HomeMy WebLinkAboutR-4069720)
0
11
0
11
0
w
3" MULCH DEPTH;
KEEP MULCH LAYER
AWAY FROM FOLIAGE
TOP OF ROOT LIGHTLY SCARIFY
CROWN TO BE o ROOTBALL TO
FLUSH WITH LOOSEN ROOTS
FINISH GRADE PRIOR TO PLANTING
FINISH GRADE PRIOR
TO PLACING MULCH
0 Ld
0 j 1 :1 SLOPE ON SIDES
m - OF PLANTING HOLE
-I BACKFILL WITH PLANTING
SOIL, THOROUGHLY
WATER SETTLE
UNDISTURBED EX SOIL
OR EX SOIL COMPACTED
PLANTING HOLE TO BE TO 85% MAX DRY
6" LARGER THAN DIA DENSITY; VERIFY
OF ROOTBALL FOR POSITIVE DRAINAGE
GROUNDCOVER, 12" PRIOR TO CONSTRUCTION
LARGER THAN DIA OF
ROOTBALL FOR SHRUBS SECTION
GROUNDCOVER & SHRUB PLANTING
NOT TO SCALE
C
n
I Immmmmm""Im
11
®Miles
5
0
w
1`0cQa
11(Lo
�x
w
LANDSCAPE BOULDER,
SEE PLANS FOR
APPROXIMATE
LOCATIONS & SIZES
FINISH GRADE PRIOR
TO PLACING MULCH
OR COBBLE ROCK
4" DEPTH
CRUSHED
SURFACING
—III BASE COURSE
SECTION UNDISTURBED EX SOIL OR EX SOIL
COMPACTED TO 95% MAX DRY DENSITY
LANDSCAPE BOULDER
NOT TO SCALE
LANDSCAPE BOULDER,
SEE PLANS FOR
Q APPROXIMATE
LOCATIONS & SIZES
NLij
FINISH GRADE PRIOR
TO PLACING MULCH
x OR COBBLE ROCK
w
w
. m o
4" DEPTH CRUSHED
SURFACING BASE COURSE
SECTION UNDISTURBED EX SOIL OR EX SOIL
COMPACTED TO 95% MAX DRY DENSITY
LANDSCAPE BOULDER ON A SLOPE
NOT TO SCALE
10M%\ff 0 m 2- zei
3" MULCH DEPTH.
KEEP MULCH LAYER
AWAY FROM FOLIAGE
UNDISTURBED
EX SOIL
OR
EX SOIL
COMPACTED
TO 85%
MAX DRY
DENSITY;
VERIFY
POSITIVE
DRAINAGE PRIOR TO
CONSTRUCTION
PLANTING HOLE TO BE 6" LARGER
THAN DIA OF ROOTBALL FOR
GROUNDCOVER, 12" LARGER THAN
DIA OF ROOTBALL FOR SHRUBS
SECTION
TOP OF ROOT CROWN
TO BE FLUSH WITH
o FINISH GRADE
' LIGHTLY SCARIFY ROOTBALL
TO LOOSEN ROOTS PRIOR
TO PLANTING
FINISH GRADE PRIOR
TO PLACING MULCH
2.5:1 MAX UPHILL &
DOWNHILL SLOPES
BACKFILL WITH PLANTING SOIL,
THOROUGHLY WATER SETTLE
SLOPE SUBGRADE TO PROVIDE
POSITIVE WATER DRAINAGE
GROUNDCOVER & SHRUB PLANTING ON A SLOPE
NOT TO SCALE
FEATHER TOP OF MULCH -
TO TOP OF COBBLE
PLANTING @
GAZEBO AREA
24"
TOP OF 4" DIAMETER
COBBLE ROCK TO BE SET
12" FLUSH WITH TOP OF
j ADJACENT PAVING
i
j CONIC RAMP 5
2" i I OR LANDING, SEE
i L-8
I
a a
\\ jx\ jam\ 24 -_
/ / / / IIIIIIIII11
GEOTEXTILE FOR SEPARATION; WRAP -
ALL SIDES; CUT 3" BELOW TOP OF
GRANITE ROCK & TOP OF CURB
SECTION
COBBLE ROCK
NOT TO SCALE
— iiTi=li=li
UNDISTURBED EX SOIL OR
EX SOIL COMPACTED TO
95% MAX DRY DENSITY, TYP
ol
3
r.
D
C'nC/�ICICfI ToIAINIt�I II A
CENTER OF GROUNDCOVER OR
SHRUB PLANTS, TYP
UNLESS OTHERWISE NOTED IN
PLANTING SCHEDULE
1 /2 SPECIFIED SPACING
UNLESS OTHERWISE NOTED
v a.
° Q D
CURB, SIDEWALK OR PAVING EDGE,
BUILDING OR MOW STRIP
° D
o
P LA N
GROUNDCOVER & SHRUB PLANTING LAYOUT
NOT TO SCALE
UNDISTURBED EX SOIL OR EX SOIL
COMPACTED TO 85% MAX DRY 12" GREATER
DENSITY, VERIFY POSITIVE DRAINAGE THAN DIA OF
PRIOR TO CONSTRUCTION ROOTBALL
E3
SECTION
)F ROOT CROWN TO BE 1 "
R THAN FINISH GRADE
JLCH DEPTH
GRADE PRIOR TO PLACING MULCH
BACKFILL WITH PLANTING SOIL, WHEN
HOLE IS HALF FILLED THOROUGHLY
WATER SETTLE, THEN ADD REMAINING
SOIL AND WATER SETTLE A SECOND TIME
1:1 SLOPE ON SIDES OF PLANTING HOLE
AFTER PLACING TREE IN PLANTING PIT, CUT
AND COMPLETELY REMOVE STRINGS, TWINE,
AND/OR WIRE BASKETS FROM ROOTBALL;
COMPLETELY REMOVE FABRIC GROW BAGS; CUT
BURLAP FROM TOP 113 OF ROOTBALL AND
REMOVE CUT BURLAP FROM PLANTING PIT
MULTI -TRUNK DECIDUOUS TREE PLANTING
NOT TO SCALE
R-406972
0)
00
N
0
0
0)
I
u