Loading...
HomeMy WebLinkAbout03369 - Technical Information Report� � 9 �' GALLOWAY AT THE HIGHLANDS �' m LUA 06-138 343 Union Avenue NE ' Renton, Washington TECHNICAL INFORMATION REPORT October 20, 2006 February 22, 2007 (updated) Prepared for: KD Properties-Pham, LLC Attn: Johnathan Kurth 1201 Monster Road SW Suite 320 Renton, Washington 98057 (425) 228-5959 office (425) 226-9227 fax Submitted by: � Offe Engineers, PLLC Attn: Darrell Offe, P.E. 13932 SE 159ti' Place Renton, Washington 9805&7832 (425) 260-3412 offioe (425) 988-0292 fax �r33co9 OFF-SITE ANALYSIS DRAINAGE SYSTF.M TABLE SURFACE WATER DESIGN MANUAL, C.ORE REQiJIRF,MF,NT#Z GALLWAY AT THE HIGHLANDS Basin: Cedar River Subbasin Namc: Maplewood Creek Basin Subbasin Number: Symbol Drainage Drainage Slope Distance Existing Potential Observations of field Component Type, Component from site Problems Problems inspector, resource Name, and Size Descri tion iischar e reviewer, or resident see map Type:sheet flow,swale, drainage basin,vegetation, % '%ml= 1,320 ft. constrictions, under capacity,ponding, tributary area, likelihood of problem, stream, channel, pipe, cotier,depth,type of sensitive overtopping,flooding, habitat or organism overflow pathways,potential impacts pond;Size:diameter, area,wlume destruction,scouring,bank sloughing, surface area sedimentation, incision, other erosion A Pipe Flow 12"concrete pipe flowing 1% i30' None None None observed North towards interscction of 4`h and Union. B Pipe Flow Along NE 4 Street Not 240' None apparent N/A Not viewable heading east viewablc C Pipe Flow Flow over open pasture 1% 220' None None None observed into Soos Creek—Heavy Vegetation at Soos Creek D Open Channel-pipe Beginning of Maplewood 2% S30' + No problem None None observed at time of site visit Creek—heavy vegetation appear at outlet of —no water within Maplewood Channel is located on stom�pipe—or Creek Ribera Short Plat project visible along the Which City of Renton has cl�annel currently under a pennit downstream with Tom Foster c:\offe engmeers\1 projects\davis group\galloway\coorespondenec\level one\drainagc system tahle.duc � i 4-�., � HIGHLAND SQUARE TOWN HOMES 343 Union Avenue NE Renton, Washington TECHNICAL INFORMATION REPORT October 20, 2006 Prepared for: KD Properties-Pham, LLC Attn: Johnathan Kurth 1201 Monster Road SW Suite 320 Renton, Washington 98057 (425) 228-5959 office (425) 226-9227 fax Submitted by: Offe Engineers, PLLC � Attn: Darrell Offe, P.E. �, 13932 SE 159"' Place � L O I Renton, Washington 98058-7832 ,�v ,� wAs �i (425) 260-3412 office �4 w° ,, • (425) 988-0292 fax , �g �,, '.. �'� �� , w � z�aso � �, � =���4'15TER�'�;"� I, `4I�NAL�'� i I qi� ��� 4EXPlRES � _ __ Project Description The purpose of this report is to present a preliminary drainage and downstream review for the proposed Highland Square Town Home 30-unit project in accordance with the City of Renton requirements. The project is located at 343 Union Avenue NE within the City limits of Renton. The Highland Square Town Home project is a proposal to create 30 multi-family residential units on the existing property comprising of 1.61 acres. The project is currently consist of an existing "Thrift Store"and paved parking lot. The existing impervious sufiaces were created during the construction of the'�Prairie Market" building in February 1970. The existing King County Tax Parcel number is 162305-9098. The existing "Thrift Store"has been abandoned and the parking lot gated off to access. The parcel is bounded to the West by a large apartment complex; to the north and east by retail; and to the south by a newer residential (multi-family) project called '�3`� and Union Townhomes". Review of Resources Critical Drainage Area Map I! • Maplewood Creek/ Cedar River / Lake Washington Watershed � Flood plain/floodway (FEMA) Maps • There is no mapped floodplain in the immediate area per the available FEMA map. Sensitive Areas • Wetlands-There are no known wetlands located on the project. • Streams and 100 Year Flood Plains-There are no streams or floodplains on or near the project. • Erosion Hazard Areas-There are no landslide hazard areas on this project. • Landslide Hazard Areas-There are no designated sensitive slopes on or adjoining the property. � Seismic Hazard Areas-The area is not mapped as a seismic hazard area. • Coal Mine Hazard Areas-The property does not appear to be located within a designed coalmine hazard area. - 2 - C:�Offe Engineers�l PROJECTS\Davis Group\Highland Square\Coorespondence�Level One\storm report.doc � U.S. Department of Agriculture, King County Soils Survey • The underlining soils have been classified by Cornerstone Geotechnical as Glacial Till. Flow Control Application • Since the existing impervious surface was created before ]anuary 201, the project is exempt from storm water detention if less than 5,000 square feet is added. The entire project is currently covered with impervious surface from the construction of the "Prairie MarkeY' in 1970. The proposed project would create 0.30 aces of pervious (landscaping/yards) and 1.31 acres of impervious (pavement, driveways, sidewalks). The existing site consists of 0.16 acres of pervious and 1.45 acres of impervious. Therefore the proposed project would DECREASE the amount of impervious surface (no net increase) and no storm water detention is proposed. Water Quality Application • The proposed project DOES NOT trigger the threshold for water quality requirements under the 2005 Manual. Landslide Hazard Drainage Area Map • The site is not located in a landslide hazard drainage area. Field Inspection Offe Engineers has visited the site on several occasions. The most resent visit occurred the morning of October 23, 2006. The site was still paved and the building still standing. The site drains from west to east into the storm system within Union Ave. NE. The existing storm conveyance within Union Ave. flows north towards the intersection of NE 4th Street and Union Ave NE. At the time of this site visit, construction activities were , occurring at this intersection, which did not allow for viewing of the existing storm ' system. Based upon plans from the City of Renton files, the storm conveyance flows east within a storm pipe (size not visually verified) approximately 600 feet to a point ' where the storm system outfalls to the south into Maplewood Creek. Review of tl�e 8 Core Requirements and 5 Special Requirements of the 2005 King County Surfaoe Water Design Manual OfFe Engineers has reviewed the Core and Special Requirements in Chapter 1 of the King County Surface Water Design Manual, and addresses each of the requirements as follows: Core Requirement No. I —Discharge at Natura/Location The project will discharge into the existing storm system within Union Avenue NE. Core Requirement No. 2—Ot�'site Ana/ysis The property appears to be an isolated parcel below Union Avenue NE with no water flowing onto the parcel. The surrounding properties are developed and contain the storm water within their projects. The elevation of Union Ave NE is below the site. - 3 - C:\Offe Engineers\1 PROJECTS\Davis Group\Highland Square�Cooresponde�ce\Level One�storm report.doc f Core Requirement No. 3—F/ow Contro/ DCEMPT Core Requirement No, 4—Conveyanc�e System The onsite conveyance system will be sized to convey the 25 year storm event as required by the 205 Manual; this analysis will be provided as part of the design documents. Core Requirement No. 5—Erosion and Sediinent Contro/ A Temporary Erosion and Sediment Control Plan implementing the Best Management Practices will be designed as part of the final engineering plans for the project in accordance with City of Renton requirements. Core Requirement No. 6—Maintenanc�e and Operations The Maintenance and Operations Manual for the Highland Square will be included in the Final Storm Drainage Report as part of the final engineering design for the project. Core Requirement No. 7—Financia/Gua�antees and Liabi/ity The Financial Guarantees and Liabilities will be required prior to the project being finalized by the City of Renton. Core Requirement No, 8— Water Qua/ity EXEMPT Specia/Requirement No. 1 —Adoptcd Area-Specific Requirements The project is located within the Cedar River Basin Plan. Specia/Requirement No. 2—Floodp/ain/F/oodway De/ineation This requirement does not apply. Specia/Requirement No. 3—F/oo�d Protection Faci/ities This requirement does not apply. Specia/Requirement No. 4—Source Contro/s This requirement does not apply. Sp�ecia/Requirement No. 5—Oi/Contro/ This requirement does not apply. - 4 - � C:\Offe Engineers\1 PROJECfS\Davis Group�Highland Square\Coorespondence\Level One\storm report.doc __ Appendix A Figures 1. Vicinity Map 2. Existing Topography 3. Proposed Site Plan 4. Drainage System Table 5. Photo Key Map 6. Photos 7. Previous Construction Plans - 5 - C:�Offe Engineers�l PRO)ECTS�Davis Group�Highland Square\Coorespondence�Level One�storm report.doc j' � � � � ■� � �� V ... � . � � r � � � � O � - � � � �' tiF ~ n S�ti O � MONROE AV NE SF'T � z � Z fTl r rn � W o � z -' o m Z _ n O � � � � UNION E E � z � z UNION AVE NE UNION AVE NE m Z m r� � N � Z � � _ � N � � � -i � r = m DUVALL AVE NE N � \ z � DUVALL AVE NE � � o cn � -� r� _ HOQUTAM AVE NE � 142nd AVE N � r � m NILE AVE NE 148th AVE N _ � �� N rn w -� I � � ,� �p� �� y � � 2 ���7 � � 2. Existing Topography I � � `'' � _ � *� RIM 07 a d i.E-+ .si(s) e'��� 7 N89'06��6�W ¢24.�0� .E� .47(N) ips4 rpd� S� � d;i � + 5'QFC7RIC EASEAIENT: � UT1UiY EAg11ENT: :CTRIC EASENENT; E REC.N0.200S072B000883— REC.N0.6647627 •p�qra�i[x #dY 20050728000683 r * 5 aiw��via ' � � �� Yd �� #�I.E.