HomeMy WebLinkAboutMFP19004989DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP19004989
IVR Number: 19004989
Permit Informaon
Permit Name:Comcast Cable Franchise Permit
Address/Locaon :09/06/2019Application Date:7231500720Parcel Number:304 MAIN AVE S
Permit Type:09/19/2019Issue Date:Franchise
Permit Work Class:09/18/2020Expiration Date:Minor Utility
Job Number:JB#0000132334Franchise Type:Cable
Description:Tie into existing case in existing vault. Proof and pull one 12CT fiber through existing occupied conduit. Access
existing vault. Proof and pull one 12ct fiber through existing occupied conduit.
Contacts
Name Address PhoneTypeBilling
Comcast Cable Communication
Management & Comcast Cable
B: (215) 665-1700Applicant
Tom Donnelly
Comcast Business Communications
1701 Jfk Blvd, 32nd Floor
Philadelphia, PA 19103
B: (215) 286-7347
C: (215) 286-7557
Contact
Michael Cannon
Cannon Construction Inc
406 Porter Way
Milton, WA 98354-9638
B: (253) 922-2787
C: (253) 588-4034
Contractor
Business License Number: 20838Construction Contractor: CANNOCI055CS
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Laurie Dietz
Comcast - Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
H: (425) 741-5733Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
MFP19004989Scott Warlick9/13/2019304 Main Ave SNathan Janders9/18/2019
MFP19004989Scott Warlick9/13/2019Monday - Friday8:00AM - 3:00PM
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
MFP19004989
1 - COVER SHEET
2 -LEGEND
3 -GENERAL NOTES
4 -OVERVIEW
5 -DESIGN
6 -NODE MAP
7-12 -PHOTOS
13 -TCP
THIS IS PROPRIETARY INFORMATION AND NOT MEANT FOR GENERAL PUBLICATION. ALL RIGHTS RESERVED CANNON COMPANIES
12 CT FIBER: 175 FT + 20% STORAGE = 210 FT
24 CT FIBER: 330 FT + 20% STORAGE = 396 FT
CONTACTS:
PROJECT MAP:
*ALL FOOTAGES AND MATERIALS ARE ESTIMATED
N
SCOPE OF WORK:
SHEET INDEX:
BILL OF MATERIALS*:
NEW AERIAL =
OVERLASH =
NEW UNDERGROUND =
EXISTING UNDERGROUND =
RISER (0)=
TOTAL FOOTAGE =
0 FT.
0 FT.
0 FT.
205 FT.
0 FT.
205 FT.
PROJECT DESCRIPTION - ROW*
NEW BUILDING PATH WAY =
EXISTING BUILDING PATH WAY =
NEW UNDERGROUND =
EXISTING UNDERGROUND =
TOTAL FOOTAGE =
175 FT.
0 FT.
0 FT.
125 FT.
300 FT.
PROJECT DESCRIPTION -SITE*
TOTAL PROJECT FOOTAGE =505 FT.
