GENERAL NOTES
1. THE PROPOSED SEQUENCE OF CONSTRUCTION SHOWN ON THE CONSTRUCTION PHASING PLANS AND DETAILS
REPRESENTS ONE POSSIBLE SCHEME FOR PLANNING PURPOSES. CONTRACTOR SHALL SUBMIT PROPOSED
CONSTRUCTION METHODS AND SEQUENCE TO THE ENGINEER FOR APPROVAL PRIOR TO THE START OF
CONSTRUCTION.
2. A MINIMUM OF FIVE FULLY OPERATIONAL AND ACCESSIBLE AIRCRAFT STAGING STALLS SHALL BE MAINTAINED WITHIN
THE PROJECT LIMITS AT ALL TIMES. CONTRACTOR SHALL MAINTAIN A 20-FOOT CLEAR -ZONE FROM AIRCRAFT IN
STAGING AREAS. CONTRACTOR SHALL COORDINATE ALL ACTIVITIES ADJACENT TO STAGING AREAS WITH BOEING
REPRESENTATIVE.
3. HEIGHT RESTRICTED WORK ZONE MUST BE CLEARED OF ANY OBSTRUCTION ABOVE 7-FEET IN HEIGHT WITHIN WINGTIP
CLEARANCE LIMITS AND ANY OBSTRUCTION ABOVE 6-INCHES IN HEIGHT WITHIN ENGINE CLEARANCE ZONE FOR PLANE
MOVEMENTS. PLANE MOVEMENTS OCCUR A MINIMUM OF 2-TIMES DAILY. CONTRACTOR SHALL COORDINATE PLANE
MOVEMENT TIMING AND ROUTE WITH BOEING REPRESENTATIVE DAILY.
4. CONTRACTOR SHALL PROVIDE A 25-FOOT MINIMUM WIDTH DRIVABLE SURFACE ALONG TEMPORARY TOWPATH. DRIVABLE
SURFACE SHALL BE WIDENED AS NEEDED TO ACCOMMODATE PLANE AND TOW VEHICLE MOVEMENTS ALONG TOWPATH
ROUTE. CONTRACTOR SHALL COORDINATE ALIGNMENT AND WIDTH OF TOWPATH PRIOR TO BEGINNING ANY NEW PHASE
OF CONSTRUCTION.
5. DRIVABLE SURFACES SHALL CONSIST OF EXISTING CONCRETE PAVEMENT, TEMPORARY ASPHALT PAVEMENT, OR
FINISHED CONCRETE PAVEMENT. CHANGES IN LEVEL AT INTERFACE BETWEEN EXISTING, TEMPORARY, AND NEW
PAVEMENT SHALL BE SMOOTH WITH A DIFFERENCE IN ELEVATION OF LESS THAN 1/2-INCH. CHANGES IN CROSS
SLOPE AT TEMPORARY PAVEMENT TRANSITIONS SHALL NOT EXCEED 3-PERCENT AND CHANGES IN LONGITUDINAL
SLOPE AT TEMPORARY PAVEMENT TRANSITIONS SHALL NOT EXCEED 3-PERCENT.
6. TOWPATH CENTERLINE AND EXTENTS SHALL BE CLEARLY DELINEATED WITH PAINT AND REFRESHED AS NEEDED.
TRANSIT ROUTES SHALL BE CLEARLY DEFINED WITH TEMPORARY TRAFFIC CONTROL MARKERS AND SIGNS FOLLOWING
MUTCD GUIDELINES. CONTRACTOR SHALL PROVIDE A TEMPORARY TRAFFIC CONTROL PLAN PRIOR TO EACH PHASE OF
CONSTRUCTION.
7. TRANSIT ROUTES FOR DELIVERIES AND PARTS MOVEMENT MUST BE MAINTAINED THROUGH CONTRACTOR OCCUPIED
WORK ZONES. TRANSIT ROUTE MUST HAVE A 25-FOOT MINIMUM WIDTH DRIVABLE SURFACE AND WILL GENERALLY
FOLLOW THE TEMPORARY TOWPATH. ADDITIONAL WIDTH MY BE REQUIRED TO ACCOMMODATED VEHICLE TURNING
MOVEMENTS. RELOCATION AND TEMPORARY CLOSURES OF TRANSIT ROUTES SHALL BE COORDINATED WITH BOEING
REPRESENTATIVE DAILY.
