Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
R_401302
SHEET NO. DRAWING NO DRAWING TITLE GENERAL 4-APRON-R-GO GO COVER SHEET 4-APRON-R-G1 G1 SHEET INDEX 4-APRON-R-G2 G2 GENERALNOTES 4-APRON-R-G3 G3 GENERAL STRUCTURAL NOTES 4-APRON-R-G4 G4 GENERAL WATERWORKS NOTES 4-APRON-R-GS G5 SPECIAL INSPECTION SCHEDULES 4-APRON-R-G6 G6 KEY PLAN 4-APRON-R-G7 G7 OVERALL SITE PLAN - EXISTING 4-APRON-R-G8 G8 OVERALL EXISTING PAVEMENT THICKNESS PLAN 4-APRON-R-G9 G9 OVERALL SITE PLAN 4-APRON-R-G10 G10 OVERALL UTILITY PLAN EXISTING CONDITIONS 4-APRON-R-G80 G80 EXISTING CONDITIONS 4-APRON-R-G81 G81 EXISTING CONDITIONS 4-APRON-R-G82 G82 EXISTING CONDITIONS 4-APRON-R-G83 G83 EXISTING CONDITIONS 4-APRON-R-G84 G84 EXISTING CONDITIONS 4-APRON-R-G85 G85 EXISTING CONDITIONS REMOVAL 4-APRON-R-C80R C80R CIVIL SITE REMOVAL PLAN 4-APRON-R-C81R C81R CIVIL SITE REMOVAL PLAN 4-APRON-R-C82R C82R CIVIL SITE REMOVAL PLAN 4-APRON-R-C83R C83R CIVIL SITE REMOVAL PLAN 4-APRON-R-C84R C84R CIVIL SITE REMOVAL PLAN 4-APRON-R-C85R C85R CIVIL SITE REMOVAL PLAN TESC 4-APRON-R-C150 C150 TEMPORARY EROSION CONTROL PLAN -AREA 1 4-APRON-R-C151 C151 TEMPORARY EROSION CONTROL PLAN - AREA 3 4-APRON-R-C152 C152 TEMPORARY EROSION CONTROL PLAN - AREA 2 4-APRON-R-C153 C153 TEMPORARY EROSION CONTROL DETAILS SITE 4-APRON-R-C80 C80 CIVIL SITE PLAN 4-APRON-R-C81 C81 CIVIL SITE PLAN 4-APRON-R-C82 C82 CIVIL SITE PLAN 4-APRON-R-C83 C83 CIVIL SITE PLAN 4-APRON-R-C84 C84 CIVIL SITE PLAN 4-APRON-R-C85 C85 CIVIL SITE PLAN CONSTRUCTION PHASING 4-APRON-R-0500-1A C500-IA CONSTRUCTION PHASING NOTESAND DETAILS 4-APRON-R-0500-1B C500-1B PHASING PLAN -AREA 1: PHASE 1 4-APRON-R-0500-1C C500-1C PHASING PLAN - AREA 3: PHASE 2 4-APRON-R-0500-1D C500-ID PHASING PLAN - AREA 3: PHASE 3 4-APRON-R-0500-1E C500-1E PHASING PLAN - AREA 1 & 3: PHASE 4 4-APRON-R-0500-1F C500-11F PHASING PLAN - AREA 1: PHASE 5 4-APRON-R-0500-1G C500-1G PHASING PLAN - AREA 1 & 3: PHASE 6 4-APRON-R-0500-1H C500-11H PHASING PLAN - AREA 2: PHASE 7 PAVEMENT 4-APRON-R-0500-2A C500-2A GRADING/PAVEMENT PLAN - SHEET 1 4-APRON-R-0500-2B C500-21B GRADING/PAVEMENT PLAN -SHEET 2 4-APRON-R-0500-2C C500-2C GRADING/PAVEMENT PLAN -SHEET 3 4-APRON-R-0500-2D C500-21D GRADING/PAVEMENT PLAN - SHEET 4 4-APRON-R-0500-2E C500-2E GRADING/PAVEMENT PLAN -SHEET 5 4-APRON-R-0500-2F C500-21F GRADING/PAVEMENT PLAN -SHEET 6 4-APRON-R-0500-2G C500-2G