HomeMy WebLinkAbout03257 - Technical Information Report .1� � cl�l-�
( �o�J
���`� ��
�� Zao�
�2-3 2��-
ENGINEERING REPORT
Teclznical Inforniation Report and
Hydrologic Anc�l�sis
Renton Technical Coilege
Maintenance/Cl oom Building
� February 17, 06
�_;
___.
E �
(
( y
PREPARED FOA:
Renton Technical College
3000 NE 4th Street
Renton,WA 98056-4195
Phone: (425)235-5839
Mr.Barry Baker
PREPARED THROUGH:
S.M. Stemper Architects
4000 Delridge Way SW
Suite 200
�� C. A Seattle,WA 98106
�q�. ������� 0� Phone: (206)624-2777
��, � Mr.jerry Osborn
!� ��
� �
- �-
I3REPARED BY:
� ZJ5?7 � �
o� <����.���� �,�w Couglrliai Porter Ltcncteen
ASS��',�L Y�G� 413 Pine Street,Suite 300
�/ O 6 Seattle,Washington 98101 � ���,
EXPIRES Ot/23/20�8 Phone: (206)343-0460 �FRENTOnr
Mr.Keith Kruger,P.E. E C E�y E�
MAR 15 2�
8����NGDtV1�ON
� _ -
Technical Information Report
Maintenance/Classroom building
Renton Technical College
Coughlin Porter Lundeen Project No.C990308-05
February 17,2006
Table of Contents
Section Page
I. PROJECT OVERVIE`V............................................................................................................................1
GENERALDESCRIPTION...........................................................................................................................................1
EXISTING DRAINAGE AND S1TE CONDITIONS...........................................................................................................1
PROPOSEDDRAINAGE SYSTEM................................................................................................................•••.............2
II. PRELI'VIIl�'ARY CONDITIONS...............................................................................................................3
COxEREQuIREyErtTS.............................................................................................................................................3
SPECIALREQUIREMENTS.........................................................................................................................................3
III. OFF-SIT'E ANALYSIS...............................................................................................................................5
IV. SITE HYDROLOGY A1�iALYSIS AND DESIGN..................................................................................6 '
STORMRCJNOFF CONTROL ANALYSIS......................................................................................................................6
WATERQUALITY ANALYSIS....................................................................................................................................6
V. CONVEYAI�CE Ai�1ALYSIS.....................................................................................................................7
VI. SPECIAL REPORTS AND STUDIES......................................................................................................8
VII. -- BASIN AND CO1VI1�1LT1VITY PLANNING AREAS................................................................................8
VIII. OTHER PERMITS.....................................................................................................................................8
IY. TEMPORARY EROSION AIVD SEDIlV1ENT COl�"TROL...................................................................8
X. BO,'�iD QUAI\TITY WORKSI�EET.........................................................................................................9
XI. �IAI�TTENA'VCE:�1��OPERATIONS 11��.'VL1AL................................................................................9
COUGHLIN PORTER LUNDEEN i February 17,2006
P:�Re�itat Tedniical Celiege-Mainte��a�tce Classroom Buildiiig ti T.I.R�Ne�u T.I.R�TIR_Report.doc �,
Figures
FIGURE 1-TIR WORK.SHEET
FIGURE 2-VICINITY MAP
FIGURE 3-SCS SOILS 11�iAP-KING COUNTY AREA SHEET#11
FIGURE 4-REDUCED USGS TOPOGRAPHY MAP
FIGURE 5-EXIST'ING SITE CONDITIONS
FIGURE 6-PROPOSED SITE CONDITIONS
FIGURE 7-DEMOLITION AND TEMPORARY EROSION&SEDIlI�NT CONTROL PLAI\'S
(Not Included at'This Time)
FIGURE 8-CITY OF RENTON STOR1�7 SYSTEM MAP
Appendix
APPENDIX A-STORM RUNOFF CONTROL AND T.E.S.C.CALCULATIONS
APPENDIX B-GEOTECH1vICAL EXPLORATION
�
�
COUGHLIN PORTER LUNDEEN ri February 17,2006
P:�Renton Tec/nticnl College-Mairiterm�tce CTassromn Building`T.I.R�Neu�T1.R�TIR_Reqort.doc
i I
i I. PROJECT OVERVIEW I
General Description
The following Technical Information Report(TTR)provides the technical information and design ,
Uackground required for developing the Drainage and Temporary Erosion and Seciimentation ,
Control(TESC)Plan for the project. The design for the new Maintenance/Classroom Building at '
Renton Tecluucal College will be based on the requirements set forth in the 1990 King County !,
Surface Water Design Manual(KCSWDM).
The proposed Maintenance/Classroom Building is located within the Renton Technical College
campus,located at 3000 Northeast 4�Street in Renton,Washington(see Figure 2-Site Vici�tihj May).
The project site is in the north portion of the campus,west of Kirkland Avenue Northeast,and south ,
of Northeast 7�Street. It is within the Lower Cedar River Community Basin and Drainage Sulr
basin. I
The site currently consists of a sloped landscaped area that sloped doivnhill from the east to the '
west. An existing day care is d'uecfly east of the site and a parking lot is directly west of the site.
The development involves clearing and excavating the site for construction of a two-story,11,088
square-foot building. Additional improvements include repairing parking lot surrounding the west
part of the building,concrete sidewalks,landscaping,and associated utilities.
The project will provide storm water runoff control per the 1990 King Couniy Surface Water
Drainage Manual(KCSWDM)and City of Renton Engineering Standards. Surface water runoff I
from ne�v rooftop areas and�valkrvays will be collected into an onsite infiltration system.
Runoff treatment will not be provided for this project since the new impervious pollution-generating
surface is less than one acre,per section 1.3.5 of the 1990 KCSWDM. This development will replace
approximately 6,500 square feet of pollution-generating impervious surface., �
W..�., c��--�C,L�.� �.,.�-�.t w-��� ���,;,,� -( 1 �
Existing Drainage and Site CondiHons ���e�c�� r}�� Soov �F- o� N e`' '"s'"��0'�' 't`�"'
„��c� -� U.�� . �,�� . V S-�
The project site consists of approximately 0.34 acres of the north portion of the Renton Technical
College campus. The site is cunently comprised of landscaped areas,asphalt parking areas,and
concrete sidewalks(see Figure 5-Existing Site Co�iditions). The project site lies within the Lower
Cedar River Sub-basin of the Cedar River Drainage Basin. The site slopes from east to west at
approximately 25%with a 20-foot elevation change. This slope is defined as a"protected slope"
under the King Couniy sensitive area folio.
Storm water discharges through a private storm system along the western edge of the campus.
Runoff is then routed to the public storm system in Kirkland Avenue Northeast.
COUGHLIN PORTER LUNDEEN 1 FeUruary 20,2006
Proposed Drainage System
The proposed project will add a new two-story,11,088 square-foot Uuilding with associated parking
and landscaping area. Surface runoff generated from the rooftop of the proposed building,
walkways,and landscaped areas will be collected and routed to the underground infiltration
chamUers. Storm water runoff will infiltrate for storms up to and including the 100-year design
storm event(see Fig-i�re 6-Proposed Site Conditio�is}.
COUGHLIN PORTER LUNDEEN 2 Februar��17,?006
II. PRELIMINARY CONDITIONS
Core Requirements
This section will address the requirements set forth by the Core Requirements listed in Chapter 1 of
the 1990 King County Surface Water Desi�Manual(KCSWDM).
1. Discharge at the Nafiuml Locatirni(1.21)-All storm runoff from developed site areas will be infiltrateci
onsite for storm events up to and including the 100-year storm event
2 Off-Site A�tal�sis(1.22)-A Level l off-site analysis is disc���ed in the"O/�Site Aru�l�sis"section of this
report
3. Riawff Crnttrol(1Z3) Pertk Rate Rintoff CrnttroL•An underground infiltration gallery has been
designed fio provide mfiltration for runoff generated by storms up to and'mcluding the 10(3-ye�r design
storm event T11is subject is addressed in the"Storm runoff Control Analysis"section of this report
4. Crn:veymtce Facilities(1.2�-This subject is covered in the"Cmizaeym2ce A�wlysis"section of this report
5. ErosirnySedinrattatirnt Control Plan(1.25)-This project will uistrll a series of tiemporary erosion and
sediment control Best Management Practices(BMP"s)related to spE�cific conciitions on-site. This subject
will be addressed in the"Temporan�Erosion and Sedn��it CrnttroP'section of this report
6. Mair�tenance artd Operafiion(1.26)-The proposed on-site storm drainage system will be o�ti��ed,
operated,and main�umeci by Renton Technical College. A Maintenance and Operation�fanual is
included in Section XI of this repork
7. Brn:�s a�ui Liabilii�j(1.2�-The Ocvner and Contractor w•ill obtain all ilecessary permits prior to the
begnuung of construction.
Special Requirements
This section will address the requirements set forth by the Special Requirements listed in Chapter 1
of the 1990 King County Surface Water Design Manual(KCSVVDM).
1. Critical Drainage Areas(1.3.1)-The project site is not located in a Critical Drainage.�rea.
2 Crnxpliance zuith an Fxi_stntg119aster Drairrczge Pla�t(1.3.2?-The project site is not located�ti-ithin an
Existing Masfier Drainage Plar►.
3. Crnzditi�ts RerJ��iring a Master D�ni�u�ge Pl�zn(1.3.3)-The project does not rec{uire a�laster Drainage
P1�1n.
4. Adopted Basiii or Cm�n�ttciiihj Plm:s(1.3.4)-The project site is located u�d�e Lo���er Cedar River sut�
Uasin w�ithin theCedar River T�r�in��e Rasin. T}�e��rojc ct i5 also located in the Lo�ver Cedar River
Conununitv Basm.
CUUGHLIi'V 1'U1L1Elt LU:Vll�.�,N 3 February�17,�006
5. Special Water Qtralihj Crntirols(1.3.5)-Less than one acre of new imperviot�s pollution-generating area
w-ill be developeci as part of this project Therefore,�vater quality treatrnent w-ill not be provided for this
project.
6. Coalescing Plate Oil/GVater Separators(1.3.6)-Since the project site area consists of less than 5 acres of
new impervious area that is subject to petroleum storage;high vehicular use(more than 2,500 trips per
day);and/ar heavy equipment use,storage or maintenance;this requirement does not apply.
7. Closed Depressirnzs(1.3.�-There are no closed depressions on or downstream of the project
development Therefore,the project is not sul}ject to this requirement
8. Lise of LaDces,Wetlands or Ciosed Depressirn�s forPeak IZate Rratoff Crnitrol(2.3.8)-The project iti-ill not
use lal:es,weflands,or closed depressions for peak rate runoff control.
9. Delnieatirni of 100-YearFloodplriirr(1.3.9)-The project is not located wzthin a designated lOQYR
floodplain.
10. Flood Protectirnt Facilities far Class 1 arui 2 Sfirear�ts(1.3.10)-There are no streams and e�dsting or
proposed flood protection facilities within the praject site.
11. Geotechnicai Arral fsis mu1 Report(1.3.11)-A geofiechnical analysis and report addressing infiltration,
excavation,and slope stability is included in Appendix A of this report
12. Soil Aru�l�sis cuui Report(1.3.12)-Soils in the area have been mapped as ulcticated by the Soil
Conservation Service,1973 King County SoiLs Report Also includeci m Appendix B is a geotechnical
engineering report prepareci by Associated Earth Sciences Inc.(dated October 10,2005)for the project
sibe.
I
COUGHLIN PORTER LUNDEEN 4 Februarn'1%,2006
III. OFF-SITE ANALYSIS i
Upstream Analysis ��
The current day care located east of the site collects any runoff upstream of the site. All stormwater �i
is then conveyed into a closed pipe system through roof drains. Surface water is then conveyed east i
through an 8-inch storm line located just north of the proposed Uuilding.
Downstream Analysis
The project site is located within Lower Cedar River Drainage Basin. Existing land cover consists of
approximately 0.34 acres of landscaped and parking areas. Storm water runoff sheet-flows to catch
basins located in the parking lot east of the project site. The onsite storm system then discharges to
the 18-inch storm main ruruling parallel to Kirkland Avenue NE(See Figure 8-City of Renton
Storm System Map).
i
COUGHLII`T PORTER LUNDEEN 5 February 17,2006
IV. SITE HYDROLOGY ANALYSIS AND DESIGN
Storm Runoff Control Analysis
The drainage system for the project site was designed in accordance with the 1990 King County
Surface Water Design Manual(KCSWDM). The peak runoff rates for the hydraulic design were
determined using the Santa Barbara Urban Hydrograph(SBUH)Method with 24-hour Type 1-A
rainfall distribution. The hydrologic computer program Watenoorks Version 4.09 was used to
develop and manipulate design hydrographs(see Appendix A for storm water calculations).
Storm runoff control will be achieved through underground infittration chambers,Stori�itedz
Systems. Impervious areas,including rooftop,paving,and sidewalk and pervious areas for the
proposed site conditions are shown in the following table:
�
Table 1: Pro osed Draina e Basin Areas � �/`
Land Cover Area acres � �
Im rvious Area ac 0.30 � G-f
Pervious Area ac 0.04
Total Area ac 0.34
The infiltration chambers are designed to infiltrate the 100-year design storm event under developed
conditions. T'he infiltration rate used to design the infiltration chambers was determined by a study
conducted by Associated Earth Sciences,Inc. The design infiltration rate is 2 inches/hour. The
required starage volume is 1,825 cubic feet. The proposed infiltration system is designed to provide
1,878 cubic feet of storage volume with 24 chambers,including washed gravel surrounding the
chambers.
The 1990 King Couniy Surface Water Design Manual requires that the design infiltration rate be
reduced by 50% prior to the ir�filtration analysis. However,geotechnical analysis indicates that 2
inches/hour is an appropriate rate for the design life of the infiltration system,and incorporates the
factor of safety. This system will be augmented with a gravel drain extending from the bottom of
the infiltration system to a more permeable layer. A geotechnical memorandum outlining these
conclusions is included in Appendix B.
Water Quality Analysis
Less than one acre of new pollution-generating impervious surface is proposed as part of this
development. Therefore,no water quality treatment ti-i11 be provided for this development.
COUGHLIN PORTER LUNDEEN 6 Februar}�17,2006 �
V. CONVEYANCE ANALYSIS
The proposed conveyance system consists of downspouts connected directly to the proposed ,
infiltration chamUer;runoff from landscape areas will be collected and routed to the infiltration ,
' system. The conveyance system will be analyzed far up to the 25-year/24-hour design storm event. i
Pipe capacity will be deterinined through Manning's Equation by a program called HHCalc. The ',
Rational Method will be used to determine peak flow rates. ,
I
� I
I
�
COUGHLIN PORTER LUNDEEN 7 February 17,2006
VI. SPECIAL REPORTS AND STUDIES
For additionaI geotechnical information,please reference the October 2005"Geotechnicnl Report
Mainf�iance/CIassroom building(Building N)-Renton Technical college"prepazed by Associated Earth
Sciences,Inc.911 Fifth Avenue,Suite 100 Kirkland,WA 98033.
VII. SASIN AND COMMUNITY PLANNING AREAS
T'he project is located within the Lower Cedar River Basin and Lower Cedar Community Plan.
There are no restrictions from either the Basin or the Community plan that effect the proposed
drainage design for the project.
VIII. OTHER PERMITS
No additional permits are required for the project
IX. TEMPORARY EROSION AND SEDIMENT CONTROL
To minimize the amount of sediment laden water from leaving the site during the construction
process,a temporary erosion and seciimentation control(TESC)plan has been designed for this �
project in accordance�vith KCSWDM. The T'ESC plan indicates the minimum necessary measures
that the contractor shall unplement during the construction process. Best Management Practices
(BMI''s)are defined as physical,structural and/or managerial practices that,when used in
combination,prevent or reduce pollution of�vater caused by construction activities. The TE.SC plan
for the proposed project has been designed to protect off-site properties as well as minimize the
quantity of sectiment-laden water from entering the public storm system. The following BMI''s will
be included on the T'ESC plan for this project
� To ensure that the disturbance of the site is limited to the development area,the clearing limits
will be clearly staked prior to any clearulg or grading as shown on the TFSC plan.
O Catch basin protection will be used on existing and future catch basins to reduce sediment-laden I
water from entering the existing storm system during construction.
❑ Cover measures such as mulch,seeding,or plastic sheeting will be implemented for ciisturbed
areas greater than 5,000 square feet in accordance with the City of Renton Standards.
❑ Temporary sed'unent storage tanks are included to allow sediment to settle out of onsite runoff �!,
prior to discharging from the site. I
❑ All construction debris will Ue promptly removed from the site to minimize demolition and
construction unpacts on the site. The contractor shall i�plement additional BMI''s as required
and/or recommended by the City of Renton inspector or other agencies as required to prevent
demolition and construction deUris,waste material,fuel,oil,lubricants,and other fluids from
entering the public starm system.
COUGHLIN PORTER LUNDEEN 8 February-17,2006
X. BOND QUANTITY WORKSHEET
A Bond Quantity Worksheet w�ill be included in later submittals.
XI. MAINTENANCE AND OPERATIONS MANUAL
See attached Maintenance and Operations Manual. �
COUGHLIN PORTER LUNDEEN 9 February 17,2006
MAINTENA:�ICE STANDARDS FOR PRIVATELY MAINTAINED DRAINAGE FACILITIES
RENTON TECHNICAL COLLEGE -
MAINTENANCE/CLASSROOM BUILDING
N0. 1 -INFILTRATION
Maintenance Defect Conditions When Maintenance Results Expected When �
Component Is Needed Maintenance Is Performed
General Trash&Debris Any trash and debris which exceed 1 cubic foot Trash and debris Geared from site.
per 1,000 square feet(this is about equal to the
amount of trash it would take to fill up one
standard size office garbage can). In general, i
there should be no visual evidence of dumping. '
Storage Area Sediment A percolation test pit or test of facility indiqtes Sediment is removed and/or facility
facility is only working at 90%of its designed is cleaned so that infiltration system
capabilities. If two inches or more sediment is works according to design.
present,remove.
Sump Filled with Any sediment and debris-filling vault to 10%of Clean out sump to design depth.
Sediment and Debris depth from sump bottom to bottom of outlet pipe
(If Applicable) or obstructing flow into the connector pipe.
Rock Filters Sediment and Debris By visual inspecUon,little or no water flows Replace gravel in rock filter.
through flter during heavy rainstorms.
