Loading...
HomeMy WebLinkAboutR-4036351 1" CHAINLOCK TREE TIES d (2)-BVC WOOD TREE STAKES (8' SHRUB FLARE SHALL BE d d HT.) CLEARLY VISIBLE MULCH 6 MIN � AFTER PLANTING 4" MULCH IN BASIN 3„ d d d WATERING BASIN BERM 3" WATER RETENTION BASIN (IN SHRUB ) AND GROUNDCOVER AREAS PLANTING PIT ROOTBALL I -III ''� _ ONLY FERTILIZER TABLETS, SHALL BE A DEPTH ' =III=III III=III=11 FERTILIZER TABLETS MIN. OF TWICE = III- 2"-6" DEPTH 1II 111 11 0 0 •:. I - O Q w III=III - = THE ROOTBALL 6" MIN. C0 0 11=-III-11 =III -III= COMPLETELY REMOVE BURLAP FROM DEPTH REMOVE BURLAP FROM A MIN. ROOT BALL. ...... ........ z =III=III= - - III=III- 'I, illliiilll 1-III-III-11 II III -III= I I III OF % FROM ROOTBALL AFTER _ BACKFILL SOIL MIX ROOTBALL PLACING SHRUB IN PLANTING N ROOT DIAMETER HOLE (REMOVE COMPLETELY IF BALL NOTES: FIBERGLASS OR TREATED). 1. REMOVE TREATED OR SYNTHETIC 6" 6" WIDTH BURLAP COMPLETELY. MIN. MIN 2. INSTALL 24" DEPTH ROOT BARRIER AT CANTING PI THE EDGE OF ANY PAVING WITHIN 8 FT. PLANTING PIT SHALL BE BACKFILL SOIL MIX SHALL BE A MIN OF OF TREE TRUNK. A MINIMUM OF TWICE 3X THE 3. ENSURE THE TRUNK FLARE IS VISIBLE THE ROOT- BALL WIDTH R OTBALL WIDTH. ABOVE GRADE AFTER PLANTING. TREE PLANTING & STAKING DETAIL N.T.S. + P-CO-REN-01 CONTINUOUS OUTER ROW OF PLANTS SPACED "X" ON CENTER AND SET BACK FROM THE PLANTING BED EDGE 2/3 "X" AREA FOR SPACING ADJUSTMENT EDGE OF PLANTING BED +-+-+-+»X»+ ULAR SPACING WITHIN PLANTING BED + SPECIFIED PLANT SPACING="X" DUAL PLANTS REPRESENTED AS: + PLANT SPACING DETAIL NTS 2/3 "X" NOTE: CONCRETE MOWSTRIP SHALL BE 5"W X 3-1/2"H AS AVAILABLE FROM (OR EQUAL): CREATE -A -CURB P.O. BOX 8726 LACEY WA 98509 JIM BRIGHAM FINE BROOM FINISH (360) 459-4479 a y (D o v CD a� 00 (D 3 N 1 / U � Z W N M y d �o I > W 3 EXTRUDED CONCRETE MOWSTRIP N `V N.T.S. o w P-CO-REN-03 RADIUS EDGE (BOTH )ES) JISH GRADE 4ER CEMENT CONCRETE )WSTRIP, PROVIDE EXP. INTS @ 10' O.C. DEPTH CRUSHED ROCK )IMPACTED SUBGRADE P-CO-REN-34 2 SHRUB PLANTING DETAIL (B&B OR CONT) NTS WIDTH VARIES REFER TO PLAN FINISH GRADE (INCLUDING BED MULCH) 2" @ SHRUB BEDS, FLUSH @ LAWN AREA Ater ASPHALT PAVING CONCRETE CURB OR ADJACENT PAVEMENT r MULCH ROOT BALL/POT BACKFILL SOIL MIX 1 FERTILIZER TABLET GROUNDCOVER PLANTING DETAIL P-CO-REN-06 \ v ) (2" & 4" POTS) 1" = 1" P-CO-REN-43 3" MIN.; REFER TO PLAN FOR SPECIFIC BERM & CROWN HTS. a� SUB -BASE MATERIAL NATIVE SOIL TOPSOIL FILL - REFER TO SPECIFICATIONS FOR SOIL TYPE NOTE: GENERAL CONTRACTOR SHALL REMOVE EXCESS ASPHALT PAVEMENT AND SUB- BASE MATERIAL DOWN TO NATIVE SOIL. PARKING ISLAND PLANTER DETAIL NTS P-CO-REN-04 6" EDGE I AWN ARFA (TYPIC:AI 1 Tocnirlu oHm IR Rr=n (TYPIC'.AI 1 (: 6 LAWN EDGE DETAIL REFER To RoA036149 Wo-1403601 , S,,403601 FOR AS -BUILT INFORMATION B. G ` q VCR °0 O 1 BUILDING PERMIT SUBMITTAL z IBUILDING PERMIT SUBMITTAL FXP.021�_�; 09/14/20181 NO. REVISION A VOS 05 01 19 JBG suwum: A VOS 06 19 19 JBG DESIGNED: A. VOS DRAWN: A. VOS CHECKED: JGL . ANDER BY DATE APPR AP. GLANDER ONE INCH AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY P-CO-REN-15 VERTICAL• NAVE) 19M HORIZONTAL: NAD 1953/1991 DATUM LANDSCAPE SPECIFICATIONS 1. Refer to details for additional information. 