=�02.2 ENExB'��a u ,rly '. . �,� SANITARY SENFR EASpAQlT; q�.�,03 REC.N0.6662916 �.E.�395.01(S) p k( I.E.-394.99(N mr • 1 *� F#� �� $ Z �z � Q mr�t cenmt ., 8 m •�' . 343 UTAON A�E N.E �p, 'r v' � W F.F.=4�0.78 . .A #� #�.y � � ma �l e� ��p1� �� * Y �Z RIMe408.22 y�4pg.2! I.E-404J2(E) I.E a103.3 )(B�CONC) O .� �'�� '� +� z .., rFw¢wrz } _ � \ .�—ROOF ORAN1 �, • r ✓ . y #�` � T N000 � d �'-' SP Pou_�os.ss z w i.e.•wz�s(s) �+' 11 � 10 9 �N�O G 5�O 7 6 5 z 4 �.E._�,.,�H� $ ' y Q Q —; as � .�N�RO 2218 Q - o J � ��. 12 � � 3 �,a � 13 -------— --- 2 � � � a a� � ._ � � a� � 0 � 0 L a . M I � �- - - - - - - - - � - - � - - - - - - - - - - -- - - - � - - - - - - - - - - - - i . . , . . . . . . . , . . , . , , . . . i y i � i r � � � r � � � r � r � r � r � � � r � r- � r -� r � r � � � I � � j I - � � 6 I - i I __" .� � � � I _ I �'' LJ LJ LJ LJ LJ LJ LJ LJ LJ LJ LJ J LJ LJ ,� � ` � I � �' � , . . , . . . . . . . . . „ , , . � - - - . - . - . - . - . - - - - - - - - - . - . - . - _ __ _ - . - . _ . _ _ . - . - . - . - . - _ _ - 4. Drainage System Tabie OFF-SITE ANALYSIS DIZAINAGE SYSTEM TABLE SiTRFACE WATER DESIGN MANUAL, CORE REQUIItEMENT#2 HIGHLAND SQUARE Basin: Cedar River Subbasin Name: Maplewood Crcek Basin Subbasin Number: Symbol Drainage Drainage Slope Distance Existing Potentiai Observations of field Component Type, Component from site Problems Problems inspector, resource Name, and Size Descri tion �ischar e reviewer, or resident see map Type:sheet flow,swale, drainage basin,vegetation, % '/.ml= 1,320 ft. constrictions,under capacity,ponding, tributary area, likelihood of problem, ' stream,channel,pipe, cover,depth,type of sensitive overtopping,flooding,habitat or organism overflow pathways,potential impacts pond;Size:diameter, area,volume destruction,scouring,bank sloughing, surface area sedimentation, incision,other erosion A Pipe Flow 12"concrete pipe flowing 1% 330' None None None observed North towards intersection of 4`h and Union. g Pipe Flow Along NE 4 'Street Not 240' None apparent N/A Not viewable headin east viewable C Pipe Flow Flow over open pasture 1% 220' None None None observed into Soos Creek-Heavy Ve etation at Soos Creek j� Open Channel-pipe Beginning of Maplewood 2% 530' + No problem None None observed at time of site visit Creek-heavy vegetation appear at outlet of -no water within Maplewood Channel is located on storm pipe-or Creek Ribera Short Plat project visible along the Which City of Renton has channel currently under a permit downstream with Tom Foster c:\offe engincersU projccts\davis group�highland squaze\coorespondence\level one\drainage system table.doc � � � � � � � � O � a . �n W � � E 4T H ST �- > _. ' � � �� � : � � �� ► s � : �� � �- � ��a � ���� � �. �. _ � �, 0 � � � �1 E 2 �I D P � o � 0 � � s a . � �Y R 4, ., � �E �.�g �t1r� H�Ia�. 9� � � #1 .7 �c �"�?4 '� M+ ' %'Y f y h � '4 ¢9 r�/k'I��4r 4 ��.�.� I __'-�_ i � , Fk ,ty�5�a.� wfl i�r�k�y< `� `'" � I � d � � � r 1 t�� t°� �"i i� i, a' ` f " � �� ,. � , . { .s �� " j � t '` � ( l p t A f a �s . � ...�. . S � 1 M . `� k ti � ,� ��, �_..,..._ d .,,, . �r ��r [ t s� ''�'y 1 � . � �,'� e ��iw i �r �a�`C�'3' NM1 �t�, � 7. . ,. �� �L� `� ,w � -m + i� ��.� 4 ��r'S:: `-r 1 ,, ���S ar �d. x " ' I ��, � 3 �,�m '��i�� ,c�t��1 t�,�fF��` �y� �' 6� � � �',` �k 4fi 3����.. R �, 1 ����,��,t�,.� i�r.����a��� � � M r b i,,.`�t��r� �,�5„°'�i�arr�rr i "�rj�h� , d � � v �nr�-�.r'�1 ���,�q'�'d� �¢�paxm. ti 1 � ' � +«, 1� " �r � �� k f'�30.,,� �a4,��:•;y I �kh7��A.� ( w c } t; 4;�- �'tl � x � I �.��;� , ai�tr �� ���'� �� "���'#�'.�. .;� � r;`4r.a h ��� ��4�4av��� ��, ��.,N,z�`,�,"�1�4�������'� �d����� }�. ( � . � � � a� r '"d,��, °�'�t �'�, �P, � ' � a}i a�� ;� r ��r''��'�a� �, . r �.«r �a, �y �f� 7 k I 'MYM q � t�� � ' � .a�;'�_. . . H�� (; S � n �y��i � . , � � � R��^ z.: �'p . �' � �.�4�� +�"r S i,�7� tt. �+� t � �I t r ��i' +�, n E g � � �;�� , � � �,r��'i �i x . { , .h k d �� �, � �,� ' �M, � � , ��. �'��,�^f ��. i�'��3 p � � j ���'M �1 ^ 1�6. �Y 6� � ' 1,r,�, 7. . � � �c��;- �'g��f���� � .4.� i` � .� �[t' o �,E'�t° i. � ��a� � ��µr �..- �:. Y �N"'�.���k��h�.�A�"'{µ y y r � �,� ,�'.''. � k.'�"�a ����;�+�n � , �, ,�.� . � . �' ������"�Fx"�y7�y � ' r�. k{,� i ll���w �' ��� �y '"�� ����.��pt'�'y�>' � r� { � �� �, � r E �.- �� ��iit��, y ,P�° � �. �i '� F �k . $ , sk�4 y� ��� � � 5�� . �� f I a,��' 1• �'�� " i i��r ��f��;l�, i ,t � � !i 3 �'P °Y,,��yy � �a � � . J � - � �1����i �'� ��,t�, y�� ���.,�' }`�Y' � �., -.�n 1` ] � s � �F t�d .r�a �,�8»@,„�# '�.r§+M1kyp.,3h'�1 `�' ' 'M1 ��� r t 7'�'k�'�l{ �X'�����' '��' t 1 Y by .l t, �'; ��+ " `�"`qa r��;�y�d�,'+u''Z���� �� ��` �9;tY M nb�p� r Y�� 1 , s� � �r Ak� } �� S'�� " � , � ! : ���«,���'������$ ��� 5�4, 4 �,y � v�,��3b��n�"' �+��+'°"�'�j �`,.�'r � , E +� � n�" ^,r�' r�'�r��, a� ��fii�', � ��,�. .�,, (} � � ' l, �'i r l�b w 'E�'(a' x rr y. �, ` � ' �ti ps � :��'�s,�fis '����s����+��`� $� ' ��`a�v�'�t�m � . �i a .�. �����r .��'y�3sl�{^�r '"'��"'s �;�-�9t��,�i,yh�� I .�o� � }} a �� p� 6q1� Ak�v �lll&u�.y�+ �F� �h� b � � � 'd s���w 1 .�yt y�r���.�Apc����l� ��..�4rs�C,s���b u� �� �, 7 r. x �t�f ogfi a t.. �x��yi'�� "4 ,{� f r i�� I ��... • . :.., .. . .7 r 1 K � � �, � ������ �,�� .. . .. ,..:, t� �. 'rta`��r'r r ����, y'� �"t���� ���� � � i�p���Y�`!��y�������r���� _ �^. _. l .__..... . � -_. .,� A� ti�.lC'.':., � +': �. � � f � I m:� � t��"�'�gr��`� x��r� �r,, � 1 .qN i "3 1 t� n �,,� d t i ��r. (�. . � v ��'. �� Y�ur � �$.:�� �.� � ...S� � ��� x h �H, t �.,., t .„m �a � �� ��: ,� � P�r��^� y�,�. � - . ��'.. `.� ��.. .� � u�'�'r,����° t� ': �,t'Y����rr..��� ��� ����� � ��w�� � � n � � r ��d T`�'� �� d �� t �y r . ` . � . ��}��.�'�r�''�'� .�43 y �,. -� h�.e,at�^ ��� 3�� ���i;.��!�" �'�Fk � . �. is' . � t'� :,�.t�'�`4�i�d?m. � 9 �.,�. '�4.,',�,�ri. , �, , ��.. �,�� . � � �� �' � .., .�.-.,.. �. ...._ ,...... ... �� ._ - - — _ _ 16�G1.. . . � T � � {,� S �k'a� ��� , ,t T g � ^ Q I ��R � � �'r t v�< ��k� �k" �" "P�.;J' n! f ' ✓ �wv r�; ' � h���� � a�-Y`x;",� ¢� a y ��,�''�aa� x�s'y�ti j'x� � �'jr "w+ l�: *�i X� .'� jy .1..- # } � >1 4�•��¢ �! ±� '�, �-n f �` ,�' ���•�� ..• i'Y I ( k'��b �'��t '?s:! i? � � �.,�d�'ry �".m:v:�uW6 iref.WLN k��"� � � � t� t Sl `�J IM ` � a ���jll � �� � �I�� � - ,�. . � , ��� � � � � � �� � � � � _ ,� _ '�. � . I • _ � � � � � � r � � . . �. " o e � � ' r�') ti :;: ' . -. ' t � �i�, �h� i� . ..i � 3�'- � "K ri> y . ` � �-', N s+: .,P ��.?� ����,''7.�`1' a a'� 9 �. '"'i d 'i''� � . �. �I � ��}�i I S �. �i a, i y.�• � p�� � ° t h :� i ,,�il �4 � � ��x r � ya;;�r+� �t ; ': +;� , »._.: a.,� , �, � ,�{ ... �`�. e� TF�'a t , .. ' ��i.. :;� c, . , � ` , �. , ', M�'n t :�... ,. _ , ' .::::� .,.L�� �s; 4,f„4 a _�^�. 'R . . .� . b"r .. `t k� � '' �� ��t r r �#.�t � l" � � � _ y . . �... .,, � �1V n ' ., : , . 4 � ��w�� _. . .. k .,r g,�1�4 i '{ �'�"�`M1�zri x�: '" . .6��,'.:".+4",�.,,,�y„^ .• .,. F�i�,. �� 'llt ���w a. � �' .. „� . 4 �� �i �y ;. • i� .��,k� k' �Y:, .`x.,r,r�`� � . ' ��W :�; � + ,.�,: .��w,,,��,. . .:'�W4�� __ 1, �+� 5�y�,��,����� .���'� �16p�1 Ah� � . .�_ . �'� . . . M° 'y}� . � - �.�� i::� �� + xi� � .�^--� . 1 �.S� � � � � �. G,., Y. e.. *,4` . . � .. . � .. . . � ti�� � �„ . \ . � { ,tif�~j. ��if- �[r � � ��t.r . T'� �� � Ytkr ' , � �� � � `x t 4 � i 1 � }r'�d'�� %a 4 i q �� " 4�Y a ��` 3 .! ;,. ,1. � :.� n � x�,q 41 I a �.� �� g ��]� � �'7 W � �.,•� � �i�� ( x „� t5r'6 �' S ^h`k1M. 1 ;t al� 4 � , �+� �I ������ '}����� ��� y��,��� j ' .� ry,g'9 ^'J Y i �i���C g�1 i:�. .� . d P �y� > � jJ'�1 l�i A / '!T �j'4�'^��n k ��'.� "% V 0 '" i .�. }�, 9+tef�.- '1.: � �' ;. ��a �,� �+ a �� !�,�� . � �u ia i �� �T �� ������'�� ���� �1`f � l:' � �r� ��v'�"'� �l ����� t� ��� ��,s C�4����,���� � " �"' ',,-� ' �. , � Y'i ' � � ��\ r w � ����(d � F ,��_ r �. �j5� . t,i �' . �u_, , ,�"' ' . �y I o���� � �� � �,`'� °� � ���'��,�e . r « � �! �r w , + rA, � � � w� � �1�, i,���'�kn'�K�,d)if ,tK����S'���"`�'�r }tn �,�n���r� 0 S� ���' �pt �" tr �'�th e.,r14� d ..' I� , �.- � "^� `t y�� ' t: q � i ` xt �M�'JRh'���y �.E . �� Y ' ":;,J. +�N+„�¢, f� cy y K y d"/ t :� t' �� �a� 5 �� � � . � r � y}�5 w $ �'r y rla�,,��t'� � i ; �.f i n rS;a � ^ e�� ��' ?Y � "�rt�'t,��qp��"%' � T—��.,. �.. x d�; � T'� d�;.f��'��i.Yt..�"��"l��iY �3a��{;'Y. � , ,�� �� � � '�^ � � , � �+o . �{.�" s}Y�l:d�� ��1��'�C{��h�'u,y�a{����P'7�i:�� ��' � � ' '� � ��e'�x��f ,��� ta*��'k�y�,r . '�" �,r ��a � }�"1,�'y�tr��,A�`'� .�' . . ' e jC 4 �,A t � �w��-�s M y�d�.';7E�y w�'�a � � � ..�i ^t+�y �,'� "�M1��j 4.�' `�f K'' k aY'r �r t�'1y4 f�y�.s "�� �r� �yp�{ t y;g ��+�, 5 �S"� ry�ati�}5F_"'P�� i�'�"�P���E, � � ���,,, �eti ��r.,;4 ��� �,'���m 9��'�� � , �� `�•wl�wy � � t�� t 1I �'� hyw�.�',y&Y 9� Y�,ti� p�� � ��, . � ��a � N � � ? ��{ �� �pC r F,� a �m�, Q� ��� � � a �� � �� 4 �' �u Ti� n V'"��,�e d �', � i � ^P w d�a � r - y � dr !l�3�'��k"�.S�desu� - � . � �'k-� � y �,!��i s4 A�� ci��r r �F��;�t��t . .+� r �� � � S� .�` �.<la- �N: � i '4 .�. IY� � � F.�,-.i M., i�' £�q�; 'y �.i ���.. �� . �.�s���+�_ �� . . `i�,� �. _ .�7� ,•,���� 1y��1�Y • n, �': r /,�{ _ .�#I:�S.�l{44 YM1� 9 .O,J'Mr, h i:F � ..f�' " .- . wa .,'y' �,', - � � t y .. 7�..,$� . � � ` , � ��, :�. � �y� q.. � ��y` _ . . ,...s...,,v. . `j,i T.,: q� �s ti f4 � `��� �, ; q' ;�. ♦} l�� . .tit iW dA � �WW��1FS '�'.! � k . � f . \ I� 4 +1 t idrr� .��� n�k yq fi�(�� ¢ t t 1� m.� y�yr J r t � ��'' � H � =� p � ��,< '�� � iw��t;t��x�n��1{��,.r 4�{�,"�a%w�,P"� , �"[7 .. '��.f. �'�y�,���h1; �` ' �y!�,��,F^�M� � ���f NX�ff��{��$�,. �;'�. f .. �. . .'1�� �k 1t�'��r � ����y�� ,y�� �f�f�����G� � � �d� �e*d� f ��+-�Y�' �h '��,i S t�'' '�� � � �'�� ��� �:� � ' Jf { ' � f' `��� � Y'W�" A' � .