Settling Ponds and Sediment Remove when 6"or more.
Vaults �
Infiltration VaulU Sediment Tanks:Sediment depth exceeds 6-inches in No sediment deposits in tank
Tank Accumulation in Vault depth. bottom.
Trash and Debris Trash and debris accumulated in tank,vault,or Trash and debris removed from
Accumulation connecfing pipe. Includes floatables and non- each facility.
floatables. I
Access Cover Cover cannot be opened or removed,especially Cover repaired or replaced to proper
Damaged/Not by one person. working speafiqtions or replaced.
Working
Tank or Vault Tank:Joints between tank sections failing,such Tank replaced or repaired to design
Structure Damaged that leakage occurs and.or material being speafications.
washed through into facility;or maintenance/
inspection person determines the tank is not
structurally sound.
Tank or Vault Vault:Cracks wider than 1/2-inch and any Tank replaced or repaired to design
Structural Damage evidence of soil particles entering the structure specifications.
through the cracks,or maintenance inspecUon
personnel determines that the vault is not
structurally sound.
Note: Sediment accumulation of more than.25 inches per year may rndicate excessive erosron is occurring upstream of the facility or that
conveyance systems are not being properly maintarned. The contnbuting drainage area should be checked for erosion problems or
inadequate maintenance of conveyance systems if excessive sedimentation is noted in an infiltration facility.
Check fwice a year during frrst 2 years of operation;once a year thereafter. Clean manho/es/catch basins,repair damaged inlets/out/ets,
c/ean trash racks.
Gperations and iviainienance Ylanuai 1 Maintenance Classroom Building—ltenton Technical College
MAINTENANCE STANDARDS FOR PRIVATELY MAINTAINED DRAINAGE FACILITIES
NO.2-CATCH BASINS ��
_ Maintenance Defect Conditions When Maintenance is Needed Results Expected When �
Component Maintenance is performed '
General Trash&Debris Trash or debris of more than 1/2 cubic foot which is No Trash or debris located
(Includes Sediment) located immediately in front of the catch basin immediately in front of catch
opening or is blocking capacity of the basin by basin opening.
more than 10%
Trash or debris(in the basin)that exceeds 1/3 the No trash or debris in the catch �I
depth from the bottom of basin to invert the lowest basin. �
pipe into or out of the basin. I
Trash or debris in any inlet or outlet pipe blocking Inlet and outlet pipes free of '�'
more than 1/3 of its height. trash or debris. �
Dead animals or vegetation that could generate No dead animals or vegetation I
odors that could cause complaints or dangerous present within the catch basin.
gases(e.g.,methane). '
Deposits of garbage exceeding 1 cubic foot in No condition present which
volume would attract or support the
breeding of insects or rodents.
Structure Damage to Comer of frame extends more than 3/4 inch past Frame is even with curb.
Frame and/or Top Slab curb face into the street(If applicable).
Top slab has holes larger than 2 square inches or Top slab is free of holes and
cracks wider than 1/4 inch (intent is to make sure cracks.
all material is running into basin).
Frame not sitting flush on top slab,i.e.,separation Frame is sitting flush on top
of more than 3/4 inch of the frame from the top slab.
slab.
Cracks in Basin Walls/ Cracks wider than 1/2 inch and longer than 3 feet, Basin replaced or repaired to ',
Bottom any evidence of soil particles entering catch basin design standards. '
through cracks,or maintenance person judges that
structure is unsound.
Cracks wider than 1/2 inch and longer than 1 foot No cracks more than 1/4 inch
at the joint of any inleU outlet pipe or any evidence wide at the joint of inlet/outlet
of soil particles entering catch basin through pipe.
cracks.
Sediment/ Basin has settJed more than 1 inch or has rotated Basin replaced or repaired to
Misalignment more than 2 inches out of alignment. design standards.
Fire Hazard Presence of chemicals such as natural gas,oil and No flammable chemicals
gasoline. present.
Vegetation Vegetation growing across and blocking more than No vegetation blodcing opening
10%of the basin opening. to basin. '
Vegetation growing in inleVoutlet pipe joints that is No vegetation or root growth ',
more than six inches tall and less than six inches present. ,
apart.
Operations and I�4aintenance Manuai 2 Maintenance Classroom Building—Renton Technical College
MAINTENANCE STANDARDS FOR PRIVATELY MAINTAINED DRAI�IAGE FACILITIES
NO.2 -CATCH BASINS (CONTINUED)
Maintenance Defect Conditions When Maintenance is Needed Results Expected When
Component Maintenance is performed
Pollution Nonflammable chemiqis of more than 1!2 cubic foot No pollu6on present other than
per three feet of basin length. surface film.
Catch Basin Cover Cover Not in Place Cover is missing or only partially in place.Any open Catch basin cover is Gosed
catch basin requires maintenance.
Locking Mechanism Mechanism qnnot be opened by on maintenance Mechanism opens with proper
Not Working person with proper tools. Bolts into frame have less tools.
than 1/2 inch of thread.
Cover Difficuit to One maintenance person cannot remove lid after One maintenance person can
Remove applying 80 Ibs.of lift;intent is keep cover from remove cover.
sealing off access to maintenance.
Ladder Ladder Rungs Ladder is unsafe due to missing rungs,misalignment, Ladder meets design standards '
Unsafe rust,cracks,or sharp edges. and allows maintenance person
safe access.
Metal Grates Grate with opening wider than 7/8 inch. Grate opening meets design
{If Appiicable) standards. I
Trash and Debris Trash and debris that is blocking more than 20%of Grate free of trash and debris.
grate surface.
Damaged or Grate missing or broken member(s)of the grate. Grate is in place and meets
Missing. design standards.
NO.3-CONVEYANCE SYSTEMS (PIPES)
Maintenance Defect Conditions When Maintenance is Needed Resuits Expected When
Component Maintenance is Performed
Pipes Sediment&Debris Accumulated sediment that exceeds 20%of the Pipe cleaned of all sediment
diameter of the pipe. and debris.
Vegetation Vegetation that reduces free movement of water All vegetatlon removed so water ,
through pipes. flows freely through pipes.
Damaged Protective coaUng is damaged;rust is causing Pipe repaired or replaced.
more than 50%deterioration to any part of pipe.
Any dent that decreases the cross section area of Pipe repaired or replaced.
pipe by more than 20%.
Catch Basins See"Catch Basins:Standard No.3 See`Catch Basins"Standard
No.2
Operations and Maintenance Manual 3 Maintenance Classroom Bui]ding-Renton Technical College
MAINTENANCE STANDARDS FOR PRIVATELY MAINTAINED DRAINAGE FACILITIES
NO.4-GROUNDS (LANDSCAPING)
Maintenance Defect Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Performed
General Weeds Weeds growing in more than 20%of the landscaped Weeds present in less than 5%
(Nonpoisonous) area(trees and shrubs only). of the landscaped area.
Safety Hazard Any presence of poison ivy or other poisonous No poisonous vegetation
vegetation. present in landscaped area.
Trash or Litter Paper,cans,bottles,totaling more than 1 cubic foot Areas Gear of litter.
within a landscaped area(trees and shrubs only)of
1,000 square feet.
Trees and Shrubs Damaged Limbs or parts of trees or shrubs that are split or Trees and shrubs with less than
broken which affect more than 25%of the total 5%of total foliage with split or
foliage of the tree or shrub. broken limbs.
Trees or shrubs that have been blown down or Tree or shrubs in place free of
knocked over. injury.
Trees or shrubs which are not adequately supported Tree or shrub in place and
or are leaning over,causing exposure of the roots. adequately supported;remove
any dead or diseased trees.
Operations and I�-laintenance'�4anual 4 ?�4aintenance Classroom Building—Renton Technical Colleee
FIGURES
FIGURE 2-VICINITY iVIAP
FIGURE 3-SCS SOILS MAP-HING COUNTY AREA SHEET#11
FIGURE 4-REDUCED USGS TOPOGRaPHY MAP
FIGLRE 5-EXISTING SITE CONDITIONS
FIGLJRE 6-PROPOSED SITE CONDITIONS
FIGURE 7-DEMOLITION AND TEMPORARY EROSION&SEDIMENT CONTROL PL.�P1S
(Not Included at This Time)
FIGL"RE 8-CITY OF REnTON STORl�i SYSTEJi'�I�P
CUIJGriL1iV PVl<lElt LUNllEEN FebruarV 17,?006
COUGHLINPORTERLUNDEEN
A CONSULTING STRUCTURAL AND CIVIL ENGINEERING CORPORATION
VICINITY MAP
NOT TO SCALE
;, � ttE � `_'>9 � �-�c � c�'� � � � � a. ,,,� y� `` °I���Ic�'r I
�S Q �-, `r � �, �T�, � � � �
` �yc g z � �. � � �- �L r �r�.�'���
_4 ea �:r � r , .. _ �
[� �y7� �t ,.,
��G�Oi�.` -(y� � rXY x �.�^,S� .� ��� b��� . �° 4{,� I . . .
���� r�E ��.��� �
y `�.��Ly !'!�)i ��IY� �"' '�. � t0. (� }. � T7s,�
S€ A�.'_�i Y ��31YIt./vWJ � ✓'���� � �i. V 11 9 �� . •� . . rti� •',i:i k.t
fY�- � � � ti) � �d. �t� `��� '7��� � S
�� !�� F'�RK �j 'NE �� a�., IVE )TI�1 Sfi� ` ��ST���ir,H p: .
� N� BT'k !-- �,�' ,_,., '-- '
�'t �' �� ��3"sE�D � � r� � ��H 5 f NI�_M 1���t►�1�
.. . .,�`.t c+�� ��.4�'. :�,~ - � � � �� � � � . :c+�F+,� .�� � �� � � � � �'F�{ +�f . �- V
� �.� �' a �`` =PiE 6�a i t�� 7 h ��,,� �-' � � :CT I ' �.
�;'n c7 '� �.� �c ``�?�� � � ! t� `x t��
� � ?L'
t,.t ���_ '';+�C'y�S N� �+� � a'`� z � � � bl}i :�..t �- �(� u.1� � ' ��iH C
.�
�,,� r< � � �t � ,� � �i r� f o NE � �,K �i � _ �TE-1_
W I�I�S A �, , �ti`�� SS +�+ ��� � � � ��t��;1 tv� `��" 57�f� Cs I
�' � {)L��. . �}r (t'{r '� C! � . � �` � �+.c� �E i.') � .
.� ��C )r" � �. Z
� 9��J f,�i> t � 5� z �: '�AV NE a � •�� ��_��� � E $T� � �
�t,r 4�- t�E �y� p� � �� c.�r. � �,-`'r �q�; ���f �1 �� � '�
��,�C. �, �'� a .� L .-. � �' �2. �✓ §;}} � r
� � —� �j � _ '� � �
����"" � t� � � � 4/r �, ' � � �
0 � � � z c, cr
dI�'��...<�hl��,':`' �ER7u�ALE� ��� � � ��`` N E `r TEC�l��CAL �� ,-'z-- �
�� -p P�l�. �^f'L`�"�E �` "��� ,� �
_ . , � } - a
, �a00 ' _ . � 4Ia3 _ . . ., _
� ; , � i . ..:
, ; � i
� cf; _ � <
" � ,' � �� �, � I �
�u j
� � �� ���� � ��; ��� �� `������ � NE 3k� CT >�
� � �- �y� �, -. : ��
— . ` ,�u-- �Ad?�'T�l;�,��'- r,
�� �.i��.. � �, �j� .�ARfi icP'�)} � �
. .� ? r r
,� �� w � G��] -�� � luj�E + s�- .-�-i
� �,�j _ ��23i� P�-!.�
�, � �� � x
�y� �� ��,.� -���, � � �,
� IgT �_�.:�'� 'ti�'
� �� x�i
4 ' L�'ISUn"E a ir z t'-� r��{`.��=.�.�
�
. �
k
:�F�.��l ; -�1� `' �; 4�_' ,
� �I�4��7 i E�TATr�S �� j ' ssE( 1sr�a� �, e��
Ct�i�'ftY P�1P � � t�s --� ����'��'�
� - S�_Y��. t�a m���pL�
� �,�:..�� ` -..� �I� � E`"
� � ����� � h������ ��
,
- ��� �- .� _ .
n. , �
_ _�. .. _. _._��. ., . � . ,. �� _ ,,:f• , ,. ,. _
' - __�—�.����'_:_______ ����:�r_��_�r_.._-�� _ _ �,�-•�;-f;a��,�.�: ��� -��,�,
c' ..... �f \/:..:...:�.. 11A., I
ri�j, fa�c � - v��.i�u�y �r�a�
Project: RTC Maintenance/Classroom Building Designed By: SMR Date: 2/17/06
Pr�ject N�. CQ4-03�$-01 Glienr: C.M. Ctemp?r Arch;rP�t� ChPrkP��y; KNK crget NA nf NA
COUGHLINPORTERLUNDEEN
A CONSULTING STRUCTURAL AND CIVIL ENGINEERING CORPORATION
NOT TO SCALE
�'rars 90 4� AkF (Joins sheet 5J nmc l99AOUAH 17 MI. lO' (
.. r .i` �.!t I . _ __ _
.:ilt! _ .,� u�.�1 .�I�I� V = � E:i. � , ' ,a, S':� �°fGD ...� . ,
`,� i 'i• � f y � `1 f. 1. '4 k _. .�r .; r � ' ...
--il�t tt• . � �� . -� �x f r . t: � - �
':. .I ' •�' � -..i �I 1; ..fnC ; ^'r �? � , - F h r a� � �
i $lgh�aDd'� y � 1{�� ; `_t y � .
V� -�� 'j �� GScn � l:;i i�'. r r � �'
'�1 L KFLD .� i � C��,.' ti � t : ° �3. e '
p. . J �= - qg� �'*".
_ 8 �, �:,�...,,. _ �' � r;9 � aia - -i-�: �' 'sN
■ �F:�' ti I. .. �', � E: �' � i. w c r:; 1 �. 835 :i
P:� � ns . �y L ? � i 1 - i _.y ..�r :� k � . :
,' � y �
�' 1 1 ' y � ..,[ - � � £= .� ..
� .AgC ~�' �r ' � ' � � -�.s �.�'k � _ _ �°�� - �'�5,�i
� 5 4 .r� • � {-x 1 .�-�„��i� rF�,i
` ,� �.� .
Y I ' L.'- 1����� .� r 5 i ' �$ _ ' .. r�r - ; ,�Y�t�;
��� �I .. � i ���p j �� - An ` �' � 5 �" r� � �c � �'�k,�""� `- � �'.
■ �! . � s� �, ,Trail�r .��
-:BM fw 1 ' -���� ' ��■ ■•'..�. D ? � . ` u� ii:��B H• "'�� 1ru��
� .ark� n�_.. n :B '�iBM p�. �,;i �_`
tw...
_ - � � � r � j' .� i`� __.�: -c j �~��. ,-r��-���-„`3. 3 3 424� r� � ,
.
• +� � '
r . _
I � .I , �ieenwaodTCe � _�� .G fG� rfi i � ` �':
�r EvD�' 1- r : t-� �,,. , _``s a� �}i ^rf ' ? '�. r f
�... �AkF� - � : ;_ � t � r �: � -`' �,:
i ,,-\-�.. i i � :- r '. � f �5-,...-t -e;
! �� �-• GS� FF — -'AgC j S.. S �� � .
. � •ff1t Oli I :� y - r � ��` �r 400 �- rl r � ` .�
- y I EvC ' a �q a t ' -_, r � �
t1F " �L � I I Cem� �� a . 0 � -� �; t ' - .� - .� _ � Y': � r��
, _
r ,�
- .PC `GRAYEL i�PIT, " a@a�,�, G"{ � c 4 . r .
k _ F p: �� , su � +-�.�: � Nr � �� 3-�t
• =: � �i BM � Qae p; � a '1 ? ` -� _ '� {� � T �
� M. rs
� ,' 1 ��,=-t-1 --�iP�21 aa+ .Y � :iK � � 15 �1 � i I - s
" �� !i �I / _ . ? � R _.r- o - .,�,�'�,.;'� t>°. �, i r,�` 5e � -�•i
_� Rh• Ii; �..: � .r- p � •G ��.�-- � a`
vC �AkF � � ���I _ ! P ��� � f �
ti,�i . �''�d_ qkFt ' � , � s ..--- � L �. _ �. �
_R T r < <� t: � ,� � ��5-� i f �
� i -=,� r t �-I . ��- "����<;; c T � K �
- � ��� - � f E F r i �.����� _ � � , ; .r
�- 1 u. '� - �.> .: „
,� �:u PY ,. i �� dl iv' i AkF , �'� ~ � � '�'s
+ AkF 2 I -� .�r' "� �.�� r 7 -� ' -
� - } �.� t, 1� �, � B�J� � �r� � I� K �*`. �
.InC - l ..,Y y ..r *� . � � ��I t������.�, �/�� , � ,� +�� H
' � � �-� ` � ' Ev8- rb
.. ��� � �_ ~ � .. T� _ F .
--1 -..� � , �,Pk
�r � � � p,gCr6[+II37 'A�CF Rr��''Ii.. �PY Ga/I a" Ma �.., ��� `,+� '" �
�' y f� .f x _ s -4k- � .
L 1\ ` �' �. T Cp _ 3 i�� �`S# _ I J '� �
':l �AmC .� k T _ 1.�AgC � - ` %� - �rse �:x '� .3:k } `� >y�� _ .d:
- _, �oC _ t i r - fr,- :' t iA F �
l = ; G : • � a �cr i _'-v� /r > � ' �° ti Rh o - ` °Y �.�
: �� � y ' . � �� ` ! �QG : i � � �� � tr ��
`z f , �_ . :;�t O, �6s� i' �fi`�` �`\ ASD ���y' ..c i ' ' 1> � �. PY .� h�'� t� � ` �',
F !
o' Substa AmC� o �D` 'r _ u (� � r ,a C M 1 . - �•1 `
-:� �C . �I ` •�y �-AkF hi = , �.. ZaP � �, ii �p d .oNg I r '"' .
