Loading...
HomeMy WebLinkAboutAdmin Report EXECUTIVE DEPARTMENT M E M O R A N D U M DATE: August 19, 2019 TO: Don Persson, Council President Members of Renton City Council FROM: Denis Law, Mayor Robert Harrison, Chief Administrative Officer SUBJECT: Administrative Report  The King County Solid Waste Division is accepting public comments on the scope of the Environmental Impact Statement for the Cedar Hills Regional Landfill 2020 site development plan until August 26. The public is invited to comment on the range of issues to study in the Environmental Impact Statement that will evaluate the proposed development alternatives for maximizing the capacity at the Cedar Hills Regional Landfill in unincorporated King County, near Maple Valley. To submit comments online, visit the King County Solid Waste Division website at https://kingcounty.gov/depts/dnrp/solid-waste/facilities/landfills/cedar-hills- development.aspx, or mail comments to King County Solid Waste Division at 201 South Jackson Street, Suite 701, Seattle, WA 98104; Attn: Molly Paterson, Project Manager.  Thursday, August 29, 8:00 a.m. to 3:00 p.m. Puget Sound Energy will temporarily shut off power to homes and businesses located within the vicinity of NE 21st Street to replace a utility pole. The planned power outage is anticipated to last up to 6 hours. During this time there will likely be noise from trucks and heavy equipment. Signs and flaggers will be onsite to guide vehicles and pedestrians through the work zone. Upon completion of the work, electrical service will be restored automatically. For more information, visit www.pse.com/plannedoutages or contact Project Manager Vince Rabon at 425-457-4955 or via email at vincent.rabon@pse.com and reference project number 101112200.  Information about preventative street maintenance, traffic impact projects, and road closures happening this week can be found at http://rentonwa.gov/traffic. Preventative street maintenance, traffic impact projects, and road closures will be at the following locations:  Monday, August 19 through Friday, August 23. Road closure on South 14th Street between Smithers Avenue South and Davis Avenue South for utility construction. Questions may be directed to Patrick DeCaro at 425-207-6013. Don Persson, Council President Members of Renton City Council Page 2 of 2 August 19, 2019  Monday, August 19 through Friday, August 23. The northbound inside lane of Oakesdale Avenue SW at SW 7th Street will be closed for concrete repair work. The lane is expected to reopen Monday, August 26.  Monday, August 19 through Friday, August 23, 8:30 a.m. to 3:30 p.m. and Saturday, August 24, 9:00 a.m. to 3:30 p.m. Single lane closures on Talbot Road South in the vicinity of Valley Medical Hospital related to the construction of the new Medical Office Building, with trucks entering and existing the hospital. Questions may be directed to Tom Main at 206-999-1833.  Monday, August 19 through Friday, August 23. Full street closure of South 23rd Street immediately east of Talbot Road South to Morris Avenue South for a period of up to four weeks in order to allow the abatement of potential hazards and repair of the sinkhole from an abandoned coal mine located under the right- of-way. Access will remain open to homes on Morris Avenue South. Questions may be directed to Tom Main at 206-999-1833.  Monday, August 19 through Friday, August 23, 7:00 a.m. to 5:00 p.m. Intermittent lane closures on Renton Avenue South from Taylor Avenue South to South 130th Street at multiple locations, and a full-time lane shift for approximately 200 feet in the southbound lane of Renton Avenue South between Taylor Avenue South and South 130th Street for utility and roadway construction. Any questions about this work can be directed to Michelle Faltaous at 425-430-7301 or Todd Freih at 206-999-1832.  Monday, August 19 through Friday, August 23, 7:00 a.m. to 10:00 p.m. South 130th Street will be closed west of Renton Avenue for utility work. Any questions about this work can be directed to Michelle Faltaous at 425-430-7301 or Todd Freih at 206-999-1832.  Monday, August 19 through Wednesday, January 1, 2020. Intermittent single and double lane closures along Logan Avenue North between North 6th Street and near Garden Avenue North in support of the King County Eastside Sewer Interceptor Rehabilitation project. Questions may be directed to Brad Stocco at 425-282-2373 or Justin Johnson at 425-430-7291.  Monday, August 19 through Wednesday, January 1, 2020. Full road closure on Burnett Avenue North at North 6th Street in support of the King County Eastside Sewer Interceptor Rehabilitation project. Resolution 4378 has been approved by City Council for the roadway closure of Burnett Avenue North. Questions may be directed to Brad Stocco at 425-282-2373 or Justin Johnson at 425-430-7291.