GRADING/PAVEMENT DETAILS - SHEET 1 4-APRON-R-0500-2H C500-2H GRADING/PAVEMENT DETAILS - SHEET 2 4-APRON-R-0500-2J C500-2J SUBGRADE IMPROVEMENT PLAN - SHEET 1 4-APRON-R-0500-2K C500-2K SUBGRADE IMPROVEMENT PLAN -SHEET 2 4-APRON-R-0500-2L C500-21L SUBGRADE IMPROVEMENT PLAN -SHEET 3 4-APRON-R-0500-2M C500-2M SUBGRADE IMPROVEMENT DETAILS - SHEET 4 4-APRON-R-0500-2N C500-2N SUBGRADE IMPROVEMENT DETAILS - SHEET 5 4-APRON-R-0500-2P C500-21P SUBGRADE IMPROVEMENT DETAILS - SHEET 6 4-APRON-R-0500-2Q C500-2Q SUBGRADE IMPROVEMENT DETAILS - SHEET 7 4-APRON-R-0500-2R C500-2R SUBGRADE IMPROVEMENT DETAILS - SHEET 8 4-APRON-R-0500-2S C500-2S SUBGRADE IMPROVEMENT DETAILS - SHEET 9 4-APRON-R-0500-2T C500-2T NE CORNER PAVING & GRADING DETAIL- SHEET 1 4-APRON-R-0500-2V C500-2V NE CORNER PAVING & GRADING DETAIL- SHEET 2 4-APRON-R-0500-2W C500-2W NE CORNER PAVING & GRADING DETAIL- SHEET 3 4-APRON-R-0500-2X C500-2X WEST AIRPLANE GATE IMPROVEMENTS - PLAN & DETAIL STORM DRAINAGE 4-APRON-R-0500-3A C500-3A STORM DRAINAGE PLAN - SHEET 1 4-APRON-R-0500-3B C500-3B STORM DRAINAGE PLAN - SHEET 2 4-APRON-R-0500-3C C500-3C STORM DRAINAGE PLAN - SHEET 3 4-APRON-R-0500-3D C500-31D STORM DRAINAGE PLAN - SHEET 4 4-APRON-R-0500-3E C500-3E STORM DRAINAGE PLAN - SHEET 5 4-APRON-R-0500-3F C500-31F STORM DRAINAGE PLAN - SHEET 6 4-APRON-R-0500-3G C500-3G STORM DRAINAGE PROFILE - SHEET 1 4-APRON-R-0500-3H C500-31H STORM DRAINAGE PROFILE - SHEET 2 4-APRON-R-0500-3J C500-3J STORM DRAINAGE PROFILE - SHEET 3 4-APRON-R-0500-3K C500-31K STORM DRAINAGE PROFILE - SHEET4 4-APRON-R-0500-3L C500-31L STORM DRAINAGE DETAILS - SHEET 1 4-APRON-R-0500-3M C500-3M STORM DRAINAGE DETAILS - SHEET 2 4-APRON-R-0500-3N C500-3N STORM DRAINAGE DETAILS - SHEET 3 4-APRON-R-0500-3P C500-3P STORM DRAINAGE DETAILS - SHEET 4-APRON-R-0500-3Q C500-3Q STORM DRAINAGE DETAILS - SHEET 5 4-APRON-R-0500-3R C500-3R STORM DRAINAGE DETAILS - SHEET 6 4-APRON-R-0500-3S C500-3S STORM DRAINAGE DETAILS - SHEET 7 4-APRON-R-0500-3T C500-3T STORM DRAINAGE DETAILS - SHEET 8 SHEET NO. DRAWING NO. DRAWING TITLE 4-APRON-R-0500-3U C500-3U STORM DRAINAGE DETAILS - SHEET 9 4-APRON-R-0500-3V C500-3V STORM DRAINAGE DETAILS - SHEET 10 4-APRON-R-0500-3W C500-3W STORM DRAINAGE DETAILS - SHEET 11 4-APRON-R-0500-3X C500-3X STORM DRAINAGE DETAILS - SHEET 12 4-APRON-R-0500-3Y C500-3Y STORM DRAINAGE DETAILS - SHEET 13 4-APRON-R-0500-3Z