�
90�� N�'�Rp
�
/ ,s9 �IT�
� �
��£.
RFNIo��
�F 1,, f
��FY���D �
� �
�
� �N.T.S.
�,
� 1�
\� //�
� �
Exhibit B
Downstream Drainage Map
_
� �
City of Renton Downstream Drainage Path
�:„ � _ _ + . � ..=f.,._: ,.,�.-.� --� �- -
��- • .0�-��, - � r ���� � , � .�-
.. A b n� � . pi ,
I~' ' �,/. � �- �r � y �
�•� _ `• � . �i .• � , ; ;•--r- ._ �
� ' •�: �:1��.. �,, �r `,� I � -� 1�
'.c�_ � I �� J � ' '{�♦ 1 . -_ L ^ � '
����. � 1...�c � S,a 1•ay . , • . � � � ",".-. ' _ u�'
- - ` I �1 ti,•,�, �('-' �� �1F C '
�i , ,. .,
� •� :� �., ►
^--� �� r �- / Hi inds
l-,,..L_ _ 5�'lG ar et . � � �1_ -- y
�� - -- - _._ _ , - - ---._ - -- -__ _ _- _ _ -
ti nno�i� � � � ��. .< - -' � '��' .- r~
�Yr
�'�{ � 'r�`� � _ ��
:r� P 1r k ►ty,_ :,t - �:: � _ -
C� + ��
Jem� — � �. r ,_ � '1 �
r ix � .-
e a�z, -� - � _ , t ��- _c�
- Halta9e L . S'� — '
- Park � � �
¢ ,
_.� ��. �` � � �` 1'"•` ..S � � i
.i
KC 6istri� -- y�~- ' �' r .� � =:
GOt7�.,_..._ . - ` - _ � �':( .'\.l:!� . . , /.= ``T.� _ _ .:.
hlic Vlod - �
KC Drp�rtrnem ur intenanc ' - =
Tnn. o�aGon IWslon . � �
P 4 . l 1 ._
� _ 'tiif.'�, o� /._. _ . i � ` .
'� lE'ti 1}•� � �� , .
. f_ . . � .,.�..�_., ��. '�t ' '.+ l4L�t�L .
• � �r E� e r�rySchao
� r ; , _ _ 1 �. t'�7 - , ./��
K��f'ornrnuni.� � Cti'. - -' ' ��•'�'�� ' .��...,._ . -
� �t �•^�d� .y J�4 � �� �r �""' 1'--; J . _ _ -- ----^--•--•••---•-'
. ,_'_" �- — . ` �. . �� ' _' �
_ w.� �,r _ tir'�`�.''` ' 41 '--�--------•- �:
'�.;. - � Manimwood -
`'i� ' •� M.:� Puk �
�� �1���� ` -
iv_. _- ..
� ----- �•- _.--------------- � S,�r4�>�Ks,u = r� _. _
. �TifS j I •:I ` •u ' ' . _ � � '
wiaplewood �_'---'-- . _ �I-�� f/ �, � i SFi`C�ru_ -
� � �
pM . •: �� __,,11 � .
� ^P �,/� �� ..
.1., t // . - � �` U � n � �, � ..., .
_ �. .�y ri-�',y� t:.. • f.�� �`��/ �� �� �� y�. �
~'r~�S��` �"�,� `T � �► � . r�. �\ � � �� , ' ; � . `
� \� ,, i'� n ;�
"'- --- Klu�r:rmn�r . i � .ti��r�_
� � Rr0[urt�--lirllt�ll ---�•- . �E-+rINST �
I _
� - �� -- --` _ ^
•`� --_ + . ��
:� � i � '�' . F'•
!( 159 Y � ' �`• %�o�.r,- ��.�.,.
�'% � �� .
.� -.-�:.`.�' � � . - .
N` _ _ ..�,�,` "Ev'•,Jldapl d
''w � � ��•;��,,v,ti�.� " GO� fL�O `
y �,l �►
ti J' • �+�.�t69`
� .��' . � n,.^`'�. ` 4 �'�'-^�'�--'t
Y .. sT�
t . _ . ._h.r�. �-l`�,vy .�yy}. _ �p'�y. �
1'� - - r�> , _ . �r, � �'�i
,�r' , �� s� �Ct��I'':'�;.. - .�1.�',c„
�� � �` ,,�R1V,�T �, .
�
� � . �j '•• � l�l,• , `• 1 '• � V� .
'4 ' ss� � ' . .q:� ��. � r ' _ w � Ron Rcqis: . �. . �'�%
s� t � �- x�3t - _ _ '� PYk t�'' .rT
r�t ` �
.� �+ .• "''`� ' y.
, - � w
. ♦ . � 1� n�y . . '�V'd2� ~ Yw��Y ',:A �:a � �, �
. � ''�.<,V: .� .. . +� �l . _ ^i"'r t;;,4 •� S" ,
��« %Sl$� � , , �,�,'Y <' ' i _ �_1��C • _
� _ , ' " ��... .� �_., `"^�. - - - _ �' .. . �SuTIiGlV�
. . �ay �
�` " ; ` . •, ' ' ` _ `��t":-�`"` � `' ;
� i' , •---- � - t� °`0�:`��Y.
.' '•v..
: �Sc. '� � � _ - i � ., ' ; - _ -.- -
�� • \ \ y _
l, ' �. c � y' S. a �
Notes Legend
None � Pump Station 0 veuit
Conveyance(Ail) 0 �a�'�e
_ Pip� � IrfiftraUon Trench
- Culvert � Filter Strip
— pipe � Rain Garden
_ CuIvM � Stortnwater WeUand
Plpe � NaWrel Wetland
.. CuIvM � Other
. • Channel � Unknown
— �n� — 2'Primary
Facility Outline(Renton Maintained) --� 2'Intertnediate
� Pond
1: 11,345 � va�n
� Bioawale
� Infll7ation Trench
1891 0 945 1891 F8� � Fllter5trip
� Rain Gerclen
NAD_1983_HARN_StatePlane_Washington_North_FI PS_4601
Information Technology-GIS This map is a user generated static output from an Irrtemet mapping site and is tor
Ci��f O� :� roference only.Data layers that appear on this map may or may not be accurate,
RentonMapSupport@Rentonwa.gov curtent,or othenuise reliable.
Finance & IT Division 9/19/2012 THIS MAP IS NOT TO BE USED FOR NAVIGATION
City of Renton Downstream Conveyance Le9 Structure
. cafa,tas+�,-ry�,
■ Catchbasin-Type7 L
'. '_ � ,�i-�_Sr—+�I! "` � ` �.------ ._..v__..� I _ '�i=-- ... • �te/Curb inlet-Type 4
�'
--- `
;�_.� _ _ __ - - . _ ■ Inlat
.__ _. '�
__ _ --Y
t- _ -- _......_. �;::_ ' _ �cJ7EC.__8�-_ :�: ._ .._ .._ _ - __
- ._..
_._.. ._�.__ .._ .,_,,,__ • -
. . _-- ;. • Glenbssin Type 2 MH
e-�.-�IL - .._ .. _. .. ..
-- _ �"■ i—�-`�i•— �'��■ .�- _ d � ACC955Ris6t
- � Y� .. . - — s:r _•—_•=5, . i G
__._ ,, . .- ■ . . Sr�'-----o.,.+..a.
,�+ Udlity Veult
`• � ,�- .�'�. - � -�
�I�� ' .� i Unknown Structure
■ � �: ,tti� � GtChbasin-Type 7
.., I + _� '',j� ';1� { . Catchbasin-Type1L
' i - -_-__ I � �� _ .
B�__ , � ` �-:'' Concrete/Curb Inlet-Type 4
y9
; �r "•� i ; . Drop lnlat
�--, �-3���`2 � - I �! 7 f_._ ._ —...--- (~'�', k . Cakhbasin-Type 2 MH
.:;�: .. .... __.. 'I .�' h' ! �; �U - Access Riser
_ :
. . � ` r ..
, ; , .. __.
_ �� i, � � �� . . . . � UtiUty Vault
� � I s Cleanout
� i r� _ � � - _ ...�a . � ofher
' ' � 'IJ�,� . - "` � ��c7
. j � �'i - -- .I� i. k�.` ... - ,. , r Uf1kflOWfl SWdUfB
_ ..
._- __-,- ///��� '.
'• j ///1(��.�`f � � - . C.21GhDeStr1-TypB 1
� _�� 1 t ,� Q � L,—�__.\� ' _ . . . .
, -•— - .
_
ir
_��.� : , -- -- - _ _
- �, .' } j Q ; T � � �!(� Catchbasin-Type 2 MH
r �� �
- � .� . �;� . _
—- - -�, ��;.! ■ � �I , � Control Structure
� .. � `c, i � 12 �xeMon t�na+ntaU,ea
i ° '� � �3 ,.______—,-.—_ y -
! �. � � - _
„ � : ! �__-- ,-:,r ,� � PAvacery btaintainea
i • � rjQ,(� S'�'0(GtAe ' �i 0 Pump Station
� � � � __ � S;fiG � '- - ouc�a�i
�' � . ■ ■� . _ �.� � G —.�— il—. 44 . � �
. . _ .,�� . � G i �...� . -, . � P Ranton Maintained OuCaU
� p �,
� r � i �.
p Privately Maintained Outfall
� _.
� ` ��',. � . ,��-`; ,, 13 Fitting
. ' ; � . u,�a
. , , -_
;:. , .,
_ ._ „�, , ; . --\
, ..- � y o�sr�u
_ __ _ -___ , , ,
___ ---..,________.. . 6end
--- _ � • . ._ ----.=:'_ •. _ -_ ° �
---� - _ ,___ * ,
� _. --- - _
o ad�� � .., NotAs
'� \ None
_ __ _.
z
__ _ _ se� � -
_ � . ..,.
__.. , _
_ : , . .... �.
.., F , _ � _ . �
; � hE7?.,lP.'. �'•,� �
"-"��-�..,��!1 -- � � p '_ � . 1 i ' � _ s -. .
. _ i '� --- t9. _._
.s 1:1,647
InfoRnation Technology-GIS This map is a user generated stafic output from an Intemet mapping site and �-�--�---
137 � 69 137 Feet is for reference only.Data layers that appear on this map may or may not be Cl�Of n '''
RentonMapSupport@RentOnwa.gov acxurate,curren4 or otherwise reGable. — O11�
���r� scace�r,e wasn��co�_ Finance&IT Division
North FIPS 4601 09/19/2012 THIS MAP IS NOT TO BE USED FOR NAVIGATION
Exhibit C
Upstream Basin Map
�
m�m rwa�c(st'cM1
iau-�ae
24'CONC E�]6�58
s�n wnra�ae(s+'wy sv�ac wu�o�{s�•oW i�•canc sr-�ez�.s
rw-�oens
24'7 E=23'+U�.P �1-�03.66 I o (FlDWS TD NESTI
I4'QOIC 1E-]82.29
(`FLON5 TO MCSn .1 r ., . 1B PVC N�J64.16 0 �
!'P.0 OfqP Sg�3B1.E1 •"P' "_I . ' . .. .. . ..34'CONC W�.7D7.10 � G7CM B�SM
' l' '- .. . i ' -�.ID WC�f) o . ..SOID ID
9 10 8'WC M�NW-�01A! . . • e ,.1 . . �•.. -. �.:: - . �•6"Dt�YFRf SL`�39726 \:� 1.� �• . '- �Y�ONC�E 590.12 � FlA.R�DOYED�6RWY
16 •f •• •� ��� :\�' •- I��'.TJ'. . '• - . • f \�• .. ; /•.12 U�N�79Bf5 '� . 47fi A.(2105 19E5T OF f�1D R.
� oF saem�o'�zea.���°i/4 cay �. , ._ ie-aWc e.1aen.n�:. . �.)varrm a�e-�-xou
� i�o.i�o u5i' ,�.:' � �1 :.� (rnr a�xrori caxma�iasi)
ata aua :y . . : x . saeuz'iet ia�3� �� ` s �,
(Kw.cac gc t� sam uo •' s�':•' ; . - wure srnwE - - .�----� . .�H tu+e mn�
FtD.CONtlEIE YONWEM ti/ pM-�0719 . •, � • !. � . ! . � . ...� . . . .f � .. �•10
U►JH ME.ILE 3 N.E�1H A. tY qP E-�0.129 'i+. �•' '�_�G.• �. ��•:. . �- e`. f ' ,� � ' .� � � .•� �_ ..���t.1 15
12'Dl S-�05.44 .'y .. .- i - ��. .. ...'�'�-r-G
THE!
vmreu a e-c-so�: �r cw w-�.s9 � af�w:rndre smwF -� _ - , _ � �• . " � s � o�a�v� K 1 4 3980 C
an oF imrtox canva!+� � � a • "- a�c4t n � ..' irve i� cae sEc.is
( $�a��, i
a � �, . NE 4TH STi3C�xT - ; � � � ,� .-�� I. r�� nr_�ma� �r o�m��e�w,m W�n�i � o
�` - -,r� .� • �.���c � ,z•c�E_��,. u�o��.m,n. ,
. • , -. .
"_ "" xUW' _'__"__ :_ . . .. . . ''M' �__ . -s.W• 'n. .w. H. e... . •.'. . ._�.' 17'CpC 11��7.Jf
.. ._ �. . ...���.. . - • _"". __ �< ' �n ( � N41ED W S 7 Z01Y
. . , __"__'_ _'
. . t1 'M6T OF FrtID R.N.EJ
_. _ .� ., .. a _��:i�_"__-'__'�4'_- � �
- °"'ra - ux„wa�o ,mx saea,•,et,zs.�e'- �_--L _ T ��r`=,- ' �
I ami e�a �ux � ,' s�r raerx/c�a snc�ss � se��a w � _ ;�,� � • ...
� Wf�D LS IW16
a t o zo 40 � roi�N�n�� so� � Fno K'r�e/cra a�ro+a�sw ; uwam�s�� � ���� ------ �
s �- .
^/� . ppy � � Y� •co��s nsss• ro-�iofS9r ..,,� � �• � ��� scw�Pac
.5'liY1� � �CV � I ' . .� «Y �
� y'' zor � is•or e-+aa�o � a.w�a�sn 1"'��s "� ��D�v�io PE!�
a !
, ,� ;, , ,z.��,_,�.� , ���� ��' �,�� .,, :�f
� �•� J}_ ' - � 11'(]�E-ABbD � ��� s°' ---
� � � •-� I �Y ar x-�aso �p�� -j-- / i:f'--
/ ��,�,b, g �N m
,�
� , �.
RESERVATIONS ANO EXCEPTIONS(�nRsr n�rncu+m�e+svwv� I �� ` „�„r rwv ` � I �� �' ��n � �
COI�Nfl"S FllE N0.NCS-520794-ORI,OY1Im JUY 20,2012) I ��� � IG��� : g I
1. LEN OF 1HE RFAL ESfATE IXCISE SALES TAl(AI�SURCHARGE lPON ANf S�LE OF � �� ..0 �'\ .... 90LD lID � � - W s I
� � ` ��oo.�z I Z I
SAID PROi56, IF UNPND. AS OF 1HE W7E FERE►{1FiE EXC15E TAl(RA7E FOR iHE I '��'_ � Y N4t i52J05-lt2s ` 7Y 0.L \ l97B2 � � MN 152706-805T ,E
Cftt OF RENTON �S AT 7.785.
�w/ua�crooe:2ioo I �! � � eac s=�ffi i. j �
FOR ALL 7R�ACilONS RECORDED ON OR AF'fER JULY t.200x � ���� .1 On s�fc �:�- � Q , 5°R�
•��oF t�o.00 wu ee cwwcm on ui om�r mws�croNs: I o�sne�eiam�c ��4 . - .�. ` '�-- �•lM � � PROCEDURE NARRATNE
�A FEE OF�5.00 WILL 6E(7NRGm ON ALL TAXABLE 7R/J75�Cf10t6 N IDpTpN TO hE /� J�` �
IXCISE TA7f DUE. � �I_ 1� � ({,�`A � pa�pY ke � A TROIBL£5900 GPS f�CEVER.TRYBLE 5600 R09071C TOTAL STATION.NW TUS
i � 6 V 1 N W E R/�N G E R M T A C O U.E C T O N S U P P L E 1 1 IX I m W l l l i Fl E L D N O l E S N'E R E U S E U i D N E A S U f�
2.DELINWEHT GENERAL TAl(ES FOR i}E YEAR 2012,PWS IMER6f ANU PEN�LiIES. I I' I AI�ESGBLISH 7F1E HOW20NfAL AND VERiK',AL CONTRaL ppM$HELp FOR TI�SURVEY.
7 umm+f v0.Z R esowise we pwVn�E l� �
� �I. HGT PUIp R6 E/guENt TEaiiBWES WIEY TA7f L015 J �YEfER � � 1HE I�SUL7ING QATA MEEfS OR IXCEEDS THE STANQARDS i'OR UND BOUNQMf
TA%rLCWM NO.: 152305-9124-03 � lOZ 8 ROM ��. ' M67 3 9RM(ICFOSS SfNFET TO CAS�) XTOAAN�. 7F1.VN1�T SWNEYS AS SET FORM UI WAC 332-17(11-Q90. p
� GSCT OF�1�lSA �, � I � �6�UOOE��OED.�� "� ' �
. HYOU�T BILLID: f 5,856.17 a5 , .�. "'� g � HORIZONTAL DATUM - BASIS OF BEARINGS
' AYOUAT PAID: S 0.00 � L� �� ` �' � PO'NER POLE W1D&l(1991)(PER CfiY OF RENTON) �
AYOUNT DUE: S 6�2t17.55 � � � I W/RR SPBCE
ASSESSm IAND VALUE: S sai,eoo-oo I f'L i I \ g ; ; � '^ "� (s�e°'°'"RK VERTICAL DATUM - BASIS OF EIEVATI0N5 (NAVD 88)
ASSFSSm YPRWEl1INi VALUE: :o.na (Hor R.orr�a.E) I /I 1� I l � � - � E 1 °E"`'0�0� ruw �ses(aex cm w�wroN)
� �rw�sz3os-aos4 I `� 1 ` GTCN B�9N � g "f
3.CELNWENf CENERAL TAXES FOR Tlff YEM 2011,PLUS INTEREST AND PFH�L71E5. I ICM FAYLY PARIItRS�LLG /1,�- ��y t` 50�»UD � gp,��;
TA7(IGCOUNT NO.: 15230�r9124-03 � �". . �R� li'Dl N�J83.37 � G� Y�.i➢.814 CIIY OF REMON VERI'G1L CONTROL POIHT�1851�.BONC
� �f � ��. ,�'o�r-�,�J ' � "� '� e•aa s=�as.�a EtFv-�98.56 iT.(w�w 88)
N10UNT BLLED: =5.�08.24 �" \`��'�L 12j 0.L E=Jy,�, 1 .
�wour�r Fno: s o.00 � -�c_��--- / ' r--------
/��, J - _ -�- 1 �encKar�- � CALCULATED LAND AREA�
lU1DUMf DUE f 6,814.39 � f--I � - � _M� _--'�'�" RN,�3Y7:38 .y. �� I , t:y �••••
I l ) -.�a �nY"DrS'-JeS.v! f I n,oa+t s.F. (os�t�s)
ASSESSED IJWD YALUE: f 441,800.00 ��S �� �! •� ••• •^>-._---�.•. �e.�-.�-'-'JtY Ol E�J95.17 � r�.
ASSESSfD II.PROVEIIENf VALUE f 0.00 (XO(ROTT�BI� � t'RGWD 1,EIptS I.: __/----' p � 3p' (51TE p0E5 NOT CONGN ANY SPECF1C STR�PED PIJtKNG ARE/S OR BULOINGS)
BIDG.COLllYN . I FND}j'IE.HYt/G➢ 12�N76 W�39S4J � i
4.OE71NaUQJT GENERAL TAXES FOR THE YEAR 2010.PL115 IMER6T Atll PEiL1Li@S. I ��) �I �.� � m��s�issb• 'I_�--�=" ���'�/� i SITE ADDRESSES:
I ,1.. . . ..; . . ., = 'C6�LS 37�' � �t V �e� APN 15270'r8004 1615 NE 4TH STREET.PENTON MiA
TNf ACCOUR NO.: 152305-9124-03 � . 3�� -s .' I.' ��FisG_V=1VE --�-��_' ." o
u,�wnr�im: t�.92s.x I ----- .e,s v,�vE• v r��,,, -_ -=��---.-r-- �'--`';�.Flo.� w•i� � t � ura a�x FLOOD INFORMATION
A M W N f P P ID: f o.a o I -•'• ! - - _ , zo.oi i mu-��.0 �oeaK Euexcenct uaru�c�mrr aca�cr(vo�u)u�oRwnar��u(rt000
i �'i � i s•o.i.N e�s s�
AMOUNf d1E: S 6.79697 I -- -... -... - ; " �� �' !� I � I l Y D J.5.J 9 s.7 s ��CE PoIiE WPj WP Na 3303.SC0982 F.PANEL 982 Cf 1725 oniFn A�AY 76,
ASS£Sg➢LM1D VAUJE B'CNP N�395.7! 1995.TfiE SUBJECi PROPQitt IS N 20NE%(UN9iIDm).NtEp$pETERAOJm TO BE
=M7,800.00 � - 11 48�� l �� OUTSI�E 500-YFM Fl00DPLPII.
n s s�s s m i�rs o v�r v�u e s o.o o (rar r�m r� � � , rus , .n "s'� � ,` I
I �" -- r T� - �� � �' t ""D00 ZONING INFORMATION - CA - COMMERCIAL ARTERIAL �
S.CtiY L1EN5 i M(Y OF 1Ff CIIY OF RINTON (NOt PLORA� �� 17 . i �ti ' �E GENERAL CHAlL1CTER6fIC5 OF TFE COMAERCLIL MTFRNL ZONE ARE
�T Y wu • VK�E E.�.56 �+' �.� 11WYW lAT SQE: 5000 SQUME FEET
� �a .,. �
6.RESIINA710N5 AND IXCEPf10NS. MCLUOING THE TERMS AND CONDRqNS TNEREOF: I � V �� � ��� .:� �T 12'ADS 5�.'�9552 �r .� ' ; � (fOR LOT CRFATED AF7ER NOVEpBER 2004)
RESERv1N4` MPlER/�L r I ��:� „� ;, �� 1 Y�`�JW.52 � � � ^ ��7�� F7tONf SE7HFCK 10 FEET•
ER N Y 2'ADS "
RESERYED 9Y: NORTFfRN PA,.FIC RA6ROAD COMPANY L--__ __----��--__ "" __�__�� ' •�• ," � arb-_� y' � " SlOE SEIB/iCK(ALONG A SfREEl� 10 FEET•
RECOROfD: UNOISCLDSED --------- � "
SOUiH LNE IOT e --------- � ,� 90E SEfBACK E NOtE••
RECORDING N:ORM+ITION: 1924J0 (NOf Pi.OTTAHE) ' i ��� RFM SElH4CK: NOPE••
!!� /� �^..,- {� W7�IUN 9UlDNG 1Elplf: SO fEET
NOiE: NO EXA41M'qN FUS B�q IIADE TO OETEHOff THE PRESFNT RECORD OWNER OF k�* /� �6� 1 \ yµ,u I
THE ABDVE NHE�ALS�OR A6NEWL UNOS ANU PPPUiiIENRHi RlGiiiS iHERETO.OR TO V I, ��}� ��!!/s • . � �_�. YA)(�1UN BULDNG COVERAGE: 657L�(77x�PMK@1G N BUllMIC OR ON-SfiE
�, OEfEfiN!NE YATTeRS W'r9CH YAY AFfECT lHE UNDS Oi RIGHiS SO RESER�EU ��I � r,�.
7.EJSEMENT,IYCLUCIHG TQNS AND PROVISIONS CON�NNED iHERE1N: �. Q 6 �c Y �-��____ ���ro��T���a�'1��W PR�C�SS
� 1,��-- ••,a r�r rs�ou�n�srtE,aa,rs��rnu�z«f
RECOROING RSORMATIOfi: JUNE J,1982 UNDER RECOROBIC!q.B20G0.10186 'a "
AFFECIS: DESCRIBED 7FEREJN `� f�� � I� I ZANNG INFORWTION W/S N0T PRQNDEO BY @6URER. PLEASE CONSUL7 THE RENiON �y
����,��,�, �SS��'1�1 t t`�5�� � a G7G1 BtSN i REOUROENIS. �WIC TIiLE 4)F9R ADDITION�I DETAIIS AND POSS�E SIIE SPEf�1C Iw��.
�„_��
tY 0.L N-�{39
B.HIGHf TO IMI�NECE55ARY A01'ES Nit CIlIS OR FlILS UPON SND REMSES Fdt J � I REf'EftENCE SURVEYS. 0 0�
lalG COUttIY AS GRIN'ED Bf OEED�ED JtR7E 24. 1987 UNDER RECOR0ING N0. w��ie, � �,°M.j � 12'0.L 3-�4.SG � 1.Cf1Y OF REMON UA N0.LU4-OS-031-111�fEWRDMG N0.20050719900008.
8706241�B8.(NOT PLOI7ABLq � � '
9.7FIE lEPoAS MID PROVISIONS CONTNIED N 7HE DOCWIXT ENRILm�OR[11NANCE N0. N O T E S: -
�,2'R'cCOROm JUNE 21, 1996 IS RECORDNG NQ 9606210866 OF OfFICW.RECONDS LEGEND �, VICINITY MAP i, 1�1pQn'RpJM URIf16 NID FFAiUR6 DEPICTED FEREON qRE B�lSE�ON FELD
iD. D�Of TRUSf MJO 1}E TERNS AND CONDtIlONS TlEREOF. S -
GRNffOR/TRUSfOR: S�IUNY,LLC R SYNNEX.LLC Qp iau t�t7 B Yev iw�Bc fY� 0' EX SSTENCE OFµBQON'l�iOUND fFi1111iE5�Y.TMUEiECiFD OR UNOEfECTED.SHDULD/BE _
G7iJd1fEE/3ENEFlCURY: FASISIDE FUNORlG.LLC.A W0.411NGTON LIYTm � VERIFlm.
���� o �� �- � ���� � � _
Tr�usreE c�scnoe rnusr�se�a NG LEGAL DESCRIPTION � r�a rur e na areer uwm�t+s ceD ��' dv � � � z.a.�asvd�ces�m�r(us surtvEr r�
' �wouNr: fs�,e�o.oz • �,n'�/a u�
RECOR�ED: JANUMY Yl�2tl0) (�fRST NIERICAN 1fILE Il811RANCE COIAPANY'S FlLE N0.NCS-52079�-ORt.Q11ED �� swffl uCt � � � 3.ND ENOEHCE OF SdL BOWIGS WERE OBSERYED AT 7FE IIIE Of 1HE FlE1D SUiVEY. _
RECOR�INC NFORAUTION: 2G070122001941 (NOT PLOTfA�.E) ��Y 20,2012) l40 �� y�
11.ANY RICHT,ASSERiED PoCFiT.OR CfW.LENGE.44DE Bf ANY PARTY.WCLU�RlC.BIJf 11E NORfH 180 FEET(AS YFASl�.O ALONG i1E EASf Lif�OF ThE NORIHEAST OUMIFN � �qElt ICIE t�-^� o�[
OF TFIE NORRIM'EST IX1ARfFA OF lff NORflf/lSf Q1U1RfER OF 7F1E NORIMYESf OUARIER ::�q.� �� �E s9!s�ET
NOT t1MRED T0,A CREOIICR.IRUSiEE OR DEHTOR IN POSSESSpN PI BANIQ2U?fGY TO pp SECfIINJ 15.TOWNSFIP 23 NORiH.RAN(iE 5 FASf,wx,w Kmw cowm. ` ��
AYOID OR IM✓ALIDATE 7FUT CERfAN CONYEYANCRlG DOCWENT WHICH REC0��0 OECE4BER W�ISHINCTUN� 7MFlC97ol irs��:',`,�'-:i. CMfl �40� :
a�,2009 A$RECORDERS N0.20D912310D0301 OF OFFICYY FECORDS.(NQi PLOTTA�� � � � _§_��� SURVEYOR'S CERTIFlCATION: ece
excerr n¢wesr iso r¢r n�rs�� -m- sur m.aa uu
72 EVIDFNCE OF 1HE A11TFqW1Y OF THE WDMWAL(S)iD IXECUIE THE FCHIICOMWC 0 me+oE u�nE � ia m[D�flat swrtcS uc..ito msr ava�w 7mE talx�t�a�up�n^. 8 y pM;
DOCIMENT FOR EAS79DE FUNpNC.LLC.COPIES OF 1FE CURRENT OPERAl4tC AGf�lf ANO EIfCEPf 7HE FASf 20 FEET 7FffRE0F CONJEYED TO lv1G CWNIY FOR RWD O cad s�(� --'- ONY Y�t fE�iE e1 l�t 6 10 CER6Y TlNT T16 IVF OR RAT NID 1ME SIRiYEY OM RCN rt 6 BtiSED YFRE WDE N
SNO'JlD 8E SUBM!TTED PRIDR TO CLOS�lG.(p0T RDITi19.E) PURPOSES BY DEW RECORDFD UNDFR RECOROING N0.i8W907: O smM�wraa(5aW -//-- �roa ic00�wCE w�x nE 40tt��s�Nu�lm uEi�L IEG.�15 PoR A�TN�WO 7rttE 3��,,��YAtq�y�� DAl
71 EVDO�CE OF 7FIE HIIFiDRJIY OF TFE OFf10ER5 OF p.WJIY FOOD CENIERS.A ONLSIDN MID DICfPf lHE NORIH 35 iEEf TFgAEOF COHNEI'ED TO I�IG COUiIY FaR RQ1D O 9ro�v ffi�wu[(sl `�� u� g wmErx,ow2r esr�aia4u wo�mnm er Ku iuo�ms wo wa�n�s�s�.���.s. o� o�n
o s+mrv�a auar 1�! - •ore�a p(e?��4V(aj,4 0.�+p�9���n.zi wa n av uat�nc�.nc n¢c noroc�es
OF FRED►El'ER STORES,NC,TO O(ECUTE 1HE FORiHC0A11NG NSTRIIAETIf,COPffS OF PURPOSES 9Y OEEU RECORDm UNDER RECO(�ING ND.SB49�34; pbYRElm�II AUpaf}p{= �
1FiE CURRENT NtTIGFS OF iN00RPW>ATION.BYUWS MO CER11FIm COPES OF C Gt t7G(p¢ -�--�cpt lw PIYMll6 0
PPPROPRUTE RESOLUf10N5 SFMJUID BE SUBAS�Im PftqR TO CL061tM,.(NOT PLOTfIIBI� M1D EXCFYT TH4T PoRTION IriJG NORiHEASTERLY OF THE NtC OF A qRQE W1MNG A d'4 vs vK�i -o- oa M�wxiaes hf�y M7E Oc rui at rw /ua�57?0.20it ^ q 40016 p �`V
14.IMHECOROED LFASEHOLDS�6 hNY�PoGHfS OF VFTIDORS N70 SEd1RiTY ACREE1ffM ON PAR^11EL i0 7HE NDRiTf 11NE Of SA�SUBDMSION A1�T�ANCfM 70 A l!�20 fEEf � r�ae[�m�x(rv� -7 lm�uc m dxrWqs �b �sip�,A��STE4E SOQ'
PEfLSONAL PROaEliTY Ml0 PoGHiS OF TEN�N�S.M�SECUFiED PARIIES TO flEuOVE 1RPOE wEST OF MD PMtilEI 10 TIE EtiST LINE OF 54D SUBUMS�OM IS CONVErED TO K7lG R rN[xaaNr(M9) �- rao w ruxw�¢ �� LAtN
Fl7(TI�S AT THE IXPIRA1qN OF THE TERN.(NQf PLOfTIHE) COUNtt FDR SE.129fH STREET BY DEED RECOttDEU JUtf 24�1987 UlDER RECORONC � wd uunt -%a9- o�a va�ua - 9'�
N0.870624118& � Wpt u�C� � Ol�pl&H61E,P1S, p�iE
D 16oGf41 Mnf °� �°a� �� 'MA9�1CfON I�CISIRATION N0.10016
.�. � � WIfU9l67RF �
-
TASK 2 RESOURCE REVIEW
• Adopted Basin Plans: The site is part of the Lower Cedar River drainage basin, and is in the
Maplewood Sub Basin.
. Finalized Drainage Studies: This is not applicable.
. Basin Reconnaissance Summary Report: Once again, the site is located in the Lower Cedar
River drainage basin and is in the Maplewood Sub Basin.
• Critical Drainage Area Maps: According to the city of Renton, Enhanced Basic Water Quality
treatment is required. Also, Level 2 (Duration standard)flow control is required for this site.
• Floodplain and Floodway FEMA Maps: Please the enclosed Exhibit D — FEMA Map utilized for
this analysis. Panel No. 982 of 1,725, Map No. 53033C0982 F, revised May 16, 1995, indicates
that the proposed project site does not lie within a floodplain or floodway of a stream.
• Other Off-Site Analysis Reports: A review of Exhibit I — Basin Reconnaissance Summary Report
and the site investigation work conducted in the preparation of this Level 1 Drainage Analysis.
The U.S. Department of Agriculture Soils Conservation Service (SCS) soils map is also provided
(see Exhibit F—SCS Soils Map).
• Sensitive Areas Folios: Based on a review of the sensitive areas as shown on the City of Renton
-- GIS maps, it was found that there may have been a wetland on subject site. However, a Critical
Areas review was done for the site and no evidence of a wetland was found. There are no
landslide, flood, seismic or coal mine hazards, etc., associated with this project site.
. Road Drainage Problems: This is not applicable.
• United States Department of Agriculture King County Soils Survey: Based on our review of the
soils map for this area, the entire site lies within Alderwood type soils.
. Wefland Inventory Map: There is a wetland mapped on this site per the Renton GIS mapping but
the site was analyzed for wetland characteristics and none were found.
• Migrating River Studies: This is not applicable.
15432.003.doc '
Q
0 �
�
� �
� �
� W
W �..L
; �
_—
� �
SOUTHeas'r i267H STREET APPROXIMATE SCALE IN FEET
500 0 500
H
w
g �
� � NATIONAL fLDOD INSURANCE PR06RAhl
�
� ^
126TH STRE
SITE FIRM
FLOOD INSURANCE RATE MAP �,
I I'' � �, KING COUNTY,
WASHINGTON AND
F INCORPOR.ATED AREAS
�
W
x
PANEL 982 OF 1725
� �
y SOUTHEAST 7QJTH I,�IIIIiIII II III �SEE M.4P INOEX FOH PANELS NOT VRINTEDI
PLACE �I!i�II'
� �,I,,I
!,il I I
�� C�MaINSr
COMMUN1IY NUMBER PANEI SUFFIX
u'xi tountt.
�r�cY[anroiartn�ut�t stmn aQ t
� .,� a�nra�on ac saaoes ac r
w I I�'J�,I�,
8 Q '.I�I� �I�il��,��.
J .iil,l'��I i�!��
W
� ���i�'Ij�ll��i'^�',It
n, iII� I
Z � S011TNEAST
737N � MAP HUMBER
' O STREET �'I�I ' � 53033C0982 F
� ` ,, ,,� MAP RE1fISED:
�a.���� MAY 16,1995
\\n��
�
Ili I Fedenl Etacrgeacy Managcment Agcncy
i ' �
This ic an oRlcfal copy of a portion of tFw abova refereneed Ilood map. It
was extracted usinp F-MIT On-Une. Thla map doea not re0ect chan9es
SOUTHEAST 136TN STREET tlUe docdk.m For the latesay ha�c been made su6sequent to ths date an the
producf Infortnation about National Flood Insurance
Propram footl maps check the FEMA Flood Map Store at wviw.mac.tema.flov
Exh i b it E
Sensitive Areas Map
i I
�
�
Legend
City of Renton Sensitive Areas WellfieldCaptureZone
■ One Year Cepture Zone
� Fiw Year CapWre Zone
i -;,i F ':'--.'���^':'_: .:.��.M�- �' a Ten Year Capwre Zone
� __ ..--,i, _-_ •-• .�._ tl
' �':: '::,L��:':--..�;;•�-�� >�_i.�:�:'
.,.. �.:::r" ..:�..:.
-- • ' • •- ���: ;; Coalmine
. i ;'yl;. --. ',i; •'a�6:.::_ -
.,�`i:'-�;J..� .:... ;'t�:•.�..i%•..�;J,:: .�' ._ ■ HIOH
. .
� -" �:::•,�.:� .,i; •' - .::I��i; � MODERATE
_rt:a�:i:.:_.:. �•..:i�: :.-:c`%/::.:_� ",,�• UNCLASSIFIED
....
