Loading...
HomeMy WebLinkAboutRES 0738M -30-H 3-32 RESOLUTION NO ....... 73 . .............. RESOLUTION AUTHORIZING THE EXECUTION AND DELIVERY OF A CONTRACT WITH PUGET SOUND POWER & LIGHT COMPANY FOR FURNISHING CIPAL WAVES IO ............... ......................... ............................ (Service Furnished) WHEREAS, PUGET SOUND POWER & LIGHT COMPANY has offered to furnish for a period of.......'.. ..........................................years, upon the terms set forth in the following proposed form of contract, to -wit: Page 1 of Resolution 9 NOW, THEREFORE, BE IT RESOLVED by the..............�`............................................ (Council or Commission) of the........ PITZ .... ........o ..i .....n............................of........................... N .................................. that a (City or own) contract be entered into with Puget Sound Power & Light Company for the furnishing of UMCIPAL WA11 P7IlI POM ......................................................................................................................................................... I .................... .............................................................................................................................................................................. upon the terms above proposed, and that the Mayor be and he hereby is authorized and directed to execute and deliver such contract on behalf and in the name of the CZTT ......................................., and the Clerk be and he hereby is authorized ............................................. (City or Town) and directed to attest such contract and to affix thereto the seal of the........ ...�.:. (City or Town) Duly adopted this..........14................day of................`�--G.................., Mayor. ATTEST: DEPUiY Clerk. Page... A......of Resolution d-40 MUNICIPAL WATER PUMPING POWER CONTRACT PUGET SOUND POWER & LIGHT COMPANY, herein called "Company," and the...' .............. (Town or City) of ..... R.eation................................................. a municipal corporation of the State of Washington, herein called "City," agree as follows: FIRST: This contract only covers power used in connection with the operation of water distribution systems. SECOND: DELIVERY —In consideration of the payments, and subject to the limitations, herein stipulated, the Company agrees for a period of .... 5... ... consecutive years, beginning..DI4a2 .0h..2.2a......... 19139., to reserve for and furnish to the City, and City agrees during said period to buy exclusively from the Company, at the rates herein fixed, all electric -power required to operate the City's water pumping plant or plants located and described as follows: 1. Upper intake pump at Springbrook# three rales south of Renton. 2. Mill street water pump at Hill Street and Sixth South in Renton. 3. Uberty Park grater pump 3n Liberty Park in Renton. It. Sewer Disposal Plant pumps at Sixth North and a ast bank of Com ercial Waterway #2 in Renton. 5. Serer pump at Sixth South and Shattuck in Renton. Said electric power shall be three-phase, sixty cycle, alternating current at approximately..7.200 and 2400 volts. Company agrees to furnish not exceeding ....... 2.7'' .......... horsepower but will furnish any additional amount required by the City if it has the power available. The point of delivery shall be at Pump Houses at above locations and as specified in attached "Uhibit All. The germs and conditions of this contract shall apply to each location. separately as fully as though each location were covered by a separate contract. THIRD: RATES — The City agrees to pay the following rates, same being Schedule No: 40 of the Company's Electric Tariff No...� ........... filed with the Department of Public Service of the State of Wash- ington: Demand Charge — $1.50 per month per kilowatt, or major portion thereof, of maximum demand. Energy Charge $0.006 per kilowatt hour for the first 25,000 kilowatt hours used per month. $0.005 per kilowatt hour for the next 25,000 kilowatt hours used per month: $0.004 per kilowatt hour for the next 50,000 kilowatt hours used per month. $0.0035 per kilowatt hour for all over 100,000 kilowatt hours used per month. Said rates are subject to change in accordance with the laws of the State of Washington and whenever a new schedule of rates for the same service is made effective the City shall thereafter pay the new rates, provided, if the new rates are higher than those herein fixed, the City shall be entitled to cancel this contract. All bills shall be payable within ten days from their date. Renewal - Renton 999-.700 998-560 998--540 998-535 998-554 CITY OF RENTON - MUNICIPAL 17ATER PUMPING CONTRACT "EXHIBIT Ars 1. Account No. 999-700 Upper intake water pump at.Springbrook, three miles south of Renton 1-7j HP pump Transformer rental, Yes, 2-5KVA, 7200/240 volt, owned by Puget Sound Power & Light Co. Metering voltage - secondary, 240 volts - restored to primary Transformer losses to be added monthly, 146 um and .2 0 to demand 2. Account No. 998-540 Hill Street crater pump at Bill Street and South Sixth in Renton 1-10 HP pump Transformer rental, Yes, 1-10 KVA polyphase 2400/240 volt, owned by Puget Sound Power & Light Company -d Metering voltage - secondary, 240 volt - restored to primary Transformer losses to be added monthly, 146 KWH and .2 Kff to demand 3. Account Pio. 998•-554 Liberty Park nater pump at Liberty Park in Renton 2-75 HP pumps Transformer rental, No, 3-37W KVA 2400 volt, City owned Metering voltage - primary 4. Account Pio. 998-5b0 Sewer Disposal pump at Sixth North and east bank of Commercial Waterway #2 in Renton 52 HP in various pumps Transformer rental, No, 2-25 KVA 2400/240 volt, City owmed Metering voltage - secondary, 240 volt - restored to primary Transformer losses to be added monthly 730 Kt7H