HomeMy WebLinkAboutE 09121914 t
THIS AGREEMENT, Bade this /,,, -rte day of
A.D. 1914, by and between the PUGE'T SOUND ELECTRIC RAILWAY, a New
Jersey corporation, hereinafter called "Railway", party of the first
(i) part, and CITY OF RENTON, a municipal corporation, hereinafter call-
ed "City", party of the second part,
WITNESSETH:
1. The Railway hereby permits the City to construct and lay
down a twelve (12) inch tile drain pipe across said Railway's fifty-
five ( 55) foot right of way through the northeast quarter (NE9) of
southwest quarter (Swk) of Section Seventeen (17) , Township Twenty-
three North (23N) , Range five ( 5) East, W.R . , said pipe line loca-
tion being more particularly described as follows:
Beginning at the south boundary line of the said Rail-
way's right of way at a point near the northwest corner of"`tract
43", Renton Co-operative Coal Company' s Acre Tracts in said Section;
thence northeasterly one hundred seventy-two ( 172) feet more or less,
to a point south of the aailway' s so called "brick yard spur";
thence north and at right angles to said tracks and underneath same,
to the north boundary line of said Railway' s right of way,
Subject to the following stipulations and conditions:
2 Said pipe line shall be laid by the City at least six (6)
inches below the surface of the ground and in a manner so as to in
no way damage or injure the conditions of the Railwas said right of
way, tracks or road bed. All work done in connection with the
laying of said pipe upon the right of way of the Railway shall be
subject to .the approval of the C -,ief Engineer of the Railway, and
shall be maintained by the City at all times so as to be free from
leakage or other sources of damage. If at any time the Railway
shall find that seid pipe line by reason of its location or method
of construction or other causes, interferes with any of its struc-
tures or other improvements of the Railway, now existing or here-
after to be constructed on or near said premises, or with the opera-
tion or maintenance of its electric railway upon said right of way,
the 'Railway shall have the right to require the City from time to
time to change the location of said pipe or to make any changes in
said pipe, and thereupon the City shall forthwith make such changes
r
STONE & WEBSTER MANAGEMENT ASSOCIATION /
GENERAL MANAGERS.
I
A.W.LEON AR U,VICE PPEsio ENT. JACOB FU RTH,PRESIDENT, LOUIS H.BE N, MANAGER,
PUGET SOUND ELECTRIC RAILWAY,
TACOMA RAILWAY AND POWER COMPANY.
ADDRESS ALL COMMUNICATIONS
TO THE COMPANY TACOMA,WASHINGTON. Sept. 12, 1914.
TACOMA
Mr. Grant Bates, City Clerk,
Renton, Washington.
Dear Sir:-
We are pleased to hand you herewith
duly executed on the part of the Puget Sound Electric
Railway, duplicate original of pipe line permit cover-
ing our right of way in the vicinity of Third Avenue
and Cedar Street, City of Renton. •
Very truly yours,
Land & Tax Agent.
Enols.