HomeMy WebLinkAbout03895 - Technical Information Report I r r��A l�
�Z,- 3�3�c�
June 20, 2016
Weston Heights
Technical Information Report
684 Nile Ave NE, Renton,WA
SDA Project#349-004-14
_ ' ��� -
.
�;
;. .. E
,,
,}�; � �" ' � �� �� '� - 4. °s... �.._
— ____. � `_ �
. ._,� _ � ° 1
< , __
,. . ,�, x � r-
� + � � _ - �� "'�y _ ��� \
��:` �' : �– :�
� � ,
. ,.
� � � r-� � . -
� �_ -
r
ti��. �;:
:� �R ..
��' _- � �
,.:
� �
� c"
,.�'
_�, ._
•�. ..t �� ,: _ �_\ � S I
Prepared for:
Prospect Development, LLC
2913 5th Avenue NE, Ste. 201
Puyallup, WA 98372
S � A CIVIL ENGINEERING � PROJECT MANAGEMENT � PLANNING
1724 W.Manne View Dnve,Sutle 140,Everett,WA 98201�425.486.6533�www.sdaergineers.com
38�-5
Weston Height�
', Technical Information Repo�
IPrepared For:
i
Prospect Development, LLC
' 2913 5�h Avenue NE, Ste. 201
Puyallup, WA 98372
Prepared Bv:
SDA Engineers
1724 West Marine View Drive, Ste 140
Everett, WA 98201
(425)486-6533
► � � � � f
� �
1 �
I ♦
I �
� ►
� �
�
1
• �
♦ ♦
� 1
► ' . - . � �
06-20-16
_u �d�e cy r'.a�i �.iCi .J,e;, .,�.. _
� , R:1Pro�ects;349(prospect developme�� ��-�-'• .�_,, cl�ts�T ,�n ca'� . ��;�ts _ r�_,;;.-s T�R�, '. �6-��_ ��,� - "�ra�na��
Report docm
Weston Heights
Technical Information Report
TABLE OF CONTENTS
SECTION 1 PROJECT OVERVIEW
. Project Overview
. Figure 1 —TIR Worksheet
. Figure 2—Vicinity Map
SECTION 2 CONDITIONS AND REQUIREMENTS SUMMARY
SECTION 3 OFF-SITE ANALYSIS
. Task 1 —Study Area Definition 8�Maps
. Task 2—Resource Review
. Task 3—Field Inspection
. Task 4—Drainage System Description and Problem Descriptions
• Task 5—Mitigation of Existing or Potential Problems
. Appendix 3A—Downstream Analysis Map and Photos
. Appendix 3B—Resource Review Documents
SECTION 4 FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND DESIGN
. Part A—Existing Site Hydrology
. Part B—Developed Site Hydrology
. Part C—Performance Standards
. Part D—Flow Control System
. Part E—Water�uality System
. Part F—Wetland Hydrology
. Appendix 4A—Flow Control Design Calculations
. Appendix 46—Treatment Design Calculations
. Appendix 4C—Wetland Hydroperiod Calculations
SECTION 5 CONVEYANCE SYSTEM ANALYSIS AND DESIGN
. Appendix 5A—Conveyance Calculations
. Appendix 5B—Isopluvial Map—100-yr,24-hr Precipitation
SECTION 6 SPECIAL REPORTS AND STUDIES
� . Appendix 6A—Geotechnical Report '
. Appendix 66—Olympus Villa LUA 10-090
. Appendix 6C—Olympus Villa As-Built Plans
SECTION 7 OTHER PERMITS
SECTION 8 CSWPPP ANALYSIS AND DESIGN
SECTION 9 BOND GIUANTITIES,FACILITY SUMMARIES,AND DECLARATION OF COVENANT
. Appendix 9—Bond Quantity Worksheet
SECTION 10 OPERATIONS AND MAINTENANCE MANUAL ,
�
Weston Heights
Technical Information Report
SECTION 1
PROJECT OVERVIEW
� � ;
,--,
�
i �
Weston Heights
Technical Information Report
�, -_.
Proiect Overview
The Weston Heights project proposes the construction of 12 single family lots on two existing parcels
totaling approximately 4.55 acres. The project occupies King County Tax Parcel Numbers 1123059092
and 1123059010, and is situated in the northwest quarter of Section 11,Township 23 North, Range 5 I
East, W.M. More specifically,the project is located on the east side of Nile Ave NE, approximately 0.4 '
miles of the intersection of Nile Ave and north of NE 4th Street. A�icinity map has been provided as
Figure 2 of this document.
A central wetland area divides the site into two distinct developable pieces. The wetland area and a
surrounding buffer will remain undisturbed, and separate access roads will be provided to each of the two
developable areas. The wetland also divides the site into two distinct drainage basin areas,which are
referred to in this report as the"West"which will contain nine new single-family lots, and "East" basin
which will contain three new single-family lots.
The central and eastern portion of the combined subject parcel is largely undisturbed, consisting of native
forest trees and shrubs. The western side has previously been cleared and primarily consists of pasture
grass and lawn area. The topography of the combined subject parcel slopes moderately from the east
and west edges into the existing wetland. The project is contained within a single threshold discharge
area, but practically speaking, the central wetland bisects the site into two distinct areas, which will be
treated separately for stormwater modeling purposes. The USDA Soil Survey for King county indicates
that the site consists of Alderwood gravelly sandy loam, which is generally characterized as glacial till,
with moderate runoff rates and low capacity for infiltration.
Much discussion involving the Olympus Villa Pond 'A' will be found within this text. This is largely due to
the fact that this development, Weston Heights, will likely be constructed concurrently with the Weston
Heights North development. Although these two developments are likely to be constructed concurrently,
they are being designed under separate plat actions. Ultimately, the Weston HeighYs stormwater
management facilities have been designed to accommodate the Weston Heights North project area.
However, the Weston Heights facilities were not able to accommodate the entire Weston Heights North
development. It is this reason that the Olympus Villa Pond `A' is mentioned frequently in this text.
Surface runoff will be detained through three separate facilities in order to avoid concentration of flows.
Surface runoff will be directed to a combined detention pond, and/or a detention vault. Flow control
structures are included to match the historic release rates. A flow spreader will service the detention
pond on the east, spreading flows overland and ultimately into the wetland. New storm sewer
infrastructure will convey storm water from the western detention vault to an existing roadside ditch along
the eastem edge of Nile Ave NE. The Olympus Villa Pond`A'flow control structure will be reconfigured to
satisfy the historic release rates. This meets the requirements for Full Drainage Review, as described
further in Section 4 of this report.
Weston Heights
Technical Information Report
i
FIGURE 1
TIR WORKSHEET
, �
�
� �,
;- :
�
� ;
, .
Weston Heights
Technical Information Report
KI;`(; �'()L:NTY. Vb'ASHINCi"r0�1, 5�1RFACE �'�'ATER DESICiN IVIANL!AL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 1 PROJECT OWNER AND Part 2 PROJECT LOCATION AND
PROJECT ENGINEER DESCRIPTION
Project Owner TAYLOR DEVELOPMENT Project Name WESTON HEIGHTS
Phone (425)869-1300 DDES Permit#
Addfess �5 LAKE BELLEVUE DRIVE#102 Location Township 23N
BELLEVUE,WA 98005 Range 5E
Project Engineer scorT nnEsic Section >>
Company SDA ENGINEERS Site Address 684 NILE AVE NE
Phone (425)486-6533 RENTON,WA 98056
Part 3 TYPE OF PERMIT APPLICATION Part 4 OTHER REVIEWS AND PERMITS
� Landuse Services ❑ DFW HPA ❑ Shoreline
ubdivison / Short Subd. / UPD ❑ COE 404 Management
❑ Building Services ❑ DOE Dam Safety � Struc I
M/F/Commerical / SFR Rocke aulU
� ❑ Clearing and Grading ❑ FEMA Floodplain
❑ ESA Section 7
❑ Right-of-Way Use ❑ COE Wetlands
I ❑ Other
❑ Other
�
� Part 5 PLAN AND REPORT INFORMATION
i Technical Information Report Site Improvement Plan (Engr. Plans)
Type of Drainage Review Full Targeted / Type (circle one): Full Modified /
; (circle): Large Site mall Site I
�- Date (include revision Date (include revision
dates): dates):
Date of Final: Date of Final:
Part 6 ADJUSTMENT APPROVALS
Type (circle one): Standard / Complex / Preapplication / Experimental / Blanket
Description: (include conditions in TIR Section 2)
N/A
Date of roval:
�
I
2009 Surface Water Design Manual 1;'9i2009
1
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 7 MONITORING REQUIREMENTS
Monitoring Required: Yes No Describe:
Start Date:
Completion Date:
Part 8 SITE COMMUNITY AND DRAINAGE BASIN
Community Plan : c�TY oF RENroN
Special District Overlays:
Drainage Basin: cE�a,R RivER
Stormwater Requirements:
Part 9 ONSITE AND ADJACENT SENSITIVE AREAS
❑ River/Stream ❑ Steep Slope
❑ Lake ❑ Erosion Hazard
� Wetlands ON-SITE;NOT DISTURBED ❑ Landslide Hazard
❑ Closed Depression ❑ Coal Mine Hazard
❑ Floodplain ❑ Seismic Hazard
❑ Other ❑ Habitat Protection
❑
Part 10 SOILS
Soil Type Slopes Erosion Potential
ALDERWOOD <10% LOW(MODERATE
❑ High Groundwater Table (within 5 feet) ❑ Sole Source Aquifer
❑ Other ❑ Seeps/Springs
❑ Additional Sheets Attached
_�����, ��.il.�:"� ;1_I,� I �,��_�� A1,��.:`�.�� �I � ' ,i�"';
,
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 11 DRAINAGE DESIGN LIMITATIONS
REFERENCE LIMITATION /SITE CONSTRAINT
� Core 2—Offsite Analvsis
❑ Sensitive/Critical Areas
❑ SEPA
❑ Other
❑
❑ Additional Sheets Attached
Part 12 TIR SUMMARY SHEET rovide one TIR Summa Sheet er Threshold Dischar e Area
Th�@ShOld DISCh8f92 A�ea: THE PROJECT IS 1 TDA WHICH DISCHARGES TO AN EXISTING PIPED CONVEYANCE
name or descri t1011 SYSTEM ALONG NILE AVE NE.
Core Requirements(all 8 apply)
Dischar e at Natural Location Number of Natural Dischar e Locations: �
Offsite Analysis Level: 1 / 2 / 3 dated:
Flow Control Level: 1 / 2 / 3 or Exemption Number
incl. facili summa sheet Small Site BMPs N1A ,
Conveyance System Spill containment located at: va,u�T�Po►v�
Erosion and Sediment Control ESC Slt@ SUPefVISOf: TO BE ASSIGNED AT PRECONSTRUCTION.
Contact Phone:
After Hours Phone:
Maintenance and Operation Responsibility: rivate / ublic
If Private, Maintenance Lo Re uired: Yes / No
Financial Guarantees and Provided: Yes No
Liabilit
Water Quality Type: Basic Sens. Lake / Enhanced Basicm / Bog
(include facility summary sheet) or Exemption No.
Landsca e Mana ement Plan: Yes / No
S ecial Re uirements as a licable
Area Specific Drainage Type: CDA/SDO/MDP/BP!LMP/Shared Fac. one
Re uirements Name:
Floodplain/Floodway Delineation Type: Major / Minor / Exemption None
100-year Base Flood Elevation (or range):
Datum:
Flood Protection Facilities D@SCflb@: 1 -EXISTING COMBINED POND, 1 -DETENTION POND,
1 -COMBINED VAULT
Source Control Describe landuse: sFR
(comm./industrial landuse} Describe any structural controls: NiA
2009 Surface Water Design Manual 1i9i2009
3
KING C(�tiNTY, WASHINGTON, SURFAC'E WATER DESIGN MANUpL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Oil Control High-use Site: Yes No
Treatment BM P:
Maintenance Agreement: Yes / No
with whom?
Other Draina e Structures
Describe:
Part 13 EROSION AND SEDIMENT CONTROL REQUIREMENTS
MINIMUM ESC REQUIREMENTS MINIMUM ESC REQUIREMENTS
DURING CONSTRUCTION AFTER CONSTRUCTION
� Clearing Limits � Stabilize Exposed Surfaces
� Cover Measures � Remove and Restore Temporary ESC Facilities
� Perimeter Protection � Clean and Remove All Silt and Debris, Ensure
� Traffic Area Stabilization Operation of Permanent Facilities
� Sediment Retention � Flag Limits of SAO and open space
preservation areas
� Surface Water Collection ❑ Other
❑ Dewatering Control
❑ Dust Control
❑ Flow Control
Part 14 STORMWATER FACILITY DESCRIPTIONS Note: Include Facili Summa and Sketch
Flow Control T e/Descri tion Water Qualit T e/Descri tion
VAULT/POND(2) ❑ giofiltration
� Detention �-NEW
1 -EXISTING � Wet VAULT/POND{EXISTING)
❑ Infiltration pool
❑ Regional Facility ❑ Media Filtration
❑ Shared Facility ❑ Oil Control I'
❑ Flow Control ❑ Spill Control
BMPs
❑ Flow Control BMPs
❑ Other
� Ot112f STORMFILTER
2009 Surface VVater Design I�4anual 1:9:2009
4
K[NG COUNTY, WASHINGION, SURFACE WATEEt DESIGN MANUAL
i
i_
' TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
�
; Part 15 EASEMENTS/TRACTS Part 1fi STRUCTURAL ANALYSIS
� � Drainage Easement � Cast in Place Vault
� � Covenant ❑ Retaining Wall
' � ❑ Native Growth Protection Covenant ❑ Rockery >4' High
� � Tract ❑ Structural on Steep Slope
� ❑ Other ❑ Other
;
�
Part 17 SIGNATURE OF PROFESSIONAL ENGINEER
� I, or a civil engineer under my supervision, have visited the site. Actual site conditions as observed were
' � incorporated' this worksheet and the attached Technical Information Report. To the best of my
i ' knowledg e� rm ion provided here is accu te.
� `� � 6 /�
�
, s ned�ere
��
�
�
�
;
i
i
i
i
`��
�
� 1
I 2009 Surface Water Design Manual 1i9/2009
� 5
FIGURE 2
VICINITY MAP
�
Weston Heights
Technical Information Report
Jun 09, 2015 — 9:57AM Last Saved By: SRose
R: Pro�ects 349 ros ect develo ment 004-14 Weston Hei hts Dw fi ures WHvinma .dw 8.5x11
v�o�o�nvx
o.�°: o, �-� �
i� �f ���
i > >
o� �
• � o
r �o
� I =�� �
Q 5 � � �o�
R
-��
� � I� ^a UNION AVE NE
� � �� � l
� z ��,
�r m ,
�
����� � _ � � ��2
� � � � m � `��`�
;� o � �
�
n o�
',�
J NILE AVE NE 148TH �4VE SE
�
m
S
_ ��� '�
�
g rN cn cn ,���
ai — —' m m � Y�
< —•�
� n Z 1 —�i � � 164TH AVE SE ��
D z � _� _ -�
� � m cn =
i IIv � �
� o
�' O
�o
Q � 176TH AVE SE
cu Z
�, v,;
m� m '�
�o "g � �
o `? � p
�+ O
SECTION 2
CONDITIONS AND REQUIREMENTS SUMMARY�
Weston Heights
Technical Information Report
Conditions and Requirements Summarv
The project proposes more than 2,000 square feet of new impervious surface area, and is subject to the
provisions for Full Drainage Review as outlined in the 2009 King County stormwater Design Manual
(KCSWDM). Full Drainage Review requires the accommodation of 8 core requirements in addition to 6 ,
speciaf requirements— all of which are listed and discussed belo�^.
. Core Requirement#1 — Discharge at Natura! Location ',
The pre-developed drainage discharge locations will be maintained for post-developed II
conditions. Drainage improvements consist of implementing new storm sewer infrastru�;��c ;. ,
utilize two separate facilities—the detention pond serving the eastern developments, and the 'I
combined detention vault serving the western developments. The eastem faciliry will discha� ;
via level spreader into the existing wetland, maintaining the pre-developed surface water ',
discharge location. The western facility will discharge via a new conveyance system into i ',
existing roadside ditch along Nile Ave NE, maintaining the pre-developed surface water d� '
location.
Those areas directed to Olympus Villa Pond `A'will ultimately maintain their existing discharge
location. The Olympus Villa Pond outlets to the south in man-made conveyance until outfalling to
the roadside ditch just south of the west basin's detention facility. Stormwater from the Olympus
Villa pond will combine with the stormwater from the west basin facility at this location,which
maintains the pre-developed surface water discharge location.
• Core Requirement#2- Offsite Analysis
A thorough off-site analysis is presented in Section 3 of this report.
. Core Requirement#3-Flow Control
Flow control of surFace runoff for this site is provided via two detention facilities—the detention
facility serving the eastern basin,and the combined detention facility serving the vvestern basin.
Olympus Villa Pond 'A' provides detention for those areas in the future Weston Heights North
project that are unable to be accommodated in the east and/or west basin detention facilities.
Design calculations for these facilities are contained in Section 4 of this report.
• Core Requirement#4- Conveyance System
Stormwater conveyance has been analyzed in Section 5 of this report.
• Core Requirement#5-Erosion 8 Sediment Contro!
An erosion and sediment control analysis has been provided in Section 8 of this report.
• Core Requirement#6-Maintenance 8 Opeiations
Maintenance and operations of the proposed storm drainage facilities is addressed in Section 10
of this report.
• Core Requirement#7-Financia/Guarantees 8 Liabilities
Financial guarantees and liabilities are addressed in Section 9 of this report.
Weston Heights
Technical Information Report
• Core Requirement#8- Water Quality
Water quality for surface runoff on the East Basin will be provided via a StormFilter vault. The
StormFilter utilizes cartridges to remove suspended solids from the runoff. Roof runoff will be
routed around the StormFilter to minimize the required treatment flowrates for the StormFilter.
Roof runoff is considered NPGIS (non-pollution generating impervious surface) and does not
require treatment if the runoff is separated from pollution generating impervious surface runoff, as
is the scenario for this project. Water quality for surface runoff on the West Basin, and for those
areas that the existing Olympus Villa Pond `A' receive, will be provided via wetpool. Permanent
wetpools allow for settling of solids that are suspended in the stormwater runoff. A discussion of
the design methodology and calculations for this feature are provided in Section 4 of this
document.
SUMMARY OF SPECIAL REQUIREMENTS
• Specia/Requirement#1— Other Adopted Area-Specific Requirements
There are no adopted basin plans or area-specific requirements affecting Parcel's 11023059092
I and 11023059010. Therefore,the project is exempt from this requirement.
• Special Requirement#2—Flood Hazard Area Delineation
The project site and surrounding area is shown on FEMA Flood Insurance Rate Map No.
53033C0982, and is not located within a flood hazard area. Therefore, the project is exempt from
this requirement. A portion of the FEMA map referenced above is included in Appendix 3-B of
this report.
• Specia/Requirement#3-Flood Protection Facilities
The project neither relies on an existing flood protection facility, nor proposes a new flood
protection facility, and therefore, is exempt from this requirement.
• Specia!Requirement#4- Source Contro/
This project does not require a commercial building or commercial site development permit, and
therefore, is exempt from this requirement.
• Special Requirement#5- Oil Control
This project does not have high-use site characteristics as defined in KCSWDM Section 1.3.5,
and therefore, is exempt from this requirement. I
• Special Requirement#6-Aquifer Protection Area ,
The project site is shown outside of the extents of Aquifer Protection Area Zone 1, Zone 1 II
Modified, and Zone 2 on Reference 11-B of the City of Renton Amendments to the 2009 I
KCSWDM. Therefore, this project is exempt from this requirement.
Weston Heights
Technical Information Report
SECTION 3
OFFSITE ANALYSIS
Weston Heights
Technical Information Report
Task 1 — Studv Area Definitions and Maps
, The projecYs study area includes the subject parcel, and a flow path extending approximately 1-mile
� downstream of the site. An off-site analysis map has been included in Appendix 3A.
Task 2— Resource Review
The following documents were reviewed, as prescribed by the 2009 King County Surface Water Design
Manuai:
■ Adopted Basin Plans
There are no adopted basin plans which affect the subject property.
■ Floodplain/Floodway Maps
; The project site and surrounding area is shown on FEMA Flood Insurance Rate Map No.
53033C0982, and is not located within a flood hazard area. Therefore,the project is exempt from
. this requirement. A portion of the FEMA map referenced above is included in Appendix 36 of
this repart.
• Sensitive Areas Folio Maps
The King County Sensitive Areas Folio Maps are outdated, and were not consulted for this
project. However, a search for other sensitive area documents was performed, and the site was
not to contain or be near a coal mine hazard area, erosion hazard area, steep slope, or landslide
hazard area. A wetland area occupies the middle of the site, but will remain undisturbed by the
project.
• Drainage Complaints
� No documented downstream drainage complaints were located. The preliminary technical
information report(prepared by others) also found no relevant drainage complaints.
• Road Drainage Problems
No road drainage problems were located that would be impacted by the project.
• USDA Soil Survey for King County
The USDA Soil Survey for King County indicates that the site is underlain by Aldenvood soils.
which are generally characterized as a consolidated till,with moderate runoff rates and tittle
capacity for infiltration. A portion of the USDA Soil Survey map is included in Appendix 3B.
• Wetlands Inventory Mapping
A wetland exists near the mi �
• Migrating River Studies
No migrating ri�erstudies .���� �v�aicu +riii�,i� afic�l iiic aui��c:,i j�ivFici[y.
Weston Heights
Technical Information Report
• DOE 303(d) List of Polluted Waters
The DOE's Water Quality Assessment Map tool does not identify any 303(d)-listed waterways in
the downstream flowpath within several miles of the site. The project is ultimately tributary to the
Cedar River, which is a 303(d)listed waterway at its discharge point to Lake Washington, but this
is a substantial distance from the site, and the flow contribution from the project site is expected
to be insignificant compared to the full capacity of the river at that point.
• King County Designated Water Quality Problems
King County I-Map does not identify the project site as containing or being tributary to any
designated water quality problems.
Task 3- Field lnsaection
A Level 1 Downstream Analysis was prepared in the preliminary design phase by Core Design, and the
photos from that analysis have been pro�ided in Appendix 3A. The project site and downstream
flowpath were visited on the afternoon of June 10, 2015 to verify the findings of that downstream analysis.
Conditions at the time of the visit were warm and sunny, with no significant precipitation having occurred
within the previous few days. No surface runoff was observed at the project site during the site visit.
The downstream flowpath for the west side of the project simply follows a road-side ditch which extends
southerly along the east side of Nile Ave NE. The ditch is primarily grassed, but has been stabilized with
quarry spalls in some locations, and contains a number of culvert crossings beneath various intersections
and driveways. The east half of the project falls to the central wetland area, then flows west where it is
intercepted by the public storm drainage system in Orcas Ave W. This storm system flows to NE 6"'
Street,jogs westerly, and then discharges to the road-side ditch in Nile Ave NE.
Task 4- Draina_qe Svstem Description and Problem Description
The west half of the project generally falls toward the west, discharging to the road-side ditch along the
east side of Nile Ave. The east half of the project generally falls toward the west, and is collected in the i
wetland area in the center of the project. Water from this wetland enters an ovefiow device just north of
Orcas Ave W, then is conveyed to the Nile Ave roadside ditch. The outfall from the conveyance
downstream of the Olympus Villa Pond 'A'is the same as the outfall for the west detention facility. There
were no significant erosion or sediment issues identified in the downstream system for the'/.-mile
analysis distance.
Task 5- Miti_qation of Existin_q or Potential Problems
No significant hydraulic problems were observed at the project site or downstream. With routine
maintenance to keep debris clear of the ditch/culverts, the downstream system is expected to continue I
functioning.
Weston Heights
Technical Information Report
I
�___
� �
L__I
i �
j
�
i '
i
, �F'��NC�iX 3r�
' DOWNSTREAM ANALYSIS
i MAP AN D P H OTOS
,����
i �
Weston Heights
Technical Information Report
�� :��� $���i � -� �� ��NA!!!�' ��R �
�`, ��
�-�it r"'�1���At'�! � -m� t7�ea� - ' ■
, � • .��MM� � '��
��� � __ � „�, .� ��l�����M�����li'�� ■
� . � "`�' � � � �
��.� �� u � �������� �������������� f
� _1
� J�� � � � �, �.,- ��� .. � - ��c
� __
�i i��a�lt � 3 ��r�! ���i���r� �����Lr����i�������.��.�
�y�.��{r . �{.'Y. - - '
� � �� � �� ' � � ��� i �� ,� y� ,
ix��. i r ir= \h � �`�.
��I�Lr�� �`��.>.. , � ��,. '
� , I f�:
� ��'��P"'�� � � �
� *
� 8 -...
�r,�;,,�� ��.� ,��� >:� �,� � .S.�.,.— t �' �,)�
-- ����'"� �� x�` Wif �.���"s' :�_TF �E � 1
�_� i�i� ; . �� � � �. =:,,,• �u: � :i
:,� � � -� 3
'�{P �� � �� �w ..� �� � � ���.YL� �.L��,# �• �
�, �r� � .� �i;�1 � '�.1�•��'i �. �»
� ��fu.1��.� t �r�:.:..� ►.��F r ����.:� �`�►�l �t��'_ >,�"� "��
t ,�� �1��'�E\..1_l4�'. ¢ � A 3
����. ��� '� � � f �` ir� :', '� ' �,�` �
=Y{({ �� �^'y "k D��. ��•�r� '��'�.. � i ■
. � • �IIt 't�7�T� i Fa�i � �`� � O
c•��r:Y. ='� � �..� ry-�� .�7t��i 1"���•l�'
F� �, � � . �� ... � '�� E� ��p�9� � ,� �;5CL7� 'LY ,-�: ..,. � �'
�� ��3� ./�� � �"� '�.� =�. � ��_ �1���. � � °��"`� i � � ��i
� � , (� ,�
•��`� ;,,,�'` s=+� `' (�� '` �L�� , p+l�k`�i�t
:
� � �
• .�,� � . i
_ �,� � � �w� r��r 7C� � � � _
�.�Mr���i� ��` -.�, k �
� r ���� t�� �c� , � ;...�� �
� �,,� .�.��.� �..+� .v � ����� �
� _r. � �
� � �� �� ■ -i
,,�, ��,. T i _� ■ ,
�,' , ��� ������I � � •'� �� !_ � -
�rr:���..�` -_-- �'. ._' -
��_ �.c ,�.' �i; �.. •.,u;
-
�: .=.�:_
��� � ����.�� �������� . �" . �' ' i '
,� �. �d ..:� .' �`�^ � _�* �� 1
� � �� � �
� ��.�E y� � '-�ar���� � y ..Y� �� � ��
� y �$
' � .
�� i ' .. " z.�`���� �
�� _ ... � ` : . -. � .. :,.� !a� � �. � _ �
�� ����� �������� � ���
�..��� ��. _ � � ��-�, ��' � �
�� � ��. �� �.����� �'�.� ���C'��'�� � _�
� . � ��,.� ���:�` _
�� i ��.y �� � � �t�af f�,++�,3r�r�r �) ��3�� ��'�.•�� ��:�� �� j
�i F-Ty-,.-r {7-.r L'�T:.TJ +i�'I�a� �
�r..-c >-: E s� . .
" .. " '
�f � � � ,�y
�� � � e�� i �eE.'�!�`:.�}�t�r�Yt 'k � ������ ��'"���� t s� "�+r. � -�-'
�� � ' �� .��,����.����; ���G�����r, ���;� �►. a
.,�
t P � -=
�,r Fyr�r '�rr�r
� �` 9 -
: � � ; R�1� : �� � ���:.r�:� �l���_� �� ���
_ . :
�1 a �
� , _ � ��...�_g� ;zy�. �:���'�
, . ,�* S ��� `.'! �������� k 1�rrv��l �.a£ �4 � ��
m . � . - � �{1 �"Y.��, �%�'TS�t. ..u� _ I
, "' . .-a;-• -1 . 1r;s 3.� •.t� '�4'.,,�.:�
�
, �, -
� ����� ��; .1 ��I��� ��. ��i - � ��� � :{Y
�, �r �� ��- �� �!`�� -���� ,� :�' � ��;��"���� r, ��1�
�. � �
� i: i.= .[.��.> � � .f.. r g� ��.c.
� � � ��i��� ������ �+.��3 ��R �������"��� .�'���
l�'°$� � j(�'
�I� Ta�1 ������� �1 v��� .� �... �� .�� ��������R�
r
.�_ � ✓�-�.�-��.N -
E f� e �� .. k� �' �,j�
� '`�� �`,��� �' � �*
_��
� � � � � �� 4 — �v
,_ :��_s . — � _ �.--�
�„��.���..'"�,���-����.��� _ ��«�� � ���.� �
� ��—��
—�
��q � s � 5 � ,s� ��� �� ..�������?:
�a.
'�. � ; ��, � � �
, ..
C - � - i ,; y �a � ' : r �a �� i.;���'�� � :.�t
, � �a� .�� r --"�
. � �}��"; .. ..�. .-,.r-y►_
�t .J�'�t�R �..� r-�'' ":-,�"' � w�" ,�:,. _'�, a i���� >� .. -.�
- .1 � ��, �. � �'�� �!".- � � ,�
� �:� ��..,r�t ��� ��.. � . �
., :
�,ir.al� - �► � -_�__ ��
�
' ����w .n...�� < ,� � �.'
� � .
� � � A� � ' �� F����� ������
� ,
Level 1 Downstream Analysis
Field Investigation
A field investigation was completed on May 21, 2014.The temperature was approximately 60 degrees
and sunny.
The existing site has two residences with gravel driveways and a detached garage. The western quarter of
the site is co�-ered in lav�rn(surrounding the residences and garage) and the remaining site is forested with
a wetland in the center of the site. The wetland drains south and overflo���s into a 12-inch storm drain in
the Edenwood Plat which continues south to NE 6`h Street. From NE 6'''Street, the 12-inch storm drain
flows west where it has a confluence with the drainage system on the east side of Nile Avenue NE.
Overland flow from the west portion of the site drains west to Nile Avenue NE and drains south in series
of grass or rock lined ditches and culverts on the east side of the street.The open channels range from a
depth of 1 foot and a width of 4 feet with rock lining on the north end of the site(Picture 1)to a vegetated
channel with a depth of 2 feet and width of 3 feet just below the project's south property line. The ditch
and culvert section continues south on the east side of Nile Avenue NE until approximately 300 feet north
of NE 4`�Pl,where it drains into an 18-inch storm drain and flows south. This is the quarter mile point
downstream of the site.
The City of Renton provides current storm water information online,using a GIS based system called
COR Maps. COR Maps pro�ides information on the type of pipes, manholes and catch basins in the city.
Following the pipe flow direction from COR Maps, the 18-inch diameter concrete pipe crosses over to the
west side of Nile A�enue just before it intersects with NE 4�'street. The pipe then heads west down NE
4'�street and crosses to the south side,just before Jericho Avenue. The storm water pipe parallels Jericho
Avenue running through pri�ate property until NE 2°d street. Picture 10 shows the manhole as the pipe
crosses from the east side of Jericho Avenue and heads south down the center line of the road. Flow
continues south until NE ls`street,where the 36-inch pipe heads west and discharges into Maplewood
, Creek.
�
,
�
Core Design, Inc. WESTON HEIGHTS Page 6
'j
a,�;
� } �
i � - . 'a,� 'e..°� :� � �
fi � .
" .a:
,
,
,, , �
j .,� . _
� .r�. ��
4 e� ,,.�;���
.,� �,
i #�y'.zr`- fi�` � �. i �.s �S'u#•• `� 3ly�,�������s ,.Y
. �, �T .'�. . �� s'+-" �+�`„`��•_'
< �,,�
i ..,
` �`�""� � . . +���
t. . .
,
a. ..i:.> '��� . .,'�
.y.t•�.'�.7� ��rA��� s��.�F�� �� 4
���r�, r�� '3�.� �� '�wr�+.. � �_ � �. _
.��'� �� 1;��+� �t+�' La� � %-,M �''" -,�`ri^'� ��
, � �.¢. r'+.34.e-� { . , *'ye.�,,.. ��Y . P�. i .:
w
.
- { . .r r....: , � .. �� ��-.'��
.'' �,�`�,3" .Ofri� �- � � � .�
..H ���H•t.- , 'r-� . �
`ss1t�._�.� xy,'�: .:.p.ii�i ��'; �" *s�` , A,��� f R- �.
�.' +� t { t ! ��`' �
( =x;r ;. `o ,�# �, ;*;
� � �s�
� t -
� �... �.
1 —Looking south in drainage ditch along the 2—Looking south along the east side of Nile '
east side of Nile A��enue next to the site Avenue into first culvert '
, ,
� �
�k
�_ _ }
.
. ;
I � ,
; �
_ x
. . ... .
,_ �.,;, .. --q. _
, Y ____ -- _
- �!
�
:��;y
�� -� �� � � ,�;,�
��.. �
� . � � " _,.', ' -
.. . ;..
,�._., .� .,.
;�� :'� �• : �;� `. �� ���,. . ��
�� ��e ��. �3��. .
-,�. �
� � �.. . _
R{
�}
.��a. - ' - _ _
. . .. y�.., }'
sT�, � J , _ `�� � + �.d' �,�',�� �k '"'. .
� �
�,4.�e _�.� _ S4.'. _" ' �.- Y �.� �'':.� ,'X .
-���k=` _ p .��f!'f.�a II�` ..yl ���( �� I�` � '
�x�` � - - � ��� ��
'�:`,
. s
�
,,- ,
3—Lookin south on the east side of Nile 4—Lookin southl alon the east side of Nile
g g g
A�-enue just downstream of site Avenue just before NE 6'e Street
Core Design, Inc. WESTON HEIGHTS Page 7
i ' I
c I
G•+��!!'Z:,- . - -�-r<n y ���.
L�k �a
.���;':., . "'.
�' ,�j�*,�.ti . � 1 ���i .
�•a,` ,� �,�l1' �
' � �. � �_ " _
.
�}��� ,� , '� ;i: . J� a�., � .
''�1 •' :� �. _ � �°.
�6Y'��� , �� ��" � •.���:• �°�
��•;,"°'�` r ,i;''-� Y����y e ,4 ��� ��� �
a�.:,3-�� � .. ��� � _ ' —
'��x�s ♦ •� K
S ir' �4�\_ .s . �- '�. . ' �r�p "�i�
�y� ,..
f.�' f i ' i J ,t�' �1�,sc �,, � Y 1"A _*��t��~ t . .
� �� 'ST`�;�� � f f��„�� �
, " ' � � i ; �e��� �� .W�`._�,
��,- , 1• ��,, �e, �'
� � �
#t�`-�•►�!'" # t� ` _ � Y �
.. `� .T ,: � . . ir. .ntl�
�r���_����iti ' k .��.�t +�.' •�; � � . . �
Pk1:;� j, ' 1 '.• �� ;'' • r ' R"�' -�'
-f!'�,� ' :.r' �j � �` �
� `Fi,1 � yt a,. j .a� .. f '�,� ��.�`�s
��,�iir,'+aoi.��A,L�P'.tiii'��.�5'�t,� �� ,d��.. E,"������� . f�a
5-Looking at a concrete pipe junction with 6-Looking south on the east side of Nile
water flowing left to right(south)down Nile Avenue at the last drainage ditch before pipe
A�enue flow
_ �
�-.� y �-
��.:
�- �, , , - r�- -
���
� „� �_
��
.�`��-;. - - -
.-�- " .
��,,-
., �,�l
r r
t � �
3 .�
;'-+.�"� .+ � ' , .
��� '� �- . �� 8-Looking South at thc interscction of 4`�
'- - and lile Avenue where pipe flow crosses Nile
� `\� � ' A�enue from left to right(east to west)
� sl
/��/ pr
_ ,_ -:�
7-Looking south on the east side of lile
A��enue before nE 4`e Street
Core Design, Inc. WESTON HEIGHTS Page 8
' r �
� �__:
f
1
�
+
i J� ,,��:�. - - .,�
` {
,
� � �� s
.�;
1 �rf ���.
e =
i ��,� i ° �
f�
��
� . �_ � _� ..
.ti �..
r
� - , �--: -��� �
. .. . _ � _ .
� _ _ _
��� ._ .� � � :�
�- �- � -
, � ,
�r :�.�, � .� ..��
..� � .� �
, . r
� ,�� �
�� �
�� y � '�,''�.
_ f- �:� `' .
J— E�i,ti�i;; mx�i hulc looking west on �E 4`b 10—Existing Man hole looking South down
� street
Jericho Avenue
i
I i
� .� . .,
� F, Y
i4.
- ��s- • � 'r ..
_ _ �, . �#�-� _ .
°-�� �4���." `.` �� � ' -" , _�
�.: �- `'' �� � � � � - ;.'
- , � -����� �,,�,` .� £ �,�
� • rt" � `����„'�� •-� �::� `.� �;;
.
�- : �` _ ,�,
�-' � ' r7�- � ';�; `r ;' - ,.-�s
��� µ� �,�i� .'4Tr1::� �i�.;...,,t� t 'A .-, . .f'r�,i._
� Y , � ..�� f7t
a ��t�' � .�cj� r. .� _ �'�,,
i �* .�.� �� �' � M��r
�5i;`��2 � � �±"r '„'y'. :c�.
�e '�r�ll"��p}�, t - r�'�� �'4�.�
���ts`�t= '�`'� �2 '' .
r:♦ ;���;'R°`+ s -� J ,r $�';�=;1:�?"+pf"';4� ,� .� ►'�'
� � I _ �y'��r��.• � !��.� ` "- ��� ., '� 'i'r''- x
� .
'9• ,i� � `sa � .�� �� �t� � ���'4 �,��a3
.�ia����" f �3, �p, f i�g.
11 —Storm �tiatcr outlet into �laplc���oo�l strcam ���;._,_ -�A�� �'� :*��
next to Jericho Street �� � . " 4
�
� � -�►��.� .:�► ,
12— Luokii�� at the �lu���nstrcam f1oK� from
� Maplewood just after outlet Looking south on
Core Design, Inc. WESTON HEIGHTS Page 9
i �
I (
I �
�
i
�
� f
I4
I ;
I ;
APPENDIX 3B
RESOURCE REVIEW DOCUMENTS
Weston Heights
Technical Information Report
� � SOIf�NE � '��
�
� C�
� APPROXIMATE SCA�E IN FEET
�CITY OF RENTON 500 0 500
530088
• Project Location
Si)uTiiE:nST �znrti
I �i �I I NATIONAL fL00D INSURANCE PROGRAM
121Sf STRFEI II' ' � I
I
' I� FIRM
, �, !� FLOOD INSURANCE RATE MAP
• '� ���� KING COUNTY,
� � '� WASHINGTON AND
} ZONE X i iINCORPORATED AREAS
� �
z �� � i i I i'i PANEL 982 OF 1715
� I" ., �� �AAV IVI)FY. �C)H Y�NCLS NOI Pfl.f�TLU�i
i
I O II I I I I
V I�I � ��'
Z ' �;' -�:_r',iNS:
� II i I II �:_'NI,'.U41TY NUMBER PANEL SUFFX
I II
�I I li I III ,�rrinC�NP011kIED u11[q5 5»p11 0°E2 f
�,I li'. I .i
C�I.[ITV OF �,:1IXb11 hq1 F
i� i
I 'I �
I ��I
I I I'
I I ' 'I ,
�zhiH srREE1 ���,''�����i'�'�j MAP NUMBER
�� �;; i i 53033C0982 F
' ' �---� � MAP REVISED:
�' ��`� MAY 16,1995 �
V �a��.t�,,��
� ��p �c�
a �\�^<� �
_ ---��
� � I�I ,^��i _-
` Pederal Cmergency Management Agency
128TH STREET SOUIHEAST ��' ��I���'��� -
This is an oficial copy of a portion of thc abo�e referenced Ilood map. It
was extracted uamg F-MIT On-Line. Thie map doce not rMect changea
or amendments which may haoe been made subsequent to the date on the
tltle doCk. FOr the late6t protluct information about National Flood Inswancc
Program Ilood mapn check the FEMA Flood Map Store at vrM,v msc fema gov
3 Soil Map—King County Area,Washington `>
m (Weston Heights) �
� �
564330 5G44N SGA470 564540 564C10 SfiAf,Pb 564750 561820 56A890 SFr19FA
47°25 43'N .I. . --:.-� �,-v� _ �� I .,.� -: . -s--- I r-. I: 4F 29 4T N
�c -,.,� . . .
-- a..�r;, `���F� _ ,� 4 I�4' _ ��'� ;�,f�',
_ . ._ ,.
x �
, ,,
� ��.,� � .�� �' , _ -�
� � F� �.r �
,�r ��.: ,!. . ��
M
i ,� , �;. � ;� i
, i i �`� � E� �+!'' ;. w: �
�' v� � . . t , •i 1d� � .,,, y a� .'� � .a r'--' '� -�
, � .
,.:- �,
:.
�
.,..._ :.�_ , � .� Ii
. .. , �
.
y .� .,... �..,1 �_ � •
;,...
� � � , .,
� , �- � � `
"� s _ �� ` Ill� ! .
- �� ' ,,, t ` ` IR
- �
i
� � ,�'
;
. -
1�'.�,•ir�'�'+ . � r«-,. � .. . '" .,
, �aa+; � i ____- --- -
i Si�.l}4 .1 , �H (T��� �
� � �'����' ��' �---= I 7 5* '� a�`., il�' �a';I �-�"�.
� ii ;r.
� �,� ` � _ y' w�w '� r-- ,r � S � � ��`�,
�
a�� ��� �� �k ��
`r k .. �'I�j� .ds. Y .,'h '�nt+Aa.., "�-a��� s�—
4Rl
��. 1�"'nK- �� :a'�� �� . `���� �
.
� � �� Y �
� .
.
• _y�, •
_ 'eli� � .. �
� �:�� �,.�,r.�- ' � �j, _ �
- --� '.w "�;r—.. ��'�''.�' '���" � ' ,..
�r �.a r�� �.?� • . ' ` '" �..� �� � ��� , � , ' o
1-� .�� . � � .
"""'� '�q`3. `�^ � - �` �"�"n �
�� � �
s ,� r.`
�..- , � . ��� �,�r, ..e• �- '�FF: �q'�`.. � �.;�w a;... .��'�.
M � .l��� 'Y + ��a` 4 .' �', .a ..�;r'
` !_
� �s '�� T4S � A,� �� � i�, + y���"'�S". ,
: � � .: y ;I,.:.:'� .
. r d�, ��y ,''` 4 r
� � �� � �� �.
� #� ;<�i�'', i t ;. �, '��'��"r � r, i �� ,
.:,
_� ., �_ l y` . 1• . � \' � rt. � ..ti.
L � >� � �
�r �.��'�E !� �, e_ �� ;� _ ,__ .i.. 4. �: �� ,� � � -�
�� R� � e, � � ��\ ,ti � � + t.
� 4 �.'. � �'r� ��e. � � � �.
�� � r, .�4 ���,� ' "y � � * .:,;i f`� �
���
* '�.Si.yF '� . . _:...�w-- ` _ '� �'Y--4--� � ` — �>� ". ....__.�n�l��
o f' e
x, .. ' ' �,^ 1� _ ,.s.� •
r � �� ' ,
. � �', , ..� _, .
�. . � . .; ""�,.: �
Z� �y � � �. '� R �R �., . '
�{ � a ' '' -
_ ° .. � � •� . . �� �. aT ( �^'�"' �• ��
�. . �r �' � ��r rA�� `�' ��Y y � ,� � �` y f " �r+,h,�4
47°79'7�Y'N � •. -.�• " , " i � 4F 29'29'N
5(A3.i11 5(rkiW :dxki/U 56454U Sb4b1U SfrlC43U SCr77.riU SH782U 'd.kM)U Sb7yW
; 3
� �
m N{ap Sole:1:3,000 if prir�ed on A lar�pe(i l"x 8.5')sheet. ao
� M�eis
N 0 40 80 1b0 240
� � � - ,Feet
0 100 200 400 600
Map proJet2lon:Web Mar�' Corr�er 000rdhaDes:WGS84 fidge UU6:UTM Zme lON WGS84
u= Natural Resources Web Soil Survey 6/8/2015
Conservation Service National Cooperative Soil Survey Page 1 of 3
- � -� � � - � ---� , - - -_
Sotl Map—Kmg County Area,Washington
(Weston Heights)
MAP LEGEND MAP INFORMATION
Area of Interest(AOI) � Spoil Area The soil surveys that comprise your AOI were mapped at 1:24,000.
� Area of Interest(AOI) Stony Spot '
� I Warning:Soil Map may not be valid at this scale.
Soila � Very Stony Spot I
J Soii Map Unit Poiygons i Enlargement of maps beyond the scale of mapping can cause
Wet Spot I misunderstanding of the detail of mapping and accuracy of soil line
r.► Soil Map Unit Lines � ' placement.The maps do not show the small areas of contrasting
Q Ott,er ' soils that could have been shown at a more detailed scale.
� Soil Map Unit Points �___
•� Special Line Features
Special Point Features Please rely on the bar scale on each map sheet for map
V Biowout water Features measurements.
Streams and Canals
� eorrow Pit Source of Map: Natural Resources Conservation Service
Transportatlon Web Soil Survey URL: http:!/websoilsurvey.nres.usda.gov
� Clay Spot � Rails Coordinate System: Web Mercator(EPSG:3857)
� Closed Depression �y Interstate Highways Maps from the Web Soil Survey are based on the Web Mercator
� Gravel Pit ,,,,,,, us Routes projection,which preserves direction and shape but distorts
distance and area.A projection that preserves area,such as the
„ Gravelly Spot Major Roads Albers equal-area conic projection,should be used if more accurate
0 �andfill �ocal Roads calculations of distance or area are required
R Lava Flow Back round This product is generated from the USDA-NRCS certified data as of
9 the version date(s)listed below.
� Marsh or swamp . Aerial Photography
Soil Survey Area: King County Area,Washington
�► Mine or Quarry Survey Area Data: Version 10,Sep 30,2014
0 Miscellaneous Water Soil map units are labeled(as space allows)for map scales 1:50,000
o Pere�nial Water or larger.
� Rock outcrop Date(s)aeriai images were photographed: Jul 8,2014—Jul 15,
� 2014
Saline Spot
Sandy Spot The orthophoto or other base map on which the soil lines were
. . compiled and digitized probably differs from the background
� Severeiy Eroded 5pot imagery displayed on these maps.As a result,some minor shifting
of map unit boundaries may be evident.
� Sinkhole
�p Slide or Slip
0o Sodic Spot
USDA Natural Resources Web Soil Survey 6/8/2015
�� Conservation Service National Cooperative Soil Survey Page 2 of 3
Soil Map—King County Area,Washington Weston Heights
; Map Unit Legend
I �- King County Area,Washington(WA633)
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI
AgC Alderwood gravelly sandy loam, 5.5 100.0%
8 to 15 percent slopes
I Totals for Area of Interest 5.5 100.0%
� 4
� I
L_'
} ,
I �
�
USDA Natural Resources Web Soil Survey 6/8/2015
� Conservation Service National Cooperetive Soil Survey Page 3 of 3
L
,r
i
t
� �_
�
SECTION 4
FLOW CONTROL AND WATER QUALITY FACILITY
ANALYSIS AND DESIGN
r-�7
� :
� ��
_ J
�_ ;
Weston Heights
Technical Information Report
Part A - Existing Site Hydrolo_qY
The project site, including the Weston Heights North development, is effectively split into two distinct
basins by a central wetland area. For stormwater modeling purposes, the Weston Heights North project
areas are included in this discussion. The separate basins will simply be referred to as"East"and "WesY'.
Both basins ultimately fall toward the southwest. The west basin is intercepted by Nile Avenue, and the
east basin discharges to the central wetland area. The central wetland area will be left undisturbed.
The west basin, within the Weston Heights project limits, is currently occupied by two existing single
family residences. The area north of the west basin,within the Weston Heights North project limits, is
currently occupied by a single family residence, a detached garage, a shed, and a Quonset hut. The east
basin, within the Weston Heights project limits, is currently forested. The east basin north of the Weston
Heights project limits, has been previously developed and is considered pasture. For purposes of the
stormwater model, both basins are considered to be forested in the historic condition, as prescribed by
the 2009 King County Surface Water Design Manual (KCSWDM).
Part B- DeveloQed Site Hvdroloqv
The Weston Heights project proposes 12 single family lots with the associated roadways and utilities.
The Weston Heights North project, included as part of the east basin, proposes 5 new single family lots,
while maintaining the existing lot to the west. Both of the existing drainage basins, east and west,will be
preserved in the proposed layout. Nine lots will be constructed in the west basin and three lots will be
� constructed in the east basin. Runoff from the west basin will be collected and routed to an underground
� detention/treatment vault, before being released to the public storm drainage system on the east side of
- Nile Avenue. Runoff from a majority of the east basin will be collected and routed to a detention pond
before being released to the wetland in the middle of the site. The remaining runoff generated in the east
� basin will be either collected and routed north to the Olympus Villa Pond or discharged to the wetland.
; The Olympus Villa Pond 'A' releases to the same ditch, at the same location, as the west detention
` facility. No wetland impacts are proposed as part of this project.
Part C- Performance Standards ,
The project is subject to the"Conservation Flow Control"criteria outlined in Chapter 1 (Core Requirement
#3)of the 2009 King County Surface Water Design Manual (KCSWDM). This requires that the developed '
discharge durations to predeveloped durations for the range of predeveloped discharge rates from 50% of
the 2-year peak flow up to the full 50-year peak flow. That lot in the Weston Heights North project not
being provided flow control will be included as a bypass basin and included as such when modeling the
western detention facility.
The project is subject to the"Basic TreatmenY'criteria outlined in Chapter 1 (Core Requirement#8). The
goal of this requirement is 80% removal of total suspended solids for a typical rainfall year.
Part D- Flow Control Slrstem
Flow control will be achieved via an underground combined vault in the west basin, an open detention
pond in the east basin, and an open combined detention pond in the Olympus Villa development—Pond
'A',to the north.
The west underground combined vault provides flow control for Weston Heights Lots 1-9, Nile Ave (to the
extent of the frontage improvements), and has been oversized to mitigate for two bypass areas; one in
the future development to the north (LoYs 2 and 3), and one on the south west side of the site. The
landscaping/yard area on the future developments(Weston Heights North) LoYs 2 and 3 is not feasibly
Weston Heights
Technical Information Report
routed to the east detention pond, and there is not capacity in Olympus Villa Pond `A'. All three of these
facilities discharge within the same threshold discharge area (TDA). Therefore, the entire lot areas for Lot
2 and 3 are considered as a portion of the total west basin bypass area. The second west bypass area
includes a portion of the frontage improvements along Nile Ave, which is not feasibly routed to the west
basin combined facility. Therefore, this area is considered a bypass area. The two bypass areas,
represented as the"West Bypass Basinn, have been modeled as bypass against the west basin
underground combined facility. These areas have been mitigated for by the oversizing of the west basin
combined facility.
The east basin detention pond provides flow control for Weston Heights Lots 10-12, Private Road `C',
future development Lot#'s 4-6(entire lot area), as well as the east bypass basin. The frontage
improvements along Private Road 'C', adjacent NE 7"' PI, is not feasibly routed to the detention pond.
Therefore, the pond has been oversized to mitigate for the East Bypass Basin.
The Olympus Villa LUA and as-built plans have been included in this report as Appendices 66, and 6C,
respectively. The Olympus Villa Pond `A'was constructed larger than designed, thereby allowing this
project's utilization. The required detention volume of the original design was 36,042-CF. The
constructed detention volume, as reported in the as-built plans, is 38,648-CF. This project directs the
frontage improvement area (sidewalk/roadway/planter area)along NE 7`" PI (which will occur during the
future developmenYs construction), as well as the impervious areas of Lot 2 and Lot 3, to Olympus Villa
Pond `A'. The ultimate discharge of Pond `A' is the same point as the discharge for the west underground
detention vault.
, All facilities have been designed using King County Runoff Time Series (KCRTS)stormwater runoff
modeling software. Refer to Appendix 4A for"Flow Control Design Calculations". KCRTS does not have
a convenient way to iteratively model irregularly shaped ponds, so the design calculations for the east
pond have been approximated by a more prismatic pond shape. A spreadsheet has been provided at the
� end of the KCRTS calculations comparing the volume of the designed pond (per plans)and the assumed
pond (used for the calculations), at 0.5-ft intervals. The spreadsheet shows that the pond used for the
modeling calculations provides slightly less volume at each interval, and therefore, provides a
conservative design.
Part E— Water Qualitv Svstem I
Basic treatment for the east basin will be provided via Stormfilter system. Basic treatment for the west
basin and those areas sent to Olympus Villa Pond 'A'will be provided via permanent wetpool.
The west basin underground vault will contain a permanent wetpool in the bottom of the vault, and has
room for detention storage in the upper portion of the vault. The permanent wetpool allows for
suspended solids to settle out retained runoff once inside the facility. Compensatory pollution generation
impervious surface (PGIS)area from Nile Ave, north of the bypass area,will be treated to offset for the
PGIS area of the bypass basin not feasibly routed to the facility.
The east basin Stormfilter system, upstream of the detention pond, provides removal of suspended solids
via cartridges. The roof areas from the future development Lot#'s 3-6, and Weston Heights Lot#'s 10-12
have been routed around the Stormfilter system. The roof areas are considered non-pollution generating
impervious surfaces and therefore do not require treatment, given that the runoff does not mix with
untreated PGIS runoff,which is the scenario for this project.
The Olympus Villa Pond'A'will contain a permanent wetpool in the bottom of the pond, and room for
detention storage in the upper portion of the pond. Olympus Villa Pond 'A'was constructed larger than
designed. The required water quality volume of the original design was 9,881-CF. The constructed water
quality volume, as reported in the as-built plans, is 15,479-CF.
Weston Heights
Technical Information Report
Wetpool volumes have been designed using the guidance provided in Section 6.4.1.1 of the 2009
KCSWDM. The Stormfilter system has been designed following the guidance provided in Section 6.5.5.1
of the 2009 KCSWDM. Refer to Appendix 46 for"Water Quality Design Calculations".
Part F- Wetland HvdroloqY
A wetland is located in the central region of the project. This wetland and its surrounding buffer—varying
between 50-feet and 56.25-feet for the Weston Heights and Weston Heights North projects, respectively,
will remain undisturbed. This wetland area divides the Weston Heights development, immediately south
of Weston North, into two separate drainage basins. The separate drainage basins, named West Basin
and East Basin, are contained within one single threshold discharge area. The predeveloped conditions
would have runoff from the eastern most extents of the Weston Heights North (future development)
project, in addition to the buffer area to the north and west, contributing flow to this wetland. The Weston
Heights areas that contribute flow to the wetland include the entire East basin and a portion of the West
basin. As a result of these two separate projects, Weston Heights North (future development)and
Weston Heights, predeveloped runoff will be directed away from the wetland in order to satisfy flow
control requirements. In order to satisfy the existing wetland hydroperiod the runoff from the undisturbed
Weston Heights North (future development)Lot 1,will be redirected into the wetland via an interceptor
dike. The yard/landscape areas on Weston Heights North (future development) Lots 2 and 3 will be
allowed to sheet flow into the wetland as well. Refer to Appendix 4C for"Wetland Hydroperiod
Calculations".
Weston Heights
Technical Information Report I
-i
i ',
� '
� . _
I
j
I .
� , ,
APPENDIX 4A �
FLOW CONTROL DESIGN CALCULATIONS �
�
Weston Heights
Technical Information Report
_ _ __ EXISTING WEST BASIN
UNDISTURBED PAVEMENT AREA = Q.14 AC
', THIS PORTION OF THE FUTURE ' (MODELED AS IMPERVIOUS)
' DEVELOPMENT AREA IS CONSIDERED
TO BE TRIBUTARY TO THE WEST � REMAINING WEST BASIN AREA = 2.19 AC
>- __. PROJECT BASW (MODELED AS FOREST)
- --
� . _ � NE 7TH P� � � -
_,__—�_`` ..
.,.�..._ ..._ ,.: . .
--
,j�_ _ `_ -''___--=-- - ---�--__-- � �.r �-- :-- , - _ TOTAL BASIN AREA = 2.33 AC
_ �_ ------ _.._ .____--__
., - _. _ =
, — _ -.�....,�_____
EXISTING PAVEMENT �;� �� �—��'���—�— � ��
�� — a
(To REMAiN ` uNDISTURSED - �� EXISTING EAST BASIN
UNDISTURBED) - r �
' � AREA FUTURE
- `, _ �" DEVELOPMENT ^ � EAST BASIN AREA = 1 .83 AC
,: � _ ,�,:._
: �� � u�� AREA � (MODELED AS FOREST)
% - -? (PART OF EAST B.4SIN) �"
;. --�---
_ - —
f
�� . �,f . ._. ... ...... _. -� . ��� ��� .
. ____----- .. .
—.._._.,. � r . - ��
. � . _ __ _. _.
_ i � � ... .. . . . .. . . .
�� __ _ _ ..�. ... . . .
,� . ._ . . . ._ _ _ • _ . �� '�— .. ... .... _ .._
.
.�.. �_ `. __� _ � .. . . . �. .. . . . _ .��_.� � i . �
� ,� -�- : : � : �__ : �
� _
,; _�__ . . . . -
. . .
,�
� . . � �
.
f - . . - �
� ,
.
. . _ � _ �_
,� �-.-. .-.-_.; � _ -._
,�� WEST > > . .
;. �` UNDISTURBED EAST
_ � <: BASIN _ WETLAND - , BASIN
, _ .
;:, w
, AREA �,�
� k �. �-_' `_` '� . .... .. .. ,
� .. — _ Y .+. ' ..
.
�_.
.._.. � + ' . �..
_ _ _ . .
...
.. . _._ �: . ��� . _ . . �
' -
. e .._ ., . . _ . �
; ,� � � _ �_ • . . . . �
�, . . _ .
�
��� � � �--- -.-.-._ __
-��� �---- .-� . . . : :
- �---
��.,� „�m� �� �
�. . ...:.:!�
;
� � ,; . �� �`�
� E _� ��_'�.._ `�t ��l � f � f•---- _'__
� � t-- —_ _ ��^ \ i r \ _ i f
C — '\. '� � ll
O --� �'� \ \ t i .
, t � ;`�.� �. � E �-�---'—�..E�
m � � ' �� � _ �`� �`� ` __ —_-- ���
�
�
>
0
�
�
° N
�
�
�
0
N
I
� JDA WESTON HEIGHTS
� Desi9n ,- Q„��g
EWJ r,q,�,-r n�wnc,7�nmrt
� Drawn _ - Plonr:rm
N „ , O 1 O O 3/11l16 i n4 w.nnadne view o�iJe.a,ne uae�vemtr,w�m sa2m
1 � �O Date onr�vs.aa.as�s rax,zf.essssa .�,v,.�sdoenpnea�rom_
Q Scale Feet P4Oe00N�14 PREDEVELOPED BASIN MAP sneec:
R:�Projects\349 (prospect development)�004-14 (Weston Heights)\Dwg\#igures\TIR Figures�WH Basin Map — Existing.dwg 11x':7
i
WEST PROJECT BASIN
TOTAL LOT AREA = 0.94 AC
FUTURE LOT #'S 1 & 2 EAST BYPASS IMPERVIOUS LOT AREA = 0.61 AC
+ (PART OF WEST BYPASS) BASIN (65� OF TOTAL LOT AREA)
PROPOSED PAVEMENT AREA = 0.45 AC
� � (INCL. PVMT/WALK/ACCESS ROADS)
-----_ _ NE 7TH PL _
� _ �- � _ � + ` � �, TOTAL IMPERVIOUS AREA = 1 .06 AC
- -- _ _ --- - -------____ --
� � r- _ _ - - - -� -� , LANDSCAPE/LAWN AREA = 0.83 AC
' - - � -- -�-- -..�. _ � - - ,_
� � � y + TOTAL BASIN AREA = 1 .89 AC
�ii� I �\� � �� \\\\ ( _
_ ��� � � � �� - ' � �
�' ;' � \ `�� FUTURE LOT #'S 3-6 I •,ti � � WEST BYPASS BASIN
' � _'.�. ,�`� (PART OF EAST BASIN) � - -
� �* PROPOSED PAVEMENT AREA = 0.08 AC
� - i�_ — —I (INCL. PVMT/WALK/ACCESS ROADS)
--- ; , - - --- - -- -- - - - - - —
� ; � , =-- — — -- -- ' LANDSCAPE/LAWN AREA = 0.36 AC
� , _ _ ,_ _ ` - - - - - - -- _
;I --._ . . .Y ,.��
: . . . .`... _ . , __. _
' �� . . . . . . .' , . � . . .._.. .... -
� � !f I TOTAL BASIN AREA 0.44 AC
-` C ��j �� �' . . - .'. �.-�.�. .�_'.�_�_'� � I,�
+ '� , ��` � ��' '� :.__: _;.: _:-. -__ - - � !'
�
�- EAST PROJECT BASIN
-�--,,��.�_� , , . . . . I- ,_ �
_
, ,
`�-� - , '. , �\ ' . � f-:�.- : �:-_ � --
�� `� ;
�.� ��`\WEST BASIN -_- • • � • - � >> � TOTAL LOT AREA = 1 .31 AC
�� �- � � ' ' ' ' '=`� ��` i_- � � (FUTURE LOTS 3-5 & WESTON HEIGHTS
� �__��\� LOTS 10-12. SEE NOTE #1 BELOW)
\} � v�; �'•., 1�--- - --- ( . _ . . . 1 - -___- - i
WEST�, , '-� � - . �
� BYPASS � -.'�� , , . � ���� �� �; � ' �: -� ' '-_-:-.-� � � EAST BASIN �'� IMPERVIOUS LOT AREA = 0.52 AC
BASIN `' `� � �� � �_"."_'.'. � (40% OF TOTAL LOT AREA ABOVE, INCLUDING
_ . . . 1
_ � _
- ___ PORTION OF ROAD 'C IN LOTS 10 13
� - '- � � � )
�\�_ii'. --L- 6 �,/ �' ':'-`•. ,__ - '� �i- PROPOSED PAVEMENT AREA = 0.13 AC
� - -- �—�
� ; ----' •� � � ' (PVMT/WALK/ACCESS ROADS, EXCEPT
- / , _h-.-:•.' / ' i ' , ' �
� �,! i ' I �l � i - ,_ - PORTION OF ROAD 'C IN LOTS 10-13)
- � , - � " '_'.'.' (x' � � �' PROPOSED POND AREA = 0.15 AC
i _ I-- __� � -_ �� . _ . -� • . + \ �
I , — (MAX. WATER SURFACE AREA)
� - - •
`.� - - -_--$o_�---_—. , - _• `• �� �_- _- � TOTAL IMPERVIOUS AREA = 0.80 AC
�� -' � � LANDSCAPE LAWN AREA = 0.98 AC
, ___ ;,
� �
T � � �; I : TOTAL BASIN AREA = 1 .78 AC
. �, ; ,
I ___
[ I \
U . I li \ I � /--�- _...__.-.
� I —_ -� ��� � � 4 �
Y
� .... ... ..- - - - ' . \'. .
- \
m
� EAST BYPASS BASIN
>
0
� PROPOSED PAVEMENT AREA = 0.05 AC
J (INCL. PVMT/WALK/ACCESS ROADS)
Q N LANDSCAPE/LAWN AREA = 0.00 AC
'� TOTAL BASIN AREA = 0.05 AC
i
� NOTES: ��A WESTON HEIGHTS
� Design Q,,��n
1. ROOF RUNOFF FROM FUTURE LOT #'S 1 & 2 WILL BE ROUTED AWAY EwJ P,a;,�,,.,,,,,�,,,,,,,
� O � �Q FROM WESTON HEIGHTS, SO THESE TWO LOTS ARE ASSUIv1ED TO Drawn �� r�•+n
" ' CONSIST ONLY OF LANDSCAPE LAWN AREA. A SEPARATE DRAINAGE 6/O6/16 �n+w.nn�xv�.o�.suneuac�ttw�wnvaam
� � � OO REPORT FOR THE FUTURE D ELOPMENT WILL ADDRESS STORMWATER $49-004-14 °"�"s�°6�'" �``�'1°"m` """'"'Oo`�O""i°"° DEVELOPED BASIN MAP
� Scale Feet MANAGEMENT FOR THESE LOTS PRIOR TO THEIR CONSTRUCTION. ProjectNo. Sheet:
R:\Projects\349 (prospect development)\004-14 (Weston Heights)\Owg\figures\TIR Figures\WH Basin Map - �eveloped �509';.dwg 1 tx17
KCSWDM— SCALE FACTOR
FTGLI2E 6.�.1� PREC�IT�TIO�FOR��.�.��.�1Z:�I.STOR�I L�L�CHES(FEE'I)
ST 1.0/ LA 1.2
ST t.1 ST 1.0 U► 0.8 LA. 0.9 � 1.OM w.,.
� ...
't _ ,ti�.� 0 .,.. �.
,
�
----�� f-.
a.�. @ �� t
h• �
•« ` � • _
� � t
i
�.,S � -, �
�,yt + �J. .i� �'� �, �
�i � er .r4.
� ��
f' • •
+� l �4 .`',c' � ��^
�J!
i . '.4'r. � � � `�,� � �.�
I .w �
'� ' -i, �
' �� i '' � ' � _i
�� , � � • �
� ' ` i' ��
.�.
! � � � .�..
�.� �� ��
i � a
\
= N. � I a�� `� �
� r
.r---
�i'1 � � �J
♦
7 �
j_� _ i w Jj�
t�� i
`n �
0•.��� � �
(0.045� �
•. H
n�rr w�..
0.47"
(0.039") " .
�
� t�oorpon�W/v�n :' -
' ..� �n.a� 0.47••
— wjor�ow (0.039� 0.52"
� (0.043� 0.65" ,
, ' worE:�nas.aa a tw�ew�+rnoa saptrrir sno�so�.o.os O.S6" (0.054� '
:+en�c�rwss raina�mta ic avai�cr tor n�wcsion a.w�ra (0.0�7� I
Weston Heights
Technical Information Report
West Basin- Existinq Condition '
-- . ����. -
� Land Use Summary � '� s„o_ �`'�
Are a J
Tilt Forest 2.19 acres
Till Pasture 0.00 acres
Till Grass O.UO acres
Oulwash Forest 0.00 acres
Outwash Pasture 0.00 acres
Outwash Grass 0.00 acres
Wetland 0.00 acres
Impervious 0.14 acres
Total
2.33 acres
Scale Factor: 0.80 Hourly Reduced
Time Series: West-Pre.tsf �»
Compute Time Series I
Modily User Input (
_ .. _ _ _ __
File for computed Time Series [.TSF]
F :_��r Freqcer,cy Analysis
T:me Series File:west-pre.tsf
Froject Location:Landsburg
---Annual Peak F1ow Rates--- -----Flow Frequency Analysis-------
Fi� w Rate Rank Time of Peak - - Peaks - - Rank Return Prob
f :FS) (CFS) Period
�.185 2 2/09/O1 15:00 0.251 1 100.00 0.590
�,OqS 8 1/05/02 16:00 0.185 2 25.00 0.560
�.126 4 2/28103 16:00 0_161 3 10.00 0.900
.097 7 8/26/04 1:00 0.126 9 5.00 0.800
).116 5 1/05/05 10:00 0.116 5 3.00 0.667
i.(lq3 6 1/18/06 21:00 0.093 6 2.00 0.500
�.161 3 11/29/06 Sc00 0.097 7 1.30 0.231
�.�51 1 1/05/r9 7:00 0.095 8 1.10 O.n91
� ��: i:t�d P�ak� ._�_ Sil,�)n ��._.�r
Weston Heights
Technical Information Report
West Basin- Deve/oped Condition (Detained Basin)
��--�
�Land Use Summary �e_- � 0 �
Are a J
Till Forest 0.00 acres
Till Pasture 0.00 acres
Till Grass 0.83 acres
Outwash Forest 0.00 acres
Outwash Pasture 0.00 acres
Outwash Grass 0.00 acres
Wetiand 0.00 acres
Impervious 1.06 acres
Total
1.89 acres
Scale Factor: 0.80 Hourly Reduced
Time Series: West-Dev.tsf I»
Compute Time Series I
Modify User Input I
_ -__
File for computed Time Series [.TSF]
'F=i I'� .�'S II�I
F1.��� Fi_�_er�y Analy"--
Time Series File:west-dev.tsf
Froject Location:Landsburg
---Annual Peak Flow Rates--- -----Flow Frequency Analysis-------
Fl�:�w Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) Period �
0.373 9 2/05/O1 2:n0 0.6fi3 1 100.00 0.990
0.220 8 12/03/O1 17:G0 0.451 2 25.00 0.960
.367 5 9/10/03 15:00 0.929 3 10.00 0.900 �
i;.429 3 8/26/04 1:00 0.373 9 5.00 0.800
i;.353 7 10/28/09 18:00 0.367 5 3.00 O.EE7
c.366 6 10/22/05 17:00 0.366 6 2.00 0.500 �
� .951 2 11/21/OE 9:00 0.353 7 1.30 0.231
��. - t 1 1/r4i�i� ;�ri `i.?2n l .l�� �'�•��"-
r � , .>.y};� i. �� . ', � .
Weston Heights I�
Technical Information Report �
West Basin—Developed Condition (Bypass Basin)
s�:,�-�. ;�-��-� :-���--�—���
�Land Ike Summary 1�'�°I� '=' �
Area ?�
Till Forest 0.00 acres
Till Pasture 0.00 acres
Till Grass 0.36 acres
Outwash Forest 0.00 acres
Outwash Pasture 0.00 acres
Ouiwash Grass 0.00 acres
Wetland 0.00 acres
� Impervious 0.08 acres
Total
, 0.44 acres
Scale Factor: 0.80 Hourly Reduced
Time Series: West-Byp.ts� �»
Compute Time Series I
� Modify User Input �
File for computed Time Series [.TSFJ
�'lou t'requency Ar,alysis
Time Series File:west-byp.tsf
Project Location:Landsburg
---Annual Peak Flow Rates--- -----Flow Frequency Analysis-------
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) Period
0.065 3 2/05/O1 2:00 0.132 1 100.00 0.590
0.027 8 12/03/Ol 17:00 0.079 2 25.00 0.960
0.040 7 2/28/03 16:00 0.065 3 10.00 0.500
0.058 9 8/26/09 1:00 0.058 9 5.00 0.�00
0.045 6 10/2�S/09 18:00 0.097 5 3.00 O.E67
0.097 5 10/22/OS 17:00 0.095 6 2.00 0.500
0.079 2 11/21/Ob 9:00 0.040 7 1.30 0.231
0.132 1 1/09/08 7:D0 0.02'7 �s 1.10 0.091
r"mpoted Peaks O.115 Sn.pn n,tigr
Weston Heights
Technical Infermation Report
West Basin- Vault Desiqn Ca/cu/ations
Retenti��n/Detention Facility
' Type of Facility: Detention Vau1t
Facility Length: 128.00 ft
Facility Width: 29.00 ft
Facility Area: 3072. sq. ft
Effective Storage Depth: 7.50 ft
Stage 0 F,levation: 505.R0 ft
Storage Volume: 23090. cu. ft
Riser Head: 7.50 ft
Riser Diameter: 12.00 inches
Number of orifices: 3
Fu11 Head Pipe
Orifice # Height Diameter Discharge Diameter �
(ft) (in) (CFS) (in) �
1 0.00 0.75 0.092
2 3.75 1.13 0._r,F,6 4.'�
3 6.20 i , i;.i;'9 1.'i
'P.-�•-, y-�tr:'i 47eir: `�-_i..
�.��.r I 1 ��.a F�:r'[� : ...i..,;-: �
ra.� F1,...� . 'i �t� t�:1= i(..,��i,: ��� f=_ .�� 1,y-: n
(f.) (ft) (cu. Yt) (ac-ft) (c_'s) (cfs)
' 0.00 505.80 0, 0.000 0.000 0,0�,
0.01 505.81 31. n.001 0.001 O.Oc
0_02 505.82 e1. 0.001 0.002 O.n�
0.03 505.83 P2. n.002 0.003 0.0�
0.04 505.84 :�3. n.003 0.003 O.n�
'i o.05 505.85 154. n.009 0.009 0.0�
0.a6 505.86 1�4. n.009 0.009 0.0�
0.21 506.01 695. n.o15 0.007 0.0
0.3E 506.16 11G�, n.OZS 0.005 0.0
- 0.50 506.30 15��. 0.035 0.011 0.0
0.65 506.95 1°��. 0.046 0.012 0.0
0.80 506.60 295��. 0.056 0.019 0.0
0.99 506.74 2858. 0.066 0.015 0.0
1.09 506.89 3345. n.077 0.016 0.0�_
1.29 507.04 3805. 0.087 0.017 0.00
1.35 507.19 9270. 0.098 0.018 0.00
1.53 507.33 9700. n.108 0.019 0.00
1.68 507.96 516'_. �.11° 0.020 0.00
1.83 507.63 5622. G.125 0.021 0.00
1.57 507.77 6052. 0.135 0.021 0.00
2.12 507.92 6513. G.150 0.022 0.00
2.27 508.07 69%3. �.160 0.023 0.00
2.42 508.22 79�4. �.171 0.029 0.00
2.56 508.36 7864. 0,181 0.029 0.00
2.71 508.51 83�5. 0,191 0.025 0.00
2.86 508.66 675e. 0.202 0.026 0.00
3.00 508.80 521E. 0.212 0.026 0.00
3.15 508.95 56?7. 0,222 0.027 0.00
3.30 505.10 1013Y. n.233 0.028 0.00
3.49 505.24 10568. 0,2q3 0.028 O.OG
3.59 509.39 110�8. (t.253 0.029 O.00
3.79 509.54 119°,5, n.26q 0.030 O.00
3.75 509.55 ll��n. n.269 0.030 0.0�
3.76 505.56 11551. 0.265 0.030 0.0�
3.77 505.57 115�1. 0.266 0.031 O.00
3.79 509.59 11693. 0.267 0.032 O.OS
3.80 505.60 11674. n.268 0.034 0.0�
3.81 509.61 11704. n,265 0.036 0.0�_
3.82 505.62 11735. 0.265 0.039 O.00
3.63 509.63 11766. 0.270 0.090 O.00
3.89 Sn9,64 11746. n.271 r.nqn O.nr
Weston Heights
Technical Information Report
3.99 509.75 12257. n.Zgl 0.097 0.00
9.19 509.99 12718. 0.252 0.052 0.00
9.28 510.08 13198. n.302 0.057 0.00
9.43 510.23 13605. 0.312 0.060 0_00
9.58 510.36 1407n. r,323 0.064 0_00
9.73 510.53 1453'_. 0.339 0.067 0_00
' 9.87 510.67 145b1. 0.393 0.070 0_00
5.02 510.82 15921. 0.359 0.073 0.00
5.17 510.97 15882. 0.365 0.076 0.00
5.31 511.11 16312. 0.374 0.078 0.00
5.96 511.26 16773. 0.385 0.061 0.00
5.61 511.91 17239. ��.396 0.063 0.00
5.76 511.56 17b��. ��.406 0.085 0.00
5.50 511.70 18125. ��.416 0.087 0.00
6.05 511.85 1P•586. ?.427 0.090 0.00
6.20 512.00 15096. �.437 0.092 0.00
6.21 512.01 15077. n.938 0.092 0.00
6.22 512.02 15106. n.q3y 0.093 0.00
' 6.23 512.03 19139. 0.935 0.093 0.00
6.29 512.09 15169. n.qq0 0.055 0.00
6.25 512.05 19200. 0.941 0.097 0_00
6.26 512.06 15231. n.941 0.058 0_00
6.27 512.07 19261. 0.942 0.058 0.00
E.42 512.22 15722. 0.953 0.109 0.00
E.57 512.37 20183. 0.963 0.105 0.00
E.71 512.51 20613. 0.973 0.114 0.00
6.86 512.66 21074. 0.989 0.117 0.00
7.01 512.81 21535. 0.999 0.121 0.00
7.16 512.96 2159E. 0.505 0.124 0.00
7.30 513.10 2292E. 0.515 0.128 0_00
7.95 513.25 2288E. 0.525 0.131 0.00
7.50 513.30 23090. 0.529 0.132 0.00
7.60 513.90 23397. 0.536 0.992 0.00
7.70 513.50 23659. 0.593 1.010 0.00
�'.80 513.60 23462. 0.550 1.740 0.00
, .50 513.70 29265. 0.557 2.530 0.00
�.CO 513.80 24576. 0.564 2.820 0.00
�.10 513.50 29883. G.571 3.070 0.00
.20 514.00 25150. 0.578 3.310 0.00
�.30 514.10 2544A. 0.585 3.530 0.00
�.90 514.20 25805. ��.552 3.790 0.00
S S 0 514.30 261�2. 0.559 3.930 0.00
Hyd Inflow Outflow Peak Storage ��,
Stage Elev (Cu-Ft) (Ac-Ft)
1 0.68 0.50 7.61 513.41 23378. 0.537
2 0.45 0.12 7.02 512.82 21558. 0.995
3 0.43 0.02 2.70 508.50 8309. 0.191
9 0.37 0.12 6.55 512.75 21397. 0.990
5 0.37 0.05 3.57 509.77 12209. 0.280
6 0.37 0.02 1.55 507.35 4759. 0.109
� 7 0.35 0.02 1.86 507.EE 5708. 0.131
8 0.22 0.02 1.26 507.06 3863. 0.089
Hyd R/D Facility Tributary Reservoir POC Outflow
Outflow Inflc•w Inflow Tarqet Calc
1 0.50 0.13 ****`*** 0.25 0.5�
2 0.12 0.08 *'�*�**+ *ar+t+• 0.1�
3 0.02 0.06 *{**'*'+ far+ra+ 0.08
4 0.12 0.07 *"**�•** *+i*+** 0.16
S 0.05 0.05 �aaa.**i *ri�i++ O.OG
6 0.02 0.09 ***{`*** *•*�*** 0.05
7 0.02 0.05 ****'*** **{*+** 0.06
8 0.02 0.03 *+++***+ *.+*.t. 0.03
----------------------------------
Route Time Series throuqh Facility
Inflow Time Series File:west-de�-.-: `_
Outflow Time Series File:West-RDi',�i�
POC Time Series File:West-DSU�i-
Weston Heights
Technical Information Report
In.t l� �h.'��i-'�-- w P.r,�al'.:�ir-.
E��,ak Inf=sM• Gis��ha_qe. �i.o�,� CFS at ;:GQ �n Jan G in Y'car _
yk Outflcw Discharge: 0.995 CFS at 5:00 on Jan 9 in Year 8
eak Reservoir Stage: 7.61 Ft
Feak Reservoir Elev: 513.91 Ft
� ak Reservoir Storage: 23378. Cu-Ft
. 0.537 Ac-Ft
A�id Time Series:west-byp.tsf
Peak Summed Discharge: 0.573 CFS at 5:00 on Jan 9 in Year 8
�int of Cempliance File:West-DSOut.tsf
cration Comparison Anayisis
Base File: west-pre.tsf
New File: west-dsout.tsf
�,ut.,ff Units: Discharge in CFS
-----Fraction of Time----- ---------Check of Tolerance-------
Cutuff Base New �Change Frobability Base New �Change
0.097 I 0.51E-02 0.85E-02 -3.2 0.91E-02 0.047 0.046 -1.9
0.057 � 0.60E-02 0.61E-02 3.3 0.60E-02 0.057 0.059 2.0
f�-�E8 I 0.35E-02 0.92E-02 7.5 I 0.35E-02 0.068 O.OE9 l.ss
:i,���79 � 0.26E-02 0.26E-02 -1.3 I 0.26E-02 0.079 0.078 -0.2
.��89 I 0.16E-02 0.17E-02 9.0 I 0.16E-02 0.089 0.092 3.0
.100 � 0.11E-02 0.13E-02 19.3 I 0.11E-02 0.100 0.106 6.3
.110 � 0.88E-03 0.58E-03 11.1 � 0.88E-03 0.110 0.119 3.0
.121 � 0.68E-03 0.65E-03 -9.8 I 0.68E-03 0.121 0.121 -0.3
.132 � 0.47E-03 0.42E-03 -10.3 I 0.97E-03 0.132 0.130 -1.0
.192 � 0.31E-03 0.29E-03 -21.1 I C.3:E-03 0.192 0.135 -2.6
.:53 � 0.15E-03 0.82E-C9 -99.9 I 0.15E-03 0.153 0.197 -3.7
' •-E4 I 0.9�5E-09 0.16E-09 -83.3 I 0.58E-04 0.164 0.152 -7.1
' •-74 I 0.95E-09 O.00E+00 -100.0 � 0.99E-09 0.174 0.159 -11.E
� ._°5 I 0.16E-09 O.00E+00 -100.0 � 0.16E-09 0.185 0.165 -10.8
>i,::.mum positive excursion = 0.007 cfs ( 7.Ot)
�urring at 0.099 cfs on the Base Data:west-pre.tsf
;od at 0.106 cfs on the New Data:west-dsout.tsf
>laximum negative excursion = 0.025 cfs (-15.6�)
-�urring at 0.192 cfs on the Base Data:west-pre.tsf
:n�i at 4.'_;4 cfs ���n the Nek� Data:'aest-�i�cn`.tsf
--- - ------
-- ---- ------------
(�r..r�a..i..�wyr-eonx .. �F:;
Io wosl�tOur
'.ve51�O50v1 aur •
W�TrD�ICW •
�
o � �`
\
_ -• \
�n - �-'_
o �� Y
•
�, � R ,�s
- ---`.-�- ------- ---------------- ----
� o -- - -_ _. .,, !
.
� ,.
� g ,,, � �'� ��
a =
�
s .. ��
e
� W � � -
o --_ -
' o D � �=Y�...1
' ro' �o' ,o' �o' ,o ' �o'
r�oe.nrr�e.ae�c.
Weston Hei hts I
9
Technical Information Report
' East Basin-Existin_q Condition
�Land Use Summary , _,;.. t�I_0 _�
Area ?�
` Till Forest 1.83 acres
Till Pasture 0.00 acres
Till Grass 0.00 acres
�
- Outwash Forest 0.00 acres
Outwash Pasture 0.00 acres
�
Outwash Grass 0.00 acres
�
Wetland 0.00 acres
Impervious 0.00 acres
Total
�
1.83 acres
Scale Factor: 0.80 Hourly Reduced
i Time Series: East-Pre.isf �»
Compute Time Series '
i
i Modify User Input !
' File for computed Time Series [.TSFJ
� i�
�
1_ Flow Freq��ency Analysi
Time Series File:east-:
Project Location:La�dsb�.: -�
I, r- ;
; ' ---Annual Peak Flow Rates--- ----Flow Frequency Analysis-------
Elow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(rFS) (CFS) Period
0.135 2 2/05/O1 18:00 0.160 1 100.00 0.950
0.022 7 1/OS/02 16:00 0.135 2 25.00 0.960
' O.OBb 4 2/28/03 16:00 0.109 3 10.00 0.900
0.016 8 3/03/09 3:00 0.086 9 5.00 0.800
0.075 5 1/OS/05 IC:00 0.075 5 3.00 O.E67
0.063 6 1/16/06 21:00 O.OE3 6 2.00 0.500
0.105 3 11/24/06 5:00 0.022 7 1.30 0.231
0.160 1 1/09/08 7:00 O.C16 8 1.10 0.051
Computed Peaks 0.151 50.00 0.580
Weston Heights
Technical Information Report
East Basin—Developed Condition (Detained Basin)
� Land Use Summary � � '�
Area ?�
Till Forest 0.00 acres
Till Pasture 0.00 acres
Till Grass 0.98 acres
Outwash Forest 0.00 acres
Ouiwash Pasture 0.00 acres
Outwash Grass 0.00 acres
Wetland �.00 acres
Impervious 0.80 acres
Total
1.78 acres
Scale Factor: 0.80 Hourly Reduced
Time Series: East-Dev.tsf »
Compute Time Series I
Modify User Input I
File for computed Time Series [.TSF]
F'1-��+� t'Leq�:er,cy Ana�ysis
�'ime Series File:east-dev.tsf
coject Location:Landsburg
---Annual Peak Flow Rates--- -----Flow Frequency Analysis-------
Fl w Rate Rank Time of Peak - - Peaks - - Rank Return Prob
i �FS) (CFS) Period
.326 9 2/05/O1 2:00 0.612 1 100.00 0.950
.'�75 8 12/03/O1 17:00 0.394 2 25.00 0.960
.289 6 9/10/03 15:00 0.355 3 10.00 0.900
':.355 3 8/26/04 1:00 0.32E 9 5.00 0.800
i.2g9 7 10/28/04 1H:00 0.255 5 3.00 0.667
i.Zgy S 10/22/05 17:00 0.289 6 2.00 0.500
�.344 2 11/21/06 9:00 0.289 7 1.30 0.231
,�.r12 1 1/09/oe 7:nn p.17° S L ln o.n51
� m:,i�.-r:1 F=aks `i,54'�' __. r�.=='C
Weston Heights I�
Technical Information Re-�crt
East Basrn — Developed Condition (Bypass Basin)
�Land Use Summary I-o �;_O_,� ,
Are a ?
Till Forest 0.00 acres '
Till Pasture 0.00 acres
Titl Grass 0.00 acres
Outwash Forest 0.00 acres
Ouiwash Pasture 0.00 acres
Outwash Grass 0.00 acres
Wetland 0.00 acres
Impervious 0.05 acres
Total
0.05 acres
Scale Fac#or : 0.80 Hourly Reduced
� Time Series: I�East-Byp.ts� »
� Compute Time Series �
Modiiy User Input �
____. _
File for computed Time Series [.TSF]
F:ow Frequency Analysis
Time Series File:east-byp.tsf
Project Lccation:Landsburg
---Annual Peak Flow Rates--- -----Flow Frequency Analysis-------
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) Period
0.013 7 2/05/O1 2:00 0.022 1 �00.00 0.990
0.009 8 12/03/O1 17:00 0.017 2 25.00 0.960
O.OlE 9 5/10/03 15:00 0.017 3 10.00 0.500
0.017 2 8/26/09 1:00 0.016 9 5.00 0.800
0.019 6 10/28/09 18:00 0.015 5 3.00 O.E67
� 0.015 5 10/22/05 17:00 0.019 6 2.00 0.500
' 0.017 3 10/26/06 3:00 0.013 7 1.30 0.231
' 0.022 1 1/09/08 7:00 0.009 8 1.10 0.051
Computed Peaks 0.020 50.00 0.580
j
I
Weston Heights
- Technical Information Report
East Basin-Pond Desiqn Ca/cu/ations
Type of Facility: Detention P�nd
Side Slope: 3.50 H:1V
Pond Bottom Length: 06.00 ft
Pond Bottom Width: 60.00 ft
Pond Bottom Area: 3560. sq_ ft
Top Area at 1 ft. FB: 8921. sq_ ft
0.205 acres
Effective Storage Depth: 3.50 ft
Stage 0 Elevation: 519.50 ft
Storage Volume: 15563. cu. ft
0.458 ac-ft
Riser Head: 3.50 ft
Riser Diameter: 12.n0 inches
Number uf orifices: 3
Fu1i Head Pipe
Orifice 1k Height Diameter Discharge Diameter
(ft) (in) (CFS) (in)
1 0.00 0.88 0.039
2 2.10 1.25 0.050 4.0
3 2.60 0.63 0.010 9.0
Top Votch Weir: Rectangular
Length: 1.50 ir,
Weir Height: 3.20 ft
Ou:flow Rating Curve: None
Staqe Elevation Storage Discharge Percolation Surf Area
(ft� (ft) (cu. ft� (ac-ft) (cfs) (cfs) (sq. ft)
r,00 51E.50 C. 7.000 0.000 0.00 3960.
