HomeMy WebLinkAboutHouser Way Bridge - Seismic Retrofit and Painting Project Info (9-12-19) PUBLIC WORKS DEPARTMENT
M E M O R A N D U M •
DATE: September 12, 2019
TO: Bob Hanson, Transportation Design Manager
FROM: Derek Akesson, Transportation Project Manager
SUBJECT: Houser Way Bridge—Seismic Retrofit and Painting
Project Information and Proposed Design Standards
Summary:
The purpose of this memo is to summarize the existing conditions of the project site and
bridge and proposed design standards.
Existing Conditions:
Exhibit A—Vicinity Map and Area Map of bridge location.
Exhibit B—Site Photos from Sept. 2016.
Exhibit C— Bridge record drawings (1960).
Exhibit D—Seismic retrofit drawings from project in 1995.
Exhibit E—Scour repair drawings from project in 1998.
Exhibit F— Bridge condition inspection report and WSBIS form (2018 inspection).
Exhibit G — Bridge Load Rating Summary (2017).
Exhibit H — Memo Preliminary Seismic Evaluation (2017).
Exhibit I — Memo Scour Assessment (2017).
Exhibit J —Test results for lead paint (2006).
Exhibit K— Local Agency Agreement and Project Prospectus.
Street:
• Houser Way is a one way street over the bridge.
• ADT= 11,315, per traffic count performed in June 2015.
• The posted speed limit is 25 mph.
Bridge:
• Structure ID: 08584300
• Bridge No.: Renton-05
• The bridge is currently posted for weight limits.
• There are no pedestrian facilities on this bridge. Pedestrians use the pedestrian
bridge, adjacent to the Houser Way Bridge, to cross over the Cedar River.
Bob Hanson
Page 2 of 2
September 12,2019
Cedar River:
• The Cedar River is documented to have Chinook, Coho and Sockeye Salmon,
Steelhead and Cutthroat Trout.
• The anticipated fish window for the Cedar River is mid-June to mid-August.
• The United States Geological Survey (USGS) maintains a monitoring station at the
Bronson Way Bridge. The following is a link to the USGS website with the monitoring
station data: https://waterdata.usgs.gov/nwis/uv?site no=12119000.
Design References:
• Washington State Department of Transportation (WSDOT), Local Agency Guidelines
(LAG), dated May 2019.
• WSDOT, Bridge Design Manual, dated July 2019.
• WSDOT/APWA 2020 Standard Specifications.
• American Association of State Highway and Transportation Officials (AASHTO), LRFD
Bridge Design Specifications, current edition.
• AASHTO, Policy on Geometric Design of Highways and Streets, dated 2011.
Bridge Painting:
• The existing paint system contains lead.
• The City has not been able to find any record of re-painting this bridge since
construction in 1960.
• There are areas of rust and potential section loss on the steel girders. One area of
particular concern is the welded joint between web and bottom flange of the
westernmost (downstream) girder(downstream face). Refer to Exhibit B site photos
and Exhibit F bridge inspection report.
• The City anticipates full removal of the existing paint system in order to identify and
conduct repairs to steel elements of the bridge as necessary.
Seismic Retrofit:
• Refer to Exhibit H for a preliminary seismic evaluation.
• Refer to Exhibit D for plans of a seismic retrofit performed in 1995.
h:\file sys\ted-transp engr design\ted 40-projects\04021 houser way bridge\2000 prelim engr\2200 studies\project
info memo\working files\memo-houser way bridge-seismic retrofit and painting project info.docx
EXHIBIT A
Houser Way Bridge — Seismic Retrofit and Painting
VICINITY MAP
Lake -� N E W C A S T L F
Was hing t-on 1
O
a .a
�• 5 f�a NE 4th St at SL 9.
RE N-T-O N '+ 1
CO
r
� +• . : �• � � fir{__�.`��
--
ir.
F �
1' j is■�.�ii Otro
--SP�T92nd St
Lake
Houser Way Bridge — Seismic Retrofit and Painting
AREA MAP
{ z \
`>
^ ® F N
f = �
¥ - G
¥ `n w
7
O,
»
:3 effy Park , . = Cedar
&a£Park
9
Renton Dam Z
,. . -
-
sy, @ ' Renton mm % \ ' -
. y `� d cityHW *} . Cent
Ce
e.
% /
{ `
.
3rdS,,.
z ^ City a Renton City 2Dryton-
EXHIBIT B
Houser Way Bridge — Site Photos (Sept. 2016)
oil
r
_e
lil�rirr•
s
Looking northeast at westernmost (downstream)girder Looking southwest at easternmost(upstream)girder
Nam,
li ,aF
r
Looking south at southern pier Looking north at northern pier
Houser Way Bridge — Site Photos (Sept. 2016)
Looking west under south approach span Looking north under south approach span
Looking north at middle spindle, south approach span Looking north at bearing, south end of main span girder
Houser Way Bridge — Site Photos (Sept. 2016)
Looking west under north approach span Looking south at middle spindle, north approach span
Looking south at west end of northern pier Looking south at bearing, north end of main span girder
Houser Way Bridge — Site Photos (Sept. 2016)
ay
�JA
Q -
Looking north at northern pier, middle girder Looking east at west face of downstream girder
yy»
a
�uiuiurmil ITiimWl41lN�III
Looking southwest at north end of bridge Looking south over bridge deck from north end
EXHIBIT C
w a� n
m
2�
000
V v v vv�I v
0 r �/Ewsfi i6tKMa Lgw� /
✓eie€sr/rs, h' -- �� 1 1J�2 / �"? -
(�044
zoo PL A N
I
_ePPRGK//✓ F C�I�FW T/?(CS
i 1
z)
r os
9 CAW k ,�Cbss H L v So
sh__f / Ears b)-, , GK.
✓2ro 98
,SYrrz.YvD Carbm Sfa'+l (LmF:S A f1 B#l�r� 4 t�h P66 1ybrdys 2ml Zeo.
o yb� µfork Lrne 2ae,t3s Jb562 _h8f,..,h 'lS f /4 /6'6Dmm Wakr F7am LLbp Sw
YaApweTy Gwa.�g nd aha� _ ib yp mon # FAc f�.nb 195. _F 3of
r) Sel cha 2 d..oy�ipzw oo C'/6
7$ OunSd /9,�iP Eauie -3P. m 4�3tl,Z
lv. a'moveg Exrsr�mo�:L' ,,75:
•LF°Y -aP%. $D' f,r� s P/vnr Mry i z;a Trn 9117
P/
sr�"roPo E l95tor 'Irret Lw.�PS'�m C,F. 99 1
�p�p �tl �°� UUDE'�P,9SS M4D(t'CAT/Oh'
tp4F0�
-.. � W ry Y3 SFiucF E frAn /20, CY.
� om�ifi Fbrntlenh J8 C�!
W R.n Z3
/90 ff ✓ fcaf Gu�ve. � '- ZS 4I GY
35 Nrs. ii
�oage `ROF/ik GRAPE
us s
DATUM F«c
©E6rGN Nor;;
/adin9 HtS sfz
'.QO ... -_ __ .. .,_ __. _ _ ___ L nc Cfcss A A'A.f30.oz"'�o.,
31
F` F=,J�o� ssfoe� sf A-
•
•.4 €arse. ,repo.:dFs nnoe i _ _ ,�
,- za R-146103
-zt Jo � A di rorr FreE. >/ 'r ��d�^'^ f m
' �_ from woranom
F .Groa e.,c-ce.
JS ti l - CITY 4T RENTED
HOUSER WAY BRI'�:Gi
ro ;eJeV AND APPROACHES
ELEVA 7"IPM ,
s<;�°'j!*";o•" GENERAL- PLAN
M t -------
DESIGNED�BY
CECL G. FfiNOLD
CONSULTING fx6ix EEP
-__ .__.___.._.._... ...__ • -- 'y,�,�_ SFATi IENaSN�NGTON SHT Of I ...
r
r- -- -- - - - - -- - -
r
'Su _
ti\ 9I .wt Pt_
DF
vJ
�J ten, ry.nr.�
y
o
a
GJ_
¢ ,
Wi Y
J
L i�l{�
a � I
r i ol/
A,v
fir+
gJ _ — z
„f
i
V
I
� � r T
1-7 f 1III ( F
HSER WAY AW BRIDGE
AND PPRDAC A HES
1I _.HST APPROACH SPAN
SC L -- _
j
. corvsu�TiNs EQRNQLD
iuewEEN +.
1-1NGiON._ St 2 Of3•�..
---------------
J
aE ?
iST
I.
r "
4aT1 /7
I
�k
.%r
_fC)<'ZQN A�1..
° o
P
R-146105
t �
roc
i
7 p R
41TV dE RE NO
' HOUSER WAV BRIDG=
* -
r74.- AND ARPR OACHES
r MAIN PIERS
b n -E
— .. � IN57Lu,e:j-"�/'o F - zN�97 sr✓e:,y"<<s f pp,-
4c+L_LD' r * R Am -
ocsienao
c ECI. c. vaeivoIo
° PoNSUJ N5 EN —
—T LE„WASH G ON $!iT,'j OFI
n+ J—r
bey pbyYr ,,yy r
o/mn
9
z
I
4 s
G i.
s r
Uk
4j Fecflr ., d 1 N ,\ Ny yu�
�:¢
4q L re 1. S �%` - ♦ i.�rr.�, nT IMo,k toc ",Jn 7V
LAhJ _LES.r_aPf R�CF1C G_FF'Ro(.CH �iFa(L—ElEdltclA ..�' loa"
A.,oA161JT,.� 1iEQ,U1E17 !off c.. n
y<p
7rJ
f I
4 H b fis hus -
1 p.ys �• e - ��6�'
a r N �
1.ti
B_T.
R-146106
r _ t 7
�
r r —�_ r _
� CIT. o1 AE�,oN
HOUSER WAY
RRID3E
AND APPROACHES
B.o.r,�AC ss 1P'o-
\ WEST APPROACH_ 'SIDAN
-------------
ar
eu
OLD
- SEnnLE,Nn5n N�62N�TIIG crvGirvEEP SST 0.
, � e
kl P I
w.
\i. R�—� P
t j � ¢
S\
u� �
I
a _
d �N1
1 0
.{. �n n n n n � -- -��_. o -•• C+-3 fi lck�^,< c/i'�=.+-_ —�'�CF-�OFl3i i.
C'
A-- o OEGK 1444-- -
lh
7--Tt
I
rs f /lo Z" £CCV/i7 U �� G/lIJt KS
d R I46I07
f Ca211
) z
4C
.x t]6-e}g
/�.t-de'v nrs 1 I c
MiSS_flsL 1 a;
4
3 T j
001,
E rc 9orrcs A rp c .� - Y �eHo sER wnvoGEZ? gB -
rta 3� ANJ APPROACHES
&RD.FR SPAN
`I
FRAMING PL4N
7 V EK S N a°�.€ r ram Fes-fNd r t+,,.,i& yy""", o - r o
au P>ro..,o.a4>/b a¢' •�fm 11 v 1 P'`ie /a.;�o- u.;.`s -
k.a G,�1rSpY a✓t rop a1?+^fF" as >ra��e oOd '€ �
AGN
mow GNU.ENGINEER
5 oeh
Ip /lei¢ Maks. 2z."SP
sl-eel ppe}`
21- " \
44°'..4 Ufuyf ✓ D-.fX1ST� '4! f
,9'sd3herr
I Shoo or Fs.'I W ld m� mnr m C.-:Yia Er-Ma V
H CONh PC TOf -'A MGM LL G .GS F
E N r
- Ina-xr rc I I
�, eva"uNlns^ _ 1-Gk3��/S,rD-v ZV � �y ITV
l P 3-,°m. Fbff M 3R`s`OE6. ) -J§l'l_ ' oEbry,Sl6 H fs
Ppj
q /I
?-d.
� -- � ,-. -- °\ vae �` 1 cx6l+se xo• `"3 9.T'_..G'�'Qa^^:.FPAjNC� —
e
2EC T/ON 'VA_ -
e� 41i-'
t,s
WAL
is
i ti d s
- 0
%I Y Ke vAr„ r TROrF�v�Rs T(6
o-r J, JMS Ppe
eye. .e.,r erozN r n t r h L .
i
•� - tll 52 d.�t Pipe �� d ttT 9i REN 0 6-=o
,. HOUSER WAY @RID.G=
5'EGTlON 00 AND AWRROACHES
J a GIRDER SPAN DET4,�LSI
r �t rr —
6✓, - Gin/Ftr R6J Fief P s@r#. APM�'h� D F I E --�
� �
TY, v G=4P6K OCi�tlLS BA�LINU
/r-EV GRJf'- IP"`/ Sco/e: -p DES 6NED 8 -
-T701NT.' ceci� c.ARNOLD
W 5 LT NG.EN
6NEEF
s«". a4„,o v, ��'o�le��/'O + sE mE mns 6 pr13 }•
I M af.yo..
0
s h4 / sn YAK ac,.o as
..r
;v. t_-s. - LAe.1`u'er<' F�/Z 1/I�-7 TE L ro/r„4k� T �A.^ a ^i��+br/foh 1` j8c dl
-
�" el L
r �>
6'
B�
M -
-
f .Les-
.
xp,4 5 JN -LI V4 A OM
sa a ai y
R-146109
PLE,N.o Lctj`
k / 5 -Le
4a�k�w fh�ddeb� � V lo V. E
w ,a a �Sl R APPROACHES
HE,
,GE
/c 6kax igzP4 � <' F{Q
'✓ � �' VI _
s�e.e l/t VA Bf�I�
M15C vI < -R DETAILS
"o e aR
A ccE.a r lnro' g
— L 0 P—z e",e4 RT Ek1-Pl
�
c a ry o
C S E G E
a
- E iTL�E SHIN GTON _NIT 7 Oil
Z
x6 a.F
n y
R a p V F
a �
4 a
1�
icy w -//TJ ..L_ -. ��O"' ��_ ---'- _� _.... � ��.-..- ..•�_ ..__- _x/._.�. .�..{�'
Z Ofi>.4.ssyy66
lba.3<lk
a 3/a
}
ALAAlfx&
tf 6Rl I
m
R-14 146
110
.�r
r
a:
61RDEfe''__�'L6 LG4Tf�JN
• . FtrpsF k':v3nnHl.nmr w/(6w CITY OF PEN TON
• hh
MOUSER WAY BRIDC-E
,�%n1
JP a> o AND APPROACHES
v •° �"' GIRDER SPAN
y
ALTERNATE DESIG�i
p aoT,oM_if1. LVCr
+ 1 t P G 0 FP
M
y�KJ_.•;.. __s��� DEB16N By
L� CECIL CC
NRN OLO
�_� GON$ULi N EN6INE ER
SEAiiLE,t-InsN NGTOry
o,
w
i
.-._. - _. _ •moo ...�" �Ff � ra°.E� - - _
e =
— 1
\ o
R-14,6111
TE
VA
— — — —
J
�•�� — - - — so Sfgi'LE,�NAr�ero« —=sr,. a, .
