Loading...
HomeMy WebLinkAboutMFP19004989DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP19004989 IVR Number: 19004989 Permit Informaon Permit Name:Comcast Cable Franchise Permit Address/Locaon :09/06/2019Application Date:7231500720Parcel Number:304 MAIN AVE S Permit Type:09/19/2019Issue Date:Franchise Permit Work Class:09/18/2020Expiration Date:Minor Utility Job Number:JB#0000132334Franchise Type:Cable Description:Tie into existing case in existing vault. Proof and pull one 12CT fiber through existing occupied conduit. Access existing vault. Proof and pull one 12ct fiber through existing occupied conduit. Contacts Name Address PhoneTypeBilling Comcast Cable Communication Management & Comcast Cable B: (215) 665-1700Applicant Tom Donnelly Comcast Business Communications 1701 Jfk Blvd, 32nd Floor Philadelphia, PA 19103 B: (215) 286-7347 C: (215) 286-7557 Contact Michael Cannon Cannon Construction Inc 406 Porter Way Milton, WA 98354-9638 B: (253) 922-2787 C: (253) 588-4034 Contractor Business License Number: 20838Construction Contractor: CANNOCI055CS CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Laurie Dietz Comcast - Billing 1701 John F. Kennedy Blvd. Philadelphia, PA 19103 H: (425) 741-5733Specialized Billing X General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES MFP19004989Scott Warlick9/13/2019304 Main Ave SNathan Janders9/18/2019 MFP19004989Scott Warlick9/13/2019Monday - Friday8:00AM - 3:00PM SKETCH I -- NORTH -- I NOTES: • Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. • The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. • Approved Temporary Traffic Control Plan must be at the work site during work hours. • Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. • Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. • Total road closure lasting more than 24 hours is subject to the approval by the City Council. • Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: • Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. • Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. • The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. • Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). MFP19004989 1 - COVER SHEET 2 -LEGEND 3 -GENERAL NOTES 4 -OVERVIEW 5 -DESIGN 6 -NODE MAP 7-12 -PHOTOS 13 -TCP THIS IS PROPRIETARY INFORMATION AND NOT MEANT FOR GENERAL PUBLICATION. ALL RIGHTS RESERVED CANNON COMPANIES 12 CT FIBER: 175 FT + 20% STORAGE = 210 FT 24 CT FIBER: 330 FT + 20% STORAGE = 396 FT CONTACTS: PROJECT MAP: *ALL FOOTAGES AND MATERIALS ARE ESTIMATED N SCOPE OF WORK: SHEET INDEX: BILL OF MATERIALS*: NEW AERIAL = OVERLASH = NEW UNDERGROUND = EXISTING UNDERGROUND = RISER (0)= TOTAL FOOTAGE = 0 FT. 0 FT. 0 FT. 205 FT. 0 FT. 205 FT. PROJECT DESCRIPTION - ROW* NEW BUILDING PATH WAY = EXISTING BUILDING PATH WAY = NEW UNDERGROUND = EXISTING UNDERGROUND = TOTAL FOOTAGE = 175 FT. 0 FT. 0 FT. 125 FT. 300 FT. PROJECT DESCRIPTION -SITE* TOTAL PROJECT FOOTAGE =505 FT. -TIE INTO EXISTING SPLICE CASE SP.WAKV.0543 IN EXISTING VAULT -PROOF AND PULL THROUGH EXISTING OCCUPIED CONDUIT -ACCESS EXISTING 17X30 VAULT. CONTINUE PROOF AND PULL THROUGH EXISTING OCCUPIED CONDUIT -INSTALL NEW IM IN FIRST FLOOR ELEVATOR ROOM. TRANSITION FROM (1) 24CT TO (1) 12CT FIBER IN NEW PLENUM -LEAVE 75' STORAGE COIL IN 2ND FLOOR IT ROOM AND CONTINUE PLACING (1) NEW 12CT IN NEW PLENUM -LEAVE 30' SPLICE COIL IN 2ND FLOOR IT ROOM CANNON COMPANIES SAFETY | QUALITY | INTEGRITY | TEAMWORK Connecting The Future Since 1985 COMCAST Business/Job Contact POC:BRAD FAULKES 425-271-8055 Review _________________________ COMCAST COMMUNICATION Mike Fontenot - (425)-213-5482 - Mike_Fontenot@cable.comcast.com 304 MAIN AVE S STE 101 RENTON, WA 98057 ALLIANCE 2020 PC#500000 JB0000132334 METRO-E CANNON COMPANIES Andrew Perkins - 253.363.1646 - aperkins@cannonconstructioninc.com MFP19004989 N EOP FL P C S D G W TS T ST UT ROW DD DD DD DD EDGE OF PAVEMENT FOGLINE POWER COMMUNICATION SEWER DRAIN DRAINAGE DITCH GAS WATER TRAFFIC SIGNAL TELCOM STEAM UNKNOWN UTILITY RIGHT OF WAY TRAFFIC CONES PROPOSED NEW CONDUIT STRAW WATTLES P V LT CW R UTILITY POLE VAULT - SMALL PEDESTAL STREET LIGHT CROSSWALK LIGHT UTILITY RISER V VAULT - SMALL 444LA MANHOLE VAULT - 25TA CB CB CATCH BASIN CATCH BASIN WITH SOCK GLULAM UTILITY POLECENTER LINE LANE LINE FENCE HIGH VISIBILITY FENCE S SEWER MANHOLE D DRAIN MANHOLE W WATER MANHOLE V UTILITY VALVE SHRUBBERY BORE PIT VAULT - LARGE VAULT - 25TA C COMMUNICATION MANHOLE FIRE HYDRANT DISTANCE STATIONSTA 0+00 NOTE CALLOUT# X.X DISTANCE DIMENSION ASPHALT SURFACE CONCRETE SIDEWALK PANEL CONCRETE ROADWAY PANEL HF H-FRAME VAULT - LARGE CAB CABINET LEGEND LANE DIRECTION INDICATOR PROPOSED MARK-UP NOTATIONS RESTORATION TYPESEXISTING FEATURESLINE TYPES COMCAST SPLICE CASE OF DATE REVISION BY QC CANNON COMPANIES 0000132334ALLIANCE 2020 304 MAIN AVE S STE 101 RENTON, WA 98057 LEGEND 2 13 8/22/19 AH AP MFP19004989 COMCAST OF DATE REVISION BY QC CANNON COMPANIES 0000132334ALLIANCE 2020 304 MAIN AVE S STE 101 RENTON, WA 98057 GENERAL NOTES 3 13 8/22/19 AH AP MFP19004989 911907 913909 915 919 905 317 304 315 1015 MAIN AVE SHOUS E R W A Y S S 3RD ST V V TIE IN TO EXISTING CASE SP.WAKV.0543 IN EXISTING VAULT PROOF AND PULL (1) 12CT THROUGH EXISTING OCCUPIED CONDUIT ACCESS EXISTING 17X30 VAULT PROOF AND PULL (1) 12CT THROUGH EXISTING OCCUPIED CONDUIT 205' 1ST FLOOR