Loading...
HomeMy WebLinkAboutAdmin Report EXECUTIVE DEPARTMENT _��i CITY OF Renton � M E M O R A N D U M DATE: August 7, 2017 TO: Armondo Pavone, Council President Members of the Renton City Council FROM: Denis Law, Mayor Jay Covington, Chief Administrative Officer SUBJECT: Administrative Report • Please join us tomorrow, Tuesday, August 8th, from 3:00 p.m. until 7:00 p.m. at the Piazza Park in downtown Renton for the Renton Farmers Market. The market will be filled with fresh flowers and a bounty of farm fresh produce every Tuesday from 3:00 p.m. until 7:00 p.m. through September 26th. In addition to market fare, shoppers will enjoy live music, food trucks, tips from Master Gardeners, cooking demonstrations, and children's activities. And we are proud to continue our Fresh Bucks incentive program, which offers a dollar-for- dollar match to be used on fresh produce for our SNAP shoppers. For more information, check out our website at rentonfarmersmarket.com, or find us on Facebook! • Gather with friends and family for Ivar's Family Fun and Films. Finding Dory will be featured on Friday, August 11th at Henry Moses Aquatic Center. Tickets can be purchased for$5.00 starting at 7:00 p.m. Entry will begin at 8:00 p.m. and the movie will start at dusk. • The city is in the process of updating its Bicycle and Trails Master Plan and is interested in public input. Please join us for an open house on Thursday, September 28th from 5:00 to 8:00 p.m. at the Renton Community Center, 1715 SE Maple Valley Highway in Renton. Questions may be directed to Parks Planning/Natural Resources Director Leslie Betlach at 425-430-6619 or Transportation Planning Manager Vicki Grover at 425-430-7393. • The famous Renton Loop returns for one day only on August 19th! The "Cruz the Loop" event will run from 12:00 to 4:00 p.m. at Renton High School, with cruising from 4:00 to 5:00 p.m. It will be an afternoon of music, food, and family fun, capped by cars cruising the loop. Registration is now open, so get your spot early. VIP registration costs $40 and includes VIP parking (close to entertainment stage and a larger spot), first out when it's time to cruise, Cruz the Loop t-shirt, commemorative poster, window cling, and key chain. General registration is$20 and includes special parking, Cruz the Loop t-shirt, and a window cling. To register, visit rentonwa.gov/cybersignup. Use code 60092 for VIP, and 60093 for general. • The conversion of Main Avenue South from a one-way street to a two-way street between South 2nd Street and South 3rd Street is almost complete. Re-opening of the street with two-way traffic flow is anticipated for mid-August. The improvements will be operated by a new traffic signal and will improve business and residential access without having to circle Armondo Pavone,Council President Members of Renton City Council Page 2 August 2, 2017 the block. More information on exact date of the conversion will be forthcoming • Information about preventative street maintenance, traffic impact projects, and road closures happening this week can be found at http://rentonwa.�ov/trafficimpacts. Preventative street maintenance, traffic impact projects, and road closures will be at the following locations: ✓ Monday, August 7th through Friday, August 11th, 10:00 p.m.to 4:30 a.m. Talbot Road South between the northbound I-405 on-ramp and the southbound I-405 off-ramp will be fully closed each night for the I-405 Direct Connector Project. Questions may be directed to Rohini Nair at 206-999-1822. ✓ Monday, August 7th through Friday, August 11th, 9:00 a.m. to 3:00 p.m. Northbound Talbot Road South between the northbound I-405 on-ramp and the southbound I-405 off-ramp will be closed for the I-405 Direct Connector Project. Questions may be directed to Rohini Nair at 206-999-1822. ✓ Monday, August 7th through Friday, August 11th, 8:30 a.m. to 3:30 p.m. Northbound lane closure on Union Avenue NE near NE 27th Place due to utility construction. Questions may be directed to Brad Stocco at 425-282-2373. ✓ Monday, August 7th through Friday, August 11th, 8:30 a.m. to 3:30 p.m. Single lane closure of eastbound and westbound SE 180th Street between the northbound SR 167 on-ramp to East Valley Road due to roadway construction. Questions may be directed to Rohini Nair at 206-999-1822. ✓ Monday, August 7th through Friday, August 11th. Northbound and southbound nighttime lane restrictions and closures along SR 167 and I-405 are scheduled this week related to the I-405/SR 167 Interchange Direct Connector Project. More detailed information about these restrictions and closures is available tonight on the back table. The information outlines specific dates and times of the closure. Questions may be directed to Craig Smiley, WSDOT I-405/SR 167 Corridor Communications, at 425-456- 8624 or visit the project website at http:j/www.wsdot,wa.