Loading...
HomeMy WebLinkAboutR-4069720) 0 11 0 11 0 w 3" MULCH DEPTH; KEEP MULCH LAYER AWAY FROM FOLIAGE TOP OF ROOT LIGHTLY SCARIFY CROWN TO BE o ROOTBALL TO FLUSH WITH LOOSEN ROOTS FINISH GRADE PRIOR TO PLANTING FINISH GRADE PRIOR TO PLACING MULCH 0 Ld 0 j 1 :1 SLOPE ON SIDES m - OF PLANTING HOLE -I BACKFILL WITH PLANTING SOIL, THOROUGHLY WATER SETTLE UNDISTURBED EX SOIL OR EX SOIL COMPACTED PLANTING HOLE TO BE TO 85% MAX DRY 6" LARGER THAN DIA DENSITY; VERIFY OF ROOTBALL FOR POSITIVE DRAINAGE GROUNDCOVER, 12" PRIOR TO CONSTRUCTION LARGER THAN DIA OF ROOTBALL FOR SHRUBS SECTION GROUNDCOVER & SHRUB PLANTING NOT TO SCALE C n I Immmmmm""Im 11 ®Miles 5 0 w 1`0cQa 1­1(Lo �x w LANDSCAPE BOULDER, SEE PLANS FOR APPROXIMATE LOCATIONS & SIZES FINISH GRADE PRIOR TO PLACING MULCH OR COBBLE ROCK 4" DEPTH CRUSHED SURFACING —III BASE COURSE SECTION UNDISTURBED EX SOIL OR EX SOIL COMPACTED TO 95% MAX DRY DENSITY LANDSCAPE BOULDER NOT TO SCALE LANDSCAPE BOULDER, SEE PLANS FOR Q APPROXIMATE LOCATIONS & SIZES NLij FINISH GRADE PRIOR TO PLACING MULCH x OR COBBLE ROCK w w . m o 4" DEPTH CRUSHED SURFACING BASE COURSE SECTION UNDISTURBED EX SOIL OR EX SOIL COMPACTED TO 95% MAX DRY DENSITY LANDSCAPE BOULDER ON A SLOPE NOT TO SCALE 10M%\ff 0 m 2- zei 3" MULCH DEPTH. KEEP MULCH LAYER AWAY FROM FOLIAGE UNDISTURBED EX SOIL OR EX SOIL COMPACTED TO 85% MAX DRY DENSITY; VERIFY POSITIVE DRAINAGE PRIOR TO CONSTRUCTION PLANTING HOLE TO BE 6" LARGER THAN DIA OF ROOTBALL FOR GROUNDCOVER, 12" LARGER THAN DIA OF ROOTBALL FOR SHRUBS SECTION TOP OF ROOT CROWN TO BE FLUSH WITH o FINISH GRADE ' LIGHTLY SCARIFY ROOTBALL TO LOOSEN ROOTS PRIOR TO PLANTING FINISH GRADE PRIOR TO PLACING MULCH 2.5:1 MAX UPHILL & DOWNHILL SLOPES BACKFILL WITH PLANTING SOIL, THOROUGHLY WATER SETTLE SLOPE SUBGRADE TO PROVIDE POSITIVE WATER DRAINAGE GROUNDCOVER & SHRUB PLANTING ON A SLOPE NOT TO SCALE FEATHER TOP OF MULCH - TO TOP OF COBBLE PLANTING @ GAZEBO AREA 24" TOP OF 4" DIAMETER COBBLE ROCK TO BE SET 12" FLUSH WITH TOP OF j ADJACENT PAVING i j CONIC RAMP 5 2" i I OR LANDING, SEE i L-8 I a a \\ jx\ jam\ 24 -_ / / / / IIIIIIIII11 GEOTEXTILE FOR SEPARATION; WRAP - ALL SIDES; CUT 3" BELOW TOP OF GRANITE ROCK & TOP OF CURB SECTION COBBLE ROCK NOT TO SCALE — iiTi=li=li UNDISTURBED EX SOIL OR EX SOIL COMPACTED TO 95% MAX DRY DENSITY, TYP ol 3 r. D C'nC/�ICICfI ToIAINIt�I II A CENTER OF GROUNDCOVER OR SHRUB PLANTS, TYP UNLESS OTHERWISE NOTED IN PLANTING SCHEDULE 1 /2 SPECIFIED SPACING UNLESS OTHERWISE NOTED v a. ° Q D CURB, SIDEWALK OR PAVING EDGE, BUILDING OR MOW STRIP ° D o P LA N GROUNDCOVER & SHRUB PLANTING LAYOUT NOT TO SCALE UNDISTURBED EX SOIL OR EX SOIL COMPACTED TO 85% MAX DRY 12" GREATER DENSITY, VERIFY POSITIVE DRAINAGE THAN DIA OF PRIOR TO CONSTRUCTION ROOTBALL E3 SECTION )F ROOT CROWN TO BE 1 " R THAN FINISH GRADE JLCH DEPTH GRADE PRIOR TO PLACING MULCH BACKFILL WITH PLANTING SOIL, WHEN HOLE IS HALF FILLED THOROUGHLY WATER SETTLE, THEN ADD REMAINING SOIL AND WATER SETTLE A SECOND TIME 1:1 SLOPE ON SIDES OF PLANTING HOLE AFTER PLACING TREE IN PLANTING PIT, CUT AND COMPLETELY REMOVE STRINGS, TWINE, AND/OR WIRE BASKETS FROM ROOTBALL; COMPLETELY REMOVE FABRIC GROW BAGS; CUT BURLAP FROM TOP 113 OF ROOTBALL AND REMOVE CUT BURLAP FROM PLANTING PIT MULTI -TRUNK DECIDUOUS TREE PLANTING NOT TO SCALE R-406972 0) 00 N 0 0 0) I u