-TIE INTO EXISTING SPLICE CASE SP.WAKV.0543 IN EXISTING VAULT
-PROOF AND PULL THROUGH EXISTING OCCUPIED CONDUIT
-ACCESS EXISTING 17X30 VAULT. CONTINUE PROOF AND PULL
THROUGH EXISTING OCCUPIED CONDUIT
-INSTALL NEW IM IN FIRST FLOOR ELEVATOR ROOM. TRANSITION
FROM (1) 24CT TO (1) 12CT FIBER IN NEW PLENUM
-LEAVE 75' STORAGE COIL IN 2ND FLOOR IT ROOM AND CONTINUE
PLACING (1) NEW 12CT IN NEW PLENUM
-LEAVE 30' SPLICE COIL IN 2ND FLOOR IT ROOM
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
COMCAST Business/Job Contact
POC:BRAD FAULKES 425-271-8055
Review _________________________
COMCAST COMMUNICATION
Mike Fontenot - (425)-213-5482 - Mike_Fontenot@cable.comcast.com
304 MAIN AVE S STE 101
RENTON, WA 98057
ALLIANCE 2020
PC#500000
JB0000132334
METRO-E
CANNON COMPANIES
Andrew Perkins - 253.363.1646 - aperkins@cannonconstructioninc.com
MFP19004989
N
EOP
FL
P
C
S
D
G
W
TS
T
ST
UT
ROW
DD DD DD DD
EDGE OF PAVEMENT
FOGLINE
POWER
COMMUNICATION
SEWER
DRAIN
DRAINAGE DITCH
GAS
WATER
TRAFFIC SIGNAL
TELCOM
STEAM
UNKNOWN UTILITY
RIGHT OF WAY
TRAFFIC CONES
PROPOSED NEW CONDUIT
STRAW WATTLES
P
V
LT
CW
R
UTILITY POLE
VAULT - SMALL
PEDESTAL
STREET LIGHT
CROSSWALK LIGHT
UTILITY RISER
V VAULT - SMALL
444LA MANHOLE
VAULT - 25TA
CB
CB
CATCH BASIN
CATCH BASIN WITH SOCK
GLULAM UTILITY POLECENTER LINE
LANE LINE
FENCE
HIGH VISIBILITY FENCE
S SEWER MANHOLE
D DRAIN MANHOLE
W WATER MANHOLE
V UTILITY VALVE
SHRUBBERY
BORE PIT
VAULT - LARGE
VAULT - 25TA
C COMMUNICATION MANHOLE
FIRE HYDRANT
DISTANCE STATIONSTA 0+00
NOTE CALLOUT#
X.X DISTANCE DIMENSION
ASPHALT SURFACE
CONCRETE SIDEWALK PANEL
CONCRETE ROADWAY PANEL
HF H-FRAME
VAULT - LARGE
CAB CABINET
LEGEND
LANE DIRECTION INDICATOR
PROPOSED MARK-UP NOTATIONS RESTORATION TYPESEXISTING FEATURESLINE TYPES
COMCAST
SPLICE CASE
OF
DATE REVISION BY QC
CANNON COMPANIES
0000132334ALLIANCE 2020
304 MAIN AVE S STE 101
RENTON, WA 98057
LEGEND 2 13
8/22/19 AH AP
MFP19004989
COMCAST
OF
DATE REVISION BY QC
CANNON COMPANIES
0000132334ALLIANCE 2020
304 MAIN AVE S STE 101
RENTON, WA 98057
GENERAL NOTES 3 13
8/22/19 AH AP
MFP19004989
911907 913909 915 919
905
317
304
315
1015
MAIN AVE SHOUS
E
R
W
A
Y
S
S 3RD ST
V
V
TIE IN TO EXISTING CASE
SP.WAKV.0543 IN EXISTING VAULT
PROOF AND PULL (1) 12CT THROUGH
EXISTING OCCUPIED CONDUIT
ACCESS EXISTING
17X30 VAULT
PROOF AND PULL (1) 12CT THROUGH
EXISTING OCCUPIED CONDUIT
205'
1ST FLOOR ELEVATOR
ROOM. INSTALL NEW IM
AND TRANSITION FROM
24CT TO 12CT
2ND FLOOR
UTILITY CLOSET
2ND FLOOR
IT ROOM
24CT IN NEW PLENUM
12CT IN NEW PLENUM
24ct
125'
175'
N
OF
DATE REVISION BY QC
CANNON COMPANIES
0000132334ALLIANCE 2020