, '.. .... i..J ..... .�,/,.. ...:':��/l, .....,
� • .....\}i�•,
i _ -;.i; -::. �>�_I;r. '_:- :�;.;:":_: �al��•.• � Erosion
I i - _::=.:J,;�....�; :At„u._ ,:;':al:..,�;- >i. ■ Flood
�„�%< -_ '.:�: _ .: `vi,:c� _�.:�,�
f 4,.�.;�� ;.i, � •�I�,..:' _ •,:-:.�..-. �,. Landsiide
i::
. w I � �� �-_•.:����� ,�. _ :..._`..•�1:-.��:• ■ VERY HIGH
� � �J.: __ •,,i aJ.c.,_i;- :d� � HIGH
- __ 'I ,.i._l;:r .�_.�• :;:: :::: .:::�_._�
i _ _. �'.::-=..�:=L.::::_: ••:;�I:r-:'_'-,ia;+.:: . � MODERATE
- - r_I:�. �•.I
�'•"�L�.. ';�:• '- UNCLASSIFED
__— _.. ...__. t , f ..
.__ — _.._ \ ��
- .___..___._.._. _.— -- �
- -_. . ____ y,.� Slope City of Renton
_ . --- �_ � � „i, .
- - NF�Tii.sT. �.�ii<•5.:.�,?.�'0-:::'�l.Ut,•. >15%3ca259L
�• . - -
�— `�' ��_ -- " >26%d<.4096(Sansitlw)
- - _ . >4096 3�--90%(Pfotade�
� _. _
� --•.:'.`.��:'.:. i •
l;, .F��4r �L !/� �
'...:�� _ ■ >so% (Prot.ctaa)
.i; ._. ) , : � �•::'�_f,,i•.:.'
':::. �wt� �_� si;.;: ,�:..`"::•i� - �'�� i ❑ Seismic I
_(;�� :'::. , : �� ' i
_,_. � .. _. : Environment Designations
:slv.. ..;�..i.�,u. . �i,� ��r;.G; __ _ � Natura�
�al;:�=-- �,�1.,:. . .:;t,li�:••,_ �I::-:__ :^ _-
`�•":J;�� =',.,��� - :;:I,� � :,,I;�..`� . � Shoraline Hlph Intansity
, .;i;�.. �7'�:is!;: r_-",'�'.�.' ' '%!.,•'✓..::;__,i,. -- � Shorollne Iwlnsd Hiph Irnensiry
........ .....:-
..._ . _._ ._ . .
_
._.. ,-, •- . ••:: � twrellns Recld�ndal
.. •. =- . •
..-::�..,.;�•..��,:G ...:.�iCc•,.,y. ..�,. . . _ �
..... . v. �..-.� . . S
. . ��:' - t� - .
�= '.` __ J,. ..� � d ,:. _- UmanConsarvarxy
A :.._...�.__ ' ,,�C( ..._. O
}�� l �4<:::==•ai�'v '^�'^ ��.�� • � ❑ Jurisdictions
� �- . (... .�:•..._:.:��-.>jj• !_._.... .rJ.
. ... ,.;,„ ..._. ..
- •• SVeams(Classified)
• • . . .. .. .. .
;y. a• • .. .._. ,...._.. .:•..��.; .:
..... • _ i
...�...•.-•....__
— 2 �
.. — - — 3
'j:;A_:� ,_' .... . . ' _ .... .. ,!.. H�te.S
�
.
: . ��- _ �- _ •-
�.. ._. ..." � " ' "
.:; • -• � -
.. .
_ ..
.._. .._.. .��;� ' :.+: �'I ��1� 1�[.•
�'.
, . �. .
.
:
.,,. .. ,� �. ..... . �• .��� . .I 'N��.' �>;1.�:;�.
�... .... ..!,.. . _.. ..... R _•..,.:;': ,.:�� - None
' •.i:�- a,
.+.1I�:• - _- - ::°�i',�,,: � - - - - ' :;,1•':�: - _ :;.i.<<c~'�
�.• ....._.. . ._
- ..... ..::•• .:.:... .
�-.,, .._._. .. .;:.. ..... ..i'. _ _ _ ._ _ . ",i,
_. .._.. . .. ..,...
.:::_
.:; '�i.
•.`/"i%..,;• .:': "vl,;. ,i: .,.�r. ,i; ,�, - .;,1;:•:�'•.i.. ;'��,'� •�.•�,:,r.i� ;;'�;•?.e
;` � ,i:" .:.: ,�;!� �` � t..:.: �,i,- a i 1 ..
� �'alc � ' '� ���
' >sl:� � .���;t.
ri ' - �:- ,i ;- �,u< u� ,,� _ , , >
� �. �. I.. .I; �� 1 . i '. Q
I .. �..� � ' �: I .:' . i�� ._ � . _ i 5�. ._ y�
y „_ .
� I: ; :_. , I.
_ .. .
i �t
� : „ � ' � --
- -- -" . . .
i • �.
t .... . .... ..- . :- �� .....:. . -. .-'- , i,... �. ._ .: , .,.._:_ -:�._- - '
1•1,399
Infomlation Technology-GIS This map is a user generated static output from an Intemet mapping site and �--
117 � 5$ 117 Feet is for reference only.Data layers that appear on this map may or may not be C1Ty Of n
RentonMapSupport@Rentonwa.gov accurate,a,rrent,or ou,erwise re�iable. O=a�
NAD 1963 HARN_StetePlane waSn�n9con_ Finance&IT Division
NoAh FIPS 4601 09/19/2012 THIS MAP IS NOT TO BE USED FOR NAVIGATION
�
�..L (�
�--+ �
� �
� �=
X O
W C�
I
Soil Map—King County Area,Washington
N
N N
m �
N N
N (V
5634�J3 Ci63502 563511 563520 563529 653!�38 Sfi3547 563556 563i�5 563574
47°29'18" a� Q; 47°29'18"
r-
m
in r'
.�._;,;;�d34..
��i
� � �
ro ,,p"-
rn �"�'
� .. «a �
.,.. ' ... o.. ,
�
��
_�
�
�
m
Bl
in y.�
y� y
,.. 9 �Y
�",��� i'�,�;
�
��
� ,�w�'��� z r
��ati,
u' (i>) t� ,� yt�.��
�Y�„�� � �
a, t
�
� �,�� y ,
uO1i �'r e�� �'3 �
�„
� `^� ��� x w �
"A,.. i�� *�,�. .r
�
.�,. `� y� q,.��
v;�Yr• �
»:. ��'"i�`..
k" y .
y ,�:�
O �N.,.
N ��� r,d. y.: ��" �:. �,*�' .
�.,� a >w 4+ ;;, r�r. A, �,""�, m+� .
"KQ"�'�5, „p,:. ''� F+t�' h,�: � . . .
. , ry ' ��n�,'F�lGf � x,.t':� .
' �„ w,s�„�u�,.,��:p � .;: ' , � _
� !� °'�., �"�
,. �
� ,,.,��� �� �
� . .,
, ,, ,� � , � ,.
47°29'16" Y� ,
47°29'16"
563493 563502 563511 563520 S63S29 563538 563547 563556 563565 563574
N Map Scale:1:422 if printed on A size(8.5"x 11")sheel. N
b� �
� ^ 0 5 10 20 30 eters �
�� Feet
/V 0 20 40 80 120
USDA Natural Resources Web Soil Survey 5/29/2012
� Conservation Service National Cooperative Soil Survey Page 1 of 3
_ ,..___._-._.i. '_.____-I --_.. . �._____.__ _ r_"__ ._-_."_.__ .-_ .-_ ____ _ _ _.. _. _.� .
Soil Map—King County Area,Washington
MAP LEGEND MAP INFORMATION
Area of Interest(AOI) � very Stony Spot Map Scale: 1:422 if printed on A size(8.5"x 11")sheet.
� Area of interest(,4oq � Wet 5pot The soil surveys that comprise your AOI were mapped at 1:24,000.
Soils � Other
I Soil Map Units Warning:Soil Map may not be valid at this scale.
Special Line Features
Speciai Point Features �, Gully Enlargement of maps beyond the scale of mapping can cause
v Blowout misunderstanding of the detail of mapping and accuracy of soil line
. . Short Steep Slope placement.The maps do not show the small areas of contrasting
� Borrow Pit soils that could have been shown at a more detailed scale.
�� Other
x Clay Spot
Political Features Please rely on the bar scale on each map sheet for accurate map
♦ Closed Depression � Cities measurements.
}� Gravel Pit Water Features Source of Map: Natural Resources Conservation Service
.. Gravelly Spot _ �_ Streams and Canals Web Soil Survey URL: http://websoilsurvey.nres.usda.gov
Coordinate System: UTM Zone 10N NAD83
� �andfill Transportation This product is generated from the USDA-NRCS certified data as of
/� �ava Fiow +++ Rails the version date(s)listed below.
ala Marsh or swamp ''�' Interstate Highways Soil Survey Area: King County Area,Washington
� Mine or Quarry M US Routes Survey Area Data: Version 6,Sep 22,2009
p Miscellaneous water Major Roads Date(s)aerial images were photographed: 7/24/2006
p Perennial Water �v' Local Roads The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
v Rock outcrop imagery displayed on these maps.As a result,some minor shifting
t Saline Spot of map unit boundaries may be evident.
. , Sandy Spot
� Severely Eroded Spot
Q Sinkhole
�f Slide or Slip
p�f Sodic Spot
� Spoil Area
Q Stony Spot
�� Natural Resources Web Soil Survey 5/29/2012
Conservation Service National Cooperative Soil Survey Page 2 of 3
Soil Map-King County Area,Washington
Map Unit Legend
King County Area,Washington(WA633)
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI
AgC Alderwood gravelly sandy loam,6 to 15 0.6 100.0%
percent slopes
Totals for Area of Interest , 0.6 100.0%I
- --
i
'
i
�
i
I� USDA Natural Resources Web Soil Survey 5/29l2012
� Conservation Service National Cooperative Soil Survey Page 3 of 3
�I
!
Exhibit G
Assessor's Map
v/ ' ' 1 9� . s Y. ,1 �.i ..:�.-; ` .�.. - � p ��' l . . :O aii . ' I�a' �' � a . 1 � I '
,
'.�„ v. . : .,
O _.. C �. '' . . .., _ : s� _ i , � � !r, � _
i µ; V
1 . ' -w G '__ � � x wp ¢ �� �'� ' I ' I� .' � 5!�� ±:-. ..
n � � � 'c:,
7 'r r� = Q � � � �� �' ' ��a oU. :,.:�1�.3
N ��.?. n � y ' �,: .� � �1i ,
Y �� K''��� � y . .� � .c I �.I. . �- I p d 1 �� �u ���, t U U
n � '- : �•' �„
� � � :
8 ,��. „ � . '�
� " ...� ' � '_' " � . ':v a�i
� ... ..�..-.,. -i �' .�.. .�.�.,1, �4rsacFri —
, y A 'n �:� { . �.,, ..: , � � 1 . —'�+-.�'�rri—:
� .- a ; � _' � �„
i' , s i ,'. i r � �
� • .. � � " � �� I •: .^ A
� , - � • . � _.,� '1 �I G y 'lr .'I� .
i II �
1 . u.r..... :. : I . � � '� i � I � ! � �'� 9 '��. �
' . i"� :. .� . '— �kdP1I�Y'_._'_I r Z �.._M�LML � � ��� �,S ' �.1': , II . {I 'l
Z :I.. al� �. . I WA�� iv` �� � � �II � .._� �•s.�i II � . .
�: � . ��� , �� � , � . _„ ;, .
.
I' Rt I ; 4
! . � .
: ,, � , �,
.�..� . . ,��_ I � ,�� ;: ....II . �. 2�F' ... � ,,. ., �.,.,. � ..- � ' ap n ib s" �W.9't��vwa`. .� �� 'Id �
�� � r �
;�+� � I, —'-.: �� ��:�.. .° -, `..,.__imuarmx�_._( F� .�� 3 ir�i . .�i Y p. w, ,_ I. � �� � @`GI �li � . �r r� u� '
I . T
�
I � " i. ,,�..
�' t„� i�- � . �� . ���� �'' 'i- r ;u r�il.;�,, , : K' �` F'
. . , �: ,, . 1 - .� - �� �. � t1: _� �. . �,d — :� .
� , :i ��L I � Ue "'� .' Y � �I, 5I .y.,..1 .7 I. p .. ii
� � . .� : p Y .� � .
9p0p 6�� �` ` I . `I... . II� � :�'.GI � ' I�Y gI:"` I � �1 n 1
r��t0 � � .�� � I ? 1 '
i � i '
: .. �� � �: ', �.
.. ' �, o ��.0sa-ro_ ; .; � ; � i� � Y� i 4 I: �' � ",�•:1, i� `
�nt e , :� - � �•
C� �� - h7i+u ��' '� 1 ��-� i G��...: . "�' � , i ;�x � ' � \ �
�� ��� �`�. k',r . .� � I .. �� ., : � I � � e
;" � ;. � .
. . . t, i,': '���� t ,. . .,`t. I 7
"_'_"'_"'_"""'_'_'"'__"� .-._ �.� .. . �umam .. . �, I li � I
_�.. � - aw.raum•"-'--""--"'-'_,. �r - �-'-
.. ���mia�a..
.,
'-�,.���.aTr.�---- .,...., �
. F, � I. t.! t
� �rirr� i. �
�_._._._.�.�._.�._'_�'�_ "'_'r��- r..�."_ _'_'_'
�4 ,. . P � � " ' . �I.. r.
, . .. .................. ......'."..... ..... .,.� -1.-_-
,u..,m�. ., ... �:.. ..�.! . --- r� � �..,,..,.ir --ai�.,,�niv.� .-^n•-- t -•-rs.xr. � � ��.�,�'
��. . � _.,..,..... . .
sr ,,r.
.. 1. ` _,-'� "U ° I I ,I. "I .�.
� * �..� � ��� I� „
. � ` `i I � .. i � � � .fl � I
I , „
: � •ay.
. . �� '�y�-ti ',.� . � � :�9
: y� .�
�• �� � � �......._; ')���i4�.�•��aa' -- zo Awyae'�i _.l.rw,, .,::.� '' i� R � '
t
n' � ��� � �'�s�ooti '`°'►.O. ;,, b � i, � i. + �� y :� p i a �
, E
- ....._... ,......__.._......�. I
� i. ti � � �� ��GI 1I �e I�_�, t
r ' � '� ���,�y ., �� i "� � I: . r-" . '1 � -. I'^ .. • �' U
�
�� :
,
� r � ..•,
: � 'q .i, . i:..l U
� �
a
�;
. . . ............_..... �............ ... �.���.� ' . �:� q
o� ,. . . � s ��� :p�� ` 3„ �'I �V W � �� , �F
� I � ( � - � � I y i� 'I U � ` i .
, � � S. i' 9 I: .�' , �I� s
6 ..!� o- - - �m3� by - I 7a y� . ,`�. d
' � . b I -� � � s t i � .�. , �i�
��, Ny,�,H„� _ E N �. l: i r � :rF ,r 1 �� I � .� '� ;• y ��
� �Op � I = � � � � � �9 .� �
� G
t . �� i �� '! :�° � !� ., II .� i .� N\ li : i ry
�� e ��`�`a � ! o .rc . � � �r�Vrwiummr - _ WO p •,
.
, �
r S i `+�� h � ., ', �. � � I It ry J i ,! �� � U U' ' N I� 1.� .
„
751���1���� �xa�w.oWw - .� � �u a7�ia�n ...... � . � �` `��a e ����� � x� � �..'Y �� �+�� v�� �7'� .'V, �''�1 p
� r .- --'-'- ---._._.� '._._ -'---" .
h a
j .,. � " . ' ... . ...
� i�� �i� i� 1�' .... - I -- . .. , i
..., .
a
����e�lF�t`t . i I . y I, i'£�: 1 >.,` � ' a..r , 1 ,�I ' ...II �.Y �'' I.; .
�fsE����,i� � ;: , u, � I � ;, , i� , , � �, ,
�iii!j�(i'�f�� , � § ' '�, ��: �I ; �. � �� �'.` � Y� -, ..... � , ,* '1 _VY . ,
� ,� .
,��2ite��Ittie 0� � �e ��:. qi y -i�. � u . • i..- {, �: ; �: 1�
.�..�..... .. . � � I 1 , i :. :. '" A „'J .`/ . �IT . � �..
. " ' i _ -_ Yl I y ,,' I y: '�, ��' k r.. piti� ' `',� \ '. �
U .. i ' " k'v k kic ' �"'' Yo�" I p, .r � � r M ....... ,.��, i: �i � ; yS� \ � Y .,U.� i �U
� I t/
� , �a , ��� � �� �� � :� �� � ��
:r ., ,� .. I b b � � .�r i I: i . I� :. "9� _ -
' .v , � .., �� .O'
'� .���,', U ; ;. � .:�� Ir '� � : i� �pax x., `\ .S`, oi9
• i ; ,
� : F , W � .��: . . ;. 'i- .1:. ' P � I z �:` s_� . U �� . U�. .:� � a�.��\
K �i ��
4 U .. � � - I 1 1�. � I � µ�' �._ � /l .f , . �� �
.�� .
f � � . '�;�;.•'......._.....� � 'e U � , `���. __ ,xroW' ., �h.� 'i "�. I y .�Ua i, /4` 4'�i en a"I dr��
i �� A� Ux'3. vl
0
, �........ ..._...... _ ..
� . � __. W / � i� r '"� �; ''
� � � � �
�
� �. ,;.+ �'�y^. � Q �� � , ..,. : I n � I� a �,.� �I � b Ux.,p
':
i'
3 - ....._............._.......... . �.,, , ; �. .. � `,``�
,
, �.
I� t :�' � ��..o..,.,.r. _. . ;-k :�.1. �-. �- , : . ,.., .,. .i� �.,,� ��' �rn p ;_` `.
. � y � �� �
r' ' :
t',
� " '" -
..... --' .. .,.. _�
....... ..... � .r .
, � � . ._ . _.. — �:.�_' ',� . �'
. '
.
� .-.
` "
.....
�. _ � �.: �.. .., _:. , ._:.. .1. ___', :.���,.�,�. .... ..:_' �;: I�,.. '�
� „ ;, � , k. � ; n,.�
on . : . : _ ,. � , .
� �� , i ;, , o _ � :i ^ , � � � ' u n a ! Y e .x�. ,
, ,. .
•'..
..� . q � �� �� .�� ��.u�'0��' � ' p x�y ii„!.
i € �� �.� � � i. " I :j i i,� �� u i, i� =i i 'r, u .I
�; ..0 _: Y 'i� ° ..�.«��..�, ... ; .. ._ � . i - _ :a S i�� . t o ��" , ' �I o�. q . ���.�.
j �
� , .,, �:� _;.
� � . ' -. .. �... . �� i . ��' •
3F U
��# � � I. ._.. � ., r`U' .. �1 � . �.:..I i: y.� ., ' , U n pon1.� ' r � b
U 4:. � wrun I
9 .... ,. F , �' 'v ` � ,' ;'�� � �. 6:i, b_ F'r � �
; � ,,
� �
i I , I I I ! , . I. � m � 1 ; , .I I l� �,,,.� � I Y, �, � i, , � Y ;:.
•; c; ., � �f � u �' ��: �
- € ;, , ..:':' .r i. - � ' =d i u : � u ,
;,
. , :,.•�,,�,
:. , � .
� � t � e � f �� I �N < i � � `
; �, � u i' � '� ' ..j .,'3 ;
J r ,. '' v � ' " _ i:
p � " ` ' ' '• tr�...�.. .,,I: � ;1w p i- i�: .. � . :;'..
S�a�� ' � ` � I I '... i :` .�� � � y o : �. � P u J �e�re: --�---niia�d�e,-
� U . " 5: � � � � ' I I U ' .i:
� � � � i � . , ro a f�� � , ' . .R' l lia � ��� q:q.� 1� s , �
i ,.. . .� . ' / . ,. ,
f� •I � �
.ft� " � I ��,' �'� " , Fim ',gC ` ,.,y U y': ai r�,i:y "°r.r�. --p: ba�r � k'. /_'"• �' F `.: t.� .'. t•,:.
: : .
+� (1 _ 1 . � � -,� T Y�: F
i n
� . �r. � �-�'j . A I '� � �' 11 l . �. ' . II .:
< I ' ..
1 4 �
. � ..�� � "' r a? �� 1 . . I-I"E ii? e '� E` , ��' I� 1�.�:i� � U I� v li p a li v �t . ��� •
.� - o u .. , �"
i
. ..,.:, . . I .� , f . ` c'... 9 c ,7 1 . ;,� r. - IJ � IiR i L'� F � �:t "p
. � { ,.
�xw.ma!a - — .... .. _. ' � e- �' A� r a
. .,.
:.:_— .-- -. ���' �.
� . ,,.. , ..., . � _��.�.�,.�..�_.— _— ---- --,— �m,`w�n --'-- -- _.-._ .-- _ . . ,... ... . ._,,.
� :S I � � . . —y .. �n�wron _'
Op� ' � L I �� i. p '• �' _ ' 't � h i�, 'I qj
I� i�' y. I V I h � �'�x p
�i
� . .
� �z , i Itg P p fi , . I�
,p� - I� ?6'r 1 -. � , :, ..,
;o -
x 5 . �' e` u '', b d i ss i, �� 'y
�o „" i� i . i�l j � �, �,, 6 5 u y'
Exhibit H
Wetland I nventory Map
;
Legend
City of Renton Sensitive Areas WellfieldCaptureZone
■ One Year Capture Zone
Fiva Year Capture Zone
' I -'�� :Ik:+ - ' � Ten Year CapWre Zone
. ��. , ._. .i`= ;i
� - "�' '-�" -- - Coalmine
- � ':yj;.�:�=:_•.i;� :��--:::.,i,::':::_:".'; .._�
, � ..t:: .._. ...I. , i.�=-.,� ■ HIGH
'� ' .' .._.. ' . . . -
.:. .._.. .... .,I�:
. �..:.._:�.
�•,:: ...... :::.,��..._.
'. _- "�.�I,,�' :.�;�� _ - ",�� .i; i-1 MODERATE
= :� ..J
.�.`��. ��. - �� ��- J., UNCLASSIFIED
�;:i::.:?�:: >r_i:,•::_�: -::�:,,:`:=: ':;��:� • � Erosion
i , - ;:. '- ..r; ..1:,- --. -_ •�. ,I.
� =�_I;�� '��•�' - � Flood
'�;;i;, __ �-,;" :' �;i;.�:
j `,'.�...�.' ;ir; : ,�j'.,:�.�:_ ::_:�._�,. =:. Landslide
:.�.<:�.
��; i �_:;';'•::i_�1:.1',.i;-�~_ --:.t_:_i:,f.�.•�=:• ■ VERY HIGH
, '�Js: .:__ .. ��>>J.:.: ' _
F.:,�;,.':.,.'.?,,�I.:';::''.._.,:I..;�..'..`.':;_I,; ■ HIGH
i..._... _ -. .. ... .::.. _.
{ `:;,6::'.::_:: ��'r j ...- .,t,l,;..:'.
y. . ..a yr.�.::_: .. � MODERATE
- Y��•,I„';�'":;s,l:i. ='.,�;..:1'',:.I
•.. : '.._. �...,;:,
"' ; UNCLASSIFED
— .--.� l. -. . . ' :
y _.
.�,......_. . .— .'_ '__. l -. .- ,. . . . f
__..
_.._... ..—__. __ ._ . .
— --- - __ ____ _ - �n �::.-1• � ' r!�_,.1 i lope iry o enton
._ .� . �.lLJT. �!'�, S+ . ,.TNM.. _ Y'IS�IO F�<=2S Y0
`` .
- �: >ZS°�(1$�<=q()y($Bf131hV9� �,
"'__' ' __ - ._:....._. ■ �',
" ' ,.. _. >409'0 8.<=90�Ya(PfOt6Cled)
.., .
-_. ,:.�. , i _ �.
l: ��6 � li
i ■ >80% (Prolectetl)
" ) • .i '� 1 I
� Hi� � ' � � i, - �'� ' ❑ Seismic �II
l f � ' � � �" - `' �� � v Environment Designations
,;.I, ,1 �A �l - - 'MIC..JI,, -- , � Natural
�I � �l : •:ix�u:�::�::•�;�.Ir,.�.- _ -
� Stareline High Intensity
� b_,': .: � ::a�;: : ' .. � ' .
C.;1.).fL ['�." .. :"`;�).:! -
_ - '.,,1,;. .:-......;::.::["-i..''.I.v:•::•"- � Shorellne Iwlated Hiph IMensity
_�.:• , ,.i, •-•- •._ -• ,i: � Shoralirw Residm6al
..._ .
,�, .... _: .._
_.. ;...:, .,,, i :. .;_,.
•. . •. �.
....:�..:.alR:t•�:�f�..�l�;.C ...... :.,w..�.•<-:�..:x.�.;r: ._._ . .� . .
._.. ._..
.I. .:G:.:,_, •- I . . .
� . J ,..�il `_:_ --__ � Urban ConservancY
�� � . '�� � ,,, 4r ���i��''�, ' `- — . ❑ Jurisdictions
v ,.I,,•� �:•..._ ._. .:J�� E '_.._. •,j;�
..�,.=•;,':•: ,-..;�,-,,�,'-•., ,,••�: : . Streams(Ciassi�ed)
_ ..... _ — �
...�.•
— 2
__. __ — 3
- - �,�i�,:, _- _ :::"..�:== �;�-� _":::�..�" ..._. �.r��:.__---„�,r--.. Notes
�" rJ,� °'��= :_l:'g:"- .i.. M�?: �•.�Ir,: :);:: .ss_;�.-�:-_: None
, ,
:-••. .
I .-.._:- '.. �` It �.
.� � i ' i, i i � � }, � il � � ••
-• - • � . I � 7 , i. �l. „';'•
r::. ::_:'= i "': � : �.% � ;. f t � _ � .:��
�. . " �,J J. I , .:i..;. .. I �a��;'� ._,
rl �"�`1 i �`��'. .i l, J J _ � , �
:....•
��,.�'''`'= :�1� :_C. ,J_: l'� � � �I ;
:ti,-t,,� �:L,: L � � - i�, � . 4 '. - a i �J _. 1 j'��
�:i� � - :::i' � �' i. - ,` - � ,� - � , � - � i ,---..
- .,,--
.. .. .
E.. , ... . .. _
.' :' � -
,.
.. .__. _. : , , r.
,. .. _. :. �
,
.:
:.:,
.. � _. ._. ... � _ .. .,�,.
. . .�...
. " '' '��-
_ . ......:.... .._. . _--
.. __. - .::_
:,...... ... . �
Information Technology-GIS This map is a user generated static output from an Intemet mappinp site and ��-
117 � 58 117 Feet is for reference only.Data layers that appear on thia map may or may not be C11y Of �O��
RantonMapSupportQRentonwa.gov accunte,current,or otherwise reliab�e,
NA��ass_w�,RN s�t�P�ane wean�n9tor,_ Finance&IT Division
North FIPS 4801 09/19/2012 THIS MAP IS N07 TO BE USED FOR NAVIGATION
Altmann �liver Associates, LL�
P(?Ii���57;i (:,�ni.i�ir�ii.�1:14)�UI a U�fi�c [F'_'3) :;3:�13:;3 Fa� i�!'_':rY :�:;3{31M1 �.111'll'pIi111Ci11�11
Y��lllillil�c'�'
Landscape
.:lrchitecturc
March 21, 2012
AOA-4169
Brian Jessen
Eastside Funding LLC
3933 Lake WA Blvd. NE, Suite 100
Kirkland, WA 98033
SUBJECT: Critical Areas Review for 4615 NE 4th Street
Renton, WA (Parcel 152305-9124)
Dear Brian:
On March 20, 2012 I conducted a wetland and stream reconnaissance on the
subject property utilizing the methodology outlined in the 1997 Washrngton State
Wetlands Identification and Delineation Manual and the 2010 Regiona! Supplement
to the Corps of Engineers Wefland Delineation Manual: Wesfern Mountains,
Valleys, and Coast Region (Version 2.0).
Existing Conditions
It is my understanding that the site was previously developed with a gas station and
associated food mart. At the time of the site visit, the property was undeveloped and
consisted primarily of compact fill. Vegetation on the site was generally confined to
a small remnant depression in the southern portion of the property and consisted of
an upland plant community that included big-leaf maple (Acer macrophyllum), black
cottonwood (Populus trichocarpa), hazelnut (Corylus cornuta), Indian plum
(Oemleria cerasiformis), Himalayan blackberry (Rubus armeniacus), and Scot's
broom (Cytisus scoparius). No hydrophytic plant communities were observed on the
site.
Borings taken throughout the vegetated portion of the property revealed dry, non- ,
hydric, high chroma soils and there was no evidence of ponding or prolonged soil �
saturation anywhere on the site. I
Surrounding land use includes NE 4th Street to the north, Duvall Ave, NE to the east,
and retail development with associated paved parking immediately adjacent the west
and south property boundaries.
Brian Jessen
March 21, 2012 '
Page 2
Conclusion
No wetlands or streams are located on or adjacent to the property. This conclusion ,
is based on a field investigation that did not identify any hydrophytic plant !i
communities, hydric soils, or evidence of wetland hydrology anywhere on or '
adjacent to the site. ',
If you have any questions regarding the reconnaissance, lease ive me a call. II�
P 9
Sincerely, '
ALTMANN OLIVER ASSOCIATES, LLC �
John Altmann
Ecologist
Exhibit I
Basin Reconnaissance
Summary Report
i
�
RECONNAISSANCE REPORT NO. 13
LOWER CEDAR CREEK BASIN
JUNE 1987
{
' r
`_
� �—i � �
;, ;
i t �
; f
Naturaf Resources and Parks Division
and Surface Water Management Division
Kinb County, Washinbton '
King County �cecutive
Tim Hill
Kiog County Council
Audrey Gruger, District 1
Cynthia Sullivan, District 2
Bill Reams, District 3
i..ois North, District 4
Ron Sims, District 5
Bruce Laing, District 6
Paul Barden. District 7
Bob Grieve, District 8
Gary Grant, District 9
Department ot PubGc Worlcs Parks. PlanninR and Resourccs
Don LaBelle, Director Jce Nagel, Director
Surtacc Watcr Maaagemeot Division Natural Resoun�es and Parks Division
Joseph J. Simmler, Division Manaper Russ Cahil(, Division Mana�er
Jim Kramer, Assistant Division Manager Bilt Jotly, Acting Division Manaber
Dave Clark, Manaoer, River �� Water Derek Poon, Chief, Resources Plannino Section
Resource Section Bilt Eckel, Manaber, Basin Yf<�nnina Prooram
larrv Gibl�ons, Manager, Project
Management and Desion Section ,
Contnbuting Staff (:onin�buting Staff
Douo Chin, Sr. Engineer Ray Heller, Project Manager �C Team Leader
Randati Parsons, Sr. Enoineer Matthew Clarlc, Projert Manaber
Andy L.evesque, Sr. Enoineer Robert R. Fuerstenberg, Biologist S Team Leadcr
C3n�re Barker, Engineer Matthew J. Bruengo, Geolobist
Arny Stonkus, Enoineer Lee Benda, Geotogist
Ray Stei�er, Engineer Derek Booth, Geoloaist
Pete Ringen, f:ngineer Dyanne Sheldon, Wetlands Biotogist
Cindy Baker; Earth Scientist
Di Johnson, Planning Support Technician
Robert Radek, Planning Support Technician
Randal Bays, Planninb Support Technician
Fred Bentler, Plannino Support Technician
Coosuliing Staff Mark Hudson, Plannino Support Technician
Sharon Clausen, Planning Support Technician
Don Spencer, Associate Geologist, Earth David Truaa, Planning Support Technician
Consultants, Inc. Brian Vanderburo, Planning Support Technician
John Bethel, Soil Scientist; Earth Carolyn M. Byerly, Technicat Writer
Consuttants, Ine. Su.sanna Hornio, 'fechnical Writer
Viroinia Newman, Graphic Artist
Marcia McNulty, Typesetter
Mildred Miller, Typesetter
Jaki Reed; Typesetter
L.ela Lira, Office 'I'echnician
, Marty Coa, Office Technician
P:CR
TABLE OF CONTENTS
I. SUMMARY 1
II. INTRODUCTION 1
III. FINDINGS IN LOWER CEDAR RIVER BASIN 2
A. Overview of Sasin 2
' I3. Effecis of Urbanization 4
C. Specific Problems 5
1. Drainage and flooding problems 5
2. Dama;e to property 6
3. Destruction of habitat 6
[V. RECOMMENDATIONS FOR ACTION 7
A. Reduce landslide hazards 7
B. Reduce erosion and flooding 7
C. Prevent future erosion and floodino with appropriate analysis, 3
planning, and poticy development
D. Srop present (and prevcnt future) damage to habitat 8
by addressinb specific problems in stream systems
V. MAP I1
APPENDICES:
APPENDIX A: Estimated Costs A-1
APPENDIX B: Capital [mprovement Project Ranking B-1
APPEDDIX C: Detailed Findings and Recommendations C-1
l. SUI�IINARY
The Lower Ccdar River Basin, in southwest King County, is unique in its devetopment pat-
terns and the associated environmental problems that appear throughout the basin. Facept
for the city of Renton and areas on the Ccdar River Valley floor, most of the development
in the basin has occurred on the upland plateaus. Most of this devetopment is recent and
primarily residential. In addition, the plateau is the site of numerous sand and gravel
mining operatians and, in the southern uplands, an abandoned coal mine. Peat is also being
mined north of Otter Lake. In some areas livestock are being raised on small farms; there
are no major crop-related agricultural activities in the basin.
The effects of development are most apparent where storm drainaoe is routed over the
valley walls. Impetvious surfaoes on t6e plateau have increa.sed the rate and wlume of
storm n,noff, nsulting in substantial erosioq siltatiog and flooding belvw. In addi-
iion, erosion and siltation 6ave damaged or destroyed habitat in many tributaries, threatening
the survival of Cs6. Habitat a�d water quality throughout the basin are also threatened by
the filling of wetlands and the presence of large amounls of domestic tiash in some streams.
The reconnaissance team noted that the Peterson Creek system has so far remained in its
natural, near[y pristine cortditioR. Maintaining ihis quality should be a high priority in
future basin planning capital project programs.
Recommendations in the Lower Cedar River Basin include 1} desig�ning and mnstructing
appropriately sizec! R/D and other drainage facilities; 2) establishing strictcr land use
policies regardin; floodplains, wetlands, and gravel mining; 3) conduding more detailed and
compreheosive hydrauGc/hydroEogic analyses of proposed developments; and 4) preveating
damage to t6e natural drainagc system. The field team also recommencfs 5) restoring the "
6abitat of several tributaries (e.g., cleaning gravels, revebetating stream banks, and diversifying
streambeds for spawning and rearing) as well as � protecting tbe nearty pristine quatity of
Peterson Creek
II. IN'IRODUCTION: History and Goals of the Prog�am
In 1935 the King County Council approved funding for the Ptanning Division (now caUed
the Natural Resourees and Parks Division), in coordination with the Surface Water
Management Division, to conduct a reconnaissance of 29 major drainage basins located in
. King County. The effort began with an initial investigation af three basins -- Evans, Soos,
and Hylebos Creeks -- in order to determine existing and potentia( surface water problems
and to recommend action to mitibate and preveat these problems. 'I'hese initial investib-
tions used available data and new fietd observations to examine geolooy, hydrology, and
habitat conditions ie each basin.
Findings from these three basins ted the King County Council ro adopt R�solution 6013 in
Aprit 193b, ca[lin; for reconnaissance to be completed on the remainin� ?6 basins. The
Basin Reconnaissance Program, which was subsequently established, is now an important ele-
ment of surface water management. The goals of the program are to provide useful data
with regard to 1) critical problems needing immediate solutions; 2) basin characteristics for
use in the preparation of detailed basin management plans, and 3) capi�al costs associated
with the early resotution of drainage and problems.
Tl�e reconnaissance reports are intended to provide an evaluation of present drainage con-
ditions in the County irt order to transmit information to policymakers to aid them in
developing more detailed reo latory measures and specific capital improvement plans. They
are not intended to ascribe in any conclusive manner the causes of drainaoe or erosion
P:LC I
I_ower Cedar River Basin
(continued)
probiems; instead, they are to be used as initial surveys from which choices for subsequent •
detailed engineerinp and other pro[cssional environmental analyses may be made. Due to
the limited amount of �ime available for the field work in each basin, the reports must be
viewed as descriptive envimnmental narratives rather thart as final engineering conclusions.
Recommendations contained in each report provide a de.uription of potential mitioative
measures for each particular basin; these measures might provide maximum environmental
protection through capital project construction or development approval conditions_ The
appropriate extent of such measures will be decided on a case-by-case basis by County offi-
cials respansible for reviewinc applications for pem�it approvals and for choosina amanp
competing projects for public construction. Nothino in the reports is intended to substitute
for a more thorough e�vironmental and engineering analysis possibte on a site-specific basis
for any proposal.