-, y _ _ - ...�@@ F,., J �� � �`t • ii��; � J ._ .. . r •
gR ZO= � ir' Ja u `�'1 . � � `� _ �� ut a
a, :: _,d'�, y:. � -,� � i . / � -� H �� ��r� 'c� 11: ,`�ri ..
t , 455 '� o a .., ,, f Y -_ 5 r�k,S;�`' - ",. � . _., �
r
���� ..;tyn"rr _ 9�'�- �Aa�' �gG I�, ���- ' �tiA1sF � A' � \y 4' tl��; IIf b9� Uf � '
�c-1 . - 1 4"r .p 1� \�. ,;��' . uac� AkF � 3�•� -,�� �Ng 'ri� ��
�.`-.'�;x . . . /1 � '. " ' ,�. .� .- �_-�c,;..' r�. " _t . 'aga p' ; ;�.�F�'�;...__ . !'d,� ,��/ �
--_ _ ,_,..��
�igure 3 - Soils Nlap
Project: RTC Maintenance/Classroom Building Designed By: SMR Date: 2/17/06
Project No. C04-0308-01 Client: S.M. Stemper Architects Checked By: KNK Sheet NA of NA �',
COUGHLINPORTERLUNDEEN
A CONSULTING STRUCTURAL AND CIVIL ENGINEERING CORPORATION
NOT TO SCALE
�r--, �r . �. , ,.� � ,.,*
�• r `�,,�� �,� }]'
`J� �+:.,�,r,r-....y: :
w �t . - �y'� S�a�+.`�. �. - . . � �. . _ ...��'Y
� . � •'grl . . �..
l.�� ��' �..
,'. - _ � nwtw�s:W
�'''� .� - .. . .�,--��...._ -_ �•
� . r � , � .twt..:�a.- .. ar. 5 . �
� - - _ � .,�� .
�`� � . � . �� �. . r�� �
�'t '4. �`� . �` � � ��-� `��1 _� � t � � r
G£.. , � T` `�, t _� � i�O
—� ��: � ��
��' � . , � L . . .- . ._" ... - .. . -.�_
. . . : � ._ .� . ..
_
' ' � r � ! , � � , �' 4. f,r,. • r � Y
� . . ��� �rti� •, � � '.,"�'}" � r
f "�•=i
_ " • ,4" . . . . " . . . � � �
� -�•. ' �� � . . . ■� Z. .
� � � ���� � _ _
� - ' .
,, � -- .,
�
`'' .� - '�' '�~ --
, � � � � _—.T
�
``j � .� : � ;� ���:� � �
( '�� � � -��
J� ..t,���` �- "��� � � � . � �hr 1 _ '�� .�l4� ._�'�Y �
` _
� �--.,,;,. '� � � t� � r r� �
�� {
�� t� � �
� . . �...... . ' � � T h� ` . � � � j
- , �
f—�' � �_.-�-� 1► '� -'�.. � •��/� � 1 �� �—��'� a � — 'a� .
* � L fi � � t ��-- � � � �,,1
�� � •}—� '�s _ � / � �_ �_I�. �'4 � .
ff � � � �f+ f : ��������
{� i `� s L r' ' �
\ � }� �� _ - `71� � � � r 'i _ � � �y�{. (4�
. ) . � , �rs■- . ' . . - � ��
� � - � J��.. � � 5t i �`j t� 1_��.{jy_'� ' . ..r.- .. . Y
'� �_ � ry.�i��'"� ,d ' � ;� + `� f� j� }' �t�:
t�y___ ',.,_ �,-; I �',�� l i 1 �;. _���'� � `�- - '�� _ ' �
I -..t � '�Y.4 w
--- 1 �� �� .� � � .� r� f� �i � '
:r r _�}e�-c.._� -` � �,�•� �;.;�. �.�. � �
_�;_�'.1� l �" � F l f . ��
� r { i - � � 1I �
r 7 '''� J� �� S�� f~ ``� � + � a 'k ���� �,;,�
�',�� �� . `� �'� '�, � � � '—� ��-�r��� ���{ �,� � . � . .
� ��,,,t�Lj• � i 'y.�' � {�� ' *6� `-- . .
�l [ • `�" 1 �� ,�f' � �.. � . :�;:a�..;.�.»
� �� � � �'�„� ;�.- � � � � _ � � �
-,.l-�f�'-;, f1�t�� t��E��� - � ; � �f'� �� � . �,,� _��"`
-=� �'��. � � � �� � � �-. �� ��� �� : �
�x��-- -5� `��� ' '��` ' �_ . }��. ..,.�'`-' � �
`�"�= z� � �� r� ��_.:�.--.� �
a:�i r . � `��1 t z� ' �•
� ,�, ,,� l �F ', r- Li� �,
} �� ti i._�? �'} 5 t:'i ,.t�"yCe.�"_4'w"'�'tJ i..
a4�: '��w'�''�_� _�%;� .+ _ r�=� � i r.�
� Figure 4 - USGS Topo Map�
Project: RTC Maintenance/Classroom Building Designed By: SMR Date: 2/17/06
Project No. C04-0308-01 Client: S.M. Stemper Architects Checked By: KNK Sheet NA of NA
COUGHLINPORTERLUNDEEN
A CONSULTING STRUCTURAL AND CIVIL ENGINEERING CORPORATION
G/ � / ,� / ���--
fBUH IYFE 7 � / µ X '��5�\ � �� �
R�:7M.Q9 � ��N�I � 'J8.-V311NG � �eRY=MS56 /
IE]I'�C�(F�`350.69 \ 3fi186 �
I`.11'�CP(N)=.FA./9/ � ' '•. /� � �
'A� W (���.(�x, r.F`'�y i� "_ i
//�� / � �pIL.��� i �
�� /�! 4. .RI(S5S0 � �.. /'UGF� /�i_�,�
N( /� `(Z}\�S�Q WR I1 t�•.150 ��. / � �/�
C /
SOW IAaN /C11� .` � ` i j�ix�� ;� �.` ,
Fa=Ji?bF ��,�e /�./�,/� � ���"�!�'��gbCC, .
E 2�At([1�3/;.7 /t.- ���� :)'' .�Y i ib'IiEC/? 1 . \ � ,
cart(r�)=Nou [a'a�r(sp=�.�s� rv /�� � /i 'tss- � ��i � �` ` � �, , �,
c�catr�x�_�oea �/j `� ./� @ �� � , . I � \ � netw
cffr��7=xou �� � ��;� �uwtxc ,����, yep��,. � � �r,x�s�
5
u_�4v� ic����. s' � y "F � � �t� )y ., � .
TFff(5=7 i8A 4 �..j / ��� /,�$�-,./ i � .. f;:6A4 �fi"�fRllfJl RCS{I 1\
/ �__. ��T� � '''��� ��i�}� �� ��uvc�r�
xx / /�� / .%�'. �/r� si i 1{� e �a.��c� �, � \ iou7mc an+c[ t�srucvse
� /� .�/// � �4...�, A�IIE( � i � ,`� ?lk��y � � ��1m._t, 541pK1 1 /F/FN1II �510 H BJtm. (10!FqM�;
� ,�� �� S' / �lit�" 1� /� / �� 4� � �1� S l gp5
/ �/.1f7 _ra///_�r �,..�a.fl°� J �� `tOHIFy '�:� \ �FL�1� �
�,.. � . ,,� 1
j �� �� � �_ � ��'_75a IOA�7`� !�� �"1� , 1 ! ;
i.�Fr'.:9� � ._ � �4'� 1 �\
� � � ��nc����vcc �i• �'� ���``�; �� E � �� 1� � � �R'4
i// �� ��' /� �r��`�� _�� ;.,, : 1,:� �n 1��� �I .
� �/`�f/ �wAt t �� i c� , �1
i� � � �'QL �� 1 �
i �� ��-' , �._._. �- -- : ed,�� g, �4 r o«u" ,�u�
i i �
- �, - P .G',�/ / � �-[iraw,iq'.s�as,`' C . . : � . 1
'��, ����/�J eroEc�� /, � nnwr c e-ur{q.�x.es h 6.�(,�'!'�167`�'�`. � � ��` ' i
y(,.���'� �' �tT" � il _ -1j y � �
,1.�O* �. �,��.:�". � / , Il IrV� � � .1
� � (I �
�� � �, /�� 1� �� �> >i � I i } I �
� �ItYqf ,,�, � � V II p� n n I
�����'�{�:�' � � ����. , ii � �y���OQ � �� vAnuxc ��� ��,��
,/� izn� �� f � ./"•.� i s;i�x
/ � � - � l+ \ � f ' S�M1Sf 1 c^ c z �
IOAE � 7`A'� .'�'4�aW�31333 % �� `f'� r�ti,�y� ��.. �'¢� ! €j� r 1 ��
'�. y C 12Ff,E)`�577 ,� �C. ;{ t .�1 `�1 �1 � �
���,� --�" c ietir(r:.�zst /' �C 1' �1 �l�"r, l � �� 1
��i=r���� ;-_ c ietiar(J-rzs�(.- ``�.'. •s xi n.w�f"'�_' \\ i ,' . �i �i1 � I
� \
<�I j _ Jb_ .� 1 �`i 1 �� '� �'\ � �1� 1 �I � Gl5 I�IER
{ d � � \�ry / � \`� �II ,'��`� S �, t� } fLlfl Rp1E:I1UN
V/CIVNJI(
�Y I i�'" �, 'EK��rr�� r � . , '_ ao�� �
�11 � ;, � �, � ��` . x � �,1 � ,�`_ i
�i ��� d �, 'ti� PAf2KtNl."� 1;1; '� ' � '� � ��1, � 11. I
�'; p�f�A '4yS � � ' =�-
�'�'i.:.:+ G:�I 1��� �1��#+"-1�- 1111} � , �.11�' U'� 1 �65�nl�fx �.
z�� ro�;� ��, 11 _ , t � '����� � �� ���r
�;¢�'� d , - � �, �`. �, i�)
3� �� ^ , ,�� � ^p\ \ �, ' • � R �'� I
�J' 1
s � �`3 � lSRYLI `�� /' �" - t� ` ,. ��\�, � 11 �f.F1flAttW.P7.6
� �.
a� ; � � ,...._-..iK- _.. ��� ' 11k, �SVI�USf �d
r"r•.�a71rE'b �� ' '-. ' � ``I �� 10.AF'(;'�'_ ,1 i .
r 4 � '� '� � . ��. I
����]� 'd � �wo-���ss�"�+s�� v�N`'� 1 ,,� ` �� t , � �, � �Y �� �1 w000-�n+E
��pp� ` .��� n.-ia:m w� �x�rta�six�cv.� � -a •, � BJLDNG
� � E-�`.�9:ti7B�.- I 1 �[1^'� mAY CAIE)
!'� � �1��ES�t�fD fOR 51AFF' EIFV:31l.06 :� 1 �� • � ',�� (
�.� ]�� ' �-) �;.� �ti,PoNf 95 � � t � L 7 . � . � l
i� t�e�I� d � � �il �� ` � , � '�� i
�l�{ � I' 1� a�_ �ss _ ` �rm�; ,
� i�tx �I��u wx� c ewc �Ncss � ' `; ; � - -`��
svtr's i� i
,J��s+ %� � � ����: 8 \ � � � 'i�r� �_�, J
I: u'A�c r � ...-' ° ., �---Jr.._! �%-� t � ' ` �.. . '�y �� � I < c?'',
i ' �y � I I ,r}_ %�---��—_.- �j�[y ��,6-'OEC/ 'I.. I ..,� `�l � ��.
� �•TM� � ' `',\ ` `�"�i p��`�-�' - /�I �k►Sf'�'aM+t.����\,� ,��s,�'� � t�rsrt � .
, �-i'I . �I `�/ \ ��U�� \� r / EI1f9_rc�QIRa �/ '�\.- . T � .�� ,� -� '�` ..
�j 1 .�. � �� 4�.F j� �� � .y� ^�.
O fY71�E VI�I�' ` ��GF UGP A�Wl! '�.. 1 \ I\ � /-,. .
21Y�o�$\, ,�\ � A41UL7 � \.�`` \� ;=_ � \�'M
� � � tUvu1'qull -..�. ` S('i Ial_� Y g� µ�379.ffi `y , \�\ 1- _. ���"� .
�_�.5�j ��so� `� _� E6W.(w�J 1�OJ� T�'� `'� '�Z, -1-_
B�.vNGlF�=.i1291 OILgF1RrNJN\ — —� C8�'!U�l'1529 � .�q�,�' � ,.
� �.ss. �o rw wc � �. ��.
wani an WRBS �.
i0a-31161 qp� � �'��`r �.[•��.
I IF BW'`I(�:5100I CBYH 11PEt ISrLFHVIL � " . , � �\�.
RII:Ni92 PI.WfED 46A : ..R Y
I I E.EYS:��A1�=7.i4% E 8 SYI=7/0.�'L � .. . ..; �. �( .�.., \ ,�. �.� \ . �
E 9�ESE�=JW.i2 .. ,.i r ":�:�T� - �� � �\ �� .
EA'W^EN =31C.17 ''MOEJ f��Mrc �caa� iv� ii� a¢ �
I EVIi,VKE fN'%N� rl� MNN}=5N91 FMPN+_E \� � I �'\
fF�312.fiB iF=4369 K6'PVC(5-.'.�X F•NZ.b ,. � �" :
E 6y.C.�E�=iiS.N
�1�-EJI`5'RON.1vfAiED Mfn USEY�7I 1$TCY1Y I�#1-N55 ���a •i� , �e?`.:
"1 FOIilIS 8 OIIER Cp5M70N5 IETNIEO WOOD B1�011(' �k 9W[1f) �J� -,�I� f\
I RR Ni^.._'E91.FEC.1p�ET117<b7 ''30�pl-t1�.0� �� .
('!7I 9pT'V Gti K:..15E5.WP) �y �. ..r � --Jf
_ _ 7
Figure 5 - Existing Conditions Map
Project: RTC Maintenance/Classroom Building Designed By: SMR Date: 2/17/06
Project No. C04-0308-01 Client: S.M. Stemper Architects Checked By: KNK Sheet NA of NA I'
�
—_ �
COUGHLINPORTERLUNDEEN
A CONSULTING STRUCTURAL AND CIVIL ENGINEERING CORPORATION
�- _...
� '' ,=
���'�� -��� ��`��=
[Bw f'PE 2 �`�� � �/ ' . �5 i
FL=L`fi'J9 \ il �JH-1b11K � /
E 7/'��c(�.gp.gq J � ��
[11'RP�►').l50.19/ ; / l �' � ` C E ���J6.1d6' / ' �
u/ w�r s�/ � c c. �i '��
✓ ���
'. +,; ��S �,��, � � ��«"—�'.`, N
min vw �� / ' ` � i s\ .�t �
�, Lm / ��� C�,� 4/ /i��4���`l L� /.L�
E I/ACIE}=.1,7. /�G -;/�� ��" �t ,uy�./J�- .� v 1 i!�' 6 �� e�'
?.'o�rlrsl•�o,s c ii'a4r(sxi.Hzs� b �.� � � R � / / � �� � },�.''` ��
� �/ � =f � �
lf�✓�j•J1QI.S� '� � � � ��../ , �� `/`�9.1AI�NG �.��� �tr�+���eW[�, ��I_` ..C. ��wMffihRi ,
I RY=,19nfi6 b�f/t��,(/' .�51.. i/ � /..127YME��F`sP�[? '.� .1� �
ii c�sl•H3:� ��;i/ 1 l�f � —� ��l,� a•�arcx bx� �; # � � g,rc�a wa F��u�sxc sixa
/j �:�� (_ / ' •. �; �,ra'`��"+^ '� �� ''� � � 0'An SfRICIUff l5af LLi'.ME��'
UI1 / y � y �-'� �, / evEc sy,,� a l'�G71L TdCE. ilf SR:lV E
� ; �• �/' /"� � �l�L � i � 12T�'� . RfTNNII�� �� /VµM1Il . rw�l,iSIC H AFa Iwl�OIl1C;
/�/�; /S j �� �(..��` \� ���WTCH IX �WAl1 'i+'� �' �� �gY6 ,
/ \ m�rc-`.c7tWE -'�
� �35. __- ,� -. � C �%� y�„ -�� �zto � /'�v�r` � �
/ � � �
Ss��� `���. \ �.:V f� �.. �lF 1 T i _. J �� '
/ �/ �// ��2��. _�s ,�p SD _ : �il'-' . ' � t x�rur
s �,a,-u�+��� �ovx� �t`Cara+ecr ro pos�ric ,�,r,�� ,��� ��'r ,1
� �.. '� ��ti+c ' ��,��' E�.3�-"- �� Y� � � 1 ��
!� ii� 1�-`�+' "%/ "`'• so%� �SDI CBTYfE1 ' � e ,,!�
"�/� ------�� �.e�m q �
�� �� ,
r��/`a'evu. i��� � wwu ��� . =.�s E�-35�6�� IN)E �,�. �b � � �
�� 3 �GY�'�ai� � � //� � � '. fE=S1.9U 12'��M i . .� F ' �i . ��I
i� ��'�6. /� ��o=� \ ,l 1� � r�z ' �,
- `6�tt ������ � �E�--M4— � � ��� �'�,�� �_ $�•�y;
%jus�ci�����/: ��v� �y..ss .� �/,/ .� ,� � ��,DWkI ��1 � `G�'C[yr' '�i1 0�I�M
��� g � �."'[i: � .Hs.�]�k � �aa l.. FE�SO.o � � �,�:'� �� � -�I
�y E IE'or(r1•J�t.l1
I ��..,� � ���� c ie'aWs1•�ns� .e 1 ,�,, � �� FF.--36'1.�5 K 4 ...,,.> 1 i / _ ,
� �, ,, i., �i ,,�� t k c" i'
� / �C` ��' _ 1t8.� "T � •.� / :�;� �, . � �,1� �11 - WilflEv
a ` 11 �
R � ' /' /"'su� _ I iV�1�1� `? _ - 11 \ � 3 . �'. 1 '1!fP.D, '/!:'l�.'lN(
a� d { `.� `- ���•r="' u t �S10(at RElE11IlON CU15fER � ��� SD 0 Six�-: � " r �[r�i�o�[_��n
� I � �```v ��25-$�qMEQ�$�ORMrE � ' � t � ' .�1� �
,^' ' � ... `�crwso+s r�w�m. _ �R � � k N `�,t� �
]� � d n x'� 5 �
$: I CIFARNC AND �II `` ' _-.. � �,;_�,TF '"`s '
iZb[c! �7� d i (iiM1iG UIIIS . � �41 .�� �e - .._:�y � '. , t;a�e .;'C� �.���isr
{o �I r r.: ��_.
i 't\ /� `�c �.. y
i ti�6� � • s _ ;—� - '�..�-� . .
