HomeMy WebLinkAboutCM_Construction Mitigation_190906_v1.pdf715 Lind Ave SW Renton, WA 98057 Construction Mitigation Description The proposed construction dates are dependent on building permits, we would like to begin as soon as possible. Construction will last approximately 60 days. We do not need to block the roads for this construction as most of it will be inside the building. Dust and noise should be minimal. We do not require special hours for construction, the work can be done during business hours. We do not need cranes for this project. RECEIVED 10/11/2019 amorganroth PLANNING DIVISION