HomeMy WebLinkAboutWilliams Ave Bridge - Seismic Retrofit and Painting Project Info (rev 9-13-19) PUBLIC WORKS DEPARTMENT
M E M O R A N D U M •
DATE: September 12, 2019 (revised September 13, 2019)
TO: Bob Hanson, Transportation Design Manager
FROM: Derek Akesson, Transportation Project Manager
SUBJECT: Williams Ave Bridge—Seismic Retrofit and Painting
Project Information and Proposed Design Standards
Summary:
The purpose of this memo is to summarize the existing conditions of the project site and
bridge and proposed design standards.
Existing Conditions:
Exhibit A—Vicinity Map and Area Map of bridge location.
Exhibit B—Site Photos from June 2019.
Exhibit C— Bridge record drawings (1954).
Exhibit D—Seismic retrofit drawings from project in 1995.
Exhibit E— Bridge condition inspection report and WSBIS form (2017 inspection).
Exhibit F— Bridge Load Rating Summary (2017).
Exhibit G— Memo Preliminary Seismic Evaluation (2017).
Exhibit H — Memo Scour Assessment (2017).
Exhibit I — Paint system information from 1997 Williams Ave Bridge painting project.
Exhibit J — Local Agency Agreement and Project Prospectus.
Street:
• Williams Avenue is a one way street over the bridge.
• ADT= 1,528, per traffic count performed in June 2015.
• The posted speed limit is 25 mph.
Bridge:
• Structure ID: 08526300
• Bridge No.: Renton-03
• The bridge is currently posted for weight limits.
• There are pedestrian facilities on this bridge. Additionally, the Cedar River Trail
passes underneath the north approach span.
Bob Hanson
Page 2 of 2
September 12,2019
Cedar River:
• The Cedar River is documented to have Chinook, Coho and Sockeye Salmon,
Steelhead and Cutthroat Trout.
• The anticipated fish window for the Cedar River is mid-June to mid-August.
• The United States Geological Survey (USGS) maintains a monitoring station at the
Bronson Way Bridge. The following is a link to the USGS website with the monitoring
station data: https://waterdata.usgs.gov/nwis/uv?site no=12119000.
Design References:
• Washington State Department of Transportation (WSDOT), Local Agency Guidelines
(LAG), dated May 2019.
• WSDOT, Bridge Design Manual, dated July 2019.
• WSDOT/APWA 2020 Standard Specifications.
• American Association of State Highway and Transportation Officials (AASHTO), LRFD
Bridge Design Specifications, current edition.
• AASHTO, Policy on Geometric Design of Highways and Streets, dated 2011.
Bridge Painting:
• Given the age of the bridge, it is very likely the original paint system contains lead.
• The last time the bridge was painted was in 1997.The original paint system was not
removed.
• There are areas of rust and potential section loss on the steel girders and deck
beams. Refer to Exhibit B site photos and Exhibit E bridge inspection report.
• The City anticipates full removal of the existing paint system in order to identify and
conduct repairs to steel elements of the bridge as necessary.
Seismic Retrofit:
• Refer to Exhibit G for a preliminary seismic evaluation.
• Refer to Exhibit D for plans of a seismic retrofit performed in 1995.
h:\file sys\ted-transp engr design\ted 40-projects\04022 williams ave bridge\2000 prelim engr\2200
studies\project info memo\working files\memo-williams ave bridge-seismic retrofit and painting project info.docx
EXHIBIT A
Williams Ave. Bridge — Seismic Retrofit and Painting
VICINITY MAP
Lake N E W C A S T L F
Was hang t-on
LO 0)
Q LL- Pi
07
NE nth St
SL 1.
Q9-02;
RE N-T-D N
CO
(u
Otto
L'#SkY Rd
7
--SP'T92nd St
Lake
Williams Ave. Bridge — Seismic Retrofit and Painting
AREA MAP
0
I N 3rd St
z
m
_ son
E Perimeter Rd m �
� ssr� N?n d St
Cedar Rives"
Trad Exten ra a D0 2M8'7rarr
High
-of a m y Jones Park V
LO cn c Sic
2
Liberty Park Cedar br NE
4a
E a y River Park
m m w Z
rn m $E© U3
0 3
J
a
�j
Prazza Park m N°v�$E
EXHIBIT B
Williams Ave Bridge — Site Photos (June 2019)
Looking east(upstream) at bridge Looking west (downstream) at bridge
TT
Looking south at southern pier Looking north at northern pier
Williams Ave Bridge — Site Photos (June 2019)
x
Y
1.
t
NAM � A.��•
Looking west at northern pier (NE rocker bearing) Looking west at NE corner of main span
t
Looking east at northern pier (NW rocker bearing) Looking east at NW corner of main span
Williams Ave Bridge — Site Photos (June 2019)
Looking west under north approach span Looking south at easternmost spindle, north approach span
all
Looking east under north approach span Looking west under north approach span
Williams Ave Bridge — Site Photos (June 2019)
a
s
Looking north over bridge deck from south end Looking west at northern expansion joint
3
�L.
Looking west at NW corner of main span Looking east at NE corner of main span
EXHIBIT C
� RSE,W.M-
;r[n
�, ca
W x iLLI
/w,u.AMr ,A,�c nr. a r9 �' ,,�'� �,oe rag�'v�, ,�• � � .� � ��., ��
PLAN
a
x�
9m9.,rai� 1,o,g,r,
i
OA UM Prrorre vb,�-Y—rer D£SIGIV NOTE$
GENERAL NOTES _-_ - -- --- - --------- --- --------- - - - - - GoodlrgN s si2-ram A-s.r 'Fa rs
srnn be
2n,Deporrmenr afH hwvys,Sor+- ek«rsroF ..ur arcJstam aa,�mw,ta_ - wy
do ds>a,r,�arerr>ra,�d¢mure- �s � l" cor f¢ .ru art naDr rvo�a NOTES
m
con>r�rcron,e red APr://sera a �i _ � ,
amended ro Decamber i 39. 10 A M'! / _ - n�L dL F helve 9 Se Sh 4
.e�.iv-Ax sa
rha G lw'Pe n96�o�r oxe�o%ne feP a,/ '� �-e.,xnry Q»orvo s/i s orforz,s>irown a•e,.fha<,�c�
otcflan as appmable ra the c - aer+° - , °„":ELf IfAT/ON
Afp ch e'o`+e fbreyroinq Sfo dated u Prea Na 2 Scar '=10=0 a Na-3
Sp iPlcorio
NOTE
rdaa,�a mo �a��q uror,d>&ud APPAoX/MA7E QUAN7ITIeS ie
einfor:nq del rb�fwrings and APPROACHES 8R/DOE Gws» .on.�mR.eaa• s-cc.A,c
fdwl fsrirq ebvarivrz>have been r g Aoa I U. , ha D gr54'
der,-se>or'ct.-,cr»e orc srmwn Y 4 1 5'"
s!where m'Jiesa dro,.-rvgs. t' f -- > Y M,x -
Af15Yucturo/St>e:C>rir>� au - �: g� ""'" 1415
CITY OF RENTON
1
19
WILLIAMS STREET BRIDGE
I
— - --- e� a AND APPROACHES
FomuJae Bl and a serond fia/d � n'^r""=< or,w, ---- ---. 1 L<u.ms.y eza co c e a,aor Croce.-_
eaar e F c� e n no -- LRN
(sera sos ca/z� .s,,
Sae 5 r:at,dip erns Fvr 9 d -. .Szr. - N P TE PS E _
rlcu/err R iremenfs -. - f, 5 I
I off F
ss
2
I, eco roca- va� ,,,error 'n. iso '....33 ope Drains,npJare -. g n .e - y -_
u
F aAx a 8'+
4 rov"
rBa-ko-fOf ' vc e.He< rr u� aZAITZIEZ
r) II
[e MAA YB NU racmaunca
ROLL iSO FR 212
z c 1z'6 rig
*
Q F
1-4
t--{-�— Y .T z>-. m e s by=t .� -
cea
-
G � r—�I-• _rtI—f,l i r' T T z rT
1 l T ( r
V]
�
C-a�Jo. 2 c zoo
8 _
SECTION A 4,
,7�� --
L v.
'f
,
r x
- � SECTION C C
APPROACH
e
r 10ry a e ,
�t7 <
TYOFREIvTON
IDGE
..�, r-.-u T _�.- # ° WILLiL,atD STREET Bi
AND APPROACHES
NORTH
,.per -.
e
-
,3
P APPROACHSPAN
ET
a v
D-1 SCALE
i r
�t�nora o- s
SECTION
D E-E
TEO-4o-14/S - _ or o.
r
ROLL 180 FR 21
v y� e
`-
T
,
t / �
B 1 F
E J
, h _ G SEJZ"N.Tj �z. - ��t�
i I
'n
IT^
H-8kE Tap 8dt _ n {
'T
SECTION F-F
I
1 T'�_�,.;�-. Fo.. U 9 •,5;�4��, m. 5 ♦ i 7 C fI }fi -- SHT.3 N
+J< f t�����r�
J� Kai a1L
i 4
,I r -
-'
j �� i � 4DSHT
2 v
Y a 1 z - 8
_ =- -
Z s-1 Ck Ba C
5bb f 4 N
—� V - Fbs iy nYS
.I a
-LEAN vj
- souTH aPPRoncH
s a
�`
J,- K� a�L
VE`�
c1 oEnr - i u suave ,--_- J._J K-K
x i 1-_ ��� CTY U4 REMTON
JL TSIPF ELFV TI(DN OF RAILING -- v
y �— �--.-_ �� WILLIAMS STREET 2RIDGE
AND APPROACHES —
a rt ' ., SOUTH APPRO4.CH-SPAN
T
J ors a - / �. 1, 'I C L SC �L
DE L OL
inl
............. .a.a.
r— �{ _e .P /ice sWrvrvm 2B z6N
ELEVATION L-L
ROLL 180 FR 215
,
_ d If N
v sErr� al y
G} o tis � r r'i 1 i�Tbd'!7✓� I g'�a,xi_=r�� ���- C/L� �i_i� e�.ke Pe.aM-nrez 3
ev.z.zv. � 6...• "tAdales E,,e
1-4
1 A i a
s,z �.
m .,
�.„ Fsb o
- �kv.95 Sete 4°-�'0'
`t°
z�
-
i
'
A r ' V5
_ 1 -
TTY-RENTON -._._....._.� ji/ i - WILLIAPAS STREET BRIDGE
ixt-11Araue of sa.,tr �' J'l d rw rA�(�,l AND APPROACHES
4 '�f
I f !�� swnneowaeaeeo� PIERS 2�3
1 D TE oT�
i
r �I
r'PD-do-ld - rt.
ROLL 180 FR 2't6
ypu�
4
1
�. 3 --. �n= .00££LEVAPDN a ana�: SmE)FIEYAT/O+'K
�I
n. .:om. 8a./ .,36 Y Web,@_
Y 6 t
!. T. ns.}_54= LPN 'Yo
� h
y 6
DL11, d4Y£SLAB —c.arvJ
� .' y a-�CK� 'o-, � s YFz - L R 1DWE2 S✓+�-'' PXF�a/CNO LOW£.2 S OG FIXED END
—
_�
141306
r`eaee a&ae ues
4. )) '--ems+
7 a� sr rxsa"s'r'd
CITY OP RENTON
g i
WILL MS STREET BRIDGE
�v xs L6m
yr H dr.
AN6'APPR OACHES
MAIN GIRDER FRG DING
h _ ----_•, K tx�`Joi .m,('�TL✓ai.t !fib-1}l" __
v a>
_
o av
scrnrvEOM4928 c c'n ""
ROLL 180 FR 217
_k
TOP FLANGE OF EAST GIRDER
WEST GIRDER SIMILAR
-U "
ic
—— —
.f s
S".rb'� x56
,.dc't INSIDE VIEW OF EAST GIRDER_
WEST GIRDER SIMILAR
� f
¢`x
A I
9'e L L —
a — --
°�.
S / ; \ I' � 'h b \��� '�+„ 5 oP�-,rzf Fprrr✓ias A-/. �
r\c 1 f � �i i "`FU a�`',� I V"'+ r4c°•, I 1 r �..�
R-MV7
Ci If flENTO
VI STREET BI, ti
' 0 PART PL J- RQGh' SYSTEM
ND APPROACHES
MAIN CDR SPAN ETAIL5
o` } ENTER LATERAL oa
o ,
SC LE A N
0
CONNECTION__
° 5 GTIQN A A • -
i
r
n c
ROLL 180 FR 2`1
a
_.. < ..: 4 ra,. _..�.__._.._ ! Ca✓ /b ,B:x__F ?• __- __._- __---.is9z(�
if 3 fr-�3 f _ ,,
_ s_ Fzw�
z o x-V-
TOP FLANGE OF EAST GIRDER -,�- .�Qcx. .ase P,r�b "M/a-s"ex<c�t c3_saow�
I WEST GIRDER SIMILAR
a-
@r 5 &d E ♦ } i Bc x,�.-57"6"Wei f F Z. s - .._ —2]•,
t i
a's t t i BxB x� o.v
a • 5'r s` 3 � eg� h h �
3 r�<non
4 Z Wb �5v5g
>I'
B 8 awn>s'Z'NS
.-k - Fimah a.de
Qe INSIDE VIEW OF EAST GIRDER /
.. ;..... WEST GIRDER SIMILAR
r/P 8.r p x4G 8 N B Splce .� 4/•/off Sc�a Or'.%/a Q.Is.p rned.moo/t /:.—i1 3z �' - a'SG di=33x /Gb✓r..�18 �p_r 39_¢" � !-Gove�fP .8 x xQi x 52=0" i ,.�— 'G,e _ w
t•t t t•.t •t T"7 ah�-# _-------
_ V
8� % $ :•g
a
S '0. 4 g
I� 3
l
WILLIAMS STRE T R
z� re.
t+ 1 f� ✓<r �A LU -I GE
T_. ',. 2�p �,,,r moo.,�,u vim..a/. AND APPROACHES
MAIN GDR, SPAN DETAILS.- BCN+nco pPfl Y 6 2Y4+
FART .PLAN OF FLOOR SYSTEM_ ,. / END E DOR BEAM AT BRIDGE o re,_
-
` P5 7
ROLL 180 FR 219
fA hwx�Yr n. '
t
t f cu o yin V _
17
_�7 7/f r it} o ,.c , i �, i _• F � T 7"
kE
- Jj
MH f —
7
,, F
A7 4 - 71
1 �
{
ury of eE=mr
y'yp —•—
'�' WILLIAMS STREET BR DC-E
I� AND APPROACHES
f �- i I � y �'_ } vax� scwmo�azam ROADWAY DETAILS
rC
-
i
MAlXi E DE2 LA3�C¢CltfY. n
ROLL 180 FR 220
'a.Mxa G6>fe
BAR 15T
litN ❑r
- Q \'S - "-
_ .h
I
i 9 5 1 25
e`T
T 1 g
r ��i � Ji"�4 S ••16 - Oi/fiom 9"��=t'vf',�
�
(�' aarn.,��r wail�
m _
I, zi �z8"Y`✓RTERMA/N Qql f,z=�r�,2;7ACH 5P9N
T I-✓ -- �. -Y' P2.f ✓dS[:Z�moo' y ,
'
I— s ® £ COPJCh'ETf TH4'P5TBLOCK
FOR ze%a'BEND
9-
El,
3
- I f1 EYATION elARJNG FACE
c �oT L 16 Gl -
z
e
9
.a E +:-A
s ^T
®ok
-a O
S STREE o���ti ( � - .SILL IAM rT ARICGc
N `�APPRSPAIN BAR LIST _
W ATERMAIN DETAILS
v �1ar m �rv'
o.
�d urx+EnanRzem,. E.
ROLL 180 FR 221
I
j �s� n-~zr r-rr a 6 @ 1 J� 64 yL0 -�
-
el {. "__Z cb,.1 to f
�24 ke
y
I
P tied ° / a 't_#— �.re �t �c Q, GKi"c tte Gv.6 �y�I ?T.34 ��r4 4.:09`93"
"" E)a¢ 2725 � rb R,•2a`
E < qq _
y- n�Z✓9K '/G 5 <r c >.vo ,G--r � M }8o m]a '�26,S ~'� 2 '15 ^..xistin9 �P Po!s ro he
tl j 9 C ' t — I� f � "'m � _/ Y Movea day ornery
-r-n ,ea J-c �'rr e Gter ?A...B 27C
0l z9. o Z
9 � tl
,q 8 C Pga fYt t?_ sue.. r m 2�.H tD.L {bt Fc � 2B 03 "SSkk
O Z
Shf 9 O for/s F A Fors s tee..-fc - p'� _ � u' ry yy
Er nd�e vro ILLIAMS STREET NORTH
/
? £7 2 ; 30
a{ � C.S Pipe r0 D erer �13C 1 �161
C. Conc. ' s \�6.75 FAQ kE WEST D N L NE
�-�. z a � one, Q m� �zc>s �P�erd � z'�✓ef�f A,. � >k ee (ay o'ee) x.,6=�.Fr.,. ,o e '
p,7^--Cued-?Y5 l F 5 � R4 LO'
-�-c",e.", JJ�0lb, — tk 24 59'
O .r y cru _ 1f
O �A R kc
c 2a' 49l bAjO \`4�
n.. >.
_p
y T
VJILLIAMS STREET DRID6E
-
Jar AND APPROACHES
fi 6nle� y'�' C-b C GNVcr
NORTH APPROACH RDW'Y
tay o eea� ' l
._-
hecf_ h)
a,j u„ PLAN
I k
ROADWAY SECTION .. 6..-
b0 L � NOR.TN
s_ ..c.o scamco mean won _ iao e.w cs _�mti
ROLL 180 FR 22
c. 390 r11LX�--`4 `�-�l ..�u15¢, 3 � � God<.V✓
"Y•F, Ct�/ i+, {' Ewa F S8 £e E L � h
1, e i T r
K�T '
�o
/ C°e a v G V� 2r p gst ,�y 5 � €.n9 ✓Anr�`ro
c
l 1 as so'E,
✓ l t r � I � Ar
2fA° r
p
.� 9 l�i•
j II F E P 9 mcn
T'
ell
2 f� / /S
o�
naa a_ El, e vm sy
2c,&
hjZD 4 ZB PHDFILE FEAST DRAIN LINEf
0
9+'R
`
�
��
_, �� fey �'�3 /�.F �/ D A k t n .o _9`G shed St 3u . ( �i Igi-
W�
IV, FR
L
,a Ak G "- " / �� tWd •\�z �/ Via, ..ob4G�fh� �6: �E lef m..,
o� so,9w
v € t
ROADWAY SECTION R 91�
,a
3g'b 2+75 boon D �NDPTN Y
NOTES sCALE:I'
A„ v e ¢suy .,<
-
o CITY OF FENTON
WILLIAMS STREET.BRIDCE
AND APPROACHES
SOUTH APPROACH(,1 ROADWA°-
P L A N
&i fa ob. 4APNP DATE: ..
�� ro
y0
c
(na� 54< a W.YxFDIIIP E!mp3 a
a ni
- �
__ ROLL 180 FR 223
EXHIBIT D
INDEX
,5HT, N0. TITLE
SCHEDULE A: HOUSER WAY BRIDGE, FEDERAL PROJECT NUMBER BRM—1169(010)
SCHEDULE 8, WILLIAMS AVE. BRIDGE, FEDERAL PROJECT NUMBER BRM—1155(00 1) DErars
GENERAL NOTES
I ALL�lLlLL,kL AND WORXMANSHZP SHALL IAL IN A-11-171 HE
I OF.1___
LEGEND 0—rssa NDI-Y(L' —ATISSS 5tilLFS—AL LI'll—A tf—
I —,1111 OF—._1—1 ILL.—1DESFCNED
Ll sy A--—AS,
"Lil—AS-—A—_____y_
'AFLf"i 1112
TAKEM OR SOWN ON 5YI ET
A SIAtuDAAO
—
11.All BEEN"l, A,ACCELERATIONl
S .1 I "
WtffRE SECTION.V%EW ORA —5 SHOWN ON THE IIA11 All.—OI.�DFIGWAL
DET-SIS 7�KAN IS 1- Ly THE G'i'YCFR64TON
SA. LEE
M.aN�p.G/ fiiH-,cx 'pERgprytyv/. DIMENSIONS All
—It HE—1 ERRED Br llE
CON?;CYOR
All—RAIT L—A FlAttittlLf7i FlAl—PRO.LET 3fALL BE
_UC ILL SAL—1- All—IL CONFORM 1 11
I ALL—71—11 11 1—
VICINITY MAP
THE CONSAACSOR SHALL—ALL NEW—C—C—Al AALL
11——Ir At —11,SlAAS—AS A
—T_--I—W4SRX LI—11.WIIS
— -. ....I�Al LPAT'—--l— 1 A 1 —ll—GI 0, ",—At" 11"—AND ittIlO fAINLWG SlIALLT IFONE— 0 ANO
CfE iliS(Sl COAT LILLIS LLS EFA
11—A A-1-11
l—F,,AAW'c-,-"
AL7—CbAr—li`,LlLDDE A—Ol'TITANIUM LI)ASi[I
AND
T l't'N'='R.X=_—M—M Z SUCH
_11AII—CLAT.AIII—T
T,7 S STAllAA`l�ff�11
A A—AFANCft0.4 ft0D5SLLALL Ill I—Af—A-77Ai
IT ND
n/^ AC 3U'-FY9EIJC43tCEANCIHM TEN—G A-
-1 A.—I f PIA11'I'AS.—WIL OR
A--ISSIA, —1 1 CISSWLTE—1 AND 11,1 1—
1 GE N —SUFA—5
ILL——,[S EIIAL iiO 11 lIfASANCHOn NW
IAI 11—
JrCITY 0: RENTON
-221S
"-6 9,
COVER SHEET
I's
7AIC 4".121151
.............
