HomeMy WebLinkAboutRC 20160829000109 � �
20160829�00109
CITY OF RENTON COV 79.00
PAGE-001 OF 007
08/29/2016 09:49
KING COUNTY, WA
_.��������l �
RECORDING REQUESTED BY AND
WHEN RECORDED MAIL TO:
CITY CLERK'S OFFICE
CITY OF RENTON
1055 SOUTH GRADY WAY
RENTON. WA 98057
DECLARATION OF COVENANT
FOR MAINTENANCE AND INSPECTION OF FLOW CONTROL BMPS
Grantor: Renton Park Avenue, LLC
Grantee: City of Renton
Legal Description:�r°�,/�/C���-- ��""G-��f'" l�3� �/���.d�i l�'f�!���>�7*G'�
Exhibit C �����,f f,� � _.
�D��n./ lSj v;si�n.J� /• >�"� c-:r�i�l�'�
Additional Legal(s)on:
Assessor's T�Parcel ID#: 334210-3281 & 334210-3282
IN CONSIDERATION of the approved City of Renton(check one of the following) ❑ residential
building permit, ❑ commercial building permit, ❑ clearing and grading permit, ❑ subdivision permit, or
�l short subdivision permit for Application File No.LUA/SWP LUA-14-001272 relating to the
real property("Property")described above,the Grantor(s),the owner(s)in fee of that Property,hereby
f
covenants(covenant)with City or Renton,a political subdivision of the state of Washington,that
he/she(they)will observe,consent to,and abide by the conditions and obligations set forth and described
in Paragraphs l through 8 below with regard to the Property. Grantor(s)hereby grants(grant),
covenants(covenant),and agees(agree)as follows:
1. Grantor(s)or his/her(their)successors in interest and assigns("Owners")shall retain, uphold,
and protect the stormwater management devices, features,pathways, limits,and restrictions,known as
flow control best management practices("BMPs"),shown on the approved Flow Control BMP Site Plan
for the Properly attached hereto and incorporated herein as Exhibit A.
2. The Owners shall at their own cost,operate,maintain,and keep in good repair,the Property's
BMPs as described in the approved Design and Maintenance Details for each BMP attached hereto and
incorporated herein as Exhibit B.
3. City or Renton shall provide at least 30 days written notice to the Owners that entry on the
Property is planned for the inspection of the BMPs. After the 30 days,the Owners shall allow the City of
Renton to enter for the sole purpose of inspecting the BMPs. In lieu of inspection by the City,the
Owners may elect to engage a licensed civil engineer registered in the state of Washington who has
expertise in drainage to inspect the BMPs and provide a written report describing their condition. If the
engineer option is chosen,the Owners shall provide written notice to the City of Renton within fifteen
days of receiving the City's notice of inspection. Within 30 days of giving this notice,the Owners,or the
engineer on behalf of the Owners,shall provide the engineer's report to the City of Renton. If the report
is not provided in a timely manner as specified above,the City of Renton may inspect the BMPs without
further notice.
4. If the City determines from its inspection,or from an engineer's report provided in accardance
with Paragraph 3,that maintenance,repair,restoration,and/or mitigation work is required for the BMPs,
The City shall notify the Owners of the specific maintenance,repair,restoration,and/or mitigation work
(Work)required under RMC 4-6-030. The City shall also set a reasonable deadline for completing the
Work or providing an engineer's report that verifies completion of the Work. After the deadline has
4 �
passed,the Owners shall allow the City access to re-inspect the BMPs unless an engineer's report has
been provided verifying completion of the Work. If the work is not completed properly within the time
frame set by the City,the City may initiate an enforcement action. Failure to properly maintain the BMPs
is a violation of RMC 4-6-030 and may subject the Owners to enforcement under the RMC 1-3, including
fines and penalties.
5. Apart from performing routine landscape maintenance,the Owners are hereby required to
obtain written approval from the City or Renton before performing any alterations or modifications to the
BMPs.
6. Any notice or approval required to be given by one party to the other under the provisions of
this Declaration of Covenant shall be effective upon personal delivery to the other party, or after three(3)
days from the date that the notice or approval is mailed with delivery confirmation to the current address
on record with each Parly. The parties shall notify each other of any change to their addresses.
7. This Declaration of Covenant is intended to promote the efficient and effective management of
surface water drainage on the Property, and it shall inure to the benefit of all the citizens of the City of
Renton and its successors and assigns. This Declaration of Covenant sha11 run with the land and be
binding upon Grantor(s),and Grantor's(s')successors in interest and assigns.
8. This Declaration of Covenant may be terminated by execution of a written agreement by the
Owners and the City of Renton that is recorded by King County in its real property records.
IN WIT`NESS WHEREOF, this Declaration of Covenant for the Maintenance and Inspection of
Flow Control BMPs is executed this �' day of �(, k s�' ,20�.
