Loading...
HomeMy WebLinkAboutR-3894120 to L0 Ln O m O U a W Q W /_ Z a: C) O �C)N Lo Z IIr N WU_X Z Z U) ZOa CCMJ W �4< WM� r m m rn n o m �o� o J zz :D � Q OF Q E_ a >a o U N }o 0 0 w Z Z Y O 0_ v) (n a D- a- rn 00 \\ w W �� o X 0 0 I •• E. w z Ln p w z u_ WATER PLAN GENERAL NOTES Standard Plan No. 300 1. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE CITY OF RENTON PUBLIC WORKS STANDARD SPECIFICATIONS AND SPECIAL PROVISIONS AND WSDOT / APWA STANDARD SPECIFICATIONS, LATEST EDITION AS AMENDED BY THE CITY OF RENTON. A SET OF CITY APPROVED PLANS SHALL BE KEPT AT THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. A PRE -CONSTRUCTION CONFERENCE SHALL BE HELD PRIOR TO THE START OF CONSTRUCTION. THE CONTRACTOR AND OR DEVELOPER SHALL BE RESPONSIBLE FOR SECURING ALL NECESSARY PERMITS PRIOR TO CONSTRUCTION. 2. ALL EXISTING UTILITIES SHALL REMAIN IN SERVICE DURING CONSTRUCTION UNLESS OTHERWISE NOTED. THE CONTRACTOR SHALL CALL 1-800-424-5555 TO VERIFY UTILITY LOCATIONS BEFORE BEGINNING EXCAVATION. 3. ALL MATERIALS USED FOR THE CONSTRUCTION OF WATER SYSTEM IMPROVEMENTS SHALL BE NEW AND UNDAMAGED, AND "CATALOG CUTS" FOR ALL MATERIALS SHALL BE APPROVED IN WRITING BY THE CITY OF RENTON PRIOR TO BRINGING ANY MATERIALS ON -SITE. 4. ALL WATER MAIN PI PE PE MATERIALS SHALL BE CEMENT LINED DUCTILE IRON PIPE, THICKNESS CLASS 52 PER AWWA C 151 AND C 104. PIPE JOINTS SHALL BE PUSH -ON OR MECHANICAL JOINT. CAST IRON OR DUCTILE IRON PIPE FITTINGS SHALL BE CLASS 250 AS PER ANSI/AWWA C110/A21.10-82. ALL DUCTILE IRON PIPE AND FITTINGS SHALL BE WRAPPED WITH 8-MIL BLACK, TUBE -TYPE, POLYETHYLENE PLASTIC PER AWWA C105 STANDARDS. 5. MINIMUM COVER FROM TOP OF WATER MAINS TO FINISHED GRADE SHALL BE 36 INCHES FOR PIPE DIAMETER OF 104NCH OR LESS AND 48 INCHES FOR PIPE DIAMETER OF 12-INCH AND LARGER. MAXIMUM COVER FOR ALL WATER MAINS SHALL BE 60 INCHES. ANY DEVIATIONS MUST BE APPROVED BY THE CITY OF RENTON PRIOR TO CONSTRUCTION. WHERE UTILITY CONFLICTS OCCUR, THE PROFILE OF THE WATER MAIN SHALL BE ADJUSTED AS NECESSARY TO CLEAR CONFLICTS AND TO PROVIDE MINIMUM COVER. PIPE DEFLECTION SHALL NOT EXCEED ONE-HALF OF PIPE MANUFACTURER'S SPECIFICATION FOR SIZE OF PIPE USED. ALL TRENCH BACKFILL SHALL BE COMPACTED TO 95 PERCENT MAXIMUM DRY DENSITY AS DETERMINED BY THE MODIFIED PROCTOR TEST METHOD (MDD) IN ROADWAYS, ROADWAY SHOULDERS, ROADWAY PRISM AND DRIVEWAYS, AND 85 PERCENT MDD IN UNPAVED AREAS. ALL PIPE ZONE COMPACTION SHALL BE 95 MDD. 6. CONCRETE BLOCKING FOR WATER MAINS SHALL BE DESIGNED, INSTALLED AND POURED IN PLACE IN ACCORDANCE WITH CITY OF RENTON STANDARD DETAILS AND SPECIFICATIONS AND SHALL BE INSTALLED AT ALL VERTICAL AND HORIZONTAL BENDS, FITTINGS AND BASE OF HYDRANTS. MEGA -LUGS (OR SIMILAR PRODUCT) MAYBE REQUIRED ON ALL MECHANICAL JOINTS IN ADDITION TO CONCRETE BLOCKING. 7. ALL NEW WATER MAIN PIPES AND FITTINGS SHALL HAVE A FOAM PIPE PIG RUN THROUGH THEM PRIOR TO BEING FLUSHED, DISINFECTED, AND TESTED. CLEANING, PRESSURE AND PURITY TESTING SHALL BE DONE IN THE PRESENCE OF AND UNDER THE SUPERVISION OF A CITY OF RENTON UTILITY INSPECTOR. THE CONTRACTOR SHALL SUPPLY, INSTALL AND REMOVE PLUGS, CORPORATION STOPS, BLOW -OFF ASSEMBLIES, AND THRUST RESTRAINT / BLOCKING FOR TESTING AND PURITY ACCEPTANCE. NO CONNECTION SHALL BE MADE BETWEEN THE NEW MAIN OR BETWEEN THE NEW WET -TAP VALVE TO AN EXISTING MAIN UNTIL THE NEW PIPING HAS BEEN FOAM -PIGGED, DISINFECTED, FLUSHED, AND PASSED BOTH PRESSURE AND PURITY TESTING. 