HomeMy WebLinkAboutR_401341J
m
a
.Z]
LAKE WASH N GTO N
I — — SUMMER EL 15.18 (NGVD29)
WINTER EL 13.18 (NGVD29)
I T HOUS — PR�T1' LINE
I.�
I � �
V \
ORDINARY HIGH WATER
11 --- - - - - ----
EASEMENT LINE (TYP) / / , , _ _ � +' �: / - -
/ I I 00151
/
I I I 4
4-82 BUILDING
o ' ` / I A
71
— �
� --
� � o � °°� m ��---- ..
"alp 8 I >, 4 81 BUILDING
31
CALL 48 HOURS
BEFORE YOU DIG
1-800-424-5555
SYM REVISION
APRON R INFRASTRUCTURE
A CITY OF RENTON COMMENTS
B CONSTRUCTION PHASING & PIPE DEPTH
LLJ
Hq
ReoR
4-41 BUILDING —� — . i . — . — —�N� - — — — — — — I =I
a , I -- -- -- -- I -I-
^` — --- I — ------ �L� —--------r`�--- --� ra--
MI - � • � �"
T
I�
I,
g i la ;
I
M
I � I
I
BY
W4700331 ABAM
W4700331 ABAM
W4700331 ABAM
4-20 BUILDING
AREA 2: PHASE 7
CONSTRUCTION PHASING KEY PLAN
X
j NASE 7 (AREA 2)
1.
ABANDON IN PLACE OR REMOVE REMAINING UTILITIES AS
SHOWN IN REMOVAL PLANS UP TO AND INCLUDING EXISTING
j
UTILIDOR NORTH OF BUILDING 4-82.
2.
CONSTRUCT SLOTTED DRAIN NORTH OF BLDG 4-82 AND
PROVIDE TEMPORARY CONNECTION TO EXISTING
•1106A-18, 1106-18
• 1107A-18, 1107-18, 1107B, TEMPORARY CONNECTION TO
EX 417
3.
PARTIALLY REMOVE EXISTING PAVEMENT AND WALL SUPPORTS
AS SHOWN IN STRUCTURAL PLANS TO CONSTRUCT
NORTH -SOUTH STORM CONVEYANCE.
•1118-18, 1119-18
IN
-WATER WORK WINDOW NOV 16 - DEC 31 2020:
4.
CONSTRUCT OUTFALL 002A IMPROVEMENTS.
5.
CONSTRUCT CATHODIC PROTECTION IMPROVEMENTS AND
FLUME WALL REPAIRS.
POST IN -WATER WORK:
6.
CONSTRUCT REMAINING STORMWATER SYSTEMS
• 1108-18, 1109-18, 1110-18, 1111-18, 1112-18,
OWS-066, RTU-16, 111-18, 1114-18, 1115-18, 1116-18,
1118-18, 1117-18
•URE 726-18, UR, URE 725-18, 1112-18
•1107-18, 1110-18
APPROVED
DATE
SYM
SPT
06/08/18
SPT
10/01/18
SPT
1 10/09/18
REVISION
7. CONSTRUCT WALL AS SHOWN IN STRUCTURAL PLANS AND
BRING AREA 2 TO GRADE.
8. COMPLETE CONSTRUCTION OF AREA 2 FIRE PROTECTION,
MECHANICAL, ELECTRICAL, DATA, AND GROUNDING SYSTEMS.
7. CONSTRUCT ALL FINISHED PAVEMENT DURING STRATEGIC
TRANSIT ROUTE CLOSURES. COORDINATE WITH BOEING
REPRESENTATIVE.
8. COMPLETE UPLAND IMPROVEMENT PUNCHLIST ITEMS.
IN -WATER WORK JUL 16 - AUG 1 2021:
9. COMPLETE IN -WATER IMPROVEMENT PUNCHLIST ITEMS AS
NEEDED.
10.
BY I APPROVED I DATE
F
n
P.
of WA �f
BOE//V� � �P ��• �1
x
31271 w�
��ssioNaL
200-FT SHORELINE SETBACK
NEW BUILDING 4-87 TO BE CONSTRUCTED
UNDER SEPARATE PERMIT.
i BergerABAM
33301 9th Avenue South, Suite 300
Federal Way, Washington 98003-2600
(206) 431-2300 Fax:(206) 431-2250
DRAWN DATE SUBTITLE
ACCEPTABILITY BEE 06/08/18
THIS DESIGN AND/OR CHECKED
SPECIFICATION IS APPROVED SPT 06/08/18
ENGINEER TITLE
APPROVED BY DEPT. I DATE BEE 06/08/18
CIVIL MASTER
CIVIL PERMIT
PHASING PLAN - AREA 2: PHASE 7
APRON R INFRASTRUCTURE
RENTON SITE
SITE
a
a
•o
2
b
e °
ut°
0
�I
4-86 BUILDING
R-401341
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
DEVELOPMENT ENGINEERING
afowler 12/20/2018 01
wI` \LIV W4700331 J `' /� D 10/09/ 18
SHEET
U500-1 H C24-
JOB N0. COMP NO.
W4700331
DWG N0.
RENTON, WA 4-APRON-R-0500-1 H