S,O1 518.51 4S. �.npl 0.002 0.00 3569.
0.02 518.52 ��. 0.002 0.003 0.00 357s_?.
0.03 518.53 L"4, G,003 0.003 0.00 3587.
��,04 518.59 159. 0.009 0.009 0.00 3595.
C,,05 518.55 1�9. 0.005 0.005 0.00 9009.
�.G6 518.56 'L3�. ��.005 0.005 0.00 9013.
O.07 518.57 27�. �.006 0.006 0.00 9022.
0.17 518.67 68r�. �.016 0.009 0.00 9111.
0.27 518."17 1=02 �.025 0.011 0.00 9202.
0.37 518.87 1526. 0.035 0.013 0.00 9293.
0.47 518.97 1960. 0.095 0.019 0.00 9385.
0.57 519.07 2904. 0.055 O.OlE 0.00 9979.
0.67 515.17 2856. 0.066 0.017 0.00 9573.
0.77 515.27 3316. 0.076 0.018 0.00 9666.
0.67 515.37 3750. 0.087 0.019 0.00 9764.
0.57 515.97 4271. 0.098 0.020 0.00 9862.
1.07 515.57 4762. 0.109 0.022 0.00 9960.
1.17 515.67 5263. 0.121 0.022 0.00 5055.
, 1.27 519.77 5774. 0_133 0.023 0.00 5155,
1.37 515.87 6295. 0.145 0.029 0.00 5200.
1.97 519.97 6826. 0.157 0.025 0.00 5362.
1.57 520.07 7367. 0.169 0.026 0.00 5966.
1.67 520.17 7919. 0.182 0.027 0.00 5570.
1.77 520.27 89�:. n.195 0.028 0.00 5675.
1.87 520.37 9r;4, ii.208 0.028 0.00 5781.
1.97 520.97 563�. 0.221 0.029 0.00 5888.
2.07 520.57 10232. n.235 0.030 0.00 5996.
2.10 520.60 10912. n.239 0.030 D.00 6028.
2.11 520.61 10972. 0.240 0.030 0.00 6039.
2.13 520.63 1054?. 0.243 0.032 0.00 6061.
2.19 520.69 10654. 0.245 0.033 0.00 6072.
2.15 520.65 10715. 0.246 0.036 0.00 6083.
2.17 520.67 10�•37. n.295 0.03G 0.00 6105.
2.18 520.68 1C�4��. C.250 0.092 0.00 6116.
2.15 520.69 109,'^. 0.252 0.099 0.00 6127.
2.20 520.70 ll02�;, n.253 0.095 0.00 613g.
2.22 520.72 71143. 0,256 0.045 0.00 6160.
2.32 520.62 117E5. Q.270 0.051 0.00 6270.
2.92 520.42 12347. 0.285 0.056 0.00 63�1.
Weston Heights ,
Technical Information Report ��
�.5� �21.OL 1309�. .2�5 i�.UEU n,gQ c�'+4.
2.50 5'L1.10 13�b9. �.311 C,063 G.00 o5�4.
2.61 521.11 1363C. 0.313 O.C64 0.00 6556.
2.62 521.12 1365c. 0.319 O.OE5 0.00 6607.
2.63 521.13 137E2. 0.316 0_OE7 0.00 6615.
2.64 521.19 13825. 0.317 0_067 0.00 6630.
2.65 52 L=5 13855. 0.315 0.063 0.00 E691.
2.75 521.25 145b5. 0.334 O.G73 0.00 6756.
2.85 521.35 1529b_ 0.350 0.077 0.00 E272.
2.95 521.95 15939. 0.366 0.0�1 0.00 o58R.
3.05 521.55 16694. 0.3R2 0.085 0.00 7106.
3.15 521.65 17360. 0.395 0.088 0.00 7225.
3.20 521.70 17723. 0.907 C.050 O.Or, 7234.
3.29 521.74 18015. 0.919 O.C99 O.DO 7332.
3.213 521.78 18310. 0.920 0.100 0.00 73'C.
3.31 521.81 18532. 0.425 O.lOo 0.00 7916.
3.35 521.B5 1882y. 0.432 O.lI3 0.00 79E5.
3.39 521.89 15129. 0.435 0_114 0.00 7513.
3.92 521.92 19355. G.494 0.125 0.00 7550.
3.96 521.G6 19658. 0.451 0.131 0.00 7558.
3.50 522.00 19963. 0.958 0.190 0.00 7697.
3.60 522.10 20733_ 0.976 0.451 0.00 7770.
3.70 522.20 21517. 0.999 1.020 0.00 7£�54.
3.80 522.30 22312. 0.512 1.750 0.00 8015.
3.50 522.90 23120. 0.531 2.590 0.00 8195.
9.00 522.50 2399�. 0.550 2.830 0.00 8272.
9.10 522.60 24775. 0.565 3.090 U.00 840r,.
9.20 522.70 25621. 0.588 3.320 0.00 8525.
9.3G 522.80 26981. 0.608 3.540 0.00 8655.
9.40 522.50 27353. 0.628 3.750 0.00 8735.
9.50 523.00 28239. 0.698 3_550 0.00 B921.
9.60 523.10 29137. 0.669 9_130 0.00 9059.
9.70 523.20 30095. 0.650 4.310 0.00 518,�.
q.ft0 523.30 30575. 0.711 9.480 0.00 9323.
9.90 523.40 31519. D.�33 4.650 0.00 9958.
5.00 523.50 328e?. 0.755 4.810 0.00 9555.
5.10 523.6u 33b33. n.777 4.560 0.00 �733.
5.20 5L3.70 39813. 0.759 5.110 0.00 9�71.
5.30 523.80 35807. 0.822 5.260 0.00 1001'_.
5.40 523.50 36815. 0.845 5.400 0.00 10152.
5.5r, 529.00 37338. 0.865 5.530 O.Or, �G2�3.
Hyd Inflow Outflow Peak Storage
Stage Elev (Cu-Ft) (Ac-Ftj
1 0_61 0.94 3.60 522.10 20717. 0.47e
2 0_39 0.10 3.27 521.77 18270. 0.41y
3 0.33 0.10 3.26 521.76 18154. 0.417
9 0.19 O.G6 2.96 52C.56 12058. 0.25'_
5 0.21 0.06 2.96 520.56 12630. 0.250
6 0.30 0.03 1.95 520.95 5505. 0.218
7 0.35 0.02 1.33 519.83 6066. 0.13�
Q 0.18 0.02 0.52 519.42 9031. � ,,"'
Hyd R/D Facility Tri�utary Reservoir POC Outflow
Outflow Inflcw Inflow Target Ca1c
1 0.99 0.02 ******** Q.16 0.4c
2 D.10 0.02 *{*•+*.* *+.*+*+ 0.10
3 0.10 0.01 *+*•+*++ *.+*+*+ 0.1�
4 0.06 0.01 +.�.**f+ �+.<+** O.Oc
5 0.06 0.01 ***"***` �*•*+** O.Cb
E 0.03 0.02 ..*.�.++ �.*�*�.+ p_r�
� O.�C �.C� ak����.. ++t�xa. 0.�9
�� r;. � ��� �=1 _....tr= �+...�� �,�
Weston Heights
Technical Information Report
Route Time Ser�es th�ough Fa�ility
Inflow Time Series File:east-de�.rrt
Outflow Time Seiies Fil�:-�aet-F=:���_t
POC Time Series F_1=:-.,r't-=c',� �.t
Inflow/Outflow Analysis
Peak Inflow Gischarq= : . �_ kc. _.� , - -, a:, r_ �y� '
' Peak Outflow Discharqe: :�.=14y � F, . . � 1:� 7- _
'_ Peak Reservoir Stage: 3.E0 Fr
Feak Reservoir E"�ev: 522.�0 F*
� _ Peak keservoir Storaqe: 20717. Cu-F-
0.976 �;_-F-
Add Time Series:east-byp.*sf
_3}; �,_7=i1R��� _ ___iyi�:a: t, _.,� `.F.r �' . .. __ ...I= .. � ,
_ .:.' I .� ,, . . ., . -. � -. .-. .- _.- ... . .
�_I_:t._�L "�.I:t _ . . , :f 11-I.�_': __E __.._,i_t'_- ' .._��__"_ .
rFS % o �
0.001 29975 98.383 48.883 51.117 0.511E+U�
' 0.009 5372 8.761 57.694 42.356 0.929E+i�r
0.007 9870 7.942 65.585 39.915 0.349E+1'�
0.010 5302 8.696 79.232 25.768 0.259E+1'
0.013 9563 7.491 81.673 19.327 0.183E+r
0.016 3748 6.112 87.785 12.215 0.122E+i:
0.018 2627 4.284 52.065 7.93i 0.793E-�-
0.021 1607 2.621 59.E90 5.310 0.531E-C
0.024 1152 1.879 56.569 3.931 0.393E-�_
0.027 782 1.275 97.849 2.156 0.21EE-�_
' 0.030 616 1.OG5 96.P95 1.151 O.11SE-C:
0.032 294 0.358 99.297 0.753 0.753E-"'
0.035 6� 0.095 59.346 0.654 0.659E-:_-�
0.038 28 0.046 9°.352 0.60t3 0.608E-02
0.041 13 0.021 49.413 n.587 0.587E-02
' 0.049 19 0.023 99.436 0.564 0.569E-02
0.047 45 0.073 95.SOG 0.491 0.951E-02
0.045 46 0.075 95.5R4 0.416 0.916E-02
0.052 41 0.067 °5.65i 0.349 0.345E-02
0.055 43 0.07? 95.725 0.271 0.271E-C2
0.058 26 0.092 9y.772 0.228 0.223E-02
0.061 18 0.025 99.801 0.199 0.195E-02
0.069 12 0.020 95.821 0.179 0.174E-02
0.066 3 0.005 59.826 0.179 0.174E-02
0.065 7 O.C11 94.837 0.163 0.163E-02
0.072 7 0.011 59.848 0.152 0.152E-02
0.075 7 O.Oli 99.960 0.140 0.190E-02
0.078 10 O.OlE 59.876 0.129 0.124E-02
C.O80 7 O.Oli 99.887 0.113 O.113E-U2
0.083 9 0.015 59.502 0.098 0.578E-03
0.08E 15 0.024 99.927 0.073 0.739E-G3
0.089 15 0.029 99.951 0.049 0.929E-03
0.092 10 0.016 99,907 0.033 0.326E-03
0_095 7 0.011 99.975 0.021 0.212E-03
0.09� 5 0.008 99.597 0.013 0.130E-�3
0.100 6 0.010 99.557 0.003 0.326E-09
i j
i
Weston Heights
Technical Information Report
i
I Duration Comparison Anaylsis
Base File: east-pre.tsf
r New File: east-dsout.tsf
Cutoff Units: Discharge in CFS
-----Fraction of Time----- ---------Check of Tolerance-------
i Cutoff Base New �Change Prcbability Base New $Change
j 0.030 � 0.11E-01 O.ilE-01 -5.7 I 0.11E-01 0.030 0.03C -0.8
, 0.036 � 0.75E-02 0.61E-02 -18.7 I 0.75E-02 0.038 0.033 -14.2
0.096 � 0.53E-02 0.50E-02 -5.3 � C.53E-02 0.09E 0.095 -1.9
0.059 � 0_33E-02 0_30E-02 -10.0 I 0.33E-02 0.054 0.053 -2.3
0.062 I 0.21E-02 0_15E-02 -5.2 I 0.2iE-02 0.062 0.055 -9.7
I 0.070 I 0.15E-02 0.16E-02 2.1 I �-15E-02 0.070 0.071 1.8
0.078 I 0.11E-02 0.12E-02 10.3 I 0.11E-02 0.078 0.081 3.5
0.086 I 0.78E-03 0.73E-03 -6.3 I 0.78E-03 0.086 0.086 -0.6
0.059 I 0.57E-03 0.21E-03 -62.5 I 0.57E-03 0.099 0.06£ -0.5
0.102 � 0.33E-03 O.00E+00 -100.0 I 0.33E-03 0.102 0.042 -10.6
I 0.111 � 0.20E-03 O.00E+00 -100.0 I 0.20E-03 0.111 0.045 -13.8
� 0.119 � 0.15E-03 O.00E+00 -100.0 ! 0.15E-03 0.115 0.0°7 -1B.0
0.127 � C.99E-09 O.00E+00 -100.0 � 0.53E-04 0.127 G.�G° -22.6
0.135 � C.16E-04 O.00E+00 -100.0 I 0.16E-04 0.135 0.1n1 -24.9
II Maximum positive excursion = 0.004 cfs ( 9.7�)
occurring at 0.075 cfs on the Base Data:east-pre.tsf
and at 0.078 cfs on the New Data:east-dsout.tsf
Maximum negative excursion = 0.033 cfs (-24.9�)
�ccurring at 0.135 cfs on the Base Data:east-pre.tsf
an�i ,a* '�.101 cfs on the New Data:east-dsout.tsf
�
� '�.8►.�+�o.�r+r�• .. . . . ,.. . . . .
� o Eas1i1DO�AEur �.
Eas�-oso�na�� .
' - A - Easl-Targel Cur •
0
' n `�
�R
��
X
O
O '��`
1_ '
U N _.
. x
e m '
� e
p o
V �.
, 0 `° °°° --... _--
0
o •
l
a - _-'_--_..._. . . .._-
-_ ___
oy. -_ -__..
pp �,-�
7__.
.. '__-�___
N _
, O
O �
f
_�``.`
O w
O �
� 10 � 10� 10 � 10 � 10 � 10�
ProbebYry E:ceederKe
Weston Heights
Technical Information Report
Equivalent East Pond Detention Storaqe
Made b�r. Date: ��ProjecC
KIM �4/25/2016 Weston Heights
Checked by. ��.Date: Project No:
�Backchecked Date: '�Sheet No: .,I
TheorcNed Pbnd Vdum!Caladatlon
Fson�aoed Fad Leerllh= 6I Jt
F.st3nare+d Fbid Wi�h= 6I fc
Fsdneaord Side Sfapr= 3 :1
Me�u,rd rbnd vdu,n�cdndatian
Cdcu/ated [akuloted Calculated Measured Cdculated Calculated
, Contour Contaur Incrcmerrcd Cumulative Cantax Conrow Incremental Cumulamve
' Elevation Arca Vdume Vdume Efevation Meo Vdume Vdume
s cu cu t cu t cu t cu C.om ',
518.0 3,721 0 0 518.0 3,508 0 0 0
518.5 � 4,096� 1,954� 1,954 518_5 3,979� 1,872 1,872 ��+
519.0 � 4,489� 2,146� 4,101 519.0 4,464� 2,1ll 3,9i83 (]1:
519.5 � 4,900� 2,347� 6,448 519_S 4,969� 2,358 6,341 (]I!
520.0 � 5,329� 2,557� 9,005 SZ0.0 5,493� 2,616 8,956 (4
520.5 � 5,776� 2,776� 11,781 520_5 6,022� 2,879 11,835 Sd
521.0 � 6,241� 3,004� 14,786 521.0 6,570� 3,1A8 14,983 19t!
521.5 � 6,724� 3,241� 18,027 52L5 7,1�8� 3,430 18,413 381:
522.0 � 7,225� 3,487� 21,514 SZ2.0 7,755� 3,726 22,138 674
522.5 � 7,744� 3,742� J5,256 522.5 8,478� 4,058 26,197 94('
523A � 8,281� 4,006� 29,263 523.0 9,293� 4,443 30,639 1,37i
Weston Heights
Technical Information Report
Made by: Date: Project Name:
�' KIM 6/6/2016 Wesfon Heights
'. ec e y: ate: ro�ed o:
XJM
ac c ec e y: ate: eet o:
- � _=�'"�`T`r K1M
Measured Pond Volume Calculation Theoretical Pond Volume Calculation
Estimated Pond Lengih= 66 ft
Meosured from CAD Drowing Estimated Pond Widih= 60 ft
fstimated Side Slope= 3.5 :1
Measured Calculated Calculated Calculated Calculated Calculated
fontour Contour Incremental Cumulotive Contour Contoui Incrementaf Cumulative
Elevation Area Volume Volume Efevotion Areo Volume Volume
(ft) (�u�r) (cu ft) (cu�t) (ft) (sq ft) (cu ft) (cu ft) Comparison
5185 3,556 0 0 518.5 3,960 0 0 0
519.0 4,433 2,097 2,097 519.0 4,413 2,093 2,093 �4j
519.5 4,930 2,341 4,438 519.5 4,891 2,326 4,419 (19)
520.0 5,445 2,594 7,032 520.0 5,393 2,571 6,990 (41)
520.5 5,977 2,856 9,887 520.5 5,920 2,828 9,819 (69)
521.0 6,527 3,126 13,013 521.0 6,471 3,098 12,917 (97)
521.5 7,095 3,406 16,419 521.5 7,047 3,380 16,296 (123)
522.0 7,679 3,694 20,112 522.0 7,647 3,674 19,970 (143)
522.5 8,282 3,990 24,103 522.5 8,272 3,980 23,950 (153)
523.0 8,901 4,296 28,398 523.0 8,921 4,298 28,248 (150)
�
� d
I
I
J ;
�I ,
I
II
'i �-_
��
� ' Predeveloped O/vmpus Villa Pond`A'Basin
I
� land Use Summary � �I i
Are a ?
� ) Till Forest 3.18 acres
' Till Pasture 0.00 acres
� , Till Grass 0.00 acres
;� �I Ouiwash Forest 0.00 acres
I ' � Ouiwash Pasiure 0.00 acres
i
i
Ouiwash Grass 0.00 acres
Wetland 0.00 acres
Impervious 0.10 acres
Total
3.28 acres �
Scale Factor : 1.00 Hourly Reduced
Time Series: Predev.tsf »
Compute Time Series I
Modify User Input I
--- _ _
File for computed Time Series [.TSFj
Flcw Frequency Anal}'s'-�
Time Series File:predev.ts=
, Preject Location:Sea-Tac
---Annual Peak Flow Rates--- ---F1_�w Fre�xuen.y Analysis-------
Flow F.ate Rank Time of Peak - - Peaks - - Rank Returt; rrob
(CFS) (CFS) Period
0.222 2 2/09/O1 1£3:0a 0.303 1 lOG.00 O.S'::�0
0.075 7 1/05/02 i6:00 0.222 2 L5.00 0.560
0.178 3 2/28/03 3:00 0.173 3 1f.00 0.50G
0.025 8 8/26/09 2:00 0.176 4 5.00 0.8G0
0.107 6 1/OS/05 L:00 0.157 5 3.00 0.66?
0.176 9 1/19/05 20:00 0.107 6 2.00 0.500
0.157 5 11/24/OE 9:00 C.075 7 1.30 0.231
0.303 1 1/09/08 9:00 0.025 8 1.10 0.091
Computed Peaks C.276 50.00 0.580
*The original design information for Olympus Villa Pond 'A' may be found in the provided "Olympus Villa
LUA 10-090" report included in Appendix 6C. The original predeveloped areas for Olympus Villa were:
- 2.78 ac Till Forest
- 0.10 ac Existing Wetland (modeled as impervious)
The Weston North project added the following values to the predeveloped conditions:
- 0.40 ac Till Forest
Weston Heights
Technical Information Report
Developed Olympus Villaqe Basin
� Land Use Summary l �`I ���
Area ? '
Till Forest a.00 acres
Till Pasture O.OU acres ,
Till Grass 1.44 acres
Ouiwash Forest 0.00 acres
Ouiwash Pasture 0.00 acres
Outwash Grass 0.00 acres
� Wetland 0.00 acres
Impervious 2.08 acres
Total
i
� 3.52 acres
Scale Factor: 1.00 Hourly Reduced
Time Series: kle�.tsf (»I
Compute Time Series I
Modiiy User Input I
�
File for computed Time Series [.TSFj
Flow E'requencp Fnalysi�
Time Series File:dev.tsf
Pruject Location:Sea-Tac
---Annual Peak Flow kates--- -----Flow Frequency Analysis-------
Flow Rate R.ank Time of Peax - - Peaks - - kank R.eturn Pr_-b
(CFS) (CFS) Period
0.633 6 2/09/O1 2:00 1.29 1 100.00 0.990
0.510 8 1/05/02 16:00 0.792 2 25.00 0.960
0.763 3 2/27/03 7:00 0.�63 3 10.00 0.�00
0.595 7 �s/26/04 2:00 0.571 4 5.00 0.800
0.658 5 10/28/04 16:00 0.658 5 3.00 0.667
0.671 4 1/1�/06 16:00 0.633 6 2.00 0.500
0.752 2 10/26/06 0:00 0.545 7 1.30 0.231
� 1.29 1 1/Ou/OS 6:00 0.510 8 1.10 0.0��1
�omputed Peaks 1.12 5��,00 0,'-�;_0
*The original design information for Olympus Villa Pond 'A' may be found in the provided "Olympus Villa
LUA 10-090"report included in Appendix 6C. The original developed areas for Olympus Villa were:
- 1.35 ac Till Grass
- 1.77 ac Impervious
The Weston North project added the following values to the predeveloped conditions:
- 0.09 ac Till Grass
- 0.31 ac Impervious
Weston Heights
Technical Information Report
O/vmaus Villaqe Pond `A'Revised Riser Desipn & Equiva/ent Areallo/ume
F.etG�,t:�_�nl��et�ntion Ea.ility
Type of Facility: Detention Pond
Side Slope: 2.35 H:1V
=cnd Bottom Length: 56.36 ft
Pond Bottom Width: 60.51 ft
Po�d Bottom Area: 5831. sq. ft
��-�f-� Area at 1 ft. FB: 1G580. sq. ft
0.252 acres
f': :�= �t 've Storage Gepth: 9.93 ft
�-aq� n Elevation: 0.00 ft
� . � � : te Volume: 38588. cu. ft
0.8�E ac-ft
Fi�er Head: 4.93 ft
.-_. � c Diameter: 12.00 inches
`d�r,��bFr uf orifices: 3
Full Head Pipe
_ i�ice # Height Diameter Discharge Diameter
(ft) (in) (CFS) (in)
1 0.00 1.09 0.065
2 3.27 1.63 0.052 4.0
3 3.90 1.09 0.030 9.0
To�� Notch Weir: Nnne
i�,i;� f _ w E�ra' i ri�; �: . _. ?d �i�
,�: PI� : . _ �i_ �� . I .. _�,' r� � ' � ' - - '��_ t r_�`'-.
(:_) (i�) (c��. �t) (zc-�-) (�,:�j ('_-�) (��y. f�)
.00 0.00 0. 0.000 0.000 0.00 5831.
.O1 0.01 58. 0.001 0.003 0.00 5�3�.
.02 0.02 117. 0.003 0.009 0.00 5896.
.03 0.03 175. 0.009 0.005 0.00 5853. �
i.09 0.09 234. 0.005 0.006 0.00 5860.
t��.05 0.05 293. 0.007 0.007 0.00 5868.
ii.06 0.06 351. 0.008 0.007 0.00 54�`
���.08 0.08 465. 0.011 0.008 0.00 5N��0.
!�.09 0.09 528. 0.012 0.009 Q.00 54`�7.
��.10 0.10 587. 0.013 0.005 0.00 55��)�,
��.20 0.20 1i31. 0.027 0.013 0.00 5975�.
�i,30 0.30 1783. 0.091 0.016 0.00 6059. i
��.90 0.90 2352. 0.055 0.013 0.00 6125.
��.50 0.50 3005. 0.069 0.021 0.00 620�.
�i.50 0.60 3633. 0.083 0.023 0.00 6���.
�i.70 0.70 9265. 0.058 0.024 0.00 635P.
�i.�30 0.80 4909. 0.113 0.026 0.00 6935.
.50 0.90 5552. 0.127 0.�28 0.00 6512.
.00 1.00 6207. 0.192 0.029 0.00 6590. ii
.10 1.10 6870. 0.158 0.031 0.00 66F�:�.
: .20 1.20 7541. 0.173 0.032 0.00 674?.
.30 1.30 8219. 0.189 0.033 0.00 6�27.
.40 1.90 8506. 0.209 0.035 0.00 6`��16. ,
_ .50 1.50 9601. 0.220 0.036 0.00 69"6.
_.60 1.60 10303. 0.237 0.037 0.00 7nt;7.
i.70 1.70 11019. 0.253 0.038 0.00 7198.
1.80 1.80 11733. C1.269 0.039 0.00 72�0.
1.90 1.50 12460. 0.286 0.090 0.00 73�1.
2.00 2.00 13195. 0.303 0.091 0.00 73'_�4.
2.10 2.10 13535. 0.320 0.092 0.00 7977.
2.20 2.20 19691. 0.337 0.oq3 0.00 7560.
2.30 2.30 15451. 0.355 o.nq4 O.nO 76q3. '
� � Weston Heights
Technical Information Report
i -'i
� '
�
2.90 2.40 16219. 0.372 0.045 0.00 7728.
2.50 2.50 16556. 0.350 0.046 0.00 7812.
2.60 2.60 17782. 0.908 0.047 0.00 7857.
2.70 2.70 18576. 0.926 0.048 0.00 7583.
2.�s0 2.80 15378. 0.445 0.095 0.00 806�.
2.5C 2.50 20189. 0.463 0.050 0.00 815�.
3.00 3.00 21005. 0.482 0.051 0.00 8242.
s.10 3.10 21838. 0.501 0.052 0.00 8325�.
3.20 3.20 22675. 0.521 0.052 0.00 891�-�.
j.27 3.27 23266. 0.539 0.053 0.00 84?- .
3.25 3.25 2393F. 0.53�5 0.059 0.00 84'.�6.
3.30 3.30 23521. G.590 0.055 0.00 85i:4.
3.32 3.32 23691. 0.594 0.058 0.00 8522.
3.39 3.39 23862. 0.593 0.062 0.00 8590.
3.35 3.35 23597. 0.550 0.067 0.00 �559'�.
3.37 3.37 2911`_t. G.554 0.073 0.00 �5��� .
3.39 3.39 29290. 0.558 a.o75 0.00 �55�-�Y.
3.91 3.41 29462. 0.562 0.080 0.00 8602.
3.92 3.92 29548. 0.569 0.082 0.00 8611.
3.52 3.52 25413. 0.583 0.051 0.00 8700.
3.62 3.62 262yiO. 0.603 0.098 0.00 87�55.
3.72 3.72 27i7:. C.529 0.105 0.00 887�.
3.�2 3.82 28r;�;9. �-.699 0.110 0.00 8970.
j.90 3.50 287�9. 0.661 0.115 0.00 9092.
� .yl 3.91 28�175. 0.663 0.115 0.00 5051.
� .92 3.52 28�65. 0.665 0.117 0.00 9060.
� .93 3.53 29056. 0.667 0.118 0.00 5070.
3.99 3.59 29197. 0.669 0.120 0.00 9079.
��.95 3.95 29237. 0.671 0.123 0.00 9088.
��.96 3.56 29328. 0.673 0.125 0.00 5057.
��.98 3.58 2951G. 0.677 0.127 0.00 9115.
3.5�5 3.99 256U2. 0.680 0.128 0.00 9124.
4.C9 9.05 30515. 0.701 0.137 0.00 9216.
1.19 9.19 31945. n.722 0.144 0.00 9303.
%>.25 9.29 32330. 0.793 0.151 0.00 9400.
;.39 9.35 33325. n.765 0.157 0.00 9953.
=.95 9.45 39275. 0.787 0.163 0.00 9587.
4.59 9.59 35292. 0.809 0.169 0.00 9680.
9.65 9.69 36215. 0.831 0.175 0.00 9775.
�.75 9.75 37197. 0.859 0.180 0.00 9865.
4.89 9.85 38189. 0.877 0.185 0.00 9564.
y.�=�3 9.53 38555. 0.886 0.187 0.00 100n3.
5.03 5.03 39553. 0.505 0.500 0.00 1005r+.
5.13 5.13 90608. 0.532 1.070 0.00 10194.
`.23 5.23 91632. 0.556 1.800 0.00 1029�.
`:.33 5.33 92666. 0.979 2.600 0.00 10385.
`.93 5.93 93710. 1.003 2.880 0.00 109�36.
5.53 5.53 49763. 1.028 3.190 0.00 10589.
5.63 5.63 95827. 1.052 3.380 0.00 10682.
5.73 5.73 4650r,. 1.077 3.600 0.00 10791.
5.83 5.83 97���3. 1.102 3.810 0.00 10880.
5.53 5.53 49C76. 1.127 9.010 0.00 109�0.
6.03 6.03 50175. 1.152 9.200 0.00 1108!i.
6.13 6.13 51292. 1.177 9.380 0.00 111�1 .
6.23 6.23 52915. 1.203 9.550 0.00 112��.
6.33 6.33 53598. 1.229 9.720 0.00 11383.
6.43 6.93 59691. 1.256 9.880 0.00 11985.
' 6.53 6.53 55895. 1.282 5.090 0.00 11587.
6.63 6.63 57005. 1.305 5.150 0.00 116����.
6.73 6.73 58183. 1.336 5.330 0.00 117��3.
6.83 6.83 59368. 1.363 5.970 0.00 118��7.
6.53 6.53 60563. 1.350 5.610 0.00 12001.
Weston Heights
Technical Information Report
! '
i
� Hyd Inflow Outflow Peak Storage
Target Calc Stage Elev (Cu-Ft) (Ac-Ft)
� 1 1.25 0.30 0.83 5.05 5.09 9017H. 0.522
2 0.75 ***t**' 0.05 3.01 3.01 21125. 0.985
f
' 3 0.76 **t�**r 0.15 9.31 4.31 3254�5. 0.747
9 0.57 **x+*** 0.11 3.82 3.�52 28033. 0.644
{ 5 0.66 *****�* 0.04 1.60 1.60 10319. 0.237
I 6 0.63 *i*}�** 0.19 9.93 9.93 38549. 0.885
� 7 0.59 *�***** 0.04 2.14 2.19 19214. 0.326
8 0.51 {��*�*� n.05 2.86 2.86 15��00. n.457
' ----------------------------------
koute Time Serie� through Facility
Inflow Time Series File:dev.tsf
Outflow Time Series File:OV rdout.tsf
Inflow/Outflow Analysis
Peak Inflow Discharqe: 1.25 CFS at 6:00 ��n Jan `! in Ye:r - I
Peak Outflow Discharge: 0.828 CFS a`_ 1C:09 cn Jan `� :�� Y�:i -
Peak Reservoir Stage: 5.09 Ft
Peak Reservoir Elev: 5.09 Ft
P�ik �eserv�:ir Storaqe: 9')17'+. Cu-F'
. . -I
G.�rati._*i C c�Fnri.,�_.ri An;_
Base File: predev.t��t
New File: ov rdout.t
Cutoff Units: Discharge ..� I'
-----Fraction of :': . -- :��_,. = i
� ., ,,i. : --
�'ut<�ff Base New ��Change Probability Base New ��!-����
0.053 � 0.76E-02 0.66E-02 -12.3 I 0.76E-02 0.053 0.052 -
0.066 � 0.56E-02 0.53E-02 -9.1 � 0.56E-02 0.066 0.061 -
0.078 � 0.93E-02 0.99E-02 19.8 � 0.93E-02 0.078 0.085
0.091 � 0.32E-02 0.38E-02 17.6 � 0.32E-02 0.051 0.056 .
, 0.103 � 0.25E-02 0.28E-02 12.6 � 0.25E-02 0.103 0.107 3.7
0.116 � 0.18E-02 0.16E-02 -10.9 � 0.18E-02 0.116 0.113 -2.5
0.128 � 0.12E-02 0.14E-02 18.9 � 0.12E-02 0.128 0.137 6.9
0.141 � 0.51E-03 0.11E-02 15.6 � 0.91E-03 0.141 0.197 9.7
; 0.153 � 0.59E-03 0.67E-03 13.9 � 0.55E-03 0.153 0.157 2.3
j , 0.166 � 0.36E-03 0.34E-03 -9.5 � 0.36E-03 0.166 0.165 -0.9
,-- 0.178 � 0.18E-03 0.16E-03 -9.1 � 0.18E-03 0.178 0.177 -0.9
0.191 � 0.13E-03 0.33E-09 -75.0 � 0.13E-03 0.191 0.131 -5.1
, 0.203 � 0.82E-09 O.00E+00 -100.0 � 0.82E-04 0.203 O.lE5 -��.0
� 0.216 � 0.16E-09 O.00E+00 -100.0 � 0.16E-04 0.216 0.155 -?.8
Maximum pusitive excursion = 0.007 cfs ( 9.5�)
occurring at 0.073 cfs on the Base Data:pred�v.tsf
and at 0.080 cfs on the New Data:ov rdout.t�f
Maximum negative excursion = 0.006 cfs (-10.9`-)
�,,c-,-urrinq a` 0.061 cf� on the Base Data:predev.t�f
:'� 1 .. . -� � f: "� -- P:�.x I .ta: l .' . . _
Weston Heights
Technical Information Report
�v,�,.e-a.,m�ar�-Katrs � �
I,- — ----=- — ---- -- _
� __ _
!I o OV rdoW dur c
ii -
. Targetdur •
c.�
o ` �__
'
- ♦
R .
' °D .
o `�
�.
4� R�'
N o �.,•:
IL •
U •-
u � ��
O� �p
`� O �
L t
� � �
O
O �
♦
� �.i
, - O 00 -.�__
' j �—_
, ' � ____�.- _
�
I �
i O
O
II O
i O O
10 5 10� 10 3 70 Z 10 � 10�
IProbabiYly Exceedence
Equiva/ent Olvmpus Villa Pond`A'Dimensions/Side Slope
--���- �.oa�n� o��e: r.q�:
� JDA 2/24�2W6 Weston Hei tr North
axd�eer o�o�: r.���
34�i0Q7-]5 I
�� !Ba�herhdby: oa�: 9�ee[No:
� Pbnd lensth= 9635TL1978 ft
Pbnd�dth= fII51331796 ft
� Sf de 510 = 735�6]5 1
Yd��
Amr Acud A�d CaloiaV Oloi� CJai� OIH�ww
Car� C�r la�r� O�i1Me fa�� Ca�o�r Yo�� �Mie (C�oiii- �
B�r. /Y�a Me�� Vd�� 9wr. h� Y�e Y�e
z � � z � s s
5]2_]0 B70 QOD 0 51210 5ffi1 0 0 0
514.OD 7198 72.889•60 S1�A0 7375 12.486 7�.�ffi JOl
57b.00 8�2 76AA00 �9b0 S76A0 9Q50 16.3G5 ?$8-S -1W
517AB 1O1L5 ... 9,77530 3�736 SS7AB S00]3 9.ffi7 3$670 i8
578.00 ]OTaD ]I�lOi98 5]SAO 109R ]O1T3 0
Weston Heights
Technical Information Report
APPENDIX 4B
WATER QUALITY DESIGN CALCULATIONS
Weston Heights
Technical Information Report
KCSWDM-SCALE FACTOR
FIGL1tE 6.1.1.� PREC�IT�1T0�FOR��.���.�1Z:�L.STOR�I L�L�C HES(FEEn
ST 7.0/ � 1.O �p 7.2
ST 1.1 ST 1.0 �/► 0.8 LA. 0.9 . t
w...
i � ... .,..
• �_,i_.
�..r� �� �J�
i �
�.
�P � �,
! i ' r�1
�� Q 1
�
.. ' � .+ �
J
�.� � t�J. �'"i 1 ! . � �• l
r� h Ia•..r}. !� .� —
`� 1 .I I,
� �
! �
� '� • �..` .
. ' 1�, '� ._ .` ��::�s.
v r. , � V 1
-T-�-- i I
, �.
_.� ' ' � - • , �
�l --� � �,
i � : �
� 1
• �
� '� � .�..
� ` � � Q
� < <, �'
_�� �
�
�
� �� !zs�
t �
s �'
i v ... �--
.�t�� �
O.S4" �' • � �
�
(0.04 51 �
.. ..
............
0.47"
(0.039") " .
.�
� r�oaPaarw r�ra , _
.$9 IyYK1{.�� 0.47�
— �ujo►now (0.039� 0.52" 0.65••
No�E�as�sa a sw�ecwrmoa�scp�nrir snaw u�s�o.os (0.04 3� 0.56" (0.054�
.+cn�wr�nina�oen w avai�w ar a»aesion a iwr�t (0.04 7�
Weston Heights
Technical Information Report
a e y: ate: ro�ec :
KJM 6/20/2016 Weston Heights
ec e y: a e: ro�ec o:
349-004
ac c ec e y: ate:
Wetpoo/Sizing Calculation
(Per KCSWDM Section 6.4.1.1)
Wetpool Description: Weston Heights-West Vault
Step 1: Identify the required wetpool volume factor(f)
f= 3 Fixed value per KCSWDM Section 6.4.1.1 (P. 6-70)
Step 2: Determine rainfall(R)for the mean annual storm
R = 0.47 in Per KCSWDM Figure 6.4.1.A
Step 3: Calculate runoff from the mean annual storm(V,)for the developed site
A; = 46,174 ftZ Area of impervious surface
A�9 = 36,155 ftZ Area of till soil covered with grass
A� = 0 ftZ Area of till soil covered with forest
� A o = 0 ftZ Area of outwash soil covered with grass or forest
R = 0.47 in Rainfall from mean annual storm(from Step 2)
V� = 1�982 ftZ Vr = �0.9Ai +0.25A�q + O.lOAtf+0.01Aa� X (R)
[KCSWDM Eq.6-13]
Step 4: Calculate required wetpool volume(Vb)
Ve= 5,945 ft3 Vb =f Vr
[KCSWDM Equation 6-14]
Step 5: Calculate minimum required wetpool depth(DREnI
Z1= 0.00 H:iV Side Slope#1
ZZ= 0.00 H:1V Side Slope#2
Z3= 0.00 H:1V End Slope#3
Z,= 0.00 H:1V End Slope#4
L�,,,o= 64 ft Pond length at top of wetpool
WVOND— Z4 ft Pond width at top of wetpool
DREQ= 3.87 ft Minimum required pond depth
East Basin Stormfilter Treatment Calcu/ations:
� land Use Summary '�� � � I � � �
Are a ?
Till Forest 0.00 acres
Till Pasture 0.00 acres
Till Grass 0.38 acres
Outwash Forest 0.00 acres
Ouiwash Pasture 0.00 acres
Outwash Grass 0.00 acres
Wetland 0.00 acres
Impervious 0.22 acres
Total
0.61 acres
Scale Factor : 0.80 15-Min Reduced
..........................................................Edit�Flow Paths..........................................................------....................._:�
.........................................................................................................................................................................................�--------...................
Time Series: East Dev 15min.tsf »
Compute Time Series I
Modify User Input I
File for computed Time Series [.TSFJ
h'luw Frequency Analy�-,i� f
':'ime Series Eile:east dev 15min.tsf
E'ro�ect Location:Landsburg
---Annual Peak Flcw kates--- -----Flow Frequency Analysis-------
Fl�-�w Rate kank Time of Peak - - Peaks - - kank Return Pr:_�b
(CFS) (CFS) Period
0.139 7 2/08/O1 19:00 0.973 1 100.00 0.990
i).116 8 5/06/02 7:15 0.320 2 25.00 0.560
i��.290 4 9/10/03 13:45 0.291 3 10.00 0.900
0,320 2 8/25/04 23:30 0.240 9 5.00 0.800
.172 6 5/10/05 16:45 0.208 5 3.00 0.667
�.251 3 10/22/05 16:15 0.172 6 2.00 0.500
�.208 5 11/21/06 8:00 n.134 7 1.30 0.231
���.473 1 1/0��/08 7:30 n.115 ��s 1.10 0.091
�' �c���_lte�� Peak:'. Ci.9L'2 5i'�,I_il� CJ.9�0 ��
• Per Section 6.5.5.1 of the 2009 KCSWDM: �
o The water quality design flow, preceding detention, shall be 35% of the '�
developed two-year peak flow rate, as determined using the KCRTS model with
15-minute time steps calibrated to site conditions.
• 35% of the 2-YR, 15-MIN peak flow for the East Basin Treatment receiving runoff areas:
0 35% x 0.172-CFS (2-YR, 15-MIN peak from KCRTS above) = 0.060-CFS
Weston Heights �
Technical Information Report
East Basin Stormfilter Cartrid_qe Calcu/ations:
I
I � �vn�FeGTEI2 �bEsi �S�ra t?�titsM9
( S�ns i E�ctt fPa�f�J�4ttb�. ..� I
[,�rR�paE. S��no,rwl :
t�FEfa�#-�' � �8,.
�6� = a..� '
� ���Crf f� �ss+�.� 1�� — � ��' � i
� 1t�. ;
G�,P7'�icr� Fitau � _ �.S��M� �
i.:
�
�:, �,.1f�e[rt; �+.•�4u R' �uSu 'R�� : f I
�.�YK , lr-n.��n� - [7.��2 �G�'r �GriiY� �G2T5)
i �� 5�-cno.� U S S: � t2�5 RZst�pM�
� � �s�.� aF ?rYft� JS-Aain �� �+�a���k� �s�s�.�,��
� b.C?ta�GFC
C..c�N�Kzs�a�.] � CF5 Th C�PN�� I
l- cFs � yy8. 83-��..�• '
� 6.b�O - c.r s = �6.�3 ! L�'.n.►
I��Q'O � ao ���rOe t'S .
� � �z�?rOot �'t2anrs E� '�� C�?� �
�
�
i 43- i�P,v� (U�t� �+� �
s�0► ��e- ,
�_ � ,
' �,S- G�r''� �C��r04�
i
� � S-$`� �- +
cltiz- C�. c��r i
I �_ _ --- — - �
' �P � �T��nr;c- ) i '�
\� — - - �.l
i
(
I
I
Weston Heights
Technicallnformat�� -,
Olvmpus Villa— Oriqina/Desipn Wetpool Vo/me
Made by: Dabe: Project:
JDA 4/25/2016 Weston Flei hts North
Checked by: Dabe: Project No:
�-� 349-007
I Backchecked by: Dabe:
i
�I I Wetpool Sizing Calcu/ation
(Per KCSWDM Sedion 6.4.1.1 J
Wetpool Description: Olympus V�la Pond'A'-Origi�al Des�n Req'd Volume
Step 1: Identify the required wetpool volume factor(f)
f= 3 Fxed value per KCSWDM Secdon 6.4.1.1(P.6-70)
Step 2: Determine rainfaM(R)for the mean annual storm
R= OA7 in Per KCSWDM Figure 6.4.1A
Step 3: Cakulate runoff from the me�annual storm(V,)for the developed site
A�= 77,101 ftZ Area of impervious surface
A�= 58,806 ftz Area of till soil covered with grass
Ay= 0 ft2 Area of tiII soil covered with forest
A,= 0 R2 Area of outwash soil covered with grass or forest
R= OA7 in Rainfall from mean annual storm(from Step 2)
yr= 3�y, RZ V, _ �0.9Ai +0.25A�A +O.lOAt� + O.OlAo� X (R)
[KCSWDM Eq.6-13]
Step 4: Cakulate required wetpool volume(Ve)
Vd= 9,881 �3 Vb =f Vt
[KCSWdM Equadon fi-14]
"This is the original design required volume for water quality in the Olympus Villa Pond `A'. The
as-built facility provides 15,479-CF of volume, for a difference of 5,598-CF in additional wetpool
storage capacity.
_ _ _ -- -- - _ _ _ _ ---_ _ --
` _ ___
' Weston Heights
Technical Information Report
Olvmpus Villa—Proposed Desiqn Wetpoo/ Vo/ume
Ma y: Da�e: Pro�ecC
, � JDA 4/25/2016 Weston Hei hts North
Checked by: Date: Project No:
349-007
Ba ckc hecked by: Da te:
Wetpool Sizing Cakulation
(Per KCSWDM Sedion 6.4.1.1)
Wetpool Description: Olympus Villa Pond'A'-Proposed Design Req'd Volume
Step 1: Identify the required wetpool volume factor(f)
f= 3 Fixed value per KCSWDM Section 6.4.11(P.6-70)
Step 2: Determine rainfall(R)for the mean annual storm
R = 0a17 in Per KCSWDM Fgure 6.41A
Step 3: Calculate runoff trom the mean annual storm(V,)for the devebped site
A;= 90�605 RZ Are�of impavious surface
A�= 62,72fi R2 Ar�of dll soil covered with grass
A y= O ft2 Ar�of d I I soi I covaed wi th fores t
A.= 0 R2 Area of oulwash soil cavered with grass or forest �
R = 0�7 in Rainfall from mean annual storm(from Step 2)
Yr= 3,808 RZ yr = �0.9A� +025A�a+010A�j +O.OlAo� X (R)
[K(SWDM Eq.6-13] �
Step 4: Calculate required wetpool volume(Vb)
Vs= 11,424 R� Y6 =f VT
[KCSWDM Equation 6-14]
"This is the required wetpool volume resulting from the addition of the Weston North basin area
to Olympus Villa Pond `A' (depicted as North Basin in the basin figures). This volume is below !
the as-built faciliry's 15,479-CF of useable wetpool storage. The additional areas from Weston �,
North leaves a remainder of 4,055-CF in wetpool storage capacity.
Weston Heights
Technical Information Report
APPENDIX 4C
WETLAND HYDROPERIOD CALCULATIONS
�
Weston Heights
Technical Information Report
� � � ' � � � I � EXISTING WETLAND HYDROPERIOD BASIN
a ; ; �
� ' ' " � �-� ° EXISTING FORESTED
� �,,�• � � ��;� s
I � _ _ � � � �` � � I ' � ! - CONDITIONS = 2.39 AC
, � -
; _
� � ` ' ` EXISTING GRASS AREA = 1 .64 AC
.___ __ ; � a
— , __ ` TOTAL PERVIOUS AREA = 4.03 AC
� �� \ -- __ ; ` EXISTING IMPERVIOUS AREA = 0.12 AC
• _
_ - --__
� � ��;� _ �
"'` TOTAL HYDROPERIOD BASIN AREA = 4.15 AC
� � o, � \� ::1
� � ��, _ .� \
� - �_ _ , -- -
I -' y \
. .` . _.'I ;:�.�i�
I-`- � \::\ � .
,
� � \ \�
. — _�
, �
�
,�
i -i . . . . . . . . . . ... , , ,.. __ . _
. f
_ ._ �. . . . . . . . . - - - �
__. ::- . . . . _ _ . . . _ . _
i � _- - � �� � .u�rorsTu�aEv� .
.� • -1NETL-AND�_- -
� _ _•AREA•_' � -,.,
� . � -
� -_ ----- �{D,�3:AC)'
�
; : � �• • , � , •
j . -� �r..�� ,i, `lrr+Y -.'--:=:-- - I
� ���' "�"'� - ' - , • , - _- : -•
���,
�_. . . _ . .
. . I. .. .. I � ��9\� ' • +•.+.•
i .��� ^ . ♦.,....++
` � . I
�: - ( .-,-.-.- LEGEND
— _ ----► �, _ - � .�-
�, • . -,-. • EXISTING GRASS AREA
_ - — `
, _
, .
, ,
{ : - - -
,_-;.: ; —�-� .,:.,:t --' — — . .
{ ., ' � � EXISTING FORESTED CONDITIONS
� I i � � I � ------ ,..� -- :�:�;��.��.,t L
o I �i � i :�i�+M�-�..z*,�=- EXISTING IMPERVIOUS AREA
tn .... :i � .S'.ti,. ��vt 6�
L I \ � ���•` 1 ��
� �J- ` \� \ /� �
C - --_ i.— _ .�. \ i � � �
•� � ��\ ;'��
� � \��1 � ' --
m ' I �� � ,� '� `�� �I I
� � �V�` � .
.
_ �
> � �
N i � , � ` --
� J * UNDISTURBED WETLAND AREA IS NOT INCLUDED IN
�
N �- - �---��\ HYDROPERIOD ANALYSIS.
a /
rn
� � -- �
I
`O JDA WESTON HEIGHTS
� Design Q,,��,,,d„�
� � �� E W J P,q,a nns,�,,,,,*
—
3/11/16 �n�w.n�ne ��
r�,.ortye.s,��e t��etr.w�ron ssaot
� � "� OO� �ate o�,���� ���,�� -,�„m,�,v,»R�;�, EXISTING WETLAND
� Scale Feet p4Oe��No4 HYDROPERIOD
Sheet:
R:\Projects\3�9 (prospect development)\004—'4 (Weston Heightsl\Dwg\figures\TIR Figures�WH Basin Map — Existing W'etland Hydroperiod.dwg 1 'xt 7
— -- --
---- �
------
_._ _
� --- -
- - -_
� ` - - - -
� � �
} * �� DEVELOPED WETLAND HYDROPERIOD BASIN
. .{ �� � � ��� f tt •. -
' ! FUTURE DEVELOPED FORESTED CONDITIONS — 3.12 AC
- ` DEVELOPMENT (iNc�u�Es AREas MITIGATED BY EAST POND, NOT INCLUDING '
— ---- _ "E�r"P� ' LOT 2&3 I FUTURE DEVELOPMENT LOT 2&3 IMPERVIOUS AREA)
- -�.
_ - -_----
, ,/ \ \ —�-��_ - -- -- -__ - _ --_- , _-- --- --`�`__ _ . DEVELOPED GRASS AREA = 0.97 AC '
T � �� __ _ _ � "� TOTAL PERVIOUS AREA = 4.09 AC
- � � \`�� .- =
L a:, ..; �vs:ocs —
_ — ,. � � ,Y µ.:;�.,`,ry`.�,; .�, ` -_ DEVELOPED IMPERVIOUS AREA — 0.20 AC
�' •�� , ,,. ,
z ' , I <- " >. , , ` ' _ ��`�;``1 • I TOTAL HYDROPERIOD BASIN AREA = 4.29 AC �
�,�. � -s-. '� _ �
� W � I � � �� �.� �;F �
>� � �' c,,ii�r,;<-?�•�.;.,:: .., __.
¢ I
� I \
�� � �\�� % � -�
� �
__.
-- -
—. _._
--__.---------- �
` � � � , / � �_- --' —.... �
I � ; _.
g � �, �`" ' � � �y UNDISTURB�D j
`� � �' = WETLAND '
�;� _ - __ _
I I �_ — — �— � AREA.
- _ _ l (0.73 AC)
- - � ; � ,. J I
_ � ,� I
I `
- ----— —-- � E \-, I / ._- . '
i� (
. ' �� ':E„ � :.
I � G �' � y
� �'f ' I t '. � � � .... __'--_ _—'_— _--
I � '� ���
— — ,5;
;
__ I '� i �`',� _- ���-- - -��__-_- -�-- i
� �-� �;� ��� . . LEGEND
. .. .
— ; � ��,s,�� i- _ ! .
' i ;, �, � ; � I
� � � ` ' �`� � DEVELOPED GRASS AREA
> � ; �
.__ � ,
_ � � _._
II� —
. ::.J'.�CF
� i' �� � � � DEVELOPED FORESTED CONDITIONS
0 1 � I !� � � �y4Y'+��t~
N I I I ; � ��z��,Y��Q-.�h�% DEVELOPED IMPERVIOUS AREA
� WE"�''``'vs'.'.
°' _1� �
�
.� � _— �� � I
�. � � �'1��
m ! � ��� -� ----, � * UNDISTURBED WETLAND AREA NOT INCLUDED IN
t - -
� � `�� HYDROPERIOD ANALYSIS.
0
N �� �\�v � V i'-
� — --� � —� ' � ABBREVIATIONS:
� N ,,
° � ' � WN = WESTON NORTH
� , ; � � �
N _ ,
; � _ -_�
cD JDA WESTON HEIGHTS
� Design a„��o
N EWJ r,q,�,t�ne„r
� Q � O(� Drawn —'�� �v
N 3/11l16 �ns w.n.xm�e v�wtio.wne i�ac E,�aeir.w�on vaam
` ,� ��� OO� 349-ooa-�a °`�:'�a`'� �`�'«� """'°°"d""""" DEVELOPED
a SCCII2 Feet Project No. WETLAND HYDROPERIOD sneec:
R:\Projects\349 (prospect development)\004-14 (Weston Heights)\Dwg\figures\T1R Figures�WH Bosin Map — D=veloped Wetland Hydroperiod.dwg 11x17
WWHM2012- Wet/and F/uctuation Report
wwxi�12oi2
PROJECT REPORT
Project Name: V7etland Hydroperiod 160428
Site Name: �^]eston Heights
Site Address: Nile Ave
City : Renton
Report Date: 4/28/2016
Gage : Seatac
Data Start : 1998/10!C1 '
Data End : �009/09/�C� �I
Precip Scale: l.l'7
Version : 2015/O�ilS
Low Flow Threshold for POC 1 : 50 Percent of the 2 Yea~
High Flow Threshold for POC 1: 50 year
PREDEVELOPED LAND USE
Name : l��etland Bas_
Bypass: No
GroundWater: Nc
Pervious Land Use Acres
C, Forest, Mod 2.39
C, Lawn, Flat 1.64
Pervious Total 4.03
Impervious Land Use Acres
ROADS FLAT 0.12
Iatpervious Total 0.12
Basin Total 4.15
Element Flows To:
Surface Interflow Groundwater
'
MITIGATED LAND USE
Name : Basin =
Weston Heights
Technical Information Report
Bypass: No
GroundWater: No
Pervious Land Use Acres
C, Forest, Mod 3.12
C, Lawn, Flat .97
Pervious Total 4.09
Impervious Land Use Acres
ROADS FLAT 0.2
Impervious Total 0.2 '
Basin Total 4.29
Element Flows To:
Surface Interflow Groundwater
Wetlands Fluctuation for POC 1
Average Annual Volume (acft)
Month Predevel Mitigated Percent Pass/Fail
Jan 83.5601 85.4451 102.3 Pass
Feb 63.2200 65.3305 103.3 Pass
Mar 54.1575 56.2056 103.8 Pass
Apr 33.8289 35.4218 104.7 Pass
May 18.5240 19.5652 105.6 Pass
Jun 14.2424 14.8053 104.0 Pass
Jul 9.8981 10.5291 106.4 Pass
Aug 9.1697 9.4648 103.2 Pass
Sep 9.0665 9.1604 101.0 Pass
Oct 17.9055 16.5603 92.5 Pass
Nov 53.2741 50.4882 94.8 Pass
Dec 75.5175 75.7115 100.3 Pass
Day Predevel Mitigated Percent Pass/Fail
Janl 2.7430 2.7996 102.1 Pass
2 2.7092 2.7360 101.0 Pass
3 2.5126 2.5642 102.1 Pass
4 2.8627 2.9198 102.0 Pass
5 2.9059 2.9554 101.7 Pass
6 3.0584 3.1118 101.7 Pass
7 2.8224 2.8662 101.6 Pass
8 2.8327 2.8714 101.4 Pass
9 2.4328 2.4934 102.5 Pass
10 2.2725 2.3262 102.4 Pass
11 2.4503 2.5090 102.4 Pass
12 2.5436 2.6150 102.8 Pass
13 3.0111 3.0849 102.4 Pass
14 3.0505 3.1042 101.8 Pass
Weston Heights
Technical Information Report
15 2.7660 2.8236 102.1 Pass
16 2.7902 2.8485 102.1 Pass
17 2.7323 2.8003 102.5 Pass
18 2.9999 3.0679 102.3 Pass
19 2.8991 2.9676 102.4 Pass
20 2.6959 2.7573 102.3 Pass
21 2.4794 2.5448 102.6 Pass
22 2.6825 2.7551 102.7 Pass
23 3.0014 3.0673 102.2 Pass
24 2.7711 2.8221 101.8 Pass
25 2.4305 2.4932 102.6 Pass
26 2.4197 2.4913 103.0 Pass
27 2.3875 2.4641 103.2 Pass
28 2.5203 2.6023 103.3 Pass
29 2.7496 2.8209 102.6 Pas�
30 2.6812 2.7648 103.1 Pas=
31 2.6590 2.7262 102.5 Pas
Febl 2.4262 2.4988 103.0 Pas
2 2.1887 2.2553 103.0 Pa_=
3 2.1662 2.2403 103.4 Pas
4 1.8991 1.9733 103.9 Pas.�
5 2.0356 2.1262 104.5 Pass
6 2.1972 2.2769 103.6 Pass
7 2.6078 2.6987 103.5 Pass
8 2.6145 2.6957 103.1 Pass
9 2.2087 2.2876 103.6 Pass
10 1.9356 2.0120 103.9 Pass
11 2.1449 2.2283 103.9 Pass
12 2.2049 2.2720 103.0 Pass
13 2.0175 2.0856 103.9 Pass
14 2.1635 2.2449 103.8 Pass
15 2.3941 2.4611 102.8 Pass
16 2.3948 2.4674 103.0 Pass
17 2.3224 2.3998 103.3 Pass
18 2.7174 2.7909 102.7 Pass
19 2.4868 2.5510 102.6 Pass
20 2.2243 2.3027 103.5 Pass
21 2.0803 2.1537 103.5 Pass
22 2.0157 2.0922 103.8 Pass
23 2.1781 2.2516 103.4 Pass
24 2.1322 2.2020 103.3 Pass
25 1.9896 2.0550 103.3 Pass
26 2.1143 2.1824 103.2 Pass
27 2.1150 2.1921 103.6 Pass
28 2.2285 2.3121 103.8 Pass
29 1.9059 1.9778 103.8 Pass
Marl 1.8695 1.9373 103.6 Pass
2 2.1162 2.1852 103.3 Pass
3 2.1276 2.1975 103.3 Pass
4 2.2343 2.3093 103.4 Pass
5 1.8870 1.9545 103.6 Pass
6 1.7340 1.8067 104.2 Pass
7 1.6571 1.7386 104.9 Pass
S 1.9223 1.9958 103.8 Pass
9 1.9731 2.0379 103.3 Pass
10 1.9524 2.0255 103.7 Pass
11 2.1620 2.2379 103.5 Pass
Weston Heights
Technical Information Report
12 1.9730 2.0331 103.0 Pass
13 1.8341 1.8971 103.4 Pass
14 1.8731 1.9439 103.8 Pass
15 1.7426 1.8084 103.8 Pass
16 1.7716 1.8356 103.6 Pass
17 1.7369 1.8094 104.2 Pass
18 1.6771 1.7380 103.6 Pass
19 1.5238 1.5859 1Q4.1 Pass
20 1.3688 1.4277 104.3 Pass
21 1.5437 1.6248 105.3 Pass
22 1.7103 1.7829 104.2 Pass
23 1.6897 1.7536 103.8 Pass
24 1.6292 1.6837 103.3 Pass
25 1.5146 1.5666 103.4 Pass
26 1.4484 1.5040 103.8 Pass
27 1.3629 1.4221 104.3 Pass
28 1.4321 1.4931 104.3 Pass
29 1.4413 1.4978 103.9 Pass
30 1.3416 1.3946 104.0 Pass
31 1.2912 1.3478 104.4 Pass
Aprl 1.2031 1.2601 104.7 Pass
2 1.2292 1.2826 104.3 Pass
3 1.4703 1.5395 104.7 Pass
4 1.5932 1.6572 104.0 Pass
5 1.4277 1.4872 104.2 Pass
6 1.2210 1.2�46 104.4 Pass
'` 7 1.2380 1.2993 105.0 Pass
8 1.3309 1.3909 104.5 Pass
' 9 1.2034 1.2559 104.4 Pass
' 10 1.1577 1.2110 104.6 Pass
11 1.1392 1.1899 104.5 Pass
12 1.1922 1.2505 104.9 Pass
13 1.1368 1.1903 104.7 Pass
14 1.0513 1.1053 105.1 Pass
15 1.2047 1.2642 104.9 Pass
16 1.2644 1.3112 103.7 Pass
17 0.9998 1.0446 104.5 Pass
18 1.1756 1.2387 105.4 Pass
19 1.2570 1.2949 103.0 Pass
20 0.9942 1.0365 104.3 Pass
21 0.9451 1.0008 105.9 Pass
22 1.1374 1.1943 105.0 Pass
23 0.9987 1.0472 104.9 Pass
24 0.8788 0.9229 105.0 Pass
25 0.7714 0.8168 105.9 Pass
26 0.8072 0.8612 106.7 Pass
27 0.7815 0.8253 105.6 Pass
28 0.8216 0.8731 106.3 Pass
29 0.9064 0.9490 104.7 Pass
30 0.8834 0.9228 104.5 Pass
Mayl 0.8146 0.8496 109.3 Pass
2 0.7234 0.7600 105.1 Pass
3 0.7039 0.7488 106.4 Pass
4 0.7335 0.7749 105.7 Pass
5 0.7237 0.7665 105.9 Pass
6 0.6674 0.7062 105.8 Pass
7 0.6067 0.6435 106.1 Pass
Weston Heights
Technical Information Report
i
I
'I 8 0.5894 0.6257 106.2 Pass
9 0.5948 0.6307 106.0 Pass
� 10 0.6170 0.6626 107.4 Pass
� 11 0.5564 0.5955 107.0 Pass
12 0.5951 0.6329 106.4 Pass
13 0.6041 0.6433 106.5 Pass
i 14 0.5836 0.6170 105.7 Pass
15 0.5778 0.6056 104.8 Pass
16 0.5337 0.5674 106.3 Pass
; 17 0.5369 0.5741 106.9 Pass
; 18 0.5724 0.6132 107.1 Pass
I '- 19 0.5710 0.6015 105.3 Pass
I r 20 0.5182 0.5499 106.1 Pass
21 0.5125 0.5431 106.0 Pass
22 0.5033 0.5415 107.6 Pass
23 0.4946 0.5305 107.3 Pass
24 0.4706 0.5002 106.3 Pass
25 0.4739 0.5153 108.7 Pass
�_ �
26 0.4951 0.5175 104.5 Pass
I 27 0.5079 0.5275 103.9 Pass
��� , 28 0.561B 0.5786 103.0 Pass
29 0.5996 0.6155 102.7 Pass
� 30 0.5979 0.6034 100.9 Pass
II 31 0.5806 0.5854 100.8 Pass
I � Junl 0.6004 0.6055 100.9 Pass
2 0.5982 0.6175 103.2 Pass
3 0.5865 0.6056 103.2 Pass
4 0.5109 0.5287 103.5 Pass
5 0.5241 0.5516 105.2 Pass
6 0.6303 0.6345 100.7 Pass
7 0.5774 0.5865 101.6 Pass
8 0.5766 0.5913 102.6 Pass
9 0.5866 0.6012 102.5 Pas;-
10 0.5274 0.5470 103.7 Pas
11 0.5057 0.5235 103.5 Pas
12 0.4584 0.4724 103.0 Pa=_
13 0.4170 0.4388 105.2 Pas
� 14 0.4063 0.4347 107.0 Pa=_
15 0.4152 0.4432 106.7 Pas
�` 16 0.4373 0.4683 107.1 Pass
I j' 17 0.4199 0.4422 105.3 Pass
' 18 0.3956 0.4221 106.7 Pass
19 0.3964 0.4263 107.5 Pass
� 20 0.4374 0.4543 103.8 Pass
� 21 0.4318 0.4411 102.1 Pass
�� 22 0.4067 0.4267 104.9 Pass
� 23 0.4853 0.5103 105.1 Pass
�� 24 0.4480 0.4510 100.7 Pass
' 25 0.3991 0.4133 103.6 Pass
26 0.3748 0.3968 105.9 Pass
� 27 0.3709 0.3978 107.3 Pass
28 0.3681 0.3934 106.9 Pass
29 0.3693 0.3946 106.8 Pass
30 0.3923 0.4125 105.1 Pass
I Jull 0.3715 0.3919 105.5 Pass
� 2 0.3610 0.3819 105.8 Pass
3 0.3479 0.3681 105.8 Pass
i Weston Heights
Technical Information Report
I
4 0.3485 0.3731 107.1 Pass
5 0.3339 0.3550 106.3 Pass
6 0.3323 0.3581 107.8 Pass
7 0.3402 0.3653 107.4 Pass
S 0.3416 0.3684 107.8 Pass
9 0.3339 0.3563 106.7 Pass
10 0.3199 0.3399 106.3 Pass
11 0.3344 0.3605 107.8 Pass
12 0.3449 0.3613 104.7 Pass
13 0.3392 0.3563 105.0 Pass
14 0.3227 0.3355 104.0 Pass
15 0.3399 0.3678 108.2 Pass
16 0.3213 0.3378 105.2 Pass
17 0.3107 0.3272 105.3 Pass
18 0.3072 0.3278 106.7 Pass
19 0.3010 0.3213 106.7 Pass
20 0.2948 0.3141 106.5 Pass
21 0.2980 0.3189 107.0 Pass
22 0.2921 0.3116 106.7 Pass
23 0.2869 0.3054 106.4 Pass
24 0.2856 0.3048 106.7 Pass
25 0.2988 0.3252 108.8 Pass
26 0.2873 0.3051 106.2 Pass
27 0.2835 0.3014 106.3 Pass
26 0.2769 0.2934 106.0 Pass
29 0.2751 0.2925 106.3 Pass
30 0.2745 0.2909 106.0 Pass
31 0.2818 0.3005 106.6 Pass
Augl 0.2B13 0.3024 107.5 Pass
2 0.3049 0.3185 104.5 Pass
3 0.2855 0.2991 104.8 Pass
4 0.2758 0.2878 104.4 Pass
5 0.2902 0.3087 106.4 Pass
6 0.2885 0.3086 107.0 Pass
7 0.2744 0.2850 103.9 Pass
8 0.2818 0.3005 106.6 Pass
9 0.2690 0.2811 104.5 Pass
10 0.2651 0.2811 106.0 Pass
11 0.2607 0.2773 106.4 Pass
12 0.2557 0.2714 106.1 Pass
13 0.2935 0.3102 105.7 Pass
14 0.3247 0.3305 101.8 Pass
15 0.2920 0.2953 101.2 Pass
16 0.2925 0.2988 102.2 Pass
17 0.3120 0.3206 102.7 Pass
18 0.2945 0.3062 104.0 Pass
19 0.2755 0.2839 103.1 Pass
20 0.2755 0.2931 106.4 Pass
21 0.2855 0.3060 107.2 Pass
22 0.3410 0.3527 103.4 Pass
23 0.3444 0.3402 98.8 Pass
24 0.3414 0.3305 96.8 Pass
25 0.3505 0.3404 97.1 Pass
26 0.3272 0.3276 100.1 Pass
27 0.2986 0.3018 101.1 Pass
28 0.3044 0.3102 101.9 Pass
29 0.3133 0.3040 97.0 Pass
Weston Heights
Technical Information Report
�;
� �
�_ ;
30 0.2885 0.2907 100.7 Pass
31 0.2829 0.2920 103.2 Pass
Sepl 0.2818 0.2928 103.9 Pass
2 0.2649 0.2760 104.2 Pass
3 0.2810 0.2946 104.9 Pass
4 0.2587 0.2683 103.7 Pass
5 0.2713 0.2866 105.7 Pass
6 0.2465 0.2535 102.8 Pass
7 0.2661 0.2814 105.8 Pass
8 0.2659 0.2723 102.4 Pass
9 0.2721 0.2907 106.9 Pass
10 0.2597 0.2718 104.7 Pass
11 0.2652 0.2650 99.9 Pass
12 0.2525 0.2612 103.4 Pass
13 0.2644 0.2858 108.1 Pass
14 0.2478 0.2625 106.0 Pass
15 0.2569 0.2724 106.0 Pass
16 0.3463 0.3665 105.8 Pass
17 0.3285 0.3195 97.3 Pass
18 0.3278 0.3260 99.5 Pass '
19 0.3146 0.3129 99.5 Pass
20 0.3152 0.3066 97.3 Pass
21 0.3942 0.3844 97.5 Pass
22 0.4552 0.4186 92.0 Pass
23 0.3714 0.3580 96.4 Pass
24 0.3180 0.3182 100.0 Pass
25 0.3202 0.3175 99.2 Pass
26 0.3047 0.3079 101.1 Pass
27 0.3497 0.3356 96.0 Pass
28 0.3116 0.3019 96.9 Pass
29 0.3716 0.3596 96.8 Pass
30 0.3468 0.3239 93.4 Pass
Octl 0.3370 0.3196 94.8 Pass
2 0.3294 0.3268 99.2 Pass
3 0.3590 0.3592 100.1 Pass
4 0.3794 0.3560 93.8 Pass
5 0.6622 0.6462 97.6 Pass
6 0.5517 0.5325 96.5 Pass
7 0.5764 0.5612 97.4 Pass
8 0.6355 0.5789 91.1 Pass
9 0.6238 0.5688 91.2 Pass
10 0.4975 0.4426 89.0 Pass
11 0.3969 0.3778 95.2 Pass
12 0.3829 0.3732 97.5 Pass
13 0.3533 0.3530 99.9 Pass
14 0.3660 0.3517 96.1 Pass
15 0.3655 0.3549 97.1 Pass
16 0.4480 0.4314 96.3 Pass
17 0.5083 0.4632 91.1 Pass
18 0.5993 0.5414 90.4 Pass
19 0.9120 0.8373 91.8 Pass
20 0.9762 0.8892 91.1 Pass
21 0.7848 0.7081 90.2 Pass
22 0.6761 0.6041 89.3 Pass
23 0.6093 0.5494 90.2 Pass
24 0.5887 0.5399 91.7 Pass
25 0.6908 0.6137 88.8 Pass
Weston Heights
Technical Information Report
26 0.7488 0.6723 89.8 Pass
27 0.7848 0.6819 86.9 Pass
28 0.8381 0.7455 89.0 Pass
29 0.8031 0.7360 91.6 Pass
30 0.7731 0.7210 93.3 Pass
31 0.7833 0.7183 91.7 Pass
Novl 0.8828 0.8152 92.3 Pass
2 1.1326 1.0302 91.0 Pass
3 1.3244 1.1552 87.2 Pass
4 1.1448 0.9786 85.5 Pass
5 1.3206 1.1962 90.6 Pass
6 1.3471 1.2203 90.6 Pass
7 1.1443 1.0365 90.6 Pass
8 1.2744 1.1724 92.0 Pass
9 1.4212 1.3107 92.2 Pass
10 1.6837 1.5733 93.4 Pass
11 1.8512 1.7016 91.9 Pass
12 1.7836 1.6399 91.9 Pass
13 1.8537 1.7018 91.8 Pass
14 1.5832 1.4738 93.1 Pass
15 1.5666 1.4737 94.1 Pass
16 1.6178 1.5200 94.0 Pass
17 1.6998 1.5989 94.1 Pass
18 2.0576 1.9994 97.2 Pass
, 19 2.3915 2.3007 96.2 Pass
20 2.2344 2.1405 95.8 Pass
21 1.9792 1.9091 96.5 Pass
22 2.0826 2.0479 98.3 Pass
23 2.9019 2.8301 97.5 Pass
24 2.9612 2.9111 98.3 Pass
25 2.6232 2.5607 97.6 Pass
26 2.3597 2.2893 97.0 Pass
27 1.9725 1.9268 97.7 Pass
28 2.0196 1.9959 98.8 Pass
29 2.2769 2.2599 99.3 Pass
30 2.1939 2.1554 98.2 Pass
Decl 2.3079 2.2620 98.0 Pass
2 2.8916 2.8564 98.8 Pass
3 2.6311 2.6009 98.9 Pass
4 2.3432 2.3375 99.8 Pass
5 2.3360 2.3093 98.9 Pass
6 2.0890 2.0749 99.3 Pass
7 2.0435 2.0358 99.6 Pass
8 2.1148 2.1203 100.3 Pass
9 2.3573 2.3600 100.1 Pass
10 2.4178 2.4195 100.1 Pass
11 2.5444 2.5379 99.7 Pass
12 2.5694 2.5602 99.6 Pass
13 2.6401 2.6304 99.6 Pass
14 3.0557 3.0670 100.9 Pass
15 2.7431 2.7507 100.3 Pass '
16 2.4663 2.4639 99.9 Pass II
17 2.2397 2.2491 100.4 Pass
18 2.0809 2.1023 101.0 Pass
19 2.4036 2.4372 101.4 Pass
20 2.4839 2.4928 100.4 Pass
21 2.3052 2.3162 100.5 Pass
Weston Heights
Technical Information Report
' i
I 22 2.3251 2.3472 100.9 Pass
23 2.2466 2.2660 100.9 Pass
I 24 2.1462 2.1858 101.8 Pass
� 25 2.5632 2.6077 101.7 Pass
26 2.9059 2.9379 101.1 Pass
27 2.3743 2.3980 101.0 Pass
28 2.3438 2.4014 102.5 Pass
29 2.9308 2.9714 101.4 Pass
30 2.4225 2.4575 101.4 Pass
31 2.3459 2.3966 102.2 Pass
Perind and Impind Changes
No changes have been mGde.
This program and accompanying documentation are provided 'as-is' w��_,ou� w�rranty ot any kin:.
The entire risk regardina the performance and results of this program is assumed by End User.
Clear Creek Solutions Inc. and the qovernmental licensee or sublicensees disclaim all warranti ,
either expressed or implied, includinq but not limited to implied warranties of program and
accompanying decumentation. In no event shall Clear Creek Solutions Inc. be liable for any
damages whatsoever (including without limitation to damaqes fur loss of business profits, lcss of
business informatien, business interruption, and the like) arising out of the use of, or
inability to use this program even if rlear Creek Solutions Inc. or their aut�orized
representatives have been advised of t`�e possibility of su-:� damages. S•,f_�.�a_e Ccpyriqht € ry :
Clear ^�eek Sclu�icns, Inc. 20D5-2��1F; A11 kiqhts R.eserved.
Weston Heights
Technical Information Report
r------�i ,-� --�, --....._..__. _. - - - --. . _--- -- -- -._.._. . __ ..
i � - �---- ;__ ___.., �- _... -�, r----- � �--- � ' .-- - -
� � �� �
� � 120 ------------------------------------------------------------------------------------------- 3.500 Z
- = Wetlands Fluctuation POC 1 �
� �. N
°3' � 100 - - v�.r---,.��- � .,vv-,�� �•s--,.,�,:�'�f1.���:_ N"��,�� -:1,��,_��,� ^�',V��I � , 3.000 i'
W ' �'
= r�,�.��. h. �. .�•' ?�
� 4 �^,n��f"yr`�;� c
� 80 -� - - 2.500 ^ �
------ -------------------------- ---------------�-------�--------�------- -- - - -
a... =
� U O
2.000 � �
� n
U gp � =
i � �? 1.500 � y
� y
40 �
1.000 '
`� ' .500
���-��- ,�.
-- :�,.�_.i.,,r�„„�,�,;�-
0 .000
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
c3 -- ca C5
i
SECTION 5
CONVEYANCE SYSTEM ANALYSIS AND DESIGN
Weston Heights
Technical Information Report
Conveyance Svstem Analysis and Desi_qn
The project is proposing a conveyance system for each project basin. The conveyance system along Nile
Ave is not a conventional layout. An existing storm drain line is located at the proposed flow line of the
frontage improvements. A shallow concrete inlet will be installed at the proposed flow line, which will tie
into a CB Type 1 located behind the proposed sidewalk. The KCSWDM requires that the conveyance
flows tributary to each catch basin be calculated with KCRTS using 15-minute timesteps. The KCSWDM
also requires that the 25-year peak design flows be contained within the conveyance system with no
surcharge. The 100-year peak design flows must also be analyzed, and it must be demonstrated that any
surcharge during the 100-year peak design event must not cause or aggravate a flooding problem.
Systems downstream of the proposed detention systems have not been included as the release rates are
a reduction of the flows entering the facilities.
Conveyance calculations for this project are provided in Appendix 5A. For simplicity of the calculation,
and in order to provide a conservative design, the calculations only analyze the 100-year storm event,
and show that there is no surcharge during that event. The 100-yr flows from detention facilities were
routed through the downstream systems—Stormshed 3G analyzed a fixed flow rate for these systems.
Weston Heights
Technical Information Report
APPENDIX 5A
CONVEYANCE CALCULATIONS
Weston Heights
Technical Information Report
i
i ; __
� — WESTON HEIGHTS BASIN AREAS
� BASIN IMERVIOUS LAWN TOTAL
' ; # AREA AREA AREA
�
,
I ! ` BASIN #IN 1 0.08 AC 0.07 AC 0.15 AC
' __ ' ` ' 1 BASIN #1 0.08 AC 0.02 AC 0.10 AC
- � i I BASIN #5 0.58 AC 0.22 AC 0.80 AC
_.�� �
� — `— . _ - :, �, - +�--�-- -- ' , BASIN #5A 0.05 AC 0.00 AC 0.05 AC
---___ - ___
_.__ — -- _
;�- = --- - -- — � — -- _ - ,
— —_-- �
: _ __ _ - --- _ BASIN #8 0.09 AC 0.63 AC 0.72 AC
� �� - ----+— --- -- _ "�� BASIN #1 1 0.14 AC 0.1 1 AC 0.25 AC
I ' � - - �' BASIN #12 0.12 AC 0.11 AC 0.23 AC
; i � ; -��, � BASIN #1 3 0.12 AC 0.1 1 AC 0.23 AC
BAs�N�, �,�,�,�� BASIN � BASIN #1 4 0.05 AC 0.05 AC 0.10 AC
' x�I ,I � ' I K,! � • I
� � !
��__ . -�,_ ---+� i i
� �
! - — —_ �-� '�-�' �-
___ __
� �' 1
� - _ _ . _ _ _
BASIN � ' '- ."'��- � � T . _" ,., .
�A �. . . . . . . _ �. � -'� T
� _ :-. . . . . . . . _ / �
. _. . _ . . . . . _ .) , BASIN ft3
� I I
—I BASIN R5 '" � xr wsree wc� �.' •��•- '`•.•- - � � �' � --
� taam v.) • • • • • • _. I .
' �J ,_— 1=— �� -� '�" . : _ : . _ : : : —- -- —�_��
I ' i i a' -�— � I • • . • �♦\ •.-_ ' BASIN it2 I
- \��\� --- f� • - - ' - ,. . � _
. ,�.i-� ' ' ' ' ' ' . ��-. '_t� I --
{ " � �~.., �-� NDISTURBE \��
�-- . ••
__ ,U D:
� �: � '; �- � ����, � ��. ��� ' ' W ETLAND Oaxi ss.) ' .
, -.,,. 3 � .�� -- , ' ' AREA ., �.._� � �� I
BASIN 01 I I � ' VAULT �, �- ��� I�"� ✓// � • '�- • ' '� '�' BASIN ft1 ---��I
(BYPASS � i BASIN � . - -•• •. � I �
AREA) ��I � � �--- — --- �`'_'•'.`.'� I
i \
.�-'..�7-� �.1- . �� .. • . � _ _
:�.a . . . . -'- .
._,.` i . ' . -
�,; - i - , ------� . . . - - - -- ..
� � /
_ � - I al5t+ 5 cOLLECTEO I ,...� � -�' �,�•�V. � ��� -- I .
__'_ �.. .��� .BY OPDI vENIS IN � • • " �...
��T� � BASIN�8 . . • . .i r = �
,''q _ , ii -. - M1� -.+.:_, . ' � � '
J . POND BASIN
� . . _ ` — a
— 3�_ . _�+� —
� i �-�
� I � _ --. �
U II (
Y
T � � �.\l � � ;� ; „ �__ �
m
I - - --� �=-� �� � ;, � /
� � - -- --- ��-�� . , � ;
> ,
v
� ��� �� � �- --� ��� �
J � � ._ ... .'.... .
�
� � �V A�� ���� .�
Ci � / —
� . � �� `-.--- -- - �
- '
� � ___ _ __� �� , --�_.
`° � �°^ WESTON HEIGHTS N4RTH
� Design a„��o
J DA ��� �Oj°`7 tiw��yer,�e,k
� Q '� O O Drawn ��ro
� � „= 100' �r,s�,s ,��W.,Y,���.�„��.W�,�,
�ate o�;o�� �,�;���„�,,,,d,.,a,,,.R�„ D EV E L O P E D
� 349-004-�5 CONVEYANCE sheet:
Scale Feet Project No.
R:�Projects\349 �prospect development)\004-14 (Weston Heigh:s)\Dwg\figures\TIR Figures\WH Basin Map - �onveyance.dwg i 1x17
Weston Heiqhts Conveyance- Stormshed 3G Report
NFT1
-o
�
Z
C65�A
r-�
Lr P--05,11
�
0
d
CB7 �
�`'� P-OT
, �
-c�'`•, b
'— 4 m
I •.'a,
- �1
i �
l
VAULT�1
�
Weston Heights
Technical Information Report
:lppended on:Thursda�,June 16,2016 3:36:57 P�1
RO['TEH1'D[)THRI? [La�•out-Ol)i'SING[100 J�ear]�►vD�TYPEIA.RAC]VOTZERO RELATI�'E SCS/SBLiH
Gravih Anah�sis using 24 hr duration storm
Reach Area Flow Full Q Full nDepth Depth n�'el fVel Infil�'ol CBasin/
ID (ac) (cfs) (cfs) ratio (ft) rado S�e (ft/s) (ft/s) (cn H}�d
P-O8 0.72 0.5615 7.1149 0.0789 0.1896 0.1896 �`1° 5.4196 9.059 0.00 BASIN-08
Diam
P-07 0.72 0.5615 7.8191 0.0718 0.1814 0.1814 12 1O 5.7752 9.9556 0.00
Diam
12 in BASN- �
P-P�II 0.15 0.1346 8.121 0.0166 0.0897 0.0897 Diam -�'g622 10.34 0.00 ��
P-OSA 0.05 0.0516 7.3126 0.0071 0.06 OA6 12 m 2.6823 9.3107 0.00 BASIN
Diam OSA
P-OS 0.80 OJ993 7.052 0.1133 02278 0.2278 1`1° 5.9377 8.9789 0.00 BASIN-OS
Diam
P�T L52 1.3608 15.7574 0.0864 0.1985 0.1985 Diam �``�g6 20.063 0.00 BASIN-3
HGL Analcsis
From Node To Vode HG El(tt) App(ft) Bend(ft) Junct Loss(ft) Adjusted HC:EI(ft) htax EI(ft)
504.9935
CB4 VACTLT-IN Sll.1361 ------ 0.0689 0.2370 � S11.4420 513.4900
CB7 CB4 513.5 l07 ------ 0.5770 ------ r S 14.0877 517.8600
CB8 CB7 �16.1246 ------ ------ ------ � 516.1246 518J100
CBS CB4 513.1183 ------ 0.0273 0.062� � 513.2081 516.4500
I'.VLET1 CBS 514.9033 --na-- --na-- --na-- � 514.9033 515.7?00
CBSA CB5 513.3186 ------ ------ ------ r 513.3186 515.4600
Conduit Notes
Reach HVI`Depth(ft) I-IVb'/D rallo Q(cfs) T�V Depth(ft) Dc(ft) Dn(ft) Comment
P-�'LT-IN 0.6461 0.6461 1.36 0.4935 0.4935 0.19R5 SuperCrit flow�,Inlet end controls �
P-07 0.4107 0.4107 0.56 0.9520 0.3113 0.1814 SuperCrit flow,Inlet end controls �
P-08 0.4146 0.4146 0.56 0.9877 0.31 13 0.1896 SuperCrit flow,Inlet end controls j
P-OS 0.5083 0.5083 0.80 0.9520 0.3738 0.2278 SuperCrit flow�.Inlet end controls ! i
i
P-IN 1 0.1833 0.1833 0.13 0.5981 0.1496 0.0897 SuperCrit flow�,Inlet end controls �
P-OSA 0.1086 0.1086 0.05 0.5981 0.0919 0.0600 SuperCnt flo���.Inlet end controls
_ - ---__------------ __---------
Licensed to: SDA Engineers
Weston Heights
Technical Information Report
Appended on:Thursda��,June 16,2016 3:35:34 P1i
La��out RepoM:La}out-01
Event Precip(in)
other 2.10
2 yr 24 hr 2_50
5 year 3.50
� 10 year �.00
25 year 4.25
I �- l00 year d.50
Reach Records
Record Id:P-05
_ _
Section Shape: I Circular
i?oiform Flo�v b'Iethod: � Manning's Coefficient: 0.011
Rouring Alethod: j Tra�•el Tune Shitt Contribudng H}'d '
DnNode � CB4 L�pl�ode � CB5
14faterial r unspeciYied Size 12 in Diam
Ent Losses � Square Edge w;'Headwall
Length � 76.00 ft Slope 2J9°ro
iTp In��ert I 512.61 ft Dn In��ert � 510.49 ft
I
Conduit Constraints �
Aiin Vel 1�4as Vel � l�tin Slope Max Slope ;i A'Iin Co��er
2.00 ft,s I5.00 fG's � 0.50°'0 2.00°�o j— 3.00 ft
nrnp acr�cc AIFI --� fi 11i)1�t Ec'infil R.�te -- f)(l�in hr
1:,_=.�i;; i�i. ;� �����
Section Shape: i Circular
LTniform Flow��lethod: ( Vfanning's Coefficient: U.U11 I
Routing Method: t Travel Time Shifr Contributing Hyd�
DuNode j CBS [TpNode CBSA
'�'Iaterial � unspecified Size ', 12 in Diam
Eot Losses � Square Edge«o`Headwall � ',
Length � 20.00 tt Slope , 3.00°o '
-- -----j
IIp In��ert � 513.21 ft Dn In��ert ' S12.61 fr
.�.
___ _ _— ______.;
Conduit Constraints _�
11iin Vel � Max Vel � 141in Slope 11iaz Slope � 14io Cover
2.00 ft�s � 15.00 fL's r 0.50°0 2.00°o � 3.00 ft
Drop across�1H � 0.00 Yt Ex/Infil Rate 0.00 im'hr
Weston Heights
Technical Information Report
(
� Record Id: P-07
;` Section Shape: Circular
� Liniform Flo�v i'Iethod: Manning's Coefficient: �—0.011
r -�
Routiog A'Iethod: ' Tra��el Time ShiYt Contribudng H��d ;
4 Dn�iode I CB4 L'pl`ode CB7
Alaterial � unspecified Size 12 in Diam
Ent Losses � Groo�e End w,Head«all
Length � 76.00 tt Slope 3.43°:0
L"p In�ert � 513.10 lt Dn Im•ert i 510.49 ft
Conduit Constraints _�i
' '�1in�'el �1ax Vel � �Iin Slope �1as Slope �1in Co��er
2.00 fU s 15.00 fU's r 0.50°0 2.004;0 3.00 ft
i Drop across 1tH � 0.00 ft Ex/Iufi►Rate 0.00 inrlu
i Record Id:P-OS
I
Section Shape: Circular
i : -- -
LTniform Flow l�fethod: '.vlannine s Coefficient: 0.011
Routing'�lethod: Tra�el Time Shifr Contributing H�d
DnNode , CB7 L?phode CB8
Material j unspecified Siu 12 in Diam
Eot Losses � Square Edge wrTIeadwall
Length � 92.00 ft Slope 2.849�0
' LTp In�ert � 515.71 ft Dn Im ert 513.(0 ft
Conduit Constraints
I ' '14in�'el � 11ias Vel � 14fin Slope hiax Slope � hiin Cover �
I.
