Loading...
HomeMy WebLinkAboutR-406707( I ti I I u CB#16 I OUTLET 1 N NPDES PERMIT# WA I I RIM:25G&2190 FG: 20.59 - e u L I'_65 I 17.W 12"(W) GRAPHIC SCALE CDC pp058 I\ - % 68 LF 0% 12"@05 1 .. .. ice_ - -- - - _ -_ _ - _ - -- 0 1530 . 60 1 CB 519 RIM=19.94 J - - - - - _ - - F-�-�®�� CONC N IE=15-90 �� r 1 1, CONIC E IE=1594 I L 1 I GRADE BREAK ` B: 21,90 GB: 214 1 0 1.1% FG 20.94 1"=30 FEET 1 LADDER w I I ) o 1 GB'2178 ,.(TYP) 1 �� HP:20.22 1 AMBL #t03 1 ;r l GB: 21. a /5 W AR AND CAP nI I� A I GB: 21 ]6 1672.D345 1 I I FG: 21,44 \ �s / / n°� /" CB#15 297746-8216 I _ I ELEV 19-67 I I I - �o �� \ �g \\ e _ RIM:19.61 NO LADDER 19.65 6 518 RIM-te.75 1 1 r \ 21.40 FG 20.fi8 LP 20.10 CONc E IE=164z -' A WNC S IE-16.13 FG: 21.15 CB #2 \ RIMCB #z^6.FA FG: 20.72 N IG CONIC W IE=1612 �% I RI :29.54 1 20.63 1 c ' {. GCB t13 20.65 m m HP: 20.10 RIM:2&78 GB: 21] GB: 21.78 .. n I 20.9 0 GB: 'a1 ]g 11.1% J I GB: 21.90 I 1, I GB. 2119 1 e Sn RIM=18.89 GB: 21.90 CONC N IE-1631 r� LP: 20.10 .a DONC E IE=1611 j � qa� \ u PVC W IE=16.81 j REFER TO STORM 01 DRAIN PROFILE C25a 1 Q FG: 21.08 o HP: 20.10 '1O �1 y. CB #6 . GB: 21.90 0 RIM 2490 GB: 21.90 GB: 22.17 G ' 1.90 \ \ /SF I .03 22 1 �I I II 65 1 GB: 22FG: 50 HP: 20.10 22 I rFG: 22.16 FG: 22.70 J OI T I n IA1 Ly019 • I I +'92F 6"@0.50% FG: 22.70 FG 22701 GB 22'.i .21.98 FG ]6 LF UP: 20.10 :2 1 V RD RD FG:2216 FG2216 1.0°% \ 1 1 _ / �07 RD I FG: 22.70 ••SDCO �� 1 HP: 20.10 I. a" ' FG 22,70 FIG 21.71 FG 2 FG: SDCO 41 21.28 I LP: 20A0 FG: 22]0 FGt 21 ]2. - SDCO#2 FL 22A 6. P 20.10 FG: 20.4 on, G 22.70 GRADING 1 FG: 22.17 \ -DETAIL DE ARGMENT C2.8 HP �0.10 FG: 22.66 \yR I` ENLARGMEN 148 LF 11 LP. 20.10 R� 2 69 GRADING-'1D26 BUILDING 6"@0.50% FG: 22.701.2% HP: 20.10 FF=22.70F FCL2t,72" l FG22,70 \ \ 1.7% 1.0 % FG: 2222 LP: 20.10 SD O#3 _ I 48'LF \\ 15' TRANSITION F ROMI .N' ' I Ijl it ,-69 6'PVC. G22.7D INTEGRAL TO FLUSH CURB JJ �\FG: 22.44 -_o -_ G2223 HP: 20.10 VAULT PAD: 20.70 � _-_~ - - 3. \ \ : 21.85 -- FG. 22.70 \ \ \ 20 LF 6" DCO #8 7� CO #7 HP: 20.10 � FG' 2188 '. S 7 m �\ 23% II GRADING 1 L I I Ao 70LF 6".0% DETAIL C26 I - o C2 BSWALEE ION / '00% 4.2°o DETAIL FG: 22.70 F :22.151 LINEG URB 23° CB #5 15' TRANSITION FROM II DCO#5 9LF 6"Q050% F OWLINEG DING is J RIM:2C.TS 20.68 INTEGRAL TO FLUSH CURB FG 22,70 1.0% I„I I FG: 95 z_ : 2208 FG: 21.74 SD#6 HP: 20.1q 1 \ GB 2139. CO n r P: 20.10 �i 1.47 #4 a 6" @ 0.50°�O FG: 21.38 7�N / p �� FG: 21.6] F :22.04 \ o / Ioy 65 LF 6" PEP 133 LF `r FG: 22.15 HP: 20.10 s V' 1 I GB. 21.31 3.84% 6" @ 2.05 % 2 FG: 22.04 GB: 21.76 0.46 BU FEF MH 512 819'S5 J CB#7 REFER TO STORtv�� @ FG: 22.04 / DD T -�_NI 1 \` C2.5 O GB:2L60 \ 050 \ �D= G ' ols 20.91 RAIN PROFILE C _ GB: 21.70 \ `1 I GB: 2121 eiz" . HP: 20.1� s I / FG 2060 RIM LP: 20.10 19.97 RIM: 20. 