ELEVATOR ROOM. INSTALL NEW IM AND TRANSITION FROM 24CT TO 12CT 2ND FLOOR UTILITY CLOSET 2ND FLOOR IT ROOM 24CT IN NEW PLENUM 12CT IN NEW PLENUM 24ct 125' 175' N OF DATE REVISION BY QC CANNON COMPANIES 0000132334ALLIANCE 2020 304 MAIN AVE S STE 101 RENTON, WA 98057 OVERVIEW 4 13 8/22/19 AH AP COMCAST MFP19004989 911907 913909 915 919 905 304 315 1015 MAIN AVE SHOUS E R W A Y S S 3RD ST S 3RD ST ROW ROW ROW ROW ROW ROW ROW ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROW ROW ROW EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOPEOP EOP EOP EOP EOP EOPEOPEOPEOPEOPV V TIE IN TO EXISTING CASE SP.WAKV.0543 IN EXISTING VAULT PROOF AND PULL (1) 12CT THROUGH EXISTING OCCUPIED CONDUIT ACCESS EXISTING 17X30 VAULT PROOF AND PULL (1) 12CT THROUGH EXISTING OCCUPIED CONDUIT 205' 1ST FLOOR ELEVATOR ROOM. INSTALL NEW IM AND TRANSITION FROM 24CT TO 12CT 2ND FLOOR UTILITY CLOSET 2ND FLOOR IT ROOM 24CT IN NEW PLENUM 12CT IN NEW PLENUM 125' 175' N OF DATE REVISION BY QC CANNON COMPANIES 0000132334ALLIANCE 2020 304 MAIN AVE S STE 101 RENTON, WA 98057 DESIGN 5 13 8/22/19 AH AP COMCAST MFP19004989 MFP19004989 EXISTING SPLICE CASE1SPLICE CASE SP.WAKV.0543 PROOF AND PULL 12CT2EXISTING VAULT PROOF AND PULL 12CT3CROSSING MAIN AVE S PROOF AND PULL 12CT4EAST CORNER OF MAIN AND HOUSER PROOF AND PULL 12CT5EAST CORNER OF MAIN AND HOUSER PROOF AND PULL (1) 12CT THROUGH EXISTING OCCUPIED CONDUIT PROOF AND PULL (1) 12CT THROUGH EXISTING OCCUPIED CONDUIT EXISTING 17X30 VAULT PROOF AND PULL (1) 12CT THROUGH EXISTING OCCUPIED CONDUIT PROOF AND PULL (1) 12CT THROUGH EXISTING OCCUPIED CONDUIT COMCAST OF DATE REVISION BY QC CANNON COMPANIES 0000132334ALLIANCE 2020 304 MAIN AVE S STE 101 RENTON, WA 98057 SITE PHOTOS 7 13 8/22/19 AH AP MFP19004989 NEW 24CT IN PLENUM6SUB FLOOR NEW 24CT IN PLENUM7SUB FLOOR SUB FLOOR HATCH REFERENCE81ST FLOOR ELEVATOR ROOM NEW 24CT IN PLENUM91ST FLOOR ELEVATOR ROOM NEW IM. SWITCH TO 12CT101ST FLOOR ELEVATOR ROOM NEW 12CT IN PLENUM111ST FLOOR ELEVATOR ROOM NEW 12CT IN PLENUM121ST FLOOR ELEVATOR ROOM (1) NEW 24CT FIBER IN NEW PLENUM DUCT (1) NEW 24CT FIBER IN NEW PLENUM DUCT (1) NEW 24CT FIBER IN NEW PLENUM DUCT (1) NEW 24CT FIBER IN NEW PLENUM DUCT (1) NEW 12CT FIBER IN NEW PLENUM DUCT NEW IM (1) NEW 12CT FIBER IN NEW PLENUM DUCT (1) NEW 12CT FIBER IN NEW PLENUM DUCT INTO HALL OVERHEAD NEW PENETRATION COMCAST OF DATE REVISION BY QC CANNON COMPANIES 0000132334ALLIANCE 2020 304 MAIN AVE S STE 101 RENTON, WA 98057 SITE PHOTOS 8 13 8/22/19 AH AP MFP19004989 ELEVATOR ROOM REFERENCE131ST FLOOR ELEVATOR ROOM DOOR NEW 12CT IN PLENUM141ST FLOOR HALLWAY NEW 12CT IN PLENUM151ST FLOOR HALLWAY NEW 12CT IN PLENUM16OVERHEAD TRANSITION TO 2ND