HomeMy WebLinkAboutR-406703PERMIT#
010130
F1
NI
r` Enlx:•.. R
OR
EXURNvnnax
-�
EBTENE�cfauxs
is "IN ssoiusxT 51 FACE
µxgxEUOMUFL
CROSS sscnON
'Po
HESSIDAMENTSTEGRAGE
EDDTEREPoNSMN
DWE VATiDNDNBYMIMNGABm
u:E N TSI
UWE%® DTnnwIsM.
PLANx-Slim
s�
PUBLICWORKS
*7�
DEPARTMENT
SEDIMENTTRAP
GAZ 9/18/2018DATE
SEEMEDMESSAGE
MODYEERYLENNEW
PERFORATED POSTRUSELESEE MARKED
&METAL RISER
ROCHESTER OCCURRING
TACKV
wx. SENSORS AS HER CALCULATIONS IN SECTION 16 2 OF
THE CRY oEMERGER SURFACE WESTER cEelox MEMW L—Jx--�••
IBM
. wTwx.Twi:, Nmw� aAr ap
I_ 9,WENT NA NN.�
NOTES:
UNLESS
D WERT"WED
® OTHERWISE
STD OPLANx-I16r10 �xrs
PUBLIC WORKS DEPARTMENT SEDIMENT POND RISER DETAIL B/ze/zole
GAZ
.NDB.cmP)
IF MAX,
FEE IN SHEETING IN
10 MAX
KNOWS ENERGY RECREATION
7ATTOEIF��IGNIS�Uy
NOTES:
ELF PLASTRECORGERENG MAYBE USED ON REFORMS AREAS FLAT REQUIRE CONER MEASURES FOR LESS LOAN ME DAYS
FULL CLAIM IS PARTICULARLY USEFUL OCR PROTECTING CUT AND FILL ELSOURE MIND OCEANSIDE
13 CLEAR PLASTIC SHENWEEN MAY HE USED OVER NEWSLYZEEDRED AMO 70 �� A SOMEWHERE EFFECT MIND ENCOURAGE (SERVES GROWTH
GREAR DEATHS SHOUTED NOT BE USED FOR THIS PUFFLUFFECKE DURING WE SUMMERS MONTHS
I A WE VOWED SHALL NOT BE UNITY UPSWERE OF AREENSES THAT MUGHT BE ADVERSEELY PREVENTED By RUNOFF SUCH ACCESS INCLUDE FEWER ADD
UNSTABLE SLIGNESSE
23 REAL FUND BRALS. OR EQUIVALENT MAYBE CREW TO WEIGHT TESTED
31 TOWN INSISTS MUST BE BREAKDOWNS OFEW HEARD RENEWED
32 IF WE POSTIC BEGINS TO DEREERSURAFTE DUME 70 ULTRAVIOLET RADIATION, iT MUST MET ORMPLERELY REVERSED ADD REERAGED
33 WERE THE ELASTIC 13 NO LONGER NEESSED. IT &KARL BE COMMODITY HEMMED
SWEDEN O (SUPREME ,ZDPLAN-213.3R SAM
STICK,0
PUBLIC WORKS GA
PLASTIC COVERING 9/28/2018
DEPARTMENT a wre
EROSION CONTROL
STANDARD PLAN NOTES
TBEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A
PRE -CONSTRUCTION MEETING SHALL BE HELD AMONG THE CITY OF
RENTON, HEREBY REFERRED TO AS THE CITY, THE APPLICANT, AND THE
APPLICANTS CONTRACTOR.
2.THE APPLICANT IS RESPONSIBLE FOR OBTAINING THE WASHINGTON
STATE DEPARTMENT OF ECOLOGY (ECOLOGY) CONSTRUCTION
STORMWATER GENERAL PERMIT, IF IT IS REQUIRED FOR THE PROJECT.
THE APPLICANT SHALL PROVIDE THE CITY COPIES OF ALL MONITORING
REPORTS PROVIDED TO ECOLOGY ASSOCIATED WITH THE
CONSTRUCTION STORMWATER GENERAL PERMIT.
3.THE ESC PLAN SET SHALL INCLUDE AN ESC CONSTRUCTION
SEQUENCE DETAILING THE ORDERED STEPS THAT SHALL BE FOLLOWED
FROM THE PRE -CONSTRUCTION MEETING TO POST -PROJECT CLEANUP
IN ORDER TO FULFILL PROJECT ESC REQUIREMENTS.