� 2.00 ft�s 15.00 ft%s � 0.50°%0 2.004'0 � 3_00 ft
Drop across 1�fH �- 0.00 tt E�/Infil Rate 0.00 im'hr
Record Id: P-IN1
' Section Shape: Circular
LTniform Flow l�fethod: I Manning's Coefficient: 0.011 ,
Routing�7ethod: I Tra�•el Time Shitt Contriburing H�d
. � . . ..__.._
DnNode � CBS L�pl�ode I:vLETI
Material � unspecified Size 12 in Diam
Ent Losses � Square Edge w;TIeadwall
Length � 57.00 ft Slope 3.70°.-0
Lip In��ert � 514.72 ft Dn In�ert W� 512.61 ft
Conduit Constraints I
Weston Heights
Technical Information Report
i
( � �� 111in�'el hiax Vel � biin Slope � r�iax Slope j �'fin Corer ���
f� 2.00 fUs I5.00 fds � 0.50% 2.00°�0 � 3.00 ft
Drop across DfH � 0.00 Yt Ex/Infil Rate 0.00 in'hr
' Record Id:P-VI.T-IN
Section Shape: ; Circular
' l?niform Flosv l�iethod: � Manning's Coe�cient: ; 0.011 _I
Routing�Iet6od: r Travel Time Shitt Contributing H�d I
� Dn�iode � VAliLT-IN tTp�iode , CB4
� '�taterial � unspecified Size 12 in Diam
Ent Losses � Square Edee wvHead�vall
' Length � 43.00ft Slope 13.93°%
� Li�Invert � 510.�9 fr Dn In�ert 504.50 ft
Couduit Constraints
114in Vel � biax Vel � biin Slope D4aa Slope � :�Iin Cover I(
2A0 tv's I5.00 tC's r 0.50°'0 2A0°-o � 3.00 ft
Drop across�IH � 0.00 fr E��Infil Rate 0.00 in-hr
Kode Records
Record Id:CB4
Descrip: Tl PE 1 Inaement 0.10 ft
Start El. 510.49 tt `�4ax El. 513.49 ft
Void Ratio 100.00
Condition Proposed Swcture Type CB-TYPE t
Channelization Vo Special Shape
Catch 0.00 ft Bottom Area 3.97 sf
MH�CB Type Node
Record Id:CB�
Descrip: TYPL 1 Increment U.IU It
Start EI. 512.61 ft Max EL 516.45 Yt
V'oid Ratio 100.00
Condition Proposed Structure Type CB-TYPE 1
Channelization '.Vo Special Shape
Catch 0.00 it Bottom Area 3.97 sf
MHr'CB Type Node i
Weston Heights
Technical Information Report
�
i
I
I
- Record Id:CBS�
r
'i Descrip: CO'vCRETE INLET Increment O.10 ft
t Start El. 513.21 ft '�ia�El. 515.46 ft
Void Ratio 100.00
� Condition Proposed � Structure Type CONCRETE INLET
Channelization No Special Shape
`_
Catch 0.00 ft Bottom Area 3.67 sf
j '�1H;CB T�-pe I�ode
i,
Record Id: ( B7
( Dewrip: I�P� 1 Incremeut O.IU tt
I Start El. S 13.10 ft Max El. 517.86 ft
`
�'oid Ratio 100.00
i
Condition Proposed Structure Type CB-TYPE 1
� Channelization No Special Shape
Catch 0.00 ft Bottom Area 3.97 sf
� r` MH,CB Type Node �
Record Id:CB8
� Descrip: TYPE 1 Increment 0.10 ft
, Start El. 51�.71 ft Max EI. 518J1 ft �
Void Ratio 100.00 rI
Condition Proposed Structure Type CB-TYPE 1
Channelization No Special Shape
Catch 0.00 ft Bottom Area 3.97 sf
h4H;CB T��pe Node �
Record Id: I�ILET1
Descrip: PIPE INLET Increment 0.10 h
Start EL 'S14.72 ft Max El. S1i.72
ft
Void Ratio 100.00 _ ; i
Dummy�Type Node
Record Id:VAL.'LT-IN
Descrip: CO1�iBINED DETENTION;�'ETPOOL VAULT Increment 0.10 ft
Start El. 501.00 ft D1ax El. 513.80
Weston Heights
Technical information Report
Yt
- ------ ---_ I
Void Ratio 100.00
Dummy Type Node
_ _
ir
I Contributing Drainage Areas
I
Record Id:BASIN-OS
�
�- Design A�lethod SBUH Rainfail t��pe � TYPEIA.RAC
H}d Int�� 10.00 min Peaking Factor � 484.00
� Storm Duration 24.00 hrs Abstraction Coeff � 0.20
Pen ious Area 0.02 ac DCI�► � 0.58 ac
Pen ious CN 86.00 DC CN � 98.00 -
I -
� j Per��ious TC ' S.00 min DC TC � 5.00 min
'� �_ _
Per��ious CV Calc
� Descriptioo SubArea � Sub cn
�- LandscaperZawn 0.02 ac � 86.00
� Pervious Composited CN(A'VIC 2) � 86.00
Per�ious TC Calc
T��pe DescripNon Length Slope Coeff l�fisc TT
Sheet Tc min=5 min 0.00 tt 0.0"% S.0 0.00 in 5.00 min
Pen ious TC 5.00 min
_
.--___. --- -----
DCI-CN Calc
Description SubArea � Sub cn
Impen ious 0.58 ac � 98.00
DC Composited CN(AMC 2) � 98.00
_, ______ .
DCI-TC Calc
T�•pe Descripdon Length Slope Coeff ilisc TT
Sheet 5 min.minimum 0.00 tt 0.0°0 5.0 0.00 in 5.00 min
Pervious TC 5.00 inin
Record Id:BASIN-Il^�
Desigu Jlethod �t;� 11 Il;iiut.�ll t�j�� � � i , ..A i<.1�
H�d Inh 10.00 min Pe�king Factor � 484.00
Storm Durallon 24.00 hrs Abstraction Coeff � 0.20 �
Per��ious area 0.00 ac DCIA � 0.05 ac
__ _ --
Per�ious CV ( 0.00 DC CN � 98.00
Per��ious TC � 0.00 min DC TC � 5.00 min
_
DCI-CN Calc �
_ _______�
Weston Heights
Technical Information Report
� Description SubArea Sub cn
�- Impen ious 0.05 ac � 98.00
' ' �- DC Composited CN(AIv1C 2) � 9g.«1
______ ___
�- �
DCI-TC Calc
T�pe Description Length Slope Coeff vfisc TT
Sheet �min.minimum 0.00 ft 0.0°0 5.0 0.00 in 5.00 min
Pen ious TC 5.00 min
Record Id:BASIN-08
Design Aiethod SBUH Rainfall hpe � TYPEIA.RAC
H�d Ioh� 10.00 min Peaking Factor � 484.00
Storm Dura6on 24.00 hrs Abstraction Coeff � 0.20
Penious Area 0.63 ac DCIA � 0.09 ac
Per�ious CN 86.00 DC Cl� � 98.00
Pen ious TC 5.00 min DC TC � 5.00 min
+ _
Pervious CV Calc
� � '� Description SubArea � Sub co
- Landscape Zawn 0.63 ac � 86.00
Penious Composited CN(A�4C 2) 86.00
� _
- __
i ' �- -- ....---
Pervious TC Calc
Type Description Length Slope Coeff Dlisc TT
; Sheet Tc min=5 min 0.00 ft 0.0°% 5.0 0.00 in 5.00 min
Pen�ious TC 5.00 min
_------__--
i `- ___. DCI-CN Calc
I
�- Description SubArea � Sub cn
�- Impen ious 0.09 ac � 98.00
, �- DC Composited CN(AMC 2) � 98.00
� �----- _ . -_.�.
DCI-TC Calc
T��pe DescripNon Length Slope Coeff �Zisc TT
Sheet 5 min.miniinum 0.00 ft 0.0°-0 5.0 0.00 in 5.00 min
Pen ious TC 5.00 min
Record Id: BASIN-3
Desigo Alethod �lil fi llainfall t�pe 11 k'1 1:\ t<:\�
H�d Inh � 10.00 min Peaking Factor � 484.00
Storm Duration 24.00 hrs Abstraction Coeff � 0.20
Per��ious Area � 0.63 ac DCIA � 0.09 ac
Weston Heights
Technical Information Report
Penious Cl� H6.00 D('CV )8.00 I
Per�-ious TC 5.00 min DC TC I �.00 min
Per�ious CN Calc
DescripHon SubArea ; Sub cn ,
- � Landscape;"La��n 0.63 ac � i� 86.00 ���
Penious Composited CN(AhiC 2) � 86.00
____ _-
- -- i
Percious TC Calc
T�pe Description Length Slope Coeff b7isc TT
Sheet Tc min=5 min 0.00 Yt 0.0% 5.0 0.00 in 5.00�nin
Pen ious TC 5.00 min
DCI-CN Calc
Description SubArea � Sub cn
Impen ious 0.09 ac � 98.00
DC Composited CN(AMC 2) � 98��
- DCI-TC Calc
Tcpe Description Length Slope Coeff A1isc TT
Sheet 5 min.minimum 0.00 Yt 0.0% 5.0 0.00 in 5.00 min
Pen ious TC 5.00 min
Record Id: B?►SIPi-IV1
Design 14tethod SBLn-I Rainfall hpe � TYPEIA.RAC
H��d Inh� 10.00 min Peaking Factor � 4g���
Storm Duration 24.00 hrs Abstraction Coeff r 0.20
Per�-ious Area 0.07 ac DCIA � 0.08 ac
Pervious CN 86.00 DC CN � 98.00
Pen ious TC 5.00 min DC TC � 5.00 min
Per�ious CN Calc
Description SubArea � Sub cn
Landscape-Lawn 0.07 ac � 86.00
Pen�ious Composited C�T(AI�4C 2) � g6��
- Per��ious TC Calc I
T��pe Description Length Slope Coeff hiisc TT
Sheet Tc min=5 min 0.00 tt 0.0°-0 5.0 0.00 i❑ 5.00 min ;;
Pen•ious TC 5.00 min !
�
DCI-CN Calc
Description SubArea � Sub cn
Impen ious 0.08 ac � 98.00
DC Composited CN(AMC 2) � 98.00
Weston Heights
Technical Information Report
' -- _-
DCI-TC Calc �i
T�pe Description Length Slope Coeff l�iisc TT
Sheet �min.minimum 0.00 ft 0.0%A 5.0 0.00 in 5.00 min
Pen ious TC � 5.00 min
�'
� ; �
�
- Licensed to: SDA Engineers
i
�_'
i ;
i '
l '.
� ,.
�
�
Weston Heights
Technical Information Report
Weston Heiqhts Conveyance— Stormshed 3G Report
V AU LT-IN
,
f-
�
O
�
�
C82 >
4
A
b�
�
_ P-�
i
�',
� �
DffCN
Weston Heights
Technical Information Report
Appended on:Thursda}�,June 16,2016 3:43:33 P111
' ROL1TEH1'D[]THRL'(La��out-02)iTSING[100}ear]A'�D[]NOTZERO RELATIVE Fi�ed Flow
Gracitp Anah sis using fixed ilowrates
Reach ID Flow(cfs) Full Q(cfs) Full rado nDepth(ft) Size n�'el(ft/s) t�'el(ft/s) CFlow
P-02 0.83 2.9853 0.27R 0.3606 12 in Diani ;.?5�7 3.8011 O.R3
I ' P-�'AULTOliT 0.50 0.1522 ;.28�6 1.00 12 in Diam 0.6366 0.1938 0.50
P-03 0.50 2.9853 0.1675 0.2764 12 in Diam 2.8279 3.801 I 0.00
P-Ol 1.402 ?.9853 0.4696 0.4822 12 in Diam 3.7395 3.8011 0.072
HGL Anah sis
From Node To l�ode HG El(ft) App(ft) Bend(ft) JunM Loss(ft) Adjusted HG EI(ft) Ataa EI(ft)
505.6012
CB I DITCH OUTLET 506.3703 ------ 0.0670 0.0635 I 506.5008 S 10.6400
CB2 CBl 506.6998 ------ ------ ------ � 506.6998 511.0100
CB3 CBI 506.6510 0.0063 0.0054 ------ 506.6502 516.0300
VAL�LT-[N CB3 506.8086 --na-- --na-- --na-- 506.8086 513.8000
Conduit Notes
Reach H�V Depth(ft) H�VID ratio Q(cfs) TV1'Depth(ft) Dc(ft) Dn(ft) Comment
P-O 1 0.7203 OJ203 L40 0.5012 O.SOl2 0.4822 SuperCrit flo��-.Inlet end controls
P-02 09898 09898 0.83 0.8508 0.3813 0.3606 Outlet Control I�41 Back��-ater ;
P-03 0.8510 0.8510 0.50 0.8508 0.2932 0.2761 Outlet Control M1 Back�vater I
P-�'ALJLTOUT 1.0087 1.0087 0.50 1.0000 0.2932 >D Outlet Control �
Licensed to: SDA Engineers
Weston Heights
Technical Information Report
Appended on: Thursda�,June 16,2016 3:45:27 PAi
La�out Report:La�-out-02
Ecent Precip(in)
other '.l0
�vr 24 hr 2.50
5 vear 3.50
� 10 year 4.00
25 year 4.25
100 vear 4.50
Reach Records
Record Id: P-Ol
Section Shape: r-- Circular
L'niform Flow Dlethod: �— Manning's Coefficient: � 0.011 _I
RouNng 1liethod: ', Tra��el Time Shift ContribuNng H��d ,
. �
DoNode � DITCH OLJTLET IIpNode j CB1
—i
14iaterial j unspecitied Size � i 12 in Diam
Eot Losses � Groo��e End w-Headwall � ��
Length � 109.00 Yt Slope � 0.5040
L'p In�ert � 505.65 Yt Dn Invert 505.10 ft
Conduit Constraints
liin Vel r J7aa Vel � 14Lin Slope Max Slope � Min Co�er —I!
7..00 fVs 15.00 fVs r 0.50°0 2.009,0 � 3.00 ft
Drop across 111H � 0.00 tt Ex/Infil Rate 0.00 inrl�r
Record Id: P-02
Section Shape: Circular
Liniform Flo�v Method: ' Manning's Coefticient: 0.011 __I
Routing Alethod: , Tra��el Time Shift Contribudng H��d
DnVode � CBI ITp'.Vode CB2
1laterial � unspecitied Size 12 in Diam ��
i
Ent Losses � Groove End«�'Headwall
Leogth � 12.00 ft Slope 0.504%
_._
LTp Inr-ert � 505.71 Yt Dn In��ert 505.65 tt
Conduit Constraints
11iin Vel � biax Vel j biin Slope lfax Slope � �4in Co�'er (
2.00 fv"s I5.00 fds � 0.50°0 2.00°�0 3.00 fi ��
-� -- -
Drop across�IH � 0.00 tt Es/Infil Rate 0.00 inihr
Weston Heights
Technical Information Report
�
� Record Id: P-03
I Sec6on Shape: I Cucular
� Ilniform Flow l�iethod: � Manning's � CoefFcient: 0.011
(
Routing Method: � Tra��el Time Shift Contributing H��d
DnNode � CB1 Lip�Iode CB3
Niaterial r unspecified Size 12 in Diam
Ent Losses � Groo�-e End w�Head«-a11 �
i Length � 30.00 Yt Slope _' 0.50"%
LTp Invert � 505.80 ft Dn In�•ert 505.65 ft
Conduit Constraiuts
�-- Aiin�'el Diax Vel �r l�tin Slope �1ax Slope �� l�fin Cover
?.00 fc's 15.00 R�s �� 0.50°'0 2.00°0 � 3.00 ft
�
Drop across MH �- 0.00 ft Ex/InC�I Rate 0.00 inrhr
; �� Record Id:P-��'AULTOIIT ��
�_ �
Section Shape: Circular
' Lrniform Flow°hfethod: � ?v[anning's Coefficient: 0.011
Routing�'Iethod: � Tra��el Time Shift Contributing Hrd
DnNode �— CB3 L?p�iode � �'AULT-IN
�'Iaterial � unspecitled Size 12 in Diam
Ent Losses � Groo��e End w;Head«�all !
��-._.__. -
Length � 8.00 ft Slope 0.00°%0
'� IIp Incert � SOS.RO fr Dn Invert ' S0�J999 ft
i _ _ _ _.___.__ _.__. _.__--- __
Conduit Constraints
' Viin Vel � �1aa Vel �� hfin Slope l�iaa Slope � 3tin Cover
'.00 Yt-s 15.00 ft-s � 0.50°'0 2.004,0 �— 3.00 ft
Drop across�1iH � OAO ft � Ex/Infil Rate �_ 0.00 inrlir
\ode Records
K���nr�l IiL ( Rl
I)���_i�-i'. Il�l'1 : 1::�;:::;��u t
Start El. 505.65 ft Max EL �10.64 8
Void Ratio ]00.00
Condition Proposed S[ructure Type CB-TYPE l
' Channelization Vo Special Shape
Catch 0.00 ft Bottom Area 3.97 sf
, ___
� � MH/CB Type Node _____�
Weston Heights
Technical Information Report
_ i
Record Id:CB2
Descrip: TYPE 1 (Solid lid,flows from O�'Pond A) Increment 0.10 ft
Start EI. 505.71 ft Max EI. 511.01 ft
Void Ratio 100.00 �'
Condition Proposed Structure Type CB-TYPE 1
Channelization Vo Special Shape
' Catch 0.00 ft Bottom Area 3.97 sf
?�9E{'CB Type Vode
Record Id:CB3
Descrip: CONTROL STRUCTURE Increment 0.10 ft
Start El. 505.80 Yt Max EI. 516.Oi tt �
Void Ratio 100.00
Condition Proposed Structure Type CB-TYPE 2-54
Channelization 'Vo Special Shape
Catch 0.00 ft Bottom Area 15.904 sf
MIL�'CB Type Node
Record Id: DITCH OLiTLE7�
Uescrip: DOWNSTREAM OCITLET INTO DITCH Increment 0.10 Yt
' titart EI. 505.10 ft '.vfar El. 506.10 II
8
�'oid Ratio 100.00 —I I
Dummy Type Node
Record Id:VALrLT-IN
Descrip: COMBINED DETENTION,�'ETPOOL VAULT Increment 0.10 Yt
Start E1. 501.00 ft Max El. 51�.80
}t �
�'oid Ratio 100.00 �
Dummy Type'.�Iode I
Licensed to: SDA Engineers
Weston Heights
Technical Information Report
Weston Hei_qhts Convevance- Stormshed 3G Report
C814
' �
A
C 13
v
w
12
v
N
�
��
Q�
/
Weston Heights
Technical Information Report ,
�
Appeoded on:Thursday,June 16,2016 3:55:14 Pbi
ROIiTEHYD[)THRtT�La�out-03]LTSING[100��ear]AND(TYPEIA.R�C]NOTZERO RELATI��SCS/SBL'H
Gravit��Anal��sis using 24 hr durallon storm
Reach Area Flow� Full Q Full nDepth Depth ��e nVel fl'el Infil�'ol CBasio/
ID (ac) (cfs) (cfs) raHo (ft) ratio (ft/s) (ft/s) (c� H�-d
' 12 in
P-14 0.10 0.0888 3.5�75 OA25 0.1091 0.1091 D�ain 19107 4.5295 0.00 BASIN-14
P-13 0.33 0.2944 2.9853 0.0986 0.212 0.212 1`1° 2.4225 3.80ll OAO BASIN-13
Diam
P-12 0.56 0.50 4.9236 0.1015 0.2148 0.2148 12 1° 4.0366 6.2689 0.00 BASIN-12
Diam
P-11 0.81 0.7262 5.031 0.1443 0.2562 02562 1`1D 4.5694 6.4057 0.00 BASIN-11
Diam
HGL Anal��sis
From Node To Vode HG EI(ft) App(ft) Bend(ft) Junct Loss(ft) Adjusted HG El(ft) 11ax El(ft)
518.855(,
'�To approach losses at node CB12 because inverts and,'or crowns are offset.
CB l l POND-IN 519.9376 ------ 0.0770 ------ � 520.0146 524.2600
CBl2 CB11 523.1757 ------ 0.0003 ------ � 523.1%l 525.2400
' CB 13 CB 12 523.4308 ------ 0.0002 ------ � 523.4310 526.1700
i CB14 CB13 524.7795 ------ ------ ------ -- 524J79� �27.9900
I Conduit Notes
Reach H�'�'Depth(ft) HV�/D ratio Q(cfs) T�V Depth(ft) Dc(ft) Dn(ft) Comment
�i P-I 1 0.4876 0.4876 OJ3 0.3556 0.3556 0.2562 SuperCrit tlow,Inlet end controls
P-l2 0.3957 0.3957 0.50 0.2932 0.2932 0.2148 SuperCrit tlow,Inlet end controls i
P-13 0.3008 0.3008 0.29 0.3961 0.2234 0.2120 SuperCrit flow,Inlet end controls
P-14 0.1595 0.1595 0.09 0.3010 0.1213 0.1091 SuperCrit flow.Inlet end controls
Licensed to: SDA Engineers
Weston Heights
Technical Information Report
Appended on:Thursda�,June 16,2016 3:SS:S6 PM
La��out Report:La}out-03
i
Event Precip(in)
' other 2.10
2 yr 24 hr 2.50
5 year 3.50
I ' 10 year 4.00
25 year 4.25
100 year 4.50
Reach Records
i Record Id: P-11
I
.---___-_..-._ _
Secdon Shape: � Circular
L'niform Flow�'Iethod: � Manning's Coefficient: OAl 1
RouNng Niethod: � Tra�el Time Shift Contribudng H��d
DnNode � POND-IN LipNode CB11
---__.__—.
Alaterial ( unspeciYied Size 12 in Diam
Ent Losses � Square Edge u;�'Headwall
Length � 67.00 tt Slope 1.424%0
' Irp In�ert � 519.45 ft Dn Invert 518.50 Yt
' Cooduit Constraiots
4lin Vel � A1as Vel Aiin Slope l�tax Slope � hiin Co�•er
Z.00 ft%s I 15.00 R%s 0.50°% 2.00% � 3.00 ft
Drop across i1iH 0.00 fr Ex/Infil Rate 0.00 in-hr
Record Id: P-12
Section S6ape: ( Circular
LTniform Flow l�iethod: � Manning's Coefficient: 0.01 l
Routing:�Iethod: � Travel Time Shift Contributing H��d
DnVode � CBI1 i�pVode CB12
�laterial � unspecitied Size 12 in Diam
Ent Losses � Square Edge w�;Headwall
Length � 76.00 ft Slope , 1.36°:0
Lip In�-ert � 522.78 ft Dn Iovert ' S21.75 ft
Conduit Constraints
Min Vel r 1taz Vel iiiu Slope �laa Slope � �'Iin Co�er
2.00 Ytis 15.00 ft's 0.50°-'0 2.00°0 � 3.00 Yt
Drop across'�ZH � 0.00 ft Ea/Infil Rate 0.00 irrhr
Weston Heights
Technical Information Report
Record Id: P-13
Sectioo Shape: � Circular
i�'niform Flow biethod: � Manning's Coefficient: � 0.011
Routing�iethod: � Travel Time Shitt Contributing H��d ',
DnNode j CB12 LTpVode CB1-�
hlaterial r unspecified Size 12 in Diam
' Ent Losses � Square Edee w•,Headwall _
Length � 70.00 tt Slope 0.504-0
Lip In�•ert � 52;.13 Yt Dn Incert 522.78 fr
Conduit Constraints _i'
�lin�"el � Alaa�'el � D�in Slope '�lax Slope � '�1in Co��er
2.00 ft's 15.00 ft�s r 0.50°0 2.00°'0 � z.00 tt
Drop across NiH � 0.00 ft Ex/Infil Rate 0.00 inrl�r
Record Id: P-14
Secdon Shape: � Circular
LTniform Flow 1b�ethod: � Manning's Coefticient: 0.011 I
Routing iiethod: ! Tra�el Time Shift Contribu6ng H�d
DnNode CB 13 iTpNode CB l4 '
i
�laterial j unspeciYied Size 12 in Diam
Ent Losses � Square Edge�v Headwall �
Length � 210.00 ft Slope 0.71% '
� L'p Invert � 524.62 fr Dn In��ert 523.13 ft ;
Conduit Constraiuts '
l�tin Vel � 11iaz Vel_ _ �iin Slope A4ax Slope .� Aiin Co��er I�
2.00 YU's 15.00 8/s j D.50°0 2.00°'0 � 3.00 ft
Drop across�'IH � 0.00 Yt Et/Infil Rate 0.00 in-'hr
Node Records
Record Id:CB11
Descrip: STORR4FILTER Increment 0.10 tt
Start El. 519.45 ft Max El. 524.26 fr I
__._ _ ---��
Void Ratio 100.00
Condition Proposed Structure Type CB-TYPE 1
Channelization No Special Shape ii
Catch 0.00 8 Bottom Area 3.97 sf �I
A4H'CB Type\'ode
Weston Heights �'
Technical Information Report
Record Id:CB12
' Descrip: TYPE 1 Increment 0.10 fr
' Start El. 522.78 ft �ax EL 52�.24 fr
Void Ratio 100.00
' I Condition Proposed Struc[ure Type CB-TYPE I
Channelization No Special Shape
� Catch 0.00 ft Bottom Area 3.97 sf
'�1H�CB T}Pe Node
Ilccuni IcL- ( R13
Descrip: TYPE 1 Ii�cremznt U.IU Yi
Start El. 523.13 fr Max EL �26.17 ft
Void Ratio 100.00
Condition Proposed Structure Type CB-TYPE 1
Channelization Vo Special Shape
Catch 0.00 fr Bottom Area 3.97 sf
MH�CB Type Node
Record Id:CB14
Descrip: TYPE I Increment 0.10 fr
Start El. �24.62 ft Max El. 527.99 ft
Void Ratio 100.00 r'
Condition Proposed Structure Type CB-I1'PE I
Channelization No Special Shape
Catch 0.00 ft Bottom Area 3.97 sf
MH/CB Type Node
_.
Record Id:POND-IV
Descrip: II�LET r0 POND Increment 0.10 fi
Start El. 518.50 ft NiaY El. 519.50
ft
�'oid Ratio 100.00 �
Dummy Type Node
Weston Heights
Technical Information Report
Contributing Drainage Areas
Record Id: BASLV-11 I�I
Design Method SBLJH Rainfall h�pe , TYPEIA.RAC II
H�d Inri� 10.00 min Peaking Factor � 484.00
Storm Duration 24.00 hrs Abstracdon Coeff � 0.20
Per�•ious Area 0.11 ac DCIA � 0.14 ac
, __ __ _
Pervious CN 86.00 DC Cl� � 98.00
Per��ious TC 5.00 min DC TC � 5.00 min
Per��ious CV Calc
' DescripNon SubArea � Sub cn
LandscaperZawn 0.11 ac � 86.00
Pen ious Composited CN(AMC 2) � 86.00
----------
_-- ---_ _-
Per�-ious TC Calc I
T}pe Description ' Length Slope Coeff �Tisc TT I
Sheet Tc min=5 min 0.00 ft 0.0°ro 5.0 0.00 in 5.00 min '
Per��ious TC 5.00 min
DCI-CN Calc '
Description SubArea � Sub cn
Impen�ious 0.14 ac � 98.00
DC Composited CN(AMC 2) r 98.00
- DCI-TC Calc - -�
T�-pe DescripNon ! Length Slope Coeff Aiisc ` TT
Sheet 5 min.minimum 0.00 fr 0.09% 5.0 0.00 in 5.00 min
Pen ious TC � 5.00 min
Record Id:BASL�I-12
Design'.1lethod � SBUH Rainfall h-pe I TYPEIA.RAC
H�d Inh � 10.00 min Peaking Factor � 484.00
Storm Duratiou 24.00 hrs Abstraction Coeff � 0.20
Pervious Area 0.11 ac DCIa � 0.12 ac
Pen�ious CV 86.00 DC CV � 98.00
Pervious TC 5.00 tnin DC TC � 5.00 min
Pervious CN Calc �
Descripfion SubArea � Sub cn '�
Landscape-Lawn 0.1 I ac � 86.00 ,
Pervious Composited CN(AMC 2) � 86.00 �i
- -- _.__ _- - ---- ___.
Per�-ious TC Calc
Weston Heights
Technical Information Report
! ;
_,
Tcpe Description Length Slope ('oeff �1isc TT I
Sheet Tc min=5 min 0.00 Yt 0.0°o �.0 0.00 in 5.00 min
Pen ious TC 5.00 min � �
I' - - �
' , � _ DCI-CN Calc
Description SubArea � Sub cn
Impen ious 0.12 ac � 98.00
DC Composited C'V(A'�fC 2) ��-98.00
� -- ll('I- I C Calc
T�pe Descriptioo Length Slope Coeft biisc TT
Sheet 5 min.minimum 0.00 ft 0.0% 5.0 0.00 in 5.00 min
Pen ious TC -- 5.00 min
� Record Id: BASL'�1-13
Design liethod SBLiH Rainfall h�pe ( TYPEIA.RAC
H�d Inh 10.00 min Peaking Factor � 484_00
Storm Duradon 24.00 hrs Abstraction Coeff � 0.20
Pervious Area 0.11 ac DCIA � 0.t2 ac
Pen•ious CV 86.00 DC CN �- 98.00 �
Pen ious TC 5.00 min DC TC � 5.00 min
Per�ious CN Calc
Descriprion SubArea � Sub cn
Landscape-Law•n O.11 ac � 86.00
Pen�ious Composited CN(AIb1C 2) � g6��
Per��ious TC Calc
T• e Descri tion Len h Slo e Coeff l�iisc TT I:
?P P I � P
Sheet Tc min=5 min 0.00 fr 0.04,0 5.0 0.00 in 5.00 min
Pen•ious TC 5.00 min ,
DCI-C�I Calc
Description SubArea � Sub cn
Iinpen ious 0.12 ac � 98.00
DC Composited CN(AMC 2) � 9g.�
- -
__ _- ---- -
DCI-TC Calc I
T}�pe Description Length Slope Coeff A1isc TT
Sheet 5 min_minimum 0.00 ft 0.0°/a ( SA 0.00 in 5.00 min
-I------
Pen ious TC --- - - S.00 min
__ _.. ___ __ - ----------- --- -- _ . �
Record Id:BASIN-14
Weston Heights
Technical Information Report
Design�lethod � SBUH Rainfall npe � TYPEIA.RAC
H}d Iut� � 10.00 min Peaking Factor � 484.00
Storm DuraHon 24.00 hrs Abstraction('oett � 0.20
Penious Area 0.05 ac D('14 �- 0.05 ac
Per�-ious�'V 86.00 DC C�T �- 98.00
Pen�ious TC , 5.00 min DC TC � 5.00 min
. -- - ___ - - -
Pen•ious CN Calc
, Descriprion SubArea r Sub cn _
Landscape-La���n OA�ac � 86.00
Pen�ious Composited CV(AMC 2) � 86.00
_ Pervious TC Calc _ -I
T}pe Descripdon Length Slope Coeff D7isc TT
'i
Sheet Tc min=5 min 0.00 ft 0.0°0 5.0 0.00 in 5.00 min ;
- Pen ious TC 5.00 min
DCI-CN Calc
Description SubArea � Sub cn
Imper�•ious 0.05 ac � 98.00
DC Composited CN(Ah4C 2) � 9g.a1
. D(I-TC Calc �
T}pe Description Length Slope Coeff '1lisc TT
tiheet 5 min.minimum 0.00 ft 0.0°�0 5.0 0.00 in 5.00 min I�
Pen�ious TC 5.00 min
Licensed to: SDA Engineers
Weston Heights
Technical Information Report
,
APPENDIX 5B
ISOPLUVIAL MAP - 100-YR, 24-HR PRECIPITATION
, � ,
Weston Heights
Technicai Information Report
� Washington 100-year 24-hour Precipitation
124�W 123"W �27W 121'W 120'W 119°W ��B�W n7V:
- s�,
�- WIMTCOk� � f �'
• F[ND
�N�µ roclpYtatlon
_.2 �a��� I `M�a».,
s�Fi
��..�, �wr
,Q sitvE"° ��u.a ma�•�
aur+ �
�+a�s
d8 N
' �,sa o
s� v N�za25
i pzsso
i Qsass
00lIOU�f I Q 3 S-!0
� . _ . ' � UICOLN YO�u�+[ �. 014a 5
0
QIS50
cwrs r wsoti4�.� . � 8670
MaliBOR �:'; 0 , �MT �
a-N �•r ��K�„�r•s ;�;aeo
� Rsta+ .:: �� � ��";�eaioo
o'' �� ' M""rww I ��eaizo
t,"` �+zai�o
�,a o�ea
„�� �""� oMSEu �,ea,eo
�� ��8P200
;�Abre Man 20 0
�`! t>.;� �BITON WALLI . AWTM
dE N �
i — N
1 KUGKITAT _J`��-f '�
`.r `
� I
�2�"W t23'W 122'W �i'�W 120'W tt9�"J4 !1B"VV 117'W N-�F
�
C
Malysls perfortned by MGS Englneermg Mac o�D+roa w�m me ait�sM a.nne moaew�p sysiem oy me
and Oregon Climate Serv�ce Spat�el Climale Analysis Service,Oreqon Slale Urwversity. W s ���+ .
htlp://www.ocs oregonslate.e�WprisM o e �a � .c a eo a�..,«.
Map Createtl.Jenuary 2606 Copyrighl(c)2003,OSU SCAS I
` - I
' , �
i �
'
SECTION 6
SPECIAL REPORTS AND STUDIES
Weston Heights
Technical Information Report I
( i
Special Reports and Studies
A geotechnical report was prepared by Geo Group Northwest for the project on February 12th, 2015. A
copy of this report is included in Appendix 6A.
A copy of the Olympus Villa LUA 10-090 TIR has been attached as Appendix 6B. The Olympus Villa
Pond `A'was utilized as part of this project.
A copy of the Olympus Villa original design and As-Built plans has been attached as Appendix 6C. The
� Olympus Villa Pond `A'was utilized as part of this project.
Weston Heights
Technical Information Report
,
APPENDIX 6A
GEOTECHNICAL REPORT
�
;
Weston Heights
Technicai Information Report
,
GEOTECfINICAL ENGINEERING STUDY
PROPOSED WESTON HEIGHTS PLAT ;
684 &6501vILE AVENUE NE '
RENTON,WASHIIVGTON
G-2884-2
Prepazed for ,
Mr.Justin Holland
Prospect Development, LLC
2913 - 5`�Avenue NE,Suite 201
Puyallup,WA 98372
February 12, 2015
GEO GROUP NORTHWEST,INC.
13240 NE 20`�Street, Suite 10
Bellevue,Washington 98005
Phone: (425)649-8757
; Email: wchang@geo�roupnw.com or agaston@geogroupnw.com
� G r o u p N o r t h w e s t, I n c Geotechnical Engineers,Geologists
• 8 Environmental Scientfsts
February 12, 2015 G-2884-2
' Mr. Justin Holland
Prospect Development, LLC
2913 - 5`�Avenue I�IE,Suite 201
Puyallup,WA 98372
SUBJECT: GEOTEC�INICAL ENGINEERING STUDY
PROPOSED WESTON HEIGHTS PLAT
684&650 NII,E AVENUE NE
RENTON,WASHINGTON
Dear Mr. Holland:
GEO Group Northwest, Inc.,has prepared the following geotechnical report for the proposed
residential development based upon our subsurface investigations at the site. This work was
performed in accordance with our contract with you dated January 28,2015.
GEO Group Northwest, Inc.,explored subsurface soil conditions at the site by excavating four
exploratory test pits on February 5,2015, foar test pits on October 30,2012 and two test pits in
May of 2009. Soils encountered at the test pits consisted of loose to medium dense sandy SII.T
and silty SAND overlying dense to very dense and gravelly silty SAND and gravelly sandy SI[,T
with some cobbles at depths ranging from 1.5 to 3.5 feet below ground surface(bgs).
Based on the results of our study, it is our professional opinion that the site is geotechnically
suitable for the proposed development The proposed buildings can be supported on
conventional spread footings bearing on the dense native site soils or on compacted structural fill
placed on top of the dense native soils. The loose site soils and fills are not suitable to support
foundations due to their loose and variable condition. Based on the findings from our soil
investigation at the site, we anticipate that the dense soil under the building areas are present at
depths of appmximately 2-feet below ground surface at the test pit locations. Some over-
excavation may be necessary at select locations but fum soil conditions are likely to be found at �
or in close pmximity to typical foundation depths. Please refer to the text of the report for more ,
speciFc recommendations regarding the site development. ',
13240 NE 20th Street, Suite 10 • Bellevue,Washington 98005
Phone 425/649-8757 • Fax 425/649-8758
February 12, 2015 G-2884-2
Proposed Weston Heights Plat,Renton, Washington Page ii
We appreciate this opportunity to have been of service to you on this project. We look forward
to working with you as this project progresses. Should you have any questions regarding this
, report or need additional consultation,please feel free to calt us.
Sincerely,
GEO Group Northwest,Inc.
���'�AM Cy"�ti
���F WAgh�� �
�
tiP � �
William Chang, P.E. � = z
Principal � �r� �'
�.� 9 20t;4 ��
f� Fv/STEAE� ��
s`r��NAL ENG
GEO Group Northwest,Inc.
TABLE OF CONTENTS
JOB NO. G-2884-2
Page
, 1.0 IlVTRODUCTION ...... . ...... . . .... . .. .... . . . . . . . . . . .. . . . . . . .... ... . .. 1
1.1 Project Description. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
1.2 Scope of Services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
2.0 SI'I'E CONDITIONS . .......... . ... . . . . . . . . . . . . . . . . . . . .. . . . ..... ....... .2
2.1 Site Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
2.2 Geologic Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
2.3 Field Investigation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
2.4 Soil Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
2,5 Groundwater Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
; 3.0 SEISMIC CONSIDERATIONS .. .. . . . . . . . . . . . . . .. .. . ... ... .... . .. ... .. .. . 3
_ 4.0 INF'II.TRATION EVALUATION . . . . . . . . . . . . . .... ... ...... . .... .... . .. . . .4
;
5.0 CONCI,USIONS AND RECOMNIENDATIONS ....... .... ...... . ... ... . . . . . 5
5.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
5.2 Site Preparation and General Earthwork . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
5.2.1 Temporary Excavation Slopes and Permanent Embankments . . . . . . . . . . 6
� 5.2.2SttucturalFill . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . • - - • - • - - . . . . . . . . . 7
' S.3 Spread Footing Foundations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
5.4 Permanent Basement and Conventional Retaining Walls . . . . . . . . . . . . . . . . . . 10
5.5 Slab-on-Grade Floors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
5.6 Footing Drains . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . • - - . . . . . . . . . . . . . 12
5.7 Segmental Block Retaining WaIls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
5.8 Pavements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
6.0 LIMITATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
7.0 ADDI'I'IONAL SERVICES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . IS
TABLE OF CONTENTS
-CONTINLTED -
JOB NO. G-2884-2
'
ILLUSTRATIONS
Plate 1 - Vicinity Map
Plate 2 - Site Plan
Plate 3 - Grading and Utility Plan
Plate 4 - Gradational Analysis
Plate 5 -Typical Footing Drain Detail
APPE�IDIX A: TEST PIT LOGS AND SOIL LEGE\iD
GEO Group Northwest,Inc. II
i'
GEOTECH1vICAL ENGINEERING STUDY
PROPOSED WESTON HEIGHTS PLAT
684 & 650 NILE AVE NE
RENTON,WASHINGTON
G-2884-2
1.0 INTRODUCTION
1.1 Project Description
' The project site is located at the eastern side of I�1ile Ave NE at the subject address. Properry taz
records indicate that the site has addresses of 684 and 650 Nile Ave NE with parcel numbers of
� 1123059092 and 1123059010, respectively. Based upon our previous work at this site we
understand that the site also has an address of 12204- 1481°Avenue SE. There is an eaisting
single family residence at the 684 address and a couple of storage buildings at the 650 address.
The existing buildings are shown on the attached Plate 2 -Site Plan.
; The project site consists of a 4.54 acre parcel. We have been provided with a Site Plan for the
� proposed development by Core Design which is dated August 2014 and which has been modified
and included with this report as Plate 2 -Site Plan. According to the site plan the development
will consist of 12 new residential lots, a Open Space lot and two lots for stormwater facilities
(Tracts A and C). We understand that wood-frarned single family residences aze planned for the
12 new lots at the site. Finish floor elevations for the new buildings were not provided at the
time of this study. A private access road is proposed to access the 9 new residences at the
western side of the parcel from Nile Avenue NE(148'�Ave SE). In addition a private road"C"
is proposed to access the eastem side of the subject parcel running south from NE 7`�Place and
accessing the site via an easement on the adjacent northern property. Three new residences aze
proposed for Lots#10-121ocated at the eastern side of the parcel. A detention water quality
vault is proposed at Tract A at the southwestem corner of the site. A detention pond is proposed
at Tract C at the southeastem comer of the site.
Based upon the Grading and Utility Plan by Core Design(August 2014)which has been modified
and included as Plate 3-Grading and Utility Plan we understand that some grading will occur
to create level building pads at each of the new lots. The proposed pad elevations are noted on
the plan. Based upon our review of this plan fills having a thickness of up to 7-feet are proposed
at the eastern lots numbered 10-12. The western lot grading appears to be generatly balanced
GEO Group lYorthwest,Inc.
I
�
� j
February 12,2015 G-2884-2
Proposed Weston Heights Plat, Renton,Washington Page 2
' with no more than a 1-foot thickness of fill at some of the lots and a cut(excavation)of up to 3.5
feet at the Lot#1. The grading plan also indicates that a 2-foot wide segmental block wali will
be constructed at the southwestern corner of the project site,primarily on Lot#9. This retaining
wall is proposed to have a height of up to 3-feet.
The existing house and accessory buildings will be demolished as part vf the new development.
1.2 Scope of Services
The tasks we completed for this study were conducted in general accordance with the scope of
� work presented in our contract dated January 28, 2015. The results of our subsurface
investigation and our recommendations regarding the proposed development are summazized in
the following report.
2.0 SITE CONDITIONS
2.1 Site Description
Based upon the site plan the site consists of a relatively flat 4.5 acre parcel occupied with one
single family residence and two accessory structures. The existing buildings and development
are located at the western side of the lot and the eastem side of the lot is undeveloped
2.2 Geologic Overview
According to the geologic map for the site vicinity the soils at the site are reported to be Ground
Moraine Deposits (Qgt). The Ground Moraine soils typically consist of glacial till, a mixture of
; sand, silt and gravel, which was consolidated by overriding glacial ice. These soils can usually
be divided into a surficial loose to medium dense weathered zone which overlies the dense to
very dense underlying un-weathered till soils.
2.3 Field Investigation
II k GEO Group Northwest, Inc.,has exptored the subsurface soil conditions at the site by excavating
and logging 10 exploratory test pits labeled TP-1 through TP-10. The test pits labeled TP-1 and
GEO Group P4orthwest,Inc.
I �
February 12, 2015 G-2884-2
Proposed Weston Heights Plat,Renton,Washington Page 3
TP-2 were excavated at the westem portion of the site in 2009 in order to support a Pavement
Design by GEO Group Northwest. Test pits TP3 through TP-6 were excavated on October 30,
2012 specifically to provide data for a November 2008 geotechnical report. Four additionai test
pits, TP-7 through TP-10 were excavated on February 5, 2015 in order to characterize the soil
conditions at the eastern side of the property. The test pits were located neaz the proposed
development areas, as shown on Plate 2 -Site Plan and Plate 3-Grading and Utility Plan.
The test pits were excavated to depths ranging between 3 and 7 feet below ground surface(bgs).
Soil samples at varying depths were collected,classified and returned to our laboratory. The test
pits were then backfilled with the excavated site soils. Backfilled soils were not compacted.
2.4 Soil Conditions
Soils encountered in the test pits consist of prirnarily loose to medium dense sandy SILT and
gavelly and cobbly sandy SILT overlying dense to very dense gravelly sandy SII,T and gravelly
silty SAND with varying amounts of cobble. The underlying dense to very dense soils appear to
be the glacial till soils or ground moraine deposits which aze noted on the geologic map. In
general, the underlying competent dense soils were encountered at depths ranging from 1.5 to 3.5
feet below ground surface.
Copies of the Test Pit Logs aze presented in Appendix A: Test Pit Logs.
2.5 Groundwater Conditions
No groundwater seepage was encountered at the test pits at the westem side of the site. Perched
groundwater seepage was observed at depths of 2 to 3 feet below ground surface at the test pits
located at the eastern side of the site. It should be noted that groundwater conditions may
fluctuate seasonaily, depending on rainfall, surface runoff and other factors.
3.0 Seismic Considerations
Based upon our subsurface investigation at the site, it is our opinion that the project buildings
may be designed using the Class C soil profile per the International Building Code. I
GEO Groap Northwest, Inc.
February 12, 2015 G-2884-2
Proposed Weston Heights Plat, Renton,Washington Page 4
4.0 INFILTRATION EVALUATION
The current site plan indicates that a detention water quality vault is proposed at the southwestern
corner of the site at Tract A and a detention pond is proposed at the southeastem comer of the
site, Tract C. Based upon discussions with the project engineer,Mr. Andy Reaves of Site
Development Associates, we understand that infiltration or dispersion is being considered for
stormwater at the westem side of the eastern lots (#10-12). Consequently, we have included this
discussion regarding the potential for infiltration at the site.
Based upon our subsurface investigation the soils at the site consist predominately of sandy SQ.T
and gravelly sandy SILT. Because these soils are fine-grained they aze relatively irnpermeable.
; Additionally, the underlying soil deposit is dense to very dense which further inhibits the
permeability of the ground. Further, groundwater seepage was observed during the winter of
2415 at depths below 2-feet below ground surface at the eastern proposed lots. This seepage
level is due to perched groundwater and is highly influenced by precipitation.
.At the time of our subsurface investigation on February 5, 2015 we collected soil samples at
various depths at the test pits TP-7 through TP-10 at the eastern side of the site. A sample from
I the 1-foot depth was collected at the TP-lO location where the new eastern detention pond will
be located. Gradational analysis was performed using this sample. Based upon the results of this
analysis the soils observed ai the 1-foot depth at TP-10 are classified as fine-sandy SII.T with
gravei as shown on the attached Plate 4-Gradational Analysis.
Based upon the gradational analysis the sampled soil has grain size D,o=0.025 mm. In
aecordance with the commonly used correlation K=C x(D,o)Z where C = 100(1/cm-sec> we
recommend that the designer use a percolation rate of 68 min/inch or infiltration rate of 0.��
inches/hour. GEO Group IVorthwest, Inc., recommends that the design infiltration rate be
corrected for the anticipated reduction in long-term infiltration rate due to plugging of soils. I-c,r
the sandy SII.TS at the site we recommend a correction factor of 0.5 be used for plugging. The
infiltration system may also require periodic maintenance in order to maintain the design
' inf'�ltration rate. And of course inf'iltration may not be relied upon during periods of wet-weather
as the rched oundwater level will be too hi to allow for infiltration. Conse uentl we
� � � q y,
recommend that any infiltration facilities be designed to a11ow for dispersion at the ground
surface or overtlow to the stormwater system(ponds or detention vaults).
i
GEO Group Northwest,Iac.
February 12,2015 G-2884-2
Proposed Weston Heights Plat, Renton,Washington Page 5
We recommend that dispersion/infiltration trenches be designed to have a minimum depth and
width of 2-feet below the ground surface. The bottom and sides of the trench should be lined
with a geotextile filter fabric such as Mir� 140N. After lining the trench the trench may be
backfilled with clean crushed rock with the placement of a level perforated pipe located within
the crushed rock material,having the perforations directed downward. A layer of filter fabric
should be placed over the crushed rock at a level6-inches below the finish grade surface. The
remainder of the trench may then be backfilled to the finish grade surface using a clean crushed
rock. Stormwater which has been pre-treated at appropriate facilities such as oiUwater sepazators
for pavements and catchbasins with sumps for roof drainage may be discharged into the
perforated pipe at the dispersion/infiltration trench. We anticipate that the dispersion/infiltration
trench will have a limited design lifetime without regulaz maintentance as the build-up of fines
will reduce the capability of the system to infiltrate stormwater and properly disperse the
overflow. We recommend that the designer require that the dispersion/infiltration system be
periodically inspected and maintained.
The Grading and Utility Plan (Plate 3)indicates that fills of up to 7-foot may be placed at the
eastem lots(#10-12). If the inf'iltration/dispersion trenches aze to be located at the fill azeas then
the dispersion/infiltration trenches must have their bottom within[he native fills in order to
assume the aforementioned infiltration rate. We recommend that the dispersionlinfiltration
trenches be located below the fill embankment since dispersion over the fill embankment may '�
contribute to erosion unless fills are well compacted, slopes do not exceed 3H:1V and the slopes
are well vegetated(see the Section 52.1 -Temporary Ezcavation Slopes and Permanent
Embankments). ,
5.0 CONCLUSIONS AND RECOMN�NDATIONS '
5.1 General
Based upon the results of our study, it is our professional opinion that the site is geotechnically
suitable for the proposed development. The proposed buildings may be supported on
conventional spread footings bearing on the dense native site soils or on compacted structural fill
placed on top of the dense native site soils. The proposed detention vault retaining walls should
also be constructed on top of the dense native soils or compacted structural fills placed on top of
the dense native soils. The overlying loose site soils are not suitable to support foundations. We
GEO Group Northwest,Inc.
February 12,2015 G-2884-2
Proposed Weston Heights Plat, Renton,Washington Page 6
anticipate that the dense soils are located at depths ranging from 1.5 feet to 3.5 below ground
surface(bgs). At most of the test pit locations the dense soils were encountered at or near
standazd shallow foundation depths of 1.5 to 2 feet bgs. Consequently, we anticipate that over-
! excavation may be required only at select locations and may be limited to the azea near test pit
TP-2 and TP-7.
� It is also important to note that mapping of our test pits indicates that some test pits may have
been located at areas where proposed buildings or pavements are to be located. No compaction
was performed at the time that the test pits were backfilled. Therefore it is anticipated that the
fills at the test pit locations will be loose. We recommend that the contractor plan on over-
, excavating and placing compacted structural fill at any test pit locations which are located at
pavement or building locations such as TP-1,TP-2,TP-5 and TP-6. GEO Group Northwest,
Inc., can be on-site at the time of grading and building pad preparation to aid in locating test pit
locations and overseeing the subgrade repair work.
5.2 Site Preparation and General Earthwork
The building pad areas should be stripped and cleared of surface vegetation and forest duff soils.
Based upon the subsurface investigation topsoiUforest duff soils were encountered to depths of
up to 2-feet below ground surface. Silt fences should be installed around azeas disturbed by
construction acavity to prevent sediment-laden surface runoff from being discharged off-site.
Exposed soils that are subject to erosion should be compacted and covered with plastic sheeting.
5.2.1 Tem�orary Excavation Slo�es and Permanent Embankments
Under no circumstances should temporary excavation slopes be greater than the limits spec�ed
in local,state and national government safety regulations. Temporary cuts greater than four feet
in height should be sloped at an inclination no steeper than 1H:1V (Horizontal:Vertical) in the
loose site soils. Temporary cuts in the dense site soils may be excavated no steeper than 1H:ZV
provided that no seepage is encountered. If groundwater seepage is encountered during
construction, excavation of cut slopes should be halted and the cut slopes should be re-evaluated
by GEO Group Northwest, Inc. The maaimum recommended inclination for temporary
excavation slopes if seepage is present is 1H:1V,however if loose soils are present and there is
seepage then the slopes should be no steeper than 2H:1 V.
GEO Group Northwest,Inc.
February 12, 2015 G-2884-2
Proposed Weston Heights Plat, Renton,Washington Page 7
If necessary the underlying very dense soils may be capable of standing at steeper inclinations
such as 1H:3V,however,this is dependent upon the conditions at the time of excavation. If it is
necessary to form such steep ezcavation slopes than GEO Group Northwest, Inc., must be
retained to evaluate the conditions at the excavation at the time of grading to provide an
evaluation of stability. If the proposed temporary excavation slopes encroach upon adjacent
properties then it may be necessary to obtain an excavation easement or plan for temporary
shoring at those locations.
The Plate 3-Grading and Utility Plan indicates that an embankment with 2H:1 V fill slopes is
proposed for the proposed detention pond at the southeastern corner of the site. In addition,
2H:1V fill slopes aze proposed at the westem side of the eastern lots(#10-12). The pond fill
embankments are proposed to have a maaimum height of 4-feet above the base of the pond.
Permanent cut and fill slopes at the site should be inclined no steeper than 2H:1 V provided that
fills are compacted to meet or exceed the 90% of the mazimum dry density(ASTM-D-1557) as
specified in the Structural Fill section of this report(5.2.2). The fill slopes at the detention pond
_ embankment should also be covered with a layer of filter fabric such as Miraf'i 140N and a layer
of quazry spall rock. Un-compacted fills may be graded no steeper than 3H:1 V.
Surface runoff should not be allowed to flow uncontrolled over the top of slopes into the
' excavated area During wet weather exposed cut slopes should be covered with plastic sheeting
during construction to minimize erosion.
5.2.2 Structural Fill
Based upon the current plans we understand that fills of up to 7-feet may be placed at the eastem
building lots. All fill material used to achieve design site elevations below the building areas and
below non-structurally supported slabs,parking lots, sidewalks, driveways,and patios, should
meet the requirements for structural fill. In addition, fills which aze placed in inclinations steeper
than 3H:1 V should meet the requirements for structural fill and be compacted in accordance with
this report. During wet weather conditions, material to be used as structural fill should have the
following specifications:
1. Be free draining, granular material containing no more than five (5)percent fines{silt and
clay-size particles passing the No. 200 mesh sieve);
GEO Group Northwest, Inc.
February 12, 2015 G-2884-2
Proposed Weston Heights Plat, Renton,Washington Page 8
2. Be free of organic material and other deleterious substances,such as construction debris
and garbage;
3. Have a maatimum size of three(3) inches in diameter.
All fill material should be placed at or near the optimum moisture content. The optimum
moisture content is the water content in soil that enables the soil to be compacted to the highest
dry density for a given compaction effort.
The majority of the surficial site soils will be moisture-sensitive because they consist of sandy
SII.T and silty SAND soils. The site soils should be suitable for use as structural fill as long as
they aze placed neaz their optimum moisture content. We anticipate that the site soils will most
1 ikely be too wet to achieve the compaction requirements unless work is performed during the
driest portions of the summer months. Altematively, an imported granular fill material may
provide more uniformity and be easier to compact to the required structural fill specification.
If the on-site soils are to be used as engineered structural fill, it will be necessary to segregate the
topsoil and any other organic-or debris-containing soil,because such soils would be unsuitable
for use as structural fill. Ezcavated on-site material that is stockpiled for later use as structural
fill should be protected from rainfall or contamination with unsuitable materials by covering it
with plastic sheeting until it is used.
Structural fill should be placed in thin horizontal lifts not exceeding ten inches in loose thickness.
Structural fill under building areas (including foundation and slab azeas), should be compacted to
at least 95 percent of the mazimum dry density,as determined by ASTM Test Designation D-
1557-91 (Modified Proctor).
Structural fill under driveways, parking lots and sidewalks should be compacted to at least 90
percent maximum dry density, as determined by ASTM Test Designation D-1557-91 (Modified
Proctor). Fill placed within 12-inches of finish grade should meet the 95%requirement.
We recommend that GEO Group Northwest,Inc.,be retained to evaluate the suitability of
structural fill material and to monitor the compaction work during construction for quality
assurance of the earthwork.
GEO Group Northwest, Inc.
February 12, 2015 G-2884-2
Proposed Weston Heights Plat, Renton,Washington Page 9
� 5.3 Spread Footiag Foundations
T'he proposed buildings can be supported on conventional spread footings bearing on the dense
native site soils or on compacted structural fill placed on top of the dense native site soils. Based
on the findings from our soil investigation at the site, we anticipate that the dense soils are
present between at between 1.5 and 3.5 feet below the existing ground surface(bgs}. Some over-
ezcavation and placement of structural fill may be required at foundation locations,dependent
upon the proposed fmish grades and the conditions encountered at the building foundation
excavations. We recommend that GEO Group Northwest, Inc.,be retained to verify competent
soils are present at each building foundation location, at the time of construction,prior to the
foundation pour(s).
Individual spread footings may be used for supporting columns and strip footings for bearing
walls. Our recommended minimum design criteria for foundations bearing on the dense site soils
or on compacted structural fill are as follows:
- Allowable bearing pressure, including all dead and live loads
Dense native soil =2,500 psf
Compacted structural fill =2,500 psf
- Minimum depth to bottom of perimeter footing below adjacent final exterior grade = 18
inches
- Minimum depth to bottom of interior footings below top of floor slab= 18 inches
- Minimum width of wall footings= 16 inches
- Minimum lateral dimension of column footings=24 inches
- Estimated post-construction settlement= 1/4 inch
- Estimated post-construction differential settlement;across building width= 1/4 inch
A one-third increase in the above allowable bearing pressures can be used when considering
short-term transitory wind or seismic loads.
GEO Grou Northwest Inc. III
P �
February 12,2015 G-2884-2
Proposed Weston Heights Plat, Renton, Washington Page 10
Lateral loads can also be resisted by friction between the foundation and the supporting
compacted fill subgrade or by passive earth pressure acting on the buried portions of the
foundations. For the latter, the foundations must be poured "neat"against the existing
undisturbed soil or be backfilled with a compacted fill meeting the requirements for structural
fil l. Our recommended pazameters are as follows:
- Passive Pressure(Lateral Resistance)
• 350 pcf equivalent fluid weight for compacted structural fill
• 350 pcf equivalent fluid weight for native dense soil.
-Ccefficient of Friction(Friction Factor)
• 035 for compacted structural fill
• 0.35 for native dense soil
We recommend that footing drains be placed around all perimeter footings. More specific details
of perimeter foundation drains are provided below in Secdon 5.6-Footing Drains.
5.4 Permanent Basement and Conventional Retaining Walls i
Based upon the site plan we understand that a water quality detention vault is proposed at the
southwestern corner of the site, Tract A. Consequently, we assume that concrete retaining walls
will be constructed for the vault. The following design recommendations may be used for
permanent basement and conventional retaining walls at the project site, if necessary.
Permanent basement walls restrained horizontally on top are considered unyielding and should be ',
designed for a lateral soil pressure under the at-rest condition;while conventional reinforced
concrete walls free to rotate on top should be designed for an active lateral soil pressure.
Active Earth Pressure
Conventional reinforced concrete walls that are designed to yield an amount equal to 0.002 times
the wall height, should be designed to resist the lateral earth pressure imposed by an equivalent
fluid with a unit weight of 35 pcf for level backfill.
GEO Group Northwest, Inc.
�
' ;
February 12, 2015 G-2884-2
Proposed Weston Heights Plat, Renton,Washington Page l 1
At-Rest Earth Pressure
Walls suppor[ed horizontally by floor slabs are considered unyielding and should be designed for
lateral soil pressure under the at-rest condition. The lateral soil pressure design should have an
equivalent fluid pressure of 45 pcf for level ground behind the walls.
Passive Earth Pressure and Base Friction
The available passive earth pressure that can be mobilized to resist lateral forces may be assumed
to be equal to 350 pcf equivalent�luid weight in both undisturbed soils and engineered structural
backfill.
The base friction that can be generated between concrete and undisturbed native soils or
engineered structural backfill may be based on an assumed 035 friction coe�cient.
Drainage
Based upon the subsurface investigation perched groundwater seepage was encountered at depths
ranging from 2 to 3 feet below the ground surface at the test pits located at the eastem side of the
site. At the time of our investigation at the western side of the site no groundwater seepage was
observed. There is the possibility that some groundwater seepage may be encountered at utility
trench excavations, the detention vault excavation and the detention pond excavation. We are
not awaze of any plans for below-grade portions of the new buildings. If seepage is encountered
then eacavation slopes may need to be graded to a less steep inclination in accordance with the
temporary eacavation slopes section of this report.
We recommend that a vertical drain mat, Miradrain 6000 or equivalent,be used to facilitate
drainage behind permanent concrete basement and conventional retaining walls. We recommend
that the drainage mat be installed on the back side of the wall extending from the finish grade
down to a footing drain pipe. The wall footing drain pipe should consist of a 4inch diameter
perforated rigid PVC pipe surrounded by a bed of washed gravel and separated from site soils by
filter fabric, Miraf'i 140N or equivalent. The drain pipe should be tightlined to discharge to the
stormwater system. Backfill behind conventional retauung walls should consist of free-draining
sand or gravel soils which are compacted in lifts.
GEO Group Northwest,Inc.
February 12, 2015 G-2884-2
Proposed Weston Heights Plat, Renton, V4'ashington Page 12
r
I Backfill in areas adjacent to basement or conventional retaining walls should be compacted with
hand held equipment or a hcepack. Heavy compacting machines should not be allowed within a
; horizontal distance to the wall equivalent to one half the wall height, unless the walls are
' designed with the added surcharge.
5.5 Slab-on-Grade Concrete Floors
Loose site soils should be excavated from all concrete slab subgrade areas or compacted to a firm
and unyielding condition. Slab-on-grade concrete floors may be constructed on top of inediurn
dense to dense native site soils or on top of compacted structural fill placed on top of the
competent site soils. The slab-on-grade floors should not be constructed on top of loose soils.
To avoid moisture build-up on the subgrade, slab-on-grade floors should be placed on a capillary
; break, which is in tum placed on the prepazed subgrade. The capillary break should consist of a
minimum of a siu (6) inch thick layer of free-draining ciushed rock or gravel containing nu ���ure
than five(5}percent finer than the I�1o.4 sieve. A vapor barrier, such as a 10-mil plastic
i membrane, is recommended to be placed over the capillary break beneath the slab to redure
� � � water vapor transmission through the slab. Two to f��ur inches of sand mav be placed o��er the
��I harricr r,�embrune f��r prc�t��li��n during �un�tru�tirr..
- _ _ .� , . s;.,
drains should consist of a four(4) inch minimum diameter perforated rigid drain pipe laid at or
neaz the bottom of the footing with a gradient sufficient to generate flow, as schematically
_ illustrated in Plate 5 -Typical Footing Drain Detail. The drain line should be bedded on,
surrounded by, and covered with a free-draining rock, pea gravel, or other free-draining granular
; material. The drain mck and drain line should be completely surrounded by a geoteatile filter
fabric, Mir� 140N or equivalent. Once the drains are installed, the eacavation should be
backfiled with a compacted fill material. The footing drains should be tightlined to discharge to
the stormwater collection system.
; Under no circumstances should roof downspout drain lines be connected to the footing drainage
, system. All roof downspouts must be separately tightlined to discharge into the storm water
I
�
GEO Group Northwest,Inc.
February 12, 2015 G-2884-2
Proposed Weston Heights Plat, Renton,Washington Page 13
i collection system. We recommend that sufficient cleanouts be installed at strategic locations to
` allow for periodic maintenance of the footing drains and downspout tightline systerns.
5.7 Segmental Btock Retaining Walls
Based upon the project site plan a 2-foot wide segmental block retaining wall is proposed with a
maximum height of 3-feet at the southwestern corner of the site(Lot 9). We assume that this
wall will retain fills for the building pad at Lot 9. Ecology btocks or Ultrablock gravity walls
may be designed to retain heights of up to 3-feet at this location provided that the wall is founded
on top of the underlying dense native site soils,the wall is backfilled with compacted structural
fills meeting the 909b Structural Fill compaction requirement and provided that a drainage zone
and wall drain pipe is installed behind the wall. The wall drainage zone should consist of a
rninimum 1-foot wide zone of free draining crushed rock sand and gravel located directly behind
' the blocks, having less than 5% finer than the#200 sieve,and extending from the ground surface
down to the wall drain at the base of the wall and for the entire length of the wall. Provided that
the wall is fully drained and fills are compacted as specified above the designer may design the
walls using the Active Earth Pressure spec�ed above.
5.8 Pavements
Based upon the site plan we understand that new private access roadways will be constructed at
the site. The adequacy of pavements is strictly related to the condition of the underlying
subgrade. We recommend that all pavement subgrades be compacted by several passes of a lazge
vibratory drum roller prior to placement of the crushed rock base. Before paving,we recommend
that the subgrade be proof-rolled under the supervision of the geotechnical engineer to verify that
the subgrade is firm and unyielding at the time of paving. The proof-roll may be performed by
driving a fully loaded dump truck over the subgrade azeas. If loose or yielding soils are
encountered it may be necessary to over-excavate and replace with compacted structural fill in
some areas. For firm and unyielding native subgrade soils we recommend the following
minimum pavement sections for driveways:
Class "B"Asphalt Concrete(AC) 3 inches
Crushed Rock Base(3/4-inch minus) 6 inches
GEO Group Northwest, Inc.
February 12,2015 G-2884-2
Proposed Weston Heights Plat, Renton,Washington Page 14
Or
Concrete Pavement 6 inches
Crushed Rock Base(3/4-inch minus) 4 inches
We understand that it may be beneficial to install a base pavement layer such as ATB (Asphalt-
Treated Base)prior to completion of the project.Oftentimes this can help protect the subgrade
from construction impacts and reduce cost related to subgrade repairs during wet weather
periods. Consequently we have calculated that the 3-inches of AC over 6-inches of Crushed
Rock Base noted above would be equivalent to the following total pavement thickness:
Class "B"Asphalt Concrete(AC) 2 inches
Asphalt Treated Base(ATB) 4 inches
Crushed Rock Base(3/4-inch minus) 3 inches
In accordance with the Washington State Department of Transportation Construction Manual,
transverse cracks will develop in concrete slabs at about 15 foot intervals along the length of
slabs and a slab wider than 15 feet may crack longitudinally. To control cracking of the concrete,
' contraction joints should be installed. Contraction joints are weakened planes which cvllect the
cracking into a controlled joint,creating a maintainable joint in the slab,and preventing random
ragged cracks which spread and require expensive maintenance. We recommend that contraction
and construction joints be connected with#5 dowel bars, 30 inches long, 18 inches on center.
The contraction joints should be placed at maximum 14 foot intervals.
6.0 LIMITATIONS
This report has been prepared for the specific application to this site for the exclusive use of
Prospect Development,LLC and their authorized representatives. We recommend that this
report be included in its entirety in the project contract documents for use by the contractor.
Our fmdings and recommendations stated herein are based on field observations,our experience
and judgement. The recommendations are our professional opinion derived in a manner �,
consistent with the level of care aad skill ordinarily ezercised by other members of the profession
currently practicing under similaz conditions in this area and within the budget constraint. No
GEO Group Northwest,Inc.
February 12, 2015 G-2884-2
Proposed Weston Heights Plat,Renton, Washington Page 15
warranty is expressed or implied. In the event the soil conditions are found to vary during site
excavation, GEO Group Northwest, Inc. should be notified and the above recommendation
should be re-evaluated.
7.0 ADDITIONAL SERVICES
We recommend that GEO Group Northwest Inc. be retained to perform a general review of the
final design and specifications of the proposed development to verify that the earthwork and
foundation recommendations have been properly_interpreted and implemented in the design and
in the construction documents. We also recommend that GEO Group Northwest Inc. be retained
to provide monitoring and testing services for geotechnically-related work during construction.
This is to observe compliance with the design concepts, specifications or recommendations and
to allow design changes in the event subsurface conditions differ from those anticipated prior to
the start of construction. We anticipate the following construction monitoring inspections may
be necessary:
1. Site clearing and grubbing;
2. Over-excavation and structural fill placement at building foundation locations;
3. Verification of bearing soil conditions for foundations;
4. Structural fill placement and compaction;
5. Slab-on-grade prepazation;
6. Subsurface drainage installation;
7. Proof-rolling of pavement subgrade azeas.
We appreciate this opportunity to have been of service to you on this project. We look forwazd
to working with you as this project progresses. Should you have any questions regarding this
report or need additional consultation,please feel free to call us.
GEO Group Northwest,Inc.
February 12, 2015 G-2884-2
Proposed Weston Heights Plat, Renton,Washington Page 16
II S incerely,
GEO Group Northwest,Inc.
��� ��-
Adam Gaston
Project Engineer
PM C HaN�'
���,OF�ASMI�yGr
� �� �y
� . Q
N W
I � �r� �
,9 2o»a �o �
, William Chang,P.E. �,� qFGIStEP �,c�
' Principal �SS�o N P�'�
cc: Andy Reaves - SDA Engineers
GEO Group Northwest,Inc. �,
ILLUSTRATIONS
G-2884-2
GEO Group Northwest,Inc.
_
. - �!_ •_....ts �� �P��� �
. . - �=� � H � '}h '3.t _� � .
1 t � �
4 :_ '.4� 1�-. . __ - � �: . ...�� �
� � ��.
� '/ "3 � . �t` . f_ . ..
- �',� " . _.. . �'. ��� � � II
-� � ♦ �,rs''y, ` ",,,,,�.�.;,r�i �►�, �'� I
O
: ' �'�+ �► ' � ' }
, . M,�� � . � ' --, - se„zr�sc �
_ e, - � 8F
r t���•�� fobw M� � ��'RO �
� � L1qAt K°ww� : �
.1 { !!ttE�st �� i
.�, � -��° � � �
_- � -; �
}' �
'-... �.. ��.i � .�.'.--. Nl�i O� i i L
�ri49 �1 } il_ : ' �
� - `i�l._� ,
S.�■w� , ;
�_NlM�F 1lN1S►- � �ICaih�r MtM�h . , .. ItM��- -:.._...�' �lt��-- � - �q
•ag:;;r �. _
11n11�0 lIrIM
� � Pa�1 OAc� ��4 . � ` E1M
�dt
w!,r a � �
� m
�V[1�'i
�� � i[�d h -.SE't3e1
� x.�
Ma�w�OoQ t
Prt �1�!
p°'�°' �,:, _ � �
� - -� " - � �,.�,, �
..a► t - � ` � � �
. � �,.�..,e« _>i , g � � _ _ _.
w co�wr c.� � �_.; �-
�012� � : -" . =-- �dt.�G��/e
� V 1C�1 i 1VJ.ti�
� Group Northwest, Inc. ,WESTON�IGHTS PLAT
�I " "°S0""�'''"'aBiOi�w"9'0°' 684&650 NII.E AVE NE
rroe.axs�.�rrn rwxasrs�n»
tmi°�°'°"`°' RENTON,WASHINGTON
SCALE: NTS DATE: 2J12/15 MADE: AG JOB NO.: G-2884-2 PLAT'E: 1
.�rn.k-r i �S� � I �
� 1
� :�' � �-._� .-
� �� �� � � i
� �
"'°v"'.�:
i� ��. , "� ' ' . �..r�..++,�.�.� � ` �1 i
* �. •r.�w u�"�" \ � I
t'� � _ _ _ __ �� �r� . . .� _ � y,� .._ �` _� �__r� ` • I ` �r �
�� �� {
1� �• ��--, r-�- r _1' �� • � 'i. . \ � � �----�-�--- `
.� -- ^ _ ' , � � � ' � ' T ., � . .� ! .. • '
� ,� � ', i
� 'I . � �� � ��wrw+� � �� y / ' � � ' /
� w�� � �
! 1 I i :� �� ar�ru 1.� � i � ' � wwr�/ � - /
� � �rr�� , wi ar) , 1 ' ���wr � /'
� r i ' , , � -; �..�.. `�� � � � \ ( _ t � ,�:
i ' `—�:._.� ��.._ � i �'3 i � � - - . � ' - '
� ; -.. \'J L '^� � ' �_ � ' + �-7-�--------`J
.� , ___`_,�--_ \��� ♦, i. � � � , � �. \ c� -"� _-- k?�
� , / , � � ' . . � `'
+ ` \ 1 I l�
' - ' •'NIO• • I � _.. � � w�+�MA �/ d_. . �.
�_
� ;� � + ��.���,�r,) � �. -� �� � > 1 i '' �
\ 71 �
. - ' !\ � 1 � � 1 � � � � n•v�a ri• _ � �r r� , —
� �.
1. �- - — `-- �_•� \ � . 1 ` • (Zts�r 1 •� w r�w�� �
� s � - � � • '
` ' r--- ----1 . � / ' ' f `\ ,w�wr. '�I . i
� f �� \ 1 1 �' / � ,�:� • . �. � ���• . i
�
� 1 / y 1 4 v . ` L �-__--_,J' l�.
�, , fA�1GT♦ �. � 1/ ��r.1 ---
� i , •�r �., �� , , �.• , �� ^ G -'
� � I ,k �---- -� o. . . ; —
.
.. ., ,• � ` � , ' `�_ -
i v � �
I • t �Zs `\\`-----�.\` .. � ` � \�, �� � ��� . i
�� , wa.�o• "' � � � 1� \i r i� , �
I ws r�v
� I ��� I � ( � ._ � I I� ' �
, � � \ � � ,
- fi� --�---� ;' � �---i----� � `:
. I ' "'' 'a w. �'' �' I ' . —
� r----R - - i
\ � i, `'\ j 1 T_� r�� , � • � ♦
' � � • � �----- ( 1 � �
-�
'* , � � i�r�� I J � � �i�,�'h �s ' � / ��ww P-10
� • j I. � �rtir �riw � � � � , . . 1 = � Ti�ii .�
� � 1 ` � 1 1 1 \ ._
� . . �. (-�_ ------� - ---�-_' v lyl��r�er vwur � 1
' — -'t � — — — rt- .�- ..._ y�q��IA+► I
-tt� ��h� , � » ,• � .
,. ,
� i snF n.wrr
Srt�r�N B�sHD�n�or�s►�t� TT:ST P(T NUMAER AND �, � r n NorthwP�`t jn ���ED WF3T(1N 1{}.}��;��rg pUT
101NYlY�RFDt31GN,AlKl201♦ O�`�' vv � "�� AMAh5041lFAVFNF
p-I APPROXIMATE L(X'ATl()N . "'•••�•�"•�•.�••'�' Rt�rroy.unsiuvc�tr�r � '�
� ' .`�`�"`"�,,,u,�.�,. PLATE:
,...
, .•
, tY ` 1 � i
� +
I k . i� .. .�..,_- �
I �..�..
I 1 T ��O Oa �� �rs� � Q I 1
' F 'T — — — — — — — - . ` , � � I
� — — — — —
— —t — — —�-- --� � �
c — �-- — —��--- , ,
, , �.
� � ' .
�-,�_ — —-- —— . , •. � �
� 1 f----- i r--'-- . • : ' \ � r-----�---------. / �\ �
� � � ' I I �� �•1 1 ' I ... � . � '�
, � 1 1 1 1 • 1 1
� �/M�� � � 1 1 f � I �, M�/I�O 10,� . � ' ' .
°'� �„ � � , I � • '� '°"' � � � I .
� �� � � � � i I1Y ��� 7s as�i�.x• 6�My*rr►�u, p � ; �
u I
I
� � �7 i 1 1 �/ . 1 \ Q�01 Sr� � � �
a � 1 1 1 . '\ , ��� SAI / / '
W ( �� � '�_'J � � �'; - . ��p� ��
-� � \ '`J ^• _t/ ' . �►�T►+ � �-7_ �j I
Z ' � l � ` \ � ----"-- -�
Y ~L.r ww� �
i � '• � i� `��`� .fw�r.��� -� _. _-��- , � ti�-- .------_... -i
1 � � � ' r ' + '
� � ' ,� �j�� �r � -�-'� - _, , '
!1/I J 1 �\ `` �.���.
iOOi� �
rin I . P � ``` na�M i�+►�I ' � �'- n Rfn�ut• '� . � �
� �i 1 '� , ''_ �"1 . \ \ • f1�.I�)�i � �� 1 �-+{
../ ! �i -rt ` 't�� �---f,----�1 `i 11� , ,�\\� n.�a, i �
-- -- I � / '
� / �wo � ``-1- --- - '
� �ni ,
.�I ` ' r���n.M �.P J i� ------�
rAw �
�� �' ' �/ ,� � -------"-'� �-9 i y 'I
� � .
��O • , 1 ' - � -, � � . I r ' �
w I � �"1 1� Ay \ i� �� � � � :
( � llrl . � � �
�y�, � 31�1' 1
f � P"6/ _ ! �s �o aaro� i ��� r �p
� . � � �
�r � '° � � ; �, . l • .:�,,: _
�� t r_ ��
��• 1 � 4 i t �. � � .,Y�. ._ ' """ � . ,_ y ' I
F �---------� I� � • '
� i� ; � ,w I � � � , ,TTP•5 � �•10
� i
� ' I I i ,yq I � � i WI , ` i
� i ` �� r�
'- �. ` 1� • !y1' � � l .
� �� � `---- � �---'-'---� ' ' '
� � i
. -- �
OO��C+qMP '-^"_�_"" i
� � ' - - - � - - � � �
� ' �rnr�.�w...s, ,��. �- - - - . '
` � �
, , —._.�._._'—.
_ _� , _.__.__....._--- �---�_`
� .� � -�-�--
� -- __.- fa�r w�sno+�.�l� , �
r���M 1 r ra��OO �
l . ND 1 1
(iRADIN(i A4D l'lli l fY PIAN
CiRAU1Pi(i AND U111_ITY PI.AN FROAKf�D WES�UN Hl�:IlilflS PIAT
A�st.t�i:�[�+�sHF.ET pn�Av c�HtF " �ST PIT Nl'MHER AND Grou� Northwest, Inc. pN1�Atp N�LE A�'l NI
nEslc!v.�l a wl� �-I APPRnXIMATf� l(X'A710N � ". "'""�-�����+^—•��^
� �\��INA.M'���R\Mf V ReNr��ti.w�s►i�ui;�„v L�'-
�
� / � • � ' • •
' � y - -
:' Il�lillaltl����Iill�l��lalll�lal�Ilallll� ! ill
., ._.,, ■ I 11�■
:, II�I�Ilalfl�atilu�����l��lalil�lal�llallll��lllllll�■
, Il�l�ll�l�l�p!�Iqilll�l�7lqlll�la1�111q1111��111l111�■
' ., 11�1�11��111�lII�Iqlllli�l��i�!II�Iql�lll�ltll��lllllll�■
, Il�All�lil��?�I�IIII�I��i811t��lAl�Il�llll��fllllll�■
, ., 11��1l9111�8�8lIII�I��IBIII�It�.�l181l11��1111111�■
� , 11�1�11�111�8�1�1111�1��18111�1a�llbl111��lllllll��
, Il��ilalll�ak�lallll�l��lalll�lal�li��lll��illliil��
, Il�i�ll�ltl,�a�lallli�l��lalll�lal�llal��s��illllll��
. 11�1�II�III�p�ipllll�l��lqlll�ipl�fiqllll��ll11l11��
,. , , „ , ..
� u
��0�0 �
� i ����� '
�� : � ;, :. � � •�_• �
���� � � �.._ ,�
�i i
� _��. �.�u• _u�. �
.� � - -
�
1 � ii.�rt� • i
1 1 ' •
. . � . �
�.71L. '�LL'
•1 ' � 1 �..� 1/�1 � � : i 1 .
: 1 � I 1 � � 1 � � 1 1", �
11 1 � � • •.
11 1
/ • 1
. .n..i ..
� � �
� . �� . a�. •
� �� � �
. _ � � , ♦ , ♦ ♦ •
C1 E C) • � • 1 • �
.: . � �
' .. . ..., ....... .. , . � • n .
� • � � • : � ■
i T
6"co 12•
SLAB
BACKFILL WITH COMPACTED
NAT[VE SOIL
���
GEOTE}CTQuE FII.'I'ER FABRIC,
M1RAF1 140N OR EQUIVALENT
FREE DRAINING BACKFILL FOOTING
CONSISTP:�IG OF WASHED
ROUND ROCK OR CRUSHED
RocK III�I I I I
MINIMUM 4 INCH DIAMETER
PERFORATID PVC PIPE
LEVEL OR WITH POSITIVE
GRADIENT
TO D[SCHARGE
NOT TO SCALE
NOTES:
l.) Do not replace rigid PVC pipe with flezible corrugated piasqc pipe.
2.) Perforated or slotted PVC pipc should bc tight jointed and laid with
perforations or slots down,with positive gadient to disc6arge. I
3.) Do not connect roof downspout draius into the footing drain lines. I
TYPICAL FOOTING DRAIN DETAIL
Group Northwest, IIIC. WESTON HEIGHTS
c,�a���s,c��,n,a 684&650 NII.E AVE�TE
6ti"°'"'�"��'�°°"°°" RENTON,W�►SHINGTON
sC�►t.E NONE ��TE 2/fi/15 MnoE AG C�cD WC doe No. G-2884-2 Pu►TE 5
r
�
APPENDIX A:
;
i
; TEST PIT LOGS
G-2884-2
GEO Group \orth���est, Inc.
LEGEND OF SOIL CLASSIFICATION AND PENETRATION TEST
UNIFIED SOtL CLASSIFICATION SYSTEM(USCS
M/UOR DNISION g��� TYPICAL DESCRIPTION LABORATORY CLASS�ICATIOH CRrtERU1
CIEAN � GW W�GFADED GRAVELS,GRAVEL-SAND Cu=1D60/D10)greater than 4
MIXTURE.LITTLE OR NO FlNES ��R�� Cc=(D302)f(D10'D60)betwaen 1 and 3
GRAVELS
PERCENTAGES OF
� GRAVELS (Idtls a no GP �' POORLY GRADED GRAVELS,M!D GRAHQ-SAND� GRAVEL AND SMD NOT MEETiNG ABOVE REQAREMENTS
• ��,�pg 7h��q lr�ea) MIXTUFES LJTTLE OR NO FINES � FROM GRAIN SIZE
COARSE- ��eG� DISTAIBUTION
GRAINED SOILS���Than No.1 CURVE ATTERBERG LIMTS BELOW
�Ve) p�qTy GM SILTY GHAVELS,GRAVEL-SANaSILT MI%TURES �; 'A'UNE.
GRAVEIS : ���� or P.1.LESS T}UN 4
��. OF FINES
(wiTh SaM � OC CtAYEY GRAVELS.GRAVEL-SAW-CUY �'�,,EXCEEDS 1296 ATTERBERG 11MT5 ABOYE
fnes) i�6XTURES �! COARSE C,HAIPED ' t 'A'LINE.
gq�,qqE a P.1.MORE TYi/W 7
SANDS wELL GRADED SANOS,GRAVELLY SANDS.llITLE� Cu����5� Cu=(060/010)qmater than 8
CLEAN SW OFi PIO FINES Cc=(03Uz)!(D10'D60)betwaen 1 antl 3
SANDS
(Abre Than F181f
���� ���G� (ktle d rq SP POORLY GRAOED SANOS.GHAVELLY SANDS. <SX Fne Grairwd: �,�pT IaEETING ABOVE REQINREMENTS
W��� SmaMarThan No.4 �� IJTRE OR NO FlNES GW,GP,SW�SP
TTan Na 200 �'e� ' ATTERBERG Li�ATS BEIOW
Sleve I >12X Ffne Grek�
pqTy SM SILTY SA1103.SAN6SILT N%TURES Gµ�S�� C��� 'A'IJNE
SAN08 wilh P.I.LESS THAN♦
� FlNES
(��» 5 to 12K Fns EXCEEDS 12% ATl'EROEHG WytfTS ABOVE
�) SC CLAVEY SANDS,SANOCLAY MXTURES GraineQ:uee 0ual 'A'LYJE
syrt� wRh P.I.MORE THAN 7
LiQuiy limit INORGAI�NC SILTS.ROCK FLOUR,$ANDY SILTS
SILTS <50�6 � OF S116M PLASTICITV 60
(eewY.a-Line on �--
PLASTICITY CHAqT �'�
FlNEGRAINED P����
����)� LiqtiO tgnil � INOfiC311MC 311T3,NCACEWS OR � �SOIL PASSINO
SOII.S >50% OIATOFMCEOUS,FlNE SANDV OR SILTY SOIL NO.40 SIEVE
� CHaOH '
INORGANIC CLAVS OF LOW PLASTICRY, x qp
CIAYS L��� Cl GHAVELLV.SANDY.OR SILTY ClAYS,CLEAN �
(A6ae A-L'ne rn CLAYS 7s
I Plaaicily Chart. } �
r.�,a�,�,�„k1 �q�;d umn iraac,�Nic cuvs oF�ncs►�aAsncm.F�T t
>SOX � Cuv3 V CL a Ol.
y �
1Aore T�an Half bp �
WeigM Smalsr I Liquid Lmit OR(jANIC SILT9 JWD ORGANIC StLTY CLAYS OF M1 a OH
TT+an No.200 �dRGANIC 57LT5 6 <50% � LOW PlAST1qTY 10 �
' S� CUYS _ 7 ML !
