HomeMy WebLinkAboutR-403605DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878 DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878 DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878 co SCJ ALLIANCE o GENERAL EROSION CONTROL NOTES: 1. THE CONTRACTOR SHALL FOLLOW EROSION CONTROL PRACTICES OUTLINED IN THE WASHINGTON STATE DEPARTMENT OF ECOLOGY STORMWATER C) MANAGEMENT MANUAL FOR WESTERN WASHINGTON AND THE SWPPP. 2. EROSION CONTROL MEASURES ARE NOT LIMITED TO THE ITEMS ON THESE PLANS. THE CONTRACTOR IS RESPONSIBLE FOR THE INSTALLATION AND I D MAINTENANCE OF ALL EROSION CONTROL MEASURES. NO SILTATION OF EXISTING OR PROPOSED DRAINAGE FACILITIES SHALL BE ALLOWED. CARE SHALL L1j BE TAKEN TO PREVENT MIGRATION OF SILTS TO OFF -SITE PROPERTIES. I- 3. EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO THE BEGINNING OF CONSTRUCTION. THE PROJECT ENGINEER AND THE REVIEWING AGENCY SHALL INSPECT AND APPROVE THE INSTALLATION OF EROSION CONTROL MEASURES PRIOR TO BEGINNING CONSTRUCTION. A. INSTALL INLET SEDIMENTATION AS SPECIFIED AT ALL CATCH BASIN LOCATIONS IMMEDIATELY UPON ARRIVAL AT PROJECT CONSTRUCTION SITE. / B. STABILIZED CONSTRUCTION ENTRANCE SHALL CONFORM TO DETAIL ON SHEET EC-02, STABILIZED CONSTRUCTION ENTRANCE. A STABILIZED CONSTRUCTION ENTRANCE SHALL BE INSTALLED AT ALL INGRESS/EGRESS POINTS TO CONSTRUCTION SITE. 4. ALL EROSION/SEDIMENTATION CONTROL FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL CONSTRUCTION IS COMPLETE AND THE SITE HAS BEEN STABILIZED. THE CONTRACTOR IS RESPONSIBLE FOR IMPLEMENTATION, MAINTENANCE, REPLACEMENT, AND ADDITIONS TO THE SYSTEM AS REQUIRED BY THE OWNER, ENGINEER, OR THE CITY OF RENTON. 5. THE CONTRACTOR SHALL MAKE A DAILY SURVEILLANCE OF ALL EROSION CONTROL MEASURES AND MAKE ANY NECESSARY REPAIRS OR ADDITIONS TO THE EROSION CONTROL MEASURES AS REQUIRED. THE CONTRACTOR SHALL PROVIDE ADDITIONAL EROSION CONTROL MEASURES AS DETERMINED NECESSARY BY THE INSPECTOR AND/OR PROJECT ENGINEER. FAILURE TO COMPLY WITH ALL LOCAL AND STATE EROSION CONTROL REQUIREMENTS MAY RESULT IN CIVIL PENALTIES BEING LEVIED AGAINST THE CONTRACTOR. 6. PRIOR TO CLEARING AND GRADING THE CONTRACTOR SHALL PROTECT TREES TO BE SAVED WITH HIGH VISIBILITY FENCING AT THE ROOT PROTECTION DELINEATION OR OTHERWISE PROTECTED AS DIRECTED BY THE ENGINEER, CITY STAFF, OR OWNERS REPRESENTATIVE. CLEARING AND GRADING LIMITS SHALL BE STAKED IN THE FIELD PRIOR TO EXCAVATION. 7 . ALL STORM DRAINAGE INLETS RECEIVING RUNOFF FROM THE PROJECT DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT -LADEN WATER WILL BE FILTERED BEFORE ENTERING THE CONVEYANCE SYSTEM. 8. ALL OFF -SITE CATCH BASINS IMMEDIATELY ADJACENT TO THE PROPOSED SITE SHALL BE PROTECTED FROM SILTATION. 9. THE CONSTRUCTION OF TRENCHES (E.G., PIPES, UNDERGROUND UTILITY LINES AND STRUCTURES) SHALL BE SUBJECT TO THE FOLLOWING CRITERIA: A. NO MORE THAN 300 FEET OF TRENCH ON A DOWNSLOPE OF MORE THAN FIVE PERCENT SHALL BE OPENED AT ONE TIME. B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. 10. TRENCH DEWATERING DEVICES SHALL BE DISCHARGED IN A MANNER THAT WILL NOT ADVERSELY AFFECT STREAMS, DRAINAGE SYSTEMS, OR OFF -SITE PROPERTIES. 