I "1 -1 Al I I-A-1—A I_f -T— T-- I-
19 18 17 18 15 14 13 12 11 10 9 8 7 6 RfU'ox J,0378 6 7 8 9 10 11 12 13 14 15 16 17 18
SEC. 17, T23N, R.5E., W.M. CITY OF RENTON
PLEB 1
BRIDGE PLAN BAN
BEARING BAR 2XZX) 6"-�
B I'f A-1
A A--A-11 �11
UPPER PLATE CAP
.1 Al 1-1- D ll�11TE
6-S �A I(-I
-ER T A-
i J
3
E
'A
IA
BUtT
sl �
Ll
PLAN VIE
TYPICAL RETROFIT OF MAIN SPAN EF-ARIN
1T F"SZI;ll C_IT
A IT
-Pll.1 A DETAIL
7-221T
_�Ty 11 RENTO
PIER PIER __� _ Z.w.
_ i
EA
LAYOUT PLAN GENERAL PLAN&DETAILS
20 19 18 17 15 1r5 14 13 12 11 10 9 8 6 14 15 16 17 18
RAR 1)x V379 ' 6 7 8 9 10 1 12 13 1
SEC. 17, T23N., R.5E., W.M. CITY OF RENTON
SPAN l o AN
BRIDGE PLAN
-Al
—11—1 A OWCN
IA
T-2215
CITY OF R�F,NTON
PIER PIER GENERAL PLAN
LAYOUT PLAN RE"'i
[A I f I F if At F.
IA I I
19 18 17 16 15 14 13 12 11 10 9 8 7 6 ox 8 ' 10 11 12 13 14 15 16 17 18
RA�� 38 A% 7
17 BEARING "F HEARING R£MOYE EXISTING XEEFER BAR T REGION N0. STA�� FEDERAL PROJECT NO.
f UPPER P
A—SPAN
A,
'AN
EWD A"'A
'I IA El
UPPER PLATE MODIFICA 770N
I—E
I,Nl
L ATF
1A 7E
PEDESTAL TOP O<Pi ER 2 OR j
LPLA7
ExIsTimo NEW EXTENSION R
ANCHOR
ELE VA TI
PLA
All.1-1 -IF �W6 Mill
PATE
fG
NEW dCAffNQ P LOWER PLA 7F MODIFICATION I -1l—
H Ft-
TYPICAL APPROACH SPAN BEARING RETROFIT6AI
p1l
DETAIL_rA_
TLI-2-
'A"MI""I,
A-ANCHOR ROD
1EQ11AA
BEARING) _
0 LONER
1b,
V
ELEVATION END VIE
TYPICAL MAIN SPAN EXPANSION BEARING RETROFIT
PLAN T PLATE DETAILff)
<
7
T-2215
F_ crry OF RENTON
.I u>�waava+r or reeve wossa
ELEVA 71 11—T-- A-A W
TYPICAL MAIN SPAN FIXED BEARING RETROFIT j DETAILS
DETAIL ..0 9:ct
Mo-41-2216'
_4 I A' I I f A I A I A I I I A I I I IA I I
19 18 17 16 15 14 13 12 11 10 9 8 7 6 f4iV)x 6 7 8 9 10 11 12 13 14 15 16 17 18
R _ J03 8 1
EXHIBIT E
BRIDGE INSPECTION REPORT Page I of 5
Status:Released Printed On: 1116/2017 Agency: RENTON
CD Guid:e4690c25-5b2l426c-b34d-aecbe33e431f CD Date:8/30/2017 Program Mgr: Roman G.Peralta
Br. No. RENTON-03 SID 08526300 Br. Name WILLIAMS AVENUE BRIDGE
C n WILLIAMS AVE Route On 52510 Mile Post 10.00
nter g CED R Route Under Mile Post
Inspector C rt# G1103 Cert Exp Date 5/12/2021 Co-Gspector's SignatGre BLR
F— Inspections Performed:
9 Operating Tons (1552) 4 No Utilities (2675)4 Structural Eval (1657) 33 2 Freq Hrs Date Rep Type
2 —Deck Geometry (1658) 0.82 Op RF (1553) 0 Bridge Rails (1684) 24 1.5 6/2712017 Routine
9 —Underclearance(1659) 19 17 elnventor�y Tons (1555) 0 Transition (1685) 24 4.0 6/27/2017 Fract Crit
8 —Alignment (1661) 0.49]Inv RF (1556) 0 Guardrails (1686) UW
6 Deck Overall (1663) 5 1 Operating Level (1660) 0 Terminals (1687)
— Special
5 Superstructure (1671) A B Open/Closed (1293) 0.00 Asphalt Depth (2610)
— Interim
6 —Substructure (1676) 8 —Waterway (1662) 10.0 Design Curb Ht(2611) UW]
9 —Culvert (1678) 5 —Scour (1680) 32.0 Bridge Rail Ht (2612) Damage
7 Chan/Protection (1677) Soundings Flag (2693) 1954 Year Built (1332)
— — Safety
N Pier/Abut/Prot (1679) N —Revise Rating (2688) 0 Year Rebuilt (1336) Short Span
5 Drain Cond (7664) —Photos Flag (2691) Y Subj to NBIS (2614) In Depth
1 Drain Status (7665) Measure CImc (2694)
— Alpha Span Type: Geometric
M Deck Scaling (7666) 6 —Sdwk Cond (7673) SG
5 Scaling Pct (7667) 4 Paint Cond (7674)
7 Deck Rutting (7669) 6 Approach Cond (7681)
7 Exposed Rebar (7670) 7 Retaining Wall (7682) Sufficiency Rating 45.80 FO
7 Curb Cond (7672) 9 Pier Prot (7683) High Risk
BMS Elements
Element Element Description Total Units State 1 State 2 State 3 State 4
12 Concrete Deck 3,720 SF 3,705 0 15 0
107 Steel Open Girder 220 LF 218 0 2 0
110 Concrete Girder 252 LF1 0 0 252 0
133 Truss Gusset Plates 41 EA 36 1 4 0
152 Steel Floor Beam 491 LF 311 5 175 0
205 Concrete Pile/Column 6 EA 6 0 0 0
212 Concrete Submerged Pier Wall 80 LF 80 0 0 0
215 Concrete Abutment 94 LF 94 0 0 0
234 Concrete Pier Cap/Crossbeam 80 LF 80 0 0 0
266 Concrete Sidewalk&Supports 1,490 SF 1,488 0 2 0
311 Moveable Bearing(roller,sliding,etc) 8 EA 0 0 8 0
313 Fixed Bearing 2 EA 2 0 0 0
331 Concrete Bridge Railing 90 LF 901 0 1 01 0
3571 Pack Rust 9 EA 01 1 1 81 0
BRIDGE INSPECTION REPORT Page 2 of 5
Status:Released Printed On: 111612017 Agency: RENTON
CID Guid: e4690c25-5b2l-426c-b34d-aecbe33e431 f CD Date: 8/3012017 Program Mgr: Roman G.Peralta
Br. No. RENTON-03 SID 08526300 Br. Name WILLIAMS AVENUE BRIDGE
Carrying WILLIAMS AVE Route On 52510 Mile Post 10.00
Intersecting CEDAR RIVER Route Under Mile Post
BMS Elements (Continued)
Element Element Description Total Units State 1 State 2 State 3 State 4
361 Scour 2 EA 2 0 0 0
408 Steel Sliding Plate 53 LF 53 0 0 0
903 Inorganic Zinc/Urethane Paint System 9,100 SF 2,460 900 5,100 1 640
9060 (Discontinued)60'UBIT 1 1 FLI 1 1 01 01 0.�
Notes
0 ORIENTATION The bridge is orientated south to north,Abut.I is south. River flows from east to west. Roadway traffic is
southbound only. Pedestrian walkway under Span 3.Fencing in place around span 1.Accessible with UBIT at top of pier 2.
1 FRACTURE CRITICAL Procedure; FC Inspection-top and bottom flange of both plate girders;inspect welds and missing rivets in
bottom flange.Site top flange for trueness.
3 MONITOR: Pack rust in gusset plate at floor beams.
11 LOAD RATING
Sargent Engineers, Inc.load rated this structure in 2017 and included the single unit trucks and emergency vehicles.With the
exception of the Type 3,load postings are recommended for all legal,permit,and emergency vehicles.
12 CONCRETE DECK:
SURFACE:Scattered mud-ball voids throughout,wom to aggregate in the wheel lines.Some transverse cracking near mid-span..
Span 3-longitudinal hailine cracks east lane,small exposed rebar in wheel line,west lane.
SOFFIT:
Span 1-longitudinal and transverse cracks common between girders 1 B/C and 1 C/D.Between girders I E/F;2 spalls-10"diameter x
1-1/2"deep.
Span 2-hairline pattern cracks not leaching-most concentrated between FB-4 and FB-6.One longitudinal leaching crack between
F134/5.
Span 3-hairline longitudinal cracks between girders 313-E.Soffit edges have longitudinal hairline and minor cracks at the horizontal
construction joints.
107 STEEL OPEN GIRDER
Both girders have speckled rust throughout.The exterior face of both girders have utility brackets attached to webs with fatigue
prone Category D welds.
2A;at FB 4;gusset has 4 unseated rivet heads, not loose.Bottom flange at Pier 3 is bent 1/4"over 6".
213;bottom flange at FB 2-1 gusset section loss less than 5%due to laminar rust.
Sixth inside vertical stiffener south of Pier 3 is bent 4";24"toward the south.
110 CONCRETE GIRDER
Spans 1 and 3;six lines cast in place girders each span. Span 1,no defects noted.
3A @ P3:longitudinal crack along deck/girder interface.
3A and 3E;minor vertical hairline flexure cracks mid-span.
3B-3D;concentrated vertical hairline to narrow flexure cracks mid-span.
3E/3F @ P3: 3"x 1"spall in diaphragm at utility line.
133 GUSSET PLATE
FB 1 at girder 2B bot plate has 3/4"thick pack rust-some section loss in plate.
FB 2 at 2B gusset plate has been heat straightened.
FB 4 plug welds at center gusset plate.
FB 5 3/8"pack rust at 2B bot plate.
FB 7 3/8"pack ryst at 2B bot plate.
FB 8 center gusset-damaged rivet head.
FB 8 bottom gusset at 2B is bent upward 1/2"over 2".
FB 9 gusset-1/8"section loss at 2B,plate is deflecting near girder 1/2".
FB 9 plate has 4 of 6 rivets not fully seated;connection does not appear loose.
BRIDGE INSPECTION REPORT Page 3 of 5
Status:Released Printed On: 11/6/2017 Agency: RENTON
CD Guid:e4690c25-5b21-426c-b34d-aecbe33e431 f CD Date: 8/30/2017 Program Mgr: Roman G.Peralta
Br. No. RENTON-03 SID 08526300 Br. Name WILLIAMS AVENUE BRIDGE
Carrying WILLIAMS AVE Route On 52510 Mile Post 10.00
Intersecting CEDAR RIVER Route Under Mile Post
Notes (Continued)
152 STEEL FLOORBEAM
Span 2-floorbeams are numbered from P2 as follows: FB 0 is the first full width beam.
FB 0.5 is the partial width beam from FB 0 midpoint to girder 2B.
FB 1 through 11 are full width beams skew to the piers.
FB 11.5 is the half width beam on the north end of span 2 and FB 12(above P3).
CONDITION:All floorbeams have chipped paint with speckled rust throughout, most pronounced on the north side webs. Lateral
braces have some surface rust.Rocks found on most lower flanges,(north face). Pack rust at most gusset plate connections.
FB 2,4,6,8 and 10-have center cross brace gusset plate connections,with category D welds.
FB's 3,5,6,7, 8,9 and 10 pack rust from 1/4"to Y4"thick,east and west gusset plates.
FB I &2 pitting at web ends near each girder up to 30%deep near connections.
FB 3 west web-4"dia.area heavy pitting with open pin hole near bottom flange at plate.East-diagonal bracing has been
replaced.
F13 5 Pack rust 3/8"between bot flange and plate at girder B
FB 7 Pack rust 3/8"between bot flange and plate at girder B
FB 11 rust along top flange east end.
205 CONCRETE COLUMN
6 concrete plinths-three each on top of intermediate piers 2 and 3.
3-1 C spall 15"x 12"north face with exposed rebar.
212 CONCRETE SUBMERGED PIER WALL Pier walls water abraded to approx.5 ft.below pier cap.Few hairline vertical cracks and
some small spalls along the top of cap. P2-has 12'x24"spall at waterline-north face.
215 CONCRETE ABUTMENT The concrete abutment quantity includes the wingwall lengths. Few hairline vertical cracks,concentrated
at utility cut out locations.Abutment 1 diagonal leaching crack at west corner.Chainlink security fence around span 1.Access from
OBIT bucket at pier 2.
234 CONCRETE PIER CAP
P3 south face-some hairline vertical and longitudinal cracks.
266 CONCRETE SIDEWALK
SURFACE-Transverse cracks both sidewalks. NW and NE joints at approach have been ground to level from previous settlement.
See Note 1672 for curb details. NE spall on approach side of joint.
SOFFIT-All spans east side above suspended utility;
spalls centered between floorbeams directly above utility line,many with exposed rebar.
311 MOVEABLE BEARING
SLIDE BEARINGS:
Piers 2 and 3 concrete girder end diaphragm;three sliding plate bearings,each mounted on concrete plinths.Bearing bottom plates
have minor surface rust.Bearings appear to be frozen at all plinths.Slide bearings are numbered 2A through 2C, at pier 3, 3-1A
through 3-11C.
ROCKER BEARINGS:
At Pier 3. No change in rocker bearings, Both bearings appear to be frozen.
No cracking in paint at pins or rocker foot to indicate movement.Last coat of paint applied in 1997.
2008 P-3 tipped 8*N @ 70'F.
2011 P-3 tipped 8'N @ 52'F.
2013 P-3 tipped 8'N @ 65'F
2015 P-3 tipped 8'N @ 67°F
313 FIXED BEARING
Bearing 2A(north side base plate anchor bolts)and 2B(all)base plate anchor bolts are bent approximately 1/2"over 2".
331 CONCRETE BRIDGE RAILING Spans 1 and 3 have concrete baluster bridge rails.Span 1 -west rail base near the south abutment
has an 8"hairline crack Span 3-west rail;at the rail base along interface with slab-longitudinal open crack from south end 6'north
NW corner of the main steel span is bearing hard against the west concrete rail of span 3.Concrete is cracking. NE corner of main
steel span has 1.5"clearance gap from concrete rail.SW corner few small spalls at end,no bar exposed.
357 PACK RUST Floorbeams 1,3,4,5,6,7, 8,9 and 10 have pack rust. See element note 152.
BRIDGE INSPECTION REPORT
Page 4 of
Status:Released Printed On: 11:6/2017 Agency: nEmTow
ooGum:mmououe-5uu1-42eo-bo4u-aevbvaae4a1r oo Date: nmo/2n1r Program Mgr: Roman G.Pon,Ua
0r. No. RENT0N-03 SIQ 08526300 Br. Name WILLIAMS AVENUE BRIDGE
Carrying WILLIAMS AVE Route On 52510 Mile Poet10.0O
Intersecting CEDAR RIVER Route Under Mile Post
BRIDGE INSPECTION REPORT Page 5 of 5
Status:Released Printed On: 11/6/2017 Agency: RENTON
CD Guid:e4690c25-5b21-426c-b34d-aecbe33e431f CD Date: 8/30/2017 Program Mgr: Roman G.Peralta
Br. No. RENTON-03 SID 08526300 Br. Name WILLIAMS AVENUE BRIDGE
Carrying WILLIAMS AVE Route On 52510 Mile Post 10.00
Intersecting CEDAR RIVER Route Under Mile Post
Notes (Continued)
7681 APPROACH ROADWAY
South approach;approximately 1/2"of settlement, raveled edge on asphalt at butt joint.Pattern cracking, most filled with sealant.
North approach settlement in both lanes near curbs.Open crack and pothole at NW corner to butt joint. NE settlement and poncling
at curb line near butt joint.
9060 UBIT No overhead obstructions. Low vertical clearance under span.2 lanes of one-way, traffic can be channeled around worksite.
Gas utility line attached to exterior west girder.
Repairs
Repair No Pr R Repair Descriptions Noted Maint Verified
10002 2 B DRAINS 7/12/2013
Drains are plugged
1.Clean drains
Inspections Performed and Resources Required
Report Type Date f Leq Hrs "s CertNo Coinsp Note
Routine 6/27/2017 24 1.5 MAG GI 103 BLR
Fracture Critical 6/27/2017 24 4.0 MAG G1 103 BLR
Equipment 6/27/2017 24 4.0 MAG GI 103 BLR Schedule UBIT inspection during low flow season, due to limited
vertical clearance under span.
Resources Hours Min Pref Max Freq Date Need Date Override Notes
UBIT 60 60 60 SDOT UB-60 used
Flagging LA LA LA City of Renton flagging contact: Derek Akesson
at 425-430-7243.
Informational 4/28/2017 CAM G1405 This informational report updates the load rating data.
cu
a)
>
C)) (a
0
cu
CL a) 0 CL
ccm E c 0 C: cm
0 co 0 a) M r
1- a: 0 CL
E
ce) 0 (n=3 0) x
o w " C6 �o Z (1)
C14 0 -"e CL co a) (1)
a)'IT -C
0
I cu 0.