C500-3Z STORM DRAINAGE DETAILS - SHEET 14 9-APRON-R-0500-3AA C500-3AA STORM DRAINAGE DETAILS - SHEET 15 PAVEMENT MARKING 4-APRON-R-0500-4A C500-4A PAVEMENT MARKING PLAN - SHEET 1 4-APRON-R-0500-4B C500-413 PAVEMENT MARKING PLAN - SHEET 2 4-APRON-R-0500-4C C500-4C PAVEMENT MARKING PLAN - SHEET 3 4-APRON-R-0500-4D C500-41D PAVEMENT MARKING PLAN - SHEET 4 4-APRON-R-0500-4E C500-4E PAVEMENT MARKING PLAN - SHEET 5 4-APRON-R-0500-4F C500-4F PAVEMENT MARKING PLAN - SHEET 6 4-APRON-R-0500-4G C500-4G PAVEMENT MARKING DETAILS - SHEET 1 4-APRON-R-0500-4H C500-4H PAVEMENT MARKING DETAILS - SHEET 2 4-APRON-R-0500-4J C500-4J PAVEMENT MARKING DETAILS - SHEET 3 MISCELLANEOUS DETAILS 4-APRON-R-0500-5A C500-5A MISCELLANEOUS DETAILS - SHEET 1 4-APRON-R-0500-5B C500-513 MISCELLANEOUS DETAILS - SHEET 4-APRON-R-0500-5C C500-5C MISCELLANEOUS DETAILS - SHEET 4-APRON-R-0500-5D C500-5D MISCELLANEOUS DETAILS - SHEET 4-APRON-R-0500-5E C500-5E MISCELLANEOUS DETAILS - SHEET 5 STRUCTURAL 4-APRON-R-S500-01 S500-01 STRUCTURAL SITE PLAN - NARRATIVE 4-APRON-R-S500-02 S500-02 STAGE 1 & 2 - NW DEMOLITION PLAN 4-APRON-R-S500-03 S500-03 STAGE 1 & 2 - NW DEMOLITION SECTIONS 4-APRON-R-S500-04 S500-04 ALL STAGES - SHORING SECTIONS 4-APRON-R-S500-05 S500-05 STAGE 3- NW DEMOLITION PLAN 4-APRON-R-S500-06 S500-06 STAGE 3- NW DEMOLITION SECTIONS 4-APRON-R-S500-07 S500-07 STAGE 1- CENTRAL RAMP DEMOLITION PLAN 4-APRON-R-S500-08 S500-08 STAGE 1- CENTRAL RAMP DEMOLITION SECTIONS 4-APRON-R-S500-09 S500-09 STAGE 2 - CENTRAL RAMP DEMOLITION PLAN 4-APRON-R-S500-10 S500-10 STAGE 2 - CENTRAL RAMP DEMOLITION SECTIONS 4-APRON-R-S500-11 S500-11 BARGE ACCESS CONSTRUCTION PLAN 4-APRON-R-S500-12 S500-12 BARGE ACCESS CONSTRUCTION SECTION 4-APRON-R-S500-13 S500-13 STAGE 1- NE DEMOLITION PLAN 4-APRON-R-S500-14 S500-14 STAGE 1- NE DEMOLITION DETAILS 4-APRON-R-S500-15 S500-15 PAVEMENT DETAILS - SHEET 1 4-APRON-R-S500-16 S500-16 PAVEMENT DETAILS - SHEET 2 4-APRON-R-S500-17 S500-17 PAVEMENT DETAILS - SHEET 3 4-APRON-R-S500-18 S500-18 NOT USED 4-APRON-R-S500-19 S500-19 NOT USED 4-APRON-R-S500-20 S500-20 STORM WATER VAULT - SHEET 1 4-APRON-R-S500-21 S500-21 STORM WATER VAULT - SHEET 2 4-APRON-R-S500-22 S500-22 STORM WATER VAULT - SHEET 3 4-APRON-R-S500-23 S500-23 STORM WATER VAULT - SHEET 4 4-APRON-R-S500-24 S500-24 DRAINAGE STRUCTURE 4-APRON-R-S500-25 S500-25 STORM WATER VAULT