Loading...
HomeMy WebLinkAboutPN_Cover Letter_190703_v1BARGTIAUSEN July 3, 2019 Hand Delivery Ms. Angelea Weihs City of Renton Department of Community and Economic Development 1055 South Grady Way Renton, WA 98057 RE:Site Plan Review Brown Bear Carwash - Auto Sentry Addition 77 RainierAvenue, Renton, Washington 98057 OurJob No.20696 Dear Ms. Weihs: On behalf of our client Car Wash Enterprises, lnc., Barghausen Consulting Engineers, lnc. is submitting the required application forms, plans, and supporting documentation for a Site Plan Review to allow for the expansion of the addition of the Auto Sentry. The project includes the addition of a 27- by 20-foot Auto Sentry canopy structure for unattended, point-of-sale transactions. Additional site improvements include the addition of a trash enclosure, asphalt paving and striping, new curbing, and perimeter and interior landscaping. The existing automotive service station will be demolished and replaced with new paving and landscaping. The following items are enclosed for your review: 1. One (1) PDF copy of the Pre-Application Meeting Summary prepared by the City of Renton dated February 22,2018 2. One (1) PDF copy of the Waiver Form prepared by the City of Renton dated April 4,2018 3. One (1) PDF copy of the Land Use Permit Master Application 4. One (1) PDF copy of the Project Narrative prepared by Barghausen Consulting Engineers, lnc. dated July 2,2019, including: a. Construction Mitigation Description b. Urban Center Design Report 5. One (1) PDF copy of the Environmental Checklist prepared by Carwash Enterprises, lnc. dated March 01,2018 6. One (1) PDF copy of the Title Report prepared by Chicago Title lnsurance Company dated May 14,2A19 7. One (1) PDF copy of the Affidavit of lnstallation of Public lnformation Sign 8. One (1) PDF copy of the photo depicting the location of the Public lnformation Sign BARGHAUSEN CONSULTING ENGINEERS, INC. 18215 72ND AVENUE SOUTH KENT, WA 98032 Pl 425-251-6222 F\ O5-29-A7A2 BRANCH OFFICES: TUMWATER, WA KLAMATH FALLS, OR LONC BEACH, CA ROSEVILLE, CA SAN DIECO, CA barghausen.com Ms. Angelea Weihs City of Renton Department of Community and Economic Development July 3, 2019 L One (l ) PDF copy of the Neighborhood Detail Map 10. One (1) PDF copy of the Preliminary Site Plan prepared by Barghausen Consulting Engineers, lnc. dated June 14, 2019 11. One (1) PDF copy of the Preliminary Grading Plan with Demo Exhibit prepared by Barghausen Consulting Engineers, lnc. dated July 2,2019 12. One (1) PDF copy of the Architectural Elevations, including Screening Details for Refuse, prepared by Barghausen Consulting Engineers, lnc. dated May 3l ,2019 13. One (1) PDF copy of the Landscape Plan, including the Landscape Analysis prepared by Bradley Design Group, lnc. dated April 16,2018 14. One (1) PDF copy of the ALTA/NSPS Land Title Survey prepared by Barghausen Consulting Engineers, lnc. dated May 6, 2019 '15. One (1) PDF copy of the Geologic Hazard Report prepared by Zipper Geo Associates dated July 27,2018 16. One (1) PDF copy of the Letter of Geologic Risk dated June 28, 2019 17. One (1) PDF copy of the Drainage Report (TlR) prepared by Barghausen Consulting Engineers, lnc. July 2,2019 18. One (1 ) PDF copy of the Colored Maps for Display, including a. Colored Preliminary Site Plan b. Colored Landscape Plan We believe that the enclosed plans and technical documents make up complete applications. Should you have any questions or require additional documentation, please contact me al (425) 251-6222 or by email at m brasel@barghausen.com. Sincerely, fb¿ a/.-* Nick A. Wecker Senior Planner NAW/lb [20696c.001 .doc]enc: As Notedcc: Mr. Joe Guiseffi, CarWash Enterprises, lnc. Mr. Jay S. Grubb, Barghausen Consulting Engineers, lnc. Mr. Chris S. Ferko, Barghausen Consulting Engineers, lnc. Ms. Mettie Brasel, Barghausen Consulting Engineers, lnc. Anthony E. Merlino, Barghausen Consulting Engineers, lnc. -2-