�, " `�,' i 7 f � � �`�1 ��� r� I , n,, k f �-�� �t' � _ � � } i!', i r; ,;:�' ' � ' � }' . .� � � � 3 � ,�{ - f: d'��- � a. � ; � , _ � ' `. � � � 1' e i F. , M1 � � � » l � �� ' , Y�� � ,� � ��M� } i , t �da": wya�,f ��. A o � f,,,,���,�� ,�� v� ��� p t C T;y F.. _ 1 � ✓�' .'y�� I,C�� ' ' IR. - . � r �'���'� . J- � ,.a f - . ' �� �t`� �`�"� 1 �� � �-� �.��� z, , ,1 ; , �. �,.,�', � ,'q�� .��� z:� � ��� � �'�� 'r� .�Y�' ��, � � �;�HR �`, � , � a,� ��A� � � 4 ��� ; ��s�„�`,� � ��r� - ' � _�._ . °'� � � ,� � �+�. � "uT ��a� u I� 4�+��� ,1���� „�,��r�`���a���-Z���,���S 1 ' Y � }h i .� t " t�i.;' �Y �,�5�� iN�kr'h.,��v�'t'yk,���:�°a�na.��r; ,�r a S .�5a t �X S .�j�w Tr�.y�} * �y, ,` ._ �. r � tW�` . - + '` ., . �"� s,t� v r t,a � �.�.� r �M��J�if bti� - i i�u� ..� ��Ty d _y�- �< a��� u • "�N� t{�l, k .� i.N..; yk .t k '�il � J'rvh ! ...{ � b �- S. 1 r � ���� '� x ,9 i ��' �iy X'�''�t � rk��h� �y ����n��r�� !;: '�; ,� �t� ,U �,Y� r'^ h ;� �y����' � '�.,ik'�'�'`�a�'��e �a+�.;�''"_'� '�;� .i�,��K7����,��ra�,T�s,,,�,,�y rq,� �� i �t�'&� .z�l ',�Pwwy, ''r`""�#i•r� ro' . .. �.. � r a � .� �£� �t fi!. s ,� p�,p j �� 7�A1 A..; ✓ �` +� w i� � t �' ti y 4 � , a "��c � ''�'�'� d k � ,r , a� ��.;r�� � "'� � '� °�_�" < ` �� 2 M 1' � `S� lE � J. . � � F+� + Iy ������� ��µ ��ry�� �� �� i ,N ; ��.�, rr ti�I� �4A..'fr�4 a ��� i n� S- � �, i�j —��-- .. - '—.'^Urtr9 ti,. . °���1"'������fl��.� E�n,'�t� '"�!^���� �N�'�� �a �. ��'1 "+„ 1 �Pw��'y�a��i€'�������.�''�'''�`�,���,�`� ��.���s� �r k �W.;,s,�'�,� ms I�5� d 1 'k� ..n a '�,.t � .i ""'*�., k �a � * _'+,,,,�1� �a a.. ---- ULN ��}�v,� � � + r �'X �F w w.� - P �j� r.� ,�u s �t i��.� # i �..v� m y "+�n ' -•7�'�� �'�kl7o f�7�Ah-��'£�, ��,1. }k �" � � . G n f� wl 4.,' � 'Ta4 n��.k 4R a'� � �^ 3 �w�y �y A Y�e �t1 � t iit �`4�47�'v�q✓��,��r�Fj���2t��Ww�1n �y � �..; h �, r F 1 � �yy N$ n�9A ��(S+"1p x dJA.,'hkM 6 Y�, 'h �, ,� ,a n t� ��s'�°�I}'1 I�� '�� v � 1 d^'4� ix's�" "� �. 1.� � ' �: ` � � � � j� "�b `f' .� 4� y � ' �t ` . y. � �' n ^��, . � t •. P,� � �j 1 \ � � 1 � 1��;�Ir F � �� ', i . ,f. . �„q � .�f � � ,�'� y� . �. i M' ,y� y ., :�,� �t�:eV Q`1,' `,'ifi i�� h . 4{^ h � ! ���r '� � �.. '��.t ` � tr��� � � ti �'t ��`� �S , � +e .i h,w,��. � ... - �' �'� $a ;' r � ����� `�`� :� ��«R fy�� ,ih I 4 � xx s . ' �'� + � i r �}y��,y�'4ry . . . . �A, ��r '��CS����h. ,.:�y � _.. y r � � F �`� N ti 1,��� i�'»."+�S � �n �� � �' i v�.'�' r �' a ^ ��i I.i ��+� �� ��7 e� ��y� � ��' X r�" � ��` �, � r ! � v�g�•F .� ' � � ��. �k ��;..,.�� Q'� �.14�. �. ,q 1�.�� .y�fi �i r�r � ' N Ix,. ,w q �� ti �`� q r� r r k�. � � r� �. , �� � ��� +. � f�� �_ . t�� A� �k �ek•:' � z. � � � h �. '8'q` �,Md���. '{Fk� �'' di�' b ��'� 3�f� �• r+ ;� �'��1 �.t,. k i � '✓ "u �Y1�1�z�` �a �� � '� maet' t n 4.{��� ��ir. ��� ����`� '� �"�� .y�r�n �� y+' � 'r �� �.�'q�� "� 4�' � R$��.i.� , S;SC+ ��Fi �R�� � ��� �R� Y�y� � :�., g.� .�fi�'� c I���� p � :" 1 t '� ��� �!� , Y'+, r K 7 h '�r.,,. � �: y. Ii + r- ¢+ � y +� ='{y ���'i�i ^��'' r pp4�,I ^� �a�[�f¢+` ��,��. Y��� .`� .�,�' y,�$�1 xl� ��l k�, �. A ¢r. `� 'd .. � � �.�'6 tl Y� w� .� r � ��_ ��'� � �1�, � ����' n u� 1 ' +����b ��� ��� � '{``�1� �? ,��4" �Fj,,�r��1� ����,��� �_�'��� � �a J �SF �'.� �; ���� �l S I11! l��J� � �r�.�.tY R+�� 1���7,�. { � ,-��F�Y1 �Y i�,,�,� �)r� w�'}�'`��'� Y�,�"{+,h °3'i rt � r� Y 1 `t�l:' - � a'� ,� '�� i �I I `� ,.� ' �r � p . ��j (1.�'� �tiu � � '�� '{ 11 j� �l ) � 4 0. . 1 k,., Kp. �, �. �`�w�Y., o r t'^ � 6 g .y� � �� � �°'�'� �`�tn d'6,� sN� '�X�7�k � ���.� � ��.., v�� i°�i� ��,�y. :.4� P �n . � ' p i,�y,� l t �e �� i. �� �' `� "�� ',��: e � ������ ! � .Ef i 6�q. `� � rt��.l5 � `��;�R� t 2",�� � {'t y 4 4 e`Y. r� 4� . �'�," . . .. l��'r� �`� ��K ... � � ° :"r� �' "; }, �y p �;. .�' '+ r sr> �` �`':. ' `�" '� :� �3 � �tr„' � �y�., ��r 'y.�'��,� v r. ..,� y +" I i� .'p , �� f�;. :,� .�}�� � � �� .;�7 y '� y, ,g �" �� � ' ,��1'�k =� �... -�r z ��+��°� ''� , `���+ *�. ,y �, �� ,� �;t " '_ �' �'" �.� .���� '� `�.r�` �M2��`.�y�'�v ��� 'r "F� •,�.1 i� , � � �� � � ,�°+�, �� ,,, ���„ �w °`r� � � w 7, �k �r 'j? � .�7 �� 1! ti �,,y .�, ,t � ,,,�` � ��,w{t, "'"y;$'��1�'F�f� �';��' �X� �.��' ��y ".� �i�k�,�. !� �t �> � '�. �� r �� ��' ��w� y�+ o�ti����� .,� r �f ti,5� �, �"�Mt�!,'G�' "" �"''�, /�� "tl;J ,7 ,I, �� ,� a., r t '�+a'�. "�, W �o-�,r.�. � �� kc �� ,�,�� �,��.�,r ti� ,� � r �%" ? � ,� � . ��a � �� . . 0.� t�,fe; � �a,�..�i� "��� �"�" i.� t a '�t � '���y �•�y +`�r„ �"& r. , '�`?, 1'���w �`r� ',tu,Ss ' � '1� r'?,: �, �'''a..+�,'�# �� , "°� . � , �� a '� , E r ,, �,} ,t. �` � xS �FnY �yfi,� 4�f,�+ ' '� S� .X +��� . �'/ ����4 �� � �,'�,r. y � �M � �� �, '�'� s 'KF''.^ r ti h�" � ���i +k, �"�';. f � 'i�'��,;����, ' ..�%�', � rn.�,�' !, ,h ' . � 1 5�f '�j yq� � h?t J '(� �. �� �,+: ���. � �� � l�r��i:i . ,�.{ti�s^�^�q r A ��,��4�xp,,��+4 a�, � � �.�f � �� �'�,1� '�' � �� �+A �, Y �'�� " G `V��� qi'p� �` ���t �� �'M+ �` . � �'•.�f �S'q`5, ���"'!�P�+j^'i; 1�k� � ! �a;-�A�� �,,s�b���f �.�;i�I�i �` �. `; r �e� �� fa { t t y k '� !,� �R � �7`E �s.,� ; ' t� �N. �, ',� �' ��k j ,,.�' ti � �+� { . _ '.���#� C ��{�r d�. ���r� �A,�, ;.'Y�".�}`,ti,_,, .yy' `'�! �`'�1.''yp,?,�';,F '� @P{ �X � , � �'gN�, �� ��„ l.r• � s�� .. A¢�14r ��t��.r.�,'r� .� � F ¢ Fr � �a %� {{"�, y a., '+s••�� 4i A � � �� ii. „K1 �1�",� .(��+� 1t . � `Nl�. ��a"f �a ry° t'�'ti � '�`''°'i� �'°.�' �^��` �F d�e�:.� R .'",� Cvi �'; Y � ��i�� ,� � i ., ��t T.4�� ;�, � �� ;�. � � � r�«�d M�'n i,�s���� � a. �-�i� I' �1� �1'1p �."A,p(� y t�.'..� r ,K/ i �t! �. P e�,4 ���: 3"�'�.w.� ' '�.p�� ����{� �'7• nF 4 k � r e '` ��� r 6}� � 8 i r�M+ � J � ,�5�V"^ °h r� �hox� � :k� t � ¢�4�1�'"��}��h���.� � t �,�. t. �� � ���'� j��''� �� J��' � � ��r i ^�r. � ae � ��,�4 ��t� '� �s . .n � �](+�l,�� � �•,� � � � � t� t.� '^4�� x ,.:��a . I�Jw�� sr'� '� :� '+ �1r+y s � -2 �' . � ����� � '.�.;"'*�/ati•.19� ; � ��p F t � tl�I.}4i �4 f � y�.An 4 .....�•.�i "{'C .� �' �a�r� + F"�Y,.�:;d��, �'F� �� �� ���xy,�p� ,� 3� �,: �� g� W ,�,� �}v/�1 f�. ' f T .y � t '+dS. ��"A!b'� q ,u '.� y.'++e,�,�a lR,n/A!"4r�'�} Q +yyy��•'''� � f . !�-}� ��M,.. � ,/{, ' �� � � . 1 A �a6� �� � �1[�P S"r 1J 9k x "�� �raM-+L �� t�b� �� �F, �. �' " . - ,M � s.� h '�� +n 4 �+J �,�F"1fK Y'�" '' t �'�,;i w 4�� r �"�ro" p M � �'i'�'$"�° .i � y�'`u,�� � �a; .� �� t ,�- � �;�,�W ���f�,� �.,��jw� t W. .� t!w , �A�,.t 1, k . r � w u � y, ,,y� � �Fr, y , . J� � � .NY '� A�Y 4qJr��4� k� +,�,�* „ �1 �a�+����,�✓g;iy„ �t'��i ����% �,:�M� ��«�s�w a�f�, - � X. � �� �a �«+ �L�'a.�� �� �'�i, y�"rAe4Yi � !d�"j,� � P�'' � ��i, ��`.ry��, F, :.,� � � . ¢r,.N� ,s ; '�,.,m, it a ' ;� ,,� �( � �,•:� r t � � �;r'; a�' ',��Y.� ., f �i �`�`�'��'�a `f� � C�� �tr��; f 1�' ;�v x�� '�h ., �' / 1��;�(�"�p � � � � �'�i �,F/ M 1!` ��,A pl. �` ��� � ,��'� � �" z�,�'� � �� `�.r �Fe�y�' �� �M .�: y , �s �9 �j r�' ��sR "�«r' '�� "� .1k y � `6 Y tl �V�'�;���� �t M Y. . ��„� � ��y���� d��4i �4 � ��. w �H�,�y id� ,��Yy � y�� � . ��' �����*' (�� sit� ��'i� . ,�. �����qA�M�l�lk1����'�'d�'� � i .F '.�, , ' ,� �' Y..� 5 �� �� �� �� "��` +� z 3,.� t � R �� � �,�' � V F � �� , .�,��,� � t� ( o, r, �xbr:a;. ',:, �� � �' ^`.as, ` a ,��'V,' ,��. �r, r , � J �♦ Yrti , �; �'� ��.�1 �:mrlt � e }�i . °"i f ��� ��fP . ��, M i i. �:t°�. �I � '�' f�� f} I � �"J�^� Y.:� � �', �...�; � r��� p {i .�er '� ��, �a�,�y��� y a��r � 4'� ra f � '��� i ••'� T�,."� ..��1� , �,� ,=�4 r' ��` ^'�+ :'�, �' � 'wn$" `" � k e arf ����� .;� �-� b�,,�,�i l�r,�'��L4. }. ����' , '�, + 4 �}N"�'� r a'�'"� �}��'��� �'��'� N. � � rV • '. i ,�� ;� �.��^` '� � ' �����!�" , � ��.' f a�!°7 7�'1��� ��°�'� �`�'� , .�, 4.L�'�,�'I`� .. .. . x�' '�i �'.. , . 'd..� , i �.. �� ''� Pd.� 1 . � � ' !'?� 7. Previous Construction Pla ns - -- —� 1 � NE . 4th ST ; 0 R � Q ` t i{ =I -�i f�— �� M081L OIL t � a • °� SAN. SEWEfi - �907.13 d ' � a ,I z - ; � �� ,25 � JACK L. SHERMAN c I ' o � SAN. SEWER - j 453.56 r , `,% �"�' \ ':TORM � 545.29 0 "_ ' _ � �-.-' _ ' 'T izs T�•87 : i �' 4ENRY t RUGGLES ' ' ' ' ,_ `•��—�'"� 2oi , i ; . � w saN. sewea _ 9l�az.2a �- �� � � � STORM � 8H'J.32 -. �" .� �"•C . ` ,�. wa��s m ` � ` �•_'J� '��= — � ' I -• . o �: Q I ': � i SAN. SEWER ' s518.36 W �•. ,i.-y �i ���` STORN " ' 623.18 � �' I ; ,;�_=� �2V� . I � 20t TL.BD � <: . :7 �' �� \:��� 632.08 g Zi I ,,rl-y ,�) r � m � .\J: . � . N 0: i 'N° HENRY T. RUGGLES � SAN. SEWER - �819.63 STORM 983.41 " PRAIRIE MARKET ., z I u ' SAN. SEWER -;1�069.11 �I O I STORM " 1,285.32 �I ^ � � ° o GARY D. MURITZ � o y - � � SAN. SEMfEN ' s647.95 632.17 _ TL.26 - :I STOAY � 778.98 I 3C' 30 ,' _ .2 -�x, r. 5-152 ''�� =`''� , CITY OF RENTON EN4iNEERIN6 �EPARTMENT � LATE - COMERS AGREEMENT � SANITAFiY S STORM SEWERS- UNION AYE. N.E. � SOUTH OF N.E. 4TH STREET —r— ___T_� oeaanm — ow... �1- 24'9U r��e wo_. I — f i � - � � . �::ST.P�" Sn�1.�—I ' E%'�5? � H. � . f ) � �..?'�oE l:u.=:G � / i 11Jti-� C�A'�L1AGE C,-CH /Z\ /� � E:C'�iT:U4B �NLFT/ � . I,_792 l.F. oF 5G2E2u ..PF E�.ct �/.1EW 6"•� CWC.'�.>N. 42� HIGH vc¢C;TY oF�chTol:-----�_ S ZOUING c�api4AUGE NEwIZ�CauC57aH I P20PcRTY LIAIE-_ -' � - - � (� T r I � PRCviDE 5'•10 SlG`J I '� E PAVEM63T -- ' - . VAVI" 9 . CW.B . _ � ' •�•� I� � O � OI \ CURB � T �, N Q Y1 �\ \ _ �'� •� %tST IG�v V./ATE� _� ` \ \ �O COV kV; \ \ �— � N44� E%UVA.c F(JR S�.�i.SEWEF SEE SNEET M-Z � Q � �� \� \ P��'NTEt'A�� �J W11EL:IT C[oSSES WE�t 3V"W.M. �FOR COYT1AlVAT101.1 � ' � Q 4i" H�GX . . p lMIDSCAPITIG. jl ' � WNiCM 1]APPRox�N.AT4�Y ?sEE- BEIOW G2ADE ' "_ _ 1'0 WATCR - . . � p �L�C:9.�UF'� . . - - . -. . - . �� G'c couC. � — / i --'-- . ---f . 1. -'-- —1�WGTER MET�2-VER�F'Y CUC6 _ 1 ILJG+%TIO�I WiTH GI?Y. 