304 MAIN AVE S STE 101
RENTON, WA 98057
OVERVIEW 4 13
8/22/19 AH AP
COMCAST
MFP19004989
911907 913909 915 919
905
304
315
1015
MAIN AVE SHOUS
E
R
W
A
Y
S
S 3RD ST S 3RD ST
ROW
ROW
ROW
ROW
ROW ROW ROW
ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW
ROW
ROW
ROW
EOP
EOP
EOP
EOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP
EOPEOP
EOP
EOP
EOP
EOP EOPEOPEOPEOPEOPV
V
TIE IN TO EXISTING CASE
SP.WAKV.0543 IN EXISTING VAULT
PROOF AND PULL (1) 12CT THROUGH
EXISTING OCCUPIED CONDUIT
ACCESS EXISTING
17X30 VAULT
PROOF AND PULL (1) 12CT THROUGH
EXISTING OCCUPIED CONDUIT
205'
1ST FLOOR ELEVATOR
ROOM. INSTALL NEW IM
AND TRANSITION FROM
24CT TO 12CT
2ND FLOOR
UTILITY CLOSET
2ND FLOOR
IT ROOM
24CT IN NEW PLENUM
12CT IN NEW PLENUM
125'
175'
N
OF
DATE REVISION BY QC
CANNON COMPANIES
0000132334ALLIANCE 2020
304 MAIN AVE S STE 101
RENTON, WA 98057
DESIGN 5 13
8/22/19 AH AP
COMCAST
MFP19004989
MFP19004989
EXISTING SPLICE CASE1SPLICE CASE SP.WAKV.0543
PROOF AND PULL 12CT2EXISTING VAULT
PROOF AND PULL 12CT3CROSSING MAIN AVE S
PROOF AND PULL 12CT4EAST CORNER OF MAIN AND HOUSER
PROOF AND PULL 12CT5EAST CORNER OF MAIN AND HOUSER
PROOF AND PULL (1) 12CT THROUGH
EXISTING OCCUPIED CONDUIT
PROOF AND PULL (1) 12CT THROUGH
EXISTING OCCUPIED CONDUIT
EXISTING 17X30 VAULT
PROOF AND PULL (1) 12CT THROUGH
EXISTING OCCUPIED CONDUIT
PROOF AND PULL (1) 12CT THROUGH
EXISTING OCCUPIED CONDUIT
COMCAST
OF
DATE REVISION BY QC
CANNON COMPANIES
0000132334ALLIANCE 2020
304 MAIN AVE S STE 101
RENTON, WA 98057
SITE PHOTOS 7 13
8/22/19 AH AP
MFP19004989
NEW 24CT IN PLENUM6SUB FLOOR
NEW 24CT IN PLENUM7SUB FLOOR
SUB FLOOR HATCH REFERENCE81ST FLOOR ELEVATOR ROOM
NEW 24CT IN PLENUM91ST FLOOR ELEVATOR ROOM
NEW IM. SWITCH TO 12CT101ST FLOOR ELEVATOR ROOM
NEW 12CT IN PLENUM111ST FLOOR ELEVATOR ROOM
NEW 12CT IN PLENUM121ST FLOOR ELEVATOR ROOM
(1) NEW 24CT FIBER IN
NEW PLENUM DUCT
(1) NEW 24CT FIBER IN
NEW PLENUM DUCT
(1) NEW 24CT FIBER IN
NEW PLENUM DUCT
(1) NEW 24CT FIBER IN
NEW PLENUM DUCT
(1) NEW 12CT FIBER IN
NEW PLENUM DUCT
NEW IM
(1) NEW 12CT FIBER IN
NEW PLENUM DUCT
(1) NEW 12CT FIBER IN NEW PLENUM
DUCT INTO HALL OVERHEAD
NEW PENETRATION
COMCAST
OF
DATE REVISION BY QC
CANNON COMPANIES
0000132334ALLIANCE 2020
304 MAIN AVE S STE 101
RENTON, WA 98057
SITE PHOTOS 8 13
8/22/19 AH AP
MFP19004989
ELEVATOR ROOM REFERENCE131ST FLOOR ELEVATOR ROOM DOOR
NEW 12CT IN PLENUM141ST FLOOR HALLWAY
NEW 12CT IN PLENUM151ST FLOOR HALLWAY
NEW 12CT IN PLENUM16OVERHEAD TRANSITION TO
2ND FLOOR PHONE ROOM
NEW 12CT IN PLENUM17OVERHEAD TRANSITION
PHONE ROOM REFERENCE182ND FLOOR PHONE ROOM DOOR
