HomeMy WebLinkAbout3006_001.pdfGrading Contractor Grading Foreman Checked By
Rino Construction ((0 0\\e>
Are approved Plans/Permits onsite YES NO Project No. Permit No.
As requested, ESNW representative was on-site to review and recommend SWPPP with client. ESNW
representative and client discussed King County Sewer Discharge permit application and regulations. Based on our
observations, ESNW representative recommends the following:
• Site is eligible for KC sewer discharge permit.
• ESNW representative recommends water be directed to on site vault or baker tank via swales and pumps.
• If authorized, per permit requirements, ESNW representative or client representative must test turbid water
with IMHOFF cone every batch release (21,000 gal) to determine settable solids in water. If acceptable,
client may discharge into sewer system.
• ESNW representative recommends installing baker tank for ease of testing, settling solids and measuring
flow rate.
• Continue to cover steep slopes of vault excavation with plastic.
• Monitor track out on main road. ESNW representati\
scheduled.
ESNW will return when requested.
Marley T Kirkham
Assistant Erosion Control Manager
(206)235-3250
COPY TO: CONTINUED ON NEXT PAGE ❑
Earth Solutions NWILLC
Field Rep.
Project No. Page 1 of 1
Report No.
MTK
5.O(p
o a.
r =
1805 136'h Place NE, FAX:
Time On Site
Time Off Site Date
Day of Week
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE:
9:30
10:00 9/12/19
Thursday
(425) 449-4704 (866) 366-8710
DAILY FIELD REPORT
Travel Time
Weather
1.25 RT
70°F, Sun
Project Name
Job Location
Client / Owner
Weatherly Inn
4500 Talbot Road South
RJ Development
General Contractor
General Contractor's Superintendent
Received Onsite By
Grading Contractor Grading Foreman Checked By
Rino Construction ((0 0\\e>
Are approved Plans/Permits onsite YES NO Project No. Permit No.
As requested, ESNW representative was on-site to review and recommend SWPPP with client. ESNW
representative and client discussed King County Sewer Discharge permit application and regulations. Based on our
observations, ESNW representative recommends the following:
• Site is eligible for KC sewer discharge permit.
• ESNW representative recommends water be directed to on site vault or baker tank via swales and pumps.
• If authorized, per permit requirements, ESNW representative or client representative must test turbid water
with IMHOFF cone every batch release (21,000 gal) to determine settable solids in water. If acceptable,
client may discharge into sewer system.
• ESNW representative recommends installing baker tank for ease of testing, settling solids and measuring
flow rate.
• Continue to cover steep slopes of vault excavation with plastic.
• Monitor track out on main road. ESNW representati\
scheduled.
ESNW will return when requested.
Marley T Kirkham
Assistant Erosion Control Manager
(206)235-3250
COPY TO: CONTINUED ON NEXT PAGE ❑