8. NEW WATER MAINS INCLUDING SERVICE LATERALS SHALL BE TESTED AT A STATIC PRESSURE OF 150 PSI ABOVE WORKING PRESSURE WITH A MINIMUM OF 225 PSI TEST PRESSURE FOR 120 MINUTES WITH A MAXIMUM OF 5 PSI PRESSURE DROP DURING THE ENTIRE TEST PERIOD. UPON SATISFACTORY COMPLETION OF THE PRESSURE TEST, THE LINE SHALL BE DISINFECTED, FLUSHED, AND THEN WATER SAMPLES SHALL BE TAKEN FOR PURITY TESTING BY THE PUBLIC WORKS INSPECTOR. 9. THE CONTRACTOR SHALL NOTIFY THE CITY OF RENTON WATER UTILITY AND MAINTENANCE DEPARTMENTS AT LEAST 10 WORKING DAYS PRIOR TO MAKING CONNECTIONS TO THE EXISTING WATER SYSTEM. THE CONTRACTOR SHALL EXPOSE THE EXISTING WATER MAIN AND FITTINGS AT THE CONNECTION POINT BEFORE ORDERING THE NECESSARY ADAPTORS AND FITTINGS REQUIRED FOR THE FINAL CONNECTION. THE CONTRACTOR SHALL EXCAVATE, REMOVE ALL SURFACE MATERIALS, AND PROVIDE SHORING AND ALL MATERIALS REQUIRED FOR THE CITY OF RENTON TO PERFORM THE CONNECTION TO THE EXISTING WATER SYSTEM. THE CONTRACTOR SHALL PROVIDE AND INSTALL BACKFILL, CONCRETE BLOCKING, AND COMPLETE SURFACE RESTORATION. STD. PLAN - 300.0 ®� PUBLIC WORKS WATER PLAN GENERAL. NOTES DEPARTMENT MARCH 2O10 Utility Specifications Water Utility Notes and Specifications THESE NOTES SHALL APPEAR ON PROJECTS FOR THE WATER UTILITY. 1. All work material shall be in conformance with the standards and specifications of the City of Renton Planning/Building/Public Works Department and the latest edition of the WSDOT/APWA Standards and Specifications, as approved and modified by the City of Renton in the Renton Standard Plans & Specifications. A set of approved plans shall be kept on site at all times during construction. 2. The hours of work in the street right of way shall be limited to 8:30 AM to 3:30 PM on weekdays unless otherwise approved in writing by the Public Works Department at (425) 430-7301. The Police Department, Fire Department, and 911 shall be notified 24 hours in advance of any work in the right of way. 3. All locations of existing utilities shown are approximate and it shall be the contractor's responsibility to verify the true and correct location so as to avoid damage or disturbance. For utility locates call 48-hour locators 800-424-5555. 4. An approved Traffic Control Plan is required to be submitted at the Pre -Construction meeting. 5. Datum for Vertical Control shall be North American Vertical Datum 1988 Meters, and for Horizontal Control shall be North American Datum 1983/1991 Meters unless otherwise approved by the City of Renton Public Works Department. Reference benchmark and elevations are noted on the plans. 6. All watermain pipe is to be cement lined ductile iron pipe conforming to AWWA C110 and C111 or latest revision, thickness Class 52. Cement mortar lining and seal coating shall conform to AWWA C104 or latest revision. Pipe joints to be push -on or mechanical joint. Bedding to be Class C. All ductile iron pipe and fittings shall be polyethylene wrapped per ANSI/AWWA C105/A21.5-93 Standards. 