Loading...
HomeMy WebLinkAboutC_Upstream_Flow_Letter_190912_v1 CONCEPT ARCHITECTURE, LLC 1712 Pacific Avenue Suite 107, Everett, WA 98201 1005 Terminal Way Suite 245 Reno, NV 89502 ConceptArchitecture.com UPSTREAM FLOW / WATER ROUTING QUESTION Project: 4th Dimension Building Site Location: 4502 NE 4th Street, Renton, WA APN 1023059068 Item A – The upstream basin has been analyzed using the Renton GIS to determine tributary areas. The calculation of upstream flows was performed in accordance with standard practice and by direction provided by the City for modeling upstream detention systems. This is all documented in the TIR. We feel the numbers generated are suitable for the flow calculations performed for the TIR in regards to backwater and flood storage. We reviewed the site and its immediate vicinity for critical areas (wetlands, streams, and their associated buffers) per the City of Renton Code Requirements. We have also prepared a TIR analysis to model if anticipated development of the project site would significantly alter downstream flow regimes. As part of the TIR model, an assessment of land use cover was assessed for the watershed basin. It was determined that no adverse impacts to stream flows would result from the project. Additional stormwater generated from site development would be directed to stormwater facilities where it would be treated and discharged accordingly. Any additional study would seem to be informational only and not necessary to the analysis and design of the project from an engineering or wetland stand point.