11. TRACKING OF SOIL, MUD, OR DEBRIS OFF -SITE IS NOT ALLOWED. SOIL, MUD, OR DEBRIS TRACKED ONTO A PUBLIC ROADWAY, SHALL BE REMOVED BY THE END OF THAT WORKING DAY. TO PREVENT THE TRACKING OF SOIL, MUD, OR DEBRIS ONTO PUBLIC ROADWAYS, SWEEPING OR WASHING OF THE VEHICLE'S TIRES MAY BE REQUIRED PRIOR TO ENTERING A PUBLIC ROADWAY. 12. ALL DISTURBED AREAS SHALL BE HYDROSEEDED WITH EROSION CONTROL SEED MIX. INCLUDING BUT NOT LIMITED TO ROADWAY EMBANKMENTS, SHOULDERS, UTILITY EASEMENTS, STAGING AREAS, CONSTRUCTED WETLANDS AND CUT/FILL SLOPES. 13. ALL SEEDED OR SODDED AREAS SHALL BE CHECKED REGULARLY TO ENSURE VEGETATIVE COVERAGE IS COMPLETE. AREAS SHALL BE REPAIRED, RESEEDED, AND FERTILIZED AS REQUIRED. 14. DROP -IN CATCH BASIN FILTERS MAY BE USED IN PLACE OF OTHER STANDARD INLET PROTECTION PRACTICES. THIS INLET PROTECTION TECHNOLOGY CAN BE USED IN SITUATIONS WHERE RIGHT-OF-WAY FLOODING WOULD BE PROBLEMATIC. 15. TO MAINTAIN FUNCTION, THE CONTRACTOR SHALL REMOVE AND CLEAN OR REPLACE FILTERS AFTER EACH STORM EVENT. CONTACT THE JURISDICTION TO DETERMINE ITS ACCEPTANCE OF SPECIFIC FILTER PRODUCTS, PRIOR TO INSTALLATION. 16. NO MATERIAL SHALL BE STOCKPILED ON PAVEMENT WITHOUT AUTHORIZATION FROM THE PROJECT ENGINEER OR OWNERS REPRESENTATIVE WHICH WILL BE CONDITIONAL ON IMPLEMENTATION OF A PROCEDURE TO PREVENT SEDIMENT TRANSPORT. 17. ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED OR AFTER THE MEASURES ARE NO LONGER NEEDED. SEDIMENT COLLECTED IN TRAPS, PONDS, OR SILT FENCE SHALL BE REMOVED AND DISPOSED IN AN APPROVED MANNER OR STABILIZED ON SITE. DISTURBED SOIL AREAS RESULTING FROM SEDIMENT REMOVAL SHALL BE PERMANENTLY STABILIZED WITHIN SEVEN (7) DAYS. ROOT PROTECTION AREA (RPA) i r � S� • w �`ii'i : i`i ii : Oi40 :•i`iL0 '�`iL'i : i`i ii' •i`i ii : i`%4 : i`i i i - o•�•..00❖...o❖..•.•o.•...oO•:.00•O...o�.•...o❖...o•O:.o•. '❖:O.❖.•:O.o❖.•O.o❖:O..❖.•:.❖.•.� .❖.❖ :•:.o❖.•O.o•.•:O..•� . ................................r.............. .............. ............................... ....ems �..._._.... TV • mans • • �i 1 ■• 1' 1 � � � 1 1' EROSION AND SEDIMENT CONTROL (ESC) STANDARD PLAN NOTES: THE FOLLOWING IS A LISTING OF GENERAL NOTES THAT SHALL BE INCORPORATED IN THE EROSION AND SEDIMENT CONTROL (ESC) PLAN SET. ALL THE NOTES ON THE LIST MAY NOT PERTAIN TO EVERY PROJECT. THE APPLICANT OR OWNER, HEREBY REFERRED TO AS APPLICANT, MAY STRIKE OUT IRRELEVANT NOTES IF NOT APPLICABLE TO THE PROJECT. HOWEVER, THE APPLICANT SHALL NOT RENUMBER NOR EDIT THE REMAINING NOTES. IF ADDITIONAL NOTES ARE NEEDED FOR SPECIFIC ASPECTS, THEY SHALL BE ADDED AFTER THE ESC STANDARD PLAN NOTES. 1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING SHALL BE HELD AMONG THE CITY OF RENTON, HEREBY REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANTS CONTRACTOR. 2. THE APPLICANT IS RESPONSIBLE FOR OBTAINING THE WASHINGTON STATE DEPARTMENT OF ECOLOGY (ECOLOGY) CONSTRUCTION STORMWATER GENERAL PERMIT, IF IT IS REQUIRED FOR THE PROJECT. THE APPLICANT SHALL PROVIDE THE CITY COPIES OF ALL MONITORING REPORTS PROVIDED TO ECOLOGY ASSOCIATED WITH THE CONSTRUCTION STORMWATER GENERAL PERMIT. 3. THE ESC PLAN SET SHALL INCLUDE AN ESC CONSTRUCTION SEQUENCE DETAILING THE ORDERED STEPS THAT SHALL BE FOLLOWED FROM CONSTRUCTION COMMENCEMENT TO POST -PROJECT CLEANUP IN ORDER TO FULFILL PROJECT ESC REQUIREMENTS. 