Loading...
HomeMy WebLinkAboutPN_Landscape_Analysis_Lot_Coverage_Parking_Analysis_190916_v1CITC RENTON HEADQUARTERS LAND USE PERMIT APPLICATION LANDSCAPE, LOT COVERAGE, + PARKING ANALYSIS SEPTEMBER 16, 2019 1 | P a g e Total Lot Area: 65,175.62sf (1.496 Acres) Gross Building Areas: Level 1 31,041 sf Mezzanines 383 sf Level 2 18,339 sf Total Gross Floor Area 49,763 sf Secondary Structures: Trash Enclosure: 353 sf Transformer Vault/ Break Structure: 307 sf Gross Secondary Structures: 660 sf Lot Coverage (Structures): Maximum Lot Coverage (Per RMC 4-2-120A) : 65% Total Structure Footprints / Lot Area = (31,041sf + 660sf) / 65,175sf = 48.6% Lot Coverage 48.6% < 65% Max. (Therefore OK) Parking Required: Renton Municipal Code Section 4-4-080.F10 requires a minimum of 1 parking space per employee and 0.5 parking spaces per full-time student. CITC doesn’t have any full-time students since they all work full-time at construction sites and then come to CITC for approximately 3 hours of evening training during the hours of 4pm-9pm. CITC currently has approximately 36 employees (administrative staff and instructors) working at the existing Bellevue facility, but over the course of the next 5-10 years CITC anticipates increasing their administrative and instructor staff to approximately 60 to manage their new larger facility in Renton. Per the Renton Municipal Code parking calculation, 36 parking stalls will be required upon opening the facility in 2021 and 60 stalls will be required within 5-10 years of operation. Since CITC has unique hours of operation and parking needs, it was suggested during the Pre-App Conference (4/19/18) that a Traffic Study be performed to accurately assess how many parking stalls would be n eeded by CITC. This Traffic Study is included in the Land Use Permit Application package and has been summarized on the following page. CITC RENTON HEADQUARTERS LAND USE PERMIT APPLICATION LANDSCAPE, LOT COVERAGE, + PARKING ANALYSIS SEPTEMBER 16, 2019 2 | P a g e City of Renton Required Traffic Analysis Traffic Analysis Report Prepared By: Gibson Traffic Consultants (6/2018) Peak Demand (per Traffic Study): 24 Stalls Actual Parking Provided: 60 Stalls Types of Parking Provided: Standard Size (9ft x 20ft): 51 Stalls Compact: (8.5ft x 16ft) 6 Stalls Accessible Spaces: 2 Stalls Van Accessible Spaces: 1 Stall with Loading Zone Parking Lot Landscaping: Landscape Buffer (10ft): 5,314 sf Interior Parking Landscaping: 4,839 sf Total Parking Lot Landscaping: 10,153 sf