7. Cast iron and ductile iron fittings shall be cement lined, pressure rated as noted on plans, and in accordance with ANSI/AWWA C110/A21.10-87. Cement lining shall be in accordance with ANSI/AWWA C104/421/4-90. If fittings are 3 to 12 inches in diameter and have mechanical joints, the fittings shall in accordance with either ANSI/AWWA C110-A21.10-87 or ANSI/AWWA C153/A21.53-94. Three (3) inch to 12 inch diameter fittings, which have mechanical joints and/or flanged joints, shall be in accordance with ANSI/AWWA C110/A21.10,87 or a combination of ANSI/AWWA C110/A21.10.87 and ANSI/AWWA C153/A21.53-94 such that the portion of the fitting with a mechanical joint(s) may be with ANSI/AWWA C153/A21.53-94 and that portion of the fitting with flanged joint(s) shall be in accordance with AWWA C110/A21.10-87. Acceptance testing in accordance with section 53.53 of ANSI/AWWA section 10-4.3 of ANSI/AWWA C110/A21.10-87 shall be obtained by the contractor and transmitted to the owner. 8. Gate valves shall be iron body, bronzed -mounted, double disc with bronze wedging device and 0-ring stuffing box (AWWA C500) or of resilient seated type (AWWA C509). CONSTRUCTION NOTES AND DETAILS RECORD DRAWING Valves shall be designed for a minimum water operating pressure of 200 psi. Gate valves shall be Clow List 14, Mueller Company NO. A2380 or M & H. 9. Fire hydrants shall be Corey type (opening with the pressure) or compression type (opening against pressure) conforming to AWWA C-502-85 with a 6 inch mechanical joint inlet and a main valve opening (M.V.O.) of 5-1/4 inch, two 2-1/2 inch hose nozzles with National Standard Threads 7-1/2 threads per inch and one 4 inch pumper nozzle with the new Seattle Pattern 6 threads per inch, 60 degrees V. Threads: outside diameter of male thread 4.875 and root diameter 4.6263. Hydrants shall have a 1-1/4 inch pentagon operating nut opened by turning counter clockwise (left). 10. The two 2-1/2 inch hose nozzles shall be fitted with cast iron threaded caps with operating nut of the same design and proportions as the hydrant stem nut. Caps shall be fitted with suitable neoprene gaskets for positive water tightness under test pressures. 11. The 4 inch pumper nozzle shall be fitted with a Storz adapter, 4 inch Seattle Thread x 5 inch Storz. Storz adapter shall be forged and/or extruded 6061-T6 aluminum alloy, hardcoat anodized. Threaded end portion shall have no lugs and two set screws 180 degrees apart. Storz face to be metal, no gasket to weather. Storz cap to have synthetic molded rubber gasket, and shall be attached to hydrant adapter with 1/8 inch, coated, stainless steel, aircraft cable. 12. Fire hydrants shall be painted .with two coats of paint. Preservative paint number 43- 655 safety yellow or approved equal. 13. Pumper connection to face roadway assembly. 14. Fire hydrants shall be installed per City of Renton Standard Detail for fire hydrants, latest revision. 15. All watermains 10 inches and smaller to maintain a minimum cover of 36 inches below finish grade. All watermain 12 inches and larger shall be at a minimum of 48 inches below finish grade. Where utility conflicts occur, watermains are to be lowered to clear. 