'CURH G GUT�R �j'�o• � / � � I �C�TY OF LELLTU: S"+�=5. . I ��' ' .RANTEA ���2 I 3'ASFNA�T�C CG1JC. Ou C�"LRV.4EL �� / , HT a E ,�I� � ROC[ �N \Z` P�T RV1J GR/+ViL PER ; � % /� � '. [ITY oF 2ENTGwi S7EC���U?'�on:5 � / / / CITY Wl�,l FV2Y�SH F:U.G21.pE5 2�ASPHAITI� C7NC.-'.Iti-TG^FF�C Z=h2��,wG �� / / / /' ,/ / ��.��� _:ri�_��L _.��� '�§�� . -�i � / - - � c a'-o' r-c m. - uew F1RS HVOCwu� � E.� � F- � � 1 -i —�^ 4' G�14lED VAQKIIK.L1UE5-TY O � Q�R CRY"OF RGUTbIJ Q ��I� Z ( � . � �T I � AIIGARk1f16 STAll50.45� _ 5T^11DARpS � SPECS. � ��'� N < N , { � �{-^� ��-Y- � � '^ : . `MJ 9'`C1UTN-7YP. .� � �.; %S . I � �.xq'lA �� �i�7�1 p�: i � `q � ��� �. � ` Q) � ^ � _ I \ �gI: �,� V °vl � � ��,'�� �r� ��i i 41i I Ll T PO E-'S=E n:•:.�,a q � i ^ � � i2r:-B` _—_�_- °'p� 6-1 OL p . r 5 PlAl1TEL _yyt '�:..� '1�� 0 i G� Q I 2,1y'�ur�.buc�15,I —T c ". , � L� '� c.o�s.w,s6_ � .---'_—_—_________._._ I �- 'c H.(New)- � . � � � Z Gwly, xC� '+o . I : � -tves— 1 � � - � � � �x�u eu:a s�w.s� E g ' > . 4 ' � � � I � ��I I : I I n i � z2 � o � �----- � - I ,. -- A1oe.rH eETAw�uG ww:l �. \ Le: �Ew`vnv 5,� I I i_r j��� I � I ; I , _ i 4 -- � '�-- ' � t'� 'SIOEF/AlK : �� -;'�i:it:6�5� ; . ��! ;N ' �:.SLea W�=•c-�y.,w_�N.n j _�' / '^_' � � f. I �B.M a i euTou s�cs. � i� v,i�ur`c�,ti� � ' i � •91 m —RAMP UP / / / ��� � � :vi;�Y� �' j ' 6'. I j i.CO C. S'iSDCM, /� : . . 6 / /� � / � / .i i t •� i � + I n� � I � �"/ � / / J�� � � j� /�i, ee ,� 1�-e�cis+iva o�vEz ao_e � �{ � I I �^ I j 2a 5�.Cuuc. rTG.: �5 � o— , � / /��/ /'� / '� �� L aDSCAW �I G `i J i I STR�LT � �I� /� � s ' --1--� � �"Q � __ �-G'�COyL S?DRt� .5. SouTw ¢ETAIN�NG wAIL E�PAyEMENT � � �a� , ��.�- G •24 L.F. Oi SGR6E11 TYiE Ffu(,E Q 424� -' � � 42' Nh:H Pte GiTv oF kE�or.1 I � LIGHT P�1lE LOAi1NG ORDiA:/.4CEQ PriO?EkTti IINc P�VG IZ'Y ST�iQY; �e'a y�l.i. Z AT PROPF�2T.� �i�.1E ,,.epP HA11D21.I1 DRA�vING I��1DEX � ' � . ' �4!WAII 0411Y — _ __ , o NQ_ TITLE , � �� � A-1 PLOT PL AN - P L � T : P L— A N �_I � _ _ _ —__.. -- -----_ .---- - .— .... . I� A-2 FLOOR PLAfJ I oc.a.�c i/�c' - �� -o• ' ; - ------ ------ - � U - _ ----- - __.. - ,- LEGAL DESC2IPTIOU - �. � 1e'u'��« A-3 ELEV,4TION5, SCLJEDU�ES, � M ISG. pETA1L5 GEUERAL NOTES • , ?�us.w�u ----�------- — ----..----------...—.___ ----- --� SIX)TN IGS �EET OF TUE IlOCTN 495 FEET GG THE I. OU:JP/�IJCY: �Z j �Fiu.G4ADE 5-S Foun,oa-r io ri �LA�I I '3C�8" I EAST GGU ffET O�TNE UOETHEAST qUAR'Et OF THE FIRE ZOUE � ; � ______ _ __ _ ________ n ..._-"_"_"'"'_ '_'_'_'___� � 41IXLTu ST OUA[TEA,SECTION Ib,TOwNSN�� 23NOKTN CdASTRVCT104,+ TYPE $-NERVY-1MBi2 ��'O� B� ��'�e" S-G ��I.�LL ELE�/�>TIL�NS e$� DETAI�S I RANGE 5 EACT,`NM uG COUYTY �VASNI44T011, '%CEP� TNE EAST 30 FEE'���TNEREOF AUp LE55 TNE N'E5- I. ALl WpRK TO C011F0[N1 Tp�pCql g�i�D�U� 2oulu� �Fpu�R£HE4T5. � j 20V GEET TN�EEUF. ; TfZUC� K�.M9� -"--'--'—"" '--' ...--" I f s. a« GWE1J DIHFi1SIp1t5 T..kc V�ECEDfNCE wER x�o o�,�cws�oNs. S-3 I ROOF FR,�,MING_ PLAN __ 4. GOUTk.�GTOR SHAII VER�:Y All O;MENS1eNS ON yoE. �.3��Z� _ '6 5. A��GVPSury aoi.w S/s", U.L.A9pROVED i Ho�R RATED. M-Z ,' PLUMBING, NEATING, 4 �/ENTIL.o,T10N Ezrauoeo couc cuc� 6. PAHdT cuaes ��,cK �d-o� caor n,� ENT¢MJCES. �Z � E-1 ' PARKiNG Lp'T' LIGNT�NG � LEGENp — =S _ �y• - ' Z G�:4T LOT FOLE @hSE.. __--T____'_____-____._.__'__.____._...._.— ._ .. 6'JNGi�:� AG4l1T ,�w, ��C.7hYEMGl�T B. LVPR4tiCN EUTRANCES�uCW PAVEN�EHT,Cutg•64TTEe S��GWhIIC CAT[X-�A5t1J5 V �3a12� E-Z LIGNTING F�L/-V v =L41IT:1JG SOII �����_C2US4EJ ED(� N1D M0.uHOLES PE1L G'.TY OF QENT01.1 SPEC�FICAT�oµS. � ir1 --- '____'_'_'_'_" J' `Z,9. PR�V�DE �uu�PCY Dc��L'e['S �u A�� i�r.�:-EeS. � �'3 , RECEPTACLE c� �O��I�R PLAN .-...._. . _ T-YP. CI.iR� DE�AI� eQ �/,' _ �'-o- RETA�NI oG WALL E-4 RISER p1AC-RAM, SGNEDULES, CTG. P R A I R I E M A R K E T , �;�. J�'�� ���07 P�AN (�� F 3, � �� Z . � i. M. C A R S T E N S E N t ♦S S O C 1 4 T E S, � N c. R � N T C '�i � �.... .e..e I DEO RETAIWN'vw�����s-z� 5',cu�.it.it m COMMERGIAL 8 INDUSTRIAI CONSUITANT3"tl�'- ILH21 132�� S. E. UNIOIJ AVENUE � f � � �TtiGMT c�TYS � � FiE.N' Ot.;� WAS HINGTpN � �/�� t ''�``� (� ueE -pQ3 Ev�sCE�-v`ex�- m EN6INEERS qNAlYSTS �:�'��I+N� � �..�,L:'j^ � o inv , k -ER .-ft � ' O W N E R: S 4 Y CC�. 1801 �.1.34 S�ATT�.g � \y!,� � " -" ' —� �'�� �� o.ti cc - � � _ 1917 15T A�ENUE $EA7TLE, WASH. 9l101 MA 3.D97t �N{�C'TC� . i � �_ �2 3 � �F ��vS �I.�C � - p: n_ 1 � . .�.. ✓-7F.M�'P`-9"-^FF �j c.� . . �_� � .•'1 ---- . ,_...-r �_a..e o.-. � ,o. 2ev.�na�„cs��,,..�o -- i \ ' : ���.��,,,..,.��.�..,. ,�... ..... .....� . . -- -- - 3o-7a�.,. � J ^i "_ Z I � '; V 4 N � -- _ � ' $ - � I I ' I I I �; ; i �j , � ; � � ' I � � � ;�; o o�R NANC � � ~ � E1O571NG BVUMG � I � Z iiiiiiiiiiii •iiiiiiiiiiiiiii �iiiiii/l\��_ a - --�L�-�y � / �I i }" � c o - I ' J!' � � .'� - ° ° ° --- o 0 0 0 0 � -N$9'85�1 2-1�--4P2�fr---�-- � o _ o o ¢ o o _o_ - II - . .-.7 =r - - t1= ` ,I � � i- _ -_ _ - - - � - - - - - - - - \\ - - - - - - - -.' �I i Cx] 0 - _ - E- i� ., -, I � ____ I I � Z � I; .� i { _ �i BLD -G BLD(S-E BLD -D � L`�. `J f I�II � ' � I I � i � BLDG-K ,, � � � , I I I I I -- ' � � I , _ _ � , � i , Ii �, ;.�,;� � � z � � 1 - — — �i � � U � ( I �i � � xz� 11 � I j I _ � � � ao I+ �� � ���,> _ BLDG-A ( � ' � � u� � � ;� � ,� k- � I � ,,, , c�Q � � _ .- � I �i, '���,,�i a�t, r:�?�;• _- - - - r = i r� i � I I w ~ - - \ s` � ! rJ f g (PRI ATE} 1 � L- -- _ � � �I I _f - - - _ MENT_ _ s -� �� o , � I � �` � I - -- ,� �` ---I ---- , � � � _ _ � r� - � � � op m I O� �C � . '\ __ _ � __ Q p E I C�iAPFiIC SCALE o I t-" 3� zo o ,o ao ro Z � I 9� sl-�- ' ' � . :Q , � r� I �I z � ' i � [~W na ( lu r�eer) � I '� I I _ .� I �� I U R i � ���i,= zo n. I - — � � � 1 � � — — i�� �I i a� s€o I � i BLDG-J � � ' BLD(�-H I I I �I ~ I BLDG-B I , � �E BLDG-F 8 G-C w I ��� ,� � � , � � 91 a I � ---�; � � `-' I I � � � � i� , ou � � _. � S � - ---- I � a� I i � - -, --' - - - - i - - -- - - --r - - - - -,' - >! �� _ 1 r---, � _ IB �� _� ~ 1 ��- --� — — -sR�9�7.l4' _ I I �- I ;i I II f� ' w�o-�— --= —� ' __�_ % ,. — __S — — � �Y�I ZIN . —.__ --_ � ��+v� � -- -- -� _�_ _ / -- � I _ —U'�� I ___'N__ _—__—k . .-_.�._ M ` ' :I _�• M 1(—� , ����— - - - _ _ -- ; _ _ _ _ N.E. 3rd CT. —� � ; ; � ` � _ � _ o .. ., g - - ' I ,, � _ . �� I ���� _ - , � � : _ - .?� - i - _. I � � i , ' � i � �� � SAW(XJT AND PAVEMENT � c � o o PRl'CHING PER DETNLS ' i y z I� F � ON SHEET 6. a SAWCUT AND PAVEMENT � I I� � � � � PATCHING PER OE7AILS � PLACE/REPLACE D(IS71NC CURB, ON SHEET 6. ( � CUTfER AND 9DEWAUC, PER CITY t,, S1DS, AS NECESSARY TO I I I a \ PLACE/REPLACE STORM LINE. � g ,� � i � � � i I �' > -- - — I a '�-�---'------ � — i � m , � w�ow . , I z�v�x � J�N`� I =��cn i -------- g --- - -�IF¢�--- - �� � ���� O a . _ . -- �r-3o o S-BUILT SET t� , w:ouc,.asro rz.�cunm en�ai s-s.�c�_..:.::^,•u. I �� ------- -�-- ------ v -1 c �ocinrnwsvwz-r. I a9`•�� _ - _ --- �� I�• i oo�:;.K r.a:nc tocwraa�.¢c rc �•r ar�r s-c�:.r I � �,A� COl/�f_MSP.EPLEC4:GwLQEk1A_SACV,L r1.'.LG I I Z � I ClR'.'f,TI;�ON.ACrL��TELY R=✓Lu'f'. _. ..._..� .\ �a ^'a5 I 0 .A' o-''->- r77ER�2..'u,-,�,(�y� o !a a ar:c . . � .. . . S N � ICY'�' 'J.•.TE-1J3//7��_ � i ur..-'u O � � DALEY-MORR4�W-POBLETE, INC. i i ..,\N �. n / � - I I _ . . .. _ . . t �- / ___ __'_._ .. _ . .. .. __ ._.-._ I � a�,. � _ CH�CKEO FOR COMPLIANCE � /.' =�o� TO CITY STANDARDS RECOMMENDED � FOR APP� �1 =I � .,. � � .�� �� ► Appendix B Technical Information Worksheet ��� � �_.��.� _ _ =-�� .. . � � �:.. - - _� -��� �.� ��.y� - --_- I - 6 - C:\Of�e Engineers�l PRO)ECTS\Davis Group\Highland Square�Coorespondence\Level One\storm report.doc City of Renton TECHNICAL INFORMATION REPORT (TIR) WORKSHEET Part 1 PROJECT OWNER AND Part 2 PROJECT LOCATION AND PROJEC7 ENGINEER DESCRIPTION Project Owner: KD Properties-Pham,LLC Project Name: Highland Square Town Address: 1201 Monster Road SW Homes Suite 320 Renton,WA 98057 Location Phone: (425) 228-5959 attn:)ohnathan Township: 23 North Kurth Range: 5 East Project Engineer: Darrell Offe, P.E. Section: 16 Company: Offe Engineers, PLLC Address/Phone: 13932 SE 159th Piace � Renton,WA 98058-7832 li 425 260-3412 � Part 3 TYPE OF PERMIT Part 4 OTHER REVIEWS AND PERMITS � APPLICATION ❑ Subdivision ',_! DFW HPA ❑ Shoreline Management i - Short Subdivision ❑ COE 404 ❑ Rockery ; rJ Grading ❑ DOE Dam Safety '— Structural Vaults Commercial !� FEMA Floodplain ! Other ' Other ❑ COE Wetlands � ; Part 5 SITE COMMUNITY AND DRAINAGE BASIN Community North Renton Drainage Basin I Maplewood Creek/ Cedar River/ Lake Washington ; Part 6 SITE CHARACTERISTICS � I� J ❑ River ❑ Floodplain C Wetlands ❑ Stream ❑ Seeps/Springs ❑ Critical Stream Reach ❑ High Groundwater Table ❑ Depressions/Swales ❑ Groundwater Recharge ❑ Lake � Other d ❑ Steep Slopes Part 7 SOILS Soil Type Slopes Erosion Potential Erosive Velcoties Glacial Till 0- 10% No ❑ Additional Sheets Attached Part 8 DEVELOPMENT LIMITATIONS ' REFERENCE LIMITATION/SITE CONSTRAINT ; ; � Ch. 4—Downstream Analysis I i � � ❑ � Additional Sheets Attached ' Part 9 ESC REQUIREMENTS MINIMUM ESC REQUIREMENTS MINIMUM ESC REQUIREMENTS � DURING CONSTRUCTION AFTER CONSTRUCTION ❑ Sedimentation Facilities ❑ Stabilize Exposed Surface ❑ Stabilized Construction Entrance ❑ Remove and Restore Temporary ESC Facilities ❑ Perimeter Runoff Control ❑ Clean and Remove All Silt and Debris ❑ Clearing and Grading Restrictions ❑ Ensure Operation of Permanent Facilities ❑ Cover Practices ❑ Flag Limits of SAO and open space ❑ Construction Sequence preservation areas ❑ Other ❑ Other Part 10 SURFACE WATER SYSTEM ❑ Grass Lined ❑ Tank ❑ Infiltration Method of Analysis Channel ❑ Vault ❑ Depression � Pipe System Compensation/Mitigati ❑ Energy Dissapator ❑ Flow Dispersal on of Eliminated Site ❑ Open Channel Stora e ❑ Wetland ❑ Waiver 9 ❑ Dry Pond ❑ Stream ❑ Regional ❑ Wet Pond Detention Brief Description of System Operation: Catch basins within access road discharging into the existing storm system within Union Avenue NE. Facility Related Site Limitabons Reference Facility Limitation Part 11 STRUCTURAL ANALYSIS Part 12 EASEMENTSITRACTS in PI c V It ❑ Draina e Easement � Cast a e au g � _� Retaining Wall � ❑ Access Easement i I _� Rockery > 4' High ' ❑ Native Growth Protection Easement � � _' Structurat on Steep Slope r� Tract I ' _' Other ! u Other ! , I i Part 13 SIGNATURE OF PROFESSIONAL ENGINEER I or a civil engineer under my supervision has visited the site. Actual site conditions as observed were incorporated into this worksheet and the attachments. To the best of my knowledge the information provided here is accurate. �7 � ./ � / - _ - �'�� l0 23 z�� i ned/Date Appendix C Geotechnical Report �� Page 7 c:�offe engineers\1 projects\davis group\highland square\coorespondence\level one\storm report.doc PREPARED FOR DAVIS REAL ESTATE GROUP ; September 27, 2006 � .