4.THE BOUNDARIES OF THE CLEARING LIMITS, SENSITIVE AREAS AND
THEIR BUFFERS, AND AREAS OF VEGETATION PRESERVATION AND TREE
RETENTION, AS PRESCRIBED ON THE PLAN(S), SHALL BE CLEARLY
FLAGGED BY SURVEY TAPE OR FENCING AND PROTECTED IN THE FIELD
IN ACCORDANCE WITH APPENDIX D OF THE CITY OF RENTON
SURFACE WATER DESIGN MANUAL (RSWDM) PRIOR TO CONSTRUCTION.
DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE
CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE
MAINTAINED BY THE APPLICANT/ESC SUPERVISOR FOR THE DURATION
OF CONSTRUCTION.
5.STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE
BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION
OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS CONSTRUCTED
WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE
THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK -OUT TO ROAD
RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT.
IF SEDIMENT IS TRACKED OFFSITE PUBLIC ROADS SHALL BE CLEANED
THOROUGHLY AT THE END OF EACH DAY, OR MORE FREQUENTLY
DURING WET WEATHER, AS NECESSARY TO PREVENT SEDIMENT FROM
ENTERING WATERS OF THE STATE.
&WASHOUT FROM CONCRETE TRUCKS SHALL BE PERFORMED OFF -SITE
OR IN DESIGNATED CONCRETE WASHOUT AREAS ONLY. DO NOT WASH
OUT CONCRETE TRUCKS ONTO THE GROUND, OR TO STORM DRAINS OR
OPEN DITCHES. ON -SITE DUMPING OF EXCESS CONCRETE SHALL ONLY
OCCUR IN DESIGNATED CONCRETE WASHOUT AREAS.
TALL REQUIRED ESC BMPS SHALL BE CONSTRUCTED AND IN
OPERATION PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TO
PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE WATER,
DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL ESC BMPS SHALL
BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME
THAT CLEARING AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL
FOR ON -SITE EROSION HAS PASSED. ALL ESC BMPS SHALL BE REMOVED
AFTER CONSTRUCTION IS COMPLETED AND THE SITE HAS BEEN
STABILIZED TO ENSURE POTENTIAL FOR ON -SITE EROSION DOES NOT
O
Know what's below.
Call before you dia. NO
ENSURES FILTERFABRICTOWASE SENCED AT
FREFFIGAUGHWISSELOR
EQUIVARREFFIFFLANDARD
FILTER FEND '"""
I_II
�j
JE «x 15 USED �.. p,xN J l
-z•BwanMS5 VEELr ORENUN.LEN.(Tr
II
NOTES: ON SEC MINIMUM
1E. SILT PENCE MAY MUSED ORGANISM OF ALL DISTURBED AREAS
1HL SILT PRINCE IS NOR MERGED TO TRUEST CONCENTRATED FLOWS, MR IS IF INTEREIRTUTREAT SU��MOU� OF OVERVAND FLON ANY �NCE�TED
FLOW MUST BECCERBEENED THROUGH WE MAURICE SYSTEM TO ASMI� DUANE OR FUND
21 WE BETHLEHEM USED MUST MERELTHE STANDARDS Li� SOLOUNIA COFFECCOF WE MAGUIESUCTRUSERCH EASED SPECANDIETIONSS M� BE AGRALASUBLE ON ROSS SO STANDARD STRENGTH! LAWS REQUIRES WIRE BACKING TO INCIDENCE WE STREEMOTH DEGREE THESE WIRE BACKED OR CLOSEER RECENT LEASING MOU ME REQUIRED
FEES GELLER; WEEINGTH CARLO IF FIELD PERFORMANCE WARRANTS A !CRUSHED ERNST
24 IF A TYPICAL SILT FACE IS USED THE STANDARD EFXG DEBBIE BUY HE REDUCED AS EASED WE THE MOTHER a INCHES OX THE FLY BIBLE GERALD IS FELL BMW SLID
SECURE IN A �N� THAT VABPL�$ IF I REBELS 00 GOES NOT ALLOW WATER TO ERNEASSE SELL UNIONERMINE THE SILT FUNDES
25 FI LTER FABRIC FENCES WELL BE INSTALLED ALONG CONGRESS UNHEISEVER BRUNEI
ZI My AWARDS SHALL BE REPARECL MAKEEDIATIELY
32 IF CONCENTRATED COMES AGE EVIDENT UEEFFILL SHE THE FEENCE BY ED MUST BE INTERESTED D AND CHNOWED TO A SEDIMENT YEAR SER ROME.
