HomeMy WebLinkAboutMFP19004304DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP19004304
IVR Number: 19004304
Permit Informaon
Permit Name:Comcast Cable Franchise Permit
Address/Locaon :08/05/2019Application Date:3340400285Parcel Number:2200 LIND AVE SW
Permit Type:08/20/2019Issue Date:Franchise
Permit Work Class:08/19/2020Expiration Date:Minor Utility
Job Number:JB#0000085665Franchise Type:Cable
Description:Fiber splicing at existing vault
APPROVED AS SUBMITTED
Contacts
Name Address PhoneTypeBilling
Comcast Cable Communication
Management & Comcast Cable
B: (215) 665-1700Applicant
Tom Donnelly
Comcast Business Communications
1701 Jfk Blvd, 32nd Floor
Philadelphia, PA 19103
B: (215) 286-7347
C: (215) 286-7557
Contact
Michael Cannon
Cannon Construction Inc
406 Porter Way
Milton, WA 98354-9638
B: (253) 922-2787
C: (253) 588-4034
Contractor
Business License Number: 20838Construction Contractor: CANNOCI055CS
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Laurie Dietz
Comcast - Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
H: (425) 741-5733Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
N
EOP
FL
P
C
S
D
G
W
TS
T
ST
UT
ROW
DD DD DD DD
EDGE OF PAVEMENT
FOGLINE
POWER
COMMUNICATION
SEWER
DRAIN
DRAINAGE DITCH
GAS
WATER
TRAFFIC SIGNAL
TELCOM
STEAM
UNKNOWN UTILITY
RIGHT OF WAY
TRAFFIC CONES
PROPOSED NEW CONDUIT
STRAW WATTLES
P
V
LT
CW
R
UTILITY POLE
VAULT - SMALL
PEDESTAL
STREET LIGHT
CROSSWALK LIGHT
UTILITY RISER
V VAULT - SMALL
444LA MANHOLE
VAULT - 25TA
CB
CB
CATCH BASIN
CATCH BASIN WITH SOCK
GLULAM UTILITY POLECENTER LINE
LANE LINE
FENCE
HIGH VISIBILITY FENCE
S SEWER MANHOLE
D DRAIN MANHOLE
W WATER MANHOLE
V UTILITY VALVE
SHRUBBERY
BORE PIT
VAULT - LARGE
VAULT - 25TA
C COMMUNICATION MANHOLE
FIRE HYDRANT
DISTANCE STATIONSTA 0+00
NOTE CALLOUT#
X.X DISTANCE DIMENSION
ASPHALT SURFACE
CONCRETE SIDEWALK PANEL
CONCRETE ROADWAY PANEL
HF H-FRAME
VAULT - LARGE
CAB CABINET
LEGEND
LANE DIRECTION INDICATOR
PROPOSED MARK-UP NOTATIONS RESTORATION TYPESEXISTING FEATURESLINE TYPES
COMCAST
SPLICE CASE
OF
DATE REVISION BY QC
CANNON COMPANIES
0000085565INTEGRITY NETWORK
2200 LIND AVE SW STE 106
RENTON, WA, 98057
LEGEND 2 9
6/25/2019 JS TG
GENERAL NOTES
STANDARD
1. THE LOCATIONS OF UTILITIES SHOWN ON THE PLANS ARE APPROXIMATE. ALL UTILITY LOCATIONS SHALL BE VERIFIED PRIOR TO
CONSTRUCTION. THE CONTRACTOR, AT HIS OWN EXPENSE, SHALL MAKE EXCAVATIONS AND BORINGS AHEAD OF THE WORK, AS
NECESSARY, TO DETERMINE THE EXACT LOCATIONS OF UTILITIES AND UNDERGROUND STRUCTURES. IT IS UNDERSTOOD THAT
THERE WILL BE INTERFERING UTILITIES AND OTHER UNDERGROUND PIPES, DRAINS OR STRUCTURES ENCOUNTERED THAT ARE
NOT SHOWN OR AREAS SHOWN INCORRECTLY ON THE PLANS OR THAT HAVE NOT BEEN PREVIOUSLY DISCOVERED IN THE FIELD.