FLOOR PHONE ROOM NEW 12CT IN PLENUM17OVERHEAD TRANSITION PHONE ROOM REFERENCE182ND FLOOR PHONE ROOM DOOR EXISTING FLOOR PENETRATION192ND FLOOR PHONE ROOM (1) NEW 12CT FIBER IN NEW PLENUM DUCT (1) NEW 12CT FIBER IN NEW PLENUM DUCT (1) NEW 12CT FIBER IN NEW PLENUM DUCT (1) NEW 12CT FIBER IN NEW PLENUM DUCT 2ND FLOOR EXISTING FLOOR PENETRATION COMCAST OF DATE REVISION BY QC CANNON COMPANIES 0000132334ALLIANCE 2020 304 MAIN AVE S STE 101 RENTON, WA 98057 SITE PHOTOS 9 13 8/22/19 AH AP MFP19004989 NEW 12CT IN PLENUM212ND FLOOR PHONE ROOM 22 24 25 26 23NEW 12CT IN PLENUM202ND FLOOR PHONE ROOM (1) NEW 12CT FIBER IN NEW PLENUM DUCT (1) NEW 12CT FIBER IN NEW PLENUM DUCT (1) NEW 12CT FIBER IN NEW PLENUM DUCT (1) NEW 12CT FIBER IN NEW PLENUM DUCT 75' STORAGE COIL (1) NEW 12CT FIBER IN NEW PLENUM DUCT (1) NEW 12CT FIBER IN NEW PLENUM DUCT (1) NEW 12CT FIBER IN NEW PLENUM DUCT NEW 12CT IN PLENUM 2ND FLOOR PHONE ROOM LEAVE 75' STORAGE COIL 2ND FLOOR PHONE ROOM NEW 12CT IN PLENUM 2ND FLOOR ABOVE DROP CEILING NEW 12CT IN PLENUM 2ND FLOOR ABOVE DROP CEILING NEW 12CT IN PLENUM 2ND FLOOR ABOVE DROP CEILING COMCAST OF DATE REVISION BY QC CANNON COMPANIES 0000132334ALLIANCE 2020 304 MAIN AVE S STE 101 RENTON, WA 98057 SITE PHOTOS 10 13 8/22/19 AH AP MFP19004989 27 28 29 30 31 32 33 (1) NEW 12CT FIBER IN NEW PLENUM DUCT (1) NEW 12CT FIBER IN NEW PLENUM DUCT (1) NEW 12CT FIBER IN NEW PLENUM DUCT (1) NEW 12CT FIBER IN NEW PLENUM DUCT (1) NEW 12CT FIBER IN NEW PLENUM DUCT (1) NEW 12CT FIBER IN NEW PLENUM DUCT (1) NEW 12CT FIBER IN NEW PLENUM DUCT NEW 12CT IN PLENUM 2ND FLOOR ABOVE DROP CEILING NEW 12CT IN PLENUM 2ND FLOOR ABOVE DROP CEILING NEW 12CT IN PLENUM 2ND FLOOR ABOVE DROP CEILING NEW 12CT IN PLENUM 2ND FLOOR ABOVE DROP CEILING NEW 12CT IN PLENUM 2ND FLOOR ABOVE DROP CEILING NEW 12CT IN PLENUM 2ND FLOOR ABOVE DROP CEILING NEW 12CT IN PLENUM 2ND FLOOR ABOVE DROP CEILING COMCAST OF DATE REVISION BY QC CANNON COMPANIES 0000132334ALLIANCE 2020 304 MAIN AVE S STE 101 RENTON, WA 98057 SITE PHOTOS 11 13 8/22/19 AH AP MFP19004989 34 35 36 NEW 12CT IN PLENUM37IT ROOM 38 LEAVE 30' SPLICE COIL39IT ROOM (1) NEW 12CT FIBER IN NEW PLENUM DUCT (1) NEW 12CT FIBER IN NEW PLENUM DUCT (1) NEW 12CT FIBER IN NEW PLENUM DUCT (1) NEW 12CT FIBER IN NEW PLENUM DUCT (1) NEW 12CT FIBER IN NEW PLENUM DUCT 30' SPLICE COIL 30' SPLICE COIL EQUIPMENT RACK NEW 12CT IN PLENUM 2ND FLOOR ABOVE DROP CEILING NEW 12CT IN PLENUM 2ND FLOOR ABOVE DROP CEILING NEW 12CT IN PLENUM 2ND FLOOR ABOVE DROP CEILING LEAVE 30' SPLICE COIL IT ROOM COMCAST OF DATE REVISION BY QC CANNON COMPANIES 0000132334ALLIANCE 2020 304 MAIN AVE S STE 101 RENTON, WA 98057 SITE PHOTOS 12 13 8/22/19 AH AP MFP19004989