Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutR0-14 - Drainage ReportPRELIMII{ARYTECHII\ICAL II{FORMATIOI{ REPORTFOR7th Street Short PtatRenton, 'WashingtonJuly 2019Prepared for:Jagadeshwar Gattu14716 NE 76th StreetRedmondo WA 98052Prepared by:William Qi, DesignerReviewed By:Eric N. Oehler, Project ManagerCara Visintainer, P.8., Senior Project Manager128LtREPORT #1,7234
TABLE OF CONTENTS
PAGE
1.0 PROJECT OVERVIEW ................................................................................................................... 1
2.0 CONDITIONS AND REQUIREMENTS SUMMARY ................................................................. 19
2.1 Analysis of the Nine Core Requirements .................................................................................... 19
2.2 Analysis of Special Requirements .............................................................................................. 23
3.0 OFF-SITE ANALYSIS ................................................................................................................... 25
3.1 Study Area Definition and Maps ................................................................................................ 25
3.2 Resource Review ........................................................................................................................ 25
3.3 Drainage System Description and Problem Descriptions ........................................................... 26
3.4 Mitigation of Existing or Potential Problems .............................................................................. 26
4.0 STORMWATER ANALYSIS AND DESIGN ............................................................................... 35
4.1 Existing Site Hydrology .............................................................................................................. 35
4.2 Developed Site Hydrology .......................................................................................................... 35
4.3 Performance Standards ............................................................................................................... 36
4.4 Water Quality System ................................................................................................................. 37
5.0 CONVEYANCE SYSTEM ANALYSIS AND DESIGN .............................................................. 45
6.0 SPECIAL REPORTS AND STUDIES ........................................................................................... 48
7.0 OTHER PERMITS ......................................................................................................................... 81
8.0 CSWPP ANALYSIS AND DESIGN ............................................................................................. 82
9.0 BOND QUANTITIES..................................................................................................................... 84
10.0 OPERATIONS AND MAINTENANCE MANUAL ..................................................................... 85
LIST OF FIGURES
Figure 1.1 – Technical Information Report (TIR) Worksheet .................................................................. 4
Figure 1.2 – Vicinity Map ......................................................................................................................... 12
Figure 1.3 – Pre-developed Basin Map ..................................................................................................... 14
Figure 1.4 – Developed Basin Map .......................................................................................................... 16
Figure 1.5 – Soil Map and Descriptions ................................................................................................... 17
Figure 3.1 – FEMA Map ........................................................................................................................... 31
Figure 3.2 – Sensitive Ares Map ............................................................................................................... 33
Figure 3.3 – Offsite Analysis Drainage System Table .............................................................................. 35
Figure 3.4 – Downstream Analysis Maps ................................................................................................. 37
Figure 4.1 – WWHM Report .................................................................................................................... 42
Figure 4.2 – Stormfilter Sizing ................................................................................................................. 51
Figure 5.1 – LDD Computer Output ......................................................................................................... 56
Figure 6.1 – Geotechnical Engineer’s Report ........................................................................................... 61
Page | 1
1.0 PROJECT OVERVIEW
The 7th Street Short Plat project consists of a single 27,705 sq.ft. (0.64-acres) parcel, addressed
3605 NE 7th Street, Renton, WA 98056, in the jurisdictional boundary of the City of Renton
(King County Tax Parcel# 8011100135). The project also lies within a portion of the NW ¼ of
the SE ¼ of Section 9, Township 23 North, Range 5 East. Refer to Figure 1.2 – Vicinity Map
within this section.
The site is generally rectangular and contains an existing single-family residence and detached
garage along with gravel drive, which are proposed to be removed along with this project. The
remainder of the site is covered with dense vegetation, and slopes from the east to the west at an
approximate gradient ranging from 5% to 10% with isolated areas up to 30%. The property is
surrounded by single-family developments to the south, north, east and west. To the north the
property abuts 7th NE Street of which a single-family residence is located across the street.
According to Natural Resources Conservation Service (NRCS), site soils consist of Arents,
Alderwood material, 6 to 15 percent slopes. According to the Geotechnical report conducted by
Earth Solutions NW, LLC (ESNW) on August 20, 2018, the native soils were classified primarily
as silty sand with gravel, consistent with the typical makeup of glacial till deposits. Based on their
infiltration tests and observation of variable soil conditions, neither full or limited infiltration is
feasible.
The project proposes the construction of 3 lots for single-family residence, frontage
improvements, private access road, driveways and associated utilities. The site improvements are
designed per the 2017 City of Renton Surface Water Design Manual (Manual) and its
amendments to the 2016 King County Surface Water Design Manual. The project site is located
in the East Lake Washington-Renton Drainage Basin resulting in 0.37 acres of new and replaced
impervious surface. According to Fig. 1.1.2.A, the proposed single-family residential project
requires a Direct Drainage Review. Therefore, all nine core requirements and six special
requirements apply. A detention vault and a Contech stormfilter are proposed for flow control and
water quality control. A TIR work sheet has been included in Figure 1.1 of this section.
Page | 2
Figure 1.1 – Technical Information
Report (TIR) Worksheet
CITY OF RENTON SURFACE WATER DESIGN MANUAL
2017 City of Renton Surface Water Design Manual 12/12/2016
8-A-1
REFERENCE 8-A
TECHNICAL INFORMATION REPORT (TIR)
WORKSHEET
Part 1 PROJECT OWNER AND
PROJECT ENGINEER
Part 2 PROJECT LOCATION AND
DESCRIPTION
Phone ___________________________________
Project Name __________________________
CED Permit # ________________________
Location Township ________________
Range __________________
Section _________________
Site Address __________________________
_____________________________________
Part 3 TYPE OF PERMIT APPLICATION Part 4 OTHER REVIEWS AND PERMITS
Land Use (e.g., Subdivision / Short Subd.)
Building (e.g., M/F / Commercial / SFR)
Grading
Right-of-Way Use
Other _______________________
DFW HPA
COE 404
DOE Dam Safety
FEMA Floodplain
COE Wetlands
Other ________
Shoreline
Management
Structural
Rockery/Vault/_____
ESA Section 7
Part 5 PLAN AND REPORT INFORMATION
Technical Information Report Site Improvement Plan (Engr. Plans)
Type of Drainage Review
(check one):
Date (include revision
dates):
Date of Final:
Targeted
Simplified
Large Project
Directed
Plan Type (check
one):
Date (include revision
dates):
Date of Final:
Full
Modified
Simplified
__________________
__________________
__________________
Project Owner __Jagadeshwar Gattu ___________7th Street Short Plat
23N
05E
9
3605 N.E. 7th Street
Renton, WA 98056
x
x
Address __14716 NE 76th Street_________
_______________Redmond, WA 98052__________________________
Project Engineer ________Eric N. Oehler___________________
Company _______CES NW Inc.__________________________
Phone ______253-848-4282_____________________________
x
x
x
Full
_________6.9.2019_
__________________
__________________
REFERENCE 8: PLAN REVIEW FORMS AND WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
12/12/2016 2017 City of Renton Surface Water Design Manual8-A-2
Part 6 SWDM ADJUSTMENT APPROVALS
Type (circle one): Standard / Blanket
Description: (include conditions in TIR Section 2)
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
Approved Adjustment No. ______________________ Date of Approval: _______________________
Part 7 MONITORING REQUIREMENTS
Monitoring Required: Yes / No
Start Date: _______________________
Completion Date: _______________________
Describe: _________________________________
_________________________________________
_________________________________________
Re: SWDM Adjustment No. ________________
Part 8 SITE COMMUNITY AND DRAINAGE BASIN
Community Plan: ____________________________________________________________________
Special District Overlays: ______________________________________________________________
Drainage Basin: _____________________________________________________________________
Stormwater Requirements: _____________________________________________________________
Part 9 ONSITE AND ADJACENT SENSITIVE AREAS
River/Stream ________________________
Lake ______________________________
Wetlands ____________________________
Closed Depression ____________________
Floodplain ___________________________
Other _______________________________
_______________________________
Steep Slope __________________________
Erosion Hazard _______________________
Coal Mine Hazard ______________________
Seismic Hazard _______________________
Habitat Protection ______________________
_____________________________________
East Lake Washington-Renton
Landslide Hazard ______________________
REFERENCE 8-A: TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
2017 City of Renton Surface Water Design Manual 12/12/2016
Ref 8-A-3
Part 10 SOILS
Soil Type
______________________
______________________
______________________
______________________
Slopes
________________________
________________________
________________________
________________________
Erosion Potential
_________________________
_________________________
_________________________
_________________________
High Groundwater Table (within 5 feet)
Other ________________________________
Sole Source Aquifer
Seeps/Springs
Additional Sheets Attached
Part 11 DRAINAGE DESIGN LIMITATIONS
REFERENCE
Core 2 – Offsite Analysis_________________
Sensitive/Critical Areas__________________
SEPA________________________________
LID Infeasibility________________________
Other________________________________
_____________________________________
LIMITATION / SITE CONSTRAINT
_______________________________________
_______________________________________
_______________________________________
_______________________________________
_______________________________________
_______________________________________
Additional Sheets Attached
Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet
per Threshold Discharge Area)
Threshold Discharge Area:
(name or description)
Core Requirements (all 8 apply):
Discharge at Natural Location Number of Natural Discharge Locations:
Offsite Analysis Level: 1 / 2 / 3 dated:__________________
Flow Control (include facility
summary sheet)
Standard: _______________________________
or Exemption Number: ____________
On-site BMPs: _
Conveyance System Spill containment located at: _____________________________
Erosion and Sediment Control /
Construction Stormwater Pollution
Prevention
CSWPP/CESCL/ESC Site Supervisor: _____________________
Contact Phone: _________________________
After Hours Phone: _________________________
Perforated stub-out connections
NA
AmC - Arents, Alderwood 6-15%
REFERENCE 8: PLAN REVIEW FORMS AND WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
12/12/2016 2017 City of Renton Surface Water Design Manual8-A-4
Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet
per Threshold Discharge Area)
Maintenance and Operation Responsibility (circle one): Private / Public
If Private, Maintenance Log Required: Yes / No
Financial Guarantees and Liability Provided: Yes / No
Water Quality (include facility
summary sheet)
Type (circle one): Basic / Sens. Lake / Enhanced Basic / Bog
or Exemption No. _______________________
Special Requirements (as applicable):
Area Specific Drainage
Requirements
Type: SDO / MDP / BP / Shared Fac. / None
Name: ________________________
Floodplain/Floodway Delineation Type (circle one): Major / Minor / Exemption / None
100-year Base Flood Elevation (or range): _______________
Datum:
Flood Protection Facilities Describe:
Source Control
(commercial / industrial land use)
Describe land use:
Describe any structural controls:
Oil Control High-Use Site: Yes / No
Treatment BMP: _________________________________
Maintenance Agreement: Yes / No
with whom? _____________________________________
Other Drainage Structures
Describe:Detention Vault
REFERENCE 8-A: TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
2017 City of Renton Surface Water Design Manual 12/12/2016
Ref 8-A-5
Part 13 EROSION AND SEDIMENT CONTROL REQUIREMENTS
MINIMUM ESC REQUIREMENTS
DURING CONSTRUCTION
Clearing Limits
Cover Measures
Perimeter Protection
Traffic Area Stabilization
Sediment Retention
Surface Water Collection
Dewatering Control
Dust Control
Flow Control
Control Pollutants
Protect Existing and Proposed
BMPs/Facilities
Maintain Protective BMPs / Manage
Project
MINIMUM ESC REQUIREMENTS
AFTER CONSTRUCTION
Stabilize exposed surfaces
Remove and restore Temporary ESC Facilities
Clean and remove all silt and debris, ensure
operation of Permanent BMPs/Facilities, restore
operation of BMPs/Facilities as necessary
Flag limits of sensitive areas and open space
preservation areas
Other _______________________
Part 14 STORMWATER FACILITY DESCRIPTIONS (Note: Include Facility Summary and Sketch)
Flow Control Type/Description Water Quality Type/Description
Detention
Regional Facility
Shared Facility
On-site BMPs
Other
Vegetated Flowpath
Wetpool
Filtration
Oil Control
Spill Control
On-site BMPs
Other
________________
________________
________________
________________
________________
________________
________________
Part 15 EASEMENTS/TRACTS Part 16 STRUCTURAL ANALYSIS
Drainage Easement
Covenant
Native Growth Protection Covenant
Tract
Other ____________________________
Cast in Place Vault
Retaining Wall
Rockery > 4ƍ High
Structural on Steep Slope
Other _______________________________
x
x
x
X
X
X
X
X
X
X
X
X
X
X
X
Infiltration
x Detention Vault___
________________
________________
________________
Connections______
Storm Filter
x
x
x
Perforated stub-out
REFERENCE 8: PLAN REVIEW FORMS AND WORKSHEETTECHNICAL INFORMATION REPORT (TIR) WORKSHEETSigned/Datel, or a civil engineer under my superv¡sion, have visited the site. Actual site conditions as observed wereincorporated into this worksheet and the attached Technical lnformation Report. To the best of myknowledge the infornption providg{ her¡ is accurate.(' l"rt" lVñbv 7't't qPaTtl7 SIGNATURE OF PROFESSIONAL ENG¡NEER12^2/20168-A-62017 City of Renton Surface Water Design Manual
Page | 8
Figure 1.2 – Vicinity Map
4,514 376
7th Street Short Plat
This map is a user generated static output from an Internet mapping site and
is for reference only. Data layers that appear on this map may or may not be
accurate, current, or otherwise reliable.