16. All watermains 6 inches and larger in diameter shall be cleaned with pipe cleaning "PIGS" prior to disinfection. The `Poly pigs" shall be Girard Industries Aqua Swab -AS or approved equal, 2 lb/cu. ft. density foam with 90A durometer urethane rubber coating on the rear of "PIG" only. 17. "PIGS" shall be cylinder shaped with bullet nose or square end. The contractor will perform the cleaning operation. 18. All watermains and services shall be pressure tested to a minimum of 200 psi or 150 psi over operating atln e pressure, In accordance p g p with the specifications of the City of Renton and the Washington State Health Department. All pressure testing shall be done in the presence of a representative of the City of Renton. The quantity of water lost from the Standard Plans & Specifications 7-11.3(11). The loss in pressure shall not exceed 5 psi during the 2 hour test period. 19. All watermains and services shall be disinfected by the injection of a 50 ppm (minimum concentration) chlorine/water solution. Dry Calcium Hypochlorite shall NOT be placed in the pipe as laid. Chlorine shall be metered/injected in accordance with Section 7- 11.3(12)E or 7-11.3(12)F of the Standard Specifications referenced above. 20. A pre -construction conference is required prior to any construction. A minimum of five (5) working days notice is required for scheduling. 21. Twenty-four (24) hours notice will be required prior to starting new construction. 22. It shall be the contractor's responsibility to secure all necessary permits prior to starting construction. 23. Installation of corporate stops, water services, lines and meters shall not be done until all service agreements, meter applications, construction permits, and payment of fees have been made to the City of Renton. 24. All connection to existing mains is to be accomplished by the City of Renton, except wet taps, which may be made by approved wet tap contractors with prior approval from the Public Works Department. All necessary excavation and materials are to be supplied by the contractor and be on -site prior to City notifications. 25. Inspection will be accomplished by a representative of the City of Renton. It shall be the contractor's responsibility to notify Development Services twenty four (24) hours in advance of backfilling all construction. The contractor, as well as the engineers, shall keep as -built drawings. 26. Contractor to provide plugs and temporary blow -off assemblies for testing and purity acceptance prior to final tie-in. 27. All joint restraint systems (shackle rods, nuts, bolts, etc.) shall be as manufactured by the Star Manufacturing Company of Columbus Ohio, or equal, approved in writing by the Public Works Department. 28. Asphalt and concrete street paving shall be sawcut to a minimum depth of two (2) inches. Oil mat streets may be spade cut. All surface concrete, pavement, sidewalks, curb, gutters, and driveway approaches shall be sawcut to a minimum depth of two (2) inches or removed to an existing expansion joint. 