- J:353.9 z.
Yp `Weald F.ringsl vv)1'
0
o
1�' o
__ € 'a_r•,,�• __ _ _._._— _ _.._ �J' OfTA/L OF SGEC/A!_.: RA/L/ft/G
g
u
Amy 2 � -
s
-
R-146112
... - - Ism M!
�- _
b _
6
LEE
a
so /e. wroo m.nn sEnrnEsweswiHeroH ser ar: _
yyy l`y /
i
I- ✓ _
r
i
Tr t.,z S
- r � VI ,
� e B
� '� t ��_{ 4i�la..,<m. pf�a..,�.,.F�,rd.. i �._._ � _. �`�t,�, ear's��. /6.�,.i�✓`°
c1� �
z,.
�rfi !-
p' Tnvdo D I -�r .I-y_<��---'�.-tl^"' ��t°yr JJ^T �-7 p,'.�. �r✓Twd � b A� -
# A�
� }y
se r oasa all e n r a i i
ft
P d-
ey/r
1P1
a
v..
i
yo,rry i
y�
SECT 10n/ -c PLq N TEM7P0 A Y A ,PO G 1if5 a,+., ,w„}>✓fu,.a n..,c°,¢Wrb/�t F s.taw/h> "g�� ___ --
r�,
°Shsef/3 fa.dh./So{imp Ny tuoh mia�.rc ,erg, l-OU S.I?TMVVAV [j RIDCz_
AND APPPOACHES
TEMPORARY CROSSING
or _
mEo
ccaL� ARIOLO
c.
J,53 I I_:.a
Q
j
f
e r ti
sou w.+�c o I �#v`fi�� I I I O
Ntt N ry E A-i.y S/Ml.ae �VIC �L3 I
1 2
5
WaN�
42
1 yE{f
wok.
r
�z
Wr 7}
0
a
R-146114
c ry of uE To
HOUSER WAY BR.IDS,IAND APPROACHES
u—Ewr Lai,P -
UNDERPASS MODIFICQIION
A��t
�z
fS D TE
N..
� r
i .--�'�
,-y � ran
e� �
,ROADWAY SECT/OYV 0
� � h� � td '�' ,X,.nlar x�fi,"/Ch. �f�lon�:a� -,e,•,,,V. ,! ! I:.
a ,d
-
x', �—_z-p egad y Lan< d v Lo-�E-. 4
WA'3�➢yM 9,N kVM'.A(•v uan -I.-4` IT ..Y '(!j
�CPi
o ��I !
sro�
� asw m
E� p
✓ZOAC11Ms('Y 5EC T1ON@STA./6tOO
IH 04v,Na
A( .T,e 47-44. V co u-
�v
R-146115
Iv—
1,d _-i '. h;, `'w• rb' can
L�: t Nd ` r ..z--_�._ Ni_F"RE pry.
c c = l / inn
c Y
O
ems- �„ 3 l '.'. 1 - H"I�SER wAv f3RIDG£
z
AND APPROACHES
—_---_—
.gGraerCw
WATER MAIN�ROnDWnY SEC
cca,� avw4LL1 v Gr_,RQ
- DE GNED can�Y
CECIL C AR,OLD ��t
EXHIBIT D
INDEX
,5HT, N0. TITLE
SCHEDULE A: HOUSER WAY BRIDGE, FEDERAL PROJECT NUMBER BRM—1169(010)
SCHEDULE 8, WILLIAMS AVE. BRIDGE, FEDERAL PROJECT NUMBER BRM—1155(00 1) DErars
GENERAL NOTES
I ALL�lLlLL,kL AND WORXMANSHZP SHALL IAL IN A-11-171 HE
I OF.1___
LEGEND 0—rssa NDI-Y(L' —ATISSS 5tilLFS—AL LI'll—A tf—
I —,1111 OF—._1—1 ILL.—1DESFCNED
Ll sy A--—AS,
"Lil—AS-—A—_____y_
'AFLf"i 1112
TAKEM OR SOWN ON 5YI ET
A SIAtuDAAO
—
11.All BEEN"l, A,ACCELERATIONl
S .1 I "
WtffRE SECTION.V%EW ORA —5 SHOWN ON THE IIA11 All.—OI.�DFIGWAL
DET-SIS 7�KAN IS 1- Ly THE G'i'YCFR64TON
SA. LEE
M.aN�p.G/ fiiH-,cx 'pERgprytyv/. DIMENSIONS All
—It HE—1 ERRED Br llE
CON?;CYOR
All—RAIT L—A FlAttittlLf7i FlAl—PRO.LET 3fALL BE
_UC ILL SAL—1- All—IL CONFORM 1 11
I ALL—71—11 11 1—
VICINITY MAP
THE CONSAACSOR SHALL—ALL NEW—C—C—Al AALL
11——Ir At —11,SlAAS—AS A
—T_--I—W4SRX LI—11.WIIS
— -. ....I�Al LPAT'—--l— 1 A 1 —ll—GI 0, ",—At" 11"—AND ittIlO fAINLWG SlIALLT IFONE— 0 ANO
CfE iliS(Sl COAT LILLIS LLS EFA
11—A A-1-11
l—F,,AAW'c-,-"
AL7—CbAr—li`,LlLDDE A—Ol'TITANIUM LI)ASi[I
AND
T l't'N'='R.X=_—M—M Z SUCH
_11AII—CLAT.AIII—T
T,7 S STAllAA`l�ff�11
A A—AFANCft0.4 ft0D5SLLALL Ill I—Af—A-77Ai
IT ND
n/^ AC 3U'-FY9EIJC43tCEANCIHM TEN—G A-
-1 A.—I f PIA11'I'AS.—WIL OR
A--ISSIA, —1 1 CISSWLTE—1 AND 11,1 1—
1 GE N —SUFA—5
ILL——,[S EIIAL iiO 11 lIfASANCHOn NW
IAI 11—
JrCITY 0: RENTON
-221S
"-6 9,
COVER SHEET
I's
7AIC 4".121151
.............
I "1 -1 Al I I-A-1—A I_f -T— T-- I-
19 18 17 18 15 14 13 12 11 10 9 8 7 6 RfU'ox J,0378 6 7 8 9 10 11 12 13 14 15 16 17 18
SEC. 17, T23N, R.5E., W.M. CITY OF RENTON
PLEB 1
BRIDGE PLAN BAN
BEARING BAR 2XZX) 6"-�
B I'f A-1
A A--A-11 �11
UPPER PLATE CAP
.1 Al 1-1- D ll�11TE
6-S �A I(-I
-ER T A-
i J
3
E
'A
IA
BUtT
sl �
Ll
PLAN VIE
TYPICAL RETROFIT OF MAIN SPAN EF-ARIN
1T F"SZI;ll C_IT
A IT
-Pll.1 A DETAIL
7-221T
_�Ty 11 RENTO
PIER PIER __� _ Z.w.
_ i
EA
LAYOUT PLAN GENERAL PLAN&DETAILS
20 19 18 17 15 1r5 14 13 12 11 10 9 8 6 14 15 16 17 18
RAR 1)x V379 ' 6 7 8 9 10 1 12 13 1
SEC. 17, T23N., R.5E., W.M. CITY OF RENTON
SPAN l o AN
BRIDGE PLAN
-Al
—11—1 A OWCN
IA
T-2215
CITY OF R�F,NTON
PIER PIER GENERAL PLAN
LAYOUT PLAN RE"'i
[A I f I F if At F.
IA I I
19 18 17 16 15 14 13 12 11 10 9 8 7 6 ox 8 ' 10 11 12 13 14 15 16 17 18
RA�� 38 A% 7
17 BEARING "F HEARING R£MOYE EXISTING XEEFER BAR T REGION N0. STA�� FEDERAL PROJECT NO.
f UPPER P
A—SPAN
A,
'AN
EWD A"'A
'I IA El
UPPER PLATE MODIFICA 770N
I—E
I,Nl
L ATF
1A 7E
PEDESTAL TOP O<Pi ER 2 OR j
LPLA7
ExIsTimo NEW EXTENSION R
ANCHOR
ELE VA TI
PLA
All.1-1 -IF �W6 Mill
PATE
fG
NEW dCAffNQ P LOWER PLA 7F MODIFICATION I -1l—
H Ft-
TYPICAL APPROACH SPAN BEARING RETROFIT6AI
p1l
DETAIL_rA_
TLI-2-
'A"MI""I,
A-ANCHOR ROD
1EQ11AA
BEARING) _
0 LONER
1b,
V
ELEVATION END VIE
TYPICAL MAIN SPAN EXPANSION BEARING RETROFIT
PLAN T PLATE DETAILff)
<
7
T-2215
F_ crry OF RENTON
.I u>�waava+r or reeve wossa
ELEVA 71 11—T-- A-A W
TYPICAL MAIN SPAN FIXED BEARING RETROFIT j DETAILS
DETAIL ..0 9:ct
Mo-41-2216'
_4 I A' I I f A I A I A I I I A I I I IA I I
19 18 17 16 15 14 13 12 11 10 9 8 7 6 f4iV)x 6 7 8 9 10 11 12 13 14 15 16 17 18
R _ J03 8 1
EXHIBIT E
Sit
a CITY OF RENTON
a �
o =
om
Department of Public Works
0
U
of $ SCOUR REMEDIATION AND EROSION CONTROL,
�z �a
ut
HOUSER WAY BRIDGE
EF
TITLE SHEET NO.
COVER SHEET 1
s VICINITY MAPS, GENERAL NOTES 2
� I HOUSER WAY BRIDGE 3
s
JUNE 1, 1998
j , conamarq Fn9xyeQ^e 9arvka.
so9 W.mp9: at.nr.e.
Olymply WA 99a9t•tt43
t
SUMMARY OF QUANTITIES GENERAL NOTES
e
ITEM UNIT AYOUNi OF MATERIAL AND WORKMANSHIP SHALL RE IN F TRANSPORTATION
WITH THE REQUIREMENTS
•�. t.� 'B=' 9r. --- OF THE 1ATI NSWANHINGTONRDA STATE DEPARTMENT OF TRANSPORTATION STANDARD
t MOBILIZATION ES. T SPECIFICATIONS FOR ROAD.BRIDGE AND MUNICIPAL CONSiRUCTICaI,
0 2 ' � 'e 2 TRAFFIC CONTROL L.S i THE CEDAR RIVER AND MAY CREEK ARE CRUCIAL SALMON AND SISTINE.SPAWNING
GROUND.ALL WORKS SHALL BE PERFORMED WITH STRICT ADHERENCE TO PERMIT
V B 3 CLEARING,GRUBBING 4 RGASSIDE CLEAN-UP I.S 1 REQUIREMENTS,AND CONSTRUCTION WINDOWS AS DIRECTED BY SPAWNING SEASONS.
p LI:
4 STRUCTURE EXCAVATION CLASS 8-INCLUDES HAUL CU.YO 18T ALL AREAS OF OF BANK INFER IMPACTED BY CONSTRUCTION SHALL BE REFAHALL I C i0 THE
w PROJECT l�'r SATISFACTION OF THE ENGINEER BY THE CONTRACTOR.REPAIRS SHALL INCLUDE
i}PLACEMENT OR EARTH AND STONE SO THAT THE BANK GLADE RISES FROM THE WATER
SITE 5 PERMANENT CONSiRUCtiON QOIEXT[LE-GLASS B So TO *3 IN A SMOOTH TRANSITION TO MEET THE ROADWAY LEVEL.
¢p 2)PLANTING OF GRASS OR SHRUBBERY,OR OTHER INOIGENOLD PLANTS AS DIRECTED BY
6 LIGHT-LOOSE RIPRAP ID iqJ THE ENGINEER.
AD ={ :I. J BANK RESTORATION L.S. 3)REPAIR OF EXISTING BANK DUE TO EROSION THAT WOULD.IF LEFT UNCORRECTED,
S _ CAUSE FUNRE DAMAGE TO THE BANKS.
THE RIPRAP SHALL BE EITHER MACHINE CR HANOPLACED.LARGEST STONES SHALL BE
LOCATED AT BOTTOM OF SLOPE AT TOE.AFTER RIPRAP 15 IN POSITIM EXCAVATED DIRT
SHALL BE USED TO FILL VOIDS IN THE RIPRAP.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TRAFFIC CONTROL REQUIREMENTS.
55 THE PRQECT SITE SHALL BE LEFT IN A CLEAN AND TIDY CONDITION TO THE
g@ SATISFACTION OF THE ENGINEER,
g THE PURPOSE OF THIS WORK IS TO PROVIDE SCOUR PROTECTION TO THE LEFT BANK
F Rg PIER USING RIPRAP.THIS REQUIRES EXCAVATION OF APPROXIMATELY 50 FT.OF BANK
Drza AND STREAMBED FOR DEPTHS VARYING BETWEEN 2 FL(z)AGO 7FT It),PLACEMENT
ti W OF A GECTEXTTLE BLANKET FOR EM EROSION CWiROL,AND PLACENT OF BROKEN STONE
—RAP WITH WEIGHT GRADUATIONS BETWEEN 50 INS AND 1 TON,
F
HOUSER WAY BRIDGE
ai 9 VICINITY MAP
i Py�
8
i
a
HOUSER WAY BRIDGE
� IIII G C S VICINITY MAPS,GENERAL NOTES
aoo w.uWa o1W.s:.rvne. SCOUR REMEDIATION
g a..WA 88601-YY4a PACE 2 OF 3 DATE:JUNE 1,1998
O
LEFT BANK
TO BE EXCAVATED AS NECESSARY
EDGE OF RAILROAD BRIDGE EXTEND RIPSTAP TO MEET LARGE A-11 H I SLOPE
I ��iXISTING RIPRAP STONES.SLOPE AND
OF RIPRAP AS GIVIT ANY
NECESSARY TOKNEES FORM LEASEEM HIGH WATER NARK
TRA-TIA
E.GTIE` ------STERIES 2'THICKNIGHT DANK EDGEDURING SORGAL
APLALTA.LOCATION UP STREAM
ED AMITER ROW
ORDINARY HIGH WATER ROW PERMANENT COAST GEOTEXTILE
A, yJ/lIFl FACE (CLASS IS CYP.)