III. CINDINGS IN LOWER (.'EDAIL RIVER BASQV
The field reconnaissance of Lower Cedar River Basin was conducted in Januarv 1937 bv
Robert R. Fuerstenberc, bioiobist; Brure L. Barker, engineer; and Lee Benda, geotoaist.
Their findinas and recommendations are presented here.
A. Ovecview o[ Lowcr Cc:clar River I3a.sin
The tower Cedar Rivcr Basin is loca�ed in southwest Kina County and is 27 square
n�iles in area. It extends southeast from tlie mouth of the Cedar River on Lake
Washington to approzimately river mile 1d.0. The boundarv to the northeast is
- marked by a rid�etop ronnectinr the rity of Renton to Webster and Franklin I.akes;
the boundary to the southwest runs along Petrovilsky Road to l.ake Younos.
ltenton is the only incorporated area in the basin_ Other population centers include
Fairwood, Maplewood Heights, and Mapte Valley. Except for the citv of Renton. most
of the residential concentrations are located on the upland plateaus overlooking the
Ccdar River Valley. The.se uptand developments are recent compared to the sma(ler
established communities on the valley floor. The btisin lies within portions of thi-�e
Kin� County ptanning areas: Newclstle in the nortlieast (w•hicl� includes Renton),
Tal�oma-Raven Heiolits in tl�e east, and Soos Creek (tlie largest of the three) in the
wesl.
Ruial areas exist on the valley floor on both sides of the Loa�er Cedar River, [rom
approaimately river mile 5.50 co 13.00. These are limited to pastureland for hor.ses.
cows_ and some sheep and several small "u-pick" fn�it and vegetahle farms. Simil��r
areas are located on the southern uplands above the reach from river mile 5.50 to 7.fl0
and in the Lake Desire-Otter Lake area. `fhe plateau is al.so tl�e site of sand and
�ravel mining operations and, in the southern uplands. of the abandoned Fire Kino
Coal Mine. Peat deposits exist west of Lake Desire and north and south ot Otter
I.ake, and peat mininp is beinb carried ou� norlh of Otter Lake.
Pre.sent zoning allows for uri�an and suburhan densities throu�hout much of the basin,
particularly on the upland plateaus and in the Cedar River Valley [rom its mouth to
appoximately river miie G.Sp. Population projections for the year 2000 in the three
plannign areas containinb the Lower Cedar Basin �re over 311,000; an increase of 47
P:LC 2
Lower Cedar River E3asin
(continued)
percent from the present. Most of this growth will occur in the Soos Creek Planninb
Area.
Dominant g�eological and geomorpttic features. The geolo�y of the Lower Cedar River
E3asin is diverse. Geological formations eaposed along the valley include sedimentary
rocks, undifferentiated older glacial dril't, extensive ground moraine deposits, recent
alluvium along the Cedar River, and landslide deposits alon� the river and its tribu-
taries. The sedimentary rocks, composed o! moderately dippinp sandstones, con-
rlomerates. mudstones, and shales, are exposed locatly along the cliffs of the Cedar
Kiver Vallev near the mouth of the Cedar River. In addition, the Renton (ormation,
composed of sancistones, mudstones, and shates with periodic deposits of coal, is also
exposed along the lower portion o[ the Lower Cedar River Valley.
Undifferentiated gtacial deposits found here are composed of three or more till sheets,
glacio-Fluvial sand and gravel, glacio-lacustrine clay, and sand, and non-glacial sand, clay
and thin peat. These lie wer the sedimentary rock formations and are best expo.sed
in cross-section along the cliffs of the main valley and major tribu�aries.
The morpholow oE the Lower Cedar River Basin is dominated bv Ih� vaf(ev Cormed
by ihe Ce�iar River. Vatley walls are steep cliffs formed by landslides in rlacial sedi-
ments. A once extensive and meandering River, which created a wide valley floor as it
cut its way w�estw�ard, the Cedar today is diked for most oC its length throu�h thc
lower valley. A narrow but extensive band of landslide deposits exists alonc the steep
cliffs of the main river and its major tributaries. The landslide deposits consist of
defornted blocks of glacial sediments and colluvium derived from slides or mass
flowaae, such as landslides and debris flow•s. Recent alluvial deposits fill the va(ley and
major tributaries. Smatl, composite, alluvial debris fans eaist at the niouths of U�e
lar�est tributaries. Closed depressions, principally in the uplands, have lacustrine an�
peat deposits.
The Lower Cedar River Valley has a higli potential for erosion due to steep slopes
and tlie existence of a clay layer that promotes soit failures. Fn addition, the confine�i
nature of trihutary channels bet.ween steep hillslopes promotes bank crosion during hibh
. ftows. Numerous recent landslides are evident alonb cliffs oC many of the steep
tributaries and atono the main stem of the Cedar River. Tl�ese have been acceler►ted
- by the remrn�al of vebetation and the routinc of conc�entrated storm Ilows over steep
slopes in areas where development has occurred.
I�ydrologic and hydrauGc characteristics. The Cedar River Basin is composed of a
complex drainace netu-ork consisiino of the Cedar River and 17 tributaries. The larger
tributaries hegin in lakes or wetlands on the bluffs and ito.�: throueh relativelv flat,
staUle channels to the edce of the Cedar River Valley, then plunge down to the valley
floor throuoh steep; erodible ravines. Tributaries of this type such as Tributary 03W
(with headwaten at Wetland 3111) and Tributary 03?3 (which beoins at L.ake Desire),
are found on the south side of the Cedar River.
Another tvpe of tributary collects surface runoff from urbanized areas, pastureland, and
wooded areas. 'Tributaries 030?, 0307, and 0312 are examp(es of this type of tributary.
The� are intermittent (depending on rainfall), shorter in lenbth, flow throuoh shallower
channels that are steeper at the bluffs and transport more materiat during times of
P:LC 3
L.ower Cedar River Basin �
(continued)
hioh flows. Some of the warst problems located during field investigation (see
Appendia C for a full listing) occur on this type of tributary.
Catchments S, b, and 12 have very infifirative soils. Urban developments hvae utilized
R/D poinds ro effectively infiitrate all urban runoff before it reaches the vaftey
hillslopes. The infiltrated runoff then reappears as springs.
Two large lakes (Desire and Otter), together with four smaller ones (Shady, Peterson,
Webster, and Francis) lie in the southeast third of the basin. Numerous larbe wetland
areas exist in this section as well_ "I'he field team identified 10 potential wetland sites
that had not been previousty identified in the Sensitive Areas Map Folio (SAMF).
The system of lakes and wetlands in this area effectively buffers the high flows
draining to these tributaries.
HabitaE chardcteristicS With few exceptions, usable fish habitat exists only in peren-
� ' nial streams (i.e., Trib. 0302, 0304, 0305, 0328, and possibty 0303). In other streams
�� , (e.g., Trib. 0303 and 0310), steep gradients preclude fish use. Steep cradienis also
' reduce fish use in tlic perennial systems (except for Trib. 0323). Habitat is in various
stabes of degradation in these systems; pools are being filted and oravels and dehris
shift reb larly. ln Tributary 0323 (Peterson Creek}, hawcver, habitat diversity is
extensive, and the channel is not seriously degraded. At this location the field team
observed at least three species of saEmonoids.
In general, the most diverse and teast disturbed habitat in a tributarv system occurs in
the large wetland areas in the southeast ihird of the basin. Us��ble habitat for
anadromous fish is found in the low-bradient portions o( stn:ams where channels cross
the Cedar River Valtey fioor. In these reaches, hou�ever, only spawninp habitat is
likely to be available, as the poots and woody debris necessary for su�cessful rearino
either do not exist or are quite limited. Excellent spaw•ning and rearinc areas exist
where pools and riffles are eatensive, irtstream cover and bank vegetation are intact,
and diversity of habitat types is abundant.
B. Effects of Uifianizatioo in the Basin
Flooding, erosion, and the dec adation of 6abitat associated with developmeni in the
L.ower Cedar River Basin are most appareni wherc developn�ent has eliminated vege-
tation alono the edges of the valley and wltere stormwater has been routed down
channels and swales. The removal of vegetation, such as trees, ahove and below the
edces of valley walls, as well as the dischar�ino of srormwater over the valley wall; has
resuited in tension cracks and landslides thlt are endanberinc some houses. The sedi-
ments from these failures are depositing in streams and on valley floors and dama�in;
fish habitat and private property. Dischargino stormwater from inrreasc;d impervious
areas into steep tributary channels and swales is seriously destabilizino channets and
valfey wails; this in turn results in channel downcutting, bank erosion, and landslides.
1'he sediments fron� these probtems often debrade fish habitat and settle out on pri-
vate property along the va({ey [loor.
Two serious instances of development-retated erosion occurreci durin� the November
193G storm: ]) culverts rerouting the stream were plu�ed, causina the formation of a
new channel that destroyed poriions of roads on Tributary 0314; and 2) new, uncorn-
P:LC 4
Low�er Ce�ar Rivcr Basin
(continued)
pacted fill adjacent to new residences near collection point 5 was washed partly awav
during the storm, causing landsliding and b 1lying.
Future problems will be similar to these, as commercia[ and residential developments
increase t7ow rates and volumes by decreasing natural storage and infiltration. This is
expected to occur if wetlands on the upper plateau are encroached upon or lost (e.o.,
on Trib. 0304 at RM 2.30 and on Trib. 03Q4A at Rm 1.60). The preservation of
wetlands and streambank vegetation and the attenuation of storn� flows are essential in
this basin.
C_ SpeciCc Problems IdentiFed
"The steep vatley sideslopes tl�rough wl�ich streams pass and the often dcn.se upland
development msult in a number oC similar problems that repeat iltemselves throubhout
the Lower Cedar River Basin. The most significant o[ these are outlined and
discussed below.
1. Drainagc and [looding probtems arc often the rcn,lt of several cooditioos:
a. UnJersized culverts and inadequate entrance siructures, The most no�able
area is on Tributarv 0306 at river mile .�0, where a culvert here was
btocked by debris carried downstream by the stream and caused erosion and
floodino of Fairwoai Golf Cour.se. ?he blocka�e was compounded by the
fact that the culvert was undersized; the problem w�ill wocsen as flows
increase from upstre��m development.
b. Serious instream erosion and subsequent downstream sedimcntation_ These
have been caused Uy three main factors: 1) runoff from residential
developments on ihe bluffs above the vallev, 2) compacted pastureland due
to livestock, and 3) runo[f from impervious areas oritrinatinb at �ravel pits.
These problems wilt continue and worsen until mitiaative measures are
taken. (See Appendix C for specific examples.)
c. Undersizeci rechannelized streams. Tributaries on the vallev floor are too
smali to carry the increased flows orie natin; in developed residential areas
along the top of the bluffs. For example, 'Cributary 0:02 at river mile .25,
the channe! alonb Maplewood C;olf Course, overtops and floods durino
srorms.
d. Coaslructioo in wedand and Iloodplain areas, Many of the wetlands on the
south side of the Cedar River are peat bo�s, and roads built through them
continue to settle each year, increasing the amount of floodin; on the road.
For example, the road crossinb with Trihutaiy 0338B norilz of Lake Desic-e
will eaperience more severe floodinb as the road settles.
c_ Discharging of stormwater at t6e top of sicep banks. At river mile 2.20 on
tlte Cedar River. a trailer park (constructed on the ed�e of the cliff)
discharges its drainage down the vaUey wall. Inereased flow�s erode the
steep valley, depositing sediments on the valley floor, blockinb channels and
causing floodino. Tl�ese probtems will eventually stabilize, but only after a
"` large yuantity of soil has bcen eraied.
P:L.0 5
Lower Cedar River Basin
(continued)
2 Damage to property is bcing caused by thrce faclors:
a. Landslides and potential landslid�s. Lancislides are accelerated by the
removal of vegetation on steep slopes in preparation for residential
construction and/or by the routing of storm flows over hitlslopes. For
exampie, a large landsiide lias atready occurred in the front yard of a resi-
dence on the Cedar River at river mile 7.80.
b. Sedimcntation (from landslides). Sedimentation and channel and bank ero-
sion are damap ng private property along the valley floor ("Crib. 0299 and
0310).
c. Ilooding during storms. Floodino has been broucht on by the effects of
development artd associated changes to the natucal drainage systems in the
" basin. (See "B" above.)
3. Destruction of habitat is being caused by four cooditions:
a. Sedimcotatioo of pools and riffles and ccmenting of gavcLs. These
proUlems, tlie result of se:vere erosion and tl�e transport of bedload
material, have been caused by upland devetopments in the basin and the
presence of associated iutpervious surfaces, which increase the rate and
yuantity of surCace runoff. Sedimentation and cementing of �ravels in
streambeds destroy natural spawninc and rearino habitat_ On Tributary
0307 at river mile .40 and Tributary 030$ at river miles .95, 1?0, anci 1.70, �
recent hibli flows have eroded the streambed at le�ist one foot, contributino
to a serious sihation problen� downstre�m. Heaw bedload transport is evi-
dent in all systems of the basin except "Tributarv 032�t. ln Tributarv 0�03
at river mile .25, fine sediments are accumulating in gravels that may be
used by resident fish. In TriUutary 030<3 between river miles .95 and 1.?0,
pools are beino filled by sands and gravels and rearing habitat is beinp
rapidly lost.
b. Channelization of stream bed.s. Lass of habitat through channelization has
occurred in all the major streams of the basin: but most notice�zbly in tho.se
reaches that cross the vallev floor. These reaches lack habitat diversitv.
reducing fish use for spawning and rearing. Channelization has damaged or
destroved habitat in several reaches that were once l�eavilv �4sed bv fish:
tl»se includc Tributary 030? betw-een river mile .30 and 40, TriUutary 0�0�
between river miles .OS and .14. Tributarv 0305 l�etween river mile .20 and
.75. and 'Tributarv 0323 (rom river mile 1.10 to 1.�30. 'The.se svstems cannot
affoni a further reduction of habitat and still remain viable fishery resour-
ces.
c. The aocvmulation ot trash in stream bed.�. This problem occurs in clo.se
proximity to residenlial areas. Trash degrades water yuality and is visually
unpleasant. Tires. appliances, furniture, and other trash l�ave been thrown
into Tributarv 0302 at river miles 1.00 and 1.10 and in "Tributarv 0�03 at
ri��er mi(e .35.
P:LC 6
Lower Cedar River Iiasin
(continued)
d. Wetland encroachment. Encroachment destrovs habita� and eliminates
natural water filtration and storage for surface runoff. Examples of this
problem were observed on Tributary 4304 at river mile 2.30, Tributary 0303
at .30, and Tributary 03WA at river mile 1.30. Many wettands have
already been completely lost through filting, for eaample on Tributary
0306A at river mile .SS. Suspected violalions were fon+�arded to Buildin�
a�d Land Development for enforcement.
IV. RECO�NDATIONS FOR ACI70N
The primary recommendations for action in the Lower Cedar River Basin addresses current
severe problems related to erosion, habitat destruction, and flooding. Prevention of these
problems will be accomplished by controllinp Icea�ions and densities of new development and
providing adequate R/D facilities for stormwater.
A Reduce landslide 6a•rards by:
1. Including seositive areas oot prcviously mapped on the Scositivc Areas Map Folio
(SAMF). See Appendix C for a [ull listing of sensitive areas.
2. Fstablishing building setbacks along clifCs and native orow�th protection easements
. along steep ravines.
ura ' or elim� atin the utia of sto ter over c� f unle.ss ade uate
3: Dis�co �n ro cmwa t!f
�g g g �, 9
tichtline systems can be constn�cted to convey flows in a s��fe, nonerosive m�nner
ro tha bottom of clifCs.
4. Decrcasing peak flow�s by constiuctino larger R/U facilities to lessen the landslide
and erosion occurcence afono tributary slopes.
B. Reducc einsion and (looding in the basin by improving surface water maoagcmeot:
1. Dircct the Facititics Maflagement Section o[ the Surface Water Maoagement
Division to evaluatc cxisling storm�ielention and 000ve�rance (aciGties to deter-
mine whether they are properfy sized to meet current standanis. Evaluatiort
should begin with all single-oriCice R/D farilities.
2 Consider areas ot6er than wetlands as regional storm-dctcntion facilities
Tributaiy 0300 at river mile .-12 is the site for a proposed dam, for example.
3. Utilize e�dsting lower quaGty wetlaads (those rated other than �1) as re�onal
storm�ctention faciGties. Wetlands 3IO2 and 31�t2 could provide more tive
stora�e, for example. '
4. Review channel and cvtvert capacily [or conveying eaisting and futuc+e runoff, and
establish floodplain areas in regions of sli�ht bradient for eaisting and [uture
runoff conditions.
5. Proroote t6e infillcation o[ sur[ace water througb !6e use of t�etcntion facilities
and opcn c6annels instead of pipes where the soil and slope conditions permit.
Collection points 5, 6, and 12 on plateaus have such soil conditions.
P:LC 7
Low�er Cedar Rivcr Basin
{continued)
C. Prevent future problems of erosion and flooding with appropriatc aoalysis, ptannin�
aad poliry dcvelopment refated to surtace water managemcot:
1. Conduct a detaited, mmprcbensive 6ydraulic/6ycirologic analysis of any propoScd
developmcnts to determine impacts on the drainage courses downstream. This is
especially critical for areas on the upper bluffs and plateau, which drain wer
sleep, sensitive banks above the Cedar River.
2. Conduct a study o( the impact of locating int"�Itration ponds utilized near the ed�e
of the bEuffs to determine their efCect on seepape faces on the [ower face of the
bluffs. This miaht be accomptished with a computer-based numericaE model of
the groundwater flow.
3. Rcquire t6e tig6tlining of storm drainage dawn steep or seositive slopes when
they cannot be directed away from thc slopes. This is done hy pipin� the flow
down the slope and dixharpin� it at the bottom with adequate enercy dissipation.
Many of the intermitlent tributaries flowing down the banks should be ti�htiined
as urban development increases flow to them. ii
4. Coastruct new R/D poacis wil6 filter berros to improve water quaGiy and recluce �i
Finc seciiment loads. New R/D ponds shoutd have two celEs with oravel-berm ',
- filters and ve�etated s�ales at the inlet and ouNet. Consider Tributaries 0�0�1,
030<3A, 0302, 1nd 0303 as si�es for this type of [acility in order enhance water '
quality. '
S. Maintain natural vegetation on streambanks aod floodplains This is especiatly
irnportant for retatively flat channels flowing on the p{�ueau before the� reach the
steep hlufCs because these channels and their ftoodplains wil! attenuate flows
durinp times of heavy runoff.
6. Maintain buffer areas around wetlands. Many o[ thc triburaries on the south side
of the Cedar Rivec headwater at wetlands. Th�;se wetlands act as natural storaae
areas during stonns.
7_ Reevaluate King County poGcy regarding permittiag for gravel mining on steep,
scnsitive slopes.
8. Include the city of Reniion in future intcrlocat agreemeofs for planninb and capi-
tal improvement Projects where rity and rounty interests overiap.
D. Eliminatc present damage to habitat aQd prevent future damage by addressing speciGc
problems in the stream systems. The follow•ina activities sliould he coordinated amon�
Kinr Connty, the Muckleshoot Indian Tril�e, and State lleparfinents af Fisherics and
Game:
1. Reduce damaging storm [tows with oreater detention volume and lower release
rates at upstream developments.
2. Implement restoration projects on 7'rii�utaries 030� (river mile .00-.20), Tributary
0305 (river mile ?0-.30), Tributary 03Q3 (river mile .?5-.3$), and Tributary 0323
(river mile 1.10 -1.40):
P:LC 3
Lower Cedar River Basin
(continued)
- a. Oo Tnbutary Q304: Clean streambed gravcis, add habitat and bed-contro!
weirs, and piant bank vegetation For shade.
b. On Tnbutary 0305: Construct a new channel and move stream from road-
side channel to its new location on adjacent lands. Implement a fuit
restoration pmject to provide channel meanders, habitat structures,
pool/riffle enhancement, streambed gravel replacement, and revegetation.
c. On Tnbutary 0303: Mrne s�ream from present channel to a location furthcr
north, away from the roadside. If relocation is not possible, these minimum
steps shouid be taken: Add habitat s�ructure to e�isting channel with root
� masses, deflectors, boulder clusters, and other features; revegetate channel
banks with shrubs and smail trees; enhance stream crossings with bottomless
pipe arches.
d. On Tributary 0328 (Peterson Creek): Add habitat structure by replacing the
straight, shortened channet with a more natural, meandering one; place
habitat structures (such as root masses, deflectors, cover locs. and boulder
clusters) throughout the channel: and revegetate banks with shrubs common
to adjacent riparian zones (salmonberry, ninebark, or dob�ood, for example).
3. Protect the Peterson Creek system (Trib_ 032t3) in its present, near-pristine state.
This will include not only the restoration outlined in section A above, but also
the adoption of tand use management reb lations to prevent future habitat
destruction:
a. Protect all exisiing wettands within tbc subcatc6mcnts o[ Peterson Creelc.
�- Employ wetland buffers at least 100 feet wide without exception.
b. Restrict development in ihe critica! headwater area (drainagc, habitat, water
quality) bounded by Lake Desire, Otter Lakc, and Petecsoa Lake to rural
dcnsities.
c. Desi�ate and protect shreamside management zones of at least 100 feet
from the ordinary high-water mark (OIiWM) along the main stem of the
creek. Use 25 feet from the OHWM on tributaries.
d. Praerve floodplains and t6eu [orests for dynamic retention o[ sediments and
water.
e. Rcstrid vegctation removal in strea�side/wetland management zones.
f. Size R!ll facilitics to store the 100-year storm at a two-to-five-year release
rate. Use the two-ccl! type of poad wi�h a forebav, a gravel fifter, and a
vegetated swale outflow where feasible.
g. Regulate more closcly all septic tank and drain-Geld iastallations; as welt as
maintenance xhedules, particularty in the Lake Desire, Otter Lake, and
Peterson L.ake drainage areas_
P:LC 9
Lower Cedar River Basin
(Conlinued)
� h. Work with t6e Statc Depariment of F.cology to csWblish minimum stream-
flaw rc�uircments for Peterson Creek and Lake Desire Iributary.
4. DevcEop and promote public cducation and involvement programs [or basin
awareness. Work with schools, environmental gmups, and the civic and business
communities to conduct educational and resioration probrams.
P:LC 10
� �. '�.�;� : = - �a;�7�, .` •` ',� — — "� � _._ . �
,;\:Y .. ''x. r:- .,4�,= " " r' �� j, \� `�, LOWER CEDAR RIVER BASIN
'�� :y/ � .�,.
i 1 � . � �J; '�Y �1 \ �,�
".,', ,;' , r, .�•�, ,, ,-• �` � � Basin Boundary
�� �' :��'' ',r�, '��'°° �'\ � `� �
�� °'r���� � , „ �� u�� , • ', �` ---�----- Subcatchment Boundary
.. ,��.� ,.� ��.�.��,,.,,�
� ... .... . ..,. .;,. . .. �, . .
, .�' ,� J` "-"2'`; I ' , �� �-...-�`\"^` . (r/ 2 Collection Point �- � '
� , , ,, f .�+� � '� - .. , . Ls,.,.�.. , � �,� r►
.,, -,;�__;,} , t � I ' \ � " - --ti� Stream ``% �
i � " �- "si � ` � ' s:, � i M o29s Tributary Number - ��
_+ �._ ,. . • � ,,._;.
, , � i .:t� � �' q Y ; '.�. � 7 _ ,I �� �3115 Proposed Project �,
.� . �;; , � ,{r, , �„ ,�,{, _ o . ��`:�
,�� al �. .1 ��` � '".� '�'. __ .. �1 P�, TR ��
4 �F � � �`r ,n' r i �; � � ;a� ••D""
-J i�t:�� �<, '` .) ;� +' .,c`� �xuca�mv v, o , 2 M�
\" w;� `; I ��ty _ i es �
� �W s�enta , :�� \ �- � I ,i '� . :, ,o� d
� ��...1��' ' � � 'a �y • j ;�W � JuIY� 1957
� .,� I {' . ?;:1 . f . . 1 ., f F � b . ,W� 3�rr.,,n.d ' L 3, '',., ' \.
r ,! J. �
+' f. I .• , ' .. f � � .. �' I.IJ ` / : '
, . I ., � O�� p I�� `''�p��{ ;p '��q ll � (� � � J c.�,�c«„ry.�'•,..�-�'��,
- a' ,r � ?L `,_��y..._:"„__�--l�' � �� (� �"�;._ \
' 1 -�,�; �) a �
i I t ,�. r.__ � ' � r M'�4 i �•/ ��� �0 , � . ''� � i. U:; � ��', �x� � 1 , . (;
'' -f: #r ,� '}r. ,"� � � `�� . .. . . _. '�y ' ' 7c'� i � j� . .: � \ �
� „ ".. � �..3105 � �ti �`h�'` `y�,j 2 p � � �: �s; � ,, � tl. '�
`--_.�_ �` ' r\ ' ;.y ` , ��..'
A f� � \``� f`•� l �. � �
.r...r._� ' �� � /. �1' .�I�,yP'J /f .,! O2 r
� . � ,' _ �' �'' r ' p r N' ,. ,... ,`p :-.,:`��'t��,. � _.
� T , 0 s O ,y ?\ �� ,�r�' `1 �,' O
�`�� t .. ,':, � + ., � ,���9 �'�o ., P� ,, o o w �� ., .. ',;�;. 3117 � a.; ..
, � � s �,� wj � , : .��,.��t � _ L.e � :t '�'�
f i � . ., , • • q ' �!'/ , �j �. .
� ��' , � : . ' [i u , j �yV.r� �� ' �x I? � `��'� .�,z'�� �
' : .�<,,,> ...�> �� .___ _ _ ... �3721 ���' _ :'� •'c-. � , �',z� �""' `
I � �� �1 , "°' ,�� ���'8 '�p ' a�t RsI�,,• � ` ��
. . � .1 � � � , >. ...:_. .�;,,;,� '` �m-���. ' °3� �
r'' ' ; �,. . � 31a6 g g{ � o � r �
IM�� I�II Q , y � O � � ti. I I
/ / . . `'� ;t �P $1'22 � � `,�1 s �N,��, 3 s � , � '
\ • � � a,- � �, , �
� y` '1,R...5\ ; ~ _ . ��f _N,1 ' ., I\� . • ` `".��,�""
..�, � ��. " � ' .f ., . �. � ' ' • • �' t'�i� .', . '� � . `y�a
� `-� .,'��., �� ,.�,,;�. a�= .o � " �1 � ,g9 l ' ' ' � '�
)', _ , '�/ , ,;. .,, 3?<p� t��' � �i� � ,' u::' yyy
i M1 a� i _ . . �� li,.i /
v .. � F1� ,� ` � ��,' : .., .� � /• I �u� ... t!., aP \, .� ,�. �I.�
�� '\ . "_��_ {.wr'a�. � �r � �
_^ F ,\ , �' $ _ � _.
� \'�� . �� „ , <�, �..�, , . : _�' °w � � 3115
. ` f`-;.� �, �\;,�h I' .� � ,.'� ._. ��� °� '�',
L`l ., ., �^M ��`�� �M, i�\ M • I .�.`� �OI'�-�� ��
! � • �+..r \,\ �y `�' , a Q 6F SEAT7LE WATER51-1 `'�I Og4J�',� ��5+'1 i � ,. �� � •
, � ' � � f � \ , � .�. 12 5 " � 311
�. � �� ��+J `Yfi�w�r
_' ,jI` /' . .s�..:�� i , ` : ) .. i ,4` nl
� , �.. � . '., ,. '. ,.. � � n y , � ' u � �s ruohV�uey
t „ ... r., , �� ..,...,, � "��swo, ,. �
'�I�=-'t•—J ,...� ,.., I..,.. . . . ' l; : �•w1 .,� '}, ` � i
i d�
, .,�� %� " � ... \���� � ' '�1 ., , , `1,�'� � ,... + � . - T `. •� -Yi 1
,... ,..�_.:�,��..-- -�---._.-- ij:^ p' -Ti.
�nu`Niu � � . �� I ---'-- -• � i , '��1;,, l t
.. --. 0. �:r'
... . ��:
, . �
_ \
n I` ,. .. •
� . .,:� � ,. � � �:� . �
� �,� . _
_-`___ _ _ ._� ._ � ..._..__-_ �___.I _ _ .. --_.. II
I
I
. APPEND[X A II
EST[MA'I'EU COSTS: PRUPOSED CAPITAL IMI'ROVEMENT PROJECTS
LOW1:;R CEDAR CRELK BASIN
° Indicates prnject was identified
by Su�face Water Management olfice
prio� to reconnaissance.
NOTE: All projeCis are loc�ted on map
included in this reporl.
I
Project Collect. Estimated Costs
Numhcr Point Prol��t Description Prohlem l�ddressed and Comments
:�105• !0 Cnhlncc 2?00' of Trih. 0305 from Miti���(es flooding of King $115,000
Cedar River to Elliot 8rid�e. County park 11nd. (NOTE: Tl�is project was
proposed by Surface Water
Mlnagement, is in thr design
phase, And will be
constructed by 1939.)
3109° 10 Se:cure easements to wetland located [3etter �itilizcs wetlnnd's stor��e $136,000
in Cascade Park �nd eonstruct a Uerm cap�city to address penk ftows from
nt the outlet. Repl�ce e�isting surrounding urbnn area.
c�tch h�isins with control stnictures. �
Pmject should he justified l�y a .
t�asin studv. Wetl�tnd rated #2.
(This wetland will require fw•thcr
Uiolooic�il �valu�ition bcfore R/U
dcsign And construction.)
I':LC.nPA A-1
Project Colle�t. Estimated Costs
Number Point Proiecc Description Prohlem Addre�.s�d and Comments
3111 Secure e�sements to outlet to Francis Will provide additional stor�ioe $175,000
(Wetland Lakc: and 1100' of channel from lake to miti�atc �inticipatcd future
31:�G) ro SE 1�{4th St. Construct a weir to incrcased Clows.
raise lake level 1', �nd enhance 1100'
of Trih. 0317. Should he justified
l�y a b�sin plan. Wctland r�tcd #!•
(This wctland will rcquire turthcr
hiolo�ical evaluation hefor� R/D
�csi�n un� constivction.)
3112 19 Sccure cascmcnt for outict to wetlan� Will providc adJitional storage �117,000
(Wctland an�1 rcplace eaisting wcir with a for antiripatcd future peak flow�s.
3142) concretaslotted wc�ir. Should be
justified hy a l��sin plan. Wetland
rated #?. (This wetland will require
furth�r hiolo�ic�l evllu�tion hefore
R/D desi�n and construction.
3114° Sccurc c��semcnt to WcUfind 3150 an�1 Addres.ses anlicipat�d increa.ses in $134,000
(Wetland consti�ct � contninm�nt berm �nd flow causea hy development.
3150) contcol structure at lhe outict.
Project should be justified l�y a
h��5in plan. Wetl�nci r�ted #2.
('l'hit wetland will r�quire furtlier
I�iolobical evaluation hvforv It/D
design �nd conshvciton.)
3115 14 Install detention pond 1nd 1,000' Miti�ates u:verc erosion And $3G1,000
of tifihtline. Project is indepe;n- floodinb durino times of high �
de:ntly justifi�Ule. flows.
I':LC.AI'� q.?
Projcct Coll�rt. Estimated Co�ts
N�imbcr Point Proicct Dc�;ription Prohlcm nddressed 1nd Comments
:�116 31 R�iSe existin� ro�d emhlnkment Mitig�tes season�l flooding of t.��ke 573,000
?-�'. 1'rojcct shouW be indc;pen- Uesire Ur. SE ca«sed Uy road bed
dently justifi�ihlc. (Refer to settlin� in Ihe peat bog.
Ito�ds Uivision.)
3117 16 Inst:ill 1,400' of ti�htline, a Miti;ltes severe erosion, sc:diments �501,000
scdin�cnt trap, �n�i 700' of chunnc! depositcd on County roads, and
from Joncs Rd. to Ccc7ar Riv�r. Clooding durinr litl�es o[ I�i�h
Project is indcpcndcntly justi- flows.
fiahlc.
:�114 ]0 Inst�ll 3()0' of 3�" culvert, � new Wilt prevent hlockape of culvert $37,000
inlet stnicture, m�nhole, �nd c�tch and the accompanyin� flooding and
h�isin. Yroject is independently erosion of 1'ai�wood Golf Course and
justifiable. mobi�e home p.�rk below.
3119 4 Construc:t a detention d�im �nd Projeet location is ideal 1�ecause $159,000
control structure in fl deep it addres.scs flows from a large
channelized sec:tion of 1'rib. resi�ienti�l are� bcfore they rench
03(�. Project is ind�penciently the stee�, �c:nsitiv� area neat to
justifiahle. the Ced1r River.
3120 15 Construct a x:dimcntation pond ana Miti�atcs floodin� of residcnce and S1G3,000
1,000' of ehanncl from Jones Rd. to sedimeni deposition on Jones Itd.
Ccdar Itivcr. 1'rojcct is indepen-
�icntly justifiablc.
P:LC.APn A.3
Project Coll�ct. Estiinated Costs
Number Point Project Description , Prablem Addre�.sed 1nd Comments ,
3121 7 Secure easement to we�l�nd and con- Addresses increased flows in TriU. $371,000 '
(Wetl�nd struct � eont�iinment hcrm and concrete 0304 an�i 0304A from residenti�l
;i102) wcir at oullet. Project should Ue developmcnts.
justificd Uy a U.isin plan. Wetlan�
r�ted #3. �iiolo�icnl 1�.sessment is
needed to assure �hat this projeet
does not decrelse hal�it�t values.
3132 ]1 Purchase existin� pands on F1inti�ood Mitig�tes floodinb and erosion $34?,000
Caolf Course and exp�ind to provide downstream.
grcater flow detention. Projcct is
independently justiCi�ble.
P:LC.APA q..�
__ _____ _
__ .
APPENDIX 6
CAPITAL IMPROVEMENT PROJECT RANK[NG
LOWER CEDAR RIVER BASIN
Prior to the Lowcr Cedar River Basin field reconnaissance, 12 projects had been identified and _
ra�ed usinb the CIP selection criteria cleveloped by the Surface Water Manarement (SWM) and
Natural Resources and Parks Divisions. Following the reconnaissance, 13 projects remain proposed
for this area. They inciude eight new, previously unidentified and unrated projects. These disptace
seven previously selected projects, which were eliminated based on the consensus of the recon-
naissance team. Projects were etiminated for several reasons: two sites were annexed by the city of
Rentan, two projects were found to be unnecessary, two sites were categorized as #1 wetlands (and
are�inelioible), and one project was determined to be infeasible.
The previous SWM capital improvement project list for the Lower Cedar Rivcr Basin had an es�i-
m�ted rost of $?,710,000, while the revised list increases to an estimated cost o[ 52,734,000. This 3
percent increase in estimated capital costs is due to the addition of projects a[ter the reconnaissance.
The following table summarizes the scores and costs for the CIPs proposed for the Lower Cedar
River Qasin. The.se projects were rated accordinp to previously estabfished SWM Proanm Citizen
Advisorv Committee criteria_ The projects ranked below are tho.se for which the first rating
questeon, E[.EMENT 1: "GO/NO GO," could be answered affirmatively. Projects with se:ores of ]00
or higher can be considered now for n�eroino into the "live" C[P list.
RANK PROJECT NO. SCORE COST
1 31?2 103 S34?.000
2 3113 90 37,OOd
3 312Q 75 163,000
� 3109' 67 1�tG.000
5 31?1 65 �71,000
6 3117 60 501,000
7 3125 60 36I.000
3 �i 16 55 73.000
9 31I4" 23 13A,OOQ
10 3111' 25 175.000
I1 3112' 17 117.000
12 3119' 15 159,000
13 3105 12 115.000
TOTAL $2,78�1,000
' Projects proposed prior to the Reconnaissance Procram
P:LC.AP[3 B-1
APPENDIX C
DETAILED FINDINGS AND RECOMMENDATIONS
LOWER CCDAR RIVER BASIN
• All items listed here are located on final display maps
in the offices ot Surface Water Mana9ement, Building and
Land Developmenl, and Basin Planning.
Tril�. c� Collect. Existing Anticipat�d
Item' River Mile Point C�te�ory Prov Proj. Conditions nnd Problems Conditions and Problems Recommendations
1 -• 5 Geology Gullying and landslides in Continued erosion. Recompact fill, revegetate,
uncomp�cted fill in�new and drain adequately.
development near edge of
steep hillslope.
? -- 13 Geology Small landslide h�s formed None (natural failure). None.
debris flow (11/36).
Sedimentation in yard of
residence.
