Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutVideo Inspection Report . . ' � ��
� �' �,�)
Drain-Pro
2901 72nd Street E
Tacoma, WA 98411 ���' �"l�`fC�- �`�`°��X
Phone: 253-539-4498
Fax: 253-539-4497 "�
�
tF
Customer Project City Street
SHOARLINE CONST. 2008 SEWER REPAIR RENTON
Start MH End MH Crew Truck Pipe Size Pipe Type
MH C1 MH EX NICK TAYLOR 210 8 PVC
MH Depth Segment ID Backup Tape Tape Counter Date Time Dyed `
SHEET 1 1 7/30/2008 10:16 AM No
/TOLD TO
FOLLOW '
JETTER
THROUGH
LINE
Length Precipitation Ground SurFace Weather
None D Paved Cloud �
;
MF..� �Z1 ZMH C1 Ftg. Condition Category Comments
� �' 0.0 Upstream Manhole Structure MH C1 _
1 �
. 4I
�
F-
\� �.
♦
�� �2 1 � -� 215.8 Downstream Manhole Structure MH EX �
MH EX
Page 1 of 1 Generated on 7/30/2008 at 11:16 AM by the PipeTech�N inspection system.