I'm ' � �- — �
,' \ , _ � x r ,
� � � - a ,�, ,.,rir. � �� � r crr�!nv_3,a,
� � � �� Aqrwr �� � �03 _ --} � �FWIlIG pWl�t � '��� ,
n��;.l� _ _,,6_.� \ �rr,•�.� s!F E'S� � � t�J u�,
IeY� lo'�ir[ � � I . � 0 20.L �� ` � F �Q �. • ...� I FST01�'
� � .''� �ca+rx�:ar�� '.�����; 5 lF 5"SD��'*'x' Rol T6 ctNOE � 1 � w000-r�a:e
�II '� �I � I� �'�� . � xc rt«v�+c�,.90!CBIYPEI ����i ���.s�� � t I �eu�onc�
� � �1E4AE�E➢Fdl AIiF' E•1.1�241.h7B � �, \ � �.{"
�9GxlTn1 —�- ��':. �1� R�146.10 w / �`� � � �� 4 + 1�`3 1
Ii I �� � ��— °N� ( :. 11 �� E�1425 6� BI)E � r �. ,- '' ��
i �.I �y/ :� �II I , 11 � E�S/J.13 8'�OUf)N _ � "r" -��� - . �' -�. . ..
-iy� 1 u �
II�i �� I /�I�%�A.fD FQt 11�77�C1��=3Wb5 ( ,'.�-,1 ��� � - � � _ _����'
�J� � � I
� SLYF'9f}71 I T��d,�.� Fs'., .� ��
£�.� � -j!?' � I ,y /� \_ I �MM" ��� � � �j r �� � kht'_'�I .�c � I �
i2'�i�� r �'� / ', :•� , -
�.� � � ,-�.--��---- �_J . �� " _,,, [ -- j ��'�'a'� � .��`' '�,�- -=�
I/f` ��''� / \,.�. ��,(}� , � �;�
rac, / �
I�I..I I 1�1 � \`�..\_��SQ ILYIER _ ''.'_ � � / t� \\V�\.� •�� 'kP� �TiNt .1�PJ!�''
WJCH IX '� '.� � Y; �
j^ i '{-� i �j, �` .cw�oE =k �� .��.�,4:
�I f''r I�..._���' �, `\ V�P ` ���LP WP \ �� ,�I�L� , r . - .�: � .J� � \.� � k
��Ir� \ � J `�E`�'� ��'�.. _�`��i�
. ��+�- Y� � \\ 59� `5 1� �,4FEC01SIRlM.T� � I �� '��
�7,� � \�� '�� �e�:.�� L �� �
i � ra' SC�� �� ,� � �' �.�,,,s ��ia�i-v��\-� � �'' � -_�__. RiNrD iR�
�, j : 'caw'xuxt �,� .,� � .
1 F4 � 1.7'SIXVJfE � _� E BW.M1MI�=31U.1a _ � ._... S.A7B `Jsf f�� . ..
�e e���ne. -ia.e� a�grkuio� �,� � .K. n � r�,.` ` -�- ,�.
� r�s' — — — ��_ � - �_` � ,
P�� I ��`�
IW=)11� �11�YP� � _ :.-.;-�n, \n ��
E! ]79% [�l7.L'9111=]10.P1 �m�' GEFKVC ; �C '� � ,.4 ,� .. _-,..
1 [A'9Y[�ESE;•l1612 ' -;� �} " }j- '� j �r.�� I`�� .:�' \
' £!'�.[�91EI'iW'. ��5�} , :'.;L 1 II�� Fu N • � �t�'1Q U1E .
I J
F/dfaW".c MRlKE � E/TCysA.��9� plpr�( ��....
if-N7� iF.1/7f9 4 F�5 3� Ail�215 .f � •:
�E eW.';E;�1'3H
fSTOFY �ttY-lb6� ��*`�+ � J3L,
��Cx i5 t7.F,YAC�f!LU�1'H GY�GlI �����K, ,�C E�1F_i.��_.. . i � •�`��
w�c�M� nurnrec{y-,W{p
,^BO"1CY.i1'7: �_ -��'.1�� .
Figure 6 - Proposed Site Plan
Project: RTC Maintenance/Classroom Building Designed By: SMR Date: 2/17/06
Project No. C04-0308-01 Client: S.M. Stemper Architects Checked By: KNK Sheet NA of NA
�►j ►� __ �j r,_.:.� ♦ � � ��
� �d!► � ♦ �: �� � �
* ► � �� ���,� � /� r:. �
♦ � i � �i
��
.� � ; �,
� �� ���
� r. Q -�--�� - 1, 1�l�!► � � �_ :
.' � � �, � �� � �,�► . _ -.�� ..
� . � � . : : � �
�> � � �� �� r �� ����►
, �� .,� �r•��� �� ► . ����� �►� .�
, ~ ��� - �� �� ,� ��� � � .
� � �, �� ' kPY�bii
�!, ` � �' '•, � . - _ . �� . ������ ���1 ,
..n� 11 ♦ !� �� ��'. , �.
'°��jA ■ �1►j !� r-� �,, � : �� . .,�II����� 1111 .
�.�■ �� ,� � ���� � �� ■ � .� ,.
�I ♦ ♦ � ■ : � ,� .�� .�
1 � �� .r� / . � ... Y. 1 11 111�
., �� � ► �< < 1;� � ��' � „� � !� �
��♦ I�� � ��,� � , �.,�.. � �� !11_
� `'�I�II � ♦ '� ��� �■ ,�
�'��� � � ■ �, i�� i� �f
I �� � � -
- � �► �rr - � \ �� � � ,
/� � �1�!�!!�I!��� �1�►� � � � " ` , � -� � :.
, �„ .. 7 ■ � � a
, a :�� r�
� ■ i�i�� ■ �i�i� `� � � � ;
17r1� ■ ■■ • � i•
� � � � �
' y
�� � ,��.. �� � �► �� � ,-
• .�,� ��i � ■ � �►�. , �' ,4 .� .
� � ��� �� �� ���� F
„ i�►'�..► �� ,-
► � ��' ��.
I �r �►. r ��.�!�'. �- ♦ �' ,
. � . . ,�
..� 1 ��.��--��' � ��
. �■ � �r. .;
�l��!!�►'� ���m� �r� o _
� �S�'
������� � �
r�����ti� ����
� r - �.������ ��,. .�
,� ,�. �..
�� ;� � .
Iit� � i i�ii��,
.
.
. . . . . .
. -
��
. „ - „ : , .
: ,
� � i
' • �
1 �i�
�
l�
-
�
I
APPENDIX A
Storm Runoff Calculations
COUGHLIN PORTER LUNDEEN February 17,2006
2/14/Q6 5 : 54 : 59 am Coughlin, Porter, Lundeen Inc . page 1
Renton Tech. main/class bldg. _
SC-740 STORMTECH CHAMBERS
BASIN SUMMARY
BASIN ID: DEVl • 2-YR DEVELOPED SITE
SBUH METHODOLOGY ``�--�
TOTAL AREA. . . . . . . : 0 . 34 Acr BASEFLOWS : 0 . 00 cfs
RAINFALL TYPE. . . . : A PERV IMP
PRECIPITATION. . . . : 2 . 00 inches AREA. . : 0 . 00 Acres 0 . 34 Acres
TIME INTERVAL. . . . : 10 . 00 min CN. . . . : 0 . 00 98 . 00
TC. . . . : 0 . 00 min 6 . 30 min
ABSTRACTION COEFF: 0 .20
TcReach - Sheet L: 70 . 00 ns : 0 . 1500 p2yr: 2 . 00 s : 0 .2500
impTcReach - Sheet L: 100 . 00 ns : 0 . 0110 p2yr: 2 . 00 s: 0 .2500
4ZD = PEAK RATE: 0 . 14 cfs VOL: 0 . 05 Ac-ft TIME: 480 min
BASIN ID: DEV2 NAME: 10-YR DEVELOPED SITE
SBUH METHODOLOGY
TOTAL AREA. . . . . . . : 0 . 34 Acres BASEFLOWS : 0 . 00 cfs
RAINFALL TYPE. . . . : TYPElA PERV IMP
PRECIPITATION. . . . : 2 . 90 inches AREA. . : 0 . 00 Acres 0 . 34 Acres
TIME INTERVAL. . . . : 10 . 00 min CN. . . . : 0 . 00 98 . 00
TC. . . . . 0 . 00 min 6 . 30 min
ABSTR.ACTION COEFF: 0 .20
TcReach - Sheet L: 70 . 00 ns : 0 . 1500 p2yr: 2 . 00 s : 0 .2500
impTcReach - �heet L: 100 . 00 ns: 0 . 0110 p2yr: 2 . 00 s: 0 .2500
QioQ = PEAK RATE : 0 .20 cfs VOL: 0 . 08 Ac-ft TIME: 480 min
BASIN ID: DEV3 NAME: 100-YR DEVELOPED SITE
SBUH METHODOLOGY
TOTAL AREA. . . . . . . : � . 34 Acres BASEFLOWS : 0 . 00 cfs
RAINFALL TYPE. . . . : TYPElA PERV IMP '
PRECIPITATION. . . . : 4 . 00 inches AREA. . : 0 . 00 Acres 0 . 34 Acres
TIME INTERVAL. . . . : 10 . 00 min CN. . . . : 0 . 00 98 . 00
TC. . . . . 0 . 00 min 6 . 30 min
ABSTRACTION COEFF : 0 .20
TcReach - Sheet L: 70 . 00 ns : 0 . 1500 p2yr: 2 . 00 s : 0 .2500
impTcReach - Sheet L: 100 . 00 ns : 0 . 0110 p2yr: 2 . 00 s : 0 . 2500
C�tooD ' PEAK RATE: 0 .28 cfs VOL: 0 . 11 Ac-ft TIME : 480 min
2/14/06 5 : 54 : 59 am Coughlin, Porter, Lundeen Inc . page 2
Renton Tech. main/class bldg.
SC-740 STORMTECH CHAMBERS
HYDROGRAPH SUMMARY
PEAK TIME VOLUME
HYD RUNOFF OF OF Contrib
NUM RATE PEAK HYDRO Area
cfs min. cf\AcFt Acres
1 0 . 036 440 2190 cf 0 .34
2 0 . 036 320 3294 cf 0 .34
3 0 . 036 170 4647 cf 0 . 34
L�Z N Flc-T�i A�T�oN iZF1-'t E
2/14/06 5 : 54 :59 am Coughlin, Porter, Lundeen Inc . page 3
Renton Tech. main/class bldg.
SC-740 STORMTECH CHAMBERS
---------------------------------------------------------------------
---------------------------------------------------------------------
STAGE STORAGE TABLE
CUSTOM STORAGE ID No. SC-740
Description: 23 CHAMBERS W/ 12IN ROCK BASE
STAGE <----STORAGE----� STAGE �----STORAGE----> STAGE <----STORAGE----> STAGE c----STORAGE---->
(ft) ---cf--- --Ac-Ft- (ft) ---cf--- --Ac-Ft- {ft) ---cf--- --Ac-Ft- (ft) ---cf--- --Ac-Ft-
60'�'(0l'� � 340.50 0.0000 0.0000 341.55 341.00 0.0078 342.62 1041 0.0239 343.70 1613 0.0370
�F s T����7 F 340.55 16.072 0.0004 341.63 396.33 0.0091 342.71 1092 0.0251 343.79 1644 0.0377
340.63 43.296 0.0010 341.71 451.67 0.0104 342.79 1141 0.0262 343.67 1674 0.0364
340.71 70.520 0.0016 341.79 507.00 0.0116 342.87 1188 0.0273 343.95 1705 0.0391 .
340.80 97.744 0.0022 341.B8 562.33 0.0129 342.96 1235 0.0284 344.04 1734 0.0398
340.86 124.97 0.0029 341.96 617.34 0.0142 343.04 1282 0.0294 344.12 1760 0.0404
340.96 152.19 0.0035 342.04 672.00 0.0154 343.12 1330 0.0305 344.20 1785 0.0410
341.05 177.82 0.0041 342.13 726.66 0.0167 343.21 1375 0.0316 344.28 1811 0.0416
341.13 202.22 0.0046 342.21 761.32 0.0179 343.29 1417 0.0325 344.37 1837 D.0422
341.21 226.62 0.0052 342.29 635.98 0.0192 343.37 1460 0.0335 344.45 1863 0.0428
341.30 251.02 0.0058 342.38 888.54 0.0204 343.45 1502 0.0345 344.50 1878 0.0431
341.38 275.43 0.0063 342.46 939.32 0.0216 343.54 1545 0.0355
To9. oF SToRAGa�
341.46 299.83 0.0069 342.54 990.11 0.0227 343.62 1582 0.0363
Ue�u M_ I 87 g L�
2/14/06 5 : 54 : 59 am Coughlin, Porter, Lundeen Inc . page 4
Renton Tech. main/class bldg.
SC-740 STORMTECH CHAMBERS
---------------------------------------------------------------------
---------------------------------------------------------------------
STAGE DISCHARGE TABLE
DISCHARGE LIST ID No. SC-740
Description: 23 CHAMBERS W/ (2IN/HR) INFIL
STAGE c--DISCHARGE---� STAGE <-DISCHARGE---> STAGE <--DISCHARGE---> STAGE �--DISCHARGE--->
(Pt) ---cfa-- ------ (ft) ---cfs-- ------ (ft) ---cfs-- ------ (ft) ---cfs-- -------
340.50 0.0360 341.55 0.0360 342.62 0.0360 343.62 0.0360
340.55 0.0360 341.63 0.0360 342.71 0.0360 343.70 0.0360
340.63 0.0360 341.71 0.0360 342.75 0.0360 343.79 0.0360
340.71 0.0360 341.79 O.D360 342.79 0.0360 343.87 0.0360
340.80 0.0360 341.88 0.0360 342.87 0.0360 343.95 0.0360
340.68 0.0360 341.92 0.0360 342.96 0.0360 344.00 0.0360
340.96 0.0360 341.96 0.0360 343.04 0.0360 344.04 0.0360
341.00 0.0360 342.04 0.0360 343.12 0.0360 344.12 0.0360
341.05 0.0360 342.13 0.0360 343.17 0.0360 344.20 0.0360
341.13 0.0360 342.21 0.0360 343.21 0.0360 344.28 0.0360
341.21 0.0360 342.29 0.0360 343.29 0.0360 344.37 0.0360
341.30 0.0360 342.33 0.0360 343.37 0.0360 344.45 0.0360
341.38 0.0360 342.38 0.0360 343.45 0.0360 344.50 0.0360
341.46 0.0360 342.46 0.0360 343.54 0.0360
341.50 0.0360 342.54 0.0360 343.58 0.0360
2/14/06 5 : 55 : 1 am Coughlin, Porter, Lundeen Inc . page 5
Renton Tech. main/class bldg.
SC-740 STORMTECH CHAMBERS
LEVEL POOL TABLE SUMMARY
MATCH INFLOW -STO- -DIS- <-PEAK-> STORAGE ,
�--------DfiSCRIPTION---------� (cfa) (cfs) --id- --id- <-STAGE> id VOL (cf)
2-YEAR .•......... . ........... 0.00 0.14 SC-740 SC-740 341.55 1 345.01 cf
10-YEAR ...................... 0.00 0.20 SC-740 SC-740 342.37 2 886.81 cf
100-YEAR ...... .... ........... 0.00 0.28 SC-740 SC-740 344.33 3 1824.75 cf ���
L7 T a P o F ST o 6�-P•c.1 E Co'_ 3�'���`�
Number of chambers- 23
�
Voids in the stone(porosity)- 0.40 StormTech�
Base of Stone Elevati�n- �,•�„r�•�
Subsurtace Stormwater Management"
StormTech SC 740 Incremental Storage Volumes
Height of ncrementa ncrementa ncrementa umu ative umu ative Infiltration
System(in) Chamber(ft3) Stone(ft3) Ch 8�St(ft3) Chamber(ft3) System(ft3) Elevation Rate(cfs)
48 0 1.13 1.13 81.66 1878 344.50 0.036
47 0 1.13 1.13 80.53 1852 344.42 . 0.036
46 0 1.13 1.13 79.41 1826 344.33 0.036
45 0 1.13 1.13 78.28 1800 344.25 0.036
44 0 1.13 1.13 77.15 1775 344.17 0.036
43 0 1.13 1.13 76.03 1749 344.08 0.036
42 0.05 1.10 1.16 74.90 1723 344.Q0 0.036
41 0.16 1.06 1.22 73.74 1696 343.92 0.036
40 0.28 1.01 1.30 72.52 1668 343.83 0.036
39 Q.60 0.89 1.49 71.22 1638 343.75 0.036
38 0.80 0.81 1.61 69.73 1604 343.67 0.036
37 0.95 0.75 1.70 68.12 1567 343.58 0.036
36 1.07 0.70 1.77 66.42 1528 343.50 0.036
35 1.18 0.65 1.84 64.65 1487 343.42 0.036
34 1.27 0.62 1.89 62.82 1445 343.33 0.036
33 1.36 0.58 1.94 60.93 1401 343.25 0.036
32 1.45 0.55 2.00 58.99 1357 343.17 0.036
31 1.52 0.52 2.04 56.99 1311 343.08 0.036
30 1.58 0.49 2.08 54.95 1264 343.00 0.036
29 1.64 0.47 2.11 52.88 1216 342.92 0.036
28 1.70 0.45 2.15 50.76 1168 342.83 0.036
27 1.75 0.43 2.18 48.62 1118 342.75 0.036
26 1.80 0.41 2.21 46.44 1068 342.67 0.036
25 1.85 0.38 2.24 44.23 1017 342.58 0.036
24 1.89 0.37 2.26 41.99 966 342.50 0.036
23 1.93 0.35 2.29 39.73 914 342.42 0.036
22 1.97 0.34 2.31 37.44 861 342.33 0.036
21 2.01 0.32 2.33 35.13 808 342.25 0.036
20 2.04 0.31 2.35 32.80 754 342.17 0.036
19 2.07 �.30 2.37 30.44 700 342.08 0.036
18 2.10 0.28 2.39 28.07 646 342.00 0.036
17 2.13 027 2.41 25.68 591 341.92 0.036
16 2.15 0.27 2.42 23.27 535 341.83 0.036
15 2.18 026 2.43 20.85 480 341.75 0.036
14 2.20 0.25 2.45 18.42 424 341.67 0.036
13 2.21 0.24 2.45 15.98 367 341.58 0.036
12 0 1.13 1.13 13.52 311 341.50 0.036
11 0 1.13 1.13 12.40 285 341.42 0.036
10 0 1.13 1.13 11.27 259 341.33 0.036
9 0 1.13 1.13 10.14 233 341.25 0.036
8 0 1.13 1.13 9.02 207 341.17 0.036
7 0 1.13 1.13 7.89 181 341.08 0.036
6 0 1.13 1.13 6.76 156 341.00 0.036
5 0 1.13 1.13 5.64 130 340.92 0.036
4 0 1.13 1.13 4.51 1 Q4 340.83 0.036
3 0 1.13 1.13 3.38 78 340.75 0.036
2 0 1.13 1.13 2.26 52 340.67 0.036
1 0 1.13 1.13 1.13 26 340.58 0.036
Total Chamber Storage= 45.9 ft
Chamber Bed Area= 777 ft2
Infiltration Rate(k)_ ��'2:;� 'T in/hr
SECTION 3.2 RUNOFF COMPVTATION AND ANALYSIS MEINODS
FIGURE 3.2.1.A 2-YEAR 24-HOUR ISOPLUVIALS
} ��— � -- .� +�� ��� � � � � �6NONOqISHCOUNTY �_
`/� 0� icoc ��; y KING COUNTY �
J� _ �""-._ l '� .�j —�
1 �' - n �� � � �? _v(~•`� �
•S '� ! ,-j ` ,. --F_^� ' �'.�. �7
�'� - = ``� _� � t ^Y�+�'t .� �I
r � x ' /
�6' �� � '- y y 1 � � �`
� ! �,> Y�' C!1 •
7� ! �'tsFin�t ; ��.�+'a :� — _j a�.�
� =� .� .��,�.o �� j � �
8 � a - s, � �D�
� ���•
r s ;::a � _ , _� � N N GD
: . ;, � , � ;.;. cy
� ,�,, � _:�' � :°f ` ���:^�-� � .
