HomeMy WebLinkAboutAdden A - Bidder Question Memo No1_2019_0912 • COMMUNITY SERVICES DEPARTMENT M E M O R A N D U M #1 DATE: September 12, 2019 TO: Bidders CC: Dean W. Koonts, HBB Landscape Architecture FROM: Alan J. Wyatt, Capital Projects Manager SUBJECT: SNP2—Bidder Questions & Responses 1. Bidder's Question: (Bill James, Mid-Mountain Contractors Inc.) • Which attachment detail should be used for the type 4 decorative grates that get attached to the gazebo columns, the architectural detail per 1/A-108 or the structural detail per D/S-4? Response:(Rich Murakami, Rolluda Architects&Chris Wiest, PND Engineers) • The detail D on S-4 is the correct attachment detail for the Trench Drain Type 4 decorative grates. Detail D/S-4 will be modified and updated in Addendum A. 2. Bidder's Question: (Geoff Molnar, Ferrotek Corporation) • Detail 2 of sheet A108 calls out"5"x20" grate (type 4) -indented pattern". I did not find any other specification for this product. Can you please refer me to the manufacturer? Response:(Rich Murakami, Rolluda Architects) • The callout will be revised to refer to "TRENCH DRAIN TYPE 4" for the specific trench drain type. 3. Bidder's Question: (Kurt Lynn,Ashford Electric) • On drawing E-3, note 4, it says remove the pole and pole bases.They were total of 3. Note 5 of E-3 states reinstalling poles per note 4. Note 5 total was 5. Response: (Ed David, Harbor Power&Chris Wiest, PND Engineers) • Add sheet note 4 at each location that sheet note 5 is shown. For clarification, remove (5) pole bases and salvage (5) poles and pole mounted luminaires. 4. Bidder's Question: (Bill James, Mid-Mountain Contractors, Inc.) • Part 1.07B of Specification Section 00 2100 states the Owner will obtain and pay for all permits prior to NTP. Please confirm the Department of Ecology General Stormwater Permit will be obtained by the City. Obtaining the Department of Ecology Permit generally requires a SWPP being prepared which \\rv12rfpso5\depts\cs\parks plan ning\capital project coordinator\projects a-z\a-sunset neighborhood park\park design\phase ii\bidding\bidder questions\bidder question memo no1_2019_0912.docx Bidders—Sunset Neighborhood Park,Phase 2 Page 2 of 6 September 12,2019 shows the discharge point location, baker tank(s) location(s), wheel washes, and construction entrance locations. Can the SWPP be provided to bidder's? • Please confirm the purchase of a Builder's Risk Insurance policy is not required. Part 2.6 of Specification Section 00 72 00 states the Contractor is to buy Builder's Risk Insurance "When the project involves substantial new building construction, as determined by the Owner." Response: (Alan Wyatt,City of Renton, PPNR) • The City of Renton has acquired the Land Use Application/Permit, Civil Construction Permit, and Building Permit for the pergolas and shelter.The Contractor is to obtain the Building Permits for electrical and plumbing and pay all associated fees. • The City of Renton will require the Contractor to provide Builder's Risk Insurance policy in accordance to Section 00 72 00. 5. Bidder's Question: (Bill James, Mid-South Contractors Inc.,Jill Agnelli, OHNO Construction &Chris Totten, Earthwork Services) • Can the AutoCAD files be issued to help facilitate to Earthwork takeoff for the Sunset Park? Response: (Dean W. Koonts, HBB Landscape Architecture) • AutoCAD files are available and the files will be made available along with electronic file disclaimers. 6. Bidder's Question: (Michelle Van Dever, Century Products, Inc.) • Do you have a bid list for the Sunset Neighborhood Park? Response: (Alan Wyatt,City of Renton, PPNR) • The City of Renton currently does not have a list of potential bidders for the Sunset Neighborhood Park, Phase 2 project. A list of responsive bidders will be available after the Bid Opening on September 17, 2019. 7. Bidder's Question: (Jill Agnelli,OHNO Construction) • Could the City provide a topographic map or drawing of the site area? Response: (Dean W. Koonts, HBB Landscape Architecture) • A survey of the site and surrounding streetscape has been included at the back the project manual, in the "additional information" section. 