B,
S, rAPllEll
-GLING BANK k STREAMED)
PIER SECTIONe
EB
HOUSER WAY BRIDGE (DIRECTION OF IT-IC)
R,' A.D.ENT "IT
,N A' PACE LC tT
E.
z lEGCPDRAl
------------------------ BRIDGE PIER BANK REPAIR
*
MATCH UP TO
o
-------------- ---------- -STING CABIONG [11 IAIY HIGH APPRoX----------- WATER ELMARK GOWNGLINE
---------
---------------- S
---------------- ----------------------
v APPREOF LOBATTON
OP D RW
E.IGH.D TE
UGLIG LEVW_EL
NALRI I F.1 GROUND LINE
NO
TO PLACEMENT OF RIPRAP TO'ILL MUMS LINE AT I!�A STOP 4'
PLAN INCEATONATE INCTOESOUS BANK MATERIAL _IEFT BANK PIER
AND PROVIDE FOR A V BLANKET COVER AS SINTVN (FACING—STREAM)
11 A A tO 11 50 ....OR MAKE 2 THILK LIGHT 100SE IS
lKISTONG —WITH I FT BELOW FNPWAP LAICS(NE.)
FEET ATTEAMBIS EIRREADDED LOWEST POINT
2.
MALANG(LOW-POINT)
SUMMARY OF QUANTITIES
ION NO. QUANTITY UNITS I SECTION
"S OT, LIGHT LLZ.E -ANY DAMAGE TO BANK RESULTING
INI TOP 11 FRgA.111-HON SHALL.11111AL 111AIAHIN REPAIRED BY ME CONTRACTOR TO THE
YD' CONSTRUCTION INOTENTILE SATISFACTION TO ME ENG:NE_N, FEET
PROJECT ADDRESS ELEV H,
SEC.17,LES R05 ADJACENT PROPERTY OWNERS
CITY OF RENTON
HOUSER WAY 1. CITY OF RENTON
INTERSECTION WITH CEDAR RIVER 2 B.S. RAILROAD CO. HOUSER WAY BRIDGE
DIRECTIONS
1-405 TO 167 HEAD NORTH TO S END ST PLAN &ELEVATION
HEAD EAST I WELLS,TAKE SOUTH T
HOUSER WAY AND HEAD EAST TO THE BRIDGE. zoe
AM.- SCOUR REMEDIATION
WA PAGE 3 OF 3 DATE:JUNE 1,1998
EXHIBIT F
BRIDGE INSPECTION REPORT Page 1 of 5
Status:Released Printed On: 314l2019 Agency: RENTON
CD Guid:88343323-32f8-4875-b977-626bf8bcd508 Release Date: 1/2812019 Program Mgr: Roman G.Peralta
Br. No. RENTON-05 SID 08584300 Br. Name HOUSER WAY BRIDGE
Carrying HOUSER WAY Route On 01169 Mile Post 0.00
Intersecting CEDAR RIVER Route Under Mile Post
inspe AG Cert# G1103 Cert Exp Date 5/12/2021 Co-Inspectors Signature HP
5 Structural Eval (1657) 41
Inspections Performed:
Operating Tons (1552) 3 No Utilities (2675)
Freq Hrs Date Rep Type
3 Deck Geometry (1658) 1.13 Op RF (1553) 0 Bridge Rails (1684)
24 1.5 9/2012018 Routine
9 Underclearance (1659) 24 Inventory Tons (1555) 0 Transition (1685)
Fract Grit
8 Alignment (1661) 0.67 Inv RF (1556) 0 Guardrails (1686)
UW
5 Deck Overall (1663) 5 Operating Level (1660) 0 Terminals (1687)
Special
5 Superstructure (1671) B Open/Closed (1293) 0.00 Asphalt Depth (2610)
Interim
5 Substructure (1676) 8 Waterway (1662) 10.0 Design Curb Ht(2611)
UWI
9 Culvert (1678) 7 Scour (1680) 42.0 Bridge Rail Ht (2612)
Damage
8 Chan/Protection(1677) N Soundings Flag (2693) 1960 Year Built (1332)
PRM Safety
N Pier/AbutIProt (1679) Revise Rating (2688) 0 Year Rebuilt (1336)
SEC Safety
4 Drain Cond (7664) Photos Flag (2691) Y Subj to NBIS (2614)
Condition
1 Drain Status (7665) Measure Clmc (2694)
Alpha Span Type: Short Span
H Deck Scaling (7666) 9 Sdwk Cond (7673)
SG In Depth
5 Scaling Pct (7667) 4 Paint Cond (7674)
Geometric
5 Deck Rutting (7669) 8 Approach Cond (7681)
7 Exposed Rebar (7670) 9 Retaining Wall (7682) Sufficiency Rating 51.61 FO
6 IlCurb Cond (7672) 9 Pier Prot (7683) High Risk
BMS Elements
Element Element Description Total Units State 1 State 2 State 3 State 4
12 Concrete Deck 3,277 SF 3,277 0 0 0
35 Concrete Deck Soffit 3,277 SF 3,277 0 0 0
38 Concrete Slab 784 SF 762 0 20 2
92 Steel Welded Girder 565 LF 556 0 9 0
212 Concrete Submerged Pier Wall 32 LF 32 0 0 0
215 Concrete Abutment 66 LF 66 0 0 0
221 Concrete Foundation 2 EA 2 0 0 0
234 Concrete Pier CaptCrossbeam 68 LF 68 0 0 0
311 Moveable Bearing(roller,sliding,etc) 11 EA 0 0 11 0
313 Fixed Bearing 5 EA 5 0 0 0
322 Bridge Impact 2 EA 2 0 0 0
330 Metal Bridge Railing 282 LF 267 5 10 0
361 Scour 4 EA 4 0 0 0
408 Steel Sliding Plate 63 LF 0 63 0 0
BRIDGE INSPECTION REPORT Page 2 of 5
Status: Released Printed On: 3/412019 Agency: RENTON
CD Guid:88343323-32f8-4875-b977-626bf8bed508 Release Date: 1/28/2019 Program Mgr Roman G.Peralta
Br. No. RENTON-05 SID 08584300 Br. Name HOUSER WAY BRIDGE
Carrying HOUSER WAY Route On 01169 Mile Post 0.00
Intersecting CEDAR RIVER Route Under Mile Post
BMS Elements (Continued)
Element Element Description Total Units State 1 State 2 State 3 State 4
901 Red Lead Alkyd Paint System 7,500 SF 3,330. 0 4,150 20
Notes
0 ORIENTATION:
Bridge is south to north.
South abutment=P1.
Cedar River flows east to west.
Bronson Way carries one way traffic.
3 GENERAL NOTE:
This is a three span bridge over the Cedar River.The main span has 5 lines of steel girders.Approach spans are CIP concrete rigid
frame on each end.
There is a pedestrian bridge located on the west side and a railroad bridge on the east side.
Deploy UBIT from east lane.Take caution of power lines on east side.
MONITOR:
Riprap is maintained at P2.
For scour holes forming at P1,P3,and P4.Expansion joint movement at centerline of bridge P2 and P3.
Condition of girder 2A at exterior bottom flange.
11 LOAD RATING:
Sargent Engineers,Inc.updated the LFR load rating in 2017 to include the Single-Unit trucks and Emergency Vehicles. The rating
indicates load posting EV3.
12 CONCRETE DECK:
Span 2 has a concrete deck supported by steel girders.
Exposed aggregate throughout With mud ball spalls in west lane span 2 and 3.Random transverse cracks in span 2.
35 CONCRETE DECK SOFFIT:
Span 2 has concrete deck soffit exposed between steel girders.
Short and scattered transverse leaching cracks in east overhang mid-Span 2,one exposed rebar.10'x 6"x 2"spalled edge along
west overhang mid-Span 2.
38 CONCRETE SLAB:
Concrete slab is present in approach spans-Spans I and 3.
SURFACE:Exposed aggregate throughout with many mud balls spalls.Approximately 6"along the expansion joint concrete is
delarrfinated with spalls and patches.
SOFFIT:Longitudinal leaching cracks Span 1 &3.
Span 1 -concrete is black from camp fire soot-no damage noted.
92 STEEL WELDED GIRDERS:
Five lines of girders in span 2.
2A:bottom flange west face(exterior)moss and debris accumulation along flange,rust bloom throughout upper surface of bottom
flange,laminar rust with areas of pitting in webs,bot flange,welds and base of stiffeners. Top flange-minor rusting along top
interface-See Repairs
213:Minor debris scrapes on the bottom of flange at south end near pier 2.
2E:Supports utility.Dusty accumulation on top of lower flanges of all girders.
12 diaphragms between individual girders-numbered diaphragm 0 through 11,0 is south.
212 CONCRETE SUBMERGED PIER WALLS:
Concrete submerged pier hammer head walls at P2 and P3,some graffiti,no structural defects noted.
215 CONCRETE ABUTMENT:
Concrete spall at NE corner of P4. Horizontal crack along wall/slab interface P4.
221 CONCRETE FOUNDATION:
PI footing exposed 1"face x 6'length.
P4 footing is exposed on the east half.
BRIDGE INSPECTION REPORT Page 3 of 5
Status:Released Printed On:3/412019 Agency: RENTON
CD Guid:88343323-32f8-4875-b977-626bf8bcd508 Release Date: 1/28/2019 Program Mgr. Roman G.Peralta
Br.No. RENTON-05 SID 08584300 Br.Name HOUSER WAY BRIDGE
Carrying HOUSER WAY Route On 01169 Mile Post 0.00
Intersecting CEDAR RIVER Route Under Mile Post
Notes (Continued)
234 PIER CAPS,HAMMERHEADS:
Minor dirt and debris with moisture accumulation from expansion joints above at P2&P3. Pigmented sealer flaking off in various
locations.The west most pedestal wall on P3 has cracks at the soffit interface.
311 MOVABLE BEARINGS:SLIDING PINTLES
Six steel pintle bearings,on short concrete columns;three at P2 and three at P3,support the concrete rigid frame slabs of approach
spans.
At pier 2 bearings are numbered 2A through 2C(2A is west).
Column 213:minor spall east face.
At pier 3 columns are numbered 3-1A through 3-1C(3-1A is west).
Column 3-1A:Open perimeter crack at column/beam interface with small spalls and rusty rebar on south face.
Column 3-1 B:horizontal crack at column/beam interface on south face.
MOVABLE BEARINGS:SLIDING PLATE
Five sliding plate bearings for the steel girders at P3.
Surface rust on faces of exterior steel bearing plates. Bearings have dirt accumulation.
3B at P3 has minor delaminations and spalls near edges of the grout pad.
313 FIXED BEARINGS:
At P2-Five fixed bearings for the steel girders are dirty with laminated rust.
Bearings are numbered 2-1A through 2-1E (2-1A is west)
322 APPROACH IMPACT:
AC is cracking in approaches,but does not increase impact onto structure.
330 BRIDGE RAIL,METAL:
Steel rails have numerous areas of peeling paint with freckled rust spots,paint chips,and a few scrapes.
Rail support corbels are cracked in spots with some exposed rusty rebar.
East rail both North end and South end have been hit and damaged.The east rail is bent outward 7"at the SE comer and 4"at the
NE comer. See Repairs.
West rail has a segment of railing with bent pickets near north approach.
361 SCOUR,FIELD:
Riprap in place at P2,no riprap at P3 or abutments.Streambed is gravel and cobbles.Channel is well defined with no visible scour.
P1 and P4 footings are exposed;they are founded on steel piles.
408 EXPANSION JOINTS,STEEL SLIDING PLATE:
Sliding plate joints located at Piers 2 and 3 have rninor'D'-spalls and concrete delaminations along the headers of both joints.Joints
appear frozen.Joints were measured at the bridge center line:
YEAR PIER PIER EMP
2 3
2018 2-1/2-2- 60°F
016 2-3/8" 1-3/4"67"F
2012 2-3/8"1-7/8"70°F
011 -3/8"1-7/8"65"F
009 2-3/8"1-7/8"70"F
008 -3/8"1-7/8"65"F
901 PAINT,RED LEAD:
Paint is chipped at many locations in the girder webs and cross frame diaphragms exposing primer and bare metal with spots of
corrosion. Chalky oxidation on surface throughout Bottom of girders have widespread speckled rust Peeling paint exterior side of
girder 2A at bottom flange.
1660 OPERATING LEVEL NOTE:
Structure originally for H15 loading with 33ksi reinforcing steel and concrete strength of 3,600 psi.
BRIDGE INSPECTION REPORT Page 4 of 5
Status:Released Printed On:34/2019 Agency: RENTON
CD Guid:88343323-32f8-4875-b977-626bf8bcd508 Release Date: 1/28/2019 Program Mgr Roman G.Peralta
Br.No. RENTON-05 SID 08584300 Br. Name HOUSER WAY BRIDGE
Carrying HOUSER WAY Route On 01169 Mile Post 0.00
Intersecting CEDAR RIVER Route Under Mile Post
Notes (Continued)
1671 SUPERSTRUCTURE CONDITION:
Rated down due to section loss in welds,bottom flange and stiffeners on girder 2A exterior face.
1676 SUBSTRUCTURE CONDITION:
Rated down due to the cracks on the approach span pedestal cracking as the joints and bearing are frozen.
1680 SCOUR,OFFICE:
P1 and P4 are founded on steel piles and the footings are exposed.
1685 RAIL,TRANSITION:
Guardrail is not installed at the southwest comer.
1686 RAIL,APPROACH GUARDRAIL:
Approach guardrail is not installed at the southwest comer.
1687 RAIL,TERMINALS:
Rails are not installed at the southwest comer.
2675 UTILITIES:
One 18"diameter steel pipe on the east side and two 5"diameter steel pipes between Girders D and E.
2688 REVISE RATING NOTE:
Rating updated for conditions noted in 2017 report.
7664 DRAINS:
The two east drains,which are on the shy area,are plugged solid with dirt and debris.The west drainss are on the traffic lane and
are open and functioning. See Repairs.
7672 CURBS CONCRETE:
Curb is broken on the southeast comer of the bridge.Debris and moss accumulating on the curbs.
Repairs
Repair No Pr R Repair Descriptions Noted Maint Verified
10003 2 B DRAINS: 11/20/2009
Drains are clogged with dirt and debris. All drains need to be
cleaned out to function property.
10004 1 B RAIL: 11/20j2009
Remove and replace damaged sections of metal bridge rail on both
the southeast and northeast end of the bridge.
10005 1 B TRANSIENT: 9/6/2012
Remove transients from approach spans,thoroughly clean area.
10006 2 B SCOUR: 916/2012
Both abutments and Pier 3 are not protected from scour. Install light
loose riprap at P1,P3,and P4
10007 2 B JOINTS: 9/1712014
Demolish steel expansion joint,chip off loose concrete and install
new header and sealent.
10008 1 B BEARINGS: 9/1712014
Clean debris and rust,and repaint all bearings.
10009 1 B STEEL GIRDER: 9/21/2016 1/15t2019
Conduct load analysis on steel girders for current condition
Laminar and pack rust on Girder 2A bottom flange,welds and
stiffeners.