2 0 � - a �: �;� `` 1"` � �:. ry o
2 _ , ,` ;. _ `�.
�� r ��.
�. � - A� ; } ,
t. if =. «., 5, 1 ;
2 .. .AaF ._: � � .. .� �
��� ��� 1
�y i
� -t f. ..! ^ V'• \�
m .:1 �
_ _ . - ."ti : \r_,,. _
�'�s _ � , ..r, �
`� _ `. �
.'`4 I _ i. - - ��- � rf `•- `'- `�
�_ f � aui�
_ �.� _ _ rat+: ��,— j �;�-..:� �
� _
' ; �. -' - — �J _� f .-�
� i y` � - � ' C�� �
l' \� , �f _ - J I J �.i
�� .\ , } - . — _ \ � . ( �.' ,
o v� 1 ��`
. yF'' , 1 ; �
;.� '��:. �:;�^!� �. �\
� . ,.s� � �_. ' � � �..� ,:�
�� . ;r -='.�I ��'t� ` �
� - � 's �
�-,, ' .._.
�� _ ., `,`�� �, I � \
,. ._ ,�; % ; _ _ _ ,
g - � ; _ � Z `_� � � _ �,,r � .
� a � F �.: .� � -�,�� ?!+�aio icc �.:t�. .
o ,j r--,- -=. _ �_,�'�., � �,
`� � .� , ;�., � =� �
'� c^�" � ,,; � ' _.� ;�
•�_' 0� .� � - r�� \ .
�� = �\ i - —
ry - �� � -: e � _ \ Q
•A� iyf�`` .
�y ` , 5 3 �� L.•� i� �
ry � � �
' ..y,—. _ � ��y.� .f ` SS / �
_Y \` M.�11/ ` � � _ � — ,� . . *'' .
� ��� "r ^:� :..�
^ � � �
•�/ � ` �
. • � .��f�l ..;��'4 ��-NING COVNTT
. Q PIEPCE COIINTI'
N
1NESTERN_ � '��.
. , -
KING C�UNTY 2`� s�� �:�
N ,�,• ry, ;'--- .s
2-Year 24-Hour _ - - - --- ---- -- - _ _ . -- ry��v� --- - __ -- - - - ._ `��'- ._ _
_
�re�iF�tatio;� ti ti -,�,-� � o
. . o .� 4�� -� - , �, � _
in Inches- _ _ __ __ �_ _-- .- ..
---- _ _ ___-- -- ___ - - - _. _
� . . i, �� 7
, _ _ __, � _
. ;
y%1%y2S � _ � � ' 1998 Surface Water Design Manual
Z � 3-14
3.2.1 RATIONAL METHOD
FIGURE 3.2.1.B 10-YEAR?A-HOUR ISOPLWIALS
r -- - - - - --- - - -- - - - -- --- - - -
�' 2 .
7 V�' iNON Etl�H COUN7Y
? J .
�� 3 :�� ;�i ':; i woct -i�it 4 --_ _— �_-- X _ KIN6 COUN7Y
•� F 3 � r, t a� xe i ra �
� ti ..r. '�' _ -.r l
a = r� ': 1 >> ` ti,� s � �`��r.._ r.
<
, � , � ��
24 y � : ` ;` �� `-;' � :K=� .���
2S , ` „� i _ ; � � 4.0
r � 'P �i � � +. —,
�r r -3� � � , i ���
'� s�t�cp: ''- �:Z �"� r �� _ 1 a�qrdi;r
6 � i` s �-r- ' q 7 s! . �� � � �
� � F �
��' '� I � �k �} - i�YJM4.
28 * � �`.``-� `L ` � '�� °' r.% D�O
r 4 � ��
n Q
�r ��
2`9 - ` ` �' ;; e`�'''�� �`�.. �`.i�e'. � .
\ � d _ F ' :�
3 - x , €�' , � a
� ,
•O - � � c�.' � .� �—� �� � � � 8 ,
� —u
S�T� --�' _ �. � ,
T I �� [tL YYR ._ .?.�a. �
F - ����L �1 S� � - — � :.F. I � -
� L - � �� '� -:�^4 i�� !.E `
] � t .� �- � •1
... .�s �� �._.� � �
_ i �� ' � -
. - t��r _ ,t�
,€��` ,-1
. , , .,
' ' ` E `
. . _ .. �� ,-'�.� _� �. tt �,.�� - • :�' -4,-.�.'�T � �:e` _ " . '_ . ._ __. /S . .... .. ._. ... .. _ .
J J [ }1 �-� � �—� _ ! 1�F� � .
�� � - -_ _ r . ,�3 � � ��
. j � � __ _,` . ��
s I ,_ � :i �' ' ` � :�:
:. . � � i
� � . ti���
� � � \ � , `"� � �
� `
� `R �
.� ) �Q ,.. `' ':� t,� "' t� �`, ? S �
:�,�' . �.�... � . - � .
�•a _ r , d _ ,.� ` �
� ' f ' :
r:� � �1�-; p t ` {_ Jf .
. ,wr1 i _ M1C = i _`• � / I�O
L ' ��' t� � vc
_ ;_ _ �
! � ��- '�� � 1�-�\ �
_ Y \
n _ _ "'' � �,
. .. H � L S-', . � �
� ' �
�" .• t . V�^I� "L � :'� y� A �X
U
� _ �� .. _ Y �� �' :' lr._ �� .
. / 1 �.__ s i z`.�s.�'•�'�y.:�„ 'E wio �,cT:�.
i � ��-F-,�,_ ___��,;�+�' ..,z�..�t-,�-lr. .f�"`
� {¢c` d ��'v _:,Y .. ��.i �
F _ �y - � ` � � t e; '� ��
r - \
�� 1 rY- � .- ' • _,,,.,-�\' �
\ .��� i . � t : ..� / �` .
*3� ��� / �` �� i�i • . . '
i � � � � � �• �F�� .
' . ` ` � � T� i � - � Z . �.� � *��r
� . ` ,--.
, � � ` �. t�-co i : . �,� � .� ' .
� ��-} �� � �-
t� _L u� ��'KIN cOUH7r �
' ' PICRCC COUN}Y � � � _
WESTERN . � ��� " ,� �
KtNG.COUNTY_ � : " ` -
� � 4.5
`
- es.�.�;
_ . . _�_ - _ _. .—__
N �
_
-'--. _.... ._ .. . --�---.._.._..._-__. - ._ . . . . _._. .A �.� ��- -- '�'�
. . . . .. .. —.__..
10-Year 24�Ho u r - - -- .... ....� _ _ _.. . .-3 � ,t ._.._ -����._�- a:o --, --
� ,
. 3• �,
___ �recipi�ati�:� . `�� o� --, �_ � �.
� � in Inches °��tl . �.y ' `�.� . �
,--�., .
_ .
� _ . .:.. : . : .`�' ° a°: .
�.-' . . . -- . � - .. -
, � •.
1998 SurFace Water Dcsign Manual 911/98
.�" I e� — Z.'�(� - � ,3-1� . . : . �
n �
3.2.1 RATIONAL METHOD
_ � FIGURE 3.2.1.D 100-YEAR 24-HOUR ISOPLWIALS
: �:��, - - - -
' `i ������ __' '� ��_� �� ' �� N 10 COIINTY
� ,'_.� .. . .: ;_ ...; q �� _�� � �� N GOUBTT
_� �
F t ' '� _
2 ' �w: �a t u�,` "f x ���t:�-_� �\
�c7� _ � �'j��'~,� '.;'s 7 y. �: '-�-% � .
Q _ ;S ;� � � . � � � ` � _
9 �:.� ' i l ,
t !!A f�g'�
�s �4 � � ;� �-d
3 � � f• � t
u�S , � . � i � � 7
3�8 �< << � � '`k � � �o (\
�x >Y YP_ , cy L "` �
4 _ - 'y t ? ` �,�� . \t
/? � y 0 P
IJ 4 " �3 +� S,_ 2. •�
g` ' { _ _ ' 4 "�.'�: . $i \
7 -• z,: � � :;
�� - � — / F F � � �� �..: t
�tS�r �_ ,{ � �E: ' � "���
i `` � ��r, •' ,[" �
" � . ' -- � �
: �p �• _ _.., a' �
F E l '
� �tz � : << t y
�. , � , j
s�� - r �� - r�. � . ��
1Ty x l
� y� ,dJ� � \ �i
; 1 _ " -� j „�` ' — -'r \
_ _�y;;> V ;
- � , - +_ i !
iS - ' - - _ _... _ i 4 �
' F _ ' - � _ _ [ _ i ��' ..r. J `� acwrr,4.'°,.Y 1 �
.
�u. ' .' = . : w.. . � .. F.a ,� ;;ir r.' 1� .
- i �, .t z ''� T�T� .
r �
� � � a � - . � ---�� i
� ��' �
3�'" t �5� ':� � - ;� _ I
�s
._ . ; r� Q � �
� 1 w:�: - y ' ��. �''a 9 ` ^J�` �� . • I�
l. � � �: }? ' ' `` � .
' . �� -� t ` t �i[ ' �! \\ .
� 'rin o E� )` 1 �
� �` � �`' �
- _ = i ` I
_ �
1 E ��.—� a
� �_,���s .
R �.. _ _ ! 1 � ^_4 •�Y •
"- _ — t �'�J < ' 8
, � ._ � . -c..,...� .,? ,. .
� � � � ��� �b ��c� � ��+ 5� � �
�a' � � ' � �_ � omrtrbs�ui n .f _
. . g ; R :. _ �. ��' �:_`t.�ir�-+�-. C:��`"'Yy�„ -: nr- � - . _ .. . . � �.
�l � y"� . c y�' � t7� �
i C� ._ '� _ L':..Lr 1 -.'� , ',
r�� � r � ,�
� `- (� `t .� ' ":i 1 ` il
_ � � � t�a�...rn.' f r�� y 3 . ;$� d�
` ! ;( /.r"� � - „ O
� ;: "_ �� ,� 1 � ` ,u�' �.. I
, - � �, i. i�/ �€ • . ���.
- �f I:s - � �-�` � � I�
�`��. _:+ v i -_ I ••
. . \ 0'�• �ca 1 S: II
. � i s- �`,e; ♦ �
1 = r> � . �
' '�}4n, �_—�rv. .;K�� 3 CDL111TY��. . . I
' P7E GE COU1iiY -
1NESTERN o� `� �� h;_�
� s.s
K[t�G_ C�U�TY. �. _ o ,� . .. �` �u. „ _ -- s.o- -
-.-- --- --- - -"-^ ---.._.,__._N ..- --------•- - - - - -�' -- ---� - - ---- ------- �------- --
�' ' r` 5.5
p�• �, f � �
•- � - - — -—. — -------- _ � �
_ ..,
100-Year 24-�ou.r ' �'� � � � .
AA� I�/f'�'lA ' . . . .. � � . �• � � / . ..
-_- . �1'��,��3i�aa�±uii -. �, � �---.�
� � - � 0 2�_ 4 Miles. ` h0 ' lr•�
"^� � in Iraches
. . : � : `. : h"
� y_ . y _
1998 Surface Water Desion Mannal . . � - 9l1198
. � ' . .� �3-17 .
� �
��
� ���
COUGHLINPORTERLUNDEEN Project Record I
To: Date:
Project: I,
Project No: �I
❑ Meeting Notes 'I
Attn: Participants: 'I
❑ Phone Conversation I
From: # '�
To: # ���
❑ Memo ❑ Site Visit ❑ Other BY�
S�p/ M�N-t _ C.o�T�-o� �,3f�-�4z �l�t�►�-�
_ _ _ _ _ __ _ _ _
_...... _ _ _ _ _ _ __ __ _ _ _ _
_ _. _ _ .... . ..._.. ..__ . _
— s . Ps . CfZ�Q'D� ' � Qt o ''` � • Z)_/ �SC D _ _
__._ _ _ _ _..... ._......._...__ __. _._....
_ _ _ _ __. . � uSEr> - O -�c�o��o �-t-�5e.,c. .__......__ __.. ......_.. _
• - O . 2a G�S _ _ _ . .
_ _
_ _ _ Q�o -_ _ _ _ __..___.. _
_. . ..._.. ._ __ .. ._.__ ... . ._. _. . .. __.. _ ___ �'
_ _ � S � f�_�_ _=_ Z 50 f+- Z _ _ _ _ _ �
_ . .. . . .. _ _
_ _ _ _ _ _
_- S��-i� �a c.�r1� = _S.Fti�"�s-r��-,E ff��cr,4t�� = zs�-� � �Z� _ Sz�o �Ff Z
�
_ _ _ _ _ __ _ _ __ _ _ _ _ ,
_. ___ _ __
_ __ _
_ _ _ __ _ _ _
_
= 37 �{ o c��r��Ns
_.._. _ __ _ __ _ __ _ _
__ _
_ _
, _ _ _ _ _ _ _
.-. lv 5 r _ _ or-��.__ (�so o c-, �-Lc,oN_. 1�o L`� t3 P�-k-�� z�N�
__. ..
_ ____ _ _ _.__ _ _ __ _._ _
_ _ _ __ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
_ __ ... _ ...__. ._ _ _ _ _ _ _ _ _ __ _ _ _ __ _ _ __ _ __ _ _ _ _ _ __
-__. ,
_ _ __ _ .. ... _ _ ___ _ _ __ _ _ _ _ _ _ _ ___ _ _ _ _ _ _ _ _ _ _ _ _ ,
_ _..._... ._. . _.._.._ .. .... _.. ... ...... .. . . .. . ....
� _ _.. . .. . ..__... .. .._ . ..... _ _.. ..._. ._ ... .. _. ___. __.... .._.. _ .. .___ ___.... .. ._ _._ _... __...____
_.. . _. . ......_.. _ _. _ _ _ _ _. .. _ __ _ __ ___ _ _ __ _ ___ __ _ _ _ _ _ __ __ __ _ _ _ _ _ __ _ __
.... . .. .._. ..... . _ _ _. _ _ _ __ _ __ _ _ _ _ _ _ _ _. __ _ _ _ _ _ _ _ _ _ _ __ __ ___ _ _ ___ _
...... .... ._....... ... ... .. ... _.... _.. _._... .. _. . __.. _.. _.. .. . .. __ __ . __.. . . ._.__..__. .... . . _ .. .. .. __
�i � . ...................... .............. ........ .... ......... .......... ... ... ............. .............. ........... ... ....... .............. . ......... .................... ..................... ............. ..................
.......... ......... ...... .... .................. ........ ................... ......................... ............. ...................... .. .. ................................. ............... .... ...... ..............................
� . ...................... .... ........ .. ........ . . .. ........ .. ... ........ .. .. .. ...._..... .... ... .. ............ . .._. ..... .. ...... .... .._ . ...... ... .. ._. ...... .. .. . ... .�. ...... .. ... .... . ..