SUPPORT PLAN 4-APRON-R-S500-26 S500-26 MINIMUM CONSTRUCTION SETBACKS 4-APRON-R-S500-27 S500-27 COFFERDAM PLAN 4-APRON-R-S500-28 S500-28 COFFERDAM & SHORING DETAILS 4-APRON-R-S500-29 S500-29 STORM WATER VAULT SUPPORT DETAILS 4-APRON-R-S500-30 S500-30 NOT USED 4-APRON-R-S500-31 S500-31 NOT USED 4-APRON-R-S500-32 S500-32 NOT USED 4-APRON-R-S500-33 S500-33 NOT USED 4-APRON-R-S500-34 S500-34 NOT USED 4-APRON-R-S500-35 S500-35 NOT USED 4-APRON-R-S500-36 S500-36 NOT USED 4-APRON-R-S500-37 S500-37 NOT USED 4-APRON-R-S500-38 S500-38 NOT USED 4-APRON-R-S500-39 S500-39 NOT USED 4-APRON-R-S500-40 S500-40 4-401 CREW SHELTER & HARDSTANDS 04-020-S534 S534 PARTIAL PLAN & DETAILS 04-041-1S61-R 1S61-R SLAB PLAN 04-041-1S61 1S61 SLAB PLAN 04-041-S502-1 S502-1 PARTIAL PLAN AND ELEVATIONS 04-041-S502-2 S502-2 DETAILS LANDSCAPE 4-APRON-R-L01A L01A EXISTING CONDITIONS - WEST 4-APRON-R-L01B L01B EXISTING CONDITIONS - EAST 4-APRON-R-LO2 L02 PROPOSED PLANTING & INVASIVE PLANT REMOVAL 4-APRON-R-LO3 L03 PROPOSED TREE REMOVAL & TREE REPLANTING 4-APRON-R-LO4 L04 CONCEPTUAL TEMPORARY IRRIGATION LAYOUT 4-APRON-R-LO5 L05 TYPICAL RIPARIAN PLANTING SECTION & HERBIVORY EXCLOSURE LAYOUT 4-APRON-R-LO6 L06 PROPOSED PLANT LIST & DETAILS 4-APRON-R-LO7 L07 PROPOSED TREE REMOVAL FOR UTILITY REMOVAL WORK 4-APRON-R-LO8 L08 PHASE SCHEDULE FOR LANDSCAPE WORK MECHANICAL/FIRE PROTECTION 4-APRON-R-M110R M110R COMPRESSED AIR UTILITY PLAN 4-APRON-R-M111R M111R COMPRESSED AIR UTILITY PLAN 4-APRON-R-M112R M112R COMPRESSED AIR UTILITY PLAN 4-APRON-R-M113R M113R COMPRESSED AIR UTILITY PLAN 4-APRON-R-M114R M114R COMPRESSED AIR UTILITY PLAN 4-APRON-R-M115R M115R COMPRESSED AIR UTILITY PLAN 4-APRON-R-M510-5R M510-5R PIPING DETAILS 4-APRON-R-M110 M110 COMPRESSED AIR UTILITY PLAN SHEET NO. DRAWING NO. DRAWING TITLE 4-APRON-R-M111 M111 COMPRESSED AIR UTILITY PLAN 4-APRON-R-M112 M112 COMPRESSED AIR UTILITY PLAN 4-APRON-R-M113 M113 COMPRESSED AIR UTILITY PLAN 4-APRON-R-M114 M114 COMPRESSED AIR UTILITY PLAN 4-APRON-R-M115 M115 COMPRESSED AIR UTILITY PLAN 4-APRON-R-M260 M260 FIRE PROTECTION AND WATER - SHEET 1 4-APRON-R-M261 M261 FIRE PROTECTION AND WATER - SHEET 2 4-APRON-R-M262 M262 FIRE PROTECTION AND WATER - SHEET 3 4-APRON-R-M263 M263 FIRE PROTECTION AND WATER - SHEET 4 4-APRON-R-M264 M264 FIRE PROTECTION AND WATER - SHEET 5 4-APRON-R-M265 M265 FIRE PROTECTION AND WATER - SHEET 6 