Inspections Performed and Resources Required
Report Type Date Freg Hrs Insa CertNo Coinsp Note
Routine 9/20/2018 24 1.5 MAG G1103 HP
Equipment 9/20/2018 48 2.0 MAG G1103 HP
BRIDGE INSPECTION REPORT Page 5 of 5
Status:Released Printed On: 3/4/2019 Agency: RENTON
CD Guid:88343323-32f8-4875-b977-626bf8bcd508 Release Date: 1/28/2019 Program Mgr. Roman G.Peralta
Br. No. RENTON-05 SID 08584300 Br. Name HOUSER WAY BRIDGE
Carrying HOUSER WAY Route On 01169 Mile Post 0.00
Intersecting CEDAR RIVER Route Under Mile Post
Inspections Performed and Resources Required (Continued)
Report lvoe Date fLe-q Hrs Insa CertNo Coinsp Note
Resources Hours Min Pref Max Freq Date Need Date Override Notes
UBIT 2.00 ANY 60 30 Seattle UB60 deployed off of the east side.
Flagging 1.50 LA LA LA Seattle Flaggers
Sticky Notes
Creator Created Table Reference Notes
King 1/16/2019 Report Types check with City for date of posting for EV-3
County/GenneauxM
BRIDGE INSPECTION REPORT Page 1 of 12
Status:Released Printed On:314/2019 Agency: RENTON
CD Guid:88343323-32f8-4875-b977-626bf8bcd508 Release Date: 1/2812019 Program Mgr. Roman G.Peralta
Br. No. RENTON-05 SID 08584300 Br. Name HOUSER WAY BRIDGE
Carrying HOUSER WAY Route On 01169 Mile Post 0.00
Intersecting CEDAR RIVER Route Under Mile Post
PHOTO RENTON-
05 ELEVATION
{root} � �*
Photo Type: E-Elevation R
e
t
Orientation: N
Date: 9I20/2018
l �
Repairs:
REMARKS:East elevation "
4
i.
S
1 ' 2 t 4 4
PHOTO RENTOW
05 WEST RAIL
{root}
Photo Type: G-General
Orientation: E
Date: 9/20/2018
Repairs:
REMARKS:Bent pickets on west rail
i�
"hr
1
BRIDGE INSPECTION REPORT Page 2 of 12
Status:Released Printed On:314/2019 Agency: RENTON
CD Guid:88343323-32f8-4875-b977-626bf8bcd508 Release Date: 1/28/2019 Program Mgr, Roman G.Peralta
Br. No. RENTON-05 SID 08584300 Br. Name HOUSER WAY BRIDGE
Carrying HOUSER WAY Route On 01169 Mile Post 0.00
Intersecting CEDAR RIVER Route Under Mile Post
PHOTO RENTOW
05 DECK
(root)
Photo Type: D-Deck
Orientation: W s `:
Date: 9/20/2018PWW-
s
Repairs:
REMARKS:Deck and south approach d o
4
PHOTO RENTOW
05 SOUTH
APPROACH
(root)
Photo Type: G-General I
Orientation: W "
Date: 9/20/2018 _
Repairs:
i
REMARKS:South approach span
- A
BRIDGE INSPECTION REPORT Page 3 of 12
Status:Released Printed On:314/2019 Agency: RENTON
CD Guid:88343323-32f8-4875-b977-626bf8bcd508 Release Date: 1/28/2019 Program Mgr. Roman G.Peralta
Br. No. RENTON-05 SID 08584300 Br.Name HOUSER WAY BRIDGE
Carrying HOUSER WAY Route On 01169 Mile Post 0.00
Intersecting CEDAR RIVER Route Under Mile Post
PHOTO RENTON-
45 LANE SPACES
{root}
Photo Type: D-Deck
Orientation: S
Date: 9/20/2018
Repairs:
REMARKS:Mudball spalls in west lane —
i -
PHOTO RENTON-
05 NORTH
APPROACH
{root}
Photo Type: G-General
Orientation: W
Date: 9/20/2018
Repairs:
REMARKS:North approach span
BRIDGE INSPECTION REPORT Page 4 of 12
Status:Released Printed On:314/2019 Agency: RENTON
CD Guid:88343323-32f8-4875-b977-626bf8bcd508 Release Date: 1128/2019 Program Mgr. Roman G.Peralta
Br. No. RENTON-05 SID 08584300 Br. Name HOUSER WAY BRIDGE
Carrying HOUSER WAY Route On 01169 Mile Post 0.00
Intersecting CEDAR RIVER Route Under Mile Post
PHOTO RENTON- — �`" .a
05 NE RAIL
{root}
' R
Photo Type: R-Repair �� •, `,
Orientation: SW
Date: 9/2 012 01 8
Repairs: 10004
REMARKS:NE rail impact damage
Pik
,s
may,
PHOTO RENTON- Fi
05 WEST 1
OVERHANG w '
{root} 4,Iqt
Photo Type: G-General 3 v 1g
Orientation: E
a � 6✓.t
Date: 9/20/2018
Repairs:
REMARKS:10'x 6"x 2"spall with
exposed rebar along west overhang
r
? ��
BRIDGE INSPECTION REPORT Page 5 of 12
Status:Released Printed On:314/2019 Agency: RENTON
CD Guid:88343323-32f8-4875-b977-626bf8bcd508 Release Date: 1/28/2019 Program Mgr. Roman G.Peralta
Br.No. RENTON-05 SID 08584300 Br. Name HOUSER WAY BRIDGE
Carrying HOUSER WAY Route On 01169 Mile Post 0.00
Intersecting CEDAR RIVER Route Under Mile Post
PHOTO RENTOW
05 SPAN 3
{root}
Photo Type: R-Repair
Orientation: SE
Date: 9/20/2018
Repairs: 10005
REMARKS:Span 3 transient activity
x
1T
t • 1 1 1
PHOTO RENTON-
05 APPROACH 4 R
'� ...
SPALL
{root}
Photo Type: R-Repair
Orientation: DN ��
Date: 9/20/2018
Repairs: 10007
REMARKS:D spall at south approach
`� +•-mot� �4
• f k rN{Q�T t #t �� A'+� tJ-.J+m 'C to..L ry: t��.�. ?
'h
BRIDGE INSPECTION REPORT Page 6 of 12
Status: Released Printed On:314/2019 Agency: RENTON
CD Guid:88343323-32f8-4875-b977-626bf8bcd508 Release Date: 1/28/2019 Program Mgr.Roman G.Peralta
Br. No. RENTON-05 SID 08584300 Br. Name HOUSER WAY BRIDGE
Carrying HOUSER WAY Route On 01169 Mile Post 0.00
Intersecting CEDAR RIVER Route Under Mile Post
PHOTO RENTOW
05 SPAN I
{root}
Photo Type: R-Repair
Orientation: SE
Date: 9/2012018
Repairs: 10005
REMARKS:Span I transient activity
F
U I
77
PHOTO RENTOW
1)
05 PIER 2(SPAN
{root}
Photo Type: G-General
Orientation: E
Date: 9/20/2018
Repairs:
REMARKS:Pier 2 south face
BRIDGE INSPECTION REPORT Page 7 of 12
Status:Released Printed On:3l412019 Agency: RENTON
CD Guid:88343323-32f8-4875-b977-626bf8bcd508 Release Date: 1/28/2019 Program Mgr. Roman G.Perafta
Br. No. RENTON-05 SID 08584300 Br.Name HOUSER WAY BRIDGE
Carrying HOUSER WAY Route On 01169 Mile Post 0.00
Intersecting CEDAR RIVER Route Under Mile Post
PHOTO RENTOW
05 PIER 3
{root}
Photo Type: R-Repair
1.
Orientation: NE a '
Date: 9/20/2018
Repairs: 10006
REMARKS:Pier 3
b N t t
.Q't.� I✓ ' '�.. T'k""'{,A •","s. '�a?Zvi'*-•L t'h�
PHOTO RENTON-
05 PIER 2 '}
{root}
Photo Type: G-General
.4
Orientation: SW
Date: 9/20/2018
Repairs:
REMARKS:Pier 2
mow.
K
• • 1 1 is : ii • ow,
• i l •• •• 111
_ f
Cr �
+•.K C e�4` r",y 7. RS$'1 n+ � :,yd FI?T t :, t
• • i `H '"t bc1''1,kk';''•< �',44 cn" � idl �! s'vt
- 1•i
„�•ar•.ea.-
t t
Y
x
. ' -.?( n .•4:h 1. 1
. a
_ �wr
,Y�G
BRIDGE INSPECTION REPORT Page 9 of 12
Status:Released Printed On:3/412019 Agency: RENTON
CD Guld:88343323-32f8-4875-b977-626bf8bcd508 Release Date: 1/28/2019 Program Mgr. Roman G.Peralta
Br. No. RENTON-05 SID 08584300 Br.Name HOUSER WAY BRIDGE
Carrying HOUSER WAY Route On 01169 Mile Post 0.00
Intersecting CEDAR RIVER Route Under Mile Post
PHOTO RENTOW
05 GIRDER 2A
(BOT) VV
(root)
Photo Type: G-General
Orientation: UP
Date: 9/20/2018
Repairs:
REMARKS:Speckled rust bottom of
girder 2A
PHOTO RENTOW
05 SPAN 2
{root}
Photo Type: G-General
Orientation: SW
Date: 9/20/2018
Repairs:
REMARKS:Span 2
Sz
BRIDGE INSPECTION REPORT Page 10 of 12
Status:Released Printed On: 3/4/2019 Agency: RENTON
CD Guid:88343323-32f8-4875-b977-626bf8bcd508 Release Date: 1/28/2019 Program Mgr. Roman G.Peralta
Br.No. RENTON-05 SID 08584300 Br. Name HOUSER WAY BRIDGE
Carrying HOUSER WAY Route On 01169 Mile Post 0.00
Intersecting CEDAR RIVER Route Under Mile Post
PHOTO RENTOW _
05 BEARING 3B
{root}
t .
Photo Type: R-Repair z
Orientation: SW
low
Date: 9/20/2018
Repairs: 10008
REMARKS:Delaminated and spalled •. -
grout pad at bearing 3B
PHOTO RENTON-
05 COLUMN @ ` d
PIER 3
{root}
Photo Type: G-General
Orientation: UP
Date: 9/20/2018 s
Repairs:REMARKS:Column 3-1A crack at
column/beam interface
i
BRIDGE INSPECTION REPORT Page 11 of 12
Status:Released Printed On: 314/2019 Agency: RENTON
CD Guid:88343323-32f84875-b977-626bf8bcd508 Release Date: 1/28/2019 Program Mgr. Roman G.Peralta
Br.No. RENTON-05 SID 08584300 Br. Name HOUSER WAY BRIDGE
Carrying HOUSER WAY Route On 01169 Mile Post 0.00
Intersecting CEDAR RIVER Route Under Mile Post
PHOTO RENTON- "'
05 GIRDER 2A . a; -
(root) �, r,t« r �►�' ",. y '
Photo Type: R-Repair t►5. 4 4
Orientation: E ' N
Date: 9l2012018 ��• .�E
Repairs: 10009 ' f
REMARKS:Girder 2A rust on bottom
flange,welds and stiffeners - T�
-r
BRIDGE INSPECTION REPORT Page 12 of 12
Status:Released Printed On: 3l412019 Agency: RENTON
CD Guid:88343323-32f8-4875-b977-626bf8bcd508 Release Date: 1/28/2019 Program Mgr. Roman G.Peralta
Br. No. RENTON-05 SID 08584300 Br. Name HOUSER WAY BRIDGE
Carrying HOUSER WAY Route On 01169 Mile Post 0.00
Intersecting CEDAR RIVER Route Under Mile Post
Entry Name Folder Name Type Repairs Page
PHOTO RENTON-05 ELEVATION {root} E 1
PHOTO RENTON-05 WEST RAIL {root} G 1
PHOTO RENTON-05 DECK {root} D 2
PHOTO RENTON-05 SOUTH{root} (3 2
APPROACH
PHOTO RENTON-05 LANE SPALLS {root} D 3
PHOTO RENTON-05 NORTH APPROACH {root} G 3
PHOTO RENTON-05 NE RAIL {root} R 10004 4
PHOTO RENTON-05 WEST OVERHANG {root} G 4
PHOTO RENTON-05 SPAN 3{root} R 10005 5
PHOTO RENTON-05 {root} R 10007 5
APPROACH SPALL
PHOTO RENTON-05 SPAN 1{root} R 10005 6
PHOTO RENTON-05 PIER 2(SPAN 1) {root} G 6
PHOTO RENTON-05 PIER 3 {root} R 10006 7
PHOTO RENTON-05 PIER 2 {root} G 7
PHOTO RENTON-05 SE DRAIN {root} R 10003 8
PHOTO RENTON-05 NE DRAIN {root} R 10003 8
PHOTO RENTON-05 {root} G 9
GIRDER 2A(BOT)
PHOTO RENTON-05 SPAN 2{root} G 9
PHOTO RENTON-05 BEARING 313 {root} R 10008 10
PHOTO RENTON-05 {root} G 10
COLUMN @ PIER 3
PHOTO RENTON-05 GIRDER 2A {root} R 10009 11
w7VA61119 Washington State WSBIS Local Agency Inventory Report
Department of Transportation
lated was 2132 late 1266 ini 2023 list 2181 2183 21" 1188
Bridge 10 Structure ID Bridge Number Bridge Name 2City Location5 Latitude Longitude
08584300 RENTON-05 HOUSER WAY BRIDGE 04 04 17 1070 O.11,11 E OF 1-405 17 23 05E 4728'S1.38" 122'12'02.07'
1250 12TA —1 T203 12T8 1286 Iss 1288 ilea t202—a late, Printed SufficiencyRating:
Feature Intersected Fadfifi.Carried Region FIPS arreas
Date
Facilities 3;��019 ED item 2111.101IRD
CEDAR RIVER HOUSER WAY NW437 11 57745 3 N B 4 MI [;'; High Pjak
— — ists 2348 i318 la. 11. rare Im 1307 1310 1312 13" 1374 1378 13" I= last Im 'an 1390 last 1"1 1397
Year Year Bridge Lane Out 0 Curb C no out Sidewalk SidewalkMin Vert Min Vert Vert Min Let Let Min Let Nm,V. w NH.ru, NneVert go Appr
sold Ramat Length NBOLorgeh M""'
Span Length On DkV%dth Drool,Verdi Lrdt night Over Lack Under Code Under Right Coda Under Lett m Cirrar Clear Lift Clear 6 RdWy
Layout
1960 0 140 110 28.3 31.6 2.0 2,0 18 N 99'99" WOO" N 0,0 N 0,0 1 0 0 0 0 29
102 14iS 1434 1436 249a tA95 1A51 iota LAST toss I"? 'In liar 2410 7479 14M 1,iM 1486 1,184 107 149 14" 13. M8f lose I— 1413 M1
R ADT Tnm, Yearo Forms A13T Faces Linear Rruchorcing LRS LRS Milepost g I'M Aid If - F.hor, - Lane -i ADTYavx u. g. Cl... Clearance Chh"n" H
Horizontal HodzorHal Max Vert
Crossing Hat, a
Real.Number Mistreat % ADT System Bob R.at.# Cie.
