HomeMy WebLinkAboutNOA_Notice_of_Application_2019_Docket_14_Group_B_190820DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE (DNS)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) –
Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: August 20, 2019
PROJECT NAME/NUMBER: PR19-000002 2019 DOCKET 14, GROUP B /
LUA19-000184
PROJECT LOCATION: City-Wide
APPLICANT/PROJECT CONTACT PERSON: Chip Vincent / 1055 S Grady Way, Renton,
WA 98057 / cvincent@rentonwa.gov
LOCATION WHERE APPLICATION MAY BE
REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also http://bit.ly/2ZdCuSR
PROJECT DESCRIPTION: Docket 14 Group B includes docket items #156, 161, 163, 167 as described below:
D-156 – Outdoor Storage: Permit bulk storage in all three (3) industrial zones (Light, Medium and Heavy) subject to
certain conditions, such as separation distances from residential buildings and residential use. D-161 – Design District
for Assisted Living: Assign Design District B to new assisted living facilities and convalescent centers when located in a
residential zone. Design District B is also assigned to the Residential Multi-Family zone. D-162 – Impact Fee Credit:
Establish a time limit for the amount of time a building can be vacant for an new user to utilize as a credit the fees paid
by the previous use of the building. Staff recommends five years. D-163 – Conditional Use Permit Criteria: Amend code
to provide specific decisional criteria in the Conditional Use Permit code section when commercial and industrial zone
development standards allow for height increases or additional residential density with Conditional Use Permit approval.
D-167 – Commercial and Oversized Parking: Institute new standards to not allow commercial vehicles greater than
10,000 pounds to park on residential lots, except with a Temporary Use Permit. However, no semi -trucks will be
permitted. Recreational vehicles shall be parked in a garage or carport, side or rear yard with minimum five feet distance
to the property line, or in a driveway perpendicular to the street and minimum five feet distance to the side property
line. If parked in side or rear yard broadside to the right of way, the vehicle must be screened.
DATE OF APPLICATION: August 15, 2019
NOTICE OF COMPLETE APPLICATION: August 20, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that
significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the
RCW 43.21C.110, the City of Renton is using the Optional DNS process to give no tice that a DNS is likely to be issued.
Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no
comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only
opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance
of the DNS.
PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review
OTHER PERMITS WHICH MAY BE REQUIRED: None
REQUESTED STUDIES: None
PUBLIC HEARING: None
CONSISTENCY OVERVIEW:
Environmental Documents that Evaluate
the Proposed Project:
Environmental (SEPA) Checklist
Development Regulations Used For
Project Mitigation:
The project will be subject to the City’s SEPA ordinance, and other
applicable codes and regulations as appropriate.
Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.
Comments on the above application must be submitted in writing to Angie Mathias, Long Range Planning Manager;
CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on September 3, 2019. If you have
questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact
the Project Manager. Anyone who submits written comments will automatically become a party of record and will be
notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.
CONTACT PERSON: Angie Mathias, Long Range Planning Manager; Tel: (425) 430-6576; Email:
amathias@rentonwa.gov
NOTICE