�co idg , L.G. Project Ge lo ' ��, CA� . �.����w�s�,tip !� � � � M vle R. Campbell, �gy �► � Principal � q�'�7���' �i�� [—Exni+es�►1��►0 6,_,� GEOTECHNICAL ENGINEERING STUDY PROPOSED HIGHLANDS SQUARE TOWNHOME DEVELOPMENT 343 UNION AVENUE SOUTHEAST RE!NTON, WASHINGTON -T - ES-Q625 Earth Solutions NW, LLC 2881 – 152"d Avenue Northeast, Redmond, Washington 98052 Ph: 425-284-3300 Fax: 425-284-2855 Toll Free: 866-336-8710 � � � i• . � . ..._..._ �.r _.Y_ '^ � ' 9 j . � � �I � ��.� � � # T. � I� �_ i I . � � ` . 4 I,'b iC�. " '�'_ i. �t S Y R?.. . F �/ .._f-.= } �•.l- i - * r t ri - .. �i ? a : } „°- .- �� `4 i :r_ - _.� I ,• F- _ tr s - � T � r . � a = -"y a � � - ..- . ._ �u .f� f� .•-� i . � # __. "t . . • . 4 ; • _�5.F� .�� - i i�� _' _ , ► �'�f 'k� r' � 1 3 t � � }1� T �Ci' (Lll .� .. rl I= -�l - L!_ r�hYi .. '.'' 's,� s � , ' .._ 4 .J_ _ •�� ' .... -_ _, . y.:' � _. ._.n.� , ��L}v.e��.cw'�. L•? �� t� �... — �:SITE � ,m---�...,.�, � t� ;.. ;. �,..�. . dis ,f'+•+8 _. ,C' F��i � . .;x . - .. �1 F r i,� -r' ;���' }�:t _ �� �. ; . .__�_�_.;.�_�.r_ ��:��. .n � -� - — - __ �� _ ;.�, I "�, � , i ...i., :i 3 . ' - �; I .-ri" ' r: � � � .. ;� ._�"; .' , 4'� `YL .. " . },,iA :I `' . . = kC �i' � �r ., �c - . r �� g y,• ; � � . _ . �_ x r- � el i._ .. 1e ��5�_ Y .� � 9 't.��' :_ rLS�;� ;:� . � . � .�� �. a'=•.� �; '3. 1. �r,>1Zc a � _�s�- . . r..-°�tl - f. - � "�€��+' � , {,. ..%�.. . . "-..��.=.e .� j�:�+ �_ ��_ �4. ; ::,+... � i�� 4��,'` 'g ti; � - - i� : �r `� s�'� . - f .3 � -; �t ?`it fL t ST ��� 4.'1_ E� ^ �������� - , ' _ - • C..i t . = � . " _�. 1 4 '+f 'i;.s c �I ;�nr " , - 3 _ � ,�� i: ,G.t'l� { . 1 .L .v �'n t � y� . :r y ....�.`..a �.�r... .:.. _� . . _ . . ..� . i � � � . '. __ t K` y Y �_t � .. ..__-bTYLr-.__..� ..� . .r .S �f . - . E �{.• � y.'+n•'_ { , � �.,�.+ �j�i ' .�� . � i 9 _ r;.- _ �•. • ; . . . . .Yi r i t ~ P �~ . } y ��! `' " .. . �� `' �'� "*�,f�- •��,,, .. : t ., , , • y' �" a�. . ��- � ` ��.;lri.� ,. � �.,? 'a,y+�' r� ,. '�,T! ., � z i�. t. . ...� .. � ` r _ �`� Y" w .�''4c. if �t i•: 1 3,�_ .4 eP5",'��'h2,4r4� S'i '7�#` .i..,..' '_ .� . _ � - � . . .� �t ! - +♦ ' ;£•. .�,�,.,Y1}a �5���'�S �h �T •. �'r�:�i��4. � � � - � ' - '= . . .�.�' . i , - _ _ � �-, _ �:n_ . � .. �� �—_.. .. _ -.._.___ . . . � . t ..{ . a .���iN'��a ='}��Y . S2'�, ul..^ . � I � �: . n. �k' ' `�`r s�=1 c'�a��',�r j� P ' �,�,i , . ? _ _� ''sa,, i't�`� i - s I •-,f= � '_ �" ',� . � .4-t_,. � ' __ . - _ � . �'�+� _ '+-Z. .. _ - .�� v --'-� ' � � -_ f .. ' . . _ f- i� - �. �� .7µ'fl.:: ''� ..tr -.. a`, �{ " `7R? ' v;y �'. :i . j i.C . . .., _ _.. - � . t 5,,ey. .... - I _ � �f, +� . - '" ^� �'_ ' _ . I P -�_j ._-� . . . . . . �i i -$��Y}�+ - . .. _ _. . �`1Y ... -1 . � __ ..� I � �, .. -: u� - ;- � �- � 7 ctt� ' �,,,�` _ . i . '^� ' 8 f - �-� -'Y�y'�^1_: . E ' .. +'*�y •�1- . I . .. ' � , . �s� ' - � f � . [ i � 4 - t - _' . � ) '( 7[ �'� �-�.rF �� s ' . e '--� - =' - - €� ��.� �.���.f�_��� ..� . - --�- - ,,, ;. � . , ' � : � � - . . c��= ' � - '` • ' # , � -- ' �� . �-:.. ` � r�.1��,F"' --' -i-f . ' ..," f �� t _ . . _ r � :_ .��,r'��-_ ... :�y; . .5tr . t"- --;�� i r . �:,�-. - I � f ' I NORTH �-�'�'� i � ' � __ _ ��3� ���� ��` Reference: 5,.��,� S � - King Counry =��'��� Map 656 By Thomas Brothers Maps VlCitllty Map Dated 2007 Highlands Square Townhomes Renton, Washington NOTE:This plate may contain areas of color.ESNW cannot be Drwn. GLS Date 09/27l2006 Proj. No. 0625 responsible for any subsequent misinterpretation of the infoRnation resulting from black&white repr�ductions of this plate. Checked KRC Date Sept. 2006 Plate 1 I i V � � � � � � � � � _... .. . __�-,�. _. _ . _ .- - ;i��. .-_ _h, ... �� „- W � , 1 - � �f�an,5� � �TP-1 TP-4 I_ ' W E ��— I I I . ! Q � TP=31 z' , I TP-2 —i— O ■ ` I ;;., , : ,,, ,_ _ z . : - . � ; i i � ; i NORTH �I � LEGEND TP-1—�—Approximate Location of ESNW Test Pit, Proj. No. I ES-0625, Sept. 2006 0 5 0 �o 0 2 0 0 Sub'ect Site �"=�oo� � � 1 Scale in Feet '� � Existing Building , � �5`:� .. ,'x2.i�:. � ' � � �.�:.:.�.i��1�� � '��.'�Y��..''i..,' ' x NOTE:The graphics shown on this plate are not intended for design ,�� 4 � Pu s or recise scale measurements,but onl to illusVate the �'-� �'`����' � � P Y � r,f��.n �;z;. , approximate test loca6ons relative to the approximate locations of exisring and!or proposed site features.The information illustrated Test Pit Location Plan is largely based on data provided by the client at the time of our Highlands Square Townhomes � � study.ESNW cannot be responsible for subsequent design changes Renton, Washington � �r interpretation of the data by others. NOTE:This plate may contain areas of cobr.ESNW cannot be Drwn. GLS Date 09/27/2006 Proj. No. 0625 responsible for any subsequent misinte�pretation of the inf�rmation resutting from bladc&white reproductions of this plate Checked KRC Date Sept. 2006 Plate 2 TdBLE OF CONTENTS ES-0625 PAGE INTRODUCTION ....................................................................... 1 General ..................................................................... ...... Proiect Descriation .......................................................... 2 Surface............................................................................ 2 Subsurface....................................................................... Grou ndwate�..................................................................... 3 DISCUSSION AND RECQMMENDATIONS....................................... 3 General...................................................................... ...... Site Preparation and Earthwork........................................... 4 Excavations and Slopes .................................................... 5 Utilitv Trench Backfill......................................................... 5 PavementSections.....................................:...................... 6 Foundations..................................................................... 6 Slab-on-Grade Floors......................................................... 7 RetaininqWalls.................. ... ...... ................................... 7 DrainaQe........................................................................... 8 Rockeries and Modular Block Walls .................................... 8 Seismic Considerations. ............. ......................................... 8 LIMITATIONS.............................................................................. Additional Services............................................................ 9 TABLE OF CONTENTS Cont'd ES-Os25 GRAPHICS PLATE 1 ViCINITY MAP PLATE 2 TEST PIT LOCATION PLAN PLATE 3 RETAINING WALL DRAINAGE DETAtL PLATE 4 FOOTING DRAIN DETAIL APPENDlCES Appendix A Subsurface Exploration Test Pit Logs Appendix B Laboratory Test Results , Sieve Analysis Results September 27, 2006 ES-0625 Davis Real Estate Group 1201 Monster Road Southwest, Suite 320 Renton, Washington 98055 Attention: Mr. Jonathan Kurth I Dear Mr. Kurth: Earth Solutions NW, LLC (ESNW} is pleased to present this report titled "Geotechnical Engineering Study, Proposed Highlands Square Townhome Development, 343 Union Avenue Southeast, Renton, Washington". Based on the conditions encountered during our fieldwortc, the rnajority of the site is underlain by native soils consisting of inedium dense to very dense silty sand with gravel and silty sand glacial till deposits. Fill was encountered in the upper one and one-half feet in test pit TP-1, and consisted primarily of inedium dense silty sand with gravel and contained trace amounts of organic debris. In our opinion, the proposed townhome development is feasibfe from a geotechnical standpoint. � The proposed structures can be supported on conventional foundations bearing on competent , native soils or structural fill, as appropriate. Where loose or unsuitable soil conditions a�e exposed at foundation subgrade elevations, such as the fill soils encountered in the western portion of the site, compaction of the soils to the specifications of structural fill, or overexcavation and replacement with structu�al fill, may be necessary. The suitability of the existing fill soils can be further evaluated during construction. The oppo�tunity to be of service to you is appreciated. !f you have arty questions regarding the content of this geotechnical engineerir�g study, please call. Sincerely, EARTH SOLUTIONS NW, LLC Kyle R. Campbell, P.E_ Principal GEOTECHNICAL