4-APRON-R-M510-1 M510-1 PIPING DETAILS 4-APRON-R-M510-2 M510-2 MECHANICAL DETAILS - SHEET 1 4-APRON-R-M510-3 M510-3 MECHANICAL DETAILS - SHEET 2 4-APRON-R-M510-4 M510-4 MECHANICAL DETAILS - SHEET 3 4-APRON-R-M510-5 M510-5 PIPING DETAILS 04-APRON-R-EO EO LEGENDS, SYMBOLS, ABBREVIATIONS POWER/TELECOMM 04-020-E4H-V49BR E4H-V49BR ONE -LINE DIAGRAM - REMOVAL 04-020-E4J-V50BR E4J-V50BR ONE -LINE DIAGRAM- REMOVAL 04-81-82-E4B-V24AR E4B-V24AR ONE -LINE DIAGRAM- REMOVAL 04-81-82-E4C-V24BR E4C-V24BR ONE -LINE DIAGRAM- REMOVAL 04-APRON-R-E110R E110R PARTIAL SITE POWER PLAN - REMOVAL 04-APRON-R-E111R E111R PARTIAL SITE POWER PLAN - REMOVAL 04-APRON-R-E112R E112R PARTIAL SITE POWER PLAN - REMOVAL 04-APRON-R-E113R E113R PARTIAL SITE POWER PLAN - REMOVAL 04-APRON-R-E114R E114R PARTIAL SITE POWER PLAN - REMOVAL 04-APRON-R-E115R E115R PARTIAL SITE POWER PLAN - REMOVAL 04-APRON-R-E36OR E360R PARTIAL SITE TELECOM/DATA PLAN - REMOVAL 04-APRON-R-E361R E361R PARTIAL SITE TELECOM/DATA PLAN - REMOVAL 04-APRON-R-E362R E362R PARTIAL SITE TELECOM/DATA PLAN - REMOVAL 04-APRON-R-E363R E363R PARTIAL SITE TELECOM/DATA PLAN - REMOVAL 04-APRON-R-E364R E364R PARTIAL SITE TELECOM/DATA PLAN - REMOVAL 04-APRON-R-E365R E365R PARTIAL SITE TELECOM/DATA PLAN - REMOVAL 04-41-E4 E4 ONE -LINE DIAGRAM 04-41-E4A E4A ONE -LINE DIAGRAM 04-81-82-E4H-V28A E4H-V28A ONE -LINE DIAGRAM 04-81-82-E4X-V28A E4X-V28A ONE -LINE DIAGRAM 04-APRON-R-E9A E9A PARTIALSITE GROUNDING PLAN 04-APRON-R-E9B E913 PARTIALSITE GROUNDING PLAN 04-APRON-R-E9C E9C PARTIALSITE GROUNDING PLAN 04-APRON-R-E9D E9D PARTIALSITE GROUNDING PLAN 04-APRON-R-E9E E9E PARTIALSITE GROUNDING PLAN 04-APRON-R-E9F E91F PARTIALSITE GROUNDING PLAN 04-APRON-R-E110 E110 PARTIAL SITE POWER PLAN 04-APRON-R-E111 E111 PARTIAL SITE POWER PLAN 04-APRON-R-E112 E112 PARTIAL SITE POWER PLAN 04-APRON-R-E113 E113 PARTIAL SITE POWER PLAN 04-APRON-R-E114 E114 PARTIAL SITE POWER PLAN 04-APRON-R-E115 E115 PARTIAL SITE POWER PLAN 04-APRON-R-E360 E360 PARTIAL SITE TELECOM/DATA PLAN 04-APRON-R-E361 E361 PARTIAL SITE TELECOM/DATA PLAN 04-APRON-R-E362 E362 PARTIAL SITE TELECOM/DATA PLAN 04-APRON-R-E363 E363 PARTIAL SITE TELECOM/DATA PLAN 04-APRON-R-E364 E364 PARTIAL SITE TELECOM/DATA PLAN 04-APRON-R-E365 E365 PARTIAL SITE TELECOM/DATA PLAN 04-020-1E-112 1.00E-112 BUILDING 04-20 277/480V POWER 04-81-82-OE-3-25-32 OE-3-25-32 BUILDING 