2. Chemically kill and remove from site all existing weeds and vegetation not shown to remain on plans. 3. Distribute imported sandy loam topsoil (approved by the Landscape Architect) in areas shown and at depths indicated for crowning and berming of landscape areas, and backfill of retaining walls (if required). Dotted lines indicate 1' contour intervals. All landscape areas shall receive topsoil, whether indicated on plans or not, so that finish grades of all shrub beds shall be 2" below tops of adjacent curbs and pavement, and lawn areas shall be 1/2" below tops of adjacent curbs and pavement. Structural fill areas: Any landscape areas occurring within structural fill zones shall have said structural fill materials excavated to a depth of 12" below finish grades in shrub areas and 6" below grade in lawn areas, and replaced with specified topsoil. Dispose of excavated material off site. 4. Fine grade all landscape beds prior to planting operations. 5. No plant substitutions shall be permitted without prior approval of Landscape Architect/Owner. 6. All plants shall conform to the latest edition of the American Standard for Nursery Stock. 7. All plant materials and plant locations shall be approved by the Landscape Architect prior to installation. All plants shall be thoroughly watered immediately after planting with Alaska Fish Fertilizer solution. 8. Root barrier shall be incorporated adjacent and parallel to paving, curb and sidewalk, a minimum of 15 linear feet (7.5' on either side of trunk), 24" deep, where any tree is within 8' of paving, curb or sidewalk. Root barrier shall be DeepRoot UB-24 as available from Ewing Irrigation Products, 2901 S Tacoma Way, Tacoma, WA 98409 (253) 476-9530 or approved equal. 9. Soil amendment for soil preparation and planting backfill shall be a screened 5/8" minus nitrified wood residual compost equal to: A. "Silver Springs Top Grade Compost" brand compost as available from Corliss Resources Lake Tapps, WA (253) 279-9102. B. "Cedar Grove Compost" brand compost as available from Cedar Grove Compost, Maple Valley, WA (877) 764- 5748. C. PREP/LRI compost as available from Randles Sand and Gravel, Inc., Puyallup, WA (253) 537-6828. 10. Soil Preparation - (all landscape areas). Spread 9 c.y. of specified soil amendment per 1000 s.f. (approx. 3" depth) of area. Spread 100 lbs./1000 s.f. of dolomite lime (in lawn areas only), 150 lbs./1000 s.f. of Agricultural Gypsum and 15 lbs./1000 s.f. of 16-8-8 commercial fertilizer over soil amendment. Roto-till all of the above to a 6"-8" depth and grade smooth, compacting as required and removing all rocks, clods and debris. 11. Lawn areas (seed or sod refer to plans) shall consist of one of the following turf types: 60% Turf -Type Perennial Rye Grass Varieties 60% Turf -Type Perennial Rye Grass Varieties 20% Bluegrass 40% Turf -Type Fescue 20% Hard Fescue 12. Seed and sod shall be equal to that as grown by Country Green Turf Farms; Olympia, WA or JB Instant Lawn, Redmond, WA. Seed shall be applied at 7 Ibs/1000 s.f. and include 10 lbs./1000 s.f. of United Horticulture 15-5-10 fertilizer in all lawn areas. 