8. CONSTRUCTION HAUL ROUTES SHALL BE COORDINATED WITH BOEING REPRESENTATIVE PRIOR TO THE START OF
CONSTRUCTION.
9. ALL NEWLY INSTALLED UTILITIES EXPOSED TO VEHICLE TRAFFIC MUST BE INSTALLED PER PIPE BEDDING AND
BACKFILL DETAILS AS SHOWN IN THE PLANS. IF SUFFICIENT COVER CANNOT BE ACHIEVED PRIOR TO OPENING THE
AREA TO TRAFFIC, CONTRACTOR SHALL PROVIDE STEEL PLATE OR OTHER MEANS OF PROTECTION APPROVED BY THE
ENGINEER FOR THE ANTICIPATING TRAFFIC LOADING. CONTRACTOR SHALL HAVE STEEL PLATE OR OTHER APPROVED
MEANS OF UTILITY PROTECTION ON HAND PRIOR TO OPENING UTILITY TRENCHES WITHIN THE DRIVABLE SURFACES OF
TOW PATH OR TRANSIT ROUTES. CONCRETE COLLARS MUST BE CONSTRUCTED AT PVC DRAIN BASINS PRIOR TO
EXPOSURE TO TRAFFIC OR CONSTRUCTION LOADING.
10. SEE SHEETS C150-C152 FOR PROJECT AREA DESIGNATIONS.
CONCEPTUAL CONSTRUCTION PHASING NARRATIVE
VASE 1 (AREA 1)
1. RE-ROUTE ABOVE WATER AND DATA UTILITIES AT AIRCRAFT STAGING
STALLS R10-R14 TO BE SUPPLIED FROM BUILDING 4-20 IN ORDER
TO FACILITATE ABOVE GROUND UTILITY REMOVAL AT CENTRAL APRON
(SEE PHASE 3). A MINIMUM OF THREE AIRCRAFT STAGING STALLS
ALONG BULKHEAD SHALL BE MADE FULLY FUNCTIONAL BEFORE
BEGINNING PHASE 2.
2. BEGIN CONSTRUCTION OF PERMANENT STORMWATER. PROTECT EXISTING
STORMWATER CONVEYANCE TO EXISTING OUTFALL 014 UNTIL
STORMWATER BYPASS IS COMPLETE (SEE PHASE 5).
3. REMOVE EXISTING 12"0 COTTONWOOD TREE PRIOR TO TOWPATH
RELOCATION (SEE PHASE 2).
PHASE 2 (AREA 3 )
1. BEGIN MITIGATION HANGAR CONSTRUCTION JANUARY 2019. SEE
MITIGATION HANGAR PLANS FOR REQUIRED STORMWATER, UTILITY, AND
PRELOAD ACTIVITIES TO OCCUR UNDER SEPARATE PERMIT.
2. REMOVE EXISTING PAVEMENT SOUTH OF TOWPATH AND AS REQUIRED
TO CONSTRUCT UTILITY IMPROVEMENTS, INSTALL STORM SEWER
SYSTEMS AND UTILITIES, AND BRING TO FINISH GRADE. PROVIDE
TEMPORARY/PERMANENT PAVING AS NEEDED FOR UTILITY PROTECTION
AND MAINTENANCE OF TRANSIT ROUTES.
3. CONSTRUCT SUB -GRADE IMPROVEMENTS AS REQUIRED TO INSTALL
PROPOSED STORMWATER AND UTILITY IMPROVEMENTS.
4. CONSTRUCT PERMANENT STORMWATER BYPASS FOR OUTFALL 004A.
• EX 492A, 1081-18, 1081 A-18, 1082-18, 1083-18, 1084-18,
1085-18, EX 488A
5. CONSTRUCT PERMANENT STORMWATER BYPASS FOR OUTFALL 004.
• 1091-18, 1081 A-18,
• EX 458, 1097-18, 1094-18, 1093-18
• SEE MITIGATION HANGAR PLANS FOR CONTINUATION
6. CONSTRUCT CONNECTION TO EXISTING FIRE SYSTEM AT NORTHEAST
CORNER OF THE 4-81 BUILDING. SEE MITIGATION HANGAR PLANS FOR
CONTINUATION.
7. REMOVE OR ABANDON IN -PLACE EXISTING STORM SYSTEM TAKEN OUT
OF SERVICE PER REMOVAL PLANS.
8. COMPLETE CONSTRUCTION OF AREA 3 STORM CONVEYANCE SYSTEM
SOUTH OF TOWPATH.
