CALL 48 HOURS
BEFORE YOU DIG
1-800-424-5555
SYM REVISION
- APRON R INFRASTRUCTURE
A CITY OF RENTON COMMENTS
B CONSTRUCTION PHASING & PIPE DEPTH
� I I II sVa •I I'/
ire
BY
W4700331 ABAM
W4700331 ABAM
W47003311 ABAM
4-41 BUILDING
ALINLU
E
1——--IJ�-- I -- --- —— --
— i,oaw•=a ' ' _°iAtao.oL La —{ e°a�:m�• L �.
4-20 BUILDING
W AREA 3: PHASE 2 CONSTRUCTION PHASING KEY PLAN
APPROVED
DATE
SYM
SPT
06/08/18
SPT
10/01/18
SPT
10/09/18
1. BEGIN MITIGATION HANGAR CONSTRUCTION JANUARY 2019. SEE MITIGATION HANGAR
PLANS FOR REQUIRED STORMWATER, UTILITY, AND PRELOAD ACTIVITIES TO OCCUR UNDER
SEPARATE PERMIT.
2. REMOVE EXISTING PAVEMENT SOUTH OF TOWPATH AND AS REQUIRED TO CONSTRUCT
UTILITY IMPROVEMENTS, INSTALL STORM SEWER SYSTEMS AND UTILITIES, AND BRING TO
FINISH GRADE. PROVIDE TEMPORARY/PERMANENT PAVING AS NEEDED FOR UTILITY
PROTECTION AND MAINTENANCE OF TRANSIT ROUTES.
3. CONSTRUCT SUB -GRADE IMPROVEMENTS AS REQUIRED TO INSTALL PROPOSED
STORMWATER AND UTILITY IMPROVEMENTS.
4. CONSTRUCT PERMANENT STORMWATER BYPASS FOR OUTFALL 004A.
• EX 492A, 1081-18, 1081 A-18, 1082-18, 1083-18, 1084-18, 1085-18, EX 488A
5. CONSTRUCT PERMANENT STORMWATER BYPASS FOR OUTFALL 004.
• 1091-18, 1081 A-18,
• EX 458, 1097-18, 1094-18, 1093-18
• SEE MITIGATION HANGAR PLANS FOR CONTINUATION
6. CONSTRUCT CONNECTION TO EXISTING FIRE SYSTEM AT NORTHEAST CORNER OF THE
4-81 BUILDING. SEE MITIGATION HANGAR PLANS FOR CONTINUATION.
7. REMOVE OR ABANDON IN -PLACE EXISTING STORM SYSTEM TAKEN OUT OF SERVICE PER
REMOVAL PLANS.
8. COMPLETE CONSTRUCTION OF AREA 3 STORM CONVEYANCE SYSTEM SOUTH OF TOWPATH.
• URE 727-18, URE 728-18, 1095-18
• 1095B-18, 1095A-18, 1095-18, 1095C-18
10. BEGIN CONSTRUCTION OF FIRE PROTECTION SYSTEM ADJACENT TO PERMANENT
STORMWATER BYPASS FOR OUTFALL 004A.
REVISION I BY I APPROVED I DATE
A
n
P.
of WA �f
BOE//V� � �P ��• �1
x
31271STf
w�
��ssioNaL
4-81 BUILDING
200—FT SHORELINE SETBACK
i BergerAB"
33301 9th Avenue South, Suite 300
Federal Way, Washington 98003-2600
(206) 431-2300 Fax:(206) 431-2250
DRAWN DATE SUBTITLE
ACCEPTABILITY BEE 06/08/18
THIS DESIGN AND/OR CHECKED
SPECIFICATION IS APPROVED SPT 06/08/18
ENGINEER TITLE
APPROVED BY DEPT. I DATE BEE 06/08/18
CIVIL MASTER
CIVIL PERMIT
PHASING PLAN AREA 3: PHASE 2
APRON R INFRASTRUCTURE
RENTON SITE
SITE
/
/
/
/
/
a
a
.p
e
ut°
0
�I
4-86 BUILDING
R-401336
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
DEVELOPMENT ENGINEERING
afowler 12/20/2018 01
wI` \LIV W4700331 J `' /� D 10/09/ 18
SHEET
U500-1 C C19
JOB N0. COMP NO.
W4700331
RENTON, WA DWG NO. 4—APRON—R—0500-1 C