4. THE BOUNDARIES OF THE CLEARING LIMITS, SENSITIVE AREAS AND THEIR BUFFERS, AND AREAS OF VEGETATION PRESERVATION AND TREE RETENTION AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY DELINEATED BY FENCING AND PROTECTED IN THE FIELD IN ACCORDANCE WITH APPENDIX D OF THE CITY OF RENTON SURFACE WATER DESIGN MANUAL (RENTON SWDM) PRIOR TO THE START OF CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION. 5. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK -OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT. IF SEDIMENT IS TRACKED OFFSITE, PUBLIC ROADS SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY OR MORE FREQUENTLY DURING WET WEATHER AS NECESSARY TO PREVENT SEDIMENT FROM ENTERING WATERS OF THE STATE. 6. WASHOUT FROM CONCRETE TRUCKS SHALL BE PERFORMED OFF -SITE OR IN DESIGNATED CONCRETE WASHOUT AREAS ONLY. DO NOT WASH OUT CONCRETE TRUCKS ONTO THE GROUND, OR TO STORM DRAINS OR OPEN DITCHES. ON -SITE DUMPING OF EXCESS CONCRETE SHALL ONLY OCCUR IN DESIGNATED CONCRETE WASHOUT AREAS. 7. ALL REQUIRED ESC BMPS SHALL BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE WATER DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL ESC BMPS SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. ALL ESC BMPS SHALL BE REMOVED AFTER CONSTRUCTION IS COMPLETED AND THE SITE HAS BEEN STABILIZED TO ENSURE POTENTIAL FOR ON -SITE EROSION DOES NOT EXIST. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT, ENHANCEMENT, AND REMOVAL OF ESC BMPS SHALL BE THE RESPONSIBILITY OF THE APPLICANT. 8. ANY HAZARDOUS MATERIALS OR LIQUID PRODUCTS THAT HAVE THE POTENTIAL TO POLLUTE RUNOFF SHALL BE DISPOSED OF PROPERLY. 9. THE ESC BMPS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE APPLICANT SHALL ANTICIPATE THAT MORE ESC BMPS WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE APPLICANT TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL ESC BMPS, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM. 10. APPROVAL OF THIS PLAN IS FOR ESC ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS, CHANNELS, OR STORMWATER FACILITIES. 11. ANY DEWATERING SYSTEM NECESSARY FOR THE CONSTRUCTION OF STORMWATER FACILITIES SHALL BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL. 12. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST THROUGH APRIL 30TH) OR SEVEN DAYS DURING THE DRY SEASON (MAY 1ST THROUGH SEPTEMBER 30TH) SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.) IN CONFORMANCE WITH APPENDIX D OF THE RENTON SWDM. 13, WET SEASON ESC REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES BETWEEN OCTOBER 1ST AND APRIL 30TH UNLESS OTHERWISE APPROVED BY THE CITY. 14. ANY AREA NEEDING ADDITIONAL ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN (7) DAYS. 15. THE ESC BMPS ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED AT A MINIMUM OF ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT. INSPECTION AND MAINTENANCE SHALL OCCUR MORE FREQUENTLY AS REQUIRED BY THE CITY. 16. BEFORE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY, CATCH BASIN INSERTS PER THE CITY STANDARD PLAN 216.30 SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR CONSTRUCTION AREA, UNLESS THE RUNOFF THAT ENTERS THE INLET WILL BE CONVEYED TO A SEDIMENT POND OR TRAP. ALL CATCH BASIN INSERTS SHALL BE PERIODICALLY INSPECTED AND REPLACED AS NECESSARY TO ENSURE FULLY FUNCTIONING CONDITION. 