THE CONTRACTOR AGREES THIS IS A NORMAL AND USUAL OCCURRENCE IN THE CONSTRUCTION OF UNDERGROUND
IMPROVEMENTS. FURTHERMORE, CONTRACTORS UNDERSTAND AND AGREE THAT WORK IN SOME CASES PROPOSED PATH MAYBE
IN CLOSE PROXIMITY TO SAID UTILITIES AND UNDERGROUND PIPES, DRAINS AND STRUCTURES NOT SHOWN ON THE PLANS WHICH
MAY REQUIRE A CHANGE IN OPERATIONS AND MAY CAUSE SLOUGHING OF THE TRENCH, ADDITIONAL TRAFFIC CONTROL,
ADDITIONAL PAVEMENT AND BACKFILL COSTS AND TIME. THE CONTRACTOR AGREES THAT A REASONABLE NUMBER OF THESE
OCCURRENCES IS USUAL AND ORDINARY, AND ARE REFLECTED IN THE BID AND PLAN OF OPERATION. THE CONTRACTORS AGREES
TO PROVIDE FOR THESE CONFLICTS AND AGREES TO PROVIDE FOR A REASONABLE AMOUNT OF TIME FOR DESIGN CHANGES
AND/OR UTILITY RELOCATIONS DUE TO SAID CONFLICTS.
2. CALL THE UTILITIES UNDERGROUND LOCATION CENTER AT 811
3. INSPECTIONS - THE CONTRACTOR SHALL NOTIFY LOCAL JURISDICTIONS FOR REQUIRED INSPECTION SERVICES.
4. EXCESS WATER - SHOULD WATER BE ENCOUNTERED DURING CONSTRUCTION, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
DEWATER, AS PER LOCAL JURISDICTIONS STANDARD SPECIFICATIONS, BEFORE CONSTRUCTION CONTINUES.
5. NO SILT LADEN WATER IS TO BE DISCHARGED FROM THE SITE WITHOUT PASSING THROUGH AN EROSION CONTROL SYSTEM.
6. THE CONTRACTOR SHALL SCHEDULE AND CONTROL HIS/HER WORK SO AS TO COMPLY WITH ALL APPLICABLE ORDINANCES TO
PREVENT ANY HAZARDS TO PUBLIC SAFETY, HEALTH AND WELFARE.
7. ALL STREETS SHALL BE KEPT FREE OF DIRT AND DEBRIS ON A CONTINUOUS BASIS.
8. AN APPROVED COPY OF THESE PLANS WILL BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
9. THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE CONDITIONS OF THE JOB SITE, INCLUDING SAFETY
OF ALL PERSONS AND PROPERTY DURING THE PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY
AND NOT BE LIMITED TO NORMAL WORKING HOURS.
10. PEDESTRIAN AND VEHICULAR ACCESS TO ADJACENT PROPERTIES SHALL BE MAINTAINED AT ALL TIMES EXCEPT WHERE PRIOR
WRITTEN APPROVAL FROM THE PROPERTY OWNER HAS BEEN OBTAINED.
11. BARRICADE OPEN DEPRESSIONS AND HOLES OCCURRING AS PART OF THIS WORK, AND POST WARNING LIGHTS ON ADJACENT
PROPERTIES WITH PUBLIC ACCESS. OPERATE WARNING LIGHTS DURING HOURS FROM DUSK TO DAWN EACH DAY AND AS
OTHERWISE REQUIRED.
12. PROTECT STRUCTURES, UTILITIES, PAVEMENTS, AND OTHER FACILITIES FROM DAMAGE CAUSED BY SETTLEMENT, LATERAL
MOVEMENT, UNDERMINING WASHOUT AND OTHER HAZARDS CREATED BY OPERATIONS UNDER THIS SECTION.