Vicinity Map
9/11/2018
Legend
2560128
THIS MAP IS NOT TO BE USED FOR NAVIGATION
Feet
Notes
256
WGS_1984_Web_Mercator_Auxiliary_Sphere
Information Technology - GIS
RentonMapSupport@Rentonwa.gov
Page | 10
Figure 1.3 – Pre-developed Basin Map
Page | 11
Figure 1.4 – Developed Basin Map
Page | 13
Figure 1.5 – Soils Map and Descriptions
Soil Map—King County Area, Washington
(Soil Map of 7th Street Short Plat)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
9/11/2018
Page 1 of 3526039052604005260410526042052604305260440526045052604605260470526048052604905260500526039052604005260410526042052604305260440526045052604605260470526048052604905260500562440562450562460562470562480562490562500562510562520
562440 562450 562460 562470 562480 562490 562500 562510 562520
47° 29' 41'' N 122° 10' 15'' W47° 29' 41'' N122° 10' 11'' W47° 29' 38'' N
122° 10' 15'' W47° 29' 38'' N
122° 10' 11'' WN
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 10N WGS84
0 25 50 100 150
Feet
0 5 10 20 30
Meters
Map Scale: 1:575 if printed on A portrait (8.5" x 11") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Map Unit Polygons
Soil Map Unit Lines
Soil Map Unit Points
Special Point Features
Blowout
Borrow Pit
Clay Spot
Closed Depression
Gravel Pit
Gravelly Spot
Landfill
Lava Flow
Marsh or swamp
Mine or Quarry
Miscellaneous Water
Perennial Water
Rock Outcrop
Saline Spot
Sandy Spot
Severely Eroded Spot
Sinkhole
Slide or Slip
Sodic Spot
Spoil Area
Stony Spot
Very Stony Spot
Wet Spot
Other
Special Line Features
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: King County Area, Washington
Survey Area Data: Version 13, Sep 7, 2017
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Jul 8, 2014—Jul 15,
2014
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Soil Map—King County Area, Washington
(Soil Map of 7th Street Short Plat)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
9/11/2018
Page 2 of 3
Map Unit Legend
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI
AmC Arents, Alderwood material, 6
to 15 percent slopes
0.9 100.0%
Totals for Area of Interest 0.9 100.0%
Soil Map—King County Area, Washington Soil Map of 7th Street Short Plat
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
9/11/2018
Page 3 of 3
King County Area, Washington
AmC—Arents, Alderwood material, 6 to 15 percent slopes
Map Unit Setting
National map unit symbol: 1hmsq
Elevation: 50 to 660 feet
Mean annual precipitation: 35 to 60 inches
Mean annual air temperature: 50 degrees F
Frost-free period: 150 to 200 days
Farmland classification: Not prime farmland
Map Unit Composition
Arents, alderwood material, and similar soils: 100 percent
Estimates are based on observations, descriptions, and transects of
the mapunit.
Description of Arents, Alderwood Material
Setting
Landform: Till plains
Parent material: Basal till
Typical profile
H1 - 0 to 26 inches: gravelly sandy loam
H2 - 26 to 60 inches: very gravelly sandy loam
Properties and qualities
Slope: 6 to 15 percent
Depth to restrictive feature: 20 to 40 inches to densic material
Natural drainage class: Moderately well drained
Capacity of the most limiting layer to transmit water (Ksat): Very
low to moderately low (0.00 to 0.06 in/hr)
Depth to water table: About 16 to 36 inches
Frequency of flooding: None
Frequency of ponding: None
Available water storage in profile: Very low (about 2.3 inches)
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 4s
Hydrologic Soil Group: B/D
Hydric soil rating: No
Data Source Information
Soil Survey Area: King County Area, Washington
Survey Area Data: Version 13, Sep 7, 2017
Map Unit Description: Arents, Alderwood material, 6 to 15 percent slopes---King County Area,
Washington
Soil Map of 7th Street Short Plat
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
9/11/2018
Page 1 of 1
Page | 19
2.0 CONDITIONS AND REQUIREMENTS SUMMARY
The project is subject to Direct Drainage Review as dictated by the Manual’s Core Requirements
No. 1 through 9, and Special Requirements No. 1 through 6.
2.1 Analysis of the Nine Core Requirements
Core Requirement No. 1: Discharge at the Natural Location
Intent: To prevent adverse impacts to downstream properties caused by diversion of flow from
one flowpath to another, and to discharge in a manner that does not significantly impact downhill
properties or drainage systems. Diversions can cause greater impacts (from greater runoff
volumes) than would otherwise occur from new development discharging runoff at the natural
location. Diversions can also impact properties that rely on runoff water to replenish wells and
ornamental or fish ponds.
Response: Historically, runoff from the site sheet flows southwest of the site, and the overflow
flows into the catch basin of the neighboring single-family residence. The project proposes to
control its runoff with the use of a detention vault. Runoff from the site will route to the
southwest corner of the parcel, and then will be discharged into the existing conveyance system
located in NE 7th Place through proposed drainage pipe. The following table summarizes the
basin areas and stormwater flows:
Existing Basin Area (Acres) 0.71
Developed Basin Area (Acres) 0.71
100-year Predeveloped Flow Rate (CFS) 0.100
100-year Developed Flow Rate (CFS) 0.079
Core Requirement No. 2: Off-Site Analysis
Intent: To identify and evaluate offsite flooding, erosion, and water quality problems that may be
created or aggravated by the proposed project, and to ensure appropriate measures are provided
for preventing creation or aggravation of those problems. In addition, this requirement is intended
to ensure appropriate provisions are made, as needed, to mitigate other identified impacts
associated with the quantity and quality of surface and storm water runoff from the project site
(e.g., impacts to the hydrology of a wetland as may be identified by a "critical area report" per
RMC 4-3-050).
Page | 20
Response: The project is proposing to detain all stormwater runoff from developed site and
frontage improvement area, and will release runoff at pre-developed rates and durations based on
a forested cover condition of the site. This is going to result in lower peak flows from the site;
therefore, no off-site flooding or erosion problems will be created or aggregated by this project. A
Level One Downstream Analysis is located within Section 3.0 of this report.
Core Requirement No. 3: Flow Control
Intent: To ensure the minimum level of control needed to protect downstream properties and
resources from increases in peak, duration, and volume of runoff generated by new development.
The level of control varies depending on location and downstream conditions identified under
Core Requirement #2.
Response: The project is proposing a detention vault for flow control. Please refer Section 4.0 of
flow control calculations.
Core Requirement No. 4: Conveyance System
Intent: To ensure proper design and construction of engineered conveyance system elements.
Conveyance systems are natural and engineered drainage facilities that collect, contain, and
provide for the flow of surface and storm water. This core requirement applies to the engineered
elements of conveyance systems—primarily pipes, culverts, and ditches/channels.
Response:
Pipe Systems:
The proposed conveyance system is comprised of privately owned roof downspout pipes, which
connect to the proposed perforated stub-out connections, and a series of storm drainage pipes
connecting from the proposed catch basins to the public drainage system in NE 7th Place. The
conveyance system is sized to convey the 100-year developed peak flow analyzed using LDD’s
Manning Calculator in Section 5.0 of this report.
Culverts:
There are no proposed culverts for this development.
Ditches/Channels:
There are no proposed ditches/Channels for this development.
Core Requirement No. 5: Temporary Erosion and Sediment Control
Intent: To prevent the transport of sediment and other impacts, like increased runoff, related to
land disturbing activities. Erosion of disturbed areas on construction sites can result in excessive
Page | 21
sediment transport to adjacent properties and to surface waters. This sediment can result in major
adverse impacts, such as flooding from obstructed drainage ways, smothering of salmonid
spawning beds, algal blooms in lakes, and exceedances of state water quality standards for
turbidity. These impacts can also result from the increased runoff generated by land disturbing
activities on construction sites.
Response: A Temporary Erosion and Sedimentation Control (TESC) Plan will be prepared as
part of the Construction Plans. The TESC Plan will prevent the transport of sediment to streams,
wetlands, lakes, drainage systems, and adjacent properties in accordance with all the applicable
standards of 2017 City of Renton Surface Water Design Manual.
Core Requirement No. 6: Maintenance and Operations
Intent: To ensure that the maintenance responsibility for drainage facilities is clearly assigned
and that these facilities will be properly maintained and operated in perpetuity.
Response: The onsite stormwater components will be located within private property and will be
maintained by the homeowners. The Flow Control Covenant and maintenance standards for the
privately maintained drainage components will be provided along with the final engineering plan
submittal.
Core Requirement No. 7: Financial Guarantees and Liability
Intent: To ensure financial guarantees are posted to sufficiently cover the cost of correcting, if
necessary, incomplete or substandard drainage facility construction work, and to warrant for two
years the satisfactory performance and maintenance of those newly constructed drainage
facilities. Core Requirement #7 is also intended to ensure that a liability policy is provided that
protects the proponent and the City from any damages relating to the construction or maintenance
of required drainage facilities by private parties.