17. AT NO TIME SHALL SEDIMENT ACCUMULATION EXCEED 213 OF THE CAPACITY OF THE CATCH BASIN SUMP. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM. 18. ANY PERMANENT STORMWATER FACILITY LOCATION USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY ESC BMPS AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE TEMPORARY FACILITY IS TO ULTIMATELY FUNCTION AS AN INFILTRATION SYSTEM IN ITS PERMANENT STATE, THE TEMPORARY FACILITY SHALL BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY. 19. AREAS DESIGNATED ON THE PLAN(S) CONTAINING EXISTING STORMWATER FACILITIES OR ON -SITE BMPS (AMENDED SOILS, BIORETENTION, PERMEABLE PAVEMENT, ETC.) SHALL BE CLEARLY FENCED AND PROTECTED USING ESC BMPS TO AVOID SEDIMENTATION AND COMPACTION DURING CONSTRUCTION. 20. PRIOR TO THE BEGINNING OF THE WET SEASON (OCTOBER 1ST), ALL DISTURBED AREAS SHALL BE INSPECTED TO IDENTIFY WHICH ONES SHALL BE SODDED OR SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SODDED OR SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. AN EXHIBIT OF THOSE AREAS TO BE SODDED OR SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY FOR REVIEW. 21. PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, THE PROJECT SITE SHALL BE STABILIZED TO PREVENT SEDIMENT -LADEN WATER FROM LEAVING THE PROJECT SITE, ALL ESC BMPS SHALL BE REMOVED, AND STORMWATER CONVEYANCE SYSTEMS, FACILITIES, AND ON -SITE BMPS SHALL BE RESTORED TO THEIR FULLY FUNCTIONING CONDITION. ALL DISTURBED AREAS OF THE PROJECT SITE SHALL BE VEGETATED OR OTHERWISE PERMANENTLY STABILIZED. AT A MINIMUM, DISTURBED AREAS SHALL BE SODDED OR SEEDED AND MULCHED TO ENSURE THAT SUFFICIENT COVER WILL DEVELOP SHORTLY AFTER FINAL APPROVAL. MULCH WITHOUT SEEDING IS ADEQUATE FOR AREAS TO BE LANDSCAPED BEFORE OCTOBER 1ST. 22. ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABILIZATION AND EROSION CONTROL. ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS RETAINING WALLS. ALL ROCKERIES IN CITY ROAD RIGHTS -OF -WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH CITY STANDARDS. ROCKERIES OUTSIDE OF ROAD RIGHTS -OF -WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE. UNLESS OTHERWISE NOTED, DRAWING 15 NOT TO SCALE (NTS) STD. PLAN - 268.00 • PUBLIC WORKS EROSION AND SEDIMENT CONTROL [PIRTVID DEPARTMENT STANDARD PLAN NOTES GAZ 9/28/2018 1 vanu"worH aamimsn,,.r DATE REFER To Ro-4403614, WI.,403601 , S*4403601 FOR AS -BUILT INFORMATION TREE PROTECTION NOTES IMPORTANT: ALL TREES INDICATED AS "TO REMAIN" MUST BE RETAINED. FAILURE TO 1. NO PRUNING SHALL BE PERFORMED EXCEPT BY APPROVED RETAIN ANY INDICATED TREE WILL RESULT IN ARBORIST. CONTRACTOR REPLACING TREE PER THE CITY 2. NO EQUIPMENT SHALL OPERATE INSIDE THE PROTECTIVE OR OTHER REQUIREMENTS. CONTRACTOR FENCING INCLUDING DURING FENCE INSTALLATION AND SHALL NOTIFY THE LANDSCAPE ARCHITECT, REMOVAL. FORESTER AND/OR CITY (AS APPLICABLE) IF IT IS 3. PLACING MATERIALS NEAR TREES: NO PERSON MAY CONDUCT DETERMINED THAT A TREE CANNOT BE ACTIVITY WITHIN THE ROOT PROTECTION AREA (RPA) OF ANY RETAINED. EXISTING TREE TO BE RETAINED, EXCEPT AS OTHERWISE NOTED (SEE LANDSCAPE AND IRRIGATION SPECIFICATIONS). THIS INCLUDES BUT IS NOT LIMITED TO PARKING EQUIPMENT, PLACING SOLVENTS, STORING BUILDING MATERIAL AND SOIL DEPOSITS, DUMPING CONCRETE WASH OUT AND LOCATING BURN HOLES. 