CO
M >
Co C> E (0 C- a) —
a) =1
-0
C:, -a > ca — CO a)
(D o (D
W -a 0 to 0
r— C-- :3 C: "a
ca " =1 m cu
0) a) a)
r r a)CY) It CL
CD—
C6 -'Z Cn �5 CL
a) 0 cu M
a) >
CL
co
0 Cl) c E
m 0
E w -o
LO (D o 0 a)
Co
" tea, `-'
2cu (,Du -0 , cu :,
m CD Ca 2? 'T
EL r- 2 CU m
U- LL 0 cu cn
O
Z CU c cu -0 M LL i5
ca 0 1
0 ch E (D (D
a) 0 a) a) a) C: a)
�o (D
0 -2 -U,
CL cu c a) 0 0 j5 C: 0 0
a) CL o co -0 T co W 0 Z
m 0 0 0
(_D
:3 a- z z z
co
CN
'o
a)
L. C: <
.0 0
;� C D --r-
cL (D
CL —, , 0
o
a)
L- y 00 E
:3 w C 4)
'2 cm ui
0 o Cf) r
(D
L— = c E En 4)
LL z (D 0 (D = c
M
LL
C)
(D 0
< m : .5 ro
E
w E
x o -2 'a m
co CL
ca m CO 0)
(D 2
(D
co (D V) �6 E -0 cL
a> E 0 C (D
E2
CD a) (D Nr2_ z 0 U) 0
tU > 0 0 co w uj m x
(D z 0
0 E
cc
0 0 0 (D
c t CU cL >
a c0 cL 21 C:
(D
LL
o cu cu Co
Cl CL CL OL co 0 cc c
L) C L Q)
0
F CL 0
cu cc m M 0) S
c 0
o)
>
< CL
E c) E
r =3 co
0 z C z E
ca
(D CL cli N N CN
4)
cn a 0) rn
w 0
o
0 C>
0
m 0 r- m Q
tm 0
E co (D
2 0c (a
0 (D
-2
ca a) �c
04 m Eca D w=3
—10
0 0 a
z
Co 0 c
0- 0 a- aaa) a
C > a 6 00)-
0
Co cu
a) 0) CL a)
Ch (D - q
a)
C: C) -0 :3 (D (D CL 0 .0
(0 0 ca
0)
r C: a)
a) a) r..i -0 co
a) c CL.C: a) A-- A-_ a)
0 FU CD CD 2
Co a) C: 0
a) (D 0 Q. W M 0 U)
-a
0 - 0)
w U") 00 C: — a C)
V cc cu m E c: a)
= 4- cn 0 a) = 0 (n o a)
cn — . — a) = 6) a a) (D
ca o w 0 CS 3:
(a
C o CL 0 (D C: M cm o C14 a)
w>
ui
C: m
-0 ic
CY) >
-a (D a>C -�e C)-.C: cu o a) a)
0
LL a) 0 CL 3: 0
M— 0
a).—
c: 0- — " a) 0 CIO
(a U- (D —0- Cc$ cm C: 3: ca -0 — L.L
(D 0 C: C: 0) ca I— — 0) 0)
(D 0 C)c: 0 m cn CO m a) 0
-0 CL
a) — a
M C L 9) :3 . -O. cu > M (D 4)
Cal —CU (D C (D a) m 2 or- C)1 0 0-W TD Cco —M 1P E o
C)- (D m 04 .0
. = = 2
t
E (D od Q) m E m m
0 0 -0 E 0 a) m _ (D
c C4 M 0 It 00 C:
0 LL 0 C:
0 0) 0 0 0 0
CL It i m 1:6 1.6 *� C6 126 �:6 cc
(D m CY) U- m LL 0 U- LL -0 U- LL LL U- W 0
0 0 m
E2 76
m 0
:3 C:2) :3 a. z z
U)
c U) CN
.2) Z5
t5 M .2a 0
a) o 0
CL = 04
16 0) = am 5 5 U)
ca -2
co 5
6
U)
'2 co c: ui E C\l co C:
QL
0_ CY) C/)
m E cy) Co CIO
L— c: E
LL z 0 (D a) m0
LL (D
m .0
E
(D L rn rn E Z,
x 0 (n m
m CD
co E (D
m ca m L- =3 CU co
a) a) —to w a) CL 0)
(D E �5 E
15 - (D c: a) c:
co w a) (.) 0 J= m X--
a) 0 z (D C) C/) Oo
0 0 m w w m =
(D > CL 0 LL z 0
Z5
t 0 m E co(D
C: 0
cj 6 m
m
U-
cu ca cati
L- 0 OL D Q. c
76 U) (f) toE , a-0 F 0
CL a)
co 0o 0 , CL
E •r " (/)
9 0 M
C:
cm
0
> aCL
.0 a) m < 0)
E E co
=3 m CL
Z z E w
O a) a) .!g -6 cc CN N 04
15 4) 0. C
tm CD :3 cn
(D
< m cb 0) > m w 0
BRIDGE INSPECTION REPORT Page 1 of 17
Status:Released Printed On: 11/7/2017 Agency: RENTON
CD Guid:e4690c25-5b21-426c-b34d-aecbe33e431f CD Date: 8/30/2017 Program Mgr: Roman G.Peralta
Br. No. RENTON-03 SID 08526300 Br. Name WILLIAMS AVENUE BRIDGE
Carrying WILLIAMS AVE Route On 52510 Mile Post 10.00
Intersecting CEDAR RIVER Route Under Mile Post
RENT-03 DECK
AND RAILS
(root)
Photo Type: (none)
Orientation: S
Date: 6/27/2017
Repairs:
FROM N APPROACH
RENT-03 *� r
ELEVATION
{root) ,
Photo Type: (none)
Orientation: SE
vex- r�
Date: 6/27/2017
Repairs: r
WEST FACE FROM OBIT ;
e -
ti
/ • 1 i #
BRIDGE INSPECTION REPORT Page 2 of 17
Status:Released Printed On: 1117/2017 Agency: RENTON
CD Guid:e4690c25-5b21-426c-b34d-aecbe33e431f CD Date: 8/30/2017 Program Mgr: Roman G.Peralta
Br. No. RENTON-03 SID 08526300 Br. Name WILLIAMS AVENUE BRIDGE
Carrying WILLIAMS AVE Route On 52510 Mile Post 10.00
Intersecting CEDAR RIVER Route Under Mile Post
RENT-03
ABUTMENT1
{root)
Photo Type: (none)
Orientation: S
Date: 6/27/2017
Repairs:
AT GIRDER B
• ��„r���7.;+r�y,X4�''Yy:h i >. yip ±,:' �. ,, ,
RENT-03 PIER 2 -
{root) 1
Photo Type: (none)
Orientation: S
Date: 6/27/2017
Repairs:
AND CHANNEL,ARMOR ON BANKS
s'
BRIDGE INSPECTION REPORT Page 3 of 17
Status: Released Printed On: 1117/2017 Agency: RENTON
CD Guid:e4690c25-5b21-426c-b34d-aecbe33e431f CD Date: 8/30/2017 Program Mgr: Roman G.Peralta
Br. No. RENTON-03 SID 08526300 Br. Name WILLIAMS AVENUE BRIDGE
Carrying WILLIAMS AVE Route On 52510 Mile Post 10.00
Intersecting CEDAR RIVER Route Under Mile Post
RENT-03 PIER 3
(root)
Photo Type: (none)
Orientation: N
Date: 6/27/2017
Repairs:
AGGREGATE BAR AND WOODY _
DEBRIS
4W
RENT-03 DRAINS
(root)
Photo Type: R-Repair
Orientation: DN
Date: 6/27/2017
Repairs:
PLUGGED DRAINS ON DECK
BRIDGE INSPECTION REPORT Page 4 of 17
Status:Released Printed On: 11/7/2017 Agency: RENTON
CD Guid:e4690c25-5b21-426c-b34d-aecbe33e431f CD Date: 8/30/2017 Program Mgr: Roman G.Peralta
Br. No. RENTON-03 SID 08526300 Br. Name WILLIAMS AVENUE BRIDGE
Carrying WILLIAMS AVE Route On 52510 Mile Post 10.00
Intersecting CEDAR RIVER Route Under Mile Post
RENT-03 JOINT
NORTH
(root)
Photo Type: (none)
Orientation: E
Date: 6/27/2017
Repairs:
STEEL SLIDE PLATES
L t'
a t
CHANNEL
I
UPSTREAM
{root)
Photo Type: (none)
Orientation: E
Date: 6/27/2017 >� -
Repairs:
AGGREGATE BAR ON RIGHT BANK
r -
y
BRIDGE INSPECTION REPORT Page 5 of 17
Status:Released Printed On: 11/7/2017 Agency: RENTON
CD Guid:e4690c25-5b21-426c-b34d-aecbe33e431f CD Date: 8/30/2017 Program Mgr:Roman G.Peralta
Br. No. RENTON-03 SID 08526300 Br. Name WILLIAMS AVENUE BRIDGE
Carrying WILLIAMS AVE Route On 52510 Mile Post 10.00
Intersecting CEDAR RIVER Route Under Mile Post
RENT-03
APPROACH
SOUTH
{root}
Photo Type: (none)
Orientation: E - -
Date: 6/27/2017
Repairs:
PATTERN CRACKING IN ACP ON S
APPROACH - r
y�
-- - -
RENT-03 DECK
SPAI.LS
{root}
Photo Type: (none)
Orientation: UP
Date: 6/27/2017
Repairs:
WITH EXPOSED BAR ABOVE UTILITY
LINE EAST SIDE
BRIDGE INSPECTION REPORT Page 6 of 17
Status:Released Printed On: 111712017 Agency: RENTON
CD Guid:e4690c25-5b21-426c-b34d-aecbe33e431f CD Date: 8/30/2017 Program Mgr: Roman G.Peralta
Br.No. RENTON-03 SID 08526300 Br. Name WILLIAMS AVENUE BRIDGE
Carrying WILLIAMS AVE Route On 52510 Mile Post 10.00
Intersecting CEDAR RIVER Route Under Mile Post
RENT-03 SPAN 1 - —
SOFFIT
{root)
Photo Type: (none)
Orientation: UP
Date: 6/27/2017
Repairs:
LONGITUDINAL CRACKS IN SOFFIT
BETWEEN GIRDERS B AND C
T
b �
RENT-03 FB 4 -
{root)
Photo Type: (none)
Orientation: E
Date: 6127/2017
Repairs:
PITTING AND PACK RUST AT GIRDER
B AND FB-4
t
'low
...oF'
BRIDGE INSPECTION REPORT Page 7 of 17
Status:Released Printed On: 11/7/2017 Agency: RENTON
CD Guid:e4690c25-5b21-426c-b34d-aecbe33e431f CD Date: 8/30/2017 Program Mgr:Roman G.Peralta
Br. No. RENTON-03 SID 08526300 Br. Name WILLIAMS AVENUE BRIDGE
Carrying WILLIAMS AVE Route On 52510 Mile Post 10.00
Intersecting CEDAR RIVER Route Under Mile Post
RENT-03 FB
WEBS z
{root} '
Photo Type: (none) sue'
Orientation: SE
Date: 6/27/2017 •�'�� +r Y"
Repairs:
PEELING PAINT AND CHIPS ON MOST
FB WEBS �r
i
RENT 03 FB 5
PLATE
{foot}
Photo Type: (none)
Orientation: E Wr
Date: 612712017
Repairs:
GUSSET PLATE AT GIRDER B BENT
FROM PACK RUST
• , 3
BRIDGE INSPECTION REPORT Page 8 of 17
Status:Released Printed On: 1 1 17120 1 7 Agency: RENTON
CD Guid:e4690c25-5b21-426c-b34daecbe33e431f CD Date: 8/30/2017 Program Mgr. Roman G.Peralta
Br.No. RENTON-03 SID 08526300 Br. Name WILLIAMS AVENUE BRIDGE
Carrying WILLIAMS AVE Route On 52510 Mile Post 10.00
Intersecting CEDAR RIVER Route Under Mile Post
RENT-03 FB 3
BRACE
(root)
Photo Type: (none)
Orientation: UP
Date: 6/2712017
Repairs: - EG
REPAIRED BRACE
AW
*� 06120 17 19 : 471?'
RENT-03 BARING w'7
313
{root)
Photo Type: (none)
Orientation: W
Date: 6/27/2017
Repairs: ,► _ -
TIPPED NORTH NO CHANGE
-21f d,
BRIDGE INSPECTION REPORT Page 9 of 17
Status: Released Printed On: 11 712017 Agency: RENTON
CD Guid:e4690c25-5b21-426c-b34d-aecbe33e431f CD Date:8/30/2017 Program Mgr: Roman G.Peralta
Br. No. RENTON-03 SID 08526300 Br. Name WILLIAMS AVENUE BRIDGE
Carrying WILLIAMS AVE Route On 52510 Mile Post 10.00
Intersecting CEDAR RIVER Route Under Mile Post
RENT-03 FB 8 B --
{root}
Photo Type: (none)
Orientation: E
Date: 6/27/2017
Repairs:
BENT GUSSET PLATE FROM PACK
RUST
0 3 27-1.20,4,
RENT-03 FB 4 B
{root}
Photo Type: (none)
Orientation: E
Date: 6/27/2017
Repairs:
PLATE BENT FROM PACK RUST ,I
I.
: 35
BRIDGE INSPECTION REPORT Page 10 of 17
Status:Released Printed On: 1117/2017 Agency: RENTON
CD Guid:e4690c25-5b21-426c-b34d-aecbe33e431f CD Date: 8/30/2017 Program Mgr: Roman G.Peralta
Br. No. RENTON-03 SID 08526300 Br. Name WILLIAMS AVENUE BRIDGE
Carrying WILLIAMS AVE Route On 52510 Mile Post 10.00
Intersecting CEDAR RIVER Route Under Mile Post
RENT-03 FIB 3 A
{root}
Photo Type: (none)
Orientation: W
Date: 6/27/2017
Repairs:
HEAVY PITTING IN WEB WITH OPEN
HOLE <,
r
1
I
RENT-03 BARING ""
3B
{root}
Photo Type: (none) y
Orientation: E '
Date: 6/27/2017
Repairs:
NO GAP BETWEEN SPAN 2 AND 3,
CONCRETE CRACKING IN 3
BRIDGE INSPECTION REPORT Page 11 of 17
Status:Released Printed On: 1117/2017 Agency:RENTON
CD Guid:e4690c25-5b21-426c-b34d-aecbe33e431f CD Date:8/30/2017 Program Mgr: Roman G.Peralta
Br. No. RENTtON-03 SID 08526300 Br. Name WILLIAMS AVENUE BRIDGE
Carrying WILLIAMS AVE Route On 52510 Mile Post 10.00
Intersecting CEDAR RIVER Route Under Mile Past
RENT-03
ABUTMENT 4 �+-
{root} -- -
Photo Type: (none)
Orientation: SE L•
Date: 6/27/2017 -
Repairs:
BACKWALL AND APRON AT TRAIL
1
RENT-04
ELEVATION
{root}
Photo Type: (none)
Orientation: W
Date: 6/27/2017
Repairs:
NOTE CHANNEL AGGREGATION
ALONG RIGHT BANK
BRIDGE INSPECTION REPORT Page 12 of 17
Status:Released Printed On: 1117t2017 Agency:RENTON
CD Guid:e4690c25-5b21-426c-b34d-aecbe33e431f CD Date: 8/30/2017 Program Mgr:Roman G.Peralta
Br. No. RENTON-03 SID 08526300 Br. Name WILLIAMS AVENUE BRIDGE
Carrying WILLIAMS AVE Route On 52510 Mile Post 10.00
Intersecting CEDAR RIVER Route Under Mile Post
104.RENT-03 6-4
-15
PAINT
Photo Type: (none)
Orientation:
Date: 2/13/2017
Repairs:
Rust between plates and floor beamsIr
1
FW
RP
106.RENT-03 6-4
-15 4
PAINT '
Photo Type: (none)
•s '
Orientation:
i
Date: 2/13/2017 '
Repairs:
inside web rust blooms
f
BRIDGE INSPECTION REPORT Page 13 of 17
Status:Released Printed On: 1117/2017 Agency:RENTON
CD Guid:e4690c25-5b21-426c-b34d-aecbe33e431f CD Date:8/30/2017 Program Mgr:Roman G.Peralta
Br. No. RENTON-03 SID 08526300 Br. Name WILLIAMS AVENUE BRIDGE
Carrying WILLIAMS AVE Route On 52510 Mile Post 10.00
Intersecting CEDAR RIVER Route Under Mile Post
093.RENT-03 6-4
PAINT
Photo Type: (none)
Orientation:
Date: 2/13/2017
Repairs:
Algae on webs and bottom flanges
f
i�
048.RENT-03 6-4 {— 'F
-15
PAINT
i
Photo Type: (none)
Orientation:
Date: 2/13/2017
Repairs: =,
Floorbeam web chipped paint • h w �4
i AIL `. •
i
a• t :x a ��► j ,
�, • — A# ' Q
imp
1 1M WAMIS
BRIDGE INSPECTION REPORT Page 14 of 17
Status:Released Printed On: 11/712017 Agency: RENTON
CD Guid:e4690c25-5b21-426c-b34d-aecbe33e431f CD Date: 8/3012017 Program Mgr:Roman G.Peralta
Br. No. RENTON-03 SID 08526300 Br. Name WILLIAMS AVENUE BRIDGE
Carrying WILLIAMS AVE Route On 52510 Mile Post 10.00
Intersecting CEDAR RIVER Route Under Mile Post
044.RENT-03 6-4 _,_
-95 � �
PAINT
Photo Type: (none) 0 A► t All
Orientation:
Date: 2/13/2017 • '
Repairs:
Floorbeam web with chipped and peeling a J •; f ,;
paint j •r
♦' 2.
a �
SIP
. i i � ." !' v , � 1 • � ♦ •ice , �`'
IL
045.RENT-03 6-4
-15 r'� w-A
PAINT . +
Photo Type: (none)
Orientation:
Date: 2/13/2017
Repairs:
Rust on rivet heads
v r'�
J �
k N.
_r,,S-U
BRIDGE INSPECTION REPORT Page 15 of 17
Status:Released Printed On: 11f712017 Agency:RENTON
CD Guid:e4690c25-5b21-426c-b34d-aecbe33e431f CD Date: 8/3012017 Program Mgr.Roman G.Peralta
Br. No. RENTON-03 SID 08526300 Br. Name WILLIAMS AVENUE BRIDGE
Carrying WILLIAMS AVE Route On 52510 Mile Post 10.00
Intersecting CEDAR RIVER Route Under Mile Post
030.RENT-03 6-4
-15
PAINT
Photo Type: (none)
Orientation:
Date: 2/13/2017
Repairs:
blistered paint on gusset plates
rjar
-
,w,
I
VON
024.RENT-03 6-4
-15
PAINT
Photo Type: (none)
Orientation:
Date: 2/13/2017
Repairs:
rust on stiffeners and rivets
r
f
ti�
BRIDGE INSPECTION REPORT Page 16 of 17
Status:Released Printed On: 11 M2017 Agency:RENTON
CD Guid:e4690c25-5b21-426c-b34d-aecbe33e431f CD Date: 8/30/2017 Program Mgr:Roman G.Peralta
Br. No. RENTON-03 SID 08526300 Br. Name WILLIAMS AVENUE BRIDGE
Carrying WILLIAMS AVE Route On 52510 Mile Post 10.00
Intersecting CEDAR RIVER Route Under Mile Post
026.RENT-03 6-4
-15
PAINT
Photo Type: (none)
Orientation:
Date: 2/13/2017
Repairs: At'
rust on longitudinal stiffeners
023.RENT-03 6-4
-15
PAINT
Photo Type: (none)
Orientation:
Date: 2/13/2017
Repairs:
rust bloom on floor beam upper flanges
WUWashington State WSBIS Local Agency Inventory Report
P Department of Transportation
Ipin 2to1 2132 let. take 101 =3 lift 2181 Me 21. in. like
Strueruca ID Bridge Name., Bridge Name j O g CRY Location I LatRude Lamarche
Bridge ID 2
08526300 RENTON-03 WIL IAMB AVENUE BRIDGE 1 04 1 4 17 1070 0.2M NORTH SIR 900 17 23 05E 47'29'03,54" 122'12'22.77'
1 47'29'02.90" 122'12'2350"
1p. 1266 1206 Im Isle 1293 1292 2296 72ae printed Sufficiency Rafing:
Feature Intersected Facade.carded -,an I$I i rips Q n S Date 45.80 Item 27105R
I nO FO loar villrofFo
Facilities I — 111712017
CEDAR RIVER WILLIAMSAVE I NW 1371 0 157745 3 N A 4 High Mai,
1382 I= 13. 2a48 Is. IRS, IM 1360 take taBJ 111.1112 18T0 1374 1— 13" 1382 1383 like ". nail late — 1—
Year Y., Bridge NETS Length M'd " Lane Curb to Curb Widow Sidineolk Si N? I App,
I min an min Vert Van M g Let Let Min 0 Nav Vert Nav Hod lift
ev Vert
Built Rebuilt 1-cup Span Length On Dick width Deck Alft Left Right Over Deck Under Cade Under Right Cents Under�ft Clear -. Lift Clear 5 Salary
Layout
1954 0 156 110 2 24.0 35.0 41 41 20 N 99'99" 00'00" N 0.0 NJ 0.0 0 0 0 0 36
I= 1433 11. 1.5 2440 1446 real 1.a — trial 1.7 14n 1409 .1. 74M IM 1414 like lon 1487 109 1490 laa, teal 1496 14" 1413 2441
Truck Fature, Linear Las LRS Mi.pne Fed M �z �M Funce
Creasing FR III jalacurehl.l.b., Wagner ADT FuAftium ADT DTy.a, Z' p can
% ADT System Sub Santa# . ce Cie. z at
reutien rs Route all Reverse 01, Route
1 5 1 52510 10.00 �E1528 14 2015 2000 2035 52510 Y 1155 0 0 0 0 16 N 1 0 24!00' 1 25
102 im Ion talk fluar t541 unut 1M5 Rate '147 — the lM leel t662 1563 1664 late nake t585 1W8 net IM pain M,
Main Met. Appr Appr Number Number Service D. Design Ope, Clear Op., 1. Inv Ime Dealt;
,,,auct Load Rating Rading Eftlng Rating Rating Rating i; BorderStruclurefl) pact Add Phepect N.
V't'6 I Membrane Deck SI I Exemption
Span Spun Spun "". Main Age, Service at n
Design Material Design Matcher Design Space Spun. Cm Under Type Surface Cd. Mab.d Ton. Fact., Mathad Tchur, Pa.
3 03 1 04 1 2 5 5 1 1 0 0 4 1 33 1 19
it..
2 29 0.82 17 0.49
M? 26k8 me Zela 2.1 —2 ago 25e4 —1 2... 71g2 7M 78M Run 7636 707——7140 Mi 48" Ikea 1— 2053 2... Ilea} 1873 28T0 laid IM 2k0
'u
14.1 0;�.192 ru Imp Roadway Chat Slid, E—
Load waterway/ 9 B 'u
OLI OL2 1: 5:2 9-, StrndC..t RdyC.at
Rating Prop Imp g, R Length Wft Per SF Year
15 it 19 ra
F B U N 5 3 N F N 2 35 1 Ise 38 400 1186 237 M 2371 2014 Y
1,09 0.90 0.88 0,70 0.93 0.88 0.80 0,71 067
l.tandna care Inspector Gert N. C—p—
Ruth,
1.p__ Da lose te .=Mun, Cede. cencep— In.pecle.h pate awls— Cart No —neplanal Safety
— T Routine E612712017 MAG I G1 103 BUR UWlnterim short span
Report Fracture Critical _, T Interim
Inspection W27/2017 MAG G1103 BUR Geometric
I Into CAM G1405 Types Special Feature n Depth +412.2.11
Underwater Darnage Inventory
EXHIBIT F
G
BRIDGE LOAD RATI N G
for
CITY OF RENTON
PUBLIC WORKS DEPARTMENT
Williams Avenue Bridge
Bridge # RENTON-03
SEI Project No. A17110.01
By: J.J. Weiks & C.A. Mallow
Original: April 2017
Revised: August 2017
SJ*WGENT
Sargent Engineers,Inc. 320 Ronlee Ln NW Olympia,WA 98502 • Tel 360 867-9284 Fax 360 867-9318
Bridge Rating Summary
E
i
t
51096
i
3 PE Stamp
Bridge Name: Williams Avenue Bridge
Bridge Number: RENTON-03.