3 0299 4 Geology Landslides in sedimentary Natural failure. None.
RM 2.6 rock in cutbanks adjacent
to railroad.
4 0?99 lb Geolooy Drainage from residential Increasino erosion. Provide adequate R/D to
RM 9.65 area is resulting in attenuate flows.
gullyino in swale.
P: LC.APC C-1
Trib. & Collect. Existing Anticipated
Item River Mile Point Cat_� Prop. Proj. Conditions and ProUlems Conditions and Problems Recommendations
5 0299 18 Geology Horse farm in uplands has Continued high erosion and Develop R/D at horse f�rm
RM 12.1 created extensive imper- sedimentation. to attenuate peak flows.
vious surfaces, resultina See Project 3115.
in channel scour, bank
erosion, landslides, and
s�;dimentation at mouth of
basin. Residence overcomc
with sediment.
6 -- 13 Geolo�y L,andslide terrain for sale Site of future mass erosion. Prohibit development here.
by realtors. High risk for Notify Building and Land
landslides, flooding (from Development. Add area to
springs). SAMF.
7 -- 7 Geology Large-scale landsides Naturaf process. None.
adjacent to Cedar River
due to springs and cutting
of toeslopes by streams.
Appears to be natural.
4 -- 2 Geology Gullying in valley wall, Unknown. None.
possibly from natural
springs.
9 -- 14 Geology Landslide debris flow from Existing tension cracks Revegetate hillslope with
residence on SE 147t1i PI., indicate future instability. trees and shrubs.
Renton.
P: LC.APC C_?
Trib. �4c Collect. Existino Anticipated
Item River Mile Point Cate�orv Prop. Proj. Conditions and Problems Conditions and Problems Recommendations
10 0299.1A 21 Hydrology 3116 Frequent floodin; of Road located on top of peat Elevate the road 3-4' by
RM .08 county road causzd by low bog and will continue to filling on top of the
road embanknzent. set�le, a�eravating flooding present road embankment.
problem. Also stabilize embankment.
11 0300 4 Geology Extensive channe( and Problems will continue. Provide adequate R/D in
RM .00-.40 bank erosion and numerous uplands. (See Project
landslides due to 3119.)
developmeni-related
stormwater.
12 0300 4 Hydrology 3119 Development-related peak Increased erosion on Construct detention dam in
flows have caused sig• hillslopes below. deep, channelized reach of
nificant bank erosion. Trib. 0300.
13 0300 4 Hydrolo;y 3109 Collection point 4 has Degradation of Trib. 0300 Construct berm and standard
RM 1.40 been nearly completely from RM .42 downstream. This control structure at outlet
urbanized. section is very�steep and to Wetland 3120 in Cascade
susceptible to erosion. Park.
14 0302 6 Geology Channel downcutting and Will continue at same level Control storm flows from
RM .50 bank erosion. or increase. uptands.
15 0302 G Geology Bank e�osion (medium den- Increasing erosion with Provide adequate R/D in I
RM .30-1.00 sity} at meanders and increasing flow from devel- uplands as area develops.
- obstructions. . opments.
P: LC.APC C-3
_..__ __ _, �-- —
,
__ _ �
_ � - -- �, � � , , , - -
'_� � � _: -—
�— � �
, , �
� � � �...._ w _ - ---- � - - -�--
, i
TriU. c� Collect. Existing Anticipated
It�m River Mile Point Cate^ory Prop. Proi. Conditions and Problems Conditions and Problems Recommendations
16 0303 6 Geolog}r Gully erosion from broken None. Culvert has been None.
culverts. re pa i red.
17 0302 6 Geolo�y Severe gutly erosion Continued erosion. Tightline flows to
RM .60-.30 creatin; smAll valleys main stem.
from daylight culverts.
13 0�0? b Habitat Stream channeled alon; While fish now use this Add habitat diversity
RM.3.5 �olf course road. No reAch, lack of habitat will (e.g., structures, overhead
overhead cover. No habi- eventually reduce popula- ve�etation). Gain
tat diversity. tions. easement to restore mean-
ders, if possible.
19 0302 6 Hydrolooy Tributary drains down Problem will worsen as Construct detention dam
RM .4.5 steep bluffs on nortl� dzvelopment upstream upstream of golf course.
side of Cedar River, continues.
carrying debris and
flooding Maplewood Golf
Course.
20 0302 6 HaUitat Water supply dam. Full As impoundment fills, storm- Dredge pond and maintain
RM .50 barier to upstrelm water will flood over bank. it as sediment catch.
migration. Impoundment Structure may fail.
is filling with sediment.
?1 0303 6 Habitat Severe gullying from ri;l�t Will continue to erode until - Tiohtline downslope.
RM .90 bank corregated metal reaches till layer. - Add velocity attenuator at
pipe. Heavy sediment stream.
delivery to stream.
r: �c.nPc c-a
. . .
Trib. 8c Collect. Existing Anticipated
Item River Mile Point Catc o Prop. Prol• Conditions and Problems Conditions and Problems Recommendations ,
22 0302 6 Habitat Trash in stre�m (auro, , Area adjacent to corridor, - Remove trash. �
RM 1.00 tires, appliances). will continue ro collect - Distribute educational
trash and debris. Further materials to streamside
worsenino of water quality, residents. I
sedimentation, erosion. - Cite violators, if problem
persists.
23 03Q? 6 Habitat Trash in stream. Water Area adjacent to corridor, - Remove trash.
RM 1.10 qu�lity problem, will conti�ue to collect - Distribute educational
unsightly. trash aod debris. Further materials to streamside
worsenin� of water quality. residents.
- Cite violators, if problem
persists.
24 0303 6 Geology Extcnsive bank erosion in Nonc. Increase R/D volumes, slow relcase
upper portions of tribu- rAte to nonerosive levels.
tary.
25 0303 6 Habitat Habit�t suitable for resi- Scdiments will evcntually - Control stormwater volumes
RM .2S dent fish. Sediment accu- cover graycls. Habitat and discharge rates from
mulatins. will become unsuitable for developments.
fish use. - Manually clean gravels
when necessary.
26 0303 6 Hal�itat Trash and litter in Further decrea.ses in watcr - Remove trash and litter,
RM .35 channel affecting w�ter quality. - Distribute educational materials
quality, causing erosion. to streamside residents.
- Cite violators, if problem
persists.
P: {_C.APC c_-5
� .
Trib. R� Collect. Existing Anticipated
item River Mile Point Caterorv Prop. Prol• Conditions �nd Prol�lems Conditions and Problems Recommendations
?7 0304 '7 Habitat I..�lndslides contributing Sediment will continue to Maintain riparian corridor
RM .40 sediment to cltannel. Heavy enter system until landslide with setbacks at least 50'
deposition in pools, at stabilizes. from tops of banks.
obstructions, even in
ri f fles.
?3 0304 8 Habitat Horses h�ve access to .Furthe.r decreases in water • Encouraoe residents to fence
RM 2.10 stream, causing some bank quality, bank erosion likely. channel back 15' from ordinary
deterioration and po.ssibly high-water mark.
affecting w�ter quality. - Limit access to livestock to
one or two points along stream.
29 0304 8 I�3ydrolooy Flooding caused by failin; Problem will continue until - Problem referred to Main-
RM ?.30 R/D at 17Gth St. �C 146th outlet structure is tenance section of Surface
Ave SE. modified. Water Management Division.
30 0:�04 3 Habitat Encroachment occurring Wetla�nd likcly to be - Require encroaching fills
RM 2.40 along all boundaries of reduced slowly until it is to be removed.
this headwater wetland. completely destroyed. Loss - Establish specific buffer
of storage, filtration, around this wetland.
or�anic production, and - Enforce sensitive areas
wildlife habitat. ordinances and regula-
tions.
31 0304 7 Geolobry Several gullies due to Problem will continue. - Tightline drainage.
RM .30 daylieht eulverts; a few
h�ve recent I�ndslides.
P: LC.APC C-6
__ ��
TriU. �C Collect. E�istino Anticipated
Ilem River Mile Point Cate�otv Prop. Proi. Conditions and Problenis Condi�ions and Problems Recommendations
32 0304 7 H�bitat Extensive riffle (to RM Gravels risk becoming - Enhance habitat by addi-
RM .00 .15. Creek channeled. No cemented. Few resting areas tion of woody debris in
woody debris, little bank for upstream migrating fish. stream.
vegetation, Steell�ead, - Revegetate bank.
coho spawners here. - �nhance pool/riffle ratio,
33 03�4 7 HaUitat Debris jam may be a Debris will continue to - Seleccively remrne debris
RM .2� partial migration barrier. accu►m►I�te. Channel will to allow fish pas.s��ge.
' likely divert or jam wilf - Stabilize large woody
fail, releasing accumulated debris.
sediment.
34 0304 7 HabitAt Debris jam. Bed drops 3' �Debris will continue to - Selectively remove debris
RM .b? over jam and sediment, accumulAte. Channel will to allow fish passage.
forming anadromous likely divert or jam will - Stabilize large woociy
barrier. fail, releasino accumulated debris.
sediment.
3G 0304 7 I-Iabitat W�ter turbid; oily sheen Water quality will continue - Educate residents about
RM .$0 �nd odor present_ Storm to decline as runoff and how to maintain water quality.
drains empcy directly into waste cnter stream. - Mark storm drains with
stre�m. "Dump no oil" signs.
- Emphasize recycling of oil.
37 0304A 7 Iiydrolo�y 3102 Existing forested wetland Additional stora�e could be Construct a proportional weir
RM 1.30 provides detention for utilized by constructing and berm at wetland outlet.
Trib. 0304A and 0304 in berm and weir at outlet. Project could be used instead
heavily developed area. This could bc done to atten- of Project 3107 to rpeserve the
I uate increased peak flows #1 rated wetland (where pro.ject
�s upstream area develops. would be built).
�
P: LC.APC C-7
1 . . . _ . ... . .
Trib. �C Collect. Existing Anticipated
Ctem River Mile Point Caterorv Prop. Proj. Conditions and Prohlems Conditions and Problems Recommendations
33 0304A 13 I-lydrolooy :i115 Runoff generated on top of Flooding will continue as - Construct detention pond
RM .40 bluffs on soutliwest sidc lon; as land use remains the at top of bluCfs.
of Cedar River is causing same on top of bluffs or - Tightline drainage down
severe Uank erosion, until miti�ating measures bluf[s, then channelize it
flooding and dehris flows are taken. Runoff origin- to �n existino ditch
onto several residcnces ates from highly eompacted alongside SR 169.
of valley floor. p�stureland on uplands. - Prevent similar prohlems
elsewhere with land use
regulations, including
provisions for preservation
of vegetation buffers near
tops of cliffs.
39 0305 10 Geolo;y Extensive bank erosion, Susceptible to inereases Attenuate high tlows.
partly du� to subsurface with in�reasing storm flow.
clay layer and landslide
topography.
40 0305 10 Geology Locat severe bank Problem will continue. Existing rock-filled
RM 1.10 erosion. , gabions are deflecting
flow.
41 0305 10 Geology Extensive channel down- Continued erosion. Attenuate high flows with
RM 2.10- cuttino and bank erosion. adequate R/D. (R/D
1.75 � currently exists.)
42 0305 10 Geology Several gullies and asso- Erosion will continue. Tightline culverts.
RM 2.15- ciated landslides due to
1.75 daylight culverts on steep
slopes adjacent to chan-
nels.
P: LC.APC C-8
Trih. �C Collcct. Existino Anticipated �,
Itcm River Milc Point Caterorv ProP• Proi. Conditions and Problems Conditions and Problems Recommendations ,
43 0�05 JO 1•Iabitat Madsen Creek in ditcl� alonb Potenti�l for fuel entry in- Acquire 30' easement away
RM .?0 SC Jones Rd. Heaw silt; to creek. I�urther decreases from roadside. Construct
road runoff; water yuality in water c�uality can be ea- new stream channel.
adversely affected. pected.
44 0305 10 I�I�bitat Creek in ditch alon� south Further decreases in water Acquire 30' easement away
RM .35 side oE SR 1G9. Heavy quality can be expected. from roadside. Construct
inputs of oils, anti- Potential for autos to enter new stream channel.
freezes, heavy metals, channel. L.ack of habitat.
organic pollutlnts likely.
Sand, silt from roadside
(of SR 169) enters also. �
45 0305
I2M .00- 10 ��ydrology 3105 Section of Trib. 0305, Flooding will continue. Construct and enhance 2?00' of
.40 RM .00-.40 is experiencing (See Appendia A, Project ch�nnel throagh undeveloped
extensive floodino. 3105,) King County Park LAnd.
46 0305 10 Habitat (:hannelized alon� dri- Further siltation, water Acquire easement; move
RM .50 veway; lacks habitat quality dcgradation can be creek from driveway
diversity. Driveway scdi- anticipated. Lack of habitat 10-15'. Add meanders and
ments enter channel, and precludes optimum salmonid habitat structures to
oil. placed on driveway u.se. increa.se diversity.
enten stream.
47 0305 10 Habitat Ch�nnelized tributary �Little salmonid use Add structures to incrense
RM .65 I�cks h�tbitat diversity, anticipated. Spawnins �nd diversity in stream.
cover for s��lmonids. rearing success limited Manually clean gravels by
Gravels compacted. (unle.ss reach is restored). churning them.
P: LC.APC C-9
Trib. 8c Colleet. Eaisting Anticipated
Item River Mile Point Cate�ocv Prop. Proi. Conditions and Problems Conditions �nd Problems Recommendations
�4 0305 10 f��ibit�t Good spawnino riffles oecur Increased flows may eause Control flows into system
RM .90 here. 1/z-3" gravets, few gravcl bar movement. from developed areas
fines, not compact. High SuitaUle gr�vels may be upstream. If necessary,
flows are moving material, transportCd downstream to add bed controls to hold
however. unu��hle areas for spawning gravels or "vee" struc-
&�Imonids. tures to recruit them.
49 0305 10 Habitlt Severe bank cutting and Further erosio�/scouring can Control high flows by
RM .95 erosion oc:cun hcre. Bed be eapected. Channel increasing upper basin R/D
scouring evident. Reach deterioration will continue. facilities, lowering
suhject to high, rapid Flows appear to bc generated dischar�e rates ro stream.
flows. at developments.
50 0305 !0 liabitat Much woody deL�ris Debris jams will occur with Control upstream flows
RM 1.20 movement and numerous greater [requency as flows with greater R/D volume,
dcbris jams. Reach is increase. Sediments will lower discharge rates,
subject to high, rapid build up and channel will Sclectively remove debris.
f lows. d ive rt.
Sl 0305 10 Hahitat Channel erosion, bank Further channel deteriora- - Increase R/D eapacity.
RM 1.70 failures, downcutting oc- tion may Ue expected. Silt, - Decrease dischar�e rates.
currin;. Reacl� suhject to sand transport to mainstem
hibh, rapid flows. will incrc�se.
52 0306 10 Geolooy F�ilure of manl�ole during Not �pplicabl�. Repair manholc.
RM .40 11/.46 storm h�s resulted in
o Ily erosion.
P: LC.APC C-10
_ . _ � . .
Trih. R Collect. Existin; Anticipated
item Riv�r Mile Point Cnte�orv Prop• Proi• Conditions and Problems Conditions and Problems Recommendations
.53 030b 10 Geolo�y Channel downcutting, bank Erosion will increase. Clay Further increase in runoff
RM .20 erosion and several layer in valley makes area should be attenuated; this
landslides, due both from sensitive to landslides. is A sensitive channei.
increased storm flows and
development along ed�e.
54 0306 10 Geology Undersized culvert in arti- Possible fill failure: Lake Enlarge the corregated
RM 30 ficial fill in golf course ponded behind culvert in metal pipe and/or
threatens to build lake and in 1931 and threatened construct adequate trash
possibly overtop bank. the fill. rack.
Breach flood possible.
SS 030( 11 I-I�bitat Channel subject to high, Further channel damage ean Increase R/D capacity, i
RM .25 damabing flows. Erosion be eapected. Sediment decrease discharge rate.
evident. transport downstream will
continue.
S<, 0304 10 Geoloby Downcutting, bank erosion Will continue or increa.se in Attenuate storm flows.
RM .:�0-.45 flnd landslides. future.
57 03QC I-Iydrology 3llg Trib. 0306 connccts witft Problem will worsen as - Replace existing pipes
RM .30 large trihutary at manhole development upstream with targer diameter pipes
here. Dcbris From 030�i continucs. (if downstream analysis
clops this manhole, causing allows for inere�sed flows).
severe erosion of Fairivood - Install new inlet struc-
Golf Course, tures with trash racks.
53 030GA 11 I-Iydrolopy 3123 Eaisting small ponds on Are1 upstream is developing - Acquire easements for ponds
RM 1.30 0306A are overtopped �nd quickly, thus worsening the and additional area around ponds
receive considerat,le silt problem. and construct detention pond.
durinp high flows. The • Location is ideal for addressome
ponds are located on peak flows hefore they rcach
l�airwood Golf Course. the sensitive Cedar Reiver bluffs.
P: I.C.APC C-11
7 .
Trib. �C Collect. Existing Anticipated
Item River Mile Point Caterorv Prop. Proj. Conditions and Prohlems Conditions and Problems Recommendations
59 030GA 11 I-Iabitat Same usable habitat exists Further habitat deterioration - Increase R/D capacities.
RM .25 for resident salmonids. (ikely. Channel erosion will - Dccrease discharge rates.
Water quality is poor. increase. • Encourage use of 2-cell
Channel subject to high detention ponds, swales.
flows. - Prohibit filling of
existing wetlands, ponds
in upper basin.
(�0 0307 1? Geology Extensive bank erosion at Inereased erosion will - Mitigate development-
RM .10-.40 all meanders and obstruc- result with increased flows. related hi�h flows.
tions (trees, cars) due - Prrnide adequate R/D.
to increased flows from
development.
61 0307 1? Geolo;y Stream erodin� toes of Incre�sing erosion with - Mitigate development
RM .10-.GO slopes resutting in increasino flows. related high flows.
landslide failures. - Provide adequate R/D.
62 0307 12 I�I�bitat Stream cliannel pushed to Erosion will worsen as - Incrcase R/D capacity at
RM .30 one side of ravine foc stream flows increase. all delivery points.
roadway. I�iol� encrgy May threaten road bartk at - Reduce release rate Uelow
system. Much hank cutting, toe o( slope. channel scour level.
scdimcnt transport, dcbris
movernent.
63 0:�07 1:� Hydrolory Are� on top of hluffs ne�r [nfiltration sites should Construct retention faci-
RM .��0 Trib. 0307 h1s excellent be used whenever possible, lities for new develop-
infiltrative capacity. These would provide ground- ments in area at these sites.
water re�harge.
P: LC.APC G12
i
• I
Trib. c'� Collect. Existino Anticipatcd I
Itent River Mile Point Cate�orv Prop. Proi. Conditions and Prohlems Conditions and Problems Recommendations
64 0309 15 Habit�t Subject to heavy, rapid Erosion, deposition will - Control storm flows
RM .10 flows, Channel erosion, increase. Sediments will upstream.
deposition bars mi�ration. migrate downstream, creating • Control volume and discharge
a water yuality problem. rates.
GS 0310 15 Geolo;y Sedimentation upstream from Continued sedimentation. - See "Hydrologic and hydraulic
RM .60 culvert due to del�ris and characteristics" section in
undersized culvert. New this report.
corregated metal pipe con-
tinues to pass w�ter througl�.
GG 0310 1S Geology Savere erosion below Continued erosion and - Install energy dissipator
RM .0.5 culvert, severe sedimen- scdimentation. below corregated metal pipe.
tation in residence y��rd. - Excavate channel through
yard where original channel
was located.
6'7 0310 15 Geolo�y Road drainage forming gully Continued erosion. Reroute drainage. Refer problem
RM 1.50 adjncent to road; road beJ to Roads Maintenance.
in danger.
6,4 0:�10 1S II�bitat 3120 Correg�ted met11 pipe is Problem will continue. ReinstaU corregated metal
RM .?S anadromous hlrricr. pipe at or bclow bed level.
P: LC.APC C-13
Trib. R Collect. Cxistinb Anticipated
Item River Mile Point C�te�orv Prop. Proj. Conditions and Prohlems Conditions and Problems Recommendations
G9 0310 15 I•iydrology 31?0 Existin; chAnnel draining Freyuency and severity of Construct detention pond
RM .40 off blu[fs on north side problem will worsen as on upstream side of Jones
of Cedar River, causin� development on bluffs Rd. to trap sediments, and
Clooding of residences and inereases, enhance 1,000' of creek
debris flows onto Jones Rd. from Jones Rd. to Cedar
durine peak flows. River.
70 0310 15 H�l�itat Correpated metal pipe Problems will continue and Remove new and old pipes; �
RM .60 outlet approximately worsen as outfall velocities replace at lower level
9' above bed levcl. will scour bed and banks. with oversized pipe with
Complete barrier to fish. Upstream has recent (11/36) trash rack.
Old culverts at bed level deposition up to 4' deep.
are plugged.
71 0311 13 Geolo�y Gully erosion in drainage Continued accelerated ero- If possible, enlarge R/D
RM 1.70 sw�ile due to outflow of sion. prior to its outlet in the
wetland that partly seems wetland.
to act as an R/D facility.
72 0314A 16 FIydrology 3117 Severe erosion, floodin�, Problem will be a�ravated - Tightline drainage between
RM .20 dlmage to County and as area above develops. detention ponds in gravel pit.
private ro�ds from - Construct detentian pond
increased runo(f from next to Jones Rd. to tr�p
gravel pit operations on sediments.
hillside. - Constnict channel from
Jones Rd, to Cedar River.
73 0314A/ 16 Geolo�y Inadequate R/D, plu�ed Not applic��t�le. See hydrology comment
0314B culvert caused by e�;ten- above.
RM .10-.40 sive channel and bank
erosion and landslides.
W�ter has cut a new channel.
P: LC.APC C-14
Trib. Rc Collect. Existinp Anticip�ted
Item River Mile Point Cate�ory Prop. Proi. Conditions and Prohlems Conditions and Problems Recommendations
74 032�4 19 Geolo�y Medium-density landslides None. Limit development in the
RM .50 and high-density bank bAsin.
erosion occurrinb due to
natural causes. This indi-
cates channel and valley
sensitive to effects of
development, (Sensitivity due
to clay layer. Basin hosts
some of best fish habitat
in upper reaches.)
79 0:�33 19 1-ilUitat Significant s�llmonid use Scdimentltion from upstream Maintain leave strips
RM .70 ' throughout. Sockeye reach possible. Adjacent adjacent to stream at
spawners, clrcasses pre.sent, development will likely least 100' from ordinary
Coho, steelhead parr in reduce diversity and c�uality hi;h•water mark. Restrict
pools. Excellent habit�t of habitat. use/development within this
for spawnin� and rearino streamside management zone.
(a redd site). Much
diversity -- most exemplary
in bAsin.
Ch�nnelized reach. Uniform May c�use thermal problems Restore stream habitat
$0 032R 19 Hlhitat channel, no h�bitat diver- ns w�ter temperatures rise. throughout: add structure,
RM 1.10 sity. Heavy s��nd deposition. No useft�l h�ibit�t. diversity, bank vegetation,
1.40 I..ittle overhead canopy or anc! clnopy. Cost should be
bank vegctation. borne by party(ies) who
channelized tltis reach.
31 0333 19 flydrology 3112 L.ake Peterson is sm111, Lake provides good peak flow Replace weir at outlet
RM 1.40 open-water wetland with a attenuation and will Uecome with a higher weir in
weir �t outlet. more import�nt as upstream order to gain additional
tributary area develops. storage.
P: LC.APC C-lb
�
TASK 3 FIELD INSPECTION
There were no problems observed during the resource review. Based on a review of the drainage
complaints of the downstream drainage course, there were a few minor drainage issues in the
Maplewood Creek drainage basin, downstream of the site.
3.1 Conveyance System Nuisance Problems (Type 1)
Conveyance system nuisance problems, in general, are defined as any existing or predicted
- flooding or erosion that does not constitute a severe flooding or erosion problem. Conveyance
system nuisance problems are defined as flooding or erosion that results in the overflow of the
constructed conveyance system for runoff events less than or equal to a 10-year event.
Examples include inundation of a shoulder or lane of a roadway. Overflows collecting in yards or
pastures, shallow flows across driveways, minor flooding in crawlspaces or unheated
garages/outbuildings and minor erosion.
Based on a review of the drainage complaints, there were complaints of localized flooding
approximately 1700 feet downstream of the site where Maplewood Creek crosses NE 2"d. The
localized flooding was due to plugged roadside culverts and the drainage ditch and fallen trees
blocking the drainage. Other localized flooding of backyards were due to a depression that has
since been corrected by the home builder. The Maplewood Creek Sedimentation Pond also has
heavy siltation but it is maintained annually as needed. These complaints all occurred prior to
2006 when this area was annexed to the City of Renton.
With the improvements of this project site, there is the potential that problems on the downstream
drainage course may be helped somewhat by providing onsite detention of storm water.
3.2 Severe Erosion Problems (Type 2)
Severe erosion problems are defined as downstream channels, ravines, or slopes with evidence
of or potential for erosion/incision, sufficient to pose a sedimentation hazard to downstream
conveyance systems or propose a landslide hazard by undercutting adjacent slopes. Severe
erosion problems do not include roadway or minor ditch erosion.
The site visit did not find erosion problems evident anywhere along the downstream drainage
course.
3.3 Severe Flooding Problems (Type 3)
Severe flooding problems can be caused by conveyance system overflows or the elevated water
surfaces of ponds, lakes, wetlands, or closed depressions. Severe flooding problems warrant
additional attention because they pose a significant threat either to health and safety or to public
or private property.
Neither the review of the drainage complaints nor the site visit noted any severe flooding
problems in the downstream drainage course. Portions of the downstream drainage course
investigated by the site visit and a review of the soils map indicates that the downstream drainage
course occurs through till type soils. The field reconnaissance for this off-site analysis drainage
report was conducted on the morning of September 19, 2012. The skies were clear and the
temperature on this day was approximately 65 degrees.
15432.003.doc II
Exh i b it J
Off-Site Analysis Drainage
System Table
OFF-SITE ANALYSIS DRAINAGE SYSTEM TABLE
Surface Water Design Manual, Core Requirement #2
Basin: Ced�tr River Subbasin Namc: M��plewood Creek Subbasin Number:
Distance Observations of Field Inspector,
Drainage Component Drainage Component from Site Existing Potential Rcsource Reviewer,or
Symbol Type,Name,and Size Description Slope Discharge Problems Problems Resident
Constrictions,undcr capacity,ponding,
Type: sheet tlow,swale,strcam, ovcrtopping,flooding,habilul ur orgunism
cl�aunel,pipe,pond;size, Drainage basin,vegetation,cover, destniction,scouring,bank sloughing, Tributary area,likelihood of problem,
Sec Map diameter,surface are� deplh,lype uf seusitive area,volume % �t. sedimentation,incision,other erosion overtlow pathways,potential imp�cts
1. Sheetflow to the southeast Discharges to existing catcli 2 0- 10 None Noted None Noted
corner of the site basin
2. 12-inch pipe Flows from structure to 0.5 10-24 None Noted None Noted
strucure
3. 12-inch �ipe Flows trom structure to 0 24-59 None Noted None Noted
structurc(cast across Duvall)
4. 18-inch pipe Flows from structure to unknown 59-262 None Noted Nonc Noted
structure(south on Duvall)
5. 18-inch pipe Flows from structure to 0.08 262-2x4 None Noted None Noted
structure(east)
6. 18-inch pipe Flows from structure to 0.25 284-402 None Noted None Noted Solid lid
structurc(cast)
7. 18-inch pipe Flows from structure to 1.08 402-417 None Noted None Noted 1 H"pipe flows througl� catch
structure(east) basin(solid pipe)
8. 18-inch pipe Flows from structure to 1.9 417-42H None Noted None Noted Solid lid
structure(east)
9. 18-inch pipe Flows from structure to 0.11 428-558 None Noted None Noted Solid lid, collects runoff from
structure (east) the north
10. 18-inch pipe Flows from structure to 0.22 558-652 None Noted None Noted Solid lid
structure(east)
1 I. 18-inch pipe Flows from structure to outfall O.lfi 652-675 None Noted None Noted 18" CPEP outfiall to wooded
(cast) area, sediment in end of pipe,
no signs of erosion or channcl
12. Shallow Flow Flows east in wooded area 2.5 675-863 None Noted None Noted
13. Maplewood Creek Flows south 0.6 863-1400 None Noted None Noted
15432.003.doc.
TASK 4 DRAINAGE SYSTEM DESCRIPTION AND PROBLEM DESCRIPTIONS '
Runoff leaves the site by discharging east into Duvall Ave NE. Runoff enters the existing catch basin at
the southeast corner of the project site. Flow is conveyed east in a 12" pipe to the east side of the road
and then south in an 18" pipe. The pipe system turns east and is routed through an 18" pipe system
within a drainage easement on private property (Storage One on 4`h, self-storage). The 18" pipe system
discharges east of the self-storage buildings to a wooded area that encompasses Maplewood Creek.
__ Flow continues overland to the east to Maplewood Creek and then south in the creek. Maplewood Creek
eventually joins another branch of Maplewood Creek before it flows through the Maplewood Golf Course
and discharges into the Cedar River.
The drainage complaints were forwarded to this office by Gary Fink, City of Renton Utility Systems
Division — Surface Water Utility and are located on the following pages of this report; however, none of
them were within '/4 mile downstream of the project site. They were placed into this report for reference
and there are no anticipated problems associated with the development of this project site.
15432.003.d oc
Exh i b it K !
Drainage Complaints
Karen Harris
From: Colleen Allen
Sent: Friday, September 14, 2012 3:12 PM
To: File '
Cc: Karen Harris
Subject: FW: Drainage Complaints-4th & Duvall, Renton-Question/BCE#15432
Attachments: AreaMap.pdf
Follow Up Flag: Follow up
Flag Status: Flagged
Karen, I will also save these in Filing.
From: Gary Fink jmailto:GFinkCa�Rentonwa.govl
Sent: Friday, September 14, 2012 3:05 PM
To: Colleen Allen
Subject: RE: Drainage Complaint Request-4th &Duvall, Renton -Question
Good Afternoon Colleen,
Per the Renton manual, I've reviewed drainage issues for a distance of one mile downstream of your project at NE 4tn
Ave& Duvall Ave NE. While the manual requires one mile downstream, I've reviewed to a radius of one mile as the
remainder of the course runs through Maplewood Creek channel.
The drainage course reviewed is as follows: '
From parce)#1523059124,east on NE 4`h Ave approximately 650'to an outfall contained in a drainage easement.
South from NE 4`h Ave, approximately 990'via channel to a City-maintained detention facility.
South from detention pond via conveyance appr.910'along Field Avenue undeveloped right-of-way,turning southeast
across residential property to NE 15L St.
East on NE is`St, South on Hoquiam Ave NE
Outfall to tributary of Maplewood Creek,South of SE 2"d St.
Maplewood Creek to City of Renton Maplewood sedimentation pond,continuing to Cedar River.
We have reports of minor drainage issues at properties located on NE 2"d Ct&NE 151 Ct. All occurred prior to 2006
annexation:
NE 2"d Ct—4901,4907,, 5003: Localized flooding due to plugged roadside culverts and ditch line. 4921:
Localized flooding on property due to fallen trees and plugged seasonal stream channel.
NE li`Ct—4904,4905,4910,4913: Localized backyard flooding due to depression. Addressed through builder.
Maplewood Creek Sedimentation pond—heavy siltation due to erosion for storm events. Maintained annually
as needed.
Please feel free to contact me if you need further information.
Best Regards,
i
Gary Fink
City of Renton
Utility Systems Division- Surface Water Utility
Phone:(425)430-7392/ Fax:(425)430-7241
GFink@RentonWa.4ov
�.1��'n� � �r��'.\
r�. �� f I �. {� f I ';'_ �
From: Colleen Allen j,mailto:callenCc�barghausen.coml
Sent: Thursday, September 13, 2012 2:54 PM
To: Gary Fink
Cc: Karen Harris; File
Subject: RE:�Drainage Complaint Request-4th &Duvall, Renton -Question
Gary, page 2-10 of the City of Renton Drainage Manual requires a 1-mile radius for the Task 2 Resource Review of a Level
1 Off-Site Drainage Analysis. Thank you.
Colleen
From: Gary Fink [mailto:GFinkCc�Rentonwa.govl
Sent: Thursday, September 13, 2012 2:47 PM
To: Colleen Allen
Subject: Drainage Complaint Request-4th &Duvall, Renton -Question
Hi Colleen,
I'm pulling the information you're requested together today, my apologies for the delay. Just wanted to confirm that
you were looking for drainage issues within a one mile radius of 4"'& Duvall. Typical request in a'/.-mile radius.
Thanks,
Gary Fink
City of Renton
Utility Systems Division- Surface Water Utility
Phone:(425)430-7392/ Fax:(425)430-7241
GFink@RentonWa.qov
t:it}'of � .;;-.�
r'�
� 1 ���I � ��jfll:�- :�
z
4.0 FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND DESIGN
A. Existing Site Hydrology
The entire 0.56 acres of new development is considered till forest for pre-developed
condition. There is a small amount of offsite landscaping that contributes runoff to the
site under existing conditions. The site is modeled as till forest and the offsite area is
modeled as till grass for the pre-developed condition. The flow control facility will be
located at the southeast corner of the project site and will discharge to the existing
conveyance system al�ng Duvall Avenue NE.
B. Developed Site Hydrology
Under developed conditions, the site has 0.50 acres of impervious and 0.06 acres of
landscape. Because this site is using a rain garden as a flow control BMP, 50 percent of
the roof area being directed to it is being modeled as pervious landscape area. This
results in 0.47 acre of impervious and 0.09 acre of pervious for modeling purposes. The
entire site and 0.06 acres of off-site landscaping will be directed to the detention vault
and have been included in the flow control calculations. See the detention and water
quality sizing criteria on the following pages of this report.
C. Performance Standards
The Area-Specific Flow Control Standard required for this project site is determined to be
Level 2 Flow Control. The applicable conveyance system capacity standard was
mentioned in the Conditions and Requirements Summary, which is to size the on-site
conveyance system by the Rational Method utilizing an initial time of concentration of 6.3
minutes and a Manning's "n" value of 0.014 with the 100-year precipitation. The Area-
Specific Water Quality Treatments Menu followed for this project was the Enhanced
Basic Water Quality Menu, and the treatment selected from this menu is to use the wet
pool in the vault in combination with a Stormfilter manhole with CSF media.
D. Flow Control System
The Flow Control BMP for this site will be a rain garden sized to treat runoff from 10
percent of the site. Flow control for this project will be in a underground vault utilizing 7.9
feet of live storage. Discharge will be through a control structure and then to a Stormfilter
manhole for additional water quality treatment. Because of the depth of this system,
discharge will then be directed to a duplex purnp station and then to the existing
conveyance system in Duvall. The design of the pump station is included in this report.
A single pump will be used to pump the 2-year ffow rate and both pumps will be utilized to
convey the 100-year discharge from the vault.
E. Water Quality System
The Enhanced Basic Water Quality requirement will be achieved with 3 feet of dead
storage in the water quality and detention vault and then a three-cartridge Stormfilter '
manhole with CSF media downstream of detention. Sizing calculations for the wet vault ,
and the Stormfilter manhole are included.
15432.001.doc I
0.
G
m
J
0
�
f-
Z
O
U
�
O
J
LL
FLOW CONTROL BMP SIZING
Site Area = 24,4Q0 sf
10%af site area = 2,440 sf
5/6 of the canopy(40'x 84')will be sent to the rain garden
Impervious area to the rain garden = 2,800 sf
Rain Garden volume required = Impervious area x 3 inches = 700 cf
Rain Garden volume provided = 701 cf
Maximum depth = 12 inches
15432.001.doc
DETENTION VAU LT CALCU LATIONS
DETENTION AND WATER QUALITY SIZING CRITERIA
Level 2 Fiow Control
Pre-Developed:
0.56 acres of till forest
0.06 acres of till grass (off-site landscaping)
Developed:
0.50 acres of on-site impervious
0.06 acres of till grass (on-site landscaping)
0.06 acres of till grass{off-site landscaping}
2,800 sf of roof area will be going to the rain garden so that area can be modeled as 50% grass
(Q.03 ac}and 50% impervious (0.03 ac)
Therefore the new totals are:
0.47 acres on-site impervious
0.09 acres till grass (on site}
0.06 acres till grass (off site)
Total = 0.62 Acres
The KCRTS calculations are on the folloU�ing pages.