4. PROTECTIVE BARRIER. BEFORE DEVELOPMENT, LAND TEMPORARY TREE PROTECTION FENCE: CLEARING, FILLING OR ANY LAND ALTERATION, THE SIX -FOOT -HIGH CHAIN LINK CONSTRUCTION CONTRACTOR: FENCE WITH PLACARDS. STEEL POSTS A. SHALL FIELD VERIFY LOCATION, SIZE AND SPECIES TO INSTALLED AT 8' O.C. DETERMINE RPA. B. SHALL ERECT TREE PROTECTION FENCING AROUND THE RPA OF THE TREE, AS DESCRIBED IN THE TEMPORARY TREE PROTECTION FENCE DETAIL. THE FENCING SHALL BE 2" X 8' STEEL POSTS OR RETAINED THROUGHOUT CONSTRUCTION. APPROVED EQUAL C. SHALL PROHIBIT GRADING, TRENCHING, CUTTING, IMPERVIOUS SURFACING, OTHER CONSTRUCTION, 3" THICK LAYER OF MEDIUM COMPACTION OF EARTH, OR OTHER POTENTIALLY BARK MULCH DAMAGING ACTIVITIES WITHIN THE RPA'S OF EXISTING MAINTAIN EXISTING GRADE WITH THE TREES. TREE PROTECTION FENCE UNLESS D. SHALL ENSURE THAT ANY CLEARING OR LANDSCAPING OTHERWISE INDICATED ON THE PLANS DONE WITHIN THE DRIP LINE SHALL BE ACCOMPLISHED WITH HAND LABOR ONLY. E. SHALL ENSURE NO ROOTS GREATER THAN 2" SHALL BE CUT. 5. ATTACHMENTS TO TREES: DURING CONSTRUCTION, NO PERSON SHALL ATTACH ANY OBJECT TO ANY EXISTING TREE. 6. THE ROOT PROTECTION AREA (RPA) IS DEFINED AS THE AREA WITHIN THE DRIP LINE OF THE TREE TO BE RETAINED, UNLESS FENCE SHALL BE MAINTAINED THROUGHOUT THE TREE IS AN OAK. THE RPA FOR OAK TREES EXTENDS TO DURATION OF CONSTRUCTION. ALL ONE AND ONE-HALF TIMES THE RADIUS OF THE CANOPY. CLEARING AND PLANTING WITHIN THE ROOT 7. RETURN ALL AREAS TO THEIR PRE -CONSTRUCTION STATE ZONE SHALL BE DONE BY HAND. AFTER INSTALLATION IS COMPLETE. 55D'IAR �O� CF WAS/,/ c�jp �P O cn Z /L OAS �FGI STEREO SIGNAL 06/19/20191 NO. P-CO-REN-12 BUILDING PERMIT SUBMITTAL BUILDING PERMIT SUBMITTAL 4' MIN. 12" DEPTH 2" - 4" ROCK 24" MIN. SETTLING DEPTH �3 ,r 3.5' - 5' 1.5' MIN. SEDIMENT STORAGE CROSS SECTION NOTES., 1, MAYBE CONSTRUCTED BY EXCAVATION OR BY BUILDING A BERM 12" OVERFLOW DEPTH OUTFLOW CHANNEL IF CONSTRUCTED BY EXCAVATION 5' MAX. 12" DEPTH 314" - 1 1 /2" WASHED GRAVEL FILTER FABRIC FENCING i 2" MIN. OVERLAP / ANCHOR IN 6" x 6" MIN. TRENCH AND STAPLE AT 12" INTERVALS 6" MIN. OVERLAP STAPLE OVERLAPS 5'MAX. SPACING II L I I BRING MATERIAL DOWN TO A LEVEL AREA, TURN THE END UNDER 4", AND STAPLE AT 12" INTERVALS NOTES: 1. CONDITIONS OF USE 1.1. FOR PERMANENT STABILIZATION OF SLOPES 2HAV OR GREATER AND WITH MORE THAN 10 FEET OF VERTICAL RELIEF. 1.2. IN CONJUNCTION WITH SEED FOR FINAL STABILIZATION OF A SLOPE, NOT FOR TEMPORARY COVER. HOWEVER, THEY MAY BE USED FOR TEMPORARY APPLICATIONS AS LONG AS THE PRODUCT IS NOT DAMAGED BY REPEATED HANDLING. 2. DESIGN AND INSTALLATION SPECIFICATIONS 2.1. INSTALLATION IS CRITICAL TO THE EFFECTIVENESS OF THIS PRODUCT. IF GOOD GROUND CONTACT IS NOT ACHIEVED, RUNOFF CAN CONCENTRATE UNDER THE PRODUCT, RESULTING IN SIGNIFICANT EROSION. 2.2. JUTE MATTING MUST BE USED IN CONJUNCTION WITH MULCH. EXCELSIOR, WOVEN STRAW, BLANKETS, AND COIR (COCONUT FIBER) BLANKETS MAY BE INSTALLED WITHOUT MULCH. 2.3. PURELY SYNTHETIC BLANKETS ARE ALLOWED, BUT SHALL ONLY BE USED FOR LONG-TERM STABILIZATION OF WATERWAYS. THE ORGANIC BLANKETS ARE BETTER FOR SLOPE PROTECTION AND SHORT-TERM WATERWAY PROTECTION BECAUSE THEY RETAIN AND PROVIDE ORGANIC MATTER TO THE SOIL, SUBSTANTIALLY IMPROVING THE SPEED AND SUCCESS OF RE -VEGETATION. 