01 REFER TO SHEET C2.3 1 \ RIM: 20.06 I FOR DETENTION SYSTEM FIG�20.P9 \ 148 CB#10 \ HP: 20.10 u RIM: 206 RIM: 19.91 RIM:1#10 E2 B # 2 RIM: 20.33� 21.03 0�20.90 11 20 \ 1.4° 1.4°o RIM: 19.86 #9 1 { 1 6 N 5 FG: 20.2] RIM, RIM 19.42 - LP: 20.10 RIM:20.45 RIM: 20.1 RIM:20145 - \ I GB: 20. o RIM. 19.81 45 - - H `F I G' ] j 1 GB: 20.5 / / I GB: 20.76 GB: 20 _ _ HP: 20.19 I 10wO _ RIM: 2.8FG: 20.28 0 RIM: 20.3 / / I _ �'FG: 2025 % 1AI°.... 20� N°I'& N. O Ge_20-54 1 CONTROL STRUCTURE FG 20,25 FG: 20.25 FG 20.25 FG: 20.25 1 RUA'88632093 STMH 503 RI =1976 CB#8 FG. 20.40 6 RIM=20.86 12" CONC NE IE=1249 ORMTANK INSPECTION PORT 6 CPR p �T. REFER TO STORM TOP=16A9 rI IE=9.99t I 3O" CONC W 'TkE TMEN LAR WETLAND RIM: 1955 DRAIN PROFILE a 36" coNc w IE=1 19.55 C2.5 r Ir=1 o.3at 1'n@ATMENT VAULT EARTHWORK VOLUMES BASIS OF BEARING CUT: 100 CY NAD 1983 FILL: 2,000 CY WASHINGTON STATE PLANE NORTH PROJECTION, BASED ON GPS NET: 1,900 CY OBSERVATIONS USING WSRN AND GEOID 2012A. UNITS OF MEASUREMENT ARE US SURVEY FEET. VERIFIED CITY OF RENTON 230 VERTICAL DATUM (CASE MONUMENT AT S 23RD ST AND WILLIAMS AVE CUL DE SAC) NAVD 1988 VERTICAL DATUM ON ORTHOMETRICALLY CORRECTED GPS OBSERVATIONS USING WSRN AND GEOID 2012A. VERIFIED CITY OF RENTON 230 (CASE MONUMENT AT S 23RD STAND WILLIAMS AVE CUL DE SAC) ELEV: 230.75 o Q as� Know what's below. Call before you dim. PNO. W3 STORM STRUCTURE TABLE STRUCTURE NAME STRUCTURE DETAILS CB#1 RIM =4P.51 N 167213.03 IE=WAS (8" W) E 1298053.73 CS #2 RIM =- PEA 4 N 167214.01 IE=1695{8" E) E 1297933.02 IE=1695(8' W) RIM 4676 CS#3 IE = 16.42 (8' N) N 167199.38 IE - 1642(8" S) E 1297827.74 IE=16.42(8" E) CB#4 RIM =-2069 N 167059.52 IE=4532-(8" N) E 1297824.00 IE=16i2(8" S) CB #5 RIM =2986 N 166976.58 IE=#69(8" SW) E 1297852.66 IE=1439(8" AE CB#8 #6 RIM 4498 IE=1607(8 N)� 1CB N 1 .8 IE -1F.@? (8" S) E 16712 IE= IA. 44(6" E) CB#7 RIM = 2091 N 166916.32 IE = 14-46t8" NE) E 1297819.48 IE =14.16 (8" S) CB#9 RIM =i0.59 N 166854.29 IE=1626(12" E) E 1298021.99 IE=i636(12" W) CB#10 RIM = 19.5d N 166850.94 IE =16.79 (12"W) E 1298120.84 CB #14 RIM = 2656 N 167261 20 IE = 46�9(8" S) E 1297829 60 CB#15 RIM =i9.61 N 16726167 IE=1},34(12 E) E 1298282 83 IE = HI.81 (6" S) CB#8 N 16685744 RIM =19.56 E 1297918.48 CONTROL STRUCTURE RIM = PEAR N 166948.15 IE=18..66(12" W) E 1297818.27 IE = 19.99 (12" N) L.