Direction RomD1r Reverse Rome
1 5 1 01169 0.00 15885 7 2014 22000 2034 4200013201 00 0.00 Y 1169 1 1 0 0 14 N 1 0 28'03' 1 25
17000 2018 2400D 2038
Im 103 1535 late rest, 1641 1340. 1596 leas iMT i6A8 Im — tell ia52
"t"t It. 1656 16. 1506 near 15&I 7585 na,
Mein Met. Auer Apin Number Number Neigh op., Open Open Inv Inv Inv I 6. an
Brad Boa Me! App, Service Send" De Wand Membrane rigD'ck Wad Rating Room, Rating Rating Rating Raring 9 Border Structure ID red AM Project No Dotage
I= 8" 'a a Under Type Surface phowd
Design ... Design Material Darv, Spa SP.- On Code Method ran. F.m., Method To. Factor Eveembon
3 02 1 07 1 2 5 5 1 1 0 0 2 1 41 1.13 1 24 0.67
— 2588 2n89 21540 2691 26ft 203 26M 2697 Mae Mae Ists 7832 7833 Tina nuer 7836 rion TOM Nutt RMO Rat IM IM 184T 2853 Main 188T 1811 Vna Iran 1879 inner rY
'a
i-,! Ear"
Load watertsayl Lenin Broom Co StmaC,,t RdwyCae, EngrCow, TotlCoor, Y
EV2 EV3 011 012 "a"imp
Rating Prop Imp It g
El a Z F 3 F VIdth Par-SF Year 'i kq
Zr' -1.47 1.50 1.50 1.21 1.3311.31 1.22 1.251 1.10 0,70 F B U U 5 1 IN F N 2 35 1 140 31 400 868 174 1 694 1736 2014 Y
C
aide 1100 test 2M9,.P-- Va. Ineeater, Con. Coma,— Inapectlon Va. I..P—, Gdw —res,— Intered- papa I.,,mwr Centel. Cad.apeer,, obi
Routine 9120)2018 MAG G1 103 HP Interim
Condition
Inspecition Fracture Critical In Depth ih.d pan JJ
Report
Types Special Feature Darilage Geometric
Underwater
S
PRM Safety Info —
UW SEO Safety Inventory
EXHIBIT G
BRIDGE LOAD RATING
for
CITY OF RENTON
PUBLIC WORKS DEPARTMENT
Houser Way Bridge
Bridge # RENTON-05
SEI Project No. A17110.01
By: C.A. Mallow & J.J. Weiks
Original: March 2017
Revision: August 2017
SI*WGENT
Sargent Engineers,Inc. 320 Ronlee Ln NW Olympia,WA 98502 • Tel 360 867-9284 Fax 360 867-9318
i
Bridge Rating Summary
POtv
5'096
PIE Stanip
Bridge Name: Houser Way Bridge
Bridge Number: RENTON-05.
Span Types: 3-Span Bridge: (2)Concrete Approach Spans, (1) Steel Main Span
i
Bridge Length: 140'-0"
Design Load: H15-S12
Rated By: C.A. Mallow
i
Checked By: J.J.Weiks
Date: March 2017
Inspection Report Date 9/21/2016 Substructure Condition 5
Rating Method LFR Deck Condition 5
Overlay Thickness 0" Superstructure Condition 5
Truck RF(INV) RF(OPR) Controlling Point
Type 3 0.88 1.47 Conc. Floorbeam, negative moment over support
Type 3S2 0.90 1.50 Interior Girder, positive moment near midspan
Type 3-3 0.88 1.49 Interior Girder, positive moment near midspan
NRL 0.73 1.21 Interior Girder, positive moment near midspan
SU4 0.79 1.33 Conc. Floorbeam, negative moment over support
SU5 0.78 1.31 Conc. Floorbeam, negative moment over support
SU6 0.73 1.22 Conc. Floorbeam, negative moment over support
SU7 0.75 1.25 Interior Girder,positive moment near midspan
OL-1 0.66 1.10 Conc. Deck, negative moment over support
OL-2 0.42 0.70 Interior Girder, positive moment near midspan
NBI Rating RF Tons Controlling Point
Inventory(HS-20) 0.67 24 Conc.Slab, positive moment near midspan
Operating(HS-20) 1.13 41 Conc.Slab, positive moment near midspan
Remarks:
This load rating updates the rating done by Parametrix in November 2006 to the current LFR standards, adds the NRL and
SU trucks,and updates the reinfocing yield strength. The bridge is within one-road-mile of 1-405;therefore, emergency
vehicles specified in the FAST Act's Memorandom dated Nov.3,2016 were also rated. Resistance factors used reflect the
reported condion of each element.
Bridge Rating Summary
(Emergency Vehicles)
If the structure is within one-road-mile of the National Network of highways,then load rate the following
vehicles and post as required.
Trucks RF(INV) RF(OPR) Posting Load in TONS
Type EV2 0.64 1.08 No posting required
Type EV3 0.48 0.80 34
WSBIS Coding Recommendations
WSBIS 1550 - Design Load 2 H 15
Operating Rating:
WSBIS 1551 - Rating Method 1 Load Factor(LF) reported by tons
WSBIS 1552 - Rating Tons 40 Tons
Inventory Rating:
WSBIS 1554 - Rating Method 1 Load Factor(LF) reported by tons
WSBIS 1555 - Rating Tons 24 Tons
WSBIS 1660 -Operating Level 5 Posting not recommended
Legal and Permit Rating Factors:
WSBIS 2587-Type 3 1.47 Posting not Required
WSBIS 2588 -Type 3S2 1.50 Posting not Required
WSBIS 2589 -Type 3-3 1.49 Posting not Required
WSBIS 2590 - NRL 1.21 Posting not Required
WSBIS 2591 - SU4 1.33 Posting not Required
WSBIS 2592 - SU5 1.31 Posting not Required
WSBIS 2593 - SU6 1.22 Posting not Required
WSBIS 2594 - SU7 1.25 Posting not Required
WSBIS 2595 -OL-1 1.10
WSBIS 2596 - OL-2 0.70
Posting Recommendations:
The recommended posting is as follows:
Type EV3: 34 Tons
i
Operating Rating Tons
xs2o Maximum Tonnage for HS20 41 Tons
36 TON Configuration:
0 0 0
Vories 1 94' ll
O
O O z
z z
TYPE 3 Maximum Tonnage for Type 3
0 0 O 25 TON 37 Tons
Configuration:
4' 15'
�n Co co
Ul c"
O O z
z z
TYPE 3S2 Maximum Tonnage for Type 3S2
36 TON 54 Tons
0 0 0 o��00 Configuration:
4' 22 4'1 11'
� Y i
J _1 —1 J U
J J J J __{
U Ul U UI O
---i ---I --I ----1 Z
00 00
z z z z
TYPE 3-3 Maximum Tonnage for 60 Tons
0 40 TON Type 3-3 Configuration:
0 0 00 0
4' 16' 15' 4' 15' i..
J J W O
00 O 00 O
Z Z Z Z Z
NRL Maximum Tonnage for NRL 48 Tons
7 0 0 000 0 0 0 0 40 TON Configuration:
6 of 4' l/ar.
-� � 03 co -1- c�
C Yl —i
0 0 0 0 0 O
7 Z 0 CD 7 Z
z
i
Operating Rating Tons
OL i Maximum Tonnage for OL 148 53 Tons
0 00 0 TON Configuration:
441 1 12 4 ' 10 '
0 0 0 0
0
n cn cn Ol z
0 0 0 0
Z Z Z Z 4
OL 2 Maximum Tonnage for OL 2
0 0 0 0 0 0 0 0 0 0 103.5 TON Configuration: 72 Tons
6' 4' 14' 6' 4'I 16' 6 4' 10'
- O O O G G G
0
O cn Cn O Ul Ui O U' U' Z
00 00 00
Z Z Z Z Z Z
0 0 0 0 27 TON Confmurat onnnage for SU4 36 Tons
g
4' 4' 10'
11
1 1
cro PO P o
cn cn �
o 0
0 o z z
z z
i
I
SUTON Maximum Tonnage for SU5
0 0;' 4'1
0 o Configuration: 41 Tons
44I4 10
co W -P 0�
Ui U1 -i -i -1
O O O
O O Z Z Z
z
sU6 Maximum Tonnage for SU6 42 Tons
0 0 0 0 0 O 34.75 TON Configuration:
4 I4 4 4 10
� 00 (Do � �
--� Ui CJi —1 1 V
o -, , 00
Z O O Z Z O
Z
sU7 Maximum Tonnage for SU7 48 Tons
0 0 0 0 0 0 0 38.75 TON Configuration:
4'1 4' 4' 4' 4' 10'
-r- co co -A - n
O O O O v
z Z 0 0 = z
j
Washington State Load Rating Criteria
For Bridges Built prior to October 1, 2010.
The Washington State Load Rating Criteria is used for legal loads and overloads in the State of
Washington. The full criteria is explained in Chapter 13 of the Bridge Design Manual. A summary of the
features of the rating are:
l'.
The adequacy or inadequacy of a structural element to carry a specified truck load will be indicated by
the value of its rating factor(RF); if it is greater than 1.0,the bridge is adequate to carry that truck.
Inventory rating level reflects the existing bridge and material conditions with regard to deterioration and
loss of section. Load ratings based on the inventory level allow comparisons with the capacity for new
structures and, therefore, results in a live load, which can safely utilize an existing structure for a long
period of time.
Operating rating level describes the maximum permissible live load to which the structure may be
subjected for a defined period of time. Allowing unlimited numbers of vehicles to use the bridge at
Operating levels, may shorten the life of the bridge.
Typically only superstructure elements are rated. If conditions warrant, substructure elements can be
rated. Typically Y bridge decks will not require rating unless the deck is p
os-tensioned. Bridge
e decks with
NBI condition of 4 or less may be load rated at the discretion of the engineer.
In cases where there is deterioration in a member, the cross section shall be reduced based on the
inspection report. For cases where deterioration in members is described in general terms, reduce
resistance factors of member by 0.10 for BMS Condition State of 3, and reduce factors by 0.20 for BMS
Condition State of 4.
For roadway widths between 18'and 20', the number of lanes for legal and permit loads shall correspond
to the number of striped lanes on the bridge, and for design trucks one lane is used. For roadway widths
between 20' and 24', use two lanes for all trucks. For roadway width greater than 24',the number of
lanes shall be equal to the integer of the ratio of the roadway width divided by 12'for all trucks.
For overload trucks, a single lane distribution factor shall be used when rating longitudinal members on
per member basis and the multiple presence factor shall be divided out when using the LRFR method. In
cases where a 3D analysis is performed, or when rating a X-beam, place an overload in one lane and a
legal truck in remaining lanes (NRL truck typically controls).
Impact for Overloads is based on the structure approach and deck condition. It is a fixed percentage of
the live load from 10 to 30 percent. Impact is not applied to timber structures, or buried structures with an
adequate depth of fill under the roadway.
A reduction factor is applied for multiple lanes loaded.
i
i
Multiple Lane reduction Factors:
Number of Loaded Lanes Reduction Factor
One or Two 1
Three 0.9
Four or more 0.75
Ultimate Method LFR
Resistance factors assuming the member is in good condition:
Structure Type
Steel Members 1.00 (flexure and shear)
Prestressed Concrete 1.00 (positive moment flexure)
0.90 (shear)
Post-tensioned, cast-in-place 0.95 (positive moment flexure)
0.90 (shear)
Reinforced Concrete 0.90 (flexure)
0.85 (shear)
For Prestressed and post-tensioned members, where reinforcing steel is used to resist negative moment, the resistance
factors for reinforced concrete section shall be used in the ratings.
Inventory Rating:
The general equation is:
(D(capacity) — 1.3(Deadload) + (prestress)
RF -
2.17(Live load)(Impact+ 1.0)
Operating Rating:
i
The general equation is:
(D(capacity) — 1.3(Deadload) + (prestress)
RF -
1.3(Live load)(Impact+ 1.0)
Service Method (LFR)
- Prestressed and post tensioned members in positive moment regions, and where post-tensioning is j
continuous over the supports, shall also be rated based on allowable stresses at service loads. The lowest
rating factor between service and ultimate methods shall be the governing inventory rating.
Allowable Stress Method (ASD)
- The allowable stress method is applicable to timber structures. Impact is not applied to timber structures.
- Allowable stress is increased 33%for Operating ratings.
Ur N 00 O (M CO r CO CO N 00 t-�
Q U( r LC) '-t M O t� d d r CO M N
N T T N T T T T Otf
o r O o o O O
m Q 0- C C C CZ 0- 0- p C1
CZ
C2 C1 CL � C1 � CL
� W cn to N W Cn U) U) O in Co cn
W C2 ..o N N Q o- N
a $ r LO rn N O LO t Lo M r CO co :a o o 0 0 -0 o
1- c rn c? m co 00 (y O o0 00 co co co n E cis ct5 La »� +- cu cis
z > O O O O r r O O O O O O >
N E E E E O E
O O O O O 0 C= O
E (u 0 0 E E E � E
N > O O O > > > O E O o >
E E E E E 0 E E
Q T t- CD ',I- CD CO N CO LO CO C) o O o o o E O o i.