2.4. DO NOT STRETCH BLANKETS/MATTINGS TIGHT -ALLOW THE ROLLS TO MOLD TO ANY IRREGULARITIES. 2.5. SLOPE SURFACE SHALL BE SMOOTH BEFORE PLACEMENT FOR PROPER SOIL CONTACT. 2.6. STAPLING PATTERN AS PER MANUFACTURER'S RECOMMENDATION. 2.7. IF THERE IS A BERM AT THE TOP OF SLOPE, ANCHOR UPSLOPE OF THE BERM. 2.8. FOR SLOPES LESS THAN 3HAV, ROLLS MAY BE PLACED IN HORIZONTAL STRIPS. 2.9. LIME, FERTILIZE, AND SEED BEFORE INSTALLATION. PLANTING OF SHRUBS, TREES, ETC. SHOULD OCCUR AFTER INSTALLATION. 3. MAINTENANCE STANDARDS 3.1. GOOD CONTACT WITH THE GROUND MUST BE MAINTAINED, AND THERE MUST NOT BE EROSION BENEATH THE NET OR BLANKET. 3.2. AREAS OF THE NET OR BLANKET THAT ARE DAMAGED OR NOT IN CLOSE CONTACT WITH THE GROUND SHALL BE REPAIRED AND STAPLED. 3.3. IF EROSION OCCURS DUE TO POORLY CONTROLLED DRAINAGE, THE PROBLEM SHALL BE FIXED AND THE ERODED AREA PROTECTED. UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS) STD. PLAN - 213.20 PUBLIC WORKS SLOPE INSTALLATIONS OF NETS AND PPR 45 DEPARTMENT BLANKETS GAZ 9/28/2018 1 vunr�wonsnamimsaawr DATE DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878 UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS) STD. PLAN - 211.00 Apottk c PUBLIC WORKS PPRLD. SEDIMENT TRAP DEPARTMENT GAZ 9/28/2018 111 a"nu�wonsaeme„nrara. DATE REVISION TEMPORARY V-DITCH NTS R.E.W. 05 01 19 R.D.J. suRVEYED: R.E.W. 06 19 19 R.D.J. DESIGNED: K. MELVIN DRAWN: S. ORDONEZ CHECKED: R. JAWS BY DATE APPR °PPROVED: R. JARVIS CONSTRUCTION ENTRANCE NOTES: rcX1S. DRIVEWAYS SHALL BE PAVED TO S1NGaOp9 1 THEPRIEDGE R TO OF THE INSTALLATIONE RIGHT-OF-WAY R = 25' MIN. /-- CONSTRUCTION ENTRANCE TO I- AVOID DAMAGING OF THE ROADWAY. 2. IT IS RECOMMENDED THAT THE ENTRANCE BE CROWNED SO THAT RUNOFF DRAINS OFF THE PAD 100' MIN. INSTALL DRIVEWAY CULVERT IF THERE IS A ROADSIDE DITCH PRESENT, AS PER CITY ROAD STANDARDS 4"-8" QUARRY SPALLS GEOTEXTILE 16MIN. PROVIDE FULL WIDTH OF INGRESS/EGRESS AREA 12" MIN. THICKNESS NOTES: 1. CONDITION OF USE 1.1. CONSTRUCTION ENTRANCE SHALL BE STABILIZED WHEREVER TRAFFIC WILL BE LEAVING A CONSTRUCTION SITE AND TRAVELING ON PAVED ROADS OR OTHER PAVED AREAS WITHIN 1,000 FEET OF THE SITE. 1.2. FOR RESIDENTIAL CONSTRUCTION PROVIDE STABILIZED CONSTRUCTION ENTRANCES FOR EACH RESIDENCE IN ADDITION TO THE MAIN SUBDIVISION ENTRANCE. STABILIZED SURFACES SHALL BE OF SUFFICIENT LENGTH/WIDTH TO PROVIDE VEHICLE ACCESS/PARKING, BASED ON LOT SIZE/CONFIGURATION. 2, DESIGN AND INSTALLATION SPECIFICATIONS 2.1. A SEPARATION GEOTEXTILE SHALL BE PLACED UNDER THE SPALLS TO PREVENT FINE SEDIMENT FROM PUMPING UP INTO THE ROCK PAD. THE GEOTEXTILE SHALL MEET THE FOLLOWING STANDARDS: GRAB TENSILE STRENGTH (ASTM D4632) 200 LBS. MIN. GRAB TENSILE ELONGATION (ASTM D4632) 30% MAX. (WOVEN) CBR PUNCTURE STRENGTH (ASTM D6241) 1 495 LBS. MIN. ADS (ASTM D4751) 20-45 (U.S. STANDARD SIEVE SIZE) 2"x2' 14 GAUGE WIRE, OR EQUIVALENT, IF STANDARD STRENGTH FABRIC USED FILTER FABRIC I Z MIN. (- 6' MAX. POST SPACING MAY BE INCREASED . . TO 8' IF WIRE BACKING IS USED I 4 x4 MIN. TRENCH BACKFILL TRENCH WITH NATIVE SOIL OR 3/4" TO 1-1/2" WASHED GRAVEL 2"x4" WOOD POSTS, STEEL FENCE POSTS, OR EQUIVALENT (TYP.) NOTES: 1. CONDITIONS OF USE 1.1. SILT FENCE MAY BE USED DOWNSLOPE OF ALL DISTURBED AREAS. 