TRAFFIC CONTROL
1. THE CONTRACTOR IS ADVISED THAT ALL LANE CLOSURES SHALL BE KEPT TO A MINIMUM. LOCAL JURISDICTIONS WILL APPROVE
ONLY THOSE LANE AND ROADWAY CLOSURES DETERMINED TO BE NECESSARY FOR THE CONTRACTOR TO ACCOMPLISH A
SPECIFIC TASK. NO LANE OR ROADWAY CLOSURES WILL BE PERMITTED WITHOUT PRIOR APPROVALS.
2. THE CONTRACTOR SHALL KEEP ALL TRAFFIC LANES AND SHOULDERS CLEAR OF EQUIPMENT AND MATERIALS DURING
NON-WORKING HOURS. EQUIPMENT AND MATERIALS SHALL NOT BE STORED ON THE STREETS. THE CONTRACTOR'S EMPLOYEES
AND AGENTS SHALL NOT PARK PRIVATE VEHICLES ALONG THE ROADWAY OR MEDIAN.
SITE PREPARATION
1. SOD AND LAWN TO BE REMOVED SHALL BE CUT TO A NEAT VERTICAL LINE 6" MINIMUM BEYOND THE TRENCH LINE. SOD SHALL BE
EITHER REMOVED FROM THE SITE, OR CAREFULLY STOCKPILED FOR REUSE.
2. SAW CUT PAVEMENT TO A NEAT VERTICAL LINE 8" TO 12" MINIMUM BEYOND THE TRENCH LINE. REPLACE PAVEMENT WITH LIKE
MATERIAL (I.E., ASPHALT WITH ASPHALT, CONCRETE WITH CONCRETE).
3. EXCEPT AS NOTED HEREIN, ALL MATERIAL REMOVED SHALL BE TAKEN FROM THE SITE AND DISPOSED OF BY THE CONTRACTOR.
TRENCH EXCAVATION AND BACKFILL
1. TRENCH BACKFILL - WHERE MATERIAL EXCAVATED FROM TRENCHES IS UNSUITABLE FOR BACKFILL, THE CONTRACTOR SHALL
BACKFILL WITH BANK RUN GRAVEL OR MAY ELECT TO USE CDF IN LIEU OF THE COMPACTION/PROCTOR PROCESS. STONEWAY MIX
351 IS ACCEPTABLE IN ALL LOCATIONS. QUICK SETTING MIX 1004 IS ACCEPTABLE IN NON-TRAFFIC AREAS. MIX 1121 IS TO BE USED IN
TRAFFIC-BEARING LOCATIONS.
2. COMPACTION, WHEN NECESSARY, SHALL BE PERFORMED IN ACCORDANCE WITH LOCAL JURISDICTION REQUIREMENTS.
UTILITY DUCT
1. BURIED DUCT SHALL BE (1) 4" SCHEDULE 40 PVC, UNLESS NOTED OTHERWISE. MINIMUM CONDUIT COVER SHALL BE 36" WITH A
MINIMUM SLOPE OF 1/2 % TO VAULT.
2. THOROUGHLY CLEAN CONDUIT BEFORE USING OR LAYING. DURING CONSTRUCTION AND AFTER THE DUCT LINE IS COMPLETED,
PLUG ENDS OF CONDUITS TO PREVENT WATER WASHING INTO CONDUIT OR MANHOLES, TAKE PARTICULAR CARE TO KEEP
CONDUITS CLEAR OF CONCRETE, DIRT AND ANY OTHER SUBSTANCE DURING THE COURSE OF CONSTRUCTION.
3. AFTER DUCT PLACEMENT HAS BEEN COMPLETED, PROOF AND CLEAN DEBRIS FROM EACH DUCT, ITS ENTIRE LENGTH. INSTALL PULL
ROPE AND PLACE WATERTIGHT COMPRESSION PLUGS AT BOTH ENDS. ANY CONDUITS CONTAINING FIBER CABLE WILL REQUIRE
SIMPLEX COMPRESSION PLUGS SEALING THE CONDUITS AROUND THE CABLE.