Span Types: 3-Span Bridge: (2)Concrete Approach Spans, (1) Steel Main Span
Bridge Length: 155'-3"
Design Load: 1-115-S12-44
Rated By: J.J.Weiks j
Checked By: C.A. Mallow
Date: April 2017
i
Inspection Report Date 6/4/2015 Substructure Condition 6
Rating Method LFR Deck Condition 6
Overlay Thickness 0" Superstructure Condition 5
Truck RF(INV) RF(OPR) Controlling Point
Type 3 0.65 1.09 Approach Span Floor Beam, Shear @ center support
Type 3S2 0.67 1.13 Approach Span Floor Beam, Shear @ center support
Type 3-3 0.70 1.18 Approach Span Floor Beam, Shear @ center support
NRL 0.52 0.86 Approach Span Floor Beam, Shear @ center support
SU4 0.56 0.93 Approach Span Floor Beam,Shear @ center support
SU5 0.53 0.88 Approach Span Floor Beam,Shear @ center support
SU6 0.53 0.88 Approach Span Floor Beam, Shear @ center support
SU7 0.53 0.88 Approach Span Floor Beam,Shear @ center support
OL-1 0.48 0.80 Approach Span Floor Beam,Shear @ center support
OL-2 0.43 0.71 Approach Span Floor Beam, Shear @ center support
NBI Rating RF Tons Controlling Point
Inventory(HS-20) 0.49 18 Approach Span Floor Beam, Shear @ center support
Operating (HS-20) 0.82 30 Approach Span Floor Beam, Shear @ center support
Remarks:
The bridge is within one-road-mile of 1-405;therefore, emergency vehicles specified in the FAST Act's Memorandum dated
Nov. 3,2016 are included. Resistance factors used reflect the reported condition of each element.
Bridge Rating Summary
(Emergency Vehicles)
If the structure is within one-road-mile of the National Network of highways,then load rate the following
vehicles and post as required.
Trucks RF(INV) RF(OPR) Posting Load in TONS
Type EV2 0.52 0.86 25
Type EV3 0.37 0.62 27
WSBIS Coding Recommendations
WSBIS 1550 - Design Load 2 H 15
i
Operating Rating:
WSBIS 1551 - Rating Method 1 Load Factor(LF) reported by tons
WSBIS 1552 - Rating Tons 29 Tons
Inventory Rating:
WSBIS 1554 - Rating Method 1 Load Factor(LF) reported by tons
WSBIS 1555 - Rating Tons 17 Tons
i
WSBIS 1660 -Operating Level 3 10.1%to 20%below legal load
Legal and Permit Rating Factors:
WSBIS 2587 -Type 3 1.09
WSBIS 2588 -Type 3S2 1.13
WSBIS 2589 -Type 3-3 1.18
WSBIS 2590 - NRL 0.86
WSBIS 2591 - SU4 0.93 Posting required
WSBIS 2592 - SU5 0.88 Posting required
WSBIS 2593- SU6 0.88 Posting required
WSBIS 2594 - SU7 0.88 Posting required
WSBIS 2595 - OL-1 0.80
WSBIS 2596 - OL-2 0.71
Posting Recommendations:
The recommended posting is as follows:
SU4: 25 Tons
SU5: 27 Tons
SU6: 31 Tons
SU7: 34 Tons
Type EV2: 25 Tons
Type EV3: 27 Tons
k
t
Operating Rating Tons
xs2o Maximum Tonnage for HS20 30 Tons
36 TON Configuration:
O O O
VGries 14'
6 6
-i
- — O
O O Z
Z L
TYPE 3 Maximum Tonnage for Type 3
o O O 25 TON 27 T
Configuration: ons
1 ' 15'
Y
0o co cc)
(n C" -
O
00
z I
z z
TWE 3 2 Maximum Tonnage for Type 3S2
TO o 00 o Configuration: 41 Tons
4' 22' 4'I 11'
9�
00 00
z z z z
TYPE 3-3 Maximum Tonnage for 47 Tons
O O 40 TON Type 3-3 Configuration:
0 o 0 o
J J O 0 6
00 O 00 O
Z Z Z Z Z
NRL Maximum Tonnage for NRL
0 000000 0 40 TON Configuration: 34 Tons
0
6 of 4' Vur.
-+- -� co C� -� -� C�
—i —i —I Ui CJ� —I —I
0 0 0 0 0 O
o o z z z
z z
i
Operating Rating Tons
OL 1 Maximum Tonnage for OL 1
0 071-"
0 0 0 48 TON 42 Tons
Configuration:
4' 114'1 10'
n
0 0 . 0
V V V
CP Cn CP U O
Z
0 0
O 0 0 O
L TON Maximum Tonnage for OL 2 73 Tons
0 0 0 0 0 0 0 0 0 0 Configuration:
--- 6 4 14 6 14 16' 6' 4' 10"
1 +� i 1
0-)
v v v v v 0
O CT Ui O UI Cl O CP LP Z
00 00 O O
Z Z Z Z Z Z j
i
i
i
S TON Maximum Tonnage for SU4 25 Tons
0 0 0 0 Configuration:
1.4" 4' 10'
T
co PO1
PO
v
0 0 z
z z
O O O O 31 TON Maximum Tonnage for SU5 27 Tons
4' 4' 4' 10' Configuration:
CD z
z �
I
sub Maximum Tonnage for SU6 31 Tons
0 0;4'
0 o s4as TON Configuration:
j4' 4 ' 10"
P 1 P 1
-> w 00 n
O - -aoo
z O CDz z
Z G
z
sup Maximum Tonnage for SU7 34 Tons
0 0 0 0 00 0 38.75 TON Configuration:
4 4 4 4 411 10
1 Y 1 Y tl
a A cn co a P
cP U,
00 , -, 00 Ul
z 2f O o = z -{
E
i
E
I
c c
CO O r 00 d- d- O � t'- C4 O LO
O d- N T CA CM N O 0) C? Cp C7 OR Q Lq N
W Q r T O O r O r O m Q r t
C) p pc0 I
o
O C) M N O LC) O w w OO O 0 LL O N LLB �(((
C CO 00 r--: r--: Lq OO r--, cq Lq 00 Id: t� Lq -O C O
> O O O O O O O O O O O O O J C C; C;
N _
C
(SS C
I.f) C+7 d' OO J CY)
Q c�
O r N C? C� 6 CT O OO OO r--: CA O Q
W Q r T O O O O O O O O O p m Q 0 O
Lb
oc p pC p
O
p p
LL co co d' N d• rn Co d- C) ",I, "' Co m d• OO
G CO Co t-- w Lo LP) Lo Lo Lo M d- Lo d: C M d'
> O O O O O O O O O O O O O Q j O C:5
C C
C
O T t-- M LC) LL) CO CO O 00 CO O OO �--' N
O) d- Lq CO N d: c? c? N N O OO rl-: J J
m O O r C7 O p p
Q p
U)
O d d T Lo P� O M r t-- m M to
C Lo 00 O O r- OO OO r- � � CO LO zt
> O O O r O O O O O O O O O � If � tf �' �' t'
> O O O O O O O O O O O O O
Q CZ CZ CZ C2 0- 0- C2 0- C2 C1 0- 0-
Q Q CZ CZ 0- C2 0- 0- 0- 02 Q 0-
-
N O M CO CO CO CO CO 00 CDr CO N N 0 CU 0
Cb O 7 C? Cb O OO OO O OR r-� Cb CO C O
O O T T T O O O O O O O O O O O O O O O O O O O O O (ll
O O O N O O O O O O N N N
� 0 (T LL) r- T N CO co C7 C7 00 Co L '
p d' Lfl co OR LqLqLLB L(� LC) LqC� co U) co co U) U) U) U) U) U) U) U) U) is
o C) C) C) C) C) CD C) C� 0 o CD o
Q co m m m m m m ❑0 m m m M m
CO d O Cq CO eo 0 0 o rn o d
o 0 0 0 0 0 0 0 0 0 0 0 o
o c� d: co 0 o r s o 0 0 0 0 0 0 0 0 0 0 0 0
r T r r Li Li LL LL LL LL LL IL U- LL IL U- U
T T T T T T T T T O
p at Lei Rs Lu c� L� ctiY c» ctY L� L� L� L�
Cz Cz 0- Lz Cz Lz 0- 0- Lz Ca Q Cz Cz
cn cn cn w w w w w w w w w w
_ _ U o U U U U U U U U U U U
+.O M d' OO t.C) T CO CO CO N CO d' w w w w Ca O O M M M w w w
- CD OO O cip r CO CO cq P--: O O d. O O O O O O O O O O O O O
O O O O O O O O O O O O O O
> Q Q C2 Q i2 SZ Q Q i2 iZ iZ
O 0- 0- 0- 0- C2 CZ 0- 0- CZ C1 0- CZ CZ
Q Q Q Q Q Q Q Q Q Q Q Q Q
i
C C
M t- LO O ti � � � t` LO M M - N O c7 00 CO CO 00 OO 00 O CO N
O Cb O (T cq o0 o0 OO Cb t� h O) O OO O T r 00 03 OR OR 00 OO OO CO
Q O T N T r T T T T O r Q O O O O O O O O O O
O � O
i
O O N M O N N N N . LLB CO O M LC) r O N Co M M c7 Cb co N t-
C CO T N r T r r T O O LC) CO C d' CO CO � Lo Lo M LO LO d' d'" LO M
> O T O O > O O O O O O O O O O O O O !
N N CO
O Cw C7 _t d' LO CO t- ; CV N C) O CY)(D M C`) J d' LO CO '-' CV N C'7
Q. O Cll M J J > > CN!) Q N Q) � � � J J
_ � Z U) U) U) U) 0 0 W W = Q Z WWWWOOWW
EXHIBIT G
SA* RGENT
Sargent Engineers,Inc.
320 Ronlee Lane NW
Olympia,Washington 98502-9241
Tel 360 867-9284
Fax 360 867-9318
www.sargentengineers.com
April 1, 2017
Mr. Derek Akesson
City of Renton Public Works Department
Renton City Hall -5th Floor
1055 South Grady Way
Renton, WA 98057-3232
RE: Renton Bridge Program
Project No.: A17110.01
Dear Mr. Akesson:
We have completed a preliminary seismic evaluation of Williams Avenue Bridge at your request. The
evaluation includes a qualitative screening of the bridge for deficient items. Based on our field observations,
review of the existing plans, and preliminary calculations, we determined that there are several deficiencies
typical for structures of this type. The deficiencies include but are not limited to inadequate concrete
reinforcing, bearing support lengths and transverse restraints for seismic event loadings.
Current AASHTO LRFD Seismic Bridge Design standards require a minimum support length of 24" and a
minimum shear reinforcement ratio for columns of 0.004. The existing approach span spindles and
bearings have a support length of 15.5" and a reinforcement ratio of approximately 0.0024. Therefore,
existing spindles do not have the required support width, reinforcing, or transverse restraint in the case of a
seismic event.
Additionally the Seismic Retrofitting Manual for Highway Structures lists rocker bearings as the most
seismically vulnerable of all bridge bearings because they usually have a high aspect ratio, are difficult to
restrain and become unstable and overturn after limited movement. Although previous retrofits have
extended the bearing seat lengths, no improvements have been made to the existing 15/32"tall shear key
to restrain out-of-plane movement.
Based on our preliminary seismic evaluation, we recommend the following seismic retrofits to the approach
and main spans:
1. Replacement of approach span spindles with a continuous reinforced concrete stem-wall.
2. Widening the pier wall to increase the support width for the new approach span stem-wall supports.
3. Remove existing approach span bearings and replace with elastomeric bearing pads.
4. Installation of longitudinal seismic restrainers.
5. Installation of girder stops at both the approach spans and main span girders.
Respectfully,
Sargent Engine s, Inc.
o
cx �
Craig A. Mallow, PE c10�
Project EngineerIo
NCI,
CAM
\\SERVERI\files\17Files\A17110.01 Task 1.3 Renton Bridge Program\RENTON-03_SeismicEvalMemo.docx
EXHIBIT H
WATERSHED
SCIENCE & ENGINEERING
,'yta f
J l� y e
WA
Memorandum
To: City of Renton, Sargent Engineers ` '31
uSf11� ONAL.tiG
From: Jeff Johnson P.E., Marissa Karpack E.I.T
Date: April 7, 2017
Re: Scour and Erosion Assessment at Williams Avenue Bridge over the Cedar River
BACKGROUND
Watershed Science and Engineering (WSE) was retained by Sargent Engineers to determine if scour and
erosion countermeasures should be installed to protect the City of Renton Williams Ave Bridge over the
Cedar River (City Bridge Number: Renton-03). The City intends to submit an application to the WSDOT
Local Agency Bridge Replacement Advisory Committee (BRAG) to seek funding for a variety of repairs to
the existing bridge. WSE's assessment will be used to determine if the request should include funding to
design and install scour and erosion countermeasures.
EXISTING CROSSING
The Williams Ave Bridge was constructed in 1954. The bridge is supported on two end abutments and
two intermediate piers. The abutments are each founded on nine eight-inch square bearing piles that
are specified as 20 feet long. The as-built pile tip elevations are unknown. The two intermediate piers
are located on the channel banks and are each supported on 26 untreated timber piles also of unknown
depth. Bridge piers and abutments are numbered from south to north.The original design drawings (see
Appendix 1) do not specify any erosion or scour countermeasures. However, there is currently rock
riprap on the left (south) bank and gabions on the right (north) bank.
The Cedar River near Williams Ave is confined in a single straight channel (Figure 1). Throughout this
reach the Cedar River is contained by a series of floodwalls and levees to prevent flooding in downtown
Renton.
INSPECTION AND MAINTENANCE OBSERVATIONS
The most recent bi-annual routine inspection of Williams Ave Bridge for the City of Renton occurred in
June 2015. This inspection noted that the piers were stable and that there was riprap and vegetation
upstream and downstream on both banks.The inspection report also noted bank slumping upstream of
the bridge on the south bank. Scour evaluations of Williams Ave Bridge were completed in 1991 and
1993 (see Appendix 2). In 1991, the evaluation did not find the bridge scour critical. In 1993, the bridge
was deemed scour critical due to the lack of riprap.
WATERSHED SCIENCE & ENGINEEMNG • 110 Prefontaine Place S.Suite 508,Seattle,WA 98104-206-521-3000
WSE FIELD OBSERVATIONS
WSE traveled to the Williams Ave Bridge on March 201", 2017 to assess the need for scour and erosion
countermeasures at the crossing. Upon inspection, it was noted that the south bank upstream of the
bridge is heavily reinforced with large riprap, likely to protect a vault and outlet pipe observed
approximately 30 feet upstream of the bridge (Picture 1). Because of this protection, Abutment 1 is in a
backwater zone (Picture 2). Along Pier 2 the flow was swift, likely in part as a result of headcutting after
the dredging of the channel in summer 2016. Pier 2 is buried in the bank and surrounded by large riprap
(Picture 3). Bank protection including burlap, willow stakes, and riprap at the toe of the slope was
observed on the steep bank downstream of Pier 2 (Picture 4).
On the north side of the river, the bank is protected by gabions and concrete on the upstream and
downstream sides of Pier 3 (Pictures 5 and 6). These protect the walkway between Pier 3 and Abutment
4. A gravel bar and large woody debris were observed in the river in front of Pier 3, which indicates that
the area near Pier 3 is primarily depositional (Picture 5). Abutment 4 is protected by concrete pavers
(Picture 6).
POTENTIAL IMPACT OF DOWNSTREAM DREDGING
The lower mile of the Cedar River was dredged in the both 1998 and 2016. In the three years following
the 1998 dredging, a headcut progressed upstream, lowering river bed levels under the Williams Ave
Bridge by approximately three feet. Since then, the river bed has aggraded and reestablished the pre-
1998 dredge bed elevations. The river was dredged again in 2016 and a similar headcut is expected to
progress upstream. Northwest Hydraulic Consultants, the hydraulic engineers responsible for predicting
how river bed levels will adjust in response to the 2016 dredging, conclude that average river bed level
likely will erode to 20.4 feet NAVD88 at Williams Ave one year after the dredging (Figure 2) (Brooks and
Rowland 2014). Even with this bed degradation at Williams Ave, no threat is posed to the bridge
because as shown in Figure 3, the abutment and pier foundations are buried well below expected bed
levels. Figure 3 compares four cross sections at Williams Ave —the original ground line circa-1954, and
surveys from 1998, 1999, and 2016. The 1998 survey is prior to headcut migration from the 1998
dredge, whereas the 1999 survey includes the effects of headcut migration. Also shown are the
approximate bottom of pile cap and pile tip elevations for both abutments and the bottom and top of
the pile caps for Piers 2 and 3.
SCOUR DEPTH ESTIMATES
Because the Cedar River near Williams Ave is a uniform prismatic channel, the bridge is not susceptible
to contraction scour. Local pier scour in the100-year event was calculated using geometry and flow data
from NHC's 2016 sediment survey HEC-RAS model (NHS 2017). The maximum calculated scour is
approximately 7.2 feet at Piers 2 and 3 (Appendix 3). It is unlikely that the calculated amount of pier
scour will occur because the piers are located outside the main forces of the flow and are protected by
riprap or gabions. However, even with this scour amount the piles that support the piers will not be
exposed (Figure 3).
fi 'A, WATERSHED 2
q SCIENCE & ENGINEERING
RECOMMENDATION
It is WSE's opinion that scour and erosion currently do not pose a significant risk to the bridge structure
and existing countermeasures are adequate. It is, therefore, WSE's opinion that scour and erosion
countermeasure improvements are not needed at this time. WSE recommends however, that as part of
routine bi-annual inspections, bridge inspectors monitor the existing rock riprap revetment that protects
the bank and a culvert just upstream from Pier 2. If this revetment fails, the river may erode the bank
between Pier 2 and the south abutment, possibly exposing the abutment piles.
fi 'A, WATERSHED Page 13
q SCIENCE & ENGINEERING
A ~ --o
I
I L n Sir
r
Figure 1:Aerial view of Williams Ave Bridge over the Cedar River.Flow is from right to left in the photograph(Aerial photo from
ESRI).
a
Picture 1:Viewing upstream to south bank protection including large riprap.The vault can be seen in the sidewalk above.
fi 'A, WATERSHED Page 14
q SCIENCE & ENGINEERING
h
y.
Picture 2:Viewing upstream between Pier 2 and Abutment 1.Note the blockage of the entryway by the upstream bank.
R a
-01
a �
'ter. �. --�1=' �"'�� "'�•,�- �.
s d q `"
Picture 3:Riprap at the downstream end of Pier 2.
WATERSHED P a g e s
`� SCIENCE & ENGINEERING
i
S c
q r�
l r
��� \ `'. S •� "V .�� ;'�R mot'--¢� �'
`E r"li'�''$ ..N�r`ik�4.�4.�rd.ems. ik �� ♦ ,i.'�
A • •• • •. • • ' ill • • • •. • • • •' • ••'
7
� I
i
�lL ELT=
Picture 6:Viewing upstream at concrete and gabion protection of the walkway by Pier 3.Note also the concrete pavers in front
of Abutment 4.
50
in
45
I4❑
m � I35 c
`0 C
Q m �
2 30 r 'n
0 2,3D0 ft
� I
Z i
C � ' - _'_f 1.
o '
2❑
LLJ ,Wn.,L
15 traAe 51° er'' i c `
r �� 2,300ft i CO 3 x Proposed Dredge Design
I ——
—Year 1
10 _ I
I
Pivot Medium Term
5 Long Term
0 ,
0+00 10+00 20+00 30+00 40+00 %+00 60+00 70+00 80+00 40+00 100+00 1l0+00 120+00
Station (ft)
Figure 2:Predicted Cedar River profiles as a result of headcutting after 2016 dredging(Figure from Brooks and Rowland 2014).
.lid► WATERSHED P a g e l
`~ SCIENCE & ENGINEERING
RENTON-03
WILLIAMS AVENUE BRIDGE
50
1. 80 4J 10 1 0 1' U 130 1.10 1 0
45
Abutment piles are specified as 8"x8"x20'steel piles.
40 As-built depths are unknown.
Pier piles are untreated timber piles of unknown depth.
35
30 ..........
z 25
y 5.3 it
o --_ -- - .. -..
JTop t Pik CaPr _ ..... __...........................,......M6 Pier Scour in t yr Flood Tep of pile ap
w 8.811 18.8R
15
--M _Pier Scou in IDD-yrFkod
Approx.Rana of Pile ap B of Pile Ca prox.Range
10
of Pile Tips aropm 13.3 ft of Pile Tips
5
Pier Pile ep1h TPier P4 DBpN
Union n
U Unk awn
STATIONING(FT) - -- 1954 AS-BUILT GrL ELEV. ———199E&L UPSTREAM(i SURVEY)
•• 1999 Gn-UPSTREAM(NHC SURVEY) —2016 GR UPSTREAM(NHC SURVEY)
1 YR POST-DREDGE CHANNEL(NHC MEMO)
Figure 3:Bed profiles for various years and estimated bed 1 year post dredging at the upstream face of the Williams Ave Bridge compared tothe bridge foundation elevations(As-Built
data courtesy of the City of Renton).Viewing Downstream.
