HomeMy WebLinkAboutA 10101911a
THIS AGRRMTERT, made and entered into by and between the
Colombia & Puget Sound Railroad Company, a Vlashington corporation,
party of the first part, and the Seattle, Renton & Southern Railmy
Company, a Washington corporation, party of the second part,
C:rITNESSETH, That for 6Ad in consideration of the sum of
one dollar ($1.00) and other valuable consideration to it in hand
paid by the second party, and in consideration of the covenants
herein contained to be kept and performed by the said socond party,
the said first party does horeby assign and set over unto the said
second party all rights privilege and authority which it has under
Ordinance number 259 and 260 of the City of Renton, to lay dorm,
construct, maintain and operate that certain transfer track men-
tioned and described in Section 2 of said Ordinance number 259,
which transfer truck is more specifically described as follorls:
A single track of standard gunge railway the
center line whereof shall be as nearly as may be co-
incident with the cen*er line of the right of way
therefor next hereinbelow specified, and a right of xray
11 feet in tridth for such track, the center line of
,which right of rmy- shall begin on the south marginal
line of Third Street at a point 32.26 feet east of the
northeast corner of block 339 as name is shown on the
official plat of Smither's let Addition to the Tom of
Renton; thence on a, curve to the left with a radius of
105 feet (said radius from point of beginning, bearing
southeasterly two degrees forty-four minutes from the
lino of Third Streetl a distance of 102.17 feet, more
or lean, to an intersection with the center line of the
-1-
i
I l:
most southerl3r of the tyro tracks of the Seattle, Renton
& Southern Railway as the same are now located, over
and across said.Third Street tangent to the center dine
of the said Seattle, Renton and Southern track and the
center kine of the 11 foot r:i�t of tray last above
described, being parallel and coincident at said.inter-
section.
And. the said :first. narty does also hereby assign to said
second party all the right, privilege and authority granted to it
by said Ordinances to locate, lay down, operate and maintain in
connection with said transfer track at such place.in Third Street
in the City of Renton, and Burnett Street in the City of Renton,
as is necessary or convenient, the necessary poles and all neces-
sary equipment of every sort, and the right to erect poles and
string wires to make proper and complete electrical connection, to
the aforesaid track of the Seattle, Renton and Southern Railvray,
This assignment is made subject to all • the condition►,
limitations and restrictions mentioned and set forth in said
8rdinanes number 259 and 260.
In consideration of the premises the said second party
does hereby agree to pave that portion of said transfer track
hereinafter described within the boundaries of Third Stroet in
the City of Renton, Vashington, whenever the remaining portion
of said street is paved under ,any ordinance of the City of Renton,
such pavement to be similar to the pavement constructed in the
rcmainder of said street.
Said second party does hereby further covenant, and
agroe4 to and vrith the party of the first part, to protect and
save harmless the said party of the first part from all claims,
actions or damagea of every kind and description Which may accrue
-2-
to or be suffered by any person or persona by reason of any defec-
tive construction or maintenance or improper occupation of said
transfer track and right of -tray, or by reason of the Negligent
operation of said second party, its successors and assigns, of its
or th-ir railway trains over Laid trans :�r trach and right of tray
above described, and in cas-- an;; action or suit should be b 1-15 .
against the said City of Renton, or against the first party herein$
arising out of or by reason of such defective construction or
maintenance or improper occupetion or negligent operation, said
socond party , its successors and assigns may and shall upon notice
to it or thea of the corenrnccnr ent of such action or shit, defend
the some at its or their sole cont and expense; and in casae judgment
shall be rendered aeainsst said City of Renton, in such action or
suit, or against the first party herein in such action or suit,
shall fully satisfy such judgment witWn ninety (90) days after
such action or suit shall have been finally determined, if
dotormined adversoly to said City of Renton or to said first party.
Said sodond party further .agrees to beCin upon the
construction of the said transfer track archin "e—days
from this. d.ato an shLi:l complete t•.ho constru tion of the sssnc
-.1 thin �r;*
d aya from thio dr te. And if Maid work shah
nol; be begunVAthIn the time in this clr=e crib ed, than unless
the b wginning of said ;cork or the completion of the same Shull
have bean prevented by injunctions, unavoidable delays in eond3nn
ation suits, strikes, riots or other occurrences beyond the control
of said socond party its successors and assigns, the said City
Council of the City of Rcnton, or the first party, shall hsavc the
right after thirty(30) days notice to said second party, its
successors and assigns, to declare the forfeiture of all ri_ its,
privileges and authorities hcrcby assigned*
-3-
;j
_1
n
`MID, aspigment shall not bo offectivo until a copy
thoroo2 aortifiod to mo ouch by the Secretary of amid socond party,
or other paccon having tho proper custody Of Duch assignment in
Its behalf, shall have been filed in the office of the City Clerk
of the City of Renton, and said second party agreed to file ouch
certified copy as aforesaid, within days From the date
hereof.
Iii 2 5 VRERMP tha, parties hereto have caused these
preownts to be caocuted b its duly authorizod officers this
day of L 1911.
COLIRMIA & PUGET SOUND RAILROAD COITANY,
Ito President.
ATTIMT
Its Secretary,
SEATTLE, R'1T419 SOUTIFPX 3AILTAY CGL"ANY.
f
Its President.
As'TIMT:
its Secretary,
.AA
b�
1
State of Washington,:
(ss
County of K i n '
Secretary of the Seattle, Renton
& Southern Railway Company, a corporation, do hereby certify
that the.above and foregoing is a true, full and correct copy
of an instrument of assignment made, executed and delivered by
the Columbia & Puget Sound Railroad Company to the said Seattle,
Renton & S'outhern Railway Company, on the day it bears.date.
And I further certify that the original of said assignment is
in my possession. as Secrtary of said Railway Company.
I__� STI T1}FSS I'IKF)3FCF, I have her
affixed the seal of said corporation
set my hand and
,
day of Gcto
.61 %
, 1911.