4. OUTSIDE INNERDUCT SHALL BE 1-1/4" OPTIC-GUARD NON-METALLIC FLEXIBLE, IN COLOR SUCH AS RED OR ORANGE, WITH PULL
ROPES AND PLUGS. EXPOSED INNERDUCT INSIDE OF BUILDINGS SHALL BE PLENUM-RATED.
CEMENT CONCRETE PAVEMENT
1. ALL CONCRETE PAVEMENT REMOVED OR DAMAGED BY THIS WORK SHALL BE REPLACED ACCORDING TO THE STANDARD
SPECIFICATIONS OF EACH JURISDICTION.
ASPHALT CONCRETE PAVEMENT
1. ALL ASPHALT CONCRETE PAVEMENT REMOVED OR DAMAGED BY THIS WORK SHALL BE REPLACED WITH CLASS B ASPHALT
CONCRETE ACCORDING TO THE REQUIREMENTS OF EACH JURISDICTION.
GRAVEL AREAS
1. ALL GRAVEL AREAS DAMAGED OR REMOVED BY THIS WORK SHALL BE REPLACED WITH CRUSHED SURFACING TOP COURSE IN
ACCORDANCE WITH THE REQUIREMENTS OF EACH JURISDICTION.
SITE RESTORATION
1. ALL DISTURBED OR DAMAGED AREAS SHALL BE RESTORED TO A CONDITION EQUAL TO, OR BETTER THAN, THAT WHICH EXISTED
PRIOR TO PLACEMENT OF THE CONDUIT AND STRUCTURES.
2. VEGETATION REMOVED FOR THIS WORK SHALL BE REPLACED WITH IN-KIND PLANT MATERIAL AND SHALL BE PROPERLY PLANTED
AND WATERED IN TO ENSURE ITS SURVIVAL.
3. SITE RESTORATION SHALL INCLUDE REPLACING EXISTING CABLING AND PULL ROPES IN EXISTING CONDUITS AS THEY EXISTED
PRIOR TO CONSTRUCTION.
WATER QUALITY
1. CONSTRUCTION ACTIVITIES OCCURRING ADJACENT TO STORM DRAINAGE STRUCTURES SHALL COMPLY WITH THE STATE OF
WASHINGTON'S WATER QUALITY STANDARDS
2. THE CONTRACTOR SHALL LIMIT THE USE OF PETROLEUM PRODUCTS ON THE SITE.
DIRECTIONAL BORING
1. WHEN BORING ROADWAYS, INSTALL (1) 4" SCHEDULE 40 PVC CONDUIT WITH PULL ROPES AND PLUGS.
2. PROTECT EXISTING UTILITIES -- COORDINATE WITH LOCAL JURISDICTIONS TO POTHOLE AS REQUIRED TO LOCATE EXISTING
UTILITIES.
FIRE PROTECTION
1. ALL INSTALLED BACKBOARDS SHALL BE PAINTED WITH FIRE-RESISTANT PAINT.
2. ALL FIRE SEALED DUCT ENDS AND CORES SHALL BE 2 HOUR FIRE-RATED. ALL FIRE SEAL IN EXISTING LOCATIONS SHALL BE
REPAIRED OR REPLACED UPON DUCT OR CABLE PLACEMENT.
AERIAL INSTALLATION
1. ALL AERIAL CONSTRUCTION IS TO BE PERFORMED TO INDUSTRY ACCEPTABLE STANDARDS.
2. ALL NEW AERIAL (AND EXISTING) CABLE HEIGHTS OF ATTACHMENT TO BE DOCUMENTED AT TIME OF CONSTRUCTION.
3. 6.35 MM STRAND TO BE USED WITH STANDARD 1/4" POLE LINE HARDWARE UNLESS OTHERWISE SPECIFIED. BOND STRAND TO
POWER MAIN WHERE APPLICABLE.