1.2. SILT FENCE IS NOT INTENDED TO TREAT CONCENTRATED FLOWS, NOR IS IT INTENDED TO TREAT SUBSTANTIAL AMOUNTS OF OVERLAND FLOW. ANY CONCENTRATED FLOW MUST BE CONVEYED THROUGH THE DRAINAGE SYSTEM TO A SEDIMENT TRAP OR POND. 2. DESIGN AND INSTALLATION SPECIFICATIONS 2.1. THE GEOTEXTILE USED MUST MEET THE STANDARD LISTED BELLOW. A COPY OF THE MANUFACTURER'S FABRIC SPECIFICATIONS MUST BE AVAILABLE ON SITE. ADS (ASTM D4751) 30-100 SIEVE SIZE (0.60-0.15mm) FOR SILT FILM 50-100 SIEVE SIZE (0.30-0.15mm) FOR OTHER FABRICS WATER PERMITTIVITY (ASTM D4491) 0.02 SEC' MINIMUM GRAB TENSILE STRENGTH (ASTM D4632) 180 LBS. MIN. FOR EXTRA STRENGTH FABRIC 100 LBS. MIN. FOR STANDARD STRENGTH FABRIC GRAB TENSILE ELONGATION (ASTM D4632) 30% MAX. (WOVEN) ULTRAVIOLET RESISTANCE (ASTM D4355) 70% MIN. 2.2. STANDARD STRENGTH FABRIC REQUIRES WIRE BACKING TO INCREASE THE STRENGTH OF THE FENCE. WIRE BACKING OR CLOSER POST SPACING MAY BE REQUIRED FOR EXTRA STRENGTH FABRIC IF FIELD PERFORMANCE WARRANTS A STRONGER FENCE. 2.3. WHERE THE FENCE IS INSTALLED, THE SLOPE SHALL NOT BE STEEPER THAN 2H:1V 2.4. IF A TYPICAL SILT FENCE IS USED, THE STANDARD 4"X4" TRENCH MAYBE REDUCED AS LONG AS THE BOTTOM 8 INCHES OF THE SILT FENCE FABRIC IS WELL BURIED AND SECURE IN A TRENCH THAT STABILIZES THE FENCE AND DOES NOT ALLOW WATER TO BYPASS OR UNDERMINE THE SILT FENCE. 2.5. FILTER FABRIC FENCES SHALL BE INSTALLED ALONG CONTOURS WHENEVER POSSIBLE. 3. MAINTENANCE STANDARDS 3.1. ANY DAMAGE SHALL BE REPAIRED IMMEDIATELY. 3.2. IF CONCENTRATED FLOWS ARE EVIDENT UPHILL OF THE FENCE, THEY MUST BE INTERCEPTED AND CONVEYED TO A SEDIMENT TRAP OR POND. 3.3. IT IS IMPORTANT TO CHECK THE UPHILL SIDE OF THE FENCE FOR SIGNS OF THE FENCE CLOGGING AND ACTING AS A BARRIER TO FLOW AND THEN CAUSING CHANNELIZATION OF FLOWS PARALLEL TO THE FENCE. IF THIS OCCURS, REPLACE THE FENCE OR REMOVE THE TRAPPED SEDIMENT. 3.4. SEDIMENT MUST BE REMOVED WHEN SEDIMENT IS 61NCHES HIGH. 3.5. IF THE FILTER FABRIC (GEOTEXTILE) HAS DETERIORATED DUE TO ULTRAVIOLET BREAKDOWN, IT SHALL BE REPLACED. UNLESS OTHERWISE NOTED, DRAWING 15 NOT TO SCALE (NTS) STD. PLAN - 214.00 • PUBLIC WORKS ic� 45 DEPARTMENT SILT FENCE Z 9/28/2018 1 v„nr"worH namimsn„or DATE DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878 2.2. DO NOT USE CRUSHED CONCRETE, CEMENT, OR CALCIUM CHLORIDE FOR CONSTRUCTION ENTRANCE STABILIZATION BECAUSE THESE PRODUCTS RAISE pH LEVELS IN STORMWATER AND CONCRETE DISCHARGE TO SURFACE WATERS OF THE STATE IS PROHIBITED. 2.3. HOG FUEL WOOD BASED MULCH MAY BE SUBSTITUTED FOR OR COMBINED WITH QUARRY SPALLS IN AREAS THAT WILL NOT BE USED FOR PERMANENT ROADS. HOG FUEL IS NOT RECOMMENDED FOR ENTRANCE STABILIZATION IN URBAN AREAS. THE INSPECTOR MAY AT ANYTIME REQUIRE THE USE OF QUARRY SPALLS IF THE HOG FUEL IS NOT PREVENTING SEDIMENT FROM BEING TRACKED ONTO PAVEMENT OR IF THE HOG FUEL IS BEING CARRIED ONTO PAVEMENT. 2.4. FENCING SHALL BE INSTALLED AS NECESSARY TO RESTRICT TRAFFIC TO THE CONSTRUCTION ENTRANCE. 2.5. WHENEVER POSSIBLE, THE ENTRANCE SHALL BE CONSTRUCTED ON A FIRM, COMPACTED SUBGRADE. THIS CAN SUBSTANTIALLY INCREASE THE EFFECTIVENESS OF THE PAD AND REDUCE THE NEED FOR MAINTENANCE. 