❑ Copy To:
❑ Fax, Pages To:
I 413 PINE STREET • SUITE 300 • SEATTLE,WA 98101 • P:206/343-0460 • F:206l343-5691
APPENDIX B
Geotechnical Exploration
COUGHLIN PORTER LUNDEEN February 17,2006
� ' °o� Well-graded gravel and Terms Describing Relative Density and Consistency
LL '.�. Gw rave!with sand, Gttle to
Densi SPTmhlows/foot
0 0 9
m c 'o� no Gnes Coarse- Very Loose D to 4
� °7 �` Loose 4 l0 10
°' i° > �°o°o° Poorly-graded gravei Grained Soils
M�um De�se 1010 30
°' �u, '�o 0 0 0 o GP Test Symbals
and gravel with sand, Oense 30 l0 50
o � � °o'o� G =Grain Size
, , , litt(e to no fines Very Dens� >50
��" � °'�°° M=Moisture Content
Z ,� o , a�o Consistency SPT��blows/foot q=Al�erberg Limils
Silry grave{and silly
� � � . G� Very Sofl 0 l0 2 C=Chemical
o t � � grauet with sand Fine-
� „ _ �_ Sofl 2 fo 4 DD =Dry Density
c, m :° c Grained Soils ���um Sliff 4 l0 8 K =Permesbilily
C 0 d LL
� � � : s��� B to 15
� � � Clayey grave!and very S��H t5 to 30
_ � `" �� ctayey gravel with sand Hard >30
o R
,� � Camponent Defini�ions
L o Well-graded sand and DescriAtive Term Size Range and Sieve Number
m � gyy sand wifh gravel,(ittle Boulders Larger Ihan 12
` � to no fnes
o i; m : cobbres 3'�01 r
� �
, m u. :•:-:•::::
� • Grave! 3'to No.4(4.75 mm)
"—' � � ;':''-�'-' Poorly-graded sand Coarse Gravel 3'to 3/a•
� ci� W•'�'-='•'� sP and sand wilh gravel, Fine Grave! 3/4'�o No.4(4.75 mm)
m o � little lo na tnes
c m Sand No.4(4_75 mm)lo No.200(0.075 mm)
� �Z _ Coarse Sand No.4(4.75 mm)to No.10(2.OQ mm)
'" Silly sand and Med'iurn Sand Na 70(2.00 mm)to No.40(0.425 mm)
� o � „ � 5 M Sllly Sand wilh Fine 5and No_40(0.425 mm)lo No.200(0.075 mm)
v o�- LL ._- � gravel 5ilt and Clay SmaNer Ihan No.200{0.075 mm)
u�
� � � sc Clayey sand and �3�Estimated Percentage Moisture Content
� '`" • ciayey sand with gravel Percentaqe 6y Dry-Absence of mois�ure,
"� Component W�g� dusty,dry lo the touch
Silt,sandy silt,gravelly sill, Trace <5 SGghty Mast-Perceptble
m � ML silt wilh sand or gravel Few 510'!0 moisture
m � Lit11e 15 to 25 Moisl-Oamp bul no visd�le
Q �L Wilh -Non-primary coarse wrater
- o � Clay of 1ow to medium constituenls: > 15X Very Moist-Water visible but
`'� U � -Finps conten!belween not Iree draining '
o �� plasticity;silty,sandy,or
Z 'c° = CL grevelly Clay,lean day 5°6 and 15% Wet-VsPble(ree waler,usually
m � E trom below waler 1a61e
a �Q =— Organic clay or silt of low Symbo(s
� � _— o� plasticity Btows/5'or
� = Sampler portion of G Cemern grout
o = Type suriace seal
Elaslic silt,clayey silt,silt 2 o„� � Sample�Type
e wilh micaceous oc : � Oesaip6on Benlonle
o „ MH Spfit-Spoon , (�) seal
u� o diatomaceous fine sand or 5ampler 3.0•oo SpGt-Spoon Sampler _ -:���, a�,,,,;w
• v�� : P
a- �o silt (S� 3.25'OD SpGt-Spoon Ring Sampler �.� : -• blank casing
�, �o Clay of high plasGaty,
: sed'ion
d c� CH sancfy or graveUy ctay,fat Budc sample 3.a"OD Thin-Wa9 Tube 5ampler "�Sueened casing
� fO E clay with sand or gravel � (ncle�d'mg Shelby lube) �`«Hydrotp
` �"J Grab Sample :•with ilter pack
C� ��o
� Q �f;� Organic clay or silt of o Port;on nol recovered � E�`�P
'L J ;;�;;� aH medium to high �>> 4
i��i� Peraentage hy dry weight ��De lh of raund water
�i��r� plasticity � (SPT}Standard PenelrationTest p 9
(ASTM D-1586) 1 ATD=At lime of dr0fing
>.`—' Peat,muck and other r� y. Static water reve!{date)
c h In General Accordance wilh
Lo, Q,�o pt highly organic soils Standard Praclice for Descriplian �� Combined USCS symbols used for
z 0 and 1dz�tification of Sals(IISTM D-2488) �nes betwern 5%and 15%
Cfassifications of soiis in Ihis reporl are based on visual field and/or labo2tory obsenralians,which mdude densitykonsistency,mais[ure condilion,grain size,and
plaslicdy esGmales and should�ot be ccnslrved to impfy Celd or lahoratory lesl"a�g unless presenled herein.�sual-manual andlor laboralory classifiwlion
� mef;r.�7s of nSTM i7-248i and u-�4o8 were used as an ideniificaiion guide ior ine unified So�G'iassificalion System.
�
�
> Associated Ear�h Sciences, Inc. F,c��
0' � � � L�1 � ��'�n,,In�rafiQn �n� i�Ca�
= .�.... . . .ra�. ■. ..� . ..L n
.� l-1,��
s
a `
��� .
��
;�� ,, . �_, ,... . t„�� �i
-1 y - .. ... , �
,�
2
F:. .��.,� ��. , _ .' '.'+�. ��:'1..1 >�:�,�{� :� .:' .,' r k _ ,.�' u��_�:�:f '.'aq! � j �� �'i , � -wt JE�
� 1.,^'w. , � ' �, ", ,1 �' .... w �.. .1 �•r 4�i X'i.- - .. i t l�lE la� ;.n.� >6 >. -
,,� :.. . _ �, �.�:..:.:x�;7r ��r :� � s� �'1 �:,� r� �'� ��� .'��f
� . .., .. . : ti :+z:1tE blll .. �.,.�:,�L� �c::ti, �.,�,�, � , � �:o' _�ITN $� ��� ' E.��1 s' '� r *v
n" f
� �i..� . ._: ..� � � �� .��,(�. ��� ...' ��'c 4V�'�` � ..,.p+ /[��N '^'.:n� .'++�I� y {.ry ��,0,+.. �_�•'' .S(�r
` d .:. ' ,.,;,�
.�' h , ,. �lGT�` . �G .. �+.. r 1, �tl�....r _�P..._tIE OTt� T1i r,$T ,,x�.,��' "v '- r�',;
1 ..: .. � . . ... . � '�{rr .... _ 1._,« i~ �..._ . ..rt�. 4 .. `:� � _� a
.. ..,.. . : �.
�... . ;�y :: : 3� !."(,y �y �. �•�;, � �.l� ,,�H �.Q�� .sLti� �i�.: �S� .o. :� r!E c„ '
_ w � :
;... _� 4 r., . _� �, fra��6 � µ ,�� — � �i ;� �.; �
� .. 4 . u a•'"y � _
4 "L1� �
TS#- � ,�nC+ � FT �� y`�� � :." 1+ Q :�i y,! Ct r V- I�
, . �,,,� s,ry., , „ K'`�, � !F« Q� �' , ,n, �; i �5 ,� - r�E�� , � -T'�•� 'aq �
�,�.�,.,�.��-,..w.,-�.»u�,�, ..v .;.., ,r,,, ,n .,� ,,,1 ..... s. ,.�._ ,,a�; , , _.x ;� �� �'� el ����a .i �
y, , . , ..
, ,x ..,....� �,i _ ��� r� ,,,
�r;..,;.,�:: �. . . ... . ::� r .!'^�lil� �'r�il �i� '
.
��,: , ,. .... _;��.t�F sr��rr �' ,..,.�c �,ti: i�;I�k �; NE GTtt� �,,,rPL �f K; w �, 1 ��
- �.. �.cv�� _ �.+��. 4v.. ,_��` �� �� :����: (,.�. �" � _ �. �� _ ,1,,ELN1�
r ..• . .. ,, -�p. Cn : t.. . :. AC ,,,'[�;`�Ui hn il��wr?. ,�•c ,r�, x.'ST� ��r,�y� !�+
.. . . �..t, ..v ., ; ''�Rf r :£- — �}
� . , �
;
. . , �,.�, � 1'�—.-�--- r_�_,__
{... .. : ..... . . �. �,-� � ,�ItlH)� .. : ; '� `"`a�4`'.�: s�� � ��� ��^ �' �F snit. .��' �,�� �' ��" ,r ._� :� �� �
,- � f
�
��. s, c t; _ �v � � =f a,5111Z .,!
, —.�
, .. , , �� �,,
. 3. .��1^ . �.. ..� G,.Lt','I �,y� T` �F��:,:�_,
�. ;.. ... . " .��� . :: .' .�� �..�:,YI.����1�:� ' �W s� �1�'„'J ��E OI' )� ' � . /� Y'�,�'i I
. . .. .. . �- , -. .. -A, � �., v
j. �._ ... ...• .,' . .,'� �,,: '," ..'.� �4' _V;,'�'+v� ^�. ''+rr� ����.. -:�� ,�,i ��p.��.: �1�f�N�' ..+'�n�cila��l�a" _�S` l:i.., . ����,�F��_I 'i.-,.��Ir �7i�a
, . . �.0 ��IBrtiA�Q` '� ��: ^ � 1� ��rS sr4�i-1J ��at�
.. . .. ..
. ,,/ ; �»� "`IK� � .fW� _ .?•'�'�ST�� `> _..' - _ i
� 1
,:. . ,
. _ f :B .:.r'. , ,.-�,,. NE - a9 � �l+ �i�.r' i, lV'C - .c>, y
. ..
�� ,r ,
, . �p�tio`'. �� r> s� . •:fj, � �� . .,ry �� "x 5ni ��:�=r� Nf�,�; �y}:
:. +
. ...
� ECW�ND i H � -�
� 4 ,�'� ..�1✓��a4 '�tT t,f �, .�'I ��tit' �� n ~� ,� W L.._I d14S1�''4 �r
_ . �
� ' ( ~T��f �� Y �i
.. � , f + �r ,... � n� '
� . . . . �... . . . ([
` . . . - � . . . ' .� . . 1�. ^ly .. ..:� . _ .. ... '.:�, .�- � . V" .��.
.: p' P �.� �A.IIttS . ', �`��l1 �y %.�i � T'rs,•� ,�� .' J Y
..
�. . . . . .' . .�.+ ..� / �l� Si'� �a: - ;��� . �.�����,�t>>r�ti��� � � :►s�TrI�C]R . . .�� ���� :�:e��
. . a.. .,..;� �......g, r�t'�'.: ..c!') �� ������ ��� �+� ....S � . ,,co � -.. . vf l•.ur�ta: �.-ex � � r
�.. � • � { WLFA � JVI111150R^`i. ' �I , l�r,,. eL� , w �(���. h1 Fl :�, ,.,ti�'t��
�.� ..;_- _..-m" �T � n,' �1 PERft41iE,:;' t{E:;y� .t� •. TfCNbPtAC wy �,` _,�VJ.-t �:c . } �tr
� ,
1 : �� � ,� �tft�.s � �.( �� - �. ►� � z ���
Ei� ' � ..5T 4, 4 �� r"�.../'f'�X+}4 ff� � �rx cr ,__ N E :4TH ��� ;;���?..:4.G� �� ��f�Y��,
�" ,��j ��� 1 ���J �' � ,. ..I � � � ��";i
..�.
,+ F �
� ,
. �� 1 ,�;a i �'o X r:' � I � l� �� i{'�:yY!
�
` ,�,�Ata�5, T ;! .� ) m l.% w � � GREENWOO,D � � �,,„ ,,�
f � ` � �r- �u; �r,
I a J t�.o �' d �:I ...,.+• .. . v `_.. (.... �t,,��, v�i �,rt�
��ST��,� r �� �jl {� . . � ��_S�� _..j a t f�lE�(ORIRL ;`T� ,PIE 3RU �T Jo � ��.
3.._._�.�",':�'_'�, I " �, :.�� � p� � ,� : I� � �r�y
� , ,
a.s �v { `` v, P/�4'K b`o �.uu'-�. �
�� ��srS+��y � \v� ; �� . .� ' �� N�N �.., ��Ir� �FZND 4L . � `�rL—, �p��,
y,
�
�
:�� �� � � .� < <,; �.._...... ���
�'h�� `'�+ `' "oi* , ,+ �'- 1_ 1�� � �2Wll .__.�S.�.,,..�. ..:�( . ,�,'�.E :3 r,> "��isr—�; ��"
��juu{ _ � i ��� .,. ' •° ' ,.. . �?..IID_ST � S� -- ----------- ��e�t;.
1�'• � `� !
'l�y� I11� J� I V {y � .I ! '��I ~ '!
��4�i�- ��4'Y �i � 1j �• f � , � � �
Ey��ri 1 1 ��i ��D ��`�f D/� ���-..?c����'�~F � , CTH ! '�f..����:' �I ��;� �'i ��i �' N i 3�'i�1i
� �_ t
' �`+f�,.� ui� �w ',, } � �... 4� �� t' � �.._..f � j t� tSt' �;'�,x'�Dl i �.? � �.
y 3 � r.,l� I r�'1 r..,,,..__ .,�' � �1 f�',�
tr � � { ,
I�'�n/ �� s w j i� r 13�� � �p ` %jsl ��� Lt'ISL4i'ti � f � �.�y:':� �^i� �Y�'�-' a�r- � ' ;-' `�� rf ,
7 ' k j �• f � { �:�'i
����� ,';3� w :�i� � f �tC��lh'T - ' ,% > ,, ��" j,.,.,.,,�.,., �.,_„j aC I�i r�L '"' �;Ir _ ti �` 4���
7fc' ' ' i i�`. ��--� :� 1?LIl'fT �' ,f. �' . tSTA7F5 � � i � � 'a'2 �t , � � si
�y�7'�� ' ti � •t r, �p n'' �'.�`�`:�,"nn I `• �5E�1ST PL t�,r �, '1 135TH ' �'� I� Sl��t�i,
��; ' , !.'EQiIIC r;,�'' ;b�' C.NFi1�R)' !t"���.�oti % 4 �" ht�.M '��-�, ,_...,.:i A`i._.�' ,`�. `�t" • $7 ^' �S� `=' w�;�
' ti /� � � ' � � ' �� �•-. � _ `
��,, (c y
' ,` It.,4'' JL �I'IV 4 �� ,f• " \J�� . � � = 4 1�" ,i 1 ~� ~' Y �
�� �'a�ra�ER. � � �, �` �C �~�';=y��,; �.I :��,� .,..� 5E ! 2WD.��� PL ySE. �
i !�� �/!. , �tY'� +''c Nn Gt;'`�I ' 1"G�t3 ` r �.....�. :. t�- . _ . � ._.._._� 'n
7 �f � �-�^-^�-_—.•`......_ SE
� � , y' ,,�SE��,�._ � ;� ._ �,!;� •F. ? :�sT�, , i1{I<
�1 '� .._,- � ,�� � Jr4�c �,' � �IN '�f . S� ' � � . . �� •� , r t ��`.' ,`�~j� :�R�j :..v Qr.. ..�'�.'. %'.p` 1 } .
�a� �.� � -1__. �` ' �'�L�` , ''`;� _ ..�-_.,.. .o' v� ,`�aF-. '` S �,'1"� �4 J �i�ti
�'�i` ' '' ,�Q i r:,. %�< ► ^ ' .-,� ,ot1 � .n� � .i r,�
!j�� .,i i.'� i � � 3F .��C� �� S$E,�?.GIi 5r G1'�•�� . . . � .1<P%lifiNlL.: � �`i ' � J��� .' . 1., '�+� � �r
� �� ��,' r ..� �a �' SE_.�. "�� •r7. i �:
�d( ~'"�trt'� � F �r il/� ��' "''�� �'k"�. �LS'� �J `(`x ti •� 1 - p�1•f.,' �'� ;7�i
���Ir' i `��,'. � � �I .�,; `m �S<�4i�Si.�iiy � � � 1 '; ''��, �''�.-1...a ' . � '���' � (?�,,,•� p:,'i ��;.
D,� II . yy' �� . . J `, . � �, ,..`- �� ? t SE 41't'` fi �(
C{II�, :� !�� �I �,, . . . � � . _ � q • t�_��. • � ^ �\�, `�
:i � �'.
5}��r; ' � � , • $E _.�.�..._STf� . — -•.L,.•.'"'.. � �ti — at ^f �a��a
;
� � , ,.
: i �y � . ��� � —z-S�, ^' .�._..�»�--.....�...._..�..�._.....�..�..1r V l ���i
SE �'
'
`�$ � ,�'� I ? � T"���rf�, �1•D�k h ✓" �BTjf. ✓` '1Ntlt'�fn'L1.�7 �������� jl ��f���itry�� �y.L.
" .`,,;i . i r';' f , , -: ti. � � „. ' ,T ��S + 'A/LIA:.: � ,���iii.��yIn��'l�,'l� ��''ly I���';t 19
. ,. ;.. ,.�,p,, ;, i,. ��'�+"�:t. f ul� � i 1�11 d i,_�'i�
� ���1 �r r�� �"r qf�'i i �I �.:i:i i� ~�4,�� �: rv, _ '-,-'-. -_.,.� �fP � ��,��,(�R�l����...i ',^ a 1�:�'u. :.``� . �.j ,'1,°j f�yy�4 . "� .'��yPl:lili�P I i��i�i�ii�i �5��r�!�� N
m'�� � �,'i �,. w„! ryl �l +�. !I��� �'li� ;i 4 � ��,. , ,,,�!'�1`r�`+�'fi q','ti' �.'; '�' � )�d'��C 'k7�,'r., .'rf,.;.. : '�''.'. '.a h�i i;q��i a i r��j�,�lll i il��ly p,�fd,r
� �. . ..l�..ni i in.M13.!}�,. 1 1 ,..�1,�_A I ry;.�!��. t�+Jw.�s .rt.4Y ., �.,.. .,._.��„Mi�'��r4µ.Y:�?;':Yn,.i .� �irf�.t;h��� �� ��,. ,.�,i` �r,R,�:.. ,_ �',f.r..-..�: �0...,�i'���.!,,,V.Sr .:� .i I ���� I I �.i,��
E �p ka��°��N! '�,+�fdy'�'�tW,o,��,n�ri,��i���' ^�,°,,.J`'1!�3u�?,M' ,; ' r , �,�, � � w ^t� ��'+ �kT�: M I,' i i i �r_.
y , ,�
o� '.�,�1��1�'���m�iYi�`��kkE1l���a!�'�1��(�'na����'a}��t���������� , *� .. ,. � :����,`^����'k�7ai;�� . ���t�� m'y� �y�';�'9�4 i�� l r�� „1 r _'1 .��+
�....e.. . .iu i sr� r �.d,�� . ,s . '�i5�7 eiL'�„'r.k�MYv idt ,�,� ... ,fi3 .,
�
m
� NO SCALE
��--s y FIGURE 1
� Asaoociated Earth Sciences, Inc. VICINITY MAP
a
� �� � f� � � PROPOSED MAI REN ON,WASHINGl'ON OOM BUILDING DATE 90/05
N � PROJ.NO. KE05606A
0�����
Proposed Maintenance/Classroom Building (Ba�ilding N) Subsurface Exploration, Geologic Hazards,
Renton Teclinical College m:d Preliminmy Geotechnical Engi�:eering Report
Renton, Washington Preliminary Design ReconUnendations
If footings are placed on suitable advance outwash sediments and then backfilled, the top of the
compacted backfill must be horizontal and extend outward from the footing for a minimum
lateral distance equal to three times the height of the backfill before tapering down to grade.
