HomeMy WebLinkAboutRC 20160329001169 . k
� '
. . ., . .� _ . . � -
�;. iVW��;✓�Li���Vv/
CI�OF REN70NSCOV �S��g
QAGE-@g1 OF' 00
KING�GOUNTY1�Wp�
_.__---''`�_��1�'�.��1 "
RECORDING REQUES`I'ED BY AND
WHEN RECORDED MAIL TO:
CITY CLERK'S 4FFICE
CITY OF RENTON
]Q55 SOUTH GRADY WAY
RENT4N, VVA 9805'7
DECLARATION t�F CtJVENANT
FC1R MAINTENANCE AND INSPECTI4N C►F FLOW C{JNTR(3L BMPS
Grantor: Park Ave. LLC
Grantee: City of Renton
Legal Description: HILLSMAN LK GARDEN OF EDEN #1
N 65FT OF S 204.5 FT �ESS E 99 FT �
PLAT BLAOCK: PL,�+T LOT: 43
Additional Lega](s)on:
Assessor's Taac Parcel ID#: ����`10-32$3
IN C4NSIDERATION af the approved City of Renton(check ane af the follotiving) �residential
building permit, 0 commercial bui3ding permit, D clearing and grading permit, 0 subdivisian permit,or
❑ short subdivision permit for Application File No. LUAfSWF' �`� � ��12�� relating tq the
real property("Property")described above,the Grantor(s),the owner(s)in fee ofthat Property, hereby
covenants(covenant)with City or Renton,a political subdivision of the state of Washington,that
he/she(they)will observe, consent to, and abide by the conditions and obligations set forth and described
in Paragraphs 1 through 8 below with regard to the Property. Grantor(s)hereby grants(grant),
covenants(covenant), and agrees(agree)as follows:
1. Grantor(s) or his/her(their)successors in interest and assigns ("Owners")shall retain, uphold,
and protect the stormwater management devices, features,pathways, limits, and restrictions, known as
flow control best management practices("BMPs"), shown on the approved Flow Control BMP Site Plan
for the Property attached hereto and incorporated herein as Exhibit A.
2. The Owners shall at their own cost,operate, maintain,and keep in good repair,the Property's
BMPs as described in the approved Design and Maintenance Details for each BMP attached hereto and
incorporated herein as Exhibit B.
3. City or Renton shall provide at least 30 days written notice to the Owners that entry on the
Property is planned far the inspection of the BMPs. After the 30 days,the Owners shall allow the City of
Renton to enter for the sole purpose of inspecting the BMPs. In lieu of inspection by the City,the
Owners may elect to engage a licensed civil engineer registered in the state of Washington who has
expertise in drainage to inspect the BMPs and provide a written report describing their condition. If the
engineer option is chosen,the Owners shall provide written notice to the City of Renton within fifteen
days of receiving the City's notice of inspection. Within 30 days of giving this notice,the Owners, ar the
engineer on behalf of the Owners,shall provide the engineer's report to the City of Renton. If the report
is not provided in a timely manner as specified above,the City of Renton may inspect the BMPs without
further notice.
4. If the City determines from its inspection, or from an engineer's report provided in accordance
with Paragraph 3,that maintenance,repair, restoration, and/or mitigation wark is required for the BMPs,
The City shall notify the Owners of the specific maintenance, repair,restoration,and/or mitigation work
(Work)required under RMC 4-6-030. The City shall also set a reasonable deadline for completing the
Work or providing an engineer's report that verifies completion of the Work. After the deadline has
passed,the tawners shali allow the City access to re-inspect the BMPs unless an engineer's report has
been provided verifying campletion of the Work. If the work is not completed properly within the time
frame set by the City,the City may initiate an enforcement�ction. Failure ta properly maintain the BMPs
is a violation af RMC 4-6-030 and may subject the C)wners to enfarcement under the RMC 1-3, including
fines and penalties.
5. Apart from performing routir►e landscape mair�tenance,the Owners are hereby required ta
obtain written approval from the City or Renton bcfore performing any alterations or moclifications to the
BMPs.
b. Any notice or approval required to be given by ane party to the other under the provisians of
this Declaration of Covenant shall be effective upan persanal delivery to the otl�er party,ar after three{3}
days from the date that the notice or approval is mailed with delivery confirmation to the current address
an record with each Party. The parties shall natify each other af any change to their addresses.
7. This Declaration of Covenant is intended to promote the efficient and effective management of
surface water drainage on the Property,and it shall inure to the benefit of all the citizens af the City af
Renton and its successars and assigns. This Declaration of Covenant shall run with the land and be
binding upon Grantor(s),and Grantor's(s')successors in interest and assigns.
8. This Declaration of Covenant may be terminated by execution of a written agreernent by the
Owners and the City of Renton that is recorded by King County in its real praperty recards.
IN WIT'NESS WHEREOF,this Declaration of Covenant for the Maintenance and Inspection of
Flow Control BMPs is executed this 9 day of March 2016
���
GRANtI'�OR, own of e Property
GRANTOR, owner of the Property
STATE OF WASHINGTON )
COLJNTY OF KING )ss.