W co �Y Co 00 co co M N co CDN co E > > > t� ] N > E E
:tf '�" G C C '�� > N C
CL > •cn cn cn •cn •cn i
J C2 p O o 0-
o 0 0 0 '� '� '� 'Y "� -0 o is
U o m co co C) 00 m 00 co 00 m co Lo co ��� o (D (D (D 0 0 0 (D (DW o ',
Z C t- co m r � � t-- r— r— Co Co � t U]� LJ i i L L L L I.L. U] u-
Q > O O O r O O O O O O O O O Lj Lj O O O U U U O U U U
U C C C N N N C C C C C C
U U U U U � U � U U
c c
'o 00 O O N Cl) 00 LO 'It O M - M r- O M CO N LO O O 00 O
/y C? 00 Lq Lq N r,-: Lq C? N r- ti Co O d• Lq d; N M M N N t` O 00
�LL Q r T T T T T T T T O T T Q T T T T T T T T T O T O
LU
LY Q as Q
E
E
Z .O O co O 00 co c') N Lo CSC N 00 Lo � -00 N 00 O 00 M m 00 Co Lo Co N �t 00
G 00 r off. 00 t- O O 00 tl- CO It CM Co C Co 00 O 00 ti � � � � CO d. Co ct
> O T O O O T O O O O O O O > O O O O O O O O O O O O O
G C
N M
C
Cl) 00 M M t` Co 00 CS' M LO O N O M coM J �• ti) Co r N N M
CO CO O OJ M M OA CO d' N 0? N T N 0 o .J J
L�J Q N M N N N M N N N N r M N = >� Cl) Z U) U) U) U) Q Q W W
rr Q ~ ~
X O t'- O O LO T O T CO - N t- I
W C Lf) N d O t~ Co d m 00 O N
>
N T r N T T T T O T T
ui
M M — r - — — O_ O � � a U) c� W � M ti
p CV N N N N N N N r T r Cd o f Cb o - O T O
0- r c� 2 � Q co � . 0 O o-
Y Q o' 0 0 o � ca r o O
o O 0 U) N O T, o
LL —Jco E
U O O II T
p cti Cn M
O yO Q Q W T c M 0 o
O O N 00 O O O O O CO M O �. E O- Q r (� �-- N d'
C CO M d- co M co M co M O O O = � co m p N E C M �t
O T T T T T T T O O T T U Z � LJ... > O O
co Q N � C O .� C m C
Q 0 T N p —
O r J a
zz0 c°sn cQ U
Q N RS Co N 70 cd
c E 15 -0 -0 .Q (D = -0 L L 0
M O M CD -t -t d- LO d' O -t 00 N '--
r d' Co 00 m m M m � M m C) 00 •��' C� O O r O CD P'
Q. r T T T r T O CD (V C/) J U U Q
m Q E c� as a> Q i 0) Q
o (KS (V o O
t- m co co O O O O M O d' m co O —cou O cz O O
C CO 00 m O 00 00 00 00 oD 00 00 CO �t cn U O E O U O C.0 m
> O O O O O O O O O O O O Ur O •,>- — > O O
cn Q cz N U
p a) p C-) Q N O _
co � p M Y
O p m N m O 0
N M Z U > C W i C-)
O M M J d• LO CO � r N N M o U p (Z c W T N
N N o J J > - ca c o E U) 0 J J
_ cLZ cn U) U) U) Q Q W W (D � •� � m 0 o p p
> -0 CO � a)(D U '
Um0Q o
i
Reactions P1 Reactions P2 Reactions P3 Reactions P4 Reactions P5
DEAD
HS20 T001 77.980
Type 3 T002 54.510
Type 3S2 T003 74.570
Type 3-3 T004 79.590
NRL T005 87.120
SU4 T006 59.230
SU5 T007 67.670
SU6 T008 84.360 I'
SU7 T009 84.120
OL1 T010 103.600
OL2 T011 196.850
EV2 T012 62.870
EV3 T013 93.980
EXHIBIT H
SA* RGENT
Sargent Engineers,Inc.
320 Ronlee Lane NW
Olympia,Washington 98502-9241
Tel 360 867-9284
Fax 360 867-9318
www.sargentengineers.com
April 1, 2017
Mr. Derek Akesson
City of Renton Public Works Department
Renton City Hall -5th Floor
1055 South Grady Way
Renton, WA 98057-3232
RE: Renton Bridge Program
Project No.: A17110.01
Dear Mr. Akesson:
We have completed a preliminary seismic evaluation of Houser Way Bridge at your request. The
evaluation includes a qualitative screening of the bridge for deficient items. Based on our field observations,
review of the existing plans, and preliminary calculations, we determined that there are several deficiencies
typical for structures of this type. The deficiencies include but are not limited to inadequate concrete
reinforcing, bearing support lengths and transverse restraints for seismic event loadings.
Current AASHTO LRFD Seismic Bridge Design standards require a minimum support length of 24" and a
minimum shear reinforcement ratio for columns of 0.004. The existing approach span spindles and
bearings have a support length of 16.5" and a reinforcement ratio of approximately 0.0003. Therefore,
existing spindles do not have the required support width, reinforcing, or transverse restraint in the case of a
seismic event.
Based on our preliminary seismic evaluation, we recommend the following seismic retrofits to the approach
and main spans:
1. Replacement of approach span spindles with a continuous reinforced concrete stem-wall.
2. Widening the pier wall to increase the support width for the new approach span stem-wall supports.
3. Remove existing approach span bearings and replace with elastomeric bearing pads.
4. Install of longitudinal seismic restrainers.
5. Install of transvers restrainers at both the approach spans.
Respectfully, O
w
Sarge t En ineers, Inc.
0
5 096
Craig A. Mallow, PE IONS
Project Engineer
CAM
\\SERVER1 files\17Files\A17110.01 Task 1-3 Renton Bridge Program\RENTON-05_SeismicEvalMemo.docx
EXHIBIT I
4a� WATERSHED
SCIENCE & ENGINEERING
!, P. J� fr
Memorandum
A 2 549
To: City of Renton, Sargent Engineers 'o ��Gts-tEs'
From: Jeff Johnson P.E., Marissa Karpack E.LT slONALE��
Date: April 7, 2017
Re: Scour and Erosion Assessment at Houser Way Bridge over the Cedar River
BACKGROUND
Watershed Science and Engineering (WSE) was retained by Sargent Engineers to determine if scour and
erosion countermeasures should be installed to protect the City of Renton Houser Way Bridge over the
Cedar River (City Bridge Number: Renton-05). The City intends to submit an application to the WSDOT
Local Agency Bridge Replacement Advisory Committee (BRAG) to seek funding for a variety of repairs to
the existing bridge. WSE's assessment will be used to determine if the request should include funding to
design and install scour and erosion countermeasures.
EXISTING CROSSING
The Houser Way Bridge was constructed in 1960. The bridge is supported on two end abutments and
two intermediate piers. The abutments are each founded on six eight-inch square steel bearing piles
that are specified as 22 feet long. The as-built pile tip elevations are unknown. The two intermediate
piers are located in the channel banks and are supported on spread footings that extend approximately
10 feet below the current riverbed thalweg. Bridge piers and abutments are numbered from south to
north.
The original design drawings (see Appendix 1) do not specify scour or erosion countermeasures;
however, rock riprap currently covers the left (south) bank surrounding Pier 2. Design drawings of a
scour remediation project at the bridge from 1998 can be seen in Appendix 2. No evidence of the
remediation was observed during the field inspection, therefore, it is likely that it was never installed.
The Cedar River at Houser Way Bridge is contained in a single stable channel that makes a slight "S"
shaped turn as it approaches the crossing (Figure 1). Within this "S-turn" Interstate 405 and a railroad
bridge cross the river. Downstream of Houser Way, a pedestrian bridge crosses the river and the river is
contained by a series of floodwalls and levees which prevent flooding in downtown Renton.
INSPECTION AND MAINTENANCE OBSERVATIONS
The most recent bi-annual routine inspection of Houser Way Bridge for the City of Renton occurred in
September 2016. The inspection noted that riprap surrounds Pier 2, but Pier 3 and both abutments are
unprotected. The inspection also describes the channel as "well defined with no visible scour." The
WATERSHED SCIENCE & ENGINEERING • 110 Prefontaine Place 5.Suite S08,Seattle,WA 93104•206-521-3000
inspectors noted that the top of the pile caps are exposed at both abutments and they recommended
continued monitoring for scour at the abutments and Pier 3. The bi-annual inspection in September
2012 recommended installation of riprap at both abutments and Pier 3 but did not describe what
prompted this recommendation.
WSE FIELD OBSERVATIONS
WSE traveled to the Houser Way Bridge on March 20th, 2017 to assess the need for scour and erosion
countermeasures at the crossing. Upon inspection, it was noted that the sediment at both abutments
was primarily depositional, consisting of find sands and silt. These depositional sediments indicate low
velocities when water flows between the pier and abutment on both banks. WSE confirmed a portion of
the pile cap is exposed at both Abutments 1 and 4 due to minor scour forces associated with flow
moving around the adjacent intermediate piers (Picture 1). This scour does not pose a threat to the
stability of either abutment and additional significant scour is not expected
Piers 2 and 3 are located at the edge of the river channel and are both buried in the river bank. Pier 2 is
surrounded by light loose riprap which appears to be in relatively good condition (Pictures 4 and 5). Pier
3 is unprotected except for a few pieces of broken concrete near the nose of the pier (Picture 6). Pier 2
is located on the outside of a bend in the river, while Pier 3 is on the inside. Because of this bend,
erosional forces are higher near Pier 2 than at Pier 3, likely explaining why Pier 2 is surrounded by riprap
while Pier 3 is not. Because Pier 3 is on the inside of the bend, the river has formed a small point bar
within the channel adjacent to the pier.
The abutments and piers of Houser Way are sheltered from the main forces of the flow by the upstream
railroad bridge.The railroad bridge piers, abutments, and rock riprap bank protection create protrusions
that prevent flow from directly impacting the piers and abutments of Houser Way (Pictures 8 and 9).
This shelter effect greatly reduces the potential for scour or erosion at the piers and abutments.
POTENTIAL IMPACT OF DOWNSTREAM DREDGING
The lower mile of the Cedar River was dredged in the both 1998 and 2016. In the three years following
the 1998 dredging, a headcut progressed upstream, lowering river bed levels under the Houser Way
Bridge by one to two feet. Since then, the river bed has aggraded and reestablished the pre-1998 dredge
bed elevations. The river was dredged again in 2016 and a similar headcut is expected to progress
upstream; however, Northwest Hydraulic Consultants, the hydraulic engineers responsible for predicting
how river bed levels will adjust in response to the 2016 dredging, conclude that river bed levels likely
will not change significantly at Houser Way (Figure 2) (Brooks and Rowland 2014). This may be in part
due to the fact that the dredge depth in 2016 was less than in 1998. Regardless, even if the bed
degrades at Houser Way, it will not pose a threat to the bridge because as shown in Figure 3, the
abutment and pier foundations are buried well below expected bed levels. Foundation exposure as a
result of migration of the thalweg is unlikely due to the reinforced banks at the railroad bridge.
Additionally, the current channel bed is approximately 5 feet higher than the bed at the time of bridge
design. Figure 3 compares four cross sections at Houser Way—the original ground line circa-1960, and
surveys from 1998, 1999, and 2016. The 1998 survey is prior to headcut migration from the 1998
dredge, whereas the 1999 survey includes the effects of headcut migration. Also shown are the
. WATERSHED 2
q SCIENCE & ENGINEERING
approximate bottom of pile cap and pile tip elevations for both abutments and the bottom and top of
the concrete footings for Piers 2 and 3.
SCOUR DEPTH ESTIMATES
Houser Way Bridge is not susceptible to significant local pier scour because the piers are located in the
banks and are sheltered from the main forces of the flow by the armored protrusions at the upstream
railroad crossing. However, because the Cedar River channel narrows as it nears the bridge, there is the
potential for contraction scour at the crossing. Contraction scour for the 100-year event was calculated
using geometry and flow data from NHC's 2016 sediment survey HEC-RAS model (NHC 2017). The
maximum calculated contraction scour is 6 feet which we expect to occur within the area between the
location of the current thalweg and the centerline of the channel (Appendix 3). If the calculated 6 feet of
scour were to occur it would not threaten the pier foundations (Figure 3). The actual depth of scour at
Piers 2 and 3 will be less because they are located landward of the maximum scour area.
RECOMMENDATION
It is WSE's opinion that scour and erosion currently do not pose a significant risk to the bridge structure
and existing countermeasures are adequate. It is, therefore, WSE's opinion that scour and erosion
countermeasure improvements are not needed at this time.
WATERSHED P a g e 13
`� SCIENCE & ENGINEERING
� ♦ � � 'tip. -
f
f
� f
i
t'
s
Figure 1:Aerial view of the Houser Way Bridge over the Cedar River.Note the"S"shaped curve in the river beginningjust
upstream of 1-40S and terminating at the bridge.Flow is from right to left in photograph(Aerial photo from ESRI).
F
u .. . ... 1.
Picture 1:Viewing Downstream between Abutment 1 and Pier 2.Slight scour visible at the toe of the abutment pile cap.
WATE R S H E D N a g e 4
`~ � SCIENCE & ENGINEERING
! Y. 16
10,
�4
Picture 2:Left pier looking upstream.Note bank protrusion upstream of the bridge that shelters the pier.
-
-
Picture 3:The Cedar River under Houser Way,looking upstream from Pier 2.
40 k WATERSHED 5
q SCIENCE & ENGINEERING
"�9r
" �•�'fJirY /It���'s r �
r
b
A_
00.
Picture 4:Viewing upstream to riprap surrounding the downstream end of Pier 2.
�~t1
�y h:
Picture 5:Viewing downstream along Pier 2.
fi 'A, WATERSHED P a g e 6
�� SCIENCE & ENGINEERING
�y r COS i
Picture 6:Viewing downstream to Pier 3. Note pieces of broken concrete on bank.
f
t'
s
t
Picture 7:Viewing downstream between Pier 3 and Abutment 4.
WATERSHED P a g e 7
SCIENCE & ENGINEERING
i
1
40 .;..
, N
h
* �
Picture 8:Viewing upstream between the Abutment 4 and Pier 3. Note the blockage of the entryway by the upstream bank.
AL
i
1
Picture 9:The heavily reinforced railroad bridge abutment just upstream of the South end of the Houser Way Bridge.This
creates an impediment to flow that shelters Abutment 1 and Pier 2 of the Houser Way Bridge.
40 k WATERSHED s
q SCIENCE & ENGINEERING
50
v
45 E a
a' "
35
•� C I
� 6Y
L
Z 30 N
2,3D0 ft
I
25 I
I y
q1 20 Q sum Lk.EL
w Mn.Lk.E1.15.8 51oP�; n., 51�eJp �.� i
15 r_•�' 2,300ft m : x Proposed Dredge Design
� I
I
I -- -Year1
10
I
Pivot Medium Term
5 — —Long Term
0
0+00 10+00 20+00 30+00 40+00 K+O0 60+00 70+O0 80+00 90+00 100+00 110+O0 120+00
Station (ft)
Figure 2: Predicted Cedar River profiles as a result of headcutting after 2016 dredging(Figure from Brooks and Rowland 2014)
WATERSHED P a g e 9
`� SCIENCE & ENGINEERING
RENTON-05
HOUSER WAY BRIDGE
60
7D W so 100 1 0 120 10 1a
55
Abutment piles are specified as 8"x8"x22'steel
50 piles.As-built depths are unknown.
45-
40-
35 Bottom Of P of Pile Cepi
340 f .oft
Z 30--
0
..................... ...........................
20 6.6 ft ........... To of Spread F ting♦
A4
Approx.Rene Max Contra on 18 6 If
on Scour in I yr low prox.Range
15 of File Tips —
Bottom of Spread F(oling Mom of Spread N oling■
13.6 ft 13.6 If
10
.............980 AS-BUILTGfL ELEV. —1998 GJL UPSTREAM(N HC SURVEY)
STATIONING(FT) . .GA_UPSTREAM(NHG SURVEY) —2016&L UPSTREAM(NHC SURVEY)
Figure 3:Channel bed profiles for various years at the upstream face of Houser Way Bridge compared to the bridge foundation elevations(As-Built data courtesy ofthe City of
Renton). Viewing Downstream.
