Loading...
HomeMy WebLinkAboutR_401344V_ LU �D �7 D II `/ FINISH GRADE ° ° \7 II BACK FACE OF CURB ° tivD p v D EL-17.88 D D D \7 ° aD� 18.80 8 17 D D D ° I I D .D. D .60 v. v DNR v � °D ° D ° D ti MATCHLINE, SEE SHEET C500-2D a 7 T ° Tz�,7 g� - - 19.8\, - g D v v CO /yam V, C A SEE MITIGATION HANGAR FOR CONTINUATION SEE MITIGATION HANGAR FOR CONTINUATION ° D°/ D .p `7 v v- D D l/VVl~� D D .v:� D d O � O R AA �/ D� �]`V•O10 96 "7.D' .° v �• p,A��D D 1bo�°.. O ° .. V, D v \_7. D v /1i Z ) `/ D1R.2 1 f7 18.6 h o p D a ° ONC° z Q Z Q 6 D w= D v'. �7..° vD '\7.v Dv 5 v II D. D 18.26, ° D\'7 D o'� D D �'- D ° O), .vD; F7 D °.D .D :vp v D D D D 200-FT SHORELINE o o ti D P ° ti -r Q ^ t� D. D - v .D D D - °Q<0ti a D SETBACK PER CITY 1 GG D 18.40J 17 v_ D D.D .v� D ti e D D OF RENTON x D D D �� 9 Y FINISH GRADE ° ° QQ I ° D 8.80 D° ° D .�. 1� D. ° .a: : `17 °D ,� D DD %8� J� 9. D DinD. °D O BACK FACE OF CURB 1 D �8 ° I I 0 D' 6 ° v S 2 D :� EL-17.68 F7 •6 v N.D p p DO.v D O -D� D - D ° v 6' .p. \7 D v. Dv OD P IIv (\7 D'v.. Dv �� 'D-j D a-18.25 8 D° D Dv v v II D D �6 °D vD•O t7..D p ° D v-� v D D D ° v. a 3 END ° Da p J D D .p D D ° d ° N: 185497.79 ° o p D \7 I v. D D v �/ D _ 6.8 - - P vD \7 v- D - �7 p ° D v v v p U F7. D °� a °° E: 1300167.36 v p � D FINISH GRADE ® o ti D ti D ry/�.�O ti o zo p 4 d d BACK FACE OF CURB o D ti ti: II 5 16.6 D � D o ° Q ti °'' v .Dv \7 p 17.96 D °..J `/ Iry K�17 D V - °'�.. D ° V D°D ^6d �[��• EL-18.80 V I v D D C9Q \� �� v D R �f A�• D v D �V �V N��V� d Q Y I g � ° ° F7D .v �.Dv p - D D � D v 1 QQ Q D .U� v D - F7 v D v D 18.6 vD' D '� U'� 4 d �7 0 4 D \ a ° D D ti o a D ° )� D. a �) ° 18.8 d a a vv v D D 8.QO D v Q P Q\7' D D. Q v !/v 'v�. D D D .. FI� 2. C. A. �. d' 4 D. \ p '7 D ° v \\ '�. LJ� D v ° D .. D. V D �7 p ° D v ° Q .. d° d _ 4° '7 .40) \ ­l P 18.4 D a ° o ti \ °� F7 p D O v"7 v 19.0 D °• \7 v .v D' .00 \\ v. ° v v 5 D D�.z ° D �7 FINISH GRADE D a ° \\ p D D a D 17.96 D 5 ° ° •D 17.96D D D- 18.2 v v 7 D p D v �] v-° D_ D_ D �7 v Q Q 4 BACK FACE OF CURB EL-17.53 $ 1 \ D v D� J�o z1_ D D v\1 ).VC ° �/ vl�. OO ° p D OO D 2.0 F7 v v D18 �V D Q .