ENGINEERING STUDY PROPOSED HIGHLANDS SQUARE ' TOWNHOMED DEVELOPMENT 343 UNION AVENUE SOUTHEAST RENTON, WASHINGTON ES-0625 INTRODUCTION Generai This geotechnical engineering study was prepared for the proposed townhome developmen# to be constructed at 343 Union Avenue Southeast in Renton, Washington. The purpose of this study was to review the project information provided to us, perform subsurface explorafion at the subject site and prepare geotechnical recommendations for the proposed development. , Our scope of ser-vices for completing this geotechnical engineering study included the following: • Excavating a series of test pits across accessible areas of the site and providing a characterization of the soil and �roundwater conditions; • Providing recommendafions for site grading, drainage, structural fill requirements, and other project-specific geotechnical recommendations; • Providing recommentlativns regarding soil bearing capacity, subgrade preparation, and recommendations for foundation support; • Providing an assessment of the suitability of site soils for use as structural fill, and; • Other pertinent geotechnical re�,ommendations, as appropriate. The following documents were revie�aed as part of preparing th�s geotechnical engineering study: • Composite Geologic Map of King Caunty, Washington, Booth et al, 2006; • King County Soil Conservation Survey (SCS); • Boundary and Topography Suroey, prepared by Kenneth R. Anderson and Associates, dated 09/91/06, and; • Preliminary Site PIaNProject Qata, Sheet SP1, prepared by Gerry Slick Design Group, dated 06/20/2006. 1 Earth Solut+ons NW,LLC Davis Real Estate Gro+ap . ES-0625 September 27, 2006 Page 2 Praiect Descriqtion We understand the subject site will be redeveloped with a 30-unit townhome development and associated infrastructure improvements. Grading will likely be minimal, with cuts and fills of less than about six feet required to achieve design footing elevations. We do not anticipate any below-grade levels associated with this development. At the time this report was prepared, specific building load values were not available. However, based on our experience with similar developments, we anticipate wall loads on the orde� of 2 to 4 kips per lineal foot coiumn loads on the order of 250 kips, and slab-on-grade loading of approximately 150 psf. We anticipate stormwater generated from new development will be discharge into an existing franchise utility. If the above design estimates are incorrect or change, ESNW should be contacted to review the recommendations in this report. ESNW should review the final design to verify that our geotechnical recommendations have been incorporated. Surface The site is located along the west side of Union Avenue Southeast, just south of Northeast 4�' Street ir� the Renton Highlands neighborhood of Renton, Washington (see Plate 1, Vicinity Map). The subject property is roughly rectangular in shape, and is bordered to the north by an existing �etail building, to the south by a new residential development, to the east by Union Avenue Northeast and to the west by a parking lot and developed parcel. The app�oximate limits of the property are illustrated on the Test Pit Location Plan (Plate 2). The subject property is currently developed with a single-story retail stare which will be removed in order to accommodate the proposed development. Asphalt pavement covers the remainder of the site, except for isolated areas of landscaping. Topography across the site is relatively level, and descends approximately ten feet to the east to meet the existing right-of- way eleva�on. Subsurface Four test pits were excavated at accessible areas of the subject site for purposes of assessing , soil conditions, and for purposes of characterizing and classifying the site soils. Access restraints and the extent of existing development fargely controlled the location and number of our test sites. Please refer to the test pit logs provided in Appendix A for a more detailed , description of the subsurface conditions. Earth Solutions NW,LLC Davis Real Estate Group ES-0625 September 27, 2006 Page 3 Asphalt pavement was encountered at the surFace of all of our test pit locations. The asphalt was approximately finro inches in thickness, and was underlain by about two inches of gravel base material. Fill was encountered at test site TP-1. The fill consisted primarily of inedium dense sifty sand with gravel (Unified Soil Classification SM) extending to a depth of approximately one and one- half feet below existing grade, and contained hace amounts of organic debris. Underlying the fill and in the remainder of the test sites, we encountered native soils consisting primarily of inedium dense to very dense silty sand with gravel (SM) glacial till deposits. The referenced geologic map of the area identifies glacial till (Qvt) deposits throughout the site and surrounding area. The glacia! till soils consist primarily of a non-sorted mixture of silt, sand and gravel in a compact condition at depth. Review of the King County Soil Survey (SCS) identifies Alderwood series (AgC) glacial till soils at the site and surrounding properties. The soil conditions encountered during our fieldwo�k generally correlate with the geologic and soil rnap designations. Based on the geologic mapping information and the soil conditions encountered during our fieldworic, we interpret the soils at the site to represent glacial till deposits. Groundwater Groundwater seepage was not encountered during the time of our field exploration (September 22, 2006). Due to tFte generally limite�i extent and depth of the building excavations anticipated for this project, we do not anticipate excessive seepage will be encountered in the site excavations, or that groundwater seepage will create significant difficulties during constcuction, except possibly in deeper utility excavations. However, it is important to note that groundwater seepage rates and elevations fluctuate depending on many factors, including precipitation duration and intensity, the time of year, and soil conditions. In general, groundwater flow rates are higher during the wetter, winter months. DtSCUSSION AND RECOMMENDATIONS General Based on the results of our study, c�nstruction of the proposed townhome development is feasible from a geotechnical standpoint. The primary geotechnical considerations associated with the proposed development include site grading and earthwork, foundation support, structural fill placement, temporary excavations and suitability of the on-site soils for use as structural filL Earth Solutfons NW,LLC Davis Real Estate Group ES-0625 September 27, 2006 Page� Based on the results of our study, tfae proposed townhome structures can be supported on conventional spread and continuous foundations bearing on competent native soils or structural fill, as appropriate. We anticipate that competent native soi! suitable fo► support of foundations will generally be encountered at depths of between two to four below existing grades. Where loose or unsuitable soil conditions are exposed at #oundation subgrade elevations, compaction of the soils to the specifications of structural fill, or overexcavation and replacement with structural fill may be necessary. In our opinion, the soils generated from cuts throughout the site should generaliy be suitable for use as structural fill. The silty sand soils encountered at the majority of the exploration sites will generally exhibit good soil strength when compacted to structural fill specifications. Recommendations for structural fill placement are discussed in the Sife Preparation and Earfhwork section of this study. This study has been prepared for the exclusive use of Davis Real Estate Group, and their representatives. No warranty, expressed or implied, is made. This study has been prepared in a manner consistent with the level of care and skill ordinarily exercised by other members of the profession currently practicing under similar conditions in this area. Site Preparation and Earthwork With respect to earthwork, the primary considerations at this site are related to fill placement and compaction, temporary excavatic�ns, suitability of the native soils for use as structural fill, and appropriate erosion control measures. From a geotechnical standpoint, the soils en�ountered at the test sites are gen�:rally suitable for use as structural fill. In our opinion, the site soils anticipated to be exposed during site excavations would exhibit a moderate to high sensitivity to rnoisture. The soiis encountered at the fest sites were generally in a moist condition at the time of the exploration (September 2006}. Soils encountered during site excavations that are excessively over the optimum moisture content may require moisture conditioning prior to placement and compaction. During periods of dry weather, the on-site soils should generally be suitable for use as structural fill provided the moisture content is at or near the optimum level at the time of piacement. If the on-site soils cannot be successfully compacted, the use of an imported soil may be necessary. Imported soil intended for use as strui.