29. A temporary cold mix asphalt patch shall be placed on the day of initial excavation with a permanent, sealed patch to be placed, to City of Renton policy, within 10 days. Call for subgrade inspection prior to placement of final patch. 30. For City projects such as telemetry conduit, the PVC pipe used shall be All chemical process lines shall be schedule 80 PVC pipe. Schedule 40 in unimproved areas and schedule 80 PVC pipe under improved areas. n v a CAP 'I 22-1/2° BEND TEE 45' BEND 90° BEND THRUST BLOCK BEARING AREA IN SQUARE FEET (SEE NOTES) FOP. HORIZONTAL AND DOWNWARD VERTICAL BENDS SOIL FIRM SILT OR FIP.M SILTY SAND COMPACT SAND COMPACT SAND & GRAVEL 9Q° 45' REND 11 1 4° / 90° 45° BEND 'I1 1 ' /4 90' 45° BEND 11 1/4' FITTING BEND TEE CAP OR PLUG & 22 1/2' BEND TEE CAP OR PLUG & 22 1/2' BEND TEE CAP OR PLUG & 22 1/2° BEND BEND BEND 4" 7.0 4.2 4.2 1,7 2.9 2.1 2.1 1.0 2,2 1.6 1.6 1.0 6" 13.3 9.4 9.4 3.8 6.7 4.7 4.7 1.9 5,0 3.5 3.5 1.4 8" 23.3 16.7 16.7 6.7 11.7 8.4 8.4 3.4 8.8 6.3 6.3 2.5 2" 53.0 7 37.5 7 3 .5 15.0 26.5 18.8 18.8 7.5 20.0 14,0 14.0 5.6 AREAS CALCULATED ON 300 PSI TEST PRESSURE. 3'-O" MIN. COVER FOR WATERMAIN LESS THAN 12". 4'-0" MIN. COVER, FOR WATERMAIN 12" OR GREATER. MAX. HEIGHT OF THRUST BLOCK (FT) = 0.5 x DEPTH OF TRENCH MIN. HEIGHT OF THRUST BLOCK (FT) = Q.D. PIPE + 1.0' TRUST BLOCK BE, ZEA REFERS TO ,CE OF BLOCK MI IN SQUARE FEET NOTES 1. LOCATION AND SIZE OF BLOCKING FOR PIPE LARGER. THAN 12"DIAMETER AND FOR SOIL TYPES DIFFERENT THAN SHOWN SHALL BE DETERMINED BY THE ENGINEER. 2. ALL BLOCKING SHALL BE POURED IN PLACE AGAINST UNDISTURBED NATIVE GROUND. 3. ALL POURED THRUST BLOCKS SHALL BE BACKFILLED AFTER MIN. 1 DAY. PRESSURE TESTING SHALL OCCUR AFTER CONCRETE HAS REACHED NOMINAL COMPRESSIVE STRENGTH. 4. ALL BLOCKING SHALL BE CONCRETE CIE 5 (1-1/2"). 5. BLOCKING AGAINST FITTINGS SHALL BEAR AGAINST THE GREATEST FITTING SURFACE AREA POSSIBLE, BUT SHALL NOT COVER OR ENCLOSE BELL ENDS, JOINT BOLTS OR GLANDS REASONABLE ACCESS TO BOLTS AND GLANDS SHALL BE PROVIDED. CONCRETE BLOCKING FOR STD. PLAN - 330.2 PUBLIC WORKS + . DEPARTMENT HORIZONTAL AND DOWNWARD �,- VERTICAL BENDS MARCH 2O10 IN COMPLIANCE WITH CITY OF RENTON STANDARDS PRECAST CONCRETE VAULT WITH 3 - 3'x 3' HINGED I STE A R N E_ PLATE TE COVERS. DIMENSIONS 5'-8"x 11'-2"x "-2" EQUAL TO UTILITY VAULT OR EQUAL TOUCH READ PIT LID SENSOR - MOUNTED ON STEEL PLATE COVER THROUGH 2" DIA. DRILLED HOLE IN COVER. THE BY-PASS ASSEMBLY SHALL BE INCLUDED AS PART OF THE DETECTOR DOUBLE CHECK VALVE ASSEMBLY. Y. SE 5/8%3/4" SENSUS SRII (TR/PL) METER-� WITH ICE REGISTER. CITY PRIVATE ONE EACH SIDE 4" ADAPTER, FL x SCREWED 4%4%6" BULL HEAD TEE, FL. 6" PIPE FL.x FL, 2'-0" LOWC., z PIPING PIPING TEE (MJ x FL) r 3-2" •' CATE VALVE (FL x MS) ..12-' s'- 8" 18" FOR 70" ASSEMBLY 17 1/2" FOR 8" ASSEMBLY 18 1/2" FOR 6" ASSEMBLY ` 1r- +--iu air rn Nin v 12" ALL AROUND j 2 6 CONCRETE BLOCKING •, •:-..� ,>._ 7,_ ALL DETECTOR DOUBLE CHECK VALVE 10", 8" OR 6" FI P,E, ASSEMBLIES SHALL INCLUDE RESILIENT' SEATED SHUTOFF VALVES AND TEST P A N PIPE WITH COLLAR 18" COCKS. AND APPROVED } FROM P.E. CROSS -CONNECTION CONTROL 10"- 3'-8" LONG ASSEMBLIES PER DEPARTMENT OF 8"- 3'-6" LONG HEALTH LATEST APPROVED LIST. 6"- 4'-0" LONG DOUBLE CHECK VALVE ASSEMBLY INCLUDES TWO RESILIENT SEATED SHUTOFF VALVES. 