.o0i WATERSHED P a g e 8
WOW SCIENCE&ENGINEERING
REFERENCES
Brooks, P. and E. Rowland. (2014) Transition Zone Analysis — Cedar River Gravel Removal Project.
Prepared for Coast and Harbor Engineering. Prepared by Northwest Hydraulic Consultants. Seattle, WA.
NHC (2017). Cedar River 2016 Annual Sediment Report. Prepared for the City of Renton. Prepared by
Northwest Hydraulic Consultants. Seattle, WA.
fi 'A. WATERSHED Page 19
q SCIENCE & ENGINEERING
APPENDIX 1: DESIGN DRAWINGS
Ab b WATERSHED Page 110
q SCIENCE & ENGINEERING
Ll
Y It zIrW < i a ge
48 '`�6' �•:�.0 ua •, Na4a�i-i q`E �Crf WWQ i �vW
d > . z i
o En IL a o� • q _
IX
w
Al`.`
IV R
ligh�iL Q I{� - hi
a6Pu®�
aS yyyy
19
M �p
re
44
LL
Q^R I I1f JJ v> r�.e
�
ff Q = "'O 6'OpON O�a'pi ONO F�
�✓ �m i dt i Y �m n:Mvp•""u s:' , ':°�'a�1
CL
I i s J
•' 'i sr� u�a j 1ryJ
t.t
F �� �gh du82um> �
Il�zsti�.sms
r
o li II � �I��\ `�• � �� R R '� v o
a 4a J.gN�_.........3 m a � - d 41pa h� a�h °Fig C�EF<
�q% g - $F,kA�&eB�E �`AhZhA
R 'S qq a q
W � 4 I 34'Q� V � F 4t.p py'411h k.Fp A.44
VCW 4 V Q � v�o gC ��°j4 pq'x�CCO�o�
p ,p S $° ° a fiak�L� a
a � I W p a k.g'� °a.,q °.�,��°H
3n� �y i I Z �.cYo u 1pap'�S Ati°E aR�cA h lk°A���p�
i a 6
W a.aBC iFr�• i 0. t Yt
m
i�asa,s p I
Fes'
CLl ......... Ld
5(n
EE Lu
M 0,7 ro m
z,- u
Lu 0 <
Z LLJ rr C)
w OL
'k LL
0 V)
OL
t 14 7L
cc
4Z
co*J
!4 A
kc
CA
a
4) IV
pi 0
-a Ln
C%l
W
LL
0
'4 co
I"T)l
LK I
7m
IywS
In
1
It
L9
tq t
L O�k
PQ
LaQV
a' v
Q, U)CL�
n t` EaSw � 1t �y Va z
ol
I 3 u
I r _
I
I N y p 6i gcrE.o�s•. \ \
A
4
C4
h. . I
19
10
a�I -
6d' I
CQ a .� °o
'3 1.
M' Ll
a
e t
m,:4 z
h w
ra i
I �
uo) F
APPENDIX 2: PREVIOUS SCOUR ASSESSMENTS
fi 'A, WATERSHED Page 11
q SCIENCE & ENGINEERING
Date BRIDGE PIER SCOUR EVALUATION
1 p_ �
Agency
Bridge Number spa 00 o
Bridge Name
Evaluated by vc
Superstructure type S
Superstructure Continuity?: Yes— No— Any Spread Footings?: Yes No X
EVALUATION: — —
YES NO
X Are foundation elevations known?
If not
scour critical (using engineering , consider the bridge
information available). Judgment and any other
X Does the thalweg (the deepest portion of the stream; the
main channel) meander back and forth across the floodplain?
If so, the potential for a scour critical condition is increased.
For a spread footing, is the bottom of the seal (or footing, if
the seal is not used) above the thalweg? If so, the bridge is
scour critical; no need to proceed further.
For a pile supported footing, is the pile tip elevation 10 feet or
less below the thalweg? If so the bridge is scour critical; no
need to proceed further.
BRIDGE IS SCOUR CRITICAL YES /� NO
EVALUATION CRITERIA:
Foundation elevations are (or are not) known and available.
The thalweg meanders back and forth across the floodplain.
Pier scour is always measured from the thalweg, even if the
pier is in the overbank.
For a spread footing, if the calculated depth of scour is below
the footing, the bridge is scour critical.
For a pile supported footing, if calculated depth of scour is
10' or less above pipe tip elevation, the bridge is scour
critical.
Scour should be calculated for 100 year flood. If not shown
on bridge plan layout, check FEMA map. If not mapped by
FEMA, use high water shown on layout.
1 1/1991
EVALUATE INTERIOR PIERS FOR SCOUR:
(For bridges with no interior piers, proceed to Page 4.)
If the column only protrudes above the thalweg, use the following method to
calculate pier scour, ds.
Dt'� ,�• q. q g
Fote
ur allowances for plea aligned parallel to flow.
If the depth of flow exceeds 5w, dsaligned = 3w. /CIO
ins P SfiapeSugg. Allowance
For Local cur*
C::r
ds-2w
Of Ditto
ds=2w
Ditto
ds=2w
Ditto ds=2w
FK2 -ALIGNMENT FACTORS
of g1e Length-To-Width Ratio Of Pier In Plan
Attack 4 8 12
flow direction
O
1.0 1.0
150 1.5 2.0 1.5 angle of
450 2.0 2.5 3.5 attack
2.5 3.5 4.5 _
ds = dsaligned x K2
dsaligned =
K2 =
Does pedestal, if used, and/or footing protrude above the thalweg? If yes,
continue with Step A; if no, go to Sig.
1/1991
2
STEP A_ Use the larger of ds as determi
the
above, or from follned for themn
colu only as calculated owing equation. ulated
ds = 1.5KsK2(w)0-7(y)0.3 where: ds= depth of scour.
Ks = Shape factor, as indicated below. Use only if the pier is aligned with
the flow; otherwise, use 1.0.
K2 = Alignment factor, see page 2_
w = width of the pedestal if only the pedesdal protrudes above the
thalweg, or,
width of footing if the footing or footing and pedestal protrude above
the thalweg.
Y = height that the pedestal, footing or footing and pedestal protrude
above the thalweg.
NOSE FORM kENGTH-WyIDTM
HAP
R n l r or Sqi iare
mi it I r
C 1
Elliptic
2.1 C:
1 �
Lenticular
C 0 SO
1 c
BQund
n
r f
lin in hr �p o
O
Ks --° K2 = w =
Y =
ds = 1.5 (--�L—j{_j0.7(__j0.3_
STEP B. Bottom of foundation (footing or seal elevation, or pile tip for pile
columns) +
Scour elevator = Thalweg Elevation - ds = _6.S N
If scour elevation is lower than the bottom of the foundation elevation or
within 10 feet of the pile tip, the bridge Is scour critical.
BRIDGE IS SCOUR CRITICAL: YES_. NO_x
3
1/1991
EVALUATE END ABUTMENTS FOR SCOUR :
Adequate and practical formulae for determining anticipated
local scour due to an end abutment do not exist; each bridge
must be evaluated individually.
Existing riprap should be evaluated by the bridge inspector.
If there is o riprap in pla or if existing riprap appears to be
in place, an by migration of the stream at
the upstream end of the riprap, treat the end abutment like an
interior pier.
If existing riprap appears to be in place, and cannot be
bypassed by migration of the stream at the upstream end of
the riprap, the bridge Is not scour critical.
BRIDGE IS SCOUR CRITICAL: YES >O NO
1/1991
4
BRIDGE PIER SCOUR EVALUATION
Date K_4�_
Agency �'j'�r� r1 Bridge Number lE17Pe O 00_-4
Bridge Name
Evaluated by
Superstructure type /fg" I ;�j 1 1�4rzl ,�� �� rq�er
Superstructure Continuity?: Yes— No Any Spread Footings?: Yes No P-'
EVALUATION:
YES NO
X Are foundation elevations known? If not, consider the bridge
scour critical (using engineering judgment and any other
information available).
�( Does the thalweg (the deepest portion of the stream; the
main channel) meander back and forth across the floodplain?
If so, the potential for a scour critical condition is increased.
'A For a spread footing, is the bottom of the seal (or footing, if
- the seal is not used) above the thalweg? If so, the bridge is
scour critical; no need to proceed further.
" X r a pile supported footing, is the pile tip elevation 10 feet or
les
s below the thalweg? If so the bridge is scour critical; no
need to proceed further.
BRIDGE IS SCOUR CRITICAL YES NO X_
EVALUATION CRITERIA:
- Foundation elevations are(or are not) known and available.
- The thalweg meanders back and forth across the floodplain.
- Pier scour is always measured from the thalweg, even if the
pier is in the overbank.
- For a spread footing, if the calculated depth of scour is below
the footing, the bridge is scour critical.
- For a pile supported footing, if calculated depth of scour is
10' or less above pipe tip elevation, the bridge is scour
critical.
- Scour should be calculated for 100 year flood. If not shown
on bridge plan layout, check FEMA map. If not mapped by
FEMA, use high water shown on layout.
1 1/1991
5®l- 7
EVALUATE INTERIOR PIERS FOR SCOUR:
(For bridges with no interior piers, proceed to Page 4.) A11411!,
If the column only protrudes above the thalweg, use the following r.ieviod to
calculate pier scour, ds. ,q ,qf
Local scour allowances for piers aligned parallel to flow.
Note: If the depth of flow exceeds 5w, dsaligned = 3w.
Pier Shape Pier Shape Sugg. Allowance
In Plan In Profile For Local Scour*
L� ds=2w f�lvv G�S
d/ �ry 2w 71
Ditto ds=2w
<*> Ditto ds=2w
K2 -ALIGNMENT FACTORS
Angle Length-To-Width Ratio Of Pier In Plan
9 9 �30 �
of Li�
Attack 4 8 flow direction
00 1.0 1.0 1.0 angle of
150 1.5 2.0 2.5 attack
0 2.0 2.5 3.5 d`
450 2.5 3.5 4.5 -
w = A Z':�7 ds = dsaligned x K2
dsaligned = �,01, Z57z-- 9,5
K2 = /10 ds �• x 1 �`
Does pedestal, if used, and/or footing protrude above the thalweg? I yes,
continue with Step A; if no, go to Step B.
1/1991
2
6' a /- T
STEP A. Use the larger of ds as determined for the column only as calculated
above, or from the following equation:
ds = 1.5KSK2(w)0.7(y)0.3 where: ds= depth of scour.
Ks = Shape factor, as indicated below. Use only if the pier is aligned with
the flow; otherwise, use 1.0.
K2 = Alignment factor, see page 2.
w = width of the pedestal if only the pedesdal protrudes above the
thalweg, or;
width of footing if the footing or footing and pedestal protrude above
the thalweg.
y = height that the pedestal, footing or footing and pedestal protrude
above the thalweg.
NOSE FORM LENGTH WIDTH SHAPE Kj
Rectangular or Square C 1.00
Semicircular C 0•90
Elliptic 2:1 C 0.80
3:1 C 0.75
Lenticular 2.1 0.80
3.1 c 0.70
Round 0.9
C liy nder-I.Group of Cylinders (i.e.. piles columns) 0 /0 0 0.9
Sharp <=> 0.8
Z"
KS = K
2 = �� � w = .1�! � y =
--
ds = 1.5 ( )( , 0 ) ,3( .Z5')0.7 �( 1re)0. _ �, L17-,�
STEP B. Bottom of foundation (footing or seal elevation, or pile tip for pile
columns) '/- 0
Scour elevaton = Thalweg Elevation - ds = j, '/4
if scour elevation is lower than the bottom of the foundation elevation or
within 10 feet of the pile tip, the bridge is scour critical.
BRIDGE IS SCOUR CRITICAL: YES NO�_
3 1/1991
EVALUATE END ABUTMENTS FOR SCOUR :
Adequate and practical formulae for determining anticipated
local scour due to an end abutment do not exist; each bridge
must be evaluated individually.
Existing riprap should be evaluated by the bridge inspector.
If there is no riprap in place, or if existing riprap appears to be
in place, and can be bypassed by migration of the stream at
the upstream end of the riprap, treat the end abutment like an
interior pier.
If existing riprap appears to be in place, and cannot be
bypassed by migration of the stream at the upstream end of
the riprap, the bridge Is not scour critical.
BRIDGE IS SCOUR CRITICAL: YES NO
lj '
1/1991
4
APPENDIX 3: PIER SCOUR CALCULATIONS
Scour Calculations-City of Renton Williams Ave Bridge
HEC-18 Method(Edition 5)
river. Cedar River by: MNK
bridge no.: Renton-03 date: 4/7/2017
Local Pier Scour Calculations—Williams Ave
CSU Local Pier Scour Equation (FHWA 2012):
Crigi 100-yr 100-yr
nal Flood Flood
Pier Layo
or ut a L K1 K2 K3 K4 Y1 V Fr Ysl
Bent Pier
No. No. (ft) (ft) (ft) (fps) (ft)
2 2 3.25 42.00 1 1 1 1 7.6 9.9 0.63 7.2
3 3 3.25 42.00 1 1 1 1 7.7 9.9 0.63 7.2
Comments:
1. a =Pier width (ft).
2. L-Pier Length
3. K1=Correction Factor for Pier Nose Shape. K1=1.0 for round nose.
4. K2=Coefficient for angle of attack. K2=1.0 for no skew.
5. K3=Coefficient for bed sediment dune formation condition. K3 =1.0 for the soil surrounding the base
of the piers is not subjected to dune formation.
6. K4 is no longer included in the CSU equation in HEC-18 Edition 5, but has been retained for it is appropriate to
use in the right setting. It is not applicable at this site.
7. Velocity(V)and Depth (Y1) directly upstream from pier were obtained from project HEC-RAS 1D model
created by NHC.
fi 'A. WATERSHED Page 112
q SCIENCE & ENGINEERING
EXHIBIT I
SEP-01-98 TUE 10:54 AM FAX NO. P. 01
H
NIGH - 1ECH COATINGS
CORROSION RES1STAN1 C 0 A I I N G S
September 1, 1998
Scott Abercrombie
A & A Coatings
Via fax- 253-845-1671
Re: Batch Certification for: Williams Avenue Bridge '
Dear- Scott
This letter will certify that the materials supplied to the above referenced project meet the
minimum requirements specified in project contract documents.
Additional product information can be referenced in the Wasser Product Data sheets.
The certified products are as follows:
Product Name Batch Color
MC-Zinc 56417
MC-Ferrox e 56399
MC-Luster RT 96462 24410
Please contact me if I can be of additional assistance.
Since Fely,
an el Rivera
Ch ist
certla&acf1_.doc16RO • Kent,Washington 98032 U.S.A - (253) 650-2967 • Fax(253) 850-3098
ht-tp://www.wassercocitings.corn
MM AM
'�"� " Z 'inc
. won- itv;:, ait:
Product Description
MC-Zinc is a proven, high-performance, single-component, moisture-cure urethane zinc primer that has 83% zinc in the dry-
film. When used as part of a high-performance, new construction or maintenance coating system, this primer offers maximum
resistance to rust and corrosion undercutting on various steel surfaces.
Area of Use
Substrates Possible Uses Water and Wastewater Treatment
Over properly prepared: Bridges Facilities
Ferrous Metal Tank Exteriors Structural Steel
Galvanized Metal Material Handling Equipment Food Processing Facilities
Pulp and Paper Mills Refineries
Chemical Processing Facilities Marine/Port Facilities
Pipes Offshore Platforms
Hydropower Facilities Work Boats
Ready Reference Information
Resin Type: Urethane Theoretical Coverage: At 1 mil DFT: 994 ft2/gal
At 25 pm DFT: 24.4 m /1
Pigment type: 83%Zinc in the dry film
Recommended Film Thickness:
Sheen: Flat Wet: 4.8-8.0 mils (122-203 microns)
Dry: 3.0-5.0 mils (76-127 microns)
Colors: Standard Grey
Recommended Coverage Per Coat:
Volume Solids: 62.0%±2.0 199 ft2/gzal at 5.0 mils DFT-331 ft2/gal at 3.0 mils DFT
(4.87 m /I at 127 microns DFT-8.11 m2/1 at 76 microns DFT)
VOC: <2.8 lb/gal (340 g/1)
(Volatile Organic Content) Thinning: MC-Thinner, MC-Thinner 100, MC-Thinner XMT
Clean Up: MC-Thinner, MC-Thinner 100, MC-Thinner XMT
Drying Times and Temperatures
*At 50%Humidity 50°F/100C 750F/240C 950F1350C
Without PURQuik° With PURQuik` Without PURQuik` With PURQuik° Without PURQuik' With PURQuik°
Tack Free 1 hour -- 30 minutes -- 20 minutes --
Recoat Minimum' 6 hours 1 hour 4 hours 30 minutes 3 hours 20 minutes
Full Cure 10 Days 7 days 7 days 5 days 5 days 4 days
*Humidity, temperature and coating thickness will affect recoat and curing times
'No outer recoat window on clean surfaces
Refer to Wasser's PURQuik°Accelerator Product Data for additional information
Product Features
• Single component Moisture Cure Urethane • Can be applied at 99% relative humidity
• No mixing errors— no pot life • Can be applied in below freezing temperatures (no ice or
• Zinc stays in solution— no need for continuous agitation frost)
• Easy to apply by brush, roller or spray methods • No dew point restrictions (substrate must be visibly dry)
• Low VOC • No outer recoat window on clean surfaces
• Immersion and non-immersion service • Compatible with PURQuik°Accelerator for faster recoat
• Impact resistant and cure times
• Abrasion resistant
Page 1 of 4 MC-Zinc2.8_W01.6_004
Wasser Corporation 4118 B Place NW Suite B Auburn, WA 98001
www.wassercoatings.com • 800.627.2968
■
mi nc 2 . 8 Wasum
Recommended Systems
Abrasion Resistance: 147 mg loss
Ferrous Metals (New Construction /Full Removal): (ASTM D4060—CS-17 Wheel, 1,000 cycles/kg load)
1 st Coat: MC-Zinc 3.0-5.0 mils DFT Prohesion: Blistering: None
2nd Coat: MC-Ferrox B 3.0-5.0 mils DFT (ASTM G85 @ 5000 hrs) Scribe Rate: 9.0
3rd Coat: MC-Ferrox A 2.0-4.0 mils DFT
Or MC-Luster Adhesion: (ASTM D4541)
Total System DFT: 8.0-14.0 mils DFT 1510 psi
Impact: (ASTM 2794)
Ferrous Metals (Immersion): Direct: 160
1 st Coat: MC-Zinc 3.0-5.0 mils DFT Reverse: 20
2nd Coat: MC-Tar 5.0-7.0 mils DFT Salt FogResistance: ASTM B117
3rd Coat: MC-Tar 5.0-7.0 mils DFT Passes 0,000 hrs. ( )
Total System DFT: 13.0-19.0 mils DFT MC-Zinc/MC-Tar/MC-Tar
Ferrous Metals (Ballast Tank): Dry Heat Resistance:
1 st Coat: MC-Zinc 3.0-5.0 mils DFT Continuous: 250°F (120°C)
2nd Coat: MC-Tar 5.0-7.0 mils DFT *Contact Wasser Corporation for detailed testing of this
3rd Coat: MC-Ballastcoat 3.0-4.0 mils DFT product
Total System DFT: 11.0-16.0 mils DFT
Compatable Coatings
Vt Coat: MC-Zinc 3.0-5.0 mils DFT
Primers:
2nd Coat: MC-Ballastcoat 3.0-4.0 mils DFT MC-Miozinc 2.8 (spot field touch-up or stripe coat)
3rd Coat: MC-Ballastcoat 3.0-4.0 mils DFT MC-Miozinc 100 (spot field touch-up only)
Total System DFT: 9.0-13.0 mils DFT Intermediates:
MC-Ferrox B 100 MC-Ferrox B 2.8
MC-Miomastic 100 MC-Miomastic 2.8
Galvanized Metal: MC-CR 100 MC-CR 2.8
1 st Coat: MC-Zinc (Spot Repair) 3.0-5.0 mils DFT
nd Topcoats:
2 Coat: MC-Ferrox B 3.0-5.0 mils DFT MC-Fe rrox A 100 MC-Ferrox A 2.8
3rd Coat: MC-Ferrox A 2.0-4.0 mils DFT MC-Luster 100 MC-Luster 2.8
MC-Shieldcoat 100 MC-Shieldcoat 2.8
Or MC-Luster MC-Tar 100 MC-Tar 2.8
Total System DFT: 8.0-14.0 mils DFT MC-Ballastcoat 2.8
Polyflex 102 Rapid Thane
Two-Coat System Option Polyflex 201 PW
Repair) 3.0-5.0 mils DFT Polyflex 202 High Chem
1 st Coat: MC-Zinc
(Spot p ) Polyflex 401 Polar Serve
2nd Coat: MC-Ferrox A 2.0-4.0 mils DFT
OR MC-Luster Coating Accelerator:
PURQuik Coating Accelerator
Total System DFT: 5.0-9.0 mils DFT
Surface Preparation
*Other Systems are available and appropriate. Contact
your Wasser Representative for any questions. Ferrous Metal
Performance Testing Data Use SSPC-SP1 solvent cleaning to remove oil, grease and other
contaminants prior to employing surface preparation methods.
System*: MC-Zinc Blast Clean surfaces for immersion or severe service projects to
MC-Ferrox B SSPC-SP10/NACE No. 2 Near White Metal finish.
