WATER PLAN GENERAL NOTES Standard Plan No. 300
1. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE W17H THE LATEST EDITION OF THE CITY OF RENTON PUBLIC WORKS
STANDARD SPECIFICATIONS AND SPECIAL PROVISIONS AND WSDOT / APWA STANDARD SPECIFICATIONS, LATEST EDITION AS
AMENDED BYTHE CITY OF RENTON. A SET OF CITY APPROVED PLANS SHALL BE KEPT ATTIRE JOB SITE WHENEVER CONSTRUCTION
ISINPROGRESS. APRE-CONSTNUCTIONCONFERENCE SHALL BE HELD PRIOR TO THE START OF CONSTRUCTION. THE CONTRACTOR
AND OR DEVELOPER SHALL BE RESPONSIBLE FOR SECURING ALL NECESSARY PERMITS PRIOR M CONSTRUCTION.
2. ALL EXISTING UTILITIES SHALL REMAIN IN SERVICE DURING CONSTRUCTION UNLESS OTHERWISE NOTED. THE CONTRACTOR SHALL
CALL 1-800424-5555 TO VERIFY UTILITY LOCATIONS BEFORE BEGINNING EXCAVATION.
3. ALL MATERIALS USED FOR THE CONSTRUCTION OF WATER SYSTEM IMPROVEMENTS SHALL BE NEW AND UNDAMAGED, AND
"CATALOG CUTS" FOR ALL MATERIALS SHALL BE APPROVED IN WRITING BY THE CITY OF RENTON PRIOR TO BRINGING ANY
MATERIALS ON -SITE.
4. ALL WATER MAIN PIPE MATERIALS SHALL BE CEMENT LINED DUCTILE IRON PIPE, THICKNESS CUSS 52 PER AW WA C 151 AND C
104. PIPE JOINTS SHALL BE PUSH -ON OR MECHANICALJOINT. CAST IRON OR DUCTILE IRON PIPE FITTINGSSHALLBE CLASS 250AS
PER ANSI/AW WA CI10/A21.10-82. ALL DUCTILE IRON PIPE AND FITTINGS SHALL BE WRAPPED WITH &MIL BLACK, NBE-TYPE,
POLYETHYLENE PLASTIC PER AW WA C105 STANDARDS.
S. MINIMUM COVER FROM TOP OF WATER MAINS TO FINISHED GRADE SHALL BE 36INCHES FOR PIPE DIAMETER OF 10-INCH OR LESS
AND 48 INCHES FOR PIPE DIAMETER OF I2-INCH AND LARGER. MAXIMUM COVER FOR ALL WATER MAINS SHALL BE 60 INCHES.
ANY DEVIATIONS MUST BE APPROVED BY THE CITY OF RENTON PRIOR TO CONSTRUCTION. WHERE UTILI Y CONFUCTSOCCUR,
THE PROFILE OF THE WATER MAIN SHALL BE ADJUSTED AS NECESSARYTO CLEAR CONFLICTS ANDTO PROVIDE MINIMUM COVER
PIPE DEFLECTION SHALL NOT EXCEED ONE-HALF OF PIPE MANUFACTURER'S SPECIFICATION FOR SIZE OF PIPE USED. ALLTRENCH
BACKFILL SHALL BE COMPACTED TO 95 PERCENT MAXIMUM DRY DENSITY AS DETERMINED BY THE MODIFIED PROCTOR TEST
M BINGO (MOO) IN ROADWAYS, ROADWAY SHOULDERS, ROADWAY PRISM AND DRIVEWAYS, AND 85 PERCENT MDD IN UNPAVED
AREAS. ALL PIPE ZONE COMPACTION SHALL BE 95 MOD.
6. CONCRETE BLOCKING FOR WATER MAINS SHALL BE DESIGNED, INSTALLED AND POURED IN PUKE IN ACCORDANCE WITH CITY OF
RENTON STANDARD DETAILS AND SPEOFICATIONS AND SHALL BE INSTALLED AT ALLVERTICALAND HORIZONTAL BENDS, FIETINGS
AND BASE OF HYDRANTS. MEGA -LUGS (OR SIMILAR PRODUCT) MAYBE REQUIRED ONAU MECHANICALJOINTS IN ADDITION TO
CONCRETE BLOCKING.
7. ALL NEW WATER MAIN PIPES AND FITTINGS SHALL HAVE A FOAM PIPE PIG RUN THROUGH THEM PRIORTO BEING FLUSHED,
DISINFECTED, AND TESTED. CLEANING, PRESSURE AND PURITY TESTING SHALL BE DONE IN THE PRESENCE OF AND UNDER THE
SUPERVISION OF A CITY OF RENTON UTILITY INSPECTOR. THE CONTRACTOR SHALL SUPPLY, INSIALLAND REMOVE PLUGS,
CORPORATION STOPS, SLOW -OFF ASSEMBLIES, AND THRUST RESTRAINT/ BLOCKING FOR TESTING AND PURITY ACCEPTANCE. NO
CONNECTION SHALL BE MADE BETWEEN THE NEW MAIN OR BETWEEN THE NEW WET -TAP VALVETO AN EXISTING MAIN UNTIL
THE NEW PIPING HAS BEEN FOAM -PIGGED, DISINFECTED, FLUSHED, AND PASSED BOTH PRESSURE AND PURITY TESTING.
8. NEW WATER MAINS INCLUDING SERVICE LATERALS SHALL BE TESTED AT A STATIC PRESSURE OF ISO PSI ABOVE WORKING
PRESSURE WITH A MINIMUM OF 225 PSI TEST PRESSURE FOR 120 MINUTES WITH A MAXIMUM OF 5 PSI PRESSURE DROP DURING
THE ENTIRE TEST PERIOD. UPON SATISFACTORY COMPLETION OF THE PRESSURE TEST, THE LINE SHALL BE DISINFECTED, FLUSHED,
AND THEN WATER SAMPLES SHALL BE TAKEN FOR PURITY TESTING BY THE PUBLIC WORKS INSPECTOR.