15432.001.doc
Flow Frequency Analysis
Time Series File:15432-pre.tsf
Project Location:Sea-Tac
---Annsal Peak rlow Rates--- -----Flow Frequency Analysis-------
, Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CF5) Period
0.040 2 2/Q9/O1 18:00 O.Q55 1 100.00 0 . 990
0.012 7 1/05/02 16:00 0.040 2 25.00 0. 960
O.Q32 3 2/28/03 3:00 0.032 3 10.00 0. 900
0. 002 8 3/24/04 19: 00 0.03J. � 5.00 0.800
0 . 039 6 1/05/05 B:00 0. 028 5 3. 00 0 .667
- 0 . 031 4 1/18/06 20:00 0. 019 6 2. 00 0.50G
', 0 . 028 5 11/24/06 4:00 Q. 012 7 1.30 0.231
0 . 055 1 1/09/OS 9:00 4. 002 8 1. 10 0 . 091
Computed ?eaks 0. 050 5Q. 00 0 . 980
Flow Frequency Analysis
Time Series File:Z5432-dev.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--- -----Flow Fzequency Analysis-------
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS} {CFS) Period
0 .127 6 2/09/Ol 2:00 0.254 1 100.00 0. 990
0.107 8 1/05/02 16:00 0.175 2 25 .00 0.960
0.153 3 2/27/03 7: b0 0 .153 3 10. 00 0.900
0.120 7 8/26/04 2:�0 0. 143 4 5. 00 0.800
0 .143 4 10/28/04 16:00 0.136 5 3 .00 0 .667
0.136 5 1/18/06 16: 00 0.127 6 2 .00 0 .500
0 .175 2 10/26/06 0:00 0 .120 7 1.30 0.231
0.254 1 1/09/08 6:00 0. 107 8 1.10 0 .091
Computed Peaks 0.227 50 . 00 0 .980
Retention/Detention Facility
Type of Facility: Detention Vault
Facility Length: 54 .00 ft
Facility Width: 20. 00 ft
Facility Area: 1080. sq. ft
Effective Storage Depth: 7.90 ft
Stage Q Elevation: 100.00 ft
Storage Volume: 8532. cu. ft
Riser Head: 7. 90 ft
Riser Diameter: 12 .00 inches
Number of oritices: 2
Full Head Pipe �
Orifice # Height Diameter Discharge Diameter
(ft) (in) (CFS) (in)
1 0.00 0.38 � 0.011 '
2 5 .25 0 .75 v 0.025 4 .0
Top Notch Weir: None
Outflow Rating Curve: None
Stage Elevation Storage Discharge Percolation
(ft) (ft) (cu. ft} (ac-ft) {cfs) (cfs)
a.00 Zoo.00 o. o_000 o.aoo o.00
o.oi ioo.ol il . o.000 o.000 o.00
o. oa ioo . oa aa . o.00a o.00i o.00
0.03 100.03 32. 0. 001 0.001 0. 00
0.17 100.I7 184. 0.004 U.002 0.00
0.30 100.30 324 . 0.007 0. 002 0.00
0.43 100 .43 464 . 0.011 0.003 0.00
0.57 1Q0 .57 61b. 0. 014 0.003 0.00
0.70 100.70 756. 0.017 0.003 0.00
Q.84 100.84 907 . 0.021 0.004 0.00
0.97 100.97 1048. 0. 024 0.004 0.00
1.10 101.10 1188. 0. 027 0.004 0.00
1.24 101.24 1339. 0. 031 0.004 O. Oa
1.37 101.37 1480. 0.034 0.005 0. 00
1.50 101.50 1620. 0. 037 0.005 0.00
1.64 101.64 1771. 0. 041 0.�05 0.00
1.77 I01.77 1912 . 0.044 0.005 0. 00
1. 91 101. 91 2063. 0.047 0.006 0.00
2 .04 102 .04 2203. 0.051 a.d06 0.00
2 .17 102. 17 2344 . 0. 054 0.006 0 .00
2.31 IO2.31 2495. 0. 057 0.006 0.00
2 .44 102 .44 2635. 0.060 0.006 O. OU
2.58 102 .58 2786. 0.064 0.006 0. 60
2.71 102 .71 2927 . 0. 067 0.0a7 0 .00
2.84 102 . 84 3067. 0.070 0.007 0.00
2.98 102 . 98 3218. 0.074 0.007 0. 00
3.11 103 .11 3359. 0.077 0.007 0. 00
3.25 103 .25 3510. 0.081 0.007 O.QO
3.38 103 .38 3650. O. Q84 0.007 0.00
;
3.51 103 .51 3791. 0. 087 fl.008 0 .00
3.65 103 .65 3942. 0.090 0 . 008 0.00
3. 78 103 .78 4082 . 0.094 0.008 0. 00
3 .92 103 .92 4234 . 0. 097 0.008 0.00
4. 05 104 . 05 4374. 0.100 0.008 0.00
4. 18 104 .18 4514 . 0.104 0 .008 0.00
4 .32 104.32 4666. �. 107 0.008 0. 00
4.45 104.45 4806. O.I10 0. 008 0.00
4.58 104 .58 4946. 0.114 0.009 0.00
4.72 104 .72 5098. O.1J.7 0.009 0.00
� .85 104.85 5238. 0. 120 0. 009 0 .00
4.99 104.99 5389. 0.124 0.009 0.00
5 .12 105 .12 5530. 0. 127 0.009 0.00
5.25 105 .25 5670. 0.130 0.009 0 . 00
5.26 105 .26 5681. 0.130 Q. 009 0.00
5.27 105.27 5692. 0.131 0.010 0. 00
5.28 1Q5.28 5702. 0. 131 0.011 0. 00
5.29 105 .29 5713 . Q. 131 0.012 fl . 00
5.30 105.30 5724 . 0. 131 0.013 0. 0�
5.31 105.31 5735. Q. 132 0.013 O. GO
� 5.45 105.45 5886 . d.I35 0. 016 0. 00
5.58 105.58 6026. 0.138 0 .018 0.04
5.71 105.71 6167. 0.142 0.020 0. 00
5.85 105.85 6318 . 0. 145 0. 022 0.00
5.98 105.98 6458. 0.148 0.023 0.00
6 .12 lOb .12 6610. 0. 152 0.024 0. 00
6.25 106.25 6750. 0. 155 O. Q25 0. 00
6.38 106 .38 6890. 0.158 0.026 0.00
b .52 106 .52 7042. 0.162 0.027 0.00
6.65 106.65 7182. 0. 165 0.028 0. 00
6.79 106 . 79 7333 . 0 .168 0.029 0.00
6.92 106 .92 7474 . 0.1'12 0.030 0.00
__ 7.05 107.05 7614. 0.175 0.031 0.00
7 .19 107.19 7765. 0_178 0.032 0 . 00
7.32 107 .32 7906. 0 . 181 0.033 0.04
7.45 107.45 6046. 0 .185 0.034 0.00
7.59 107.59 8197. 0. 188 0. 034 Q. Ofl
7.72 107.72 8338. 0.191 0.035 0.0�
7.86 107 .86 8489. 0 . 195 0.036 0.00
7 . 90 107.90 8532. 0.19b 0. 036 0.00
8.00 108.00 B640 . 0 .198 0.345 0. 00
8.10 208. 10 8748. 0.201 0.908 0.00
8.20 108.20 8856. 0.203 1.640 0.00
8.30 108.30 8964 . 0.206 2.430 0.00
8.40 108.40 9072. 0.208 2 .710 0.00
8.50 108.50 9180. 0.211 2.970 0.00
8.60 106.60 9288. 0.213 3 .200 0. 00
8.70 108.70 9396. 0.216 3 .420 0.00
8.80 108. 80 9504 . 0.218 3 .630 0.00
8.90 108.90 9612 . 0.221 3.820 0. 00
9. 00 109.00 972a. 0 .223 4 .010 0.00
9.10 109 .10 9828. 0.226 4 .190 0.00
9.20 109.20 9936. 0.228 4 .350 0.00
9.30 109 .30 1Oa44 . 0_231 4 .520 0. 00
9.40 109 .40 10152. 0.233 4 .680 Q.00
9.50 169.5Q 10260. 0.236 4 .830 0. 00
9.60 109.60 10368. 0.238 4 .980 0. 00
9.70 109.70 10476. 0.240 5.120 0.00
9. 80 109.80 10584 . 0.243 5.260 0.00
Hyd Inflow Outflow Feak Storage
Target Calc Stage Elev (Cu-Ft) (Ac-Ft}
1 0.25 O.Q4 0.14 7. 93 107.93 8569. 0.197
2 0 .13 ******* 0. 03 7.70 107.70 8315. 0 .191
3 0. 13 ****�** 0.03 6.92 106. 92 7470. 0.171
4 0.15 ******* 0. 03 6 .90 106.90 7447. 0.171
S 0.14 ******* 0.02 5.64 105.69 6097. 0. 140
6 0.08 0.01 0.01 4 .81 104.81 5190. 0.119
7 0.11 ******* Q. O1 4 .52 104.52 4882. 0.112
S 0.12 ******* 0.01 3.37 103.37 3636 . 0.083
----------------------------------
Route Time Series through Facility
Inflow Time Series File:15432-dev.tsf
Outflow Time Series File:rdout
Inflow/Outflow Analysis
Peak Inflow Discharge: 0.254 CFS at 6:00 on Jan 9 in Year 8
Peak Outflow Discharge: 0. 144 CFS at 10:00 on Jan 9 in Year 8
Peak Reservoir Stage: 7.93 Ft
Peak Reservoir Elev: 107 . 93 Ft
Peak Reservoir Storage: 8569. Cu-Ft
. 0.197 Ac-Ft
Flow Frequency Analysis
Time Series File:rdout.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--- -----Flow Frequency Analysis-------
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) (ft) Period
0 .036 2 2/09/O1 20:00 0.144 7.93 1 100.00 0.990
0.009 7 1/07/02 4:00 0.036 7. 90 2 25. 00 Q .960
0.030 4 3/06/03 22:00 0.030 6.92 3 10. 00 0.900
0 .007 S 8/26/04 7:00 0.030 6.91 4 5.00 0.800
0.009 6 1/OS/05 5:00 0.019 5.65 5 3 .00 0.667
0.019 5 1/19/06 0:00 0.009 4 . 81 6 2.00 0 .500
0.�30 3 11/24/06 8:00 0 .009 4 . 60 7 1.30 0 .231
0 .144 1 1/09/08 10:00 0.007 3.37 8 1.10 0. 091
Computed Peaks 0.108 7. 92 50 .00 0.980
` Flow Duration from Time Series FiZe:rdout.tsf
Cutoff Count Frequency CDF Exceedence_Probability
CFS % s %
0.001 29203 47.624 47.b24 52 .376 0.524E+00
0.001 4369 7.125 54.749 45.251 0.453E+00
0.002 6792 11.076 65.825 34 .175 0,342E+00
O , d03 6015 9.809 75.634 24 .366 0.244E+00
0.004 5223 8.518 84 .152 15 .848 0. 158E+00
0.005 3537 5.768 89.920 10.080 O.101E+00
0.006 2390 3 .898 93 .818 6.182 0.618E-01
0.007 1514 2.469 9b.287 3 .713 0.371E-01
O.Q08 1481 2.4I5 98.702 1.298 0.130E-01
0.009 520 0.848 99.550 0.45a 0.450E-02
0.010 5 0.008 99.558 0.442 Q.442E-02
0.011 7 0.011 99.569 0.431 0.431E-02
0.012 8 0.013 99.583 Q.4I7 0.417E-02
0.013 15 0.024 99.607 0.393 0.393E-02
0.014 18 0.029 99.636 0.364 0.364E-02
0.015 17 0.028 99.664 0 .336 0.336�-02
0 .016 17 0. 028 99.692 0.308 0.308E-02
0.017 19 d.031 99 .723 0.277 0.277E-02
0 .018 25 0.041 99.764 0.236 0.236E-02
0.019 19 0 .031 99.795 0.205 0.205E-02
0.020 6 0 .010 99.804 0. 196 0. 196E-02
0.021 9 0.015 99.819 0.181 0.181E-02
0.�22 6 0 .a10 99.829 0.171 0. 171E-02
' 0.023 9 0.015 99.843 0 . 157 0. 157E-02
0.024 10 0.016 99 .860 0.140 0. 14�E-02
0.025 11 0.018 99.878 0.122 �. 122E-02
0.026 9 0.415 99.892 0 .1d8 0. 108E-02
0.027 8 0.013 99. 905 0. 095 0. 946E-d3
0.028 9 0 .015 99 .920 0.080 0.799E-03
0 .029 12 0.020 99.940 O.fl60 0.603E-03
0.030 17 O.Q28 99.967 0. 033 Q.326E-d3
0.031 2 0.003 99 .971 0.029 0.294E-03
0 .032 2 0.003 99.974 0.026 0 .261E-03
0.033 3 0.005 99.979 0.021 0.212E-03
0.034 5 0.008 99_987 0. 013 0.130E-03
0.035 3 0 .005 99.992 0.006 0.815E-04
Flow Frequency Analysis
Time Series File:rdout.tsE
Project Location:Sea-Tac
---Annual Peak Flow Rates--- -----FLow Frequency Analysis-------
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) (ft) Period
0.036 2 2/09/Ql 20:00 0.144 7 . 93 1 100. 0� 0.990
0.009 7 1/07/02 4:00 0.036 7.90 2 25.00 0 .960
0.030 4 3/06/03 22:00 0.430 b. 92 3 10. 00 0.900
0.007 8 8/26/04 7:00 0.030 6.91 4 5.00 0.800
0 .009 6 1/OS/OS 5:00 0. 019 5.65 5 3 .00 0.667
0.019 5 I/19/06 0:00 0.049 4.81 6 2.00 0.500
0.030 3 11/24/06 8:00 0.009 4.60 7 1.30 0 .231
0 .144 I 1/09/08 10:00 0.007 3 .37 8 1.10 0.091
Computed Peaks 0.108 7.92 50. 00 0 .980
Duration Compazison Anaylsis
Base File: 15432-pre.tsf
New File: rdout.tsf
Cutoff Units: Discharge in CFS
-----Fraction of Time----- ---------Check of Tolerance------- �(y
Cutoff Base New %Change Probability Base New %Change• /� ��1�
0 .009 I 0.86E-02 U.45E-02 -47.7 I 0.86E-02 0.009 0. 009 -5 . 1� G v
0.012 ( 0.61E-02 0.42E-02 -30.7 I 0.61E-02 0.012 0.009 -23 .7
0. 014 ( 0.47E-02 0.37E-02 -22 .8 I 0.47E-02 0.014 0.009 -36 .3
0.016 � 0.36E-02 0.30E-02 -15 .5 � 0.36E-02 0.016 0 .014 -12 .9
0.019 I 0.28E-02 0.22E-02 -21.2 I 0.28E-02 0. 019 0.017 -8 .6 �
0.021 � 0 .21E-02 0.18E-02 -12 .6 � 0.21E-02 0.021 0.019 -9 .5
0 .024 � 0.14E-02 0.15E-02 5.7 � Q.14E-02 0. 024 0.024 2 .2
0 .026 I 0.11E-02 0 .11g-02 3 .0 � 0. 11E-02 0.026 0.026 0 .8
0.028 I 0.64E-03 0.78E-03 23 . 1 I 0.64E-03 0.028 0.029 2.3 ��
0. 031 I 0.34E-Q3 0.33E-Q3 -4 .8 � 0.34E-03 0.031 0.030 -1.8 �
0.033 � 0.23E-Q3 0.23E-03 0.0 � U.23E-03 0 .033 0.033 0.0
0.035 � 0. 15E-03 Q.82E-04 -44 .4 � 0. 15E-03 0 .035 0.034 -3 .6
0.038 � 0.98E-04 O.00E+00 -100.0 � 0. 98E-04 0.038 0.035 -7.2
0.040 I 0.16E-04 O.00Et00 -100.0 � a. 16E-04 0.040 0.036 -9 .8
Maximum positive excursion = O.OQ2 cfs ( 5.9%} �'v 1
occurring at 0.026 cfs on the Base Data: 15432-pre.tsf
and at 0. 028 cfs on the New Data:rdout.tsf
Maximum negative excursion = 0.005 cfs (-37.30)
occurring at 0.014 cts on the Base Data: 15432-pre.tsf
and at 0.009 cfs on the New Data:rdout . tsf
INATER QUALITY CALCUATIONS
WETVAULT SIZING 1NORKSH�ET
Projec# name:
1111ETHODS OF ANALYSIS (see 6.4.2)
Ste� 1)_ Determine volume #actor f:
Basic size f= 3 Consult WQ requirements(Section1.2.8)
Ste� 2) Determine rainfa(! R far rnean annual storm.
Rainfall (R) Q��3� (feet) Required from Figure 6.4.1.A
Step 3) CalculaEe runoff from rr�ean annual storm
Vr= (0.9A;+0.25A�5+ 0.10A�+0.01 Aoy)X R '
A;= tributary area of impervious surfac Z' 7 Determine now
A,y= tribu#ary area of till grass � {s� Determine now
Atf= tributary area of till forest 0 (sf) Determine now
Ao9= tributary area of outwash grass 0 {s� Defermine now
R= rainfalf from mean annual storm Q,(13�J (ft) From Step 2
V�= volume of runoff from
mean annual storm g js (cfl
Step 4) Calculate wetpool volume
V� =fV�
f= Vofume factor 3' (unitless) From Step 1
Vr= volume of runoff, mean annual storm (cfl From Step 3
Vb = Volume of the wetpool 2 � , c
Step 5) Determine wetpool dimensions
a) Determine geometry of first cell
Vo[ume in first ceq (cf) Must be 25- 35%
Depth h 1st cell (minus sed. stor.) (ft} See Section 6.4.1.2
Determine horizontal xs-area at surface
Atop = (sf� If square =fake sqrt
Find top dimensions by adjusting for shape geometrics
Dimension of 1st cell: width (ft)
length (ft)
b) Determine geometry af second cell
Volume in second cell (cf) Must be 65 - 75%
Dep#h h of 2nd cell (ft) See Section 6.4.1.2
Determine xs-area at surface
Atop = (sf�
Dimension of 2nd cell: width
Dimension of 2nd cell: length (ft) If rectangular, short side=
24 ft#o match cel[ 1
Geometry check: overall pond L :W at mid depth = 3 : 1
Cell 1 length (mid-depth) (ft}
Cei12 length (mid-depth) (ft}
Vault length = cell 1 +2 (�p {ft)
Vault width Zp (ft)
Lmid :Wmid = 3: (
Step 6) Desic�n rest o#vau It (Section 6.4.2.1)
Internal baffle - 1Vof rC�vi�cd
In1et & Outlet
Access 2 - 5'�r/D' a c c�ss ��cztts
Effective area f 20 0 (3.2.2.1)
Note 5'X10" access, grating and corner vent holes
Other Design De#ails (Sections 6.2.2, 6.2.3, and 6.2.4)
Sequence of Facilities
Setbacks
Sideslopes, fencing, embankment
SIZE SUMMARY: Su�face area, change in elevation
Vault width 20 {ft)
' Vault length 6p {ft)
Surface area f 2 00 (sf)
Efevation change needed: ��2 (ft)
Karen Harris
From: Hass, Chris <CHass@conteches.com>
Sent: Friday,August 31, 2012 9:37 AM
To: Karen Harris
Cc: . Zeman, Mark;Scott, Mike
Subject: RE: New Projed in Renton,WA BCE#15432
Attachments: DSOD-Filtration Design.pdf; SFMH48-DTL.dwg
Follow Up Flag: Follow up
Flag Status: Flagged
Hey I<aren,
Thank ou e email. Based on your release rate and our mass loading calculations you will need a 48" SFMH with 3
18"cartridges. lease see attached calculations.The calculations are based on 6"of dea storage an a 70mg po utant
concentration. I
The estimated cost for the unit is$18,060. In addition, I have also attached the CAD file of our standard detail.Should �i
you need any additional information, please do not hesitate to contact me. i
Regards,
Chris R.Hass,E.I.T.
Stormwater Designer-Engineering and Customer Solutions
Contech Engineered Solutions LLC
11835 NE Glenn Widing Drive � Portland,OR 97211
Office:(503)258-3156 � Fax: (800)561-1271
chass@conteches.com www.ContechES.com
From: Karen Harris jmailto:kharrisCa�barghausen.comj
Sent:Thursday, August 30, 2012 10:10 AM
To: Hass, Chris
Subject: FW: New Project in Renton, WA BCE #15432
Chris-Hopefully you can help me while Mark is on vacation.
Thanks,
Karen
From: Karen Harris
Sent: Thursday, August 30, 2012 10:08 AM
To: Zeman, Mark(MZemanCa�conteches.com)
Subject: New Project in Renton, WA BCE #15432
Mark-
I have a new QFC fuel station in Renton,WA and we will be doing a storm vault with water quality(wetvault)and
detention and then a Stormfilter with CSF per the 2009 King County Storm Manual. The discharges from the vault are
attached.
1
The developed site is 0.5 acres impervious and 0.12 acres landscape. The detention design was done using KCRTS.
If you could give me a size and cost that would be great. Please let me know if you need any additional information for
your design.
Thank you,
Karen
Karcn E.Harris, P.E.
Project Engineer
Barghausen Consulting Engineers,Inc.
18215 72nd Avemie South
Kent,WA 98032
(425)251-6222-Phone
(425)251-8782-Kent O�ce Fax
http://www.barghausen.com
--------------------------------
The information contained in this message may be confidential and/or proprietary,and Iega�ly protected from discfosure.If the reader of this message is not the
intended recipient,or an employee or agent responsible for delivering this message to the intended recipient,you are hereby notified that any retenlion,
dissemination,distribution or copying of this communication is strictly prohibited.If you have received this communication in error,please notify us immediately by
replying to ihe message and permanently deleting it from your computer.Thank you,Contech Engineered Solutions LLC
_ 1
2
��i� D
Determining Number of
�.►�NTE H Cartridges for Systems
ENGINEERED SOLUTIONS Downstream of Detention
CONTECH Stormwater Solutions Inc. Engineer: CRH
Date 8l3112012
Site Information
Project Name QFC Fuel
Project State Washington
Project Location Renton
Drainage Area,Ad 0.62 ac
impervious Area,Ai 0.50 ac
Pervious Area,Ap 0.12
% Impervious 81%
Runoff Coefficient, Rc 0.78
Upstream Detention System
Peak release rate from detention, Qrelease peak 0.15 cfs
Treatment release rate from detention, Qrelease treat 0.01 cfs
Detention pretreatment credit 50%
(from removal efficiency calcs)
Mass loading calculatlons
Mean Annual Rainfall, P 36 in
Agency required % removal 80°/a
Percent Runoff Capture 90%
Mean Annual Runoff,V� 57,106 ft'
Event Mean Concentration of Pollutant, EMC 70 mg/l
Annual Mass Load, M��� 249.40 Ibs
Filter System
Filtration brand StormFilter
Cartridge height 18 in
Specific Flow Rate 1.0 gpm/ft2
Number of cartridges-mass loading
Mass removed by pretreatment system, Mpre 124.70 Ibs
Mass load to filters after pretreatment, MPe�� 124.70 Ibs
Estimate the required filter efficiency, Efi�ef 0.60
Mass to be captured by fitters, Mfi„ef 74.82 Ibs
Allowable Cartridge Flow rate,C�,t 7.50
Mass load per cartridge, M�a�(Ibs) 36.00 Ibs
Number of Cartridges required, N�� 3
Treatment Capacity 0.05 cfs
Determine Critical Sizing Value
Number of Cartridges using Qre�a�,�c. N+�,,,, 1
Method to Use: MASS-LOADING
SUMMARY
Treatment Flow Rate, cfs 0.05
Cartridge Flow Rate,gpm 7.5
Number of Cartrid es 3
1of1
. - i
5.0 CONVEYANCE SYSTEM ANALYSIS AND DESIGN II
The conveyance system for this praject is sized to convey the 100-year storm event based on the I',
modified rational method with an initial time of concentration of 6.3 minutes. This site is '
approximately 0.62 acres in size (including offsite basin), which is significantly less than the 10-
acre requirement for using the modified rational method. For this project, we are using the
modified rati�nal method.
Backwater calculations are also included to show the 0.5 foot of freeboard being provided.
l
, l
15432.001.doc
CONVEYANCE MAP LAOPOSEO ASPw�1T PAVE4EM 0 PQ`�'HAV�'�
� � VNOPOSED CONCAEiE PMIELEM "�_____„ m ` `
� � I � . .
v � , • ; ��
� ` '1 " t EwSiNC COt+CaEtt CURB ��--�-------. -"' ' '
I � � , �-� . '� ! o
1�ZO ��� C : � ' NEW CONCREfE CURB y'�p � 4.
o io so ,o ;. •�. c ; e k ------� c f� ; ��e
.. ,�..-.;:. ; ; �� : : --- -S tA '�`, I �EW CONC.SWALE — HQ EN61N
,._. ..:.�.�..-..,.;... . � �\� . : _-_-.0 • '__' 81 S
: ! r . . �
.
, . p f 77Np AVENUE SOUIH
1 �•\� • j/�j•. """ E%.UIG PoNER - � KENI.WA 980JY
•�� � ? 'f�":'i j,�j. �-"-'-' ElC 7ELEPHONE � U2 51251-62Z2
� �
F' �.� :��. w ',l ` (�25)ISI-E782 flul
.
' � �• � - � •'` "' E%5NM STONM PnE SD Cmt 06M[MNq.IANO RAtYs�G.
�
:
i • � �`�,�l ���� . SWYO'NC.U(MOMiURN SfANCCS
'""' ""'� " "
, � ���•� ;� ��i j��-J� �:� � t� -- -------.�_!-•- [xisrr+c suaru�r s�e awe - ss
.
:
/
• -/ r- _.• , : cJ :;i'�! _ - n;•f., �,�, _ ''�
'--•-'-'••"'."''---- --'--'---- "- '---'--"--�'---'�-"--"'.-�'"" '
. � p � . j
i i ' J r ___��, ���z�l�t I �' ' ..�-� E705TNG WAiER lhE .... , .. ---�� h �
� Q
_ .. F t .:.............J..�.'-�--._a.111:tE1'�._�..r..�...�.�.=r....�: a ru�-. ' :� � Fr= ' --"-'-"�{-' a
���� � � T�cE i� j ...�c+s._:.wa���� ;ca`� ��` � /� �Z: .4. ._:r� 1�1� =d �`F �
_ '� � r�i= c * �1L ' '� . vr+0a05Eo SNIrtNtr SEwEq � ��
a�'� i -:�� , .-c... � �s „ r g �� i
-�� +-tEiN _ _ _ ' _ ' _ ' _ _ _ _ ' ' ' _ _ _ _ L. �_ �. ��� _ ' ' - ,�-F�.. .r �� I ��- PROP'OSED SENER 1W6101E • i
<_s�;.
. t�»csr� - �" '-- n L� 1__ r�.•.�. . -" $ �i`S��
�. [• i�.� � i
. s � . c L-�. � �� �.y. i�, m
��. cF . _��_': ;'___, _ - ^
_ ..I,; i � ;.. .. - � _.,:;_.. ' � � �Z» PROPOSED STORAI DRNW�GE � �a;�
` ��" <-c,: I .._ f`u y. ,��
.--.------ / �
_ ��_-�� -��--`- _ . _ �� �'r'nr �s - PROPOSED 1rPE IL CAIpi&lSW � ��r,
.8156 Ot - � - e''-
-
- f6 ]56S.7S SFC.C09.TO 1�COR ',- - �'S� � �a' >_n- �a 'o .- �
)Sesm'iot sa.�a'(�cws �sw i i) � :IF-: i -:..� PROPOSED 7rPE 2-�8'GTq+80.5W (�) �<Q��u
' !I6'[IYyy,�t
a F.�-:-. I __—� .=c--.. . _...-.�_��.:—_- _—... __�___ _-_ ___ _�. � �, -- •.r:�;: �
' � . -- -- �_ EtuSTWG CRWI1b SPOT 0.EVAM7N .:c�ss
_ \ ---I-� � ,-----� -�"4T I - -EET �,� � �
i' C`„ F + ' ' ' _ ' ' _ ' ' ' ' ' ' _ _ _ ' _ -�- . G � �L� r� _ . El0$11NG CROUND CONfOUR -.. O$
,
� ,,.� 33
.�. �... �' . � '„ ' _ ' g
: �r i � .:.._.-\,. i _ . F �.. .� � ' - - - .; � ��+ �. • ..� �-4 �It • PNOVOSED fPOSHEO GRIOE SPOT EtEVATiON � W � Ut ��
, — —_ i r ;'�. �� ']i70 �.
so�su s ----•- '� -�1!_-.! — �_ � _ _w—Lt � =-ll' �• - _``,.. .. , 1, �...�— J g���
/ _ _.. i:
.�.,._ ` . I ' v
•------- xec'----------- . � _ - - -w- --- - -�--- _ . ' � w—' PAVEYEM SWALE a ��R
w
' __- -- - � pi�G� -- 4EEf h WTGf EIOSLNC YE Y
— �� _� =PNG> . � ;T— i--�Z ��' �A�����< T�W) T P(lG) T � ~_� V !L-Rd�g
� �:RI 1 i '� ` y��i � :f T' _ i . r�=_�_�-�_ x
if_ . . �._,� _- f /p��_, j ,�0�� �',^' � __�.i..s___-� � �,,\ ( ',. �. - � �__ �'_' ._, _� v 5.rs
1 �-/, �'-/-'� � -pi 'I ' tr'�_ �� ` � �\�Cj se�ti'set ~ �P�a�*a;�GBB
� h . /I� „� ',,,_��.� � !' ' .i �.\ < \.'� o.00' �' •�
I ` ,�,:.,�: /j �� � `` �, � i �r. - . ,{ � .
� )� ,1� / ~� �� ���,1� n� u _ ���J.-- �
��� �� I ' y �esz� o F
� I : °. /� �' �� i , �� � .� 'o,, f6 B� ��.,
�I i � ��4- / � /i , I na�) �}f �SiC �
� � � :. 7 _ ; � , - ,�y ac o��< <��
i �� �� -� � L.- l ,� '�, k z i .... ,.- - a
i �� � :p. .oti�l' �/: 't� : •� i" - i
l� .� � �
j �� � •� ->.ZI Q,jn .' y • �• � i ' � '-Q � � � � � �
� l� 6�"- j '�,� � �'O,� -� � , � / E R R
iF. _... F�rr. :r.. .-. �� J �' � / \••S�; ��• I e I / o
� I � �'C� � � � ' J L/,-r.;� r e
I �� `��,I i�• , .\�r' " n ' � _ - � � � 7E
1 � 1 �i • , ' � �� ,��r' � ' � Y �_ . _
.
. .
`� _., I �i O. , �\ r ' �.' -
j " , �? /�I � �i '��', '��i.. . ' .� :'��ot��"�� i. i , - - -�- - I
� ' I I� '� '/, _ 1 . d :��r � .'� �� � _ �i_, � _ � �
��• � � , ' .�'I: ?•'. . t e 1 -
� � �!� � •�� ����} • � � �o�_ f.� = � r-��.
1 �� I 1 io• J � : �. . .�, —` � . �
I � �� `J • � � � � i � ��" (/�
i
� I �.`, i .� �•��� (� `/ ��•' � �' E � Z
..f.. ., S . I
� 'a / \ \ .� :?�.% \�� , 1 : � r-'- t'4Ii ii[+� O
i . :..._ ' .�• �' ./ `( . � . /' 1 _ i� uR � 0.iN e , ' "
I � I I � * \ . �• . '/ c � � ;'_'___',.. �
� I 1 1 4, •� \ \ ``=� �.e" ; � � � r__ >
� �I �i T' �`1 ---- - -- - =�-- ::..*- _ _., �i ` Vw � �'J
1 rzvc-�� i i .�,- / -- -- - _-_� - �i - � ,� I G' �� � �
� - ---�' � � �r i / �- -- � � - b�' �� - - �" -J i
���� �;,� � . �� 8=- �- �' �► ;
i �,,�1�1��� ~' . -_--_ _.'es°' _ _ _ � . �o _i—`°���s_.:� �:�3, '
� y� .W d = _ _ _. _ _ --, � o3't t �q , �� � ;rcr.s:,,: �,
� ------ - _ v ��---- — — — � N; m s , �:,,=:���3 d a
( � I t?"CI.W�}c:.Y �7Y
I � I � i ' � : - _ _ �+p \ � � 12�U I 5.w'. ?
j . � � ' YRIR �� ..�� � � � �� I$ 1 `�* `R LtIF t1.k:`3
� ; ���. �i -��t_ _� : � .C', � �
� . � t .7; -�� � �, G"hf Qa�£, � � �
i J � . �C�[I 3 i I � r 'r x Sr�t��y �
i i ' �_ -- ifi _ ; .�: I 1 ; � � «�� .�j„ ._.�, � v � _
t l YR��C J� t ^I � l 1
1 I F: rt .1 . ' .�
,�.�� _ .
i L,�J � �1F, v�r i:'ac_r i_.�s: �{ � � I ,. c . _r � ^ �
'� ,'. � l...i 1 �' �pTtH E+' s
L________________ ____ -____-_--_ ' ___ � � t ? RV .3 .
�j,-- �.oi:._t�t., r}---------- , -�- ' ,:e� � 7 d�., r,qcc��:Is+ury 51aa IOOE7�
� - (:r�:� � � - � r� :Z'LI F� �<.� '• n
r�' �i':e]:. .-- OnqneA Br IIEM
F�.�_�:,:� , ;� �y� _
- " o
�:.-�_. .,. . . ,p __ - ; \ �_ ae.�er Ra �
� • '� .,..._�,;.., tn.�►ea e�. .M
� r/ �------- uw.: e.w.iz �
IF:G�
�_ k�: t
YF;�"I I as►ne: g
r�rr.H eaw: I uoed:
- = 3ga..�I � v
�'�GI'I.�= i33`: ' .
i_'�i�' S : :`i.:i I c
I I �e� 1613 NE�M�� S
�
� �
� �
FU0.NC1 FACL1iY
o..q ia_ %
�
of 12 =
i.'