Renton-05 10
REFERENCES
Brooks, P. and E. Rowland. (2014) Transition Zone Analysis — Cedar River Gravel Removal Project.
Prepared for Coast and Harbor Engineering. Prepared by Northwest Hydraulic Consultants. Seattle, WA.
NHC (2017). Cedar River 2016 Annual Sediment Report. Prepared for the City of Renton. Prepared by
Northwest Hydraulic Consultants. Seattle, WA.
fi 'A, WATERSHED Page 111
q SCIENCE & ENGINEERING
APPENDIX 1: DESIGN DRAWINGS
Ab b WATERSHED Page 112
q SCIENCE & ENGINEERING
„N 1
tl a li'S it J 4.]Cih<'i h s U T
/� r . - LLJ
\ l C Monk,y vi h
�� �uCV �k3v;m h oO�awn, d W
�� nhQvvvmg � m� z fall
zz 1 P N wv:rvM
;r
1.
- All
T
Z ._d
O
+
v
ti o
0
I.
.r
i
J ri?d
o
I
Qm -ft ui
IF
b f AR$ tv� M1I x p,•f -
i.
40
w
� tl• � N �
O
10
ti fir_
44
L4 6
aI
fir./_
- y91
ro
PM
Ij
��.
� D it N::��➢V n. *:3 90 U Willi,
v �{ 4,
�. I
p r LX
^'
VMS
� I
u,a1S y� ddy. h I - -
,
� Y
- ...'. ... ,�•: . ,f�, `d< ., ,. �, §���'�§� a �-•--� _ -
_
e
J .. Own m
� La
* �s
NO
MIN
'Y a:� r h N f'�`�!!..�r '� s*•n�, - q ,� x m ,aF Px ,,§I us
yyP r.^ --------------------------
too,
MV
m
v,
E l
ILI -
y x 0
z �z
APPENDIX 2: SCOUR REMEDIATION PLANS
fi 'A, WATERSHED Page 113
q SCIENCE & ENGINEERING
' EDGE OF RAILROAD BRIDGE EXTEND RIPSTAP TO MEET LARGE A-11 H I Y.lE
APPENDIX 3: CONTRACTION SCOUR CALCULATIONS
Scour Calculations-City of Renton Houser Way Bridge
HEC-18 Method(Edition 5)
river. Cedar River by: MNK
bridge no.: Renton-05 date: 4/7/2017
Contraction Scour Calculations
Comments:
Laursen's Live-Bed Contraction Scour Formula (FHWA 2001, pg. 5.10):
100-yr Q= 12,000 cfs
Y1 Q1 Q2 W1 W2 K1 Y2 Ysc
(ft) (cfS) (cfs) (ft) (ft) (ft) (ft)
13.68 12,000 12,000 136.7 80.9 0.69 19.6 6.0
Comments:
1. Y1 is the average flow depth in the upstream channel.
2. W1 and W2 are the average channel bottom widths of the upstream and bridge cross-sections respectively.
3. K1=exponent reflecting bed material transport type. K1=0.69 conservative value.
fi 'A. WATERSHED Page 14
q SCIENCE & ENGINEERING
EXHIBIT J
NORTHWEST LABORATORIES Seattle, Incorporated
)f
ESTABLISHED 1896
Technical Services for. Industry,Commerce,Legal Profession&Insurance Industry
241 South Holden Street e Seattle, WA 98108-4359 - Phone: (206) 763-6252 Fax: (206) 763-3949 9 www.nwlabsl896.com
Report To: City of Renton Date: March 9, 2006
Attention: Jason Fritzler
Report On: Lead Analysis/Paint Samples Lab No. E79928
SUBMITTED: Two (2) Paint Samples RECEIVED
IDENTIFICATION: Houser-Way Bridge Paint Chips MAR 13 2006
#I - North Bridge Rail#2- South Bridge Rail Transportation systems Div.
ANALYSIS: (Total Lead Content)
The sample was digested in cone. HNO3. The resulting solution was analyzed for
lead by means of ICP/AES. "Lead-Containing Paint" is defined by CFR 16 (1986),
Prt. 13 03.1, para. (a) when"the lead content (calculated as lead metal) is in excess of
0.06 percent of the weight of the dried paint film".
TEST RESULTS:
Lead, Pb Content
Sample# % By Weigh
1 27.4*
2 22.6*
*Note: Both samples are considered lead based.
This report applies only to the actual samples tested. Northwest Laboratories
does not certify, warrant, or guarantee any products manufactured by others.
Samples discarded within thirty (30) days unless otherwise requested in writing
by you.
NORTI IWEST LABORATORIES, INC.
ii�_o . C er�ist 0 1��ff,a�r Simon,-m-, n, C emi
nbe
EXHIBIT K
AGENCy CAG-18-229
' Washington State Local Agency Agreement
Department of Transportation
Agency City of Renton CFDA No.20.205
(Catalog or Federal Domestic Assistance) `
Address FFit f'— )1 1 6 q (0Z' 1
Renton City Hall-nth Floor Project No. T J
lent S Grady Way LA 9499
Renton,WA 98057 Agreement No.
For OSC WSDOT Use Only
The Local Agency having complied,or hereby agreeing to comply,with the terms and conditions set forth in(1)Title 23, U.S.Code
Highways, (2)the regulations issued pursuant thereto,(3)2 CFR Part 200, (4)the policies and procedures promulgated by the
Washington State Department of Transportation,and(5)the federal aid project agreement entered into between the State and Federal
Government, relative to the above project,the Washington State Department of Transportation will authorize the Local Agency to
proceed on the project by a separate notification.Federal funds which are to be obligated for the project may not exceed the amount
shown herein on line r, column 3,without written authority by the State,subject to the approval of the Federal Highway Administration.
All project costs not reimbursed by the Federal Government shall be the responsibility of the Local Agency.
Project Description
Name Houser Way Bridge-Seismic Retrofit and Painting Length MA
Termini 150-ft north of the bridge to 150-ft south of the bridge
Description of Work
BriEeserm,seismic retrofit and painting.
3
UCso(�e2v
Project Agreement End Date 42ai7swq->''�( Claiming Indirect Cost Rate
Proposed Advertisement Date Yes Z No
Estimate of Fundin
Type of Work (t) (2) (3)
Estimated Total Estimated Agency Estimated Federal
Project Funds Funds Funds
6.5 °10 a.A enc $48,000.00 $6,480.00 $41,520.00
b.Other Consultant(s) $570,000.00 $76,950.00 $493,050.00
Federal Aid c.Other
Participation d.State $2,000.00 $270.00 $ 1,730.00
Ratio for PE - —---
e.Total PE Cost Estimate a+b+c+d $620,000.00 $83,700.00 $536,300.00
R8igght of Way°f.Agency
Federal Aid g.Other
Participation h.Other
Ratio for RW i.State
0
.Total R/W Cost Estimate f+ +h+i $0.00 $0.00 $0.00
Construction k.Contract
100 °1.Other
m.Other
Federal Aid n.Other
Participation
Ratio for CN o.A enc
.State
q.Total CN Cost Estimate k+l+m+n+o+ ��`� R E $0.00 $0.00 $0.00
r.Tot Pro' ct Cost Estimat ++ "k """"""�n, �'�. $620,000.00 $83,700.00 $536,300.00
Agency Officia = Washingto St a Department f Transportation
�r
By _ AL - _ By .
Title Denis Law,Mayor '; ° �a Director, Local rograms
4�6`,,� Date Executed DEC 2018
DOT Form 1 0 039EST: � � ,��*k Page 1
pRevised 0512015 /'asc; S e t ' m
Construction Method of Financing (Check Method Selected)
State Ad and Award
Method A-Advance Payment-Agency Share of total construction cost(based on contract award)
Method B-Withhold from gas tax the Agency's share of total construction coast(line 5, column 2)in the amount of
$ at$ per month for months.
Local j6'orce or Local Ad and Award
•V/Method C-Agency cost incurred with partial reimbursement
The Local Agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and
as a condition to payment of the federal funds obligated, it accepts and will comply with the applicable
provisions set forth below.Adopted by official action on
Resolution/Ordinance No.
Provisions
I.Scope of Work
The Agency shall provide all the work,labor, materials,and services necessary to perform the project which is described and set
forth in detail in the"Project Description"and"Type of Work."
When the State acts for and on behalf of the Agency,the State shall be deemed an agent of the Agency and shall perform the
services described and indicated in"Type of Work"on the face of this agreement,in accordance with plans and specifications as
proposed by the Agency and approved by the State and the Federal Highway Administration.
When the State acts for the Agency but is not subject to the right of control by the Agency,the State shall have the right to perform
the work subject to the ordinary procedures of the State and Federal Highway Administration.
It.Delegation of Authority
The State is willing to fulfill the responsibilities to the Federal Government by the administration of this project.The Agency agrees
that the State shall have the full authority to carry out this administration.The State shall review,process,and approve documents
required for federal aid reimbursement in accordance with federal requirements. If the State advertises and awards the contract,the
State will further act for the Agency in all matters concerning the project as requested by the Agency. If the Local Agency advertises and
awards the project,the State shall review the work to ensure conformity with the approved plans and specifications.
III.Project Administration
Certain types of work and services shall be provided by the State on this project as requested by the Agency and described in the
Type of Work above. In addition,the State will furnish qualified personnel for the supervision and inspection of the work in progress.On
Local Agency advertised and awarded projects,the supervision and inspection shall be limited to ensuring all work is in conformance
with approved plans,specifications,and federal aid requirements.The salary of such engineer or other supervisor and all other salaries
and costs incurred by State forces upon the project will be considered a cost thereof.All costs related to this project incurred by
employees of the State in the customary manner on highway payrolls and vouchers shall be charged as costs of the project.
IV.Availability of Records
All project records in support of all costs incurred and actual expenditures kept by the Agency are to be maintained in accordance
with local government accounting procedures prescribed by the Washington State Auditor's Office,the U.S.Department of
Transportation,and the Washington State Department of Transportation.The records shall be open to inspection by the State and
Federal Government at all reasonable times and shall be retained and made available for such inspection for a period of not less than
three years from the final payment of any federal aid funds to the Agency.Copies of said records shall be furnished to the State and/or
Federal Government upon request.
V.Compliance with Provisions
The Agency shall not incur any federal aid participation costs on any classification of work on this project until authorized in writing
by the State for each classification.The classifications of work for projects are:
1.Preliminary engineering.
2. Right of way acquisition.
3. Project construction.
Once written authorization is given,the Agency agrees to show continuous progress through monthly billings. Failure to show
continuous progress may result the Agency's project becoming inactive,as described in 23 CFR 630,and subject to de-obligation of
federal aid funds and/or agreement closure.
If right of way acquisition,or actual construction of the road for which preliminary engineering is undertaken is not started by the
close of the tenth fiscal year following the fiscal year in which preliminary engineering phase was authorized,the Agency will repay to
the State the sum or sums of federal funds paid to the Agency under the terms of this agreement(see Section IX).
If actual construction of the road for which right of way has been purchased is not started by the close of the tenth fiscal year
following the fiscal year in which the right of way phase was authorized,the Agency will repay to the State the sum or sums of federal
8uu0 ddS i 1 40
to$y Agency under the terms of this agreement(see Section IX). page 2
Revised 05/2015
The Agency agrees that all stages of construction necessary to provide the initially planned complete facility within the limits of this
project will conform to at least the minimum values set by approved statewide design standards applicable to this class of highways,
even though such additional work is financed without federal aid participation.
The Agency agrees that on federal aid highway construction projects,the current federal aid regulations which apply to liquidated
damages relative to the basis of federal participation in the project cost shall be applicable in the event the contractor fails to complete
the contract within the contract time.
VI.Payment and Partial Reimbursement
The total cost of the project,including all review and engineering costs and other expenses of the State,is to be paid by the Agency
and by the Federal Government. Federal funding shall be in accordance with the Federal Transportation Act,as amended,2 CFR Part
200.The State shall not be ultimately responsible for any of the costs of the project.The Agency shall be ultimately responsible for all
costs associated with the project which are not reimbursed by the Federal Government. Nothing in this agreement shall be construed as
a promise by the State as to the amount or nature of federal participation in this project.
The Agency shall bill the state for federal aid project costs incurred in conformity with applicable federal and state laws.The agency
shall minimize the time elapsed between receipt of federal aid funds and subsequent payment of incurred costs. Expenditures by the
Local Agency for maintenance,general administration,supervision,and other overhead shall not be eligible for federal participation
unless a current indirect cost plan has been prepared in accordance with the regulations outlined in 2 CFR Part 200-Uniform Admin
Requirements,Cost Principles and Audit Requirements for Federal Awards,and retained for audit.
The State will pay for State incurred costs on the project. Following payment,the State shall bill the Federal Government for
reimbursement of those costs eligible for federal participation to the extent that such costs are attributable and properly allocable to
this project.The State shall bill the Agency for that portion of State costs which were not reimbursed by the Federal Government(see
Section IX).
1. Project Construction Costs
Project construction financing will be accomplished by one of the three methods as indicated in this agreement.
Method A—The Agency will place with the State,within(20)days after the execution of the construction contract,an advance in the
amount of the Agency's share of the total construction cost based on the contract award.The State will notify the Agency of the exact
amount to be deposited with the State.The State will pay all costs incurred under the contract upon presentation of progress billings
from the contractor.Following such payments,the State will submit a billing to the Federal Government for the federal aid participation
share of the cost.When the project is substantially completed and final actual costs of the project can be determined,the State will
present the Agency with a final billing showing the amount due the State or the amount due the Agency.This billing will be cleared by
either a payment from the Agency to the State or by a refund from the State to the Agency.
Method B—The Agency's share of the total construction cost as shown on the face of this agreement shall be withheld from its
monthly fuel tax allotments.The face of this agreement establishes the months in which the withholding shall take place and the exact
amount to be withheld each month.The extent of withholding will be confirmed by letter from the State at the time of contract award.
Upon receipt of progress billings from the contractor,the State will submit such billings to the Federal Government for payment of its
participating portion of such billings.
Method C—The Agency may submit vouchers to the State in the format prescribed by the State, in duplicate,not more than once
per month for those costs eligible for Federal participation to the extent that such costs are directly attributable and properly allocable
to this project.Expenditures by the Local Agency for maintenance, general administration,supervision,and other overhead shall not be
eligible for Federal participation unless claimed under a previously approved indirect cost plan.
The State shall reimburse the Agency for the Federal share of eligible project costs up to the amount shown on the face of this
agreement.At the time of audit,the Agency will provide documentation of all costs incurred on the project.The State shall bill the
Agency for all costs incurred by the State relative to the project.The State shall also bill the Agency for the federal funds paid by the
State to the Agency for project costs which are subsequently determined to be ineligible for federal participation(see Section IX).