Response: Bond Quantities will be provided along with the final engineering plan submittal.
Core Requirement No. 8: Water Quality
Intent: To require an efficient, cost-effective level of water quality treatment tailored to the
sensitivities and resource protection needs of the downstream receiving water to which the
project site drains, or, in the case of infiltration, protection of the receiving groundwater system.
Response: The project proposes 8,276 sq. ft. of new pollution impervious surfaces (PGIS). A
stormfilter with three (3) 18’’ ZPG cartridges will be provided upstream of the detention vault for
basic water quality control.
Page | 22
Core Requirement No. 9: On-site BMPs
Intent: To provide mitigation of hydrologic impacts that are not possible/practical to mitigate
with a flow control facility. Such impacts include increases in runoff volumes and peak
discharges and decreases in groundwater recharge. Increased runoff volume and peak discharges
leads to higher and more variable stream velocities at low flows and more frequent water level
fluctuations in streams and wetlands. This causes wash-out and stranding of aquatic species, algal
scour and washout of organic matter, loss of vegetation diversity and habitat quality, and
disruption of cues for spawning, egg hatching, and migration. Decreased groundwater recharge
reduces water supply for human use and summer base flows in streams, which is critical to water
temperature, salmonid use of smaller streams, and the habitat quality of mainstem side channels
and wetlands used for spawning, rearing, and flood refuge. On-site BMPs seek to reduce runoff
volumes and flashiness and increase groundwater recharge by reducing imperviousness and
making use of the pervious portions of development sites to maximize infiltration and retention of
stormwater onsite. Thus, the goal is to apply on-site BMPs to new impervious surfaces, new
pervious surfaces, and replaced impervious surfaces, to the maximum extent feasible without
causing flooding or erosion impacts.
Response: According to Section 1.2.9.2 of the Manual, the project is on a site that is larger than
22,000 sq. ft., therefore, large lot BMP requirements apply. Project proposes perforated pipe
connections (C.2.11) to control its roof runoff. The following is an evaluation of each BMP as
required by Section 1.2.9.2.2 of the Manual:
1. Full Dispersion:
Full Dispersion BMP was deemed infeasible since there was not a 100-ft flow path
available onsite.
2. Full Infiltration:
Full Infiltration BMP was deemed infeasible due to the low infiltration capacity of
onsite soils according to the onsite soil infiltration tests shown in geotechnical
report.
Limited Infiltration:
Limited Infiltration BMP was deemed infeasible due to the low infiltration capacity
of onsite soils according to the onsite soil infiltration tests shown in geotechnical
report.
Bioretention:
Page | 23
Bioretention BMP was deemed infeasible due to the low infiltration capacity of
onsite soils according to the onsite soil infiltration tests shown in geotechnical
report.
Permeable Pavement:
Permeable Pavement BMP was deemed infeasible due to the low infiltration
capacity of onsite soils according to the onsite soil infiltration tests shown in
geotechnical report.
3. Basic Dispersion:
Basic Dispersion BMP was deemed infeasible for roof area since there was not a 25
feet flow path available on site for the dispersion trench (C.2.4.4). Basic Dispersion
BMP was deemed infeasible for driveways since there was not a 10 feet flow path
available for dispersion.
4. Soil Moisture Holding Capacity Protection:
All new pervious surface area will be protected in accordance with the soil amended
BMP as detailed in Appendix C, Section C.2.13 of the Manual.
5. Perforated Pipe Connection:
A 10 ft. perforated stub-out connection will be provided for runoff from the rooftop
as detailed in Appendix C, Section C.2.11 of the Manual.
2.2 Analysis of Special Requirements
Special Requirement No. 1: Other Adopted Area-Specific Requirements
Response: The following is a list of other possible adopted area-specific requirements according
to the Manual:
Master Drainage Plan – The area is not part of a master drainage plan.
Basin Plans – This site is located within the East Lake Washington-Renton drainage basin. No
additional requirements have been identified.
Salmon Conservation Plan – The site is located within the WRIA 8 Chinook Salmon
Conservation Plan Area. No additional requirements apply.
Flood Hazard Reduction Plan Updates – This project does not appear to be within a Flood Hazard
Area; therefore, this plan does not apply.
Page | 24
Shared Facility Drainage Plan – The project does not propose to connect to a shared detention
facility system or create a shared facility; therefore, this plan does not apply.
Special Requirement No. 2: Flood Hazard Area Delineation
Response: The proposed site is not located within the 100-year floodplain or flood hazard area.
Please refer to the FEMA map within Section 3.0 of this report.
Special Requirement No. 3: Flood Protection Facilities
Response: Special Requirement No. 3 is not applicable to the proposed site since the site will not
affect any existing flood protection facilities.
Special Requirement No. 4: Source Control
Response: Special Requirement No. 4 only applies to commercial site development permits.
Since this site is a single-family residential, this requirement does not apply.
Special Requirement No. 5: Oil Control
Response: Special Requirement No. 5 does not apply to the site since it is not classified as a
high-use site.
Special Requirement No. 6: Aquifer Protection Area
Response: The project is not located within either Aquifer Protection Area Zone 1 or Zone 2;
therefore, this requirement does not apply.
Page | 25
3.0 OFF-SITE ANALYSIS
3.1 Study Area Definition and Maps
The City of Renton requires a summary of the upstream drainage basin, and one-quarter mile
downstream drainage analysis. Under predeveloped condition, stormwater from a portion of south
side of NE 7th Street flows to the site from the north property line, which sheet flows to the
existing landscape area. Under developed condition, stormwater from the frontage improvement
areas (i.e., roadway, sidewalk, landscape) will be collected by two proposed catch basins and
conveyed to the proposed detention vault onsite.
3.2 Resource Review
Adopted Basin Plans: This site is located within the East Lake Washington –
Renton drainage basin. According to the City’s GIS Map Viewer the site is tributary
to Cedar River, and ultimately Lake Washington.
Floodplain and Floodway FEMA Maps: Per the FEMA map number
53033C0981F the site is located in Zone X and is not located within the 100-year
floodplain. Please see the FEMA map within this section.
Offsite Analysis Report: No other offsite analysis reports were located.
Sensitive Areas Folios: Based on a review of the Renton and King County Sensitive
Areas Maps and Land Survey, it was found that the subject site does not contain any
seismic hazards, flood hazards, erosion hazards, wildlife network, aquafer protection
zone, or coal mines.
United States Department of Agriculture King County Soils Survey: Based on
the NRCS soils map for this area, the entire site is located within AmC-Arents,
Alderwood material, 6-15% slopes, AmC soils are typically underline by gravelly
sandy loam 0 to 26-inches then to very gravelly sandy loam from 26 to 60-inches.
These soils are classified as type C and have low capacity to transmit water.
Wetlands Inventory Maps: Based on a review of the Renton and King County
maps there are no onsite or adjacent offsite wetlands.
Washington State DOE List of Polluted Waters: There are no polluted waters
within 1-mile of the project site.
Page | 26
Erosion and Landslide Maps: As shown in the sensitive area map, a small
moderate slope area exists in the south of the site. A temporary erosion control and a
retaining wall are proposed to prevent erosion and landslide, respectively.
3.3 Drainage System Description and Problem Descriptions
The project site slopes from east to west at an approximate rate of 5% to 10% with isolated areas
up to 30%. The current runoff from the existing house and detached garage disperses to the
western portion of the site. The overflow from the site flows into the existing storm drainage
system within Pierce Pl. NE and NE 6th Ct. to the west of the property. Under developed
condition, the project is proposing to detain all stormwater runoff from developed area of the site
and frontage improvements, and release runoff matching 50% of the 2-year peak flow up to full
50-year peak flow of the pre-developed basin (forested condition). The drainage from the
detention vault will route to the southwest corner of the site and ultimately discharge to the
existing conveyance within NE 7th Place, and then flows to the 12-inch drainage pipe along
Olympia Ave NE to the South. The runoff then flows southernly into the 30-inch private
stormwater main within Olympia Ave NE and Monroe Ave. The stormwater continue flows
southernly for approximately 0.50 miles to NE 2nd Street, then discharges to Cedar River and
eventually flows into Lake Washington. No off-site flooding or erosion problems will be created
or aggregated by this project due to the proposed detention vault. An Offsite Analysis Drainage
System Table is included within this section for reference.
3.4 Mitigation of Existing or Potential Problems
There are no existing problems that need mitigation due to the construction of this project. The
runoff from the site will be controlled with a proposed detention vault of 10,800 cubic feet
storage volume, which will release runoff matching 50% of the 2-year peak flow up to full 50-
year peak flow of the pre-developed basin (forested condition). Therefore, no potential problems
will be aggravated by this project.