• URE 727-18, URE 728-18, 1095-18
• 1095B-18, 1095A-18, 1095-18, 1095C-18
10. BEGIN CONSTRUCTION OF FIRE PROTECTION SYSTEM ADJACENT TO
PERMANENT STORMWATER BYPASS FOR OUTFALL 004A.
CALL 48 HOURS
BEFORE YOU DIG
1-800-424-5555
SYM REVISION
- APRON R INFRASTRUCTURE
A CONSTRUCTION PHASING & PIPE DEPTH
CONSTRUCTION PHASING KEY PLAN LEGEND
a
c
PgASE 3 (AREA 32
1. SEE MITIGATION HANGAR PLANS FOR ONGOING CONSTRUCTION
ACTIVITIES TO BE COMPLETED UNDER SEPARATE PERMIT.
2. REMOVE EXISTING PAVEMENT NORTH OF TOWPATH AND AS REQUIRED
TO CONSTRUCT UTILITY IMPROVEMENTS, INSTALL STORM SEWER
SYSTEMS AND UTILITIES, AND BRING TO FINISH GRADE. PROVIDE
TEMPORARY/PERMANENT PAVING AS NEEDED FOR UTILITY PROTECTION
AND MAINTENANCE OF TRANSIT ROUTES.
3. REMOVE OR ABANDON IN -PLACE EXISTING STORM SYSTEM TAKEN OUT
OF SERVICE PER REMOVAL PLANS.
4. REMOVE OR ABANDON IN -PLACE EXISTING FIRE PROTECTION SYSTEM
AND UTILITIES TAKEN OUT OF SERVICE PER REMOVAL PLANS.
5. CONSTRUCT STORM TREATMENT SYSTEMS AND ASSOCIATED STORMWATER
CONVEYANCE SYSTEMS
• 1095-18, OWS-064, RTU-13, RTU-14 1085A-18, 1096-18, EX
488A
6. CONSTRUCT STORM TREATMENT SYSTEMS AND ASSOCIATED STORMWATER
CONVEYANCE SYSTEMS IN HEIGHT RESTRICTED WORK AREA
• 1102-18, OWS-065, RTU-15, 1101-18, 1100-18, 1099-18,
1098-18
7. CONSTRUCT MECHANICAL, ELECTRICAL, DATA, AND FIRE SERVICE
UTILITIES NORTH OF TOWPATH WITHIN WORK LIMITS.
PPASE 4 (AREA 1 $ 3)
1. SEE MITIGATION HANGAR PLANS FOR ONGOING CONSTRUCTION
ACTIVITIES TO BE COMPLETED UNDER SEPARATE PERMIT.
3. REMOVE EXISTING PAVEMENT NORTH AND SOUTH OF TOWPATH AND AS
REQUIRED TO CONSTRUCT STORM SEWER SYSTEMS AND BRING TO
FINISH GRADE. PROVIDE TEMPORARY/PERMENT PAVING AS NEEDED FOR
PIPE PROTECTION AND MAINTENANCE OF TRANSIT ROUTES.
3. CONSTRUCT SUBGRADE IMPROVEMENTS AT EASTERN PILE SUPPORTED
APRON PER SUBGRADE IMPROVEMENT PLAN C500-2L.
4. CONSTRUCT PERMANENT STORMWATER CONVEYANCE AS REQUIRED TO
ACHIEVE UNOBSTRUCTED MITIGATION HANGAR INGRESS/EGRESS
•1087B-18, 1087-18
•1082A-18, 1082-18
VASE 5 (AREA 1
1. CONSTRUCT SLOTTED DRAIN SYSTEM SOUTH OF TOWPATH, PROVIDE
TEMPORARY BYPASS CONNECTION TO OUTFALL 004A.
• 1073A-18, 1073E-18, 1086A-18, 1086-18, 1086E-18, PROVIDE
TEMP CONNECTION FROM 1078E-18 TO 1082-18.
2. COMPLETE STORMWATER BYPASS CONSTRUCTION FOR OUTFALLS 012
AND 014
• 1077A-18, 1077-18, 1078-18, 1079A-18, 1079-18, 1080-18,
1082A-18
IN -WATER WORK WINDOW NOV 16 - DEC 31 2019
3. CONSTRUCT TEMPORARY CONTAINMENT WALL PER STRUCTURAL PLANS.
4. BEGIN PHASED DEMOLITION AND REMOVAL OF PILE SUPPORTED
STRUCTURES AS SHOWN IN STRUCTURAL PLANS AND CONSTRUCT SUB
GRADE IMPROVEMENTS PER PLANS.