15432-kingco.xls
BARGHAUSEN CONSULTING ENGINEERS-PIPE FLOW CALCULATOR
using the Rational Method&Manning Formula
KING COUNTY DESIGN FOR 100 YEAR ST�RM
JOB NAME: ng Facility#871 NOTE:ENTER DEFAULTS AND STORM DATA BEFORE BEGINNING
JOB#: 15432 DEFAULTS C= 0.9 n= 0.014
REVISED: 6/24/2013 d= 12 Tc= 6.3
A=Contributing Area(Ac) Qd=Design Fiow(cfs) COEFFICIEN7S FOR THE RATIONAL METHOD"Ir"-EQUATION
C=Runoff Coefficient Qf=Full Capacity Flow(cFs) STORM Ar Br
Tc-Time of Concentration(min) Vd=Velocity at Design Flow(fps) 2YR 1.58 0.58
l=Intensity at Tc(in/hr} Vf=Velocity at Full Flow(fps) 10YR 2.44 0.64 PRECIP= 4
d=Diameter of Pipe(in) s=Slope of pipe(%) 25YR 2.66 0.65 Ar= 2.61
L=Length of Pipe(ft) n=Manning Roughness Coefficient 50YR 2.75 o.65 Br- 0.63
D=Water Depth at Qd(in) Tt=Travel Time at Vd(min) 100YR 2.61 O.fi3
FROM TO A s L d Tc n C SUM A A'C SUM A'C I Qd Qf Qd1Qf D/d D Vf Vd Tt
CB 1 VAULT 0.14 2.00 26 12 6.3 0.014 0.9 0.14 0.13 0.13 3.27 0.41 4.68 0.088 0.198 2.37 5.96 3.58 0.12
CANOPY VAULT 0.01 2.00 31 4 6.3 0.014 0.9 0.01 0.01 0.01 3.27 0.03 0.25 0.118 0.233 0.93 2.87 1.90 027
RAIN
GAFtpEN VAULT 0.10 2.00 26 12 6.3 0.014 0.9 0.1 0.09 0.09 3.27 0.29 4,68 0.063 0.171 2.05 5.96 3.29 0.13
TRENCH
DRAIN VAULT 0.37 2.00 15 8 6.3 0.014 0.9 0.37 0.33 0.33 3.27 1.09 1.59 0.687 0.608 4.87 4.55 4.89 0.05
Page 1
BACKWATER PROGRAM FOR ROUND/ARCH CULVERTS
Tailwater Elevation:396.5 feet
Discharge Range:0.21 to 0.41 Step of 0.01 [cfs�
Overflow Elevation:398.25 feet
Weir:NONE
Channel Width:3. feet
GB� 1 -� vo�.���-
CULV 1V0. 1: 26 LF - 12"CP @ 2.15� OUTLET: 394 .69 INLET: 395.25 INTYP: 5
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.21 1.26 396 .51 * 0.012 0.19 0.14 1.81 1.81 1.26 1.26 0.24
0.22 1.25 396.50 * 0.012 0 .20 0.14 1.81 1.81 1.25 1.25 0.25
0.23 1.25 396.50 * 0.012 0.20 0.14 1.B1 1.81 1.25 1.25 0.26
0.24 1.25 396.50 * 0.012 0.21 0.15 1.81 1.81 1.25 1.25 0.26
0.25 1.25 396.50 * 0.012 0.21 0.15 1.81 1.81 1.25 1.25 0.27
0.26 1.25 396.50 * 0.012 0.21 0.15 1.81 1.81 1.25 1.25 0.27
0.27 1 .25 396 .50 * 0.012 0.22 0.15 1.81 1.81 1.25 1.25 0.28
0.28 1.25 396.50 * 0.012 0.22 0.16 1.81 1.81 1.25 1.25 0.28
0.29 1.25 396.50 * 0.012 0.23 0.16 1.81 1.81 1.25 1.25 0.29
0.30 1.25 396.50 * 0.012 0.23 0.16 1.81 1.81 1.25 1.25 0.30
0.31 1 .26 396.51 * 0.012 0.23 0.16 1.81 1.81 1.25 1.26 0.30
0.32 1.26 396.51 * 0.012 0.24 0.17 1.81 1.81 1.25 1.26 0.31
0.33 1.26 396.51 * 0.012 0.24 0.17 1.81 1.81 1.25 1.26 0.31
0.34 1.26 396.51 * 0.012 0.25 0.17 1.81 1.81 1.25 1.26 0.32
0.35 1.26 396.51 * 0.012 0.25 0.17 1.81 1.81 1.25 1.26 0.32
0.36 1.26 396.51 * 0.012 0.25 0.18 1.81 1.81 1.25 1.26 0.33
0.37 1.26 396.51 * 0.012 0.26 0.18 1.81 1.81 1.25 1.26 0.33
0.38 1.26 396.51 * 0.012 0.26 0.18 1.81 1.81 1.25 1.26 0.34
0.39 1.26 396.51 * 0.012 0.26 0.18 1.81 1.81 1.25 1.26 0.34
0.40 1.26 396.51 * 0.012 0.27 0.18 1.81 1.81 1.25 1.26 0.35
0.41 1.26 396.51 * 0.012 0.27 0.19 1.81 1.81 1.25 1.26 0.35
0.41 1.26 396.51 * 0.012 0.27 0.19 1.81 1.81 1.25 1.26 0.35
BACKWATER PROGRAM FOR ROUND/ARCH CULVERTS
Tailwater Elevation:396 .5 feet
Discharge Range:0.01 to 0.03 Step of 0.01 [cfs]
Overflow Elevation:400.8 feet
Weir:NONE
Channel Width:3 . feet
C4�Y�°P� � IfAUw.�l�"
CULV NO. 1: 31 LF - 6"CP C� 2.00% OUTLET: 396.00 INLET: 396.62 INTYP: 5
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
**********************************,r**************,r****�****�t*******************
0.01 0.06 396.68 * 0.012 0.05 0.04 0.5Q 0.50 0.05 ***** 0.06
0.02 0.09 396.71 * 0.012 0.07 0 .06 0.50 0.50 0.07 ***** 0.09
0.03 0 .11 396.73 * 0.012 0.09 0 .07 0.50 0.50 0.09 ***** 0.11
I
BACKWATER PROGRAM FOR ROUND/ARCH CULVERTS
Tailwater Elevation:396.5 feet
Discharge Range:0.09 to 0.29 Step of 0.01 [cfs)
Overflow Elevation:399.4 feet
Weir:NONE
Channel Width:3. feet
�4•i�1 6'Q.rd-�in 7 (/a•v t f
CULV NO. 1: 26 LF - 12"CP C� 2.00% OUTLET: 394.88 INLET: 395.40 INTYP: 5
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.09 l.11 396.51 * 0.012 0.13 0.09 1.62 1.62 1.11 1.11 0.16
0.10 1.10 396.50 * 0.012 0.13 0.10 1.62 1.62 1.10 1.10 0.16
0.11 1.10 396.50 * 0.012 0.14 0.10 1.62 1.62 1.10 1.10 0.17
0.12 1.10 396.50 * a.012 0.15 0.11 1.62 1.62 1.10 1.10 0.18
0.13 1.10 396.50 * 0.012 0.15 0.11 1.62 1.62 1.10 1.10 0.19
0.14 1.10 396.50 * 0.012 Q.16 0.12 1.62 1.62 1.10 1.10 0.20
0.15 1.10 396.50 * 0.012 0 .16 0.12 1.62 1.62 1. 10 1.10 0.20
0.16 1.10 396.50 * 0.012 0.17 0.12 1.62 1.62 1.10 1.10 0.21
0 .17 1.10 396.50 * 0.012 0.17 0.13 1.62 1.62 1.10 1.10 0.22
0.18 1.10 396.50 * 0.012 0.18 0.13 1.62 1.62 1.10 1.10 0.22
' 0.19 1.10 396.50 * 0.012 0.18 0.13 1.62 1.62 1.10 1.10 0.23
0.20 1.10 396.50 * 0.012 0.19 0.14 1.62 1.62 1.10 1.10 0.24
0.21 1.10 396.50 * 0.012 0.19 0.14 1.62 1.62 1.10 1.10 0.24
0.22 1.10 396.50 * 0.012 0.20 0.14 1.62 1.62 1.10 1.10 0.25
0.23 1.10 396.50 * 0.012 0.20 0.14 1.62 1.62 1.10 1.10 0.26
0.24 1.10 396.50 * 0.012 0.21 0.15 1.62 1.62 1.10 1.10 0.26
0.25 1.10 396.50 * 0.012 0.21 0.15 1.62 1.62 1.10 1.10 0.27
0.26 1.10 396.50 * 0.012 0.21 0.15 1.62 1.62 1.10 1.10 0.27
0.27 1 .10 396.50 * 0.012 0.22 0.16 1.62 1.62 1.10 1.10 0.28
0.28 1 .10 396.50 * 0.012 0.22 0.16 1.62 1.62 1.10 1.10 0.29
0 .29 1.10 396.50 * 0.012 0.23 0.16 1.62 1.62 1.10 1.10 0.29
` ;
--,
__4
�
BACKWATER PROGRAM FOR ROUND/ARCH CULVERTS
Tailwater Elevation:396.5 feet
Discharge Range:0.09 to 1.09 Step of 0.05 [cfs]
Overflow Elevation:398.2 feet
Weir:NONE
Channel Width:3 . feet
1`v e.nch O�a.:� 7 1lav( !-
CULV NO. 1: 15 LF - 8"CP Q 2.00% OUTLET: 395.20 INLET: 395.50 INTYP: 5
4�CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.09 1.01 396.51 * 0.012 0. 14 0.11 1.30 1.30 1.01 1.01 0.18
0.14 1_Ol 396.51 * 0.012 0.18 0.13 1.30 1.30 1.00 1.01 0.23
0.19 1 .01 396.51 * 0.012 0.21 0.15 1.30 1.30 1.00 1.01 0.27
0 .24 1.02 396 .52 * 0.012 0.23 0.17 1.30 1.30 1.01 1.02 0.31
0 .29 1.02 396.52 * 0.012 0.25 0.18 1.30 1.30 1.01 1.02 0.34
0.34 1.03 396.53 * 0.012 0.28 0.20 1.30 1.30 1.01 1.03 0.38
0.39 1.04 396.54 * 0.012 0.30 0.21 1.30 1.30 1.01 1.04 0.41
0.44 1.05 396.55 * 0.012 0.31 0.23 1.30 1.30 1.02 1.05 0.44
0.49 1.07 396.57 * 0.012 0.33 0.24 1.30 1.30 1.02 1.07 0.47
0.54 1.08 396.58 * 0.012 0.35 0.25 1.30 1.30 1.03 1.08 0.50
0 .59 1.10 396.60 * 0.012 0.37 0.26 1.30 1.30 1.03 1.10 0.53
0 .64 1.11 396 .61 * 0.012 0.38 0.28 1.30 1.30 1.04 1.11 0.56
0.69 1 .13 396.63 * 0.012 0.40 0.29 1.30 1.30 1.04 1.13 0.59
0.74 1.15 396.65 * 0.012 0.41 0.3a 1.30 1.30 1.05 1.15 0.61
a.79 1.17 396.67 * 0.012 0.43 0.31 1.30 1.30 1.05 1.17 0.64
0.84 1.20 396.70 * 0.012 0.44 0.32 1.30 1.30 1.06 1.20 0.67
0.89 1.22 396 .72 * 0.012 0.45 0.33 1.30 1.30 1.07 1.22 0.70
0.94 1.25 396.75 * 0.012 0.46 0.34 1.30 1.30 1.08 1.25 0.73
0.99 1.27 396.77 * 0.012 0.48 0.35 1.30 1.34 1.09 1.27 0.76
1.04 1.30 396.80 * 0.012 0.49 0.36 1.30 1.30 1.09 1.30 0.79
1 .09 1 .33 396.83 * 0 .012 0.50 0.37 1.30 1.3� 1.10 1.33 0. 82
6.0 SPECIAL REPORTS AND STUDIES
A geotechnical engineering report has been prepared for this site by The Riley Group dated
August 22, 2012. The report is enclosed.
15432.001.doc
The Rilev Groirp, Inc.
GEOTECHNICAL ENGINEERING REPORT
PREPARED BY:
THE RILEY GROUP,INC.
17522 BOTHELL WAY NORTHEAST
BOTHELL,WASHINGTON 98011
PREPARED FOR:
I KROGER,INC.
3663 1ST AVENUE SOUTH
SEATTLE,WASHINGTON 98134
PROJECT NO. 2012-345
GEOTECHNICAL ENGINEERING REPORT
QFC 871 FUEL STATION
4615 NORTHEAST 4TH STREET
RENTON,WASHINGTON 98059
AucusT 22,2012
SERVING THE PACIFIC NOR7'HWEST
Tf�esYer�i Washingfon,Corponrle OJJIce Eas►ern R'ashing�on and Oregon OJy'ice
/7521 Bothell Way Northeart 1838 Soulh Washiitglo�e S[r•eet
Bodre!!, Washinglon 98011 Kenneirrck, Washingfo�t 99337
Phone 425.4I5.0551�Fax 4Z5.41 S.OJII Phoi�e S09.S86.4840�Fax 549.586.4863
�t9Yw.�'ilel'-f�rouD.conf
�_
�
Tlie Riley Grorrp,lnc.
August 22,2012
Mr. Brian Peterson
I�•oger, Inc.
3663 lst Avenue South
Seattle, Washington 98134
Su6ject: Gcotechnical Engineering Report
QFC 871 Fuel Station
4615 Northeast 4th Sh•eet
Renton,Washington 98059
Px•oject No.2012-345
Dear Mr. Peterson:
As requested, The Riley Group, Ina (RGI) has performed a Geotechnical Engineerin�
Report (GER) for the QFC 871 Fuel Station located at 4615 Northeast 4fli Street in
Renton, Washington. RGI understands that Kroger, Inc. is �l�ruiing to construct a fuel
station at the site. Our seivices were outlined in our proposal dated December 21, 2011 and
authorized on July 27, 2012.
This GER presents our geoteclutical findings and recommendations for the proposed
project. These recommendations should be incorporated into project design and
construction. RGI also recommends that a representative of our frm be present on site
during poi�tions of the project construction to confiin� that the soil and groundwater
conditions are consistent with those that form the basis for the engineering '
recommendations in this GER.
If you Ilave any questions or require additional information, please call us at (425) 415-
0551.
- ,.t
Respectfully submitted, �U�1 C7/ �,,
�'HE�ZILGY GROUP,�NC. �� �4 W������'9
+. a.� px'�
�: y W'
"�
' `.
� 35013
� � '�*
����� . �--� �, �
.��
�r; ~ � ZZ 20
! 12
Eric L. Woods LG Ricl R. Wan PhD PC /
, �Y �, ,
Project Geologist Principal Engineer
EW/RW/sp
S6N17NG'1'ilE PACICICNORTfi�\'FST
IVester�i IVasbinglon,Carporn[e OJJ'Ice Enstern Il'ns111ngral a�td Oregol�Ojjce
17522 Bofhel!Jf'ny A'orlheasl,Str11e A 1838 Sar1l�)l�ashrnglon Shee!
Tio(hell, i!'ashinglon 980)T Kenneu�ick, IPashinglou 99337
Plioire�25.415.055!�Fa.r 425.4/5.0311 PJrare 509.586.4840�Fa�509.586.4863
i ririr.rile�•-grorrp.corn
Geotechuical F.ngineerixg Report Pnge ii Augrrst 22,2012 ',
QFC 871 Fue!Sta(roit,Renton, Washingtos: RGI Project No. 101Z-345 ''
TABLE OF CONTENTS '
,
1.0 PROJECT D�SCRIPTION.............................................................................................................. 1 !
2.0 SCOPE OF V6'ORK........................................................................................................................... 1
3.0 SITE CONDITTONS..........................................................................................................................2
3.1 SuitF'ACF...............................................................................................................................................2 �
3.2 S�tLs.....................................................................................................................................................2 '
3.3 GROUNDWATER.......................................•••......................,...................................._....................-••........2
3_4 SEis�r[cCoNsi�E�Trorts....................................................................................................................Z
4.0 DISCUSSION AND RECOMMENDATIONS................................................................................3
4.1 GENETtAL...............................................................................................................................................3
4.2 SITE PREPARATION AA'D GRADING........................................................................................................4
4.3 S7'RUCZ'1JRAL FILL.................................................................................................................................4
4.4 EXCAVATIONS AND SHOR[NG................................................................................................................S
4.5 UNDERCROUND STORAGE TANKS(USTS�.............................................................................................5
4.6 Fou�voAT�oNs.......................................................................................................................................6
4.7 KtOSK SLAA-0N-GRADF............................................................................................ ..................,...6
......
4.8 DRAINAG�.............................................................................................................................................6
4.9 t3T�Lrrr�s...............................................................................................................................................7
4.10 PAVEMEN'CS...........................................................................................................................................7
5.0 ADDITIONAL S�RVICES............................................................................................................... 8
6.0 LIMITATiO1V5..................................................................................................................................8
FIGURES AND APPENDICES
Figure1................................................................................................................... Srte Vicinity Map
Figure 2............................................................................................. Geotech�zical Exploration Plan
Appe�tdix A........................................................................Field Exploration and Laboratory T�sting
THE RILEY GROUP,INC.
Geotechrrical Engineeri�rg Repor•t Page 1 Acry,yrsl Z2, ?01?
QFC 871 Ftre!Station,Renton, 6t-asltirrgtori RGI Projec!No. 2072-341
LO PROJECT DESCRTPTIOl\T
The Riley Group, Inc. (RGI} has perfor�ned a Geotechnical Engineering Report {GER) for
the praposed QFC 871 Fuel Station located at 4615 Northeast 4th Street in Renton,
Washington. The approximate location of the site is shown on Figure l. The site is
currently vacant.
The proposed project consists af a ftieling facility including two underground storage tanks
(iJST). Our understanding of the project is based on the Detailed Site Plan {DD2) prepared
by Barghausen Consulting Engineers, Inc. clated Jut�e 25, 2012. At the time of preparing
this GER, detailed desig�n plans were not available far olir review.
Based on our experience with similar projects, RGI expects that the proposed kiosk will be
a one-stoiy, Iight-weight structure supported an perimeter walls and spread-footing
foundation. Steel columns at each puinp island will support the pump island canopy. The
maximum load for the canopy is expected to be 50 kips per column. RGI expects that
excavations up to 20 feet in depth will be needed for the UST instatlatian.
The recommendatious in the following sections of this GER are based upon our
undex-standing of the above design features. If actual features vary or changes are made,
RGI shouid review them iu order to modify our recomn�endations as reyuired. In addition,
RGi requests to review final design drawings and specifications to verify that our project
understanding is correct and that our recommenda#ions have been properly interpreted and
incorparated into project design and construction.
2.O SCOPE OF WORK
On August 9, 2012, RGI driiled two test harings to a �naximum depth of 26 feet below
ground surface (bgs}. The borings were driiled with a rubber-track, hallow stem auger drill
rig within the proposed fuelir�g facility and UST area. The approximate boring locations
are shown on Figure 2.
Using the infarmation obtained fi•om our subsurface exploration, RGI developed
geatechnical recommendations for project design and construction for the fallowing:
➢ Soil and graundwater conditions ➢ Underground storage tanks
➢ Seismic ct�nsiderations ➢ Foundations
➢ Site preparation and grading ➢ Slab-on-grade
➢ Excava�ions ➢ Utilities and pavements
Field screening of the soils was completed as part of the explorations on site. 'The result of
the field screening and testing of the groundwater is provided under separate cover.
THE RILEY GROUP,INC.
Geotechnicaf Eugineering Report Page 2 Augzesl 22,2011
QFC 871 Ferel Stution,Reirton, Washiirgton RGI Project No. 2011-345
3.0 SITE C�NDITIONS
3.1 SURFACE
The site is a rectangular-shaped praperty located at the southwest corner of Northeast 4th
Street and Duvall Avenue. The site is bound to the north by Northeast 4th Street, to the
east by Duvall Avenue, to the south and west by commercial properties.
The site is currently vacant. Tlie site is reiatively flat with overall elevation difference less
than 5 feet.
3.2 SOILS
The soil encountered during the field exploration was consistent in the tvvo locations
explored. The site is underlain by over 25 feet of very dense glacial till whicl� consists of
silty sand with gravel.
Our review of the Geologic Map of Surftcial Deposits i�i the Seattle 30' by 60'
Quadrangle, Washi�zgton (James C. Yount, etc. 1993) indicates that the native soil in the
area was mapped as Vashon till (Map unit Qvt). Glacial till is described as a light to dark
gray, nonsorted, nonstratified mixture of clay, silt, sand, and gravel to boulder size. The
native soits encountered at the site are generally consistent with the above description.
More detailed deseriptions of the subsurface conditions encountered are presented on the
boring logs in Appendix A. Grain-size analyses were performed on selected samples and
the results are located in Appendix A.
During the geatechnical investigation, RGI project geoiogist field screened the soil
samples using a photoionization detector (PID}. Field screening with a PID was
accomplished by placing a small amount of soil in a plastic bag and sealing the hag,
allowing any vapois to collect. The metal tip of the PID was used to pierce the bag and a
reading was taken after the values had stabilized. No visual indicatians of contamination or
readings with the PID were observed.
3.3 GROUNDWATER
A groundwater table was not encountered during the field exploration. Light groundwater
seepage was encountered at Boring B-1 at a depth of 6 feet. The seepage appears to be
indicative of seasanal groundwater collecting within clean sand interbeds.
Flttctuations in groundwater level should be expected on a seasonal and annual basis. The
level will be highest during the extended periods of heavy seepage in the wet winter
months. Groundwater seepage may be encountered in excavations area if the consfizction
occurs in die wet season. It will not likely affect the construction activities.
3.4 sEISMIC CONSIDERATIONS
Based on the 2009 International Buitding Code {IBC), RGI recommends the following
seismic parameters for design:
THE RiLEY GROUP,INC.
Geotechnicu!Errgi�ieering Report Page 3 Augtisf Z2, 2U1?
QFC 87J Fuel Statiorr,Reirton, N�ashr11g1on RGI Project�o. 2(712-345
Table 1 2009 IBC
Parameter Value
Site Soil
Site Latitude � � 47.488203
Site Longit�de J�---y�---v �N V��».�~--�--^-T i22.156704-----------
------._._�__----- — --------- ----_._.----._.._.._....___.____._._.__-----._.._.
Short Period Spectral Response Acceleration, (percent g} ; 139
– ---------.______.___--------------- �
---------�-- -- -
1-Second Period Spectral Response Acceleration, (percent g) 47.3
Seismic Coefficient, 1.000
--____._�_�_----- ------------ ------------------___.__.________..._____._..-----___._..--.____..__.__
Seismic Coefficient, , 1.327
l.IVote:in genera!accordance with the 2609 IBC,Table 1613.5.2.lBC Site Ciass is based on the average characterisfics of the uppei-
l00 feet of the subsurface profile.
2_Note:The 2609 ISC requires a site soil pmfile deiennination eactending to a depdi of 100 feet for seismic site ctassificatiou.The
cuaeni scope of our services does not include the required 160-foot soil profiEe determination.Borings extended to a ma�cimum depth
of 26 feet, and this seis�nic site class definition cunsiders that similar soi!conUnues below the maximutn depth of the subsurface
exploration. Additional exploration to deeper depths n�ould be required to confinn the condirions below the current depth of
eacploration.
Liquefactian is a pl�enamex�on where there is a reduction or complete loss of soil strength
due to an increase in water pressure induced by vibrations from a seismic event.
Liquefaction mainly affects geologically recent deposits of fine-grained sands that are
below the groundwatec table. Soils of this nature derive their strength from intergranular
fi-iction. The generated water pressure or pore pressure essentially separates the sail grains
' and eliminates this intergranular friction, thus reducing or etiminating the soil's strength.
RGI reviewed the soi{ conditions encountered during field explo�ation and assessed the
poten�ial for liquefaction of the site's soil during an earthquake. The native soil is very
dense glacial and is generally considered �lot subject to soil liquefaction during an
earthquake.
4.0 DISCUSSION AND RECOMMENDATIONS
4.1 GENERAL
Based on our explorations, tl�e site is suitable for the proposed project fi•om a geotechnical
standpoint. The native soil is suitable for supporting of the proposed foundations and tanks.
The canopy for the praposed fueling facility can be supported on column footing
foundatians bearing on stiff native soil. The propased kiosk can be supparted on spread
faoting foundation bearing on native soil. Pavernent can be similarly supported on native
soil.
Detailed i•ecommendations regarding the above issues and other geotechnical design
considerations are provided in the following sections. These recommendations should be
incarporated ii�ta the fnal design drawings and construction specifications.
THE RILEY GROUP,INC.
Geotechirical F.�tgi�reef•ing Re�ort Page 4 Au�C�st 22,2011
QFC 8%1 I�uel Stutiat,Rerttott, l�ashington RGI Project No. 2(J12-345
4.2 SITE PREPARATION AND GRADL'�iG
The site shauld be prepared far canstruction by removi�ig the asphalt surfaciug. Utilities to
be abandoned should be removed and replaced with structural fill.
Proofrolling and subgrade verification should be cansidered an essentiai step in site
preparation. After stripping and prior to placement of structu�-al fill, RGF recommends
proafrolling subgrades of the canopy area, pavement area, and areas to receive structural
fill. These areas should he compacted to a firm and unyielding condition in order to
achieve a minimum compaction level of 95 percent of the modified proctor maximum dry
density as detennined by the American Society of Testing and Materials D1557-09
Standard Test Methods for Laboratory Compactian Characteristics of Soil Using Modified
Effort(ASTM D 1557).
Proofrolling and adequate subgrade compaction car� Qn1y be achieved when the soils are
within appraximately t 2 percent moisture content of the optimum moisture content. Soils
that appear firm after stripping and grubbing may be praofrolled with a heavy compactor,
loaded double-axle dump truck, or other heavy equipnnent under the observation of an RGI
representative. This observer will assess the subgrade conditions priar to filling, The need
for or ad�isability of proofralling due to soil inoisture conditions should be determined at
the time of consti-�ction. In wet areas it may be necessary to hand probe the exposed
subg�•ades in lieu of proofrolling with meclianical eyuipment.
Subgrade soils that become disturbed due to elevated moisture conditions should be
overexcavated to reveal firm, non-yielding, nan-flrganic soils and backf'illed with
compacted structural fill. In order to maximize utilization of site so�ls as structural fili, RGI
recommends that the earthwork portion of this project be completed during extended
periods of warm and dzy weather, if passible. If earthwork is completed during the wet
season {typically Novernber through May) it will be necessary to take extra precautionary
measures to protect subgrade soils. Wet season earthwork will require additional mitigative
measures beyond that would be expected during the drier summer and fall months.
4.3 STRUCTURAL FILL
The nati�e soil is moisture sensitive and may not be suitahle to be used as structural fill if
the conshuction occurs in the wet season. If the site soils become wet or the construction
takes place in wet weather, RGI recommends irrtport material that meets the following
grading requirements for site grading and backfill.
Tahfe 2 Structural Fill Gradafion
U.S.Sieve Size ' Percent;Passing
3 inches 100
No.4 sieve 75 percent
No. 200 sieve j 5 percent *
"Hased on minus 3/4 inch fraction.
THE RILEY GROUP, INC.
Geotecl�nica!Errgrrree►•ilrg Repoi•t Page 5 Rirgerst 22, 2012 I
QFC 871 Fuel Stutro�r,Rerrlon, �3'ashi�rgton RGI Project Rro. 1011-345 '�
Prior to use, an RGI representative should observe and test alI materials imported to the
site for use as structural fill. Structural fill materials shouid be placed in uniform loose
layers not exceeding 10 inches and compacted as specified in Table 3. The soil's maximum
density and optimum moisture should be detennined by ASTM D1557.
Table 3 Structural Fitl Campaction ASTM D1557
1�'Iinimum MQ�stare Content
Lacation Material�ype Compaction
Percentage Range
Foundations Approved impoi�ted fill soils: i 95 +2 -2
__ _ _ __ _ _ _
__ _
Slab-on-grade Approved iniported fill soils: 95 +2 -2
General Fill {non- : Approved imported fili soils: ! 90 +3 -2
stnictural areas)
Pavement—Subgrade Approved imparted fill soils: ': 95 -+-2 -2
and Base Course
Flacement and compaction of structural f 11 sl�ould be obsezved hy RGI. A representative
number af in-place density tests should be performed as the fill is being placed to conftrm
that the recommended level of compaction is achieved.
4.4 EXCAVATIONS AND SHORING
Site excavations for ilSTs, pump island dispei�sers, and utility and piping trenches must be
compieted in accordance with the applicable Occupational Safety and Health
Administration (OSHA) and American Petroleum Institute {APn or other requirements.
Based on QSHA regulatians,the native soii classifies as a Group A soil.
In all cases, however, appropriate incIinations will depend on the actual soil and
g�-oundwater conditians encountered during earthwork. Ultimately, the site contractor must
be responsible for maintaining safe excavation slopes that comply with applicable OSHA
or Washington Industrial Safety and Health Act{WISHA) guidelines.
Accordirigly, for excavations more than 4 feet but less than 20 feet in depth, the temporary
side slopes should be laid back with a n�inimum slope incl�nation of 3/4I�:l V (Horizontal:
Vertical). Following excavation, all exposed slopes must be covered witb reinforced plastic
sheeting that is securely anchored to the slope face. This sheeting will contain loose soil
canditions �hat may develop on the slope face and ravel off, �herefoi�e, preventing erosion
of the slope face during periods of precipitatian.
� '�___ 4.5 UNDERGROUI�'D STORAGE TANKS {USTS�
RGI understands that two USTs will be installed to the south of the ca.nopy and near the �
existing restaurant dumpster area. The instalIation of the USTs will requi�•e an excavation
of up to 20 feet bgs. The USTs can be installed in a single excavation. The depth to the top
, of the USTs is typically 3 feet below finished grade with at ieast 2 feet of appropriate
backfill material. The backfill can he either pea gravel or other material per API
specifications for setting the tanks.
' THE RILEY GROUP,INC.
Geotechraical Es►grireering Report Page 6 A�rgrrst 21, 2Q1?
QFC 871 F►�el Stution,Re�rton, id'ashi�rglot� RGI Project No.2012-345
Seepage should be expected in the excavation, however, if the excavation is completed in
the drier summe�• ;nonths, this seepage should be controllable with sumps set in the
excavation.
The installation will require tank hold down slabs or anchors to acco�nmodate possible
buoyant fQrces. The UST systein installation and design must be in accordanee with APi
regulations.
4.6 Ti OUNDATIONS
Following the site grading and UST installatian, the proposed canopy can be supported on
column foundatians bearing on dense native soil. The proposed kiosk can be supported an
continuous footing bearing on native soil. RGI recommends designing foundations for a
net allowable bearing capacity of 2,SQ0 pounds per square foot {ps�. For short-term loads,
such as wind and seismic, a 113 increase in this allowable capaciry can be used.
For designir�g foundations to resist laterai loads, a base friction coefficient of 0.30 can be
used. Passive earth pressures acting on the side of the footing can also be considered for
resisting lateral laads. RGI recommends calculating this lateral resistance using an
equivalent fluid weight af 250 pounds per cubic foot (pc�}. This vaIue assumes the
foundation will be coi�smzcted neat against competent sfiructu�•al fiil as described in Section
4.2. The recommended friction and passive resistance values include a safety factor of 1.5.
Wit11 fou��dations designed in accordance with the recammendations in this section,
�naximum total and differential post-constn�ction settlements of 1 inch and 1/2 inch in 50
feet, respectively, should be expected.
4.7 I{IOSK SLAB-ON-GRADE
RGI recommends that slab-on-grade be supported on firm native soil subgrade.
Immediately below the floor slab, RGI recommends placing a 4-inch-thick capillary break
layer of clean, free-draining pea gravel, washed rock, o�� crushed rock that has less than 5
percent passing the U.S. No. 200 sieve. This material will reduce the potential for upward
capiliary move�nent of water through the underlying soil and subsequent wetting of the
floor slab. Where maisture by vapor transmission is undesirable, an S- to 10-milli�neter-
thick plastic membrane should be placed on a 4-inch-thick layer of capillary break.
4.8 DRAINAGE '
Final exterior grades should promote free and positive drainage away from building. Water
nnust not pond or collect adjacent to the kiosk or within the immediate canopy area. RGI
recomFnends providing a minimum drainage gradient of 3 percent for a minimum distance
of 10 feet from the canopy perimeter, except in paved lacations. Tn paved locations, a
minimum gradient of 1 percent should be provided unless provisions are included for
collection and disposal of surface water adjacent to the structure.
RGI understands that an in�ltration system is heing considered for the on-site disposal of
storm water run-off in tl�e parking area. The native soil is noi suitable for infiltration. In
our opinion,an on-site infiltration system below the ground surface is not feasible.
THE RILEY GROUP, INC.
Ceotecltnicn!Eslgir�eerirrg Report Page 7 Au��st 22,20l2
QFC 871 Fue!Statror�,Renton, [3�ashinglor� RGI Pr�jecl Na.101Z-345
4,9 U'r�iTiEs
Utility pipes should be bedded and backflled ii� aecardance with American Public Works
Association (APWA) specifcations. For site utilities located within the City of Renton
right-of-ways, bedding and backfill should be completed in accordance with City af
Renton specifications. The trench backfill should be pfaced and compacted as structural
fill, as described in Section 4.2.
Where utilities occur below unimproved areas, tl�e degree of compaction can be reduced to
a minimum af 90 percent of the soil's maacimum density as determined by the referenced
ASTM standard. As noted, excavated native soil is maisture sensitive and may not be
suitable for being used as backfill. Imported structural f 11 should be used for all hacicfills if
the consh�zction occurs in wet season. The backfill material should satisfy the sn-uctural fill
requirements listed in Section 4.3.
Product and vent piping trenclies should be sloped, bedded, and backfilled in accordance
with the API specifications.
4.10 PAVEMENTS
Pavement section may match the existing paveinent section on the site. For new pavement,
the subgrade should be prepared as described in Section 42 of this GER and as discussed
, below. Regardless of the relative compaction achieved, the subgrade must be firni and
reiatively unyieIding before paving. 'This conditian should be verified by proofrolling with
construction equ�pment or hand probe by an RGI representative.
- With the pavement subgrade prepared as desci-ibed above, RGI recommends that the area
be paved with flexible pavement surface. The following pavement sections are
recommended:
➢ For heavy truck traffic areas: 4 inches of asphalt concrete (AC) over 8 inches of '
crushed rock base (CRB) '
- ➢ For general parking areas: 3 inches of AC over 6 ittches of CRB
The asphalt-paving materials «sed should conform to the Washington State Department of ',
Transportation {WSDOT) specifications for Hot-Mix Asphalt 1/2-inch Class and CRB I
surfacing.
Long-term pavement perforn�ance will depend on surface drainage. A poorly-drained
pavement sectian will be subject to premature failure as a result of surface water
infiltrating inta the subgrade soils and reducing their supporting capability.
For optimum pavement perfonnance, surface drainage gradients of no less than 2 percent
are recommended. Also, some degree of longitudinal and transverse cracicing of the
pavement surface should be expected over time. Regular maintenance should be planned to
seal cracks when they occur.
THE RiLEY GROUP, INC.
Geolechriicrtl F.irgiireerirrg Report Page 8 Augrrst 11,Z01?
QFC 871 Ftrel Stution,Rer�ton, f3°as/rr�rgloit RGI Prqject No. 101 Z-345
5.0 ADDITI�NAL SERVICES
RGI is available to provide further geotechnical consuitation as the project design
develaps. RGI should review #he final design and specifications i�� order to verify that
earthwork and foundation recommendations have been properly interpreted and
incorporated into project design and construction.
RGI is also available to provide geotechnical engineering and monitoring services during
construction. The integrity of the earthwork and construction depends on proper site
preparation and procedures. In addition, engineering decisions may have ta be made in the
fieid in the event that variations in subsurface conditions become apparent. Construction
monitoring setvices are not part of this scope of work. If these services are desired, please
let us know and RGI will prepare a cost praposal.
6.0 LIMITATIONS
This GER is the property of RGI, Kroger, Inc., and their designated agents and was
prepa�•ed in accordance with generally accepted geotechnical engineering practices. This '
GER is intended for specific application to the QFC 871 Fuel Station in Renton,
Washington. This GER was prepared for the exclusive use of Kroger, Inc. and its
authorized representatives. It should be made available to prospective cant�•actors for
information or factual data only and not as a warranty of graund conditions. No othet•
v��arranty, expressed or implied, is made.
The scope of services for this project does not inch�de either specifically or by implication
any biological (for example, mold, fungi, bacteria} assessment of the site or identification
or prevention of pollutants, hazardous materials or conditions. Fietd screening of the soils
and sampling of the groundwater was completed as part of the explorations on site. The
resutt of the field screening and testing of the groundwater is provided under separate
cover.
The analyses and recommendations presented i�i this GER are based upon data obtained
from the test borings driiled on site. Variations in soil conditions can occur, the nature and
extent of which may not become evident until construction. Site safety, excavation support,
and dewatering requirements are the responsibility of others. In the event that changes in
the nature, design, or location of the project as outtined in this GER are planned, the
conciusions and recotnmendations contained in this GER shall nat be considered valid
unless RGI is requested to reevaluate the recommendations in this GER prior to proceeding
with construction.
It is the ciient's responsibility to see that all parties to the project, including the designers,
contractors, subcontractors, are made aware of this GER in its entii-ety. The use of
information contained in this GER foi� bidding purposes should be done at the cantractor's
option and rislc.
THE RILEY GROUP, INC.
: F ��- ��:,< _ � ; .;. � .
•-t�_��_.<;��, _ ■ �
e< 1 • ��p �z °��t r ,'' �k .i `.,;�N � � !�E • i 1 ■ • ■� 1
� � � y Z ry ,. . .;v. . - - - ! ! ■ y ■ ■
' • 1--' ■ � � f �7 �
.' F 1.i. T~ _.J. +' I� � ' �� •
� �:� .►�..:� �-•... ...,. S ■ � • � ��
�i L_ , • . �) . t ,--',�
-` ' � ` `.�. t ■ w �
�� '}:•_� �i , � ....� - - �
.:� .� � '>:.� ' -,q '� ��'`' � .
.. �ISrR �i-�, r5•��� ;��{hY�ye �'•�-�' /
. . � e5.�.- .