I I�A-tine an 6
' ��r�� �0�'"' a., o�u�rc cuvs oF►acir+Pusncm °
'. �509� 0 10 20 30 10 80 70 BO 90 700 710
i
LIOUID LpN1T(%)
� HIGHIY ORGMIIC S01LS Pt PEATAND OTHER HIGHI.Y ORGANIC SOILS
SOIL PAqTN;LE SIZE
QENERAL OUIOANCE OF SOIL ENBNIEEitlNO FROPERTIES fROY STANOARD PENETRA770N TEST(SVT1
U.B.ST/WDARO SIEVE
��� Peping Rstainsd SANOY SOILS s�rr a cu►ver sons
Sisv� � Sfsw � aar Reiawe Fricnm Bbw �'1CO"�"�
(�) (mm) Ca�s Densiy Mqle Oexriptia+ Ca� Strenptti � Dwcrbtlon
SILT/CLAY �200 0.075 N � �•�� N qU.tsf
$�Q 0-! 0•15 I Very Lmss <2 c 0.25 Very soll
FIWE !40 ! 0.4� M200 Q WS 1-10 15-35 28-30 LOOse 2-4 0.25-0.50 SOR
MEDIUM t10 ; 2 a40 0.425 t0-�0 �-G5 28-35 MBdit)n DenS6 1•8 0.50-1 00 Medium SIiH
COARSE f4 4.75 t10 2 30•50 66-85 35•42 pwr� B-16 1.00-200 Stitt
i
4��, >50 � BS-100 3B-48 Very Oense 15-30 2.00-4.00 VBry Still
FINE 19 N 4.75 >30 >4.00 Flafd
CAARSE 76 19
CO�LEB 78 mm W 20.7 mm
Group Northwest, Inc.
eouwEns >za►mm
Geooecr,nical B,pt�eers.Geo�ogists.a
ROCK F11vYO�Y1BfIFdi SceNisb
>78mm
� 132<0 NE 20M Stteet.Suis 10 BeMerue.W A 98005
ROCK >0.76 tubic meter in vWine P��°(42b)6�98757 Fax(a25)W9�8758
PLATE A1
TEST PIT NO. TP-1
IOGGED BY AW TEST PIT DATE: OS/l5/2009
DEPTH SAMPLE Weter OTHER TESTS/
� ft. USCS SOIL DESCRIPTION No. 9` COMMENTS
t
MI,, Dk Bmwn topsoil,SII.T,loose 3_1 Probe 5-9"
--- ---- --------------------------------------------------
�, Brown sandy SQ.T with pavel, fine-grained,moist,loose to medium S-Z �0�41��
��� ---- dense S-3 Probe 0-3"
Gray gravelly silty S,0.ND with cobble,dense,becoming very dense at
!_ 5 S�1 3'bSs(unweathered Ta.L)
�
� Total depth of cest pit=3.3 fePt bgs
No groundwater seepage observed
10
f5
TEST PIT NO. TP-2
� LOGGED BY AW TEST PR DATE: 05/15/2009
DEPTH SAMPLE Water OTIiER TESTS✓
ft. USCS SOIL DESCRIPTION No. 96 COMMENTS
` NII, Dric.Brown Topsoil,SQ.T,very loose Probe 30"
--- ---- --------------------------------------------------
i rq., Brown sandy SII..T with some gravel,fine-grained,moist,loose probe 10"
1
--- ---- -------------------------------------------------- Probe2"
5 gly Gray gravelly silty SAND with cobble,dense becorning very dense at
4'bgs(unweathered T'Q.L)
Total depth of test pit=4 feet bgs
No g�oundwater seepage observed
10
i
15
TEST PIT LOGS
WFSTON HEIGH'I5 PLAT
Group Northwest� �C. 684&650 MLE AVE 1�IE
ceomcndca�e,gneers.c,edopsn.a RENTON,WASHL'VVGTON
Env.orrrerfia�Scwntlsb
JUB NO.GZ8B42 DATE 2/6/15 PLATE A2
`
l
TEST PIT NO. TP-3
- LOGGED BY AG TEST PIT DATE: 10/30/2012
pEPTFI SAMPLE Water OTHER TESTSJ
� 1t. USCS SOIL DESCRIPTiON No. % COMMENTS
14II, Dk.Brown sandy SQ..T(topsoil),moist,loose to medium dense S-i Probe 3-6"
--- ---- -------------------------------------------------- Probe 2-3„
, MI. Gray gavelly sandy SII.T with occasional cobble,dense,becoming S"2
very dense and cemented at 3'bgs(unweathere�TIl.L) �O����
5
Total depth of test pit=6 feet bgs
' No groundwater scepage observed
10
15
TEST PIT NO. TP-4
LOGGED BY AG TEST PIT DATE: 10/30/2012
DEPTH SAMPLE Water OTHER TESTS/
ft USCS SOIL DESCRIPTION No. 9L COMMEHTS
N[l, Ddc.Brown sandy SII.T(toQsoil-forest duf�,moist,very loose to S 1 Probe 12-I8"
medium dense
--- ---- ----------------------------------------------- Probel-3"
--- S-2
� Tan and motded sandy SILT with occasional giavel and cobbles,
dense becoming very dense at 3.5'bgs(unweatheced TII.L.) ���l�
S
Total depth of test pit=5 fcet bgs
No groundwater seEpage observed
10
15
TEST PIT LOGS
7� WESTON E�IGHTS PLAT
Group Northwest, illC. 684&650 NQ.E AVE�IE
�� Geotechoica�5g�eers.Geo�oqists.6 RENTON,WAS�IIl\GTON
Erv:mr�l Scianma
JOB NO.G-28842 DATE 2/6/15 PLATE A3
TEST PIT NO. TP-5
LOGGED BY AG TEST PIT DATE: 10/3d/2012
DEP'TH SAMPLE Watsr OTHER TESTS/
R. USCS SOIL DESCRIPTION No. % COMMENTS
�,[V Dk.Brown silty SA:VD/sandy SII.T(topsoil),mois4 loose to medium Probe 18-24"
SM dense
--- ---- ---------------------------------------------- Probe<t"
"" S-1
� Tan gravelty sandy SII.T with occasional cobbles,cxmented,moist,
dense to very dense(unweathered TII.,L)
5 Total depth of test pit=3 feet bgs
To groundwater seepage obsrned
10
15
TEST PIT NO. TP-6
LOGGED 8Y AG TEST PIT DATE: 10/30/2012 �
DEPTH SAl1APLE Water OTHER TESTSI �
fL USCS SOIL OESCRIPTION No. 'Xo COMMENTS
ML L)rk.Brown to red-brown silty SAND/sandy SIL,T with some gtavel and Probe 4-10"
I ;
--- occasiunal cbbble,moist,loose to medium dense
---- ---------------------------- Probe2"
---------------------- S-1
SM Brown to tan and chen gay graveily siIty SAND,dry,dense to very S 2
dense,cemented(unweathered TQ.L)
5 Tdal depth of test pit=4 feet bgs
No groundwater seepage observed
10
i
i
15
I TEST PIT LOGS
WE.STON HEIGHTS PLAT
, Group Northwest, In�. 684&650 NII.E AVE NE
� Geo�ecnnica�5qneers.Geo�opists.a RENTON,WASf�INGTOri
,-- Er+v:onmenlsl ScieMbes
JOB NO.G-288+-2 DATE 2J6/IS PLATE A4
TEST PIT NO. TP-7
LOGGED BY AG TEST PR DATE: OJOS/2015
DEPTH SAMPLE Water OTHER TESTS/
ft. USCS SOIL DESCRIPTION No. °�L COMMENTS
� Dk.Brown to orangish brown gavelly sandy SII.T,moist to wet,loose Probe 8-16"
S-1
--- ---- -------------------------------------------------- Probe Q„
�,� Gny/mottled gravelly and cobbly sandy SQ..T,wet,dense to very dense S-2 Probe<l"
(TQ.L)
5
Total depth of test pit=4 fcet bgs
Perched goundwater seepage at 2.5 feet bgs,on top of unweathered
glacial till
10
15
TEST PIT NO. TP-8
LOGfaEO 8Y AG TEST PR DATE: 01105/2015
DEPTH SAMPLE Watsr OTHER TESTS/
ft USCS SOIL DESCRIPTION No. '1�. COWIMENTS
ML, Dk.Brown graveily sandy SII.T,moist to wet,loose to medium dense Probe 1-2'
--- ---- -------------------------------------------------
S-1
Grey/mottled gcavelty and cobbly sandy SII.T,wet,dense to very �O�1�
�' dense('TQ.L)
S-2
5 -bxoming sandiedless silty at 3'bgs
Total depth of test pit=5 feet bgs
Perched�ndwater seepage at 2'bgs,on top of unweatheied glacial
till
10
15
TEST PIT LOGS
WFSTON HEIGHTS PLAT
Gtoup Nocthwest, I�1C. 684&650 MLE AVE NE
ceoee�.w+ry eqi�aa.s,Gso�d�a RENTON.WASHII�iGTOIY
Erniorrren►al ScixNsts
JOB NO.Cr28e4-2 DATE 2/6/l5 PLATE AS
TEST PIT NO. TP-9
LOGGED BY AG TEST PR DATE: 02/05/2015
DEPTH SAMPLE Water OTHER TESTS/
ft. USCS SOIL DESCRIPTION No. �G COIu1MENTS
� Dk.Brown to orangish brvwn�ravelly sandy SILT,moist to wet,loose Probe S-I8"
--- ----------- --- S-1
--- - ------------------------------------ Probel-3"
� Gray/motded gravelly and cobbly sandy SII..T,wet,dense to very dense Probe<1"
(TII-i-)
5 � Gray gravelly sandy SII.T/silty SA,�ID,moist,very ciense
SM
Total depth of test pit=7 feet bgs
Perched groundwater seepage at 2 feet bgs,on top of unweathered
g[acial till
10
15
TEST PIT NO. TP-10
I LOGGED BY AG TEST PR DATE: 02/OS/2015
DEPTH SAMPLE Watsr OTHER TESTSI
R USCS SOIL DESCRIPTION No. % COMMENTS
ML Dk.Brown gravelly sandy SIL.T,moist to wet,medium dense Probe 3-6"
--- ---- -------------------------------------------------- S-1 Probe 2"
Gray/motded gravelly and cobbly sandy SII.T,wet,dense to very �Obe 1�
�'II- dense(TQ.L) S-2
5 -becoming sandierAess silty at 3.5'bgs
Total deph of test pit=5 feet bgs
Penchod goundwata seepagc at 2-3'bgs,on top of unweathe[td
glacial till and atinterface
10
15
�
TEST PIT LOGS
WESTON HEIGH'TS PLAT
Group Northwest, Inc. 684&650 NII.E AVE NE
Gewecnnice�5+qiieers.Geobp►sts,a RENTON�WAS�VGTON
6iviomiMKB1 SCenhsb
JOB NO.G-2881-2 DATE 2/6/15 PLATE A6
*i� '�;r _� � � � , I � � �
� � .� � � � �
� �; i �
� 4 i . � -_ �
� > �� � :
� � � - . � :
. �` ! � � �
, � �
� . � �4 �, . . , �•.aceas, urumes
� , . _ c�•�►� � � ; I
',� �,►• � } - : � - '' -' ` i
, ,i'. . d• ��,u�,ri v,�u,�t, �_� . (
J-� � i� ��e c..Yer+eeKr —_ ,- � l
; ,
° r `�
. .
� . � , f , _' .< - . . , t'+ , 9 .
_.� �� _:� � _ . . • , , ... �t �- :
�. � _� . � � � �
� _ . . `.�0� .�'r� .. ^ . - `�t �— � - •
1 � . - �' ' . .- -` n r_ _ / ... - �` _ �
_ r���, r��.� �—..��` Q ~'.. � �' � �`'# `\ � , 1 � - --}�— n� S, _ �
'�- _ t ` � i '` .� • . 1b - . ; f . � _ Z . .,--- --1 i
��. _ ._, r , . � I ' � � � � 2 I � ; , r:4 : �,, � ,' 1 ,- � ; /
�. � � �{ ` � i+a I � �� �� . ' .. � t , � � � , a :
' _ 4 .{ .��.�nu� I �,�n�� � �3. � ,y� ��a,ve�� �.�3 f �� , f ' ' Koc+�.rr raa j'- �' $ '' /` �
� � f r ' I � • • " � ls�w�rd � 1 �G7 iF.) - � r , � � aw.r cw • }, ;. �
� � _ j � _ � �.�
i < " - �� _��. � l� ��._i_ t""_ �v '` �', -3 �` '" � f - �� ��� �' _ .
� � + lt �� .....� ��`J � �' f��f � ' / � �. _ �_ .� /, � � � � ----------�J t � � ,
# — r f �� - a�" � l `�TP-7�
� � � , i 3� ���+�� i� � � t � � c _ _=�..____.+a3� _,�
� t ', ,, . . ••� �*� � - \ � 'I 'S. .t. _'� • i y(��� �4 `� . � i�_ '� } �, ��� �•.
� + .\� � � '�j ? '` �^�� • �` ��� �� � � � .�.�. �� ,: '-� �� `.� •~,�r.> > � , ` I � ' ..
� , . ���
r ��- . 1 �� e � � ' 1 1 - ! �
� - `r, �:i - TP-1 .,.� � �� � , � � � r � . *; �s• eu�e u�� ,_ � o,p.��:�a, ` . . .
� �
°� � - ; � ~ �y. • - : L..—_ ` .� � \ ,' _,• t2�.sea s.�.� ,� ;,r rw _� ,� , ,
ti � _:.� •,,, �� i ;
'r ; f ` - 'r"� _ � � lp�-�'�+r.+►�T�t - �. - .�
. rF' �� � ``,. , + , � S.-_� ���.� _ � � f � . .-. t��- � r � , ,l�i.��.�^• —��i 4_� _ • .. '- • 'r • y�' ..
i �. 1 � � �-- � �_ ----- -� ',
` � — '' � 5 1 � -. ', ��, . . . . ,
� ; ; ' Tlq,l�T A . � � / a.�nr ce� � - -� —— ——14T'— � .
� : • �� �ra�.�,�os. _ _ _ '� •�os rr cw � �p�� . � .f�I -
�. ` �� � � � .. ���. ``� � h � �..� �'. �� �' '� �.. �. � e i i .
_ ti .r � +�. � '� _ ----- ---- `/ , �' �� _ � .
� _ • - "► `� '� a• . r -9 . I � _. ,
� J • � t , , �',._� L � � /�. G r t � � 1� ,
, � � �� _2 �r �� \ b \ . �, `I � � j , .:
� , � � � ' t � ..,n �� 1 _ ''�, � "� �^ .
� s .-� ,-� ( h! � s.�.. .�rw � 'r�i � �� `- � _ __ /j` j • � � '
; � . +F. "' � ._J � �• ' � � � `�1 � r.
F ! •.- t� �w. ,. _��j..�.�� ` . ..
; � � . ; < _ - , :��� �o� y�,� `i = .` L --- �-- - --► `. �`
'�+� � t ho+s r �
�i . .� , . �— —+- —� O�i _TO 1 �.�� _t� �� '�-
' � �� � �� `�. ` . _., t 1 � _.r.J .'11µftR r !'� �'y - _� `-' .l • � �� • '
__ . ' � � - �, � � - '. -_� � —�,..�..r� � , . .: .
, ` , , t, _ -, � , � - �,
� �� � � g � _ ...R..��� „ TP-5 � � • �, � � •t� �TF-10 � _ � , '
; � ,r, .�.��� $ � � S� � - .�. •.r n.,. _ �:. _� r � T c
, s� •r n+� TR,4G -
. ;1 �sai +r rw � ��s, 1 � � '. ' ' 1 � � s.ma .�s ,`
� ", , I i - � � ;
� � + ,� �-`*-*T- __ �- -�J L----f- -! l D� �R'SM!`NT V1M1'�L �...- � ` , -
..�. � � � � — —=; -� — — — �- — �=— -- e�saeR e.�e�-+ea�rT ^' _ 1 1 _'_ �
,
y �
__"'j , ` �,�,` ` �,b. , ,.�� - �
� 'j- ..�-- �� , . �_ . , �3' . - .
� i ' � 'x. .' ' .
_
LE END �
._.�.�. PKc�3E c r_;:: u-���a-�
�� st� P�.AN �,;�-���. � �,;�;
SITF� PL:'1': B:�SED ['I'[�ti �HF.ET = 'j'EST PIT NUMBER AND � �JrOu Northwest Inc. PROPOSED V4ESTON HEIGHTS PLAT DR,�V4ti. A
FO1 BY Ci�R� [�ESIG'�, :��'G. ?Qt4 � � 684& 650 NIi.E AVE t*tE CHECKED: V1%C
P-� �PPROXIM:4TE L�CATIC?N �� "= ��E=����,�.���.�, ��
��s �,eo:s:e.sas�s' ��x a_�eav_x,�s RENT4?v, �t'ASI-IItiGTO'� SCALE: 1" = �{1'
F�.,,�nf�Q�^.�� P LAT E: 2
_ ` I
� , � �
� -} � � �, `
_ � '
� �
: , �
� � _ � ;
; .
K.,��s , �
uxet.n� � � ' � �
_ �� ' CQMEGT TD fJC
c�,r+eR. c.+e�r� 1: � � y � i
�' ; ----- � �.� � � ' �
r . �
� , ,
;. _ � _.�. � � j
_ ; � -�� �_ � ,
�� � � ;
C y � ., ,r'�, � , `4 -_.
. i } � � _ , _
_ .
* ,
- - , .
, � � --- ,
' — � _. � ._ .�"" _ . �
..- � 's
,
i �� —
�... r ��—� �� .� � . . ' :
� � - -_���� �..._ �s`l ; ''� t..
j � ' � � r � I ' . a � - .. . } I � � ..�.��'�i_v_.._.�e..�� � ��`��`::� �
Rr Z -�� � p ,a•� i .�....._^ �'" � . s� � ., .
(I
i 1 �'•
1 ! � 1 I ' � `> !
�! �tt ru�1P8�r�G
�t[ Ut'�'� t. �' � � l� t i \ 4 'ie4_ .�!urt��olt�D'rs = f � � � I i
'`� � r i I 1 1 $ \ � �-� TO*iE ltN rt,.00E, !' � � �` ; .
_ � ; �
f P,10 � 1 ---n-r �s3�E a � � �
� : t � P.f�1 � L ' '
; � t 5!!S � R+Lf! � a �StdtJ . } �, " �' �F' � } � �
�- i . � `, � SXlC3 • • °
� _f 1 r " r +
. . . 1
i 'Q :� : �. ' - - I ` , • t ' .
PAtI � � .
til • , � _J � � � \ � -��_� ..,-- ` � Y. � �
.
, �� �
. `� •� �.�?_ --._ � t F
` J # � , R«?9` `\"`�-,,,� i r- -r /�`-� ,�!"'' � • _ �ir►vED�T1T) F �,t I '�
� � h�i �.
i � � , � r � , `' �- - � ' �� -__________- --�
. `, i - __, �^ ; {'
, A =
:. ' S, . ��! �� 3/.f'iii►TE1[ � . � l P���
; : _� �# . _�. �_s.�,.�. +�� / �ER CTTT3\ '.� � � � {�,. �._�-- --__.�-----� I i= ���,
�
,
« i; ." , - ,--.: 1. � � -� ! . . \ _
. -_
1 n . � � t � _._ � � T � f ,, * ' �� �
\ " �
�. �� - , - � � ' z � I`
_
'� t'.Atl I __571�` _ �
- � �---- � �._�__ � ` � �
: ,; � �j� .,,,,_ Sld 0 2 _,C � c '�" `j `- � 1 _. � �!O'!fMev,�TE � � � i
.r..�1�ECT T " 1 �-.r �. �. . � 4 �. lTAM'E�Al�'�_'�.. ` �
-� ' -r
fx 3'�TER , , ,. 1 6T�C�!'f1� '�s`.,
. . � � i �.wa�tr � � , . �
,iim.��T T . ,- -: -� -. , __�_..._ - -+ �- � - - � � � -
--- I � " '
_ �� r. � -___�_��.�_�� � • � '` f, ' a�.�s� � �' i ;
;, � � , n
� " -�--- - - � , �`!� ��° , -�
�� � � � � „ ,,� ��� r___� ___.�__-� � � J . � � �.�+�� � � �� �
, _ 1 ,
R � r ,' / I�1.1. 1 � � ��. � 1 1 ! t ! y �' ''� • 1 +SL�?YF T f � . �
__ ' 7 � -
` . _ `� : " ' lE ; � / PAD t �- } --��
� ' � . � ' - - ; i � ---___--
4 ti , st�o t , ,
og�.�r ` . ( � � � ` ; ` �•�R a�ue rnrr�i T�'-4 � �, z - --__--s__-�� i
� --
� art�l�t. ` i ` p� ; �,__---__-�__-� ' � ` . ' ` ;
f�3.�ILtT1' '� `-`�l _ � t . t" . ' . . -�� f ' � .� f
. • '
;i�iL T _ i � � Cl�LI ? ��� ��-------�, : �;0 � P_(� ` � ,` '
97ACJ' j� f L'��. j
' � � '_ --•_� _ �
_ ` ;
.6��6 ' � ' _ - f \ � �. � �. , 1
!t �! > � . B t P/11J �* �• 1 t
f �*�*'',� � ` , :i � � ,. . _ �, � sr�s o � ' �' p'�u' ' � E
. . -`-�'T :
; , , 1 ' S�U B�
� � � ���w P-�i ,r�4r� Y ; � �+�.,�.w�exc.ou�ca� ; ,, � '� t � -
; � :, . ____1_-�-_�_,.�,� ,�'� d ' 'a+l�'�'"'e`� _� � � ' ._ -- . ��r �� �.., � ;
. _ ' _ � ' �- -- —--__ .r : � -
i : � � � r '`, � `
,
T ,t � .
� �, [ ��+� o ��. ++f` 8 : car�wa� / '
_-- f �: ��- � � •� . �-__,__-� � �.�. _. jr_____- � a �. .�+... -
ner�
ai - -
� � ...
, � �
. > -
� ----^ —,,..--
• (
� _t``� , � •� � '^ � -- � ' e, (
.t f t
- ; .. � _ �l r` � :n
..,e�^'
, ; , S " ' � _ . ;
` a �;. � t ; a � x -- i�-� ���-S � �
1 � �'yi � • p� � t � � `
� + P+11J . � j '�{�
' � � s ` � � `.Nra j � �°� ; � Sid11 ,- °ti _ I � � i
"ti..° i , , � . ' SldC1« - ` � f f ( ! � �1� +�ip!'i� GEi.I 3 Ct�LL 1 E
.� ..
' �.. ; � �---�:��� �.____»__�� � _` � ! er -1
. "_�"---�-----' �` , t � � �
G[7�EGT t0 Gc�' --� � � � , _ .�. -:- �.. ` s �
� ._ .__ � `�i, � , i�+M�TI1R'T/E;�iR[TT1�'� f�'i�+ t!TT1 , E � � � '� v - �
� = _- � I FC�.� , � , � � I
�� ` _-. �
, � q �
' . . - �, �- . . .
�
' Gt�l+�CT!' DETL�V�I�+RY�►TE �;,
' ...... 1 Yi«IIILlE 7t� t t11l�t.tTfi�K�li'T � ' •�+
� � I"lti.�JL �. �'a�.00�'t.'�
""""�� GRAT�ItiG �A�I? L�"[`ILITY PL.AN I7ATE ',�f+f15
' iiR.AI?ItiC',�ND UTIL1Tl' PL�!+; ' = TEST PIT �tUTMBER AND �I� �J�C�Ll ��O��W�,'S l� 1nC PRO�'t,1SED WESTON HEIGHTS FLAT D�t��.:_ AG _
BASED UPQN SHEET P0; B'i'CURE � r,.__.,.� , * bt�4&650 NILE AVE NE CHFCkED. V4'C
nFs[c,v, :�,t��. �o�a F-1 �PPROXIMATE Lt�ATI�JN -= `;_ s������x�'-�`���:,,�� R���'ro�r, w'�SHItiGTO?v sc�L�: t�=>t�
���..-�,.G� P LATE: 3
il
� ,,
il I
I
APPENDIX 6B
OLYMPUS VILLA LUA 10-090
� i'
Weston Heights
Technical Information Report
. , i
� OLYM PUS VILLA
n LUA 10-090
n Utility Permit ##U110042
NE 7th PLACE and NILE AVENUE NE
Renton, Washington
Technical Information Report
(TY OF RF��T�^'
RECE�e� � ��.�
April 20, 2011 JUL 2 � 2011
Revised June 14, 2011
Revised July 18, 2011 PLAN REVIEIfV
Prepared for:
Camwest Olympus Villa, LLC F NTO I
9720 NE 120"' Place RECEIVED
Kirkland,Washington 98034 ��� � 5 2p11 I
(425) 825-1955 x-142 office � �: 3 � o�
(425) 825-1565 fax PLAN REV�EVII '�
Subrnitted/Prepared by:
o I
Offe Engineers, PLLC �
Attn: Darrel! Offe, P.E. �e s'r� A���
13932 SE 159"' Place f°N�$ � �v"
Rentan,Washingbon 98058-7832 ��
(425) 260-3412 offioe
(425)988-0292 fax
3 58�
�roject Description
; The purpose of this report is to present a final conclusion for the storm drainage control and
' treatrnent af this 11-lot proposed plat of Olympus Vlla in Renton, Washington.
This project is a proposed single family plat located in the Renton Highlands at the intersection
of Nile Avenue NE and (proposed) NE 7"' Street. The project also takes access off the existing
', road of Pasco Piace NE within the City limits of Renton.
The Olympus Villa project is a proposal to create 11 single family lots from an exrsting 6.72 acre
j (292,483 sq. feet) parcel zoned R-4. Appravals for the project aliows for Lots 1-7 can be
'- clustered using the R-8 zoning; and Lots 8-il are to use the R-4 zoning requirements. The
project currently consists of over-grown pasture land with sparse trees. �n the east side of the
property is a large Class 2 wetland tiiat extends off the property to the south and east. No
' work is proposed within this Class 2 wetland, mitigafion and wetland creation is proposed within
the bufFer. There are no existing build�nas on the property. The ex.isting King County Tax
Parcel number is 1123�5-9065.
L �� TfT@ p8!'C2� IS �70UIiC�Bd t0�'t@�'d�'S' b'y, "�;;? A�i��l�? �VE 'C t�a �"tor-�h by '�rq ��ar':c�rS .�. �h 5�^ylE
family homes; to the ea�r =r.�' - � -� ` -� } � , -
,,. . . . ,._,fi
� ,_ . . ,. , ,.
Review of Resources
Critical Drainage Are.� �'��
• Maplewood Creek Sub i
• Cedar River/ Lake Washingtc
Flood plain/floodway(FEMA) Ma
• There is -
Sensitive Area
• Wetlands-There are two wetlands located on the project; they consist of a Class 2
wetiands to the east side of the property that continues off site to the south and east,
there is a smaller Class 3 wetland on the west side of the property. See the Sensitive
Areas study prepared by Ed Sewall and Assoc. as part of the preliminary plat submittal
package.
• Streams and 100 Year Flood Plains-There are no streams or floodplains on �r near
the project.
• Erosion Hazard Areas-There are no landslide hazard areas on this project.
• Landslide Hazard Areas-There are no designated sensitive slopes on or adjaning
the praperty.
• Seismic Hazard Areas-The area is not mapped as a seismic hazard area.
• Coal Mine Hazard Areas-The property does not appear to be located within a
designed coalmine hazard area,
U.S. Department of Agriculture, King County Soils Survey
• The soils on the site are classified as Alderwood gravelly and ioam (AgB), 5 to
10 percent s�opes. These soils types are described in the Soil Survey of King County
Area, Washington (Soil Conservation Service [SCS], 1973). Alderwood soils are
characterized as gravelly sandy loam to a depth of 12 inches and gravelly, sand loam
with organics between 12 and 27 inches. This gravelly, sand loam structure is underlain
by weekly to strongly consolidate till to a depth of 60 inches. Permeabil'sty is moderately
rapid in the surface layers and very sfow in the till layer, runoff is slow to medium, and
the potential fo�erosion is moderate.
Soil Logs can be found as part of Appendix G of this report.
Flow Control/ Water Quality design —
The project would be required to meet the 2009 KC Drainage Manual (Modified by the
City of Renton)for design and sizing. The area is designated as Forest Condition pre-
existing condition. A wetpond shall be designed for this treatment.
Field Inspection
Offe Engineers has visited the site on several occasions during the fall of 2010 and winter of
� 2011. The most resent visit occurred the moming of April 20, 2011 as part of the downstream
� analysis. The weather conditions were dry, cool, and partly cloudy.
The property has two separate drainage basins both of which are within the Maplewood Creek
sub-basin; wester{y Basin A slopes from the extension of Pasco Place NE on the east towards
Nile Ave to the west, Basin B is the area east of Pasco Place which slopes towards the east and
southeast. Basin A flows westerly and collects into the roadside ditch along the east side of Nile
Ave. This ditch is very flat with a grade towards the south. A grade break (high point) is
located within the ditch at approximately station 22+00 along Nile Ave. The entire drainage
from Basin A sheet Aows into this ditch then continues south along Nile Ave towards NE 4�'
Street, approximately 2600 feet south. Along the ditch line are several cross culverts for access
and the intersection of NE 6"' Street. Near NE 6�' St. the ditch is enclosed within conveyance
pipes for about 150 feet then continues within the open ditch. During the several site visits, I
there is no indication of overtopping or capacity problems within the open ditch (culvert)
system.
Basin B sheet flows towards the east and into the larger Class 2 wetlands on site. The drainage
then continues within the wetland area towards the SE corner of the property and is coliected
with a bird-cage structure just west of Rosario Ave NE (structure #18575) as part of the plat of
Maureen Highlands approximately 700 feet downstream. This structure is part of an overall
drainage and pond system for this plat. The flow then continues within a 24"convey pipe into
large storm water pond (#P1194), 1050 feet downstream. The pond then discharges at the SE
corner of NE 6"' Street and Shadow Place NE into a drainage swale (coRidor) —which is along
the easterly boundary of Maureen Highlands. The drainage swale is heavily over-grown with
small alders and blackberries. A site inspection from the end of NE 6�' and from neighboring
yards shows no indication that flooding of structures is occurring within this carridor. Actual
' walking of the corridor was limited by fences and lack of easement. The drainage reaches this
corridor then continues south an additional 1250 feet to NE 4"' Street. No signs of overtopping
� or flooding appears within the Basin B downstream system to NE 4�'Street.
Photos of both these systems can be found in this report under Appendix A, figure 4.
_ Mi:.;.��:>_.:
The project proposes to use the 2009 King County Drainage Manual (with the City of �
! ! Modification) for storm water treatment of the targeted impervious and for the Pollution
Generating Impervious Surfaces(P.G.I.S.). The proposed storm water mitigation for this
development is ta: (i) utilize full dispersion of Lot 1 with a 100'flow path within the wetla�
buffer/open space; (ii) provide lot area BMP's for each individual building permit-consistinc
i ; 10% of the lot area of impervious surface. BMP's can be sheet flow, gravel trench, splash
blocks, etc.; (iii) provide a water quality/detention facility <wetpond> within Tract A; (iv) se?
aside 30% Open Space; {v) provide 10'perforated pipe connection to storm system. Other
� mitigations were considered -full Dispersion and/or infiltration are not available for lots (2-1
t '' The soils were not�onducive to infiltration and flow path lengths were not available for
dI$pe��inn Thn hinh nrn��rrl .n�ai�ar alatrati.nn 4niithin th� nr��a�^t limiharl fha t-hnirac !lf RMP'�
�_ the Ic _ _
Revi�
, King County Surface Water Design Manu�
� Offe Engineers has reviewed the Core and Spec:� :.��_: �.
_. ._ : _.._� __. _ _ . ._ .
County Surface Water Design Manuaf, and addresses each of the requirements as follow
�- Core Requirement No. 1-Discharrge at Natura/Lorallon
The current property has two points of discharge; Basin A -westerly basin-the property sheet
� flows to the west and into the drainage ditch along Ni1e avenue NE, Basin B-easterly basin -
'; ' flows east into the large wetlands then flows to the southeast corner(this drainage break is
approximately along the easterly side of the pro�sed extension of Pasco Piace NE). The
easterly basin -this area will be set-aside as open space with the only de�relopment being lot 1
which will utilize fufl dispersion of runoff continuing into the existing wetlands and flowing to
�` the southeast; the westerly basin-this flow will be collected into a wet pond and discharged
into the existing roadside ditch along Nile Avenue NE.
�r
' Core Requir+ement Na 2-Offsite Ana/ysis
There are no upstream basins that contribute to the site. Nile Avenue IVE has a ridge line (high
, point)just to the north of the property. This properly appears to be the northerly extents of
; the basin on N91e Ave that flows into Maplewood Creek. The wetland to the east is proposed to
be left un-disturbed with no changes occurring in this basin,
Core Requir+ement No.3-flow Cont�n/
The proposed project wil! be required to provide detention for the impervious areas.
A storm water facility is proposed on the westerly side to collect and discharge flows per the
, 2009 Manual. Afl the proposed roadways onsite (NE 7�' and Pasco Ave NE) wiEl be collected and
conveyed to the sto�rn water facility. Lot 1 on the east wilf utilize full dispersion with a 100 foot
flow path for flow control within the easterly basin. The pond was sized for the impervious
runoff of: Wetpond area = 9,583 square feet; roadways/sidewalks/driveways = 31,509 sq. ft.;
and from lots 2-11 = 36,000 square feet (OR 3,60Q square feet average). Note: the impervious
area from lots 2-11 is area released to the storm conveyance system. i0% of lot area
impervious surface sha11 be mitigated on each lot reducing the amount being discharged into
, the pond. Lot area for 2-il = 73,297 sq. feet; (10% lot BMP = 7,330 sq. ft.); maximum
' impervious of each lot 4,Q00 sq. ft. = 40,000 sq. feet. Therefore, the maximum impervious
from lots to pond would be 40,000 -7,330 = 32,670 sq, feet. Pond was sized fo� �.+��� sq. ft.
Pond is oversized.
Cor�e Requirement No, 4—Conveyanae S�stem
The proposed on-site conveyance improvements will include curb, catch basins and a pipe
network for collection of surface runoff from landscape, driveways, roadways, and sidewalks.
Ro�f downspouts will be connected via tight �ine to the conveyance system.
Core Requrrement No.5—Erosion and Sediment Contro/
A Temporary Erosion and Sediment Control Plan implementing the Best Management Practices
will be designed as part of the final engineering plans for the project in accordance with Gty of
Renton requirements.
Core Requfrement No. 6—Maintenanae and Ope�ations
The Maintenance and Operations of BMP's can be found within Appendix E. A declaration of
Covenant shall be recorded on the plat to aElow for inspection and maintenance of storm water
BMP's.
Co�e Requinement No. 7—l�'inancia/Guarantces and Liabi/ity
The �inancial Guarantees and Liabilities will be required prior to the project being finafized by
the City of Renton.
; Core Requinement No.8—Water Qtra/ity
� � The project will provide water quality treatment as a wetpond within the stormwater facility
located within Tract A. Two water quality cells are provided: Cell #1 providing 3,450 cubic feet;
and Cell #2 provicling 6,440 cubic feet of treatment. The calc�lations for water quality
treatment can be found in the Appendix of this report.
Specral Requirement Nv, 1—Adopt�ed Area-SpeciFc Requir+ement_s
There is no special overlay or requirements within the City of Rentor
Specia/Requir+ementNo. Z—P/oodplain/F/oodway De/ineat,�
This requirement does not apply.
Sp�ecia/Requirement No.3—Plood Protection Faci/itres
This requirement does not apply.
Sp�ecia/Re+quir�ement No. 4—Sourc�e Contro/s
This requirement does not apply because the project is located in the basic water quality
treatrnent area.
Spec�ia/Re,quir+ement No.5—Oi/Contro/
This requirement does not apply.
Spec�fa/Requirement No. 6—Aquifer Protection Area
The project is located outside the zone i and 2 aquifer protection areas,
APPENDIX
A - ORAINAGE CONTROL PL4N
B-STORM WATER CALCUL4TION5
C-DOWNSTREAM REVIEW
D-GRDUNDWATER PROTECTIONAREA MAP
E-ORAFI DECLARATION OF COVENANT-Inspection and Maintenance
F- TIR WORKSHEEI
G SOIL LOGS(by Associated Earth Sciences, Inc.)
Z
�
I �
�
�
U
�
Z
ti
O
Q
__ - --- — i___ �- , , —, --- -- -
, � - ---i, r--, r-----, �-- � ,_ , -- �--� �-----� �
- -� �
i
PORTION OF THE NW 1/4,SW 1/4 OF SECTION 1 t,TONRJSHIP 23 N,RANGE 5 EA5T,W.M. �
STORU NNi�R 1A�p�GEMENi NQf6: ��., o¢sru�c uru.r.v�wno�a oo��a rc a
� b)���a w/�ppry�w uo� N)M�p�1 I�p�1pN■�vawc �wmmurz o��. R Pr1l t nc qN� `a�
�,111Mrm Mp�OOOC IOt WIIMV,IQ AI�V�MIU1 A M O?�� �I �T rti RIOM[IIC OGCf M p
IVM N G01 lOf OY�L YCIOIIY��M�RPO. � 101fIDrtAL lfUiOl R YL OCRM VO�YN b
��aas.m ro�orx mnnu[roi ia �
(p�w�on�ean�n.rr wt�uRmo �I �ru urMi.�nwr�u oos�ooa q�o r
�i �m�ai.a na���sow a unirm $�
o ��w�..�is�n r�na.ownici.r .a. � ... uu�cac w ss�+r-�evs �6
b� �� �� �� �€
� n v ��.dv ���
c�
y � _4
,��� � l �i �,``,---- � �r �
��� I ° ' ' ___ �
�., , -
a+ `�__`_ 'i � � d' � 1/�I
ir I�r � � .V. T .Mw
�Y ♦��� I SECTION A-A �
��(( �, r
O� � .�rrv �"'{yrY�_ �!!t_ . .�r WqR w L �
Z0q 2 � �
�C � � � ��. . r�Q1' llOi- �€ �
��L_ �~`� 10�u0�R r^!l� �
I : V
'�� �E�IQ�� l _ � .mFnr.r A ~ ����3
�� �s•`I � �,. �i � w@� � a s
. " I O
r �
��i Ilf� _�__7tlL-�r.R__.1� �_...�-...��.1�_�_�.,=_f'�y__ _�-
i P�0�ACE/E I R Y If FY
a •��...� � � d e
A
�� �lr' M ���{
�
1
eac►uDuc nc V �
i t �r..
v u�..� ����}�i'13i�"� �^ ra � .�
wMe�K Na�or�wm vac �yr..• .�...�,.� D e s m LL'
' I ��� ���� �w'dnl K4� iNt M O�M Q �
� IF��I.\�ILN.��I1f11• �0 0 �0 b M r�' a =� n-
I � r.ew Puce Ne je�cnorq. — � ]
N?a. bvazanw tdr N ►r rw� °6
� � J � �
I a .. ` � �. R "'� a p a
0
�� � i � � � �W �
,o � r � .+ .-y r� - �I �,• S �
� i � _1 S
i I �, � C ���r � � I � Q �
� �w I��I _ 4.:�r. �r �. '�'j. w+ + i .. . �. �w; V ��
...� �. niu.r«.�++. � � � '�� � � � .
v►w ; �
� ..... : � .. �..�r.w��. � . .n' oa[ w+nw' i
��
� 6 �6 � b t� ' � a�.. y� 1
wa xa
�� �W nqw II�Lf K � .l.. �. 11Mf_. �M� hf_.Iw� .ML Ml�L K�� V
•
I � �' — 5 � 9
JI
I �
--- s C11'Y OF �LYYVUS NLLA PUT (w�io-000) m�s„
� RSNTOTi unun a�R iiooaz
- � �,�,��� - l
ia — �ava+ w wE .n� � rr..�....mr....n
• • �
)
� i ; ! I ! i '� p
h
�
� --�r�� � � �� � ---- -R----�- �
r �� �� �� '- -
� � �I,�►� t . �
z � � ' ' �
� i � , , I
� ;
y � � � 6 � - ....�
i ;r � � :
i
tr. ._ _ i � � .
i �
�P � �� i
- .�.. � - ' � � � �
; y ( _;
� � �'� 4Z 1� e � � �
l �
I � i E�� ��� �
; � i i� �.. ....._..... —; � �
� � ,� = � �
!f , , :
4 � L� 7� �� � ~
i ! li � �i� � • : 1 Z .
� �Ir ♦ i
i I i ..............' O I
i i �� . � r i
�� i � � � I
�
; i ��f� � i � � m
i � i I �
� �
' �� r .., � � 1
.......`
K � I
� -� ���� �...._ _ � � �
� �,�� � ,
d � A
� ��
� �` a ' �+i� � r, � �� .
� � I , r �'' �::... l ���£, �
.
_
t c � � . ��� � � ........
, �... � , z
, , . .. ., .
�� � � �;� � :................� ' ���'a ;
..,:• � . _.
� � �
�l �. T� � ,' � ... �
..
# � •.i ; I i r E ` : ' $� . _�
. � ' I
•c e �a I;� . � i ...� � ,n .
� i
� F �` §���j� �
I N
_ , �,� � � ,� �
a � . : 2 �
ti # �� ....._..._. : ' � � 21 � .
�
��� . .._..�,�--� �: Z �
x � _ ' � ��
� , * c�
's�i'1�7 ' i � � � ' {A�
� �� _ m
g "�� D
i � i... r� ... .... � .
' i L � � ,
� • • � 3
� e
a
� ` � — � ' � �
�
' �a� ....� €������ ; a a a a � � � � � � I
1 3 7 � I 9 � � � ��� ; ;� 3�i� F �
3 4 ; ; � � ��� . q3 �� �
iI � S� " �i �� ��S � � �� �a�p���R�
I lf y� �� � � i S�� q �S �--j
I � � aI p4
� • ' °i"'i �� � �� �eeNN � i �� 9p ����F� ' .
F 0
� � � � � � �g ���i��� � �� ��g���
� s s � � � 9 •5 �iE���j � ��� � � i
i : u � � a t
. � z
t
� � � a���
�
� � � �
�
�
� � � ���
, � OLYMPUS VILLA PLAT • OFFE ENGINEERS �
m ����� �
�����
� �I �� C�AMINEST OLYMPUS VILLA,LLC ��^ ,r �n`
ROADlSTORM PLAN&PROFfLE , ,� � '���
I I �
I
_1
,---4 .... . . . . .
� I
B - STORM {�YA TER CALCULA TIONS
, �
'�� ;-
� I
� �
�
,� ,
, r
„
W
2
� \
2 ` —
.�I ` � ____ ____—.'_—__ '—__—.___-'_
��M
0�[��oP� �j
+�•�"� p�E_pEVELOPE� SU8 BA�`N B � \ _
V�►
I V
� `�.
` PRE-���,OPED SUB B15� B
� c�_ <�.
2'��
`
� � �
I ^"�,^� __-�_ _
J' - _-
� �.
� `� �
4 ��""
_,
SUB BASIN DELINEATION MAP
2
� �
�
ti L��
�
2
�
.,--..�..�...»_
.� ���rmi�nv
IIAY CJm(MAl
(1/ME MYSIf1010N)
a��� : PRE-DEVELOPED SUB F3ASIN 8 � �
wr�w000 a�x salw � \
� \
���ri�n.w �.
f� �
W
� � �
�
e
J �
�
� _�
�, J�I.
��
� '2
oy,
�'
��z
PRE_pEVELOPED SUB BASIN B
�
�
�, FLOW
� � -- .. --_.
F I
��
. 0. p�r�
�
BREAKDOWN OF BASINS
Existinq Site Conditions
To1al Till Till
Area Grass Forest Wetland Notes
Basin A 2.88 ac 0.00 ac 2.78 ac O.fO ac KCRTS Input Paramefers
Basin B 3.84 ac 0.00 ac 2.�16 ac 1.38 ac KCRTS lnput Parameters
6.72 ac
Developed Site Conditions
8asin A Total Max. Design Till Till
Area Imperviou Impen+ious Grass Forest Wetland Notes
Public RMI 49:144 sf - 24,444 sf 17,635 s 0 sf 0 s 8'Planter,5'Sidewalk,26'paved section
Sidewalkl DW - 7,065 sf 0 sf 0 sf 0 s
Lot 2 5,612 si 3,76B sf 3,600 sf 2,012 sf 0 sf 0 sf
Lot 3 5,455 sf 3,489 sf 3,600 sf 1,855 sf 0 sf 0 sf
Lot 4 8,467 sf 4,000 sf 3,600 sf 4,867 sf 0 sf 0 sf
Lot 5 7,013 sf 4,000 sf 3,600 sf 3,413 sf 0 sf 0 sf
Lot 6 7,013 sf 4,000 sf 3,600 s 3,413 sf 0 sf 0 sf
Lot 7 7,013 si 4,000 sf 3,600 s 3,413 s 0 sf 0 s
Lot 8 8,181 sf 4,000 sf 3,600 sf 4,581 sf 0 sf 0 sf
Lot 9 8,181 sf 4,000 sf 3,600 sf 4,581 sf 0 sf 0 sf
Lot 10 8,181 sf 4,D00 sf 3,600 sf 4,581 sf 0 sf 0 sf
Lo111 8,181 sf 4,000 sf 3,600 sf 4,581 sf 0 sf 0 sf
Det Pond Tract 13,199 sf 9,583 sf 3,616 sf
Totals(S .Feet 135,640 sf 77,092 sf 58,548 si 0 sf 0 sf
Totafs(Acres) 3.12 ac 1.77 ac f.35 ac 0.00 ac 0.00 ac KCRTS Input Parameters
Design 3.12 Acres
' Ma�mum Impervious:ziculaton-R 8;i5°k)for lots'-i R-��55%)for lots 8-�� The�reducing an a�citional �0`i�tc obtain maximum
�mpervious a'Jowed oy 2�09 Manual.
Maximum Impervious:s e ther lot area'max ailcwed by zoning CR 4.000 sq fee'whichever is less.
Sasin `A'-Existinq Sasin Conditions: Basin `B'—Existinp 8asin Conditions:
Existing Forest Area= 2.78 Ac. Existing Forest Area= 2.46 Ac.
Existing Wetland Area= 0.10 Ac. Existing Wetland Area= 1.38 Ac
Total Basin Area= 2.88 Ac. Total Basin Area = 3.84 Ac.
8asin `A'—Developed Basrn Conditions: 8asin 'B'—Develoaed Basfn Condldons:
Total R-O-W Area= 1.03 Ac. Remaining Forest Area= 222 Ac.
' (Assume 70%Impervious (Lot#1 fully dispersed,assumed forest)
Impervious R-O-W Area= 0.72 Ac.
� Landscaped R-O-W Area= 0.31 Ac. Remaining Wetland Area = 1.38 Ac.
� (Wetland Areas to remain undisturbed)
Tota! Lot Area= 1.74 Ac.
(Max. per lot coverave restr�ction) Total Basin Area = 3.60 Ac.
impervious lot Area= 0.83 Ac.
Landscaped Lot Area= 0.91 Ac.
Total Detention Pond Tract= 0.35 Ac.
(Max. water surface assumed imuervious)
Impervious Tract Area= 0.22 Ac.
Landscape Tract Area= 0.13 Ac.
Total Impervious Area= 1.77 Ac.
Total Landscaoe Area= 1.35 Ac.
Total Basin Area= 3.12 Ac.
Existina Basin Summarv: Develoc�ed Basin Summanr:
Existing Area—Basin `A'= 2.88 Ac. Developed Area—Basin 'A'= 3.12 Ac.
Existing Area—Basin 'B'= 3.84 Ac. Develooed Area—Basin 'B' = 3.60 Ac.
Existing Area—Totai Site = 6 72 Ac. Developed Area—Total Site = 6.72 Ac.
Q
�
m
�
Basin `A'—Existina Basirr Condifions
�� Land Use Summary __ �`�
_ . _ -- _ __
Area �
Till Forest 2.78 acres
Tili Pasture 0.00 acres
7i11 Grass 0.00 acres
Ouiwash Foresi 0.00 acres
Outwash Pasture 0.00 acres
Outwash Grass 0.00 acres
Wetland 0.00 acres
Impervious 0•10 acres
Total
2.88 acres
Scale Factor: 1.00 Hourly Reduced
Time Series: A-Predev.ts� »
Compute Tirne Series
Modify User Input
__ File ior computed Time Series [.TSFj
:!ow Frequency Analysis
:'i^�e Series E'ile:a-predev.csf
Froject Location:Sea-Tac
--Hnr.ual Peak F;ow RateS--- -----FlOw erequency Anal•ysis------
�low Rate Rank Time of Peak - - Peaks - - Rank Return P_ob
CFS) ICF3) Period
=�.19C 2 2/09/O1 18:00 �.203 1 lOC.CO 0.990
�.067 7 i/05/02 16:00 �.1?0 2 25.00 0.960
' J.155 3 2/28/03 3:00 0.1�� 3 10.00 0.900
025 8 9126/C4 2:00 0.151 4 S.CO 0.600
0.093 6 1/D5/OS 8:OD D.137 5 3.00 0.66"I
_.151 9 1i18/06 20:00 �.C93 6 2.00 0.500
0.137 5 11/29/OE 9:00 O.OE7 7 1.30 0.231
0.263 1 1/J9!08 9:00 0.025 P. 1.10 0.09=
-� --_ =eak= -._-� __.__ _."'°"`
Basin `A'—Develoaed Basin Conditions
r 1
� Land Use Summary �` , -"" I
- - - - - - -
Area ? i
Till Forest 0.00 acres
Till Pasture 0.00 acres
Till Grass 1.35 acres
i Outwash Forest 0.00 acres
� N� Outwash Pasture 0.00 acres
! ' �� 0.00 acres
� � Outwash Grass
i�l Wetland 0.00 ac�es
��� Impervious 1.77 acres
h� Total
� ,
��
, 3.12 acres
- � Scale Fador: 1.00 Hourly Reduced
�� Time Series: A-Dev.ts� »
i ' IIl
Compute Time Series
� Modiiy User Input
__ I� - -
— --- --- ---- -
�' File for computed Time Series [.TSF�
:loW Frequency Rnaly=:=
Time Sezies File:a-ce•s.-__
Project 1,ocation:Sea-'�
---A.nnual Peak Flow F.. -r _,,:: -.
Flow Rate Rank Time of Peaic - - PeaAs - - �.at;k ReLcrr, �c�.:
(CFS) ;CFS) Period
�.550 6 2109/O1 2:00 1.12 1 �OO.OD C.=
J.990 8 1/05/02 16:00 0.67fl 2 25.00 C.=�"
, �.663 3 2/27;03 7:�0 0.663 3 :0.00 C. - .
'.466 7 8/26;09 2:�0 0.582 4 5.00 C.-
�.569 5 10/28/09 16:00 0.569 5 3.OD 0.
�.582 4 1/18/06 16:00 0.550 6 2.00 0.-
Q.678 2 10/26/06 D:00 0.466 7 1.30 0.'=
:.12 1 1/09/6H 6:70 0.49Q 8 1.7� � �
- . � o� . _. ,._ ; _.
Basin `A'Pond Design
FacilitV DeRni6on
Type of Facility: Beten:ion Pond
S�de Slope: 3.00 H:1V
?�nd Bottom Length: 65.�0 ft
acnd eottom ➢lidth: 55.00 ft
Fond Bottom Area: 35�5. so. f:
:_� Area at 1 ft. FB: lOQ�S. sa. f=
0.231 acres
___...._,i.-v Stozage Depth: 5.75 ft
",�e 0 Elevatior.: 5i1.25 ft
;torage Volume: 34740. cu. ft
0.798 ac-ft
Riser Head: 5.75 ft
a:sez Diametei: '_2.00 inches
,,:;er of orifices: 2
Full Head Pipe
::_`ice # Height D�acoeter Discharge Diameter
(ftl ;in) {CFS} �in)
' D.00 0.86 0.050
2 9.35 i.88 0.1�3 9.0
Top Notch weir: None
-`ioN Rating C��rve_ None
Staqe�Sforaae/Discharqe Perfom�ance
Stage 3�e•�ation Storage Discharge Percolation Sur� Area
;ft) {ft1 (cu. ft) (ar ftl (cfs) (cfs) (sq. ft)
0.00 �11.25 0. 0.000 O.00C� 0.00 3575.
0.01 511.26 36. 0.001 O.00Z 0.00 3562.
��.02 512.27 72. 0.002 O.003 0.00 3589.
0.03 511.28 lOB_ 0.002 O.D03 0.00 3597.
0.09 511.29 199. 0.003 O.009 O.00 3604.
0.05 511.30 190. 0.004 0.005 0.00 36i1.
C.06 511.31 216. 0.005 D.D�S 0.00 3618.
0.07 511.32 252. 0.006 �.D06 0.00 3626.
�.17 511.42 618. O.Oi9 �.D09 0.00 3698.
�.27 511.52 992. 0.023 �.011 0.00 37'12.
0.37 511.62 1373. 0.032 �.�23 0.00 3896.
p_S7 511.72 1761. 0.040 ].D19 0.00 3921.
0.57 511.82 2157. 0.050 O.D16 0.00 3997.
0_67 511.92 25fi1. 0.059 ��.017 O.GO 9C79.
G.77 5:2.02 2972. 0.068 O.O1B 0.00 9151.
�.87 512.12 3391. 0.0"78 0.019 0.00 9229.
`�.97 512.22 3817. 0.088 G.020 0.00 9307.
' :.07 5'_2.32 4252. C.a9B �.622 0.00 4387.
1.17 512.42 4695. 0.108 C.022 0.00 4967.
1.27 512.52 5196. O.11B C.023 0.00 4597.
].37 512.62 5604. 0.129 C.024 0.00 4629.
1.47 512.72 6071. 0.139 C.025 0.00 9711.
1.�7 512.82 6597. 0.15D 0.026 O.OG 4794.
1.57 512.92 7030. 0.162 0.02� D.00 4878.
].77 513.02 ]522. 0.173 0.028 O.DO 4962.
1.87 513.12 8023. D.1B9 0.028 O.00 5097.
1.97 513.22 8532. 0.196 0.029 O.DO 5133.
%.07 513.32 9049. 0.2DE 0.030 0.00 5«�. '
_.i7 513.42 9576. 0.22D 0.03i O.D� 5�_�%
�.27 513.52 1C111. 0.232 0.031 0.0� 5395.
_.37 513_62 10655. 0.295 0.032 O.GO 59"09.
_.97 513.72 1120�. 0.257 0.033 0.6D 557<.
-.57 513.82 11769. 0.27C� 0.033 O.GD 5co�
-.67 513.92 12340. 0.283 0.034 D.OD 575a.
_.77 514.02 12920. 0.297 0.035 D.CO 589�.
?.87 514.12 13509. 0.31C 0.035 D.CO 5938. '
_.q� ..�..« 14:On, C.�. _ p.0?5 '.��.�� _�,3:. �,
Stacrd5toraom�Dischaive Performance(corttinve�
Staqe E'_evation Storage Discharge Percolaticn Surf Area
"1 (`t) icu. ft; {ac-ft) (cfs) �cfs> ,sq. fc1
'.0'J 514.32 14715. 0.339 0.036 C.00 6125.
�.17 519.92 15333. 0.352 0.037 C.00 6219.
3.27 514.52 15959. 0.36"0 0.038 O.00 6319.
?.37 514.62 16596. 0.381 0.038 �.00 6910.
'.97 519.'2 17241. Q.396 0.039 D.00 6507.
3.57 519.B2 17897. Q.911 0.039 Q.00 6609.
'.67 519.92 18562. 0.426 0.040 0_00 67D2.
�.77 515.02 i9237. 0.992 0.040 C.00 6E�1.
3.87 515.12 19922. 0.957 0.04''. C.00 6901.
!.97 515.22 206i6. 0.473 0.09i C.00 7�D2.
1.07 515.32 21323. D.490 0.092 C.00 7102.
=.17 515.42 2203B, 0.506 0.092 C.00 7203.
.27 515.52 22�63. 0.523 0.093 C.00 7306.
:.35 515.60 2335:. C.53E 0.093 C.00 7388.
�.37 515.62 23499. C.539 0.044 0.00 7909.
=.39 515.69 2369?. G.593 0.046 0.00 7930.
�.41 515.66 23796. G.596 0.050 0.00 7950.
V.43 SI5.68 23945. 0.550 0.055 0.00 7971.
y.45 515.70 29095. Q.553 0.062 0.00 7992.
5.4'7 515.?2 29295. 0.557 0.069 0.00 7513.
�.49 515_79 24396. C.560 0.078 0.00 7534.
I.51 515.i6 29596. C.564 0.082 0.00 7559.
�1.61 515.86 2530'. 0.581 0.093 0.00 7659.
�.?1 515.96 26078. 0.599 0.102 0.00 7765.
4.8i 516.06 2686C. 0.617 O.11Q 0.00 7871.
9.91 516.16 27653. 0.635 0.117 0.00 7978.
�.01 516.20 28456. 0.653 C.129 0.00 8686.
5.11 516.35 29270. 0.672 0.130 0.00 8194.
�.2? 515.95 30095. 0.691 0.136 O.QO 8303.
5.31 515.55 30931. 0.7I0 0.141 0.00 84i3.
5.91 515.'cv 31777. 0.730 0.146 0.00 6524.
�.51 S1o.76 32635. 0.749 0.151 D.00 6635.
5.61 516.85 33505. 0.769 0.156 0.00 6747.
5.71 51r.95 34385. 0.789 0.161 0.00 6860. '
�. ,° ��_7.00 35-�5C�. 0.��76 0.16�� ''.00 G905.
Staqe/Stora4e/Oischarae Performance af Sianifrcant Srorm Events
Hvd ;nfiow Cutflow Feak Stciage
Target Calc Stage Elev (Cn-Ft) (Ac-Ft)
: 1.12 0.26 0.73 5.89 517.14 36092. 0.827
� 0.55 "'***** 0.16 5.74 516.99 39579. 0.796
< 0.55 •***"*• 0.13 5.18 516.43 29888. 0.686
�3 4.fi6 *'**>*� 0.19 �.31 516.56 �09QB. 0.71C
=, �.58 "*'*" 0.04 9.57 515.82 29580. 0.573
' E G.34 •'*'*'" 0.09 9.23 515.4B 22952. 0.516
C.99 •""*' 0.09 3.71 514.96 188�1. 0.432
0.97 *x***** D_�3 2.b9 513.99 12983. 0.287
KCRTS Rou6no/nstructia►s
Route Time Series throug.`: eacility
"r.florr Time Series File:a-dev.ts`
:tflow Time Series File:A-RDOut i
'nt;o•.+/Out`low Analysis
Peak Inf2ow Discharge: L i2 CFS �r ':r,r cr, �ar, 4 i-_ rea- £�
Feak Out�low Discharge: 0.727 CFS �t 1�:OG c; Ja^ 4 ir. fza: ?
Peaic Reservoir Stage: 5.89 Ft
Peak Reservoir Elev: 517.i9 Ft
?=_ak Reservoir Storace: 36092. Cc-et
A^- . i
i
�
r
II
�
�
Duration Comparison
Duration �cmpa=_�. ... __.- . .
Base File: a-�_ede�� r r�
New FiiE: a-rdout.t;f
Cutoff Units: Discharge ir, i:__
', ' -----Fraction of T�c�e--- - -- --- Cneci: oi T�ie-ance-----
I_ �utoff 3ase New iChange Probability Base NeW BChan�c
0.090 i 0.77E-02 O.S1E-02 -33.9 � 0.77E-02 0.046 �.043 -9.
0.057 I 0.56E-02 a.93E-02 -29.1 � 0.56E:-02 0.057 �.044 -23.
( O.D66 I 0.93E-02 �.3�E-02 -13.5 � 0.93E-02 0.068 0.056 -18.
� 0.080 I 0.33E-02 0.�96-02 2.D I 0.338-02 �.680 �.081 1.
O.D91 � 0.25E-02 0.29E-02 -3.3 I 0.25E-02 O.Q91 0.089 -1.
O.IO2 I 0.18E-02 0.1�E-02 9.5 � 0.28E-02 0.102 0.103 _.
0.113 I 0.12E-02 C.1�E-02 26.7 I 0.12E-02 0.113 0.12i -. '
D.129 � 6.90E-03 �.11E-02 27.3 I 0.90E-03 0.129 0.131 _.
0.135 I 0.60E-63 �.08E-03 13.� � 0.60E-03 0.13� 0.139 �.-
D.14F � 0.36E-03 C.29E-03 -18.2 I 0.36E-03 0.196 0.145 -_
0.157 ( 0.:6E-03 C.15E-03 -10.v I 0.16E-03 0.157 0.156 -�.
G.168 � O.ilE-03 C.33£-04 -71.9 � 0.11E-03 0.162 0.159 -_
� 0.179 � 0.62E-09 0.15E-04 -80.0 I 0.82E-04 0.175 0.162 -9. -
� ' 0.190 � 0.16E-D9 0.16E-04 0.0 � 0.16E-04 D.:�� C.20� '.
i
Maximum positive excursion = 0.016 cfs ( 8.�4'
occuzring at 0.168 cfs en the Base Daca:a-p.�
and a: 0.203 cfs oa the Nev Data:a-rdout.t�
- Maximum negative excuzsion = D.O15 cfs (-25.
occurzing at O.Q`5 efs on the base Qata:a-p:
and at 0.045 cfG or. the New Data:a-rdout.ts
� I
- i�v�;xa-a„�,��,a,.y,:�-rcxis .-.,�; �, ---e.t.�
N _-__ -
3 0
` A-Targetdur •
�, ,
, w �
o �..,
R -- L
u� '��
o ti.
.�
�
I (n cv y.
LL
U o '
•
ai �
o�
m �� il I
i L � -
a
y O i�
� ,�•
I� : i
, o ,
� - i�
o .
00
.
, �
�,
0
0
0
0
00
,
�o�` ,o� ,o-' ,o'z ,o-' ,o�
Probabdrtv Exceedence
I
�
m
�
m
Basin 'B'—Exlstin_a Basin Conditions
r -
� LandUs�Summary l-_; '_._—____�
__ _
— - _ _
Area ?
�_ ( '
Till Forest 2.46 acres
Till Pasture 0.00 acres
Till Grass
D.QO acres
� Outwash Forest 0.00 acres
��� Outwash Pasture 0.00 acres
� Ouiwash Grass 0.00 acres
�� Wetland 1-38 acres
�_
, �! Impervious 0.00 acres
!�' Total
, 3.84 acres
Scale Factor: 1.00 Hourly Reduced
' ! Time Series: B-Predev.ts� »
' I #' Com ute Time Series
a; P
.� Modity User lnput
, _ ----------—_
File 1or computed Time Series [.TSF]
Flow Frequency Analysis
T�:me Series File:b-pr=dev.-.sf �,
Pro�ect Location:Sea-Tac ��.
--Annual Peak Flow Ra_e= - -----Flo•�r =requency A:alysis-------
:low Rate Rank Time cf Peak - - P2eks - - Rank. Ret.:rn Pzoo
'CFS) ICFS) Period
=.339 2 2l09/O1 15:00 D.996 1 100.00 C.990
O.D65 ? 1/OS/02 16:00 0.3:s9 2 25.00 0.960
, 0.31C' 3 2/27/03 8:00 0.31D 3 10.00 C.?0�
�.O1C 9 3/24/09 19:00 0_173 4 5.00 0.8G�i
0.08� 6 1/O5/OS 8:00 0.122 5 3.00 0.667
C,.122 5 1/16/OE 21:00 O.D?3 6 2.00 O.SGO
0.173 9 2/O1/07 0:00 D.'v65 1.30 0.231 ,
�.496 1 1I09/08 9:00 0.010 B 1.10 0.091
Conp'�ted _eaks 4�= � C4 C_9R5
6asirt 'B'— Developed Basin Conditions
r — �
Q Land Use Summary �.`T' _ __.
_ __ -- - -
i ' Area ?
� - �
ji ����
Till Forest 2•22 acres
Till Pasture 0.00 acres
Till Grass 0.00 acres
Outwash Forest 0.00 acres
Outwash Pasture 0.00 acres
Outwash Grass 0.00 acres
Wetland 1.38 acres
Impervious 0.00 acres
Total
3.60 acres
Scale Fador: 1.00 Hourly Reduced
i
Time Series: B-Dev.tst� » �
Compute Time Series
Modify User Input
File for computed Time Series [.TSF]
F_ow FzE;�_e::cy rina�i.,�s�s
- .,e Serie=_ Pile:h-dev.tsf
ect Loca�ion:Sea-Tac
Anr.ual ?eak Flow Rates--- -----Flox Fiequency Analysis-------
�.� Rate Rank Time of Peak - - Peaks - - Rank Return Prob
�FS) ICF5) PetiOd
�i,319 2 2/09/O1 15:00 0.927 _ 100.00 0.990
`.�6� 7 1/OS/02 16:00 0.319 2 e5.00 0.960
, J.3G1 3 2/27/03 8:00 0_301 3 1C.00 C.900
.�1J 8 3/251�9 19:00 �.165 4 5.00 C.800
.�.C77 6 1/05iD5 B:00 D.110 5 3.00 0.667
i.110 5 1/16/D6 21:OD O.G77 6 2.00 0.500
�.165 4 2/O1/07 0:00 O.C60 '! 1.30 0.231
'.47"1 _ _;09/''8 9�00 2.C10 8 1.'_0 0.691
WATER QULAITYCALCULATIONS
'
Wetpool Sizing Calculations
Per 20D9 King County Stormwater Management Manual
Project Name: Olympus Villa
Project Number: 107-033-11
Facility Description: Basin 'A'Wetpool
Step 1: Identify required wetpool volume factor(f�.
f= 3 Per KCSWDM 6.4.1 1
Step 2: Determine rainfall(R)for the mean annual storm.
R= 0.47 Per KCSWDM Fig. 6.4.1.A
Step 3: Calculate runoff from the mean annual storm(V�)for the developed site.
V._ (0.9A;+0.25Ata+ 0.10AK+0.01 AoJ x{R/ 12)
where A; = Impervious Surface Area= 77 101 s.f.
A,9=Till Grass Area = 58,80o s f.
A„ = Till Forest Area = 0 s.f.
A� = Outwash Area = 0 s.f.
V,= 3,294 c.f.
Step 4: Calculate required wetpool volume(Vbl-
Vb= fxV,
Vb= 9,881 c.f.
3
�
W
�
�
Q
o�c
Z
�
0
0
�
v
�
E7h'N - N i 23N R�SE^.,�.
� __ . �--- - ---- - �--- .}. _ __ � � , -- ! ,
- � � �. y . ' ��,I �'..
s
. �'� 1
� � - T. - - � �, - --;� . _ .. _
�£7th Ct� - � , . i �
'�. � ' � . „ . . � .
� � � . . .. � _ , ----� �
3� �t�A . �,� �. - -�
! _ '' � , : '.� _ � I
"� � �,
- 1 �;. : �� -_ i
q �'�� � -. 'r--�- �
-� _ �
- , � � � � � , I
; , � ��, . . - _ _ ; . � � , �
I"'_" ' __ . � �I�M h I ' U1
a, .. ' ' , , � � '� m
o• _
W . ' '—�. � - - . - - - . -
o —" � ; It - - . � ti
(Y �„SE!JM St V£61k S�� ' - � .
a ' er Z
� — 1 � I � � _ � S£/IHi St, '... SE Ith S�i O I
r �
? � m
U �ry • ` Iy` , I . . , . _'_�__ . I N
tn � 1 u � '�. f71
. � 1
W 1 . � . , . m � . ... '"' , r ? - . }�
. . � . , ;. _.--�
_ I'' , ,��- ,
����{ . . y ...rZi' : . . _ i " .
. . � �� .. � i,,--- I
4�
�a � "o L ;
3
� � ' ai—
�,mr , �f�� � l� r • - �—/
� �, _ , � � !. 1 ,.i t _ I
�� , _ � _ _ �----f
„ . . . L---S II
m, ,. �
�� _ r�
i
� ' , Y . � H£�16 P!y � � �..
��� . � ... �, � ��� .�.r �. 1 � � � � . I —'_ j
� � > ����. 4�. —.L � ' � -- �'�.
. 1� r I' � \1�� .yrnlM � . `�
, ' '-9.. -�..y ' I �:�.. . l� S , 1.. .. ._
n ' .
�a , .� W ,m� � ��° . L—�„� ' �' �,
��� �� �� 'W "'' � �� �wd�_-..i,.r�-SS/7&kSr . � -. �:..m � �
�. ! "Z li � � ,. ', ` -.\ �- � ' "--�=k. p,'-.y.� � ,
Y\
. "o,_ '' . _ '1 .-+�,.����_ �, ' ', � +w� �', �
n
i �' � �'�W i �t � — I � ��^m.y�', �
, � ,
r�.` NE'3rdW � "'a`�-.� '7'�.. .\� a � � ���., tr. ..��i :
�y�
F7NW- 'AT 23N R0.5E NW 1�4
'V N` Y N
Structures Convayancr Flow ConVol Facflfty y�'+ �t� 41 • _
...� ' �.a r Cn�cf��
'� Rantan R�nton R�Mon �,� ' u � r t_ ;*_r _ .' � r���(� �
■ Irw� —�P�W O Pad uv �.H a.y s. � .�.��.Jv'� �.��..�
• Typ�t .�Givri � '�ni � 4' n c. ` u�.
�'' Surface Water Utility
. ,,,.� �,,.�. • �.�� ,. � v
� � r� P�.��•���x� `;���� Q " � � Asset Inventory
� �S� -�..., • � _
Prlvsb�'P'Pr�flc) Kinp County p Ani '� T+_ r,
� n May 2009
. • w.� --pw � v.,,n ���� - �;
• typ�7 —Cubsn !Wy Ca�mry w� �n
• Typ�7 WSDOT � PW �♦ W► -�
■ ue�tt ^Pp� �p Ta�t � _ �15'!� 0 150 300 600
Klnp Counry ��G+iran Nfse�llanwua � �
�c � � Feet
.. � InW OIM� ���R«Yan Lmu . i a' � fmi.�
■ Tyq 1 �CTw��' �PM -�1
nT ur ��
UI�NHm.:
' Ws�t°" —� ���. m.��.������b.�.�� aa. 11T 23N R05E SW 1/4
� Try�i Flow Controt +ort ca+�ar k/o'mrbn��N�W M NY lim�MiC�Mua�n.
O Typ�2 ��MW��on wJ b p�nti pi0r+u u+h' 'M GM d Rnron ����
Y mi nyen�id�b�rtM o�OnW�rom �Mun Tu
. �Biwr4s Momrtn a ww br Va'�nM.a.qn..nabr
mu�ufon W�pw�.uun w b RMd.Mh w� 5311
Inb�lbn.
I� I
� i
OFF-SITE ANALYSIS D1tAINAGF, SYSTEM TABLE
SURFACE WATER DESIGN MANUAL,CORE REQUIREMENT#2
OLYMPUS VILLA
RASIN A(wEs�ui.v)
Basin: Cedar River Subbasin Name: Ma}�lewood Creek Basin Subbasin Number:
Symbol Drainage D�ainage Slope Distance Existing Potential Observations of feld
• Component Type, Camponent from site Problems Problems inspector, resource
Name, and Size Descri tion dischar e reviewer, or resident
sea map Type:sheet flow,swale, drainaga basin,vegetation, % Y.ml=1,320 ft. constrictions,under capaaty,ponding, tri6utary area,Iikelihood of problem,
stream,channel,pipe, cover,depth,type of sensitive overtopping,flooding,habitat or organism overflow pathways,potential impacts
pond;Size:diameter, area,volume destruction,scouring,bank sloughing,
surface area _ sedimentafio�,incision,other erosion
,� Channel Flow Open grassed ditch along 2% Sta 0-8+00' None None None observed
Nile Ave tlowing south Ditch needs to be
together with several maintained
driveway crossings with
12"culverts.
$ Pipe Flow Across entry of 3% Sta 8+00'- None None Upstream end open and clean-no
development at the Tnt'x of 9+50' apparent capacity problem.
Nile Ave and NE 6�'Street
-flow continues south
- - _ -- - _ —__ _
_- --
C Channel Flow Flow continues south along 5% 5ta 9+50' - None None None observed
east side of Nile Ave NE in 15+00'
open ditch and driveway
cross culverts
_ ---- _ --- -
P Pipe Flow Flow enters storm drainage 4% Sta 15+00'- No problem None None observed at time of site visit
system of resent 23-+00' appear at inlet of Flow continues downstream to the
development and conveyed storm pipe-or west along NE 4'"Street
to the Int'x of Nile Ave visible at
and NE 4�'Street. downstream end
;�,
_ _- --- '- '
�.- � _ _
', ,, :
�- -
� . .. ,. , _ � --
, _
, , j ,.
� ,
, .:�: -
I ;t " : . ..
,.� �� jM' f ��y f� �:.
., q.� - .� �� } . t . .
� � ��;� �
� �
w
�
a . �
'rt
�y
f',
�.
_
- � :.
> �,
� k 4 , =y*;�� �� . � . �.��
�
�� �" �'r:iF��`��,'� �x ��- ,,, � �
. : .
�R �T A �A ��t� h 1�1 .� L
1 �..
I _ � h��• Y �}�'. ,F
H � ¢,:
. � Y�� . � � . _ �Y_ �
. ' �I ;, ��+i.w_ .�"�p'_� �___.�
'" '4�1t ..�•¢'.�. ._ _
,_ �.�- __ — '+��II��
i,` �'Y �.k�.�
����
il
� .�..�. ., ,F.-.... �.F,.,,,... .`r .--, :. ,:�. �,�..� --... ,.s., � .. ... ,. ..c`.�-
i Photo 1
Site looking East from Nile Ave NE
i e►�p '�,\ \\\
, \ ,
�
�� �• �
.� a
� ,'�,
,r� <
r �:
._ . 1 - -
- � . a � �--� ..�., .
� � "'u i �r
� .'�, rc�„�` k _
�.,� '
.3. .t`�• > � :
�� � � .� 1
� % ,�,�3:,� , . �t �`.
f��J �� ��y,, ����-��
� " ' 'y f 2�;,, .�-�_.� }�, --
. ♦ ,n. .. � . - , �:�,.* , a
�I �e _ ��Y�� 3-.y{a� • t.^ f - ~,�.4'.r .
. '.3 ^�r�_��L �`1.i'Y4- .n� . .J!' '�.•3 ' a . . �.. �.
Photo 2 �
Site looking South along Nile Ave NE
r- F
s ��
_ � "�
, t : `�
Y�. 1 ��.�i�
�� y f
�, t ' ♦�
)� � - ':
: �� �y .��3._'
t: � . _ � �
_� � �
�-•�
_ " =z�" �� �'' �
,:.�'"=" i
K� ^ �� t � �� .
-•.k. �. i 1 . R-.".z-
��
�
!
_.. . .s�"'�-�s.. . .
Photo 3
Downstream roadside ditch with driveway culverts
���
. s ;
. ,
;
�� �. g , �
xy.
�_�� ..
! 5.� �
4��� �. >,
P� — —
' �,
��x.
...r�
��:. -0
� s;���
Photo 4
Downstream roadside ditch ���ith driveway culverts
�,
Y
.����d,� ;M r~. '
.,'7:y,. � �i �' � � �.
�:y- � � '
�s'�< n- �s � •
� � �'��
� y �
` G .
�9 � p
���.��:, I�b' ` 1 ``'r .°'i� _
��� ��i I '�' }� ��� —
�3 "�'�'�+.,: , � '�r '�'
,f- �y �«� �
n.}` `
�_.. °-�f�y.,..r�s ,a �.
J . _. ��h 4� � s
<.��z r� . ._,.� ,y.. � ���r C, .
, .._ " �' �' _ .
t '�-a� �t"� s '.
�.,, �°�'�,, � 3.z�
�.� x :Y�r�1�- ��,,. . .
��_� � _- _ � ��..
�.4 � . _ _ L_ ���� �'� '��'�'
�,.
Photo 5
Intersection of NE 6�' street and Nile Ave NE
C x�-` �.�� . �
; _ ���� � �
, . � .:,
�
_,:� � ��µ "'��I � .. � -
� : :3. -� .
�,�
a . - .
� �t���. � � (
�^f`
_�. �'�,�
, r
�
:Y �w:.
e. -- , �.;:. � a ...
.c»~ r`, ,�
x�.. �lk��� ,�,A� �:... � ,, ,
�','.>x {F "�;, �s � a''1
i .
;e�a,'.'� `,'� �- �� ;�-�C]."
Y ` � �`-�` I"�
✓ L•
s ��:� .� �,r� ��` '°:,
�
i.�' ,.� . `�� ���'.�:
*'�, .� *����� '�
- ,����'S� �t'�` '
�� �
�t ��r
`"�`•''�?' s,��"` "�1�.�;'
Photo 6 ,
Downstream of intersection
.P��f��
:� _ t �
..;:� •!.�_ ' ` �t��� � , `.� '
C.�.����� ��.1 � �� ��� t� ����
-� � "� �� ;��+ �s`� �,�rl� �
�,,. `i� ' `� `' �;� �'.� ..�.�
1 �a��`' + ;���=� 4
;�, _ �,. � 9� . � _._. .::� !
. :�_.r.;...�
:�� � c' � t ..'u:
' " �ii �`�' 'a sF�.
-- - . . , � _ . . �.
-c. : . . _.... .... ... "... .._. ., . ... _ ..
Photo 7
Pasco Ave NE viewing North and second entry
'
� __ _ — --
OFF-SITF ANALYSIS DRAINAGE SYSTEM TARLE
SURFACE WATER DESIGN MAIYiJAi,, CORE REQUIIZEMENT#2
OLYMPUS VILLA
BAS1N B(EASTERLY)
Basin: Cedar River Subbasin Name: M�lewood Creek Basin Subbasin Number:
Symbol Drainage Drainage Slope Distance Existing Potentiai Observations of field
Component Type, Component from site Problems Problems inspector, resource
Name and Size Descri tion dischar e reviewer, or resident
see map Type:sheet flow,swale, drainage basin,vegetation, % '/.ml=1,320 ft. constrictions,under capacity,ponding, lributary area,Ilkelihood of problem.
stream,ehannel,pipe, co�er,depth,type of sensitive ovartopping,flooding,habitat or organism overfbw pathways,potential impacts
pond;Size:dlameter, area,volume destrudion,scouring,bank slouyhing,
__ surface area sedimentatbn,incision,other erosion _____
E Sheet Flow Class 2 Wetlands and O.SU% Sta 0—7+00' None None None observed
buffer azea. Wetland outlet
bird cage we11
maintained
--- _ — - -
F Pipe Flow 24"minimum pipe Crom 1% Sta 7+00'- None None Water in pipe same elevation as
outlet structure#18575 to 11+50' No apparent pond
pond#P I 194. Water overflow or
surface within pipe same as capacity issues
ond.
___- ---- .
('r Pond Plow Open Pond control facility flat Sta 1 I+50'- None None None observed
for Maureen Highlands 13+50' Outlet swcture from pone well
#P1194 maintained/overtlow structure
_______ open and cleazed
�j Channel Flow Open Channel along east 0.50% Sta 13+50'- Channel not Blockage of swale Able to view channel behind
side of Maureen Highlands 26+00' ' maintained- could cause pond houses as possible-several trees
Plat. overgrown with #P1194 to not and heavy brush block view of
small alders and function correctly bottom of channel. Outlet
blackberries- - channel needs to be maintained to
water standing in allow for pond to function as-
bottom of ditch desi ned
'1 `��$�' �- i
l.. �"�, r �9`,`AI:�R . r{ .�
� _ M�i q
, � ��a ��y,.
�
t��1� y, , � , :
� . �F: •� .1�� �. _�' _ . , . � �a ��r_ ��t.;, �.r.�
��"� � ,�� �� �� �� �, �},�, ��,r
a.,` � '��� '��' �4.�4 ; E t
ti :. � :'�,s�*t•�'�e ,� ,�:; �" �'as
;� �.3 =ti' �a�o � 3�. n• -'
.. t'� ��'�* rAr, ��'�.� :� -t.
t
. . � _...,� �' .,
r � {� 4- x .. rt. . . .
t �� .^� .a�� , .� �, � €�
, .�
�s, � �`y'�_ _ �� i s�'-�
� S�R:. �� °�, a
. < �'
. , �
. � : �
>, y
. ;.,
,
. .
,
, � _ „, �. .,'.
a r .,
�� � ���*�,� 'fi� � t� 3� . .•�' :C 't`'"
� r � � `�s� �tlt_' r,`.'��-�f' T� ..��..�
'� ��� f 3�x,��
��� } �
... " � .�� i� x , t - i .�� . '�.
i " �
t '
� '` � ��;�L�.'���i���`� F,• "a. ' .."P ...
.. . o ��z�a. ..� ��i A i � '/ t'.iN���.�.� �<t� . .�_ #�
°�'�J �,�'� �e*r,�
�„ - �'� �„
, � :
. �• .is '� 'V� .' x ,�' � . � a � s
-� �� a�"'i'�`
. �� �L�E+•_. ' s�.:: � �`'��t�� .. �:.'Ci� ..
�` i ^�i
PtlOtO H
Bird-Cage Structure#18575
� �,.. f ,
��.����� r
;�, ' �' ����
..
,�. �:
�` �� � �� �. �:
£�
r__ ..�',�` ■e��S�,. "�� .. 's ��.i-"� �� � .
kl K '� ��- . �
�! �� `� � ��, ,y '-
�' �.� _ � ��,` ��,� "�:
� �' �
,�, ,
�-� ��
. !r ,' t �� f .� �.-,rt- � =._t-��' # �=
�r+; ' �� '� ; � n , �
. .v'�.*ti - _�'@=,�c• _.,
e s� `- ' ':� '"�-.
' � ����� - ��t r ���� �.�§
��`�� �'�d �K.,� �#�
�,1 �, �� . ,. � . "W •�`z
. `���.. �� ' - .
��x �
�y
� `s_� . .#.. :_�
_— . - ��
� �� � �
� �� �.
�
..� f:s F�z' �� . � � "RX
� �p,�� � ` � �r1�r � 'h`�r�7v
I__- �+,��',��� 3 �o� �+'t�;.' -x.e�_ .
��>�,
. . r,. -�Y`= ., , . . _. . '�. � :- -.
Photo 9
Viewing Sout6 on Rosario Ave NE #18575 to the right
; �y� - .-�y�ti� i �--�
Slr Y �� . �'��� .��� y. ,�.ti.
� ti � �
� t �>� �, �4 a . $ _
• � �
� ' �#.�� � ;:�' .. �Y� .. ' .
� � � '
v Y� +' 'r �}i�- - �`�.. . -
c,�-'�y+s.;. :r '� _ ^_t- fr+�y'.
�
.gv
`�s
� F�i3 _ . .:. . ...
��mae,� �.., d" � ..
' f, . �$
.� ����
. - � '�'�'�{{`� y`}�� .
• ��''-'�� � J� � � -
.% /� .,�� �� y���� �.. .. ._
Photo 10
YE 6te St into Pood #Pl l94
-;� p' ��' ��, ��`
;� ��`� �,;�., 'r��;,,;.. i�. _ ..
� 4 :
' e„'" t`" }� i�a; r i i
. �'t;, `t� ��?j . . Y..1_ �
�� �
� ,�� ��� � . . . .
.t �
�'� 1 , � �{ ...l�F- �• �y �., .� , �pr..ww-q .
� h. '1. ,� � `'Y
e" -� , d _ �' ��.; w+"i�. � �� �; A i{
� � 5k< �� , �i +,'� r r
� �_' �',� . _ ,,� . .�;4���'_
,� �;,�.�,, �-�...
�' �.
�, � �A��� t�-� � ' _ .
•-�, ".,.��''� - ��,�F,. .H,_ Ry..- , �
`� �, .,�- .� ,
' �.,��� , t` �
, «_ a
-� �,. e,j...�i r�xw� } >•+'J ,�'� ¢ "�
��*.. , � �
. " ���� ��.. . � . : � {��?� �'�t''�ru���tiLt t� f;.
t � t' rt'}{.'f�h.y j�
���tyii,;..�`}M�..� ,.��_��-�f�-b�''.:Yi t. ��': - � . �f������+� �y a�t'j�+ '?t.1
!s � F.
5��. r„ _ .� .� t :
.- ,;;, .
,
`
i �t'. f •�}�-i:l: �..�`'� - ' � :., A,�} � �
� r�
, ^��r`�r�� �s�, i �_� � `�#' 'i�}Hj
��- ,'m�ni¢'�- ���_ �z �,�t� , ., ''��5�.'
� •- - ` �Y 1��` l�'��! ; t�� !'...
� F.r-�- �:-. ' =i " }'y s�-,•f 'r , ' %� ,i
PIlOtO 1�
Pond #P1194 outiet
r_��
, j ; �.
• r �
�.� i .. �.� . . . �
���y. r
4� r+a; ► �(G ste,0� , `�< t` i>�� ta��� i s 1� r � • :
� ��'r�`+'i'��� `- 'i 3- `�,.:?.�• �i'��,r'� i,� *� � � '�p ;� '-� �� +-+��
`,*�� '�`�.�., ,,. x.r��v�•�`-`- +�*`:l'.-,.�. �"�,��5.'7,`�,y.�'.'�,�+��f�;..��, ,��y^ ���'���'� " .i'r��. '�1
�'� !� .� µ,�j�-q r- 1.��� ��.i��CPi�� +S'�'Y*i;` - .�l�. .� +r�- 1 y '1{
' 'C�j r 'i \.�i` '` � : 4e ''';• 2.. � ♦,..T�%►�:'� .�
�1 ,� Yf�.c.'(��1,. + �' ���.' �"1�� 5��� Ya ��"���'� } � . �� '" I�
� 1�.s F I i�4� 'I \ l E� J l _ -TT�
`� `�.1,�tr��y�+ r� � `?7�..,�� t��� �' �' 1�F '►`� `r� "P►`'Y � �
�_. a � � �. � L+ . i b-'KF �,�.� �. ���` a.� �.r�,..".
� �t��k,�'��-��' 1 '(�� - :�' ,��-,��,�Y�..�� `: K, s:`�t,711 s- .T �
k ' f�!�!'..��,►j�,f , �Qt�`�p��� *�1��` i��`�i 3:;•" �'.� ��.� i
�`_ �i'. �7 �,,jA C „"T"�-�v � r r'R �.� s
( ,'� l'�i L� .� T � ��� .�K� � . . fi�� i ���.
{ ''.� �, � ���T �r � � , � y
��� i}� `} �'� �„ .,t''' jy�'� !
, ,� � ,�-•
��s'�'�r� ^�� 'F`I� -�: ,� �d' _-�-r
� 46��t,' , 4'`„°T � t�_ . ,
I�'h �� ' 1: �"`i �7�t t'� � `�: -�"�� '�
'F `� , '!,�kn, �rA�. '�.A .. 2 ' f, t
�" [l� �I.Is`: ,.�E .A a`-tµ��;' 1.,4p�'ft. � ,Y�i-f ' ' T
(� .WT yF
- �P•'. _. •,-' � . � t {�t .
C ' ,�. � . ' �, .
� 4 /� �4.'�.^' ���.- ��'.���,f f � ��`~� .i `� l�'<�T r�j..
i �` J :�� 4 `>�'��_( #� �{�����`''`•�_f1�� �n► � � .f.�i�-� , 3��..
I ' �^����'Q �._ aY���i� ��,;�"����,,� '�' _, '. , _:� �,�"° `;�;;,;�
� � , „�t �t,� �'y'" , -
� t'�``� �-��� :��� ,f�.s g �a` w,',�✓f } ���ti- �' .t .�,� . .
'.�/ r �� K� �,r �' J�
1 •) r,'t} .� ^x�� �i , _,��.�' _ t.��r_
t �
a4
� J
r c
>d
� �
rr�. � �
, � 's�r� �'�'` „�°''#! �' �
� �\ �,�'��uy� r�-gi�.� t . V " ;� �j"y� •�',� �C�T�
�'! •• _ i�-: .�j;��`1 y.,;y ��`' �� ' �3• �� �►+
� q: `` �' `�a'i'�i ' �'jv e _ � � ,'� ��..�
� _ ��. 1 i"S_ �. �.