8. Bidder's Question: (Chris Martin, Krazan &Associates, Inc.) • Krazan would like to submit an estimate for any material testing/special inspection that might be required for the new Sunset Neighborhood Park— Phase 2 (there are utilities going in and concrete work). Please let me know if there is an opportunity for us to do that. \\rv12rfpso5\depts\cs\parks plan ning\capital project coordinator\projects a-z\a-sunset neighborhood park\park design\phase ii\bidding\bidder questions\bidder question memo not-2019-0912.docx Bidders—Sunset Neighborhood Park,Phase 2 Page 3 of 6 September 12,2019 Response:(Alan Wyatt,City of Renton, PPNR) • The City of Renton has submitted Requests for Proposals to qualified firms to provide Special Inspections and Material Testing Services. 9. Bidder's Question: (Christina Rasmussen,The Bryer Company) • Please see the attached substitution request form for the metal roofing panels. Also attached is the product data sheets, sample Kynar warranty, Kynar tech data sheet, and our standard Kynar color chart. Response: (Dean W. Koonts, HBB Landscape Architecture) • Contractor directed substitution requests will be evaluated and considered once the contract has been awarded as part of the standard submittal process. 10. Bidder's Question: (Kurt Lynn,Ashford Electric) • Drawing E-3, Note#7 says: provide CCTV System components per City of Renton Standards. Can the city confirm which items will be needed? Response: (Alan Wyatt, City of Renton, PPNR) • The City of Renton has installed a CCTV system at Sunset Neighborhood Park. The existing CCTV cabling is expected to be sufficient to make the necessary modifications to relocate the pedestrian lighting poles with the CCTV cameras. In the event additional modifications, equipment, material is required, the Contractor shall immediately notify the Owner of the conditions.The Contractor shall coordinate work with the City of Renton IT Department the Work associated with the CCTV system. 11. Bidder's Question: (Rebekah Washington,Terra Dynamics; &John Skaggs,Core & Main) • Who is the manufacturer of the Decorative Mist feature in Section 13 12 00? • Will they also be the supplier of the pump, system control panel,Zone valve control panel, filtration units, service boxes,tubing, wind speed sensor and appurtenances? Response: (Dean W. Koonts, HBB Landscape Architecture) • The Approved Manufacturer: Subject to compliance with requirements, the following approved Manufacturer Equipment Supplier for specialized mist feature system equipment shall be used: Mee Fog &Soucy Aquatik(jointly supplied through Soucy).The Soucy contacts are: Jonathan Gosselin iosselin@soucyaquatik.com Marie-Anne Bosse mabosse@soucyaquatik.com T :418-872-4440 F : 418-872-3570 http://soucyaguatik.com/en/ • It is intended that Soucy will supply all of the scheduled specialized equipment except the service box access door. A schedule will be provided in Addendum A. \\rv12rfpso5\depts\cs\parks plan ning\capital project coordinator\projects a-z\a-sunset neighborhood park\park design\phase ii\bidding\bidder questions\bidder question memo not-2019-0912.docx Bidders—Sunset Neighborhood Park,Phase 2 Page 4 of 6 September 12,2019 12. Bidder's Question: (Bill James, MidMountain Contractors) • In Detail 4/A107 how do you plug weld the W sstl bars to the stanchion? Is it at every third stanchion, fourth stanchion and then loose ones held in by the flat bar? • Detail 4/A107 calls for 'rubber EPDM washers at bolts. Detail 5/A-107 calls for 'nylon washers.' Which one?Also, are these sleeves or washers? Is there a requirement to isolate the%"x 2" stainless flat bar from painted stanchions? Response: (Rich Murakami, Rolluda Architects) • SST%"x2" bars and SST%" rods are to be fabricated as separate units that are attached to the 1"x3" painted steel stanchion in the field. • Nylon Washers.They are washers. 13. Bidder's Question: (Jill Agnelli, OHNO Construction) • Is there a self-performance requirement for the General Contractor to perform a certain percentage of work under this bid? • Builder's Risk: Reference: 00 72 00— Part 2, 2.6—"Contractor to buy Builder's Risk Insurance when the project involves substantial new building construction, as determined by the owner" Question:Will Builder's Risk coverage be required for this project? • What is the deadline and procedure to file a bid protest? • Can the subcontractor list be submitted within one hour of the bid submittal deadline, per RCW 39.30.060? Response: (Alan Wyatt,City of Renton, PPNR) • There is no self-performance requirement for the General Contractor to perform under the Work. • The Contractor shall provide Builder's Risk Insurance per Section 00 72 00—Part 2, 2.6. • The City of Renton follows Washington state law, RCW 39.04.105 regarding bid protest procedures. • The City of Renton requires that the list of subcontractors be provided on the Bid Form, completed in its entirety upon submittal. In accordance with RCW 39.30.060, the City of Renton requires the names of Electrical, Plumbing, HVAC subcontractors in addition to Landscape, Irrigation, Metal Fabrication and Concrete. 