04-81-82 PARTIAL UNDERGROUND 480Y/277V 04-81-82-OE-3-37-44 OE-3-37-44 BUILDING 04-81-82 PARTIAL UNDERGROUND 480Y/277V 04-81-82-1E-3-44 1E-3-44 BUILDING 04-81-82 PARTIAL FIRST FLOOR 480Y/277V 04-81-82-2E-3-44 2E-3-44 BUILDING 04-81-82 PARTIAL SECOND FLOOR 480Y/277V 04-APRON-R-E510-3 E510-3 ACTUATOR VALVE CONNECTION DETAILS 04-APRON-R-E510-4 E510-4 BURIED CONDUITS DETAILS 04-APRON-R-E510-5 E510-5 BURIED CONDUITS DETAILS 04-APRON-R-E510-6 E510-6 GROUNDING DETAILS 04-APRON-R-E510-7 E510-7 HANDHOLE BUTTERFLIES & DETAILS 04-APRON-R-E510-8 E510-8 HANDHOLE BUTTERFLIES & DETAILS 04-APRON-R-E510-10 E510-10 HARDSTAND R2 DETAILS 04-APRON-R-E510-11 E510-11 HARDSTAND R3 DETAILS 04-APRON-R-E510-12 E510-12 HARDSTAND R4 DETAILS 04-APRON-R-E510-13 E510-13 HARDSTAND R10 DETAILS 04-APRON-R-E510-14 E510-14 HARDSTAND R11 DETAILS 04-APRON-R-E510-15 E510-15 HARDSTAND R12 DETAILS 04-APRON-R-E510-16 E510-16 HARDSTAND R13 DETAILS 04-APRON-R-E510-17 E510-17 HARDSTAND R14 DETAILS 04-020-E581-1 E581-1 04-20G-TOWER DETAILS 04-041-E502-2 E502-2 V45CONNECTION DETAILS 04-81-82-E502-2 E502-2 04-81-82TRENCH DETAILS 04-81-82-E502-3 E502-3 PULL BOX DETAILS CATHODIC PROTECTION 04-APRON-R-CPI CP1 CATHODIC PROTECTION PLAN 04-APRON-R-CP2 CP2 CATHODIC PROTECTION DETAILS - SHEET 1 04-APRON-R-CP3 CP3 CATHODIC PROTECTION DETAILS - SHEET 2 AS-BUILTS INCLUDED FOR REFERENCE SHEET NO. DRAWING TITLE DATE C-IJ2 (RAMP & RUNWAY PILING KEY PLAN) 5/26/1942 C-11 (APRON) BULKHEAD DETAILS 1/5/1942 C-13 LAYOUT& DETAILS OF P RECAST S ECTI 0 N (RAMP) 12/26/1941 C-IJ4 MONOLITHIC SECTION OF (RAMP &TAXI STRIP) 3/8/1942 C-J1 STEEL PLACING DIAGRAM FOR TAXI STRIPS 3/8/1942 C-J6 EAST & CENTER RAMPS 2/9/1942 C-J5 RAMPS BRACING OF PILES 2/9/1942 C-J7 WEST RAMP 1/12/1942 C-J8 PAVED AREAS 1 AND 2 BETWEEN RAMPS 2/9/1942 C-J9 PAVED AREAS 3 AND 4 NORTH OF ASSEMBLY BLDG 3/3/1942 C-J10 APRON PAVED AREAS 5 AND 6 3/6/1942 C-J11 MONOLITHIC SECTION EAST AND CENTER RAMP 3/20/1942 C-J12 PAVED AREA 7 6/12/1942 S-B1 (PLAN OF APPROACH AND BRIDGE) 11/20/1944 S-132 (BULKHEAD DETAILS FOR APPROACH SECTION) 8/21/1943 S-133 BRIDGE TRESTLE SECTIONS 8/27/1943 S-134 APPROACHES TO REMOVABLE BRIDGE 6/4/1943 S-135 (DETAIL OF BENTS OVER EXISTING RAMP) 6/4/1943 S-136 (REMOVABLE BRIDGE) 6/4/1943 S-137 PONTOONS FOR REMOVABLE BRIDGE 6/4/1943 S-138 DETAIL OF (BOAT BUMPER) AND (LOG BOOM) FOR REMOVABLE BRIDGE AND CONCRETE PIERS 