. � .�� ,:���,;�f ..-'�"= _ ' '�;f ..-Cti
j ` .��' � ,. o�l,/ �; .y`� ,�
- � -�.`��.�.�,.,.-�S:.r ,, r�. ` t -,,+�'
r � . ��s' � ` �t�g� _,` '' '�.
� ' ✓,� i w
< �- s�a . �
�u�`� �r , r;� ' 3�?4�� :��(�';� ���
p,� �,_- /. ' ,�
� .e�:;`�Y'+f.' .'�•: . , _ . �- `•� , , :t _ -
P�OtO 12
Outlet Pond#P1194 to drainage swale
'
D - GROUNDWA TER PROTECTl01V AREA MAP
;
'
� �
,
;
� l It
i — ) • � . _ — � • � I
�/ ' _. - I I
. � =� T ,�� �I
. . ' �:. - ' i.
-_i� � ���„� �
i - -- I
�w�.wnstm+c[a+ I
I '�t �T - •. � � II
i
I _' I
� � � � �� ��?� � . �
� I
_— �_. i
� _ - 1 's r, .. .. V ' , II
I. ` . ��1�� +� . _ l' �� i� � li
1y � �� !
�
.� � � _ _ I
.�-- —- ( I
�� _ .�� - \ ,.- - --- -
�� T=__
- ;_
i J f n ... �. -- —
, -. � ^ ;
I � _T - �
I +��//r� i .
I �• `�` �J
� � ���/�.� '
t����/
._____1
I
� _1--f I
r
j, �_ ,
_ � Q--�'�1�
v
_ 1 +
- �� � ^�
� _ � "'"j�1 - ',
�
---�__ _ , , �, i
; � ; � ;
�-
+l��-
� �� �
i ' �
�, i
I -'�— - �
,
r
u�yax+cs i
._..-J_
� l: � � '
, _ �� o �� ��
��
� � �
, - —
__
�� _ _ _ -
AQUiFER PROTECTION Z4NES
�����.
�� T�� ___
�,, �++�u�+d.+o�k v�s zone,
R YWrle.�.VfvetlA ... Zaw 1 4od6ed
F':.�� JarnwY�2008 � Zaie i
(�h Wria
��. � ` � .,ti � -}} .. � f� �� � ,: � � � Z'>:_(. �-':}:`}. . - rr ' ' "r ' .
' q `Y l-} �`rr r r ri 4`yti1�r� {�:�:��f::�:. ti �rxr
� h. ti;S. � f� j �I�•• �YL� VN ' (•r:'.�'.', k y—{}� .�f.� 1 .. S
• �, '�Yh 4 �S�L � {h�'i`)4 1 1,C� � 1�•• •-}.: ), . .l� �t"t� .�1. S'"�' • t�'
i t`' r 4 ..r�. { ti .r+C'i.{G� kt �''n.}�?f•K`�};;'_ r �v'}h�r� .�,ri:4^.:�5� r. k '
ti(�4�`�h��rY �}. .• �'�� } Y:sf}; �r'�yi�v,{r�' :� . � �.rv�? .ti''"'44�X �'4'1',
:,ti?.:ti. �i:4�:•,}.y.� k.`�v� {�r � `t;:;,'"^,�t�ti:.� ,f%�:•:.. . ' r.. •r?:;"rF r
. .{r .<� � h a {,.�n�:'�"'S'v�. �,'�h=::
x ti r {;�+'r. {i�, f�:. �' -,s:. �y. .r v 4:�'�i{ "�$..1 .s.. .���� ..�_ti�3�{��ih�. 4�'ti ,-:
-�+.�,1�''Fk�rrZ 1��:�}f'�� L ti �7; '$tr �'•`.�,t.{h�:��'r,�' :l ���•1 ,r r..�S`: .
�w' �' ti `{'...
t.r � �4`S vr i}'.•+-;�:� •. , ¢fi 1.:• '� }�4��r.�
r
.}�:4: h _nti.'� .. {�'
� ,.Ye' l r I.y ��t" t� t�}s1�1`S1 v.ti�,.F,•;�` � ' .�L`�. '.
l 1.�, l'::. � ,�;
-7;.{.�, 'l.{^�'Y��;ry{. ��,�h? �, ..�.•: ,�-F.�{f t}h. ;�.�r'^
ff.i. 1.4a �
�.::�`.}�t y�:•.}� }f c 7*�iYr%:l`4.��:v ti�:4 �ti�r.f.��ti::;:r%t;.,"'�, ',��':{_:
:�,`�� { � S,t y t� {t�r ��}
' �l*��4� }E r��- .. __rY}�r},� Y n.y K,�.r IS<�.,�. `�-�y}'�, I ' '� �,��.
r r r � � v.t k r S
ti{�..�} a. F a�3.� .� Sf Nv JC v ��. ,�:Q�:I �JP �_
�.. „4, _ � -
. .
._ "`,S . .�t�r����,�{};k���� . _ ���,��
�y�•',�•}r � �G.j�;,r,v � .
r�-�,�r �,.. , .� }� ��'�'!. :^_ , C; �� ,'�."�y;{�1"} :�r� ti s ��, .
S r }{�vtih i'`1 t�r r''���{iv'}i�� ��"i,. ----��' _ .'�^,�,��� :}.�.
�;,, � F s ti, n, "`_�i�_ r�'�. �Y%` r{,�� `�$:
� ''{;�'ti?t,4 h �` .<'}y� i � r � , �4.};. .'' �%,�
sy:yz`?'�" ,��?�,��'�j`11�r��,r,!��,y��s�{'i'j ��z C, I,�� � 'r . v'Z�f ���¢ t�.�r, ;
�1 r::. �;i�:•X{ $ }'•ti`�`}_•,}}.�� �t} ��,.�� f,:;:1.��}.�r ti°�r,�X "Kr 'ti ,
,...:lCh � Y_�_- .,.. �'..S � +n ,r`{ '� .v r - �'-
. S�rti},�.��. M 1
— —� ��r� �Z�T' �f�T ',
I f �f�. 1 r�vl�1}Y
Iy ti
�� f,� I� S•l.'fT'{'• `�r L ti�.
ii ��z, ---'�^ ;= ,�-�S�.r�,�f ��. fi, �;��`
i i �'` x
_:[''�la u,m u,v2 �Jc � ; � �,�`t�,� F!o u;
J_— _..
��- �-,,; _ � �n��r—___
�� , _ ��� �. �- � -
� � �i �--,
,���� .���� I r�� � ; I ���
�� �...�� � �� ' 1�;� s� .� �� �
;;
_I ier�c � 1ve p= `� ���� ^�'
� ' -'i�ha�I� f r��
... � �==, �, 7 �----�- ( , '�
�' �r � � ���� 1 ��.
� ��I �'�i r_ _��� � � �_I 1�0;
� i, � �,�� � i r �;_�
I � �i �`_/r_J� ' -
i� �' �'_`-} �� .
. � u�E /iYF i_ �l'�141�,t"�� r-lv2 5C .� T � �.
—,:(._-- �— I .
��f� i--- i —1 i
m �I 'Im I
'4 n hv° 5E ' �
L
v � i� ~
�� 'I�"l - _ \� I��I3 � (.'� I C � 1
, I H�e SE, �G. �!z ^, � U
� J �v-: !i � '�='�
'� �—;�!"
/%-'�v, �r—./ � I
f;� ���ncv,iz 1 �l� ')
i/a ' ,"�__," .n ' �
'�� � ��t'OS4(i�1 � �_" I;
`—_,�--- m.
_.�-�+� �s I I 5 d .A ;E,
� I IS ...�osar n P:t,v i I' �,
z —� �_� �� �
�. Shadow Ave r/
,����_� �I i� � �
�,i V :; :��`�I !
JJU` . �'N �: _ �.iy-,-� ' '
':,fift' hv_ SE J,� ��,�� � `�
-�,;��-'��, , �
r �
J �
� j w
)
- �
_c �-
� � �
�: r'�
/
� r-�/�-.�- �
6�tn p.ve SE ,, �`�"'-' �.� '
\\\�// /( � a �`,
�� � j .�_st Nve SE j
� -/1.i� ;�E�;�
;��-��%�
',�
�--� n ,4,;e SC r-- _
.�-- ---__-- ��--��t-= -
J��, - ,I,
E- DRAF!'DFCLARA TION OF COVENANT
:_
i
,
�- ;
i �
� I
' �
�
� '� �
�
W
Z
�
�
V
V
Z
Z
W
I
�
City of Renton
TECHNICAL INFORMATION REPORT {TIR) WORKSHEET
Part 1 PROJECT OWNER AND Part 2 PROJECT LOCATION AND
PROJECT ENGINEER DESCRIPTION
� Project Owner. Camwest Olympus Vi11a,LLC Project Name: Olympus Villa
Address: 9720 NE 120`� Place '
Kirkland,WA 98034 Location
Phone: (425) 825-1955 x-142 Township: 23 North
Project Engineer: Darrell Offe,P.E. Range: 5 East
Company:Offe Engineers, PLLC Section: 11 !
Address/Phone: 13932 SE 159th Place
Renton, WA 98058 i,
425 260-3412
Part 3 TYPE OF PERMIT Part 4 OTHER REVIEWS AND PERMITS
APPLICATION
X Subdivison
C DFW HPA ��� Shoreline Management
� Short Subdivision �,
❑ COE 404 !! Rockery
C� Grading
; _ � DOE Dam Safety � Structural Vaults I
� Commercial
C Other ❑ FEMA Floodplain I � Other il
❑ COE Wetlands I
� Part 5 SITE COMMUNITY AND DRAINAGE BASIN
�- --- _
� Community
' ' North Renton
I I�
Drainage Basin
; Maplewood Creek/ Cedar River/ Lake Washington
Part 6 SITE CHARACTERISTICS
' � River C Floodplain
X Wetlands Class 2
❑ Stream �1 Seeps/Springs
- Critical Stream Reach ❑ High Groundwater Table
� Depressions/Swales � Groundwater Recharge
� Lake u Other
Steep S!opes
- -___ -----_ - —
Part 7 SOI LS �
Soil Type Slopes Erosion Potential Erosive Vefcoties �
Ag6 5-10% Possible ,
i
- ❑ Additional Sheets Attached
_ ,
Part 8 DEVELOPMENT LIMITATIONS
I �
REFERENCE LIMlTATiON/SITE CONSTRAINT
❑ Ch. 4-Downstream Analysis _Restrictive Impervious Areas
� _Dispersion
❑
� !
❑ �
� ,
� Additional Sheets Attached
Part 9 ESC REQUIREMENTS
MINIMUM ESC REQUIREMENTS MINIMUM ESC REQUIREMENTS
DURING CONSTRUCTION AFTER CONSTRUCTION
C Sedimentation Facilities ❑ Stabilize Exposed Surface
U Stabilized ConsVuction Entrance [ Remove and Restore Temporary ESC Facilities
- ❑ Perimeter Runoff Control ❑ Clean and Remove AI!Sift and Debris
❑ Clearing and Grading Restric6ons ❑ Ensure Operation of Permanent Facilities
, ❑ Cover Practices ❑ Ffag Limits of SAO and open space
❑ Construction Sequence preservation areas
❑ Other ❑ Other
Part 10 SURFACE WATER SYSTEM
�.� Grass Lined _ Tank (_`' Infiltration Method of Analysis
Channel � Vault � Depression _�09 KC Manual_
, , �' Pipe System � Energy Dissapator ❑ Flow Dispersa! KCRTS i
' ❑ Open Channel � CompensatioNMitigati '
❑ Wetland L; Waiver on of Eliminated Site
, ❑ Dry Pond ❑ Stream ❑ Regional Storage
'' ; X Wet Pond Detention
i
', Bnef Description of System Operation: Catch basins within curb line af street,conveyance
i ' to wet pond on westerly side of properly The discharge will inM the existing roadside
� ditch along Nile Avenue NE
Facility Related Site Limitations I
Reference Facility Limitation
Part 11 STRUCTURAL ANALYSIS Part 12 EASEMENTSITRACTS
� Cast in Place Vault ❑ Drainage Easement
— Retaining Wall �� Access Easement
� Rockery >4' High X Native Growth Protection Easement
Structural on Steep Slope
X Tract !
' Other
'� Other I
Part 13 SIGNATURE OF PROFESSfONAL ENGINEER
I or a civil engineer under my supervision my supervision have visited the site. Actual site
conditions as observed were incorporated into this worksheet and the attachments. To the best of
my knowledge the information provided here is accurate.
� �'� 2 � /� Z�l?
� Signed/ afe
I '
�
�
V
H
�
�
�
�i;�' ` �� �-----�.�. _�- _--_ _ _ .,,�_ - �
� � -� _
� ��--_ . , .� - � _ __ - -- - --
. � - ----
, �. ,
� r---- -__, , ._
�. -x--i r----�- �-- i' i
i � ,,,, i r � ...
' ' - nia ar. " ' i �;, � � � �� i i` ---i i---_—_,� �--------� i ...• ,a�•
I mn na �EP-2 � � � � I � � i � �
Y I i I �1�'i,r i EP � �EP-M � �m�.�. j j �� � i i � � i
o ,
! �
2k � I j w� "' �.., ..,, ' i i EP-6 � -- -- � 9
r � 7D EP• i i
r«� m " �-- �ti .0��i 1 I •• � � I ��� � �r Ep-
@Cu,.. � _ / ..��- -�� v,� • ----`---J (._----- � 1I � ..�
�-7A i -
n � J l'__'_ M 1 � ' I
�\y � � �i / i�.�i�l i.... EP-7E L rc xa �i �
. .. , ... . - -- "
� t � . �
aM' , p.� . �. I j � 1
------�__�.'! � ; . ... . . ' . �� r �. _ ��---- --� SEE
K�R�J
� 1 ' �' ' —_
__
I� . • __ ---
-,.�vn�": �
� '^.. �_'`��-
r. I"- J yr�' "'_"..�"_'_"'� '� -.L_ _
�� _ - '�" '."".�_. .1 ' . _ . , . . . .. '
�r..�r.-ii�{;�A/w ... w- « , � _..-------- lP•6_____~_�.._ ''!ML`--�EP .._�«
�, I � I 1�11.IY N-li�]m[ -. . �_. ._ - - �_ /
� wv_n-�-y r j.ee. _ O
�� � �ecww�n aNle nrz Ne MV�MkC 1 N[ 7U `. � ' �tl7':y u-��yp�Wl[ iur.. T M y��R-a.oM . ` I
(
^I� I / K.�It�1f•(b f10.IWI/Al.m t�.f .-. ` W �'�^ �\ � •
[-0laa6 YIM 16efsll.tY �� ___
o-m.ia.i�. o�i��a�r �{1�tE' M.n I I• f"-- � .
�i�Yii
SCC SHFFT 5 r-�vn.u• i S �
r.enr ir � � fE
a-+a�.a..• k � �1EET 3
�� 1 �� i
n ia+w in I� j i
r-aioii.�e ��
�- .
�EP•70
APPROKIMATF LO(:AT10N
OF FXPt ORATON PIT
IYP
N
§ i `
,� a 7o eo
i -- -
iFET
� REFERENCE:OFFE EN(a1PFEA8
�
� Aseociated Euth 9ciencee,Inc SITE AND EXPLORATiON PLHIV FKiUFtE Y
� � � � � � arMPus viva o�r�sn,
� RFNTON,VWI3HINGTON
PROJ NO 1�11020U
LOG OF EXPLORATION PIT NO. EP-1
� This log is part ot tha report prepered b Assodated Earth Sciences,Inc.(AESIl for the nemedp��o1'ect and shoutd be roed
{ together wttt�that report for complete�rpretatbn.Thfs summary app6ea oNy to the bcabon of�Is trench at the tlme of
�}} excavation.Subs�xf�e cond�itions mey chenge et ttus locaUon wilh if�e passage oF time.Tt►e date preseMed are e
b elmplficatbn of actual condidons encourdered
DESCRIPTION Approximate Elev.518 Feet
TopsoN
Topsoil and roots,uaoe concrete,asphaft, and metal debris.
� Veshon Lodgement Till
Medium dense,very mast to wet(varies}, mottled grey:fine to coarse SAND with siit few fine to coarse
2 gravel,trace cobbles(sm). No stratification or structure.
3
! 4
I5 Dense grading to very dense very mast slightfy motUed gray,fine to coarse SAND with sdt,few fi�e
; s gravel,trace cobbles(sm). No stratification or structure
7
8
9
10
Bottom of axploration pk at 10 feet.
11 Plo Cevinp.
Weak 3eepege Zonea: 1.5,3.0,4.0,6.0 feet
12
13 �
�I 14
! 15
16
17
�
18
I 19
I
��
� Oiympus Villa
� King County
a'
u
� Associated Earth Sciences,Inc. project No. KE110202A
�g Loe9ed by. BWO � � � � �
Approvad by: 6/?J11
U
Y
LOG OF EXPLORATION PIT NO. EP-2
� Thls bp Ispa rt oi the report prepared b�yAasoclated Earth Sclences,Ina(AESI)for ihe�med proJect and should be read I
togeCier with tt►et reQoA tor complete kderpreta5on.Thic summaryeppies only to ihe bcetion of ih+s trench at ihe Ume of I I
� i excavation.Subauriece condtior»mey chanpe at thb locatlon with tlu pessage of time.The dafn prexnted are a
eimplflcatlon of actuel condi6or►s encountered
I
I DESCRiPTION ppProximate Elev.618 Feet
Topsoll
� i Topsoil and roots,trace concrete rubble, asphalt, metai debris. Peat-like.
!__; � ^ Vashon Lodgement TUI
' Medium dense:very moist,to wet(vanes)mottled gray, flne to coarse SAND with sllt few flne gravel
;--.
2 j (sm). No sVatificatoin or structure.
�
3 -+
� _ , ,�
� �, , y Becomes very dense,less mottled.
5 �- ' 6
7 -{
, -
� I 8
; �
9
i
' �p
Bottam of eMplotatian pit at 10 feet
11 SI¢rt alougFinp due to seepepa.
Moderote Seepepe 2one: 2.0�6.0 feet
I
12
13 , i
14 '
15 ; I
16 �
17
I
18 '
19
�e —
� Olympus Villa
� King County
a
0
� AssociaEed Earth Sciences,Inc. project No. KE910202A
Lopged by: BWG
� Approved by: � � � � � 6/2111
U
Y
LOG OF EXPLORATION PIT NO. EP-3
Ic Th�s�08�s pert of tlie report prepared by Associated Eart�Sdences,Inc.(AESI)iw tlie named pro�ect end shauld be read
a � together wfth M�et repart for eompiete interpretation.This summary a�pplles oniy to the locatfon of Ws trench at the tlme of
ezcava�oa.Subsurface conQi4ons may chenge at tlws location wRh tlie passage of time.The data presented are a
� simplfication of achtai coodiUons encrountered.
� I �
DESCRIPTION Approximate Elev.518 Feet
_ __ _�___ - Topsoil -- -----
� i � Topsoil and roots,trace concrete, asphelt, metal debris. _ _
Vaahon Lodgement TII!
- 2 Medium dense, very moist to wet(varies)mottled gray,fine to coarse SAND with silt, trace fine gravel
�_ (sm). No stratificaBon or sVucture. �
3 I
4
5 Becomes dense grading to very d�se,and less mottfed.
�
6 �
7 � (
i � g �
� �
� 9 ' �
� 10 ��-- — - --
11 � Bottom of exploration pit a110 feet.
Moderete eloughinp due to seepsge.
, Moderote Seepage Zone: 1.5-6.5 feet
� 12 - �
13 -� �
,_ + I
i �
14 �
�
. I 15 '
� 16 -�
17 '
18
� 19 '
I i
nn
� Olympus Vilia
m
� King County '
�
a
0
� Associated Earth Sciences,Inc. pro ect No. KE110202A
Lopped by. BWO � � � � � �
� aPAroved by: W2l11
$
LOG OF EXPLORATiON PIT NO. EP-4
� —
� ?his log is pert o!the report prepered by Associated Earth Sclences,Inc.(AESI�(or the named pro ect and should be read I
� together wNh ihat report for complete ir�terpretetion.This eummary appfies only;o the loce8on of s trench at the tttne of f
� excavadon.Subsurfece conditlons may change at this bcatlon wNh tF�e paaaage ot tima The da6a presented are a I
� s'nnplflcation of actuel condldons encountered, i
i
�
DESCRIPTION Approximate Elev,b21 Feet i
i_
' ' Topsoll
Topsoil and raots. Trace concrete rubble. Large t�ee roots to 3.5'deep.
1
Vashon Lodgemerrt 3iil
2 Medium dense,very moist to wet(varies), moriled gray, ,fine to coarse SAND little fine to coarse gravel,
trace c�bbles(sm). No stratrfication or structure.
3
4 Becomes densa grading to very dense with tess mottling.
5
I
; 6
I
� 7
8
9
I
10 —---
Bottom of e�loration ptt at 10 feet.
11 No caving.
Weak Seepage Zone: 2.0-4.5 feet
,�2 ' Sight ayallo septicNke odor.
� 13
�! 14
;
i
' 15
�
16
17
18 ,
�
19
�� �
—Z -- -
m Olympus Villa
� King County
a' I
� Agsociated Earth Sciences,Inc. project No. KE1102DZA
R Logyed by: BWG
� Approvad by. � � � � � 6/2191
U
Y
I�
f� -�
LOG OF EXPLORATION PIT NO. EP-4A
°��% This log is part of ihe report prepared.p�Associeted Earth Sdences,Ina(AESp for fhe namedpro ct and ahould be read '
{ to�ether wih tl�at report for complete mterpretatior►.This summaryap pNes only to the locetlon of�trench et the Ume of
; ,a, excavatbn.Subsurface caic5tiona mny dienge et tt�s location wiVi ihe passape af Ume.The deta prosented are e
� p aimplRcatian of actuel con�dorre encounlered.
' ` DESCRIPTION
Approximate Elev.621 Feet I
TopaoN �
1
Fill
2 Loose to medium dense,very moist,brown fine to medium SAND with s�t(sm).
3
4 Vashon Lodgemerrt Tlll
Medium dense,very moist to wet(varies}, mottler!gray,fine to coarse SAND with sift, littte flne to
5 coarse gravel, trace cobbies(sm). No stratiflcetion or siructure. Trace organic(sticks)at 4 feet.
8 Becomes dense grading to very dense,and less mottled.
7 '
8 Bottom of exploreYon pit at 7.5 feet.
No Cavkig.
g ; Weak Seepupe Zone: 3.0-6.�feot
;
10
11
12
93
14
15
16 �
'17
98
19
,,..
� Olympus Villa
� King County
�
�
� Associated Earth Sciences,Inc. project No. KE1102U2A
Lngged by: BWG � a � � �
� Approved by: 61TJ11
u
Y
L4G OF EXPLORATION P!T NO. EP-5
�v
This!og is pert of tl►e report prepared bv Associated Earth Sdences,Inc.(AESI�1or the named pro1ect aod should be read
� logefher wNh thaf report for compbete Interpretetlon.Thia summary appIies only o the locetion of thfs trench at the time of
�} excavation.Substrface con�tla�s may chenae at this bca8on wtfh tfie passage of tlme.The deta presented are a
a simpific�lion of ecWal condidons encourrtered.
DESCRlPTION Approximate Elev.522 Feet +_
--- i - _ _ --- _�� _ —- —-
, Topsoll — _
; Topsoil and roots,trace debris(bottles and cans).
1 �----- - — Vasbon Lodgement TIII - ----- - -----
2 Medium dense,very moist,mottled gray,fu�e to coarse SAND with silt few fine to coarse gravel{sm).
, - No stratificaation or stntcture.
3
_ 4 ,
�
5 8ecomes dense grading to very dense and fess mottled. Trace boulders to 12"diemeter.
' 6
7
I
8
9
,
�� 10 ---------— - - — —— -— ;
�
Bottom of exploretlon ptt at 10 feet �
11 No Cavng. �
Weak 5eepage Zoae: 1.5-4.0 feet
�2 i i
13
14
15
16
17
18
19
I I
�� —
o Olympus Vi
� King Coun�
a'
0
� Associated Earth Sciencrs,izti. Project No. KE110202A
�o�g�d ny: ewc
� a�uo,red n,�: � � � � � s�ar11
U
Y
LOG OF EXPLORATION PIT NO. EP-6
� This log is pert of riie report prepared by Assodated Earth Sdences,lnc.(AESI�for the nemed prolect end should be read �
� tagether wph thet report for complete ir�rprets8on.Thie summary�i�es only o the locatlon of th(s trenoh at the time of
$� excavatlon.Subsurtace condl6ons mey chanpe et thls IocaYon wtth tf�e passape of time.The date preserrted are a ;
p slmpificeUon of actusl condldons encouirtered j
DESCRiPTlON Approximate Ele�.524 Feet
Topsoil ,
Topsoii and roats '
� Vashon Lodgement Till '
2 Medium dense,very moist to wet, mottled gray,fine to coarse SAND with silt, little fne to coarse gravei
trace cobbles(sm). No stratificatlon or structure.
3
4 Becomes dense grading to very dense,and less mottled.
�_ '� 5
6
7
' ' 8
i` �
�
9
, �� Bostom�f explore6on pit at 9.5 feet I ,
_ � No Caving.
�� Weak Seepage Zones: 3.5 and 9.0 feet
+. ,
12 '
13 I�I
14 !
15 �
16
17
18
19
-- �'�- --
� Olympus Viila
� King County
,
� Associated Earth Sciences,Inc. proJect No. KE110ZOZA
Logged by: BWG
� Approved by: '�i` � � � 6/2111
u
Y
LOG OF EXPLORATION PIT NO. EP-6A
� This log�s perf of fie repaR prepared by Aeeoclated Earth Sdences,Inc.(AESI)(or the nemed pro1'ecf and shou{d be reed
� loeether wAh ilret report 1or complete interpretetlon.Thfa summery app9ea only to the locetton of thfa trench at the tfine of
$ excavedon.Substrfaae condtlans mey chanpe at this bcation wfth the passape of tlma.The date preseMed are a
o simplficatlon of actual conditlons encountered.
DESCRIPTION Approximate Elev.52b Feet
Topsoil
� FIII
Loose to medium dense,very mo'tst, brown flne to rnedum SAND with sllt(sm).
2
3
Vashon Lodgemerrt Till
4 Medium dense to dense,very mofst, mottled gray,flne to medium SAND with siR, few flne�avef(sm).
No stra'trFicebon or structure.
i 5 �
�
� 6 —
Bottom of exploraYon pit at 6 teet.
7 No Cavhi9.
No Seepape.
B
9
� 10
� 11
12 �,
13 � �
14
15
16
17
18
19
� !
--�E�- -- '
� Olympus Vilia
� King County !
a
�
� Associated Earth Sciences,Inc. pro)ect No. KE910202A !
Logged by: BWG
� Approved by: � � � � � 6/2l1'1 I
U
Y I
LOG OF EXPLORATION PiT NO. EP-7 I
— - -------- — — ,
� I Tfiis Is p�art of the report r eredby Aasodated Ear�Scfences,Inc. AESI)for ihe namedpro ecf and ehould be read
� tageU�r witlt ihat report Tor cort�iptete hterpretetlon.This summary a�Iies only to Ihe bcadon of th�trench at Ihe tlme oi
excavatlon.Subsurface condtlons may change et�is locadon wAh 6�e peasage of @me.The data presented are e
simplfica6on of actual condltions enco�aitered.
DESCRIPTION '
- ,t—! -- ----— - ---- -- - Approximate Elev.628 Feet i
Topsoil � I
, � Concrete-Possibte intact strip footing ' �,
2 - ---- ----- ---- ----- �
FIII
Loose,wet, brown,flne to coarse sand with sift, wood debris with water in voids(old basement?).
3
4
5 I
6 -- - - - - - - --- - - I
Firtner based on difficulty of excava6on. Vsual observations not possible due to water.
7 -�---- -- --- -- — - —----- -- i
' 8 � Hottom of e�loradon pit a!7 feet
Strong Seepage below 3A feet.
9 -�
10 -
' 11
12
13
14
'15
16
� 17
18
19
,�
�
� Qlympus Villa
� King County
'a
0
sLopged by. BWG Asaociated Earth Sciences,Inc. project No. KE110202A
� Approved by: � � � � � 6/2H 1
�
U
z
LOG OF EXPLORATION PIT NO. EP-7A
� Thls bg is pert ot the repoR prepared by Associated Earth Sdences,Inc.(AESI for Qie named profect and should be read
together w�th that report for complete iriterpreta6on.This summary appApes o g�o tl�e location of Ihrs trench at the tlme of
ffi
� '� axcavaHon.Subsurface condtions mey chenge et this lacation wilh the essa e of tane.The data presented are a
a j simplflcaHon o#actual conditlone encountered.
i
DESCRIPTION p�roxlmate Eiev.628 Feet
— ----- -- Topao{! �
� Vashon Lodgement TII{ �
Medium dense,very rnoist to wet,mottled gray,fine to coarse SAND with si�, little flne to coarse gravel
2 trace cobbles(sm}. No stratification or structure.
i
3 t Becomes dense grading to very dense, and less mottled. i '
i
4
5 i
6
7
i Sottom of expioradon pEt at 7 feet.
8 - No Cavhp.
I � Weak 9eepage Zones: f.0 and 3.0 feet
9 -+
+ �
10 -t
� 11 �
12 -
13
14
15
f E
, 16
17
18
19 �
(
�� ' _
L'�—_—__. _
� Olympus Villa
� King County
a
o �
� Associated Earth Sciences,Inc. project No. KE110202A
Logged by: BWG
� Approved ay: � � � � 81Z/11
U
Y
i
LOG OF EXPLORATION PIT NO. EP-7B
I � Thk log is part of 1he repwt prepared bv Assce�eted Earth Sdences,Ina(AESI]tor tlu named prolect and should 6e reed
topether wrth tttat report for complete interprotation.This summary aPpl�es only�o the locatlon of th(s trench at the dme of
excavation.S�surtace conditiorts mey chen�e at tlUs locatlort wtth the passape ot tlme.The data presented are a
simplficafion of actual condldors encountered.
�' DESCR{PTION
Approximate Elev.528 Feet
� Topsoll
i �
FlII
2 Loose, very moist brown and biack SAND wi#h silt,trace organics, and sticks. Irt a wedge-shaped
3 deposit thickening toward EP-7. i
4
5 Vaahon LodgemeM TU{
Medfum dense, very molst,mottled gray,fine to medium SAND with silt,few fine!o coarse gravel (sm).
No stratificatfon or structure.
6
7
8
Bottom of expbrati�pBt et 8 feet.
9 No Caviig.
Weak Seepage Zone: 2.0-5.0 feet
1 p -�
11 --F
�
12
13 '
14
15
16
17
18
19
—�� - --
� Olympus Villa
� King County
d
n
� �o ed� . ewc Associated Earth Sciences,Inc. proJect No. KE114202A
� Approved by. � � � � � 6/2J11
�
f I
LOG OF EXPLORATION PIT NO. EP-7C I,
' � � � This log is part of the repod prepared by Associated Earth Sciences,pc.(AEy j for the nemed pro ect and ahould be read �
$ ; tagether with ihat report for comptete N�terpretation.Thfs su.mmaryap 6es ort to the IocaSon of a tre�h at Use tlme of �
a excavatlon.Subswface conditions may change at tMs loptlon with ihe passage of time.The data presented are a
a' � aimplf�cadon of ectual condltlons encountered.
� DESCRIPTION pppraxi�nate Elev.628 Feet
Topsoii
' � � Fi11
Similar#o EP-7. Loose,wet, brown,flne SAND with si1t,organics, and sticks(sm). '
2
3 �
4 Bottom af exploratio�pR at 3.5 feeL
Strong Seepepe below 2.5 feet.
5 Abandoned due to water-Moved West.
6
�
�_' 7
, 8
9
i
�� I
� 11 ;
i� ��
12 I
�-
93
� ��� 14 ��
15
', � 16
, 17
`-�� 18
; ; 19
, ;
�_
� q Olympus Villa
� King County
I'� ; � Associa#ed Earth Sciences,Inc.
Lo�ed by� BWG ProJect No. KE110202A
� Apprwed by: � a � � � 6/2111
�
I L_
;-,I
' LOG OF EXPLORATiON PIT NO. EP-7D
� This log k part of the repoA prepared by Asaoaiated Earth Sdences,Inc.(AESI for the named pro'ect and should be read
� togetlier with Uwt report for complete interpretation.Ttus BummaryappNes onty�o the IocaHon of th�trench at tfie dme of
� excavadon.S�surface conditions may change at this loca8on wrth the passage of time.The data prese�ted are a
simptfication of actuel conditlnnn ertcountered
D£SCRIPTtON ppproximate Elev.628 Feet
Topsofl
1 Fql
Loose to medium dense,very molst, brawn flne to medium SAND with silt(sm).
2 ---- ----- -- Vashon Lodgemerrt TiN
3 Medium dense,very moist,brown fine to medium SAND with silt,few fine to coarse gravel(sm). No
strat�icetion or structure.
� 4 I Becomes dense grading to very dense, and less moriled.
�i 5 -+
I I
6
7 -- (
Bottom of exploretion pit at 7 feet
8 No CavF�.
Weak Seepage 2one: 4.0 feet
9
10
11 i
12 I
13 �',
14 � �I
15 � �
16 '
�� II
18
19 '
--�e
R Olympus Villa
� King County
a
u
� Associated Earth Sciences,Inc. Pro ect No. KE110202A
�ego�a by: awo j
� App►oved by. � � � � � 6l?111
LOG OF EXPLORATtON PIT NO. EP-7E
� Thls log la part of the roport prepered bv Aasociated Earih Sciences,lnc.(AE31j fa ihe rremed pro ect and should be read
atogether vnth that report tor complete Interpretetion.Thia eummary e��onty to the iceetlon of trench at the time of
m excavaGo�.Subsurface conations may change at tF►�IocaSon with die peasage of time.The dete presarted are a
o simptficatian of ectuel condftlons encountered.
DESCRIPTION Approximate Elav.628 Feet
Topaoil
� Vashon Lodgement T!N �
Medium dense, very moist to wet, mottled gray,fine to coarse SAND with silt, little fine to coarse grevel I
2 ; trace cobbles(sm). No stratificadon or structure. '
3 Becomes dense grading to very dense, and less mottled.
4 �
�
5 �
6
Bottom of e�loraflon p�et 6 feet.
7 No Seepaye.
8
9 �
10
11
12
i
13 -�
14
15
16
17
18
19
��
� Olympus Vitia
� King County
a
0
gLogged by: BWG Associated Earth Sciences,Inc. p���, ��7o2o2A
� Approved by: � � � � � 612111
Y
I l_
ira-�.-_r_.. ..__"__ . ..._._.._ _.._....._.�,._�. .,-t--^- ..E--:_, ._ .-.- ..- . ... -'_ . . _.,- - .. - -. __� . ..-. , ._. . .,.. . .. .
� � �' . . . .. � . . ... .. . . . . . . . . . .
I
� �
LOG OF EXPLORATION P�T NO. EP-8
� Thts log is part of the report prepared by Assoeieted Earth Sckncea,Inc.(AE51)for the nemed p►oJed and shouid ba read '
� £ together with that report for complete lnterpretatlon.This sttmmary app{ies orily to the locetion af Mr�trench et the time of
I n excavagon.Subsurface conditlons may ch�ge atthls bcatlon wHhtfre passage of tima.The data preseMed are e �
�' slmpiflcation of actual conddia�s encouMered.
DESCRIPTION approximate Elev.b28 Feet
Topsoil
� 1 Vashon Lodgement Trll
2 Medium dense, very moist ta wet, mottled gray,fine to coarse SAND vwth silt, fittis fine to coarse gravel
� trace cobbles(sm). EVo stratfication or structure. i
3 I�
�
I 4 '
i 5 ^ Becomes dense grading to very dense, arxi less mottMed.
6
7
�
8
� 9
10 gotlom of e�bretloci pit at 9.5 feet.
No Cevir�g.
� �� Wenk Seepege Zones: 3.0,4.5,8.0 feet
12
(
� 13
(
14
15 -
� 16
17
18 �t9
!
A/1
-ZO-
� Olympus Villa
� King County
a
a
o Associated Earth Scieaces,Inc. pro ect No. KE1102o2A
g Logged by. BWG �
� APProved by: � � � � � 612111
U
Y
LOG OF EXPLORATI�N PIT NO. EP-9
C Tfis log is part ot$ie report prepared bv Aseodeted Earth Sclences,Inc.(AESI)for fhe named profect end ehadd be read
a topether wdh that report for compiete Interpretation.This summary appRee only io fhe locatlon oi M�(e trench at tl►e time of
excavatlan.Subaurface con�tlons may change at thlc bcatlon wMh ihe passege of tlme.The data presented are a
� simpfficstion of ectu�condHo�encountered
DESCRIPTION Approximate Elev.530 Feet
Topsoll
� Vashon Lodgement 1iA `
Medh�m dense, very moist to wet, mottled gray,fine to coarse SAND with silt, little fine to coarse graval '�
2 trace cobbtes{sm). No stratlfication or structure.
3 �
Becomes dense grading to voryr dense, and less mottied. �
4
5 -+
�
�
6 ;
7
8
9 C
10
Bottnm of e�forotlon pR at 10 feet. I
11 No Caving. '
Wealc Seepage Zonea: 2.0,4.Q,and 6.0.9A feet '
12
13 II
� 14
15 -7
16
17
'!8
19
L ,,.,
�� — _ .-- --
� Olympus Vi
� King Coun�
a
0
� �e�d�' �G Associated Eaxth Sciences,Ina project No. KE110202A
� Approved by: � � � � 6/2/71
Y
-- - I
LOG OF EXPLORATION PIT NO. EP-10
i � This log tspart of U►e report prepared by Assoctated Eattfi Sciences,inc.(AESI)tor the�amed project and should be read
� together wl�that report tor campbte irderpretatlon.Thls summary app�es ony to the locatlon of 1Hs French at ihe time of
I � excavation.Subswtace condfions may chan at this location wHh the passage of time.Tt►e data presented ere a
on
! p simplficatlon of aatuai conditions encountere .
I
� ` ----- DESCRIPTlON Approxtmate Elev.530 Feet
i � Top.toi!
� ' '�
� � Vashon Lodgemertt TIII
Medium dense,very moist to wet, mottled gray,fine ta c�arse SAND with sift,�ttle fine to coerse gravel
', 2 � trace cobbles{sm). No sirat'�ication or structure.
�
I 3 �
i4 8ecomes dense grading to very dense, end less mottled.
I
� 5
�
i � �
7
8
9
�� Botlom of e�loratlon pk et 9.5 feet. �
Weak Seepage Zones: 3.0-4.0,6.0 feet
11
I
12
13
14
i 15
� 16
' 17
18
19
_ _ Ln
� Ofympus Villa
� King County
'a
�
� Associated Earth Sciences,Inc. project No. KE110202A
o Logged by: BWG
� Approvad by: � � � � � 6/2/�1
�
Y
APPENDIX 6C
OLYMPUS VILLA AS-BUILT PLANS
i.
Weston Heights
Technical Information Report
� a' PORTION OF THE NW 1/4, SW 1/4 OF SECTION 11,TOWNSHIP 23 N, RANGE 5 EAST, W.M. �
� �� I
_�� �� � ; a
o _ � �
OLY� PUS VI LLA PLAT � t � �
� � �
� ! �
��� RENTON , WASHINGTON � ; � 5
�T LAND USE PERMIT # LUA10-090 ; ' ��;�
��3 = - - ��- UTILITY PERMIT #U110042 �n ,- � � � � � �a'�
, ,
� __�-=� ����= � , v`JI�. �-�,'..T ..\'�K�,ti �.r< , � i
� ��
��^,`v,,Z iHA? �QRTION OF THE NORT+t'N�S- OU4rZ'_4 �" . ��.;;1'FW[Si 'J..'`tT�- ��:i= � I '�'�,>
� JUARTER OF SECSION 'i, TOWhSHW 23 NORTH, wAhGE 5 EAST, OYMER / DE�LDPeR: CNJ.WES' O..Y�lPUS VILLn, �C
>>> R M, iN KING COUNTY. W�ISHI�^.70H, DESCRIB£D AS FOLL01Y5: ' `
9720 NE 120;h P�,A�E ' ' �
` KIRKLAND, WAS+�iNGTON 9803a
��'=� iu.GiNNihY. AT THE NQRTHWE57 �,^,ORNfR Of TME $CUThNE$T � � � I � > �
' - Gu�vt�Ex �f SaC sE.."noN 7'. THE`1C� sou'rr+ o��G n� wEs �._'=- OF�'CE P�iONE� 425-825-?955 _�c� •":'
EH .�. I { FAX NUMBER: 425-825-'565
S J :NE 0: SND SUBOMSiON. 330 r'ET TO il;E TRUE POMi' OF � . - - -- —.-- , '
3_CiNN�r�, � ENpNEER: OFF; ENGINEERS, PLLC �
'�r�Cc FIST t320 FEET. uQRE OR iE55. TO '� EAST UNE OF - � `�
� S:!BDmS10N. � ATTN: `JARRELL OFFE. P� { ri
?�+EHC: SOUTF+. ALON.^> SNO EAST uNE. J75 FEET: - � 13932 SOtlTI-ic'AST 155TH ?.A�� :
�Y�-..
THENCE wEST 645 iEE?: - - ---�, RENT�. W{iSMitJGTON 98058-'S3�
TMewC_ rroan+ t57S FEET; � '� _ _, 1 '3 OrFICE NUMBER: 425-260-3�"<'
7.iEt�� WESi 675 iEEi. uDRE OR LESS. TO TtiE M�ESI UnE � �^ � -. -- FAX NUM9ER: 425-988-D292
----- SNC• SiIBDMSiON; ,I-_- _, -
_ tyENCE NORTH ALONG SAD WEST LMlE. l57� FEE'. TC TtiE TRt1E � - .� .. --._. _ -. •�, .e,. i Si1RVEYC•R. MEAD vl�MMr dt ASSOCWTES �
� POINtT OF BEC�NhING;
� ATTN. SHANE BARNES, PLS
'_+� ^ EXCEPi 1TIE YMEST 30 PEE' THEREOF i0R RWh, �� -- . � � i �i
P.D. HOx 288 0
�� 3 A^� EXCEot THE NORT�; t"v3 =E£T OF ?N� `MES �5 FE-_"'. -�..n � .. � i -� , WOODINVI�f.. WASHINGTON 98�'2 w S� � �;,m '�
� 1* � OFFIC[ NUM$=R. 425-<85-'2�2 � �' o
�y - -- . PRO„=CT � _
FAX NiiM$ER: 42j-486-fit u9 z r��� �
v ~
-,�_, S 1 Lfh:ATl.^,�N (')� �_
� 'KV�" �1�'IF ` '. �Z�o�
�t �
- �Hs�tuuJ+r aNe aaoc��uR�s: ' _ s����' R :� ,�_ r �' ; TASLE OF CONTENTS W�ZYv
A � EL_C7RONiC TOiAI STATION NlAS USED fOR 1HtS FlECD �, '-'--
�aav�sE suKVEr. �;:u�.:. �eeETs ort exeEEns w�e. `
! ,�� _ `�i..----� ' �� I+I �ri�ET NUMBER TI W�Y��
_ 332-'30-090. f -� (��¢ w
- �tT` �F SURVEY: NOVE�BER 20�G ! CQYER SHEE' ;y_ `
- - a,�,: r�nw es M.0f9IYYAP z E*�Fw� Nc-�s � Z
= Q 3 =�RdSiONjGRAD�hG °'�ti� J
� �� BErvCMMr�c: C�TY OF t�rtipt� gtit 4 RvAD/ST6RM °LA!d & PRO`:,c `—
� vOqJt wWE REMT2tOtf 6COPPER PiN w CONCRETE 5 ROA�jSTORM PLAtv & PROFl:�
��~ AT 1F1E MtTERSECTiIN�t OF S.E. t207H ST. ANO 148T+ 6 c?cTAILS dc NO'ES
�a IN•
� - �VEraUE SE. 7 SANITARY S-`YYER PLAk
ELEV. - 512_02' 3 SANlTARY SEWER PROFll� dc �_iA:_5
: a S(Tr SENCHAIARK: ?BY-A F►ID. R/�Rd1D �IKE UI THE NORTHWEST �' �TORMWA?GR �AC�L:iY � - �
:_. ��� ��:E OF POwER POLE- E�EV. . St9.39' � v
�i� 'HM-B: iTfp. RARRWD SWf� IN 1HE NORTHWEST
i� cACE OF POWQt PO�. ELEV. . SiB.93' a �is.r r m.v �o errrz+'r ,in�zr LL _ �
� � � � w ! �n.o• ro.e• eo.c� ao.a so.o� -
� � � i �.6 f ` � 0
Xa � qr�_ � � 04` I 1 � = w
�M�,tFs` it. •. ,��' � o .� � � 0 � �� ' � ' ,
' $ Sti�" 199 Sfl -' Q. � �,�.y s� p�` � 6 O'`'� � ^ 4�� a/`� � c!� .! ( 1 I V - (j1
. � 13. 0 e _ �,,� e ��l�� b i b r � �
" ■anri,•. 9s.ar i �� e' � 06 0� o °7� �°�� � `�°�� is3•� � �"' J �
'I ;' w' acr rs f �• o ' o � .w � r zas•r � �
I� i� i� i� „ ».r �o,u� ! � �• '�• o• l
, �CErRER �CT10N 71 5� � 7n.0' R�2SA�
� o :6s. �°D� w.c so.a � �.�a27 ,` / �� n J
� ( 1i - _ a� �en v� J+; ' S 9 . �i� .
i � zI ts.o' - - - _ _ _ _ x 1f�`! �'p�Q'�`��f� � Q .. � w
M IT1711'! 61y.2p- -�'1...7 � "' �
12.5. .4 � 8T� � � w
;' W ' � ' � -J � 2
3 ' „ x.a � `�
" � »-:sa• �� � � � (n
� i, � �',�I cwsr,�enT $o; `�—� ' - � �
i !�� �� .Le�cjl' � � � , � �
' i'.. . � �Sa .. J
' ».a' � ,. Q �
� , • � � yes aC, F- O
I G
� � ' Sti �� ti � ,
I z �.. $: �o��. � �t ' �. o W
�, � '; % 'yy� 2Es.)xs z beg� S° �I J � ,
! ij i! � 7JA' 8.fi � 6.T- 5020' O . C
� o �'g �e nrzr w e�s.00 � Q :_
; , I w .-5� CQR SEC t0-23-5: FOUhD `-'�2' SRASS ��_ .,� .,. U �
�� ,S„ SJRFACE 6pN. W/ PIAiCM. HELD PpST'tON. =I �' � ;z ��
� � ' � �`/ ��TT OF RE,NTOfr COMRO: MON d1852 (3/27�06) �. y � ff�� W w
� N 180'904.�37 Q j_ �u ..
I E t3 1 6622 3832 G F PPR VA' g Iv w
'o „ NE 4th sr�� y� GR.4 Pf I!C>C_.�LE' ,� - o,�: , r o�.� o�o„
I i ,.5 �4 �N 86'27'OY W 2W2.56� �YtEAS� N —�'.--.��p2 0 30 60 S20 ;yy, Ooce:
88'2�'2'' W 2E22.33' (M�) f =y4 '��
i I ' 4 �
�,� �o T�� MAP . R-3 5 l0 I °��°
I ;ncn c 60!w� '9r� Dota: —����T
i ��i z p> -.-_ _ 1 � 9
;
�G; ,_3sz�'�,
,. ,
_ ' ,,,�,,,�",,�';",,,y,.,, UL'�'Mf'U� VI�V1 i'll�l (I_1111i(1 Of1(1) 03/29/Zoi+
_ -- _ ...,. _. _ _ � �� _ �., �► (.;17'Y OT' ur��irv r���Mi� yi.i>>oc7n2 +�,;_.
._ � ,,
---- -- ____ . . ...,, - ------- --- r _ .� ����-.�... F�i.,.�� � , QZF n� w�w�u�p� RENTO , WASHINC,f ON _�
- uniu�n_ < ,.,.., N
NU. R,NISIqN 43Y DAt_ Mf'R ao�__. �a�_.
l_ � � 9
N N
P N P l. - (i m t* t o �+ Cl +D a . . �" . . . .
� �� � ��� �^� ����F� �.:.� �� �« �` N �� � 47A � m a. t� r,� . �.
"'��TM �. �n� �� ~. � �" � � �' �x �v ��c�d "• «� , 3�r �SN-�j, ��=$ �i�`�o � `�' �. k,�„� ��,�
��� �� ���� ���a ��� �� � �� )���� �o����> � ���t ���� �� � � s'����* �`� ���� ��� ����> .1I�q�:�l(�y);� '[¢� � ��: � ���p (xJN���j ��p���,� :�,
� ,� � , �, _ _
� - �,. . �. p � ,,,
� , � � Z�SID � � r ` I..... V �� .ZI 1 � ��� �<N�VI �� f- MY ���U1���Sr� ��y) [) CU'�C ,1on�:7�
y y � �+I�� 'R � y O C_. D• O Cr �� ��.� �..� � OtA A1� T { `I
''� '^� v$ � g �� " �Z �q � � �� � r� g,z�� � �� ��1 ���fc S".� � .�� z���c�� N ^a� ��i � ���� �� fs��,��U�� ���, -r� � 3d�� f5«�� � �'�
, z� � � �� <, [� z ��7 z
�` 1 y p y Z ■f�LpC�Z m b v� m I� tn i oo �(� (�,�lC�i � y
� �ro N „4{" Z S�' ��� R N �,� �n�V1 Y .T.^MUI �1 ��� 7. � ��rF � . �S �aN '��� "� Tj� ��1�i�mW�=9F "� � .'O [iiL �1�1M� "�
�,pq �a � a � � [. l� �1 � x * �'� 'yi? �� �1 �z-e�-. z ' G �r ,^� '�' a tl � m 1 �af
e, y v� r �o �� c �+, . S f �+ r� '� � ,uL" o F � T� �i ��� .. > � �f a� r��`�c��Z�q p�1r� F � � i a
� -" < v�7 ' r� �i � � � y � p q a... non � 'r� r�' :� �''° �� p� .
+. � � Q �jj'j � ��y�0 � y b �x �Y O� � Cj i:g � . � . 1 �>n +.i+�'�ri � � � �Z'
n � IF � ()- � � C rv x3� �y£ �' � . - 3 t7-� � 7 C� � S^
3 A% �'Jlk p S � �"' �y Z K� � F � T � � zy �f � )Cv
� �i ��q� �S � Y � ] P f � Nm Z m F � 22�C�
� $ � � � '� R r" o ��1 � ' 4 w Uil �n � �z0_ �� �'
� �� fj�i �� � �y 1� mo� � �' �^ a z ,��� �,_ 4�I�n i ��_ '�'o � �m z �
,.. �� ��,� �9�� �my � � �� ���� �"���r£�� � ��� �€� �� � �� ����Nv#� ��ii�� ��+�€ 5 '0 ���5� ���,(`^�����{¢�T�� �g��' �� � � � � � �Z�N
� � f � 44 ��'i�j. ��n '^ r^ �� �;�^ � c�i��=�yp� � oNZ� �I�1� 1-� '° �� �7�om�4��� F,�`�" ��""�� i�i�� ^sTf. ;m"�:�iE§rp��W�.vf� _ ��i...� � � � �`� � `�W'y
�7 N�....
�j � � � � � � � � '� �.� +1G�,� � �o z F�1 m Q � �I.,i� r� u� U9-� `I- � #2i tl L p t� � T.[�^ � o ��gg7 yL
$ p �y �5 g � � Tr� y1 N Y O G)2' �i ryy L$S-fY
�� '* ��� �� � u�q M �� Fi������ �y9 ��3 AN� u S �� j�>e�'���' ��� ^��-1'~ z��� g� n ��F> � �u� �m= ; � �8� � ��R pC' �z
f.. � j � � g z s w Q x ro o 0
� � �o> � � � '� � �� � �Y' U�Nr}x� � �' � `3�y � � r"���' � r�aW ��y� ��o �lEr�"�,' ������t������ ���Qf^6' � 1iR� ���q" ���n-;��
�n A � a r F, i'.�r �
cpp� � 1Q z • ��ZZ �{����� � 4 � � CCC��' �� �.. u, , f'r� au r
�Z � Zy��' r"7� Y'S s�' u'lE� .+� � � � � tM VC � Q �p AT ��� W��, .. ,� �D�C "'_y �j ��". ��r t7e�[ S? � �� �w_ 2.F .11'}�jn
$ �� �� O r�i � �f� � L Qi ,� Y o a: n `-�� � �4�.1��" . '�' �ns�^'�i �
� 'a� �� �� � � L. � ��G�-. � Z ?� � � ' � �(�> � �tio "'T^� �� ��oR �'� '�i�}�r`^ n � � � �� � 'Q �
`i''^ � p'�iga h u� ,� .� g. `Sa-r� .y �< ��L sa��� e '� �"z� o��`..Y �'��=,' I� �+" � �' �`�"��-
2i� g y �[��� � N yy � y 7F (�1�z Q T� g p x �nn• z r �/ o
� �Fp ��~� � (} � y .�.� � '�L��� t�1� � i�i�1� � M'�� "I 'A�� ��1�~ !,� � Or��it.r V, 4'ppi'j u1 �� U� � � yi°�� ��C'�" �. D.
�� x ar � o a � �J V�7 � ��� a a� t � t �q�..�z �� c� wr �� �* I �� �° }r7 '� °�`. r ��c�`
w �] 1� „, � � 0l��i O l -��� �n U � wNen -�m0 V r.f �D� ���{C $ .t�" 1 4
i,+�. a�� y(7 � �y+�� y [�� �R1� � � � � s � �-Y� y��.c � � z�5�♦ �� pfm$ � � [ � r�w
.�a A � ��� � � dN "' r� F� ��r'-�O � � p�� � np ��A- C �r° �� B Lq )1�"'y�Y- � p� �tn� zv � �m,y �?"� � �i
�}��� K � -1 Y1�n �Z�IR �-�'Jmf � �p�m C $9 �C � � L Z '�b � � �Vn �2y�: ��W ��, f .QiQn �t �m-,
pN �Y�� �� � � i��� �`Qx� TM� y� � M ���� ��a �1 �� �� � m\vi�� �'^� Q����i�6 � p(� " �'ii +a �
p () y�n�. ��". L4n u 'j[9�z'�^„.pi� Y T5�y �c)
�� ��� ���. � \ �1�,����� p � �p� � �b�"� ,' ��� . �T �� ��A � ���' ��� � N O�A A '^.A� KI�� �}�Ny
Y -7 T{[J,� /'1}r� a R G�p 7 �Y�j v�7
� � �� �� �� � � . � � � ��� �� ��� ��pQ � ' �Jy a � N � S �� �n���\ � ��V � � �`
�.,� � � �� ��� y � � � � � � u� S ��� i� � � � � �m � �>
.� � Z 8 '�G '1 � h- �N� �� < �UnAD ��� �VI� N ��
zL � � � n � Q' � � '� ;� c� ��(:1 � � ��x Bm a:-+ . T�" ycY� �o�-. i o �K �v
� � �� � n �,�3$ �!. � � �� �� � � � � �i�' �' � �� �,�� z�`. ;� oz� � yo �� � �,M
�� � � � � �,,�y �w�g � `�� ^+�,� i ��Y;�x �S� �' � y� ��'�^ " ����in�'����� �,� ��„! ��� � �;
�4� ga � �h �m y,y � t� '�P11. `��iL� �r$i� t�' �,Y^ � � _ ^'�U � c �y Liz 7.m"" �s"�.. 7t5C1�r�g{� �n `�� �ni� x�i-yn �-^5°f�
°!� � ��y�y( �Zm � � � � • ��� fnn� mf'ein �tiJj �t�nyyY . m� �� Q"{p/� :� �'`z�t ��.. ���T'�' U'p".{. y�u{,� c4���
� � L-i -iR+� Z � � � :�Q+�N AN ���- �.� ��D�Z p�� n1 ��m N 4� tJ�p �1 U �!�{ � .
�� � � �� OM � � � m�" . � r.Cl �A � �p�l'1� �� N ��q '"� '�
RI �� � �
�
N O W (n Or V' , W t.f � � U � y }N 1.? , O �D lb •.! O� Cn l+ N SiNa p 4
� �� Y O IM �(>.0 Vf A i��'V >( VD 'V.y � CGO O =:E � eq���Nf�� O�� Q 99 C)IOY ' D � � V'A 41 �' Try �Tl.t >D A O
�< :� ���L�� S� � �' � � �Q A� � �� � t�r�, � r g��" `�o � ����� m€N � �� �� � o` ��� �t�� `�� � ��� �,��y ����
� �� '� ��������� ��� ,���� ��'� �,� �� ��� �� ��� � $� c������� ��� ����� ����� ��" �� �$ �� �� � �� ��� � ��� ���
m � � f�� �����n� � `�j' °`�'a c��'�' �� �' �9�,�,*, �o� r�.,3 y,' g'� � a��x,r„�� q W � �^� ggr`-�+'k' � � `' °9 r� �� ��r ��� ��� :z �� �°�� ����
r y � � � � � i � � ��. �}
� , v�..
� p� �� °���_���y � � ��a � � �� � ���; ��p`-� E'� Z '" � �3b,��� ��� m a���� ��R���. ��� � �� �� � �cf ��yo F° z ��� ��
1 � f� mp S! �=r �� ry Or� tnr � D �Y n0� L z7 .i r� j flr) c>O m v y �Qt O+i 7 � � � � Q �
� �� `� � •N�C #.L 4�m �r[ X ` # �f�i^� � z ...r = r� GA��� � .� �5�� y�C�� ��N � 8m �1.. � �VI �.�'� � _�� � 6 �� �
�►� � �'�'a �� �� �A �� v� � �a� `�, A�� 7 � 9 � +-'
�n `�'�R', � � � ���� � `2 � � �: a ' €Q �g 4fo�'}� ��N ° b 8 '�'s s� �� � �+;'` � � � � ���' ��� nr9q,�
� � x��mM�i� �� ��� ..��� �� � ���� � ���� �� �"" m�p���� ��� � ��+� � ����� � � � o� � _� ��� �� _. ��� �i� � C�
m �� � '^��8��°s � 1 ��� � ftp � � � = 4,� � ��•, ��Vy ty`� �'°�' p 3ZY'�33 � m t�� b �F � ��� �� ^ 9 �So� ,�,�
� ���y� ^ s�� Y� r� v x. CS'1'4-i * ��� � Q � � �_ �� � 7
`� �a ys$_ ���,� � ��� m�� � ���� � �� � a m>#���� �� �F��$ ��_�� �� � � �� �� � �* ��; o�� ���'
(�n
� �� �� ���-"'�+� � Sp,; �_ �6 �_ ' �� �� � ��� �"� � �'�,� � , �� � � � � �� R�St � �
����7r�w� �� - � �� � � � � � k � y �� � �ib � ��� �� � �' ^ a� � �m' �� � �{
� y A`lny r C +�yj 2 r Y1. 'y r y 1�p �1
!h �� �� zi�Cr'�la�g ��' �� -i� �� m ��re'�� n� V� +�j � m� n1 �O � < p �� �~mvO �� � <m �� NF
� ��� O �r•1�- Z� p � m � � �� v ��� � � � � � �
CI p s m <UXn t''i ,-�^ ��°� �� �. �� �o" � ; ��o �S 4y�31 $ � ,4 �� � � � � �
o � �� .d� I'���� �n. ��J o� � � ��� � � � � � � c� s}� � ��� �A'iv�L� � � � m� Qi � S�i �; �q� ��&
Y� � k�A ���'�o�� � ��Y ��� � Q� �y5 � �� � �� � � ��`��]� �F� x�'�^$ �'�`°'��' � � � � 7v r���
7 �$i % c� �� ��� o r'�iK #� ��I �Nl�1 �Q +2°' y C�� �ig s#�g �m��� �� r{t ��r �� � ��� � � ��� ���
w m� t ��m�n�Ni � Ir L� ��J `� yF� �a� . y{ � 'A �� � y Q�S�' g vk" �ist� �Q y� � � y� 5
�� � ��'iL�.F�y i.{� r�.�� o �S� ;`4 M�� ��i � � � �"�N�� �� ����� fiiu�� 7�}��> �� � � �1r7r��. y�� �`�'� �gp � � }-a
y;' � � -i Y rl I'- .O � � C �' r r�� Cj Z � T o �i� ri� � 'f�y
D �� � �;����� e � � � �� �� � �� ��� ^y�y' � � �"��� �� ���P� �� � �� �" � � �� � � � _ � � SC'�
z "' i�� �����^� y�� ' � O � �� ��� ' �1� �� ��J� muI `����� �{ary�s �� •" � � �, � � �!� � •�4 ��'[
? � � v�Hp� �� {�� � �y � � � ..c �y�F��., ��� 1;�•jy{ -� � c� �yy,� ��' yN� ,N¢ p �
i Qi j ;a'^���Ti+RT� _3 � � ^�� ��j� � �N � �in. �' � �� �x� �6 'N Ki � �� � 'i� i- g �v_r'.u,
� �m,� rnpF- ���tr� x �i�G � � 5�; �7�0 �.� � Pn����%� �� �vi�� �� � � m � � �� � �a �id'.'
� 1 yNlnA�l�l�� �^� �-� �'d � �g ��� x C �� � �-' �i ^ < '� z � � t
r � �_7 ) x� � � ��� �� � � >' �� �o��l � � s � ��� �- � �� �"=
' � ��D^ �y� `.Ii o �� �5 k� v= o Y �� � � z y��'> � `" Q' `a� � zi7 �,'a-
� � ��(pp�J(��-� <�� �� � a ��yt � g ��� � �y� '77^��� � �� ��� °s�t - � � # �� � �� ps ;c�
�, �,1 �U 5 ��� � �j}t �� � N �y� . S�� � �� �, F��� �fC�� �f*�1 1� � � IA � � � �i �� O� ��� Iry l.
a: t = f� � ��a � y� �r� .�r ( ���
� �O Gi �� Z A L�i Gi �[ a� i '� �� � F O v
L �T � �^ �� �i / � � O 'o � o n � .
N
V!
o '�
u ni P � P If !�
�7�A �
=��5 ._..�.....`__..�,....... �9 !������I�i AA�+a�" ui�>�� F �� � ���
m m I CV7 n {.�
� �o�Si7�� � (.}��,t O� ' �� r f)C� \}� �"i�,
ii "''���" �� � -�T.. _�._ Zf � ����� '��,�"' F��� 3f�� ��s
c,[i7 �$ �� � P. ' I �.. �� � ��^e� �°`x7�'y� �'A� �Q� ���
;
~y �^S cn �r.� c ' I e yy$ sFi �c-r v n
^��
v ''°� �� Em � �� p. .,,� :g� ��^�� M� �j ��� ��
, �6
i �C_, S
� �'�. � t. �o „ � �"�t � �>�('. � �� Fr� ° a'
�� � � � �� 1 ���-, y ���p � �$ ���� j;�`� �:.
'�8i fl� P, �Q, � ..� �Eu"'+"-. �: y�Aia p�� �;��r � .� �s
�
� r� p � � ����
� 'r.� � � `, I... nSn �_ :_i - ..._..._. �rom '9 � ij��7�g� g��� ���� ��i i�
� . ...'] w'A�; t'� t� �i �f -1 � [ (1
1 r*� \ _..___ n ' c��, ��, �o��t 3'�7� �'k�� t.4��. � � ��
� A � � .... -....._�_.. � rpiw �0 � ��ir�Yn' ii�t!'�� T+:r��� ��� ��1
D � q -� ��' o � n �o�re9=� �o '� �,u"� ��� Z%a
� q ' � "�{,, �� '3f��� ti� ri^.
� :�Tl Y � ..�'_� °i >� �� .��1taii rn ��� nt�'�m � �:?�
o �p � i{� � rn
C7 �.; y� U
�,,,J � �G; � " ����� �-�� ���b {�� ��
� � T'2 2
��� n ��S�c��in�� �9, �� �^vim N�� �g}>
� Z a u, �,n p f. nr .. D �g� ,�5�6�� :S��n�" a�r� '�� �s t
�Y� 9 3 r � �"' � �
N s yY�' � �ts"�'=� �c c� �� a 1 F �n��A�, 9gi'^r "�,o F c>
O �Nr�r� f �ry. o -si��� � ITI� ��^ l"n i �'`i��� '�n�io Pn' 1'i � �z
m $�. � $�A �� 6 „ �� � � � �y��= � �^ o � � -
.. ,:
N ,
-� �,� . � y� r� � z Hm� �� -•.�'n i 5���'''T" ��' z �o �'-� „ m w..
(p �1 m_._. r ��R� ��� �� �irry�y� �i "W �'' '" tN�y��r�4r� �i��.%i o�� '� ���
��[I Q � s m p 1 a pv�r. � �Q,
;1 �.5 '.�i � � ' i.� 2 C�1 � �Cx� o� � b� � �Y<�.L'�� yLp �� 9�T ��
� \ L�� � 8 �A 8 � 2 o
'1��,�/�)f q �y F��y� v)��y �� Q�(,]C '�O'j N �� � ����m� �^.. r qf�� ��� �rJ
..�� ' �� �...Y Ei Z�S 2 2 'p'.' (Y.Ay� f7 �g'M S) .Sr�Y�. �� � n rl
(.� � � ��� � � ���� � F
� I � � �� � � � ��� � & �� � �
, _� �
e �
�j 1 � �� q� � �'�;� ��� � ��'�� � �
�� � �� � � ��� ��� „ �Q��;., � � �
pg gq $ + Fy tiU+
n S 7Y S �A v � �� ���I,� \ "r�`i. �
� � � � �_ ��� � � �
� ���-f �� � �� ; �
= - mr (rn < IIQ�A �� � V
� A t � ��{�
MtOJECt
' .. ___ _�— __...
►� �Z � � OLYMPUS VILLA PLAT OFFE ENGINEERS i ,. �. -_ _ __._
O 13y125tNJilIfAST15Y�f7�IPfACF �¢����u,kti,
.._.._..... ......... .... ...._... HI':N'11.7N NAti11IN(RNJ'/N(Y".14 ; .. . ....,. ,.�.. �...._. _ ..._._..
� CLIENT .... ... .. I'I IC1NF�.�:S2W 3411 I "�
" � � CAMWEST OLYMPUS VILLA, LLC CVNfA(T DARRF.4LC1fFi,pF. ; __
.__ .._. ...... .._...._. . ... . _...._ ._.... .._.__ .. _.., , . ..._.,_ .... .� . . ' •.
� � SNfCIC(NJIf'.NI OF.SI:NEI)BV 17NTWNOv C/�ECKFOBY !'';.', � _.... ... ... ........
GENERAL NOTES � _w..._. ..W...
�;<<, vs �� ,� ....
ae�.+no o�rc oEscamrioN
�.,r.�
�� i,��iuisi,uitn�
LBS�.-01�-Q��I,
_ _ _ _ _ _..... �_ 1�sC""':�"»� � C;1`j'1' �)�,, C'.)!'Yh�f'iJ`> VlLLA @LAT (LUA10 09C7) na/r,�zun
_.__ __ ...
_ _ �� r�n ' � l�fI�JT r P�.RMIT #U110047 _ .___
_. . _� _ _ «�., _. � ' _ ItEN 'UN ��r.��c,r�, wr�si-�wcTON
_ ---- '� I `
_ --- o.a=_ ...� ��h��,w
._""'__'_ _.....,__..." '_"_."' _.. `..,rw..awy�.{ f� Vton��nq/�u:�Ui�ry��'ubllc �Y�,x�s U�:rl
rawe �
M0. RfVIS10N f3Y DAIE MPR .+'�_. �'...�_..P
. �� �g��
i �
n
Y Lid. ��' j .
r
t 1
� .
,
' ' " �'i i ._ ./ '
,va,�:.>.r, . ,.�,,....:Ivi. �inl � k ��.i.
. . �, ......s �...WI_.._. '. .,
' .'::�.� ' H�� /�Vfr.�l.�� ��� .. ... ___... .....___'_"_'___'"'". .
.-`�f � _.w'R
. . . ,.. ... .y ., m '�'.'��..x�.�.tilF'.._.
.���� ' � �n r__•. ;,.
a " ��. !; � .. i ^�.. .�. ` 4 �µ »��i,..
� �"�� .� � T` ������_
� � �
� , � �� � �
� � �. r . � 'i,�. . . ,
. FI � ���_� � �" '� �I � �� N ,
�•. . a ry� � a ��a ;' « .. .s . � `�i�Zj� � ��' J �� . ,
�Y� ��� ��������"t �� # � � a���������a ���f'��� �� F r�� ' �1{�� �Q�
. � s� � u ��•
� ,
� � I�� h� ��� � �7 �� ��� � . � , W Sl , J.. , �... •\� I
� � � � � � � t � � �
, r ;$�s� � � � �3� � ' I "� �
�� ��� ��h`���g��� ���� ��� �����"��� �n.�� �� �� � �� 4 ' �+'� � �� !� � �r� � :
�
��� �� `2�& ������ ���� �g�� �#�g����� �� � �g���! �� ��� ' � � i....
T F . �_
_a� �� <g��c�� e � A�a ���� ���'����> ��������� �� � � � . � ; , _� �
�� � �� ��� � 8 � p� �� �Q� � , �
��.+ ��� � ������� � � ������b���g�� � ��f�$�} � �� �¢tc� � � ; ; �
m� � � �r��G. 'S� .y��� ��� . ►���,F £'�� 7��V'�r��5��� � `� . �, w„ ...� . � .
..� � � �;a����`�'�� ��,x ��� ��������" �.E� � � �� �� � � -
< � �
g �����r�,� � � ����' r>,'�y � � _, � ��� > '� i v �
�= �� �� � �c� ���� � sr� �4� �� �����$¢ � �� �� � ' � '
�c- � '� �
� ��� � �� � � ��. � .� �
x �� �� � � � �� ����. � �, � o� �� : � , � -�
��v �� � �' � �� � � ������� ����f � ��, ' '
. , o
�� � ��������� ��� �� a��gn � Y ��� ���� � : � � � , l�._ � .�.�_,._._. __ �
< � �` � � ��� �� '� � � ; ' �� I —1
z � ��� � �a ,�.� � �� �'� � � ���,�, � I � O
� � � � z
0
�ga � �\ -n
, � � �
v - u �-'� ��� _ . _ .._ _. � m
� . ,n ,. \
� - � `'•�. �
__�_— �� �,
'� '� � �.. �� \ I -- ��� Z
�.� �a �� �
����� � � � ' � �
C) F y� a �' � ��-� & � '� ,,,�
� �� �� � ^��� y` ��� � �-.� '__ �. ..� __ ......... _._ �� A
�- �� ° ���€ ���g � � j � � ��� �
�
r � � � � g
� �� e� ��� -s �; ' �" �% I �� i�� �
�� �� _� .: / I r..
�� �- .A
��� < � � �__ _ _ _ _.��
.y' � �� � — - . .$.._.._. . -
... --_
�� � �' � ����� � O
�• .
�
�, �� , -- ��� �� rn
,,, � - -- -...._ ___ _
,� - -- �� -- -- --
. � . , c�
� � ; ��� r. �o.�,,,. �� �, � � .
� �
� � ���� �� ,.�� , � o
� � � � � q� � � ��� � � � z
� �d a�� � , ,, .,, � I f . _ _ _ ___. - �
� �j � � � , � o I
� � �,. � . _ _,.�.__.._ � 1 .. t �
f
� � ��i� � � � _ _ _.. _
g A f�-� � �
g �li � ., � i r i _ N
• .,:. _.. ..__. ,_.,�_ .�., / � + � W
4'�nn /' : _..�. � 4 ! *
r__
N $ ...-� r'+tlCT PUCf M •., . , ��� � .
'. ._ �............__- _
��"� _c ..�_,, . . . ptY.y����.f '.' . _,. .__.. � ¢� � •
��c ......._ ,.. � � . L:
�� �,�' 9 ...._ __.._ ��4dr i . _._. LL 1 neH„sws_.., 1�W
• r . � _,_ -_,_�
�� �
/ 1 d� � � ,r,'�.vr �r � ���"�^ � � � �. �.� �
Ri { � '�q�� Rlv.ehne . � �'^
\ ./ �p ' �, +�•� f ,f-, t���' . �r� �'�.... 'prµR,u;•'�±�r� , _- S!a �1
�.11 � � < � r '' �,':,ry � _.u:. ,�. � ( .��.f ..�a m1�
ri M��i � •� � ��J' Ix y t � �'�J� (�� 1. a' J'
� P R � �
.'p �� � M',,,� ry 5 . � , '� . --� � 4 �� �
,. ,Y� /^'1 _" ..
�J� I
o �N ��-.. `;?'.YL� !' � � � ,6+''� -�
� �� Q � - � (; _ �' �' � � � �:.-- �
� � '-'-'��-�'-`� �
__,
7 �� � � � u � �7 a '_... `` . � � � �
�
�
.
�r �p i �' '�F�,� '',�� ,.�,��� ��� � i..._��.._.�,� ea.
«, �'J ,y � �,,
�'.� y1a $ Y:.:.: 1 . ..... ...... ._ �� f , Ij
CJ ^� Z 1 ...... l� � ,� ' �� .�� �' � � � ��n7,�
� � � �d // 1 S $� 3` F
-i �� � � ��r� � p � �� � � � � �� �
. .
_ �_--- � �� � g� � _�
n �, �' �1 � � � � �f�
Y :.
�- t _ ... '� _ - -- � � � � �� ��
�, � � __ --
a ye' s• �, fi �' �������N c�i
.. ' �..�...�.._ r� ����r��t`' �a
� �
, �° �e' $� � ,.
� 7
m .� -�, — ( '� _ _ I � ��� c �-
�; I� . �. � +I- ` n__ � � ����;m U
., =v �
'� v
"� 3 U�z V � ` ���. '�� � 25 rn y i Sj
� �i�'�� a � � �� `, �' � t y �z��Pi+
, ��� q �
l Q
�� ' ....N � ���. � ��� 3� � c` ( J� `�j �p7 ���0
lh ', n U .b �� � � �� � . a _ � p �v��o_��g
5 x
{�) ' ' � l_ f ` i_ �� �� �7�� � � a � N aF���a��
�� . i� � � �_ ,' ,
___ _
n � .
i� � � ��� �� � � � � , �� � ������
� ^-��
� � � D i � �' ��$ � - - � �..�.,► � ��� o���
„ � � u = � ��� �p
� s � � �- � W , _ � ,,-v
--�-- ��,
^ �, __ t ....._:�1 ' ��,T�O�%,
� ". - ���1 � � T �
v - _ op ,
p�FK1JEGi
OFFE ENGiI�1ECRS �"'�
w � � � OLYMPUS VILLA PLAT � � _..- - ---- - - .
y z � , IiH.�25i)Vt'F1FA5'Ils��llll'I.AC:N. �.4'�",f;+r.i�:•• ��,,....._ ..
p Cj 1 Q, �. ......' '
' ....,:_. __.. ___—_ ...._ . .._...._. . _._. .; !tliN'IIIN�WASMSN(lY}hT19N0?iP ".
� C41EMI . ..- ... i 141UNl4�175.2h(INI2 . — ..." .
�n � IONI'A(T�i>ARRFLI rIFIF P.F. �' ..... .__ .....
CAMWEST OLYPMUS VILLA, LLC � � ��
�y � SHFE�CONIE//t ..... -..... . .. .. .....__. .._.._.._. .... f)FSIONF(1flY�...... .. �� OMWNOv .�....... � Cf1FCKEDBY...���_�---� �l�('�' ,,� � ��11/ PERCITVCp1,IM(NISbAi[U`.��W7i111 ..
.......
'ONAI _- ._.._' ".__ _.
' EROSION 8 GRADING PLAN - � ' �'"""' "`"�'ERR��'s�°°`�°�"`'�`°"
'� �a�� � �>�-; _. __
l ar. �r.: nntF � rsc�arr�o�.
���, ,r
A1'�Id k�I IlAtilld{ti,1"II,1
LBS�-Ufi-a:�.L
'", � �,.�`��«�l.� � (�LYMPUS VIIIA 1'IAT� (l..l.lAt G1-Og01 oa/2�/�0,�
--.. _ _ _ _.. � _.. i Ql� ('I���Y ON _
______ _ -� «� �,� "7� RI'N '()N ur�tirY nfRMfr yr�c�o��y
� . . _ . _ ,, _ . �, > , b_
.� '[ F r i� c �ti� aitir c ��
,s
. . K «�, �,_
_ _ ---- ,_ �� a �i � ! �n ,���E ,, .�
.. "`. (lA7UlA ,
_� , f..rw.nu �� P'lurm r Bid„m f i�b��i'. WnrM9 bept_
NCI..., . '-'--'-"'......._ . ... .. . _..— .mv ae w �
_ ,.,._""_'__ wu..an..ur \ iY�a�.__...�.r..
aevis�cN r+r r,r�i� nvvr+ �' • 4 >
c
�h �FiNn�CUR F\'MO1RMlN!�AF Cl
_r---- eu ao�:oo��m�ri;ij � ��
.�� .., � � � � ��. � � �� � � vm!�3'
v v
. �
�� � �
i � f ,�, :�'��y'�,�::,-�^�r i`3 ' ',� � � i
. � �
�
z . • .
m � : , , �' r� % ' � � j
A �
8 . . . �rr �x H_c/�c(in rh.nC4.. Lc...�..-�lJ.R.PA � I a � 1d'w� . C ii-:ro .......___ r-� .. 7�p0 . _ �.. ...... �y.00*
F ,....
....'-$�fti�s�dt'iWS��fNF yin,rr) a "�. • .• �� 7.._. __.�
, � 1 � I ` k r i 4 j'� � i @ .
' cewLewu._:,]p.Ltero �,...]IB.I9 �j � ��':Q , � .; ' T' — - �n� .
- � rn 1 �q,
.a»e , n --y i '
r� �
�1°urt.�
K.s,�. � �� �� �� ���� �� _o�N� r '� ��;���������
� , , ;� .. ...��.� :� ( � �� ��.�
� �' ��} � I � �,
LT � �`"
��� � �5 � .� �d'� N��" a�� (r) i �'� � � i 9'
_ � . .
f Q��{ 9;"� z �� �x , :, '�A,- i Pa' �'�� � � ' '�
:; �� 4' _.sia.ua � � $�f " f F
�y ' � �i/��,t '" , 5� o w-�i„ma.za� LL � ' ���� N���•� � " ,�
�u � ,� � � ,, I� � yn�! � i �_.�v
�fi�f.skta?� � $� � � ��r-f`�' �- .:.g , � !�
x c-e,e.:.rr•� .:._ -'i � , I ' �' � �� �
c�I.f - • ` , 1.. .,_51A.Mt � .• ..._..._. -"
li9cr�+1'_—_ . . I o .�.... � ,
:I ,� .._,..--..._..- �
... __.. _._......_.-
�F�bth.t0.17' � ���Y �. i� M f !�?� � _ ..... ..
� a _ r ��. � � � ..�
--- - �
� `,: i. �.— � , �._ _-���g-r"'� �`� �
_. � _
.�,..« � ��.�,.� � _` - �. . .
e.e��.o�.�Y . : � ..........__. �_ » ' ��`�ef. l' I �' `,�.... .��f�5�`cj� ���� � a.
o-�io.ez.�a• C�-., �..� , t ____ _......_w+_►�a�rt_,su�.a�ro�.0 ____3�0 , '7;;�P.. � � . _ °M1��.r�k a7" ,..''....,...._r'y ' (..
emr..u�M_�:rs-ran�
-ei�� '�. �i ! I '' . r __.. +en �� � �ma� � I ,� . .r<�rK$io7a m� �� � I
�.2- . . PN 41A 59 OD � ..�... 6 s} � � I�g ��tl..N-�7 �u�
ti SI]0�. �t' I
� _..___. ...."'__" .._"_
. . Ef.EY.SI7,IDa � } �� �" ;` ' • . I
� ���. . � �„j �� �`,
� ....._�.. ____._. � I ': i �
- i u2' ^t
f ; .. � 1 �,. ¢�p� ; . ; �� � Q � ••
(
,� R !� �
, . ,
' . ' . .����] T � I 1 ;� � M i � I �t.... ���. ..:�,� } I
.- _._
i p+�Su �i.fi?9....._ �._.,�]AR,f 1 �� " � 1 .- � � — ....�__„i �
„ ..... .............. ...._. - .:
'
� 1 I '�. � 6 �, ,.. T � � � a- Q
Iti �� y� �� � ! - � ..�� § :� .. � �� �
t�z ......_..... •_._. �.
c.e���e u ..._ J�' .� � � � i . IT�• ...... . '--�
::... I N ' �S JJF.. 3 ,er �� i �) ' ? � � ` � �
�u31�� � ...._._.3_.��.. .� I I z �� � �q (Id `' i.
� u � I I
r.e�eae.e _�, � � � �4.
g s?,$ r 1 r I u• e I � T� � � p �' �
ro 7' w+ ' .
I ' `"
�
. . `�i _!3�-.3 � I 1 ' � � � ��� � � � �
� � � ' ' �
�
___ � �
� � . �. ',. I� . .� „ � I T
4 ' i �� z , � � � . �� .,,�
� �
, i m
. �. —.63!�l ry � I 1 f I�j I { . �� p� � .. I' �
,,,
ti I�1 ��
' ~ rv '� ' I�
, 1 }� R I
"i �, l.._' ��I v 'k q� � . l,__............._..-- ---� �
I _
. � I
� . ... � F z I N �M ..__...,
I I
k m ~ su�a �!� �! • � �tit,;ti i� �
' s j; § � iot . w.mr1 �.. {
v 1 I o i": . �C
� ,v � ,. �� � C� i�I� ���. "�"- '�a k � 1:..
Fi .� �� �a
1' � ', �� .�t� :1� �
J
,� --r— ...... r � � �'+ I A
� .-r I �
, i
, ., � -� ��- -_f ��
� � __ �
r I � .f� ,�� i � ........._ -�'�
.,...: . � � 1 � - I � ( ' �
I,R^ �' I ' � �. , „-t ��.. � , , � m
�p ..� __�_' - � � � . I
67�}'_�---[.- -- ,in ": I • I .� �` (7
x-sir�. ,r ;____ � I i �� �4I i �, Fa
¢.�nw e' �� ��� ++.... • e i I� . �����,� , ^I
v • � � f p
,
, .
.
, , � , K ,
s � � �� ��,�,� :. _ ,: � I : � , 1 Z
• `, __ � � � . . ' � "_' .._._-----.--_- �
� ' ,�� � �y I � '��"`�'�• � �
a v S.� t. � I I� '� � O
� � ~ �� � � � �' � �3 t �
.
� �
,
- .. i ........:]2.43,� _ � • g '., � � S ,
:, ��'t . ,. � , . �
. I
F . . � I I • I�
��t � . L I V1
{ �1 �:�'.:= .n i .s� ; � i -`t_-�.. ._....�____�_�. . _
k �i , `_ ' , .� T�• ` i —
i ... . ....._.__.31A.L � �� � • � �
� N � � � i i �
� y
; • ; . . : I , H �
� � � �. �
... . , . ���� .
���' � ' �,�. �
_,_� ��� a � , � a ,����: w
� �
� ���,��� - �
N � v a� Z
t q� ; �i �L3� !, � I ����;R?
4 ----.3,V.3� � � � + .....�,ay i __._.. —_--J ni z
f�'s,i'��--..� ., ', � I � � ; � . f ��F � ��;
K-."F9.fi?• ..._� . � ' `.f"I.� ,. �....W�. �� � I ^V�.� �� �n(�I U/
� 'I�'4 ... .-..—1.� —__ W{I�I 0. �'1 �� � ���' m
{f ? 8u -__ .. . . � � fn N i
�Fpsz,�� �:(«.z� a , __—.�a.a.a� -�------- r ••: �� � o � _ " � cJ�
� �c.at�e� ia'(vl «- r - ��o. ,� �.��I� �p � , � or���n (ll
�.. � N i� I „ i b . �p �D�.�S-�.00f1 4M....._ P� ��� ��
fi � � `9 � �.r�r±�:x � �, .' �f-..._.. �...__._._. � w ����o� �
N..11. } � 1.,.
1 .y �"�`�
.. ^�. 2`.� y �f�'1�.. • "' ^ � \ 2�?7[�� �
�� � �, �9t _._......a�!.� � �� ;: � �
� � � r� �
*� , � � � �°
.. $11�V w . �` I � r. �me�i
� w� � 8� °� CN�u ( �� ��r �
�,.,� � � — ' �, ,�`� ��g��
,. .
�/ 5� � a ......._� ,� _�3iQ�FtlF (n i ..x n °�W��
� � � i �.._.._ ,�� ��u�tlG�
,
— - _ �. Y _ _ i �=N��
�,�e._�r �
' 1�77D�.9�lp:...___ _ ._...._ � 1 N
H � �
R.6t�14 I T �.�t..�.,,,,��` „�.. � ��m
7 Lf� �a ..I
: ? :
�t a � � � � � � �
, � �
�`� �r�i�,c'�.'�-,�� "!�'�' �` � � v' -'u �♦ + Z
' •
r . �..,
') V� r t7 tl fJ i U 1`C ��n'.� U � !+' � .r..._._ . _.. ....... ..
_�,��2 Lf � n (� a,�� .Zl �Qi�i u �� .. .._.___. _..._ ...._.. D 0����'�rN�j'D�ypM L,...
�' �Ir �j>OmC �n+;= �O m� fQj � � /� 1- (V,7 V%fV' I'1
y Y'3 r�0�1 �a�Obm ��� �� t�� ��� V O � O b T73N 1�2�
��vl > S. tro � !'t O�)❑ z N�
Q •� L
rr���'y� ���7p�p�A� Zya}m;{1 Y� �'tl D .p� y �� fU1f��LU�
Ili �,�2 �p , Oy l/, -� <7 M t' � I� \ W y � � '.� Z( �p f"'ry�w
....... .......... y .f�'I�O�NI� (1 I = �^ 7 y ♦
....R� m uf al nj9Q -�}y .bm � m � . �� %� R � � �:� d�i V 2��p~p f "�O .
. `( `C ,c S. A� mOS� �O� b n�I r� POV G G L♦ ' p p7!X7� 2 ��
, _ .. ., r �..� Q .
y,, . O ` ro N �`Ar4'(� c��n'�r��v�� ��S �� �' y � �"''u�e'"��P4D� . � � �'�i''���� i�
... �s i . , _.._.._......__... ..._,......__ .
� m,_ � � -� n
. . �a .� r�{�q�� ��t � ^�iE�b� 9�� �� ��. D ,'S �'��; '�3 A � S� c���riA�� ���
,�7 3 0 `"m� 4+�� ��iBN �y- � �P'�' G) k3C`1�i�fd6�G3 r� rr�ri��i�'�N�_'.