° A- \\ D� D OO � 19.00p ti " 8.0 Sj ° D D D \ \\ 18O `/ D BOO p D v ` D o BOO D v 800 D a P 8O0 D Q 4° ° 4 O \\ ° FINISH GRADE @ `\ IB.60 ti a �D ti a D o » 5 "7 D D ° o ti �h °�74 12 Q °BACK FACE OF CURB Dti\oD M J ti 12 D ° ti °d a 2 'S EL- aD Q D S500- 1 7 ° D C ° D D v ° b D o 18.40 ° d a ° \ i \ 19.00 \ 18.29 D ti J J 18.17 ti D D° Q° D° ° ° D D P ° d a° 19.03 FINISH GRADE ® a \ D ° \ D 18.60.. p. \ \ BACK FACE OF CURB \ \ 2 D o ti J 1 18.32 18.58 18.94 \\ ° ° \ EL- a 6 D ° �D ° �� O D v v ° D D D D° D ° d 18.65 D �� D D \17O a v ° \\ \ \ v D p8 v D v D Df p p 5 Q °° \\\ \ S500-17 O ° D ° D ° DD " ° Q ° °°. D 7 v 7 ° \ \ D..D 76 %n D D'. v. /d(:D �6 D.. D D,� v D. p V.^°° ° Jn \\\\ FINISH GRADE ° o JJ D D D d a l l - Dv ° _ O \ 18.81 6 a ,/ D D° a °D D D Q° 4 Q ° 4 0 'BACK FACE OF CURB 0 ti ° D ,/ ti ° P D a ° EL-17`25 19 D K ° J 18.4 D ° \ _18.4 d '17 ° 8 - ° .° , .. D .. D SSOO-17 J aD .v D D FF 'D ° °D Q _ vD v D �v v \/ .. D� D .. D _ D 4° \ \\ FINISH GRADE (� D \\7 o ° D J Q Q D ti D Q ti g \\ \ \ \\ BACK FACE OF CURB D p a D a ° J,/ ° ti o Q Q M EL- D v D �� v D Q! ° v D d 4Q ° QaQ ^� 7 p ° -° � �° c� Jam/ D v v � v v D D D p � v _ Q 1(J.4O p ° a Q 11611 Q D D v BAD VAR D D Q ° �6 d° 61 a , a d `/ D\IV o J 7�CIa D D T� DV pO 6 - d' a D °° d vDt7. ._ ° v v D D D O1°G °° D -JJ .D .. ° D o�. v D v 1�•. I I v Q0 ° d ° v J / D aD D p a D '.D FINISH GRADE ° D ti v P ti p I I ° BACK FACE OF CURB ^^\ G� - ° 4 a ° (` -° _ J� - D - p D ° D v v . v v D v 1 8. V D° D w -° ° Q a 4 Q CA� EL-17.62 \ v D �/ / '� v :v Q D p D .D _ v vD D I I ° 4 _ 4' ° ° d. °a... Q - K -�//Jw.J/� � D X D Q Q �/ / � D D v !D D QO 6 ° ��/ D. D °D ° DD/ D - °. _ Q .4 a. 4 4 Q y.\ • \ \ \ \ \\ \ \ \ \ \ \ c 17.13 i7. J .v a �] ° _ ° °.% \ \ \ \\ \\ \ \ ° R °D 8 a �0 I 1 y2 1 ° �8 79 ` D' � ) D' -Dv �11 D .6� _ D ° ° D a D v �`+, 64a �7 Q ° �° � L1�( ,p p �.6� ° vD �[,J• `. VAO _ �60 ° O d •&6'aQ ° Q ®.° -•,� ° w \ \ \\ l\\ \ \ \ 9 V «fill J Cll f Fd V v� Q D_ 4Q '�. 1 \\ \ \\ D v D D ° c D v D D ° D ° I I ° ° Q Q 4 d ° Q ° $a = / J p p`. D °. ° ° _ _ D `/ _ D � D ° .. I I O Q, ° ° ° 4 0 ° ° F O ° D JJ `/. D..' D °' Q a Q 4 Q° °° ° d °. Q d ° d d ° ° Q FINISH GRADES C� -� �` 0 D D °. ° ° ti - D D_ D °. BACK FACE OF CURB 8 J D . `'p ° v ° Q ° m °° EL-17.51 ti ° I I ° 5 d Q ° - \ \ LAKE WASH N GTO N \\ \ \ \ FINISH GRADE @ a Pti v _j J 18.8 ° v p ti D a D ° ° I I ° ° a m \ \\ \ \ BACK FACE OF CURB / D a ° d Cb \ \1` Q D v J �l J D � ° � v - v D 4Q 4 - ° ° ° Q ° ° ° SUMMER _ EL 15.18 �GVD29 EL-17.62 9.00 1 18 ° N4 �J \ \\ \ �/ ° D ° ° •� 1 8.8 O ° D D ° D ' ° •8 ° D D p_/ ; D \�• I I �.7�0 ° °4 _ •8Lt°- ° '. ° �l d �7d Q - ° ° 1 I 1 ) WINTER o EL 13.18 NGVD29)/ \ \ \ \ I� (/\ ° \7 ° I I ° Q C! f\ J J S500-17 JS500-16 v' D D F7 /1 � / / D � D v \7. � D D p ° �7 d 4 d 1 11I1 �► J J D� II \��� \ \ D D 18.6 D p Q ° Q ° d \\ / / / / '..D .. _ _ D °' D ° JJ v. D D. �D v v �' .tea° Q ° ° °� O ° ° N a \\ \ J / \/ D D ° D ° v p ° �7 D 00 D 00 Oj ° °� O� ° d:d ° 00 C 5 \ J \7 D ° o� \\ \ \ FINISH GRADE JJ �JJ ti D D ti i Q ° ° ° BACK FACE OF CURB �° v Q ti 0 1 I 7 Q� ° EL- 18.4 8 8 8 Q 8 ° 8 9' _j ti D 6 °^,� I I �O ° 6oQ 86 a Q l END J� D _ P � D o I I ° ° Q I 1 ` �/` \ 7 ° v a ° ° D I ° Q ° d. \� Lk � �N: 185717.16-, \ �\ E: 1299831.02 D ti ti ° a �a a°4 ,/ BEGIN \7 p °DaD " J N: 185717.io 8 p '\7 ° D Q Qa a d 4 d a° ° / \\� \ \� ��'Z `✓ o v \ l \\ \ FINISH GRADE @ J E: 1299831.09 FACE OF WALL I J 1 \ 1 o 6' EL-16.70 .8 v D SS °1860 a 788s Q 1g �, ° , �. p ° D D° v 4Q Qa°_ 8_ ° / \ 1 p ° 4 ° �< a �\ �v /� \7 D D ° ° D b D 1 8.00 -� p� D D °D ° °Q ° d Q 4 a ° 4 ° Q 17 '11 ^ � `/D -D vD `v Q {I) 1 1 `1 \` �-O / ✓) (J l/l �- 500-16 D D ° D v v�. ° D D D I I 18.36 - ° -a d ° 7 ° D ° Q D Q I I d Qa Q ° ° ° d $ Q ° CO \ FINISH GRADE ® J D D \7Q a D I .�� /) �O� o \) \\ \ FACE OF WALL a D D D o L/ i.l� Ii �. n 1 ` \` •� D�0�. / D.. �. D (�%�� L EL-16.70J\_L i Ber erABAM CALL 48 HOURS BEFORE YOU DIG 33301 9th Avenue South, Suite 300 Federal Way, Washington 98003-2600 1-800-424-5555 (206) 431-2300 Fax: (206) 431-2250 SYM REVISION BY APPROVED DATE SYM - APRON R INFRASTRUCTURE W4700331 ABAM SPT 06/08/18 A CITY OF RENTON COMMENTS W4700331 ABAM SPT 10/01/18 REVISION MATCHLINE, SEE SHEET C500-2B BY I APPROVED I DATE of wesh� �f BOE//V" �P �1 x 31271 w� ��ssioNaL 20 0 20 40 scale feet DRAWN DATE SUBTITLE ACCEPTABILITY JDM 06/08/18 THIS DESIGN AND/OR CHECKED SPECIFICATION IS APPROVED SPT 06/08/18 ENGINEER TITLE APPROVED BY DEPT. I DATE BEE 06/08/18 CIVIL MASTER 12" THICK REINFORCED CONCRETE PAVEMENT 12" THICK REINFORCED CONCRETE RELIEVING SLAB 14.5" THICK REINFORCED CONCRETE RELIEVING SLAB 14.5" THICK REINFORCED CONCRETE PAVEMENT 14.5" THICK