6/4/1943 S-B10 WEST APPROACH TO MOVABLE BRIDGE 2/14/1944 S-4 AREA PLAN 6 9/6/1956 SUR-6 DETAILS SURVEY 9/6/1956 P-6 NORTH DRAINAGE PLAN 2/1/1966 P-28 NORTH APRON BULKHEAD AND WING WALL 12/6/1965 P-29 NORTH APRON BULKHEAD AND WING WALL DETAILS 12/6/1965 P-40 ELECTRICAL MANHOLE STRUCTURES AND DETAILS 3/24/1966 P-47 NORTH APRON BULKHEAD AND WINGWALL 8/10/1967 1 NORTH AIRPLANE BRIDGE, EAST RAMP STRENGTHENING 12/23/1969 1 NORTH AIRPLANE BRIDGE, LAYOUT 10/3/1969 2 NORTH AIRPLANE BRIDGE, NEW PILE LAYOUT 9/9/1969 3 NORTH AIRPLANE BRIDGE, SLAB 1/28/1970 1 NORTH AIRPLANE BRIDGE, PILE DRIVING RECORD 1/29/1970 S-1 WEST RAMP EXTENSION, MOD EXIST RAMP, GENERAL NOTES 3/4/1974 S-2 WEST RAMP EXTENSION, PLAN, SECTIONS, DETAILS 3/4/1974 S-1 EXISTING RAMP PILING PLAN 6/2/1993 S-2 EXISTING SECTION - LOOKING SOUTH 6/2/1993 C220 BULKHEAD AND PAVEMENT REPAIR, DEMO AND PROPOSED PAVING 3/16/2001 C500 CIVILSECTIONS, DETAILS, & WORK SEQUENCE 3/16/2001 C501 BULKHEAD AND PAVEMENT REPAIR, PAVEMENT DETAILS 3/16/2001 S500 BULKHEAD AND PAVEMENT REPAIR, STRUCTURAL DETAILS 3/16/2001 OPTION 2 CHANGE INCORPORATION LAYOUT OPTION 2 6/22/2015 AO COVER SHEET 2/11/1992 C2 SITE TOPOGRAPHY 7/16/1991 C20 ARCHITECTURAL AND UTILITY DEMOLITION PLAN 2/11/1992 C30 STRIPING PLAN 2/11/1992 C50 SOUTH PAVING PLAN 2/11/1992 C51 NORTH PAVING PLAN 2/11/1992 C52 PAVEMENT DETAILS 2/11/1992 C100 UTILITIES PLAN 2/11/1992 C101 WATER AND STORM DRAINAGE DETAILS 2/11/1992 C102 FIRE MAIN AND DOMESTIC WATER MAIN PLAN 6/2/1992 S500 WETVAULT PLANS 2/11/1992 S501 WETVAULT DETAILS 2/11/1992 S502 WETVAULT DETAILS 2/11/1992 S503 DIVERSION STRUCTURE DETAILS 2/11/1992 CIVIL PERMIT R-401302 IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING SURFACE WATER UTILITY afowler 12/20/2018 rstraka 12/20/2018 1 UNAWN UAIL SUBTITLE CURRENT REVISION SYMBOL DATE SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE ACCEPTABILITY JDM 06 08 18 W4700331 ,q 1 tiN P. THIS DESIGN AND/OR CHECKED SHEET INDEX 0/01/18 T APRON R INFRASTRUCTURE W4700331 ABAM SPT 06�08�18 w� oe WAsyi SPT 06 08 18 SHEET �, � SPECIFICATION IS APPROVED A CITY OF RENTON COMMENTS W4700331 ABAM SPT 10 01 18 ® ���ENGINEER TITLE APRON R INFRASTRUCTURE >- APPROVED BY DEPT. I DATE BEE 06 08 18 � � � 0 1 CHECKED I 31271w� RENTON SITE JOB No. W4700331 COMP N0. ���sIONAL �APPROVED APPROVED CIVIL MASTER SITE RENTON, WA DWG NO. 4-APRON-R-G1