BY APPROVED DATE SYM
W4700331 ABAM SPT 06/08/18
W4700331 ABAM SPT 10/09/18
REVISION
STALLS OPEN TO MANUFACTURING
TEMPORARY TOWPATH CENTERLINE
TEMPORARY TOWPATH ENGINE CLEARANCE LIMIT
TEMPORARY TOWPATH WINGTIP CLEARANCE LIMIT
CONTRACTOR OCCUPIED
AREA: UNRESTRICTED
CONTRACTOR OCCUPIED
AREA: HEIGHT RESTRICTED
PARTS MOVEMENT TRANSIT ROUTE
DELIVERY TRUCK TRANSIT ROUTE
NOTE: AIRCRAFT DIMENSIONS SHOWN ARE FOR THE 737-MAX 9 UNLESS OTHERWISE NOTED AND ARE GIVEN
FOR INTERIM TOWPATH PLANING PURPOSES ONLY. THEY ARE ACCURATE WITHIN +/- 6 INCHES.
CONTRACTOR SHALL COORDINATE WITH BOEING REPRESENTATIVE TO OBTAIN ACTUAL AIRCRAFT DIMENSIONS
AND EQUIPMENT TURNING CAPABILITIES PRIOR TO REVISING HEIGHT RESTRICTED WORK ZONE LIMITS.
U 0000000000 00000000 00000 0 00000000000000000
0
I
L _ J
0
20'-3" 10'-0" 1'-5"
138'-2" (737-MAX 9)
143'-7" (737-1OX)
PHASE 5 (AREA 1)- CONTINUED
5. CONSTRUCT STORMWATER IMPROVEMENTS NORTH OF
SLOTTED DRAIN.
• 1087-18, URE 724-18, 1088-18, URE 723-18,
1086-18
OWS-063, RTU-12, 1089-18, 1090-18, V-1081A-18
• URE 722-18, URE 721-18, 1074-18, OWS-062,
RTU-11,
1075-18, 1076-18, V-1075-18
7. COMPLETE CONSTRUCTION OF AREA 1 MECHANICAL,
ELECTRICAL, DATA,
AND GROUNDING SYSTEMS.
8. CONSTRUCT PERMANENT PAVEMENT AT NORTH EDGE
OF APRON FOR
TOWPATH RELOCATION (SEE PHASE 7).
9. CONSTRUCT 8" DOMESTIC WATER SOUTH OF TOWPATH
AND ELECTRICAL
CONNECTION ADJACENT TO BLDG 4-41.
IN -WATER WORK WINDOW JULY 16 -AUG 1 2020:
10. CONSTRUCT OUTFALLS 004A, 012A, AND 014A.
11. INSTALL PILES IN BARGE AREA PER STRUCTURAL PLANS.
12. INSTALL IN -WATER FILL FOR HABITAT BENCH.
13. TEMPORARY WALL CUT-OFF/REMOVAL.
PHASE 6 (AREA 1)
1. REMOVE EXISTING PAVEMENT AT MITIGATION HANGAR, NORTH OF BLDG
4-81 AND AS REQUIRED TO CONSTRUCT UTILITY IMPROVEMENTS.
INSTALL STORM SEWER SYSTEMS AND UTILITIES AND BRING TO FINISH
GRADE. PROVIDE TEMPORARY/PERMANENT PAVING AS NEEDED FOR
UTILITY PROTECTION AND MAINTENANCE OF TRANSIT ROUTES.
2. COMPLETE CONSTRUCTION OF AREA 3 STORM CONVEYANCE SYSTEM.
•1103-18, 1102-18
• 1106-18, 1104-18, 1102-18
• 11056-18, 1105A-18, 1105-18, 1104-18
3. REMOVE OR ABANDON IN -PLACE EXISTING STORM SYSTEM TAKEN OUT
OF SERVICE PER REMOVAL PLANS.
4. REMOVE OR ABANDON IN -PLACE EXISTING FIRE PROTECTION SYSTEM
AND ABOVE AND BELOW GRADE UTILITIES TAKEN OUT OF SERVICE PER
REMOVAL PLANS.
5. CONSTRUCT MECHANICAL, ELECTRICAL, DATA, AND FIRE SERVICE
UTILITIES WITHIN WORK LIMITS.