�ov/Proiects/1405/SR1671CDirectConnector/. ✓ Monday,August 7th through Friday, August 11th, 8:30 a.m. to 3:30 p.m. Intermittent lane closures with localized overnight lane diversion at the 4800 Block of NE 4th Street due to removal and restoration of concrete panels. Questions can be directed to Todd Freih at 206-999-1832. ✓ Monday, August 7th through Sunday, August 13th. Road closure on South 14th Street between Smithers Avenue South and Davis Avenue South for utility construction. Questions may be directed to Patrick DeCaro at 425-207-6013. Armondo Pavone,Council President Members of Renton City Council Page 3 August 2,2017 ✓ Tuesday,August 8th through Thursday, August 10th, 8:30 a.m.to 4:30 p.m. Intermittent lane closures for asphalt repairs will take place along Rainier Avenue South between Hayes Place SW and South 2nd Street. Lane closures are scheduled as follows: Tuesday, August 8th: Southbound curb lane. Wednesday, August 9th: Southbound center lane. Thursday, August 10th: Southbound inside lane. Questions may be directed to John Kalmbach at 425-766-6183. ✓ Monday, August 7th through approximately Friday,August 18th. South 2nd Street, east of and adjacent to the intersection of Main Avenue South and South 2nd Street, will be closed for a period not to exceed two months. A map showing alternative routes through this area is available tonight on the back table. Questions may be directed to Keith Woolley at 425-430-7318. ✓ Monday, August 7th through approximately August 31st. Expect some intermittent lane closures in the Highlands as a result of the Highlands Sewer Main and Manhole Rehabilitation Project, between NE Sunset Blvd and NE 4th Street, from approximately I- 405 to Monroe Avenue NE. Questions may be directed to John Hobson at 425-430- 7279. ✓ Monday, August 7th through Friday, September 29th. Full road closure on Harrington between Sunset Lane NE and Harrington Avenue NE as well as a full road closure on Harrington Avenue NE between NE 10th Street and Sunset Lane NE will be in place as part of the Sunset Lane Capital Improvement Project. Questions can be directed to Keith Wooley at 425-430-7318 or Mark Wetherbee at 206-999-1829. ✓ Monday, August 7th through approximately Friday, October 6th. WSDOT will be repaving and installing sidewalk upgrades along a portion of Maple Valley Highway (SR 169) between 140th Avenue SE (MP 22.86) and Blaine Drive Vic (MP 24.84). Construction will occur during daytime and nighttime hours and will result in a reduction of lanes as outlined below: � Daytime closures(up to one lane at a time in either the westbound or eastbound direction, not concurrently): • Northbound —Lane closure permitted between 8:30 a.m. and 5:00 p.m., Monday through Friday. • Southbound —Lane closure permitted between 7:00 a.m. and 3:30 p.m., Monday through Friday. Nighttime closures (up to 2 lanes will be permitted in either the westbound and/or eastbound direction: Armondo Pavone,Council President Members of Renton City Council Page 4 August 2,2017 • Northbound —Lane closures permitted between 8:00 p.m. and 10:00 a.m., Sunday through Friday. • Northbound —Lane closures permitted between 8:00 p.m. Friday and 10:00 a.m. Sunday. • Southbound —Lane closures permitted between 10:00 p.m. and 5:00 a.m., Sunday through Friday. • Southbound —Lane closures permitted between 9:30 p.m. Friday to 10:00 a.m. Sunday. A map from WSDOT showing the location of the project and a copy of the traffic control plan, including the lane closure schedule, is available tonight on the back table. For more information please visit the project website at http�//www wsdot.wa.�ovJProjects/SR169/140thSECedarRiverPkPavin�ADA/default.htm. Questions may be directed to Lisa Van Cise, WSDOT Communications at 206-440-4702 or via email at vancisl@wsdot.wa.�ov. ✓ Monday,August 7th through August 2018, 8:30 a.m. to 4:45 p.m. Additional construction traffic due to the construction of Sartori Elementary School at the 300 block of Park Avenue North and Garden Avenue North. Questions may be directed to Patrick DeCaro at 425-207-6013. ✓ Thursday, August 10th through Saturday, August 12th. WSDOT maintenance crews will be working along with City maintenance crews on SR-169 (Maple Valley Highway) at night. Questions may be directed to Justin Johnson at 425-430-7291. ✓ Monday, August 7th through approximately Friday,August 18th. The intersection of NE 10th Street and Harrington Avenue NE will be closed to accommodate construction of the Sunset Neighborhood Park and surrounding area. Questions may be directed to Keith Woolley at 425-430-7318. ✓ Tuesday, August 8th through approximately Friday, September 1st. The City of Kent will be conducting a pavement rehabilitation project along 80th Avenue South between South 194th Street and South 190th Street. This project is near the City of Renton border. Lane reductions and/or closures may impact Renton residents. A map of the affected area is available tonight on the back table. Questions may be directed to City of Kent Pavement Manager Joe Araucto at 253-856-5664 or via email at jaraucto@kentwa.�ov. ✓ Tuesday, August 15th, 7:00 p.m.to 5:00 a.m. Possible lane closures on Rainier Avenue at South 2nd Street for utility construction. Questions may be directed to Pat Miller at 206-794-6162.