Page | 27
Figure 3.1 – FEMA Map
D
::::
,,::::,,,,SUNSETNESTREETAVENUE
H I LLS
6 8 ZONE XDAYTON1ST SENE
SE SHELTON8
3AVENUEPLACE
STREET
ACCESSS T R E E T
PLACE
STREET55AVENUE
8
1
SERENTON AVENUE NES E
3RD
NE
AVENUEINDEXSE
6 4
NE
STR EETKIRKLAND
PLACE SE6TH
COUR T
STREET
3RD
2ND
6TH
STREET
NEN
EAVENUENE
AVENU
E
NEGLENWOOD
CEDAR
7TH
SEHARRINGTONCHELANNE
530088
6TH
STREET
EDMONDS AVENUE NEAMZONE X
Bridge
NE PLACE
¥k405
N ENEDRIVEPARK
10THBOULEVARD
ST R E E T
STREET PLACEPLACE
AVENENE2 N D PLACE
STREET
S T R E E T
ZONE XNE 10
AVENUE NESTREET
7 T H
PLACE
2ND
DRIVE
STREET UNIONSUNSET
49S
U
N
S
ET
8 T H
RIVER6017
131ST4TH
P L A C E NE5TH
NE
PLAC
E
OLYMPIAAVENUE NEPLACEAVENUE144TH
SE
D
RIVE AVENUESENE 5TH
ZONEFERNDALEPLACENE 6TH
NE
7TH
5TH
9TH
136TH6TH
STREET
C
HE
L
A
N
A
V
EN
UE
S
EAVENUE1ST
AVENUE
ZONE X
NE 10TH PLACE
50
W IN D S OR
58STREET
PLACE
SE
8 T H
INDEXNE
6T HAVENUEZONE X
2ND
5TH
CT2ND DUVALLNES E
AVEAVENUEAVENUESTREET7TH
A
VEN
U
E
A VENUE
KING COUNTY
10TH
HARRINGTONSE JEFFERSONP L A C E
6TH
66
STREET
NE
SE 135TH
IN
DEX
APAO80
1ST NEAVENUEPLACE
QUEENPLACE
ZONE AE
NE
8TH
SE
10TH
NE
8 T H EDMONDSPLA
C
E AVENUEP L A C E
ZONE X
4THPLAC E6TH CHELANNE
NE 5TH
NE
G L E N WOOD5TH
AVENUEBREMERTONROADSTREETS T R E E TNENEOLYMPIA
54PLACE5TH
STREETINDEXZONE AE
NE
PLA
C
E
NE 5TH STREET
5TH STREETNESENEPLACEAVENUE530071
3 R D
1 41ST67
S ENE
SHEL
TONN E VASHON5THSTREET PLACEPLACE
NECEDAR RIVER
PLACE
NENE
TACOMA
PLACE
PLACE
AVENUEZONE X
52
STREET
STREET
NE
UNINCORPORATED AREASVASHON
SENE
79
3 R D
21LYNNWOOD4TH
2ND
SE BREME
R
TON
STREET
S E OLYMPIANE 6TH
N E
NE 7TH
RAILROAD53STREET
N E
NE
NE 5TH
RENTONCITY OF RENTON
CAMAS
DRIVE
SE 11THNEAVENUE6THPIERCE AVE SEINDEXQUEENSENE NE
S E
NE
PLACENE
133RDMONROEC O URT NESTREET
SE
N E 6 T H
SE
9TH
VASHONNESTREET
AVENUECOURT
PROFILE BASELINE AVENUESTREET
SEAVENUENE9TH
116TH
1 S T
ZONE X
6 5
7TH
SE
CEDAR
MAPLEAVENUEINDEXFERNDALE
Footbridge
A IANAVENUEPLACE BREMERTONP
L
ACE8TH
AVENUE NENE
57WI
NDSORI
NDEXN E 6 T H
NEPLACE NEZONE X
5TH
C O U R T
ZONE X
NE
AVENUE SE22
STREETCOURTCIRCLE
9TH
SENE
SE PLACEHIGHWAY
LAN E
NEASHELTONROAD6TH NEP L A C E ZONE AEPLACENEPLACEAEINDEX3RD
NE
4T H BREMERTONP
L
A
C
E
SY5646 PLACE NEAVENUE
NE 7TH
TRAIL
NE
ST R EE TRENTON DIST CTNENENEFERNDALEPINES T R E E TEDMONDSSEAVENUENE
SE
16
NE
NE
N
E
FERNDALE
SESHELTON 5TH
NE
ROADNE
S T R EETSTREET
NE
NE
N E
NE 9TH
NENE
ZONE X
ZONE X
PLACE NECOURTZONE X
COURT
132ND AVE SEAVENUE
PROFILE BASELINE
SE
15 138THPLACE
9
ROYALLANE
5THNESTREET
STREET
63SE
77
SE
61ST
R
E
D
MONDNE9TH
10TH
TACOMANE7TH NERID
G
E NEACCESS ROADNEAHAGVALLEY
82
4 T H
RAILROAD
FERNDALE
S EUNIONPLACE
51 PLACE NE9TH
NENE
NEWPORTCEDAR RIVER
ZONE X
STREET
AVENUEPLAC E
10TH
P LA C E
PLACEAVENUE
G L ENWOODNE
PLACE7THAVENUEBREMERTONSTREET
COURT
SE
59148TH
4TH
3RD
CTNENE
QUEEN567TH
NE 9TH
AEAVENUESTREET
NE 4TH PLACE
ACNE
AV
ENUE
6TH
130THCOURT
DIST2NDPLACE
STR E E T
NE NEFERNDALEBOULEVARDZONE X
CT
AVENUE SESEAC62NE STREETA J
NE 10TH STREET
NE
CT
NE
20
NE 2NDFE
RNDALE8
EVERGREEN
3RDAVENUE PLACEPLAVENUE
NE
Riverview ParkBridge
COURTPIERCE
NEN EZONE X NEJEFFERSONW
AY
C O U R TNENENE
AVENUEAVENUE SEREDMOND
SESE2ND
SE
INDE
XAVENUE NENES ECOURTACCESS
AFA
D
STREETNEAVENUESE
STREET
SE 125TH
SE
SEAVENUEPLACE
COURT
140TH
WAY SE86
ZONE X 84SE
124TH
SEAVENUE 69ROYAL
INDEX
141ST
H IL L S
SE 87PLACEAVENUE NESE 140TH
S E
116TH
136THAVENUESTREET140TH
1 4 1 S T
140THABSTREET
530088
PLACE
530088
STREET
STREET
125TH
SENE
SEAVENUE NEZONEAE AVENUE143RDAVE SESTR E ET
STREET
141STNE 4TH
150THSTREET SE9188PLACE85
H
A
RRIN
GTON
SEAVENUE
SECITY OFAVENUE
22
STREET
NE 9TH
144TH
STREET
STREET
SESTREET
142NDSE
90144THS T R E ET
530088
AQ133RD
143RDSTREET
SES E HOQUIAMRENTON 143RD86SESEAVENUEDUVALL
15
NE 4THLANE
AVENUESE
SE
SE
141S
TSESTREET
ZONE X142NDPLACE
132ND
SE
STREET
SE SE141STNE 4TH
CITY OF RENTON138TH SE140THJERICHOCEDARAVENUE SE10
132ND
AR143RDSEST
SE
SE
SE126TH NE139THPLACE
122ND
83AVENUESE
PLACE
RIVERSENE 4TH STREET
142ND13 4 T H139TH
STREET
ST
STREET
AVENUESE1 3 1 ST
139THSTREET
SE
SE
146TH
STREET
121ST
AS118TH
SE
AVENUESE
AVENUESE
135TH
ZONE X
HOQUIAMSE
129TH
SE
PROFILE BASELINE
530088
NE 6TH
NE 4TH
CITY OF RENTON
89SE
STREETAVENUESTREET
ZONE X138TH AVENUE SESE 140TH
STREETAVENUECITY OF RENTON
142ND
HILLS151STDRIVEBEACON AS88SE 90WAY SE
ZONE X 85WAY SE78
WAY SE87 89WAY140TH134THZONE X
133RDAVED R IVE91ZONEAE ZONE X
140TH 140TH
140THWAYNESE
NE
10TH
MONTEREY NEPARKING
DRIVE3RD
C O URTSUNSET
C OURT 47C
EMETARY
AAZNERIVERSTREET
RAILROADNEWA
YNENE
8TH
BLAINEBOULEVARDNE44ZONE AE
8THWINDS O R
ZONEX
S
CITY OF RENTONKENWORTH PLACE
PLACECOURT NEPLACE4THABERDEEN AVENUE NEBLAINEZONE AE
MT.OLIVETCAMAS
BEACON
ZONE X
4 5DRIVEHOUSER S
E
H
OUS
E
RNEA
VENU
E
W A Y
NEWAYAVENUESE BRONSONBL
AINEABERDEEN 9TH
STREET
PLACE
3 R D
NOTE: MAP AREA SHOWN ON THIS PANEL IS LOCATED WITHIN TOWNSHIP 23 NORTH, RANGE 5 EAST.43SUNSETD R IV ECAPRINE 10THRIVER
STREET
NPLACE NENE
NEPLACE8TH
ZONE X
¥k405
CEDARVALLEY
STREET
NE
RAILROAD
530088
ZONE X
S T R E E T
AVENUE8TH
ZONE XGRAND EYS E
NE
SEAVENUENEWAYNE
9 TH
4 6
TRAIL
MAPLE
PLACE
P A R KBRONSONNE
BYPASSNE¥k405
7TH
NCED A RSE2ND NE8
DRIVEWAYNEBOULEVARD
7THHIGHWAYMONTEREY BLAI
NEW
AY
LOT
NEDR6
THN E
2N D
RIVER
STREET
STREETPLACEAVENUER
AIL
R
O
A
DCIRCLE
6TH
PLACE
NE 6TH
COURT
VUEMONTHOUSERN48SE 138TH STR
BEACON
WAY
NOTE: MAP AREA SHOWN ON THIS PANEL IS LOCATED WITHIN TOWNSHIP 23 NORTH, RANGE 5 EAST.S
NOTE: MAP AREA SHOWN ON THIS PANEL IS LOCATED WITHIN TOWNSHIP 23 NORTH, RANGE 5 EAST.
Ñ
Ñ
Ñ
Ñ
Ñ
Ñ
Ñ
Ñ
134TH AVE SESE 149THSTREET
ZONE X ZONE AO(DEPTH 1')135TH AVE SE
SOOS CREEK PARK AND TRAIL
ZONE X ZONE X
ZONE X
PROFILE BASELINE
JOINS PANEL 0983
JOINS PANEL 0668
JOINS PANEL 0982JOINS PANEL 09775261000mN .
5260000mN .
5259000mN .
5258000mN .
563000mE
7
562000mE
7
47° 28' 07.5"
122° 09' 22.5"47° 28' 07.5"
122° 11' 15"
47° 30' 00"
122° 11' 15"47° 30' 00"
122° 09' 22.5"
COMMUNITY NUMBER PANEL SUFFIX
CONTAINS:
(SEE MAP INDEX FOR FIRM PANEL LAYOUT)
Federal Emergency Management Agency
FLOOD INSURANCE RATE MAPFIRM
MAP REPOSITORIESRefer to Map Repositories list on Map Index
EFFECTIVE DATE OF COUNTYWIDEFLOOD INSURANCE RATE MAPSeptember 29, 1989
EFFECTIVE DATE(S) OF REVISION(S) TO THIS PANELMay 16, 1995 - to update map format.(Date of Revision) - to change Base Flood Elevations, to update corporate limits, to add roads and road names, to update the effects of wave action, to change Special Flood Hazard Areas, to change zone designations and to incorporate previously issued Letters of Map Revision.
For community map revision history prior to countywide mapping, refer to the CommunityMap History table located in the Flood Insurance Study report for this jurisdiction.
To determine if flood insurance is available in this community, contact your insurance agentor call the National Flood Insurance Program at 1-800-638-6620.
Notice to User: The Map Number shown belowshould be used when placing map orders; theCommunity Number shown above should beused on insurance applications for the subject community.
MAP REVISED
MAP NUMBER53033C0981G
KING COUNTY,WASHINGTONAND INCORPORATED AREAS
KING COUNTY 530071 0981 GRENTON, CITY OF 530088 0981 G
NFIP
NATIONAL FLOOD INSURANCE PROGRAMPANEL 0981G
PANEL 981 OF 1700
250 10000FEET
150 3000METERS
MAP SCALE 1" = 500'500
150
NOTES TO USERS
This map is for use in administering the National Flood Insurance Program. It doesnot necessarily identify all areas subject to flooding, particularly from local drainagesources of small size. The community map repository should be consulted forpossible updated or additional flood hazard information.
To obtain more detailed information in areas where Base Flood Elevations (BFEs)and/or floodways have been determined, users are encouraged to consult the FloodProfiles and Floodway Data and/or Summary of Stillwater Elevations tables containedwithin the Flood Insurance Study (FIS) Report that accompanies this FIRM. Usersshould be aware that BFEs shown on the FIRM represent rounded whole-footelevations. These BFEs are intended for flood insurance rating purposes only andshould not be used as the sole source of flood elevation information. Accordingly,flood elevation data presented in the FIS Report should be utilized in conjunction withthe FIRM for purposes of construction and/or floodplain management.