6. COMPLETE PHASED DEMOLITION AND REMOVAL OF PILE SUPPORTED
STRUCTURES AS SHOWN IN STRUCTURAL PLANS AND CONSTRUCT SUB
GRADE IMPROVEMENTS PER PLANS.
7. COMPLETE AREA 1 FIRE PROTECTION SYSTEM CONSTRUCTION.
8. COMPLETE AREA 1 STORM SYSTEM CONSTRUCTION
•1073A-18, 1073-18, 1074-18
• 1071 A-18, 1071-18, 1072-18, 1073-18
9. COMPLETE AREA 1 PERMANENT PAVEMENT
10. COMPLETE AIRCRAFT STAGING STALLS R10 - R14 PRIOR TO PHASE 7
BY I APPROVED I DATE
56'-4"
13'-5"
PHASE 7 (AREA 2.)
1. ABANDON IN PLACE OR REMOVE REMAINING UTILITIES AS SHOWN IN
REMOVAL PLANS UP TO AND INCLUDING EXISTING UTILIDOR NORTH OF
BUILDING 4-82.
2. CONSTRUCT SLOTTED DRAIN NORTH OF BLDG 4-82 AND PROVIDE
TEMPORARY CONNECTION TO EXISTING
•1106A-18, 1106-18
• 1107A-18, 1107-18, 1107B, TEMPORARY CONNECTION TO EX 417
3. PARTIALLY REMOVE EXISTING PAVEMENT AND WALL SUPPORTS AS
SHOWN IN STRUCTURAL PLANS TO CONSTRUCT NORTH -SOUTH STORM
CONVEYANCE.
•1118-18, 1119-18
IN -WATER WORK WINDOW NOV 16 - DEC 31 2020:
4. CONSTRUCT OUTFALL 002A IMPROVEMENTS.
5. CONSTRUCT CATHODIC PROTECTION IMPROVEMENTS AND FLUME WALL
REPAIRS.
POST IN -WATER WORK:
6. CONSTRUCT REMAINING STORMWATER SYSTEMS
• 1108-18, 1109-18, 1110-18, 1111-18, 1112-18, OWS-066,
RTU-16, 111-18, 1114-18, 1115-18, 1116-18, 1118-18, 1117-18
• URE 726-18, UR, URE 725-18, 1112-18
• 1107-18, 1110-18
7. CONSTRUCT WALL AS SHOWN IN STRUCTURAL PLANS AND BRING AREA
2 TO GRADE.
8. COMPLETE CONSTRUCTION OF AREA 2 FIRE PROTECTION, MECHANICAL,
ELECTRICAL, DATA, AND GROUNDING SYSTEMS.
7. CONSTRUCT ALL FINISHED PAVEMENT DURING STRATEGIC TRANSIT
ROUTE CLOSURES. COORDINATE WITH BOEING REPRESENTATIVE.
8. COMPLETE UPLAND IMPROVEMENT PUNCHLIST ITEMS.
IN -WATER WORK JUL 16 - AUG 1 2021:
9. COMPLETE IN -WATER IMPROVEMENT PUNCHLIST ITEMS AS NEEDED.
P.
of WAsh� �f
BOE//V� OD
x
31271 w�
��ssioNaL
I I
TOWPATH
i BergerABAM
33301 9th Avenue South, Suite 300
Federal Way, Washington 98003-2600
(206) 431-2300 Fax:(206) 431-2250
�/Ji—IVIMA y a: iJi— I UA) I
140'-0" _
HEIGHT RESTRICTED WORK AREA
COORDINATE EQUIPTMENT MOVEMENTS WITH
BOEING REPRESENTATIVE
CIVIL PERMIT
R-401334
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
DEVELOPMENT ENGINEERING
afowler 12/20/2018
ACCEPTABILITY
THIS DESIGN AND/OR
SPECIFICATION IS APPROVED
UNAWN
BEE
UAI E
06 08 18
SUBTITLE
CONSTRUCTION PHASING NOTES AND DETAILS
CURRENT REVISION
W4700331
SYMBOL
A
DATE
10/09/18
CHECKED
SPT
06 08 18
SHEET
C500-1 A
C17
ENGINEER
BEE
06 08 18
TITLE APRON R INFRASTRUCTURE
RENTON SITE
CIVIL MASTER SITE RENTON, WA
APPROVED BY
DEPT.
DATE
CHECKED
JOB N0.
W4700331
COMP NO.
APPROVED
APPROVED
DWG NO. 4-APRON-R-0500-1A