9. THE CONTRACTOR SHALL NOTIFY THE CITY OF RENTON WATER UTILITY AND MAINTENANCE DEPARTMENTS AT LEAST 10 WORKING
DAYS PRIOR TO MAKING CONNECTIONS TO THE MISTING WATER SYSTEM. THE CONTRACTOR SHALL EXPOSE THE EXISTING WATER
MAIN AND FIRINGS AT THE CONNECTION POINT BEFORE ORDERING THE NECESSARY ADAPTOBS AND FIRINGS REQUIRED FOR
THE FINAL CONNECTION. THE CONTRACTOR SHALL EXCAVATE, REMOVE ALL SURFACE MATERIALS, AND PROVIDE SHORING AND
ALL MATERIALS REQUIRED FOR THE CITY OF RENTON TO PERFORM THE CONNECTION TO THE EXISTING WATER SYSTEM. THE
CONTRACTOR SHALL PROVIDE AND INSTALL BACKFILL, CONCRETE BLOCKING, AND COMPLETE SURFACE RESTORATION.
STD. PLAN — 300.0
R.
• PUBLIC WORKS
DEPARTMENT WATER PLAN GENERAL NOTES
MARCH 2O10
WATER PLAN GENERAL NOTES
� a
o ash
Know what's below.
Cell before you
EXISTING WATER LINE
PLAN VIEW
TESTING DETAIL
±B FT
.. O NEW WATER LINE
VERTICAL CROSS(MJxFU FOR PBLYPIGGING
ONE BLIND FLANGE ON TOP WITH 2-TAP & 2-PLUG
ONE BLIND FLANGE ON BOTTOM
ONE (NJ) PLUG WITH 2- TAP & 2' TEMPORARY BLOW -OFF
TEMPORARY BLOCK
CUT -IN (BY CITY FORCES)
TEE (ELATE) W/ CONC. BLOCK
3- GATE VALVES (FLxMJ)
2- SOLID SLEEVES (NJ) OR RO-MAC COUPLINGS
1- PLUG (NJ) W/2'TAP & TEMP, BLOW -OFF
TEMP. BLOCK
EXISTING WATER LINE
EXISTING WATER LINE
FINAL CONNECTION DETAIL
AFTER ALL TESTING, CLEANING BY POLYPIG, AND DISINFECTION,
REMOVE TEMP. BLOCK & BLOW -OFF L CONNECT
WITH SLEEVE (NJ) & ➢I SPOOLS
FINAL CONNECTION BY CITY FORCES
JEXISTING WATER LINE
PUBLIC WORKS CONNECTION TO WATER MAIN STD. PLAN — 900.4
DEPARTMENT CUT IN -LINE TEE & THREE VALVES
MARCH 2O10
WATER MAIN CUT IN CONNECTION
BE L I RELIABLE MBS NOT RESPONSIBLE FOR ITS ACCURACY. OR ERROROR ML
OMISSIONSWHICR MAY NAME BEEN INCORPOPATED INTOTRI S DOCUMENT AS pM pA
ARESULT. THOSE RELYING ON THIS RECORD DOCUMEHTAREADVISEDTO ML
OBTAIN INDEPENDENT VERIFICATION OF ITS ACCURACY BEFORE "PLYING IT MOTS
MR ANY PL IQ SK ATZM
N0. I REVISION Bl' DATE 1 APPR
NPDES PERMIT# WA
TEMPORARY 2" GALVANIZED PIPE
AND 2" GATE VALVE
FINISHED GRADE ELEVATION
INSTALL 2' PLUG ON TOP BLIND FLANGE
AFTER REMOVAL OF POLYPIG
3 FT MIN. COVER (10-INCH DIAMETER AND UNDER) /
4 FT MIN. COVER (12-INCH DIAMETER AND OVER) !//
NEW WATER MAIN POLYPIG
riuvLy��yx.���r.LainwurKHI.L.��e�rz.�a
SIZE OF VERTICAL CROSS SMALL BE THE SAME AS SIZE OF MIN ONE
VERTICAL CROSS (MI X R)
ONE BLIND FLANGE ON TOP OF CROSS WITH 2' TAP & 2' TEMPORARY BLOW -OFF ASSEMBLY
(REMOVE BLOW -OFF ASSEMBLY AND INSTALL 2' PLUG AFTER REMOVAL OF CLEANING POLY -PIG')
ONE BLIND FLANGE ON BOTTOM OF CROSS
ONE PLUG IMF) ON END OF CROSS
CONCRETE BLOCKING
ALL DEBRIS AND POLYPIGS SHALL BE REMOVED FROM SUMP OF VERTICAL CROSS BEFORE
DISINFECTION OF NEW WATER MIN
f n.
PUBLIC WORKS POLY PIG STATION FOR CLEANING OF
DEPARTMENT WATER MAINS
POLY PIG STATION
CITY OF
' RENTON
DATUM
Planning/Building/Public Works Dept.
STD. PLAN — 800.e
MARCH 2O10
mclom
T A C O M A • S E A T T L E
S P O K A N E • T R I- C I T I E S
2215 North 30th Street, Suite 300 Tacoma, WA 98403
253.383.2422 TEL 253.383.2572 FAx WR EahtI.mm WEB
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
WALKER MAZDA DEALERSHIP
PERMIT SET
AHBL JOB #2180100.11
WATER NOTES AND DETAILS
7/29/2019