and 1.0 KO to demand 5. Account No. 998-535 Sewer pump at Sixth South and Shattuck in Renton 2-72 AP pumps Transformer rental, No, 2-5 RVA 2400/240 volt, City owned Metering voltage - secondary 210 volt, restored to primary Transformer losses to be added monthly, 116 KUH and .2 K9 to demand 7.42 MUNICIPAL WATER PUMPING POWER CONTRACT -PAGE 2 FOURTH: MEASUREMENT — Maximum demand, consumption and power factor shall be measured by commercially accurate maximum demand, watt hour and power factor meters furnished and installed by Company, suitable space for which shall be furnished by the City; provided, maximum demand and power factor may at Company's option be determined either by meters or by check of service. The maximum demand for any month is understood to be the average kilowatt demand, or aver- age rate of use measured in kilowatts, during the fifteen minute interval in which the consumption of electric energy is greater than during any other fifteen minute interval in the month. FIFTH: USE OF EQUIPMENT —The City agrees to install and maintain in good condition. proper equipment for the use of such power and to save the Company harmless from all liability for any loss or damage caused by such equipment to either party hereto or to any person whomsoever; not to sell to others any electric power furnished hereunder, nor use or permit others to use any of such power in any other place or for any other purpose than to operate said. plant. City agrees to notify the Company before making any increase in the connected load and to operate its electric equipment so as not to impair the general service rendered by Company to its other customers. If the City's use shall impair such service to other customers, the City will, upon demand, install the proper apparatus to prevent City's power factor from falling below 85 per cent, and Company shall have the right to discontinue service to the City until such apparatus is installed. The City agrees to use reasonable diligence to protect the Company's property from injury and Company shall have free access to all parts of the premises where its electricity is used, to inspect, repair, remove and replace its property. SIXTH: SERVICE INTERRUPTIONS—Company shall use reasonable diligence to furnish uninterrupted service but shall not be liable for any interruptions caused by strikes and/or other labor disputes, accidents or acts of God, or by any cause beyond the control of the Company, or by the necessity for making repairs or changes in the Company's equipment and facilities, and the City waives and shall not assert any claims against the Company for damages to the City caused by any suspension, interruption, failure or curtailment of service by the Company under this agreement attributable in any manner to national war emergency, including voluntary cooperation by the Company in any method of operation or in any program recommended or requested by civil or military authorities. No temporary interruption shall cancel this contract. SEVENTH: The Company shall have the right to cancel this contract if any part of the Com- pany's property used for the rendition of this service is taken by eminent domain, or if such service can no longer be rendered by reason of franchise expiration and the inability of the Company to secure a renewal thereof: Datedthis.........../ ... .....................day of ........................ - ................., Attest; nEPCity Clerk. Witness: ........... ......../...................... .............. till B . . Mayor. PUGET SOUND POWER & LIGHT COMPANY B..... ........ .................. ......................:.......... He r R. use -� G ner 1 Co�merciU bSanager TRANSFORMER RENTAL CONTRACT This Agreement Witnesseth: That PUGET SOUND POWER & LIGHT COMPANY, as Lessor, has rented to CITI OF WIN "I ........................................................................................................:.................................................................................................. as Lessee, upon the terms hereinafter stated, the following electrical equipment, to -wit: $8.o2 (Tom 010YOWY r sr€sme Vital. $UWi S x 44256x- 9 6 G.5A 6(`i'l I .GA Ua @'@ f.'A,�;4a,Q 6:A.t'>,@,i►.4 � H @. U'H,C!'!i6 !1'@:1 @ @ tl'd'@. ,40, Ae .oi.vint,f- I-:MV'A pr 1 —'h&ze 2/404/240 voltf 34 onthly reutel t,2. 1. Said equipment shall be installed by the Lessor upon the said premises of the Lessee desca�ed in that .certain... as sm @@4m .............. .... Power Contract between the parties hereto effective ..................................and shall at all times be and remain the property of the Lessor and shall not be removed from said premises without the Lessor's written consent and the Lessee agrees to use reasonable care to protect said equipment from injury while in its possession. 2. The Lessee agrees to pay to Lessor upon demand the sum of $...:... ................... ................................. to cover costs of installation and further agrees to pay to the Lessor as consideration for the use of said equipment the sum of $... ? .: 8 ................................ per month on the..�tt ........day of each month. 3. This rental contract. shall run for the same time as, and terminate with, the power contract above mentioned;, provided a breach by the Lessee of any of the terms hereof will entitle the Lessor to terminate this rental contract upon five (5) days' written notice to the Lessee. At the expiration or termination hereof Lessor may remove its equipment from the premises. DATED this......... ...........day of....... %T1 O IWC Lessee ..... .............................................................., By,,G� .. ............ ......................... PUGET SOUND POWER & LIGHT COMPANY, Lessor By....../...:............................................................................ ....... G neralyConime ial ]tanager