On this day personally appeared before me:
—��►/-�Q�." -�.�,YY'c.u� .to me known to be the individual(s)described in
and who executed the within�and foregoing instrument and acknowledged that they signed the same as
their free and voluntary act and deed, for the uses and purposes therein stated.
Given under my hand and official seal this �`�`" day of _ _,20�.
�
�C. Q
LINDA R. WHITE �;�
NOTARY PUBLIC
STATE OF WASHINGTON Printed name
COMMISSION EXPIRES Notary Public in and far the State of Washington,
JUNE 7, 2018 residing at
.(.�,��..�e. �-ls�
� � ,
My appointment expires ��?-!�
TQTAI. L.O� AftEA: 10,�7� 5Q. FT. NQUSE (W/ OV��I-lANG): 3122 SCl. rT.
1`OTAL IMP�RVIOUS: 3.957 SQ. �T. �RIVEWAY/WAIKWAYS: 835 5C?. �T.
sOTAI, PERVEC3US; G.315 SQ. FT. PATI�>fF't3t�CH: � S�i. FT.
I.AND DISTURBiNG ACllillTY: 5,(lUG S�'. FT. TC7TAL IMPERV��}US: 39�i7 SC�_ �T.
E������ �
YARO �RAIN
PARK AVE NUF f�l�R`CFi r,/��M=2,b6.0
� i�=ZC}.3.5, �"
�" ����� �vc sc� ._ _ �,, ���.. o�wr� �u��
�s=�,��� �..., f �.�.�ow
e''�
� � / I
.� �,.,� . �''�.__. �
�--�-� �
J' 6' +tn � �
r �
� — �
f � � � � !
CJ Z �.__..�... _� �i 3
c� w w � t �
r
' �l.` �*�e.ce�.4.�....,.,«
� �� N i.���������y�x��.v�4 .
�✓
�"
W �,��,
�' ��i W� r �2�`
C.?W ¢� "� E��`JW�J�'JPOUTS,
�.i Cy C�ti.. --
�c�cs�et��� � �� � (TYP.)
wcsa-'�rnt� ; ��C�
.w _ .
°'�.��?�n � 4 ��,`�° I �V,E�_Ff,4�JG. Ll.hl�
� ��� �� � ��.�
,� ca� � , �a�- �,.---�
��t�y c�� �,,� �-., R 1 G I i� F'ut; .
>-�'���� �'�" �� �'"`�5T(JRM F'!PE
�in t-�'-��� ���:��:���..,., ^ --'./ C�S=2.�t7% (htElN)
� �, "� , � TYPICA�
FOUNDATI4�! �ENE � �,a-____�� �
� � �
��
l !
I ;
� j
� � �
��ov� �a�vTRa� �M� ��a� ����►
seA�� : �r� = 30� R EN Tt�N
2�i08 E�ark Ave:nue Nr�rtP�
LEGAL t3ESCRlPTIQN: l.t1T 43, i�li_��lAN`S t_Af�E GARE��3v ���7��, w�,. �8o5s
ADL�I110N �1 PAR�E.L�33431C?---�283
_
EXHIBIT B
FU�I.INFIITRATION MAINTENANCE tNSTRUCTlONS
Your property contains a stormwater management flaw cantral BMP (best management practice) ca(led
"ful! infiitration," which was installed to mitigate the stormwater quantity and quality impacts of some
or aA of the impervious surfaces on your property. FuN infiltration is a method af oaking runoff from
impervious area {such as paved areas and roofs) into the graund. if properly instal{ed and maintained,
fuA infiltratian can manage runoff so that a majarity of precipitatian events are absorbed. Infiltratian
devices, such as gravel filled trenches, drywells, and ground surface depressions, facilitate this pracess
by putting runaff in direct contact with the sail and holding the runoff long enough ta soak mast of it
into the ground.To be successful, the sail conditian around the infiEtratian device must be reliably abfe
to saak water into the ground for a reasonabfe number of years.
In#iltration Devices
The in#iltration devices used on your pro erty include the fo!lowing as indicated on the flow contro!
BMP site plan. �l grave! filled trenches,�drywells, I� ground surface depressians. 7he size, placement,
and compasition of these devices as depicted by the flaw cantrol BMP site plan and design details must
be maintained and may not be changed without written appraval from the City of Rentan.
Infiltration devices must be inspected annually and after majar storm events to identify and repair any
physical defects. Maintenance and aperation of the system should focus on ensuring the system's
viability by preventing sediment-laden flows fram entering the device. Excessive sedimentation wiU
result in a plugged ar non-functioning facility. If the infiltratian device has a catch basin, sediment
accumulation must be remaved on a yearly basis or more frequently if necessary. Prolonged ponding
around or atop a device may indicate a plugged facility. If the device becomes plugged, it must be
replaced. Keeping the areas that drain to infiltration devices well swept and clean will enhance the
longevity of these devices. For roafs, frequent cleaning of gutters will reduce sediment loads to these
devices.