Coastal Base Flood Elevations shown on this map apply only landward of 0.0’North American Vertical Datum of 1988 (NAVD 88). Users of this FIRM should beaware that coastal flood elevations are also provided in the Summary of StillwaterElevations table in the Flood Insurance Study Report for this jurisdiction. Elevationsshown in the Summary of Stillwater Elevations table should be used for constructionand/or floodplain management purposes when they are higher than the elevationsshown on this FIRM.
Boundaries of the floodways were computed at cross sections and interpolatedbetween cross sections. The floodways were based on hydraulic considerations withregard to requirements of the National Flood Insurance Program. Floodway widthsand other pertinent floodway data are provided in the Flood Insurance Study Reportfor this jurisdiction.
Certain areas not in Special Flood Hazard Areas may be protected by flood controlstructures. Refer to Section 2.4 "Flood Protection Measures" of the Flood InsuranceStudy Report for information on flood control structures for this jurisdiction.
The projection used in the preparation of this map was Universal TransverseMercator (UTM) zone 10. The horizontal datum was NAD 83, GRS 1980spheroid. Differences in datum, spheroid, projection or UTM zones used in theproduction of FIRMs for adjacent jurisdictions may result in slight positionaldifferences in map features across jurisdiction boundaries. These differences do notaffect the accuracy of this FIRM.
Flood elevations on this map are referenced to the North American Vertical Datum of1988. These flood elevations must be compared to structure and ground elevationsreferenced to the same vertical datum. For information regarding conversionbetween the National Geodetic Vertical Datum of 1929 and the North AmericanVertical Datum of 1988, visit the National Geodetic Survey website athttp://www.ngs.noaa.gov or contact the National Geodetic Survey at the followingaddress:
NGS Information ServicesNOAA, N/NGS12National Geodetic SurveySSMC-3, #92021315 East-West HighwaySilver Spring, Maryland 20910-3282(301) 713-3242
To obtain current elevation, description, and/or location information for bench marksshown on this map, please contact the Information Services Branch of the NationalGeodetic Survey at (301) 713- 3242, or visit its website at http://www.ngs.noaa.gov.
Base Map information shown on the FIRM was derived from multiplesources. Base map files were provided in digital format by King County GIS, WADNR, WSDOT, and Pierce County GIS. This information was compiled at scales of1:12,000 to 24,000 during the time period of 1994-2012.
The profile baselines depicted on this map represent the hydraulic modeling baselines that match the flood profiles in the FIS report. As a result of improved topographic data, the profile baseline, in some cases, may deviate significantly from the channel centerline or appear outside the SFHA.
Based on updated topographic information, this map reflects more detailed andup-to-date stream channel configurations and floodplain delineations thanthose shown on the previous FIRM for this jurisdiction. As a result, the FloodProfiles and Floodway Data tables for multiple streams in the FloodInsurance Study Report (which contains authoritative hydraulic data) may reflectstream channel distances that differ from what is shown on the map. Also, the road to floodplain relationships for unrevised streams may differ from what isshown on previous maps.
Corporate limits shown on this map are based on the best data available at the timeof publication. Because changes due to annexations or de-annexations may haveoccurred after this map was published, map users should contact appropriatecommunity officials to verify current corporate limit locations.
Please refer to the separately printed Map Index for an overview map of thecounty showing the layout of map panels; community map repository addresses;and a Listing of Communities table containing National Flood Insurance Programdates for each community as well as a listing of the panels on which each communityis located.
For information on available products associated with this FIRM visit the MapService Center (MSC) website at http://msc.fema.gov. Available products mayinclude previously issued Letters of Map Change, a Flood Insurance Study Report,and/or digital versions of this map. Many of these products can be ordered orobtained directly from the MSC website.
If you have questions about this map, how to order products, or the NationalFlood Insurance Program in general, please call the FEMA Map InformationeXchange (FMIX) at 1-877-FEMA-MAP (1-877-336-2627) or visit the FEMAwebsite at http://www.fema.gov/business/nfip.
Zone D boundary
Floodway boundary
1% Annual Chance Floodplain Boundary
0.2% Annual Chance Floodplain Boundary
*Referenced to the North American Vertical Datum of 1988
D
!!!!!!!!!!!!!!LEGEND
SPECIAL FLOOD HAZARD AREAS (SFHAs) SUBJECT TOINUNDATION BY THE 1% ANNUAL CHANCE FLOOD
ZONE A
ZONE AE
ZONE AH
ZONE AO
ZONE AR
ZONE A99
ZONE V
ZONE VE
ZONE X
FLOODWAY AREAS IN ZONE AE
OTHER FLOOD AREAS
OTHER AREAS
ZONE XZONE D
The 1% annual chance flood (100-year flood), also known as the base flood, is the flood that hasa 1% chance of being equaled or exceeded in any given year. The Special Flood Hazard Area isthe area subject to flooding by the 1% annual chance flood. Areas of Special Flood Hazardinclude Zones A, AE, AH, AO, AR, A99, V, and VE. The Base Flood Elevation is the water-surfaceelevation of the 1% annual chance flood.
No Base Flood Elevations determined.
Base Flood Elevations determined.
Flood depths of 1 to 3 feet (usually areas of ponding); Base Flood Elevationsdetermined.
Flood depths of 1 to 3 feet (usually sheet flow on sloping terrain); averagedepths determined. For areas of alluvial fan flooding, velocities also determined.
Special Flood Hazard Areas formerly protected from the 1% annual chanceflood by a flood control system that was subsequently decertified. ZoneAR indicates that the former flood control system is being restored to provideprotection from the 1% annual chance or greater flood.Area to be protected from 1% annual chance flood by a Federal floodprotection system under construction; no Base Flood Elevations determined.
Coastal flood zone with velocity hazard (wave action); no Base Flood Elevationsdetermined.
Coastal flood zone with velocity hazard (wave action); Base Flood Elevationsdetermined.
The floodway is the channel of a stream plus any adjacent floodplain areas that must be kept free ofencroachment so that the 1% annual chance flood can be carried without substantial increases inflood heights.
Areas of 0.2% annual chance flood; areas of 1% annual chance flood withaverage depths of less than 1 foot or with drainage areas less than 1 squaremile; and areas protected by levees from 1% annual chance flood.
Areas determined to be outside the 0.2% annual chance floodplain.
Areas in which flood hazards are undetermined, but possible.
CBRS areas and OPAs are normally located within or adjacent to Special Flood Hazard Areas.
CBRS and OPA boundary
Boundary dividing Special Flood Hazard Area Zones and boundary dividing Special Flood Hazard Areas of different Base Flood Elevations, flood depths, or flood velocities.
Base Flood Elevation value where uniform within zone; elevation infeet*
Cross section line
Transect line
Geographic coordinates referenced to the North American Datum of1983 (NAD 83) Western Hemisphere
1000-meter Universal Transverse Mercator grid values, zone 104989000m N
Bench mark (see explanation in Notes to Users section of this FIRMpanel)
River Mile
Base Flood Elevation line and value; elevation in feet*
COASTAL BARRIER RESOURCES SYSTEM (CBRS) AREAS
OTHERWISE PROTECTED AREAS (OPAs)
513
(EL 987)
45° 02’ 08”, 93° 02’ 12”
DX5510
M1.5
A A
23 23
Page | 29
Figure 3.2 – Sensitive Areas Map
2,400 200
City of Renton Print map Template
This map is a user generated static output from an Internet mapping site and
is for reference only. Data layers that appear on this map may or may not be
accurate, current, or otherwise reliable.
None
10/16/2018
Legend
136068
THIS MAP IS NOT TO BE USED FOR NAVIGATION
Feet
Notes
136
WGS_1984_Web_Mercator_Auxiliary_Sphere
Information Technology - GIS
RentonMapSupport@Rentonwa.gov
Erosion hazard - high
Floodway
Special Flood Hazard Areas (100
year flood)
Landslide
Very High
High
Moderate
Unclassified
Slope City of Renton
>15% & <=25%
>25% & <=40% (Sensitive)
>40% & <=90% (Protected)
>90% (Protected)
Environment Designations
Natural
Shoreline High Intensity
Shoreline Isolated High Intensity
Shoreline Residential
Urban Conservancy
Jurisdictions
Streams (Classified)
<all other values>
Type S Shoreline
Type F Fish
Type Np Non-Fish
Type Ns Non-Fish Seasonal
Page | 31
Figure 3.3 – Offsite Analysis Drainage System Table
CITY OF RENTON SURFACE WATER DESIGN MANUAL2017 City of Renton Surface Water Design Manual12/12/2016Ref 8-B-1REFERENCE 8-BOFF-SITE ANALYSIS DRAINAGE SYSTEM TABLECITY OF RENTON SURFACE WATER DESIGN MANUAL, CORE REQUIREMENT #2Basin:Subbasin Name:Subbasin Number:DateSymbolDrainage Component Type, Name, and SizeDrainage Component DescriptionSlopeDistance from Site DischargeExisting ProblemsPotential ProblemsObservations of Field Inspector, Resource Reviewer, or ResidentSee mapType: sheet flow, swale, stream, channel, pipe, pond, flow control/treatment/on-site BMP/facilitySize: diameter, surface areadrainage basin, vegetation, cover, depth, type of sensitive area, volume%¼ ml = 1,320 ft.Constrictions, under capacity, ponding, overtopping, flooding, habitat or organism destruction, scouring, bank sloughing, sedimentation, incision, other erosionTributary area, likelihood of problem, overflow pathways, potential impactsEast Lake Washington-Renton7th Street Short Plat10/16/2018ABCDEFGPipePipePipePipePipePipePipe4.311.622.050.530.770.741.033796528911,1041,2191,3281,511NoneNone10'' in Diameter12'' in Diameter12'' in Diameter30'' in Diameter30'' in Diameter30'' in Diameter30'' in DiameterNoneNoneNoneNoneNoneNoneNoneNoneNoneNoneNoneNoneNoneNoneNoneNoneNoneNoneNone
Page | 33
Figure 3.4 – Downstream Analysis Map
4,514752
7th Street Short Plat Downstream map
This map is a user generated static output from an Internet mapping site and
is for reference only. Data layers that appear on this map may or may not be
accurate, current, or otherwise reliable.
THIS MAP IS NOT TO BE USED FOR NAVIGATIONWGS_1984_Web_Mercator_Auxiliary_Sphere
Notes
None
10/17/2018
Legend
512 0 256 512 Feet
Information Technology - GIS
RentonMapSupport@Rentonwa.gov
Water Service Areas
Wastewater Service Areas
Network Structures
Inlet
Manhole
Utility Vault
Unknown Structure
Control Structure
Pump Station
Discharge Point
Water Quality
Detention Facilities
Pond
Tank
Vault
Wetland
Stormwater Main
Culvert
Open Drains
Facility Outline
Private Network Structures
Inlet
Manhole
Utility Vault
Unknown Structure
Private Control Structure
Private Discharge Point
Private Water Quality
Private Detention Facilities
Pond
Tank
Vault
Wetland
Private Pipe
Private Culvert
Private Open Drains
Private Facility Outline
Fence
Special Assessment Districts
Points of Interest
Parks
Waterbodies
Streets
2015.sid
Red: Band_1
Green: Band_2
Blue: Band_3
CacheExtent_144K
Page | 35
4.0 STORMWATER ANALYSIS AND DESIGN
4.1 Existing Site Hydrology
The existing site is, generally, rectangular in shape, covered with trees, grass and blackberries.
