Loading...
HomeMy WebLinkAboutR_401339/ �I \ e ORDINARY HIGH WATER // �� /%/• ________ LAKE WASH NGTON \ I _ _ SUMMER o EL 15.18 (NGVD29) / I /� q \\\ EASEMENT LINE (TYP) WINTER o EL 13.18 (NGVD29) , , — — �'� — /•ems _ _ \\ T HOUS _ — PROPER — I STY LINE I � ,� — �J:°q�• --I I-------1—I--�/ °t / I I 4-82 BUILDING I •" m W ACID \ > I \ - \ \ a ELI • � I trio � I 7111 �� I 4-81 BUILDING _4.p ' ` • M M � I __I� - - - -- - - 200-FT SHORELINE SETBACK o, I \ 'k - 4-86 BUILDING D $ I I I I\ INNER I 4-41 BUILDING I e a p ° NEW BUILDING 4-87 TO BE CONSTRUCTED 13 L, I UNDER SEPARATE PERMIT. Y11 ° U • 1� M P M � f S n I• \ t l • °____j I� III 4-20 BUILDING •° AREA 1: PHASE 5 CONSTRUCTION PHASING KEY PLAN 7. ) COMPLETE CONSTRUCTION OF AREA 1 MECHANICAL, PNASE 5 (AREA 1b =. ELECTRICAL, DATA, AND GROUNDING SYSTEMS. € 1. CONSTRUCT SLOTTED DRAIN SYSTEM SOUTH OF TOWPATH, 8. CONSTRUCT PERMANENT PAVEMENT AT NORTH EDGE OF APRON PROVIDE TEMPORARY BYPASS CONNECTION TO OUTFALL 004A. a� • 1073A-18, 10736-18, 1086A-18, 1086-18, 1086B-18, FOR TOWPATH RELOCATION (SEE PHASE 7). = PROVIDE TEMP CONNECTION FROM 1078E-18 TO 1082-18. 1 9. CONSTRUCT 8" DOMESTIC WATER SOUTH OF TOWPATH AND 2. COMPLETE STORMWATER BYPASS CONSTRUCTION FOR OUTFALLS ELECTRICAL CONNECTION ADJACENT TO BLDG 4-41. n 012 AND 014 • 1077A-18, 1077-18, 1078-18, 1079A-18, 1079-18, 1080-18, 1082A-18 IN -WATER WORK WINDOW JULY 16 -AUG 1 2020: IN -WATER WORK WINDOW NOV 16 - DEC 31 2019 10. CONSTRUCT OUTFALLS 004A, 012A, AND 014A. 3. CONSTRUCT TEMPORARY CONTAINMENT WALL PER STRUCTURAL 11. INSTALL PILES IN BARGE AREA PER STRUCTURAL PLANS. PLANS. 12. INSTALL IN -WATER FILL FOR HABITAT BENCH. POST IN -WATER WORK 13. TEMPORARY WALL CUT-OFF/REMOVAL. 4. BEGIN PHASED DEMOLITION AND REMOVAL OF PILE SUPPORTED STRUCTURES AS SHOWN IN STRUCTURAL PLANS AND CONSTRUCT SUB GRADE IMPROVEMENTS PER PLANS. 5. CONSTRUCT STORMWATER IMPROVEMENTS NORTH OF SLOTTED DRAIN. • 1087-18, URE 724-18, 1088-18, URE 723-18, 1086-18 OWS-063, RTU-12, 1089-18, 1090-18, V-1081A-18 • URE 722-18, URE 721-18, 1074-18, OWS-062, RTU-11, 1075-18, 1076-18, V-1075-18 R-401339 IN COMPLIANCE WITH CITY OF RENTON STANDARDS BergerAB" DEVELOPMENT ENGINEERING 07 CALL 48 HOURS 33301 9th Avenue South, Suite 300 atowler 12/20/2018 BEFORE YOU DIG Federal Way, Washington 98003-2600 CIVIL PERMIT 1-800-424-5555 (206) 431-2300 Fax: (206) 431-2250 SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE �N P. THIS ACCEPTABILITY BHECKED EE 06 08 18 PHASING PLAN AREA 1: PHASE 5 W4700331 B 10/09/18 APRON R INFRASTRUCTURE W4700331 ABAM SPT 06/08/18 T� SPT 06 08 18 SHEET w of WAsx�� G SPECIFICATION IS APPROVED A CITY OF RENTON COMMENTS W4700331 ABAM SPT 10/01/18 APPROVED BY DEPT. DATE BEE 06 08 18 TITLE APRON R INFRASTRUCTURE CHECKED C500-1 F C22 B CONSTRUCTION PHASING &PIPE DEPTH W4700331 ABAM SPT 10/09/18 ,� w� RENTON A ' TO A ' SITE T� 31271 o K Iv I Iv J I JOB N0. COMP N0. The� ��rSTf AL APPROVED ss/oNAL �W4700331 APPROVED CIVIL MASTER SITE RENTON, WA DWG NO. 4-APRON-R-0500-1 F