3. MAINTENANCE STANDARDS 3.1. QUARRY SPALLS SHALL BE ADDED IF THE PAD IS NO LONGER IN ACCORDANCE WITH THE SPECIFICATIONS. 3.2. IF THE ENTRANCE IS NOT PREVENTING SEDIMENT FROM BEING TRACKED ONTO PAVEMENT THEN ALTERNATIVE MEASURES TO KEEP THE STREETS FREE OF SEDIMENT SHALL BE USED. THIS MAY INCLUDE STREET SWEEPING AN INCREASE IN THE DIMENSIONS OF THE ENTRANCE OR THE INSTALLATION OF A WHEEL WASH. IF WASHING IS USED IT SHALL BE DONE ON AN AREA COVERED WITH CRUSHED ROCK AND WASH WATER SHALL DRAIN TO A SEDIMENT TRAP OR POND. 3.3. ANY SEDIMENT THAT IS TRACKED ONTO PAVEMENT SHALL BE REMOVED IMMEDIATELY BY SWEEPING. THE SEDIMENT COLLECTED BY SWEEPING SHALL BE REMOVED OR STABILIZED ON SITE. THE PAVEMENT SHALL NOT BE CLEANED BY WASHING DOWN THE STREET EXCEPT WHEN SWEEPING IS INEFFECTIVE AND THERE IS A THREAT TO PUBLIC SAFETY. IF IT IS NECESSARY TO WASH THE STREETS, A SMALL SUMP MUST BE CONSTRUCTED. THE SEDIMENT WOULD THEN BE WASHED INTO THE SUMP WHERE IT CAN BE CONTROLLED AND DISCHARGED APPROPRIATELY. WASH WATER MUST BE PUMPED BACK ONTO THE SITE AND CANNOT DISCHARGE TO SYSTEMS TRIBUTARY TO SURFACE WATERS. 3.4. ANY QUARRY SPALLS THAT ARE LOOSENED FROM THE PAD AND END UP ON THE ROADWAY SHALL BE REMOVED IMMEDIATELY. 3.5. IF VEHICLES ARE ENTERING OR EXITING THE SITES AT POINTS OTHER THAN THE CONSTRUCTION ENTRANCE(S), FENCING SHALL 8E INSTALLED TO CONTROL TRAFFIC. UNLESS OTHERWISE NOTED, DRAWING 15 NOT TO SCALE (NTS) STD. PLAN - 215.10 • PUBLIC WORKS APPROVE° 450 DEPARTMENT STABILIZED CONSTRUCTION ENTRANCE GAZ 9/28/2018 1 vanu"worH nammisn,,.r DATE SCALE: " 1NA� 19M HORIZONTAL:CITY OF NAD 1883/1891 I RENTON ONE IN DATUM AT FULL SCALE Planning/Building/Public Works Dept. IF NOT ONE INCH SCALE ACCORDINGLY rVAX- DRAINAGE GRATE TRIM GRATE FRAME _ C- OVERFLOW BYPASS a• BELOW INLET GRATE DEVICE SEDIMENT AND DEBRIS F FILTERED WATER - i DRAINAGE GRATE (RECTANGULAR GRATE SHOWN) RETRIEVAL SYSTEM (TYP.) n BELOW INLET GRATE DEVICE ISOMETRIC VIEW OVERFLOW BYPASS (TYP.) NOTES: 1. PROTECTION SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR CONSTRUCTION AREA, UNLESS THE RUNOFF THAT ENTERS THE CATCH BASIN WILL BE CONVEYED TO A SEDIMENT POND OR TRAP. 2. INLET PROTECTION SHALL BE USED TO PROTECT THE DRAINAGE SYSTEM, 3. THE CONTRIBUTING DRAINAGE AREA MUST NOT BE LARGER THAN ONE ACRE. 4. SIZE THE BELOW INLET GRATE DEVICE (BIGD) FOR THE STORMWATER STRUCTURE IT WILL SERVICE. 5. THE BIGD SHALL HAVE A BUILT-IN HIGH -FLOW RELIEF SYSTEM (OVERFLOW BYPASS). 6. THE RETRIEVAL SYSTEM MUST ALLOW REMOVAL OF THE BIGD WITHOUT SPILLING THE COLLECTED MATERIAL. 7. PERFORM MAINTENANCE IN ACCORDANCE WITH STANDARD SPECIFICATION 8-01.3(15). 8. ANY SEDIMENT IN THE CATCH BASIN INSERT SHALL BE REMOVED WHEN THE SEDIMENT HAS FILLED ONE-THIRD OF THE AVAILABLE STORAGE. THE FILTER MEDIA FOR THE INSERT SHALL BE CLEANED OR REPLACED AT LEAST MONTHLY. UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS) PUBLIC WORKS APPRED STD. PLAN - 216.30 ;} 45 �y ., DEPARTMENT CATCH BASIN INSERT GAZ 9/28/2018 1 v�nr�w.nsnamimmawr DATE R-403605 IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING • + jchavez 07/16/2019 WEATHERLY INN RENTON 4500 TALBOT RD S RENTON, WA 98055 PAGE:AGE OK: P DRAWING NO: TESC NOTES AND DETAILS Ec-02 SHET. 5 OR51 :45 An :45 AP