Loading...
HomeMy WebLinkAbout3247_001.pdfField Rep Project No. Page 1 of 2 Report No Earth Solutions NWLLc S0111,11 AK 0895.06 32a 6LN ULC 1805 – 136TH Place N.E., Suite 201, Time On Site Time Off Site Date Day of Week Bellevue, WA 98005 Phone (425) 449-4704 FAX (425) 449-4711 12:00 PM 12:30 PM 9/16/19 Monday CONSTRUCTION STORMWATER NPDES Permit No GENERAL PERMIT - FIELD REPORT WAR -307963 Project Name Job Location Client / Owner Weatherly Inn 4500 Talbot Rd. S., Renton RJ Development, LLC Erosion Control BMPs Overall ConditionG= Need Repair (13 Elements) Good F=Fair Y= Yes N=No Comments P=Poor 1. Preserve Vegetation/Mark Clearing Limits Buffer Zones Around Sensitive Areas G N Silt fence working as intended • Silt Fence _ ^2. Establish Construction Access • Fabric/Quarry Spalls G N Sweep roadway when soil is seen on surface, • Wheel Wash replenish quarry spalls as needed • Sweeper Truck 3. Control Flow Rates .. ........ –... .... — • Stormwater Vault/Facility F N Add check dams and straw wattles as needed to • Straw Wattles slow storrnwater onsite • Check Dams 4. Install Sediment Controls • Silt Fence • Straw Bale Barriers Add straw as needed throughout the site, 2" • Vegetation G N • Straw minimum • Sediment Ponds/Traps/Filters • Chemical Treatment 5. Stabilize Soils • Nets and Blankets • Mulch / Bark / Rock • Hydroseeding / Grass • Plastic Sheeting G N • Stabilize Stockpiles • Stockpiles • PAM • Water Truck 6. Protect Slopes G N • Benching / Track Walking • Pipe Slope Drains • Plastic Sheeting / Anchors (1) 7. Protect Drain Inlets • Catch Basin Inserts G N CB inserts working as intended • Gutter / Road N/A 8. Stabilize Channels and Outlets N/A N/A • Channel Lining i • Check Dam • Outlet Protection Nets and Blankets 9. Control Pollutants N/A N/A N/A • Chemical Storage Area Covered • Concrete Handling 10. Control De -Watering N/A N/A N/A 11. Maintain BMPs G N See recommended notes 12. Manage the Project G N Available upon request Maintain SWPPP / Site Lo Book 13. Protect Low Impact Development (LID BMPs) • Bioretention Rain Garden Facilities N/A N/A N/A • Permeable Pavement Field Rep. NPDES Permit No. Date Project No Page 2 of 2 Report No. AK WAR -307963 9/16/19 0895.06 Ongoing 32a j Monitoring and Records / Recommendations? Will existing BMPs need to be modified or removed, or other BMPs installed? If YES, list the action items to be completed on the following table: ❑ YES ® NO Actions / Recommendations To Be Completed Completed Y or N Initials / Date if Complete Sweep site entrance when soil is seen on roadway Ongoing Ongoing Add 2" straw throughout the site over exposed soils as needed Ongoing Ongoing .......... ..._.. Replenish quarry spalls at the main entrance to the site as needed Ongoing .............. Ongoing discoloration, or oil sheen. N/A Turbidity Meter Used: Hanna Meter # 15 — ..... .... .......... .......... _.... _................. Monitor Location Turbidity (NTUs) _... i. ....... _... _.......... _ pH Describe Current Weather Conditions: 60so F, Overcast Approximate amount of precipitation since last inspection: 1.02 inches Approximate amount of precipitation in the last 24 hours: 0.03 inches Was water quality sampling part of this inspection? ❑ YES ® NO If YES, record results in the table below: Describe below the discharging stormwater, if present Note the presence of suspended sediment, "cloudiness", discoloration, or oil sheen. N/A Turbidity Meter Used: Hanna Meter # 15 — ..... .... .......... .......... _.... _................. Monitor Location Turbidity (NTUs) _... i. ....... _... _.......... _ pH • Is the site in compliance with the SWPPP and the permit requirements? • If NO, indicate tasks necessary to bring site into compliance on the "Actions To Be Completed" table above, and include dates each job will be completed. • If NO, has the non-compliance been report to Dept. of Ecology? • If NO, should the SWPPP be modified? Sign the following certificate: "I certify that this report is true, accurate, and complete, to the best of my knowledge and belief." By: (Print/Sign) Andrew Kimn , CESCL Certification Number: CESCL-EP8182309 Inspection completed on: (Date) 9/16/19 Notes ® YES ❑ NO ❑ YES ❑ NO ❑ YES ❑ NO A6