, `. F .:yY� ..z. . . ,
• � y {1� 1 �Q� P11t /' -. h~ ...�.` r`` ' rr• • J �,
.4 r'k•r �� ' r l ti' � S. " l ���
�r x'+ Q ty=` • `..�
�DI� ��� 1 . V� �5 .t�;:,- K`:i.'�i I �'�
�"�� '{ i 5 � � ...�_ r r�� .?;.-:" ��' �,.
i:J? � � ' ■ �� •'�•- � '�*! �• �•,. I
A' YY •.% ��G,;�.;: 5
�� � � �'" �v`a,r � � + � f ' �'„i�:s ��� � Y M ���
•s i �. t :�,�.::,,�:. .r f ■
'� ' - i:, f
r +6 ��.;'' r t . •
�: ? �3�:.r±y µ _ `:` '+-' �� # � r �
j t h* -1 Z.� �.'..T..' �''~.� I
yY� 1; ry" tx �� 1 � � ! L ^+'����• n�wi� { •
_ .i.a . ,t . ...... r '�i'''` •`'•��'-s f �r
,',t-.�L,L ; ..`.,... ' i •:{�.'�:1. � • . ■
:� _:�; ,M .1�j'.e` �
� t� . r � ■
�;t
1 �
- � �� t
i`�Q . :'"•'F'�Yr.£t�. .. - -. � � •
:_S f � .i i. L� �� . �y�b�4.. r•',L�Y.?.''l t T..r�� } !'. �
' 1 A �l f' . p'�lR�Jul" 'S s' 1 I . �'�.�1 �
'. 4� � rr�u i Y� '1 • �. '!F�:.��, '•ti.- • r•�'� . ■
Ya>:7_f�_" . ' .7.._p�:, •:•.r':.-:,"@�r��_ - :..ry.-. ' - ': ai+.�`r:'4 � �
y ti?,�,J,_�,y Y_;� v.�.:,�.: .4� r-..:`- - " _- ''::' •
T5:"J-:e;i:' �t;r' �`^' ��•sj.,.�j.�'."' _ _ • "'ti:j.` ,.11, � �. �. ]
:'..L4 ':��:.�• �:.�}� ' _ " _ r f`. _ . .��� �
_ ,�k� .r,:lv��'.'.�. � ' '',rY.:: ■ 1'�I'.}r:' '
J �' . f� . � ■� �• 'S -�.s s� • t
7c j ���' { � � � 'f a :M �1 1 • ��.:
F • � � ;;a
r ` � , _ �- �r ;" •
- � i _� - � r � i : ■
_ a ���.�; - ° � t;��,'" �
� -.- �- � � " •
�.� `�'� �' rz : ��:� �!.� r, I � . . /
r .r ■ « r 5f' � s.
. . • �• 4 � �
,
�` t .l ' � � 1 ' �� � � • ' ' 4
:-`�,- :,• �,Z '•-r:,;-.- � r
� �'4� i:d:".:. ��'�� `l� .� �R
?F�'. '�•.7`::``.' - ,,.� :':'6�'�Y� ■ t ■• �� ■
��d.�t�.., �
'� _ � ;,y� 1�s 1:i`.`-?` � .
'_..� - �..,.,i._; ��i$h`;y`Yi;� ::z~� (� : . ■ a��� � 1
..y.._� '?F. � u - !r� ii R1 / �i �
' �- _ }. � T; +�S: l !
� :f' p_ry �r���• � �-. } .�, ` • r� � r a
'Ay:'���n?�`�_���;.,_?: .
� ';�:.. r;; _ - " -"_x`;°.c.;q�.:,- `' � � ry a R i
_ '. �.' _- __ '<r`.••:^,":�?�:rr r � Y � i � 1� +
- =•;:: '�;, _ - `x"'���':1.':=, � .3�... • r
� +:��, s � ��
�''f ?5 _ -. . .=_' . y
i� ff� - C . -' i.�r. �, :3., �� �-`-: � ■ •� c• ��}
�
�,� 4 r 5 y y +, , � h �F•w R • .
_ � � '^�, i � - .� t� '` � • ■
4 , . f .l at_ .� . •.�� T 4 'C �* ,.. . ! t:'=+_ • r
� "N� ' _ r [ A�.r7,' " ,:L.(.= t- ■
•' �T T Y f� f n J4 " ���'•. '�,� . � .
5. �� _ . ' ,
� ., . 9 f Y ' diY�(.Vs.,i`. .!x � , #
r t.�. L ..s ' 4 � . s j - }' . � R f.�e,� �
� �jf y _ P,1����,�t� ,i'° t �
_ 1 '.1 ��. 43 J /�
' +� c ti n�Fi._.:�t �' �ji.
q .� �i� �Jt 1. 5\rr t k'2 L . ■
4.J . 4` , . ��� � �_ -S-�a�'�
� �� _ ..�. sf. •l��:• . t (� � i �+
ry. t ' ? r ��'- - � :' � .. �.-....�.
1�� 1. � � ��..
+ � ` • � f3F.y' � yM ' : i
.i �.�J� 1 l 1'. ' . 7 '�' _ 9 � - l " �'S:J; 'i�l � ' .�
}� 3 J� y
� � y� �'� ,� 7� .
d_ � r_!� i 'l . � •
y} C \�Y'S �P Y.. L l� '.5 1 l ry f..�'a 1 � ' L t � T tb 'J `
4 F �'' �, ._ ` ,?: �
"!h ' 1� ' } , "s�, '�Zrl`1 �5�,R..e.-.�k3'�iJ�'�;�'J�41+`-�t �J��'�i
i y,ri �
��tk 4 i S i ''f 1 tr d a'X � _ �'Y f�:i ' .f..i':
� � . : y. - _ -� r , - •�U i o._r M
1:. ,t .5 . � P � s _, . !_ .�r �;�-';�'y�er` i _ ��7:r -i-•:.�• t -
�
r t . s ' �.'r Y e_%� :.'r.� '� 's. -tx'"�._ _ `V�,/�'' t� � � � �.
` _ _r 1� �'{ 1. - T �t j. i r�-- � 4��� 4f� 5 ' l.
..�..• n Fr i � a as'4 c4 r. E � p� �
s .,�� i' - -l::r:- ii. }-.,,-` _ �r.. .� � � ;s; �o: Y.tii .�.
��•£ay�a x, - , _
.', � t --c r. t �r' � -'� �� 1 �t�._ rv. },- r:
x (.
,z. . ' 'yJ'� , - 2 .N,�F`::_ .-�,.
. . . �f 1 k
s..:..�: .�T i'y � _4. '�'. }.
^i . _ _ ',:,. A l. q�
t ��'Y5 �f' '.,* ;`j�._ r 2 r _�,�# :5'r"
USGS, 1994,Renton,Washington Approximate Scale: 1"=1000' �
7.5-Minute Quadrangle 0 500 1000 2000 N
� The Riley Group, Inc. QFC 871 Fuel Station Figw•e 1
RG[Projcct Numtxr Date Drawn:
17522 Buthcll Way Northcast,Suitc A Site Vicinity Map
Bothell,Washington 9801 I 2012-345 08/2012
Phone:425.4t5.0551 ♦Fax:425.415.0311 Address:4615 Northeast 4th Street,Renton,Washington 98059
N.E. 4TH STREET
' — — ��� � � ��� � �. ��� .� �.
EX. TRAFFlC 51GWA1
. . . .. - ... . .
POLE TO BE RELOCATEO
.,� .�. � . •.... . . .
� � �.=�!��:�.� �.,•,���,+-..�
,.� ' `� PLAZA AREA
'�►.:
EX. PROPERfY LIWE
PROPDSED PROPERTY
UNE °D
1 N
' ��
� / � ,
oA-� ' �ti ' �� �
B� / � , z
� � '� � �
� a
i 'Q � � �
/A,� B-2 J
/�� �� � J
�:J 43, �F� ' � a
!'� �
� � a
� � 1 .
� �s.
� � �
� �
TRASH
ETJCLOSURE
� � ��, � � �� � � �� � —
�
�
Approximate Scale: I"=30' �
� B-1 to B-2 Test Borings up to 25'bgs
Drawn from Barghausen Consulting�ngineers,Inc.,DD-2 Detailed Site Plan,06/25/12 0 I S 30 60 N
QFC 871 Fuel Station Figure 2
' The Riley Group, Inc. RGI Projcct Numbcr Date Drawn:
17522 Bothcll Way Northcast,Suitc A Geotechnical Exploration Plan
Bothcll,Washington 9801 I 2012-345 08/2012
Phone:425.415.0551 ♦Fax:425.415.0311 Address:4615 Northeast 4th Street,Renton, Washington 98459
Geotechrlical F.�rgi�ieeri�ig Repori Ate��st 11, 2012
QFC 871 Fe�el Stution,Renton, Washi�rglor� RGI Project No.201 Z-345
APPENDIX A
FIELD EXPLORATI�N AND LABORATURY TE5TING
QFC 871 Fuel Station
4615 Northeast 4th Street
Renton, Washington 98059
On August 9, 2012, RGI perfonned our field exploration using a nibber-track drill rig. RGI
explored subsurface soil conditions at the site by advancing two test borings to a maximum
depth of 26 feet below existing grade. The boring locations are shown on Figure 2. The
boring locations were approximately detertnined by interpolating from existing property
features.
A geologist from ou�• office conducted the field e�ploration and classified the soil
conditions encountered, �naintained a log of each test boring, ohtained representative soil
samples, and obse�ved pertinent site features. All soil samples were vis�iaily classified in
accordance with the Unified Soil Classification System (USCS) described on the sheet
behind the boring logs.
Representative soil samples obtained from the borings were placed in closed containers
and takei3 to our laboratory for further examination and testing. The nnoisture content of
selected samples was measured and is reported on the boring logs. Grain-size analyses
were performed on selected samples.
THE RILEY GROUP, INC.
I
Project Name: QFC 871 Fuel Station
Boring No.: B-1
Project Number: 2012-345 Sheet 1 of 1
Client: Kroger, Inc.
Date{sj Drilled: 8/8J12 Logged By: EW Surface Conditlons: GrasS
Driliing Method(s): HSA briil Bit Sizeffype: 6"Diameter Total Depth of Bwehole: 25.25 feet bgs
Drill Rig Type: Rubber Track Drill Rig Drilling Contractor: BoreteC f1PProximate �a
Surface ElevaGon:
Groundwater Level Not EnCountered ATD Sampiing Method(s): SPT Hammer Data: 740 Ib,301n d�op,rope and
and Date Measured: Cathead
Borehde BadcfilC Bentonite Chips Location: 4615 Northeast 4th Street,Renton,WA 98059
m
U
C
N
.N
m
C N �"- � �7 � E O o
O � m N S� N N V � .
� � >
t O. Q N !/� a 7
w o cf0n cn in � � � C�7 MATERIAL DESCRIPTION g°
� SM Gray silty SAND with some gravel,very dense,moisl(Glacial Till)
sas• s.s
5 Becomes moist to we4 28•5%fines
5e 1I4"sand interbeds with light groundwater seepage at 6' s.s
to
so�s• �s.o
ts �• No recovery
� �" 5.6 II
25 `�" 6.4
30
The Rdey Group,inc.
� 17522 Bothell Way NE,BotheA,WA 98011
1838 South Washington Slreet,Kennewidc,WA 99337
Project Name: QFC 871 Fuel Station BOf Itlg NO.: B-2
Project Number: 2012-345
Sheet 1 of 1
Ciient: Kroger, Inc.
Date(s)Driiled: 8/8112 Logged By: EW Surface Conditlons: GraSs
Drilling Method(s): HSA Drill Bil SizelType: 6"Diameter Total Depth oi Borehole: 20.5 feet bgs
Drill Rig Type: Rubber Track Drill Rig Drilling Contractor: Boretec f1PProximate n/a
Surface Elevation:
Groundwater Level Not Encountered ATD Sampling Method(s): SPT Hammer Data: 140 Ib,30 in drop,rope and
and Date Measured: Cathead
Borehole Backfiu: Bentonite Chips Locatfon: 4615 Northeast 4th Street,Renton,WA 98059
U
C
N '
.�
N
C N h � O1 Z. � � � I�
O v � N C� N � V � '�.
>
� a E E E 3 °� U m N ,
w o t`n° t`n° in° a � � c7 MATERIAL DESCRIPTION �
� SM Gray silty gravelly SAND,very dense,mast(Glacial Till) I
13.5%fines �,
90 1a.1
5 �� s�� Gray silly SAND with some gravel,very dense,moist(Gfacial Till) 8•4
10
SOl3• 8.4
15
50f5' 8.4
20 ��,
8.2
25
30
The Ritey Group,Inc.
17522 Bothell Way NE,BotheA,WA 98011
1838 Soulh Washinglon SVeet,Kennewidc,WA 99337
P�o�e�t Name: QFc a7� F�ei station Key to Log of Boring
Project Number: 2012-345 Sheet 1 of 1
Client: Kroger, Inc.
�
U
G
�
�(N
m
C N � � 01 � 7. J o
O .'�.� N y c ',C-' m Cn C� m
>
� O. Q f�/ Cn d N
N
W p � � � -a° � � � MATERIAL bESCRIPTION g
1 2 3 4 5 6 7 8 9
COLUMN DESCRIPTIONS
1 Elevation(feet):Elevation(MSL,feet). 06 Recovery(�o):Core Recovery Percentage is determined based on
2 Depth(feet):Depth in feet below the ground surface. a ratio of the length of core sample recovered compared to the
3 Sample Type:Type of soil sampie collected at the depth interval cored interval length.
shown. B7 USCS Symbol:USCS symbol of the subsurface material.
84 Sample ID:Sample identification number. 8 Graphic Log:Graphic depiction of the subsurface material
5 Sampling Resistance,blowslft:Number of biows to advance driven encountered.
sampler one foot(or distance shown)beyond seating interval 09 MATERIAL DESCRIPTION:Deswiption of material encountered.
using the hammer identified on the boring log. May include consistency,moisture,color,and ofher descriptive
text.
� Moisture(°k):Moisture,expressed as a water content.
FIELD AND LABORATORY TEST ABBREVIATIONS
CHEM:Chemical tests to assess corcosivity Pi:Plasticity Index,percent
COMP:Compaction test SA:Sieve analysis(percent passing No.200 Sieve)
CONS:One-dimensional cAnsolidation test UC:Unconfined compressive strength test,Qu,in ksf
LL:Liquid Limit,percent WA:Wash sieve(percent passing No.200 Sieve)
MATERIAL GRAPHIC SYMBOLS
�Silty SAND(SM)
TYPICAL SAMPLER GRAPHIC SYMBOLS OTHER GRAPHIC SYMBOLS
� Shelby Tube(Thin-walled, �CME Sampler � Pitcher Sample � Water Ieve1(at time of drining,ATD)
fixed head)
�Auger sampler �Continuous Core Sampler �2-mch-OD unlined split —= water level(aRer waiting)
� spoon(SP� Minor change in material properties withi�a
� Bulk Sample �Grab Sample �Shelby Tube(Thin-walled, � siratum
fixed head) - Inferred/gradationai contact between strata
m3-inch-OD Califomia w! 2.5-inch-0D Modified -?- Queried cbntact between strata
bress rings California w!brass liners
GENERAL NOTES
1:Soil classifications are based on the Unified Soil Gassification Syrstem.Descriptions and stratum lines are interpretive,and actual lithologic changes may be
gradual.Field descriptions may have been modified to reflect resuits of lab tests.
2:Descrip8ons on these logs apply only at the speafic bwing locations and at the time the borings were advanced.They are not warranted to be representative
of subsuriace wndit(ons at other locations or times.
The Riley Group,Inc.
17522 BoU�ell Way NE,Bo1heU,WA 98011
1838 South Washington SVeet,ICennewick,WA 99337
THE RILEY GROUP,INC. PHONE: (425)41r0551
17522 Bathell Way NE FAX: (425)415-0311
Bdhell,WA 98011
GRAIN SIZE ANALYSIS
_ ASTM D 421, D 2217, D 1140, C 117, D 422, C 136
PROJECT TITLE QFC Fuel Station Renton SAM PLE I DITYPE B-1
PROJECT NO. 2012-345 SAM PLE DEPTH s
TECHIDATE E�w 08l9h2
WATER CONTENT(Delivered M asture) Total Wei e Used For S1 eCor ed For H ic Moisture
Wt Wet Soil & Tare(gm) (w1) 611.50 Wei�t OF Sarriple(gm) 574.40
Wt Dry Sal &Tare(gm) (w2) 574.40 Tae Weight (gm) 14.20
Weight of Tare(gm) (w3) 14.20 (W6� Total D Wei ht m 560.20
Weight of Water(gm) (w4=w1-v�2) 37.10 SI EVE ANALYSIS
Wei�t of Dry Soil (gm) (w5=w2-w3) 56Q.20 Cumulative
M d sture Content % w4/w5'100 6.62 Wt Ret t-Tare �%Retai ned� %PASS
+Tare {(wtreuwsp�ook 100-°oret
%COBBLES 0.00 12.0" 14.20 0.00 0.00 100.00 Cobbles
%C GRAVEL 6.71 3.0" 14.20 0.00 0.00 100.OQ Co2rsegravel
' % F GRAVEL 17.30 2.5" ooasegra�rel
%C SAND 7.50 2.0" o0ar9egravel
% M SAN D 12.01 1.5' 14.20 0.00 0.00 100.00 ooarse graveJ
% F SAN D 27.95 9.0" ooar��avel
% FINES 28.53 0.75' S1.80 37.60 6.71 93.29 finegravel
%TOTAL 700.00 0.50" finegravel
' 0.375" 100.10 85.90 15.33 84.67 finegravel
D10(mm) nla #4 148.70 134.50 24.01 75.99 ooase sand
, D30(rtxn) Na #10 190.70 176.50 31.51 68.49 medium sand
j D60(mm) nla #20 me�iium sand
� Cu n/a #40 258.00 243.80 43.52 56.48 fi ne sand
Cc n/a #60 fi ne sand
' #100 357.40 343.20 61.26 38.74 finesand
#200 414.60 400.40 71.47 28.53 fines
PAN 574.40 560.20 100.00 0.00 silUday
100 i
% 90
80
P 70
p► 60
S 50 -----
S 40
� 30
N 20
G 10
0
1000 1 d0 10 1 0.1 0.01 0.001
Grain size in millimeters
DE9CRI PTI ON S�Ity SAND with sorriegravel
U3CS SM
The Ri/ey G�oup, /nc.
THE RILEY GROUP,INC. PHONE: (425)415-0551
17522 Bdhell Way fdE FAX: (425)415-0311
Bothell,WA 98011
GRAIN SIZE ANALYSIS
ASTM D 421, D 2217, D 1140, C 117, D 422, C 13G
PROJECT TITLE QFC Fuel Station Re►tton SAMPLE ID/TYPE B-2
PROJECT fd0. 2012-345 SAM PLE DEPTH 2.5
TECHIDATE ELW 08/9/12
WATER CONTENT(Delivered M d�urel Tot ' t e U For H r 'c a e
Wt Wet Soil &Tare(gm) (w1) 431.40 Weight OF Sarrple(gm) 399.10
Wt Dry Soil 8�Tare(gm) (w2) 399.10 Tare Weight (gm) 14.10
Weight of Tare(gm) (w/3) 14.10 (W6) Total D Wei ht 385.00
Weight of Water(gm) (w4--w1-w2) 32.30 SI EVE ANALYSIS
Weight of Dry Soil (gm) (w5=w2-w3} 385.00 Cum�ative
MastureConte�t % w4/w5'100 8.39 Wt Ret ,�Wt_Tare� _(%Retainedl ° PA
+Tare 100-%r�
% COBBLES 0.00 12.0" 14.10 0.00 0.00 100.00 CObbles
% C GRAVEL 3.66 3.0" 14.10 0.00 0.00 100.00 coarsegra�el
%F GRAVEL 27.30 2.5" ooarsegavel
%C SAN D 13.97 2.0" ooarse ga�el
% M SAND 22.91 1.5" 14.10 0.00 0.00 100.00 coa'segravel
% F SAND 18.70 1.0" Coar9egavel
% FINES 13.45 0.75' 2820 14.10 3.66 96.34 fine�avel
%TOTAL 100.00 0.50" fl ne gravel
0.375" 71.90 57.60 15.01 84.99 fi ne gravei
D10(rrxn) n/a #4 133.30 119.20 30.96 69.04 coarse sand
D30(mn) nJa #10 187.10 173.00 44.94 55.06 medium sand
D60(mm) n/a #20 medium sand
Cu n/a #40 275.30 261.20 67.84 32.16 fi ne sand
Cc n/a #/60 fi ne sand
#100 329.70 315.60 81.97 18.03 fi ne sand
#200 347.30 333.20 86.55 13.45 fi nes
PAN 399.10 385.00 100.00 Q.00 sit/da�r
100
% 90
80
P 70
A gp
S 50 . --- -_ .._
S 40
I 30
N 20
G 10
0
1000 100 10 1 0.1 0.01 0.001
Grain size in millimeters
DE9CRIPTION Silty graveJly SAND
USCS SM
The Ri/ey G�oup, /nc.
7.0 OTHER PERMITS
Other permits for this project indude:
• Building Permit
• Right-of-Way Use Permit
�
15432.001.doc
; 8.0 CSWPPP ANALYSIS AND DESIGN
,-- This project will utilize appropriate erosion and sediment control measures in order to protect the
site and adjacent prope�ties.
1. Clearing Limits — The clearing limits are shown on the Demolition and TESC Plan, part of
' the site development drawings.
2. Cover Measures—Cover measures are added in the TESC notes on the engineering plans.
I', 3. Perimeter Protection—Perimeter protection is shown on the engineering plans (silt fencing).
4. Traffic Area Stabilization —A stabilized construction entrance is shown on the engineering
�, plans.
5. Sediment Retention—Catch basin filters will be used for sediment retention.
' 6. SurFace Water Collection —Onsite surface water will be routed through an onsite BMP prior
to being discharged from the site.
7. Dewatering Control — Dewatering may be necessary during onsite excavation. Only clean
water may leave the site. Dewatering may be acc�mplished through the use of sump pumps.
8. Dust Control— Dust control by sprinklering will be utilized if needed.
9. Flow Control — Permanent flow control will be through the proposed water quality and
detention vault.
Because this site is less than 1 acre, a General Permit from the Department of Ecology is not
required.
15432.001.doc
9.0 BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT
See the following pages for the bond quantities.
15432.001.doc
Site Improvement Bond Quantity Worksheet S,5 Webdate: 02/22/201<
� King County
Department of Permitting & Environmental Review
35030 SE Douglas Street, Suite 210
Snoqualmie, Washington 98065-9266 For alternate formats, call 206-296-6600.
206-296-6600 'rl'Y Relay 711
Project Name: QFC Renton Highlands �ate: 6/28/2013
Location: 4th and Duvall Project No.:
Activity No.:
Note: All prices include labor, equipment, materials, overhead and
Clearing greater than or equal to 5,000 board feet of timber? profit. Prices are from RS Means data adjusted for the Seattle area
or from local sources if not included in the RS Means database.
yes x no
If yes,
Forest Practice Permit Number:
(RCW 76.09)
Page 1 of 9
Unit prices updated: 02/12/02
Version: 11/26/2008
15432 qfc renton li-wks-sbq.xls Report Date: 6/28/2013
Site Improvement Bond Quantity Worksheet S15 Webdate: 02/22/201:
Unit #of
Reference# Price Unit Quantity Applications Cost
EROSION/SEDIMENT CONTROL Number
Backfill &compactio�-embankment ESC-1 $ 5.62 CY 100 1 562
Check dams, 4"minus rock ESC-2 SWDM 5.4.6.3 $ 67.51 Each
Crushed surfacing 1 1/4" minus ESC-3 WSDOT 9-03.9(3) $ 85.45 CY
Ditchin ESC-4 $ 8.08 CY
Excavation-bulk ESC-5 $ 1.50 CY 4600 1 6900
Fence, silt ESC-6 SWDM 5.4.3.1 $ 1.38 LF 100 1 138
Fence, Temporary(NGPE) ESC-7 $ 1.38 LF
Hydroseeding ESC-8 SWDM 5.4.2.4 $ 0.59 SY
Jute Mesh ESC-9 SWDM 5.4.2.2 $ 1.45 SY
Mulch, b hand,straw, 3"deep ESC-10 SWDM 5.4.2.1 $ 2.01 SY
Mulch, b machine, straw, 2"deep ESC-11 SWDM 5.4.2.1 $ 0.53 SY
Piping,tempora , CPP, 6" ESC-12 $ 10.70 LF
Piping,temporary, CPP, 8" ESC-13 $ 16.10 LF
Piping, temporary, CPP, 12" ESC-14 $ 20.70 LF '
Plastic covering, 6mm thick, sandbagged ESC-15 SWDM 5.4.2.3 $ 2.30 SY
Rip Rap, machine placed; slopes ESC-16 WSDOT 9-13.1(2) $ 39.08 CY ',
Rock Construction Entrance, 50'x15'x1' ESC-17 SWDM 5.4.4.1 $ 1,464.34 Each 1 1 1464 '
Rock Construction Entrance, 100'x15'x1' ESC-18 SWDM 5.4.4.1 $ 2,928.68 Each
Sediment pond riser assembly ESC-19 SWDM 5.4.5.2 $ 1,949.38 Each
Sediment trap, 5' hi h berm ESC-20 SWDM 5.4.5.1 $ 17.91 LF
Sed.trap,5'high,riprapped spillway berm section ESC-21 SWDM 5.4.5.1 $ 68.54 LF
Seeding, by hand ESC-22 SWDM 5.4.2.4 $ 0.51 SY
Soddin , 1"dee , level ground ESC-23 SWDM 5.4.2.5 $ 6.03 SY
Sodding, 1"deep, sloped ground ESC-24 SWDM 5.4.2.5 $ 7.45 SY
TESC Supervisor ESC-25 $ 74.75 HR
Water truck, dust control ESC-26 SWDM 5.4.7 $ 97.75 HR I
WRITE-IN-ITEMS **** (see paqe 9)
Each
ESC SUBTOTAL: $ 9,064.34
30%CONTINGENCY 8�MOBILIZATION: $ 2,719.30
ESC TOTAL: $ 11,783.64
COLUMN: A
Page 2 of 9
Unit prices updated: 02/12/02
Version: 11/26/2008
15432 qfc renton li-wks-sbq.xls Report Date: 6/28/2013
Site Improvement Bond Quantity Worksheet Webdate 12/02/2008
Existing Future Public Private Quantity Completed
Right-of-Way Right of Way Improvements (Bond Reduction)*
8 Draina e Facilities Quant.
Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Com lete Cost
GENERALITEMS No.
Backfill&Com action-embankment GI-1 $ 5.62 CY
Backfill&Com action-trench GI-2 $ 8.53 CY 100 853.00
Clear/Remove Brush,b hand GI-3 $ 0.36 SY
Clearin /Grubbin /Tree Removal GI-4 $ 8,876.16 Acre 0.6 5,325.70
Excavation-bulk GI-5 $ 1.50 CY 4600 6,900.00
Excavation-Trench GI-6 $ 4.06 CY 100 406.00
Fencin ,cedar,6'hi h GI-7 $ 18.55 LF
Fencin ,chain link,vin I coated, 6'hi GI-8 $ 13.44 LF 48 645.12
Fencin ,chain link, ate,vin I coated, GI-9 $ 1,271.81 Each 1 1,271.81
Fencin ,s lit rail,3'hi h GI-10 $ 12.12 LF
Fill&com act-common barrow GI-11 $ 22.57 CY
Fill&compact- ravel base GI-12 $ 25.48 CY 280 7,134.40
Fill&com act-screened to soil GI-13 $ 37.85 CY 100 3,785.00
Gabion, 12"dee ,stone filled mesh GI-14 $ 54.31 SY
Gabion, 18"dee ,stone filled mesh GI-15 $ 74.85 SY
Gabion,36"dee ,stone filled mesh GI-16 $ 132.48 SY
Gradin ,fine,b hand GI-17 $ 2.02 SY
Gradin ,fine,with rader GI-18 $ 0.95 SY 140 133.00
Monuments,3'lon GI-19 $ 135.13 Each
Sensitive Areas Si n GI-20 $ 2.88 Each
Soddin , 1"dee ,slo ed round GI-21 $ 7.46 SY
Surve in ,line& rade GI-22 $ 788.26 Da
Surve in ,lot location/lines GI-23 $ 1,556.64 Acre 1 1,556.64
Traffic control crew 2 fla ers GI-24 $ 85.18 HR
Trail,4"chi ed wood GI-25 $ 7.59 SY
Trail,4"crushed cinder GI-26 $ 8.33 SY
Trail,4"to course GI-27 $ 8.19 SY
Wall,retainin ,concrete GI-28 $ 44.16 SF 250 11,040.00
Wall,rockery GI-29 $ 9.49 SF
Page 3 of 9 SUBTOTAL 39,050.67
Unit prices updated: 02/12/02
"KCC 27A authorizes only one bond reduction. Version: 11/26/08
15432 qfc renton li-wks-sbq.xls Report Date:6/28/2013
Site Improvement Bond Quantity Worksheet Webdale 12/02/ZOOfJ
Existing Future Public Private Bond Reduction"
Right-of-way Right of Way Improvements
8 Draina e Facilities Quant.
Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Com lete Cost
ROADIMPROVEMENT No.
AC Grindin ,4'wide machine< 1000s RI-1 $ 28.00 SY
AC Grindin ,4'wide machine 1000-200 RI-2 $ 15.00 SY
AC Grindin ,4'wide machine>2000s RI-3 $ 7.00 SY
AC RemovaUDis osal/Re air RI-4 $ 67.50 SY 280 18,900.00
Barricade,t e I RI-5 $ 30.03 LF
Barricade,t e III Permanent RI-6 $ 45.05 LF
Curb&Gutter,rolled RI-7 $ 17.00 LF
Curb&Gutter,vertical RI-8 $ 12.50 LF 295 3,687.50
Curb and Gutter,demolition and dis os I RI-9 $ 18.00 LF
Curb,extruded as halt RI-10 $ 5.50 LF
Curb,extruded concrete RI-11 $ 7.00 LF
Sawcut,as halt,3"de th RI-12 $ 1.85 LF 500 925.00
Sawcut,concrete, er 1"de th RI-13 $ 1.69 LF 600 1,014.00
Sealant,as halt RI-14 $ 1.25 LF
Shoulder,AC, see AC road unit rice RI-15 $ - SY
Shoulder, ravel,4"thick RI-16 $ 15.00 SY
Sidewalk,4"thick RI-17 $ 35.00 SY 240 8,400.00
Sidewalk,4"thick,demolition and dis o RI-18 $ 29.50 SY
Sidewalk,5"thick RI-19 $ 38.50 SY
Sidewalk,5"thick,demolition and dis o RI-20 $ 37.50 SY
Si n,handica RI-21 $ 85.28 Each 1 85.28
Stri in , er stall RI-22 $ 5.82 Each 1 5.82
Stripin ,thermo lastic, for crosswalk RI-23 $ 2.38 SF 70 166.60
Striping,4"reflectorized line RI-24 $ 0.25 LF 860 215.00
Page 4 of 9 SUBTOTAL 24,908.10 8,491.10
Unit prices updated: 02/12/02
"KCC 27A authorizes only one bond reduction. Version: 11/26/08
15432 qfc renton li-wks-sbq.xls Report Date:6/28/2013
Site Improvement Bond Quantity Worksheet Webdate: 12/02/2008
Existing Future Public Private Bond Reduction*
Right-of-way Right of Way Improvements
&Draina e Facilities Quant.
Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Com lete Cost
ROAD SURFACING (4"Rock=2.5 base&1.5"top course) For'93 KCRS(6.5"Rock=5"base&1.5"top course)
For KCRS'93, additional 2.5"base ad RS-1 $ 3.60 SY
AC Overla , 1.5"AC RS-2 $ 11.25 SY
AC Overla ,2"AC RS-3 $ 15.00 SY
AC Road,2",4"rock,First 2500 SY RS-4 $ 21.00 SY
AC Road,2",4"rock,Qt .over 2500SY RS-5 $ 19.00 SY
AC Road,3",4"rock,First 2500 SY RS-6 $ 23.30 SY 905 21,086.50
AC Road,3",4"rock,Qt .over 2500 S RS-7 $ 21.00 SY
AC Road,5",First 2500 SY RS-8 $ 27.60 SY
AC Road,5",Qt .Over 2500 SY RS-9 $ 25.00 SY
AC Road,6", First 2500 SY RS-1 $ 33.10 SY 280 9,268.00
AC Road,6",Qt .Over 2500 SY RS-1 $ 30.00 SY
As halt Treated Base,4"thick RS-1 $ 20.00 SY
Gravel Road,4"rock, First 2500 SY RS-1 $ 15.00 SY
Gravel Road,4"rock,Qt .over 2500 S S-1 $ 8.50 SY
PCC Road,5",no base,over 2500 SY RS-1 $ 27.00 SY
PCC Road, 6",no base,over 2500 SY RS-1 $ 25.50 SY
Thickened Edge RS-1 $ 8.60 LF
Page 5 of 9 SUBTOTAL 9,268.00 21,086.50
Unit prices updated: 02/12/02
"KCC 27�4 authorizes only one bond reduction. Version: 11/26/08
15432 qfc renton li-wks-sbq.xls Report Date: 6/28/2013
Site Improvement Bond Quantity Worksheet Webdate 12/02/2008
Existing Future Public Private Bond Reductlon"
Right-of-way Right of Way Improvements
8 Draina e Facilities Quant.
Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Com lete Cost
DRAINAGE (CPP=Corrugated Plastic Pipe,N12 or Equivalent) For Culvert prices, Average of 4'cover was assumed.Assume perforated PVC is same price as solid pipe.
Access Road, R/D D-1 $ 21.00 SY
Bollards-fixed D-2 $ 240.74 Each 4 962.96 ,
Bollards-removable D-3 $ 452.34 Each �I
" CBs include frame and lid '
CB T e I D-4 $ 1,257.64 Each 2 2,515.28 '
CB T pe IL D-5 $ 1,433.59 Each 2 2,867.18 j
CB T e II,48"diameter D-6 $ 2,033.57 Each 2 4,067.14 I
for additional de th over 4' D-7 $ 436.52 FT 15 6,547.80 '�
CB T e II,54"diameter D-8 $ 2,192.54 Each
for additional de th over 4' D-9 $ 486.53 FT
CB T e II,60"diameter D-10 $ 2,351.52 Each
for additional de th over 4' D-11 $ 536.54 FT
CB T e II,72"diameter D-12 $ 3,212.64 Each
for additional depth over 4' D-13 $ 692.21 FT
Throu h-curb Inlet Framework Add D-14 $ 366.09 Each
Cleanout, PVC,4" D-15 $ 130.55 Each
Cleanout,PVC,6" D-16 $ 174.90 Each 6 1,049.40
Cleanout,PVC,8" D-17 $ 224.19 Each
Culvert, PVC,4" D-18 $ 8.64 LF
Culvert,PVC,6" D-19 $ 12.60 LF 220 2,772.00
Culvert,PVC, 8" D-20 $ 13.33 LF
Culvert,PVC, 12" D-21 $ 21.77 LF 85 1,850.45
Culvert,CMP,8" D-22 $ 17.25 LF
Culvert,CMP, 12" D-23 $ 26.45 LF
Culvert,CMP, 15" D-24 $ 32.73 LF
Culvert,CMP, 18" D-25 $ 37J4 LF
Culvert,CMP,24" D-26 $ 53.33 LF
Culvert,CMP,30" D-27 $ 71.45 LF
Culvert,CMP,36" D-28 $ 112.11 LF
Culvert,CMP,48" D-29 $ 140.83 LF
Culvert,CMP,60" D-30 $ 235.45 LF
Culvert,CMP,72" D-31 $ 302.58 LF
Page 6 of 9 SUBTOTAL 22,632.21
Unit prices updated: 02/12/02
'KCC 27A authorizes only one bond reduction. Version: 11/26/OS
15432 qfc renton li-wks-sbq.xls Report Date:6/28/2013
Site Improvement Bond Quantity Worksheet Webdate: 12/02/2008
Existing Future Public Private Bond Reduction*
Right-of-way Right of Way Improvements
DRAINAGE CONTINUED 8 Drainage Facillties Quant.
No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Com lete Cost
Culvert,Concrete,8" D-32 $ 21.02 LF
Culvert,Concrete, 12" D-33 $ 30.05 LF
Culvert,Concrete, 15" D-34 $ 37.34 LF
Culvert,Concrete, 18" D-35 $ 44.51 LF
Culvert,Concrete,24" D-36 $ 61.07 LF
Culvert,Concrete,30" D-37 $ 104.18 LF
Culvert,Concrete,36" D-38 $ 137.63 LF
Culvert,Concrete,42" D-39 $ 158.42 LF
Culvert,Concrete,48" D-40 $ 175.94 LF
Culvert,CPP,6" D-41 $ 1070 LF
Culvert,CPP,8" D-42 $ 16.10 LF
Culvert,CPP, 12" D-43 $ 20.70 LF
Culvert,CPP, 15" D-44 $ 23.00 LF
Culvert,CPP, 18" D-45 $ 27.60 LF
Culvert,CPP,24" D-46 $ 36.80 LF
Culvert,CPP,30" D-47 $ 48.30 LF
Culvert,CPP,36" D-48 $ 55.20 LF
Ditchin D-49 $ 8.08 CY
Flow Dis ersal Trench 1,436 base+ D-50 $ 25.99 LF
French Drain 3'de th D-51 $ 22.60 LF
Geotextile,laid in trench, ol ro lene D-52 $ 2.40 SY
Infiltration ond testin D-53 $ 74.75 HR
Mid-tank Access Riser,48"dia, 6'dee D-54 $ 1,605.40 Each
Pond Overflow S illwa D-55 $ 14.01 SY
Restrictor/Oil Se arator, 12" D-56 $ 1,045.19 Each 1 1045.19
Restrictor/Oil Separator, 15" D-57 $ 1,095.56 Each
Restrictor/Oil Se arator, 18" D-58 $ 1,146.16 Each
Ri ra , laced D-59 $ 39.08 CY
Tank End Reducer 36"diameter D-60 $ 1,000.50 Each
Trash Rack, 12" D-61 $ 211.97 Each
Trash Rack, 15" D-62 $ 237.27 Each
Trash Rack, 18" D-63 $ 268.89 Each
Trash Rack,21" D-64 $ 306.84 Each
Page 7 of 9 SUBTOTAL 1045.19
Unit prices updated: 02/12/02
'KCC 27A authorizes only one bond reduction. Version: 11/26/08
15432 qfc renton li-wks-sbq.xls Report Date:6/28/2013
Site Improvement Bond Quantity Worksheet Webdale 12I021'1008
Existing Future Public Private Bond Reduction`
Right-of-way Right of Way Improvements
8�Draina e Facilities Quant.