Q ,_ �in�m� yp{ ,y�ii�� � � �� � r� I�y R dy6 �Ry i� oOpo ����.�rz+ =D�
��\' � .+ .. �:]y� 1. No "`��Sl�f �itzV � �KI r' J n ,e g . � �y �y � '� 1 �M�ry�Zf...�,t
` „ N � j � `... - �p j �i �4 'l.(�1 Q� � Z ��� � � 1 � � .. , ry AY�"12� N
v +o � _ �..._ `l � ��, ��.i � Sy� 8�8."� , g � ��n��'r1 zT°�'K
� ,, m�-�> c�
a n n �._ `� b {'l
♦� ,. .... 7_.. tn�:4� �r�� 7F Z � � . �� V�� N (� yMv } �'�.OI {JN . Z
\... � �jqr f�j-p;p C-'i� �n mmya � � . .rJ �. �� �O��V{�eO d U fAyl'IN=f'IS
O A p�12 ��1��h � ', h1 3� � �i � i i� ¢ � �-tii����i�B�vRi+. UI . SyjN"�fif fl7J
�� o
� � S S D �9n ������..�� � � r Vl ����4�31 f� m ��.�.�� iri
A � z-!� z-yya� mi o . �y� . �_p �r � �-,z
I� ` < ^ � ��� zi�j9����� � �� � Y i r� �!if1�7$�'l,�=�� �`�F'�ApNA
' , �
� -� �iu
i - I ., W.t ,; C� � -�V� -1� n �. � � . r _,��,_N
� (' '�D� �n'z N ... � R' � y m yz
, , a U
. ,
, in ..�__._._ . ........... .............. 'a
PROJ[S:T � ( �
�__
-P � a ' OLYMPUS VILLA PLAT i ���'�� ENGII�IEERS ' t -�:• � - --
.,,,.... .,
. 2 � I 1'+i7 a H.Il(CA�'1 t NIH I'I.ACE y�. 6 ' .._..„,,. �__,. ..... _
� RI�N'((1N,WAtiiI1Nl:11.r�tMt[K4 4 :' � � ....
� ( � CUCNf..... .._.. ....... .... ._.. ... ... , .. ..,. PUONP..J2StN77412 ....._ _.....�...,.._.�_ ....
MWEST OLYMPUS VILLA LLC ct�xrncr:o�xxeiioFrwe.F. '; � _
_ � •. '� 7 07I10/2011 PEA CYf1'COMMPNTS WTED 1�8�2[�f�
> .. . .' _ ___. .
_._ . . ._.._ ....... ..........._. .?„E�.W� 1 ...06l7YlDtl PERCITYCOMMENT9OAICD&76+]Utt
� ;. � SN6t(C:bNIF.NT DF51�}NEfJOY UNAWN11v CHF.CKFDHY �/jN,�� t , _._,.,,,,r,,._ ____..... ..__
�TM � 1 l'47'ft7q�� OWNIRRpVISfD(�RADINOOfL078
� � ROADISTORM PLAN & PR(��ILE o�� � � �
�_ 9Lo rr, r��i ,n•c � � �C v,ar�ncr;
�.F LI 4 I II�\�,1�111 l li�
L8S�—Ofi—(I7.1,
I _. .___-.-_.. . . . ., �. � I � �` ,.r,.y_�_ �.- � . ._ Y .'A' ..SA���v..�yy .:.F�'T- � �;��P�1:�"�V�".:.A�;" ,{ �
,.,. . . ' +V' ".,.. " I'_ P�if�r ` , ...
. _. . _ ._ . '., . i ..b �� �-�r� �. .
_ __ ,,.,,�w^„�. 01 �'MF'US VILLA PLAi (Ll.l��' �_U:?iJ) o�/zs/�o�,
...... K
n IZi�N ON
-- - °""° au , , U11LIlY PE..RMIT 1 tU{)n.� �
� _ _ �---- � ,� +
- - - - ... '� ' C2ENiDN, Wh;I I�NGT�)J
_ "°`
- - �������s� un�ip� c�.-
._. .._. ._ ... .. ...._. '_.. ___� _._ eew� f ,�y-� . � I I'Inrn.r9/�3i:iitllnqfCu6Lr WcrM� Depl.
♦aa�o
._. .__.. a.r..e.... . s�r.5...�..9.
NO R(NS�ON PY pAiE APFR ��•
M '�_ �
��.
:s �t`� % r ,:�� ;, `;, �4 .
t � '
� m '�� y ���uru�n7�i��'"sHzt+�
p � r � � � � ��
. � ,. -
� � � � � + �'J" , � �.�� wscro w�cc ir � �� ��^ ui
y srw o.�
� _.._ -._ - �w .�. � "RAO.`'Fi�Nz u�t', 8 i F .��,�i— _s_r•�'• - - �� � � r �i �
.. .iy9� . � �S �
�-�— � .� :. . ; • � .... ?� �_ €m �omo ...
c-e�.Soo.�a' `. - k � r----------? �„ .... 1� ��z �Tz�� '��^� � �
. . . � ..........xtt � v - i w., , �� ;� ��Q ^' � h
' � � � � � ..� � � � �� �� � ��� �� ��� �
� V
b 1 � ,;' � '� �+� � 1 �
� y f' `V � ' '� . S� m^p O � � r' 00� -..
i
� r '�1 ....✓:� �b�� �75 �� ' vi
. .'.�s•,s �'.- i � i � " .'S � '7' z � f ��� D
�".
� "��� �' i� i � t • ,�'�S� '. �v�FR � yo D
^
�
-- � ;,
"' � vt �L_ G>
_ � � i .R�___� ��gg �a � �� r�
. ,�
s�: , , � : � ���8 � ( r
� u; �r'"`- _..i � i � �n
._.. � i ,; i ti
� ..1t4:. .�,. �'� ��l ",��, B c�''' 4� � �� 7'
� • �i
� .� ul ... . 1 :1, .:,� .., 1RIGSP�c;f. � � �
y , ---...' `�� �p�• ■ o � -_,_,:.',,,� , ' .It � �µ ��o � � �� CJ
� ��1�j n' -- .:�• r.� o�� � � �!x r i
.
�°5A'� ; - � r , ss
rt_�r��e.�t' ' . � �� G-� . � . � I.. � y�� V7
i .. .. ....:24_J7 ;� � l . .._ v � �� ^ i ,y,. r'� � IJ �.
�
� I � ' r� � �� �: m � t '�.1t� � Y� L'�` ` ..`'�I,��� r� N
O
n�O � o �e ..;W 5 � Iz'1 ,/ .' - _ STA J7 M PUC[! I� .-.
} ^�� �- 97r r• � q{0 RK6 Mf.) , 1� ' �u�
`;�� � �� ���\\ ^.. u �^� ,�- ' I Y '... a�SrNL WMIYlMGW' �•� 1 5 Sa�,�„
N ���F "
. �e
�, ! 1,� �..���. ���
' � ' � .
� .'. � ���y � . � � � .-. ' ..�� '. ..� ����g ��m���i�� ,
PF Sa.-7�3YCq ..foA) VI . �, � � � ,� QQQ r� �
_.__.__. '_'_ ....._-_.__. 6
� �� � •. � � ' » . .., , � A�=�p� ) I
o , � �______� � g
r � /-- @ 3 g
- ----
" :' v�xo►uttnt y � i � : -..._-----.. . --.•r..:._. hAI ���9me5mt �
- ------ ' �a� s T
. .7 Z� (t" ..� ttNrtxMt P' � . , � ��. ..._.. .�,, c r�� ,y
�wl+PO�M� . Y�pn 1 f . � rr� �r �- __''__ � i. ... � �' O
.. .-$IA.2l7.N � -.. � �7Q T � I . 1 �� 1 � � � ��) 'K��O ��fn N
. r^a su..t�aroo R .._�----3��-44 �m � "'�„ tD i - °t^ � �, �� � ��� �on v�y �
__..___ . � r�
' utv..s.�i.,fs . � ^' `
1 R y q��;� � w p i Y ,_7.�.� ;� � �� a �'o� �Zg�� _
`� m � •'°r � ,.i e> C � t�'i,' � � '�`� 7r�i�g Z
� i � . �� : �� i. ; �`> � t � O
, : � � ,
_.__���� —x -� ..
��s � � _ ' _� W���r�. ' _ �' �
Z _ 1 ' ' �; �� Z��
qq - � -- --- �^ � o
.� �
�c.s� ii, ii' __` :Yzeu �,��� - � -�t°""' _ -- o� ��om
� ' � �,,,sr,.;.,px •�� ,� / " � \ ..� . _ +i�". �mo� Sg� m
t.e��se.ix' �� '�` ', , z �O �� .:
.� I � �� . _......� � �.. - � ��` �� � ��'Q , Z
� i� �
� , � � �, � � �� � , � ��� ��� ,
_ ��' �� i :FZ '�
� �:4 r � ' =} q� �d 3R �
� � � � fi ����� II I Y - �O� ��F�� A
`' � � y 4 ;� � � , � ��� � (�
� �
� Y � .. � �, �
�
--- ..
A
� „ �. . �, �
� ii ,6 ,i i.; �. �� � .___._...._ .._.___.. .1Ni'�pA9G0!'tKL.NVx[qH�.Frntn
V �O \` ^fA. 'O�GO!f'�'iC0[YM�i M) -�'f1f d�NLMYX%1 T
5 f'1 i : � !` /n
O f1 � � �\, \ (^n
. � p ... . .. i . r l J
f � t„ �
� � Uy� U b ' � . .
n ` �� i I�.,/r.i � -� O
x V '� � � 'Y� \\�pp Z
n y..
� i � � J
� . + m �
� �J. )s n il! .„. 4 . . '�` ' q 1+ q. . �
'...... :...-��C+�17,���Ni. � M
� �"� ' � �
� � �
� � : W� - ���� � ! z
o � ' �
{ ��'� � � '; _
x � ��� ��j � � ;� �
� ��� � � �` �r w
�i'a z
_, �a �' r
�. � �fP�ACL TI'. 11�N-11 GV VlRI � � � D
�' _yH�2!»� � �� . � Vl 6 Z
�� � W � � � c�
.� � � � � S�_ F,��� .,� � m
,� �J„� � . _.__
e .
m � �, .. �, /� � y "� � � M �
............. --- �" , �:� �
s � .� �H j vrr s � �
� � � -.., �� �g �
z �� o � ^��� � �
' ; "•. , ,. �. ;� cs.0 aa.ii C
,_S�_2'3:4.� i . .
� ' �
r ' P[�I�CC 4�'.1�'M��17 f.U'.HN� 5` � �$ —_—M��A�W7lSY) � �
7 �
� a �o ,, � f i i ��� ...� V ,
M � i u: �
�e� ' ,.,,! ...,. � �... U� y .. �}^�
r� ���� . � � �1 ..., �. 32 � R K
x �'a'�=4° `i i �
r� 'u(/L1(L 15'.1)'N-tJ CV�.VIFI
{� � _'_ K.O�DA7 `� :� .
Y, � ..�$. ! . �
( �_.._r..._!['�15:Q) b � T
• a� + F
0 3�� . � '4rrwa.o'. ,r w.ro c�nvcm # .
� r . •
.
y -. ,. .�..,,_ �
��� , �'Nr p 1 ... �,
� ; i � r� ._..
� .C�7}.7P6 ��' I � a .P :. . __. ._.. . .. .
� ��A������ ,1
� � � �;° �-,�:a'•
� , ,., �
. � � y�g yN,_^.1I10Oy .
` - �, � �� .. ._-- _... . __...._. ... ._..._. � L'i�i�r�nti"z
� ��a� m v ur �e y 93 r �m���np�x.
k q ...... � I � A� . ,.�Fi �>i � � �=sv f'-��i
� ..._-__. .. pp
' g i .... -.,� � ...
�i.xe �< � � �c. i � . y ��4w i ��§ �� � � Q .y^�i��y�f�
, � . s ;
-.�`��`ti(.3ib�."s � ' b . �g$�i e���� `� � r � _._.. e '�1���finn����u
� � ' � � . �^:�� �y �E2- �' �T{.0 �~ � ....... __ ' .. - � � latl.�.2 � �i•.iD
:_" ...�_"" ,� �.�� I . �� p �• q��y {� pQ]x ��p� t • I� i � ��1 � 1 �' ,'1����y�.�
�J., �.. . .._ _..........._ ........... ' N Z Vl ... i�r,� � �...�y� �1 ��� Y � �d� MR C :� ...._ ..,... J �� ..I� � � � �p 22n�2rl+i
�� � ,
�-'..,.. !�_ SZ_ �M'.1m�� �+ .,� �In V . � i �' y �ytY.. �.�
� .... .¢yi�.�i.rt���[�NE)� ,i S �AE--Ti}_"Fj�`F � . •. e `.c - � � �� 1 � �' � � N � �r�_� i'
�> ai s si� .�o�ca(wr n�a.tt) � ' p. � . .. k �R 3 � i .,\ F � �..�� I a Dy��> x=°�i�
�� : -. ��, M � �Q . � �. ..���� UI ��OrG�� r
� _�
��` v � � O '�' I I � � ■ "~ .
•.� �Y �� p b � I.� ; ��� � � �t �� oawror •/I � G�Y)N��D� S
/ e n A � P " I� f.e rynm.wr � N.., ` ..1_. �� i 1 ���yp f t �
.,� " . ._.._ a�
rY � � n �i ' _ ,.,. � n j8 y ............... ..._...__��� �::�� �i`.'�,[i
6 �
i; ��� �g � � �Ri ��������
r
�:Il � o u �i i% � y � b �� ���i � � � F �a�ri
l� � � tl �� �� -. ,��h�H
�.� � Y
� � �^ ci
�
'� NRO.IECi
' _—'__"____'_'__ ..... ...._.__......
cn � � � � OLYMPUS VILLA PLAT UFFE ENGINEERS � - -
z ? I � er9,3anntte;nsriswriiri.n<'p �k�..�.,«o
y f --_......... ern;n�N.wnsritwcnw�Mnsn e::o �
._ . _.._.
cueHr _ j riKx�e�z.moa��z d.•'•' _� --..__
� � ccxvinct:n.wte��.or►F r.e. • e
CAMWEST OLYMPUS VILLA, LLC � ,,:a � a�,,.�„ ���,.�.�N,a�T���„
,^ _'__ __.- ____.._ .._. ....___..... . _._._ _........ I_.... ._. . .. ._.'_-7-'--"'.....- .': . : , ? U617]RON PEACITYCOMMF.NT8W7ED5l167011
`1, ROAD/STORM PLAN & PROFILE ao ,� ,. �� � T' ` ���-- � OWNEAREVISED09/�'�tM.OFl0T5
SHCF�CONTFN( DFS�CNF�RY 1)NnWNN� I
� 4A
I GSItK1011 . .. .
.ir� . .__ . _.. .. _—____—._._..
�tFY NO� [MrE Dfcr,qipT�f?v
I
J.V 1�11 I il.\�Id{\{-II�
�ss�.-ov-u�.�
_ e. - �� � �,�o �,.>»,'7., � � IZ��V`r��1i r>� rMF���i���YII�L� � (f_UA Q--O9U} t��/�e/t�>>
__.�A -___.. �l10EN, F'L�11' 1
_ __. ..... _ �. . b�ira�n� . '�fZhdl f �l.J 1 1OQ4:� ro"m' —�
__ ..� �T _ _ wi» � � _ C WY1,�IIIPd(,;if7hJ ��..
ww
___ .. _.... ..... _ . ..
.._ _
, . s.nwn �"rvruu.ra+w � V�e�r,n.ng/Id�iHa'-ny,f�'���fr W<.rk.� DeFt.
.. ........ __ ....... _ . ...�� .,.__._. ..... r.er awo wa.
NO. RFVi51ON Q'I I,AT6� APF'R ._+^�^��... ...... rre�rmw.r .. "�g,..T+..�..
2..
..._,,.. ...._...�.._ � ..__
............ _...__... . ....... ._ . . .
,F q i.r x m �''f �C� #':.� � �..�
a
, ° ;�� �� g a �'��' �'� �? -- __ __.. ._. _. _.___._ . _ __.__._
� a $ �o �s Us�s ��� <:
�q��� �� �t ��� p �..T„�
{) �� ���,� �� �q ��� �g (- � �
� ry>Vy � C �l1 � �S� �:."� yp1� „ 'r
Sr �� O>��� �n y� YP'� � r�� � M '+�� P '�g��j i
q Q � 4 (�� , c i7��.?
,.
�s � 9 � � ��, �,
'� � � �� ��y,�( 8g �d 9�pµ �'�� W Q T�' � �m � � * ° p � tll " ... C i
�� � � ' .. � � „ �
� � 'k �d.e� 5 C ��� �...� g ^ � 4 �.--._. ,.
�
7 ` � � � � s� �� � � � ' r#p �
r� /
C 7 a , '� ' � � ' ' ' n
� ��, „J� �'��g� �� i� ��,�, $�"' � � � � 8iti �
sr
� �.,.--. � g���g �� ��` '�3 W-� �: � �� '� 4 �ie r�
. ,._. ,
.0 g!4 g�� g �� �° '" f''1 n #* � �� � ��
� �. � � � ' ,� `' � k � �
v tTt r " �#�3� ¢ �q sS �� �' �, �' .' � ��rl'4� 1� �` � �� y� u � � � y 1
� --1 i' v� �- � ) i � �
z � �
� � ,� � �� � �, � g
+^:7� ' a 's�. a �� �:� �;_ �; "y'� �� � �� ' f ; � $ j
�`'- �� � �� _ �� � � g� � � � �
o`-� � . �� ,;' � $ �R � � � � j
� �� p� 17 ^ � � � � {
�', " „ .. i
x' a r � � °� C�) .. ' .. " _.. .� ..� a�
.,
� "� $� ;� ss �1l ����c� �������� �'� ��� �. M� �
�� :
� .
�u � �� r �,�, 3� t� �g� ��a�g �� � ��� ��.� �
_ _ ..
� .
� � "� �� T�^ � r.N �� � �� �x � (; .€d, � -�; � `n
�� �� � � �� �a �� , t r �
!�� ��'<+ � 1M �.�. ,.Z� �� �l ^� � � r ��,�'
*� �� � �� � � L �
�� ��� � C, � �
� 1 �� }
Q� s �
�g� � t'1
,u- � _ __ __ __
,�
�
�,
�`" �n�
� __._. --- -_ . ,_ _ ...... _ ...._....._
x
��� '�. _ MAR9H 5{116 ��� ww'1.l{llf� ..... ..... ....... .........
x�� . �� �� .. � V� w
�
��Z � �" � �
, : �
�., �
� �
v� ,�" 'd' ,*,,�, . I� ..C1 � � ��i',,�'$et� `��g�+�r��`.
AN �T a � ,� {y..l � i �� `F� �����', �
,,{) '
rh m
a . � .. ;��' "� s�3
�M �a y�°�'m . , �� � L �,�� ���� � '
r��, ��� . <. 'i'„� � � . [� � ��� �jb' s
���. �' -.�. c-�� .� a� ': �i J ' � ____ ��� � ;��
i m y� �4� �
-��-�$� ., � �•�
� � �m �'� `���f .,�..._rx�m?�_ in 4� ' ..�.�,'� ��. � M,�.'yr !'N��.. 1 y �'Q . � � ����a� q�� � ��
��'�'{�''y C[N1ERLflIf -i ( I i 1 C[M1EAtlIMC �� 9 � �.� ""..— � � « �
?.�,ry 5 � ' �r� I .,....,._................... �
� Y F �` � t:�:a '�t ;� � r . � ' � '��
` -�:, �j u� ,n � _ IP� .� .:� �g � � �.
�'� �^ �vi K` ,�a �: U� ��n sQ ..� �� ..., iF .....�.._._....... �'i�"� � ��' .�` � ���E. ,��.a
� � ll
v5 � �� .:,��' . _ r�, Y�A� ;�? � , � �� �',� � "� � ��, � ����9��
c7� 8 ��, '' `� �� � : � � g ��1 s d`c
. ��� �. Y �
�-. ��r�� !, �z� �� l �_� � — � � _ ,:�: y; . . �� ��� ..
. � ��
g ) � �
�! y ����f> p � m � �,,,r' I.: � (_I °r :s+ �' � � � ���ppp� ������1
�, � p r:: -�.u�� '. � � � �
�� � r _ c4K11N ctQ[ � F9� I_...._sexern aia._ t. � � � � �;�� �w��y �
� � �._._ � 1 �'
� ..�._.__ � ' �C-} ��� � � A` �� ���N�� �
_� ��� � � .��. ' � � $ �'�� �
, � � � ��� ��� �� 1
E_:1 3 � ��� �����g �
a �
� ���� �3���� �
«
� � i �� ia.� �
R� x
� —-- r �
�5�� wer��s�x
x
. _ ---....... €
n�, � . __.. _._. ._. ..._. . . ... .............-
� � ..... .__... ._._.._ ...._ ..._ .. _..
� y r;{ _.
l
�',, ,�
--- � ���1
k' NY
Z�' �j�
r"nr P
m � �
.
., � .,
➢9 ' +��� "
�y
�9 � •'� i u� ��� � �;^
S Z[[[--- ^'��, .....�.R�v.{�L%.�..,i,..... . � m
.,+m� ��}t. __.. CLNYLXLINF ( t ..
� �.� ��
in p.� ����E � v 1�i.,� f f � "� �� ��I
�� ,
_ .. .—�..J � �,
W .....
���.� �i '�-��,,��w s�t ��; t� �,�... ,
` �� ` 1
��i �F � e-o wN.C�n ,r� v,�+� � � `-
_..._
, •
�� �� �� � �J � . tit��' ] � �."" � _ � ''_I _
� ..Y., ' � _. � " i.
���N� . � � � � �� ��� � � '
���� :.;I �� l` p rr��r � r �� � � P
�� ..__�..... � � r � • ... 4 � l
� xu�TN xemir ... (T m C ��.�... ,,..,.,,.,,, . ..,,..,,_ ,.
�p ...� . t
� ��h/' �,
k �r� .. .. 'S' _... � }�'`" .��, �
�
4,j �,.,.� ,_ _ _, .. , �, � .
_ ��ti �� ���`- �
(,� � �� FME UP 4URF] f,� . � I �q��l'� 1+�.,'� � � �•
%' • IJk ((,I [;{' AipltA 1�
.:... � �� ...__. 1 ..___.. ,,./�..,........_.. ., i�� ,. �
-[1 L�Ap /V �� �' i
�....� � J' � � ' '"_'"".,-_ .. .�.�......�...........,,..»._ � .L �
C jx � I !" 1:r'�� l
. ...,......� ,. . ...... ....._ , � �. .....
. � w�� M ,m � � �����kiY� �� ��e r � f� .. .�..��„ � }� m � � -
� ._�, ...... �n
� -� � ^_t�d
...0 MH1.l'tlR iNi} 4 ".
_ r
�,' u � �' ��� a 1 c>�� p n +mM_cuw.ln�',,s�crs)'� 77` ������ �
t • � � r
-� �. y � _..... ..... r � �
f .y � � � ,�v . (� ± _ . .. �
.
_�"�� � /��/II�\ �.._� _� � ��`y{� R � � n
t'V .^ .. �/ ■ �,""�'._' �� � � .� __._� � �
\ �P �/�/ �' ��M � Yt�p L'_� �S
� � A ; � V `"'"� �� Q ��s; vy �� v� �
� � �
,� t,�; �� � �� � �
� � - , p`„ �'� �� �
I , ' �; �
�
PRnJECT
� " � (�FFE EN�INEEIZS _ . . _
� �' rn OLYMPUS VIL.�A PLAT ti �: -_—_ ... _ __ _
_ .
Q�I a s »v�z!una�t n�sr tam�r�ncp ���.��a' _,
� . � . .� _ .... ,
" -- xrn:rar�.wnsi�rNcruva�ne �' % •
0 2 Q CLI[Nr ..... ___ .... ._�.�� 191UNF�125.3h113�t2 � . _._ . ,.. ._.... .....
" � � CAMWEST (7LY�1AP'US VILLA, LLG `",,�„"'`°"R"F`�"FF�PF � � � W __.__
I _ _ _ , _ .�....
.___..—
`^ �1 _ . ......... ......... ......... _—__—_ ...... ... ."' . . .�._I :[:: Vt �. � P DI758V7011 P�RCITYG(H�M8NTS1>A7fU10Y20�i
SIifA�iC(7N�E.MY1 LTF$IGNF08Y L1FL14YNf1X � C:W�LI(�m�Y � II4At ,t ' - . - _...-.-�---
W I ... "
�-y������ "�� � � I p57711X411 PERGITYCGMMiNf9f3�IPONiN2411
l./ IHO YS [JIJ:7 � A ,.....,�....,. ........... _... ..__ ...
'1 171 V NC). pA1F �� IIESCRINr1UN
i���. i,� �
I4'I.I N IIIA�'i l.11YAl��
L8�'£"�b'CI��I,I.
�
�� � PC3RTION OF THE NW 114, SW 1i4 OF SECTI�N 11,TOWNShiIP 23 N, RANGE 5 EAST,W.M. , : _
� �# Em EX S r �I Y LC"a -�aES S*�tir t�uti aR� . � ' . R
.,��. !� A PR..i7 riF'E �r Y. I S�+tr�L Bi H :h RA �.ili�'1 � �"�; �
�' �� � R'S�S z Tr �� DE citH.N= 's,t Ex4.;� ti ER ..A� a�.'. � ; t 7s
��. � F �`.-n� ��ATI�7 '3' ts�i. _X.ST2� LN�z.�c RQJti� c�
'�� LTTI i�.. � �I�7+'. TII �flMM�N�'IN� ..�YS.ec-.i�.=,�. hC . �;-.�
G PR S-N: `i�h 14 MAIr T�� ts. �'S'*t ?rS � . c �
' G'�'�hT_�l�i '� A�t S:.t. 'h tiERE'cSA.. Tut �N:�jt�`_ER h S t� �,. � m
� ,�ivfl��"C �i�1�Y�s ' �'S�7"occS�3i Iix c.� : t.IrS H .,."� .. _ ._. ._,.� ; � � :
� Z E �2 � ; '�€7T SF€lVh IN ??�iR PfZO?�R :�R Cl�ss � t �� -.�
a � . . . '-�'. VQLUAd_ P,�QUiREC 9.$3: � - �ET �p�k� 3E«2E Ytk7 IIIG� . B.�-§?e -�v_ { ` �!�(
� � V4L:tME P�l?��D 9�� C� �. � 5t2.2t� >� t
,� �• � 6' n!�rL FENLE {1Yp � GE:I �i _ 345^ aJ rc; 1 s i
��� w �--""�- '� � C��L 2 = 6 4aG CU. .="E£T ,�, .
�'�
.- _ .�
"F C� 52� O .-t' FFcct.3(MRC n- � � ?J�����. '.J��KrR.Y
�_.._ tr : ^ � I -
� a _ _ V S C�TT.'JTI:.`h Yr'�i;M� 5<<�NC:_� _ � ° l���___.��t uni�ta �� :
j.�z �6P �F PflND-51$.75��d�v.�__e_ �- �' -' � -
�+ � ---- 3t---- --------- ;r, +�r"€+n a'ar. � ! .
tdAX v�=5t7.7� _____
f- - ' ---_-►`-___-j-___________ � ���i!t.� REL'tNR�C 3..i1�� +,.i:_ r_, - --- _-, - : !�
_ "�N�
��� 3' p VC�vk±� �R�VID=�` = 35.1� LU �. � 5t''5 .` - �� _ � � � a�
. - , l ! _�='4�
`t��3 s � �z f,? � � . " ^ �` �a,
- �
�o`''..z �,�', �.;#2 �� E� d` �/f� - 4 � �� ` ' `$
�..� � WQ WS �5 2.20 ��'� � ` t � ij',` ,
----- -------- __ } � � � � � , '� ! �
� :� i , 4 � ^ � '
� _ -''�� 4.3 N".�� L 'i � i I t+ t '. �� � � � ' .; �� �, ..
'y' , c
c � STORk:, � -� -= A : ftA'J_.. -t�:A�� -. � � i ��13 � ; r�.i
� r
� --- ---+--- ( � i i 1-- �` � ( ; 'F -
.. .�• c��JiMEhT- 3��"GM_� , .; �-:.� � ��: �� 1 � . � � ' ]'y .F�
ST�f?kGi � tn t;n :�+ a i � _� � � i )v� � € i (_l.,. i � �.�
� � 0 1 i y � � t f r o� � ' �cn �a � x
LJ'li� �i 1 �o y ; 'C,ario,.�j �� `' -
^".��:� `i,-r-E^,h k-A i" ��j aa� P���� � �
',
__�..� ., . �kn
,�
,
� j . --� � - 1 c'`
�, � �-'� �` �'� � i�` r���� E �
SjV :'.�. �" ti-t: � 5=-1;.t'9. � : { ,3 ` ` oV I ; _ ;
�
� d � , �t � .' �bp'3 a I ' � �2 �
5'n ? 3� 4 Z;. } i ; +`_ ;;a t �po� , �" -��-+ iI
v Z r �B# d 'Y"�-�. E i8 . � � i ff ,r�r��C a� � ; � ..°� - i �
_ t+�'cPF�01R �`::J_TUR� � � 1 ,,.� t ;3 �
'� V,'�RD i.AGi GRA�t \ �i p c'"�� ` u{ � �j
;'-�Z, _ it� St77� �_j j'�'� �D� � # Z z^� lY
�� _ `.� _=573.75. �2 4 = �i f� ��„� 1L' �r.3� GRA, �=�� "?:�_ +-.� r_ "��.
, MAX. u1�Ac7E ._ � �' z ,� ,:s
`-- _ -' k `"' �--___1-_---- ..=,.-^c� �
- • ' .,'_f.. '2" t�i-'2 9�=6.239, •�� L� �Q o•-_= � -r. �<4 ^
� 'J VIA�Y r'.C�'4.v ,ti,g_, 'J � � k v� } L^� �Yr:�'�a�r CM�,���J �i.� ��4
� �� - � � ,,.i'• � a4t 4 [����L�� .
- .�.L'� ^$� f�EL��.�L�i�.. v�. .i�.� �__ ��rl � R ' ^�5 �
_���'i ���� 4� �� 5�&.7v 1���.� me- � __��� .� �1 f ' �� � /� ` �tl
■ �.X �S .�' ?§ �.{/ _ � - I •- 2
-�, ( t...-�'_.-�}�T . ���a..,..--..�- ✓ Z r v�. �, .SiA. ..��.'4'�J \.f y�
� I � � _ lS }�Y f`L_
� , . � fl �'-+.
( -.���i� �.�t��
�� � � 7 3. �Y- .-_ � _._ ��- f�ndw.�� �14 _ _ -
� �^�,....<
,� < ' c e. ^- . e : ...—'
6
���_ I , 1 y tJ'� �i . . . / '`y , - - � T�., _�� '__ ..__�.
� � _
� �e/ . . . , �i:t _ . . �:7A -`_`.}'= 37 /' -t' '�„_- � .._ - _
' �� WC K5=5'22G ' �-g � �— _ �{
___�.�
_r �
!� 4 �
�--+-- _______-- --- _- .�., , , a fa �
�..-
! rJ"` 'LF` . �4" Wr -=?�Z.r?�. �� �S � ._ �A. 144fi6 4 �f � � � - �
f J i f5 �`,�.1 SJ..54, 1 c' ��'»' j G 3 TY*�R ! `s�
�' '�. � '�-'JR.A,^i� � � CO��tN STRit""U�E _
�,��� "`_; ________--_ aI�J�T�cxL1-v �.�' �� _ nl
i 5�2.2G. i2' /'� ? � �"'�
5;��, ' "� 5C7TTDMa5:,.� 5T1+ t t;g?1 O L . � � �V��� 'G � �
}i,� Yf�50LIQTLOCKlNG4LID �
�c �'-` 46Lf_. t2" N-;2 6S=2.ab�
� : W,�A _ Sc'E TH�S SHEET a �
RIM=Si8.44 ' �
j f � ��=5t;.07. '2' � �+
�! 5`� � 5� ; �dP1D StC'i�� B-� f�=510.82, T5" � r.:4a= '9.?^ (� i J
5�� J � J �
�� e v �S� 3A.� GRA'� � � i �
� �t �� f � n� :i�, 'v �� - � - �� � _ � �r � � �R s� oNOriRr €�L�?� � 1-
d f � �` N W` �.7G ''.. .-'. , c> yy_ � � ._� � : � .., J
s
,__ a f �
� 3
, `
� , ti, � {.�
�� � 1 � � � � �Bk��^�JIAFR�R 4 � J � .....
. ' � ¢ s . � ' � _ �
_. 3 ° - ;� � i � 4 � , (i..
Y ;CE W ,
_ p .�� 1 � � � � � i 'm � I ` .
i > 3 ���� � ; + 4a y ±r+c 7.P MJ �
1 x, i c F-
; ;�o � ,,,�` � : ! � ; oR .��..� ' V3 ,' � , d
1 ' � °
� � � 7 ti 1� ''��' � � ; 1 N � '� � , � �
( '" ' J �._ ' >
� 4 �a r I ;��,'' � jZ' G�tr:ET t'�J ��ao� =w.0 �fZAPH/C�C=�L£ � ' �j �
� ! � �..
� . f o ea�is �_ �� W O
I ' —
i '
o +e �c ao
i i.' ; � ��� IE=51 Z24 '..� .� � . ? F-
1 / ' i +.�. SNFAR GA,T� _ �I 7
. i "---- ; ' ; � ! incA - ?G fasl -
! t �: ----'-..�, 5'. � k W �'O"7FRC dGG � � U�
i � � ,s-our� a 1= f/� �4,•'1 '� � � � r. , .,z� Q ��
� � ? � �� - ( � 88` DW�S�TERy � U
� � � �, z 1 � �y
¢ I __________� � ; o iF � ''E � ' j j�w
# � �. '� �� � � __ M N' P 'A' � ?U' �w
� 508.20 E �.,/ avis2w�
� i .y� � . �y t . �� �� �B� Batr- Y�t 11{� �T= .
�
i •
BY` Ilnt� J{JE NG.
�wC. NO.
i:��'� C`JNTRrJL S7RUCfiURE-�4" sr n�te
I � � H
� j � � =2' �sy Dat�__ 9 � 9
` L �_v= � �
i
�� � � PORTION OF THE NW 1/4, SW 1/4 OF SECTION 11,TUWNSHIP 23 N, RANGE 5 EAST, W.M. t ( i ;
��g � � ` � � � `�i
a E � �
� ���m
� L`�� �' l� � V L LA P LAT � � � � ���L
I
� :���:
� ;� o
� �� RENTON , WASH I NGTQ�N � ; ; � '�I ��
� � LAND USE PERMIT # LUA� 0-090 � ' ' F �
� �-�
�= ���a
C� ,;::,� �:�Y - -k� � UTILITY PERMIT #U11 Q042 �-� -�� : ; ����
z = 'v `� �'' u�.� t :" � �-�����; �'v j ( �a � ,
Z
r�A7 °�RTC'JN G:`7HE �:CY7i!itME.r•T QJARTER G= ?r!E 5G 3rt#�=.T iv�h:=' �WN�R ,! D`t1��c�t�;:P,: C±U,RWt`'> �f Yk;�ti:5 vk��h. L � � `i?
� v A� R f3�� S� 1 T�??'r 2. .'3i?Tti .Zih'G�_ � .�ia.. � ; -� ,.% .u:
� Yf.'+' IA! Kiho .AU�'t'r WASHIHGT6N CxSCRI$EC 0.S F{Y i7WS: ..-.y�-el.- ��", = , i �F'�� N� �G�t-= �i.$::E �: i¢
� f I �'iRKLA1vD. KASs�1I�i:S4N 98C3a4 -
�ELihN'N� A� T�+� 1t� R?FfiYES3 `e"�n^ME"' r.')' THE �JT*iYP'S? .,�-���_� � CIF';v� P1i0t+{L. G6�-$�°J_ G,�iS s_;{x r; �
c� UA�"-R G" s:�� SE::tt6h tt Treh�v€ Sottrrt q6�NG Tt3=' wC_^ � _ �._+!S^•---""±"-.. _ FAX !vi7Ma=R: �2J�$2`a_��E� <. w
'*c C SF9I� "HOM:IOh 33G �=T..E' '•C 7HE TRU�� P�tM 6�� s�� T �—
- n'��': ' ENGINi2: %:}r=� fNGi1eEER5. f��>�
_ ,�' � ` T + : ,+:
; 'ic EAS' t324 �"E£T. 4QRE L�t i.ESS. 1� THE :A57 �tN_ .^�. �✓
�reDv. �h • ! �--e--� „TTN PO..�e�'�� p�� -z` .�.�' .
� n SDi.:n +t� SS1C EA�+ ��tJ£. St5 FEEi. `,�� � ^-. ' .y32 SDv N.AS- SQT�- PLACE �w�.': �•
-� r, r�pRix�{�5�Ec^. ` 1`'-�'".-".' i'� � hEP�rOi�. WAS*ilf1G"fl'ti 98v58-�832 °. .
Y`_- ' .. . 0�?�;. tdJMB�.R. 42,. 26G 3«•.2. f -
-^��h,. S4'z5T b75 �EET. M�iE �2 t�SS. TO TME tMESt Uh�C 0� . � �y�,-,1� � " � fAX NU1���.R: 425--�'8-C291 . .. .
5L� SJ3�".V6SON- !„ ....
. .N >ii'" hi4a?T.�ri A��K' SAiG WEST t�+:E. ?57.5 �E? T4 THE iRUz � - SURI�tYG'�� A!!LA4 GSLU?AN & kj50CiA7E$� �
= ��T 5_viNNIN'°v� � � � �w i - A
� � - ATft� SiRt;E 3t+RNES. Pl5
"�� y �XCEa; �rtE W'ESS� 30 F€E?7HER�OF fOR itQkD: ,.� ,� � � a r $ X ��� '
�� � ��� El{CFPi' TkE HORTN ?G3 fcc? p: THE WESt 45 F'E:R; _ ;.� 1�� �-�` , : , �5U"v�NVII�E. NA5NihG7Qtv 98C i e �S� � � �
�..,� _ _ , '+:�` � � vr �„- t2J'yABc�� �25-4$5-S 25� �-'-�r a �r c
�r�, � --• y�
� �----? : IPR �J��T � ��3t niU►�ER �25-49fi-6+D8 ,� L�c x
_ �+'_�. f i \ b-.. 1��n. ,� .
Lj� \ ._i . - •-t-` 1,' , i !L�r'.41.Q'-��~ IY _ ��p, L .
'_= ���vf � �E�!�`.r`v' � .� �,Wt'j'"�C
- rts'=iUMEtv: Anu �r7JCE7stkE5: •'.`.^ ' �� #�'` � ` �� �. � ' Te+�i'�'t.0 l�.� rv�tii�.`_��� w�-z�
° 5 EI.E�,'R�N�. TOTla STFTt�. WAS il��.^, €O? `:M� FlE:,� n�� ; z�G
TRav£RSE SURY:'. 4C��URA..`Y �?5 �JR rJCC�EJS 3tiAC_ �`—� � I �,� �: ��4<
91 e ��—,�•—��a � � � j SHEF' rtu�6Ert �� W rz �
� L.*_r�s � >
DAT� Ot SUF2Y�';': M-'.SVEM9€� ZOtG - 1 G`JU`R Sr?GLf (r_
�An1u: r,�� ss �� 2 GE�l�RA= hpT`5 =
�seurrrr u,�n
`z � , �•m 3 ERGS�(3h�j::?iku'F3G ?L.-A� •�i
�- � — -- - 4 RC�/S7GRAS Rtt1R Ec °��r.�
f ' S {�3��kiit!AftK: 'I??' 0�= REM70ti � � 5793 '
��.+ � -G'h'? NAtdE Re'H'ZSQi. LDPPGI2 P�N �N LONCRt�E 5 R'`JAi7i S��RM ?'.J4h�� 6C P+.2�F;LE -
�z a: r AT Tt;�tHT��RSEC7bN OP S.E_ 92QTN ST. #dC3 ISST�t O DL�RlLS dc i�Q�S
�? y� AV'cHUE �. 't SRNfTAe Y S�1k�R PEAl�t
A
� �'N. = StZG?' $ SANI3A.RY S�W'4 �s?�Ft� P1 1�AIL� � ^
. �9 ��ORMNA?EF F$�^Si.;T`.� � �
T i�5�_ 9�.h�HMAkK: "`3re-A �ID. RT,1lR01.� 5��. tk TtIE rtiSRTiiM�,_S'T � � �
� i� `Ak '.t� flDw�u4 POLE. £LEV. . Sf9.39' 3 = �.
=a� I =
1g' � '9M-8: FND. �A�Rfi,A-a SG+C� 3ti '!P+�E MOR?hMc5' g R ar�-.Z�.�. � _ �
:z�� 'A� � ?Ck>Y�[,t'? gCiL�. e�V. = 57Pi.��'z� ,q a�6.7' i 7bG' M^v' 71�.g?' .�, _ �
Y ,
0
_ -+- ` ° '°.a '°.a' �e•
= v �. . _ _. . _. .. .. . ? .. � . ( r�°� b , - '�+'�'
- e � � �.o �,s F� � � � ,�_ I
I � I
, , . ,
� ( za
; . o �c
i � i �� A��,f� m Q�$y pe ,�yp o,' ar `�p� 0 � � ( � - �,.e�
e�e� _
'.:�� � ; � 5?�ti4° _��: _'-!. � ..�:r�'� ro!- �t`� a �' "_Q.`� Fe � E~"� a `� �� f� '�� � "' � }I
. Y�;: z ! Y0 !., � ��_ �,$� �.� _ .�1 H .� ��a6 .�u �h .� � �.. . q ' � U J
�, ,n er7�2f'r W.n7 t �a' . �. �: ._4s' .. .^� Q3, }�:l y t"'w. � =.ph� �"C-'� . mj Ms� � � � �
_ _ _� }6' 'v ?a-4- ri7.Y i � ` i . _. � 4 ! Qti� _� � ���." ��� ,�.� F'- J �
(@F � _ �.c' ! � r + 1' � + �` � � Q 4
� i� ';f i� �4 a _�C£NtE.,� SECiIQM ,! 6� � '� � +¢.o� sao' 70,0' ooa• so.a � euo k-�r j 1 f � f��1 �i I
. 'y �; � - - _. NE ?ih P[.�;E 4i � � •-C - L�L � � . .
j �� .8.3' = p $ 1
�; � z, i ,..a� - - � _ _ a tcWi � '�`�pA�`� � s�' ` �
{
' ,,. ; � d arxxrs,-k ea�.zc• ---`"'-_-- �� � � 5°. n J � j��j .
i�_� � � i � 7z3' a � �'g� w
;�ea' ,a�^., 1 u • --� � Z
; I ;� �z� � - ��o��, �� t � � a �
� v, � *�.�.��� �
i � � �•� � � � �
��5� � �
1 � �a, � � J ' `f
�
, ` � W �Q �
,
I ; . . _ . , � � O
� . � ��-----�---, j d. �- � a
, > W ��''{��' s: 4 z s��f � � s , . i r�, � �
o sc d r .,.o
'�� �-;� �'-y6�� gtM.s(Zs,s� �99v s�'��� �( I '.. W [[
I c " j ..31.0' S.M E T. � �i J � E
z :� wG.c� - � `�. �
� �� �Pr:'It�� 6�S.CD' � - 2
; ( "a�`+ r-S G-c ��., 10-23-5 �OUk� 5-1��2� 9R:5S" z�z j Q
�i ' S3R A!:r M�Jh. W/ PUh`::H �tt} �OStTtC7N. 1P8a�� � . ' U �
. � � '� �'?r ^� P�rrFOr. C'JM7R�. ►+Oy �tas2 {a/27fxi> �° '"� --,�-s��,,,, " � . c.
t i � N ?fle9t74.f�3? i � � ` � +-� �� � �u�s E�,�',
' E 733fi522.3E32 { � � , i��, R C ALN�iti"=t�, �bR APPRIIYA� � L �m
�� c�u`� o�nYr1�
I � ' i '` F' .. �`� �rn s'�z�'r _ ,] - Vf __ , � GRAPHICSCr111.E .. ._ _ _ _ �.. � n -� �x= ,
�
' 15_it '� $$2 - `� w 26�2.56' :AffAS —�y � 2'" Y. ^=3' :4`.� tt 2 Yif - !!
) t� &'_€' � /�j� � 0 3U HO i2Q �r'
� i �J�-'�r: � � �V ( �V W m ' � �r r,w.e; .ws r�a.
� i .Dl � _ �'�' � ' owctw.
� : - r ��er. = sn r..� � t�` SHEET
� �,,9}�: 6¢:e- _ � O� Q
! v
. �.�.. ,.��°�sr;�, �► ('I'I'Y` C)F ��irMrSus vu.�.� ���nr (�unin..��o) oaiisi�o„
� .. �
._. .�,
--- .. ._ ��� ,, �..�, � u�i�ri�r �k;�zr��r ��.a� i��cyn�>
._ .._. _..... ,,,. ,,.,. _... . rtus.�. f'lr.rnlir�i�fi.��.lydliu���h����N
�." � unn„a_. � ��f�NC�1r�4. wa or-�Rra�,r(7�J a�,,_ -
_._._ — - �. �
�—
� : �° - ,Kw9 r�r,�i
___ _..._._. __._. _.. .._._, . __ _ ,
.�.��
Nrl ttEVISIQN EfY QnfK AhPR ���"��- � � ���� ""'"'�tl"""" �`�
. v.s'? ��.,y
a'n c w ,su,+ n .. °a�i ui a %. �� � w m �s v ♦. �+ .. .
. . , . . . ' 27 �
`�ry� a�^ -"'�, rip" �=F . sr xvr[�' i�r�i� R ��' �P�d �i"x ..... �� �,� r.r r��' ruyi tn�... u��-, �^icZi ci--°? c<i� rr.�� a�a- r. m z-`�n� i �v � :'ar,��a-t. °"�ti5i'�.r. T �
vptfik�� �� ��'��n �'��� Sri�� tn �ro C•�� Jr!- .s, '�� z. ��','" in !� �� �'�"�o�Or�t �` �' � � �`�'n r=F��-1' o��' 1� �;7yk,����'' �'o� .ti� �� � r.r�. _` i
pN �' N �ry 1�1 1 -I � � "� rp�Z� �k
* �• �i t Cy y I ` xi sp {� 4""�, i� S 9{A �.In .K � �' � 1 4 I �.i S nt ta '.TJ
S'rRi � �r��� ( i C'J � � �.� � C> �`-��r n4ii �� a � a � (n.. ��rn ��� � ��� 'pT �teir�r, �I�yt��1 y��,"�(���Cc+'�_{1 t�r;�„�n�rr> �"� +.°i=' a+`t�{O
..� ' b m ,� 2. � 7�K��� A CJ �J 7
� � � ���� �� � � � t �S�SF�f�r' x���..�� �� �XI��� qr'�� S � ��`V� ro . �� ���yz `�,� �� �mz �,>.�,N� ,.� ��..��;E �� �� � ���� �=�o� ;
� ,� ��- � � � €� � , � m „ �� ,., � � �,� z �t �. ,.
� 4 fr � � (i m�. � c�.'z ^
� r
`t � G '
�^� �, i �'�'�-� T �� � fi� T `�� : Y��'�r,l� �� �a�f,iA � ..� � � �v� �`�'�'ej��1 �a: i"�.�,�$ Y'��� RiS'�&� �� �m."��`'`�-zn ���5� c��� �}r�i�� r,�jc3�� ?
� � � ,
e� �""�ti� �"� ��cr � �'c�-"r. r*�n � z �� 3� � {�, p�z r�pi�i t,
R 4 �� � � T� y�' �"
{ �t�
�� � c�f�°;' ,>y� � � c3 � � � � {� x � � � ;�y �q
�!A � Fn�o ]� . i�1�o Nt7����� hli r M *._Cf 'l��V�ei�.U ,''� � \p�� � G�Sk� bR 7r�i....re1�'"5x s $�?r$ � � � �...r-� � tZy0+5;, .
,� .: I� y� � 2 ir", � 1 s �y { �E { �r}i L (] r JC p� w �', ; ,� Qp � '7 � ��px x � p.r� -
n 4�T. �CIIM A C7 ��1.. irt �Zr (/1 S��al Y� � 1fD�,j �m �,L.� � � �f �.� �4�y.�C' �}y[1��.� �kl � �+1�IL f � ���b
�� � ��Ry.'rr��+tr'� ��.��.� y� . � .� �v�!,� � �v�5v.`" �+� m "- r� �"i <�' o�@ �'9;"�"�� c rn �� �� ��, s,r�a���' f>�cr �$ ��� � � c��ci� 'S
� �� "-i` ci r. (a} a ) c N 1,[q} g�,�,�"i�(yp �,y�y�. `�J�y ��ico c yn-1r rr���.+���'�
'� �C 9� y Q �GZ'1 �� +i$ � -<�� �� � p` ��s� � z A� �. �{ G}�� ���� ��� t��'�2 VI '"�.1N -J"C �'(� t00(�yrn �� �C c3� M A" ("1
m`u�{ ,�c �c�r�S �� • �' Y' � � � � 1� £i�' � �� � i+f r�' �77� (� �•_` � yii_ '" n`�'� a ��x ° z �� � K'^.�'Z�i�°�!7
�in i v�° � € � � � �� �?'n� �, ��� �� �`�' �� � �� �� � ��'�� �o� "��� ''�'*,����������.,. o��. �� n� �`� i
� r� �� �'�i1z � N � �� ��.'� �'�`�'6���� y{ £j�,�- ec�� �T' g�y �n x �c sx. x �:- p.. sx 'j �j Cp
Lp� �i !n p � �� � � �t' � m��t�a„ LJ�I o`[*1 � � G , �jr� ?� ini�'� �� C? .� ,�. C � �;'q�pp� ��� Y
,., �� �f '� '"1� � .O � � �j � R m� } CI� �'� . m��. �C� rryt" W 9g�- i'�a�;`�U].� tA@CT ,y �+1
a�' � �y ' � � I'�Y � � � � � ' � ' V�� ��>� '� -t mT ���� � � ��� �.��� � �.' �ly�.�, n1�1D�+ i+i� ��` ��.r��r N -r�� ��'�+� ��y7� �
>
� �
�3� �_ u~ �� m � ��m �� +� � � �` ��� > � Q �r � '-�y'1 .* 1� � v! (,'] ry � } �
y � � � 5� � �j y � ��� y} �� ���. � � � ��nG = T , � .{ J
�7'� yy W-{ ^y �D�y��ryp� 1� � I� �v�(�,� r�i ���t -A � K{ � � - '^ } `��+�� UV ��yr1^ u`F �� � �t'� # �(���
'�R� 'tl����.�� , ��j �}I[� � (C � y � � �� .c..�i � >� �Oco � • P'i �1
�T � ��� r^I��4� 2 Cl � � ^��� ��2 T�AN L�i� ` � Q � � �V+i A w�,� et�_ �`-^� ���y'l�p p'bt�.q. tn ft�yi� � j[f�G,� � n�D �!7
� �� tl � �9 � �W � G'� �� . (�1 f:7 5.�� �j � C` � 7D,��
i . `�� � � y�il� .�� `$}� � -� ) � � � �. � � T � � � �- �w�Lk����� �'� `A �. r m ����� ��yvA
a � i' ��(f � �� o c '� �� �" fi� .�' ,� . x � � -�... a�.. n
..,a� � mi�', v� $}�t ro � @ ��r+�p..�i�i �� �1 � 5�, -1� i� � �c+. � 4"*' �,�p� ..�"�y� ��' {/f o T{-�' �:> � ��� (��.
(} � d�h �� `- b � ��.< �!% {h � 41 Y � 1"Al� � al�Z n � ,7. �j �yIwrrt\� �'W$' �� I�y � � ��n� �� r}��rt
�vi � � I7, � � � }��' �n�Q � `� � �� T+ r 'a�..�� �` "' �`�'�R S�� '�'�f� ��r � �� �j m
� �`� �Q `� � p � �t:���� r��o ' �� �+ ��� '� -�a �����q r� ���� �� �� � � Yay �a� �-•� �r��° � � � ���� gn'�"'�
�� �" Y �n � � � � '`+i��R z� c� � ���' F"� r3 '�.i ��� � A i� T�� T-�' ��r � `�F,�ar� �� i`
r�. � � ��z � � � � ��, ��� �;�� �, x p�� � �� „ ' � ���- �,-" � � ' a�����;� ���� �F� r�`�� �!" >��
a �
y �[ ut � m n yj }
. �
� �hfl1 Y.� z�'ry -1 �.C' W Z_ �jp�1`l � • 11��` '�� _ ' �1� '�' NT^ � �Y � �., � 7
�'lYl � �.' �7y�(K� � y CIW 'Y � �y p..�� m 9'11'< �� �� q Y� �,��t=t f L'��� � } () 1S,(yI yn 2 �� � ��� (���' �.. ',
CJr- `NP �gl�'F '� � C� � �:� .y��� �� � s� }� �> ��y ��M ORr �V�A � � �����C>�� �'S��. Y�� -� 70t'S!!(L�� � Yy
c�r�i � �A� �� , �t^ '� � n� �3�y;c� !'�� � �x � �.�u� �5c� P �r.i�,b' a � "�°i�i� i r zg � �,.r�.tZ}p���' ��f�i ��c� � s��w� -'�� �' �r.r .
� 25 b F _
y � "� '� � r� - ._.w � :
, � u y� r. aa�� fR �.� F 3 �' �c� :;; N SQ �U � �, �� �d�-� i'�i .�� ��z�
2', '� . �+ �� � rq �w n �� �.Ya p�a � n ���ls ��''�'� ra� ��.+ y� � � n � � N� ro�� �
� �O n 3, �'a" ' �.a � �c� } ¢ m :r_ � C$f xp!� � � ��z �i� ' !� � � -n $ ln► �
�C ��� � �� � �p }� �+�+V ���,+�C�� ��9 ��'C� � � ����. �� ry. N.". �4 "' ���F L7G�����S�N y . �"3 ��� fC�O ��l'`'
'�` � r� y+n a i��
�'�' �� � ��! �^�� ��i a� 2� � st°C ..u+,,,��_ � ���; r°�n(� �o"��-"`�"" 73�� �i'���� ��� '�'�y�� ����:���rry��� ���`��' cn� �`('4, ��i�'
v t� £ `"' 'aZ _ � �� �"rt'1 � ��� Im r� � r+�Y,�; ��� Sri����i� �x N �� ����
x.r•i � � �i�� r�+ ra �: � � �'i � tin.�'
_�
�
� _ .
n, ... ,� �r: i�n •� a, ?n �n v.� .. .. .. .. .. .. ,. . ,
, . . . I,l) � w o� r., m .� . . . . . �.ii �
..� .r �.. r r��g�ri r . , p :� � .�
�° �i.`-7 � �r.,m 1 i I���a. �.:u�� a'�g ri g. �u i, v�. ��� c+ m n.� �n w i`_) "T v� �r � �ii��i� o�'T�' 1}� �c� .G m .�, m xo �r ��.n... �,., in t� �u Ci r�i�'r'r
� i p q ni p n n v }! s' � t+r� + S 'c"y� i ,m' n ,Y {� s o
}=� -y� ..L���iC'�V �i- ( ��}- �..7- gi" � 3 Ai. �� � � `� � � �K�' �' S.l�x' �1 in� �''. Y� t- ^xy p�.T�' y�r�
Z 1•Yp y�� �C y� ZI .�a L o �y f1 .'�. M y C') .�N q} 1�5�� � 1 q
� Y�S � ro� �711 �N Ul A -i � u 'G. '� A g>D Z�- Y} �� � � � Ji 2� " �l� � :M') �@y�f � �
� �c-t �� .�����'i��i�� � �� � �'i� �� r �isi'A y�3f �� V �v � s9�'���� � �.r �=Wi�� i �m��� ��U �� �' �� �� ��� �xF� ��� � Fi"'� � � ��y¢-'
�S . � �� ��T � a � z� }� �t I ��cz ,y tj �'}��j�, !^ �ry�p () ,rry i m y � � zl
s� {�, n � tS o� }T. fi�m� � � � �ry o �p x 4 ��„ y
'. � � �WJ �"c��T� ''i � �$ �..�a �� .. `��:Y� Z � �" ;b' �� �� Ent (�qt��(? �Sp�.. r r�➢3rJ R� n� :ON � �I� � I^�� 3t. ,��'2.s c` vmry �j:i s�+��
fi ,`� $ g M � t.,� iJy� ��� m �. "t t�J Y T. � L� !y e� n '�i
I n �� �� �'��t�"������' ;•"�� �� r�y� .a� r� ���> ��� . } � � 4�"�$ � t, ���z ����� TS��, � � �� � �a$ t��� �� f.' � `�' u��s � ��
� �m �� ���v��,"t� `��� ��� ��� �$� � ���� �"� ���' y� �7i �y����� �.� ^ �uci�`� ���� k�ic� �� � �� �� �3� 7� ? ��� ;��� ����
� � �_ }(1� ��Y;� r��. �� �_ � � � ,_�
� � �H� ����,n ��� � � r� � �� �`��}� � � � � ��'�''`i�7�c �r�' . r ��"s� m�rr��.,� ��y'� � � `� �. � ��,�, �� i N 8�� x ��
�r' �. o, m ; � r• � � n � Gf �m��� � � �i �
. _ ,;
r �. � p �ty� o y
� r �+ 5
� �� ��.,�'��. t�� �Q� ��� ��F �{ � ���� � z �� � �y 1S�t ����, �1� �� � ���� a����M, �.�� � � r� '� r�ro& �� ��� �3ti-' �7y���
, � � n e1 o ^��� n .y �p� �, i�.7�`�iy D o n rs�i��,F_ �{'��-�i �31� �T� �' �+ A, 8 � �iv �$ �tn
i ��z �T�4"� �n '�'� TiS eF vl �t ;u��' � ro�mi- xq� R� �- . � �� +�w�� � �' i} s Z�'75
�� �� p� �'�M � fn� � ��'y' � ��qr� ��� e"i�� �c� �� 'm �� �r , �_ i �� m .i n �j q� n
� �1� � bi � x � „ � m ��
`a' o � a 5'r`�i �j � "y5'_,} �`� ��� y .�a� a � � ��'�� �$', -�H` � -� �o;-{`�� � � -� ��� �� � �E�'y L''r �
������ ^��j �� �Srf; r^� � � .w x g'O r ) � �0�(��i� ��il, c^��� u� � �p IS'� �� ��
y } � '' g _ �" 'a+ �' �� � u ° ' ^ ��e �� ((�} n � �
1�1 �(�� � � C�"� �_� �L � C . Z � �Q � � f„? �i� �(7 m -y � 4
` 7 +�^ �" r n!-c�'i�3�;� r' '^ � �. �{p � Rp�� '?� pr +� r M��'"a n f z��z �ocr�� r�+�� q� p p ..}<� � �' � yI�
�. ftS ��[ tT�' �C.�f7f� " �/h C ' �� N t�!'S�y �� � �.[ �}(') 9�..b'!X� Yrl f^ RI . � �� A�� t 'f t+i�i. � �Cr
b ?~ �'� n�r��r.�ro� �..� �C� ro`� �`r�� � ��� ��� ���� "ti� � ��TF,�'��, i�c ����`u�� �s�� ��� � � � �i�, `+'���,n-by S. ma ��.am ��;a
4 � �� ��� � � �a
� K� �
m � y
- , � � �'^ i � y Q"i S •. � � dY r� �'+-try �M�
(` W ��` � f� � aU m�-+ �' n 1rla�'c�.v AiG^�t j �L','r�"� )-i 4 � r m�( '��.� rA� ^n y,, �
r �� �� � �mCA�-+�� M � � �4 �� � �*' �� 74m .Z mq C� +1 �p�p n' z�' �r�it7 Z$ �y � '�o.1 .�N �i r:i� (�}T Z� 4Qh $O(S
� �.� ��7c�3�� y� �.. � �p ��� �p� � �25 � GY�N�� 'W.�1 QpmvSvi� � ��' � ��+�f 4 � o ((,,))� ��d .,Q�� t'�5 �Vn 4j=Ci
..,� � � '�`p]�.� �+} " ',p� A� �{(� � �n(1 T oG � � � �...��� �p &V�,. g-1 r��S �i� �� Z= � p� � �.Ta� � �.,..�
a t� �+ ��F�(�Yr r� ��'y�` �� `` . ^r� "'' '� ,�i � r�i��� :- �� � .��Z"i �v7 "° ik �+ � � � k� u� -.�6 s-Ir+
�y . �F�"'*� $�pp- �� �� �� m� �'`"� �,g � �� 'a �,ir���'�� m� -�7�� �"�� �� � �� � �� �+r� �� � � �
U �a
� L•'1�' S ��h�z� r � � cv �a� N �o m ��. '� x�° � � � ' � �o,.
v �c ,mo{= cr�1n� � � r .�,r u f"y ,+W m t�,i� �� �'r r> r� .o �a C
� � l � r �� o s.�j�'
> n ,�< � � � ,� � �ri �u F� �,,,�� .m � � �� y� � "+ C� "'� ric�
LJ _ � <�Z.1�y��C-_x.� ��+� � � � � ,�� J,"-I[ 1 �� (�'S���t^,' 1.va vy��.. � -� . o� � Z � �^t
7� `-� {e � ��r r�: b � .�� 9+� m� c� � �r�'a'..� � '�rri ,.� � � �i �y .p� y� �y.
� � � x � �, oC 1 x�+a z� �y+��c�i:a i„��� o �� � ~ v � �' ��„m
� ������_° � � � �� � ,�� �h � � �f � � � �� �� � �� � �,��
� Z � X�kryyx('`'n� ��ay �R � ��i m�i ��� � ��j � (y�T`i�.ry��T� �� ��yM� A�y= .a� Q ..� Q � a :38� �� r� �� � �
�.. �/p�} 'T�/� y
� � r��{{�p� �� M� m�y � }�'0 � (��r � S � C�i7mF.Z � l5 �2ytN �jpC�* ZS � � � �M5 zryi'Yt4,' '„�p p� O�i p .
� g �
g � r z�z � �p" S � �� ��� �' ,� 25�','�ey"t �� `��� ,� �r �� ro � <' � c �� y�> c�
� E' � ������¢��� v� �'� � � � ��� �^�iA � �� # ���� a � ��i�+� ��'�� �� � � � � � �F t�� �� y� ��r�
� ��' � � �' � u+� � rm"�n� � ,� n a � Cf � � �� � sn
_ �� " - s x �
r � z �ri cn z-�r�.
u�
... .. w. .........__.__
n
�'�''1nQx '_7� ~_.. uNl � rJYV�� �+v a V7u�`yf� nURi. '�"yo
�'P,�.f�Fi� m uE �� o� �C�it�.� �'i���'� ��`�F- � �j L
� � �j �iaffy�l��' � � ii�� iy��*��'�� ��`�� ��'� ��� ���
y .
� a n �?���". T � r__. � -____. . � ��' ` ��� ��'���y ����/1� ��� � A
�� �z .ly �12W.. �� � yV1� f '•_.�. �� �M���b� ���z N�V1 i1 � ��j{J
.. ` � �p � � �"p���, �". w �A � ( � ��5 m��[ �G nm ��o� � ��p"
� �,°� 3�� �� �m � �...,i �.... q l., ?� ��y�`��y-�i= 5�`�'rc�'`- ��n� .c�'+f� �"'
� �� � '�K� � �_�' �'e I Aamu � �r� trn��� ��C� F��t� N� �'�i
y� � r � m�t � '��•, ��"�����^ ����� }���y�0 #�'t+�� a=
.i �� 1� � �c> .�..: t _.._.. �..- j �f�.. � ��� c�y�� ��f'-,o c �I{^ ,y,Y�� �
�a '- a�� �
6IIm ' CY7} J n ` AnC7 . Z�fiY ?' � Q(��7Y
G . .� � N t 1 h� 4 .�:� :�_:" .. . ] �' � � t�,�� �b� �t��� �f'�> \Q" �,y�
�'*"� t� � r � � �"�'��'r �� �..7 � ���
� N� '{ �n G� vs��� �sp� r�
�.... . l � 'ry I A zm a I�''.lr�� U� ��U U =�,�cp7' �q4 -'
�"��.. � � �' : .... ........ t� � �tn.. 8� �r r5��� � ����� � �� ����7 a�,g
,� � -r� e� rn ��j � .. i yµU�,���� an � r�52'n� v+y,� �'A'� .
4,1 g s�(
��� CT) 5 � �� � ��; x C��'g77t��4 y'�r"i�ap ��� �th �,.�
y- N �
��
� .�� ��y� :�8,� u�� ���� , � v�
�, � � , Qu � k'�� > ��F3"'��� � �"' �;�� ���
r �$ � �' Z � ��
�,,� -,�� � '- �,;
��; � � � �y������ ��,�� ���p N�g� '
, � (`D a }n in e n yu � ., r 4F��-f Sta�i�^ o {n^ �� ' �q �
rn ;� �j �� �
��: SJ ���� ��� ��t s�`�� �i� �� ���^ tn '`n��z`�� `Mo 7"�L '�3 4/?
p y � r� ��� n ., ��'� I VN QQQN � ��1
� ""' ���}'t tC�� �At �� �� G �T �j fi US� T S�ti rx�i '� Ci�
S�
� � y�� �.i �mr�.�ib� m ,:� �r� y 4�nyr � �i�j'j�r �� m�� �y�
i� � � ��.._. r_ , Y.i< � �� � �`�'�� �+� � ta� `• � �•,,�`�a� v � .. p
� o�rz
t �;0 a �� f � a *�r� � �n Sy� � � ' � �� Y� r�{ �
..�) 4' � `Y ���J�'� ��� ��� �� ���� �� � �� .,d',��. � ni*�"�� �� �''.� ��� y�� �
> �- F
� � y/�✓ L � � j�� x�� �m ��� � :2 a-^ � .
� ,." ' � � ��� ���. � ���.�.� �� � V ,
i.r� , �, �� � ��� �@� H 'y"��"� � �
¢ �
� �i v�� q n �" zG}�i�" � �i
�� � ���8 y � � �. �'
, '�' 4 y �,,' 5� �, �r"`,�n".� �� � � F'�"i� ��'6 � ��'�� '� '�
�t� » n n� "�b �'yr� 'Xi p �i o� tg�$:{� A �� �i � �
��''s � `"� 3
� G1 � � ��� ��� � `�`� � � � ' 'v5 ;
� � � � �m� '
� !� t�1�N
�a�er
rv � � � (�LYMPUS VILLA PLAT taFFE ENGINf�ERs �_, __ ...........
� �� � .._ ,_, .,-. e m.
� . f.W32SYlU't"kil{AS1'ItgF1117,.At,'N. �.'Z•:`N q:�;
.. __�__ _ —`
RIRRJ7C)N,WASFIINGTCA'd5t�(?!SN y �`" ,' " .. ..
CIiCNt....._ .. ___. ...... ......_ .._._ . .. ... I'!14}N61ISH�Oiik2 ...._.
� � CAMWEST OLYMPUS VILLA, LLC ���r�,^R�F,,��F F.F . _ _._ �. .. _
�°'
_:
�/�, � --___.. _ ----- - —--_... __ _ ___... . .... . . .... . __ } _______ �....�.
�.L/ 1 BW�FfCC1NiENT L1F$14NEORY D�tAWhiBV CIMCKEUBY y ��i��i 4`�� _...,._ . _� ... ... __.
GENERAL NfJTES �,�� ve ��n �•�1R! �z�::N� oAr� _��.=r;R��T���
,�.,.
�<�.������,,.,�;�.�„ ��
L8S£-Ot�-tI.►l�.1�
�
- --- ----- s� oi rMPu.� vii i.n ��..nr (�i_i.a�ia flso) �3f2g/7n,�
__ _ : ,� _____ »,�rz" ,�t�9 C1`I'Y UF `� �.._ .
_ m° , UTILIIY NEHMI'1" �flJl1UC)4`l.
.__ .. ,,,,, RE NiC! WAS1�lINC TON "`
'.
_ __._ _..------ �i� ltl•N1'ON
__ �.�
.... __ ___
� „���,M N' , a.�. _
.. -- --- «� t--w-� ���<��,�„
— —_ _ ----.. _— ,.,�,.,,,,,,F�,��< w�„w, �,.tv,
N0. NEVISION HY U4TE MPR ^�� . �.-... am'�r�i. �`_,. �"3--7�"9.
l ' �
�
i�����i, i,,.. .
� ; i I
^��;�'�"� � e� �� ', .
i'
�_....._. . �:�� /
.__ .. ;1. �....�_....1� .. .....I �.mw . .....�..�_'__..
___ ..
" . .. ... . . .
_ _ ..... ._ ._.. . _.,_.._._._. ... ,._ .. ..
N4f AlFt.'IF N( �
— _ ' Y � _... { _ _— ._ _.
_—_",�`.', �. h t a,t„r,*����`�'�s��t'�5 r :,, ' f j q �� _'� „
�
� r
:
".. �
� � � t '�t ,�'' f �t,� 'f
� � , .�, � -+S ����� .
, ,.
_
a,., r- i�� � � I � ,..,:�ti � �} i , �
, Y � t � �` .
d � , �. . ,. �. . � � ���� �'� � � � f,���i i� � �� �'' ,
�� ` :� � � �
��� � � ��'�� ���� �� � ��1 � ��� ���� � _ti���{ t I' ��� � ���� i'I �Q r !�r';� � �� , f
� �a �
� �-
�� �� �� ,�p��� �� � � � �� � ��� �� � �� � E , �n��� �� ' .
� �.;� , � � �- � �, �„� �: � , i ��
,
��� �� ���� �g�� ���� � � � ��i����g� � ���' d�c �� 4 ' �� � �/� . � f ,� � �,
�. ,� � �. �
� - � Q�� a� � �,�� ..� � ��`�� x � , � � t j�•�� ��. �A,
�� �� ��� ������ ���� ��� �R � �� � � �i �,� � �� � - i t ��� �� l �'>�' ;
�� -:� �,� � �� a ��" �� ��� ��� �� +���� � �$ � '. I.'' �J ,
� ��, � a �� � � .� � �
a ��� � �f����� � � ��� � ����� � ���� �� � � � a ' ' ) i ,'
�� � � $yy�q�� � �. .��� �� ��� � �R� �� � ��� �
yy i5 4 � . � � ''..„ ,, J
� � t �'��� � . G � � $' �� p 't� � ��n� 1 . �.d * ._�/��,,.
k �� �� q �' � � � b I ..
' a a ` � Y;A ������� r ' 3 N _ ........
" r � y
�� ��� �*� P �l�y rrlj 'R�r �.i
�� � � R � � � �. �}� ¢ �� r '�1��� ,f� �,�'y �� �r� � �� t 1
�8. �'� ��� �'"�Y � � .��r,,� �{� li,'?� � F � �� � i / � � .
� �� � ������� �� � �� �����3��� �� �� ������ � / I �' v
_
� � �
. �
�i�q �� �� ����� ��� � � � ��� ��� � ��T��� �� �. � �� ' �-_._ . 7�0
' � � � ,_. ._.
,t�� ;7� ���� �.�� �� ��� � �R��� � ���1 g� �,� �Y ( � ��, � ��+ �
``' � �� ��
� , � � �� � � I ,.�. � ;� j� i .- z
- � .
i g� � O
._.. _.
1 i ,� .._ .___ , --t
_ ;, � , __
" R .--'' � � '' _
;� ;� a�,.- � `., � ��_ i m
� '
---- � � �� , • 1 ��� z
- . . ��f �,:
o °f �� ��� � ��" � ,' � � � � � `Z
vi �� F � 93 � �� —'
��� ; , �.-.- .__ __ _.. _ __ ��
� � �� ����� ���� � � � .. ,, ,1 _. � ��� �
� ,� = �_� i � :' '
� � ,. ^
o �� �� �g }��� � ' ; � _ _ f ._.i , I '�..._ __... �� ��� �
z � ..
� . ' i
,�� �� �� �� '$ � , ,- � i -_ _ �� �
�: - ._._ __ _ , , . o
� A _ � : �
� � � �. & � ���'� E � � cTn
T.
,�
" �� �
��� -- _ _ ��� ��
}� �
y I '
. ?i FOAnM�� ... � I I � t m
/���A
. R N r.1 � , , ..
� I
..�.��- ':"
z :'> � � � ..w '� ,_ ......
i �
If �
� E `t' > . � I
�� R - 1��^ �'; ...� , 1 _ �� I � O
� f o '9 R i � � Z
g �� J`, I � �� � .. __ -�
L
��� � , ,.
rU' �
� � �� 8 �a , � ' � !i . r1 h......,, __. —'
,.-
�?6 � '" � i _ __�� �� � � �� �
� ., �
. , . , ,
,
_ _.
.
�" � �.. � x }`, � ..,. _T___._._�.. � � ... � _ . �
� ,;-
' � � yi , ' � � � z
. � ;
� �_ E� ; S , ._ _.__ ,� (n
� � � - — -. ,_
g `� r. i �' ( � 2
�� i' � � � � �
,. ( I r �
�
_��M��� _ _� t�� � - . ..:_:� .�I . _�/ � � ! �" ��,, � w
f- � r .._ ..r .__ �_. . �
w'�� ,� �y wASCR�l�M!"NC -�_"' �...,. �,a � � � ����� ��� '''
_✓�: �'
��� �' '..1L�ir .�.,. � .�,... � i,ii� T _.. _.. ._ _.._ y�� 'v ..
� ,nW g
., (� .��,,'�•4 .. ;� ��� Y .. ; ��eElow �� ._ _
��" �� 1', "...Y. . � � .. � El nyp) � - .. _ Oi'+.etas _
M �, x . __ . ._ ._ _' _ n
. �(
' _, f� .. .. .�
�. {�
�
� � .. , . __. � � �{"� ___ A�
. � � , _
, � o r � ,ti�".'� ` � ���� "��� � � -
. �
_ . , '.
�� � € �`.x -��; �� +�`^}Y ... ,' �ylK-•� �""�:°��. �� m
A� `� fx < ✓ �ti`' > e y� �: l � /•� .��-�' ��'�+LiuR ~ v�� (Tt
:b 8 � ��a�,� ',- �.. � �' � �� ,
U r� �� �, � y� � � � � ' -' ,� � � *�',�r' � _��.
' P _ `,
L �
� ���_� ,., ` �,.. �
lv �{0
� G7 �� �� ��r . - �j� � .. � y� \ {I�"' _ � —{
i
��9�
r�C) ' f � Q� - �-' C
�� � `� .�- -�
� � ,.'.�`�`S w -�� R \ i1 'f �.. <
�:� �� � � C� a , � � i �� �
ri � �f ��'��,:�a�,,� '� c� I .
frl �� � S 4y __. .._I._ . . a_ � . '�j�'� ��, �'���� � � �...��---� � ��,
� � , ��
�; �� �`%,..y , � ���� �� ��� ��� � � � � ���
_, .� -� . � ._. ,- �� �� � V�� � �
�. � �� , . ,y :- _.,,�-- I� � � � �_ � ��
�
=T> ,,��: ' � �� � �� �g� � �� � ����
tJ , r;;�� � `.� � � � t3� € ���
_� _ -- --- __ ��,
, ... �:� �,�;
,,�
a � __
�.l �e se' n• 6�i°
� � ��� ��,c�� .
_.-- ----•
.; ., � C��� ,�<"i �1
�e• ie- � -� = r�
�� . .' — � �nNn����h
.. ;: ;.�.�, . -'
. �
"_'T �_...__. ...I �. . � U O�y C
�p . � f � „_+
�� 'S � .� .'�, .. i .-1.. . ` N ����:�
�� , t:�,• � _.. _... -�. _ � � or
f_� � . i i; '� `— --.- . � i,p Q(G
.. � i - lC?f' D / � � � �pA`" �i�
��1 4 t' f f 1 � � � 'V� n�j.�'i-�..0
. �, ''� tl � -1��+s� �.:i CJ� •,,, ,M1 � � A I .� CW�n°�.t
� gg qV7[n
�7J p � ��� cf 1 y
ii 7:• ,�
ih z � N b ���� - ��� - i�`Q �r� s� �ry rWi .'�{r� i a,q��T����
i r,(1 f � C��z � „ � �.} �, 'Q (� � � S a O�pz��L �Y
�. -J ,� n yr 1 � ./- � �w? ��_,.i � F �a ���' i p np'LN"�?;
�� (_) .a yi 'o � 1.�__:_-..-_ .,�... �ai (�i ��� � 'i \`F�� �� ��U' U ��;
d Wt1r. I��1 <n 1 11 C�A
(A� C' n p A + C� `[�V� "_ ((J�N ry�pNAl
r u S O T7 y nC'C) l) }7my �N
n n n � .Z. ��x ��� / � 1U �..� �V?y
. .. . �� ,.1 n ('r r c) �
I.. . � ....� � � 3, _... ... . �� � �'�n�y�����}y
i _ � z� _u_T � ,o�m„
r - `, j 9��s
;, �� ��r;
i � - --� Ga �e��
.,Q ;
rao.�Ct
. ..._ .. ____ -_.______.— _..
�.....� . _.._
w �� � OLYMPUS VILLA PLAT OrrE ENCINEERs E - __�____ _.. _
� � � i
� n � I�'fe'4A?UUfI1CA.47'lBvftll'I.AC"p, q.y�J.� �,0 ..
, 4�" _--`. . .....,_.�_...___ ..._..
' . . .-... .-.... NV.NI'C1N 14Ati11LNl[I..INrltllO".kR �.. ����� t
� c�ieur._ _ __ . ---_ --___..�_,.__,_...___ .......�
CAMWEST OLYPMUS VILLA, LLC .� . -� --
'1 tl7NF�.�2.5.7Yi17 S�11
�'�fh"1�AC I 1>XRk6:Y.t t1PFf�.P N. ;
... ___ _.. _ _.._ . ._..._...... ....... OW�VVNBv V� ORFCKFDI3i , ( .',-`Mi���a�;� � 7 _.OY1V20t1 PFNCItY MNIL�NTBDAtE09'INfi17_.
,^ _.._
�iJ ; SHF.F7CONTF.NT -....�... . .... DE51GrdIl1P�' I ` . ... ._.. �_„
EROSION & GRADING PLAN ^ ` ; ��d?°,' °'N�Fk��F��9E������pTS
�,��� . _. _ _.
�nFti n�i onTe in a��rn�r�c�ra
���>xt,r
� I Y��l'I If':ll ld{1':l Ir'�
L8S�'-Ob-(i 3.L
�
, . . ._ __ — - ___
..�
......... _._ ...... ..... ...... .._. __ '" ""'��m �)��Fti'!�L�� V��.�./A ��J�T I'7 N II^y��)—C)q�,l� 03�25/2C111
._... �.e � � �,� E ;.:,�;�.� �. � ��mn�r���� r�,�„�„�r �� � U�(lLITY f�'El�t.�ll� iI��C;TC)4:y r�___ _
--
���',��1'�)� 1�
_ -- . � �
_, _ , r�'FNF4)RJ, 'JV�'1.`ih hl C)N a�,,,, :-.
.. a.�, °^�...__
_.. _. , ,.........«__... ».��� 'a/lAule}kr�!p/f r�ilc Wc.rka C�ept .
TMwim'mn"n' ,.. � iYCf._.,.S .
_..r..__. ....... � ,.i
N<?. R�V151(7N E3Y pAt£ MPlY "'M" �1
� ......... _...,.T_ ��T.� . '".i k u17"ML�3u�WrvNMNr CY&[ �O�
'.. i� 1a N $ � Ei . .••� ' � f.��.! 9tA YJ�W��i1��L'f� . �.
� � , m
. ... I... . . . . .�� . . . � t R �. . yf� �t
I�y> �
�'�. . . . � �� � (/� wl��tlt.tl x W9v!'. �T4 4:� ��. /,p.... � I�
' �`.
�. �. I�H � R � � �� . � � F 1
. . � _ , ,......
I .�»x�as+.v..�:, � y . .. ., � ...... _
�ti �� '. C� x � r a4� �� l/ 1 r!ro � . .��i .... ....... Y ��`334�$b(_
. �, j . �. ._�A�����.� �.--� ( �.�I,g.� .• ,,t �... _ ...�. _ � �
��f �r.-.. �---. . � �.°'s '' ' . �r � � ._� �
� �
. I , .......GMOE.tl@EAs..�_""•�+1J10 :..�—�Elt�E.G o �' �J'4� ��,/� �� � , a P
�f����'�y �rPM . ''._-'—"r- �. ��. . ,, in I � ✓� �� Y� c ry ,.:,, I r��" .'_m �� -.:�i�r ,.�i
.�...�.�__ .. �
2�sio4� iry'J� � � �.. ' . ..� � I d�"? "� I 1 .: �{na�"�, )_�p- ��� .
. _. .....\ . r� .. . �. . ._.. ;. . .. _�.._._3�4:VA X•y' - � ,�. � .. '�� ( }.... , ` C: ..
C� � �� � �' � �"` % � 1,r � � N .�� � � Y.�.,
��� ��. Pr . .... k>� ��d. �ti'`.'d:e*.�. n�� �:t .,��y.� ' ( ��7A''E ��
'�' �}' �f �i �� ��'� :' 'YiL �{! � sa�� an����La ( ��
�$� ' � � �
-' " �' �I,, � "4! � ,{ � ,
H '�' _.a�aoa !. ,. T � , y� � ���'fi
9 .,
s. ��L� � .�'y'�. �. � tSG��� `S �����G]7al ��. ,� :� °1,U� ����� � ."P . � ���.w
� 1.�'kll,� 7YFK:,...� � Ir4� `�.. I � � � 3Z��j � _ ,.I - ..,��, Y`i� ��i.`� �p.., ��,
iw 7s�9 �� ` I -i �Y� ' 1� ' }yy 4 �a
� r-r�.+.w�iw,n'5�9.tb �. � � _"" ` � � .� �'� ._....._...�_..._....-.,.._.._....._�- �'� � � �u���� '7
� � �� � _�� .�� ��.. �d,.. ��aar � ��r��`I�°�•'+� ,r '� �"'�. 1! � ��� �. �r�--�'� �� �r �
��fl�Ll�r���l Y � O � �
. ✓ �...� . ... '� , ��._.........�...�.�..�:'��' .w„-- ,J�4 � �.,.........,. ,.-„...r.. � .�: i ° � �.,
p....{ . ......, . „ „... �. �.. �...'" �ro I... fi � ',' •�,. h � , � � i
�if,'���r ,��+[Ss �T -- �� t.,i..... ?� . �J� � , ..� ���, .._ "� � �.L�G6.S i�.7'; ��"�`9+ �:
ro s wr�, ,� 6�r __. i, . n,,« _
II,M NM44 S I i`;C 5tA»J11. I Vt . !': ��. . I j ' yf w'���1.6 � �'1
...., Y �y }y� �
Y ECtt OJ � 4 . ...... ` ' i � � ��._ f, ♦ ; f
K�-��aax.ro V ,. I � ... ,... . ?S�PA � .. „ � .-." 2,+�n ''�`�-.,, QG. (�`
e.oit�ex'n �x�5��I ��,��, p r � .. � s . . _._ � i K, ..�, d!s
' I �* '�J�.�j� .. r � �tf� �y 1i,La Y pyl���
. � S i ,_ _....., Utw,i�i�...xfk b1 !�95 .31.Id��.9 : ,.« u' � °N„i.,,,y,� n.. ...;w�.^�ei � .
..___.. �
wu..da�Qal� . � � � � _ . . � .�t � � T H,,Y �as M a �
�;2..6M�M.ff'4f`I.03 I � . � Pv�&tr.�}a.ro � ,. . . .x�A,iS �p �+ '' '}��� �Y il�b oi"��uR T. �.gP s��N !
�. .... , ., . ._... _.____ e� i
r� . ' 1 �) (IfY,.911Rd � P V t �,�N� Pf �.�..� -�/„ E
I�
� � �; ! � � ,..........�-.... ... ( �, e�N � �
.._
� �� .. � ., n ° I +� �' �I ���F
k �
I I � '�� � � � � t
i �� 'y If
� � ? � . � � r ... �., � � • p� � r �b � '� Y �� .x L.
�"
. f
' "' i �}��t4T��� � � ( I a � . ��� R di � ., �. �,+ ....._� ' la
_..�.,
i .n 9rx..a� e�1eua � t 9� + ; • � � � � , << -� �0
�
`� �..._..� �— �_ � _ '
�;tl� �vp �� �' y� � � �� ���r '� i;� � I,��. � ..w,.� � �� � � �
I ,
�F�'96111.r ..... �''I.�,;�., 7� ���" . �n I 1 •� K• �r�. ' :li I� V-.,,l�..'C t ^ .. �. +� ...._..�, t �
vi � �t � r
6
- �-- i �C I �l, ,- .
�ttu9t9tn �7✓ � i , . . .........ti,�4�.�. .... . ,,,� y R �
�C„F�E1.etl.�'✓ F I t �'� � e I I; ^� ���� �il„ �.0�;� _. � ,. Q
7� � I � $ �RtE.. �x
7 ��� � � � :� � I� � �
�
! 4 � . °�� ���'i�' �a� s' z� H r� � I � .� '
H I � � N � � � t� t, �' �.. Q
y y �__....._._,�._
. � � � �' , a ,� , �'�
_ 1 ('. . ..� -i� .. . . .. . .....iN�r��4n.A. � �„ ` ( t.� �. '�.'N� ' �
. �
� ��i' � a � � � �. V� ��.��� ��� '"� � � --i
-� � i � � �_ _
� ., ..
, _
� � � , � � � _ ; � � _ g � � � �� m
n , ., � �, ��, �
� .. ' ,x,,z, r i �� Z
_�..._ ' '1 i = , i�; � � �
i �� i ��
, . � , w r�
. :. �,
i � ;� �41 . '.._�..._.......1 e,_.,... ...� �� �� . �N ..(i� . .. ..,.., .,._«.____.��_.} '�-.
k � � ��r a3a.i� �� �y r'�'Y� a...f 7'$.!..';' �'�. � {".... (l3
., .z . . . . ._. .. . . A � � io'Y ..y � mrrv � .' ::. �
H $ �y}+
� f1I � '
:t u � �$ � ., P t'��� ,�p'��,�' � �
�+ 15 I P
,U � � � ;• �� i�n�� _ f �a �r ...��r �
� 4� �' c
�� : ..`!1&96� _ f— " - __.._ , [ '..'1 .. i �4 `�M1+'yl t
i � � O
�..� � a ;`.E �� �`� , �� "E"������ + ___ -�,� �
, �
�
, - .,, ,
� �'�. r' I i , � a i (/?
� .. .
c-e�oc�.e•�v. � ' . _ �� � �. �. � '� �. �. ��� � ��'+M_ 'Tr.,�. � � � �
^ � _ ' .. � � .,� I
. ._.. _ - k-aia�� rY�/1.. .. . , .' ...3;�ni �.r �� � � � �� I . �,, � p .. ,.,J .. . . _._. � '�.