MC-Ferrox A
*At 75°F and 50% RH 7 day min. cure
Page 2 of MC-Zinc2.8_W01.6_004
Wasser Corporation 4118 B Place NW Suite B Auburn, WA 98001
www.wassercoatings.com • 800.627.2968
as at
JKC1= Zimnc
Prepare surfaces for non-immersion or atmospheric service galvanized surface cleaning with mechanical abrasion to impart
projects to SSPC-SP6/NACE No. 3 Commercial Blast Clean surface profile and support mechanical adhesion.
finish. For minimum surface preparation, use conscientious
power tool cleaning methods, in accordance with SSPC-SP3, to Good Practices
remove corrosion and loose or failing paint (feather edges of
sound,existing paint back to a firm edge). The surface to be coated must be dry, clean, dull, and free from
dirt, grease, oil, rust, mill scale, salts or any other surface
Blast cleaning methods should produce a surface profile of 1.0 - contaminants that interfere with adhesion.
2.0 mils (25 -50 microns).
Ensure welds, repair areas, joints, and surface defects exposed
Galvanized Metal by surface preparation are properly cleaned and treated prior to
coating application.
Prepare surfaces using SSPC-SP1 Solvent Cleaning and SSPC-
SP12/NACE No. 5 Low Pressure Water Cleaning methods to Areas of oxidation after surface preparation and prior to coating
remove surface contamination. Supplement weathered application, should be prepared to specified standard
galvanized surface preparation with SSPC-SP2 and SSPC-SP3
Hand and Power Tool cleaning to remove excessive corrosion Consult the referenced standards, SSPC-PA1 and your Wasser
and impart surface profile on bare metal. Supplement new Representative for additional information or recommendations.
Application Information
MC-Zinc can be applied by brush, roll, airless spray and conventional spray application. Follow proper mixing instructions
before applying.
Mixing: Reducer: MC-Thinner, MC-Thinner 100, (if VOC regulations
Material temperature must be 5° F above the dew point restrict thinning, use MC-Thinner XMT).
before opening and agitating. Reduction is typically not required. If necessary, thin up to
Power mix thoroughly prior to application. 10% with recommended thinner. Thin in accordance with
Do not keep under constant agitation. local and federal regulatory standards.
Apply a 3-6 oz solvent float over material to prevent moisture
intrusion and cover pail. Clean up: MC-Thinner, MC-Thinner 100.
Brush/Roller: If Wasser thinners are not available, use MEK, MIBK,Xylene,
Brush: Natural fiber a 50:50 blend of Xylene and MEK or MIBK, or acetone for
Roller: Natural or synthetic fiber cover clean up only. Do not add unauthorized solvents to a Wasser
Nap: ''/4'to%" coating.
Core: Phenolic
Reduction: Typically not required. If necessary, reduce with Application Conditions
MC-Thinner 100.
Airless Spray: Temperature: 20'- 120°F (-8° -49°C)
Pump Ratio: 28-40:1 This temperature range should be achieved for ambient,
Pressure: 2400-2800psi surface and material temperature. Substrate must be visibly
Hose: ''/4'to%" dry. MC-Thinner 100 is recommended for spray application in
Tip Size: .013- .019 temperatures above 90°F.
Filter Size: 60 mesh (250 µm)
Reduction: Typically not required. If necessary, reduce with Relative Humidity: 6%-99%
MC-Thinner or MC-Thinner 100.
Conventional Spray: (DeVilbis MBC, JGA or equivalent) Coating Accelerator: PURQuik®Accelerator.
Fluid Nozzle: E Fluid Tip See Wasser's PURQuik® Accelerator Product Data for
Air Cap: 704 or 765 information.
Atomizing Air: 45-75 lbs.
Fluid Pressure: 15-20 lbs. Storage: Store off the ground in a dry, protected area in
Hose: '/2' ID; 50' Max temperature between 40 - 100°F (4 - 381C). MCU containers
Reduction: Typically not required. If necessary, reduce must be kept sealed when not in use. Use a solvent float to
with MC-Thinner or MC-Thinner 100.
reseal partial containers.
Certifications and Qualifications
VOC Compliant (National Standards — Industrial Maintenance Coating)Tested in accordance with AASHTO R31 Standard
Qualified for use in USDA and FDA inspected facilities
Passes 20,000 hrs ASTM B117 in MC-Zinc/MC-Tar/MC-Tar immersion System
Page 3 of 4 MC-Zinc2.8_W01.6_004
Wasser Corporation 4118 B Place NW Suite B Auburn, WA 98001
www.wassercoatings.com • 800.627.2968
■
mi nc 2 . 8 Wasum
Ordering Information
Shipping Information
Product Numbers: W01.6 Standard Grey
W01.0080 Pink Flash Point: 75.2°F (24°C)
Weight/gallon: 24.3 ± 1.0 lbs.
Package Size: 1 gallon and 3 gallon pails (Std. Grey) (3.2± .12 kg/1)
3 gallon pails (Pink) DOT HAZARD CLASS 3
DOT PACKAGING GROUP III
Shelf Life: 12 months from date of shipment when DOT LABEL FLAMMABLE LIQUID
stored unopened at 75°F (24°C) DOT SHIPPING NAME PAINT
DOT PLACARD FLAMMABLE LIQUID
UN/NA NUMBER 1263
Safety Precautions
DANGER!
VAPOR AND SPRAY MIST HARMFUL. OVEREXPOSURE MAY CAUSE LUNG DAMAGE. MAY CAUSE ALLERGIC SKIN
AND RESPIRATORY REACTION, EFFECTS MAY BE PERMANENT, MAY AFFECT THE BRAIN OR NERVOUS SYSTEM
CAUSING DIZZINESS HEADACHE OR NAUSEA. CAUSES EYE, SKIN, NOSE AND THROAT IRRITATION.
FLAMMABLE LIQUID AND VAPOR.
CONTAINS: Petroleum Distillates, Methyl-n-Amyl Ketone, Isophorone Diisocyanate, Homopolymer HDI
NOTICE: Reports have associated repeated and prolonged occupational over-exposure to solvents with permanent brain and nervous
system damage. Intentional misuse by deliberately concentrating and inhaling contents may be harmful or fatal. INDIVIDUALS WITH
LUNG OR BREATHING PROBLEMS OR PRIOR REACTION TO ISOCYANATES MUST NOT BE EXPOSED TO VAPOR OR SPRAY
MIST. Use Only With Adequate Ventilation. Do not breathe dust, vapors or spray mist. Ensure fresh air entry during application and
drying. If you experience eye watering, headache or dizziness or if air monitoring demonstrates vapor/mist levels are above applicable
limits, wear an appropriate, properly fitted respirator (NIOSH approved) during and after application. Follow respirator manufacturer's
directions for respirator use. Do not get in eyes, on skin or on clothing. Wash thoroughly after handling. Keep away from heat, sparks and
flame. Vapor may cause flash fire.
KEEP OUT OF REACH OF CHILDREN
FIRST AID: If affected by inhalation of vapor or spray mist, remove to fresh air. If breathing difficulty persists or occurs later, consult a
physician and have label information available. In case of eye contact, flush immediately with plenty of water for at least 15 minutes and get
medical attention; for skin, wash thoroughly with soap and water. If swallowed, get medical attention immediately. If swallowed, do not
induce vomiting. Get medical attention immediately. Wash clothing before reuse. Thoroughly clean or destroy contaminated shoes.
Keep container closed when not in use. If spilled, contain spilled material and remove with inert absorbent. Dispose of contaminated
absorbent, container and unused contents in accordance with local, state and federal regulations.
WARNING: This product contains a chemical known to the state of California to cause cancer and birth defects, or other reproductive
harm.
Obtain and Read the Material Safety Data Sheet Before Using.
INTENDED FOR PROFESSIONAL USE ONLY.
W01.6
Note: Ingredients and VOC/VOS may vary for products with catalysts,tint bases,and other colors
Wasser Corporation's liability on any claim of any kind, including claims based upon Wasser Corporation's negligence or strict liability, for
any loss or damage arising out of, connected with or resulting from the use of the products, shall in no case exceed the purchase price
allowable for the products or part thereof that give rise to the claim. In no event shall Wasser Corporation be liable for consequential or
incidental damages. Published Product Data Sheets are subject to change without notice. Contact your Wasser Representative for current
Product Data Sheets.
Page 4 of 4 MC-Zinc2.8_W01.6_004
Wasser Corporation 4118 B Place NW Suite B Auburn, WA 98001
www.wassercoatings.com • 800.627.2968
Qrrox13 2mg
Product Description
MC-Ferrox B is a unique single-component, moisture-cure urethane intermediate coating based on micaceous iron oxide
(MIO). This is Wasser's most specified intermediate for new construction and maintenance project applications. It also serves
as an excellent primer for non-ferrous metal surfaces.
Area of Use
Substrates Possible Uses Structural Steel
Over properly prepared: Bridges Food Processing Facilities
Ferrous Metal Tank Exteriors Refineries
Galvanized Metal Material Handling Equipment Hydropower Facilities
Aluminium/Non-Ferrous Metal Pulp and Paper Mills
Metallized Chemical Processing Facilities
Previously Existing Coatings Water and Wastewater Treatment Facilities
Ready Reference Information
Resin Type: Urethane Theoretical Coverage: At 1 mil DFT: 994 ft2/gal
At 25 pm DFT: 24.4 m /1
Pigment type: Micaceous Iron Oxide (3.5 Ibs/gal)
Recommended Film Thickness:
Sheen: Flat Wet: 4.8-8.0 mils (122-203 microns)
Dry: 3.0-5.0 mils (76-127 microns)
Colors: Standard Brownish Grey
Recommended Coverage Per Coat:
Volume Solids: 62.0%±2.0 199 ft2/gzal at 5.0 mils DFT-331 ft2/gal at 3.0 mils DFT
(4.87 m /I at 127 microns DFT-8.11 m2/1 at 76 microns DFT)
VOC: <2.8 lb/gal (340 g/1)
(Volatile Organic Content) Thinning: MC-Thinner, MC-Thinner 100, MC-Thinner XMT
Clean Up: MC-Thinner, MC-Thinner 100, MC-Thinner XMT
Drying Times and Temperatures
*At 50%Humidity 50OF1100C 750F1240C 95OF1350C
Without PURQuik` I With PURQu7 Without PURQuik` With PURQuik` Without PURQuik` I With PURQuik`
Tack Free 1 hour -- 30 minutes -- 20 minutes --
Recoat Minimum' 8 hours 1 hour 6 hours 30 minutes 4 hours 20 minutes
Full Cure 10 Days 7 days 7 da s 5 days 5 days 4 days
*Humidity, temperature and coating thickness will affect recoat and curing times
'No outer recoat window on clean surfaces
Refer to Wasser's PURQuik°Accelerator Product Data for additional information
Product Features
• Single component Moisture Cure Urethane • Can be applied in below freezing temperatures (no ice or
• No mixing errors— no pot life frost)
• Superior adhesion to most aged coatings • No dew point restrictions above 320F (substrate must be
• Easy to apply by brush, roller or spray methods visibly dry)
• High performance intermediate coating for primed steel • No outer recoat window on clean surfaces
and aluminum • Compatible with PURQuik°Accelerator for faster recoat
• Low VOC and cure times
• Impact and abrasion resistant • Use as a prime coat over new or weathered galvanized
• Maintains build on edges, threads and weld seams surfaces
• Can be applied at 99% relative humidity(substrate must be
visibly dry)
Page 1 of 4 MC-FerroxB2.8_W.11.61_004
Wasser Corporation 4118 B Place NW Suite B Auburn, WA 98001
www.wassercoatings.com • 800.627.2968
errox 13 2 m 8 vwowm
Recommended Systems Prohesion: (ASTM G85 @ 5000 hrs)
Blistering: None
Ferrous Metals (New Construction /Full Removal): Scribe Rate: 9.0
1 st Coat: MC-Zinc 3.0-5.0 mils DFT Dry Heat Resistance:
2"d Coat: MC-Ferrox B 3.0-5.0 mils DFT Continuous: 250°F (120°C)
3rd Coat: MC-Ferrox A 2.0-4.0 mils DFT
Or MC-Luster *Contact Wasser Corporation for detailed testing of this
Total System DFT: 8.0-14.0 mils DFT product
1 s1 Coat: MC-Miozinc 3.0-5.0 mils DFT Compatable Coatings
2"d Coat: MC-Ferrox B 3.0-5.0 mils DFT Primer:
3rd Coat: MC-Ferrox A 2.0-4.0 mils DFT MC-Prepbond 100 MC-Prepbond 2.8
MC-Zinc 100 MC-Zinc 2.8
Or MC-Luster MC-Miozinc 100 MC-Miozinc 2.8
Total System DFT: 8.0-14.0 mils DFT Topcoats:
MC-Ferrox A 100 MC-Ferrox A 2.8
Ferrous Metals (Overcoat): MC-Luster 100 MC-Luster 2.8
MC-Shieldcoat 100 MC-Shieldcoat 2.8
1 st Coat: MC-Miozinc(Spot Prime) 3.0-5.0 mils DFT MC-Tar 100 MC-Tar 2.8
2"d Coat: MC-Ferrox B 3.0-5.0 mils DFT MC-BallastCoat 2.8
3rd Coat: MC-Ferrox A 2.0-4.0 mils DFT Coating Accelerator:
Or MC-Luster PURQuik°Coating Accelerator
Total System DFT: 8.0-14.0 mils DFT Surface Preparation
Aluminum/Galvanized Metal:
1 s1 Coat: MC-Ferrox B 3.0-5.0 mils DFT Ferrous Metal
2"d Coat: MC-Ferrox A 2.0-4.0 mils DFT Apply to clean, dry, Wasser recommended primers. Refer to the
Or MC-Luster primer Product Data for additional information.
Total System DFT: 5.0-9.0 mils DFT Aluminum/Galvanized/Non-Ferrous Metal
Use as an Intermediate over recommended primers for Prepare surfaces using SSPC-SP1 Solvent Cleaning and SSPC-
ferrous metal. Not recommended for direct to ferrous SP12/NACE No. 5 Low Pressure Water Cleaning methods to
remove surface contamination. Supplement weathered
metal applications. galvanized surface preparation with SSPC-SP2 and SSPC-SP3
*Other Systems are available and appropriate. Contact Hand and Power Tool cleaning to remove excessive corrosion
your Wasser Representative for any questions. and impart surface profile on bare metal. Supplement new
galvanized surface cleaning with mechanical abrasion to impart
Performance Testing Data surface profile and support mechanical adhesion.
System*: MC-Zinc Previously Existing Coatings
MC-Ferrox B Prepare surfaces using SSPC-SP12/NACE No. 5 Low Pressure
MC-Ferrox A Water Cleaning methods to remove surface contamination.
*At 75°F and 50% RH 7 day min. cure Supplement SSPC-SP 12 LPWC with SSPC-SP1 Solvent
Cleaning and SSPC-SP2 and SSPC-SP3 Hand and Power Tool
Abrasion Resistance: (ASTM D4060—CS-17 Wheel, 1,000 clean areas of corrosion and loose or flaking paint (feather
cycles/kg load) edges of sound, existing paint back to a firm edge). Spot prime
147 mg loss clean, bare metal with Wasser recommended primer. Sand
glossy surfaces to provide profile. Apply a test sample to a small
Adhesion: (ASTM D4541) area to determine coating compatibility.
1510 psi
Good Practices
Impact: (ASTM 2794)
Direct: 160 Reverse: 20 MC-Ferrox B is designed for application to tightly adhering,
previously existing coatings. Apply a test sample to a small area
Page 2 of 4 MC-FerroxB2.8_W.11.61_004
Wasser Corporation 4118 B Place NW Suite B Auburn, WA 98001
www.wassercoatings.com • 800.627.2968
M" C® Qrrox 13 2mg
to determine coating compatibility. Spot prime any areas cleaned When surfaces are cleaned to bare metal, areas of oxidation
to bare metal with a Wasser recommended primer. after surface preparation and prior to coating application, should
be prepared to specified standard prior to applying the Wasser
The surface to be coated must be dry, clean, dull, and free from recommended primer.
dirt, grease, oil, heavy rust, salts or any other surface
contaminants that interfere with adhesion. Consult the referenced standards, SSPC-PA1 and your Wasser
Representative for additional information or recommendations.
Ensure welds, repair areas, joints, and surface defects exposed
by surface preparation are properly cleaned and treated prior to
coating application.
Application Information
MC-Ferrox B can be applied by brush, roll, airless spray and conventional spray application. Follow proper mixing instructions
before applying.
Mixing: Reducer: MC-Thinner, MC-Thinner 100, (if VOC regulations
Material temperature must be 5° F above the dew point restrict thinning, use MC-Thinner XMT).
before opening and agitating. Reduction is typically not required. If necessary, thin up to
Power mix thoroughly prior to application. 10% with recommended thinner. Thin in accordance with
Do not keep under constant agitation. local and federal regulatory standards.
Apply a 3-6 oz solvent float over material to prevent moisture
intrusion and cover pail. Clean up: MC-Thinner, MC-Thinner 100.
Brush/Roller: If Wasser thinners are not available, use MEK, MIBK,Xylene,
Brush: Natural fiber or a 50:50 blend of Xylene and MEK or MIBK, or acetone for
Roller: Natural or synthetic fiber cover clean up only. Do not add unauthorized solvents to a Wasser
Nap: ''/4'to%" coating.
Core: Phenolic
Reduction: Typically not required. If necessary, reduce with Application Conditions
MC-Thinner 100.
Airless Spray: Temperature: 20'- 100°F (-8°-38°C)
Pump Ratio: 28-40:1 This temperature range should be achieved for ambient,
Pressure: 2400-2800psi surface and material temperature. Substrate must be visibly
Hose: ''/4'to%" dry. MC-Thinner 100 is recommended for spray application in
Tip Size: .013- .019 temperatures above 90°F.
Filter Size: 60 mesh (250 µm)
Reduction: Typically not required. If necessary, reduce with Relative Humidity: 6%-99%
MC-Thinner or MC-Thinner 100.
Conventional Spray: (DeVilbis MBC, JGA or equivalent) Coating Accelerator: PURQuik°Accelerator.
Fluid Nozzle: E Fluid Tip See Wasser's PURQuik® Accelerator Product Data for
Air Cap: 704 or 765 information.
Atomizing Air: 45-75 lbs.
Fluid Pressure: 15-20 lbs. Storage: Store off the ground in a dry, protected area in
Hose: '/2' ID; 50' Max temperature between 40 - 100°F (4 - 381C). MCU containers
Reduction: Typically not required. If necessary, reduce must be kept sealed when not in use. Use a solvent float to
with MC-Thinner or MC-Thinner 100.
reseal partial containers.
Certifications and Qualifications
VOC Compliant (National Standards — Industrial Maintenance Coating)
Tested in accordance with AASHTO R31 Standard
Qualified for use in USDA and FDA inspected facilities
Page 3 of 4 MC-FerroxB2.8_W.11.61_004
Wasser Corporation 4118 B Place NW Suite B Auburn, WA 98001
www.wassercoatings.com • 800.627.2968
Ferrox 13 2 m 8 vwowm
Ordering Information Shipping Information
Product Numbers: W11.61 Standard Grey Flash Point: 75.2°F (24°C)
Weight/gallon: 13.5± 1.0 lbs.
Package Size: 1 gallon and 5 gallon pails (Std. (3.2± .12 kg/1)
Grey) DOT HAZARD CLASS 3
DOT PACKAGING GROUP III
Shelf Life: 12 months from date of DOT LABEL FLAMMABLE LIQUID
DOT SHIPPING NAME PAINT
shipment when stored unopened DOT PLACARD FLAMMABLE LIQUID
at 75°F (24°C) UN/NA NUMBER 1263
Safety Precautions
DANGER!
VAPOR AND SPRAY MIST HARMFUL. OVEREXPOSURE MAY CAUSE LUNG DAMAGE. MAY CAUSE ALLERGIC SKIN
AND RESPIRATORY REACTION, EFFECTS MAY BE PERMANENT, MAY AFFECT THE BRAIN OR NERVOUS SYSTEM
CAUSING DIZZINESS HEADACHE OR NAUSEA. CAUSES EYE, SKIN, NOSE AND THROAT IRRITATION.
FLAMMABLE LIQUID AND VAPOR.
CONTAINS: Petroleum Distillates,Xylene, Ethylbenzene, Methyl-n-Amyl Ketone, Toluene, Modified MIDI
NOTICE: Reports have associated repeated and prolonged occupational over-exposure to solvents with permanent brain and nervous
system damage. Intentional misuse by deliberately concentrating and inhaling contents may be harmful or fatal. INDIVIDUALS WITH
LUNG OR BREATHING PROBLEMS OR PRIOR REACTION TO ISOCYANATES MUST NOT BE EXPOSED TO VAPOR OR SPRAY
MIST. Use Only With Adequate Ventilation. Do not breathe dust, vapors or spray mist. Ensure fresh air entry during application and
drying. If you experience eye watering, headache or dizziness or if air monitoring demonstrates vapor/mist levels are above applicable
limits, wear an appropriate, properly fitted respirator (NIOSH approved) during and after application. Follow respirator manufacturer's
directions for respirator use. Do not get in eyes, on skin or on clothing. Wash thoroughly after handling. Keep away from heat, sparks and
flame. Vapor may cause flash fire.