13. All trees in lawn areas shall be planted in a 3' diameter circle of bed mulch. 14. Backfill mix for all plants (except Rhododendrons & Azaleas) shall be a blend of 1/3 existing site soil, 1/3 coarse sand, and 1/3 soil amendment specified in No. 9. Backfill mix for Rhododendrons and Azaleas shall consist of 2/3 above specified backfill mix and 1/3 fine grind hem -fir bark mulch. 15. Apply Osmocote 18-6-12, 9 month slow release fertilizer over the surface of all plant pits at the following rates: Trees Over 10' Height 2 Cups Trees Under 10' Height: 1 Cup All Shrubs Except 1 Gallons: 1 /2 Cup 1 Gallon Plants: 1 /4 Cup Ground Covers: 1 /4 Cup 16. Fertilizer tablets for all plants shall be Agriform (20-10-5) 21 gram or 10 gram tablets distributed as follows: All trees: 4-21 gram tablets, all shrubs (except 1 gallons): 3-21 gram tablets, all 1 gallons: 1-21 gram tablet, all 2-1/4" and 4" pot ground covers: 1-10 gram tablet each. Set tablets directly next to rootball. 17. All shrub and ground cover beds shall receive a 2" depth (6 c.y. per 1000 s.f.) of "Fine Grind" hem/fir bark mulch as top dressing. 18. Apply a granular pre -emergent herbicide to all shrub and groundcover beds at the conclusion of the maintenance period. Do not use Casaron or Norasac Brands. 19. All work shall be performed to the satisfaction of the Landscape Architect/Owner. 20. All plants shall be guaranteed for one full year from date of project acceptance. All replaced plants shall be re -guaranteed. All replacements shall be made within 21 days of receiving written notice from the Owner. Contractor shall not be responsible for plants dying due to Owner neglect or vandalism, after the maintenance period. 21. Plant list quantities are shown for reference only. Contractor is responsible for verifying all quantities in list with actual plan call -outs, and installing plantings per the landscape plan. Groundcover and/or mass shrub quantities shall be adjusted as required for field conditions at the specified spacing. 22. Final inspection shall occur at the conclusion of a 60-day maintenance & plant establishment period. Maintenance period shall commence upon completion of all landscape installation activities and shall include the following: A. Mow lawns once per week. B. Remove all weeds over 1" in height. C. Replace dead or unhealthy plants. D. Ensure proper function of irrigation system. E. Ensure adequate moisture is delivered to all landscape beds including non -irrigated areas. F. Fertilize all lawns at conclusion of maintenance and plant establishment period. CITY OF RENTON 1-`R V4297 Planning/Building/Public Works Dept. R=40363,5 F OMPLIANCE WITH CITY OF RENTON STANDARDS NT PLANNING rera 08/05/2019 WEATHERLY INN RENTON FIRIM 4500 TALBOT RD S PME. OK: PAGE: RENTON, WA 98055 DRAWING NO: DETAILS AND SPECIFICATIONS Ls-10 SHEET. 45 OP51