Historically, a 676 sq.ft. roof area of single-family home was onsite with lawns and one detached
855 sq.ft garage and 1,200 sq.ft. gravel drive, which will be demolished as part of this project.
The site slopes from northeast to southwest at approximate rates of 5% to 10%, at the west of the
site the slopes exceed 20% while continuing to slope downward from east to west. Overall, the
existing site has an elevation range of 412-ft near the northeast corner to 400-ft near the
southwest corner near the west property line of the site. The onsite soils are Arents, Alderwood
material, 6 to 15 percent slopes (RmC). According to the geotechnical report conducted by
ESNW on August 20, 2018, the native soils were classified primarily as silty sand with gravel,
consistent with the typical makeup of glacial till deposits.
A Pre-developed Basin Map is included in Section 1 of this report. The land-use of the pre-
developed basin is as follows:
Area WWHM Land-use Acres
Till Forest C, Forest, Mod 0.64
Grass (frontage) C, Pasture, Mod 0.04
Roadway (frontage) Road, Mod 0.03
Total 0.71
Table 4.1- Pre-Developed Basin Summary
The 15-minutes pre-developed peak flows for the basin (0.71-acre) are as follows (from WWHM
report attached):
Q2= 0.03-cfs
Q10= 0.06-cfs
Q25= 0.07-cfs
Q100= 0.10-cfs
4.2 Developed Site Hydrology
Limits of site disturbance will include installation of sediment and erosion control Best
Management Practices (BMPs), construction of frontage improvements, driveways, detention
Page | 36
vault, utilities, landscaping and 3 single-family residences. Frontage improvements include curb,
gutter, 8-foot planter and 5-foot sidewalk on the southern side of NE 7th Street. The total
disturbed area will cover approximately 0.71 acres both onsite and off.
Upon completion of the project, impervious surfaces covering the site include approximately
0.11-acre of access road, 0.08-acre of driveways, and 0.15-acre of new rooftops. Please refer to
the Developed Basin Map in Section 1 of this report. The land-use of the post-developed basin is
as follows:
Area WWHM Land-use Acres
Access Road Roads, Flat 0.11
Roof Roof Tops, Flat 0.15
Driveway Driveways, Flat 0.08
Lawn C, Lawn, Flat 0.30
Road (frontage) Roads, Flat 0.04
Sidewalk (frontage) Sidewalk, Flat 0.02
Landscape (frontage) C, Lawn, Flat 0.01
Total 0.71
Table 4.2- Post Developed Basin Summary
The 15-minutes post-developed peak flows for the basin (0.71-acre) are as follows (WWHM
report):
Q2= 0.013 cfs
Q10= 0.034 cfs
Q25= 0.049 cfs
Q100= 0.079 cfs
4.3 Performance Standards
The site does not have the proper flow paths and soils for either full dispersion or infiltration.
The runoff of the site will flow to the detention vault, which is sized to match 50% of the 2-year
peak flow up to the full 50-year peak flow of the existing site condition (forested).
Page | 37
4.4 Water Quality System
The project proposes 8,276 sq. ft. of new PGIS. A Contech Stormfilter is proposed for basic
stormwater treatment, the detailed calculation of the stormfilter sizing is shown in this Section
below.
Page | 39
Figure 4.1 – WWHM reports
WWHM2012
PROJECT REPORT
___________________________________________________________________
Project Name: Detention Vault 6.7.2019
Site Name: 7th St. SP
Site Address: 3605 NE 7th Street
City : Renton
Report Date: 6/7/2019
Gage : Seatac
Data Start : 1948/10/01
Data End : 2009/09/30
Precip Scale: 1.00
Version Date: 2019/04/13
Version : 4.2.16
___________________________________________________________________
Low Flow Threshold for POC 1 : 50 Percent of the 2 Year
___________________________________________________________________
High Flow Threshold for POC 1: 50 year
___________________________________________________________________
PREDEVELOPED LAND USE
Name : Basin 1
Bypass: No
GroundWater: No
Pervious Land Use acre
C, Forest, Mod .64
C, Pasture, Mod .04
Pervious Total 0.68
Impervious Land Use acre
ROADS MOD 0.03
Impervious Total 0.03
Basin Total 0.71
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
___________________________________________________________________
MITIGATED LAND USE
Name : Basin 1
Bypass: No
GroundWater: No
Pervious Land Use acre
C, Lawn, Flat .31
Pervious Total 0.31
Impervious Land Use acre
ROADS FLAT 0.15
ROOF TOPS FLAT 0.15
DRIVEWAYS FLAT 0.08
SIDEWALKS FLAT 0.02
Impervious Total 0.4
Basin Total 0.71
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
Vault 1 Vault 1
___________________________________________________________________
Name : Vault 1
Width : 22.8146761986609 ft.
Length : 45.6293523973221 ft.
Depth: 11 ft.
Discharge Structure
Riser Height: 10 ft.
Riser Diameter: 18 in.
Orifice 1 Diameter: 0.33 in. Elevation: 0 ft.
Orifice 2 Diameter: 0.79 in. Elevation: 6.67 ft.
Orifice 3 Diameter: 0.5 in. Elevation: 8.04125000000003 ft.
Element Flows To:
Outlet 1 Outlet 2
___________________________________________________________________
Vault Hydraulic Table
Stage(feet) Area(ac.) Volume(ac-ft.) Discharge(cfs) Infilt(cfs)
0.0000 0.023 0.000 0.000 0.000
0.1222 0.023 0.002 0.001 0.000
0.2444 0.023 0.005 0.001 0.000
0.3667 0.023 0.008 0.001 0.000
0.4889 0.023 0.011 0.002 0.000
0.6111 0.023 0.014 0.002 0.000
0.7333 0.023 0.017 0.002 0.000
0.8556 0.023 0.020 0.002 0.000
0.9778 0.023 0.023 0.002 0.000
1.1000 0.023 0.026 0.003 0.000
1.2222 0.023 0.029 0.003 0.000
1.3444 0.023 0.032 0.003 0.000
1.4667 0.023 0.035 0.003 0.000
1.5889 0.023 0.038 0.003 0.000
1.7111 0.023 0.040 0.003 0.000
1.8333 0.023 0.043 0.004 0.000
1.9556 0.023 0.046 0.004 0.000
2.0778 0.023 0.049 0.004 0.000
2.2000 0.023 0.052 0.004 0.000
2.3222 0.023 0.055 0.004 0.000
2.4444 0.023 0.058 0.004 0.000
2.5667 0.023 0.061 0.004 0.000
2.6889 0.023 0.064 0.004 0.000
2.8111 0.023 0.067 0.005 0.000
2.9333 0.023 0.070 0.005 0.000
3.0556 0.023 0.073 0.005 0.000
3.1778 0.023 0.075 0.005 0.000
3.3000 0.023 0.078 0.005 0.000
3.4222 0.023 0.081 0.005 0.000
3.5444 0.023 0.084 0.005 0.000
3.6667 0.023 0.087 0.005 0.000
3.7889 0.023 0.090 0.005 0.000
3.9111 0.023 0.093 0.005 0.000
4.0333 0.023 0.096 0.005 0.000
4.1556 0.023 0.099 0.006 0.000
4.2778 0.023 0.102 0.006 0.000
4.4000 0.023 0.105 0.006 0.000
4.5222 0.023 0.108 0.006 0.000
4.6444 0.023 0.111 0.006 0.000
4.7667 0.023 0.113 0.006 0.000
4.8889 0.023 0.116 0.006 0.000
5.0111 0.023 0.119 0.006 0.000
5.1333 0.023 0.122 0.006 0.000
5.2556 0.023 0.125 0.006 0.000
5.3778 0.023 0.128 0.006 0.000
5.5000 0.023 0.131 0.006 0.000
5.6222 0.023 0.134 0.007 0.000
5.7444 0.023 0.137 0.007 0.000
5.8667 0.023 0.140 0.007 0.000
5.9889 0.023 0.143 0.007 0.000
6.1111 0.023 0.146 0.007 0.000
6.2333 0.023 0.149 0.007 0.000
6.3556 0.023 0.151 0.007 0.000
6.4778 0.023 0.154 0.007 0.000
6.6000 0.023 0.157 0.007 0.000
6.7222 0.023 0.160 0.011 0.000
6.8444 0.023 0.163 0.014 0.000
6.9667 0.023 0.166 0.017 0.000
7.0889 0.023 0.169 0.018 0.000
7.2111 0.023 0.172 0.020 0.000
7.3333 0.023 0.175 0.021 0.000
7.4556 0.023 0.178 0.023 0.000
7.5778 0.023 0.181 0.024 0.000
7.7000 0.023 0.184 0.025 0.000
7.8222 0.023 0.186 0.026 0.000
7.9444 0.023 0.189 0.027 0.000
8.0667 0.023 0.192 0.029 0.000
8.1889 0.023 0.195 0.031 0.000
8.3111 0.023 0.198 0.033 0.000
8.4333 0.023 0.201 0.035 0.000
8.5556 0.023 0.204 0.036 0.000
8.6778 0.023 0.207 0.038 0.000
8.8000 0.023 0.210 0.039 0.000
8.9222 0.023 0.213 0.040 0.000
9.0444 0.023 0.216 0.041 0.000
9.1667 0.023 0.219 0.042 0.000
9.2889 0.023 0.222 0.044 0.000
9.4111 0.023 0.224 0.045 0.000
9.5333 0.023 0.227 0.046 0.000
9.6556 0.023 0.230 0.047 0.000
9.7778 0.023 0.233 0.048 0.000
9.9000 0.023 0.236 0.049 0.000
10.022 0.023 0.239 0.102 0.000
10.144 0.023 0.242 0.919 0.000
10.267 0.023 0.245 2.175 0.000
10.389 0.023 0.248 3.562 0.000
10.511 0.023 0.251 4.790 0.000
10.633 0.023 0.254 5.646 0.000
10.756 0.023 0.257 6.215 0.000
10.878 0.023 0.260 6.695 0.000
11.000 0.023 0.262 7.143 0.000
11.122 0.023 0.265 7.564 0.000
11.244 0.000 0.000 7.963 0.000
___________________________________________________________________
___________________________________________________________________
ANALYSIS RESULTS
Stream Protection Duration
___________________________________________________________________
Predeveloped Landuse Totals for POC #1
Total Pervious Area:0.68
Total Impervious Area:0.03
___________________________________________________________________
Mitigated Landuse Totals for POC #1