GIZANTOR,owner of the Property
��a�� �-
GRANTOR,owner of the Property
STATE OF WASHINGTON )
COUNTY OF KING )ss.
On this day personally appeared before me:
�.Q�, ��.�.'�L ,to me known to be the individual(s)described in
and who executed the within and foregoing instrument and acknowledged that they signed the same as
their free and voluntary act and deed,for the uses and purposes therein stated.
Given under my hand and official seal this �`�'� day of_��, Q� ,20 I C� .
� —
� ���
LINDA R.WHITE -. L„�.,�,, �X,,,�,�.�,
NOTARY PUBIIC = printed name
' STATE OF WASH�NGTON ° Notary Public in and for the State of Washington,
COMNNSSION EXP�RES - residing at
JUNE 7, 2018 '
�An,•���p��
,� -� �
My appointment expires �'�� ��t
EXHIBIT A
Flow Control BMP Site p�an
FROM DRY WELLS IN RFAR
YARD TO COLLECT 0/W tlF HOUSE TO C(ILLECI:,
(1YP�CAL) /RUNOFF FROM NEW HOUSE (TYPICAL)
I _ � ....�N p..... _ .. �T
15'O� ♦ .OI� I I
� �� �uS� O: 0 ,�� JyF, / f
_ '� �'� �p I
,� : _� ' ....... O,
''� � ° � ...... j J� � I
,
. .._ ..
, : _ .- .
,�......... � � :.:. � �
i�.�� � � ........ �— �
� ��s�� i � :....... ��
_� . �� � ,
�
� � ,,���,�, � d I I �
e :
�, ° :. .or��. ; �
- I
� ............... � �
��'I � I
� e o�� � I
. � � S� � i �
."�e �°a
...........
ry \��� � i �
� �,o� �S�' e • . - I I �
1 I e � � � 1 �
e . 1..��..;..............: �
--------------=
� � e �° s� i �
� �;eee � � o�' � � I
---_------. -� �......� , .
.e..a..... ..i'..................... , .
� :... . .... I i i .
, < ; ° ;I \'�j I
I OV�'� �,��� � �y� O�
� , � �.° o�s� I i �
� . o �
.. .. -.....: e...... I � `
�
\ : � i �
_� NORTH 28th SINEET
EXHIBfT B
FULL INFILTRAT#ON MAINTENANCE IN5TRUCTIONS
Your property contains a stormwater management flaw control BMP (best management practice} called
"full infiltratian," which was installed to mitigate the starmwater quantity and quality impacts of some
or all of the impervious surfaces an your property. Ful! infiltration is a method of taking runof# from
impervious area (such as paved areas and roofs} inta the ground. !f properly installed and maintained,
full infiltratian can manage runo#f so that a majarity of precipitation even#s are absorbed. Infiltration
devices, such as gravel filled trenches, drywells, and ground surface depressions, facilitate this process
by putting runoff in direct contact with the soil and holding the runoff long enough to soak most of it
inta the ground. To be successful, the soil condition araund the infiltration device must be reliably able
to soak water into the graund far a reasonable number af years.
Infiltration Devices
The infiltration devices used on your property include the fallowing as indicated on the flow control
BMP site plan: � I gravel filled trenches, Pi drywells, ' I ground surface depressions. The size, placement,
and compasition of these devices as depicted by the flow control BMP site plan and design details must
be maintained and may not be changed without written approval from the City of Renton.
Infiltration devices must be inspected annually and after majar storm events to identify and repair any
physical defects. Maintenance and aperation of the system should focus on ensuring the system's
viability by preventing sediment-laden flows from entering the device. Excessive sedimentation wiil
result in a plugged or non-functioning facility. If the infiltration device has a catch basin, sediment
accumulation must be removed on a yearly basis or more frequently if necessary. Prolonged ponding
around or atop a device may indicate a plugged facility. if the device becames plugged, it must be
repiaced. Keeping the areas that drain to infiltration devices weil swept and clean wiil enhance the
langevity of these devices. For roafs, frequent cleaning of gutters will reduce sediment loads to these
devices.
EXHiBiT C
LEGA�DE5CRIPTION
Parce1334218-3282
7he North 3Q4 feet of Lot 43,Niliman's�.ake Washington Garden of Eden Division number 1,Eess the
south 40 feet of the west 14Q feet,according ta the plat thereof,recorded in Volume 11 of Plats,page
63,in King County,State of Washingtan.
Parcel 334210-3281
Tract 43:except narth 100 fee#and except west 158 feet of sou#h 65 feet of north 165 feet,Hiltman's
Lake Washingtan Garden of Eden Division number i,according to the plat thereof,recorded in
Votume 11 of Plats,page 63,in King County,5ta#e of Washington.