EXISTING FLOOR PENETRATION192ND FLOOR PHONE ROOM
(1) NEW 12CT FIBER IN
NEW PLENUM DUCT
(1) NEW 12CT FIBER IN
NEW PLENUM DUCT
(1) NEW 12CT FIBER IN
NEW PLENUM DUCT
(1) NEW 12CT FIBER IN
NEW PLENUM DUCT
2ND FLOOR EXISTING
FLOOR PENETRATION
COMCAST
OF
DATE REVISION BY QC
CANNON COMPANIES
0000132334ALLIANCE 2020
304 MAIN AVE S STE 101
RENTON, WA 98057
SITE PHOTOS 9 13
8/22/19 AH AP
MFP19004989
NEW 12CT IN PLENUM212ND FLOOR PHONE ROOM
22
24
25 26
23NEW 12CT IN PLENUM202ND FLOOR PHONE ROOM
(1) NEW 12CT FIBER IN
NEW PLENUM DUCT
(1) NEW 12CT FIBER IN
NEW PLENUM DUCT
(1) NEW 12CT FIBER IN
NEW PLENUM DUCT
(1) NEW 12CT FIBER IN
NEW PLENUM DUCT
75' STORAGE COIL
(1) NEW 12CT FIBER IN
NEW PLENUM DUCT (1) NEW 12CT FIBER IN
NEW PLENUM DUCT (1) NEW 12CT FIBER IN
NEW PLENUM DUCT
NEW 12CT IN PLENUM
2ND FLOOR PHONE ROOM
LEAVE 75' STORAGE COIL
2ND FLOOR PHONE ROOM
NEW 12CT IN PLENUM
2ND FLOOR ABOVE DROP CEILING
NEW 12CT IN PLENUM
2ND FLOOR ABOVE DROP CEILING
NEW 12CT IN PLENUM
2ND FLOOR ABOVE DROP CEILING
COMCAST
OF
DATE REVISION BY QC
CANNON COMPANIES
0000132334ALLIANCE 2020
304 MAIN AVE S STE 101
RENTON, WA 98057
SITE PHOTOS 10 13
8/22/19 AH AP
MFP19004989
27 28 29 30
31 32
33
(1) NEW 12CT FIBER IN
NEW PLENUM DUCT
(1) NEW 12CT FIBER IN
NEW PLENUM DUCT (1) NEW 12CT FIBER IN
NEW PLENUM DUCT
(1) NEW 12CT FIBER IN
NEW PLENUM DUCT
(1) NEW 12CT FIBER IN
NEW PLENUM DUCT (1) NEW 12CT FIBER IN
NEW PLENUM DUCT
(1) NEW 12CT FIBER IN
NEW PLENUM DUCT
NEW 12CT IN PLENUM
2ND FLOOR ABOVE DROP CEILING
NEW 12CT IN PLENUM
2ND FLOOR ABOVE DROP CEILING
NEW 12CT IN PLENUM
2ND FLOOR ABOVE DROP CEILING
NEW 12CT IN PLENUM
2ND FLOOR ABOVE DROP CEILING
NEW 12CT IN PLENUM
2ND FLOOR ABOVE DROP CEILING
NEW 12CT IN PLENUM
2ND FLOOR ABOVE DROP CEILING
NEW 12CT IN PLENUM
2ND FLOOR ABOVE DROP CEILING
COMCAST
OF
DATE REVISION BY QC
CANNON COMPANIES
0000132334ALLIANCE 2020
304 MAIN AVE S STE 101
RENTON, WA 98057
SITE PHOTOS 11 13
8/22/19 AH AP
MFP19004989
34
35
36
NEW 12CT IN PLENUM37IT ROOM 38 LEAVE 30' SPLICE COIL39IT ROOM
(1) NEW 12CT FIBER IN
NEW PLENUM DUCT
(1) NEW 12CT FIBER IN
NEW PLENUM DUCT
(1) NEW 12CT FIBER IN
NEW PLENUM DUCT
(1) NEW 12CT FIBER IN
NEW PLENUM DUCT
(1) NEW 12CT FIBER IN
NEW PLENUM DUCT
30' SPLICE COIL
30' SPLICE COIL
EQUIPMENT RACK
NEW 12CT IN PLENUM
2ND FLOOR ABOVE DROP CEILING
NEW 12CT IN PLENUM
2ND FLOOR ABOVE DROP CEILING
NEW 12CT IN PLENUM
2ND FLOOR ABOVE DROP CEILING
LEAVE 30' SPLICE COIL
IT ROOM
COMCAST
OF
DATE REVISION BY QC
CANNON COMPANIES
0000132334ALLIANCE 2020
304 MAIN AVE S STE 101
RENTON, WA 98057
SITE PHOTOS 12 13
8/22/19 AH AP
MFP19004989