33 IT IS IMPORTANT TO CHECK THE FLY ITT SIDE OF THE BRUCE FDIC SIGNS OF THE ROME CLOGGING KIND ACTING AS A BEFERNER TO FLOW KIND THEN CLAUSING
CHANNELIZATION OF FLOWS PARALLEL TO WE FENCE IF WIN OCCURS REMARK THE
OR KROGER THE
34 B. SEDIMENT THE ENTMUSER TBR REMOVE xAw EDNso REFINERY 6INCHES HIGE TOH .� xE., oowxERSIwLBE WARNER SEDIMENT
mx[ewn STIES
PLLAN 21,100 v[grsl
O STD. PLAN-214.00
PUBLIC WORKS SILT FENCE s/za/zola
DEPARTMENT GAZANTS
REAUX
Tsn
5¢E IPIDd.:SmmI FORSOMFR spBRICS
n Nsmwup
THIISTNC1590
px4smwflssl
v muMMwsHITu:
xcEyiM Mw51
EXIST. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT,
ENHANCEMENT, AND REMOVAL OF ESC BMPS SHALL BE THE
RESPONSIBILITY OF THE APPLICANT.
B.ANY HAZARDOUS MATERIALS OR LIQUID PRODUCTS THAT HAVE THE
POTENTIAL TO POLLUTE RUNOFF SHALL BE DISPOSED OF PROPERLY.
S.THE ESC BMPS DEPICTED ON THIS DRAWING ARE INTENDED TO BE
MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS
CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL
CONDITIONS DICTATE, THE APPLICANT SHALL ANTICIPATE THAT MORE
ESC BMPS WILL BE NECESSARY TO ENSURE COMPLETE SILTATION
CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF
CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF
THE APPLICANT TO ADDRESS ANY NEW CONDITIONS THAT MAY BE
CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL ESC BMPS,
OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO
PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE
RECEIVING DRAINAGE SYSTEM.
10.APPROVAL OF THIS PLAN IS FOR ESC ONLY. IT DOES NOT
CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR
LOCATION OF PIPES, RESTRICTORS, CHANNELS, OR STORMWATER
FACILITIES.
11.ANY DEWATERING SYSTEM NECESSARY FOR THE CONSTRUCTION OF
STORMWATER FACILITIES SHALL BE SUBMITTED TO THE CITY FOR
REVIEW AND APPROVAL.
12.ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY
EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING
THE WET SEASON (OCTOBER 1ST THROUGH APRIL 30TH) OR SEVEN
DAYS DURING THE DRY SEASON (MAY 1ST THROUGH SEPTEMBER 30TH)
SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC
COVER METHODS E.G. SEEDING MULCHING PLASTIC COVERING ETC.
IN CONFORMANCE WITH APPENDIX D OF THE RSWDM.
13.WET SEASON ESC REQUIREMENTS APPLY TO ALL CONSTRUCTION
SITES BETWEEN OCTOBER 1ST AND APRIL 30TH, UNLESS OTHERWISE
APPROVED BY THE CITY.
14.ANY AREA NEEDING ADDITIONAL ESC MEASURES, NOT REQUIRING
IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN (7) DAYS.
15 THE ESC BMPS ON INACTIVE SITES SHALL BE INSPECTED AND
MAINTAINED AT A MINIMUM OF ONCE A MONTH OR WITHIN 24 HOURS
FOLLOWING A STORM EVENT. INSPECTION AND MAINTENANCE SHALL
OCCUR MORE FREQUENTLY AS REQUIRED BY THE CITY.
1B.BEFORE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY, CATCH
BASIN INSERTS PER THE CITY STANDARD PLANS SHALL BE PROVIDED
FOR ALL STORM DRAIN INLETS DOWNSLOPE AND WITHIN 500 FEET OF A
DISTURBED OR CONSTRUCTION AREA, UNLESS THE RUNOFF THAT
ENTERS THE INLET WILL BE CONVEYED TO A SEDIMENT POND OR TRAP.
ALL CATCH BASIN INSERTS SHALL BE PERIODICALLY INSPECTED AND
REPLACED AS NECESSARY TO ENSURE FULLY FUNCTIONING
CONDITION.