4. ALL ANCHORS TO BE USED WILL BE 3/4" SCREW TYPE.
5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN AND FOLLOW ALL NESC CODES ALONG WITH APPLICABLE LOCAL AND
REGIONAL GOVERNING AUTHORITIES. ANY DISCREPANCIES BETWEEN THESE AUTHORITIES AND OR THE CONSTRUCTION PERMITS
IS TO BE VALIDATED WITH THE DESIGNER OR ENGINEER PRIOR TO CONSTRUCTION.
COMCAST
OF
DATE REVISION BY QC
CANNON COMPANIES
0000085565INTEGRITY NETWORK
2200 LIND AVE SW STE 106
RENTON, WA, 98057
GENERAL NOTES 3 9
6/25/2019 JS TG
2201
2233
2220
2200
2210
2230 0
0
0
LIND AVE SW
V
P P
244'220'500'5'350'12ct
12ct
12ct
TIE INTO EXISTING SPLICE
CASE SP.WAKV.0200
PROOF AND PULL (1) 12CT FIBER
THROUGH EXISTING CONDUIT. (TYPICAL)
PROOF AND PULL (1) 12CT FIBER
THROUGH EXISTING BUILDING CONDUIT.
INSTALL NEW 1-1/4" PLENUM DUCT
AND PULL (1) 12CT FIBER THROUGH.
LEAVE 50 COIL IN STORAGE
ROOM
15'
LIND AVE SW
SW 21ST ST.
P
N
COMCAST
OF
DATE REVISION BY QC
CANNON COMPANIES
0000085565INTEGRITY NETWORK
2200 LIND AVE SW STE 106
RENTON,WA, 98057
OVERVIEW 4 9
6/25/2019 JS TG
2201
2233
2220
2200
2210
2230 0
0
0
LIND AVE SW EOPEOPEOPEOPEOPEOPEOPEOPEOP
EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOP
EOP
EOP
EOPEOPEOPEOPEOPEOPEOPEOP
EOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP
EOP EOP EOP EOP EOP
EOP
EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW
ROWROWROWROW
ROWROWROW
ROWROWROWROWROWROWROWROWROWROW
ROWROWROWROW
ROWROWROW
ROWROWROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROWEOPEOPEOPEOPEOPEOPEOP
ROW
ROWROWROWROWROWROWROW
ROWROWROW
ROWROWROWROWROWROWROW
ROWROWROW
ROWROWROWROWROWROWROW EOPEOP
EOP
EOPEOP
EOP
EOPEOPEOP
EOPEOPEOP
EOPEOPEOP
EOP
EOPEOPEOPEOPEOP
EOP EOP
EOP
EOP
EOPEOPEOPEOP EOPEOP
EOPEOPEOP EOPEOPEOPEOPEOPEOP
EOPEOPV
P P
244'220'500'5'350'TIE INTO EXISTING SPLICE
CASE SP.WAKV.0200
PROOF AND PULL (1) 12CT FIBER
THROUGH EXISTING CONDUIT. (TYPICAL)
PROOF AND PULL (1) 12CT FIBER
THROUGH EXISTING BUILDING CONDUIT.
INSTALL NEW 1-1/4" PLENUM DUCT
AND PULL (1) 12CT FIBER THROUGH.
LEAVE 50 COIL IN STORAGE
ROOM
15'EOPEOP
EOP EOP
EOP
EOP
EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOP EOPEOPEOPEOPEOPEOPEOPEOP
EOP EOP EOP EOP EOP
EOP EOP
EOPEOPEOP
EOP EOP
EOP EOP EOP
EOPEOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP
EOP
EOP EOPEOPEOPEOPEOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP
EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPLIND AVE SW
SW 21ST ST.