�tural fill shoutd consist of a well graded granular soil with a maximum aggregate size of four incfies, and a moisture content that is at or near the optimum level. During wet weather condition�, imported soil intended for use as structural fill should consist of a well graded granular soif with a fines content of five percent or less defined as the percent passing the#200 sieve, based on the minus three-quarter inch fraction. Structural filt is defined as compacted soil placed in foundation, slab-on-grade, and roadway areas. Fifls placed to const�uct permanent slopes and throughout retaining wall and utility trench backfill areas are also considered structural fifl. Soils placed in structural areas should be compacted to a relative compaction of 90 percer�t, based on the maximum dry density as determined by the Modified Proctor Method (ASTM D-1557) and placed in maximum 12 inch fifts, In pavement areas, the upper 12 inches of the structural fill should be compacted to a relative compaction of at least 95 percent. Earth Solutions NW,LLC Davis Real Estate Group ES-Ofi25 September 27, 2006 Page 5 i Temporary erosion controt measures�should include, at a minimum, silt fencing placed along the development perimeter of the co�struction site. As appropriate, temporary canstruction entrances should consist of at least 'six inches of quarry spalls to help minimize off-site soil tracking and to help provide a stable temporary road base. Mulching of exposed earth surfaces, and other measures for controlling drainage and erosion during construction should be considered, as appropriate. Excavations and Sloaes The Federal and state Occupation Safety and Health Administration {OSHAIWISHA) classifies soils in temns of minimum safe slope inclinations. Based on the soil conditions encountered during our fieldwork, the fill and weathered till soils observed in the upper approxirnately two to four feet at our test sites would be classified by OSHA/WISHA as Type C. Temporary slopes over four feet in height in Type C soils should be sloped at an inclination of 1.�H:1V, or flatter. If appropriate slopes cannot be achieved, temporary shoring should be used to stabilize the excavations. The unweathered glacial till soils encountered below about four feet would be class�ed by OSHA/WISHA as Type A. Temporary sfopes over four feet in height in Type A soils should be sloped at an inclination of 0.75H:1V or flatter, respectively. Permanent slopes should maintain a gradient of 2H:1V, or flatter, and should be planted with an appropriate species of vegetation to enhance stability and to minimize erosion. The geotechnical engineer should observe temporary and permanent slopes to verify that the inclination is appropriate, and to provide additional slope grading recommendations, as necessary. Utilitv Trench Backfill Based on the subsurface conditions encountered at the test sites, the native soils should be suitable for support of utilibes. Organic or highly compressible soils encountered in the trench excavations should not be used for supporting utilities. In general, the native soils observed at the test sites should generally be suitable for use as structural backfill in the utifity trench excavations, provided the soil is at or near the optimum mo�sture content at the time of placement and compaction. Moisture conditioning of the soils may be necessary at some locations prior to use as structural fill. Utility trench backfill should be placed and compacted to the specifications of structural fill provided in this report, or to the applicable specifications of the city or county jurisdictions, as appropriate. - _.w-- __ � -_ ,..� -. - - _-� . _ . Earth Solutions NVV,LLC Davis Real Estate Group ES-Ofi25 September 27, 2006 Page 6 Pavement Sections The perfoi-mance of site pavement� is largely related to the condition of the underlying subgrade. To ensure adequate pavement performance, the subgrade should be in a firm and unyielding condition when subjected to proofrolling with a loaded dump truck. Structural fill in pavement areas should be compacted to the specificat�ons detailed in the Sire Pr�eparation and Earfhwork section of this report. It is possible that soft, wet, or otherwise unsuitable subgrade areas may still exist after base grading activities. Areas of unsuitable or yielding subgrade will require remedial measures such as overexcavation and thicker crushed rock or structural fill , sections prior to pavement. For relatively lightly loaded pavements subjected to automobiles and occasional truck traffic, the follawing pavement sections can be considered: • Two inches of asphalt concrete (AC) placed over four inches of crushed rock base (CRB), or; • Two inches of AC placed over three inches of aspfialt treated base (ATB}. The AC, ATB and CRB materials should conform to WSDOT specifications. Heavier truck-traffic areas generally require thicker pavement sections depending on site usage, pavement life expectancy, and site traffic. The geotechnical engineer should provide appropriate pavement section design recommendations for truck traffic areas and right-of-way improvernents, as necessary. Additior�ally, the City of Renton Road Standards may supersede the recommendations provided in this report. Foundations The proposed townhorne structures can be supported on conventional spread and continuous foundations bearing on competent native soils or structura( fill, as appropriate. We anticipate � that competent nabve soil suitable for support of foundations will generally be encountered at depths of between two to four feet below existing grades. Where loose or unsuitable soil conditions are exposed at foundation subgrade elevations, compaction of the soils to the specifications of structural fill, or overexcavation and replacement with structural fill may be ' necessary. Assuming the foundations are supported on competent, undisturbed native soils or suitable structural fill, the following parame�ers stiould be used for foundation design: Earth Solutlons NW,LLC Davis Real Estate Group ES-0625 September 27, 2006 Page 7 • Allowable Soil Bearing Capacity 3,500 psf • Friction 0.40 • Passive Resistance 350 pcf (equivalent fluid) • Total Settlement 1 inch • Differential Settlement Q.5 inches For short term wind and seismic loading, a one-third increase in the allowabte soil bearing capacity can be assumed. A factor-of-safety of 1.5 has been applied to the friction and passive resistance values. Slab-On-Grade Floors � Slab-on-grade floors for the proposed buildings should be supported on a firm and unyielding subgrade consisting of competent native soil or structural fill. Unstable or yielding areas of the subgrade should be recompacted or overexcavated and replaced with suitable structura! fill prior to construction of the slab. A capillary break consisting of a minimum of four inches of free draining crushed rock or gravet should be placed below the slab. The free draining material should have a fines con#ent of five percent or less (percent passing the #200 sieve, based on the minus three-quarter inch fraction}. In areas where slab moisture is undesirable, installation of a vapor barrier below the slab should be considered. Retainins� Walls Retaining walls should be designed to resist earth pressures and any applicable surcharge loads. For design, the following parameters can be assumed for retaining wall design: • Active Earth Pressure (Yielding Wall) 35 pcf (equivalent fluid) • At-Rest Earth Pressure (Restrained Wal!) 50 pcf • Traffic Surcharge (Passenger Vehicles) 70 psf (rectangular distr�bution) • Passfve Resistance- - - -_ - 35Q pcf(equivalent fluid) I . _ l • Coefficient of Friction 0.40 � Earth Solutions NW,LLC I Davis Real Estate Group ES-0625 September 27, 2006 Page 8 Additional surcha�ge loading from foundations, sloped backfill, or other loading should be included in the retaining wall design, as appropriate. Drainage should be provided behind retaining walls such that hydrostatic pressures do not develop. If drainage is not provided, hydrostatic pressures should be induded in the wall design, as appropriate. Tfie geotechnical engineer shou(d review retaining wall designs to verify that appropriate earth pressure values have been incorporated into design, and to provide additional recommendations, as necessary. Retaining walls should be backfilled with free draining material that extends along the height of the waN, and a distance of at least 18 inches behind the wall. The upper one foot of the wall backfill can consist of a less permeable (surface seal) soil, if desired. A rigid, perforated drain pipe should be placed along the base of the wall, and connected to an appropriate discharge location. We have provided a typical retaining wall drainage detail on Plate 3 of this report. Draina�te Groundwater seepage was not observed in any of fhe test sites at the time of our �ieldwork (September 200fi). However, the presence of groundwater seepage should be expected at the dense till contact in the winter and spring months. In the event groundwater seepage is encountered, temporary measures to controi seepage and surface water runoff during construction would likely involve interceptor trenches and sumps, as necessary. In our opinion, perimeter drains should be installed at or near the inve�t of the building footings. A typical footing drain detail is provided on Plate 4 of this report. Rockeries and Modular Block Walls � In our opinion, the use of rockeries or modular block walls at this site is feasible from a geotechnical standpoint. Rockeries or modular block walls over four feet in exposed height will require an engineered design. ESNW can provide engineered rockery and modular block wali designs, upon request. At a minimum, ESNW should review the final wall locations and heights, as necessary. Seismic Considerations The 2003 Intemational Building Code spec�es several soil profiles that are used as a basis for seisrnic design of structures. Based on the soil conditions observed at ihe test sites, Site Class C, from table 1615.1.1, shou�d be used for design. In our opinion, liquefaction susceptibility at this site is 1ow. The relative density of the site soils and the absence of a uniform, shallow groundwater table is the primary basis for this designafion, i Earth Solutions NW,LLC Davis Real Estate Group ES-0625 September 27, 2046 Page 9 LIMITATIONS The recommendations and conctusions provided in this geotechnical engineering study are professional opinions consistent with the level of care and skill that is typicai of other members in the profession currently practicing .under similar conditions in this area. A warranty is not expressed or implied. Variations in the soil and groundwater conditions observed at the test sites may exist, and may not become evident until construction. ESNW should reevaluate the conclusions in this geotechnical engineering study if variations are encountered. i Additional Services ESNW should have an opportunity to review the final design with respect to the geotechnical I recommendations provided in this report. ESNW should also be retained to provide testing and I, consultafion services during construction. Earth Solutions NW,LLC � N J � � Uz W �o �� O� — � a �. a. � H p � C � � m � � .