17.AT NO TIME SHALL SEDIMENT ACCUMULATION EXCEED 2/3 OF THE
CAPACITY OF THE CATCH BASIN SUMP. ALL CATCH BASINS AND
CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE
CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER
INTO THE DOWNSTREAM SYSTEM.
i B.ANY PERMANENT STORMWATER FACILITY USED AS A TEMPORARY
SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY ESC BMPS
AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE
PERMANENT FACILITY IS TO FUNCTION ULTIMATELY AS AN INFILTRATION
SYSTEM, THE TEMPORARY FACILITY SHALL BE ROUGH GRADED SO THAT
THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL
GRADE OF THE PERMANENT FACILITY.
1B.AREAS DESIGNATED ON THE PLANS) CONTAINING EXISTING
STORMWATER FACILITIES OR ON -SITE BMPS (AMENDED SOILS.
BIORETENTION, PERMEABLE PAVEMENT, ETC.) SHALL BE CLEARLY
FENCED AND PROTECTED USING ESC BMPS TO AVOID SEDIMENTATION
AND COMPACTION DURING CONSTRUCTION.
20.PRIOR TO THE BEGINNING OF THE WET SEASON (OCTOBER 1ST), ALL
DISTURBED AREAS SHALL BE INSPECTED TO IDENTIFY WHICH ONES
SHALL BE SODDED OR SEEDED IN PREPARATION FOR THE WINTER
RAINS. DISTURBED AREAS SHALL BE SODDED OR SEEDED WITHIN ONE
WEEK OF THE BEGINNING OF THE WET SEASON. AN EXHIBIT OF
THOSE AREAS TO BE SODDED OR SEEDED AND THOSE AREAS TO
REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY FOR REVIEW.
21.PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, THE PROJECT SITE
SHALL BE STABILIZED TO PREVENT SEDIMENT -LADEN WATER FROM
LEAVING THE PROJECT SITE, ALL ESC BMPS SHALL BE REMOVED, AND
STORMWATER CONVEYANCE SYSTEMS, FACILITIES, AND ON -SITE BMPS
SHALL BE RESTORED TO THEIR FULLY FUNCTIONING
CONDITION. ALL DISTURBED AREAS OF THE PROJECT SITE SHALL BE
VEGETATED OR OTHERWISE PERMANENTLY STABILIZED. AT A MINIMUM,
DISTURBED AREAS SHALL BE SODDED OR SEEDED AND MULCHED TO
ENSURE THAT SUFFICIENT COVER WILL DEVELOP SHORTLY AFTER
FINAL APPROVAL. MULCH WITHOUT SEEDING IS ADEQUATE FOR SMALL
AREAS TO BE LANDSCAPED BEFORE OCTOBER 1ST.
22.ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK
STABILIZATION AND EROSION CONTROL. ROCKERIES SHALL NOT BE
CONSTRUCTED TO SERVE AS RETAINING WALLS. ALL ROCKERIES IN
CITY ROAD RIGHT-OF-WAY SHALL BE CONSTRUCTED IN ACCORDANCE
WITH CITY STANDARDS. ROCKERIES OUTSIDE OF ROAD RIGHT-OF-WAY
SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE INTERNATIONAL
BUILDING CODE.
12/0312020 RRP MEECEADI
OF BEEN BASED NO SCALE �°,�Y,N, CITY OF
:'O SIBLETHIS LE FORITINFORMATION IORERROR N ML x1SM:x. ^ r'NTOI�I
EEN INCORPORATED
Ir5ED IWO THIS
ORERRORaR
EEN I NCORPORATES DOCUMENT
DOCUMENT
TO S
mo or ITS ACCURACY
PREA0NPEST0
aION OE rts Accuw•cv BEFORE APPLYING lr�SK I �Db' DATUM Planning/Building/Public Works Dept.
REVISION BY DATE APPR �•N �"'E xED01°"N'
T A C O M A S E A T T L E
S P O K A N E T R I- C I T I E S
2275 North 30th Street, Suite 300 Tacoma, WA 98403
253.383.2422 TEL 253.383.2572 FAx wRR.ahhl.mm WEB
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
WALKER MAZDA DEALERSHIP
AS-BUILTS
AHBL JOB #2180100.11
TESC DETAILS
CID
Lf!
O
co
O
O
Q
J00
N
N
0
O
0
T
R-4067 03