HomeMy WebLinkAboutRES 0627 �^^�'^"9 4r��- - �
y. � '� J
�Eso�Ul,zor� ��o, s2�r
��JHERF.�,S, und.er the B. H. Sheldon contract on�nit #2,� nro,�ect
#45-175-Pd, Renton Sewer Plant has been completed, partly by the
contractor and partly by the City oP Renton, and
'1VHEREAS, the construction und.er this contract a_s performed
�_ �_ r .r
by the contr�ctor �nd the City, �s��.s inspected and founc� to be in
e4,
�ccorc�ance with the pl�nG �n� sneciflications, contr�_ct documents �
L- �
anc� the change orders �s apvroved by our engineer �n� re^ional
en�ineer of the Federal ��lorks A�ency.
NOi� THr�REFORE BE IT RESOLVED BY THE CITY COL1r'�IL OF' TH^ CITY
OF RENTON AS FOLLO�.JS:
Tha.t the s�id Sewa�e Disposal Pla.nt �s constructed by the
contr�ctor and the City of Renton be and thP sr,,,r::e berebv is
^ccente� ?s of the d�.te of July lf�, 1944.
Passed, by the City Council of the Cit,y of Renton, this 18th
d�y of July, 1944.
C�C� ,� ���
?�ta.yor
Attest;
V1t,y Cle�'k