KEEP OUT OF REACH OF CHILDREN
FIRST AID: If affected by inhalation of vapor or spray mist, remove to fresh air. If breathing difficulty persists or occurs later, consult a
physician and have label information available. In case of eye contact, flush immediately with plenty of water for at least 15 minutes and
get medical attention; for skin, wash thoroughly with soap and water. If swallowed, get medical attention immediately. If swallowed, do not
induce vomiting. Get medical attention immediately. Wash clothing before reuse. Thoroughly clean or destroy contaminated shoes.
Keep container closed when not in use. If spilled, contain spilled material and remove with inert absorbent. Dispose of contaminated
absorbent, container and unused contents in accordance with local, state and federal regulations.
WARNING: This product contains a chemical known to the state of California to cause cancer and birth defects, or other reproductive
harm.
Obtain and Read the Material Safety Data Sheet Before Using.
INTENDED FOR PROFESSIONAL USE ONLY.
W11.61
Note: Ingredients and VOCNOS may vary for products with catalysts,tint bases,and other colors
Wasser Corporation's liability on any claim of any kind, including claims based upon Wasser Corporation's negligence or strict liability, for
any loss or damage arising out of, connected with or resulting from the use of the products, shall in no case exceed the purchase price
allowable for the products or part thereof that give rise to the claim. In no event shall Wasser Corporation be liable for consequential or
incidental damages. Published Product Data Sheets are subject to change without notice. Contact your Wasser Representative for current
Product Data Sheets.
Page 4 of 4 MC-FerroxB2.8_W11.61.004
Wasser Corporation 4118 B Place NW Suite B Auburn, WA 98001
www.wassercoatings.com • 800.627.2968
am AM IdIIIIIIIII=
" iF m Laster 2 . 8 won- it
vF; -vit.
Product Description
Wasser's most specified aesthetic topcoat MC-Luster is a single-component, semi-gloss, aliphatic, moisture-cure urethane that has
excellent resistance to UV,weathering and abrasion. It is an ideal topcoat solution for new construction and maintenance projects with
proven performance and easy recoat-ability.
Area of Use
Substrates Possible Uses Structural Steel
Over properly prepared: Bridges Food Processing Facilities
Ferrous Metal Tank Exteriors Refineries
Galvanized Metal Material Handling Equipment Marine/Port Facilities
Aluminium/Non-Ferrous Metal Pulp and Paper Mills Offshore Platforms
Metallized Chemical Processing Facilities Hydropower Facilities
Previously Existing Coatings Pipes
Concrete Water and Wastewater Treatment Facilities
Concrete Block
Ready Reference Information
Resin Type: Aliphatic Urethane Theoretical Coverage: At 1 mil DFT: 994 ft2/gal
At 25 pm DFT: 24.4 m /I
Pigment type: Coloring
Recommended Film Thickness:
Sheen: Semi-Gloss Wet: 3.2-6.4 mils (81-163 microns)
Dry: 2.0-4.0 mils (51-102 microns)
Colors: Standard and various colors
(See Wasser's Color Chart) Recommended Coverage Per Coat:
Volume Solids: 62.0%±2.0 249 ft2/gal at 4.0 mils DFT-497 ft2/gal at 2.0 mils DFT
VOC: <2.8 lb/gal (340 g/I) (6.1 m2/I at 102 microns DFT- 12.2 m2/I at 51 microns DFT)
(Volatile Organic Content) Thinning: MC-Thinner, MC-Thinner 100, MC-Thinner XMT
Clean Up: MC-Thinner, MC-Thinner 100, MC-Thinner XMT
Drying Times and Temperatures
*At 50% Humidity 50OF1100C 750F1240C 95OF1350C
Without PURQuik' With PURQuik`" Without PURQuik` With PURQuik' Without PURQuik` With PURQuik`
Tack Free 1 hour -- 30 minutes -- 20 minutes --
Recoat Minimum' 10 hours 1 hour 8 hours 30 minutes 6 hours 20 minutes
Full Cure 10 Days 7 days 7 da s 5 da s 5 da s 4 da s
*Humidity, temperature and coating thickness will affect recoat and curing times
'No outer recoat window on clean surfaces
Refer to Wasser's PURQuik°Accelerator Product Data for additional information
Product Features
• Single component Moisture Cure Urethane • Can be applied in below freezing temperatures (no ice or
• No mixing errors— no pot life frost)
• Easy to apply by brush, roller or spray methods • No dew point restrictions (substrate must be visibly dry)
• High performance finish coat for various substrates and • No outer recoat window on clean surfaces
services • Compatible with PURQuik°Accelerator for faster recoat
• Low VOC and cure times
• UV, impact and abrasion resistent
• Can be applied at 99% relative humidity
Page 1 of 4 MC-Luster2.8_W21.7_004
Wasser Corporation 4118 B Place NW Suite B Auburn, WA 98001
www.wassercoatings.com • 800.627.2968
Laster 2 m 8 vwowm
Recommended Systems @75OF and 50% RH 7 day min. cure
Ferrous Metals (New Construction/Full Removal): Abrasion Resistance: 147 mg loss
1 st Coat: MC-Zinc 3.0-5.0 mils DFT (ASTM D4060—CS-17 Wheel, 1,000 cycles/kg load)
2"d Coat: MC-Ferrox B 3.0-5.0 mils DFT
3rd Coat: MC-Luster 2.0-4.0 mils DFT Adhesion: 1780 psi
Total System DFT: 8.0-14.0 mils DFT (ASTM D4541)
1 st Coat: MC-Miozinc 3.0-5.0 mils DFT Impact:
2"d Coat: MC-Ferrox B 3.0-5.0 mils DFT (ASTM 2794)
3rd Coat: MC-Luster 2.0-4.0 mils DFT Direct: 130
Total System DFT: 8.0-14.0 mils DFT Reverse: 20
Ferrous Metals (Overcoat): Prohesion:
1st Coat: MC-Miozinc(Spot Prime) 3.0-5.0 mils DFT (ASTM G85 @ 5000 hrs)
2"d Coat: MC-Miomastic 3.0-5.0 mils DFT Blistering: None
3rd Coat: MC-Luster 2.0-4.0 mils DFT Scribe Rate: 9.5
Total System DFT: 8.0-14.0 mils DFT
Dry Heat Resistance:
Aluminum/Non-Ferrous Metals/Galvanized Metal: Continuous: 285°F (141°C)
1 st Coat: MC-CR 3.0-4.0 mils DFT
2"d Coat: MC-Luster 2.0-4.0 mils DFT *Contact Wasser High-Tech Coatings for detailed testing
Total System DFT: 5.0-4.0 mils DFT of this product
1sdtCoat: MC-Ferrox B 3.0-5.0 mils DFT Compatable Coatings
2 Coat: MC-Luster 2.0-4.0 mils DFT
Total System DFT: 5.0-9.0 mils DFT Primer:
MC-Zinc 100 MC-Zinc 2.8
Concrete' (Interior/Exterior): MC-Miozinc 100 MC-Miozinc 2.8
1 st Coat: MC-CR 3.0-4.0 mils DFT MC-Prepbond 100 MC-Prepbond 2.8
2"d Coat: MC-Luster 2.0-4.0 mils DFT Intermediates:
Optional Clear Coat MC-Ferrox B 100 MC-Ferrox B 2.8
3rd Coat: MC-Antigraffiti 100 1.5-2.0 mils DFT MC-Miomastic 100 MC-Miomastic 2.8
Total System DFT: 6.5-10.0 mils DFT MC-CR 100 MC-CR 2.8
1. Prime coat for concrete may be reduced up to 25% to Topcoats:
MC-Antigraffiti 100
facilitate coating penetration. Subsequent coating
applications may be reduced as necessary up to 10%. Thin Coating Accelerator:
in accordance with local and federal regulations. PURQuik°Coating Accelerator
Note: Use over recommended primers and Surface Preparation
intermediates for ferrous metal. Not recommended for Ferrous Metal
direct to ferrous metal applications.
Apply to clean, dry, Wasser recommended primers and
intermediates. Refer to the primer Product Data for additional
*Other Systems are available and appropriate. Contact information.
your Wasser Representative for any questions.
Aluminum/Galvanized/Non-Ferrous Metal
Prepare surfaces using SSPC-SP1 Solvent Cleaning and SSPC-
SP12/NACE No. 5 Low Pressure Water Cleaning methods to
Performance Testing Data remove surface contamination. Supplement weathered
galvanized surface preparation with SSPC-SP2 and 3 Hand and
Power Tool cleaning to remove excessive corrosion and impart
System: MC-Miozinc surface profile on bare metal. Supplement new galvanized
MC-Ferrox B surface cleaning with mechanical abrasion to impart surface
MC-Luster profile and support mechanical adhesion.
Page 2 of 4 MC-Luster2.8_W21.7_004
Wasser Corporation 4118 B Place NW Suite B Auburn, WA 98001
www.wassercoatings.com • 800.627.2968
ON
us Qr 2 . 8 W
Concrete/Concrete Block clean, bare metal with Wasser recommended primer. Sand
glossy surfaces to provide profile. Apply a test sample to a small
The surface must be dry, free of surface contaminants, and in area to determine coating compatibility.
sound condition. Grease, and oil should be removed by ASTM
D4258-83 (Reapproved 1999) and release agents should be Good Practices
removed by ASTM D4259 - 88 (Reapproved 1999). Refer to
SSPC-SP13/NACE No 6 mechanical or chemical surface MC-Luster is designed for application to a variety of substrates
preparation methods for preparing concrete to suitable and tightly adhering, previously existing coatings. Apply a test
cleanliness for intended service. Surface preparation methods sample to a small area to determine coating compatibility. Spot
should impart sufficient surface profile for mechanical adhesion prime any areas cleaned to bare metal with a Wasser
to occur. Ensure surface is thoroughly rinsed and dry prior to recommended primer.
coating application. Allow a minimum 7 - 14 days cure time for
new concrete prior to preparation and application. The surface to be coated must be dry, clean, dull, and free from
dirt, grease, oil, rust, mill scale, salts or any other surface
Previously Existing Coatings contaminants that interfere with adhesion.
Prepare surfaces using SSPC-SP12/NACE No. 5 Low Pressure Ensure welds, repair areas, joints, and surface defects exposed
Water Cleaning methods to remove surface contamination. by surface preparation are properly cleaned and treated prior to
Supplement SSPC-SP 12 LPWC with SSPC-SP1 Solvent coating application.
Cleaning and SSPC-SP2 and SSPC-SP3 Hand and Power Tool
clean areas of corrosion and loose or flaking paint (feather Consult the referenced standards, SSPC-PA1 and your Wasser
edges of sound, existing paint back to a firm edge). Spot prime Representative for additional information or recommendations.
Application Information
MC-Luster can be applied by brush, roll, airless spray and conventional spray methods. Follow proper mixing instructions
before applying.
Mixing:
Material temperature must be 5° F above the dew point Reducer: MC-Thinner, MC-Thinner 100, (if VOC regulations
before opening and agitating. restrict thinning, use MC-Thinner XMT).
Power mix thoroughly prior to application. Reduction is typically not required. If necessary, thin up to
Do not keep under constant agitation. 10%with recommended thinner. Thin in accordance with local
Apply a 3-6 oz solvent float over material to prevent and federal regulatory standards.
moisture intrusion and cover pail.
Clean up: MC-Thinner, MC-Thinner 100.
Brush/Roller: If Wasser thinners are not available, use MEK, MIBK, Xylene,
Brush: Natural Fiber or a 50:50 blend of Xylene and MEK or MIBK, or acetone for
Roller: Natural or synthetic fiber cover clean up only. Do not add unauthorized solvents to a Wasser
Nap: ''/4'to%/8' coating.
Core: Phenolic
Reduction: Typically not required. If necessary, reduce Application Conditions
with MC-Thinner 100.
Airless Spray: Temperature: 20'- 120°F (-8° -49°C)
p y' This temperature range should be achieved for ambient,
Pump Ratio: 2400-2 surface and material temperature. Substrate must be visibly
Pressure: 240o%" psi dry. MC-Thinner 100 is recommended for spray application in
Hose: '/0 3-.0 temperatures above 90°F.
Tip Size: .013-.019
Filter Size: 60 mesh (250 µm)
Reduction: Typically not required. If necessary, reduce Relative Humidity: 6%-99%
with MC-Thinner or MC-Thinner 100.
Coating Accelerator: PURQuik®Accelerator.
Conventional Spray: (DeVilbis MBC, JGA or equivalent) See Wasser's PURQuik® Accelerator Product Data for
Fluid Nozzle: E Fluid Tip information.
Air Cap: 704 or 765
Atomizing Air: 45-75 lbs. Storage: Store off the ground in a dry, protected area in
Fluid Pressure: 15-20 lbs. temperature between 40 - 100°F (4 - 38°C). MCU containers
Hose: '/2' ID; 50' Max must be kept sealed when not in use. Use a solvent float to
Reduction: Typically not required. If necessary, reduce reseal partial containers.
with MC-Thinner or MC-Thinner 100.
Page 3 of 4
Wasser Corporation 4118 B Place NW Suite B Auburn, WA 98001
www.wassercoatings.com • 800.627.2968
Laster 2 . Wols- alt
013
z5 v
Certifications and Qualifications
VOC Compliant(National Standards—Industrial Maintenance Coating, and Concrete Protective Coating)
Qualified for use in USDA and FDA inspected facilities
Ordering Information Shipping Information
Product Numbers: W21.7 White Flash Point: 80°F (26.6°C)
W21.64 Standard Grey Weight/gallon: 11.5± 1.0 lbs.
(3.2± .12 kg/1)
Package Size: 1 gallon and 5 gallon pails DOT HAZARD CLASS 3
DOT PACKAGING GROUP III
Shelf Life: 12 months from date of DOT LABEL FLAMMABLE LIQUID
DOT SHIPPING NAME PAINT
shipment when stored unopened DOT PLACARD FLAMMABLE LIQUID
at 75°F (24°C) UN/NA NUMBER 1263
Safety Precautions
DANGER!
VAPOR AND SPRAY MIST HARMFUL. OVEREXPOSURE MAY CAUSE LUNG DAMAGE. MAY CAUSE ALLERGIC SKIN
AND RESPIRATORY REACTION, EFFECTS MAY BE PERMANENT, MAY AFFECT THE BRAIN OR NERVOUS SYSTEM
CAUSING DIZZINESS HEADACHE OR NAUSEA. CAUSES EYE, SKIN, NOSE AND THROAT IRRITATION.
FLAMMABLE LIQUID AND VAPOR.
CONTAINS: Petroleum Distillates,Xylene, Ethylbenzene, Methyl-n-Amyl Ketone, Isophorone Diisocyanate, Homopolymer HDI
NOTICE: Reports have associated repeated and prolonged occupational over-exposure to solvents with permanent brain and nervous system damage.
Intentional misuse by deliberately concentrating and inhaling contents may be harmful or fatal. INDIVIDUALS WITH LUNG OR BREATHING PROBLEMS
OR PRIOR REACTION TO ISOCYANATES MUST NOT BE EXPOSED TO VAPOR OR SPRAY MIST. Use Only With Adequate Ventilation. Do not
breathe dust, vapors or spray mist. Ensure fresh air entry during application and drying. If you experience eye watering, headache or dizziness or if air
monitoring demonstrates vapor/mist levels are above applicable limits, wear an appropriate, properly fitted respirator (NIOSH approved) during and after
application. Follow respirator manufacturer's directions for respirator use. Do not get in eyes, on skin or on clothing. Wash thoroughly after handling. Keep
away from heat,sparks and flame. Vapor may cause flash fire.
KEEP OUT OF REACH OF CHILDREN
FIRST AID: If affected by inhalation of vapor or spray mist, remove to fresh air. If breathing difficulty persists or occurs later, consult a physician and have
label information available. In case of eye contact, flush immediately with plenty of water for at least 15 minutes and get medical attention; for skin, wash
thoroughly with soap and water. If swallowed, get medical attention immediately. If swallowed, do not induce vomiting. Get medical attention immediately.
Wash clothing before reuse. Thoroughly clean or destroy contaminated shoes.
Keep container closed when not in use. If spilled,contain spilled material and remove with inert absorbent. Dispose of contaminated absorbent,container
and unused contents in accordance with local,state and federal regulations.
WARNING:This product contains a chemical known to the state of California to cause cancer and birth defects,or other reproductive harm.
Obtain and Read the Material Safety Data Sheet Before Using.
INTENDED FOR PROFESSIONAL USE ONLY.
W21.7
Note: Ingredients and VOCNOS may vary for products with catalysts,tint bases,and other colors
Wasser Corporation's liability on any claim of any kind, including claims based upon Wasser Corporation's negligence or strict liability, for
any loss or damage arising out of, connected with or resulting from the use of the products, shall in no case exceed the purchase price
allowable for the products or part thereof that give rise to the claim. In no event shall Wasser Corporation be liable for consequential or
incidental damages. Published Product Data Sheets are subject to change without notice. Contact your Wasser Representative for current
Product Data Sheets.
Page 4 of 4
Wasser Corporation 4118 B Place NW Suite B Auburn, WA 98001
www.wassercoatings.com • 800.627.2968
EXHIBIT J
AGENCY CAG-18-228
Department of Transportation' Washington State Local Agency Agreement
Department
Agency City of Renton CFDA No.20.205
(Catalog or Federal Domestic Assistance)
Address 6,q M
Renton City Hall-Sth Floor Project No. C
lent S Grady Way 9 4 9 8
Renton,WA 98057 Agreement No. LA
For OSC WSDOT Use Only
The Local Agency having complied,or hereby agreeing to comply,with the terms and conditions set forth in(1)Title 23, U.S. Code
Highways, (2)the regulations issued pursuant thereto,(3)2 CFR Part 200, (4)the policies and procedures promulgated by the
Washington State Department of Transportation,and(5)the federal aid project agreement entered into between the State and Federal
Government,relative to the above project,the Washington State Department of Transportation will authorize the Local Agency to
proceed on the project by a separate notification.Federal funds which are to be obligated for the project may not exceed the amount
shown herein on line r,column 3,without written authority by the State,subject to the approval of the Federal Highway Administration.
All project costs not reimbursed by the Federal Government shall be the responsibility of the Local Agency.
Project Description
Name Williams Ave Bridge-Seismic Retrofit and Painting Length N/A
Termini N Riverside Dr. to S Riverside Dr.
Description of Work
ridgeroser+e ,seismic retrofit and painting.
Project Agreement End Date } Claiming Indirect Cost Rate
Proposed Advertisement Date Yes _Y No
Estimate of Funding
Type of Work (1) (2) (3)
Estimated Total Estimated Agency Estimated Federal
Proiect Funds Funds Funds
PE a.Agency $48,000.00 $6,480.00 $41,520.00
°
86.5 �0 b.Other Consultant(s) $570,000.00 $76,950.00 $493,050.00
Federal Aid c.Other
Participation d.State $2,000.00 $270.00 $ 1,730.00
Ratio for PE
e.Total PE Cost Estimate a+b+c+d $620,000.00 $83,700.00 $536,300.00
Right of Way f.Agency
86.5 % .Other
Federal Aid h.Other
Participation
Ratio for RW i.State
i.Total R(W Cost Estimate f+ +h+i $0.00 $0.00 $0.00
IGonstruction° k.Contract
100 %1.Other
m.Other
Federal Aid n.Other
Participation
Ratio for CN o.Agency
Sp tate ►►►►�u
a.Total CN Cost Estimate k+I+m+n+o+ '�'�� 0F R f�''i $0.00 $0.00 $0.00
si.
r.T al o'ect Cost Esti to e++ $620,000.00 $83,700.00 $536,300.00
Agency Offici _ Washing'
tat Qepartment of ransportatian
By A * SEAL * _ B
Title Denis Law,Mayor �, : Director, Local P grams
ATTEST: f �r i0 ������ Date Executed DEC 0 6 2018
DOT Form 140-039 S OClerk Page 1
Revised 05/2015 ����►►►►0
Construction Method of Financing (Check Method Selected)
State Ad and Award
Method A-Advance Payment-Agency Share of total construction cost(based on contract award)
Method B-Withhold from gas tax the Agency's share of total construction coast(line 5, column 2)in the amount of
$ at$ per month for months.
Local Force or Local Ad and Award
'Method C-Agency cost incurred with partial reimbursement
The Local Agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and
as a condition to payment of the federal funds obligated, it accepts and will comply with the applicable
provisions set forth below.Adopted by official action on
Resolution/Ordinance No.
Provisions
1.Scope of Work
The Agency shall provide all the work,labor, materials,and services necessary to perform the project which is described and set
forth in detail in the"Project Description"and"Type of Work."
When the State acts for and on behalf of the Agency,the State shall be deemed an agent of the Agency and shall perform the
services described and indicated in"Type of Work"on the face of this agreement,in accordance with plans and specifications as
proposed by the Agency and approved by the State and the Federal Highway Administration.
When the State acts for the Agency but is not subject to the right of control by the Agency,the State shall have the right to perform
the work subject to the ordinary procedures of the State and Federal Highway Administration.