;# I, efl, .. . ..' I � �.�,� ' �.ime����..,, e � �
I C O
F .��. �. 1 '� � ��� .
p � � � 1G 1 • �....i � � � � ' �
ry • � � (�, �� I
= �. . • ,8
' �4 . ,.;v,..�..�, ,�. �
,� �, �� � r� x � .. ' � i� �" _1 _.�_..�
� ....,.� � , _ .� .�._. . _
. � �
.
, � ', :� � �. — � ��: + �. �
I e � .m.."`-.�.:. �� �4Mt4 �� � I � � � �� �
..-
i ' " �
.•
. � � . I�� i �'i .` u, L .� f i ��c e` • � 1
'�Fn 1� . .. . . ....11�.$I � ..^,y �c '` i' ;q "�� � o ...�...
. �
�./v .. I. _. , � , . � �K i� ' Z
- ��
.; .
�' � 1� � � . ; .� ;t IQ '��---�-w.��---- � I �
.
� + .• .�� ,.�� �, i �. � �� �
� �_. � ,i �, i , � ��� � �
� � � Y �� i �
� �� �� t ' _.__� . �'� �_ ° � +��� � i r.
� � �, � � I { " �a r�;wn��,;� I� `� �+ �
I -..�_�_.." If u� J � s�' GJ
..�� � ����; i'I »k� 1�; � + ,�, ,. ��`' Z
" t � 1�� -
� � i i. .
■wwr � , �'Nr�_ , a , �� � i 77
'.. . ... . . ..... _ ___�_�7�,IS h4 � �, YM R�a N� ' ............. �. )L{S}
i r� e I , ."I ra^ "„' ' � .. '� �:a, r� �"'s� `y
af3 rGN'���r?�.iA � I` � i.,� a � �i�I�� � � � .^p �,r��.�y» Z/�
q..++7�iM+..C'6ti4� � �. � . ............ . �I.^.:�X''. . '..� ._....�' �:r�i � S` 11 ' WJ
x � ( . .........,. . �� .� . '1.��.' . � � ' �,. y .f�.�
� � (3 N11 � � '" . � 1 G/ (p n �
� N�T J! ' ..i,�,..... ....,. .. ....�,..,.. '�R'1Y�1 (1. �T' �` �f�
� ��sa.- � . ,___.:Mz�.v� '__ _ __ ,,� ....,r , � '�z,, � �� " t1�
�z
. . Rv� o'�'�i',�7t\.yy , .. . . .. .'.... . . ::=$�iT�«ii �,c'�� � �je'P.����4PX ur1 . � Td ���q�r�
eax-
5sx o4 ta`w4 u t_._ � .�.. ,} . s'�� .
�' 1 Sz3.oa tt•s i g �� �., t r� � ira�r.�_. rt� �"� � ...�� i. �pn��i�,-a� ���`///��� �
' �t ' y,�, � I y'tly_���
h M� �k' N . J �i�'Ibi1 �,+'Y �' . .Iq' �C•.� � �- fi�^I�V �
.
,,..� �� �� � N� �__, A, � ��. .,, � ,,� � ������
r tl e�
"+h� .. � I � 'C
iu I � ��� } � x � r ` ..��`�_�
i��:� 4 ' � �. ' : e CW)� I � � �a- �
' .�, fi g ''��
., �� . . + • . w
. . �. .. Q .. � .�� �4,xe ut . �c,�' ,� ..m� z
, � (k r� � , � �
j � „ � " �. A ��,�;
'�� � � p�t . .... . J *,���.. vr �:or�
� r
� i Y{ p a ,,.....,S.dP.�90 ly . �'3 �,� :a_vmimiC
��:�i� �� : �� � `' , ..... � tG ._,.._ � .. u ����'
' . � �l "" '" � _. - . .. ��� "
�w-.� � p� - ,...
- r
� . t'f . . �-6���,l '—Y ...,..,n.,. �r. .,._- ,,... u • � ry �1�xy�
,.. . &�FMy!4ra+'62 .._, � T�,��2
, Y.Yt�L•w jS ci--. .%' �1
' ��. �� SLi.y4 4"IN. F�..' Ur �-�.{� C�1
T �L} �
tAI � Sf u '� � � � V�
'Il ., � * v � .� y�t i�
,�� ... ... r- ��� fi �� ' �v��,^ .... .. . . ��r•��r•i-auri u.Y..`...
�+� T��11C� ���h�p(;,�yfA��� �� �' � �n� � �$�..{ F� � .i...... } (,J�..,......_.. yl�'r�f�l...�)�.JL]N ,7
�n �'pf "b ���� fy3 ,r"'R7 Y rl!L 2 xJ 8�t�l +1'
�p� {E)A J.VI�C��� r�7p � �[l � � �p 1" TJ�� ��OA In
_��F^CJ i
� » �'�¢^ ,C��,°�r ��T..� ,q "m��,� � �� �Q ; U U G ;:' r`, ;�����;��"�,
, p'1�"OU �"y��¢f�,.�F� ��� Si� g44ry � �W {.Y Y ",2 VJI f"
{- z � (
9t�nl �ao�v�c`� �"j q} T� � � `a uk �jyp ^; jj � 3/A � � :
�n._.�c ez+....p.�-.,___ � t,,. �p i�����in�� r'� � r,x �r"�� 'z7 i�� � $� �� �x �r . �' ����-�r�r r
i-� s� ki< ��� �ao�' '��-� m � p���� ��i� <>` ..�� . g 1" r kp• �'� . C� � ; "�+ f' :
a} p ". � � ��.r�- � ��i cy ��ra v� c+g .'"� i� b KS.. s .:� ��� � "�'���Hc7 `�`i-
t 4t �� m �� _. � U r! - ,.�... ._,... _..... ... k �'�t [.. 7
__ t7
y N� ..._:_: � � }r1�5��y 7v.� �� � D '� � �;�. '-3i .'.4„ q� �" y�-�'�c���� ra
!A �h n b � y6
_ h •�••d r �- � t:� � X
/�7 � � � . �,... �,r' �r�...� x't`� � ��Q����11`�7 0� � FR fi �i im ������x�Wo�
nj ci n �n � p��"' r�i�1���ryn"'� �� c)� � �^ � � ..�� �� � o v' �nrir��r�;
,p � . �t , � � r
.,,
+..� F 'y L_._ _. �.. �l3 V *. • F�[9 � ��Y�� �� C 7i��* N Gt Z �ff'T.� Y
�� �..
�/� v cro � .. �_ . c�" ��� �� �x� o � r}M1 ....� ^���A�S� 3 �� � U ����g(^r"��i
�M .t� P ....,} � ♦- fl+(,�� � �ab hCywT y� '" �} b• � ry wa >
"! � � s V��c.+� �, g
/ 47 �f � .�<{��� p o" ln . ,,.� r'1 i T
�� . \:,i R i� e�-���rar�� � ' 4f �n G `�i s I'�;,.�.1 �r!E'�oa 'fFtl.� in T��ii:c-iG xr�ti
t,�m � �a ^xi � '�i �s --1 i �p�� �3�'�{w8.�}S�" � ��C�.
� �' �� �� ��'� � � m4� ����yi-�� � a' r U1 �� �'t � � fY���X XrJ
, �' �, .. �k.��� '.� ' � u,z;,u�, � .
� .�T ., TJ � �� ��m . �.... 7� O G z ���ys�Y�� la�' � t��anav'
a� ���r�
S. �' ([((',,�,� � � � rh KSS v.8 �� �$ ���] or�o'"i
.i� v �` � uj� 'c-. ��` �V{��y1��'�� � � � N .`,. � �9M � '�' F��Dtt
� -1
_. �.. -
. p
n
� ��f 1t�"� i.... .�� � � � y W T
� � t� . � ., _.` ... ,... ep
� vkp�Gt:r
-� � " � QLYMPUS VILLA P�AT C)FaFE GNGIN�ERS — �__._ _..._ .. . .. . _._
...
, , . .
. z � IF+32'�C7t}ftiF.ASI'7:JilHP1..M1C7S �rti �� . ��' _.....
� c] � ., � .. .... .. .
____. .____.._. .............„..._.... Kt�.N1t1N KASNIM1Ff;11.NV4lK17N v1
�. p 11R1N[ d2S2M}7{12 .. . '. ... . .
f Llf NI
`h � � S�17IfA(T IIARR�,TIOPFF P.P. � . . _. __. .
CAMWEST ULYMPUS VILLA, LLG , ; a �Ta,��,,, �� n��«r��V�nM�rti����,t�>r�,;
_._. ...... ._..._..__ ........,,,.,. _,..__.r,_._ .... ...........__. ._ .. . _....,. _.. ......... . .�������....,�y � 2 05:7Xf7U11 M.N(.I'I'Y COb1MFNTS pATf I!5�t9f)tii 1
(fl , 5NREICUNIINr .._... ... OPS10�1)HY ...... . .. l3t�AWNfMv .._ C';Hf(Kfnqv `..�:y '.`;.�, ._._......._ � � _ _._.....
ROADISTORM PLAN & PROFILE �„t� � �,� r��, � os'�e�?n+� om+�RaEv�seoGRnoiNaoF�.o*�
_.__ �_�.___._. _.._ � ._.__ _
RfV fv0. O�i6 OESCRIP71OPa
.. .I�d t,t t��I 11,1�;I d StA�U��
L���:-Ofi'CI��1.1,
_ � _-_ __ _� «., ,��a"G"' �,�o��� ¢�.11'i��1� ll�:� ��IE.�<� f Il�l (,1..1.!�w�p. �}(3i.7) oa/7si,u>> �
_ .____-_ _ (��`�'�� �)1'
.—.�---, �•••`• �p IJltt_I1'Y f'EIiMI l #1 1 UU�1' ��'
. . .. _.__ ____ ,�; .... � tF;N I'(IN rEt�r� w��f ir�rrca � !
� �
_ ._ � _ _.. . _ ... ,� ,��. � , u � �����
- _ . _...... ---__. nnh,u.
cN � h
. .__ ___ :.. __: h�,n � rvu�sw� � {'Iunninq,R�l�tdin�fP'utotr Wi�rke Onpt
. ._. _� . ._ ..............._ . ..— �._
W0, kE;YIStCN H'�' p+�if: AhPR
—_' �r�wnw+ .,,t �5 � 9
� � ��[�
V���n �
� � ..�..._. N �e` S
`� �n � p � s : �i
� u� z �t�,_.. �.
;� .�
,� � � � raw,w.��.t i 9�� a�� �ira c'I� � /
� �• � r .' � M`�l tl t�$Y[Ct' ._.
, �. . . . ...... . ... .... : m. � /� IxPlJfhflS.�.f'LALL�JfL. � '1 � n' . ��,�
� � � "� , b ` �h f'�r�o�i44r (rr,w+�rwct.++Ft �u� � -ry .u� � -�
�. � ..... su b,iai b�.ao �ti4.,,,.....d � y� � .�1�.. � -��+*� _....� '��" .>_...,..,, .,... . ; .57l� IRazG,.Cdn..rVlvEH4tn � ���� � p ��� r'� Q tJ
i SSop 1,�, �a Q' 1�•;-uR'"` ./ 7 ti A' �� I,1
�����BqC+�J�✓ ., ; �",.." . �� _".�a£�a � � �`•.. :� i ��� ' �,� .:�:'.' ' d��� � n ��� �'.
a'x , r
,. . p I � e -I p }!?'�1 'q Irt c: '4,
' � � � .D � i ..., p fi� ` � r' �+��� ��}}�� th ��o -�-�
� � .�r�� � r� ��,v �t
e i i � ' s � .r t�'r �, ,,, . r,
� i � � i r �kt � � >> t;� t„x"w` �� � � � � �i4�� �.
.j
.:;� '' �� � �
. i�. .fi� �� y�a . .ai4�^, � ' �`. j� � t� fi��.� '��� a ,"` � x���y a � w � �x G3 er,
i � �I ��� � � f :� � fn�w� �� � t� .F
11
��. M '� .�.p —_'_
f � y .�ZY,P.r � _ � 7'� �u 1
� � I �fr� ___ , ',. I I,�� �M�1"� � ' � "� �t �C� u�y � r't
� � �" � r � � f �.�S.r. a �
r. . ��?�-,. � ' .��1�� �"
1,f , ��i
. �.F. . . ..b� ..'J,/ . . � w �'r , S 0 �..��� �, ro n� yi
! � x �
x
� �- '. _, , ;.
� � .�. � -i L o ! , ,- tStR�� P��F� � r�
� ���" y! tq _:.: x : � �"o l�� 6Pf.w�"'� r� � r�+i , � �{ f�y
i�y �- ------- � � ......_tt�v,�+ � ,i �`, �'. ! � :r"�u� � � vA, �o� � � � � i i
'�;�:���t � f __........__.,_�.. ..........� ��� � ... ........�..�_. e �� -.� !,J,� � + �u`��4,�' �:s l w't"4, .p r�� � c 9_j t)
v� �,i . � 3 � . �� �":I - �„ � r .."'-'.�, � 1�� a3 N+"k � `m1CX� a wr�fk�u�.fuct,. f�i �rt? '� I
m _
��g �$ � a,t4 l � �yp� , y� fyi. �'� � '
..�5; � � �� � . II ��„ .l�y -+ � ��j ..� INSTML.fi4�i IHIpI�M.M,�CASP,
.. ^ i 5�KJ
'�rvi � I ',� � �� `R ��� r � i � .. � �i� ��-'�4�i'� �'] ��
� ;
i � :.....,., F�� �$ N -'. . "0 �� A� rV
m .::; f � 'L ... M �I I � ..' '� >. -.,� �:.��- �..p..x �d , �+ .�. Cf V¢�r��AY�:+�.
P✓6!tA-31a000 ` 1 q �y �. f
.......................... ......,. ' '�y7�
. . j.� .. . ... .s�W�k? � �� �`. � � f I _., r �w, � �s+[�� ����'�-v7�mi.rj
� '
� I
� -__.._ _I 1 �R �"i �
. ;
� ' � � � � , . --,.._..--�.� .., I 7' .' ����" t�,�. �� �b�r1
II ." i�y �
�� ' � '� .. .P!'�54�.1�.. � ., � i . —_ _ ____..,_;_^" � �i �"� t�"" ���tlS n'�' �
. .� '- .._._,.. y�
7 I 2'�(7 �w��11� ceM7a11utB 1 .;...����,..���� ��.r __.. ' .. y'�,.S�Ss?��'�pn�i �Tf
7 1 N�cN OOM t 5]I o6 „� ��� � ' ���� '�. 'r � � 1 t�...�+ ��' A K ry 1 ti �.1�li N
37A 7�7'.�.�4... "` . �+,
I I . . . 'Na � i.��, ��� �,I �rY w.�t'4e'�m�d 1�1.Ax�.., G j 11 � ��� . 4?
�. 1 1 v�s su. r.re.no '- �,i oe� m �' i �y, �"d zuy ���n�n
tn � t i r �}
�'1 qN..6bi.AD � ..._ .� ����' � •y � � �'wy� [7� �
r i r ��: ,, ��¢� `0',4
� � �� g m . � � : �� �, i h„„ �� ,, vy+ �
� n �+��q` � ,. _._. . . ��i � �vC � � 1 � r�Li���rsn���G /^y
�e.6t4 It�nrpy., . . _I l�gr� k .�, � , ,.�.�.� Y� �h�' \✓
Ye.SCX t)!t•N�. p �,., .... .aan.nt � �k�,{�� ,.. _..,r�us_J : '/y.,. ' ' '�.. \„ a
�7 4 ,. ...f_ _.'_..�""' f2 � p� ....�...e.,., � .._ _. �"--_. � C��$�2G �
�
97�': j i
F {S �
�M- � � . 'tvT.Sn � .i .q..,.� ... R4 c _.. _..,.,y„{,_ ��j� !)��`� �I
�-�,�u'�_�
__..._
K�•n:ro�w+s ��d� � r ,� 'R7r�ix.�;t;ii�(� � f�y ;� � .:frf 2 �I.. .. . .._i ... . ._.... , Xm�<7�`u�' m
k�`�
rFCT�i T'J�T!' � ' �, .
�
� . S6;c.,7f.._� , :, { r�� � _. .._-__ iw � �� ,� f� E. .. '{ ��1g� ��
w C, ��J, Z
r� ,� „
� � � � �'�p�rv �,s� '�. �� ������r.� �
N
s � -i
� �� ���� r�.� ar Y �, . �.�v^"
. �. � : � I ,� „ � � . z��'� ��9iw �a
i -' ,(!. f. °'�F"+ q -- �t!, '�' ��� �
. .� 1 . � . � 8 ��..� A�w� � � �����m�?�
� �
,aa�, . � E �i r^�
�� � � �,�»�I'�.. � � I `�:i I ���' �
� � ki ��u �i �A _a
3 `
_� �
�: ' � x �d 's o c s�� �—__... ... ...... ._,... .�..Hn�.��7.4_etn��.Mvb:Se_srrv:u �
��� b N sin. tosne,fa�.^u:n Ftf�cr uEl -rvA��x wm�w���i� '�
N t�� ( f I � U�
I� t � P .. , j, /�
4 � .�.��i�•�I' . "
_� t1.- � � p �� �� � � , I
t � _ � � � �
^_ �� .
, w _
m o _ ., ,, ,......
� ' i '�. �/� � '. �'. � ' r ��»� ��i.., �_ Q
� i �
� ry
-- � . i
'9 � ���..tI �p� iw �u.�rrm�wsr: ...�
��Y i r' --r�4 r -r_ �' y,� .
ta � n ier e r' i � „, � � '�r '{S�.*.6�y`\ -�
� �a..W� 'Rf. � � � t f � � /��,r•6�h�N, �"l I
�..�
(
,� ` I ':i �"' �+�4�� ' ���s�"„ �
---....,.. �""� ., T (
7� x � I j�
� � ��=1� �� "* �.�.y� -i'," ���� . ;: ��d �oY^'"�'�� �
�� , � � ��,( � � �� �j � i \��...?� �
7� _
� � ��� �a� � �� P 1 � N
� + ��
� � .
� �, � `''
��� � � :� t W
� � i�� �,n! , z
._�-e+�ut su�c � s i � .
a, i � � �� � � , � �j
`Wff�ACL iY.1T'N�17 ::U'.4¢m� Ir � 1,,�� m Y
N5 fl
My� t_ .. Sq.fl ` z �� I��� � �n 3 � . ,��'
�o ti . � � ft �'�� t
v N , I � SI
�� � ' �� � r' ,� Yi
� Q � , � ����, .�� rn
�i y., S�j i i �I N'I�,p���il ��! ... g � �........ ... ._ __,..__..
N�t'�� 2f k� I � I- �I� i"� �, �y U7
Zy I t ��' � � � wi
, _._. ;
W
9 �� i i� �� � �
_ �
� g �R i � �, �� �R D
� � ',� �{� � � �_, �, � ti_�� -��
i �y� �l� ' �I ' �� w�IqLL[YB.� �
� �� .�„ �c�-ers.� Sis.sc Yri � . ... . � oti .nc ����. � � � �,ui?ww»x�t
.Fi � .urw.�ct�r. �r K-���nn��xx, r''r�.i ��"� ' � .4,�' �� �� . .._._ewJa�utu.s"vi �
��� � � _ � s,�.�s _, F �� _ , � ; ��k � -� � �' � .
,
�, , �
, ,�
� r�r Y S,�, �, � ...,�n � ��
" �r,}t}l I, ' �� " �
i � I :. �� T��TY"I�iq .._..... ........ �,E{ d N
�.� - "-+_.�E°'u�}i.�p SlN.Cd f�; ��` i ,.�. I �� � �. �
� �t 4 .FtelMtt �5'.�1'K-�7.".u1.�.1:ar _:. � w m�.
�. .. .� ...... . ''M�4�.' �16.[y � �� G .4.. �
. � j ���� 1., ���� � .
Gt
� � { � a�s.�p r �i � �-
�'ti� � �� � � �� ��f r !
�'n, � � ��� i �.,� �� � °�
..�rca�tc�o•.�r7•n-�f�cuvca+ �
k� sg.
o I ,. �'.�#t!!!«.i�1 �;,r � 1 1'
�e . . . �� �G4 �._�.» '�'�'' z' ..B w - u�� i ' .,.... :..
� �
I � � � u
� � � � .
.�, _a. ,
:�_
u� �. �,-,; � � a� �,a����
, � � �x�A�����x
,�,-� �
� , r,
� �, _� � `� . _, � " ��� i ; 3 ..,u�� - __ -- �---—_ . � ,���,�,�, ���� rz
,�� i �
=. ;' � S� _ '
J� ' � iF2 �V 9+ . . ._ ,1y�,q r i r��p�ai
d �� __..... .. ...... I `.. ` . . �w� y�,��, �� ' ���i � �iy ��# .� y . �;
.__........
_ � �� e�,u Kw ro a�r 4 � i" �r u�o
• ,......u ,. „I�ii � i < e p u .
fSP� ib.3� �� � . \ t �� � {S � � p -� .
Z,.ze . .. . � . . . a M
.... . y. . I W � �
k� l �� � C S"1 yp�4�.
I I (� }}}ppp �G7� O
i 1 .,.n 5:.� ., d ��T� ���L� ��� b� 1 ._� b � �
�
� /'1 t � Y IL " " .........:�
� , "�,, _ �... ��I � �, K"- � ,� _ _ _. �+ � ��$ � i,
�..�..� ...,.� _____. _-+�!!A.- �:�.,,! � n, ...___ _, .�..�:r..�1 -. .t � �� �" Y "' �S : I �. r ,��.r ��� � •' ��z�a�sc�`�c,��
.. �
_ .__.
{ C`_ -�..`""p. ,� ,....-..�:� V Y ,, a .�,. , ��Y �� �� �" A ' x r.i kt" k� �_ � .�ro �,�e�4��°rA
E� ,, . �rd,ea��%✓er .�,� � v� , �+N r. u '� _... �
_ , � .
�
.. ., i A'F."�S�T, �,. �� ..i� i e � ,..i z �v
�' � �" '� ��� Srw.3oaao C�4'7m r.u:r� � ��3LAPK .'7 }-.�y. 1 � � A N �� w� ,p{ �crn„,
� 3r�.t�a7� rr[t A�t Mf rn a`1 m I 1'��
. A��
.. ` �
4� � � � � ��n. i � . . � �� . _ "N c � axhP i " � �i�°�" '''�i�r
. � ""��W.... ^ t \ J h Y1 �
�.. Y� Y
��l ���..t `.-' . . j ,�, .,.u.4.}ai::.,��'� �, �� 9�� � ��� �y�� w � � � .w � �+�� v�i ��c'nK����s
`7 � �5� `:� n rti+ a � ` p���kl1�� ^vwr^ �.. � �� "�1.5 V� ��w�mn�� �y����7s�fi
� <
� ` � �r n � � � � � ° 7�� , f1`,�$ °y R �..... ��, aiy �5{x '�
'•. _ _ _ ' �4""i i. v
,, t� R � t.:i ri
l.Pl � r �» � �:. h { Q '�," IR� ,� � ��� ���c��r�i n�'i u
c rn " � A..,�an
� n � �
� _ � o � � �� y r����
� � -� t.� �^
� � � �� �
I �� ;
P�td�L��T�
...�..._ .._.,_ ,,,,..,,_..,_.,.,_. , ..._.... ._.
cn � m � OLYMPUS VILLA PLAT C�FFE ENGII�IEERS �--• --..
� � ����' r' .
� r, � 1,'i4929S'iVTTIFAST1s4l711�I.AC't# �2. A.ir`.. " .. ..__. ....__
,,,......_ .. ....._...,._...�_ RF.ML}N W'A4E11NUIKINVMf'9!t - � ^...
,. .� .� ...... __ ._. _.._
� Cl1EM .._ ....... ° }'IIUVL J:92C�1 W12 ._.
.. C,'C7M'AC'i�[7hRRFI.A(�F'FE V H, _ _ T ._,,.,^ .._ __
�."� 9 f11t16r}(IiV pE'RCITYCC1MMfN1RtlhlFl)7lIv101t..
.... � � �� T _ ..... _.. _.. _.
cp _ S�,�FfrCAMWEST ULYMPUS V1LLA,..LLC..._.._ nFs,�;�F��,- �����-- �����:K���,� _ ._ .,�, ;; `� �" � z ��:�.��1 �FA��,������r��p�����,�r.�.,.
_�. . .
• ' � + .Ob+tMDf t Ow'NCR ii6vi6F0 G+rnn•ar,�F I or;
� R4ADISTC7RM PL.AN 8� PROFILE �:w�, YS m.�� -
HPV t�l. OAtE L7f.S(f{1•I UN
$�eUe�
� �
�v�ia v�rr�n xnasvn�ac� '
L�5£-Oh-C1:►1�1. �
I
. ,. ,
� -- , - � �
.
' --- , ''� , - � — , � , ---—� � ---� � , �_ ��.
.__...� �._.__.�. ,. . __ ,...m . ..�.._.___.__'-'. _._ «�.". i�ro'°w�. . . .. ��Y���ai ���.� ��/ti,f ��L��1�U��C)�{)� Q4/tA/�2D11
i1 ��������I' C)�'
__..____. . ......_. . .... _.. ____.._. '°�' ato r.,,, l.J1fLJlY (-�E(�`k11I �1111G),�J sR,�x„.__.._,...
�............. ... � .� EtJ�N 1 t:1N rrNt� wn�,�ii 3s {t�r '�
�.. �. ... � ti= N� �':, , t��---
__ ., ,. ..W_�_ ._,......_...._. __... S w� pATUA7
. .� -.._ ,.__ -- '�ri I «�.i-I {�Ir..nnln,�ff3u�lA'�nS7r�t'��R,•r. 4tir,rrkrc f'?apt �
__........ ..... ..."""'"_". .____._....._.._... _....._.�.. .� ._ r.a art re«
�_,... __..... xrr�r
Nft, RMS�ON Hv DA7E IWWR �� ..............._.
"'S_ '�w 5 "��4
, _,_,_..._._._....._........_ _._......._...W.._.��,...�.
� •
»
b S. .+ � �..1
` °�� �� � �' � $�� - �a .... ,. ..... ......... . ........ . _. _
�� I . ________ ._
A
, _ �� ����� �� �� y�� �Q �,
{'j �� '?q� � �� �3�' .4x� �r� � � � : ;.
� � �'� ff'j�y� �j� ��p �� � pp»���$ ':-::'� `B ... " ����` � �s$�
� � �ggg '"W.�'S �4S Ny� .�i� "' f� r � B I`m94 ,� �����
q�y `�'r R ..g �"" �nl. � <
.. � �i g A
{ ���� A ��i+f�wQ �� �{+ ��� p�� I.T,� � {p � �1� rl �� � ._ .. �� . � �
--} �� C' .'.. `•-c � *.:L � . +� � .�+ t�, R! ,,. �.�'...�u'.u' �,�B.' p.. � 1
y
j� e 9
' ... v� � : � � u n � � I
a
_
?J '�� g� � �^ � � �
r� g Y�
, �... .�� . � �� � c7 � � _ � � �.� �) .,� � � �
' , -� �� �� � �� �� ��r � ��� � � � ` �
�,� r i � ry ,. `. P.��, � $a ��_ �� � , �� ��, t� �y �.� �� � m � � �, �
x F
C7 ,. ,. ��.��. `� �'� �� �o [ �'� � ' �� £ '�� Sh � � ��'
� -�-,�' � � ��. R �� ,; � �� �� � �� � � # � �
r '�
� �� f . � � � � � �� � � � �
� �� � �.D � A �
r'? o� ��� -� � a� i7 � �� ��.��M�a��� �" '� � � � �
..,
�� � �� (",�' � �"�� ' ;.� t:�:� ��� ����� �� �� _�_ d`*R� .��
{ > � g p. I .� �..
�t ,. � ..
�� � b'i� \�\��#�' 7� [A7 �^� �� J!} �� i.ci •+�� 't�� � ��
,� � � � CP �
� �� \\� � ��� � �� �� s� �� � T ��: `�
� � r �
� �q�� \ "� t_vf � �� � � � f� �
°°"� � ��i
y
�.��' .� L�
` � �:':' __�.__.. .. .......... _, _ . _... , _... _ .......... ..... _......_........ _.........._..
' �
»�A k 4 . ........ . . ...... ..... ...... ..... ..... ..... . ..... ..... .._...
'. "i��`� �} KRiH SIM..... �� *�' . .NUFIH$I�C_._..
..... ._..,,..� t
T6 � iI , �•
� � � M.� 7 �� ��.� � �
� b � �
; �: � .
, �
��r � U
c�o
i
fi''' ' � � l, � a ��'��� ����� � �
'".' ' n
"" t�{' ��m 'C� � � a',��$ 3������ Q,
��
.
�s. 4 _ � w I i � ' ��g� �
�N ���, � � �'�I ��
i�i �� : %� ..,,,._
� � I
� �p � +m r v v � �.�.___.-..... �s<����� � ��� ������� }
��'�'� � � z8� �''^ c I�-
8 0 � �
�� �� W 5..� � �i�T �� ���� , �'iiriiiN��k.. l� � � :X ' ,: � ���� ���y��� !
�� m U r � i�
w� �� � �i � � �� �x � � �� +� ����
�
, y ,. " ,..." Vt g
�:.
U� �N `�� � - IT J�� � .: �V � ��` -...----'---._....__.._ �.• � '.C?, � � ��'`" ,��3 r �,a �
� � ti . S n b ; m �_� n � ;� P y� �S�,
�� �� �+ ,�r, � u �� �'���•, � IT,,, '-' � ( � ���� �� ����
„ ��� � . z �� �� � �.. ' � �,�� ��'� ,g�
� 'i�. m P (") � � � � � � �3 � ��7
� R� "'^ � � �� + � u g � . e N a
��g, � � �$ � � �. �.� � ,� � t Y � ��, ��
- -- � �
� � � � � , ��
�� : � �„�x�,� �� � ���,,,��� ._ � � j � , � � �� �� ���� q
-�.-
�
�:�5 � � — — �� ��N � � � � �# � � �
`_{ {�� �� � � ��� �'��� �
� � � ���� ��"��� '
�,' � "��� � ��a� #
� n� ���� ;
���� � u� >
�
� � �� � � �
�� � � t;4..� o
,
£�`� �
�� ' N3GiH£iCA.
, __.. _._–.._ ._.........
�'�a ._._'"_`_ —_"__ "—""_"__—_'___
"'—___'"' _'"_.._'_._.._ ..__. ...._......
.. ..........
�����
�,, ;;.
�� �
����
; ����
z m ' F/�� � �"�'
m V ,: , � . .... ___..:w._._.::...... 5' �� � 1
<?��
mg ,,�'�,: y�y? �, °�'"�—......_ ��
g�T� � ' p. M ]hM�67 A' '� `
m c�C�nri4:lp�,iur,. �, �-
�'°� �� ��r �f I �.�. .._,J� G� "� "'^.
y rc- t��� ; " a" ut.,
�.
T r ,� e � :: � 7"-4"Wtt CtR fA+l wK,�'1,.. U '� - - .. �..
�.W � � s
� �� y
w ��N L 1 E 0 MMI c!. �+o�wsl ��-, S �_ �
. �
. -
N ����t . .,. _ � � � ` 'r�l w �...� � .. '�� .....�..
� 1'� Y j
� g'. �� � Y ' iO � �" I,l ���� ��� �} � 'ti
. e .''.
w..:� � . ..__....: �p�r � ■�r�r ae r � '�3 ��-� � 6.: � �
(1'i� ��� � ",� �� � � _ � uE �n � .�
�' , --- suu iv... � +�° �„,� �L;�1 � _`".�� s�..�:�..._�_:.�:�...__. ......._. .7t�/�-__.... �� ;y
> � --�---- qy�.. r ......... . ....... .. ........... 'S`�............. d i
� � �
` � � �, �
(.�! L �'�{�i .;1 G7 ''. ----._.�.._ ... ..,: _ . . � '�:,�„ it�., �a�� ;:
g f�"M
� $(4.�� ��� „ �� �_.I� , �nr[ �)P �.urtEa � ry��t,{���',� �I�
� � - � -- _�,�, � � ���
. . ,._
C1 nR CPu�4f ASc�tUL� � m
, � ,��, �
( � � ��: _
lN � t4 � �e+� �'��� �. —�' � y
�`-,.�. . •' +-� � �7.�' u. � . ..... ��� I�bR
..,x:�a..- � " � � , .'� , �'_ �,y�
ar .w ao m s ■���r■ �a tt f I ,.,.._,.�._.. �_,..... �..
4 5— `--�--` � �r �' ...� p »� n
'_� '� ' .. . � ?
, � �iF," ..� M �
I
.. � y r.. ��� o �,� sn�_r o u,v c�� �ur+F uu� �" � ��{ `a i �..
�1: I �1i � Y, � �-,- � .. d +r u��Ra.u. rwit sciid�� .I> ..- $ � �� ;° .
� d'u��",� � �, �r. � �� , �
i � ga � >
�,� . �� �r/� e--� �� � ��� .. �7 � � � ___.__�� �
� �I �� ° • V) �� 7'
„__.. ,._, ':
f � �° � �
l,f} ry �.��^1 �.1�� T �+� ���, ) (-r
•4
K�� ��".K �- � � $� ;. �S
t�� � o a n � �la�u�.,1 � �� ��` ��i4 t�•J „ �� q� �
.., m q � .� 'U �s..�: x a�a f� i1
,n+ �rrr�w �'' r,�-� �' �� � �
� .�� �Y l
P r��� �N �
PiiqJEC"Y� .
� � �
�; OFFE ENGINCERS ._. � _ ::
o, z x ' C?LYMPUS VILI.A PLAT �. �s -
�, � iJ992Pl1lTilfif.AS'!'1!SYCHYIAC`I? �.....
c� . 441'�n-w `� •: . _ .._ _. .— ---�
.__.___. ..._....._._. _.... . ._... ..........__ ....._._..._____.._..___._.... RIiMl'C1N 41A4tIilVf:;1C1N4'RQ9R � .
Q 1 LYFNr PIIC�Np 0.:3�26(134I2
..... . _ ... _...._....... . . .......
�^ R C�l)WTAf'T�PARRP.LLOFFkP.Fi �^ '•; . :�' ._..
�, CAMWEST OLYMPUS VIL.�A, LLC t .� -- W— �
� ___.._ ._ . ...., _ ________._., . _ _ _ __ .. _,.,.. � ,, � �,
__. � . _
//+t - fiNE&TCON7fMi' � �����.��������� (7�q.I��WF.[7t1V QRANM6�' C41[OKE.CIOY •, ' ` 7 bt!lBf7U11 PFRCITVO00.kAfNTSDA1FDtl8l.'�JIt
•y�� • �_����
DETAILS ... �..�.._ ._ __-
f)lf) VS UlC? Y� � 1 G9f23.Tf1�t P E RGTYCOM1��IFNIyDATF�!Ii1B/dRiP
...._.... ........... _�. _...___ ._...
RfV P1�7; [)A�f �)FSt.NiPilO!V
F:h
,1.`.'�f�l Y,��II�L�����171�^I:l'S4� .
LS��:—{}t�—CI.�I�1, �
___�
�.
�; '� PORTION OF 7HE NW 1la, SW 1J4 OF SECTION 11,T�WNSHIP 23 N, RANGE 5 EAST, W.M_ �T=
'L
=x S Irt �.I : -q [�S Srt3�rw -��£.�r- �R ; � {{
\ „.sK" . . - AcaRtlXl ��L . ' S1#A - BE **� .a77�TRA T�R'S � �a��I
c��� � _.`: SPilNS E' FY C DETe.Ft!�iq `�HE EXA . JE42TIiA:. AduC � J � � �!
-=J2IZ.,NikL LD w'.'0!. ❑ AuL EXISTPw t�tl`rc.R nOtk�iD � I ( ��i
�T 2 F S ui220P 'Il COw±EN�i�:C. Cffit k:J 'TCN+ *Ti `L
. ? ''CEa h.K IOh '$ MAB Ti+p7 4 Lr X STIh'G LTI�iTIES i � `a'�
.�2 SH Vh liLRrDd TI�. Efw.i`�E1? .ScS:��S hI'i �
.- - �tr. PG`tSIB�� ��x �-{� UTL ITIES NCI7 Sr�TkS � LTI�I�FES ; � z:j
O .�".�._�k .,�_F`,�..�` �".','L•i: `w7 SN;Y1N :t3 Tt�tR PR�ER LiCAii'�ti i � �' � ���� __
O LL .--._. _: . _A�� B=F'Ot�f rtht DI6: 3^BW--c24-5555 � � - � �i �
:F. �1
G� u: ��`'� �[.�c, ie:tA�: ;:NCE - � y�_ `�` �Evi��G � 9,86t Ci1. �c£' �� ' 3 s ��
� ' ---.___ a iqd� PR6v1�;.� i5.4 9 J ��. C SI2.tc� ; � ta
-'�� _ '� �` . � a�
'q t3��, �2v � . .� �; I
::�c'_" � �3 �E=9tharzu ,� "t �M,l:.h v`G_r�ME s���� ._-_. ____ -a-�-� n" �:aa �r�L_ . ; �_
�' �. � 0� �`''vND .3 L+�:� -R-Ih,' . � � � - _ - - i
_.
�--�eT� _ ,� ----� -- M�S WS 5 703_� 1v- , J:.�htE P£.'�.UIRcO = 35.04E �3.E. FEET ' �-------_ --- ___ - E ( :�
�J�.
,,;rt
_ _�_� �
-� �� � --�,,,_ � � � �
.e+-u'� i ---- -�---- ---- - ; L•��uME F��'VI�fD = 38.naE �U f,. 4 517.G3 - ° : �
tn, f i
`��'s< n 1� `S`' � ���---�---- `, ; � y
,
�t'a � ' ��i,t. q � ���T��' � -- -- f y . ,� , . � �� ' i � i �
. j�-�� . __�: ��L ��r WQ lYSr.�?� �:._C'._.._. ����j i � - . 3 ' --.._--._ � \�� � � � �
,� � I' [ V � � .� : j �.
t
s�-�� 5�'= �r- `•�ii�1 "�`�._, '�ii; ! � � � � �, } f! �(1 m
`�'~� ���C,.,r� `,, _ -,.aY�_ 4o,L�^; _��i i � � '. � � ` t j �i '�. � A._� � �
"' S�r.AS_hi �.��.- S.'JTT^,-M�.iCir.G s�`s i ! rj I'x .- � � l�i��,n � `,§. '':'��s�' �'
- _ ORP.vE i ,� �;' [� � � t ij c �x� � <
�� � � �'.'.�� �� j ''j i �G' as��� :g,�
- cF"r ��nt. F:���� I � 1 �� �� ��1 �� ...� ��; _ -
_._- ���T�.�.v �-�5 _ . _ I i � i'r 1 � l� . i i �� �����'���:i�����
,� � � , �1 , :: �
s,u �_ _ _ ",_'' � �__'.��� .;� ' `� ! ' � �� i' j
,= I i � � �. ?� � ;
� t ' n•s.�.; ;
= 3�s� '�p��� i-�` � E` � a / �� 1 f � ��� R, tJ�
Ls.,� r :7VEPFL�.S S��v7llRE t 1^ 7 �(1 �j �r �
C� � fi'�k� _.A � �R,A7E � 1 ��� � 1 w- ; c
� ^� -
;4! � ! � � I :� � �<� �m
,
�� � �-- o�. "� � _ �.� ,' '1 - � � i�
�f � �,��= z -
r�,.�+ - ., �` - .� _ #y t k � 1?' WiC}� 4'iFtA'vL: ....=5� ..0 �g .�''= �w
;
� ` .0
� � ... _ �';�=. -:,.,: � � ----�- ---- lAAX. GRA.,E ..,.v ��z ,� ]� �
r..� .� �«t>' � c A '�'s
� � SJ-'� �'�JAn `ENCi'^`.�,,.� '.�. . _ .. . � � - � ._� �`^��1
�. .,_ _-,.:_r.. �.[ -��i-�^ 43-;,!J� '' LRC� N _. _ +._
., c. .,� � ', t ,,r % $� B ._ Vl "L c'NC, 3
^ 1�..._�-o' BLAC.K �NY'� s�N�4 �. :1 _ ,� - ?� �� ��<
- ! �
1! : = '- W`� Wi
G
,_ �23 � 52� 3�"✓C t ` �4 � L=.i�� � �
_ . . . �, . ;�'-F�i'EBe'JA�E � 3. ( '�. ' ��"�� � .��� � j1` !s
�'EB
�. '_- = z
� � � 7L5�'?C3f arNv-51 B Q��ladtti�-- � ��•�. f << -
,� _ _- F.> � '- 1 >
�_
� �'--i -� �sra ts� {��.03------- Z - ; t _ �2+�C � y
�q�i � •z _ 1; - � -
��si � ` �i� . � _ � r'��---=�1�g- �-+=- ---___� -- - ' �-
� � ��� � �` ' � - --�+'--- " ... �� �
�.� � �..��,2,G � _ \/ '�_ i�� _ _ -�- - --i �;
J--f"1 - �- - ---- T � i c� '�± r�-a.:' �
� - 4tfl i i = � +,' �YQ 5'C� ;.��-�ucrurx� T c
,^S` . . . . . . . i ! �sTfi,�l'.uE. . . � � Ri�573 4 G:IONG :� � �
�<��� � .. �� __�._�-___,���__ ...� .. _ � � iE�5:2.3G�,. :2' �Z
�i��} . � �..: • . �'��:i�M=`�.l'7_G��� t�/�3 L�CK1�h� �:.lD °'
�1 "' - =;�Rt•G�tMEsi� SEE T�I� �4�' �46L.�.. t2` N-i� �SS=2_3i;z '
c
�` �iM-51$.38
�E=5 3�z, ,
� { i� �Ea� OE3, ��- �
� �� � � f'fl�:G SE�TI4N $-� s� � R�R�519.i;: � J
5JG �
i
I ,nk ,ry�� .`�i� ��s }�l 4 R 1"t�' 3AP a.Aa= � ` � m
� �� C� ,� �� � �` INSI? =V 5 7.a� � 4 /r ' 'rJn SECaN ARY [:�� Q E �
r ,i " c�s. w� � T-� Ur��E�ow s �„z _! � J Q
:'� , � € J
j [ ; � .
k { � �
� � t = CR�FiCE 62=5t5-SC Q ��/y ' }- --
[ Y5 I � �.BCi �-7 FS . �IAkA.ETLR � � VJ � .J
[ ' �� � ht f � � ,__I I �
; ' � o�.Y�Pus vE��, Por,� ,� j � � � ` � ���a � ,-P �� > ; � � Q
� � �' AS-BUELT � ,�� � � � �� ;�;�a�R � � ����, ti
� � �
`� � ` , fl � w
Av�Ra�� roT,at. i � I ``:����P�e GR�PNIC SC;�1LE a` t- a
( EtEVATIOH SURFAGE Au'2EA SURFACE AREA E3EPTH VQLUME VOLUME �To Ce�!t 5 � ` � , tf� ;
j i�__ � � i ,
� � (FEEf) {8Q.FEEf) (SQ.FEET) (F�ET) (CU.FT.j (CU.FT.) St2_aU � � I ��2� o �0 20 � � � t3J �y
`_..�,__�r____
i E '_{� S =Ai2 k�E J ' � �
t %ndi c 20 leef
� t , � 597_0 964 �.�, 1.353 t.0 1,��i � I � � ��r� w eo R � �c� � �
508.� 1.7a� � a,353 , � , � i i�
€ � a �,: 2.385 2.0 4,7Tt! WATER QUALITY � � O��:IGE t=5av.2� G[ Ec a
, 510.�J 3,02$ 6.123 E , .�-
�, a.37� 2.0 8.752 =t5,478 Cu.�T. [ � << o�3` {7J6"} nla��R �1 �_' ____ � , j � ; U ��
� i ,� 512.0 fi.724 � '14,875 f
' � � WATER QUAItTY=512.10 6.370 fi.447 4.'f Q 605 15.479 512.10 C � - i� � ! 1`-� ' J •.� � `� I ~ ;2 ���
� � _ __�� �--�• 6,784 1.9A t2.8� '�'� ` � �zE�ot,st�=�rtE� =�R APaa�tva�
a � ` �y�� 7,�� 8.035 2.0 16,070 -' 28,369 pET VOLUME ' � S�g.�
� �� ��
516.0 8,8T2 � 44.439 , k . . �o�e+ pn;= o�r�srza,z
, I 3 9.494 't.43 9,778 -� =3 8,6 4 8 C U.F T. . �,.
, 3 , ; OVERFLOW=517.03 _�_ '10.115 _ 10 4�8 0.97 10.105 c�' 54,217 517.(13 d� ric.--
� , ��_�_._
, � 518,0 14.720 -� _ � fi4,322 n; c �i � �� ! � � sr no�. � �+o
�� � ' :�}. .,_ �:::. -�L-�4' �. ,Er�-_ �ut:�
��� i , •� :BY' t7nte� 5�F�
9A
��i3�R-3s��;�-
SECTION 7
OTHER PERMITS
��
Weston Heights
Technical Information Report
Other Permits
This project will require the following permits:
Grading Permit - City of Renton
Right-of-Way Use Permit - City of Renton
Construction Stormwater Permit - WA Dept. of Ecology
I
__----- - ---- ------- --- __-- - ,
Weston Heights
Technical Information Report
SECTION 8 ��
CSWPPP ANALYSIS AND DESIGN
Weston Heights
Technical Information Report
ESC Plan Analysis and Desi_qn
This section, along with the Temporary Erosion and Sediment Control (TESC) Plan contained in the
engineering drawings, is intended to serve as the construction Stormwater Pollution Prevention Plan
(SWPPP)for the project. The SWPPP is outlined in conformance with the 2005 edition of the
Washington State Department of Ecology's Stormwater Manaqement Manual for Western Washinaton
(DOE Manual).
1.0 —INTRODUCTION
An introductory overview of the project has been provided in the Project Overview section of this
report.
2.0 —SITE DESCRIPTION
A general site description has been provided in the Project Overview section of this report. Additional
detailed information is provided through the rest of this report.
3.0 —CONSTRUCTION STORMWATER BMPs
3.1 —12 BMP ELEMENTS
Elemen!#1—Mark Clearing Limits
To protect adjacent properties and to reduce the area of soil exposed to construction, the
limits of construction will be clearly marked before land-disturbing activities begin. Trees that
are to be preserved, as well as all sensitive areas and their buffers, shall be clearly
delineated, both in the field and on the plans. In general, natural vegetation and native
topsoil shall be retained in an undisturbed state to the maximum extent possible. The BMPs
relevant to marking the clearing limits are identified in Appendix 86. ,
Altemate BMPs for marking clearing limits are included in Appendix 8C as a quick reference I
tool for the onsite inspector in the event the primary BMP(s)are deemed ineffective or
inappropriate during construction to satisfy the requirements set forth in the General NPDES
Permit(Appendix 8D). To avoid potential erosion and sediment control issues that may
cause a violation of the NPDES Construction Stormwater permit, the Certified Erosion and ;
Sediment Control Lead will promptly initiate the implementation of one or more of the
alternative BMPs after the first sign that existing BMPs are ineffective or failing
Element#2—Establish Construction Access
Construction access or activities occurring on unpaved areas shall be minimized, yet evhere '
necessary, access points shall be stabilized to minimize the tracking of sediment onto public
roads, and wheel washing, street sweeping, and street cleaning shall be employed to prevent
sediment from entering state waters. All wash wastewater shall be controlled on site. The
specific BMPs related to establishing construction access that will be used on this project are
identified in Appendix 8B.
Alternate construction access BMPs are included in Appendix 8C as a quick reference tool
for the onsite inspector in the event the primary BMP(s)are deemed ineffective or
inappropriate during construction to satisfy the requirements set forth in the General NPDES
Permit(Appendix 8D). To avoid potential erosion and sediment control issues that may
cause a violation of the NPDES Construction Stormwater permit,the Certified Erosion and
Sediment Control Lead will promptly initiate the implementation of one or more of the
alternative BMPs after the first sign that existing BMPs are ineffective or failing.
Weston Heights
Technical Information Report
Element#3-Control Flow Rates
In order to protect the properties and waterways downstream of the project site, stormwater
discharges from the site will be controlled. The specific BMPs for flow control that shall be
used on this project are identified in Appendix 86.
Altemate flow control BMPs are included in Appendix 8C as a quick reference tool for the
onsite inspector in the event the primary BMP(s) are deemed ineffective or inappropriate
during construction to satisfy the requirements set forth in the General NPDES Permit. To
avoid potential erosion and sediment control issues that may cause a violation of the NPDES
Construction Stormwater permit, the Certified Erosion and Sediment Control Lead will
promptly initiate the implementation of one or more of the altema6ve BMPs after the first sign
that existing BMPs are ineffective or failing.
In general, discharge rates of stormwater from the site will be controlled where increases in
impervious area or soil compaction during construction could lead to downstream erosion, or
where necessary to meet local agency stormwater discharge requirements (e.g. discharge to
combined sewer systems).
Element#4-lnstall Sediment Controls
All stormwater runoff from disturbed areas shall pass through an appropriate sediment
removal BMP before leaving the construction site or prior to being discharged to an infiltration
facility. The spec'rfic BMPs to be used for controlling sediment on this project are identified in
Appendix 86.
Altemate sediment control BMPs are included in Appendix 8C as a quick reference tool for
the onsite inspector in the event the primary BMP(s) are deemed ineffective or inappropriate
during construction to satisfy the requirements set forth in the General NPDES Permit
(Appendix 8D). To avoid potential erosion and sediment control issues that may cause a
violation of the NPDES Construction Stormwater permit, the Certified Erosion and Sediment
Control Lead will promptly initiate the implementation of one or more of the alternative BMPs
at the first sign that existing BMPs are ineffective or failing.
In addition, sediment will be removed from paved areas in and adjacent to construction work
areas manually or using mechanical sweepers, as needed,to minimize tracking of sediments
on vehicle tires away from the site and to minimize wash off of sediments from adjacent
streets in runoff.
Whenever possible, sediment laden water shall be discharged into onsite, relatively level,
vegetated areas(BMP C240 paragraph 4, Volume II page 116).
In some cases, sediment discharge in concentrated runoff can be controlled using permanent
stormwater BMPs(e.g., infiltration swales, ponds, trenches). Sediment loads can limit the
effectiveness of some permanent stormwater BMPs, such as those used for infiltration or
biofiltration; however, those BMPs designed to remove solids by settling (wet ponds or
detention ponds)can be used during the construction phase. When permanent stormwater
BMPs will be used to control sediment discharge during construction, the structure will be
protected from excessive sedimentation with adequate erosion and sediment control BMPs.
Any accumulated sediment shall be removed after construction is complete and the
permanent stormwater BMP will be restabilized with vegetation per applicable design
requirements once the remainder of the site has been stabilized.
Weston Heights
Technical Information Report
Element#5-Stabi/ize Soi/s
Exposed and unworked soils shall be stabilized with the application of effective BMPs to
prevent erosion throughout the life of the project. The specific BMPs for soil stabilization that
shall be used on this project are identified in Appendix 86.
,I Seeding will be used on disturbed areas that have reached final grade or that will remain
unworked for more than thirty days. Plastic Covering will be used on the temporary stock pile
areas and elsewhere on the site as needed. Dust control will be implemented as needed, to i
prevent it being required all roadways and driveways to be paved will receive eariy ��
application of gravel base.
Alternate soil stabilization BMPs are included in Appendix 8C as a quick reference tool for the
onsite inspector in the event the primary BMP(s)are deemed ineffective or inappropriate
during construction to satisfy the requirements set forth in the General NPDES Permit
(Appendix 8D). To avoid potential erosion and sediment control issues that may cause a
violation of the NPDES Construction Stormwater permit, the Certified Erosion and Sediment
Control Lead will promptly initiate the implementation of one or more of the alternative BMPs
after the first sign that existing BMPs are ineffective or failing.
The project site is located west of the Cascade Mountain Crest. As such, no soils shall
remain exposed and unworked for more than 7 days during the dry season (May 1 to
September 30)and 2 days during the wet season (October 1 to April 30). Regardless of the
time of year, all soils shall be stabilized at the end of the shift before a holiday or weekend if
needed based on weather forecasts.
In general, cut and fill slopes will be stabilized as soon as possible and soil stockpiles will be
temporarily covered with plastic sheeting. All stockpiled soils shall be stabilized from erosion
protected with sediment trapping measures, and where possible, be located away from storn.
drain inlets,waterways,and drainage channels.
Element#6-Protecf Slopes
All cut and fill slopes will be designed, constructed, and protected in a manner than minimizes
erosion. The specific BMPs that will be used to protect slopes for this project are identified in
Appendix 86.
Alternate slope protection BMPs are included in Appendix 8C as a quick reference tool for the
onsite inspector in the event the primary BMP(s) are deemed ineffective or inappropriate
during construction to satisfy the requirements set forth in the General NPDES Permit
(Appendix 8D). To avoid potential erosion and sediment control issues that may cause a
violation of the NPDES Construction Stormwater permit,the Certified Erosion and Sediment
Control Lead will promptly initiate the implementation of one or more of the alternative BMPs
after the first sign that existing BMPs are ineffective or failing.
E/ement#7-Protect Drain Inlets
All storm drain inlets and culverts made operable during construction shall be protected to
prevent unfiltered or untreated water from entering the drainage conveyance system.
However, the first priority is to keep all access roads clean of sediment and keep street wash
water separate from entering storm drains until treatment can be provided. Storm Drain Inlet
Protection (BMP C220)will be implemented for all drainage inlets and culverts that could
potentially be impacted by sediment-laden runoff on and near the project site. The inlet
protection measures to be applied on this project are identified in Appendix 86.
Weston Heights
Technical Information Report
If the primary BMP options are deemed ineffective or inappropriate during construction to
satisfy the requirements set forth in the General NPDES Permit (Appendix 8D), or if no BMPs
are listed above but deemed necessary during construction, the Certified Erosion and
Sediment Control Lead shall implement one or more of the alternative BMP inlet protection
options.
Element#8-Stabilize Channe/s and Outlets
Where site runoff is to be conveyed in channels, or discharged to a stream or some other
natural drainage point, efforts will be taken to prevent downstream erosion. The specific
BMPs for channel and outlet stabilization that shall be used on this project are identified in
Appendix 86.
Alternate channel and outlet stabilization BMPs are included in Appendix 8C as a quick
reference tool for the onsite inspector in the event the primary BMP(s)are deemed ineffective
or inappropriate during construction to satisfy the requirements set forth in the General
NPDES Permit(Appendix 8D). To avoid potential erosion and sediment control issues that
may cause a violation(s)of the NPDES Construction Stormwater permit, the Certified Erosion
and Sediment Control Lead will promptly initiate the implementation of one or more of the
alternative BMPs after the first sign that existing BMPs are ineffective or failing.
The project site is located west of the Cascade Mountain Crest. As such, all temporary on-
site conveyance channels shall be designed, constructed, and stabilized to prevent erosion
from the expected peak 10 minute velocity of flow from a Type 1 A, 10-year, 24-hour
recurrence interval storm for the developed condition. Alternatively, the 10-year, 1-hour peak
flow rate indicated by an approved continuous runoff simulation model, increased by a factor
of 1.6, shall be used. Stabilization, including armoring material, adequate to prevent erosion
of outlets, adjacent stream banks, slopes, and downstream reaches shall be provided at the
outlets of all conveyance systems.
Element#9- ControJ Pollutanfs
All pollutants, including waste materials and demolition debris, that occur onsite shall be
handled and disposed of in a manner that does not cause contamination of stormwater.
Good housekeeping and preventative measures will be taken to ensure that the site will be
kept clean,well-organized, and free of debris. Any required BMPs to be implemented to
control specific sources of pollutants are identified in Appendix 86.
The contractor shall implement the following measures as much as is practicable, in order to I
mitigate pollutant impacts from vehicles, construction equipment, and/or petroleum product
storage/dispensing:
• All vehicles, equipment, and petroleum product storage/dispensing areas will be
inspected regularly to detect any leaks or spills, and to identify maintenance needs to '
prevent leaks or spills.
• On-site fueling tanks and petroleum product storage containers shall include
secondary containment.
• Spill prevention measures, such as drip pans, will be used when conducting I
maintenance and repair of vehicles or equipment.
• In order to perform emergency repairs on site, temporary plastic will be placed I
beneath and, if raining, over the vehicle.
Weston Heights
Technical Information Report '
• Contaminated surfaces shall be cleaned immediately following any discharge or spill
incident.
• The contractor shall implement the following concrete and grout pollution control
measures:
• Process water and slurry resulting from concrete work will be prevented from entering
the waters of the State by implementing Concrete Handling measures (BMP C151).
The contractor shall implement the following Solid Waste pollution control measures:
• Solid waste will be stored in secure, clearly marked containers.
Element#10- Control Dewatering
Foundation,vault, and trench de-watering water,which shall have similar characteristics to
stormwater runoff at the site,shall be discharged into a controlled conveyance system prior to
discharge to a sediment trap, pond, or other specified facility. Channels must be stabilized as
specified in Element#8.
Clean, non-turbid de-watering water, such as well-point groundwater, can be discharged to
systems tributary to state surface waters, provided the de-watering flow does not cause
erosion or flooding of receiving waters. These clean waters should not be routed through
stormwater sediment ponds.
Highly turbid or contaminated dewatering water shall be handled separately from
stormwater.
Element#11-Maintain BMPs
All BMPs should be monitored and maintained regularly to ensure adequate operation. A
TESC supervisor shall be identified at the beginning of the project to provide monitoring and
direct the appropriate maintenance activity. As site conditions change, all BMPs shall be
updated as necessary to maintain compliance with local regulations.
Temporary BMPs can be removed when they are no longer needed. All temporary erosion
and sediment control BMPs shall be removed within 30 days after construction is completed
and the site is stabilized.
Element#12-Manage the Project
Erosion and sediment control BMPs for this project have been designed based on the
following principles:
• Design the project to fit the existing topography, soils,and drainage patterns.
• Emphasize erosion control rather than sediment control.
• Minimize the extent and duration of the area exposed.
• Keep runoff velocities low.
• Retain sediment on site.
• Thoroughly monitor site and maintain all ESC measures.
Weston Heights
Technical Information Report
• Schedule major earthwork during the dry season.
As this project site is located west of the Cascade Mountain Crest, the project will be
managed according to the following key project components:
Phasinq of Construction
• The construction project is being phased to the extent practicable in order to prevent soil
erosion, and,to the maximum extent possible,the transport of sediment from the site during
construction.
• Revegetation of exposed areas and maintenance of that vegetation shall be an integral
part of the clearing activities during each phase of construction, per the Scheduling BMP (C
162).
Seasonal Work Limitations
• From October 1 through April 30, clearing,grading, and other soil disturbing activities
shall only be permitted if shown to the satisfaction of the local permitting authority that silt-
laden runoff will be prevented from leaving the site through a combination of the following:
c Site conditions including existing vegetative coverage, slope, soil type, and proximity to
receiving waters; and
o Limitations on activities and the extent of disturbed areas; and
o Proposed erosion and sediment control measures.
• Based on the information provided and/or local weather conditions, the local permitting
authority may expand or restrict the seasonal limitation on site disturbance. '
• The following activities are exempt from the seasonal clearing and grading limitations:
o Routine maintenance and necessary repair of erosion and sediment control BMPs;
o Routine maintenance of public facilities or existing utility structures that do not expose the
soil or result in the removal of the vegetative cover to soil;and
� Activities where there is 100 percent infiltration of surface water runoff within the site in
approved and installed erosion and sediment control facilities.
Coordination with Utilities and Other Jurisdictions
• Care has been taken to coordinate with utilities, other construction projects, and the local
jurisdiction in preparing this SWPPP and scheduling the construction work.
Inspection and MonitorinQ
• All BMPs shall be inspected, maintained, and repaired as needed to assure continued
performance of their intended function. Site inspections shall be conducted by a person who
is knowledgeable in the principles and practices of erosion and sediment control. This
person has the necessary skills to:
o Assess the site conditions and construction activities that could impact the quality of
stormwater,and
o Assess the effectiveness of erosion and sediment control measures used to control the
quality of stormwater discharges.
Weston Heights
Technical Information Report
• A Certified Erosion and Sediment Control Lead shall be on-site or on-call at all times.
• Whenever inspection and/or monitoring reveals that the BMPs identified in this SWPPP
are inadequate, due to the actual discharge of or potential to discharge a significant amount
of any pollutant. appropriate BMPs or design changes shall be implemented as soon as
possible.
Maintaininq an Updated Construction SWPPP
• This SWPPP shall be retained on-site or within reasonable access to the site.
• The SWPPP shall be modified whenever there is a change in the design, construction,
operation, or maintenance at the construction site that has. or could have. a significant effect
on the discharge of pollutants to waters of the state
�� • The SWPPP shall be modified if, during inspec�ions or �nvestigatio���s condu�ted �y thE
owner/operator, or the applicable local or state regulatory authority, it is determined that tl -
SWPPP is ineffective in eliminating or significantly minimizing pollutants in stormwater
discharges from the site. The SWPPP shall be modified as necessary to include addition
modified BMPs designed to correct problems identified. Revisions t� thP S1,Nppp sh_all r.
completed within seven (71 days following the inspectior
3.2 -SITE SPECIFIC BMP�
SitespecificBMPsareshow�� ii�i iiic i cJl. �iaii �iicci��j �ii r`,j:Ficlluin _
4.0 -CONSTRUCTION PHASING AND BMP IMPLEMENTATION
� The BMP implementation schedule will be driven by the construction schedule. The list below provides
an estimate of the anticipated construction schedule. The project site is located west of the Cascade
Mountain Crest. As such, the dry season is considered to be from May 1 to September 30, and the wet
season is considered to be frmm ��r�hcr � ±� n.,�i 3n.
�.„
5.0 - POLLUTION PREVENTION TEAM
�
5.1 ROLES AND RESPONSIBILITIES
The pollution prevention team consists of personnel responsible for implementation of the
SWPPP, including the following:
• Certified Erosion and Sediment Control Lead (CESCL)-primary contractor contact,
+ ' responsible for site inspections (BMPs, visual monitoring, sampling, etc.); to be called
I upon in case of failure of any ESC measures.
• Resident Engineer- For projects with engineered structures only(sediment
ponds/traps, sand filters, etc.): Site representative for the owner that is the projecYs
supervising engineer responsible for inspections and issuing instructions and
drawings to the contractor's site supervisor or representative.
• Emergency Ecology Contact-Individual to be contacted at Ecology in case of
emergency.
�' • Emergency Owner Contact-Individual that is the site owner or representative of the
site owner to be contacted in the case of an emergency.
• Non-Emergency Ecology Contact- Individual that is the site owner or representative
I of the site owner that can be contacted if required.
L
--_ _ _ __ - -_ _ _ _ _ _ _
Weston Heights
Technical Information Report
• Monitoring Personnel—Personnel responsible for conducting water quality
monitoring; for most sites this person is also the CESCL.
5.2 TEAM MEMBERS
Names and contact information for those identified as members of the pollution prevention team
are provided in the project summary in Appendix 8B.
6.0 —SITE INSPECTIONS AND MONITORING
Monitoring includes visual inspection, monitoring for water quality parameters of concern, and
documentation of the inspection and monitoring findings in a site log book. A site log book will be
maintained for all on-site construction activities and will include:
• A record of the implementation of the SWPPP and other permit requirements;
• Site inspections; and,
• Stormwater quality monitoring.
For convenience, the inspection forma and water quality monitoring forms included in Appendix 8E of this
report include the required information for the site log book. This SWPPP may function as the site log
book, if desired, or the forms may be separated and included in a separate site log book. However, if
separated, the site log book must be maintained on-site or within reasonable access to the site and be
made available upon request to Ecology or the local jurisdiction.
6.1 SITE INSPECTION
All BMPs will be inspected. maintained. and repaired as needed to assure continued performance
of their intended function. The inspector will be a Certified Erosion and Sediment Control Lead
(CESCL) per BMP C160. The name and contact information for the CESCL is provided in
Section 5 of this SWPPP.
Site inspection will occur in all areas disturbed by construction activities and at all stormwater
discharge points. Stormwater will be examined for the presence of suspended sediment,
turbidity, discoloration, and oily sheen. The site inspector will evaluate and document the
� effectiveness of the installed BMPs and determine if it is necessary to repair or replace any o'
BMPs to improve the quality of stormwater discharges. All maintenance and repairs will be
documented in the site log book or forms provided in this document. All new BMPs or design
changes will be documented in the SWPPP as soon as possible.
6.1.1 Site Inspection Frequency
Site inspections will be conducted at least once a week and within 24 hours following any
rainfall event which causes a discharge of stormwater from the site. For sites with
temporary stabilization measures, the site inspection frequency can be reduced to once
every month.
6.1.2 Site Inspection Documentation
The site inspector will record each site inspection using the site log inspection forms
provided in Appendix 8E. The site inspection log forms may be separated from this
SWPPP document, but will be maintained on-site or within reasonable access to the site
and be made available upon request to Ecology or the local jurisdiction.
Weston Heights
Technical Information Report
' 6.2 Stormwater Quality Monitoring
� 6.2.1 Turbidity Sampling
f Monitoring requirements for the proposed project will include turbidity sampling to monitor
site discharges for water quality compliance with the 2010 Snohomish County Drainage
manual and Snohomish County Code Title 30.63A NPDES Construction Stormwater
General Permit(Appendix 8D). Sampling will be conducted at all site discharge points at
least once per calendar week.
Turbidity monitoring will follow the analytical methodologies described in Section S4 of
the 2005 Construction Stormwater General Permit (Appendix 8D). The key benchmark
values that require action include 25 NTU and 250 NTU for turbidity. If the 25 NTU
benchmark for turbidity is exceeded, the following steps will be conducted:
1. Ensure all BMPs specified in this SWPPP are installed and functioning as
intended.
2. Assess whether additional BMPs should be implemented and make revisions to
the SWPPP as necessary.
3. Sample the discharge location daily until the analysis results are less than 25
NTU (turbidity)or 32 cm (transparency).
� If the turbidity is greater than 25 NTU but less than 250 NTU for more than 3 days,
i additional treatment BMPs will be implemented within 24 hours of the third consecutive
sample that exceeded the benchmark value. Additional treatment BMPs will include, but
are not limited to, off-site treatment, infiltration,filtration and chemical treatment.
� If the 250 NTU benchmark for turbidity is exceeded at any time, the following steps will be
conducted:
1. Notify Ecology by phone within 24 hours of analysis.
2. Continue daily sampling until the turbidity is less than 25 NTU.
3. Initiate additional treatment BMPs such as off-site treatment, infiltration, filtration
and chemical treatment within 24 hours of the first 250 NTU exceedance.
4. Implementadditionaltreatment B":'�p_ �.� ��� ��� ;�� ;_ ���t���- � _,. .�. t�� r , _; :,� _�t
the first 250 NTU exceedance
5. Describe inspection results an - '' • � �
book and in
6.2.2 pH Samplin
Stormwater runoff will be monitored for pH starting on the first day of any activity that
includes more than 40 yards of poured or recycled concrete, or after the application of
"Engineered Soils"such as, Portland cement treated base, cement kiln dust, or fly ash.
This does not include fertilizers. For concrete work, pH monitoring will start the first day
concrete is poured and continue until 3 weeks after the last pour. For engineered soils,
the pH monitoring period begins when engineered soils are first exposed to precipitation
and continue until the area is fully stabilized.
Weston Heights
Technical Information Report
Stormwater samples will be collected daily from all points of discharge from the site and
measured for pH using a calibrated pH meter, pH test kit, or wide range pH indicator
paper. If the measured pH is 8.5 or greater, the following steps will be conducted:
1. Prevent the high pH water from entering storm drains or surface water.
2. Adjust or neutralize the high pH water if necessary using appropriate technology
such as COz sparging (liquid or dry ice).
3. Contact Ecology if chemical treatment other than COZ sparging is planned.
7.0 — REPORTING AND RECORDKEEPING
7.1 RECORDKEEPING
7.1.1 Site Log Book I�
A site log book will be maintained for all on-site construction activities and will include: I
• A record of the implementation of the SWPPP and other permit requirements;
• Site inspections;and.
• Stormwater quality monitoring.
For convenience, the inspection form and water quality monitoring forms included in
Appendix 8E of this report include the required information for the site log book.
7.1.2 Records Retention
Records of all monitoring information (site log book, inspection reports/checklists, etc.).
this Stormwater Pollution Prevention Plan, and any other documentation of compliance
with permit requirements will be retained during the life of the construction project and for
a minimum of three vears follov✓ing the termination of permit coverage in accordance :�:±h
permit condition SS.0
7.1.3 Accessto Plans and Records
The SWPPP, General Permit, NotlCe o� r��.;�������,�;;�� ,c�;C�, ai�u ��iC �;,y o��n �,iii :,c
retained on site or within reasonable access to the site and will be made immediately
available upon request to Ecology or the local jurisdiction. A copy of this SWPPP will be
provided to Ecology within 14 days of receipt of a written request for the SWPPP from
Ecology. Any other information requested by Ecology will be submitted within a
reasonable time. A copy of the SWPPP or access to the SWPPP will be provided to the
public when requested in writing in accordance with permit condition SS.G.
7.1.4 Updating the SWPPP
In accordance with Conditions S3, S4.B, and S9.B.3 of the General Permit, this SWPPP
will be modified if the SWPPP is ineffective in eliminating or significantly minimizing
pollutants in stormwater discharges from the site or there has been a change in design,
construction, operation, or maintenance at the site that has a significant effect on the
discharge, or potential for discharge, of pollutants to the waters of the State. The
SWPPP will be modified within seven days of determination based on inspection(s)that
Weston Heights
Technical Information Report
additional or modified BMPs are necessary to correct problems identified, and an
updated timeline for BMP implementation will be prepared.
7.2 REPORTING
7.2.1 Discharge Monitoring Reports
Discharge Monitoring Report(DMR)forms will not be submitted to Ecology because
water quality sampling is not being conducted at the site.
7.2.2 Notification of Noncompliance
If any of the terms and conditions of the permit are not met, and it causes a threat to
human health of the environment, the following steps will be taken in accordance with
permit section SS.F:
1. Ecology will be immediately notified of the failure to comply.
2. Immediate action will be taken to control the noncompliance issue and to correct
the problem. If applicable, sampling and analysis of any noncompliance will be
repeated immediately and the results submitted to Ecology within five (5)days of
becoming aware of the violation.
3. A detailed written report describing the noncompliance will be submitted to
Ecology within five(5)days, unless requested earlier by Ecology.
In accordance with permit condition S2.A, a complete application form will be submitted
to Ecology and the appropriate local jurisdiction (if applicable)to be covered by the
� General Permit.
,
�__,
4' �
Weston Heights
Technical Information Report
APPENDIX 8A �
SITE PLAN WITH BMP MEASURES
Weston Heights
Technical Information Report
SEC. 11, TWP. 23 N, RGE. 5 E., W.M. ' ' � '� o
,. :
� _ �
��_� PROPEFtTY UNE � :. .... .._ -'��. � _ ._.. . . _ . . . ... ... __. __ .... ...._ . _ __ ._. - _ �
-- . .,.. --- � .._. _� . .
> -- _ � � - � '
aFarrn�c/cRnaNc uMrrs � �->_-�`_ � -- - NE 7TH PL r� . :� �-__ x=.��,� ,__�;.
-------- � - -� - - ' _ �
�_ _, _ - - --- �
._ _._ - -- - - r� ❑ �` - �' ' �
. X ..X •X �X X STf2UCTURE TO BE REMOVED UNDER SEPARA7E PERMIT I .-� �� . � � _ .. __ .. -__ - �- - ,..__ I ��__ -_'_���� � > i ,im
SILT FENCE ' ' -- .. . � ` _ _-�-�✓ � ..__._.__ =�.. ¢ i �'�'
1 � \ � ti:,' � _._ _ � � 'c�ii'o
;�"', ROCK CONSTRUCTON ENTRANCE 1 -
_
� ' � �� �i-- r.__�`-"'�:1't.=. � � i z�o
❑... FLTER FABRIC PROiECT10N --- �,. . . . i
'�= � �
� � 1 -
.
I `.' � �
->--- INTERCEPTOR SWALE _ _ ,,:,, � 1 �-'� ' �o
._. � g 2
♦ CHECK DAA1S W� i ..t �" i - z.. .
� , m m m
_ FOUNO SUKVEY MARI�'R 0.5 NOiED W� ; 1 ,;�_.- I = m
_. FlI� HYDw�NT � >. I � � ' .. .. . _ Q e� P� �� n� .
_ � TFLE?HONE RISER a' I � - �- � . R Y O Y o ai�u�<'�o
= TYPE 7 CB W/ VANED GRATE �. � �� �� 1 .. .� • ..
�. TYPE t CB W/ SOUD LID Z� � �� TOPSOIL.SfOCKPILE : ►�_ ( -......'" . e - .
- 1 w/ PLAS't1C COVERING 2.t ; � I y q o Z
_���_ GnS VAVE � � � � _ . I` I '� � � . �
_ � �_ �
�---� STREEf LICFfT ry�5 _- -� _�_. .. I .. ` o
t""'- � �- , � � _ � w o
,�--�_. -� . � • v �
���������
=� FOUND SURVEY MONUAEFfi (AS NOTED) � '. ' �I .. x X�X z-•X-•:X� l.� �'"_- v . �� �_�\ __.�� .�.� -� -�_ � -- i__�. � _. _ ' ^ylC �' n9
.., � x x � .; . _ __ -==- __ - . ���" � �q o .n
�-� FOUND OUAR7ER CORNER � I W "~ �~`. ' k � • pE►Ap�1T1pN UKDER ' � '� - � �. � ��� '
�wE FOUND '�� I. - ( "� �� % � . = �SfPMATE PERMR (T7P) y � I� � / ���' . ^r .9
, � � .
SECTION CORPER .L x`�. .�' x . � / 6 .,�
e
(X, WA7E1z VaLVE I I Q- x �.� � . � � . • + ��+ �' 11 f I '��2r ����
, .
I� MP1L BOX �.: � �IE-5t3.52 X-= _._. X �� s�°.zc�s.FRE \•. - • + • + • - _ . _ •_s�, �j . � �. ' �'�,4
/ I
� GUY MlqiOR �:. � � - x�X•X'X�X X X- \� . � .. ',. � .i � ,' . j � .. -- -- (
� SANRARY SEWER M/WFIOLE 1 � . _�� �;\ -_ ��`W . v . . - - . , .. �► 4� . �
� TREE TYPE � �� s. . -. _. �C2.7 ��FENCE '- ,_ I . ` _ „ �. . �� PROTECIION C2.1
_ . �
•- WAiER METER .� - .
�
�� � " '
�:; _ .
--- �p r : _ i _ �� �� i �
.__ �YlER CLEANCUT 1 �4. i�;i: . . _ • . � "� • �-� . - : c4 �
, - -�__r;�. G � - . ,
'.�� BLOW OFF 4 ROCK ���^. . � .. . .. -� -' � . \. .- -' I - ~ .LL - . y �. �� - I STOCKPILE 2 . -
� - ._- - � -� -. ` � \ �� ��• :W/ PLASTIC COVERING 2 1 I �_..�
."�. AIR VA0. C2.1 CONSfRUCT10N �_� ,� _ 4�9t�-R X•X'%•X.X.X. . X�X�X• . � v � � . � . BU�R�� •., � . . . �I� �- �
_. _ � ...-�-_ X '
'.. WEflANO FLAG {�RANCE . ± . ' T._ (X, x X ..._ . ♦,,.' � - . _ +W\ �(18,Sa�S.FiEY �� ' - _ _. __ ...___� I P�
":.,�\ �,�, .
. �{' �' t '. -� � � _
'. � : a i y � ., s . 8
E..xjt.`x-*x�'�r=X'�('1C X x ' / r r�H+� +\ `` � �i �
CONSTRUCTION SEQUENCE TEreaaurzr t I � �_ iE=5i2�a � } ._ : , ` . � . . . ` . ' _ . � . � �ceProe sw s � �
�Q�
t. Sq�imULE AND ATIEND A PRE-CONSTRUCTpN MEETING WfRI THE Cftt 12' WLVEKT l � �-� " -- � . , x �� � \ .� � - .� � _ � � � �- ��� m �
OF RENTDN. I . ' � x . . �� . y y - 1\ W/ CHECK DAMS C2.1 C2.1 . �
1 � � , �� :J s �
� � "x x x y.. � . . .. . . '� , d w ' m
2. POST SIGH WRhI THE NAME A1d0 PHONE NUAIBER Of T.E.S.C. TD BE C�STRU�^TE➢ � � - ' � V V� � - �
SUPERVISOR h CESCL (MAY BE CONSOLIDATED WRH THE REQUIRED I � ,, � '. E WEST DEtEM10N VAULT ' � � � � � - A• , , .-` I� 2 I _ >_
NOT10E OF CONS1RUO110N SIGN. PER DRAINAGE PLAh � . . . \ \ � . � . .. _.. ---_.. �
�TG 6E USE� FOR \ �� - - - � � � � W ' O �
� dc PROFlLE. C4.0, : I � , + + . . W � ��� � I �� �
TEMPORAftY SEDIAIEf1TAT10N \ . . �` ,� 11 � Q
C4.1. C4.2 � __ .._._. ._._. � -�ACILITY CONSTRUCT �I � - � • � � � � . � > �
3. FLAG OR FENCE CLE�RING L1MRS. ; � '0 vnULT rWD DUTLET �;` + • �7 'f � � O '��. -�� �
4. �ALL CATCH BASIN PR07ECT10N AS SFpWN FOR D(ISIING GTCH 1 --E - C�tF1�RING GRADRJG. �, IN L1MR ' /� ,/ � y. + Y -1.� ', -- �� II N . �� � �
� \\ 1 �~ �v�j� (n'P) /,' ' . . � : � . . . 'f II a - � �
5. GRADE M7D INSTALL CONSTRUCiION ENTRAt�ES. #J .-.. I� -_ ' `� • • • 14 �'\ . . . �
�J � ' --- =' � �j . . � . � � � + . v� 1� � I - $
6. INSfALL PERIMEIER PROTECiION (SILT FENCE BURSH BARRER. ETC.) _.._.. ____---- ! .. . i :. . �� . \ •..__ � �r �-- � ... ....... �
i _ � ._ _..._
7. CONSiRUCT WEST �ETENTION VAULT, OUi1.ET WORKS. AND OOWNSTRF.AYA 6ta0p . � 1 -�� � i' �. � - I � ��. � ' 4 `. V ' � ' � i
CONNECTION TO PUBLIC STORN DRNNAGE SYSTEM. A ROW OF SILT - -r- SE 123RD ST eo . N� - � I '.� + � 5�� .�P � - � - II , �
, � N
G _ t c
FFNCE SHALL BE IN-PUCE MMWIATELY DOWNHl OF D(CAVATED , � � . �
����� ' '�' �' 1 25'x50') " I i ; w
MATERIAL UNT�7HE VAULT IS CONSTRUCTED AND SURFACE WATER " �� � � � . � � '�_� �
�
CONTROLS ARE FUNCTIONAL �� - I I � ' ' �� � . . . � � i � � m.
8. DCCAVATE FitST SEDIMENT TRAP AIJD ROCK 011RET. .- ... � I � � l li L . .. .. V i . I - -. _� �� ' ''-' g <
;-- �_ / ' . � . ' 1 I �� � m �
._ I � ��_ "E „
9. GFtqDE AND STABILIZE CON57RUCipN ROADS. , , . � 1 i _-=- _--f_ --- "-t� , ._ _ _ „ . �1 ' 's I . .... - _ ---.___ ( i � < N
� - - - - - _ - __ __C . . _ p W W 3 � �
1C.CONSTRUCT SURFACE WATER CONTROLS (IMERCEPTOR DIKES, PIPE ' I �I_j � -- �-'�___ (-� _ __ _ _ y � � w � ^ F
FORPPR0.IEACT DEVELOPMENi.�SURFA�CE W TER CORLLECTION SHALLNBE � � ����. � �=�� r u�i � '' h m`
PER SECTION D.3.6 OF APPENDIX D OF TF� 2009 KCSWDN. : - . ��. INTERCEPTOR SWALE 6 7 ' v 3 '= m � ¢u'
3 SILT FENCE • `
I jI m j w/ cHEa< oa�s cz.i c2.i cz.i (n'a> _ i
1 t.MMNTAIN EROSION CANTROL kEASURES IN ACCORDANCE WITN THE CRY �' .... -- -� �
OF RENTON STANDARDS AND AIANUFACTURER'S RECOMAIENDATIONS. I �" � f`-'S �'"� � - NG NR � � � ���
� e��. . ;
I ' � � � � �c � -
12. RELOCATE EROSION COtJTR� MFJSURES OR INSTNI NEW MFISURES � --I � I -- . - �� ��� � �li
S6 THAT AS SffE CONDfT10NS C14DNCE THE EROSpN pND SEpMENf �� ���� � "- N
CONiROI IS PLWAYS IN ACCORDANCE WITH 71$ pTY OF RafTON � �� � � .. .__. _ _.. _ .
EROSION AND SEOIMENT COHTROL STANDARDS. �
13. COVER ALL ARFJS THAT WILL BE UNWORKED FOR MQRE iHAN SEVEN N � Z
DAYS DURING TF� DRY SEASON OR TWO DAYS DURING THE WEf Q
- sEasori wm� sntnw, WOOD Fl�R MULCH, COMPOST, PLASTIC SHEETING NPDES PERMIT#:WAR344061 W a
� OR EOUNALENT. SEE EROSiON CONfROL NOTE 7, SNEET C2.1. � �
; i4.srnse�zE a1 utFi�s nwr RE►,cH Flru,� cw�oE wm�u+ sEVEn o�rs. CERTIFIED EROSION CONTROL SPECIALIST 40 0 40 80 � U
= 15.5� OR SOD ANY AREAS TO I�IAAIN UNWOfil� FOR MORE TH4N 30 WESTON FEIGHTS. LLC 1�=40� �
- a+n� CRPIC SEARS �
- CESCL� Ef'8�87808 Scale Feet � �
�� 16.INSTALL STORM DRAINAGE SYS?QA WITH TEMPORARY CATCH 94SN 15 LAKE BELLEVUE, STE 102
PROTECTION. BELLEVUE wA saoos a CITY OF O W I
(425)869-7300 � � 1� �,I
J 17.INSTALL ALL OTHER UTILRIES, CURB, CUTTER, SIDEWALK AND PAVING. CRWGOTAYLORDEV.CON � RENTON �/� r
V�
?� 18.UPON COMPLE110N OF iHE PRQIECT, ALL D5ll1RBm ARFAS YUST 8E DATUM � COMPLIAI�iE YVRH � I�
STABILIZm AND BMPS REMOVED IF APPROPRIATE �
� 19.REMOVE ACCUMUUTID SEDINENT FROM DEfENT10N VAULT AND PONO. �W 88, PER CITf OF RENTON �Y��ON STANDARD6 �
- FLUSH STORMWATER SYSTDA UPON COAIPLETION OF CONSTRUCTION. �ERT�CAL CON�ROL , I�'� Date: �
BENCHMARK
BY Date:
� TOP OF THE NONUMENT AT THE WEST
_ t/4 CORNER OF SECTION 11-23-5, By: Dote: /�
= CfTY OF RENTON POINT N0. 2101 Know whaes below. / �
E1.� 512.01 FEEf (OR 756.060 �,: p�: �/��0
M�� C2II before you dig.
. .e., •_,3"-9 ;presp��: d_._cp,-�_ ,_ -._ ;h __� H •t�,.�.C. . r� -_- _ ., ..1F-er� . ..�
_ ...�� ,, � . , .o ,-�... ..�. . .��., ..�. .. a„ ,,z�-:
U 15-006162
i
i
l
APPENDIX 8B
SWPPP PROJECT SUMMARY
'� Weston Heights
4 Technical Information Report
�
, �
�- �
PROJECT TEAM MEMBERS:
. • . -
Certified Erosion 8�Sediment Control Lead Craig Sears (425) 869-1300
Resident Engineer Scott Mesic (425)486-6533
�
� Emergency Ecology Contact Puget Sound Office (425)649-7000
, Emergency Owner Contact Craig Sears (425)869-1300
! Non-Emergency Ecology Contact Northwest Region (425)649-7000
Monitoring Personnel Craig Sears (425)869-1300
ESTIMATED CONSTRUCTtON SCHEDULE:
• Construction Start Date July 2016
. Install ESC Measures July 2016
• Construction End Date October 2016
CONSTRUCTION BMP LIST IDetails followinq):
• Silt Fence (BMP C233)
• Stabilized Construction Entrance
• Storm Drain Inlet Protection (BMP C220)
• Materials on Hand (BMP C150) may also be applicable
• Detention Pond Or Vault
• Temporary and Permanent Seeding (BMP C120) ,
• Plastic Covering (BMP C123) �
• Interceptor Dike and Swale(BMP C200) �
• Check Dams (BMP C207) ;
Weston Heights
Technical Information Report
�
3 JOINTS IN FILTER FABRIC SHALL BE SPLICED
y
� AT POSTS.USE STAPLES,WIRE RINGS,OR
EOUNALENT TO ATTACH FABRIC TO POSTS. Yx2'BV 14 Ga.WIRE OR
� EQUVILLENT,IF STANDARD
� � STRENGTH FABPoC USED 1
E `
F�TER FABRIC �
I Z
�
I I�I
� � — �—i �— ����I1����=—
�i li..� �I-,_�-�I�=--��-�_��—��—I �—��.—��_���_��=I �'�—��I— I� -��.��_'��.
�i i—I�—i I—i_ITi— �—I I I=
'—I11=1I1 s
� 6'MN(. � � MINIMUAA I'z1'TRENCH � '
�`-� / --
� BACNFILL TRENCH VNTH
POST SPACING MAV BE INCREASED NATIVE SOIL
TO 8'IF WIRE BACKING IS USED
2'x4'WOOD POSTS.STEEL FENCE
POSTS,REBAR.OR EQIHVALENT
NOTES
1. CONDRION OF USE
1.1. SILT FENCE MAY BE USED DOWNSLOPE OF ALL DISTURBED AREAS.
7.2. SILT FENCE IS NOT INTENDED TO TREAT CONCENTRATED FLOWS,NOR IS INTENDED TO TREAT SUBSTANTIAL AMOUNTS OF OVERLAND FLOW.
ANY CONCENTRATED FLOW MOST BE CONVEYED THROUGH THE DRAINAGE SYSTEM TO A SEDIMENT TRAP OR POND.
2. DESIGN AND INSTALLATION SPECIFICATIONS
2.1. THE C�EOTEXTILE USED MOST MET THE STANDARD LISTED BELLOW.A COPY OF THE MANUFACTURER'S FABRIC SPECIFICATIONS MOST BE
AVAILABLE ON SITE.