�t01:�l�l1 lei 0 :K 20.63 17.87 20.65 17.35 17.23 t0.93 '6.61 '6.6/ '6.57 t0.69 15.74 15.80 ?0.68 14.35 14.51 15.51 " 65 8.13 6.38 4.01 '4.23 9.42 16.31 16.28 Lxsy 20.58 16.92 19.55 17.43 17.46 Eli 20.93 13.87 13.54 STORM STRUCTURE TABLE STRUCTURE NAME STRUCTURE DETAILS SDCO#1 RIM =22.68- N 167126.25 IE = 20.18 (6" W) E 1297972.06 SDCO#2 RIM=W.AA N 167127.56 IE =19.81 (6" E) E 1297898.99 IE = 19.81 (6" W) SDCO#3 RIM =? 56- N 167010.38 IE = 17.91 IS" SE) E 1297888.30 RIM =22.62 SDCO#4 IE 16.50 (T E) N 166954.96 IE 16.50 IS' S) E 1297931.54 IE = 1650(6'NW) SDCO#5 RIM =2266 N 166950.15 IE = 19.57 IS' E) E 1298081.47 IE = 19.57 (6' W) SDCO#6 RIM = 223' N 166959.38 IE = 1970 (6' N) E 1298105.77 IE = 1970 (6' W) RIM = i252 SDCO#7 IE = 1984 (6' W) N 166988.21 IE=19.84(6 S) E 1298108.14 IE = 19.84(6" N) SDCO#8 RIM = 22.69 N 166988.35 IE = 20.50 (T E) E 1298087.89 BODO#9 RIM 22E6 N 167116.02 IE-20.48 (6 S) E 1298114.71 1 PROVIDE4 PERFORATED FOUNDATION DRAINSAROUND BUILDING FOUNDATION. CONNECT TO STORM SYSTEM. 2. PROVIDE 6 PVC SDR-35 ROOF DRAIN LINES AT 0.5% MINIMUM SLOPE UNLESS OTHERWISE NOTED. 3. PROVIDE HERRINGBONE GRATE INLETS FOR ALL CATCH BASINS PER WSDOT STANDARD PLAN B30 50 02 UNLESS OTHERWISE NOTED. 4 CONTRACTOR SHALL COORDINATE AND CONFIRM DOWNSPOUT ROOF DRAIN LOCATIONS WITH BUILDING PLANS PRIOR TO CONSTRUCTION. DOWNSPOUTS SHALL BE COORDINATED WITH FOOTING CONSTRUCTION TO ENSURE ADEQUATE COVER. 5. PROVIDE STORM TRENCH PER DETAILe C3.2 _ W _ 22.63 I V 22.47 22.70 1.0 O CM 0 22.60 O QD 22.34 I Q 22.54 22.97 "•���Q�� m1nom ro w14 TACOMA - SEATTLE 'O.AoFja SPOKANE - TRI-CITIES �s7DRn1. gWt 2215 North 30th Street, Suite 300 Tacoma, WA 98403 osnv:oz/ 253.383.2422 TEL 253.383.2572 Fax wwwuhRoom WEB IN COMPLIANCE WITH CITY OF RENTON STANDARDS 12103/2020 � RIM) EOH""'""' CITY OF :s. WHILE THIS INFORMAnoN is aeusyso ro wHO@ML'� p� 'ONSIBLE FOR ITS ACCURACY, OR ERROR OR ' ^r'NTOIQ BEN INCORPORATED I NTO TR I S DOCUMENT AS pyAR RENTON TRI& RECORD DOCUMENT ARE ADVISED TO L JOB OF ITS ACCURACY BEFORE "PLYING IT DATUM SK ATZM Planning/Building/Public Works Dept. REVISION BY DATE APPR .ee.am w-'E�' WALKER MAZDA DEALERSHIP 7/29/2019 AS-BUILTS 'a®"° FORD AHBL JOB #2180100.11 IWI Wk PRIVATE GRADING AND DRAINAGE PLAN C2.1SNUBS. IF ON w R-4067 07 N N O 0 00 00 T i1