VII.Audit of Federal Consultant Contracts
The Agency, if services of a consultant are required,shall be responsible for audit of the consultant's records to determine eligible
federal aid costs on the project.The report of said audit shall be in the Agency's files and made available to the State and the Federal
Government.
An audit shall be conducted by the WSDOT Internal Audit Office in accordance with generally accepted governmental auditing
standards as issued by the United States General Accounting Office by the Comptroller General of the United States;WSDOT Manual
M 27-50,Consultant Authorization,Selection,and Agreement Administration;memoranda of understanding between WSDOT and
FHWA;and 2 CFR Part 200.501 -Audit Requirements.
If upon audit it is found that overpayment or participation of federal money in ineligible items of cost has occurred,the Agency shall
reimburse the State for the amount of such overpayment or excess participation(see Section IX).
Vill.Single Audit Act
The Agency,as a subrecipient of federal funds,shall adhere to the federal regulations outlined in 2 CFR Part 200.501 as well as all
applicable federal and state statutes and regulations.A subrecipient who expends$750,000 or more in federal awards from all sources
during a given fiscal year shall have a single or program-specific audit performed for that year in accordance with the provisions of 2
CFR Part 200.501. Upon conclusion of the audit,the Agency shall be responsible for ensuring that a copy of the report is transmitted
promptly to the State.
DOT Form 140-039 Page 3
Revised 05t2015
IXPmyinentofBilling
The Agency agrees that if payment or arrangement for payment of any of the State's billing relative to the project(e.g.,State force
work,project cancellation,overpayment,cost ineligible for federal participation,etc.)is not made to the State within 45 days after
the Agency has been billed,the State shall effect reimbursement of the total sum due from the regular monthly fuel tax allotments to
the Agency from the Motor Vehicle Fund. No additional Federal project funding will be approved until full payment is received unless
otherwise directed by the Director,Local Programs.
Project Agreement End Date-This date is based on your projects Period of Performance(2 CFR Part 200.309).
Any costs incurred after the Project Agreement End Date are NOT eligible for federal reimbursement.All eligible costs incurred prior
to the Project Agreement End Date must be submitted for reimbursement within 90 days after the Project Agreement End Date orthey
become ineligible for federal reimbursement.
X.Traffic Control,Signing,Marking,and Roadway Maintenance
The Agency will not permit any changes to be made in the provisions for parking regulations and traffic control on this project
without prior approval of the State and Federal Highway Administration.The Agency will not install or permit to be installed any signs,
signals,or markings not in conformance with the standards approved by the Federal Highway Administration and MUTCD.The Agency
will,at its own expense,maintain the improvement covered by this agreement.
XI.Indemnity
The Agency shall hold the Federal Government and the State harmless from and shall process and defend at its own expense
all claims,demands,or suits,whether at law or equity brought against the Agency,State,or Federal Government,arising from the
Agency's execution,performance,or failure to perform any of the provisions of this agreement,or of any other agreement or contract
connected with this agreement,or arising by reason of the participation of the State or Federal Government in the project,PROVIDED,
nothing herein shall require the Agency to reimburse the State or the Federal Government for damages arising out of bodily injury to
persons or damage to property caused by or resulting from the sole negligence of the Federal Government or the State.
XU.Nondiscrimination Provision
No liability shall attach to the State or Federal Government except as expressly provided herein.
The Agency shall not discriminate on the basis of race,color,national origin,or sex in the award and performance of any USDOT-
assistedcontneoiand/oraQmementorintheadminintnahonufdoDBEpmgnomor the requirements of48CFR Part 2O.The Agency
shall take all necessary and reasonable steps under 49 CFR Part 26 to ensure nondiscrimination in the award and administration of
USDOT-assisted contracts and agreements.The WSDOT's DBE program,as required by 49 CFR Part 26 and as approved by USDOT,
is incorporated by reference in this agreement. Implementation of this program is a legal obligation and failure to carry out its terms
shall be treated as a violation of this agreement.Upon notification to the Agency of its failure to carry out its approved program,the
Department may impose sanctions as provided for under Part 26 and may, in appropriate cases,refer the matter for enforcement under
18U.&C. 1OO1 and/or the Program Fraud Civil Remedies Act of1SO8(31U.S.C.38U1eteeql.
The Agency hereby agrees that it will incorporate or cause to be incorporated into any contract for construction work,or modification
thereof,as defined in the rules and regulations of the Secretary of Labor in 41 CFR Chapter 60,which is paid for in whole or in part with
funds obtained from the Federal Government or borrowed on the credit of the Federal Government pursuant toa grant,contract, loan,
insurance,or guarantee or understanding pursuant to any federal program involving such grant,contract,loan, insurance,or guarantee,
the required contract provisions for Federal-Aid Contracts(FHWA 1273),located in Chapter 44 of the Local Agency Guidelines.
The Agency further agrees that it will be bound by the above equal opportunity clause with respect to its own employment
practices when it participates in federally assisted construction work: Provided,that if the applicant oo participating ioa State orLocal
Government,the above equal opportunity clause is not applicable to any agency,instrumentality,or subdivision of such government
which does not participate in work onor under the contract.
The Agency also agrees:
(1)To assist and cooperate actively with the State in obtaining the compliance of contractors and subcontractors with the equal
opportunity clause and rules,regulations,and relevant orders of the Secretary of Labor.
(2)To furnish the State such information as it may require for the supervision of such compliance and that it will otherwise assist the
State in the discharge of its primary responsibility for securing compliance.
(3)To refrain from entering into any contract or contract modification subject to Executive Order 11246 of September 24, 1965,with
a contractor debarred from,or who has not demonstrated eligibility for,government contracts and federally assisted construction
contracts pursuant omthe Executive Order.
(4)To carry out such sanctions and penalties for violation of the equal opportunity clause as may be imposed upon contractors
and subcontractors by the State, Federal Highway Administration,or the Secretary of Labor pursuant to Part 11,subpart D of the
Executive Order.
In addition,the Agency agrees that ifit fails or refuses to comply with these undertakings,the State may take any or all of the
following actions:
(a)Cancel,terminate,or suspend this agreement in whole orinpart;
(b)Refrain from extending any further assistance to the Agency under the program with respect to which the failure or refusal
occurred until satisfactory assurance of future compliance has been received from the Agency;and
(c)Refer the case to the Department of Justice for appropriate legal proceedings.
DOT Form 1«o'000 Page
Revioeuoa/2o1e
XIII.Liquidated Damages
The Agency hereby agrees that the liquidated damages provisions of 23 CFR Part 635,Subpart 127, as supplemented,relative to
the amount of Federal participation in the project cost,shall be applicable in the event the contractor fails to complete the contract within
the contract time.Failure to include liquidated damages provision will not relieve the Agency from reduction of federal participation in
accordance with this paragraph.
XIV.Termination for Public Convenience
The Secretary of the Washington State Department of Transportation may terminate the contract in whole,or from time to time in
part,whenever:
(1)The requisite federal funding becomes unavailable through failure of appropriation or otherwise.
(2)The contractor is prevented from proceeding with the work as a direct result of an Executive Order of the President with
respect to the prosecution of war or in the interest of national defense,or an Executive Order of the President or Governor of
the State with respect to the preservation of energy resources.
(3)The contractor is prevented from proceeding with the work by reason of a preliminary,special,or permanent restraining
order of a court of competent jurisdiction where the issuance of such order is primarily caused by the acts or omissions of
persons or agencies other than the contractor.
(4)The Secretary is notified by the Federal Highway Administration that the project is inactive.
(5)The Secretary determines that such termination is in the best interests of the State.
XV.Venue for Claims and/or Causes of Action
For the convenience of the parties to this contract, it is agreed that any claims and/or causes of action which the Local Agency
has against the State of Washington,growing out of this contract or the project with which it is concerned,shall be brought only in the
Superior Court for Thurston County.
XVI.Certification Regarding the Restrictions of the Use of Federal Funds for Lobbying
The approving authority certifies,to the best of his or her knowledge and belief,that:
(1)No federal appropriated funds have been paid or will be paid,by or on behalf of the undersigned,to any person for influencing or
attempting to influence an officer or employee of any federal agency,a member of Congress,an officer or employee of Congress,or
an employee of a member of Congress in connection with the awarding of any federal contract,the making of any federal grant,the
making of any federal loan,the entering into of any cooperative agreement,and the extension,continuation, renewal,amendment,
or modification of any federal contract,grant,loan,or cooperative agreement.
(2)If any funds other than federal appropriated funds have been paid or will be paid to any person for influencing or attempting to
influence an officer or employee of any federal agency,a member of Congress,an officer or employee of Congress,or an employee
of a member of Congress in connection with this federal contract,grant,loan,or cooperative agreement,the undersigned shall
complete and submit the Standard Form-LLL,"Disclosure Form to Report Lobbying,"in accordance with its instructions.
(3)The undersigned shall require that the language of this certification be included in the award documents for all subawards at
all tiers(including subgrants,and contracts and subcontracts under grants,subgrants, loans,and cooperative agreements)which
exceed$100,000,and that all such subrecipients shall certify and disclose accordingly.
This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into.
Submission of this certification as a prerequisite for making or entering into this transaction imposed by Section 1352,Title 31, U.S.
Code.Any person who fails to file the required certification shall be subject to a civil penalty of not less than$10,000 and not more than
$100,000 for each such failure.
XVII.Assurances
Local agencies receiving Federal funding from the USDOT or its operating administrations(i.e., Federal Highway Administration,
Federal Transit Administration, Federal Aviation Administration)are required to submit a written policy statement,signed by the Agency
Executive and addressed to the State,documenting that all programs,activities,and services will be conducted in compliance with
Section 504 and the Americans with Disabilities Act(ADA).
Additional Provisions
DOT Form 140-039 Page 5
Revised 05/2015
Aft
ToWashington State Local A enc Federal Aid
Department of Transportation g Y
Project Prospectus
Prefix Route ( } Date 9/21/2018
Federal Aid DUNS Number 092278894
Project Number
Local Agency WSDOT Federal Employer 91-6001271
Project Number Use Only Tax ID Number
Agency CAAgency Federal Program Title
City of Renton ❑✓ Yes ❑No 0 20.205 ❑Other
Project Title Start Latitude N 470 28'51.0" Start Longitude W 122' 12'2.9"
Houser Way Bridge-Seismic Retrofit and Painting End Latitude N 470 28' 52.0" End Longitude W 122' 12' 1.0"
Project Termini From-To Nearest City Name Project Zip Code(+4)
150-ft north of bridge 150-ft south of bridge Renton 98057-5647
Begin Mile Post End Mile Post Length of Project Award Type
N/A N/A N/A 0 Local❑Local Forces❑State❑Railroad
Route ID Begin Mile Point End Mile Point City Number County Number County Name
1169 NIA N/A 1070 17 King
WSDOT Region Legislative District(s) Congressional District(s) Urban Area Number
Northwest Region 37 9 1
Total Local Agency Federal Funds Phase Start
Phase Estimated Cost Funding Date
Nearest Hundred Dollar Nearest Hundred Dollar Nearest Hundred Dollar Month Year
P.E. 620,000 83,700 536,300 11 2018
R/W 50,000 6,750 43,250 1 2020
Const. 2,424,450 5,000 2,419,450 3 2021
Total 3,094,450 95,450 2,999,000
Description of Existing Facility (Existing Design and Present Condition)
Roadway Width Number of Lanes
28 feet 2
Bridge built in 1960. Main span is 5 steel welded plate girders supporting deck.No records of bridge painting
since built. Seismic site class E. Minor seismic retrofit in 1995.
Description of Proposed Work
Description of Proposed Work(Attach additional sheet(s)if necessary)
Bridge preservation, seismic retrofit and painting.
Local Agency Contact Person Title Phone
Derek Akesson Transportation Project Manager 425-430-7337
Mailing Address City State Zip Code
Renton City Hall- 5th Floor, 1055 S Grady Way Renton WA 98057
By
Project Prospectus Approving Authority
Title Transportation Design Manager
DOT Form 140-101 Page 1
Revised 04/2015 Previous Editions Obsolete
a e
Agency Project Title J691t2112018
City of Renton Houser Way Bridge-Seismic Retrofit and Painting
Type of Proposed Work
Project Type(Check all that Apply) Roadway Width Number of Lanes
R New Construction R Path /Trail 3-R 28 feet 2
FiReconstruction El Pedestrian Facilities F]2-R
F] Railroad R Parking F]Other
Z Bridge
Geometric Design Data
Description Through Route Crossroad
Z Principal Arterial El Principal Arterial
Federal W] Urban Minor Arterial El Urban E:]Minor Arterial
Functional [:]Rural Collector Rural R Collector
Classification F] NHS El Major Collector NHS E]Major Collector
El minor collector El minor collector
[:]Local Access [:]Local Access
Terrain Flat [:] Roll Mountain F]Flat [:]Roll [:]Mountain
Posted Speed 25 mph
Design Speed N/A
Existing ADT 11,315
Design Year ADT N/A
Design Year N/A
Design Hourly Volume (DHV) IN/A I
Performance of Work
Preliminary Engineering Will Be Performed By Others Agency
Consultant 99 % I %
Construction Will Be Performed By Contract Agency
Contractor 100 %, 0 %
Environmental Classification
class I - Environmental Impact Statement(EIS) Z Class 11 - Categorically Excluded (CE)
Project Involves NEPA/SEPA Section 404 Projects Requiring Documentation
Interagency Agreement (Documented CE)
Class III - Environmental Assessment (EA)
F]Project involves NEPA/SEPA Section 404
Interagency Agreements
Environmental Considerations
In water work, street closure traffic impacts.
DOT Form 140-101 Page 2
Revised 04/2015 Previous Editions Obsolete
Agency Project Title Date
City of Renton Houser Way Bridge-Seismic Retrofit and Painting 9/21/2018
Right of Way
❑No Right of Way Needed ✓❑ Right of Way Needed
*All construction required by the 0 No Relocation ❑ Relocation Required
contract can be accomplished
within the exiting right of way.
Utilities Railroad
❑No utility work required ❑✓ No railroad work required
❑All utility work will be completed prior to the start ❑All railroad work will be completed prior to the start of
of the construction contract the construction contract
❑✓ All utility work will be completed in coordination ❑All the railroad work will be completed in coordination
with the construction contract with the construction contract
Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project
A number of utilities utilize this bridge to cross over the Cedar River. Some permanent adjustments to utility
routing and/or temporary relocations may need to occur in order to perform this bridge preservation work.
FAA Involvement
Is any airport located within 3.2 kilometers (2 miles) of the proposed project?❑✓ Yes ❑No
Remarks
The Renton Municipal Airport is located within 2 miles of the proposed project. However, this bridge
preservation work will not involve construction equipment or activities that affect airport operations.
.�` N"
This project has been reviewed by the legislative body of the administration agency or agrE3'n ,s;``br
designee, and is not inconsistent with the agency' mprehensive for community r ; la'pmt.
Agency �'