� E'Z � � � a °- ...... '� � � 0 �� — a`� � � o �o V ll. �� Z� � � � � w � � p 0 y � � C � � � � k UZ � � = m � av? F"{pj Z '� N � � 0 0 0 0 o e o �Q :r� .,-,7, z � �, � G ..... ° °�a o ° °°0 b �oo ° 8 0° r • r•� = o a g' V ; Op O oDao oe � o 0 000 �4 a �• � � � � Y ° o p ° o Gb° o ' °�o 0 0 °aP aOo 0 0 ° � (.9 o °O o�o 0 0° '� 0 oe o0 00 o a O e� o� e � o �� oo a 8 a Oo a� �p o � 0 0 � o 0 0 0 �o° o° Oo a e o0° °�o° pd'o � � _Cr0 Oa° oQ p� e p Op o p° Q o ° p° � U 0 Q 0 Qo 0 p o� � ° � �i o q�o o � 0 8 p o e N «� 0 0 o p op o o O o 0 o N � ' o a o 000o a0 0 0 0 000 0 � � � a ' oo�0 0 0 0 �0 00 ° vo Q oQ0 o C �� yZ �� � 0 o p a o ° ° ° °� ° o° o o p CN �� � - o ° ° p o 0o c o ° � o o a O � � .�W �.� �7 � � � p$ � — � � �� "'� ,��f� —� � �� �� y = � � L�' � �� �� � � � �� � � I m � � ''°1 ' z� � � � C�'� C �'e� �a.�c „ � � c ` — � a �� �.c� � c � �� o � 1 �- vi o .c � � G� � a�� Z �a ❑ � �� � `�� ��� � � � � Z ti o a � ��$ o��'o � cn� u. � s • o,o ~�� A '°4 r��' Oo� v� m 'Q 0 �Z N C.) � � p � — Q z � ? m ..... �� � � � a a � ...•:'`�`•:. ?� � � � � � N ':6' �� 0 � � r. a • ;•'�'��'.;� � O� z N O o c� •.t"": �..� fV—„zp ,�, •'�'� $ C N � � . .�. N CLY �Q 'f` � t � � �f�}� r a � =F- � U . {� . � � �Z = � � .ti �•�.ti. 0 � _ '� . �� � � �v c C3 U � � � � a �, � � � � � � ��� � Q �� � ��� �� � � ��� '� � ` � ��� � � � �o � �� � �, �� � o � � � y � c o ¢ �»-n � � o � � Z$ � t� ,� m . 2 � � l%1�� � t= o � • • ,�� ��� I _. _ _ -- APPENDIX A SUBSURFACE EXPLORATION ES-0625 The subsurface conditions at the site were explored by excavating a tota! of four test pits using a trackhoe and operator contracted by ESNW. The approximate test pit locations are illustrated on Plate 2 of this report. The test pit logs are provided in this Appendix. The subsurface exploration was completed in September 2�06. n �-._ _ _ .= -= --�.::�-- �.:<�- �:�- - _ - Earth Solutions NW, LLC Earth Solutions NW��� SOIL CLASSIFICATION CHART MAJOR DIVISIONS S�BQLS TYPICAL GRAPH I.ETrER DESCRtPTIONS . CLEAN '�� �'�� WELL-GRAOED GRAVELS.GRAVEL- GRAVEL GRAVELS • ►�• � GW sallo�u�s.urr�oR No AND ��•� �n�s GRAVELLY ,�e ,Q. POORLY-GRADED GRAVELS, SOILS �E�R P�p Fq,�ES) �p�D GP R NO fIN�D M1XT1lRES,LITTLE �o COARSE ° GRAI�fED GRAVELSWITti '� �' � satYcitnv�.s.cw►v�-s�wn- 301LS �RE�� FINES Q o D GM S�T MD(TURES OFCOARSE FRAC710N RETAINED ON NO. 4 SIEVE G�PRECWBLE �+`+ CLAYEY ORAVELS.GFiAVEL-SANO- AMOUNT OF F1NES) CIAY MIXTSJRES SAN� CLEAN SANDS S`w WELL-GRADED SAND3.GRAVELLY MORE 1'FiHN 50'� SMID3,I.ITTLE OR NO FINE3 OF PMTERWI.IS �d t�tc�t Truw SANDY NO.zoo SI� SOILS PooruY-cr�eo S�oS, SIZE (LITTLE OR NQ FINESI SP fiRAVELLY SAND.UTil.E OR NO FINES •., �E�� SANDS WI7H SM ��,SAND-SILT ��� FINES FFiAC710N PASSING ON NO. 4 SIEVE (!►PPRECU16lE SC CtAYEY SANDS,SAND-CLAY AMOUKf OF FMES} MIXTUR�S INORGANIC SILTS ANQ VERY F1NE ML ��'ROCK FlAUR,SILTY OR CLAYEY FlNE SANDS OR CIAYEY SIL7S WfTH SLIGHT PLASTICfCY SILTS �NORGAN�C CLAYS OF IOVY 70 FlNE AAED ueui�uMrr CL A�D►Uwt P1AsncrrY,cRAVel.�v GRAlNED CL,4YS ���� CLAYS,LEAN CLAYS S,Si�tY SOiLS __= pL oac�cc s��Ts rwo or�c,�wic — sa.n cv►irs oF t.ow�nsrtcmr ��T�N�% MIORGAWC SILT3,MICACEOUS OR OF MATERIAL IS �{ DUITOMACEOUS FINE SAf�OR s�rn�.�n�w sx.n soi�s r+o.soo sc� S� SILTS �D LIOUID LtAAtT C'„� IltORQAN�C CIAYS OF HKiH CLAYS c�t�a�R n�so �u►snGrr �H oRc3nr�ic cu►Ys oF�wM� HIOH PIASTiCRIf,OR(i�WIC SILTS - _ . . HIGHLY ORGANIC SOILS '��` '��` � PT �T'H��'���'S wm� l u u �!• ' IiK3H OROANIC CONTENfS I DUAL SYMBOLS are used to indicate borde�line sofl classifications. The discussion in the text of this report is necessary tor a proper unclerstanding of the naturs ot the material presented in the attached bogs. i � I �nn sd�riw,uc TEST PiT NUMBER TP-1 2881 152nd Avarwe N.E. PAGE 1 OF 1 Redmond,WA 96052 Tdephone: 4252843300 Fax: 4252842855 CUENf Davis Rea1N Grouc PRO,l6CT NAI� Higfiland Sauare Townhomes PROJEGT Nt�Tt 0625 PROJEG?LOCATION ReMon.Washin�ton DATE STARTED 922/08 CO#pLETED 9�I24/W GROUI�O EIEVATION 410 A 7E3T PIT SIZE EXCAVATION CONTRAC.'T�OR Aikins ExCavatin9 GROIJMD WATER LEVELS: EXCAVAT10fi NEIFIOD AT TIIIE OF DCCAVA710N — W(3GED BY SSR CHECI�BY SSR AT ENp OF EXCAVA7TON — NOTES 2"AsohaR PavemeM,2'Gravel Base AFTER DCCAVATIOIi — W }� � U �� �� TESTS N �� MA7Ei21AL DESCRIPTION o a �z � t� Br�nm si�y SAND,medium dense,moist(Fal} SM 1.5 -bfaCe Org8niC8�1r8Ce gr�v81 408.5 Reddiah brown silty SAND,medium dense,mast � � -trace gravel and organics MC=13.00'6 • :-3.5 406.b Gray silty SAND wRh gravel,dense,moist 5 MC=8.60% Fines=16.40% � �• II - -decrease in gavel content �0 NIC=11.9096 •:•:to.o �oo.o Test p�termina�ed a�10_0 feat below e�dsting grede.No groundwater encounterect during e�a;ava6on. Bottom of test pit at 10.0 feet � r� _ � � �i 0 � � � � � x m � z w c� EaM SoluUona NW,u.c TEST PIT NUMBER TP-2 2881 152nd Avenue N.E. Redmond,WA 98052 PAGE 1 OF 1 Tefephone: 4252843300 Fa�c 4252842855 CIJENT Davis Reakv Groua PRWECT MA� Hi�hland Sauare Townhomes PROJECT NII�ER 4625 PROJECT LOCATiON Renton.Washlnaton DATE 3TARTED 9/22/06 CONi�LE7ED 9i2?!06 GROt1t�D ELEVATION 4U8 ft TEST PtT SIZE EXCAVATION CON'TRACTaFFt Aiklns Excavatinq GROl1ND WATFR LEVEI.S: D(CAVA710N IYETHOD AT TINE OF D(CAVAl70N — LOCiOED BY SSR CFEq(ED BY SSR AT EI�OF D(CAVATION — I NOTE3 2"Asphaft Pavement.2"Gravel Base AFTER EXCAVAT1pN — I� w I w �� �� TESTS � �C� MATERIAL DESCRlPTION � �Z � C7 0 Brown siRy SAND w3th gravei,madium dense.mo�sst -Decotnes de�se MC=8.3Q% SM :. -slightiy cemented MC=10.70% �= 7.0 401.0 Test pit tertninated at 7.0 feet below existing grade_No groundwate�encauntered during excavation. B4ttom of test pit at T.4 feet. � � c� _ ai � � 0 � � � � � � � w z w � Ee�s�wo�$rrw.LLc TEST PIT NUMBER TP-3 2881 152rW Avenue N.E. PAGE t OF 1 Redmond,WA 98052 Telephone: 4252843300 Fex: 4252842855 CU@R Davis Reakv Grouo PRWECT NAIVE Hightand Sauare Tvwnhomes PROJECT MJII�ER 0625 PRO,IECT LOCA710Ti ReMon.Washington �I►TE STARTED 9/2?JQ6 COI�'L.ETED 922108 GROLNiD ELEVA710N 4021t TE8T PIT SRE EXCAVATIOM CONTRACTOR Aakins Excavating GROUI�WATER IFVELS_ D(CAVATION�FIOD AT T111E OF EXCAVAIION — W(iC3ED BY SSR CFECI(�BY SSR AT EI�D OF D(CAVATiON — N�T6S 2"Aspehlt Pav�ement,2"Cravel Base AFTFR EXCAVA7TON — w �w �? _�7 �� �� TESTS ? �O MATERWL DESCRIPTION �Z � Brown sity SAND with gravel,medium dense,molst -becomes dense MC=B.00S6 Flnes=23.00% SM :. 5 MC=9.90°�6 .` �.o aes. Test pit tetminated at 7.0 leet betow ebsting grade.No groundwater encountered during excavation. Sottom of test pit at 7.0 feet. � � o - _. 0 ai � � � c°�f r � � � � � � / __ _ APPENDIX B LABORATORY TEST RESULTS ES-0625 _ _. � -_-� �::;���� - -. _.: _ Earth Solutions NW,LLC [.�s•Ih ,� � � • W►luti��n+ � � . •:�� �K'i�� _ �� �. •• - . - _�- -. • . .• , :�- ••. - - � � � .� � .� �� � �� `' II�rII�II111Y►rYIlY1�YY1ifIYli1�1Y1ii1111111��llllil��■ :, II��IIli111■����!1111��11111�1��EI�1111■�Eit1111�■ . 11��1111111����1'►t11��l1il1l1��1111111■�IIIIIII�■ :, 11��1111111■�Ili��,���llltill��llfl111■��IIIIII�■ 11��1�11111��111111\��IIIIIiI��f111111��1111111�■ , II��If�1111��1111111\�`!IIlil1��III1111��1i11111■■ II��IIri111��IIIItlliill�!1�1��11�1111��111111��■ :,II��IIrI111��III1111��III1�r1■■II�III1�■IlII111�■ 11��1111111��1111111��I��IIt;1��II�It11��1111111�■ �� , l1��11�l111■�IIIIt11��i11l�1\��II�1111��1111111�■ II��IlI1111��III1111��IIIII�f��1111111��1111111■■ , . , II��IIII111�■IIIIIII��Ilillll►1�1111111��1111111�■ � 11��1111111��11111l1��1111111�, II�II11��1111111�■ , 11■�I111111��1111111■�lIIIIii\l� IIIIIII��IIII111�■ II��Ilrlll���lllllll��Ilil111�\IIIi111��llliill�� , 11■�IIIIf11��1111111��iiIIlll�iil��t111��111111�� II��IIIIIII��iI11111��III11�1��i�dl111��111111��■ , 11�■IIwi111��1111111■�IIIII�1��11�1111■�ilifil�■■ II��IIIi�ll��lllllll��il11111��11�1111��111111��■ , II��IIIIIII��IIIIIII��iIII111��IIlifll��llIIII�■�, , . , . : : �0 ... :_ =��■i� ' � � .- - , - _ ,. - . mmmmm : o . , , . , , : . , , . . ����� . � . , , - . . ���■�� . n . , . � � , , , . . ����� .. ■ �■■�■��� ■ ����� .- - . - � _ �. � �� ..� i � . � ���� � � � ' ' �� ' � -��_ c ' „ �� • iK r � � I �-�� � � a - , . . , � ���■���� � ■ �■����■��� � ■ ������■■�� I REPORT DISTRIBUTION ES-0825 4 COPIES Davis Real Estate Group 1201 Monster Road Southwest, Suite 320 Renton, Washington 980Sb Attention: Mr. Johnathan Kurth �' Eerth Solutions MN, lLC