Total Pervious Area:0.31
Total Impervious Area:0.4
___________________________________________________________________
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.02924
5 year 0.044231
10 year 0.05567
25 year 0.071902
50 year 0.085325
100 year 0.099924
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 0.012853
5 year 0.024027
10 year 0.033787
25 year 0.049117
50 year 0.062915
100 year 0.078921
___________________________________________________________________
Stream Protection Duration
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 0.041 0.007
1950 0.042 0.020
1951 0.051 0.046
1952 0.021 0.006
1953 0.016 0.019
1954 0.022 0.007
1955 0.033 0.007
1956 0.030 0.026
1957 0.031 0.007
1958 0.024 0.008
1959 0.022 0.007
1960 0.043 0.027
1961 0.024 0.022
1962 0.015 0.006
1963 0.023 0.015
1964 0.030 0.021
1965 0.026 0.022
1966 0.020 0.008
1967 0.047 0.018
1968 0.029 0.007
1969 0.027 0.008
1970 0.025 0.017
1971 0.027 0.007
1972 0.041 0.038
1973 0.020 0.024
1974 0.029 0.010
1975 0.036 0.007
1976 0.028 0.007
1977 0.013 0.005
1978 0.022 0.018
1979 0.020 0.005
1980 0.062 0.034
1981 0.021 0.007
1982 0.043 0.023
1983 0.030 0.008
1984 0.019 0.006
1985 0.013 0.006
1986 0.041 0.013
1987 0.040 0.026
1988 0.016 0.007
1989 0.018 0.006
1990 0.098 0.033
1991 0.058 0.039
1992 0.026 0.014
1993 0.021 0.006
1994 0.012 0.005
1995 0.027 0.023
1996 0.066 0.043
1997 0.048 0.038
1998 0.023 0.007
1999 0.063 0.035
2000 0.024 0.007
2001 0.016 0.004
2002 0.029 0.018
2003 0.044 0.007
2004 0.042 0.034
2005 0.031 0.007
2006 0.031 0.024
2007 0.078 0.047
2008 0.086 0.033
2009 0.045 0.021
___________________________________________________________________
Stream Protection Duration
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1 0.0981 0.0465
2 0.0858 0.0463
3 0.0784 0.0435
4 0.0662 0.0387
5 0.0633 0.0379
6 0.0621 0.0377
7 0.0583 0.0351
8 0.0508 0.0337
9 0.0476 0.0336
10 0.0471 0.0335
11 0.0447 0.0326
12 0.0437 0.0274
13 0.0433 0.0265
14 0.0425 0.0256
15 0.0419 0.0242
16 0.0416 0.0238
17 0.0412 0.0234
18 0.0408 0.0234
19 0.0407 0.0224
20 0.0404 0.0220
21 0.0359 0.0211
22 0.0331 0.0208
23 0.0314 0.0205
24 0.0311 0.0192
25 0.0308 0.0184
26 0.0304 0.0183
27 0.0304 0.0179
28 0.0295 0.0174
29 0.0293 0.0153
30 0.0293 0.0144
31 0.0291 0.0130
32 0.0279 0.0103
33 0.0272 0.0077
34 0.0271 0.0076
35 0.0271 0.0076
36 0.0263 0.0075
37 0.0260 0.0074
38 0.0247 0.0074
39 0.0245 0.0074
40 0.0241 0.0073
41 0.0240 0.0073
42 0.0235 0.0073
43 0.0225 0.0072
44 0.0222 0.0072
45 0.0222 0.0069
46 0.0220 0.0068
47 0.0212 0.0068
48 0.0208 0.0067
49 0.0208 0.0067
50 0.0203 0.0067
51 0.0201 0.0066
52 0.0197 0.0063
53 0.0193 0.0063
54 0.0180 0.0061
55 0.0163 0.0060
56 0.0161 0.0060
57 0.0158 0.0058
58 0.0150 0.0054
59 0.0130 0.0054
60 0.0129 0.0052
61 0.0115 0.0043
___________________________________________________________________
Stream Protection Duration
POC #1
The Facility PASSED
The Facility PASSED.
Flow(cfs) Predev Mit Percentage Pass/Fail
0.0146 9313 7676 82 Pass
0.0153 8277 7099 85 Pass
0.0160 7386 6586 89 Pass
0.0168 6583 6051 91 Pass
0.0175 5863 5525 94 Pass
0.0182 5281 5020 95 Pass
0.0189 4748 4539 95 Pass
0.0196 4282 4094 95 Pass
0.0203 3850 3681 95 Pass
0.0210 3484 3268 93 Pass
0.0218 3148 2892 91 Pass
0.0225 2866 2627 91 Pass
0.0232 2597 2348 90 Pass
0.0239 2334 2097 89 Pass
0.0246 2108 1884 89 Pass
0.0253 1904 1740 91 Pass
0.0260 1729 1549 89 Pass
0.0268 1560 1404 90 Pass
0.0275 1401 1257 89 Pass
0.0282 1261 1171 92 Pass
0.0289 1134 1084 95 Pass
0.0296 1031 1007 97 Pass
0.0303 945 936 99 Pass
0.0310 869 873 100 Pass
0.0318 788 795 100 Pass
0.0325 729 702 96 Pass
0.0332 673 576 85 Pass
0.0339 600 505 84 Pass
0.0346 537 452 84 Pass
0.0353 485 406 83 Pass
0.0360 430 371 86 Pass
0.0368 383 332 86 Pass
0.0375 340 294 86 Pass
0.0382 296 259 87 Pass
0.0389 260 224 86 Pass
0.0396 227 206 90 Pass
0.0403 197 183 92 Pass
0.0410 166 165 99 Pass
0.0418 147 141 95 Pass
0.0425 136 121 88 Pass
0.0432 119 101 84 Pass
0.0439 105 77 73 Pass
0.0446 93 63 67 Pass
0.0453 80 48 60 Pass
0.0460 69 24 34 Pass
0.0468 58 0 0 Pass
0.0475 52 0 0 Pass
0.0482 42 0 0 Pass
0.0489 33 0 0 Pass
0.0496 31 0 0 Pass
0.0503 30 0 0 Pass
0.0510 27 0 0 Pass
0.0518 24 0 0 Pass
0.0525 22 0 0 Pass
0.0532 20 0 0 Pass
0.0539 19 0 0 Pass
0.0546 16 0 0 Pass
0.0553 16 0 0 Pass
0.0560 15 0 0 Pass
0.0568 14 0 0 Pass
0.0575 12 0 0 Pass
0.0582 11 0 0 Pass
0.0589 10 0 0 Pass
0.0596 9 0 0 Pass
0.0603 9 0 0 Pass
0.0610 9 0 0 Pass
0.0618 9 0 0 Pass
0.0625 8 0 0 Pass
0.0632 8 0 0 Pass
0.0639 7 0 0 Pass
0.0646 7 0 0 Pass
0.0653 7 0 0 Pass
0.0660 7 0 0 Pass
0.0668 6 0 0 Pass
0.0675 5 0 0 Pass
0.0682 5 0 0 Pass
0.0689 5 0 0 Pass
0.0696 5 0 0 Pass
0.0703 5 0 0 Pass
0.0710 5 0 0 Pass
0.0718 5 0 0 Pass
0.0725 5 0 0 Pass
0.0732 5 0 0 Pass
0.0739 5 0 0 Pass
0.0746 5 0 0 Pass
0.0753 5 0 0 Pass
0.0760 4 0 0 Pass
0.0768 4 0 0 Pass
0.0775 4 0 0 Pass
0.0782 4 0 0 Pass
0.0789 3 0 0 Pass
0.0796 3 0 0 Pass
0.0803 3 0 0 Pass
0.0810 3 0 0 Pass
0.0818 3 0 0 Pass
0.0825 3 0 0 Pass
0.0832 3 0 0 Pass
0.0839 3 0 0 Pass
0.0846 3 0 0 Pass
0.0853 3 0 0 Pass
_____________________________________________________
___________________________________________________________________
Water Quality BMP Flow and Volume for POC #1
On-line facility volume: 0.0585 acre-feet
On-line facility target flow: 0.0639 cfs.
Adjusted for 15 min: 0.0639 cfs.
Off-line facility target flow: 0.0357 cfs.
Adjusted for 15 min: 0.0357 cfs.
___________________________________________________________________
LID Report
LID Technique Used for Total Volume Volume Infiltration Cumulative Percent
Water Quality Percent Comment
Treatment? Needs Through Volume Volume Volume
Water Quality
Treatment Facility (ac-ft.) Infiltration Infiltrated
Treated
(ac-ft) (ac-ft) Credit
Vault 1 POC N 79.57 N 0.00
Total Volume Infiltrated 79.57 0.00 0.00 0.00
0.00 0% No Treat. Credit
Compliance with LID Standard 8
Duration Analysis Result = Failed
___________________________________________________________________
Perlnd and Implnd Changes
No changes have been made.
___________________________________________________________________
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear Creek
Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either expressed
or implied, including but not limited to implied warranties of program and accompanying documentation.
In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever (including without
limitation to damages for loss of business profits, loss of business information, business interruption,
and the like) arising out of the use of, or inability to use this program even if Clear Creek Solutions
Inc. or their authorized representatives have been advised of the possibility of such damages. Software
Copyright © by : Clear Creek Solutions, Inc. 2005-2019; All Rights Reserved.
Page | 40
Figure 4.2 – Stormfilter Sizing
11835 NE Glenn Widing Dr., Portland OR 97220
Toll-free: 800.548.4667 Fax: 800.561.1271
©2012 Contech Engineered Solutions LLC
www.conteches.com
Page 1 of 1
TS-P026
Size and Cost Estimate
Prepared by Renna Esmabe on June 10, 2019
7th Street Short Plat – Stormwater Treatment System
Renton, WA
Information provided:
Total contributing area = 0.71 acre
Impervious area = 0.37 acre
Water quality flow, Qwq = 0.036 cfs
Peak hydraulic flow rate, Qpeak = <1 cfs
Presiding agency = Renton, WA
Assumptions:
Media = ZPG cartridges
Drop required from RIM to outlet = 2.3’ minimum
Size and cost estimates:
The StormFilter is a flow-based system, and therefore, is sized by calculating the peak water quality flow rate
associated with the design storm. The water quality flow rate was calculated by using SBUH and provided to
Contech Engineered Solutions LLC.
The StormFilter for this site was sized based on treatment flow rate of 0.036 cfs. To accommodate this
treatment flow rate, Contech Engineered Solutions recommends using a steel three-cartridge CatchBasin
StormFilter (see attached detail). The estimated cost of this size system is $13,900, complete and delivered to
the jobsite. The contractor is responsible for setting the CatchBasin StormFilter and all external plumbing. The
steel CatchBasin StormFilter has an internal bypass capacity of 1.0 cfs, which does not exceed the peak flows
from this site.