Unit Price Unit Quant. Price Quant. Cost Quant. Cost Com lete Cost
PARKING LOT SURFACING
No.
2"AC,2"to course rock&4"borrow PL-1 $ 21.00 SY
2"AC, 1.5" to course&2.5"base cou PL-2 $ 28.00 SY
4"select borrow PL-3 $ 4.55 SY 280 1274
1.5"to course rock&2.5"base course PL-4 $ 11.41 SY
UTILITY POLES &STREET LIGHTING Utilit ole relocation costs must be accom anied b ranchise Utilit 's Cost Statement
Utilit Pole s Relocation UP-1 Lum Sum
Street Li ht Poles w/Luminaires UP-2 $90,000.00 Each 1 90000
WRITE-IN-ITEMS
Such as detention/water ualit vaults. No.
Detention/Wet vault WI-1 $50,000.00 Each 1 50,000.00
Filter Manhole WI-2 $20,000.00 Each 1 20,000.00
Trench Drain WI-3 $ 35.00 LF 29 1,015.00
WI-4 LF
WI-5 FT
WI-6
WI-7
WI-8
WI-9
wi-io
SUBTOTAL 90,000.00 72,289.00
SUBTOTAL(SUM ALL PAGES): 124,176.10 164,594.67
30%CONTINGENCY 8�MOBILIZATION: 37,252.83 49,378.40
GRANDTOTAL: 161,428.93 213,973.07
COLUMN: B C D E
Page 8 of 9
Unit prices updated: 02/12/02
'KCC 27A authorizes only one bond reduction. Version: 11/26/08
15432 qfc renton li-wks-sbq.xls Report Date:6/28/2013
10.0 OPERATION AND MAINTENANCE MANUAL
The Operation and Maintenance Manual is included in this section.
15432.001.doC
OPERATIONS AND MAINTENANCE MANUAL
QFC Fueling Station #871
4615 N.E. 4th Street
Renton, Washington
Prepared for:
The Kroger Co.
3800 S.E. 22nd Avenue
Portland, OR 97202
September 19, 2012
Our Job No. 15432
�GHA�SF
m -` Z GVIL ENGWEERING, LAND PLANNING,SURVEYING
'I82'I5 72ND AVENUE SOUTH KENT,WA 98032 (425)251-6222 (425)251-8782 FAx
Z � ? BRANCH OFFICES ♦ OLYMPIA,WA ♦ TACOMA,WA ♦ CONCORD,CA ♦ TEMECULA,CA
"a 4• www.barghausen.com
_.. <�.�Mc EnG�N���
TABLE OF CONTENTS
1.0 INTRODUCTION/GENERAL INFORMATION
EXHIBIT A MAINTENANCE GUIDELINES
15432.002.doc
1.0 INTR�DUCTf01�tlGENERAL INFORMATION
Catch basins are Iocated on the QFC Fueling Facili#y site that oollect runoff from the project site
and route that runoff through conveyance piping to the sautheast comer of the site where runoff
enters a wetldetention vau[t which provides water quality treatment as well as flow control for the
new fand covers on the project site. Level 2 Flow Control is the required means of providing Flow
Control for this project. Additional water quality treatment will be provided in a Stormfilter
manhole with CSF media cartridges to meet the City of Renton's Enhanced Basic Water Quality.
The release mechanism frorrt the wet/detention vault is a control structure focated on the west
side of the vault,which has a riser pipe inside of it that releases runoff at a slow rate and teRds to
back up water in the vauEt during peak storm events. The release to the downstream drainage
course is also through the Stormfilter manhole, then a pump system and force main to Duvall
Avenue NE.
All facilities on the project site should be maintained fln a regu[ar basis of at least twice a year at
en interval of every six man#hs. Should vegeta#ion become sparse ar shoufd it die out, then if
should be replaced around the site to match what the design canditions of the site were when the
site was initially constructed.
The following pages of this report delineate the requirements far flow contral, conveyance, and
water quality facilities maintenance. Please refer to these dacuments when performing your
maintenanee on the project site.
11
,' I
; i
_ ,
15432.002.doc I
Exh i bit A
Maintenance Guidelines '�
APPE�IDIX A vtANTENANCE REQUIREMENTS FOR FLOW CONTROL,CONVEYANCE,AND WQ FAC[L[TIES
NO. 3- DETENTION TANKS AND VAULTS
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Site Trash and debris Any trash and debris which exceed 1 cubic foot Trash and debris cleared from site.
per 1,000 square feet(this is about equal to the
amount of trash it would take to fill up one
standard size office garbage can). in general,
there should be no visual evidence of dumping.
Noxious weeds Any noxious or nuisance vegetation which may Noxious and nuisance vegetation
constitute a hazard to County personnel or the removed according to applicable
public. regulations. No danger of noxious
vegetation where County personnel
or the public might nortnally be.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollufion as oil,gasoline, concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surtace oil film.
Grasslgroundcover Grass or groundcover exceeds 18 inches in Grass or groundcover mowed to a
height. height no greater than 6 inches.
Tank or Vault Trash and debris Any trash and debris accumulated in vauit or tank No trash or debris in vault.
Storage Area (includes floatables and non-floatables).
Sediment Accumulated sediment depth exceeds 10%of the All sediment removed from storage
accumulation diameter of the storage area for%z length of area.
storage vault or any point depth exceeds 15%of
diameter. Example:72-inch storage tank would
require cleaning when sediment reaches depth of
7 inches for more than Y�length of tank.
Tank Structure Plugged air vent Any blockage of the vent. Tank or vauit freely vents.
Tank bent out of Any part of tank/pipe is bent out of shape more Tank repaired or replaced to design.
shape than 10%of its design shape.
Gaps between A gap wider than Yz-inch at the joint of any tank No water or soil entering tank
sections,damaged sections or any evidence of soil particles entering through joints or walis.
joints or cracks or the tank at a joint or through a wall.
tears in wall
Vault Structure Damage to wall, Cracks wider than Y�-inch,any evidence of soil Vault is sealed and structurally
frame,bottom, and/or entering the structure through cracks or qualified sound.
top slab inspection personnel determines that the vauit is
not structurally sound.
InIeVOutlet Pipes Sediment Sediment filling 20%or more of the pipe. Inlet/outlet pipes Gear of sediment.
accumula6on
Trash and debris Trash and debris accumulated in inleUoutlet No trash or debris in pipes.
pipes(includes floatables and non-floatables).
Damaged Cracks wider than Yz-inch at the joint of the No cracks more than'/<-inch wide at
inleUoutlet pipes or any evidence of soil entering the joint of the inlet/outlet pipe.
at the joints of the inleUoutlet pipes.
' ?009�urface Water Design I�fanual—:lppendix A 1i9/2009
A-5
APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL,CONVEYANCE,AND WQ FAC[L[TIES
NO. 3- DETENTION TANKS AND VAULTS
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Access Manhole Coverllid not in place Coverllid is missing or only partially in place. Manhole access covered.
Any open manhole requires immediate
maintenance.
Locking mechanism Mechanism cannot be opened by one Mechanism opens with proper tools.
not working maintenance person with proper tools.Bolts
cannot be seated. Self-locking cover/lid does not
work.
Cover/lid difficulf to One maintenance person cannot remove CoverAid can be removed and
remove coverllid after applying 80 Ibs of lift. reinstalled by one maintenance
person.
Ladder rungs unsafe Missing rungs,misalignment,rust,or cracks. Ladder meefs design standards.
Allows maintenance person safe
access.
Large access Damaged or difficult Large access doors or plates cannot be Replace or repair access door so it
doors/plate to open opened/removed using normal equipment. can opened as designed.
Gaps,doesn't cover Large access doors not flat and/or access Doors close flat and covers access
completely opening not completely covered. opening completely.
Lifting Rings missing, Lifting rings not capabie of lifting weight of door Lifting rings sufficient to lift or
rusted or plate. remove door or plate.
V9;'2009 2009 Surface Water Design V[amial—Appendix A
A-6
APPENDIX r� MA[NTENANCE REQUIREMENTS FOR FLOW CONTROL,CONVEYANCE,AND WQ FACILITI�S
NO. 4- CONTROL STRUCTUREIFLOW RESTRICTOR
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Structure Trash and debris Trash or debris of more than YZ cubic foot which No Trash or debris blocking or
is located immediately in front of the structure potentially blocking entrance to
opening or is blocking capacity of the structure by structure.
more than 10%.
Trash or debris in the structure that exceeds'!, No trash or debris in the structure.
the depth from the bottom of basin to invert the
lowest pipe into or out of the basin.
Deposits of garbage exceeding 1 cubic foot in No condition present which would
volume. attract or support the breeding of
insects or rodents.
Sediment Sediment exceeds 60%of the depth from the Sump of structure contains no
bottom of the structure to the invert of the lowest sediment.
pipe into or out of the structure or the bottom of
the FROP-T sec6on or is within 6 inches of the
invert of the lowest pipe into or out of the
structure or the bottom of the FROP-T section.
Damage to frame Corner of frame extends more than'/.inch past Frame is even with curb.
andlor top slab curb face into the street(If applicable).
Top slab has holes larger than 2 square inches or Top slab is free of holes and cracks.
cracks wider than Y.inch.
Frame not sitting flush on top slab,i.e., Frame is sitting flush on top slab.
separation of more than'/<inch of the frame from
the top slab.
Cracks in walls or Cracks wider than%2 inch and longer than 3 feet, Structure is sealed and structurally
bottom any evidence of soil particles entering structure sound.
through cracks,or maintenance person judges
that structure is unsound.
Cracks wider than Y:inch and Ionger than 1 foot No cracks more than'/,inch wide at
at the joint of any inleUoutlet pipe or any evidence the joint of inlet/outlet pipe.
of soil partiGes entering structure through cracks.
Settlement/ Structure has settled more than 1 inch or has Basin replaced or repaired to design
misalignment rotated more than 2 inches out of alignment. standards.
Damaged pipe joints Cracks wider than%-inch at the joint of the No cracks more than Y.-inch wide at
inleUoutlet pipes or any evidence of soil entering the joint of inletJoutlet pipes.
the structure at the joint of the inleVoutlet pipes.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
poliution as oil,gasoline,concrete slurries or paint. according to applicabie regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Ladder rungs missing Ladder is unsafe due to missing rungs, Ladder meets design standards and
or unsafe misalignment,rust,cracks,or sharp edges. allows maintenance person safe
access.
FROP-T Section Damage T section is not securely attached to structure T section securely attached to wail
wall and outlet pipe structure should support at and outlet pipe.
least 1,000 Ibs of up or down pressure.
Structure is not in upright position(allow up to Structure in correct position.
10%from plumb).
Connections to outlet pipe are not watertight or Connections to outlet pipe are water
show signs of deteriorated grout. tight;structure repaired or replaced
and works as designed.
Any holes—other than designed holes—in the Structure has no holes other than
structure. designed holes.
Cleanout Gate Damaged or missing Cleanout gate is missing. Replace cleanout gate.
2009 Surface Water Design Manual–Appendix A li9i?009
A-7
APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL,CONVEYANCE,AND WQ FACILITIES
NO. 4- CONTROL STRUCTURElFL�W RESTRICTOR
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Cleanout gate is not watertight. Gate is watertight and works as
designed.
Gate cannot be moved up and down by one Gate moves up and down easily and
maintenance person. is watertight.
Chain/rod leading to gate is missing or damaged. Chain is in place and works as
designed.
Orifice Plate Damaged or missing Control device is not working properly due to Plate is in place and works as
missing,out of place,or bent orifice plate. designed.
Obstructions Any trash,debris,sediment,or vegetation Plate is free of all obstructions and
blocking the plate. works as designed.
Overflow Pipe Obstructions Any trash or debris blocking(or having the Pipe is free of all obstructions and
potential of blocking)the overflow pipe. works as designed.
Deformed or damaged Lip of overflow pipe is bent or deformed. OverFlow pipe does not allow
lip overflow at an elevation lower than
design
InIeUOutlet Pipe Sediment Sediment filling 20%or more of the pipe. inlet/outlet pipes clear of sediment.
accumulation
Trash and debris Trash and debris accumulated in inlet/outlet No trash or debris in pipes.
pipes(includes floatables and non-floatables).
Damaged Cracks wider than Y:-inch at the joint of the No cracks more than'/.-inch wide at
inleUoutlet pipes or any evidence of soil entering the joint of the inlet/outlet pipe.
at the joints of the inleUoutlet pipes.
Metal Grates Unsafe grate opening Grate with opening wider than'/e inch. Grate opening meets design
(If Applicable) standards.
Trash and debris Trash and debris that is blocking more than 20% Grate free of trash and debris.
of grate surface. footnofe to guidelines for disposal
Damaged or missing Grate missing or broken member(s)of the grate. Grate is in place and meets design
standards.
Manhole CovedLid CoverAid not in place Cover/lid is missing or only partially in place. Cover/lid protects opening to
Any open structure requires urgent structure.
maintenance.
locking mechanism Mechanism cannot be opened by one Mechanism opens with proper toois.
Not Working maintenance person with proper tools.Bolts
cannot be seated. Self-locking covedlid does not
wark.
Cover/iid difficult to One maintenance person cannot remove Cover/lid can be removed and
Remove cover/lid after applying 80 Ibs.of lift. reinstalled by one maintenance
person.
U9/2009 2009 Surface Water Design Manual—Appendix A
A-8
APPEND[X A ;�IAINTENANCE REQUIREMENTS FOR FLOW CONTROL,CONVEYANCE,AND WQ FACILIT[ES
NO. 5 -CATCH BASINS AND MANHOLES
Maintenance Defect or Problem Condition When Maintenance is Needed Resuits Expected When
Component Maintenance is Performed
Structure Sediment Sediment exceeds 60%of the depth from the Sump of catch basin contains no
bottom of the catch basin to the invert of the sediment.
lowest pipe into or out of the catch basin or is
within 6 inches of the invert of the lowest pipe
into or out of the catch basin.
Trash and debris Trash or debris of more than Y:cubic foot which No Trash or debris blocking or
is located immediately in front of the catch basin potentially blocking entrance to
opening or is blocking capacity of the catch basin catch basin.
by more than 10%.
Trash or debris in the catch basin that exceeds No trash or debris in the catch basin.
'/,the depth from the bottom of basin to invert the
lowest pipe into or out of the basin.
Dead animals or vegetation that could generate No dead anirnals or vegetation
odors that could cause complaints or dangerous present within catch basin.
gases(e.g.,methane).
Deposits of garbage exceeding 1 cubic foot in No condition present which would
volume. attract or support the breeding of
insects or rodents.
Damage to frame Corner of frame extends more than'/.inch past Frame is even with curb.
and/or top slab curb face into the street(If applicable).
Top slab has holes larger than 2 square inches or Top slab is free of holes and cracks.
cracks wider than Y.inch.
Frame not sitting flush on top slab,i.e., Frame is sitting flush on top slab.
separation of more than'/.inch of the frame from
the top slab.
Cracks in walls or Cracks wider than Y:inch and longer than 3 feet, Catch basin is sealed and
bottom any evidence of soil particles entering catch structurally sound.
basin through cracks,or maintenance person
judges that catch basin is unsound.
Cracks wider than Yz inch and longer than 1 foot No cracks more than'/4 inch wide at
at the joint of any inleUoutlet pipe or any evidence the joint of inleVoutlet pipe.
of soil particles entering catch basin through
cracks.
SettlemenU Catch basin has setUed more than 1 inch or has Basin replaced or repaired to design
misalignment rotated more than 2 inches out of alignment. standards.
Damaged pipe joints Cracks wider than YZ-inch at the joint of the No cracks more than Y.-inch wide at
inleUoutlet pipes or any evidence of soil entering the joint of inleUoutlet pipes.
the catch basin at the joint of the inleUoutlet
pipes.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil,gasoline,concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
InletlOutlet Pipe Sediment Sediment filling 20%or more of the pipe. InleUoutlet pipes clear of sediment.
accumulation
Trash and debris Trash and debris accumulated in inlet/outlet No trash or debris in pipes.
pipes(includes Floatabies and non-floatables).
Damaged Cracks wider than%rinch at the joint of the No cracks more than Y.-inch wide at
inleUoutlet pipes or any evidence of soil entering the joint of the inlet/outlet pipe.
at the joints of the inleUoutlet pipes.
2009 Surface Water Design Manual—Appendix A 1/9/2009
A-9
APPENDIX A NtAINTENANCE REQUIREMENTS FLOW CONTROL,CONVEYANCE,AND WQ FACILIT[ES
NO. 5-CATCH BASINS AND MANHOLES
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Metal Grates Unsafe grate opening Grate with opening wider than'/e inch. Grate opening meets design
(Catch Basins) standards.
Trash and debris Trash and debris that is blocking more than 20% Grate free of trash and debris.
of grate surface. footnote to guidelines for disposal
Damaged or missing Grate missing or broken member(s)of the grate. Grate is in place and meets design
Any open structure requires urgent standards.
maintenance.
Manhole CoverlLid Cover/lid not in place CoveNlid is missing or only partially in place. Cover/lid protects opening to
Any open structure requires urgent structure.
maintenance.
Locking mechanism Mechanism cannot be opened by one Mechanism opens with proper tools.
Not Working maintenance person with proper tools.Bolts
cannot be seated. Self-locking cover/lid does not
work.
Cover/lid difficult to One maintenance person cannot remove Cover/lid can be removed and
Remove cover/lid after applying 80 Ibs.of lift. reinstalled by one maintenance
person.
- {
—'s
, (
i
' i
i
l/9/2009 2009 Surface Water Design Manual—Appendix A
A-l0
APPENDIX A MAINTLNANCG REQUIREMENTS FOR FLOW CONTROL,CONVEYANCE,AND��Q FACILITIES
NO. 6-CONVEYANCE PIPE�AND DITCHES
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Pipes Sedirnent 8 debris Accumulated sediment or debris that exceeds Water flows freely through pipes.
accumulation 20%of the diameter of the pipe.
Vegetation/roots Vegetation/roots that reduce free movement of Water flows freely through pipes.
water through pipes.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil,gasoline,concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Damage to protective Protective coating is damaged;rust or corrosion Pipe repaired or replaced.
coating or corrosion is weakening the structural integrity of any part of
pipe.
Damaged Any dent that decreases the cross section area of Pipe repaired or replaced.
pipe by more than 20%or is determined to have
weakened structural integrity of the pipe.
Ditches Trash and debris Trash and debris exceeds 1 cubic foot per 1,000 Trash and debris cleared from
square feet of ditch and slopes. ditches.
Sediment Accumulated sediment that exceeds 20%of the Ditch cleaned/flushed of all sediment
accumulation design depth. and debris so that it matches design.
Noxious weeds Any noxious or nuisance vegetation which may Noxious and nuisance vegetation
constitute a hazard to County personnel or the removed according to appiicable
public. regulations. No danger of noxious
vegetation where County personnel
or the public might normally be.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil,gasoline,concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
VegetaUon Vegetation that reduces free movement of water Water flows freely through ditches.
through ditches.
Erosion damage to Any erosion observed on a ditch slope. Slopes are not eroding.
slopes
Rock lining out of One layer or less of rock exists above native soil Replace rocks to design standards.
place or missing(If area 5 square feet or more,any exposed native
Applicable) soil.
, -,
� ,
2009 Surface Water Desion Manual—Appendix A 1/9/2009
A-ll
APPENDIX A �IAINTENANC�REQUIREMENTS FLOW CONTROL,CONVEYANCE,AND WQ FACILITIES
NO. 9- FENCING
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Site Erosion or holes Erosion or holes more than 4 inches high and 12- No access under the fence.
under fence 18 inches wide permitting access through an
opening under a fence.
Wood Posts, Boards Missing or damaged Missing or broken boards,post out of plumb by No gaps on fence due to missing or
and Cross Members parts more than 6 inches or cross members broken broken boards,post plumb to within
1 Yz inches,crass members sound.
Weakened by rotting Any part showing structural deterioration due to All parts of fence are structurally
or insects rotting or insect damage sound.
Damaged or failed Concrete or metal attachments deteriorated or Post foundation capable of
post foundation unable to support posts. supporting posts even in strong
wind.
Metal Posts, Rails Damaged parts Post out of piumb more than 6 inches. Post plumb to within 1Y:inches.
and Fabric
Top rails bent more than 6 inches. Top raif free of bends greater than
1 inch.
Any part of fence(including post,top rails,and Fence is aligned and meets design
fabric)more than 1 foot out of design alignment. standards.
Missing or loose tension wire. Tension wire in place and hoiding
fabric.
Deteriorated paint or Part or parts that have a rusting or scaling Structurally adequate posts or parts
protective coating condition that has affected structural adequacy. with a uniform protective coating.
Openings in fabric Openings in fabric are such that an 8-inch Fabric mesh openings within 50%of
diameter ball could fit through. grid size.
1/9/2009 2009 Surface Water Design Manua(—Appendix A
A-14
APPE�IDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL,CONVEYANCE,AND WQ FACIL[TIES
NO. 10- GATES/BOLLARDSlACCESS BARRIERS
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Chain Link Fencing Damaged or missing Missing gate. Gates in place.
Gate members
Broken or missing hinges such that gate cannot Hinges intact and lubed.Gate is
be easily opened and closed by a maintenance working freely.
person.
Gate is out of plumb more than 6 inches and Gate is aligned and vertical.
more than 1 foot out of design alignment.
Missing stretcher bar,stretcher bands,and ties. Stretcher bar,bands,and ties in
place.
Locking mechanism Locking device missing,no-functioning or does Locking mechanism prevents
does not lock gate not link to all paRs. opening of gate.
Openings in fabric Openings in fabric are such that an 8-inch Fabric mesh openings within 50%of
diameter ball could fit through. grid size.
Bar Gate Damaged or missing Cross bar does not swing open or closed,is Cross bar swings fuily open and
cross bar missing or is bent to where it does not prevent closed and prevents vehicle access.
vehicle access.
Locking mechanism Locking device missing,no-functioning or does Locking mechanism prevents
does not lock gate not link to all parts. opening of gate.
Support post Support post does not hold cross bar up. Cross bar held up preventing vehiGe
damaged access into facility.
Bollards Damaged or missing Bollard broken,missing,does not fit into support No access for motorized vehicles to
hole or hinge broken or missing. get into facility.
Does not lock Locking assembly or lock missing or cannot be No access for motorized vehicles to
attached to lock bollard in place. get into facility.
Boulders Dislodged Bouiders not located to prevent rnotorized vehicle No access For motorized vehicles to
access. get into facility. ,
�
Circumvented Motorized vehicles going around or between No access for motorized vehicles to
boulders. get into facility.
i
S
�
z
(
'_ �
_�
�� �
2009 Surface Water Design Manual—Appendix A l/9/2009
A-IS
APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL,CONVEYANCE,AND WQ FACILITIES
NO. 11 - GROUNDS (LANDSCAPING)
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Site Trash or litter Any trash and debris which exceed 1 cubic foot Trash and debris cleared from site.
per 1,000 square feet(this is about equal to the
amount of trash it would take to fill up one
standard size office garbage can). In general,
there should be no visual evidence of dumping.
Noxious weeds Any noxious or nuisance vegetation which may Noxious and nuisance vegetation
constitute a hazard to Counry personnel or the removed according to applicable
public. regulations. No danger of noxious
vegetaUon where County personnel
or the public might normally be.
Contaminants and Any evidence of contaminants or poliution such Materials removed and disposed of
pollution as oil,gasoline,concrete slurries or paint. according to appiicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Grass/groundcover Grass or groundcover exceeds 18 inches in Grass or groundcover mowed fo a
height. height no greater than 6 inches.
Trees and Shrubs Hazard Any tree or limb of a tree identified as having a No hazard trees in facility.
potential to fall and cause property damage or
threaten human life. A hazard tree identified by
a qualified arborist must be removed as soon
as possible.
Damaged Limbs or parts of trees or shrubs that are split or Trees and shrubs with less than 5%
broken which affect more than 25%of the total of total foliage with split or broken
foliage of the tree or shrub. limbs.
Trees or shrubs that have been blown down or No blown down vegetation or
knocked over. knocked over vegetation. Trees or
shrubs free of injury.
Trees or shrubs which are not adequately Tree or shrub in place and
supported or are leaning over,causing exposure adequately supported:dead or
of the roots. diseased trees removed.
l/9/2009 2009 Surface Water Design Manual—Appendix A
A-16
APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL,CONVEYANCE,AND WQ FACILITIES
NO. 12-ACCESS ROADS
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Site Trash and debris Trash and debris exceeds 1 cubic foot per 1,000 Roadway drivable by maintenance
square feet(i.e.,trash and debris would fill up vehicles.
one standards size garbage can).
Debris which could damage vehicle tires or Roadway drivable by maintenance
prohibit use of road. vehicles.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil,gasoline,concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate_ No contaminants
present other than a surface oil film.
Blocked roadway Any obstrucbon which reduces clearance above Roadway ovefiead clear to 14 feet
road surface to less than 14 feet. high.
Any obstruction restricting the access to a 10-to At least 12-foot of width on access
12 foot width for a distance of more than 12 feet road.
or any point restricting access to less than a 10
foot width.
Road Surface Erosion,settlement, Any surface defect which hinders or prevents Road drivable by maintenance
potholes,soft spots, maintenance access. vehicles.
ruts
Vegetation on road Trees or other vegetation prevent access to Maintenance vehicles can access
surface facility by maintenance vehicles. facility.
Shoulders and Erosion Erosion within 1 foot of the roadway more than 8 Shoulder free oF erosion and
Ditches inches wide and 6 inches deep. matching the surrounding road.
Weeds and brush Weeds and brush exceed 18 inches in height or Weeds and brush cut to 2 inches in
hinder maintenance access. height or cleared in such a way as to
allow maintenance access.
Modular Grid Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
Pavement pollution as oil,gasoline,concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Damaged or missing Access surface compacted because of broken on Access road surface restored so
missing modular block. road infiltrates.
2009 Surface Water Design Mamial—Appendix A (/9/2009
A-17
APPENDIX A MAI�ITENANCE REQUIREMENTS FOR FLOW CONTROL,CONVEYANCE,AND WQ FACILITIES
NO. 17-WENAULT
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Site Trash and debris Trash and debris accumulated on facility site. Trash and debris rernoved from
facility site.
Treatment Area Trash and debris Any trash and debris accumulated in vault No trash or debris in vault.
(includes floatables and non-floatables).
Sediment Sediment accumulation in vault bottom exceeds No sediment in vault.
accumulation the depth of the sediment zone plus 6 inches.
Contaminants and Any evidence of contaminants or poilution such Materials removed and disposed of
pollution as oil,gasoline,concrete slurries or paint. according to applicable regulations.
Source cantrol BMPs implemented'rf
appropriate. No contaminants
present other than a surface oil film.
Vault Structure Damage to wall, Cracks wider than%:-inch,any evidence of soil Vault is sealed and structurally
frame,bottom,and/or entering the structure through cracks,vault does sound.
top slab not retain water or qualified inspection personnel
determines that the vault is not structurally
sound.
Baffles damaged Baffles corroding,cracking,warping andlor Repair or replace baffles or wails to
showing signs of failure or baffle cannot be specificafions.
removed.
Ventilation Ventilation area blocked or plugged. No reduction of ventilation area
exists.
Inlet/Outlet Pipe Sediment Sediment filling 20%or more of the pipe. InleUoutlet pipes clear of sediment.
accumulation
Trash and debris Trash and debris accumulated in inleUoutlet No trash or debris in pipes.
pipes(includes floatables and non-Floatables).
Damaged Cracks wider than Y�-inch at the joint of the No cracks more than Y.-inch wide at
inlet/outlet pipes or any evidence of soil entering the joint of the inlet/outlet pipe.
at the joints of the inleUoutlet pipes.
Gravity Drain Inoperable valve Valve will not open and close. Valve opens and closes normally.
Valve won't seal Valve does not seal completely. Valve completely seals closed.
Access Manhole Access coverllid Access cover/lid cannot be easily opened by one Access cover/lid can be opened by
damaged or difficult to person. Corrosion/deformation of coverllid. one person.
open
Locking mechanism Mechanism cannot be opened by one Mechanism opens with proper tools.
not working maintenance person with proper tools. Bolts
cannot be seated. Self-locking cover/lid does not
work.
Coverllid difficult to One maintenance person cannot remove Cover/lid can be removed and
remove covedlid after applying 80 Ibs of fift. reinstailed by one maintenance
person.
Access doorslplate Large access doors not flat andlor access Doors close flat and covers access
has gaps,doesn't opening not completely covered. opening completely.
cover completely
Lifting Rings missing, Lifting rings not capable of lifting weight of door Lifting rings sufficient to lift or
rusted or plate. remove door or plate.
Ladder rungs unsafe Missing rungs,misalignment,rust,or cracks. Ladder meets design standards.
Allows maintenance person safe
access.
2009 Surface Water Design Manual—Appendix A I/9/2009
A-23
APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL,CONVEYANCE,AND WQ FAC[LITIES
NO. 21 -STORMFILTER (CARTRIDGE TYPE)
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Site Trash and debris Any trash or debris which impairs the function of Trash and debris removed from
the facility. facility.
Contaminants and Any evidence of contaminants or poliution such Materials removed and disposed of
pollution as oils,gasoline,concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surtace oil film.
Life cycle System has not been inspected for three years. Facility is re-inspected and any
needed maintenance pertormed.
Vault Treatment Sediment on vault Greater than 2 inches of sediment. Vault is free of sediment.
Area floor
Sediment on top of Greater than Y:inch of sediment. Vault is free of sediment.
cartridges
Multiple scum lines Thick or multiple scum lines above top of Cause of plugging corrected,
above top of cartridges. Probably due to plugged canisters or canisters replaced if necessary.
cartridges underdrain manifold.
Vault Structure Damage to wall, Cracks wider than Y:-inch and any evidence of Vault replaced or repaired to design
Frame,Bottom,andJor soil particles entering the structure through the specifications.
Top Slab cracks,or qualified inspection personnel
determines the vault is not structurally sound.
Baffles damaged Baffles corroding,cracking warping,and/or Repair or replace baffles to
showing signs of failure as determined by specification.
maintenance�nspection person.
Filter Media Standing water in 9 inches or greater of static water in the vault for No standing water in vault 24 hours
vault more than 24 hours following a rain event and/or after a rain event.
overflow occurs frequendy. Probably due to
plugged fiiter media,underdrain or outlet pipe.
Short circuiting Flows do not properiy enter filter cartridges. Flows go through filter media.
Underdrains and SedimenUdebris Underdrains or clean-outs partially plugged or Underdrains and clean-outs free of
Clean-Outs filled with sediment and/or debris. sediment and debris.
InleU�utlet Pipe Sediment Sediment filling 20%or more of the pipe. InleUoutlet pipes clear of sediment.
accumulation
Trash and debris Trash and debris accumulated in inlet/outlet No trash or debris in pipes.
pipes(includes floatables and non-floatables).
Damaged Cracks wider than Yrinch at the joint of the No cracks more than Y.-inch wide at
inletloutlet pipes or any evidence of soil entering the joint of the inleUoutlet pipe.
at the joints of the inleUoutlet pipes.
Access Manhole Cover/lid not in place Covedlid is missing or only partialiy in place. Manhole access covered.
Any open manhole requires immediate
maintenance.
Locking mechanism Mechanism cannot be opened by one Mechanism opens with proper tools.
not working maintenance person with proper tools.Bolts
cannot be seated. Self-locking cover/lid does not
work.
Cover/lid difficult to One maintenance person cannot remove Cover/lid can be removed and
remove covedlid after applying 80 Ibs of lift, reinstailed by one maintenance
person.
Ladder rungs unsafe Missing rungs,misalignment,rust,or cracks. ladder meets design standards.
Allows maintenance person safe
access.
Large access Damaged or di�cult Large access doors or plates cannot be Replace or repair access door so it
doors/plate to open opened/removed using norma�equipment. can opened as designed.
l/9/2009 2009 Surface Water Desi�n Manual—Appendix A
r1-30
APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL,CONVEYANCE,AND WQ FACILIT[ES
NO. 21 -STORMFILTER{CARTRIDGE TYPE)
Maintenance Defect or Problem Condition When Maintenance is Needed Resuits Expected When
Component Maintenance is Performed
Gaps,doesn't cover �arge access doors not flat andlor access Doors close flat and cover access
completely opening not completely covered. opening completely.
Lifting Rings missing, Lifting rings not capable of lifting weight of door Lifting rings sufficient to lift or
rusted or plate. remove door or plate.
f �
II �
��.�-�
i� I
�i__.�
�� k
,� �
' l
IL .�
i-�
I �
I
I i
(
�' `
�_l
2009 Surface Water Design Manual—Appendix A U9/2009
A-3 l
APPENDIX A MAINTENr1NCE REQUIREMENTS FLOW CONTROL,CONVEYANCE,AND WQ FAC(LITIES
NO. 22- BAFFLE OILNUATER SEPARATOR
Maintenance Defect Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Site Trash and debris Any trash or debris which impairs the function of Trash and debris removed from
the facility. facility.
Contaminants and Floating oil in excess of 1 inch in first chamber, No contaminants present other than
pollution any oil in other chambers or other contaminants a surface oil film.
of any type in any chamber.
Vault Treatment Sediment Sediment accumulates exceeds 6 inches in the No sediment in the vault.
Area accumulation vault.
Discharge water not Inspection of discharge water shows obvious Effluent discharge is clear.
clear signs of poor water quality-effluent discharge
from vault shows thick visible sheen.
Trash or debris Any trash and debris accumulation in vault Vault is clear of trash and debris.
accumulation (floatables and non-floatables).
Oil accumulation Oil accumulations that exceed 1 inch,at the No visible oii depth on water.
surface of the water in the oil/water separator
chamber.
Vault Structure Damage to Wall, Cracks wider than'/rinch or evidence of soil Vauit replaced or repaired to design
Frame,Bottom,and/or particles entering the structure through the speafications.
� Top Slab cracks,or maintenance/inspection personnei
determines that the vault is not structurally
sound.
Baffles damaged Baffles corroding,cracking,warping andlor Repair or replace baffles to
showing signs of failure as determined by specificaUons.
maintenance inspection personnel.
Gravity Drain Inoperable valve Valve will not open and close. Valve opens and closes normally.
Valve won't seal Valve does not seal completely. Valve cornpletely seals closed.
InletlOutlet Pipe Sediment Sediment filling 20%or more of the pipe. InleUoutlet pipes Gear of sediment.
accumulation
Trash and debris Trash and debris accumulated in inleUoutlet No trash or debris in pipes.
pipes(includes Floatables and non-floatabies).
Damaged Cracks wider than Y:-inch at the joint of the No cracks more than Y.-inch wide at
inlet/outlet pipes or any evidence of soil entering the joint of the inlet/outlet pipe.
at the joints of the inlet/outlet pipes.
Access Manhole Cover/lid not in place Cover/lid is missing or only partiaily in piace. Manhole access covered.
Any open manhole requires immediate
maintenance.
Locking mechanism Mechanism cannot be opened by one Mechanism opens with proper tools.
not working maintenance person with proper tools.Bolts
cannot be seated. Self-locking cover/lid does
not work.
Cover/lid difficult to One maintenance person cannot remove Coverllid can be removed and
remove cover/lid after applying 80 Ibs of lift. reinstalled by one maintenance
person.
Ladder rungs unsafe Missing rungs,misalignment,rust,or cracks. Ladder meets design standards.
Allows maintenance person safe
access.
Large access Damaged or difficult Large access doors or plates cannot be Replace or repair access door so it
doors/plate to open opened/removed using normal equipment. can opened as designed.
Gaps,doesn't cover Large access doors not flat and/or access Doors close flat and cover access
completely opening not completely covered. opening completely.
Lifting Rings missing, Lifting rings not capable of lifting weight of door Lifting rings su�cient to lift or
rusted or cover/lid. remove cover/lid.
U9/2009 2009 Surface Water Design Manual—Appendix A
A-32