10", 8", OR 6" FLANGED COUPLING ADAPTER EQUAL TO ROMAC. -_ • 1 `I`l � III Ilr'�- Ili 11SM l' .�11 TOUCH READ PIT LID SENSOR MOUNTED ON STEEL PLATE COVER THROUGH 2" DIA. NOTE: DRILLED HOLE IN COVER. 1, LOCATE VAULT IN PLANTING AREA, NOT IN PAVING. 2. 4" AND LARGER BENDS AND TEES TO BE CAST IRON CEMENT LINED. 18" FOR 10" ASSEMBLY 17 3. TEMPORARY SUPPORT SHALL BE PROVIDED UNDER 1/2" FOR 8" ASSEMBLY '18 VALVES AT THE TIME OF INSTALLATION TO CENTER 1/2" FOR 6" ASSEMBLY -- -- THE PIPE IN VAULT OPENING. AFTER COMPLETE 5/8"x3/4" INVENSYS INSTALLATION REMOVE THE TEMPORARY SUPPORT TP,-PL METER NTH 7'-2" AND INSTALL ADJUSTABLE PIPE SUPPORT. ICE REGISTER 4. INSTALL GALVANIZED LADDER FOR ACCESS. 6" MIN. DRAIN TO DAYLIGHT OR STORM DRAIN SYSTEM WITH 5. AFTER FIELD INSTALLATION, MAIN DDCVA AND CATCH BASIN OR MANHOLE BY-PASS DCVA MUST BE TESTED SATISFACTORILY BY A DEFT. OF HEALTH CERTIFIED BACKFLOW ASSEMBLY TESTER. TEST REPORT TO BE SUBMITTED TO CITY OF RENTON WATER UTILITY ENGINEERING DEPT. PRIOR TO ACTIVATION OF NEW LINE. 4% 2 1/2" FIRE DEPARTMENT DOUBLE CONNECTION FOR STAND PIPE WITH BREAKABLE CAST IRON HOSE CAPS. ONE EACH SIDE EQUAL TO GRINNEL FIG. 1682 WITH HOSE CAPS FIG. 1333. - 6" SWING TYPE GRAVITY OPERATED CHECK. VALVE, FL. EQUAL TO MUEI_I_ER CO. A-2600-6 WITH BALL DRIP VALVE AT BOTTOM INSTALL EPDXY NON -SHRINK GRO UT T TYP. 6" PIPE, FL.x FL. 3'O" LONG 6"& T ASSEMBLY. 6" SHORT m RADIUS 90' BEND FL. 10' ASSEMBLY 90' 8' X6" REDUCING BEND FL. TO BUILDING DEADMAN BLOCK REQUIRED. Z10",8",6" FL x MJ ADAPTOR 10" ASSEMBLY 10"x1O%8"TEE FL. 8" ASSEMBLY 8%8"4" TEE, FL. 6" ASSEMBLY 6'x6"x6' TEE, FL. 10", 8", OR 6" GATE VALVE, FL,x MJ, WITH INDICATOR POST. INDICATOR POST VALVE SAME SIZE AS DOUBLE CHECK VALVE (MUELL.ER CO. OR EQUAL), PAINTED RED. 10", 8", OR 6" DUCTILE IRON CLASS 52 NIPPLE PIPE, CEMENT LINED, LENGTH TO FIT. 3" 36 6" PIPE r FL_ x�SCREN! 2'-6" 3'�2' I 6" 90° BEND FL. - GALVANIZED STEEL LADDER COMPACTED FOUNDATION --/ 6. INSTALL BRASS y," FLARE TEST COCKS WITH Y,," GRAVEL FLARE CAPS. ADJUSTABLE STEEL PIPE SUPPORT, STANCHIONS BOLTED TO FLOOR. END VIEW 6"18" & 10" DOUBLE DETECTOR CHECK STD. PLAN - 360.2 PUBLIC WORKS DEPARTMENT ASSEMBLY WITH STANDPIPE OUTSIDE �N�o• INSTALLATION MARCH 2O10 AS -BUILT "CERTIFY THAT THE INFORMATION SHOWN HEREON WHICH WAS AS -BUILT BY BARGHAUSEN CONSULTING ENGINEERS, AND MAY INCLUDE LOCATIONS, ELEVATIONS, DEPTHS, PIPE SIZES, AND AS -BUILT COMMENTS, ACCURATELY REFLECTS EXISTING FIELD CONDITIONS AS DETERMINED BY ME (ALI SADR) OR UNDER MY DIRECT SUPERVISION ON THIS DATE: 07-26-2019." SIGNATURE: ( �^ 01 U C/ I CITY OF RENTON COMMUNITY AND ECONOMIC DEVELOPMENT Pot AA�R RENTON HOTEL PERMIT #U15008433 �V 0 ti� m >>�►,�, . 2 CONSTRUCTION NOTES AND DETAILS z ENGINEER: MARRIOTT RESIDENCE INN BARGHAUSEN CONSULTING ENGINEERS n / \ o = 2466O DESIGNED AS 1 18215 72ND AVENUE SOUTH .y , DATE 09/14/2015 FILE NO. � KENT, WA 98032 sG j� �� ° �' DRAWN MB ss/0NAL F(425)251-6222 `TANG ENG�N��� CHECKED AS SCALE N/A FIELD BOOK PAGE_ (425)251-8782 FAX 07/26/2019 CONTACT: DAN BALMELLI APPROVED C13 20 DIRECTOR of PUBLIC WORKS SHEET OF I I U 1n DD 00 m 0 N W CID 0 I I Ln Ln O J GO 0 N I z O 0 co co In Ln i U) 0 0 0 i L.� In L0 O Z m O 7 W U m