II.Delegation of Authority
The State is willing to fulfill the responsibilities to the Federal Government by the administration of this project.The Agency agrees
that the State shall have the full authority to carry out this administration.The State shall review,process,and approve documents
required for federal aid reimbursement in accordance with federal requirements. If the State advertises and awards the contract,the
State will further act for the Agency in all matters concerning the project as requested by the Agency. If the Local Agency advertises and
awards the project,the State shall review the work to ensure conformity with the approved plans and specifications.
Ill.Project Administration
Certain types of work and services shall be provided by the State on this project as requested by the Agency and described in the
Type of Work above. In addition,the State will furnish qualified personnel for the supervision and inspection of the work in progress.On
Local Agency advertised and awarded projects,the supervision and inspection shall be limited to ensuring all work is in conformance
with approved plans,specifications,and federal aid requirements.The salary of such engineer or other supervisor and all other salaries
and costs incurred by State forces upon the project will be considered a cost thereof.All costs related to this project incurred by
employees of the State in the customary manner on highway payrolls and vouchers shall be charged as costs of the project.
IV.Availability of Records
All project records in support of all costs incurred and actual expenditures kept by the Agency are to be maintained in accordance
with local government accounting procedures prescribed by the Washington State Auditor's Office,the U.S. Department of
Transportation,and the Washington State Department of Transportation.The records shall be open to inspection by the State and
Federal Government at all reasonable times and shall be retained and made available for such inspection for a period of not less than
three years from the final payment of any federal aid funds to the Agency.Copies of said records shall be furnished to the State and/or
Federal Government upon request.
V.Compliance with Provisions
The Agency shall not incur any federal aid participation costs on any classification of work on this project until authorized in writing
by the State for each classification.The classifications of work for projects are:
1. Preliminary engineering.
2. Right of way acquisition.
3. Project construction.
Once written authorization is given,the Agency agrees to show continuous progress through monthly billings.Failure to show
continuous progress may result the Agency's project becoming inactive,as described in 23 CFR 630,and subject to de-obligation of
federal aid funds and/or agreement closure.
If right of way acquisition,or actual construction of the road for which preliminary engineering is undertaken is not started by the
close of the tenth fiscal year following the fiscal year in which preliminary engineering phase was authorized,the Agency will repay to
the State the sum or sums of federal funds paid to the Agency under the terms of this agreement(see Section IX).
If actual construction of the road for which right of way has been purchased is not started by the close of the tenth fiscal year
following the fiscal year in which the right of way phase was authorized,the Agency will repay to the State the sum or sums of federal
rp�tltls ppaid to thy Agency under the terms of this agreement(see Section IX).
07 Fbrm 140-039 Page 2
Revised 05/2015
The Agency agrees that all stages of construction necessary to provide the initially planned complete facility within the limits of this
project will conform to at least the minimum values set by approved statewide design standards applicable to this class of highways,
even though such additional work is financed without federal aid participation.
The Agency agrees that on federal aid highway construction projects,the current federal aid regulations which apply to liquidated
damages relative to the basis of federal participation in the project cost shall be applicable in the event the contractor fails to complete
the contract within the contract time.
VI.Payment and Partial Reimbursement
The total cost of the project,including all review and engineering costs and other expenses of the State,is to be paid by the Agency
and by the Federal Government. Federal funding shall be in accordance with the Federal Transportation Act,as amended,2 CFR Part
200.The State shall not be ultimately responsible for any of the costs of the project.The Agency shall be ultimately responsible for all
costs associated with the project which are not reimbursed by the Federal Government.Nothing in this agreement shall be construed as
a promise by the State as to the amount or nature of federal participation in this project.
The Agency shall bill the state for federal aid project costs incurred in conformity with applicable federal and state laws.The agency
shall minimize the time elapsed between receipt of federal aid funds and subsequent payment of incurred costs. Expenditures by the
Local Agency for maintenance,general administration,supervision,and other overhead shall not be eligible for federal participation
unless a current indirect cost plan has been prepared in accordance with the regulations outlined in 2 CFR Part 200-Uniform Admin
Requirements, Cost Principles and Audit Requirements for Federal Awards,and retained for audit.
The State will pay for State incurred costs on the project. Following payment,the State shall bill the Federal Government for
reimbursement of those costs eligible for federal participation to the extent that such costs are attributable and properly allocable to
this project.The State shall bill the Agency for that portion of State costs which were not reimbursed by the Federal Government(see
Section IX).
1. Project Construction Costs
Project construction financing will be accomplished by one of the three methods as indicated in this agreement.
Method A—The Agency will place with the State,within(20)days after the execution of the construction contract,an advance in the
amount of the Agency's share of the total construction cost based on the contract award.The State will notify the Agency of the exact
amount to be deposited with the State.The State will pay all costs incurred under the contract upon presentation of progress billings
from the contractor.Following such payments,the State will submit a billing to the Federal Government for the federal aid participation
share of the cost.When the project is substantially completed and final actual costs of the project can be determined,the State will
present the Agency with a final billing showing the amount due the State or the amount due the Agency.This billing will be cleared by
either a payment from the Agency to the State or by a refund from the State to the Agency.
Method B—The Agency's share of the total construction cost as shown on the face of this agreement shall be withheld from its
monthly fuel tax allotments.The face of this agreement establishes the months in which the withholding shall take place and the exact
amount to be withheld each month.The extent of withholding will be confirmed by letter from the State at the time of contract award.
Upon receipt of progress billings from the contractor,the State will submit such billings to the Federal Government for payment of its
participating portion of such billings.
Method C—The Agency may submit vouchers to the State in the format prescribed by the State,in duplicate, not more than once
per month for those costs eligible for Federal participation to the extent that such costs are directly attributable and properly allocable
to this project.Expenditures by the Local Agency for maintenance,general administration,supervision,and other overhead shall not be
eligible for Federal participation unless claimed under a previously approved indirect cost plan.
The State shall reimburse the Agency for the Federal share of eligible project costs up to the amount shown on the face of this
agreement.At the time of audit,the Agency will provide documentation of all costs incurred on the project.The State shall bill the
Agency for all costs incurred by the State relative to the project.The State shall also bill the Agency for the federal funds paid by the
State to the Agency for project costs which are subsequently determined to be ineligible for federal participation(see Section IX).
VII.Audit of Federal Consultant Contracts
The Agency,if services of a consultant are required,shall be responsible for audit of the consultant's records to determine eligible
federal aid costs on the project.The report of said audit shall be in the Agency's files and made available to the State and the Federal
Government.
An audit shall be conducted by the WSDOT Internal Audit Office in accordance with generally accepted governmental auditing
standards as issued by the United States General Accounting Office by the Comptroller General of the United States;WSDOT Manual
M 27-50, Consultant Authorization, Selection,and Agreement Administration; memoranda of understanding between WSDOT and
FHWA;and 2 CFR Part 200.501 -Audit Requirements.
If upon audit it is found that overpayment or participation of federal money in ineligible items of cost has occurred,the Agency shall
reimburse the State for the amount of such overpayment or excess participation(see Section IX).
Vill.Single Audit Act
The Agency,as a subrecipient of federal funds,shall adhere to the federal regulations outlined in 2 CFR Part 200.501 as well as all
applicable federal and state statutes and regulations.A subrecipient who expends$750,000 or more in federal awards from all sources
during a given fiscal year shall have a single or program-specific audit performed for that year in accordance with the provisions of 2
CFR Part 200.501. Upon conclusion of the audit,the Agency shall be responsible for ensuring that a copy of the report is transmitted
promptly to the State.
DOT Form 140-039 Page 3
Revised 05/2015
IX.Payment of Billing
The Agency agrees that if payment or arrangement for payment of any of the State's billing relative to the project(e.g.,State force
work,project cancellation,overpayment,cost ineligible for federal participation,etc.)is not made to the State within 45 days after
the Agency has been billed,the State shall effect reimbursement of the total sum due from the regular monthly fuel tax allotments to
the Agency from the Motor Vehicle Fund. No additional Federal project funding will be approved until full payment is received unless
otherwise directed by the Director,Local Programs.
Project Agreement End Date-This date is based on your projects Period of Performance(2 CFR Part 200.309).
Any costs incurred after the Project Agreement End Date are NOT eligible for federal reimbursement.All eligible costs incurred prior
to the Project Agreement End Date must be submitted for reimbursement within 90 days after the Project Agreement End Date or they
become ineligible for federal reimbursement.
X.Traffic Control,Signing,Marking,and Roadway Maintenance
The Agency will not permit any changes to be made in the provisions for parking regulations and traffic control on this project
without prior approval of the State and Federal Highway Administration.The Agency will not install or permit to be installed any signs,
signals,or markings not in conformance with the standards approved by the Federal Highway Administration and MUTCD.The Agency
will,at its own expense,maintain the improvement covered by this agreement.
XI.Indemnity
The Agency shall hold the Federal Government and the State harmless from and shall process and defend at its own expense
all claims,demands,or suits,whether at law or equity brought against the Agency,State,or Federal Government,arising from the
Agency's execution, performance,or failure to perform any of the provisions of this agreement,or of any other agreement or contract
connected with this agreement,or arising by reason of the participation of the State or Federal Government in the project,PROVIDED,
nothing herein shall require the Agency to reimburse the State or the Federal Government for damages arising out of bodily injury to
persons or damage to property caused by or resulting from the sole negligence of the Federal Government or the State.
XII.Nondiscrimination Provision
No liability shall attach to the State or Federal Government except as expressly provided herein.
The Agency shall not discriminate on the basis of race,color, national origin,or sex in the award and performance of any USDOT-
assisted contract and/or agreement or in the administration of its DBE program or the requirements of 49 CFR Part 26.The Agency
shall take all necessary and reasonable steps under 49 CFR Part 26 to ensure nondiscrimination in the award and administration of
USDOT-assisted contracts and agreements.The WSDOT's DBE program,as required by 49 CFR Part 26 and as approved by USDOT,
is incorporated by reference in this agreement. Implementation of this program is a legal obligation and failure to carry out its terms
shall be treated as a violation of this agreement. Upon notification to the Agency of its failure to carry out its approved program,the
Department may impose sanctions as provided for under Part 26 and may,in appropriate cases, refer the matter for enforcement under
18 U.S.C. 1001 and/or the Program Fraud Civil Remedies Act of 1986(31 U.S.C.3801 et seq.).
The Agency hereby agrees that it will incorporate or cause to be incorporated into any contract for construction work,or modification
thereof,as defined in the rules and regulations of the Secretary of Labor in 41 CFR Chapter 60,which is paid for in whole or in part with
funds obtained from the Federal Government or borrowed on the credit of the Federal Government pursuant to a grant,contract,loan,
insurance,or guarantee or understanding pursuant to any federal program involving such grant,contract, loan,insurance,or guarantee,
the required contract provisions for Federal-Aid Contracts(FHWA 1273),located in Chapter 44 of the Local Agency Guidelines.
The Agency further agrees that it will be bound by the above equal opportunity clause with respect to its own employment
practices when it participates in federally assisted construction work:Provided,that if the applicant so participating is a State or Local
Government,the above equal opportunity clause is not applicable to any agency, instrumentality,or subdivision of such government
which does not participate in work on or under the contract.
The Agency also agrees:
(1)To assist and cooperate actively with the State in obtaining the compliance of contractors and subcontractors with the equal
opportunity clause and rules,regulations,and relevant orders of the Secretary of Labor.
(2)To furnish the State such information as it may require for the supervision of such compliance and that it will otherwise assist the
State in the discharge of its primary responsibility for securing compliance.
(3)To refrain from entering into any contract or contract modification subject to Executive Order 11246 of September 24, 1965,with
a contractor debarred from,or who has not demonstrated eligibility for,government contracts and federally assisted construction
contracts pursuant to the Executive Order.
(4)To carry out such sanctions and penalties for violation of the equal opportunity clause as may be imposed upon contractors
and subcontractors by the State, Federal Highway Administration,or the Secretary of Labor pursuant to Part Il,subpart D of the
Executive Order.
In addition,the Agency agrees that if it fails or refuses to comply with these undertakings,the State may take any or all of the
following actions:
(a)Cancel,terminate,or suspend this agreement in whole or in part;
(b)Refrain from extending any further assistance to the Agency under the program with respect to which the failure or refusal
occurred until satisfactory assurance of future compliance has been received from the Agency;and
(c)Refer the case to the Department of Justice for appropriate legal proceedings.
DOT Form 140-039 Page 4
Revised 05/2015
XIII. Liquidated Damages
The Agency hereby agrees that the liquidated damages provisions of 23 CFR Part 635,Subpart 127,as supplemented, relative to
the amount of Federal participation in the project cost,shall be applicable in the event the contractor fails to complete the contract within
the contract time. Failure to include liquidated damages provision will not relieve the Agency from reduction of federal participation in
accordance with this paragraph.
XIV.Termination for Public Convenience
The Secretary of the Washington State Department of Transportation may terminate the contract in whole,or from time to time in
part,whenever:
(1)The requisite federal funding becomes unavailable through failure of appropriation or otherwise.
(2)The contractor is prevented from proceeding with the work as a direct result of an Executive Order of the President with
respect to the prosecution of war or in the interest of national defense,or an Executive Order of the President or Governor of
the State with respect to the preservation of energy resources.
(3)The contractor is prevented from proceeding with the work by reason of a preliminary,special,or permanent restraining
order of a court of competent jurisdiction where the issuance of such order is primarily caused by the acts or omissions of
persons or agencies other than the contractor.
(4)The Secretary is notified by the Federal Highway Administration that the project is inactive.
(5)The Secretary determines that such termination is in the best interests of the State.
XV.Venue for Claims and/or Causes of Action
For the convenience of the parties to this contract, it is agreed that any claims and/or causes of action which the Local Agency
has against the State of Washington,growing out of this contract or the project with which it is concerned,shall be brought only in the
Superior Court for Thurston County.
XVI.Certification Regarding the Restrictions of the Use of Federal Funds for Lobbying
The approving authority certifies,to the best of his or her knowledge and belief,that:
(1)No federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned,to any person for influencing or
attempting to influence an officer or employee of any federal agency,a member of Congress,an officer or employee of Congress,or
an employee of a member of Congress in connection with the awarding of any federal contract,the making of any federal grant,the
making of any federal loan,the entering into of any cooperative agreement,and the extension,continuation, renewal,amendment,
or modification of any federal contract,grant,loan,or cooperative agreement.
(2)If any funds other than federal appropriated funds have been paid or will be paid to any person for influencing or attempting to
influence an officer or employee of any federal agency,a member of Congress,an officer or employee of Congress,or an employee
of a member of Congress in connection with this federal contract,grant,loan,or cooperative agreement,the undersigned shall
complete and submit the Standard Form-LLL,"Disclosure Form to Report Lobbying,"in accordance with its instructions.
(3)The undersigned shall require that the language of this certification be included in the award documents for all subawards at
all tiers(including subgrants,and contracts and subcontracts under grants,subgrants,loans,and cooperative agreements)which
exceed$100,000,and that all such subrecipients shall certify and disclose accordingly.
This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into.
Submission of this certification as a prerequisite for making or entering into this transaction imposed by Section 1352,Title 31,U.S.
Code.Any person who fails to file the required certification shall be subject to a civil penalty of not less than$10,000 and not more than
$100,000 for each such failure.
XVII.Assurances
Local agencies receiving Federal funding from the USDOT or its operating administrations(i.e., Federal Highway Administration,
Federal Transit Administration, Federal Aviation Administration)are required to submit a written policy statement,signed by the Agency
Executive and addressed to the State,documenting that all programs,activities,and services will be conducted in compliance with
Section 504 and the Americans with Disabilities Act(ADA).
Additional Provisions
DOT Form 140-039 Page 5
Revised 05/2015
Aft
Washington State Local A enc Federal Aid
�i Department of Transportation g y
Project Prospectus
Prefix Route ( ) Date 9/17/2018
Federal Aid DUNS Number 092278894
Project Number
LocalAgency WSDOT Federal Employer 91-6001271
Project Number Use Only I Tax ID Number
Agency CAAgency Federal Program Title
City of Renton ❑✓ Yes ❑No 0 20.205 ❑Other
Project Title Start Latitude N 470 29'4.5" Start Longitude W 122' 12'22.8"
Williams Ave Bridge-Seismic Retrofit and Painting End Latitude N 470 29' 2.8" End Longitude W 1220 12'23.7"
Project Termini From-To Nearest City Name Project Zip Code(+4)
N Riverside Dr. S Riverside Dr. Renton 98057-5647
Begin Mile Post End Mile Post Length of Project Award Type
N/A N/A N/A ❑✓ Local❑Local Forces❑State❑Railroad
Route ID Begin Mile Point End Mile Point City Number County Number County Name
1155 NIA N/A 1070 17 King
WSDOT Region Legislative District(s) Congressional District(s) Urban Area Number
Northwest Region 37 9 1
Total Local Agency Federal Funds Phase Start
Phase Estimated Cost Funding Date
Nearest Hundred Dollar Nearest Hundred Dollar Nearest Hundred Dollar Month Year
P.E. 620,000 83,700 536,300 11 2018
R/W 50,000 6,750 43,250 1 2020
Const. 2,410,450 5,000 2,405,450 3 2021
Total 3,080,450. 95,450 2,985,000
Description of Existing Facility (Existing Design and Present Condition)
Roadway Width Number of Lanes
24 feet 2
Bridge built in 1954. Main span is 2 steel thru-plate girders,with deck beams spanning between them to
support deck. Fracture critical. Last painted in 1997. Seismic site class E. Minor seismic retrofit in 1995.
Description of Proposed Work
Description of Proposed Work(Attach additional sheet(s)if necessary)
Bridge preservation, seismic retrofit and painting.
Local Agency Contact Person Title Phone
Derek Akesson Transportation Project Manager 425-430-7337
Mailing Address City State Zip Code
Renton City Hall- 5th Floor, I W S Grady Way Renton WA 98057
By
Project Prospectus Approving Authority
Title Transportation Design Manager FDate/ 11
DOT Form 140-101 Page 1
Revised 04/2015 Previous Editions Obsolete
Agency Project Title Date
City of Renton Williams Ave Bridge-Seismic Retrofit and Painting 9/17/2018
Type of Proposed Work
Project Type(Check all that Apply) Roadway Width Number of Lanes
❑ New Construction ❑Path/Trail ❑3-R 24 feet 2
❑Reconstruction ❑Pedestrian ! Facilities ❑2-R
❑ Railroad ❑ Parking ❑Other
0 Bridge
Geometric Design Data
Description Through Route Crossroad
❑ Principal Arterial ❑Principal Arterial
Federal ❑✓ Urban vf Collector Minor Arterial ❑ Urban ❑ Minor Arterial
❑ Rural Functional ❑Rural ElCollector
Ejj
Ma or Collector
Classification ❑NHS ❑NHS ❑ Major Collector
❑Minor Collector ❑Minor Collector
❑ Local Access ❑ Local Access
Terrain ❑✓ Flat ❑Roll ❑Mountain ❑ Flat ❑ Roll ❑ Mountain
Posted Speed 25 mph
Design Speed N/A
Existing ADT 1,530
Design Year ADT N/A
Design Year N/A
Design Hourly Volume (DHV) N/A
Performance of Work
Preliminary Engineering Will Be Performed By Others Agency
Consultant 99 % 1 %
Construction Will Be Performed By Contract Agency
Contractor 100 % 0 %
Environmental Classification
❑Class I - Environmental Impact Statement(EIS) ❑ Class II - Categorically Excluded (CE)
❑Project Involves NEPA/SEPA Section 404 0 Projects Requiring Documentation
Interagency Agreement (Documented CE)
❑Class III - Environmental Assessment (EA)
❑Project Involves NEPA/SEPA Section 404
Interagency Agreements
Environmental Considerations
In water work, street closure traffic impacts.
DOT Form 140-101 Page 2
Revised 04/2015 Previous Editions Obsolete
Agency Project Title Date
City of Renton Williams Ave Bridge-Seismic Retrofit and Painting 9/17/2018
Right of Way
❑ No Right of Way Needed Right of Way Needed
*All construction required by the ❑�/ No Relocation ❑Relocation Required
contract can be accomplished
within the exiting right of way.
Utilities Railroad
❑No utility work required V No railroad work required
All utility work will be completed prior to the start El All railroad work will be completed prior to the start of
of the construction contract the construction contract
All utility work will be completed in coordination [:]All the railroad work will be completed in coordination
with the construction contract I with the construction contract
Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project
A number of utilities utilize this bridge to cross over the Cedar River. Some permanent adjustments to utility
routing and/or temporary relocations may need to occur in order to perform this bridge preservation work.
FAA Involvement
Is any airport located within 3.2 kilometers (2 miles) of the proposed project?❑✓ Yes ❑No
Remarks
The Renton Municipal Airport is located within 2 miles of the proposed project. However, this bridge
preservation work will not involve construction equipment or activities that affect airport operations.
This project has been reviewed by the legislative body of the administration agen �R� encies, or it's
designee, and is not inconsistent with the a ncy s compre nsive plan for c! -,% I ent.
4SSw�����,``ti�,�NH
Agency `+Vim`,•
Date By AThS�`- f0
Den s Law, Mayor Z It a
sit a_ h, City Clerk
.' R
DOT Form 140-101 �Il
k
6 ``. Page 3
Revised 0412015 Previous Editions Obsolete ��'�i,� PORATEO`gti4 N�`'��`