CEMENT CONCRETE PAVEMENT GENERAL NOTES 1. HORIZONTAL DATUM: WASHINGTON STATE COORDINATE SYSTEM, NORTH ZONE, NORTH AMERICA DATUM 1983(91). VERTICAL DATUM: NATIONAL GEODETIC VERTICAL DATUM 1929 (NGVD29). VERTICAL DATUM CONVERSION: NGVD29 TO THE NORTH AMERICAN VERTICAL DATUM 1988 (NAVD88) =NGVD29 + 3.60 FEET. 2. THERE SHALL BE NO EXPOSED GALVANIZED MATERIALS, COATINGS OR ZINC APPLIED SURFACE TREATMENTS ON ANY EXTERIOR OR UNDERGROUND MATERIALS OR SURFACES. ALL GALVANIZED OR ZINC APPLIED MATERIALS OR COATINGS SHALL BE PERMANENTLY PAINTED OR COATED TO PREVENT EXPOSURE OF THE GALVANIZED/ZINC MATERIALS PRIOR TO INSTALLATION OR COMPLETION OF CONSTRUCTION. 3. SEE SHEETS C500-213 THROUGH C500-2W FOR PAVEMENT, GRADING, AND SUBGRADE DETAI LS. 4. SEE STRUCTURAL SHEET S500-16 THROUGH S500-17 FOR REINFORCED PAVEMENT, RELIEVING SLAB AND TRANSITION DETAILS. 5. ALL ELEVATIONS ARE GIVEN AT THE TOP OF PAVEMENT/FACE OF CURB UNLESS OTHERWISE NOTED. 6. PROVIDE EMERGENCY DRAINAGE SPILLWAY AT ALL 4" RAISED CURBS UNLESS OTHERWISE NOTED. SEE DETAIL 5 ON SHEET C500-2H. 7. SEE CIVIL SITE PLANS ON SHEETS C80 THROUGH C85 FOR HORIZONTAL CONTROL. 1 COMBINED BYPASS AND OIL/WATER SEPARATOR WITH REINFORCED SLAB LID PER DETAILS ON SHEET S500-20 THROUGH S500-23 AND LID C500-3Q ELEVATIONS PER C> MODULAR WETLAND VAULT LID, SEE DETAILS ON SHEET C500-31.1 FOR LID ELEVATIONS. E> PROVIDE TIE IN TO EXISTING REINFORCED CONCRETE SLAB PER DETAIL C500-2G PROVIDE FLUSH CURB AND ACCESS PER DETAIL C500 2H 5� PROVIDE REINFORCED CONCRETE AT SLOT DRAINS AND PVC DRAIN CONNECTIONS PER DETAILS ON SHEET C500-3M. © PROVIDE REINFORCED CONCRETE COLLAR AT DRAINAGE STRUCTURES PER DETAILS ON SHEET C500-3L. PROVIDE INTEGRAL CURB AND STEM WALL PER SHEET S500-16 IL 1. ® PROVIDE INTEGRAL CURB AND REINFORCED THICKENED EDGE C500- H PROVIDE REINFORCED CONCRETE COLLAR AT EXISTING DRAINAGE STRUCTURE PER SECTION 1E ON SHEET C500-3L. 10 PROVIDE TRANSITION TO EXISTING HMA PER DETAIL C500-2G CIVIL PERMIT GRADING/PAVEMENT PLAN - SHEET 3 APRON R INFRASTRUCTURE RENTON SITE SITE KEY PLAN SCALE: N.T.S. R-401344 IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING atowler 12/20/2018 01 wI\ \LIV W4700331 J `' A ""' ` 10/01 / 18 SHEET U500-2C C27- JOB NO. COMP NO. W4700331 RENTON, WA DWG N0. 4-APRON-R-0500-2C