AOS(0.5TM D4751) �-10051EVE SIZE(0.660.15Mv1�FOR SILT FlLM
i0-100 SIEV E SIZE�0960.15bM)FOR OTHER FABRICS
WATERPERMITTIVI7Y(ASTMD491) 0.025EC^�1MINIMUM
GRAB TENSILE STRENCHT IASTM D46321 180 LBS.MIN.FOR E%TRA STRENGH FABNIC
100 LBS.MN.FOR STAN DA RD SIAENGHT FABRIC
G(iABTEN5ILEELONGATION ASTMD4632 30%MA7(.
ULTIIAVIOLATE RESISTANCE(ASTM D4355) 70%MIN.
2.2. STANDARD STRENGTH FABRIC REQUIRES WIRE BACKING TO INCREASE THE STRENGTH OF THE FENCE.WIRE BACKING OR CLOSER POST
SPACING MAY BE REQUIRED FOR EXTRA STRENGTH FABRIC IF FIELD PERFORMANCE WARRANTS A STRONGER FENCE.
2.3. WHERE THE FENCE IS INSTALLED,THE SLOPE SHALL NOT BE STEEPER THAN 2H:1V
2.4. IF A TYPICAL SILT FENCE IS USED,THE STANDARD 4X4 TRENCH MAY NOT BE REDUCED AS LONG AS THE BOTTOM 8 INCHES OF THE SILT FENCE
IS WELL BURIED AND SECURE IN A TRENCH THAT STABILI2ES THE FENCE ANO DOES NOT ALIOW WATER TO BYPASS OR UNDERMINE THE SILT
FENCE.
3. MAINTENANCE STANDARDS
3.1. ANY DAMAGE SHALL BE REPAIR IMMEDIATELY.
3.2. IF CONCENTRATED FLOES ARE EVIDENT UPHILL OD THE FENCE.THEY MUST BE INTERCEPTED AND CONVEYED TO A SEDIMENT TRAP OR POND.
3.3. IT IS IMPORTANT TO CHECK THE UPHILL SIDE OF THE FENCE FOR SIGNS OF THE FENCE CLOGGING AND ACTING AS A BARRIER TO FLOW AND
THEN CAUSING CHANNELIZATION OF FLOWS PARALLEL TO THE FENCE.IF THIS OCCURS,REPLACE THE FENCE OR REMOVED THE TRAP
SEDIMENT.
3.4. SEDIMENT MOST BE REMOVED WHEN SEDIMENT IS 61NCHES HIGH.
3.5. IF THE FILTER FABRIC(GEOTEXTILE)HAS DETERIORATED DUE TO ULTRAVIOLET BREAKDOWN.IT SHALL BE REPLACED.
Y
�'~�.,,��"� PLBLIC WORKS SILT FENCE �• p� - 214.00
����� DEPARTMENT
ir��p MARCH 2O08
�
�
�
�
� DRIVEWAYS SW1LL BE PAVED TO THE EDGE
OF R-O-W PRIOR TO INSTALLAiION OF THE
o Ey'�Sj\NG�O� / DAMAGING OFOTHE ROADWAY AVqD
� IT IS RECOMMENDED TMAT THE
R�25'MIN. \ ENTRANCE BE CROWNED SO THAT
RUNOFF DRAINS OFF THE PAD
��.
�Z
��
\ \
\
�
INSTALL DPoVEWAY CULVERT IF THERE \
IS A ROADSIDE DITCH PRESENT.AS
PER CITY ROAD STAFAARDS
4"-8'QUARRY SPALLS i
GEOTEXTILE � \ II,
1����
12'MIN.THICKNESS � �_� p{Zpy�DE FULL WIDTH OF
NOTES INGRESS/EGRESS AREA
1. CONDRION OF USE
1.1. CONSTRUCTION ENTRANCE SHALL BE STABILIZED WHEREVER TRAFFIC WILL BE LEAVING A CONSTRUCTION SITE AND TRAVELING ON
PAVED ROADS OR OTHER PAVED AREAS WITHIN 1,000 FEET OF THE SITE.
GRABTENSILESTREBNGTH ASTMD4751 200PSIMIN.
GRAB TENSILE ELONGATION(ASTM D4632� 3096 MAX.
MULLEN BURSTSTRENGTH ASTMD3786-SOA 400P51 MIN.
AOS�ASTM D4751) 2a45(U.S.STANDARD SIEVE SIZE�
2. DESIGN AND INSTALLATION SPECIFICATIONS
2.1. HOG FUEL(WOOD BASED MULCH)MAY BE SUBSTITUTED FOR OR COMBINED WITH QUARRY SPALLS IN ARES THAT WILL BOT BE USED
FOR PERMANENT ROADS.HOG FUEL IS NOT RECOMMENDED FOR ENTRANCE STABILIZATION IN URBAN AREAS.THE INSPECTOR MAY
AT ANY TIME REQUIRE THE USE OF QUARRY SPALLS IF THE HOG FUEL IS NOT PREVENTING SEDIMENT FROM BEING TRACKED ONTO
PAVEMENT OR IF THE HOG FUEL IS BEING CARRIED ONTO PAVEMENT.
2.2. FENCING SHALL BE INSTALLED AS NECESSARY TO RESTRICT TRAFFIC TO THE CONSTRUCTION ENTRANCE.
2.3. WHENEVER POSSIBLE,THE ENTRANCE SHALL BE CONSTRUCTED ON A FIRM,COMPACTED SUBGRADE.THIS CAN SUBSTANTIALLY
INCREASE THE EFFECTIVENESS OF THE PAD AND REDUCE THE NEED FOR MAINTENANCE.
3. MAINTENANCE STANDARDS
3.1. QUARRY SPALLS SHALL BE ADDED IF THE PAD IS NO LONGER IN ACCORDANCE WITH THE SPECIFICATIONS.
3.2. IF THE ENTRANCE IS NOT PREVENTING SEDIMENT BEING TRACKED ONTO PAVEMENT,THEN ALTERNATIVE MEASURES TO KEEP THE
STREETS FREE OF SEDIMENT SHALL BE USED.THIS MAY INCLUDE STREET SWEEPING,AN INCREASE IN THE DIMENSIONS OF THE
ENTRANCE,OR THE INSTALLATION OF THE WHEEL WASH.IF WASHING IS USED,IT SHALL BE DONE ON AN AREA COVERED WITH
CRUSHED ROCK,AND WASHED WATER SHALL DRAIN TO A SEDIMENT TRAP OR POND.
3.3. ANY SEDIMENT THAT IS TRACKED ONTO PAVEMENT SHALL BE REMOVED IMMEDIATELY BY SWEEPING.THE SEDIMENT COLLECTED BY
SWEEPING SHALL BE REMOVED OR STABILIZED ON SITE.THE PAVEMENT SHALL NOT BE CLEANED BY WASHING DOWN THE STREET,
EXCEPT WHEN SWEEPING IS INEFFECTNE AND THERE IS A THREAT TO PUBLIC SAFETY.IF IT NECESSARY TO WASH THE STREETS,A
SMALL SUMP MUST BE CONDUCTED.THE SEDIMENT WOULD THEN BE WASHED INTO THE SUMP WHERE IT CAN BE CONTROLLED AND
DISCHARGED APPROPRIATELY.
3.4. ANY QUARRY SPALLS THAT ARE LOOSENED FROM THE PAD AND END UP ON THE ROADWAY SHALL BE REMOVED IMMEDIATELY.
3.5. IF VEHICLES ARE ENTERING OR EXITING THE SRES AT POINTS OTHER THAN THE CONSTRUCTION ENTRANCE(S),FENCING SHALL BE
INSTALLED TO CONTROL TRAFFIC.
ti`�Y�� STD. PIAN — 215.10
°�: � PUB�c woRxs i STABILIZED _
��;� DEPARTMENT i CONSTRUCTION ENTRANCE
�a�p , MARCH 2O08
��.
� DRAINAGE GRATE � TRIM
�
� GRATE FRAME
� � V
° � I .
SmIMENT AND DEBRIS
� . OVERFLOW BYPASS
t-���5-
. k
o D �%''P�� , � BELOW INLET GRATE DEVICE
� �6 .
FILTERED \
� WATER �
�`
1
�. __ U
e o
: e n
' p ' D ° p ' .
SECTION VIEW
DRAINAGE GRATE
-RECTANGULAR GRATE SFIOWN RETRIEVAL SYSTEM(TYPJ
/�
Q �
\
BELOW INLET GRATE DEVICE OVERFLOW BYPASS(TYP.)
\ / �
I
ISOMETRIC VIEYr
NOTES
7. Size the Below Inlet Grate Device(BIGD)fa the storm water structure It wlll servioe.
2. The BIGD shall have a bWtt-in hlgh-flow relfef system(oveAbw bypass�
3. The retrieval system must allaw removal of Ihe BIGD wlihout spllling the cdleded material.
4. Perform mafMenance fn accordance wl�Standard Spedflcation 8-01.3(15).
TY
� 4TD. PLAN - 216..g�
�� � PUBLIC WORKS CATGH BASIN FILTER
-' DEPARTMENT
� MARCH 2O08
�
i , � i a tia�c.
� _ . - _
=III—III�—I —I = -- � --
�ill���������� � �„ I������� ��I
-��I—��—
—���—���
TOE IN SHEETING IN I-I I I-I I I �p�
YIN61Uq 4'X�'TRENCH �I-I I I-I I
I I I-I I I-I
-I I I-I I
-I I I-I I I-
P R O V I D E E N E R G V q S S I P A T 1 0 N I�I I I I I I I I I I I . .
AT TOE WHEN PEmED - - - � . . . � . , .
-1I1= I 1=1 - . . � . .
NOTEB
1. CONDITION OF USE
'1.1. PLASTIC COVERING MAY BE USED ON DISTURBED AREAS THAT REQUIRED COVER MEASURES FOR LESS THAN 30 DAYS.
'1.2. PLASTIC IS PARTICULARLY USEFUL FOR PROTECTING CUT AND FILL SLOPES AND STOCKPILES.
1.3. CLEAR PLASTIC SHEETING MAY BE USED OVER NEWLYSHEEDED AREAS TO CREATE A GREENHOUSE EFFECT AND ENCOURAGE GRASS
' GROWTH.CLEAR PLASTIC SHOULD NOT BE USED FOR THIS PURPOSE DURING THE SUMMER MOPfTHS
', 1.4. THIS METHOD SHALL NOT BE USED UPSLOPE OF AREAS THAT MIGHT BE ADVERSELY IMPACTED BY RUNOFF.SUCH AREAS INCLUDE STEEP AND
' UNSTABLE SLOPES
2 DESIGN AND INSTALLATION SPECIFIG►T10N3
2.7. PLASTIC SHEETING SHOULD HAVE A MINIMUM THICIQJESS OF 0.03 MILLIMETERS.
i 2.2. IF ER0310N AT THE TOE OF A SLOPE 13 LIKELY,A GRAVEL BERM,RIPRAP,OR OTHER 3UITABLE PROTECTION SHALL BE INSTALLED AT THE TOE
� OF THE SLOPE IN ORDER TO REDUCE THE VELOCITY OF RUNOFF.
3. MAINTENANCE STANDARDS
3.1. TORN SHEETS MOST BE REPLACED RND OPEN SEAMS REPAIRED.
3.2. IF THE PLAS7IC BEGINS TO DETERIORATE DIE TO ULTRAVIOLET RADIATION,IT M06T BE COMPLETELY REMOVED AND REPLACED.
! 3.3. WHEN THE PLASTIC IS NO LONGER NEEDED,IT SHALL BE COMPLETELY REMOVES.
i
i �
II
`� ' 3PD. PLAN - 215.30
�� � PUBLIC WORKS PLASTIC COVERING
'' DEPARTMENT
MARCH 2O08
1
�
�
N
2
�
2:7 MAX SLOPE
� DIKE MA7ERIAL COMPACTED �
� 909:MODIFIED PROCTOR I \
7 MI11 \i
�� �18'MIN. —
� I�i I
� , —I I I—I I I—I I I ..
- � � -I I 1=I I 1-1 I 1=���-� � � ii
_ -
I — I— DIKE SPACING OEPENOS ON SIOPE GRADIENT
NOTES
1. CONDRION OF USE
1.1. REQUIRED AT:
1.1.1. THE TOP OF ALL SLOPES IN EXCESS OF 3H:1V AND WITH MORE THAN 20 FEET OF VERTICAL RELIEF.
1.1.2. AT INTERVALS ON ANY SLOPES THAT EXCEEDS THE DIMENSIONS SPECIFIED BELLOW.
AVERAGE SLOPE SLOPE PERCENT FLOWPATH LENGTH
20H:1V 3-5% 300 FEET
(1OT020)H:1V S10% 200FEET
(4T010)H:1V 1425% 100FEET
(2T04�H:1V 25-509�o SOFEET
2. DESIGN AND NSTALLATION SPECIFlCATIONS
2.1. FOR SLOPES STEEPER THAN 2H:1V WITH MORE THAN 10 FEET OF VERTICAL RELIEF,BENCHES MAY BE CONSTRUCTED OR CLOSER SPACED
INTERCEPTOR DIKES MAY BE USED.THE DESIRE MEASURE MOST BE DESIGNED BY AN ENGINEER TO EFFECTIVELY INTERCEPT THE HIGH
VELOCITY RUNOFF TO A SEDIMENT POND OR TRAP.
2.2. CONSTRUCTION TRAFFIC OVER TEMPORARY DIKES SHALL BE MINIMI2ED.
3. MAINTENANCE STANDARDS i
3.1. DAMAGE RESULTING FROM RUNOFF OR CONSTRUCTION ACTIVITY SHALL BE REPAIRED IMMEDIATELY.
3.2. IF THE FACILITY DO NOT REGULARLY RETAIN STORM RUNOFF,THE CAPACITY AND/OR FREQUENCY OF THE DIKES SHALL BE INCREASED.
��`�Y���, STD. PLAN - 217.00
� • �� PliBLIC WORKS INTERCEPTOR DIKE _
\��/ DEPARTMENT
� MARCH 2O08
�
y 2:1 MAX.SLOPE
3
m -III
€ LEVELBOTTOM - - _� _ I - I
� 1'MIN. � - i �_�I-
f _ � ��.- � -
I - I I-1 i I-��i-" ' ' -
- ,- � -�
II -ITi=� � - 1
�
2'MIN.
I _ -
SWALE SPACING DEPENDS ON SIOPE GRADIENT
NOTES
1. CONDITION OF USE
1.1. REQUIRED AT:
1.1.1. THE TOP OF ALL SLOPES IN EXCESS OF 3H:1V AND WITH MORE THAN 20 FEET OF VERTICAL RELIEF.
1.1.2. AT INTERVALS ON ANY SLOPES THAT EXCEEDS THE DIMENSIONS SPECIFIED BELLOW.
AVERAGE SLOPE SLOPE PERCENT FLOWPATH LENGTH
20H:1V 3-5% 300 FEET
1OT020 H:1V 5-1096 200FEET
�4 TO 10)H:1V 1425% 100 FEET
2 TO 4 H:1V 25-50% 50 FEET
2. DESIGN AND INSTALLATION SPECIFlCATIONS
2.1. FOR SLOPES STEEPER THAN 2H:1 V WITH MORE THAN 10 FEET OF VERTICAL RELIEF,BENCHES MAY BE CONSTRUCTED OR CLOSER
SPACED INTERCEPTOR SWALES MAY BE USED.THE DESIRE MEASURE MOST BE DESIGNED BY AN ENGINEER TO EFFECTNELY
INTERCEPT THE HIGH VELOCITY RUNOFF TO A SEDIMENT POND OR TRAP.
2.2. CONSTRUCTION TRAFFIC OVER TEMPORARY SWALES SHALL BE MINIMIZED.
3. MAINTENANCE STANDARDS
3.1. DAMAGE RESULTING FROM RUNOFF OR CONSTRUCTION ACTIVITY SHALL BE REPAIRED IMMEDIATELY.
3.2. IF THE FACILITY DO NOT REGULARLY RETAIN STORM RUNOFF,THE CAPACITY AND/OR FREQUENCY OF THE SWALES SHALL BE
INCREASED.
p��Y��,s, STD. PLAN — 217.10
PUBLIC VrORKS INTERCEPTOR SWALE
���i� DEPARTMENT
'p��p MARCH 2O08
�
� ROCK NUST COMPLETELY COVER THE
� BOTTOI+1 AND SIDES OF TFE DRCH
�s
a �\ 6'NIN. 'n ��
�L ! �\ �` 1�D
. ������r��/<;� Q 21'MIN.
� ����� �DO�
;
� � 2:1 SLOPES
� 2'�'ROCK
L=THE DISTANCE SUCH THAT POIN75
D A AND B ARE OF EQIIAL ELEVA710N
-IIIA B
� � �-� � � ��,�il -- � �
�I 1=1 I I, ,—;I I I---— o� �oo
'��—, I ;— I —, I —
—���—i��=1 I I,;,_ ��, ,—� I I-I I-1 I -
—� � �—
, NOTEs I
1. CONDITION OF USE
1.1. WERE CONCENTRATED RUNOFF FROM DISTURBED AREAS TO AND FROM PONDS OR TRAPS.
12. TO CONVEY RUNOFF INTERCEPTED FROM UNDISTURBED AREAS AROUND THE SITE TO A NON-EROSNE DISCHARGE POINT.
2. MAINTENANCE STANDARDS
2.1. ANY SmIMENT DEPOSITION OF MORE THAN 0.5 FEET SFWLL BE REMOVED SO THAT THE CHANNEL IS RESTORED TO ITS ORIGINAL
DESIGN CAPACITY.
22. THE CHECK DAMS SHALL BE DUMINED FOR SIGNS OF SCOURING AND EROSION OF THE BED AND BANKS.IF SCOURING AND EROSION
I1AS OCCURRED,AFFECTED AREAS SIIALL BE PROTECTED BY RIPRAP OR AN EROSION CONTROL BLANKET.
� � � PUBLIC WORKS C1�IECK DAMS SPACING AND
3PD. PI.AN - 217.40
'` DEPARTMENT CROSS SECTIONS MARCH 2�08
APPENDIX 8C
ALTERNATIVE BMPs
;i
_ �
Weston Heights
Technical Information Report
�
i
The following includes a list of possible alternative BMPs for each of the 12 elements not described in the
main SWPPP text. This list can be referenced in the event a BMP for a specific element is not
functioning as designed and an alternative BMP needs to be implemented.
Element#1 -Mark Clearing Limits
• High Visibility Plastic or Metal Fence (BMP C103)
Element#2 -Establish Construction Access
• Wheel Wash (BMP C106)
Element#3-Control Flow Rates
. (none)
Element#4-Install Sediment Controls
• Straw Bale Barrier(BMP C230)
• Vegetated Strip(BMP C234)
• Materials on Hand (BMP C150)
Element#5 -Stabilize Soils
• Dust Control (BMP C140)
• Topsoiling (BMP C125)
• Sodding (BMP C124)
Element#6-Protect Slopes
• Straw Wattles (BMP C235)
• Grass-Lined Channels(BMP C201)
Element#7-Protect Drain Inlets
• (none)
Element#8 -Stabilize Channels and Outlets
• Level Spreader(BMP C206)
Element#10-Control Dewatering
• (none)
;
�
APPENDIX 8D
GENERAL PERMIT
,
Weston Heights
Technical Information Report
Construction Stormwater General Permit
At the time of submittal of this report, the project is within the public comment period for the Stormwater
General Permit. The Department of Ecology has assigned the project the following General Permit
Number:
WAR304061
A copy of the construction stormwater general permit coverage documents will be added to this appendix
during the preconstruction meeting.
-- --- -------- --------- ---- ------- _ -—_ ------ I
Weston Heights �
Technical Information Report �
' i
i
I �
I,_ i
�
APPENDIX 8E
c�T� � nr ,s� tni�p�r�Tin�i �nRn,nc
,
� Weston Heights
Technical Information Report
Site Insaection Forms (and Site Loa)
The results of each inspection shall be summarized in an inspection report or checklist that is entered into
or attached to the site log book. It is suggested that the inspection report or checklist be included in this I
appendix to keep monitoring and inspection information in one document, but this is optional. However, it
is mandatory that this SWPPP and the site inspection forms be kept onsite at all times during
construction, and that inspections be performed and documented as outlined below.
At a minimum, each inspection report or checklist shall include:
a. Inspection date/times
b. Weather information: general conditions during inspection, approximate amount of precipitation
since the last inspection, and approximate amount of precipitation within the last 24 hours.
c. A summary or list of all BMPs that have been implemented. including observations of all
erosion/sediment control structures or practices.
d. The following shall be noted:
i. Locations of BMPs inspecte �.
ii. Locations of BMPs that neeu �� U�,�����U,�,_-
iii. The reason maintenance is needed
iv. Locations of BMPs that failed to operate as designed or intended, and
■ v. Locations where additional or different BMPs are needed, and the reas���,�; ,,��;
�
e. A description of stormwater discharged from the site. The presence of suspended sediment,
turbid water, discoloration, and/or oil sheen shall be noted, as applicable.
f. A description of any water quality monitoring performed during inspection, and the results of that
monitoring.
g. General comments and notes, including a brief description of any BMP r repairs, maintenance or
installations made as a result of the inspection.
h. A statement that, in the judgment of the person conducting the site inspection,the site is either in
compliance or out of compliance with the terms and conditions of the SWPPP and the NPDES
permit. If the site inspection indicates that the site is out of compliance, the inspection report shall
include a summary of the remedial actions required to bring the site back into compliance, as well
as a schedule of implementation.
i. Name, title, and signature of person conducting the site inspection; and the following statement: "I
certify under penafty of law that this report is true, accurate, and complete, to the best of my
knowledge and belief'.
When the site inspection indicates that the site is not in compliance with any terms and conditions of the
NPDES permit, the Permittee shall take immediate action(s)to: stop, contain, and clean up the
unauthorized discharges, or otherwise stop the noncompliance; correct the problem(s}; implement
appropriate Best Management Practices(BMPs), and/or conduct maintenance of existing BMPs; and
achieve comp�iance with all applicable standards and permit conditions. In addition, if the noncompliance
� causes a threat to human health or the environment, the Permittee shall comply with the Noncompliance
Notification requirements in Special Condition SS.F of the permit.
Weston Heights
Technical Information Report
Site Inspection Form
Generai Information
Project Name:
Inspector Name: Title:
CESCL# :
Date: Time:
Inspection Type: ❑ After a rain event
� Weekly
❑ Turbidity/transparency benchmark exceedance
� Other
Weather
Precipitation Since last inspection In last 24 hours
Description of General Site Conditions:
Inspection of BMPs
Element 1: Mark Clearing Limits
BMP:
Location Ins ected Functionin Problem/Corrective Action
Y N Y N NIP
BMP:
Location Ins YctN YunNio NIP Problem/Corrective Action
_ _---- ---- - -- __1___ _ '_ 1_ _ _ _ ____ _ _ _ -- - - — -!
Element 2: Establish Construction Access
BMP:
Location Ins ected Functionin Problem/Corrective Action
Y N Y N NIP
BMP:
` Location Ins Y�N YunN io NIP Problem/Corrective Action
r
Weston Heights
` Technical Information Report
I
E/ement 3: Control Flowrates
BMP:
Location Ins ected Functionin Problem/Corrective Action
Y N Y N NIP
BMP:
Location Ins YctN YunN io NIP Problem/Corrective Action
E/ement 4: Install Sediment Contro/s
BMP:
Location �ns ected Functionin Problem/Corrective Action
Y N Y N NIP
BMP:
Location �ns ected Functionin problem/Corrective Action
Y N Y N NIP
E/ement 5: Stabilize Soils
BMP:
Location �ns ected Functionin problem/Corrective Action
Y N Y N NIP
BMP:
Location InS Y�N YunN io NiP Problem/Corrective Action
Weston Heights
' Technical Information Report
i
E/ement 6: Protect S/opes
BMP:
Location Ins ected Functionin problem/Corrective Action
Y N Y N NIP
BMP:
Location Ins YctN YunN io NiP Problem/Corrective Action
E/ement 7: Protect Drain/nlets
BMP:
Location Ins ected Functionin Problem/Corrective Action
Y N Y N NIP
BMP:
Location Ins Y�N YunN'� NIP Problem/Corrective Action
E/ement 8: Stabilize Channels and Outlets
BMP:
Location Ins ected Functionin Problem/Corrective Action
Y N Y N NIP
BMP:
, Location Ins YctN YunN'� NIP Problem/Corrective Action
Weston Heights
Technical Information Report
E/ement 9: Control Pollutants
BMP:
Location Ins ected Functionin Problem/Corrective Action
Y N Y N NIP
BMP:
Location Ins YctN YunN io NiP problem/Corrective Action
E/ement 10: Control Dewatering
BMP:
Location Ins ected Functionin Problem/Corrective Action
Y N Y N NIP
BMP:
Location Ins YctN YunN io NIP Problem/Corrective Action
Stormwater Discharges From the Site ''
Observed? Problem/Corrective Action '
Y N '
Location
Turbidi
Discoloration
Sheen
Location
Turbidi
Discoloration
Sheen
Weston Heights
Technical Information Report
Water Quali Monitorin
Was any water quality monitoring conducted? ❑ Yes ❑ No
If water quality monitoring was conducted, record results here:
If water quality monitoring indicated turbidity 250 NTU or greater; or transparency 6
cm or less, was Ecology notified by phone within 24 hrs?
c Yes c No
If Ecology was notified, indicate the date, time, contact name and phone number
below:
Date:
Time:
Contact Name:
Phone #:
General Comments and Notes
Include BMP re airs, maintenance, or instaltations made as a result of the ins ection.
Were Photos Taken? � Yes � No '
If hotos taken, describe hotos below: '
Weston Heights
Technical Information Report
APPENDIX 8F
TESC CALCULATIONS
;
V
i
�
r
Weston Heights
Technical Information Report
West Basin— Deve/oped Condition(Detained Basin)
��.; ,,,
�Land Use Summary �� O �
Area ?
Till Forest 0.00 acres
Till Pasture 0.00 acres
Till Grass 1.06 acres
Quiwash Forest 0.00 acres
Oulwash Pasture 0.00 acres
Outwash Grass 0.00 acres
Wetland 0.00 acres
Impervious 0.83 acres
Total
1.89 acres
Scale Factor: 0.80 15-Min Reduced
Edit Flow Paths �
Time Series: West-15min.ts� »
Compute Time Series
Modiiy User Input
File for computed Time Series [.TSF]
Flcw Frequency Analys_.
Time Series File:west-1 ,
Project Location:LandsbuLu
---Annual Peak Flow Rate
Flow Rate Rank Time of r--:r: - - _-:�.: - - �-. . _ ._., i :
(CFS) (CFS) Period
0.99'_ 7 2/08/O1 15:00 1.57 1 100.00 0. �
0.914 8 5/06/02 7:15 1.09 2 25.00 0.'��
0.858 9 9/10/U3 13:95 0.989 3 10.00 0.'=�
1.04 2 8/25/09 23:30 0.858 9 5.00 0.,-
0.599 6 5/10/05 16:95 0.656 5 3.00 0.�
0.985 3 10/22/U5 16:15 0.599 6 2.00 O.SU�_
0.696 5 11/21/06 8:00 0.491 7 1.30 0.231
1.57 1 1/04/OS 7:3p n.419 a 1.10 O.nyl
rnm:�,uted Feaks 1.3� 50,02 n,58p
Per Section D.3.5.1 of the 2009 KCSWDM, the minimum pond surface area is calculated from
the 2-yr peak flow calculated above as follows:
SA{MIN) = 2,OHO X Q2-Y�
SA(MIN) = 2,080 x 0.599 = 1,246 sf
Weston Heights
Technical Information Report
East Basin—Developed Condition (Detained Basin)
' � Land Use Summary - � av D
�-- - �
Area ?J
Till Fores# 0.00 acres
Till Pasture 0.00 acres
' Till Grass 1.15 acres
Outwash Forest 0.00 acres
Ouiwash Pasture 0.00 acres
( Outwash Grass 0.00 acres
f Wetland 0.00 acres
� Impervious 0.80 acres
Total
! 1.95 acres
Scale Factor : 0.80 15-Min Reduced
i �
Edit Flow Paths
Time Series: East-15min.ts� »
Compute Time Series I
� Modify User Input I
-------- __ _
' File for computed Time Series [.TSFJ
E_cM F�equen�y 'r.-�al�-s=s
Time Series File:east-15min.t;,t
� Project Location:Landsburg
---Annual Peak Flow Rates-- ---Fl<�:: Fr�=:.r��.:y rr.a_rr,i ,
Flow Rate Rank Time of Peak - - Feaks - - F:an;c keturn Fr�-�ia
� � (CFS) (CFS) Period
0.995 7 2/OS/O1 19:00 1.58 1 100.00 O.�S
0.906 E 5/06/02 7:15 1.06 2 25.00 0.��
� 0.891 9 5/10/03 13:95 0.987 3 10.00 0.�(
1.06 2 8/25/09 23:30 0.891 9 5.00 0.�0
0.553 6 9/10/05 16:95 0.655 5 3.00 n,�.�
0.987 3 10/22/OS 1E:15 0.593 6 2.00 O.SI�
O.EG9 5 11/21/OE 8:00 0.445 7 1.30 0.� '
1.59 1 1/04/08 �:30 0.406 P 1.10 0.�''
rr,m�cred Peaks 1.91 5�i.���n n,�.
� �
Per Section D.3.5.1 of the 2009 KCSWDM, the minimum oond surface area is calculated from
the 2-yr peak flow calculated above as follows
SA(MIN) — Z,OHO X Q2-Y,
SA(M,N) = 2,080 x 0.593 = 1,233 sf
Weston Heights
Technical Information Report
SECTION 9
BOND QUANTITIES, FACILITY SUMMARIES.
AND DEC�ARAT!�N nF CO�✓ENANT
Weston Heights
Technical Information Report
Bond Quantities, Facilities Summaries, and Declaration of Covenant
Bond Quantities have been provided at the City's request.
Storm drainage facilities are detailed on the engineering plans.
1
,
I
' i �
; -
� I
, �
, ,
Weston Heights
Technical Information Report
iI
;
��.
, _,
APPENDIX 9
BOND QUANTITY WORKSHEET
Weston Heights
Technical Information Report
Site Improvement Bond Quantity Worksheet S,5 Webdate 04/03/201°
� King County
Department of Permitting & Environmental Review
35030 SE Douglas Street, Suite 210
Snoqualmie, Washington 98065-9266 For alternate formats, call 206-296-6600.
206-296-6600 TTY Relay 711
Project Name: Weston Heights Date: 6/14/2016
Location: RentOfl, WA Project No.:
Activity No.:
Note: All prices include labor, equipment, materials, overhead and
Clearing greater than or equal to 5,000 board feet of timber? profit. Prices are from RS Means data adjusted for the Seattle area
or from local sources if not included in the RS Means database.
yes X no
If yes,
Forest Practice Permit Number:
(RCW 76.09)
Page 1 of 9
Unit prices updated: 3/2/2015
Version: 3/2/2015
King Counry SI Bond Quantiry Wsksht.xls Report Date: 6/14/2016
Site Improvement Bond Quantity Worksheet S,5 Webdate 04/03/201',
Unit #of
Reference# Price Unit Quanti A plications Cost
EROSIONISEDIMENT CONTROL Number
Backfill &com action-embankment ESC-1 $ 6.00 CY
Check dams,4" minus rock ESC-2 SWDM 5.4.6.3 $ 80.00 Each 7 1 560
Crushed surfacin 1 1/4" minus ESC-3 WSDOT 9-03.9 3 $ 95.00 CY
Ditchin ESC-4 $ 9.00 CY
Excavation-bulk ESC-5 $ 2.00 CY
Fence, silt ESC-6 SWDM 5.4.3.1 $ 1.50 LF 1700 1 2550
Fence, Tem ora NGPE ESC-7 $ 1.50 LF
H droseedin ESC-8 SWDM 5.4.2.4 $ 0.80 SY 12000 1 9600
Jute Mesh ESC-9 SWDM 5.4.2.2 $ 3.50 SY
Mulch, b hand, straw, 3"dee ESC-10 SWDM 5.4.2.1 $ 2.50 SY
Mulch, b machine, straw, 2"dee ESC-11 SWDM 5.4.2.1 $ 2.00 SY
Pipin , tempora , CPP, 6" ESC-12 $ 12.00 LF
Pipin , tempora , CPP, 8" ESC-13 $ 14.00 LF
Pi in , tempora , CPP, 12" ESC-14 $ 18.00 LF
Plastic coverin ,6mm thick, sandba ed ESC-15 SWDM 5.4.2.3 $ 4.00 SY 100 1 400
Rip Rap, machine placed; slopes ESC-16 WSDOT 9-13.1(2) $ 45.00 CY
Rock Construction Entrance, 50'x15'x1' ESC-17 SWDM 5.4.4.1 $ 1,800.00 Each 2 1 3600
Rock Construction Entrance, 100'x15'x1' ESC-18 SWDM 5.4.4.1 $ 3,200.00 Each
Sediment ond riser assembl ESC-19 SWDM 5.4.5.2 $ 2,200.00 Each
Sediment trap, 5' hi h berm ESC-20 SWDM 5.4.5.1 $ 19.00 LF
Sed.trap,5'high,riprapped spillway berm section ESC-21 SWDM 5.4.5.1 $ 70.00 LF
Seedin , b hand ESC-22 SWDM 5.4.2.4 $ 1.00 SY
Soddin , 1"dee , level round ESC-23 SWDM 5.4.2.5 $ 8.00 SY
Soddin , 1"dee , slo ed round ESC-24 SWDM 5.4.2.5 $ 10.00 SY
TESC Su ervisor ESC-25 $ 110.00 HR 1 90 9900
Water truck,dust control ESC-26 SWDM 5.4.7 $ 140.00 HR
WRITE-IN-ITEMS """"' see a e 9
Each
ESC SUBTOTAL: $ 26,610.00
30%CONTINGENCY&MOBILIZATION: $ 7,983.00
ESC TOTAL: $ 34,593.00
COLUMN: A
Page 2 of 9
Unit prices updated: 3/2/2015
Version: 3/2/2015
King County SI Bond Quantiry Wsksht.xls Report Date: 6/14/2016
Site Improvement Bond Quantity Worksheet Webdate 04/03/2015
Existing Future Public Private
Rightof-Way Right of Way Improvements
&Draina e Facilities
Unit Price Unit Quant. Cost Quant. Cost Quant. Cost
GENERAL ITEMS No.
Backfill&Com action-embankment GI- 1 $ 6.00 CY
Backfill 8 Com action-trench GI-2 $ 9.00 CY
Clear/Remove Brush,b hand GI-3 $ 1.00 SY
Clearin /Grubbin /Tree Removal GI-4 $10,000.00 Acre 0.09 900.00 0.28 2,800.00 2.52 25,200.00
Excavation-bulk GI-5 $ 2.00 CY 1645 3,290.00 4071 8,142.00
Excavation-Trench GI-6 $ 5.00 CY 155 775.00 600 3,000.00
Fencin ,cedar,6'hi h GI-7 $ 20.00 LF
Fencin ,chain link,vin I coated, 6'hi h GI-8 $ 20.00 LF 400 8,000 00
Fencin ,chain link, ate,vin I coated, 2 GI-9 $ 1,400.00 Each 1 1,400.00
Fencin ,s lit rail, 3'hi h GI-10 $ 15.00 LF
Fill 8 com act-common barrow GI-11 $ 25.00 CY 6580 164,500.00
Fill&com act- ravel base GI-12 $ 27.00 CY
Fill&com act-screened to soil GI-13 $ 39.00 CY
Gabion, 12"dee ,stone filled mesh GI-14 $ 65.00 SY
Gabion, 18"dee ,stone filled mesh GI-15 $ 90.00 SY
Gabion,36"dee ,stone filled mesh GI-16 $ 150.00 SY
Gradin ,fine,b hand GI-17 $ 2.50 SY
Gradin ,fine,with rader GI-18 $ 2.00 SY
Monuments,3'lon GI-19 $ 250.00 Each 1 250.00 2 500.00
Sensitive Areas Si n GI-20 $ 7.00 Each 9 63.00
Soddin , 1"dee ,slo d round GI-21 $ 8.00 SY
Surve in ,line& rade GI-22 $ 850.00 Da 2 1,700.00
Surve in ,lot location/lines GI-23 $ 1,800.00 Acre 3 5,400.00
Traffic control crew 2 fla ers GI-24 $ 120.00 HR
Trail,4"chi d wood GI-25 $ 8.00 SY
Trail,4"crushed cinder GI-26 $ 9.00 SY
Trail,4"to course GI-27 $ 12.00 SY
Wall, retainin ,concrete GI-28 $ 55.00 SF
Wall,rocker GI-29 $ 15.00 SF 300 4,500.00
Page 3 of 9 SUBTOTAL 1,150.00 6,865 00 222,405 00
Unit prices updated: 03/02/2015
•KCC 27A authonzes only one bond reducGon. Version: 03/02/2015
King County SI Bond Quantity Wsksht.xls Report Date:6/14/2016
Site Improvement Bond Quantity Worksheet Webdate 04/03/2015
Existing Future Public Private
Rightoi-way Right of Way Improvements
&Draina e Facilities
Unit Price Unit Quant. Cost Quant. Cost Quant. Cost
ROADIMPROVEMENT No.
AC Grindin ,4'wide machine<1000s RI-1 $ 30.00 SY
AC Grindin ,4'wide machine 1000-200 RI-2 $ 16.00 SY
AC Grindin ,4'wide machine>2000s RI-3 $ 10.00 SY
AC Removal/Dis osal RI-4 $ 35.00 SY 805 28,175.00 100 3,500.00
Barricade, III Permanent RI-6 $ 56.00 LF
Curb&Gutter, rolled RI-7 $ 17.00 LF
Curb 8 Gutter,vertical RI-8 $ 12.50 LF 600 7,500.00
Curb and Gutter,demolition and dis osa RI-9 $ 18.00 LF
Curb,extruded as halt RI-10 $ 5.50 LF
Curb,extruded concrete RI-11 $ 7.00 LF 150 1,050.00
Sawcut,as halt, 3"de th RI-12 $ 1.85 LF 700 1,295.00
Sawcut,concrete, er 1"de th RI-13 $ 3.00 LF
Sealant,as haR RI-14 $ 2.00 LF 600 1,200.00 300 600.00
Shoulder,AC, see AC road unit rice RI-15 $ - SY
Shoulder, ravel,4"thick RI-16 $ 15.00 SY
Sidewalk,4"thick RI-17 $ 38.00 SY 315 11,970.00
Sidewalk,4"thick,demolition and dis os RI-18 $ 32.00 SY
Sidewalk,5"thick RI-19 $ 41.00 SY
Sidewalk,5"thick,demolition and dis os RI-20 $ 40.00 SY
Si n,handica RI-21 $ 85.00 Each
Stri in , r stall RI-22 $ 7.00 Each
Stri i� ,thermo lastic, for crosswalk RI-23 $ 3.00 SF
Stri in ,4"reflectorized line RI-24 $ 0 50 LF 600 300.00 250 125.00
Page 4 of 9 SUBTOTAL 30,970.00 24,745.00
Unit prices updated: 03/02/2015
'KCC 27A authorizes only one bond reduction. Version: 03/02/2015
King County SI Bond Quantity Wsksht.xls Report Date:6/14/2016
l ii
Site Improvement Bond Quantity Worksheet Webdate 04/03/2015
Existing Future Public Private
Right-0f-way Right of Way Improvements
8 Draina e Facilities
Unit Price Unit Quant. Cost Quant. Cost Quant. Cost
ROAD SURFACING No. 4"Rock=2.5 base&1.5"to course 9 1/2"Rock=8"base 8 1.5"to course
Additional 2.5"Crushed Surfacin RS- 1 $ 3.60 SY
HMA 1/2"Overla , 1.5" RS-2 $ 14.00 SY
HMA 1/2"Overla 2" RS-3 $ 18.00 SY
HMA Road,2",4"rock, First 2500 SY RS-4 $ 28.00 SY
HMA Road,2",4°rock,Q .over 2500 S RS-5 $ 21.00 SY
HMA Road,3",9 1/2"Rock,First 2500 S RS-6 $ 35.00 SY
HMA Road,3",9 1/2"Rock,�t Over 25 RS-7 $ 42.00 SY
Not Used RS-8
Not Used RS-9
HMA Road,6"De th,First 2500 SY RS-1 $ 33.10 SY 350 11,585.00 650 21,515.00 1200 39,720.00
HMA Road,6"De th,Qt .Over 2500 S RS-11 $ 30.00 SY
HMA 3/4"or 1",4"De th RS-12 $ 20.00 SY
Gravel Road,4"rock,First 2500 SY RS-13 $ 15.00 SY 200 3,000.00
Gravel Road,4"rock,Qt .over 2500 SY RS-14 $ 10.00 SY
PCC Road Add Under Write-Ins w/Desi RS-15
Thidcened Edge RS-17 $ 8.60 LF 350 3,010.00
Page 5 of 9 SUBTOTAL 11,585.00 21,515.00 45,730.00
Unit prices updated: 03/02/2015
"KCC 27A authorizes only one bond reduction. Version: 03/02/2015
King County SI Bond Quantity Wsksht.xls Report Date:6/14/2016
Site Improvement Bond Quantity Worksheet Webdate 04/03I2015
Existing Future Public Private
Rightof-way Right of Way Improvements
8 Draina e Facilities
Unit Price Unit Quant. Cost Quant. Cost Quant. Cost
DRAINAGE (CPP=Corrugated Plastic Pipe,N12 or Equivalent) For Culvert rices, Avera e of 4'cover was assumed.Assume erforated PVC is same rice as solid i e.
Access Road,R/D D-1 $ 21.00 SY 100 2,100.00
Bollards-fixed D-2 $ 240.74 Each
Bollards-removable D-3 $ 452.34 Each
` CBs inGude frame and lid
CB T I D-4 $ 1,500.00 Each 11 16,500.00
CB T e IL D-5 $ 1,750.00 Each
CB T II,48"diameter D-6 $ 2,300.00 Each
for additional de th over 4' D-7 $ 480.00 FT
CB T II,54"diameter D-8 $ 2,500.00 Each 2 5,000.00
for additional de th over 4' D-9 $ 495.00 FT 11 5,445.00
CB T II,60"diameter D-10 $ 2,800.00 Each
for additional de th over 4' D-11 $ 600.00 FT
CB T II,72"diameter D-12 $ 3,600.00 Each ,
for additional de th over 4' D-13 $ 850.00 FT I
Throu h-curb Inlet Framework Add D-14 $ 400.00 Each 1 400.00 li�
Cleanout,PVC,4" D-15 $ 150.00 Each
Cleanout, PVC,6" D-16 $ 170.00 Each 16 2,720.00
Cleanout, PVC,8" D-17 $ 200.00 Each
Culvert, PVC,4" D-18 $ 10.00 LF
Culvert, PVC,6" D-19 $ 13.00 LF
Culvert, PVC, 8" D-20 $ 15.00 LF
Culvert, PVC, 12" D-21 $ 23.00 LF
Culvert,CMP,8" D-22 $ 19.00 LF
Culvert,CMP, 12" D-23 $ 29.00 LF
CulveR,CMP, 15" D-24 $ 35.00 LF
Culvert,CMP, 18" D-25 $ 41.00 LF
Culvert,CMP,24" D-26 $ 56.00 LF
Culvert,CMP, 30" D-27 $ 78.00 LF
Culvert,CMP, 36" D-28 $ 130.00 LF
Culvert,CMP,48" D-29 $ 190.00 LF
Culvert,CMP,60" D-30 $ 270.00 LF
Culvert,CMP,72" D-31 $ 350.00 LF
Page 6 of 9 SUBTOTAL 32,165 00
Unit prices updated: 03/02/2015
'KCC 27A authorizes only one bond reduction Version: 03/02/2015
King County SI Bond Quantity Wsksht.xls Report Date:6/14/2016
�
Site Improvement Bond Quantity Worksheet Webdate 04/03/2015
Existing Future Pubiic Private
Rightof-way Right of Way Improvements
DRAINAGE CONTINUED 8�Drainage Facilities
No. Unit Price Unit �uant. Cost Quant. Cost Quant. Cost
Culvert,Concrete,8" D-32 $ 25.00 LF
Culvert,Concrete, 12" D-33 $ 36.00 lF
Culvert,Concrete, 15" D-34 $ 42.00 LF
Culvert,Concrete, 18" D-35 $ 48.00 LF
Culvert,Concrete,24" D-36 $ 78.00 LF
Culvert,Concrete,30" D-37 $ 125.00 LF
Culvert,Concrete, 36" D-38 $ 150.00 LF
Culvert,Concrete,42" D-39 $ 175.00 LF
Culvert,Concrete,48" D-40 $ 205.00 LF
Culvert,CPP,6" D-41 $ 14.00 LF
CulveR,CPP,8" D-42 $ 16.00 LF
Culvert,CPP, 12" D-43 $ 24.00 LF 1554 37296
Culvert,CPP, 15" D-44 $ 35.00 LF
Culvert,CPP,18" D-45 $ 41.00 LF
Culvert,CPP,24" D-46 $ 56.00 LF
Culvert,CPP,30" D-47 $ 78.00 LF
Culvert,CPP,36" D-48 $ 130.00 LF
Ditchin D-49 $ 9.50 CY
Flow Dis ersal Trench 1,436 base+ D-50 $ 28.00 LF 50 2836
French Drain 3'de th D-51 $ 26.00 LF
Geotextile, laid in trench, ol ro lene D-52 $ 3.00 SY
Mid-tank Access Riser,48"dia, 6'dee D-54 $ 2,000.00 Each
Pond Overflow S illwa D-55 $ 16.00 SY 16 256
Restrictor/Oil Se arator, 12" D-56 $ 1,150.00 Each
Restrictor/Oil Se arator, 15" D-57 $ 1,350.00 Each
Restrictor/Oil Se arator, 18" D-58 $ 1,700.00 Each
Ri ra , laced D-59 $ 42.00 CY 10 420
Tank End Reducer 36"diameter D-60 $ 1,200.00 Each
Trash Rack, 12" D-61 $ 350.00 Each 2 700
Trash Rack, 15" D-62 $ 410.00 Each
Trash Rack, 18" D-63 $ 480.00 Each
Trash Rack,21" D-64 $ 550.00 Each
Page 7 of 9 SUBTOTAL 41508
Unit prices updated: 03/02/2015
'KCC 27A authorizes only one bond reduction. Version: 03/02/2015
King County SI Bond Quantity Wsksht xls Report Date: 6/14/2016
Site Improvement Bond Quantity Worksheet Webdate 04/03I2015
Existing Future Public Private
Rightof-way Right of Way Improvements
8 Dreina e Facflitfes
Unit Price Unit Quant. Price Quant. Cost Quant. Cost
PARKING LOT SURFACING Not To Be Used For Roads Or Shoulders
�'!2�
2"AC,2"to course rock&4"borrow PL-1 $ 21.00 SY NA NA
2"AC, 1.5" to course&2.5"base cour PL-2 $ 28.00 SY NA NA
4"select borrow PL-3 $ 5.00 SY NA NA
1.5"to course rock 8 2.5"base course PL-4 $ 14.00 SY NA NA
TILITY P LES TREET LIGHTING Utilit ole relocation costs must be accom anied b Franchise Utilit 's Cost Estimate
Utilit Pole s Relocation UP-1 Lum Sum �
Street Li ht Poles w/Luminaires UP-2 Each �
WRITE-IN-ITEM
Such as detention/water ualit vaults. �
West Vault WI- 1 ######### EA 1 150,000.00
Stormfilter WI-2 $23,000.00 EA 1 23,000.00
WI-3 CY
WI-4 LF
WI-5 FT
WI-6
WI-7
WI-8
WI-9
wi-io
SUBTOTAL 173,000.00
SUBTOTAL(SUM ALL PAGES): 43,705.00 299,798.00 268,135.00
30%CONTINGENCY 8 MOBILIZATION: 13,111.50 89,939.40 80,440.50
GRANDTOTAL: 56,816.50 389,737.40 348,575.50
COLUMN: B C D
Page 8 of 9
Unit prices updated: 03/02/2015
'KCC 27A authorizes only one bond reduction. Version: 03/02/2015
King County SI Bond Quantity Wsksht.xls Report Date:6/14/2016
� __
Site Improvement Bond Quantity Worksheet Webdate 04/03/2015
Original bond computations prepared by:
Name: Date:
PE Registration Number: Tel.#:
Firm Name:
Address: Project No:
FINANCIAL GUARANTEE REQUIREMENTS
PERFORMANCE BOND' MINIMUM BOND'AMOUNT pUBLIC ROAD&DRAINAGE
AMOUNT REQUIRED FOR RECORDING OR MAINTENANCE/DEFECT BOND'
TEMPORARY OCCUPANCY AT
Stabilization/Erosion Sediment Control (ESC) (A) $ 34,593.0 SUBSTANTIAL COMPLETION•"
Existing Right-of-Way Improvements (B) $ 56,816.5
Future Public Right of Way&Drainage Facilities (C) $ 389,737.4
Private Improvements (D) $ 348,575.5
Calculated Quantity Completed 'I
Total Right-of Way and/or Site Restoration Bond"/'" (A+B) $ 91,409.5
(First$7,500 of bond'shall be cash.
Performance Bond'Amount (A+g+C+D) = TOTAL (T) $ 829,722.4 T x 0.30 $ 248,916.7
Minimum is$2000 Minimum is$2000.
(B+C)x
Maintenance/Defect Bond*Total 0.25= $ 111,638.5
Minimum is$2000.
NAME OF PERSON PREPARING BOND'REDUCTION: Date:
'NOTE: The word"bond"as used in this document means a financial guarantee acceptable to King County.
"NOTE: KCC 27A authorizes right of way and site restoration bonds to be combined when both are required.
The restoration requirement shall inGude the total cost for all TESC as a minimum,not a maximum. In addition,corrective work,both on-and off-site needs to be included.
Quantities shall reflect worse case scenarios notjust minimum requirements. For example,if a salmonid stream may be damaged,some estimated costs for restoration
needs to be reflected in this amount. The 30%contingency and mobilization costs are computed in this quantity.
•'•NOTE: per KCC 27A,total bond amounts remaining after reduction shall not be less than 30%of the original amount(T)or as revised by major design changes.
REQUIRED BOND'AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY KING COUNTY
Page 9 of 9 Unit prices updated: 03/02/2015
Check out the DDES Web site at www.kinpcountv.aov/permits Version: 03/02/2015 �
King Counry SI Bond Quantity Wsksht.xls Report Date: 6/14/2016 �
i ��
SECTION 10
OPERATIONS AND MAINTENANCE MANUAL
M
Weston Heights
Technical Information Report
Operations and Maintenance Manual
PERFORATED PIPE CONNECTION
Rooflfooting drain lines, including perforated pipe connections shall be kept open and clean. If the pipes
appear to be clogged, they should be cleaned by high pressure flushing with water or flexible sewer rods.
In cases where roots effectively block the drainage, the use of herbicides may be indicated. Whatever
method of cleaning is used, consideration for erosion and sediment control is needed.
DISPERSION TRENCH
Perforated pipes in dispersion trenches shall be kept open and clean. If the pipes appear to be clogged,
they should be cleaned by high pressure flushing with water or flexible sewer rods. In cases where roots
effectively block the drainage,the use of herbicides may be indicated. Whatever method of cleaning is
used, consideration for erosion and sediment control is needed. The top of the dispersion trench should
be kept free of leaves, debris, soil, moss, and other sources of c�ogging. If the surFace or drain-rock
becomes clogged, it should be excavated and replaced.
The following pages are selections from Appendix A of the 2009 King County Stormwater Design Manual,
applicable to this project:
Weston Heights
Technical Information Report �
APPE�IDIX A hiAIVTENAVCE REQUIRE'�tE:�iTS FLOW CONTROL,COVVEYANCE,AND WQ FACILITIES
N0. 1 - DETENTION PONDS
Maintenance Defect or Problem Conditions When Maintenance Is Needed Results Expected When
Component Maintenance Is Pertormed
Site Trash and debris Any trash and debris which exceed 1 cubic foot Trash and debns Geared from site.
per 1,000 square feet(this is about equal to the
amount of trash it would take to fill up one
standard size o�ce garbage can). In general,
there should be no visual evidence of dumping.
Noxious weeds Any noxious or nuisance vegetation which may Noxious and nuisance vegetation
constitute a hazard to County personnel or the removed according to applicable
public. regulations. No danger of noxious
vegetation where County personnel
or the public might normally be.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil,gasoline,concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if '�
appropriate. No contaminants ',
present other than a surface oil film. I
Grass/groundcover Grass or groundcover exceeds 18 inches in Grass or groundcover mowed to a I I
height. height no greater than 6 inches. �
Top or Side Slopes Rodent holes Any evidence of rodent holes rf facility is acting Rodents removed or destroyed and I
of Dam,Berm or as a dam or berm,or any evidence of water dam or berm repaired. '
Embankment piping through dam or berm via rodent holes.
Tree growth Tree growth threatens integrity of slopes,dces Trees do not hinder facility
not allow maintenance access,or interferes with perfortnance or maintenance
maintenance activity. If trees are not a threat or activities.
not interfering with access or maintenance,they
do not need to be removed.
Erosion Eroded damage over 2 inches deep where cause Slopes stabilized using appropriate
of damage is still present or where there is erosion conVol measures. If erosion
potential for continued erosion. Any erosion is occurring on compacted slope,a
observed on a compacted slope. licensed civil engineer should be
consulted to resolve source of
erosion.
Settlement Any part of a dam,berm or embankment that has Top or side slope restored to design
settled 4 inches lower than the design elevation. dimensions. If settlement is
significant,a licensed avil engineer
should be consulted to determine
the cause of the settlement.
Storage Area Sediment Accumulated sediment that exceeds 10%of the Sediment deaned out to designed
accumulation designed pond depth. pond shape and depth;pond
reseeded if necessary to control
erosion.
Liner damaged Liner is visible or pond does not hold water as Liner repaired or replaced.
(tf Applicable) designed.
Inlet/Outlet Pipe. Sediment Sediment filling 20%or more of the pipe. InleUoutlet pipes Gear of sediment.
accumulation
Trash and debris Trash and debris accumulated in inleUoutlet No trash or debris in pipes.
pipes(includes floatables and non-floatables).
Damaged Crecks wider than Yrinch at the joint of the No cracks more than Y.-inch wide at
inleUoutlet pipes or any evidence of soil entering the joint of the inleUoutlet pipe.
at the joints of the inleUoutlet pipes.
Emergency Tree growth Tree growth impedes flow or threatens stability of Trees removed.
Overflow/Spillway spillway.
Rock missing Only one layer of rock exists above native soil in Spillway restored to design
area five square feet or larger or any exposure of standards.
native soil on the spillway.
Ii9;2009 2009 SurYace lVater Design Manual Appendix A
A-Z
' APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOVV CONTROL,CONVEYANCE,AND��4'Q FACILITIES
NO. 3- DETENTION TANKS AND VAULTS
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Pertormed
Site Trash and debris Any trash and debris which exceed 1 cubic foot Trash and debns Geared from site. '
per 1,000 square feet(this is about equal to the
amount of trash it would take to fill up one
standard size office garbage can). In general,
there should be no visual evidence of dumping.
Noxious weeds Any noxious or nuisance vegetation which may Noxious and nuisance vegetation
constitute a hazard to County personnel or the removed according to applicable
public. regulations. No danger of noxious
vegetation where County personnel
or the public might normally be.
Contaminants and Any evidence of contaminants or poluGon such Materials removed and disposed of
pollution as oil,gasoline,concrete slurries or paint. according to applicable regulations.
� Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
� Grass/groundcover Grass or groundcover exceeds 18 inches in Grass or groundcover mowed to a
' height. height no greater than 6 inches.
Tank or Vault Trash and debris Any trash and debris accumulated in vault or tank No trash or debris in vault.
Storage Area (includes floatables and non-floatables).
Sediment Accumulated sediment depth exceeds 10%of the All sediment removed from storage '
accumulation diameter of the storage area for YZ length of area. I
storage vault or any point depth exceeds 15%of �i
diametec Example:72-inch staage tank would i
', require cleaning when sediment reaches depth of I
7 inches for more than Yz IengUi of tank.
Tank Structure Plugged air vent Any blockage of the vent. Tank or vault freely vents.
Tank bent out of Any part of tank/pipe is bent out of shape more Tank repaired or replaced to design. I
shape than 10%of its design shape.
Gaps between A gap wider than Yrinch at the joint of any tank No water or soil entering tank
sections,damaged sections or any evidence of soil partides entenng through jants or walls.
' f joints or cracks or the tank at a joint or through a walL
tears in wall
Vauk Structure Damage to wall, Cracks wider than Yrinch,any evidence of soil Vault is sealed and structurally I!�
frame,bottom,andlor entering the structure through cracks or qualified sound. ,
itop slab inspecbon personnel determines that the vault is
not structurally sound.
InIeUOuUet Pipes Sediment Sediment filling 20%or more of the pipe. InleVoutlet pipes clear of sediment.
j accumulation
ITrash and debris Trash and debris accumulated in inleUouUet No trash or debris in pipes. �
pipes(includes floatables and non-floatables).
Damaged Cracks wider than Yrinch at the joint of the No cracks more than Y.-inch wide at
inleUoutlet pipes or any evidence of soil entering the joint of the inleVoutlet pipe.
at the joints of the inleUoutlet pipes.
�00)Surface Water Desien Nfazival-Appendix A 1 9 2009
A-5
APPENDIX A 'viAINTENANCE REQLTIREMENTS FLOW CONTROL,CO'.�IVEYANCE.AND WQ FACILITIES
NO. 3-DETENTION TANKS AND VAULTS
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Access Manhole Coverllid not in place CoverAid is missing or only partially in place. Manhole access covered.
Any open manhole requires immediate
maintenance.
Locking mechanism Mechanism cannot be opened by one Mechanism opens with proper tools.
not working maintenance person with proper tools. Bolts
cannot be seated. Self-locking coverAid does not
work.
CoverAid difficult to One maintenance person cannot remove Coverflid can be removed and
remove coverflid after applying 80 Ibs of lift. reinstalled by one maintenance
person.
Ladder rungs unsafe Missing rungs,misalignment,rust,or aacks. Ladder meets design standards.
Allows maintenance person safe
access.
Large access Damaged or difficult Large access doors or plates cannot be Replace or repair access door so it
doors/plate to open openedfremoved using normal equipment. can opened as designed.
Gaps,doesn't cover Large access doors not flat and/or access Doas close flat and covers access
completely opening not completely covered. opening completely.
Lifting Rings missing, Lifting rings not capable of lifting weight of door Lifting rings sufficient to lift or
rusted or plate. remove door or plate.
U9�2009 2009 Surface Water Desien'�lanual Appendix A
:a-c
APPE'.VDIX A MAINTENAVCE REQL?IREMENTS FOR FLOW COVTROL.CONVEYAI�CE.A�ID��'Q FACILITIES
NO. 4-CONTROL STRUCTURE/FLOW RESTRICTOR
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Pertormed
Structure Trash and debris Trash or debris of more than Yz cubic foot which No Trash or debris blocking or
is located immediately in front of the structure potentially blocking entrance to
opening or is blocking capacity of the structure by structure.
more than 10%.
Trash or debris in the structure that exceeds'/3 No trash or debris in the structure.
the depth from the bottom of basin to invert the
lowest pipe into or out of the basin.
Deposits of garbage exceeding 1 cubic foot in No condition present which would
vdume. attract or support the breeding of
insects or rodents.
Sediment Sediment exceeds 60%of the depth from the Sump of structure contains no
bottom of the structure to the invert of the lowest sediment.
pipe into or out of the structure or the bottom of
the FROP-T section or is within 6 inches of the
invert of the lowest pipe into or out of the
structure or the bottom of the FROP-T section.
Damage to frame Corner of frame extends more than'/.inch past Frame is even with curb.
andlor top slab curb face into the street(If applicable).
Top slab has holes larger than 2 square inches or Top slab is free of holes and cracks.
cracks wider than Y.inch.
Frame not sitting flush on top slab,i.e., Frame is sitting flush on top slab.
separetion of more than'/.inch of the frame from
the top slab.
Cracks in walls or Crecks wider than Y:inch and longer than 3 feet, Structure is sealed and structurally
bottom any evidence of soil partides entering structure sound.
through cracks,or maintenance person judges
that structure is unsound.
Cracks wider than Yz inch and longer than 1 foot No cracks more than'!,inch wide at
at the joint of any inleUoutlet pipe or any evidence the joint of inleUoutlet pipe.
of soil particles entering strudure through cracks.
Settlement/ SVucture has settled more than 1 inch or has Basin replaced or repaired to design
misalignment rotated more than 2 inches out of alignment. standards.
Damaged pipe joints Cracks wider than Yrinch at the joint of the No crecks more than Y.-inch wide at
inleUoutlet pipes or any evidence of soil entering the joint of inleVoutlet pipes.
the structure at the joint of the inleUoutlet pipes.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as al,gasoline,concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Ladder rungs missing Ladder is unsafe due to missing rungs, Ladder meets design standards and
or unsafe misalignment,rust,cxacks,or sharp edges. allows maintenance person safe
access.
FROP-T Section Damage T section is not securely attached to sVucture T section securely attached to wall
wall and outlet pipe structure should support at and outlet pipe.
least 1,000 Ibs of up or down pressure.
SVucture is not in upright position(allow up to Structure in correct posi6on.
10%from plumb).
Connections to outlet pipe are not watertight or Connections to outlet pipe are water
show signs of deteriorated grout. tight;structure repaired or replaced
and works as designed.
Any holes--other tt�an designed holes—in the Structure has no holes other than
structure. designed holes.
Cleanout Gate Damaged or missing Cleanout gate is missing. Replace cleanout gate.
20(19 Surface��later Design'�9anual Appendix A Ir'9�2009
A-7
j
APPENDIX A MAINTENA'.VCE REQUIREMEVTS FLOW COVTROL,CONVEYAVCE,AND WQ FACILITIES
NO. 4-CONTROL STRUCTURE/FLOW RESTRICTOR
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
' Component Maintenance is Pertormed
Cleanout gate is not watertight. Gate is watertight and works as
designed.
Gate cannot be moved up and down by one Gate moves up and down easily and
maintenance person. is watertight.
Chainlrod leading to gate is missing or damaged. Chain is in place and works as
designed.
Orfice Plate Damaged or missing Control device is not working properly due to Plate is in place and works as
missing,out of place,or bent or�ce plate. designed.
Obstructions Any tresh,debris,sediment,or vegetation Plate is free of all obstructions and
blodcing the plate. works as designed.
Overilow Pipe Obstructions Any trash or debris blocking(or having the Pipe is free of all obstructions and
potential of blocking)the overflow pipe. works as designed.
Deformed or damaged Lip of overflow pipe is bent or deformed. Ovefiow pipe does not albw ,
lip overflow at an elevation lower tfian
design
InIeUOutlet Pipe Sediment Sediment filling 20%or more of the pipe. InleUoutlet pipes clear of sediment.
accumulation
Trash and debris Trash and debris accumulated in inleUoutlet No trash or debris in pipes.
pipes(includes floatables and non-floatables).
� Damaged Cracks wider than YZ-inch at the joint of the No cracks more than Y.-inch wide at
inleVoutlet pipes or any evidence of soil entering the joint of the inleUoutlet pipe.
at the joints of the inleUoutlet pipes.
Metal Grates Unsafe grate opening Grate with opening wider than'/B inch. Grate opening meets design
(If Applicable) standards.
Trash and debris Trash and debris that is blocking more than 20% Grate free of trash and debris.
of grate surface. footnote to guidelines for disposal
Damaged or missing Grate missing or broken member(s)of the grate. Grate is in place and meets design
standards.
Manhole Cover/Lid CoverAid not in place Covedlid is missing or only partially in place. Cover/lid protects opening to
Any open structure requires urgent structure.
maintenance.
Locking mechanism Mechanism cannot be opened by one Mechanism opens with proper tools.
Not Working maintenance person with proper tools.Bolts
cannot be seated. Self-locking coverllid does not
work.
Cover/lid difficult to One maintenance person cannot remove Cover/lid can be removed and
Remove coverAid after applying 80 Ibs.of lift. reinstalled by one maintenance
person.
1i9;2009 ?009 Surtace R'arer Desien�'Ianual AFP������•�
A-8
APPEVDIX A 'vIAINTENAVCE REQUIREMENTS FOR FLOW CONTROL.CONVEYANCE.AND WQ FACILITIES
NO. 5-CATCH BASINS AND MANHOLES
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Structure Sediment Sediment exceeds 60%of the depth from the Sump of catch basin contains no
bottom of the catch basin to the invert of the sediment.
lowest pipe into or out of the catch basin or is
within 6 inches of the invert of the lowest pipe
into or out of the catch basin.
Trash and debris Trash or debris of more than'/z cubic foot which No Trash or debris blocking or
is located immediately in front of the catch basin potentially blxking entrance to
opening or is blocking capacity of the qtch basin catch basin.
by more than 10%.
Trash or debris in the catch basin that exceeds No Vash or debris in the catch basin.
'/3 the depth from the bottom of basin to invert the
lowest pipe into or out of the basin.
Dead animals or vegetation that could generate No dead animals or vegetation
odors that could cause complaints or dangerous present within catch basin.
gases(e.g.,methane).
Deposits of garbage exceeding 1 cubic foot in No condition present which would
vdume. attract or support the breeding of
insects or rodents.
Damage to frame Corner of trame extends more than'/.inch past Freme is even with curb.
and/or top slab curb face into the street(If applicable).
Top slab has holes larger than 2 square inches or Top slab is free of holes and cracks.
cracks wider than Y.inch.
Frame not sitting flush on top slab,i.e., Frame is sitting flush on top slab.
separetion of more than'/.inch of the frame from
the top slab.
� Cracks in walls or Cracks wider than Y:inch and longer than 3 feet, Catch basin is sealed and
bottom any evidence of sal partides entering catch structurally sound.
basin through cracks,or maintenance person
judges that catch basin is unsound.
Cracks wider than Yz inch and longer than 1 foot No cracks more than'/a inch wide at
at the joint of any inleUoutlet pipe or any evidence the joint of inleVoutlet pipe.
of soil particles entering catch basin through
cradcs.
SettlemenU Catch basin has settled more than 1 inch or has Basin replaced or repaired to design
misalignment rotated more than 2 inches out of alignment. standards.
Damaged pipe joints Cracks wider than'/rinch at the joint of the No cracks more than Y,-inch wide at
inleUoutlet pipes or any evidence of soil entering the joint of inleUoutlet pipes.
the catch basin at the joint of the inleVoutlet
pipes.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as al,gasoline,concrete slurries or paint. according to applicable regulations.
Source contrd BMPs implemented ff
appropriate. No contaminants
present other than a surface oil film.
InIeUOutlet Pipe Sediment Sediment filling 20%or more of the pipe. InleUoutlet pipes clear of sediment.
accumulation
Trash and debris Tresh and debris accumulated in inleUoutlet No trash or debris in pipes.
pipes(includes floatables and non-floatables).
Damaged Crecks wider than Y:-inch at the joint of the No crecks more than Y.-inch wide at
inleUoutlet pipes or any evidence of soil entering the joint of the inleVoutlet pipe.
at the joints of the inlet/outlet pipes.
2009 Surface Water Design Manual-Appendix A 1 9?009
A-9
APPENDIX A A4AI?�ITENA�ICE REQL'IREMEVTS FLOW CONTROL,CONVEI'A�ICE.AVD WQ FACILITIES
NO. 5-CATCH BASINS AND MANHOLES
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Metal Grates Unsafe grate opening Grate with opening wider than'!8 inch. Grate opening meets design
(Catch Basins) standards.
Trash and debris Trash and debris that is blocking more than 20% Grate free of trash and debris.
of grate surface. footnote to guidelines for disposal
Damaged or missing Grate missing or broken member(s)of the grate. Grate is in place and meets design
Any open structure requires urgent standards.
maintenance.
� Manhole Cover/Lid Cover/lid not in place Cover/lid is missing or only partially in place. Cover/lid protects opening to
Any open structure requires urgent structure.
maintenance.
Locking mechanism Mechanism cannot be opened by one Mechanism opens with proper tools.
Not Working maintenance person with proper tools.Bolts
cannot be seated. Self-locking cover/lid does not
work.
CoverAid difficult to One maintenance person cannot remove CoverAid can be removed and
Remove cover/lid after applying 80 Ibs.of lift. reinstalled by one maintenance
person.
�
1-9-2009 2009 Surface Vb'ater Desieu Manual-Appe��dix A
A-10
APPENDIX A AtAIVTENANCE REQUIREVIENTS FOR FLOW CONTROL,CONVEYANCE,AND Vb'Q FACILITIES
NO. 6-CONVEYANCE PIPES AND DITCHES
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Pipes Sediment&debris Accumulated sediment or debris that exceeds Water flows freely through pipes.
accumulation 20%of the diameter of the pipe.
Vegetation/roots VegeWtionlroots that reduce free movement of Water flows ireely through pipes.
water through pipes.
Contaminants and Any evidence of contaminants or polution such Materials removed and disposed of
pollution as al.gasdine,concrete slurries or paint. according to applicable regulations.
Source contrd BMPs implemented ff
appropriate. No contaminants
present other than a surface oil film.
Damage to protective Protective coating is damaged;rust or corrosion Pipe repaired or replaced.
coating or corrosion is weakening the structural integrity of any part of
pipe.
Damaged Any dent that decreases the cross section area of Pipe repaired or replaced.
pipe by more than 20%or is determined to have
weakened structural integrity of the pipe.
Ditches Trash arx!debris Tresh and debris exceeds 1 cubic foot per 1,000 Trash and detxis cleared from
square feet of ditch and slopes. ditches. �
Sediment Accumulated sediment that exceeds 20%of the Ditch cleaned/flushed of all sediment
accumulation design depth. and debris so that it matches design.
Noxious weeds My noxious or nuisance vegetation which may Noxious and nuisance vegetation
constitute a hazard to County personnel or the removed according to applicable
public. regulations. No danger of noxious
vegetation where County personnel
or the public might nortnally be.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil,gasdine,concrete slurries or paint. according to applicable regulations.
Source contrd BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Vegetation Vegetation that reduces free movement of water Water flows freely through ditches.
through ditches.
Erosion damage to Any erosion observed on a ditch slope. Slopes are not eroding.
slopes
Rock lining out of One layer or less of rock exists above native soil Replace rocks to design standards.
place or missing(If area 5 square feet or more,any exposed native
Applicable) soil.
2009 Surface Water Design Manual-Appendix A 1!9;2009
A-11
APPENDIX A MA[VTE�IAVCE REQl1IREMENTS FOR FLO\�'COVTROL.COI�VEYA:VCE.A\D Vl'Q FACILITIES
NO. 8-ENERGY DISSIPATERS
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Pertormed.
Site Trash and debris Trash andlor debris accumulatan. Dissipater clear of trash and/or
debris.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil,gasoline,concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented ff
appropriate. No contaminants
present other than a surface oil film.
Rock Pad Missing or moved Only one layer of rock exists above native soil in Rock pad prevents erosion.
Rock area five square feet or larger or any exposure of
native soil.
Dispersion Trench Pipe plugged with Accumulated sediment that exceeds 20%of the Pipe cleaned/flushed so that it
sediment design depth. matches design.
Not discharging water Visual evidence of water discharging at Water discharges from feature by
properly concenVated pants along trench(nortnal sheet flow.
condition is a"sheet flow"of water along Vench).
Perforations plugged. Over 1/4 of perforations in pipe are plugged with Perforations freely discharge flow.
debris or sediment.
Water flows out top of Water flows out of distributor catch basin during No flow discharges from distributor
"distributo�'catch any stortn less than the design stortn. catch basin.
basin.
Receiving area over- Water in receiving area is causing or has No danger of landslides.
saturated potential of causing landslide problems.
Gabions Damaged mesh Mesh of gabion broken,twisted or deformed so Mesh is intact,no rock missing.
structure is weakened or rock may fall out.
Corrosion Gabion mesh shows corrosion through more than All gabion mesh capable of
Y.of its gage. containing rock and retaining
designed form.
Collapsed or Gabion basket shape deformed due to any All gabion baskets intact,structure
deformed baskets cause. stands as designed.
Missing rock Any rock missing that could cause gabion to No rock missing. ��
loose structural integrity. I
Manhole/Chamber Worn or damaged Structure dissipating flow deteriorates to Yz or Structure is in no danger of failing. I
post,baffles or side of original size or any concentrated wom spot II
chamber exceeding one square foot which would make
structure unsound.
Damage to wall, Cracks wider than'/rinch or any evidence of soil Manhole/chamber is sealed and
entering the structure through cracks,or
frame,bottom,and/or structurally sound.
top slab maintenance inspection personnel determines
that the sUucture is not sVucturelly sound.
Damaged pipe joints Cracks wider than Yrinch at the joint of the No soil or water enters and no water �
inleUoutlet pipes or any evidence of soil entering discharges at the joint of inleUoutlet
the structure at the jarrt of the inleVoutlet pipes. pipes.
�
2009 Surtace V'�'ater Design Manual-Appendi�A 1!9�2009
A-13
APPENDIX A MAINTEVANCE REQUIREMENTS FLOW CONTROL,CONVEYANCE.AND WQ FACILITIES
NO. 9- FENCING
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Pertormed
Site Erosion or holes Erosion or holes more than 4 inches high and 12- No access under the fence.
under fence 18 inches wide permitting access through an
opening under a fence.
Wood Posts,Boards Missing or damaged Missing or broken boards,post out of plumb by No gaps on fence due to missing or
and Cross Members parts more than 6 inches or cross members broken broken boards,post plumb to within
1'/z inches,cross members sound.
Weakened by rotting Any part showing structural deteriora6on due to All paRs of fence are strudurally
or insects rotting or insect damage sound.
Damaged or failed Conaete or metal attachments deteriorated or Post foundation capable of
post foundation unable to support posts. supporting posts even in strong
wind.
Metal Posts,Rails Damaged parts Post out of plumb more than 6 inches. Post plumb to within 1 Yz inches.
and Fabric
Top rails bent more than 6 inches. Top rail free of bends greater than
1 inch.
Any part of fence(including post,top rails,and Fence is aligned and meets design
fabric)more than 1 foot out of design alignment. standards.
Missing or loose tension wire. Tension wire in place and holding
fatxic.
Deteriorated paint or Part or parts tfiat have a rusting or scaling Structurally adequate posts or parts
protective coating condition that has affected structural adequacy. with a unrform protective coating.
Openings in fabric Openings in fabric are such that an&inch Fabric mesh openings within 50°/a of
diameter ball could fit through. grid size.
1:9�'2009 2009 Surface Water Design Manual—Appendix A �
A-14
APPENDIX A MAINTENANCE REQUIREVtENTS FOR FLOW CONTROL,CO'�IVEY.4_VCE,AND WQ FACILITIES
N0. 10-GATES/BOLLARDS/ACCESS BARRIERS
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Chain Link Fencing Damaged or missing Missing gate. Gates in place.
Gate members
Broken or missing hinges such that gate cannot Hinges intact and lubed.Gate is
be easily opened and closed by a maintenance working freely.
person.
Gate is out of plumb more than 6 inches and Gate is aligned and vertical.
more than 1 foot out of design alignment.
Missing stretcher bar,stretcher bands,and ties. Stretcher bar,bands,and ties in
place.
Locking mechanism Locking device missing.no-functioning or does Locking mechanism prevents
does not lock gate not link to all parts. opening of gate.
Openings in fabric Openings in fabric are such that an 8-inch Fabric mesh openings within 50%of
diameter ball could fit through. grid size.
Bar Gate Damaged or missing Cross bar does not swing open or closed,is Cross bar swings fully open and
cross bar missing or is bent to where it does not prevent closed and prevents vehicle access.
vehiGe access.
Locking mechanism Locking device missing,no-functioning or does Locking mechanism prevents
does not lock gate not link to all parts. opening of gate.
Support post Support post dces not hold cross bar up. Cross bar held up preventing vehide
damaged access into facility.
Bollards Damaged or missing Bollard broken,missing,does not fit into support No access for motorized vehides to
hde or hinge broken or missing. get into facility.
Dces not lock Locking assembly or lock missing or cannot be No access for motorized vehides to
attached to lock bollard in place. get into facility.
Boulders Dislodged Boulders not located to prevent motorized vehicle No access for motorized vehicles to
access. get into facility.
Circumvented Motorized vehicles going around or between No access for motorized vehicles to
boulders. get into facility.
; I
i
i _.
�
�
2009 Surface��l'ater Design�4anual Appe�dix A l�9;2009
A-l5
APPENDIX A MAI>TTENANCE REQLTIREMENTS FLOW CONTROL.CONVEYA'VCE,AND VVQ FACILITIES
N0. 11 -GROUNDS (LANDSCAPING)
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Site Trash or litter Any trash and debris which exceed 1 cubic foot Trash and debris deared from site.
per 1,000 square feet(this is about equal to the
amount of trash it would take to fill up one
standard size office garbage can). In general,
there should be no visual evidence of dumping.
Noxious weeds Any noxious or nuisance vegetation which may Noxious and nuisance vegetation
constitute a hazard to County personnel or the removed according to applicable
public. regulations. No danger of noxious
vegetation where County personnel
or the public might normally be.
Contaminants and Any evidence of contaminants or pollubon such Materials removed and disposed of
pollution as oil,gasoline,concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented iF
appropriate. No contaminants
present other than a surtace oil film.
Grass/groundcover Grass or groundcover exceeds 18 inches in Grass or groundcover mowed to a
height. height no greater than 6 inches.
Trees and Shrubs Hazard Any tree or limb of a tree identified as having a No hazard trees in facility.
potential to fall and cause property damage or
threaten human life. A hazard tree identified by
a qualified arborist must be removed as soon
as possible.
Damaged Limbs or parts of trees or shrubs that are split or Trees and shrubs with less than 5°/a
broken which affect more than 25%of the total of total foliage with split or broken
foliage of the tree or shrub. limbs.
Trees or shrubs that have been blown down or No blown down vegetation or
knocked over. knocked over vegetation. Trees or
shrubs free of injury.
Trees or shrubs which are not adequately Tree or shrub in place and
suppoRed or are leaning over,causing exposure adequatety supported;dead or
of the roots. diseased trees removed. I
�
1,9;2009 2009 Surface Water Design Manual—Appendis A
A-16
APPENDIX A ?v1AINTENANCE REQUIRE'.vIENTS FOR FLOW CONTROL,CO�I�'EYANCE,AND Vb'Q FACILITIES
N0. 12-ACCESS ROADS
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Site Trash and debris Trash and debris exceeds 1 cubic foot per 1,000 Roadway drivable by maintenance
square feet(i.e.,trash and debris would fill up vehicles.
one standards size garbage can).
Debris which could damage vehicle tires or Roadway drivable by maintenance
prohibit use of road. vehicles.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil,gasoline,concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented rf
appropriate. No contaminants
present other than a surface oil film.
Blocked roadway Any obstruction which reduces clearance above Roadway overhead clear to 14 feet
road surface to less than 14 feet. high.
Any obstruction restricting the access to a 10-to At least 12-foot of width on access
12 foot width for a distance of more than 12 feet road.
or any point restricting access to less than a 10
foot widih.
Road Surtace Erosion,settlement, Any surface defect which hinders or prevents Road drivable by maintenance
potholes,soft spots, maintenance access. vehicles.
ruts
Vegetation on road Trees or other vegetation prevent access to Maintenance vehicles can access
surface facility by maintenance vehides. facility.
Shoulders and Erosion Erosion within 1 foot of the roadway more than 8 Shoulder free of erosion and
Ditches inches wide and 6 inches deep. matching the surrounding road.
Weeds and brush Weeds and brush exceed 18 inches in height or Weeds and brush cut to 2 inches in
hinder maintenance access. height or cleared in such a way as to
allow maintenance access.
Modular Grid Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
Pavement pollution as oil,gasoline,concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Damaged or missing Access surtace compacted because of broken on Access road surface restored so
missing modular block. road infilVates.
�
I
�- , ,
�� ,�
- - i
�, �
I__ � �
�
i
i ` �
I
I
2009 Surface Water Desien Manual—Appendix A 1,9,'2009 I
A-17
APPEI�DIX.4 hfAIVTEVANCE REQLiIRE�4EN"r5 FOR FLOVI'CO�ITR()L.COI��'E�',A_'�I('E.A�1D�'VQ FAC'll_CI�IES
N0. 17-WENAULT
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Site Trash and debris Trash and debris accumulated on facility site. Trash and debris removed from
facility site.
Treatment Area Trash and debris Any tresh and debris accumulated in vault No trash or debris in vault.
(includes floatables and non-floatables).
Sediment Sediment accumulation in vault bottom exceeds No sediment in vault.
accumulation the depth of the sediment zone plus 6 inches.
Contaminants and My evidence of contaminants or pollution such Materials removed and disposed of
pollution as al,gasdine,concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Vault Structure Damage to wall, Cracks wider than Yrinch,any evidence of soil Vault is sealed and structurally
frame,bottom,andlor entering the structure through cracks,vault dces sound.
top slab not retain water or qual�ed inspecUon personnel
determines that the vault is not structurally
sound.
Baffles damaged Baffles corroding,cracking,warping and/or Repair or replace baffles or walls to
showing signs of failure or baffle cannot be specifications.
removed.
Ventilation Ventilation area blocked or plugged. No reduction of ventilation area
exists.
InIeUOutlet Pipe Sediment Sediment filling 20%or more of the pipe. InleVoutlet pipes clear of sediment.
accumulation
Trash and debris Trash and debris accumulated in inleUoutlet No trash or debris in pipes.
pipes(inGudes floatables and non-floatables).
Damaged Cracks wider than Yrinch at the joint of the No cracks more than Y.-inch wide at
inleUoutlet pipes or any evidence of soil entering the joint of the inleVoutlet pipe.
at the joints of the inleUoutlet pipes.
Gravity Drain Inoperable valve Valve will not open and close. Valve opens and closes normally.
Valve won't seal Valve does not seal completely. Valve completely seals clased.
Access Manhole Access cover/lid Access cover/lid cannot be easily opened by one Access cover/lid can be opened by �'
damaged or diflicult to person. Corrosion/deformation of coverllid. one person.
open
Locking mechanism Mechanism cannot be opened by one Mechanism opens with proper tools.
not working maintenance person with proper tools. Bolts
cannot be seated. Self-locking cover/lid does not
work.
CoverAid difficult to One maintenance person cannot remove Coverllid can be removed and
remove coverllid after applying 80 Ibs of lift. reinstalled by one maintenance
person.
Access doors/plate Large access doors not flat and/or access Doors close flat and covers access
has gaps,dcesn't opening not completely covered. opening completely.
cover completely
Lifting Rings missing, Lifting rings not capable of lifting weight of door Lifting rings sufficient to lift or
rusted or plate. remove door or plate.
Ladder rungs unsafe Missing rungs,misalignment,rust,or aacks. Ladder meets design standards.
Allows maintenance person safe
access.
�
2009 Sircface�l'ater De�ign�9:u�ua1-Appendix.'� 1:9:2009
A-��
APPEVDIX A MAINTENANCE REQUIRE:4fENTS FLOW CONTROL,CONVEY.ANCE.A�1D�,l-'Q FACILITIES
NO. 21 -STORMFILTER(CARTRIDGE TYPE)
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Site Trash and debris Any Vash or debris which impairs the function of Trash and debris removed from
the facility. facility.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as als,gasoline,concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
! Life cycle System has not been inspected for three years. Facility is re-inspected and any
needed maintenance performed.
Vault Treatment Sediment on vault Greater than 2 inches of sediment. Vault is free of sediment.
Area floor
Sediment on top of Greater than Yz inch of sediment. Vault is free of sediment.
cartridges
Multiple scum lines Thick or multiple scum lines above top of Cause of plugging corrected,
above top of cartridges. Probably due to plugged canisters or canisters replaced if necessary.
cartridges underdrain manifold.
Vault Structure Damage to wall, Cracks wider than Yrinch and any evidence of Vault replaced or repaired to design
Frame, Bottom,and/or soil particles entering the structure through the specifications.
Top Slab cradcs,or qualrfied inspection personnel ,
determines the vault is not structurally sound.
Baffles damaged Baffles corroding,cracking warping,and/or Repair or replace baffles to
showing signs of failure as determined by specfication.
maintenance/inspection person.
Filter Media Standing water in 9 inches or greater of static water in the vault for No standing water in vault 24 hours
vault more than 24 hours fdlowing a rain event andlor after a rain event
overflow occurs frequently. Probably due to
� plugged fifter media,underdrain or outlet pipe.
Short circuiting Flows do not properly enter filter cartridges. Flows go through filter media.
Underdrains and SedimenUdebris Underdrains or clean-outs partially plugged or Underdrains and Gean-outs free of
Clean-0uts filled with sediment and/or debris. sediment and debris.
InIeVOutlet Pipe Sediment Sediment filling 20%or more of the pipe. InleVoutiet pipes Gear of sediment.
accumulation
Trash and debris Trash and debris accumulated in inleUoutlet No trash or debris in pipes.
pipes(includes floatables and non-floatables).
Damaged Cracks wider than'/2-inch at the joint of the No cracks more than Y.-inch wide at
inleUoutlet pipes or any evidence of soil entering the joint of the inleUoutlet pipe.
at the joints of the inleUoutlet pipes.
Access Manhole CoverAid not in place Cover/lid is missing or only partially in place. Manhole access covered.
My open manhole requires immediate
maintenance.
Locking mechanism Mechanism cannot be opened by one Mechanism opens with proper tools.
not working maintenance person with proper tools.Bolts
cannot be seated. Self-locking coverAid dces not
work.
CoveNlid drfficult to One maintenance person cannot remove Coverllid can be removed and
remove coverllid after applying 80 Ibs of lift. reinstalled by one maintenance
person.
Ladder rungs unsafe Missing rungs,misalignment,rust,or aacks. Ladder meets design standards.
Allows maintenance person safe
access.
Large access Damaged or difficult Large access doors or plates cannot be Replace or repair access door so it
doors/plate to open opened/removed using normal equipment. can opened as designed.
119;2009 2009 Surtace�y'ater Design'�4anual :'lppendix A
.a-:o
APPENDIX A bfAIVTENANCE RI�:(1UIRED4E'.�]TS FOR FLO\�'CUYIROL COI�VE�'AI�CE.AND Vb'(1 FACILI CIES
NO. 21 -STORMFILTER(CARTRIDGE TYPE)
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Gaps,doesn't cover Large access doors not flat and/or access Doors close flat and cover access
completely opening not completely covered. opening completely.
Lifting Rings missing, Lifting rings not capable of lifting weight of door Lifting rings sufflcient to lift or
rusted or plate. remove door or plate.
2009 Surface Water Design�lanual Appendix A 1:9 2009
A-3 I