Loading...
HomeMy WebLinkAboutR_401336LAKE WASH N GTO N I _ _ SUMMER o EL 15.18 (NGVD29) — — WINTER o EL 13.18 (NGVD29) I T HOUS _ PRT1' LINE ° J c� m a / / / / / ORDINARY HIGH WATER / EASEMENT LINE (TYP) / I _ I I I I I I // // '••/ ,,, 4 / . � - . 4-82 BUILDING / o r / I I ❑ MID min --- e _ — 2 w I ILd F I ° E� I Ld NNER H,I gRB / I / y � 4 �I I �I CALL 48 HOURS BEFORE YOU DIG 1-800-424-5555 SYM REVISION - APRON R INFRASTRUCTURE A CITY OF RENTON COMMENTS B CONSTRUCTION PHASING & PIPE DEPTH � I I II sVa •I I'/ ire BY W4700331 ABAM W4700331 ABAM W47003311 ABAM 4-41 BUILDING ALINLU E 1——--IJ�-- I -- --- —— -- — i,oaw•=a ' ' _°iAtao.oL La —{ e°a�:m�• L �. 4-20 BUILDING W AREA 3: PHASE 2 CONSTRUCTION PHASING KEY PLAN APPROVED DATE SYM SPT 06/08/18 SPT 10/01/18 SPT 10/09/18 1. BEGIN MITIGATION HANGAR CONSTRUCTION JANUARY 2019. SEE MITIGATION HANGAR PLANS FOR REQUIRED STORMWATER, UTILITY, AND PRELOAD ACTIVITIES TO OCCUR UNDER SEPARATE PERMIT. 2. REMOVE EXISTING PAVEMENT SOUTH OF TOWPATH AND AS REQUIRED TO CONSTRUCT UTILITY IMPROVEMENTS, INSTALL STORM SEWER SYSTEMS AND UTILITIES, AND BRING TO FINISH GRADE. PROVIDE TEMPORARY/PERMANENT PAVING AS NEEDED FOR UTILITY PROTECTION AND MAINTENANCE OF TRANSIT ROUTES. 3. CONSTRUCT SUB -GRADE IMPROVEMENTS AS REQUIRED TO INSTALL PROPOSED STORMWATER AND UTILITY IMPROVEMENTS. 4. CONSTRUCT PERMANENT STORMWATER BYPASS FOR OUTFALL 004A. • EX 492A, 1081-18, 1081 A-18, 1082-18, 1083-18, 1084-18, 1085-18, EX 488A 5. CONSTRUCT PERMANENT STORMWATER BYPASS FOR OUTFALL 004. • 1091-18, 1081 A-18, • EX 458, 1097-18, 1094-18, 1093-18 • SEE MITIGATION HANGAR PLANS FOR CONTINUATION 6. CONSTRUCT CONNECTION TO EXISTING FIRE SYSTEM AT NORTHEAST CORNER OF THE 4-81 BUILDING. SEE MITIGATION HANGAR PLANS FOR CONTINUATION. 7. REMOVE OR ABANDON IN -PLACE EXISTING STORM SYSTEM TAKEN OUT OF SERVICE PER REMOVAL PLANS. 8. COMPLETE CONSTRUCTION OF AREA 3 STORM CONVEYANCE SYSTEM SOUTH OF TOWPATH. • URE 727-18, URE 728-18, 1095-18 • 1095B-18, 1095A-18, 1095-18, 1095C-18 10. BEGIN CONSTRUCTION OF FIRE PROTECTION SYSTEM ADJACENT TO PERMANENT STORMWATER BYPASS FOR OUTFALL 004A. REVISION I BY I APPROVED I DATE A n P. of WA �f BOE//V� � �P ��• �1 x 31271STf w� ��ssioNaL 4-81 BUILDING 200—FT SHORELINE SETBACK i BergerAB" 33301 9th Avenue South, Suite 300 Federal Way, Washington 98003-2600 (206) 431-2300 Fax:(206) 431-2250 DRAWN DATE SUBTITLE ACCEPTABILITY BEE 06/08/18 THIS DESIGN AND/OR CHECKED SPECIFICATION IS APPROVED SPT 06/08/18 ENGINEER TITLE APPROVED BY DEPT. I DATE BEE 06/08/18 CIVIL MASTER CIVIL PERMIT PHASING PLAN AREA 3: PHASE 2 APRON R INFRASTRUCTURE RENTON SITE SITE / / / / / a a .p e ut° 0 �I 4-86 BUILDING R-401336 IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING afowler 12/20/2018 01 wI` \LIV W4700331 J `' /� D 10/09/ 18 SHEET U500-1 C C19 JOB N0. COMP NO. W4700331 RENTON, WA DWG NO. 4—APRON—R—0500-1 C