14. Bidder's Question: (Jill Agnelli,OHNO Construction) • Section 00 45 13, Bidder's Qualification Statement, includes Item 7, Work Plan. Can this schedule/work plan be submitted post-bid as part of the Supplemental Bidder Responsibility Criteria, instead of with the bid? Response: (Alan Wyatt, City of Renton, PPNR) In accordance with Section 00 45 13, Bidders are required to submit along with the Bidder's Qualification Statement a Work Plan, providing a description of \\rv12rfpso5\depts\cs\parks plan ning\capital project coordinator\projects a-z\a-sunset neighborhood park\park design\phase ii\bidding\bidder questions\bidder question memo not-2019-0912.docx Bidders—Sunset Neighborhood Park,Phase 2 Page 5 of 6 September 12,2019 how the work will be done within the time frame allowed. Include a schedule of activities with working hours and days. 15. Bidder's Question: (Ken Land, Service Electric Co. Inc) • Reference Note 15 of sheet E-3. Please send us the manufactures name and part number for the Receptacle Bollard. Response: (Ed David, Harbor Power) • The manufacturer name and part number are included in note 15. See underlined portion as follows: Verify exact Placement of Receptacle Bollard prior to rough-in. See Landscape Plans. BK Lighting#RB-18-RE1-BLP-PP (with GFCI Outlet) or approved equal. 16. Bidder's Question: (Ken Land, Service Electric Co. Inc) • Could you please send me information or drawing for the size of the Concrete Foundations for the Light Poles? Response: (Chris Wiest, PND Engineers) • Detail 3 on Sheet L-9 calls for the light pole foundation diameter to be 3-feet. Per City of Renton Standard Detail 116.1 the CONTRACTOR shall submit structural analysis to determine the depth of the foundation.The submitted structural analysis shall confirm the required reinforcing steel. . 17. Bidder's Question: (Bill James, MidMountain Contractors) • Concerning Gazebo:The "Natural Rust" color is a custom color. If you want it in 24ga.we would have to order 45sq. for manufacturer to make it. However, AEP does have a coil of 26ga in the "Natural Rust". Would this be of interest to the architect? • Concerning Gazebo:The Gazebo has multiple slopes and no detail callouts to accompany. It is my assumption that each roof is a separate entity. Am I correct in assuming that the detail 4/A1.06 is the rake at gridlines 2.1, 2.2, 2.4& 2.5? • Concerning Gazebo:The architect is asking for the gutter color to be TNEMEC "Briquet" Once again this is a custom color and would need to order a larger quantity than needed, thus incurring much greater cost. Response: (Rich Murakami, Rolluda Architects) • The specification has been revised to resolve gauge issue.The revision will be issued in the Addendum. • Detail callouts are on architectural plans and sections. There are 3 roofs, but the structure is interconnected (i.e. one structure). Roofs slope generally to the west with a ridge condition at gridline 2.5, ridge with gutter condition below at gridline 2.4, ridge with gutter condition at gridline 2.2, and gutter condition at gridline 2.1. Rake condition detail on 4/A1.06 occurs on the south and north roof edges. \\rv12rfpso5\depts\cs\parks plan ning\capital project coordinator\projects a-z\a-sunset neighborhood park\park design\phase ii\bidding\bidder questions\bidder question memo not-2019-0912.docx Bidders—Sunset Neighborhood Park,Phase 2 Page 6 of 6 September 12,2019 • Product and Color are per Phase 1 of the park project and confirmed as specified. In addition to the Gazebo,this is the primary finish for the 3 Pergolas as well. 18. Bidder's Question: (Bill James, MidMountain Contractors) • Concerning Pergolas: I'd like to clarify with you that the Pergola's have no metal roof and thus, no gutter, rake, peak or flashing of any kind. So there's nothing to bid. Response: (Rich Murakami, Rolluda Architects) • Confirmed.There is no metal roof, gutter or sheet metal flashing on the pergola structures. End of Questions. \\rv12rfpso5\depts\cs\parks plan ning\capital project coordinator\projects a-z\a-sunset neighborhood park\park design\phase ii\bidding\bidder questions\bidder question memo not-2019-0912.docx