P
N
COMCAST
OF
DATE REVISION BY QC
CANNON COMPANIES
0000085565INTEGRITY NETWORK
2200 LIND AVE SW STE 106
RENTON,WA, 98057
DESIGN 5 9
6/25/2019 JS TG
EXISTING 2" CONDUIT1CUSTOMER ENTRANCE
EXISTING 4" CONDUIT2CUSTOMER ENTRANCE
EXISTING 4" CONDUIT3CUSTOMER PARKING LOT
EXISTING 4" CONDUIT4CUSTOMER PARKING LOT
PROOF AND PULL
(1) 12CT FIBER THROUGH
EXISTING 2" PIPE
PROOF AND PULL
(1) 12CT FIBER THROUGH
EXISTING 4" PIPE
TIE INTO EXISTING SPLICE CASE
SP.WAKV.0200
PROOF AND PULL
(1) 12CT FIBER THROUGH
EXISTING 2" PIPE
PROOF AND PULL
(1) 12CT FIBER THROUGH
EXISTING 4" PIPE
PROOF AND PULL
(1) 12CT FIBER THROUGH
EXISTING 4" PIPE PROOF AND PULL
(1)12CT FIBER THROUGH
EXISTING 4" PIPE
COMCAST
OF
DATE REVISION BY QC
CANNON COMPANIES
0000085565INTEGRITY NETWORK
2200 LIND AVE SW STE 106
RENTON,WA, 98057
PHOTOS 7 9
6/25/2019 JS TG
PLACE NEW 1 14" PLENUM DUCT5CUSTOMER STORAGE ROOM 6
EXISTING 1 1
4" EMT7
8 OPEN WAREHOUSE ROOM
LEAVE 50' NEW (1) 12CT
FIBER IN STORAGE ROOM
PROOF AND PULL
(1) 12CT FIBER
THROUGH EXISTING
4" PIPE
PROOF AND PULL
(1) 12CT FIBER
THROUGH NEW 1 14"
PLENUM DUCT
CEILING
PENETRATION
PROOF AND PULL
(1) 12CT FIBER
THROUGH EXISTING
1 14" EMT
PROOF AND PULL
(1) 12CT FIBER
THROUGH EXISTING
1 14" EMT
PROOF AND PULL
(1) 12CT FIBER
THROUGH NEW 1 14"
PLENUM DUCT
PLACE NEW 1 14" PLENUM DUCT
EXISTING 1 1
4" EMT
CUSTOMER STORAGE ROOM OPEN WAREHOUSE ROOM
COMCAST
OF
DATE REVISION BY QC
CANNON COMPANIES
0000085565INTEGRITY NETWORK
2200 LIND AVE SW STE 106
RENTON,WA, 98057
PHOTOS 8 9
6/25/2019 JS TG
9 OPEN WAREHOUSE ROOM
10 OPEN WAREHOUSE ROOM
11 OPEN WAREHOUSE ROOM 12 CUSTOMER SERVER ROOM 13 CUSTOMER SERVER ROOM
PROOF AND PULL
(1) 12CT FIBER
THROUGH EXISTING
1 1
4" EMT
PROOF AND PULL
(1) 12CT FIBER THROUGH
EXISTING 1 1
4" EMT
PROOF AND PULL
(1) 12CT FIBER THROUGH
EXISTING 1 1
4" EMT
PROOF AND PULL
(1) 12CT FIBER THROUGH
NEW PLENUM DUCT 1 14"
INSTALL NEW
TERM PANEL IN
SERVER RACK
EXISTING 1 1
4" EMT
EXISTING 1 1
4" EMT
EXISTING 1 14" EMT PLACE NEW 1 14" PLENUM DUCT INSTALL NEW TERM PANEL
ENTER SERVER ROOM
THROUGH EXISTING
CEILING PENETRATION
COMCAST
OF
DATE REVISION BY QC
CANNON COMPANIES
0000085565INTEGRITY NETWORK
2200 LIND AVE SW STE 106
RENTON,WA, 98057
PHOTOS 9 9
6/25/2019 JS TG