Project Name:7th Street Short Plat
Site Designation:Date:6/10/19
County or Independent City:Renton Designer:RPE
State:WA
Flow Based Data:
Peak Design Flow (cfs)
Water Quality Flow (cfs)
Annual Rainfall (inches)
Total Drainage Area, A (ac)
Post Development Impervious Area, AI (ac)
Pervious Area, AP (ac)
TSS Removal By Pretreatment
Agency Required TSS % Removal
Required TSS Removal Efficiency of Filter
Percent Runoff Capture
Mean Annual Runoff, Vt (ft3)
Event Mean Concentration of Pollutant, EMC (mg/L)
Annual Mass Load, Mtotal (lbs)
Flow Based Filter Sizing:
Mass to be Captured by System (lbs)
Filter Type
Structure Type
Cartridge Height
Media Type
Cartridge Flow Rate, gpm/sf
Allowable Load Per Cartridge (lbs)
Cartridges Required
Recommended Model
TSS Treatment Capacity (lbs)
Maximum Water Quality Flow
44
0.71
0.37
0.036
StormFilter
Catchbasin (Steel)
90%
52,971
69.40
3
SFCB3
1.00 gpm/sf
ZPG
<1
50%
60%
0.34
0.95
0.25
80%
231.34
70
108.00
0.05 cfs
18''
36
Page | 45
5.0 CONVEYANCE SYSTEM ANALYSIS AND DESIGN
The 100-year unmitigated peak flow rate (0.40 cfs) as determined by WWHM stormwater model
is used to check the conveyance system. The minimum pipe diameter, material type and slope is
as follows: 12-inch ADS N-12 at 0.51 percent. Using LDD’s Manning Calculator, a Mannings
Coefficient (n) of 0.012 and the aforementioned pipe parameter results in a full flow rate of 2.75
cfs; therefore, the proposed system has sufficient capacity to convey the 100-year, 15-minute
flow rate.
Page | 46
Figure 5.1 – LDD Computer Output
Manning Pipe Calculator
Given Input Data:
Shape ........................... Circular
Solving for ..................... Flowrate
Diameter ........................ 12.0000 in
Depth ........................... 10.0000 in
Slope ........................... 0.0051 ft/ft
Manning's n ..................... 0.0120
Computed Results:
Flowrate ........................ 2.7962 cfs
Area ............................ 0.7854 ft2
Wetted Area ..................... 0.6994 ft2
Wetted Perimeter ................ 27.6063 in
Perimeter ....................... 37.6991 in
Velocity ........................ 3.9983 fps
Hydraulic Radius ................ 3.6480 in
Percent Full .................... 83.3333 %
Full flow Flowrate .............. 2.7564 cfs
Full flow velocity .............. 3.5095 fps
Critical Information
Critical depth .................. 8.9556 in
Critical slope .................. 0.0064 ft/ft
Critical velocity ............... 4.7447 fps
Critical area ................... 0.6390 ft2
Critical perimeter .............. 24.7609 in
Critical hydraulic radius ....... 3.7162 in
Critical top width .............. 12.0000 in
Specific energy ................. 1.1043 ft
Minimum energy .................. 1.1195 ft
Froude number ................... 0.8640
Flow condition .................. Subcritical
WWHM2012
PROJECT REPORT
___________________________________________________________________
Project Name: TESC
Site Name: 7th St. SP
Site Address: 3605 NE 7th Street
City : Renton
Report Date: 6/7/2019
Gage : Seatac
Data Start : 1948/10/01
Data End : 2009/09/30
Precip Scale: 1.00
Version Date: 2019/04/13
Version : 4.2.16
___________________________________________________________________
Low Flow Threshold for POC 1 : 50 Percent of the 2 Year
___________________________________________________________________
High Flow Threshold for POC 1: 50 year
___________________________________________________________________
PREDEVELOPED LAND USE
Name : Basin 1
Bypass: No
GroundWater: No
Pervious Land Use acre
C, Forest, Mod .64
C, Pasture, Mod .04
Pervious Total 0.68
Impervious Land Use acre
ROADS MOD 0.03
Impervious Total 0.03
Basin Total 0.71
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
___________________________________________________________________
MITIGATED LAND USE
Name : Basin 1
Bypass: No
GroundWater: No
Pervious Land Use acre
C, Lawn, Flat .31
Pervious Total 0.31
Impervious Land Use acre
ROADS FLAT 0.15
ROOF TOPS FLAT 0.15
DRIVEWAYS FLAT 0.08
SIDEWALKS FLAT 0.02
Impervious Total 0.4
Basin Total 0.71
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
___________________________________________________________________
___________________________________________________________________
ANALYSIS RESULTS
Stream Protection Duration
___________________________________________________________________
Predeveloped Landuse Totals for POC #1
Total Pervious Area:0.68
Total Impervious Area:0.03
___________________________________________________________________
Mitigated Landuse Totals for POC #1
Total Pervious Area:0.31
Total Impervious Area:0.4
___________________________________________________________________
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.02924
5 year 0.044231
10 year 0.05567
25 year 0.071902
50 year 0.085325
100 year 0.099924
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 0.172917
5 year 0.227272
10 year 0.265349
25 year 0.315942
50 year 0.35549
100 year 0.396672
___________________________________________________________________
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear Creek
Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either expressed
or implied, including but not limited to implied warranties of program and accompanying documentation.
In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever (including without
limitation to damages for loss of business profits, loss of business information, business interruption,
and the like) arising out of the use of, or inability to use this program even if Clear Creek Solutions
Inc. or their authorized representatives have been advised of the possibility of such damages. Software
Copyright © by : Clear Creek Solutions, Inc. 2005-2019; All Rights Reserved.
Page | 48
6.0 SPECIAL REPORTS AND STUDIES
Geotechnical Report, prepared by ENSW dated September 28, 2018.
Page | 49
Figure 6.1 – Geotechnical Engineer’s Report
EarthSolutionsNWLLC
EarthSolutionsNWLLC
1805 -136th Place N.E.,Suite 201 Bellevue,WA 98005
(425)449-4704 Fax (425)449-4711
www.earthsolutionsnw.com
Geotechnical Engineering
Construction Observation/Testing
Environmental Services
GEOTECHNICAL ENGINEERING STUDY
PROPOSED SHORT PLAT
3605 NORTHEAST 7 STREET
RENTON,WASHINGTON
ES-6261
TH
Geotechnical Engineering,Construction
Observation/Testing and Environmental Services
Drwn.CAM
Checked CGH Date Sept.2018
Date 09/26/2018 Proj.No.6261
Plate 1
Earth Solutions NWLLCEarthSolutionsNWLLC
EarthSolutionsNWLLC
Vicinity Map
7th Street Short Plat
Renton,Washington
Reference:
King County,Washington
Map 626
By The Thomas Guide
Rand McNally
32nd Edition
NORTH
NOTE:This plate may contain areas of color.ESNW cannot be
responsible for any subsequent misinterpretation of the information
resulting from black &white reproductions of this plate.
SITE
Geotechnical Engineering,Construction
Observation/Testing and Environmental Services
Drwn.CAM
Checked CGH Date Sept.2018
Date 09/26/2018 Proj.No.6261
Plate 2
Earth Solutions NWLLCEarthSolutionsNWLLC
EarthSolutionsNWLLC
n.e.7th street
queenavenuen.e.House
Garage
400
400
405
405
410
410
TP-1
TP-2
TP-3
TP-4
TP-5
NOTE:This plate may contain areas of color.ESNW cannot be
responsible for any subsequent misinterpretation of the information
resulting from black &white reproductions of this plate.
NOTE:The graphics shown on this plate are not intended for design
purposes or precise scale measurements,but only to illustrate the
approximate test locations relative to the approximate locations of
existing and /or proposed site features.The information illustrated
is largely based on data provided by the client at the time of our
study.ESNW cannot be responsible for subsequent design changes
or interpretation of the data by others.
LEGEND
Approximate Location of
ESNW Test Pit,Proj.No.
ES-6261,Aug.2018
Subject Site
Existing Building
TP-1
NOT -TO -SCALE
NORTH
Test Pit Location Plan
7th Street Short Plat
Renton,Washington
Drwn.CAM
Checked CGH Date Sept.2018
Date 09/26/2018 Proj.No.6261
Plate 3
Earth Solutions NWLLCEarthSolutionsNWLLC
EarthSolutionsNWLLC Geotechnical Engineering,Construction
Observation/Testing and Environmental Services
Retaining Wall Drainage Detail
7th Street Short Plat
Renton,Washington
NOTES:
Free-draining Backfill should consist
of soil having less than 5 percent fines.
Percent passing No.4 sieve should be
25 to 75 percent.
Sheet Drain may be feasible in lieu
of Free-draining Backfill,per ESNW
recommendations.
Drain Pipe should consist of perforated,
rigid PVC Pipe surrounded with 1-inch
Drain Rock.
LEGEND:
Free-draining Structural Backfill
1-inch Drain Rock
18"Min.
Structural
Fill
Perforated Rigid Drain Pipe
(Surround in Drain Rock)
SCHEMATIC ONLY -NOT TO SCALE
NOT A CONSTRUCTION DRAWING
Drwn.CAM
Checked CGH Date Sept.2018
Date 09/26/2018 Proj.No.6261
Plate 4
Earth Solutions NWLLCEarthSolutionsNWLLC
EarthSolutionsNWLLC Geotechnical Engineering,Construction
Observation/Testing and Environmental Services
Footing Drain Detail
7th Street Short Plat
Renton,Washington
Slope
Perforated Rigid Drain Pipe
(Surround in Drain Rock)
18"Min.
NOTES:
Do NOT tie roof downspouts
to Footing Drain.
Surface Seal to consist of
12"of less permeable,suitable
soil.Slope away from building.
LEGEND:
Surface Seal:native soil or
other low-permeability material.
1-inch Drain Rock
SCHEMATIC ONLY -NOT TO SCALE
NOT A CONSTRUCTION DRAWING
Page | 81
7.0 OTHER PERMITS
The following permits and/or approvals are thought to be required as part of this project:
Postmaster Approval
Grading permit
Right of Way Permit
Page | 82
8.0 CSWPP ANALYSIS AND DESIGN
TESC measures are put into place to prevent sediment from leaving the site. The proposed TESC
plan, Construction Pollution Prevention Plan, includes and is not limited to the following
guidelines set in the Manual and the City Amendments to Appendix D of the 2016 King County
Surface Water Design Manual in order to comply with Core Requirement No. 5.
Clearing Limits – The clearing limits are on the engineering plans and will be flagged in the
field.
Cover Measures – Cover measures are specified on the TESC plan set and will be
implemented in the field as necessary. These cover measures include mulching, temporary
seeding, and plastic covering.
Perimeter Protection –The silt fence and clearing limits will be shown on the TESC plans
and implemented in the field. The silt fence is placed on the downslope side of the property.
During construction no runoff shall leave the site.
Traffic Area Stabilization – Traffic area stabilization will be addressed by a stabilized
construction entrance.
Sediment Retention – Retention will be established by silt fences around the perimeter and
catch basin inserts that will control of the on-site sediment-laden water.
Dust Control – Dust control by splinklering will be provided as needed.
Wet Season Construction: Infrastructure construction will be conducted in the summer months.
Any construction planned during the wet season will be according to King County and the City of
Renton standards.
Construction Within Sensitive Areas and Buffers: There are no onsite sensitive areas or
buffers.
Maintenance: Maintenance requirements are detailed in the TESC notes on the engineering
plans.
Final Stabilization: Upon completion of the project, all disturbed areas will be stabilized and
Best Management Practices removed if appropriate.
Page | 84
9.0 BOND QUANTITIES
The City of Renton Bond Quantity Worksheet will be included along with the final engineering
plan submittal.
Page | 85
10.0 OPERATIONS AND MAINTENANCE MANUAL
The drainage facilities on this project will be maintained by the homeowners. Maintenance
instructions will be provided along with the final engineering plan submittal.