With backfill placed as discussed, footings may be designed for passive resistance against
lateral translation using an equivalent fluid equal to 250 pcf and the truncated pressure diagram
discussed above. Passive resistance values include a factor of safety equal to 3 in order to
reduce the amount of movement necessary to generate passive resistance.
The friction coef�cient for footings cast directly on undisturbed, dense outwash sediments or
structural fill may be taken as 0.35. This value includes a safety factor of at least 1.5.
14.0 FLOOR SUPPORT
The slab-on-grade floor may be founded on structural fill or unweathered outwash sediments.
The floor should be cast atop a minimum of 4 inches of washed pea gravel to act as a capillary
break. It should also be protected from dampness by a minunum 10-mil-thick vapor retarder ,
membrane.
15.0 DRAINAGE CONSIDER.ATIONS '
All retaining and perimeter footing walls should be provided with a drain at the footing '
elevation. Drains should consist of minimum, 6-inch-diameter, rigid, perforated, polyvinyl
chloride (PVC) pipe surrounded by washed pea gravel. The level of the perforations in the
pipe should be at least 12 inches below the bottom of the floor slab, and the drains should be
constructed with sufficient gradient to allow gravity discharge away from the building.
Footing drains should be provided with cleanouts to allow periodic future ,
cleaning/maintenance. � '�,
All retaining walls should be lined with a minimum, 12-inch-thick, washed gravel blanket to �
within 1 foot of the top of the wall and which ties into the footing drain. Less permeable on-
site soil may be used as a cap over the gravel. Filter fabric should be placed over the gravel
prior to soil cap placement to reduce the potential for migration of fines into the wall drain.
Roof and surface runoff should not discharge into the footing drain system, but should be
handled by a separate, rigid, tightline drain. In pianning, exterior grades adjacent to walls
should be sloped downward away from the strncture (minunum 2 percent slope) to achieve
surface drainage. �
^�tohe;1�, 2'�'�JS ASS�CI.4TED�d.ATI�7 SCfET,'CE� L':'�.
MT/!d-K605606A2-Projecfs120056061KE1WP Page 21
Proposed Mainte�uuzce/Classroom Building (Bccilding 1� Subsccrface Explor•atior:, Geologic Hazards,
Re�iton Tecl:nical College and Prelinii�tary Geotech�:ical Engi�ieeririg Repon
Reriton, Washington Preliminary Desig�t Recolru�tendntions
amount of fine-graiiied material limited to 5 percent by weight when measured on the minus
No. 4 sieve fraction with at least 25 percent retained on the No. 4 sieve.
An AESI representative should inspect the stripped subgrade and be present during placement
of structural fill to observe the work and perform a representative number of in-place density
tests. In this way, the adequacy of the earthwork may be evaluated as filling progresses and
any problem areas may be corrected at that time. It is important to understand that taking
random compaction tests on a part-time basis will not assure unifomuty or acceptable
performance of a fill. As such, we are available to aid the owner in developing a suitable
monitoring and testing frequency.
12.0 FOLTNDATIONS
Spread footings may be used for building support when founded direcdy on suitable outwash
soil or on structural fill placed as previously discussed. Footings founded an suitable outwash
sand or on structural fill above the outwash sand may be designed for an allowable foundation
soil bearing pressure of 2,500 pounds per square foot (ps fl, including both dead and live loads.
An increase of one-third may be used for short-term wind or seismic loading. Based on the
anticipated dense condition of the granular soils at the base of the excavation along the east
perimeter of the proposed structure, a higher allowable bearing capacity of 6,000 psf may be
used in design of the footing for the eastern retaining wall. All foundations must penetrate to
� the prescribed bearing stratum and no foundations should be constructed in or above loose,
organic, or existing fill soils. In addition, all footings must have a minimum width of 18
inches.
Perirneter footings should be buried at least 18 inches below lowest adjacent grade for frost
protection; interior footings require only 12 inches buriaL
Considering the granular nature of the site soils, settlements are expected ta be small and occur
rapidly during the initial application of dead load. Anticipated settlement of footings founded
as described above should be on the order of �Y4 inch with differential movement about half of
that total. However, disturbed soil not removed from footing excavations prior to footing
placement could result in increased settlements. Installation of settlement-sensitive surfaces
should be delayed as long as practical. A1T footing areas should be inspected by AESI prior to
placing concrete to verify that the design bearing capacity of the soils has been attained and
that construction conforms to the recommendations contained in this report. The City of
Renton rnay require such inspections. F�iim�t�r foGting drains shauld he pravided, a� �
discussed under the secrion on Drainage Considerations. �
that the area bounded b lines extendin downward at 1H:1V from an
It should be noted y g y ,
footing niust not intersect another foodng or intersect a filled area that has not been compacted i�
ASSOCIAT'ED EARTH SCIENCES INC. I
pct�her 1�, 2005 .
tirrne-xEos6osAz-pro;e�rsiaoos6oeucEiwP Page 19
Proposed Maintena�:ce/Classroom Building (Building 1� Subsurface Exploration, Geologic Hnzards,
Renton Technical College mid Prelilninary Geotechnical Engineerilig Report
Renton, Washington Prelimina�y Design Reconunendations
below the level of excavation, the 60 pcf may be considered to act only over the diameter of
the grouted soldier pile section. The use of active pressure for the shoring system assumes
sufficient deformation if the soil occurs to develop an active condition-- typically on the order
of 0.001 to 0.002 times the height of the excavation. Any settlement-sensitive structures
should be set back a minimum horizontal distance equal to the shoring wall height so that wall
deflectionslsoil movement do not impact adjacent foundations.
A combination of temporary 1.SH:1V slopes and shoring may be utilized to reduce the overall
height of shoring. Once the shoring/slope configuration is developed, AESI should be
consulted to review the design pazameters, as necessary.
10.2 Shoring Wall Passive Earth Pressure
The soldier piles must be located a sufficient depth below the base of the excavation to provide
adequate lateral resistance to horizontal loads. The lateral resistance may be computed on the
basis of passive pressure in the form of an equivalent fluid equal to 300 pcf. The upper 2 feet
of passive soil resistance should be ignored due to disturbance. This pressure may be
considered to be acting against twice the diameter of the grouted soldier pile section. Piles
should extend at least 10 feet below the excavation level.
,
10.3 Shoring Inspections
Shoring installation should be observed by a representative of AESI to verify that subsurface
conditions are as anticipated and that the shoring elements are installed in conformance with
the shoring plan. Inspections should include pile installation, excavation and lagging
placement, lagging backfill, and drainage. Survey monitoring of the piling and adjacent
structures may also be required.
10.4 Tiebacks
Tieback anchors may be used to aid in resisting lateral loading on the shoring system. A
tieback system consists of drilling behind the soldier pile wall at an angle to the horizontal and
installing rods or cables with a grout anchor. The anchor loads are transmitted to the
surrounding soil by side friction or adhesion with the soil. If requested, recommendations for
design and testing of tieback anchors can be provided.
11.0 STRUCTURAL FILL
Structural fill will be necessary for wa11 backfill, utitity backfill, and beneath hardscape. All
refereiices to structural fill in this report refer to subgrade preparation, fill type, placement,
uctober i u, Zvu.S ASSOCIATED EARiri SCiBNCES, IivC.
MT/!d-KE05605A2-Projeccs110056061KE1WP P1ge 17
Proposed Mairite�iance/Classroom Buildiltg (&uildi�tg N) Subsurface Exploration, Geologic Hazards,
Renton Technical College cmd Prelimuiary Geotechnical Engineering Report
Renton, Washirigton Preli�ninary Design Recommendatio�u
closer than 5 feet from existing structures such as light poles/hardscape to remain. To reduce
the potential for loose, unstable zones on the cut face, we recommend that the surface be
recompacted using a backhoe-mounted plate compactor ("hoepac") as the excavation proceeds.
Compaction should be performed under the observation of a representative of AESI. As is
typical with earthwork operations, some sloughing and raveling may occur and cut slope
gradient may have to be adjusted in the field. In addition, WISHA/OSHA regulations should
be followed at all times.
Where space limitations result in temporary cuts steeper or higher than recommended herein,
shoring will be require�. The actual location and configuration of the temporary cut will
factor into determination of how much and where shoring will be required. Recommendations
are presented in the Shoring - Soldier Pile Walls section of this report.
9.2 Erosion/Piping Protection for Temporary Cuts
Cuts in sandy advance outwash sediments may be prone to localized erosion due to seepage if
encountered. During earthwork, areas determined by the project geotechnical engineer or
geologist to be potentially unstable due to seepage/erosion may require removal of the
unstable/saturated soil and placement of a stabilizing rock blanket. If necessary, a rock blanket
would typically consist of a minimum, 2-foot-thick prism of 2- to 4-inch-sized crushed quarry
rock embedded in the seepage zone. A layer of filter fabric (Mirafi 140N, or equivalent)
- should be provided between the rock and the subgrade soil to prevent the migration of fines
. through the rock. The requirement for and extent of rock protection for seepage zones can be
determined in the field during site earthwork as seepage areas are exposed. In general, late,
dry season construction is anticipated to minimize the seepage quantities and the requirements
for erosion/piping protection.
9.3 Site Disturbance
A portion of the on-site soils contains a high percentage of fine-grained material, which makes
them moisture-sensitive and subject to disturbance when wet. The contractor must use care
during site prepararion and excavation operations so that the underlying soils are not softened.
If disturbance occurs, the softened soils should be removed and the area brought to grade with
structural fill. Consideration should be given to protecting any unpaved access and staging
areas with an apprapriate section of crushed rock or asphalt treated base (ATB).
If crushed rock is used for the access and staging areas, it should be underlain by engineering
stabilization fabric to reduce the potential of fine-grained materials pumping up through the
rock and turning the area to mud. The fabric will also aid in supporting construction
equigme��, thus red�lcing �e asne���t �f crushed r�ck re1»sed. YY P FP.���,17e��t rt,?t at least 1�?
inches of. rock be placed over the fabric; however, due to the variable nature of the near-
n�tQHQr��, ?nng A.c.cn��a���EAR_�H sG1ENCES, IN�_
MT/!d-KE05606A2-Projects12005606IK61WP Page 15
Proposed Maintenance/Classroom Biuldiiig (Building 11� Subsurface Exploration, Geologic Hazards, ,
Renton Technical College and Preliminary Geotechrucal Engineeri�ig Report
Rentan, Washington Geologic Hazards and Mitigations
S. At the end of each workday, disturbed areas should be sloped to drain into a storm
conveyance and seal-rolled to promote surface drainage.
9. A temporary, rock-surfaced construction entrance and staging areas should be
established early in the project sequence. ,
10. All storm water from impermeable surfaces, including driveways and roofs, should be �I
tightlined into approved facilities and not directed onto or above steeply sloping areas. I
11. As much of the natural vegetation on the slopes as is possible should be left intact
during construction. Sloping areas without sufficient vegetation and areas stripped of
vegetation during construction should be planted as soon as possible or otherwise
protected.
12. Erosion control measures should be inspected regularly and maintained/improved as
necessary to maintain function.
13. The surface of the slopes to remain adjacent to the proposed building and associated
hardscape should be scarified, moisture-conditioned as necessary, and compacted. The
resulting slope gradient should be as uniform as possible and should match that of the
surrounding areas.
14. Regular pest control services should be employed to maintain the site free of burrowing
rodents.
Associated Earth Sciences, Inc. (AESI) would be available to provide site-specific
recommendations upon request. We recommend that an erosion control inspector or the
geotechnical engineer make on-site inspections as needed to monitor performance of the
erosion control system. In this way, site-specific recommendations, modifications, and
construction sequencing decisions can be made during the construction phase.
October 10, 2005 ASSOCIATED EARTH SCIENCES,INC.
narae-xEossnr�na-r�o�e�,siaoosso6iKEiwP Page 13
Proposed Maintericuzce/Classroom Building (Building 11� Subsurface Exploratian, Geologic Hazm ds,
Renton Technical College cutd Preliminary Geoteclinical Engilleering Report
Renton, Washington Geologic Hazards c�nd Mitigatio�u
The second type is termed Debris Slump or Debris Flow and usually involves the upper few
feet of the regolith. This rype of slide is very dependent on local drainage patterns and the
resulting moisture content of the soils.
Based on the site stratigraphy and visual geologic reconnaissance, the slope areas appear to be
more susceptible to a shallow debris flow due to the presence of the medium dense outwash
soil encountered below the surficially disturbed fi11/topsoil horizon. A slope stability analysis
was beyond the scope of this study, and therefore the stability risks cannot be quantified by this
study. However, it is our opinion, based on previous similar studies and similar slope and soil
types, that the seismic and static factors of safety would lie within generally accepted limits
and that the deep-seated landslide risks on the site are low under both static and seismic
conditions. The proposed development should not increase the risk of deep-seated movements
provided the recommendations presented in this report are followed.
As discussed earlier in this report, proposed development will eliminate the existing slope
within the building area and will eliminate the potential risk of landslides affecting the
proposed structure. Slopes will remain north and south of the proposed structure and adjacent
to pedestrian walkways. Based o� observed evidence of weathering and disturbance due to
burrowing rodents, it is our opinion that shallow movement on the slope areas to remain north
and south of the proposed structure presents a low risk under current site conditions. Since
local drainage, slope steepness, slope height, and vegetation cover largely influence the
shallow stability and soil erosion, the planned development will require specific mitigation
measures to avoid increasing the shallow earth movement risk. These mitigations include
controlling runoff, establishing vegetation cover, and following the recommendations as
outlined in this report. In our opinion, by following these recommendations, the. risk of
shallow eazth movement on the site or on surrounding properties will not be increased by the
proposed construcdon.
7.0 EROSION HAZARDS AND MITIGATION '
As defined by the City of Renton, "Erosian hazard areas are ident�;fied by the presence of �I
vegetative cover, soil texture, slope, and rainfall patterns, or human-induced changes to such �'
characteristics which create site conditions which are vulnerable to erosion. Erosion hazard
areas are classified as having moderate to severe, severe, or very severe erosion potential by
the Soil Conservation Service, United States Department of Agriculture (USDA). "
Soils in the vicinii�,� of the project are mapped by the USDA as Alderwood gravelly sandy loasn '�
on slopes of 6 to 15 percent. Site-specific information from our explorations is in general I�
agreement with the USDA mapping. Some.areas of Alderwood soils on slopes of 15 to 30
percent may be encountered, but are not mappable at the USDA map scale. Surface runoff and
erosion hazards soil characteristics of these soil types are presented in Table 4.
October 10, 2005 ASSOCIATED EARTH SCIENCES,INC. II
MTIId-KE05606AZ-Projectsl?0056061KEIWP Page 11 �I
.Proposed Mainte12m1ce/Classroonz Building (Buildirig NJ Slibsttrface Exploratio�2,.Geologic Hazards,
Renton Technical College and Preliminmy Geotechnical Engirteering Repor7
Renton, Washington Geologic Hazards and Mitigations
II. GEOLOGIC HAZARDS AIVD MITIGATIONS
The following discussion of potential geologic hazards is based on the geolog-ic, slope, and
ground water conditions as observed and discussed herein. The discussion will be limited to
seismic, landslide or mass wasting, and erosion, including sediment transport.
5.0 SEISMIC HAZARDS AND RECOMMENDED MITIGATION
Earthquakes occur in the Puget Lowland with great regularity. The vast majority of these I�
events are small and are usually not felt by people. However, large earthquakes do occur as
evidenced by tUe 1949, 7.2-magnitude event; the 1965, 6.5-magnitude event; and the 2001 6.9- ',
magnitude event. The 1949 earthquake appears to have been the largest in this area during
recorded history. Evaluation of earthquake return rates indicates that an earthquake of the '
magnitude between 5.5 and 6.0 is likely within a given approximate 20-year period.
Generally, there are four types of potential geologic hazards associated with large seisrnic
events: 1) surficial ground rupture; 2) liquefaction; 3) ground motion; and 4) seismically
induced landslides. The potential for each of these hazards to adversely impact the proposed ',I
project is discussed below. I
5.1 Surficial Ground Rupture
Generally, the largest earthquakes that have occurred in the Puget Sound area are sub-crustal
events with epicenters ranging from 50 to 70 kilometers in depth. For this reason, no surficial
faulting or earth rupture as a result of seismic activity has been documented to date within at
least 5 miles of the site. Therefore, it is our opinion, based on existing geologic data, that the
risk of surface rupture impacting the proposed project is low, and no mitigations are necessary.
5.2 Liquefaction
Liquefaction is a process through which unconsolidated soil loses strength as a result of
vibratory shaking, such as that which occurs during a seismic event. During normal
conditions, the weight of the soil is supported by both grain-to-grain contacts and by the
pressure within the pore spaces of the soil below the water table, Extrerne vibratory shaking
can disrupt the grain-to-grain contact, increase the pore pressure, and result in a decrease in
soil shear strength. The soil is said to be liquefied when nearly all of the weight of the soil is
supported by pore pressure alone. Liquefaction can result in deforrnation of the sediment and
sPttlemPnt ^f OVCI�y1L�b St!'»Ctures. ArP�s IrlO�t �»c�prl�?�� i0 �lz»Pfa,t�nr� Lnrl�iciP �1�Se 3IPac
underlain by coarse silt and sand with low relative densities accompanied by a shallow water
table.
Qcr��or 1(1 ?nns �_ccn��,��ED�AItTN_�S�IE_NCE�s,�r_r.,
MT/Id-KEOS60bA?-ProjecrsL005606tKElWP Page 9
Proposed Maintenance/Classroom Building (Buildi�tg 1� Subsurface Fxploration, Geologic Hazaf'ds,
Renton Technical College and Prelimi�2ary Geotechnical Engineering Repon
Renton, Washington Project and Site Conditions
ground surface. Where encountered during our exploration, the Vashon recessional outwash
sediments extended to depths in excess of the maximum depth explored.
4.2 Hydrology
No ground water/seepage was encountered in our explorations. It should be noted that
fluctuations in the level of the ground water may occur due to the time of the yeaz, variations
in rainfall, irrigation, on- and off-site land usage, and other factors.
4.3 Site Infiltration
The Ecology Manual defines three methods for determi.ning long-term infiltration rate. The
methods are identified in the following paragraphs and results, as related to the project site, are
presented.
