HomeMy WebLinkAboutR_401339/
�I
\ e
ORDINARY HIGH WATER // �� /%/• ________
LAKE WASH NGTON
\
I _ _ SUMMER o EL 15.18 (NGVD29) / I /� q \\\
EASEMENT LINE (TYP)
WINTER o EL 13.18 (NGVD29) , , — — �'� — /•ems _ _ \\
T HOUS _ — PROPER
— I STY LINE
I � ,� — �J:°q�• --I I-------1—I--�/ °t / I I 4-82 BUILDING
I •" m
W ACID \
> I \ -
\ \ a
ELI
• � I trio � I
7111
�� I 4-81 BUILDING _4.p
' `
• M M
� I __I� - - - -- - -
200-FT SHORELINE SETBACK
o, I \ 'k - 4-86 BUILDING
D $ I I I I\ INNER
I
4-41 BUILDING
I
e a p ° NEW BUILDING 4-87 TO BE CONSTRUCTED
13 L, I
UNDER SEPARATE PERMIT.
Y11 ° U • 1� M P M � f S
n
I• \ t l • °____j
I�
III 4-20 BUILDING •°
AREA 1: PHASE 5
CONSTRUCTION PHASING KEY PLAN
7. ) COMPLETE CONSTRUCTION OF AREA 1 MECHANICAL,
PNASE 5 (AREA 1b =.
ELECTRICAL, DATA, AND GROUNDING SYSTEMS. €
1. CONSTRUCT SLOTTED DRAIN SYSTEM SOUTH OF TOWPATH, 8. CONSTRUCT PERMANENT PAVEMENT AT NORTH EDGE OF APRON
PROVIDE TEMPORARY BYPASS CONNECTION TO OUTFALL 004A.
a� • 1073A-18, 10736-18, 1086A-18, 1086-18, 1086B-18, FOR TOWPATH RELOCATION (SEE PHASE 7). =
PROVIDE TEMP CONNECTION FROM 1078E-18 TO 1082-18.
1 9. CONSTRUCT 8" DOMESTIC WATER SOUTH OF TOWPATH AND
2. COMPLETE STORMWATER BYPASS CONSTRUCTION FOR OUTFALLS ELECTRICAL CONNECTION ADJACENT TO BLDG 4-41. n
012 AND 014
• 1077A-18, 1077-18, 1078-18, 1079A-18, 1079-18,
1080-18, 1082A-18 IN -WATER WORK WINDOW JULY 16 -AUG 1 2020:
IN -WATER WORK WINDOW NOV 16 - DEC 31 2019 10. CONSTRUCT OUTFALLS 004A, 012A, AND 014A.
3. CONSTRUCT TEMPORARY CONTAINMENT WALL PER STRUCTURAL 11. INSTALL PILES IN BARGE AREA PER STRUCTURAL PLANS.
PLANS.
12. INSTALL IN -WATER FILL FOR HABITAT BENCH.
POST IN -WATER WORK
13. TEMPORARY WALL CUT-OFF/REMOVAL.
4. BEGIN PHASED DEMOLITION AND REMOVAL OF PILE SUPPORTED
STRUCTURES AS SHOWN IN STRUCTURAL PLANS AND
CONSTRUCT SUB GRADE IMPROVEMENTS PER PLANS.
5. CONSTRUCT STORMWATER IMPROVEMENTS NORTH OF SLOTTED
DRAIN.
• 1087-18, URE 724-18, 1088-18, URE 723-18, 1086-18
OWS-063, RTU-12, 1089-18, 1090-18, V-1081A-18
• URE 722-18, URE 721-18, 1074-18, OWS-062, RTU-11,
1075-18, 1076-18, V-1075-18 R-401339
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
BergerAB" DEVELOPMENT ENGINEERING 07
CALL 48 HOURS 33301 9th Avenue South, Suite 300 atowler 12/20/2018
BEFORE YOU DIG
Federal Way, Washington 98003-2600 CIVIL PERMIT
1-800-424-5555 (206) 431-2300 Fax: (206) 431-2250
SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE
�N P. THIS ACCEPTABILITY
BHECKED EE 06 08 18 PHASING PLAN AREA 1: PHASE 5 W4700331 B 10/09/18
APRON R INFRASTRUCTURE W4700331 ABAM SPT 06/08/18 T� SPT 06 08 18 SHEET
w of WAsx�� G SPECIFICATION IS APPROVED
A CITY OF RENTON COMMENTS W4700331 ABAM SPT 10/01/18 APPROVED BY DEPT. DATE BEE
06 08 18 TITLE APRON R INFRASTRUCTURE
CHECKED C500-1 F C22
B CONSTRUCTION PHASING &PIPE DEPTH W4700331 ABAM SPT 10/09/18 ,� w� RENTON
A ' TO A ' SITE
T�
31271 o K Iv I Iv J I JOB N0. COMP N0.
The� ��rSTf
AL APPROVED
ss/oNAL �W4700331
APPROVED CIVIL MASTER SITE RENTON, WA DWG NO. 4-APRON-R-0500-1 F