Method 1
The results of grain size analyses conducted on soil samples obtained from IP-1 excavated in
the vicinity of the proposed storm water facility indicate a silt content ranging between O.b and
4.7 percent. Using the United States Depart�nent of Agriculture (USDA) Textural Triangle
presented as Figure 7.1 in the Ecology Manual, the texture of the samples tested is determined
to be sand. Using this texture classification in conjunction with Table 7.1 in the Ecology
Manual, an estimated long-term (design) infiltration rate of 2 inches per hour, which includes a
correction factor (C� of 4, is considered appropriate for site soils.
Method 2
The second method, Method 2, presented in the Ecology Manual, allows estimation of long-
term (design) infiltration rate directly from soil gradation data. This method requires a
determination of the effecti�e size of the grains comprising the soil. The effective size (D�o) is
defined as the size corresponding to 1Q percent on the grain size curve. The effective size of
soil within samples obtained from the site ranges from approximately 0.15 millimeter (mm)
(IP-1 at 7 to 10 feet) to 0.25 mm (IP-1 at 5 to 7 feet). Using the effective size determined for
samples tested and Table 7.2 presented in the Ecology Manual, the corresponding estimated
long-term (design) infiltration rate for site soil ranges from 2 to 3.5 inches per hour.
Method 3 ,
As described in Section 3.3 Infaltration 7'esting, a PIT was conducted in general conformance
wi�h MPthn�l � YrPc�r�tPrl in thP F�nlna Maniial, T�iP r@ci�ltc nf thP tPgt iPrli��tPri a�
infiltrarion rate of 14.6 inches per hour.
Qr�nhar jn� 2!?OS A.S.SQGIA_T�n_F.ARTF7 S'l.'IF1V(.'_F.s j]Vf;
MT/ld-KE056�6A1-Pinfeust20056061KEIWP PSge 7
Proposed Maintena�:ce/Classroom Building (Building N) Subsurface�Yploration, Geologic Hazards,
Renton Technical College and Preliminary Geotechnical Enginee�ing Report
Reraon, Washington Project cuid Site Co�tditio�zs
recovered from the exploration were transported to our laboratory for further visual
classification and testing, as necessary.
AlI infiltration test data was recorded by hand in the field and subsequently transferred to an
electronic spreadsheet to allow more accurate and consistent infiltration rate calculations. The
infiltration testing results are summarized below in Table 1.
The infiltration rate measured during the constant head test was equal to or slightly greater
than the rate measured during the falling head test. This is typical and is reflective of the
decreasing head in the pit below that maintained during the constant head test.
Table 1
Summary of Infiltration Testing Results
Infiltration Rate
Constant Head Test Falling Head Test
Test No. �����1> ����n�
IP-1 14.6 12
�'� in/hr = inches per hour
3.4 Laboratory Testing
In order to provide a preliminary infiltration rate estimate based on published correlation to
sflil grain size, samples were submitted for mechanical grain size analysis testing in accordance
with ASTM:D 1140. A sumtnary of preliminary testing results is provided below in Table 2.
Table 2
Summary of Laboratory Testing Results
Percent Silt
Infiltration Pit Sample Depth (°k passing
No. (feet) Soil Type No. 200 sieve)
IP-1 0 - 5 SAND, trace silt 2.9
IP-1 5 - 7 SAND, trace siIt 2.8
IP-1 7 - 10 SAND, trace silt 4.3
October 10, 2005 ASSOCIATED EARTH SCIENCES,INC. i
MT/!d-KE05606A1-Projeus120056061KE1WP Page 5
Proposed Maintenmice/Classroom Building (Building 11� Subsurface Exploralion, Geologic Hazards,
Re�itan Technical College and Preliminary Geotechnical Engineering Reporl
Renton, Washington Project and Site Conditions
3.0 SUBSURFACE EXPLOR.ATION
Our �eld study included drilling one exploration boring, excavating one exploration pit,
performing infiltration testing, and conducting a geologic and geologic hazard reconnaissance
to gain information about the site. The various types of sediments, as well as the depths where
characteristics of the sediments changed, are indicated on the exploration logs presented in the
Appendix. The depths indicated on the logs where conditions changed may represent
gradational variations between sediment rypes in the field. If changes occurred between
sample intervals, they were interpreted. Our explorations were approximately located in the
field by estimation from known site features shown on the site plan provided to us.
The conclusions and recommendations presented in this report are based on subsurface
conditions revealed in the exploration boring and exploration pit completed for this study. The
number, locations, and depths of the explorations were completed within site and budgetary
constraints. Because of the nature of exploratory work below ground, extrapolation of
subsurface conditions between field explorations is necessary. It should be noted that differing
subsurface conditions may sometimes be present due to the random nature of deposition and
the alteration of topography by past grading and/or filling. The nature and extent of any
variations between the field explorations may not become fully evident until construction. If
variations are observed at that time, it may be necessary to re-evaluate specific
recommendations in this report and make appropriate changes.
3.1 Exploration Boring
The exploration boring was completed by advancing a 33/s-inch, inside-diameter, hollow-stem
auger with a track-mounted drill rig. During the drilling process, samples were obtained at
generally 2.5- or 5.0-foot-depth intervals. The boring was continuously observed and logged
by a geotechnical engineer from our firm. The exploration log presented in the Appendix is
based on the field log, drilling action, and inspection of the samples secured.
Disturbed but representative samples were obtained by using the Standard Penetration Test
(SPT) procedure in accordance with American Society for Testing and Materials (ASTM):D
1586. This test and sampling method consists of driving a standard 2-inch, outside-diameter,
split-barrel sampler a distance of 18 inches into the soil with a 140-pound hammer free-falling
a distance of 30 inches. The number of blows for each 6-inch interval is recorded and the
number of blows required to drive the sampler the final 12 inches is known as the Standard
Penetration Resistance ("N") or blow count. If a total of 50 is recorded within one 6-inch
interval, the blow count is recorded as the number of blows for the corresponding number of
inches of penetration. The resistance, or N-value, provides a measure of the relative density of
granular soils or the reiative c�nsis+_ency of cc►hesive seils; these val»Ps arP p1_otted on the
attached boring log.
OctQ�+er 10, 2MJ5 � ASSOCIATED EARTFI.sCIFN.rES, INC.
MT/!d-KE05606A?-Projeus120056061KBlWP P3ge 3
Proposed Maintenance/Classroom Building (Building 1� Sctbstcrfnce�rploratio�t, Geologic Hazards,
Rento�i Technical College a�ul Preliminary Geotecl�nical Engineering Repart
Renton, Waslzington Project c�nd Site Coliditions
I. PROJECT AND SITE CONDITIONS
1.0 INTRODUCTION
This report presents the results of our subsurface exploration, geologic hazards, and
preliminary geotechnical engineering study for the proposed Maintenance/Classroom Building
(Building N) within the Renton Technical College campus located at 3000 NE 4`'' Street,
Renton, Washington. The general location of the site is depicted on the Vicinity Map, Figure
1. The proposed building location and approximate locations of the explorations accomplished
for this study are presented on the Site and Exploration Plan, Figure 2: Our recommendations
are preliminary in that site grading, structural plans, and construction methods have not been
finalized at the time of this report. In the event that any changes in the nature, design, or
location of the structure are planned, the conclusions and recommendations contained in this
report should be reviewed and modified, or verified, as necessary. ,
1.1 Pu ose and Sco e I
rP
The purpose of this study was to provide subsurface data to be utilized in the prelirninary 'i
design and development of the subject project. Our study included a review of available �,
geologic literature, excavating an exploration pit, drilling an exploration boring, and I
performing geologic studies to assess the type, thickness, distribution, and physical properties �i
of the subsurface sediments and shallow ground water conditions. Infiltration testing was ',
conducted within the exploration pit. Geologic hazard evaluations and geotechnical �,
engineering studies were also conducted to determine suitable geologic hazard mitigation � I
tech.niques, the type of suitable foundation, allowable foundation soil bearing presswes, '
anticipated settlements, temporary slope/shoring recommendations, basemendretaining wall
lateral pressures, floor support recommendations, and drainage considerations. This report ,
summarizes our current f eldwork and offers hazard mitigation, development, and infiltration '
recommendations based on our present understanding of the project.
1.2 Authorization
Authorization to proceed with this study was granted by Ms. Sally MacGregor of S.M.
Stemper Architects, PLLC. Our study was accomplished in general accordance with our
proposal letter dated August 25, 2005. This report has been prepared for the exclusive use of
Renton Technical College, S.M. Stemper Architects, PLLC, and their agents for specific
application to this project. Within the limitations of scope, schedule, and budget, our services
have been performed in accordance with generally accepted geotechnical engineering and
e�gineeri��g g�alogY p:���:c�s in effe�t in this ar�� at 1�e ti.*ne eu: r�port v:�� gr�gared. I�1�
other warranty, express or implied, is made. It must be understood that no recommendations
Qctob�r 10, 2G'OS AScnCltl.TED Fr1R_TH SCIEN.CE•S, �lvr�,
MT/!d-KE05606A3-Projects12f1056061KE1WP P3g0 1
A�ssociated Earth Sciences, Inc.
. � � � � ' � `
October 10, 2005
Project No. KE05606A , � _ - _
Renton Technical Co�lege � _
c/o S.M. Stemper Architects, PLLC
4000 Delridge Way�SW, Suite 200 .
Seattle, Washington 98106
Attention: Ms. Sally MacGregor � .
"Subject: Subsurface Exploration, Geologic Hazards; and
Preliminary Geotechnical Engineering Report "
Proposed Maintenance/Classroom Building (Building 1� �
Renton Technical College , _
- 3000 NE 4'� Street
Renton, �Vashi.ngton
Dear Ms. MacGregor: �
.We are pleased to present the enclosed copies of the above-referenced report. This report
summarizes tlie results of our subsurface exploration, geologic hazards, and preliminary �
� geotechnical engineering study and offers recommendations for the preliminary design and
development of the proposed project. Our recommendations are preliminary in that site
grading, structural plans, and construction rriethods have not been finalized at the time of this I
report. � � _ i
We have enjoyed. working with you on this study and are confident that the recommendations . �
presented in this report will aid in the successful completion of your project. If you should
have any questions or if we can be of addirional help to you, please do not hesitate to call.
�
� Sincerely, '
ASSOCIATED EARTH SCIENCES,�INC. � � j
Kirkland, Washington _ ;
� ,
. . . I
Kurt D. Merriman, P.E. -
Principal Engineer � � - _
KDMAd-KFA5606A2-Projeas120056D61KE\WP
, • 9 I I RRh Avenue,Suite 100• IGrkiand..`NA 98Q33 •Phone 425 827-7701 •Fax 425 827-5424 -
�1'u
E;�
/�E-Ctf�'�]0 .
/ -
'7�9'
Q CYl tYrli�i.'}� �
9� l
/�0.O!2 IS7O,C43.7 ' � ` ' � .
/ � � GiQ�]!L7
� /�C C!;�ti:`�_3
�� f � �� / -�
� ,
� � �
/ � `\
\ /
_`_''�� ,N� / ' .� ,\-E� f aKp/OHZ i
�� � i � .,�x i
E� G mF � � � f
� � . / 1 �Gp �p�C�j r � � ,i
/ V`1 � � �� {�' �s� �
� � i � � t �
� i i vlts�r � � �` r�a\ �
i � �' �� �aumos ' � �
� /y,� � �,.�P�°Y �F+�°ri���t��� f t� �
/ ``�� ��Y�N°� �WN � � � . .
/a�r�c.�o�fisua � ��y,. e.-mct � �� � �r G / I
/- � �` -�
► � _�--- _ -�� e �:� � c�
� rr� � -�--,� � `-�� \� ' � � PRQ)`CI �LQ {4TION
� � � � , � `. � � �g �OF EXP`O TfC3N�,Q�ING
�
,v-.,�/-IO
�i y� ' � � � ` � �� —y}y ¢ �cca �— � .
J ' — --- 1 1 k�'� _ �
., , � . _� � ,�a , �
--�----__ , � , � � l �
�'� • � �- � l � a t�t � �
, / ` ` '¢�.,r•�i� ' Sp � E4��a ',��m��� 1;��� � . . .
- � �-/.r
� m� / � \ \ �1
� aa�+N /S E� u \ J'� ti+ •�1 \ \ . l w�usam J 1 7G 1
�` J�`` \ 1 1 1
� scm � � 1 1 l 1 � � !
/ i 9�,-� � � � r (\ i i � ti �
� � e v�ucp-�m.• Rs.a"""� ��'� � ^ � ` �\ � 7 (�I �
� I �� ` ,`•-• \ 1 ,e � � � .
t� ' / G � � L �` \ � 1 � i
wa C'° \ 1 �_ �` � i � ` C � '
1 I 1
L �� , � j 1 � �� �� I .
I , � T , ` �.�q
� i. I �� i
{ �� t � �
_ l, ' i�^�*a� ` ` 1 1 t ; � � ` t\q \ � ' �• 7��
f ' `` � l� ' ' .
i � ��` \ ` ' � + ` u FF.�MA9W T¢i � .
t i � � 7 � , � � � � ,q�
I rsuu I � � U \ � 1 �, �` �� 1` �t ,� .
� \ � 1 \ 1 � � 1
� "`-�--�APP OXIMA�E OI�t , `, � 't ��'�'�`� `. �
9 I OF7 FI�. � ' N PIT � '� ; � ' � �'`�' � � ,-s�arr
� I . i ��'`�- � �� , �+ + � t '�c°°-� ;
V7 1! ..LL.� y �6
� � i� � �GtT '�� �� 1 \ \ \ `\ 1 �Y CH'E}' ' f- .
� � � IP-1 � 5s—i � � �` �� i � � �
a I G4 1 �ii� �♦ �■ ,� ,1 `� \ t\ 1 i� �ti �i � �
F -
o ��1��� �1�5 f �� ��\ �`��,,��`� `�+�` �� � it % .
g ` � �� � �� � � '�\ �� \ � —� �
��- �o� _ . Ya�s� � I
� ---�«-- �,�„°5��� AF,.�pXtMAj �OCA ION��` �� ���c������.,��`�`�-�; '
a � y -dN P . � �;�;�'�� � �;_ ''�� t �
.� - , .
� ucP � � �`.� �� �`�����,,,�-�`;�\� +
a � ���� � ��� � � ,
�� � . .
� A°"`T me�,uzs � � `'� -.�3� �.��.
1� rar av c nwou0-wx mur � o�.aua ��� � �. . . pi
� F�-79.7 � � �
ar�sac� / $ � �m m g°^�m�° `p �. ��\��````;\ � 1�!
� / � m� 1 � �
�.:�'fueo.axa � � �nc�nvrenom �� \��`��\, �� ` \ .
r
m� -`y�un �e+ec� ------ — — -- � �` �`�`�` ` i_ �
� E r,r-t�}M2R /��� � �� � �����,� � �� � � ��� mysx� \ �(� \ \
� � � ��� � . . , . k
� '� � 6�� �; "�i— . I �. ,r �, c zc �o
m Reference: PACE � ,�Y,��,�
� �.��w� `'\ I �` fEEr
r--UGP\` �
c
c
0
5 Associated Earth Sciences, Inc. SITE AlVD EXPLORATI4N PL�N F'�uR� 2
o �`
o � � � � � PR4PC�SED M4!NTE�!?NCE AND CL.4��RGOF"BL'lLD�NG j ca,r� �0�05
� � RENTON, WASHINGTON '
� I PROJECT NO. KE05606A
1
Associated Earth Sciences, Inc. G@O�O ic & Monitorin Well Construction Lo
� � � � � Project umber Well Num er Sheet
KE05606A EB-1 1 of 1
Project Name Renton Technical College Location Renton, WA
Elevation(Top of Well Casing) Surface Elevation(ft)
Water Level Elevation Date Start/Finish Al1�/flF q/1:�1f1�
DrillinglEquipment DaVI@5 DfIIII�C� Hole Diameter(in) �
Hammer Weight/Drop 140#/30"
L m V O
9
�� W �� � 7`
� WELL CONSTRUCTION T 0° ��' DESCRIPTION
Surface Monument 15 Fill
14 Moist,dark brown to light brown,silty SAND,roothairs.
Cement 14
-------- ---------------------
Outwash
Bentonite
5
� Moist,gray,fine SAND/coarse SAND,stratified.
tz
12
�� Well Screen
7 Moist,gray,fine SAND/coarse SAND,stratified.
a
19
15 '
� y Moist,gray,fine SAND/coarse SAND,strat�ed.
tz
t5
Zp End Cap
� Moist,gray,fine SAND/coarse SAND,stratified.
24
30 Boring terminated at 21.5 feet on 9l13/05
No ground water.
25
30
� 35
�
0
c�
c�
z
�
0
m
�
a
��' Sampler Type(S17_
m 2"OD Split Sp�an Sa�pler(SPT) Q No R�:.avery ti1 - Arioisture Logged by: iviT
� m 3"OD Split Spoon Sampler(D 8 M) � Ring Sample � Water Level p Approved by: ,
� e Grab Sample Q Shelby Tube Sample 1 Water Level at time of drilling(ATD)
LOG OF INFILTRATION PIT NO. IP-1 �
� This log is part of the report prepared by Associated Earth Sciences, Inc.(AESI)for the named p,roject and should be II�
� read together with that repor�for complete interpretation.This summary applies only to the location of this trench at the
� time of excavation.Subsurface condifions may change at this location with the passage of time.The data presented are
p a simplfication of actual conditions encountered.
DESCRIPTION I�
______ 2 1/2"to 3"Asphalt Concrete on surface over 1"thick Fine Crushed Gravel _ � '
Oufinrash
1
2 Medium dense, damp, light brown, silty fine SAND, slight stratification.
3
-----------------------------------------------------
4 Medium dense, damp, light brown, fine to medium SAND, slight stratification.
5
6
� Medium dense, moist�li ht brown, sil fne SAIVD.
-------- -- �— — —�--------------------------------'
8 Medium dense, damp, light brown, fine to medium SAND, slight stratification.
9
10
Bottom of exploration pit at depth 10 feet
11 No ground watedseepage. No caving.
12
13
14
15
16
17 �
18
19
�
0
0
� Renton Technical College MaintenancelClassroom Building
B
o Renton, WA
�
d Associated Earth Scie���es, Ii�C. Project No. KE05606A
� Logged by: MT
�� � � � � �
Approved by: � 9/26/05
U
Y